Transfer of Maintenance Responsibility Including the Corresponding Maintenance Allocation of the Misamis Oriental-Bukidnon-Agusan Road (Bukidnon Section), km. 159.020 to km. 198.000, with a Length of 38.98 kms. From Bukidnon Engineering District to the Misamis Oriental Engineering District, Region X.