Civil Works - Awarded Contracts
A) Date Entered in Civil Works Registry B) Contract ID C) Contract Name D) Implementing Office | 1) Awarded Contractor 2) Awarded Amount 3) Extent Of Participation % 4) Notice to Proceed Date |
---|---|
A) June 6, 2024 B) 24OI0128 C) CONSTRUCTION F C5 DIVERSION ROAD IN BRGY. MANUYO 2, LAS PINAS CITY D) Las Pi�as-Muntinlupa District Engineering Office |
1) EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTR 2) 94,567,924.23 3) 100 4) -/-/- |
A) June 6, 2024 B) 24DK0106 C) ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRA D) Quezon 1st District Engineering Office |
1) IANDE CONSTRUCTION CORPORATION (FORMERLY: IANDE CONSTR 2) 66,202,120.41 3) 51 4) 6/26/2024 |
A) June 6, 2024 B) 24DN0167 C) CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - KULASISI - PANTAY ROAD (PHASE 3), BARANGAY SAN LUIS AN D) Rizal 1st District Engineering Office |
1) D.R. ROBLES CONSTRUCTION 2) 48,041,844.18 3) 100 4) -/-/- |
A) June 6, 2024 B) 23CD0214 C) CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY LOMA DE GATO, MARILAO, BULACAN D) Bulacan 2nd District Engineering Office |
1) TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.) 2) 9,624,158.19 3) 100 4) 7/1/2024 |
A) June 6, 2024 B) 24DK0108 C) CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE B D) Quezon 1st District Engineering Office |
1) F.M. PUJEDA BUILDERS AND CONSTRUCTION SUPPLIES 2) 1,939,723.51 3) 100 4) -/-/- |
A) June 6, 2024 B) 24KE0087 C) CONSTRUCTION OF MULTI-PURPOSE BUILDING, BALBAGON, MAMBAJAO, CAMIGUIN D) Camiguin District Engineering Office |
1) JEJOR'S CONSTRUCTION CORPORATION 2) 29,499,237.63 3) 100 4) 7/9/2024 |
A) June 6, 2024 B) 24DK0109 C) CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE B D) Quezon 1st District Engineering Office |
1) JOMZKI CONSTRUCTION AND SUPPLY 2) 1,889,833.78 3) 100 4) 6/26/2024 |
A) June 6, 2024 B) 24DN0162 C) REHABILITATION OF LIBHO CREEK, BARANGAY STA. ANA TAYTAY, RIZAL (FIRST DISTRICT) D) Rizal 1st District Engineering Office |
1) FRANZCOR TRADING AND CONSTRUCTION 2) 6,735,214.18 3) 100 4) 6/26/2024 |
A) June 6, 2024 B) 24DN0155 C) CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY MAMBUGAN AND BARANGAY MUNTINDILAW GOING TO BULAO R D) Rizal 1st District Engineering Office |
1) STREAMLINE BUILDERS CORPORATION 2) 25,429,141.19 3) 100 4) 6/26/2024 |
A) June 6, 2024 B) 24DK0105 C) CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE B D) Quezon 1st District Engineering Office |
1) C. VILLASE�OR JR. CONSTRUCTION 2) 2,851,508.16 3) 100 4) 6/26/2024 |
A) June 6, 2024 B) 24KE0005 C) WIDENING OF PERMANENT BRIDGES DINANGASAN BRIDGE (B00020CG) ALONG CAMIGUIN CIRCUMFERENTIAL ROAD (PHAS D) Camiguin District Engineering Office |
1) JEJOR'S CONSTRUCTION CORPORATION 2) 114,596,399.27 3) 100 4) 7/8/2024 |
A) June 6, 2024 B) 24I00221 C) NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - PRIMARY ROADS - DAANG MAHARLIKA (SM) (SN ISIDRO D) Region VIII |
1) EZJONES CONSTRUCTION INC. 2) 91,607,648.26 3) 100 4) -/-/- |
A) June 6, 2024 B) 24MF0057 C) REPAIR/MAINTENANCE OF DPWH BUILDING SULTAN KUDARAT I DEO COVERED COURT (GYM) OLD CAPITOL SITE KALAWA D) Sultan Kudarat 1st District Engineering Office |
1) FPJ CONSTRUCTION AND SUPPLY 2) 1,871,029.93 3) 100 4) -/-/- |
A) June 6, 2024 B) 24BE0122 C) CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIP D) Isabela 1st District Engineering Office |
1) DRAGON TWELVE BUILDERS AND CONSTRUCTION SUPPLY 2) 48,994,560.00 3) 100 4) 6/24/2024 |
A) June 6, 2024 B) 23CD0215 C) CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY LIPUTAN, CITY OF MEYCAUAYAN, BULACAN D) Bulacan 2nd District Engineering Office |
1) TRIPLE 8 CONSTRUCTION AND SUPPLY, INC. (FORMERLY TRI 2) 9,625,118.58 3) 100 4) 7/1/2024 |
A) June 6, 2024 B) 24JG0040 C) CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL R D) Zamboanga del Sur 2nd District Engineering Office |
1) RUDHIL CONSTRUCTION AND ENTERPRISES, INC.(FORMERLY R 2) 77,149,791.84 3) 100 4) 7/12/2024 |
A) June 6, 2024 B) 24I00199 C) CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DAPDAP RIVER, BRGY. DAPDAP, ALANGALANG, LEYTE D) Region VIII |
1) CDU CONSTRUCTION 2) 96,449,160.00 3) 100 4) -/-/- |
A) June 6, 2024 B) 24CD0231 C) CONCRETING OF BARANGAY PINAGTULAYAN FMR, BARANGAY PINAGTULAYAN, NORZAGARAY, BULACAN D) Bulacan 2nd District Engineering Office |
1) TIONGCO MENDOZA CONSTRUCTION CO. INC. 2) 14,696,390.37 3) 100 4) -/-/- |
A) June 6, 2024 B) 24DK0107 C) CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE B D) Quezon 1st District Engineering Office |
1) N.T. SOTELO CONSTRUCTION AND SUPPLY CORPORATION 2) 3,920,056.63 3) 100 4) -/-/- |
A) June 6, 2024 B) 24II0081 C) CONCRETING OF BRGY. TO BRGY. GINAGDANAN FMR, SAN ROQUE, NORTHERN SAMAR D) Northern Samar 2nd District Engineering Office |
1) ANLE CONSTRUCTION 2) 14,894,890.76 3) 100 4) 7/21/2024 |
A) June 6, 2024 B) 24I00216 C) CLUSTER 10: 1. NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - ARTECHE, BRGY. CATUMS D) Region VIII |
1) QUEEN MARIECRIS CONSTRUCTION CORP. 2) 96,449,641.77 3) 100 4) 7/16/2024 |
A) June 6, 2024 B) 24MG0108 C) CONCRETING OF SITIO DUNGAN LAHEK, BRGY. SARAVIA FMR, BRGY. SARAVIA, KORONADAL CITY, SOUTH COTABATO D) South Cotabato 2nd District Engineering Office |
1) NIRVANA CONSTRUCTION AND SUPPLIES 2) 15,714,704.22 3) 100 4) 7/12/2024 |
A) June 6, 2024 B) 24MG0111 C) CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM (RWCS) IN PUBLIC FACILITIES D) South Cotabato 2nd District Engineering Office |
1) MR-B CONSTRUCTION SERVICES 2) 2,872,192.33 3) 100 4) 7/12/2024 |
A) June 6, 2024 B) 24MG0110 C) CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE-SURALLAH-LAKE SEBU-MAITUM RD-K1787+100-K1787+260, K1 D) South Cotabato 2nd District Engineering Office |
1) ABU CONSTRUCTION 2) 25,860,199.01 3) 100 4) 7/12/2024 |
A) June 6, 2024 B) 24CN0097 C) CONSTRUCTION OF BOX CULVERT, BRGY. LOBBOT, DIPACULAO, AURORA D) Aurora District Engineering Office |
1) GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO 2) 4,798,860.49 3) 100 4) 7/5/2024 |
A) June 6, 2024 B) 24DK0106 C) ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRA D) Quezon 1st District Engineering Office |
1) MOTIONTRADE DEVELOPMENT CORPORATION 2) 66,202,120.41 3) 49 4) 6/26/2024 |
A) June 6, 2024 B) 24DN0166 C) CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TAYTAY RIVER INTERCEPTOR, BARANGAY STA. ANA AND SAN ISIDRO D) Rizal 1st District Engineering Office |
1) G.F. FABIAN CONSTRUCTION 2) 47,529,074.88 3) 100 4) -/-/- |
A) June 6, 2024 B) 24AF0101 C) CONST/REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST OF D) La Union 2nd District Engineering Office |
1) PANGASINAN NEW WILSON LUMBER AND CONSTRUCTION SUPPLY 2) 28,946,444.57 3) 100 4) 6/19/2024 |
A) June 6, 2024 B) 23CD0213 C) CONCRETING/ COMPLETION OF ROAD IN BRGY. MATICTIC FMR, BRGY. MATICTIC, NORZAGARAY, BULACAN D) Bulacan 2nd District Engineering Office |
1) 1199S CONSTRUCTION 2) 9,754,560.58 3) 100 4) -/-/- |
A) June 6, 2024 B) 24BE0118 C) ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGR D) Isabela 1st District Engineering Office |
1) EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTR 2) 96,451,001.74 3) 100 4) 6/24/2024 |
A) June 6, 2024 B) 24BE0119 C) ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGR D) Isabela 1st District Engineering Office |
1) EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTR 2) 96,451,000.39 3) 100 4) 6/24/2024 |
A) June 6, 2024 B) 24BE0120 C) ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGR D) Isabela 1st District Engineering Office |
1) ARVEA'S CONSTRUCTION 2) 144,700,104.16 3) 30 4) 6/24/2024 |
A) June 6, 2024 B) 24BE0120 C) ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGR D) Isabela 1st District Engineering Office |
1) EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTR 2) 144,700,104.16 3) 70 4) 6/24/2024 |
A) June 6, 2024 B) 24BE0121 C) ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD - FLOOD MANAGEMENT PROGRA D) Isabela 1st District Engineering Office |
1) EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTR 2) 48,980,104.16 3) 100 4) 6/24/2024 |
A) June 6, 2024 B) 24CN0206 C) CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN DIKAPINISAN ELEMENTARY SCHOOL, BRGY. DIKAPIN D) Aurora District Engineering Office |
1) RADIANCE TRADERS AND BUILDERS 2) 4,888,159.52 3) 100 4) 7/2/2024 |
A) June 6, 2024 B) 24BE0117 C) CONCRETING OF BRGY. SIMANU NORTE - MT. HAMUT ROAD, BRGY. SIMANU NORTE, SAN PABLO, ISABELA D) Isabela 1st District Engineering Office |
1) DRAGON TWELVE BUILDERS AND CONSTRUCTION SUPPLY 2) 19,894,806.25 3) 100 4) -/-/- |
A) June 6, 2024 B) 24CN0163 C) CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. RAMADA, MARIA AURORA, AURORA D) Aurora District Engineering Office |
1) 1ST CUT AND FILL CONSTRUCTION CORP. 2) 4,836,824.55 3) 100 4) 7/2/2024 |
A) June 6, 2024 B) 24KE0083 C) CONSTRUCTION OF MULTI-PURPOSE BUILDING/FACILITY, BALBAGON, MAMBAJAO, CAMIGUIN D) Camiguin District Engineering Office |
1) JEJOR'S CONSTRUCTION CORPORATION 2) 49,299,406.92 3) 100 4) 7/9/2024 |
A) June 6, 2024 B) 24AJ0114 C) CONSTRUCTION OF 4-STOREY 8-CLASSROOM SCHOOL BUILDING IN CANDIDO MARCELLANO INTEGRATED SCHOOL, SAN CA D) Pangasinan 4th District Engineering Office |
1) MIGHTYWAY CONSTRUCTION AND SUPPLY 2) 24,422,777.11 3) 100 4) -/-/- |
A) June 6, 2024 B) 24CN0212 C) CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM D) Aurora District Engineering Office |
1) CONRADO B. BAUTISTA CONST. AND SUPPLY CORP. (FORMERL 2) 2,855,514.50 3) 100 4) 7/2/2024 |
A) June 6, 2024 B) 24BE0123 C) CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR D) Isabela 1st District Engineering Office |
1) DRAGON TWELVE BUILDERS AND CONSTRUCTION SUPPLY 2) 14,844,823.10 3) 100 4) 6/24/2024 |
A) June 6, 2024 B) 24B00084 C) ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - RETROFITT D) Region II |
1) R.D. INTERIOR JUNIOR CONSTRUCTION 2) 115,768,472.92 3) 100 4) -/-/- |
A) June 6, 2024 B) 23CC0596 C) INSTALLATION OF MATERIALS TESTING BUILDING NETWORK CABLING SYSTEM AT BULACAN 1ST DEO, DPWH COMPOUND, D) Bulacan 1st District Engineering Office |
1) RVR3 CONSTRUCTION SUPPLY AND SERVICES 2) 4,918,438.59 3) 100 4) -/-/- |
A) June 6, 2024 B) 24AI0250 C) CONSTRUCTION OF TWO (2) STOREY EIGHT (8) CLASSROOM SCHOOL BUILDING AT PINDANGAN WEST ELEMENTARY SCHO D) Pangasinan 3rd District Engineering Office |
1) R.A. MATIAS CONSTRUCTION AND DEVELOPERS INC. (FORM 2) 30,348,181.03 3) 100 4) 6/26/2024 |
A) June 6, 2024 B) 24DN0170 C) COMPLETION OF MULTI - PURPOSE BUILDING, SITIO GUMAMELA 2, BARANGAY STA. CRUZ ANTIPOLO CITY (FIRST DI D) Rizal 1st District Engineering Office |
1) LTDL BUILDERS 2) 1,921,176.68 3) 100 4) -/-/- |
A) June 6, 2024 B) 24CC0516 C) CONSTRUCTION OF MULTI-PURPOSE BUILDING, PLARIDEL, BULACAN D) Bulacan 1st District Engineering Office |
1) AESIC CONSTRUCTION 2) 6,790,130.57 3) 100 4) 7/12/2024 |
A) June 6, 2024 B) 24CC0514 C) CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PAMARAWAN, CITY OF MALOLOS, BULACAN D) Bulacan 1st District Engineering Office |
1) CHRISTINE ARA CONSTRUCTION SERVICES 2) 4,825,438.97 3) 100 4) 7/12/2024 |
A) June 6, 2024 B) 23CC0598 C) CONSTRUCTION OF SOLAR WATER SYSTEM, PAOMBONG, BULACAN D) Bulacan 1st District Engineering Office |
1) CHRISTINE ARA CONSTRUCTION SERVICES 2) 9,598,819.97 3) 100 4) 7/12/2024 |
A) June 6, 2024 B) 23CC0597 C) CONSTRUCTION OF SOLAR WATER SYSTEM, HAGONOY, BULACAN D) Bulacan 1st District Engineering Office |
1) CHRISTINE ARA CONSTRUCTION SERVICES 2) 9,598,373.36 3) 100 4) 7/12/2024 |
A) June 6, 2024 B) 24FL0060 C) CONST. OF MULTI-PURPOSE BUILDING (SCHOOL BUILDING), BULAN NATIONAL HIGH SCHOOL, BULAN, SOR (PHASE 2) D) Sorsogon 2nd District Engineering Office |
1) ALHADRAX CONSTRUCTION AND SUPPLY 2) 38,808,000.00 3) 100 4) 7/8/2024 |