June 2, 2025 2025 WIN5E03729 GAA 2025 January 20, 2025 Cordillera Administrative Region Lower Kalinga District Engineering Office
"Project ID: P00914687LZ
UACS: 310109101731000

FROM:
Project Name:
Bulo National Rd (Agbannawag-Bulo-Callagdao Sect) - K0502 + (-016) - K0502 + 001
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 153 Square meters
Allocation:
Php 2,500,000

TO:
Project Name:
Bulo National Rd (Agbannawag-Bulo-Callagdao Sect) - K0508+178 - K0508+208
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 180 Square meters
Allocation:
Php 2,500,000"
June 2, 2025 2025 WIN5E03729 GAA 2025 January 20, 2025 Cordillera Administrative Region Lower Kalinga District Engineering Office
"Project ID: P00914687LZ
UACS: 310109101731000

FROM:
Project Name:
Bulo National Rd (Agbannawag-Bulo-Callagdao Sect) - K0502 + (-016) - K0502 + 001
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 153 Square meters
Allocation:
Php 2,500,000

TO:
Project Name:
Bulo National Rd (Agbannawag-Bulo-Callagdao Sect) - K0508+178 - K0508+208
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 180 Square meters
Allocation:
Php 2,500,000"
June 2, 2025 2025 WIN5E03728 SR2025-03-008449 March 12, 2025 Cordillera Administrative Region Lower Kalinga District Engineering Office
"Project ID: P00923067LZ
UACS: 320102107103000

FROM:
Project Name:
Construction of Flood Control Structure along Chico River (Buenan), Sta. 115 + 741 - Sta. 115 + 941, Barangay Dupag, Tabuk City, Kalinga
Type of Work:
CW1 - Construction of Flood Mitigation Structure
Physical Target:
CW1 - 125 Lineal meters
Allocation:
Php 8,000,000

TO:
Project Name:
Construction of Flood Control Structure along Chico River (Buenan),Sta.115+786 - Sta. 115+866, Barangay Dupag, Tabuk City, Kalinga
Type of Work:
CW1 - Construction of Flood Mitigation Structure
Physical Target:
CW1 - 80 Lineal meters
Allocation:
Php 8,000,000"
June 2, 2025 2025 WIN5XY00472 FY2025 GAA December 20, 2024 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Tarlac City - San Jose via Tibag-Burgos Rd - K0129+301 - K0130+650
June 2, 2025 2025 win5f08555 FY2025 GAA December 20, 2024 Region III Regional Office III
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

Maharlika Highway - K0039+000- K0039+740, K0041+653 - K0042+000, K0048+000 - K0048+500
June 2, 2025 2025 FY2025 GAA December 20, 2024 Region III Regional Office III
Asset Preservation Program - Preventive Maintenance - Primary Roads

Maharlika Highway - K0111+385 - K0112+220
June 2, 2025 FY 2025 P00909495MN SR2025-003-009500 March 17, 2025 Region XII Regional Office XII
Contract ID: 25M00013
Amount: ₱ 49,552,000.00

Project Name:
From: Maharlika Highway( Digos-Makar Rd) - K1612 + 961 - K1613 + 532, K1613 + 590 - K1613 + 996, K1618 + 526 - K1618 + 750
To: Maharlika Highway( Digos-Makar Rd) - K1612 + 961 - K1613 + 532, K1613 + 590 - K1613 + 996, K1620 + 098 - K1620 + 322

Type of Work/ Physical target:
From: CW1 - Road Widening = 2.562 Lane Km
To: CW1 - Road Widening = 2.562 Lane Km, CW2 - Construction of Road Slope Protection Structure = 3,479.00 Square meters
June 2, 2025 FY 2025 P00909449MN SR2025-003-009465 March 17, 2025 Region XII Regional Office XII
Contract ID: 25M00014
Amount: ₱ 49,599,000.00

Project Name:
From: Maharlika Highway( Digos-Makar Rd) - K1628 + 850 - K1630 + 142
To: Maharlika Highway( Digos-Makar Rd) - K1627 + 417 - K1628 + 617

Type of Work/ Physical Target:
From: CW1 - Road Widening = 2.523 Lane Km
To: CW1 - Road Widening = 2.400 Lane Km, CW2 = Construction of Road Slope Protection Structure = 3,910.00 Square meters
June 2, 2025 FY 2025 P00935914MN GAA 2025 January 1, 2025 Region XII South Cotabato 1st District Engineering Office
Contract ID: 25MB0043
Project Name: Construction of Drainage Structure, Marcos Avenue, Barangay Apopong, General Santos City
Amount: P10,000,000.00
Type of Work: Construction of Drainage Structure

Physical Target:
From: 485 Lineal meters
To: 493 Lineal meters
June 2, 2025 FY 2025 P00938513MN SARO-BMB-A-25-0008281 March 11, 2025 Region XII South Cotabato 1st District Engineering Office
Contract ID:25MB0017
Project Name: Construction of Road, National Highway to Purok Upper London, Barangay Siguel, General Santos City
Amount: P5,000,000.00
Type of Work: Construction of Concrete Road

Physical Target:
From: 0.273 Lane Km
To: 0.576 Lane Km
May 29, 2025 2025 WIN5XY00478 FY2025 GAA December 20, 2024 Region III Regional Office III
Network Development Program - Off-Carriageway Improvement - Primary Roads

Maharlika Highway - K0037+(-725) - K0037+(-668), K0037+(-618) - K0037+(-435), K0037+(-54) - K0037+242.00
May 29, 2025 2025 WIN5F08570 FY2025 GAA December 20, 2024 Region III Regional Office III
Asset Preservation Program - Preventive Maintenance - Primary Roads

Maharlika Highway - K0046+463 - K0046+746
May 29, 2025 2025 WIN5F08570 FY2025 GAA December 20, 2024 Region III Regional Office III
Asset Preservation Program - Preventive Maintenance - Primary Roads

Maharlika Highway - K0046+463 - K0046+746
May 29, 2025 2025 WIN5F08552 FY2025 GAA December 20, 2024 Region III Aurora District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Baler-Casiguran Rd (Baler-Dinadiawan) - K0251+282 - K0252+207, K0269+440 - K0269+817
May 29, 2025 2025 WIN5F08547 FY2025 GAA December 20, 2024 Region III Aurora District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads


Baler-Casiguran Rd (Baler-Dinadiawan) - K0248+105 - K0248+689, K0273+450 - K0274+450
May 28, 2025 2025 WIN5F08543 FY2025 GAA December 20, 2024 Region III Regional Office III
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

Maharlika Highway - K0112+507.30 - K0112+807.30, K0112+733.30 - K0112+807.30
May 28, 2025 2025 WIN5XY00471 SARO-BMB-A-25-0009037 March 27, 2025 Region VI Capiz 1st District Engineering Office
UACS No. 310102102179000
Project ID: P00908626VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo East Coast-Capiz Rd – K0163 + 760 – K0171 + 781

CW1- Preventive Maintenance: Asphalt Overlay: 15.396 lane km – 100,360.00
EAO – 3,640.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo East Coast-Capiz Rd – K0163 + 760 – K0167 + 524

CW1- Preventive Maintenance: Asphalt Overlay: 10.446 lane km – 100,360.00
EAO – 3,640.00
May 28, 2025 2025 WIN5F08551 SARO-BMB-A-25-0009037 March 27, 2025 Region VI Capiz 1st District Engineering Office
UACS No. 310102102188000
Project ID: P00908634VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Maayon-Jct Bailan Rd - K0125 + 743 - K0131 + 062

CW1- Preventive Maintenance: Asphalt Overlay: 10.140 lane km – 68,032.50
EAO – 2,467.50


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Maayon-Jct Bailan Rd - K0126 + 117 - K0129 + 000

CW1- Preventive Maintenance: Asphalt Overlay: 7.280 lane km – 68,032.50
EAO – 2,467.50
May 28, 2025 2025 FY 2025 GAA, RA 12116 December 30, 2024 Region XIII Regional Office XIII
UACS No. : 310107100777000
Project ID: P00909150MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

FROM:

Maharlika Highway (Agusan-Davao Sect) - K1316 + 321 - K1316 + 630

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 11000 Square meters

Allocation:
TOTAL: P 165,000,000
CW1: P 159,225,000
EAO: P 5,775,000

Unit Cost:
CW1: P 14,475/Square meters

TO:

Maharlika Highway (Agusan-Davao Sect) - K1316 + 000 - K1316 + 120 , K1316 +250 - K1316 + 360, K1316 + 415 - K1316 + 470, K1316 + 590 - K1316 + 630, K1317 + 045 - K1317 + 200, K1317 + 250 - K1317 + 440, K1317 + 440 - K1317 + 540

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 12,313.01 Square meters

Allocation:
TOTAL: P 165,000,000
CW1: P 159,225,000
EAO: P 5,775,000

Unit Cost:
CW1: P 12,931.44/Square meters
May 27, 2025 2025 WIN5E03732 GAA 2025 January 20, 2025 Cordillera Administrative Region Apayao 2nd District Engineering Office
"Project ID: P00914631LZ
UACS: 310105101374000

FROM:
Project Name:
Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0617 + 420.50 - K0618 + 078
Type of Work:
CW1 - Reconstruction to Concrete Pavement
CW2 - Construction of Road Slope Protection Structure
CW3 - Upgrading of Drainage Structure along Road
Physical Target:
CW1 - 0.39 Lane Km
CW2 - 509.70 Square meters
CW3 - 27 Lineal meters
Allocation:
Php 19,500,000

TO:
Project Name:
Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0617 + 420.50 - K0618 + 078, K0621 + 009.50 - K0621 + 028, K0621 + 073 - K0621 + 177
Type of Work:
CW1 - Reconstruction to Concrete Pavement
CW2 - Construction of Road Slope Protection Structure
CW3 - Off-Carriageway Improvement: Paving of Shoulders
Physical Target:
CW1 - 0.6175 Lane Km
CW2 - 580.72 Square meters
CW3 - 916.50 Square meters
Allocation:
Php 19,500,000"
May 27, 2025 2025 WIN5E03731 GAA 2025 January 20, 2025 Cordillera Administrative Region CAR - Regional Office
"Project ID: P00900504LZ
UACS: 310105101275000

FROM:
Project Name:
Baguio-Bontoc Rd - K0376 + 000 - K0391 + 000
Type of Work:
CW1 - Reconstruction to Concrete Pavement
Physical Target:
CW1 - 30.316 Lane Km
Allocation:
Php 100,000,000

TO:
Project Name:
Baguio-Bontoc Rd - K0376 + 000 - K0391 + 000
Type of Work:
CW1 - Reconstruction to Concrete Pavement
CW2 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 - 3.384 Lane Km
CW2 - 8.296 Lane Km
Allocation:
Php 100,000,000"
May 26, 2025 2025 GAA 2025 May 22, 2025 Cordillera Administrative Region Apayao 2nd District Engineering Office
"Project ID: P00914637LZ
UACS: 310109101710000

FROM:
Project Name:
Apayao (Calanasan)-Ilocos Norte Rd - K0618 + 840 - K0619 + 042, K0622 + 577 - K0622 + 628, K0629 + 000 - K0629 + 045
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 1,629.00 Square meters
Allocation:
Php 29,900,000

TO:
Project Name:
Apayao (Calanasan)-Ilocos Norte Rd - K0622+577 - K0622+628, K0629 + 000 - K0629 + 045
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 1,924.49 Square meters
Allocation:
Php 29,900,000"
May 26, 2025 2025 SR2025-02-001881 February 3, 2025 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0697 + (-124) - K0697 + 000

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 24.125 M
Structure: 1,280 Square meters

EAO P 0.875 M

Total P 25.00 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0697 + (-124) - K0697 + (-054)

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 24.125 M
Structure: 1,190 Square meters

EAO P 0.875 M

Total P 25.00 M
May 26, 2025 2025 SR2025-03-009399 March 17, 2025 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0777 + 090 - K0777 + 138

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 11.580 M
Structure: 850.01 Square meters

EAO P 0.420 M

Total P 12.00 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0777 + 065 - K0777 + 106

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 11.580 M
Structure: 900.18 Square meters

EAO P 0.420 M

Total P 12.00 M
May 26, 2025 2025 SR2025-03-009501 March 17, 2025 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0794 + 800 - K0794 + 873, K0797 + 140 - K0802 + 300, K0803 + 010 - K0803 + 300, K0803 + 750 - K0803 + 800, K0804 + 310 - K0804 + 355

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 19.300 M
: 1.036 Lane Km

EAO P 0.700 M

Total P 20.00 M

AS MODIFIED:


Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0794 + 800 - K0794 + 873, K0797 + 140 - K0797 + 210, K0802 + 210 - K0802 + 300, K0803 + 010 - K0803 + 300, K0803 + 750 - K0803 + 800, K0804 + 310 - K0804 + 369

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 19.300 M
: 1.476 Lane Km

EAO P 0.700 M

Total P 20.00 M
May 26, 2025 2025 SR2025-03-009496 March 17, 2025 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0699 + 071 - K0700 + 000, K0675 + 535 - K0697 + 663, K0698 + 032 - K0698 + 163.5

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 33.775 M
: 1.991 Lane Km

EAO P 1.225 M

Total P 35.00 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0697 + 535 - K0697 + 663, K0698 + 032 - K0698 + 163, K0699 + 071 - K0700 + 000

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 33.775 M
: 2.114 Lane Km

EAO P 1.225 M

Total P 35.00 M
May 23, 2025 2025 SARO-BMB-A-25-0009037 March 27, 2025 Region VI Guimaras District Engineering Office
UACS No. 310102102194000
Project ID: P00908638VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Guimaras Circumferential Rd (S00028GR) K0101 + 392 - K0102 + 494, K0103 + 376 - K0104 +348

CW1- Preventive Maintenance: Asphalt Overlay: 8.312 lane km – 96,017.50
EAO – 3,482.50


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads
Guimaras Circumferential Rd (S00028GR) K0098 + 732 - K0098 + 801, K0103 + 376 - K0104 +380, K0105 + 800 - K0106 + 800

CW1- Preventive Maintenance: Asphalt Overlay: 7.874 lane km – 96,017.50
EAO – 3,482.50
May 23, 2025 2025 SARO-BMB-A-25-0009037 March 27, 2025 Region VI Capiz 1st District Engineering Office
UACS No. 310102102455000
Project ID: P00908657VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo-Capiz Rd (New Route) - K0116 + (-173) - K0116 + 100, K0116 + 400 - K0118 + 100

CW1- Preventive Maintenance: Asphalt Overlay: 3.982 lane km – 35,770.00
EAO – 730.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo-Capiz Rd (New Route) - K0116 + (-173) - K0116 + 100, K0116 + 400 - K0117 + 080

CW1- Preventive Maintenance: Asphalt Overlay: 3.817 lane km – 35,770.00
EAO – 730.00
May 23, 2025 2025 SARO-BMB-A-25-0009037 March 27, 2025 Region VI Capiz 1st District Engineering Office
UACS No. 310103101857000
Project ID: P00908675VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Roxas City Bdry-Panitan-Bailan Rd - K0112 + (-268) - K0113 + 434, K0115 + 110 - K0118 + 000, K0118 + 402 - K0120 + 850

CW1- Preventive Maintenance: Asphalt Overlay: 14.164 lane km – 141,855.00
EAO – 5,145.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Roxas City Bdry-Panitan-Bailan Rd - K0112 + (-268) - K0113 + 434, K0116 + 606 - K0118 + 000, K0118 + 402 - K0118 + 920

CW1- Preventive Maintenance: Asphalt Overlay: 14.382 lane km – 141,855.00
EAO – 5,145.00
May 23, 2025 2025 SARO-BMB-A-25-0009037 March 27, 2025 Region VI Iloilo 1st District Engineering Office
UACS No. 300214102007000
Project ID: P00934901VS


FROM:

Convergence and Special Support Program

Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Guimbal-Igbaras-Tubungan-Leon Rd - K0038 + 000 - K0040 + 253

CW1- Road Safety: Roadway Lighting: 226 number of units – 29,400.00
EAO – 600.00


TO:

Convergence and Special Support Program

Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Guimbal-Igbaras-Tubungan-Leon Rd - K0035 + 500 - K0043 + 000

CW1- Road Safety: Roadway Lighting: 250 number of units – 29,400.00
EAO – 600.00
May 22, 2025 2025 SR2025-02-003246 February 3, 2025 Region VIII Regional Office VIII

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Off-Carriageway Improvement - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0934 + 881 - K0935 + 058, K0935 + 205 - K0935 + 404 (Off-Carriageway Improvement)

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: P 10.230930M
Construction of Sidewalk :
1,116 Square meters

EAO P 0.371070 M

Total P 10.602 M

AS MODIFIED:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0934 + 900 - K0936 + 000 (Off-Carriageway Improvement)

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: P 10.230930M
Construction of Sidewalk :
3,273 Square meters

EAO P 0.371070 M

Total P 10.602 M
May 22, 2025 2025 SR2025-02-001694 February 3, 2025 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0702 + 483 - K0702 + 800, K0703 + 459 - K0703 + 853, K0705 + 122 - K0705 + 167, K0705 + 790 - K0705 + 811, K0706 + 000 - K0706 +500, K0707
+ 108 + K0707+ 267, K0707 + 830 - K0708 + 000, K0709 + 203 - K0709 + 240, K0710 + 630 - K0711 + 000, K0713 + 200 - K0713 + 554


Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 81.060 M
: 4.734 Lane Km

EAO P 2.940 M

Total P 84.00 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0702 + 483 - K0702 + 800, K0705 + 122 - K0705 + 167, K0706 + 000 - K0706 + 500, K0707 + 830 - K0708 + 000, K0710 + 630 - K0711 + 000, K0713 + 200 - K0713+ 554


Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 81.060 M
: 4.166 Lane Km

EAO P 2.940 M

Total P 84.00 M
May 21, 2025 2025 GAA 2025 January 20, 2025 Cordillera Administrative Region Lower Kalinga District Engineering Office
Project ID: P00921762LZ
UACS: 320102107791000

FROM:
Project Name:
Rehabilitation of Flood Control Structure along Chico River, Sta. 104+937 - Sta. 104+237, Barangay Amlao, Tabuk City, Kalinga
Type of Work:
CW1 - Rehabilitation / Major Repair of Flood Control Structure
Physical Target:
CW1 - 194.92 Lineal meters
Allocation:
Php 20,000,000

TO:
Project Name:
Rehabilitation of Flood Control Structure along Chico River, Sta. 104 + 937 - Sta. 105 + 027 and Sta. 105 + 074 - Sta. 105 + 206 , Barangay Amlao, Tabuk City, Kalinga
Type of Work:
CW1 - Rehabilitation / Major Repair of Flood Control Structure
Physical Target:
CW1 - 222 Lineal meters
Allocation:
Php 20,000,000
May 21, 2025 2025 SR2025-02-001182 February 1, 2025 Cordillera Administrative Region Lower Kalinga District Engineering Office
Project ID: P00914681LZ
UACS: 310108101979000

FROM:
Project Name:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0471 + (-497) - K0471 + (-460), K0471 +020 - K0471 + 096, K0472 + 294 - K0472 + 410, K0473 + 384 - K0473 + 470, K0475 + 389 - K0475 + 470, K0475 + 782 - K0475 + 842, K0476 +613 - K0476 + 697, K0477 + 341 - K0477 + 422, K0479 + 000 - K0479 + 146, K0480 + 071 - K0480 + 181, K0480 + 262 - K0480 + 351, K0481 + 215 - K0481 + 254, K0484 + 670 - K0484 + 724, K0484 + 734 - K0484 + 864
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 5378 Square meters
Allocation:
Php 52,800,000

TO:
Project Name:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0471 + (-497) - K0471 + (-460), K0471 +020 - K0471 + 096, K0472 + 294 - K0472 + 410, K0473 + 384 - K0473 + 470, K0475 + 389 - K0475 + 470, K0475 + 782 - K0475 + 860, K0476 +613 - K0476 + 697, K0477 + 341 - K0477 + 422, K0479 + 000 - K0479 + 146, K0480 + 071 - K0480 + 181, K0480 + 262 - K0480 + 351, K0481 + 215 - K0481 + 254
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 4672 Square meters
Allocation:
Php 52,800,000
May 9, 2025 2024 409903000000000 SR200-11-021202 November 19, 2024 Region II Isabela 2nd District Engineering Office
FROM:

Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Sifu River Flood Control Project, Sta. 0+600 - Sta. 1+400, Phase II, Barangay San Jose, Quirino, Isabela

TO:

Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Siffu River Flood Control Project, Sta. 1+400 - Sta. 2+069.94, Phase II, Barangay San Jose, Quirino, Isabela
May 9, 2025 2024 409903000000000 SR200-11-021202 November 19, 2024 Region II Isabela 2nd District Engineering Office
FROM:

FROM:

Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Sifu River Flood Control Project, Sta. 0+600 - Sta. 1+400, Phase II, Barangay San Juan, Quirino, Isabela

TO:

Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Siffu River Flood Control Project, Sta. 1+400 - Sta. 2+044.50, Phase II, Barangay San Juan, Quirino, Isabela
May 9, 2025 2024 409903000000000 SR200-11-021202 November 19, 2024 Region II Isabela 2nd District Engineering Office
FROM:

Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Mallig River Flood Control Project, Sta. 0+960 - Sta. 1+760, Phase II, Barangay Imbiao, Roxas, Isabela

TO:

Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Mallig River Flood Control Project, Sta. 1+760 - Sta. 2+455.36, Phase II, Barangay Imbiao, Roxas, Isabela
April 15, 2025 2025 WIN5F08487 FY2025 GAA December 30, 2024 Region III Regional Office III
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R. A. 11239

Installation of Road Safety Devices and Facilities along Manila North Road (S01366LZ) - K0021+343 - K0022+060, K0022+125+K0022+1931, Barangay Abangan Sur, Marilao, Bulacan
April 15, 2025 2025 WIN5F08486 FY2025 GAA December 30, 2024 Region III Regional Office III
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R. A. 11239

Installation of Road Safety Devices and Facilities along Manila North Road (S01366LZ) - K0018+201 - K0018+457, K0018+541 - K0021+343
March 28, 2025 FY 2024 P00800818MN SR2024-01-00359 January 26, 2024 Region XII Cotabato 1st District Engineering Office
24MD0049:
Project name: Midsayap - Libungan Bypass Road, Cotabato
Project Amount: P150M
Type of Work:
From:
CW1 - Construction of Concrete Bridge = 1,686 square meters
ROW Acquisition = 39,270.00 square meters
To:
CW1 - Construction of Concrete Bridge = 1489.5 square meters
ROW Acquisition = 39,270.00 square meters

March 28, 2025 FY 2024 P00820926MN SR2024-01-002591 January 27, 2024 Region XII Saranggani District Engineering Office
Project name: Construction of Glan River Flood Control Structure, Glan, Sarangani Province, Phase II
Project Amount: P100M
Type of Work: Construction of Flood Mitigation Structure
physical Traget:
From:720.944 Lineal meters
To: 450 Lineal meters
March 26, 2025 FY 2024 WIN4E03680 310205101246000 January 27, 2025 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 409903000000000
Project ID: P00860425MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads

Jct. Imelda-Alicia Rd (S01114MN) - K1765+005.50 - K1765+550, K1765+550 - K1766+052, K1766+052 - K1766+525, K1766+561 - K1767+755.50
CW1- Preventive Maintenance of Road/Asphalt Overlay: 8.649 Lane-km
Unit Cost: ₱ 16,736,038.85/ Lane-km
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
March 26, 2025 FY 2024 WIN4E03680 310205101246000 September 30, 2024 Region IX Regional Office IX
UACS No. 310205101246000 Project ID: P00800269MN
OO1: Ensure Safe and Reliable National Road SYstem - Network Development - Construction of Missing Links/New Roads
Sindangan - Bayog - Lakewood Road, Package 2, Zamboanga del Norte

CW1 - Construction of Concrete Road: 3.043 Lane-km
Unit Cost: ₱ 45,676,815.52/ Lane-km CW2 - Construction of Road Slope Protection Structure: 41,318.50 sq.m.
Unit Cost: ₱ 392.83/sq.n.
EAO: ₱ 5,635,000.00 EXCESS: ₱ 139,437.48
Allocation: ₱ 161,000,000.00
March 26, 2025 FY 2024 WIN4B01255 310306100265000 July 2, 2024 Region IX Regional Office IX
UACS No. 310306100265000
Project ID: P00800760MN

OO1: Ensure Safe and Reliable National Road System – Bridge - Construction of New Bridges

Seit-Tayungan-Camp Andres Br. along Seit-Tayungan-Camp Andres Rd

CW1- Construction of Concrete Bridge: 397.63 sq.m.
Unit Cost: ₱ 174,735.306/ sq.m.
EAO: ₱ 2,520,000.00
Allocation: ₱ 72,000,000.00
March 26, 2025 FY 2024 310302100482000 July 2, 2024 Region IX Regional Office IX
UACS No. 310302100482000
Project ID: P00800759MN

OO1: Ensure Safe and Reliable National Road System – Bridge - Replacement of Permanent Weak Bridges

Suang Kagang Br. (B00003TW) along Bongao - Pahut - Sanga-Sanga National Road, Bongao, Tawi-Tawi

CW1- Replacement of Bridge: 294.786 sq.m.
Unit Cost: ₱ 130,942.44/ sq.m.
EAO: ₱ 1,400,000.00
Allocation: ₱ 40,000,000.00
March 26, 2025 FY 2024 300225101692000 August 3, 2024 Region IX Regional Office IX
UACS No. 300225101692000
Project ID: P00836149MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities

Construction of Shore Protection at Sapang Beach, Brgy. kan Mindus, Luuk, Sulu

CW1- Construction of Flood Mitigation Structure: 50 ln.m.
Unit Cost: ₱ 90,000.00/ ln.m.
EAO: ₱ 4,950,000.00
Allocation: ₱ 5,000,000.00
March 26, 2025 FY 2024 310201101316000 May 23, 2024 Region IX Regional Office IX
UACS No. 310201101316000
Project ID: P00802666MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Road Widening - Primary Roads

Dipolog-Sindangan-Liloy Rd - K1919+514 - K1920+650.77, K1920+793 - K1920+905.61, K1921+500 - K1921+580
CW1- Road Widening: 2.659 Lane-km
Unit Cost: ₱ 29,037,226.75/ Lane-km ROW Acquisition: 306.012 sq.m.
EAO: ₱ 1,925,000.00
Allocation: ₱ 55,000,000.00
March 21, 2025 FY 2024 GAA WIN4XW00159 FY 2024 GAA RA 11975 January 1, 2024 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Digos-Makar Rd - K1576 + 975
Physical Target:
CW1: 1 number of intersection (Off-Carriageway Improvement: Flaring of Intersections/Improvement of Intersections)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,300,000.00 (Off-Carriageway Improvement: Flaring of Intersections/Improvement of Intersections)
EAO: P 700,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Digos-Makar Rd - K1576 + 975
Physical Target:
CW1: 1 number of intersection (Off-Carriageway Improvement: Flaring of Intersections/Improvement of Intersections)
ROW: 1,525.706 square meterss (ROW Acquisition)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 16,405,000.00 (Off-Carriageway Improvement: Flaring of Intersections/Improvement of Intersections)
ROW: P 2,895,000.00 (ROW Acquisition)
EAO: P 700,000.00
March 21, 2025 FY 2024 GAA WIN5E03699 FY 2024 GAA RA 11975 January 1, 2024 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) - K1456 + 051 - K1456 + 836
Physical Target:
CW1: 2,767.242 lineal meters (Construction of Drainage Structure along Road)
CW2: 1 number of intersections (Off-Carriageway Improvement: Flaring of Intersections/Improvement of Intersections)
CW3: 0.896 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 89,133,000.00
CW1: P 52,885,860.00 (Construction of Drainage Structure along Road)
CW2: P 15,853,020.00 (Off-Carriageway Improvement: Flaring of Intersections/Improvement of Intersections)
CW3: P 17,274,465.00 (Reconstruction to Concrete Pavement)
EAO: P 3,119,655.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) - K1456 + 051 - K1456 + 836
Physical Target:
CW1: 1,344.295 lineal meters (Construction of Drainage Structure along Road)
CW2: 1 number of intersections (Off-Carriageway Improvement: Flaring of Intersections/Improvement of Intersections)
CW3: 1.338 lane km (Reconstruction to Concrete Pavement)
CW4: 2,163.348 square meters (Off-Carriageway Improvement: Construction of Traffic Island)
CW5: 572.85 square meters (Off-Carriageway Improvement: Construction of Bike Lanes)
Allocation:
TOTAL: P 89,133,000.00
CW1: P 40,035,161.80 (Construction of Drainage Structure along Road)
CW2: P 14,711,692.15 (Off-Carriageway Improvement: Flaring of Intersections/Improvement of Intersections)
CW3: P 12,756,404.99 (Reconstruction to Concrete Pavement)
CW4: P 15,367,484.34 (Off-Carriageway Improvement: Construction of Traffic Island)
CW5: P 1,602,770.63 (Off-Carriageway Improvement: Construction of Bike Lanes)
EAO: P 3,063,806.39
EXC: P 1,595,674.70 (Excess)
March 21, 2025 FY 2024 GAA WIN5E03699 FY 2024 GAA RA 11975 January 1, 2024 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1511 + (-235) - K1511 + 695, K1519 + 656 - K1519 + 720,
K1520 + 428 - K1520 + 500, K1520 + 920 - K1520 + 960,
K1520 + 030 - K1520 + 050, K1521 + 505 - K1521 + 524
Physical Target:
CW1: 5,432.75 square meters (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: 133.50 square meters (ROW Acquisition)
Allocation:
TOTAL: P 28,800,000.00
CW1: P 20,458,000.00 (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: P 7,334,000.00 (ROW Acquisition)
EAO: P 700,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1511 + (-235) - K1511 + (-127), K1511 + (-125) - K1511 + (-085), K1511 + (-061) - K1511 + 047,
K1511 + 177 - K1511 + 205, K1511 + 213 - K1511 + 243, K1511 + 287 - K1511 + 332, K1511 + 523 - K1511 + 576, K1511 + 585 - K1511 + 600,
K1511 + 609 - K1511 + 647, K1511 + 676 - K1511 + 785, K1518 + 226 - K1518 + 361, K1519 + 385 - K1519 + 412, K1519 + 655 - K1519 + 716,
K1520 + 030 - K1520 + 050, K1520 + 166 - K1520 + 195, K1520 + 428 - K1520 + 500, K1520 + 920 - K1520 + 964, K1521 + 306 - K1521 + 416,
K1521 + 433 - K1521 + 480, K1521 + 485 - K1521 + 524
Physical Target:
CW1: 3,195.90 square meters (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: 45.92 square meters (ROW Acquisition)
Allocation:
TOTAL: P 28,800,000.00
CW1: P 13,896,000.00 (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: P 1,544,000.00 (ROW Acquisition)
EAO: P 560,000.00
EXC: P 12,800,000.00 (Excess)
March 21, 2025 FY 2024 GAA WIN5XW00177 FY 2024 GAA RA 11975 January 1, 2024 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Jct. Mamay-La Verna Bypass Road-Davao City Diversion Road (Jct. Airport Cargo Section),
Physical Target:
CW1: 0.569 lane km (Construction of Concrete Road)
CW2: 0.569 square meters (Construction of Road Slope Protection Structure)
ROW: 1,780.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 105,000,000.00
CW1: P 28,950,000.00 (Construction of Concrete Road)
CW2: P 28,950,000.00 (Construction of Road Slope Protection Structure)
ROW: P 43,425,000.00 (ROW Acquisition)
EAO: P 3,675,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Jct. Mamay-La Verna Bypass Road-Davao City Diversion Road (Jct. Airport Cargo Section),
Physical Target:
CW1: 0.183 lane km (Construction of Concrete Road)
CW2: 183.00 lineal meters (Construction of Drainage Structure along Road)
CW3: 1,333.208 lineal meters (Road Safety: Pavement Markings)
CW4: 784.14 square meters (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: 51,780.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 105,000,000.00
CW1: P 2,029,698.00 (Construction of Concrete Road)
CW2: P 4,207,160.00 (Construction of Drainage Structure along Road)
CW3: P 2,204,963.00 (Road Safety: Pavement Markings)
CW4: P 2,501,279.00 (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: P 1,215,900.00 (ROW Acquisition)
EAO: P 441,000.00
EXC: P 92,400,000.00 (Excess)
March 21, 2025 FY 2024 GAA WIN5XW00176 FY 2024 GAA RA 11975 January 1, 2024 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Panacan Bypass Road, Package 2, Davao City
Physical Target:
CW1: 1.339 lane km (Construction of Concrete Road)
ROW: 13,393.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 130,400,000.00
CW1: P 62,416,200.00 (Construction of Concrete Road)
ROW: P 63,419,800.00 (ROW Acquisition)
EAO: P 4,564,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Panacan Bypass Road, Package 2, Davao City
Physical Target:
CW1: 1.672 lane km (Construction of Concrete Road)
CW2: 183.00 lineal meters (Construction of Road Slope Protection Structure)
ROW: 51,780.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 130,400,000.00
CW1: P 39,260,223.00 (Construction of Concrete Road)
CW2: P 36,299,277.00 (Construction of Road Slope Protection Structure)
ROW: P 8,3959,500.00 (ROW Acquisition)
EAO: P 3,045,000.00
EXC: P 43,400,000.00 (Excess)
March 20, 2025 2024 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00832313LZ
UACS : 300207101063000

FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Various Infrastructures in Support of National Security (Tatag ng Imprastraktura para sa Kapayapaan at Seguridad Program - TIKAS) - Construction of Barracks and Other Military Camps Facilities at Barangay Lamon, Goa, Camarines Sur,

Physical Target :
CW1 - Construction of Other Facilities - 1 Number of Facilities
CW2 - Construction of Other Facilities - 1 Number of Facilities
CW3 - Construction of Other Facilities - 1 Number of Facilities
CW4 - Construction of Other Facilities - 1 Number of Facilities


TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Various Infrastructures in Support of National Security (Tatag ng Imprastraktura para sa Kapayapaan at Seguridad Program - TIKAS) - Construction of Barracks and Other Military Camps Facilities at Barangay Lamon, Goa, Camarines Sur

Physical Target :
CW1 - Construction of Other Facilities - 9 Number of Facilities
March 20, 2025 2024 300215103578000 FY 2024 GAA January 3, 2024 Region II Regional Office II
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Ilagan-Divilacan Road, Ilagan-Divilcan, Isabela
March 19, 2025 2024 310103101524000 FY 2024 GAA January 3, 2024 Region II Batanes District Engineering Office
FROM:

Asset Preservation - Preventive Maintenance - Tertiary Roads - Airport-Mauyen Port Rd - K0009 + 264 - K0009 + 618

TO:

Asset Preservation - Preventive Maintenance - Tertiary Roads - Airport-Mauyen Port Rd - K0009 + (-372.00) - K0009 + (291.90)
March 19, 2025 2024 300215104441000 FY 2024 GAA January 3, 2024 Region II Batanes District Engineering Office
FROM:
Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Sumnanga Diversion Road, Sabtang, Basco, Batanes

TO:
Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Sumnanga Diversion Road, Sabtang, Batanes
March 19, 2025 2024 310109101437000 FY 2024 GAA January 3, 2024 Region II Nueva Vizcaya 2nd District Engineering Office
FROM:
Asset Preservation Program – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads – Aritao-Quirino Rd – K0274+847-K0274+870

TO:
Asset Preservation Program – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads – Aritao-Quirino Rd – K0274+378-K0274+770, K0274+850-K0275+069
March 19, 2025 2024 310109101455000 FY 2024 GAA January 3, 2024 Region II Nueva Vizcaya 2nd District Engineering Office
FROM:

Asset Preservation Program – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads – Bambang-Kasibu-Solano Rd – K0265+796-K0265+946

TO:

Asset Preservation Program – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads – Bambang-Kasibu-Solano Rd – K0283+031-K0283+481
March 19, 2025 2024 310109101558000 FY 2024 GAA January 3, 2024 Region II Nueva Vizcaya 2nd District Engineering Office
FROM:

Asset Preservation Program – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads – Papaya-Malabing-Wangal-Binugawan-Tadji-Runruno Rd – K0295+256 - K0295+270, K0297+889 - K0297+920, K0302+134 - K0302+149, K0305+615 - K0305+635, K0306+489 - K0306+503, K0306+528 - K0306+541

TO:

Asset Preservation Program – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads – Papaya-Malabing-Wangal-Binugawan-Tadji-Runruno Rd – K0309+488 - K0309+681 & K0310+760 - K0311+180
March 19, 2025 2024 310109101447000 FY 2024 GAA January 3, 2024 Region II Cagayan 3rd District Engineering Office
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Peñablanca- Callao Cave Rd- K0478+(-260)- K478+(-287), K0483+000- K0483+(-068)
March 19, 2025 2024 310109101448000 FY 2024 GAA January 3, 2024 Region II Cagayan 3rd District Engineering Office
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Peñablanca- Callao Cave Rd- K0480+200- K0480+300
March 19, 2025 2024 310109101449000 FY 2024 GAA January 3, 2024 Region II Cagayan 3rd District Engineering Office
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Peñablanca- Callao Cave Rd- K0478+(-160)- K478+(-260)
March 19, 2025 2024 310109101451000 FY 2024 GAA January 3, 2024 Region II Cagayan 3rd District Engineering Office
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Peñablanca- Callao Cave Rd- K0479+898- K480+024
March 19, 2025 2024 310109101452000 FY 2024 GAA January 3, 2024 Region II Cagayan 3rd District Engineering Office
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Peñablanca- Callao Cave Rd- K0479+325.47- K0479+401
March 19, 2025 2024 310109101453000 FY 2024 GAA January 3, 2024 Region II Cagayan 3rd District Engineering Office
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Peñablanca- Callao Cave Rd- K0482+600- K0482+692
March 19, 2025 2024 310109101454000 FY 2024 GAA January 3, 2024 Region II Cagayan 3rd District Engineering Office
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Peñablanca- Callao Cave Rd- K0478+(-060)- K0478+(-160)
March 19, 2025 2024 320102106894000 FY 2024 GAA January 3, 2024 Region II Cagayan 3rd District Engineering Office
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Cagayan River Flood Management Project, Minanga Sur, Iguig, Cagayan
March 19, 2025 2024 300221105235000 FY 2024 GAA January 3, 2024 Region II Cagayan 3rd District Engineering Office
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road, Brgy. San Juan, Tuao, Cagayan
March 19, 2025 2024 300221105236000 FY 2024 GAA January 3, 2024 Region II Cagayan 3rd District Engineering Office
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities -Construction of Tuguegarao Circumferential Dike Road, Tuguegarao City, Cagayan (Package 2)
March 6, 2025 2024 WIN5XW00172 GAA 2024 January 1, 2024 Cordillera Administrative Region Upper Kalinga District Engineering Office
"From:
Cagaluan Bypass Road, Kalinga;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
1800 Linear Meters;
Allocation:
Php 8,000,000"

"To:
Cagaluan Bypass Road, Kalinga;
Type of Work:
CW1: Construction of Drainage Structure along Road
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 17 Lineal meters
CW2: 594 Square meters;
Allocation:
Php 8,000,000"
February 27, 2025 2024 WIN5XY00458 SR2024-01-001452 January 27, 2024 Region VIII Regional Office VIII
OO2: Protect Lives and Properties Against Major Floods

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Flood Control Structure along Barangay San Miguel Protecting National Road and Bridges, Balangiga, Eastern Samar

Physical Target: Allocation:


CW1- Construction of Food Mitigation Structure: P 144.750 M
1,068.952 Lineal Meters

EAO P 5.250 M

Total P 150.00 M

AS MODIFIED:

Construction of Flood Control Structure along Barangay San Miguel Protecting National Road and Bridges, Balangiga, Eastern Samar

Physical Target: Allocation:

CW1- Construction of Food Mitigation Structure: P 144.750 M
474 Lineal Meters

EAO P 5.250 M

Total P 150.00 M
February 14, 2025 2024 WIN5XY00457 SR2024-07-017806 July 11, 2024 Region VIII Regional Office VIII
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads - and/or Bridges (or, roads that traverse multiple LGU jurisdictions)

AS PER GAA/ORIGINAL:

Construction of Tolosa - Dulag By-pass Road, Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 144.750 M
2.948 Lane Km

EAO P 5.250 M

Total P 150.00 M

AS MODIFIED:

Construction of Tolosa - Dulag By-pass Road, Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 144.750 M
1.696 Lane Km

EAO P 5.250 M

Total P 150.00 M
February 4, 2025 2024 WIN4F08323 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00837686LZ
UACS : 399214191187000

FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 112389 - Installation of Road Safety Devices and Facilities along Daang Maharlika Rd (LZ) (S03732KZ) - K0542 + 000 - K05553 + 000, Castilla, Sorsogon

Physical target :
CW1 - Road Safety - Pavement Markings - 11019 Lineal meters


TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 112389 - Installation of Road Safety Devices and Facilities along Daang Maharlika Rd (LZ) (S03732KZ) - K0551 + 250 - K0551 + 520, K0551 + 900 - K0552 + 897, Castilla, Sorsogon

Physical Target :
CW1 - Road Safety - Pavement Markings - 1270 Lineal meters
CW2 - Road Safety Lighting - 4 Number of Units
January 7, 2025 FY 2024 P00800819MN GAA 2024 January 1, 2024 Region XII Regional Office XII
Contract ID: 24M00110
Project Name: Banga-Tupi-Malungon Road (Malungon-Tupi Section), Sarangani
Type of Work: Construction of Road Slope Protection Structure
Physical target (From): 640 Square meters
Physical target (To): 1,383 Square meters
January 7, 2025 FY 2024 P00821095MN GAA 2024 January 1, 2024 Region XII Regional Office XII
Contract ID: 24M00218
Project Name: Construction of Concrete Revetment, Saldua Br., Poblacion, Polomolok, South Cotabato
Type of Work: Construction of Revetment
Physical target (From): 360.472 Lineal meters
Physical target (To): 239.47 Lineal meters
January 3, 2025 2024 WIN4F08339 SR2024-02-008212 February 1, 2024 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (SM) (Sn Isidro - Sn Juanico Br) - K0796 + 685 - K796 + 795

Physical Target: Allocation:

CW1- Construction of Road Slope Protection P 81.7548 M
Structure: 8,580 Square Meters

CW2- Road Widening: P 2.65375 M
0.220 Lane Km

CW3- Reconstruction to Concrete Pavement: P 2.44145 M
0.220 Lane Km

EAO P 3.150 M

Total P 90.00 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0794+040 - K0794+200, K0795+230 - K0795+280, K0796+685 - K0796+770, K0797+015 - K0797+140

Physical Target: Allocation:

CW1- Construction of Road Slope Protection P 80.87410603 M
Structure: 3,639.60 Square Meters

CW2- Road Widening: P 5.97589397 M
0.445 Lane Km

EAO P 3.150 M

Total P 90.00 M
January 3, 2025 2024 GAA FY 2024 January 1, 2024 Region VIII Leyte 3rd District Engineering Office
Convergence and Special Support Program

SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Bridge Replacement/Rehabiltation, Brgy. Hinabuyan, Villaba, Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 24.5 M
0.491 Lane Km

EAO P 0.5 M

Total P 25.00 M

AS MODIFIED:

Bridge Replacement/Rehabiltation, Brgy. Hinabuyan, Villaba, Leyte

Physical Target: Allocation:

CW1- Replacement of Bridge: P 24.5 M
160.875 Square Meters

EAO P 0.5 M

Total P 90.00 M
December 27, 2024 CY 2024 WIN4F08340 SR2024-11-020396 November 5, 2024 National Capital Region NCR - Regional Office
As per GAA/Original
UACS No. 300214100920000
Project ID.: P00837528LZ

Convergence and Special Support Program

Special Road Fund – Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Installation/Application of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, along Epifanio Delos Santos Ave., (EDSA) – K0016+679 – K0017+525, Barangay Dolores-Kamuning, Quezon City
Physical Target: CW1 = 1,000 lineal meters
Unit Cost (P’000) = P 1.048/ lineal meters
Allocation = P 1,048,600.00
EAO = P 21,400.00
Total = P 1,070,000,00

As Modified
As per GAA/Original
UACS No. 300214100920000
Project ID.: P00837528LZ

Convergence and Special Support Program

Special Road Fund – Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Installation/Application of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, along Epifanio Delos Santos Ave., (EDSA) – K0016+679 – K0017+525, Quezon City
Physical Target: CW1 = 1,000 lineal meters
Unit Cost (P’000) = P 1.032/ lineal meters
Estimated Cost = P 1,032,550.00
EAO = P 37,450.00
Total = P 1,070,000,000
Bar Code #WIN4F08340
December 19, 2024 2024 WIN4F08327 FY 2024 GAA December 20, 2023 Region III Regional Office III
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)

Construction of Dingalan-Doña Remedios Trinidad Road, Aurora (Phase 3)
December 18, 2024 FY 2024 P00800756MN 24-01-000613 January 26, 2024 Region XII Regional Office XII
Contract ID: 24M00060
Project Name: Pigcalagan Br. (B02135MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect)
Project Amount: P19,200,000.00
Type of Work: Widening of Bridge
Physical Target:
From: 152.640 square meters
To: 91.98 Square meters
December 16, 2024 2024 SR2024-02-008272 February 24, 2024 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Bridge – Widening of Permanent Bridges

AS PER GAA/ORIGINAL:

Tagbinunga Br. (B00549LT) along Daang Maharlik (LT)

Physical Target: Allocation:

CW1- Widening of Bridge: P 54.622860 M
450.002 Square meters

EAO P 1.981140 M

Total P 56.604 M

AS MODIFIED:

Tagbinunga Br. (B00549LT) along Daang Maharlik (LT)

Physical Target: Allocation:

CW1- Widening of Bridge: P 54.622860 M
268.240 Square meters

EAO P 1.981140 M

Total P 56.604 M
December 16, 2024 2024 WIN4F08322 SR2024-04-014889 April 15, 2024 Region VIII Regional Office VIII
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities

AS PER GAA/ORIGINAL:

Construction of Basey - Maydolong Road (Phase 2), Eastern Samar

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 86.850 M
5.812 Lane Km

EAO P 3.150 M

Total P 90.00 M

AS MODIFIED:

Construction of Basey - Maydolong Road (Phase 2), Eastern Samar

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 72.30665237 M
1.56 Lane Km

CW2- Construction of Road Slope P 14.54334763
Protection Structure: 1,627.55 Square meter

EAO P 3.150 M

Total P 90.00 M
December 16, 2024 2024 SR2024-02-008195 February 1, 2024 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide –Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) – K0935 + 125 – K0935 + 250

Physical Target: Allocation:

CW1- Construction of Road Slope Protection P 71.816265 M
Structure: 1,200.00 Square meters

EAO P 2.604735 M

Total P 74.421 M

AS MODIFIED:

Daang Maharlika (LT) – K0935 + (-122.80) – K0935 + (-039), K0935 + 125 – K0935 + 250

Physical Target: Allocation:

CW1- Construction of Road Slope Protection P 71.816265 M
Structure: 1,257.6 Square meter

EAO P 2.604735 M

Total P 74.421 M
December 12, 2024 FY 2024 P00832860MN SR2024-01-000869 January 29, 2024 Region XII Regional Office XII
Contract ID: 24M00030
Project Name: Tuka-Bai Saripinang Road in Bagumbayan SK in support of Agri-based Industries: Pineapple, Coffee, Rubber, Corn and Muscovado Processing Plant, Bagumbayan, Sultan Kudarat
Amount: P65M
Physical Target (From):
CW1: 3.92 Lane Km
CW2: 40.01 Square meters
Physical Target (To):
CW1: 1.216 Lane Km
CW2: 190.80 Square meters
CW3: 820 Lineal meters
December 11, 2024 CY 2024 P00837492LZ SR2024-11-020397 November 6, 2024 National Capital Region NCR - Regional Office
As per GAA/Original
UACS No. 30021400913000
Project ID.: P00837492LZ

Convergence and Special Support Program

Special Road Fund – Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Installation/Application of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, and Zebra Pedestrian Crossing along Epifanio Delos Santos Ave., (EDSA) – K0016+679 – K0017+525, Quezon City
Physical Target: CW1 = CW1 – Road Safety: Road Signs = 50 No. of Signs
Unit Cost (P’000) = P 29.998/ No. of Signs
Allocation = P 1,499,400.00
EAO = P 30,600.00
Total = P 1,530,000,00




As Modified
UACS No. 30021400913000
Project ID.: P00837492LZ

Convergence and Special Support Program

Special Road Fund – Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Installation/Application of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, and Zebra Pedestrian Crossing along Epifanio Delos Santos Ave., (EDSA) – (S05142LZ) K0018+383 – K0017+475, Quezon City
Physical Target: CW1 = CW1 – Road Safety: Road Signs = 50 No. of Signs
Unit Cost (P’000) = P 29.529/ No. of Signs
Allocation = P 1,476,450.00
EAO = P 53,550.00
Total = P 1,530,000,00
November 28, 2024 2024 WIN4XY00450 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00820500LZ
UACS : 32010111112000

FROM :
ORGANIZATIONAL OUTCOME 2 - Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Road Dike, Budiao, Daraga, Albay (Package 2)

Physical Target :
Construction of Flood Mitigation Structure - 573.86 Lineal meters


TO :
ORGANIZATIONAL OUTCOME 2 - Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Road Dike, Budiao, Daraga, Albay (Package 2)

Physical Target :
Construction of Flood Mitigation Structure - 458.7 Lineal meters
November 22, 2024 2024 WIN4XY00389 FY 2024 GAA November 20, 2024 Region III Bataan 2nd District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and / or Bridges from the National Road/s leading to Major / Strategic Public Buildings / Facilities

Construction of Bridge at Barangay Wawa, Pilar, Bataan


November 20, 2024 FY 2024 WIN4XW00170 310205101245000 September 30, 2024 Region IX Regional Office IX
UACS No. 310205101245000
Project ID: P00800268MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Missing Links/ New Roads

Sindangan - Bayog - Lakewood Road, Package 1, Zamboanga del Norte
CW1- Construction of Concrete Bridge: 294.786 sq.m.
Unit Cost: ₱ 230,354.80/sq.m. CW2- Construction of Concrete Bridge: 1,156.248 sq.m.
Unit Cost: ₱ 88,268.38/ sq.m. CW3- Construction of Concrete Road: 1.049 Lane-km
Unit Cost: ₱ 37,164,927.68/ Lane-km ROW Acquisition: 25,410.00 sq.m. Unit Cost: ₱ 118.06/ sq.m.
EAO: ₱ 7,700,000.00 Excess: ₱ 348,478.86
Allocation: ₱ 220,000,000.00
November 20, 2024 FY 2024 310108101770000 July 2, 2024 Region IX Regional Office IX
UACS No. 310108101770000
Project ID: P00800546MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Slope Protection along Seit-Tayungan-Camp Andres Road Section

CW1- Construction of Road Slope Protection Structure/ 5,196.74 sq. m.
Unit Cost: ₱ 13,369.92 sq. m.
EAO: ₱ 2,520,000.00
Allocation: ₱ 72,000,000.00
November 20, 2024 FY 2024 WIN4B01223 310105101057000 April 17, 2024 Region IX Regional Office IX
UACS No. 310105101057000
Project ID: P00802721MN


OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Jolo Port-Bud Daho-Romandier Road K4+340-K5+404, Patikul, Sulu


CW1- Rehabilitation of Paved Road: 2.128 Lane-km
Unit Cost: ₱ 18,139,097.74/ Lane-km
EAO: ₱ 1,400,000.00
Allocation: ₱ 40,000,000.00
November 20, 2024 FY 2024 WIN4XW00157 300214100809000 May 23, 2024 Region IX Regional Office IX
UACS No. 300214100809000 Project ID: P00833090MN Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Lanao-Pagadian-Zamboanga City Rd - K1766+114.22 - K1767+000, K1785+000 - K1786+320, K1789+000 - K1789+237, K1809+500 - K1810+000, K1812+332 - K1812+458, K1812+458 - K1813+000, K1845+000 - K1846+820

CW1 - Rehabilitation of Paved Road: 10.6 Lane-km
Unit Cost: ₱ 9,832,229.56/ Lane-km CW1 - Road Widening: 5.1 Lane-km
Unit Cost: ₱ 18,300,753.89/ Lane-km
EAO: ₱ 7,352,800.00 EXCESS: ₱ 5,171,721.77
Allocation: ₱ 210,080,000.00
November 20, 2024 FY 2024 300225102216000 June 26, 2024 Region IX Zamboanga del Norte 1st District Engineering Office
UACS No. 300225102216000
Project ID: P00836172MN

Convergence and Special Support Program (CSSP)– Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities

Construction of Flood Control Structure, Poblacion, Polanco, Zamboanga del Norte

CW1- Construction of Flood Mitigation Structure : 68.00 Linear Meters
Unit Cost: ₱ 446,635.59/ Linear Meter
EAO: ₱ 306,780.00 EXCESS: ₱ 322,000.00
Allocation: ₱ 31,000,000.00
November 20, 2024 FY 2024 300219102955000 June 7, 2024 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300219102955000
Project ID: P00835858MN

Convergence and Special Support Program Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities

Construction of Flood Mitigation Structure along Tumaga River (Sta. Maria Section), Barangay Santa Maria, Zamboanga City
CW1- Construction of Flood Mitigation Structure: 45.95 Lineal meters
Unit Cost: ₱ 383,895.539/ Lineal meters
EAO: ₱ 360,000.00
Allocation: ₱ 18,000,000.00
November 19, 2024 2024 300219102254000 FY 2024 GAA January 3, 2024 Region II Isabela 3rd District Engineering Office
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities

FROM:

Rehabilitation of Minanga Flood Control Project, Sta. 0+000 - Sta. 0+330, Naguillian, Isabela

TO:

Rehabilitation of Minanga Flood Control Project, Sta. 0+000 - Sta. 0+270.20, Naguillian, Isabela
November 18, 2024 2024 WIN4F08284 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00821397LZ
UACS : 320102106464000

FROM :
ORGANIZATIONAL OUTCOME 2 - Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Flood Mitigation Structure, Bato River, Sipi Section, Bato, Catanduanes

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 198 Lineal meters


TO :
ORGANIZATIONAL OUTCOME 2 - Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Flood Mitigation Structure, Bato River, Sipi Section, Bato, Catanduanes

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 165.7 Lineal meters
November 14, 2024 2024 WIN4XY00448 SR2024-04-014740 April 12, 2024 Region VIII Regional Office VIII

OO2: Protect Lives and Properties Against Major Floods

Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

AS PER GAA/ORIGINAL:

Construction of flood Control structure along Suhi River ( downstream ) phase 2-A, Tacloban City
Physical Target: Allocation:

CW1- Construction of Flood Mitigation Structure: P 144.750 M
1,068.952 Lineal Meters

EAO P 5.250 M

Total P 150.00 M

AS MODIFIED:

Construction of Flood Control Structure along Suhi River (downstream) Phase 2-A, Tacloban City

Physical Target: Allocation:

CW1- Construction of Flood Mitigation Structure: P 139.750M
430.50 Lineal Meters

ROW- ROW Acquisition: P 5.00 M
4,305 Square Meters

EAO P 5.250 M

Total P 150.00 M
November 14, 2024 2024 WIN4XY00449 SR2024-10-019907 October 24, 2024 Region VIII Regional Office VIII
Convergence and Special Support Program (CSSP)

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

AS PER GAA/ORIGINAL:

Installation/Application/Construction of Signage, Pavement Markings, and Paved Shoulders along Daang Maharlika (SM) (Sn Isidro- Sn Juanico Section) - K0884 + 000 - K0885 + 000, Sta. Rita, Samar

Physical Target: Allocation:

CW1- Road Safety: Pavement P 7.704760 M
Markings: 1,007 Lineal Meters

EAO P .157240 M

Total P 7.862 M

AS MODIFIED:

Installation/Application/Construction of Signage, Pavement Markings, and Paved Shoulders along Daang Maharlika (SM) (Sn Isidro- Sn Juanico Section) - K0884 + 000 - K0885 + 500, Sta. Rita, Samar

Physical Target: Allocation:

CW1- Off-Carriageway Improvement: Paving: P 7.51209840 M
of Shoulders: 2,340 Square Meters

CW2- Road Safety: Pavement P .7473160 M
Markings: 42 Lineal Meters

EAO P .275170 M

Total P 7.862 M
November 14, 2024 2024 WIN4XY00446 SR2024-10-019904 October 9, 2024 Region VIII Regional Office VIII
Convergence and Special Support Program (CSSP)

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

AS PER GAA/ORIGINAL:

Installation/Application/Construction of Signage, Pavement Markings, and Paved Shoulders along Daang Maharlika (SM) (Sn Isidro- Sn Juanico Section) - K0829 + 200 - K0830 + 200, Paranas, Samar

Physical Target: Allocation:

CW1- Road Safety: Pavement P 5.266520 M
Markings: 1,014 Lineal Meters

EAO P .107480 M

Total P 5.374 M

AS MODIFIED:

Installation/Application/Construction of Signage, Pavement Markings, and Paved Shoulders along Daang Maharlika (SM) (Sn Isidro- Sn Juanico Section) - K0829 + 200 - K0830 + 200, Paranas, Samar

Physical Target: Allocation:

CW1- Off-Carriageway Improvement: Paving: P 3.12278551 M
of Shoulders: 819 Square Meters

CW2- Road Safety: Guardrails P 1.3178302 M
: 366 Lineal Meters

CW2- Road Safety: Road P .74529429 M
Signs: 53 Number of Signs

EAO P .188090 M

Total P 5.374 M
November 14, 2024 2024 WIN4XY00447 SR2024-10-019908 October 9, 2024 Region VIII Regional Office VIII
Convergence and Special Support Program (CSSP)

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

AS PER GAA/ORIGINAL:

Installation/Application/Construction of Signage, Pavement Markings, and Paved Shoulders along Daang Maharlika (SM) (Sn Isidro- Sn Juanico Section) - K0885 + 500 - K0886 + 500, Sta. Rita, Samar

Physical Target: Allocation:

CW1- Road Safety: Pavement P 7.029540 M
Markings: 1,006 Lineal Meters

EAO P .143460 M

Total P 7.173 M


AS MODIFIED:

Installation/Application/Construction of Signage, Pavement Markings, and Paved Shoulders along Daang Maharlika (SM) (Sn Isidro- Sn Juanico Section) - K0885 + 500 - K0886 + 500, Sta. Rita, Samar

Physical Target: Allocation:

CW1- Off-Carriageway Improvement: Paving: P 6.144217 M
of Shoulders: 1,872 Square Meters

CW2- Road Safety: Guardrails P .7777271 M
: 219 Lineal Meters

EAO P .251055 M

Total P 7.173 M
November 12, 2024 2024 WIN4XW00148 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Surigao del Sur 1st District Engineering Office
UACS No. : 300215104142000
Project ID: P00834950MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Costruction of Dike in Barangay Cabangahan, Cantillan, Surigao del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 520.905 Lineal meters

Allocation:
TOTAL: P 75,000,000
CW1: P 72,375,000
EAO: P 2,625,000

Unit Cost:
CW1: P 138,940.88/Lineal meters

TO:

Construction of Dike in Barangay Cabangahan, Cantilan, Surigao del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 195.20 Lineal meters

Allocation:
TOTAL: P 75,000,000
CW1: P 72,375,000
EAO: P 2,625,000

Unit Cost:
CW1: P 370,773.57/Lineal meters