Isabela 4th District Engineering Office |
24CSBH02 |
REQUEST OF EXPRESSION OF INTEREST (REI), Bidding Documents and TOR for 24CSBH02 - CONSULTING SERVICES FOR THE CONDUCT OF SOIL TESTING / EXPLORATION FOR FLOOD CONTROL STRUCTURE |
September 26, 2024 |
October 3, 2024 |
Benguet 1st District Engineering Office |
24CSPE0002 |
24CSPE0002- Geotechnical Investigation for Various Proposed 2025 Projects within the jurisdiction of DPWH Benguet First District Engineering Office |
September 26, 2024 |
October 3, 2024 |
Iligan City District Engineering Office |
24CKM0001 |
Request for Quotation 24CKM0001 - (TOR and other BAC Forms) |
September 26, 2024 |
October 3, 2024 |
Central Office |
24CSZ104 |
24CSZ104 - Request for Proposals (RFP) and Terms of Reference (TOR) for the Consulting Services for the Project Management Consultant (PMC) of the Bataan-Cavite Interlink Bridge (BCIB) Project |
September 25, 2024 |
November 7, 2024 |
Bohol 1st District Engineering Office |
24CSHA0013 |
24CSHA0013 - Conduct of Subsurface Geotechnical Investigation for the Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Slope Protection Structure, Calunasan SRIP, Calape, Bohol |
September 25, 2024 |
October 3, 2024 |
Bohol 1st District Engineering Office |
24CSHA0012 |
24CSHA0012 - Conduct of Subsurface Geotechnical Investigation for the Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Drainage Structure, Jct. Tagbilaran North Road K0002+170 and Peñaflor Street leading to Outfall with Integrated Waste Water Treatment, Barangay Cogon, Barangay Booy and Barangay Taloto, Tagbilaran City, Bohol |
September 25, 2024 |
October 3, 2024 |
Bohol 1st District Engineering Office |
24CSHA0011 |
24CSHA0011 - Conduct of Subsurface Geotechnical Investigation for the Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure, Phase 2, Barangay Panadtaran, Tubigon, Bohol |
September 25, 2024 |
October 3, 2024 |
Bohol 1st District Engineering Office |
24CSHA0010 |
24CSHA0010 - Conduct of Subsurface Geotechnical Investigation for the Rehabilitation of DPWH Area Equipment Service Building, De La Paz, Cortes, Bohol |
September 25, 2024 |
October 3, 2024 |
Bohol 1st District Engineering Office |
24CSHA0009 |
24CSHA0009 - Conduct of Subsurface Geotechnical Investigation for the Construction of Fatima Bridge, Barangay Fatima, Cortes, Bohol |
September 25, 2024 |
October 3, 2024 |
Bohol 1st District Engineering Office |
24CSHA0008 |
24CSHA0008 - Conduct of Subsurface Geotechnical Investigation for the Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Protection Dike, Cahayag CIS, Tubigon, Bohol |
September 25, 2024 |
October 3, 2024 |
Bohol 1st District Engineering Office |
24CSHA0007 |
24CSHA0007 - Conduct of Subsurface Geotechnical Investigation for the Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Mitigation Structure, Habitat Road leading to Tagbilaran East Road (Below the Regional Hub), Tagbilaran City, Bohol |
September 25, 2024 |
October 3, 2024 |
Bohol 1st District Engineering Office |
24CSHA0006 |
24CSHA0006 - Conduct of Subsurface Geotechnical Investigation for the Widening of Permanent Bridges – Macaas Br. (B00018BH) along The President Carlos P. Garcia Circumferential Rd |
September 25, 2024 |
October 3, 2024 |
Davao Oriental 1st District Engineering Office |
25CSLF0003 |
REI for 25CSLF0003 - Cluster III Geotechnical Investigation - Conduct Of Soil Testing/Exploration for the Proposed FY 2025 Slope Protection and Flood Control Projects, Cateel, Davao Oriental 1st LD Scope of Work : Subsurface Exploration, Soil Testing, and Geotechnical Evaluation Report for one (1) Slope Protection and two (2) Flood Control Projects |
September 26, 2024 |
October 17, 2024 |
Davao Oriental 1st District Engineering Office |
25CSLF0002 |
REI for 25CSLF0002 - Cluster II Geotechnical Investigation - Conduct Of Soil Testing/Exploration for the Proposed FY 2025 Slope Protection and Flood Control Projects in Caraga and Baganga, Davao Oriental 1st LD Scope of Work : Subsurface Exploration, Soil Testing, and Geotechnical Evaluation Report for one (1) Slope Protection and two (2) Flood Control Projects |
September 26, 2024 |
October 17, 2024 |
Davao Oriental 1st District Engineering Office |
25CSLF0001 |
REI for 25CSLF0001 - Cluster I Geotechnical Investigation - Conduct Of Soil Testing/Exploration for the Proposed FY 2025 Slope Protection Projects along Surigao del Sur Bdry-Davao Or Coastal Road (Tarragona Section), Davao Oriental 1st LD Scope of Work : Subsurface Exploration, Soil Testing, and Geotechnical Evaluation Report for three (3) Slope Protection Projects |
September 26, 2024 |
October 17, 2024 |
Regional Office III |
23CSC009 |
REI and Bid Docs for CONTRACT ID NO.: 23CSC009 - Procurement of Consulting Services for The Geological and Geotechnical Surveys/ Investigations for the Proposed Various Projects of sub-Soil Exploration for Bridges, Flood Control and Other Structures of Bulacan sub-District Engineering Office (Bulacan 3rd DEO) |
September 25, 2024 |
October 2, 2024 |
Surigao del Norte 2nd District Engineering Office |
24CSNG011 |
24CSNG011 - CONSULTING SERVICES FOR THE CONDUCT OF GEOTECHNICAL/SOIL EXPLORATION FOR THE CONSTRUCTION OF DPWH-SURIGAO DEL NORTE 2ND DEO BUILDING, SURIGAO CITY, SURIGAO DEL NORTE |
September 21, 2024 |
September 24, 2024 |
Central Office |
24CSZ017 |
REI, EDS, RFP, and TOR - CONSULTING SERVICES (INDEPENDENT THIRD-PARTY AUDITOR/CERTIFYING BODY) TO PROVIDE RE-REGISTRATION TO ISO 9001:2015 CERTIFICATE TO THE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FOR A 3-YEAR CYCLE TO INCLUDE SURVEILLANCE AUDITS (NEGOTIATED PROCUREMENT – TWO FAILED BIDDINGS) |
September 20, 2024 |
October 8, 2024 |
Central Office |
24CSZ015 |
RFP AND TOR - CONSULTING SERVICES FOR THE DETAILED ENGINEERING AND ARCHITECTURAL DESIGN (DEAD) AND SPECIAL STUDIES OF VARIOUS DPWH PROJECTS (CY 2024) – CONTRACT PACKAGE 3 |
September 19, 2024 |
October 3, 2024 |
Central Office |
24CSZ014 |
RFP AND TOR - CONSULTING SERVICES FOR THE DETAILED ENGINEERING AND ARCHITECTURAL DESIGN (DEAD) AND SPECIAL STUDIES OF VARIOUS DPWH PROJECTS (CY 2024) – CONTRACT PACKAGE 2 |
September 19, 2024 |
October 3, 2024 |
Central Office |
24CSZ013 |
RFP AND TOR - CONSULTING SERVICES FOR THE DETAILED ENGINEERING AND ARCHITECTURAL DESIGN (DEAD) AND SPECIAL STUDIES OF VARIOUS DPWH PROJECTS (CY 2024) – CONTRACT PACKAGE 1 |
September 19, 2024 |
October 3, 2024 |
Masbate 2nd District Engineering Office |
24CSFI01 |
24CSFI01 - Consulting Services for the Sub-Soil Investigation for the Construction of New Bridges – Ilaya Br. Along Balud National Road connecting Barangay Danao in support of Agribusiness, Balud, Masbate and Widening of Permanent Bridges – Marintoc Br. 2 (B00084MT) along Masbate – Cataingan – Placer Rd. Mobo, Masbate |
September 19, 2024 |
September 26, 2024 |
Masbate 2nd District Engineering Office |
24CSFI01 |
24CSFI01 - Consulting Services for the Sub-Soil Investigation for the Construction of New Bridges – Ilaya Br. Along Balud National Road connecting Barangay Danao in support of Agribusiness, Balud, Masbate and Widening of Permanent Bridges – Marintoc Br. 2 (B00084MT) along Masbate – Cataingan – Placer Rd. Mobo, Masbate |
September 19, 2024 |
September 26, 2024 |
Masbate 2nd District Engineering Office |
24CSFI01 |
24CSFI01 - Consulting Services for the Sub-Soil Investigation for the Construction of New Bridges – Ilaya Br. Along Balud National Road connecting Barangay Danao in support of Agribusiness, Balud, Masbate and Widening of Permanent Bridges – Marintoc Br. 2 (B00084MT) along Masbate – Cataingan – Placer Rd. Mobo, Masbate |
September 19, 2024 |
September 26, 2024 |
Regional Office X |
24CSK009 |
Bidding Documents - 24CSK009 |
September 19, 2024 |
September 26, 2024 |
La Union 2nd District Engineering Office |
24CSAF0010 |
24CSAF0010SVP, SUB-SURFACE EXPLORATION OF PROPOSED CONSTRUCTION OF COASTAL BRIDGE FOR FY 2025 PROJECT, BRGY. POBLACION EAST, ROSARIO, LA UNION |
September 18, 2024 |
October 1, 2024 |
La Union 2nd District Engineering Office |
24CSAF0009 |
24CSAF0009SVP, SUB-SURFACE EXPLORATION OF PROPOSED CONSTRUCTION OF FOOT BRIDGE FOR FY 2025 PROJECT, BRGY. POBLACION EAST, ROSARIO, LA UNION |
September 18, 2024 |
October 1, 2024 |
Regional Office III |
24CSC003 |
REQUEST FOR EXPRESSION OF INTEREST (REI) FOR CONTRACT ID NO. 24CSC003 - Procurement of Consulting Services for the Geotechnical Investigation for Amo Br. (B01613LZ) along Jct. Layac – Balanga - Mariveles Port Rd (Phase 1) |
September 11, 2024 |
September 18, 2024 |
Regional Office III |
24CSC002 |
REQUEST FOR EXPRESSION OF INTEREST (REI) FOR CONTRACT ID NO. 24CSC002 - Procurement of Consulting Services for the Geotechnical Investigation for the Construction of New DPWH Office Building, Bataan 3rd DEO, Bataan |
September 11, 2024 |
September 18, 2024 |
Cotabato 2nd District Engineering Office |
24CSMC01 |
GEOTECHNICAL SUB SURFACE EXPLORATION: PACKAGE NO. 01-2025, ALL IN NORTH COTABATO |
September 11, 2024 |
September 19, 2024 |