April 27, 2017 |
2017 |
WIN7G01334 |
165003015800469 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary Road
Road Upgrading (unpaved to paved) along NRJ Bahbah-Talacogon By-Pass Road (S00465MN), Chainage 864 - Chainage 1115
Allocation : ₱ 5.800 Million
Physical Target : 0.502 lane km
|
April 27, 2017 |
2017 |
WIN7G01340 |
165003014200317 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Secondary Road
Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Road along NRJ Bahbah-Talacogon Road, K1298+191 - K1298+249.70, K1299+811 - K1299+865, K1299+965.0 - K1299+1086, K1301+088 - K1301+128.24
Allocation : ₱ 6.500 Million
Physical Target : 0.54688 lane km
|
April 27, 2017 |
2017 |
WIN7G01412 |
292003020403473 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Hamogaway Flood Control Phase II (Downstream) along Daang Maharlika (Agusan-Davao Section), K0000+000 - K0000+056, Bayugan, Agusan del Sur
Allocation : ₱ 5.000 Million
Physical Target : 56.00 lm.
|
April 27, 2017 |
2017 |
WIN7G01413 |
103004010313911 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
LIP-Buildings and Other Structures - Multipurpose/Facilities
Rehabilitation of Multi-Purpose Building, Poblacion, San Luis, Agusan del Sur
Allocation : ₱ 2.875 Million
Physical Target : 1.000 number of building
|
April 27, 2017 |
2017 |
WIN7G01426 |
292003020403474 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rechanneling of Afga River (Downstream) Phase I, Sibagat, Agusan del Sur, K0+000 - K0+130
Allocation : ₱ 5.120 Million
Physical Target : 130.000 lm
|
April 27, 2017 |
2017 |
WIN7G01431 |
165003015100340 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Network Development - Improvement/Widening of National Roads - Secondary Road
Improvement/Widening of National Roads along NRJ Awa - Lianga Road, Prosperidad, Agusan del Sur, K1291+-796 - K1291+-440
Allocation : ₱ 9.397 Million
Physical Target : 0.712 lane km
|
April 27, 2017 |
2017 |
WIN7G01425 |
292003020403475 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rechanneling of Afga River (Upstream) Phase I, Sibagat, Agusan del Sur, K0+130 - K0+330
Allocation : ₱ 5.120 Million
Physical Target : 200.000 lm
|
April 27, 2017 |
2017 |
WIN7G01430 |
292003020403476 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Crossing Luna Flood Control (K0+000 - K0+019.60), Esperanza, Agusan del Sur
Allocation : ₱ 5.000 Million
Physical Target : 19.600 lm
|
April 27, 2017 |
2017 |
WIN7G01428 |
165003014600268 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Tertiary Road
Construction of Road Slope Protection Structure along NRJ Bayugan - Calaitan - Tandag Road (K1277+019.43 - K1277+066.60)
Allocation : ₱ 9.915 Million
Physical Target : 518.870 sq. m.
|
April 27, 2017 |
2017 |
WIN7G01427 |
165003016900138 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Network Development - Off-Carriageway Improvement including drainage - Tertiary Road
Off-Carriageway Improvement including drainage along NRJ Bayugan - Esperanza Road, K1277+-640 - K1277+-210
Allocation : ₱ 3.141 Million
Physical Target : 1,841.750 sq. m.
|
April 27, 2017 |
2017 |
WIN7G01429 |
165003014600267 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Tertiary Road
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide along Agusan - Malaybalay Road, K1289+140 - K1289+169
Allocation : ₱ 6.111 Million
Physical Target : 319.000 sq. m.
|
April 26, 2017 |
2017 |
WIN7E01098 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 2nd District Engineering Office |
As per GAA:
MFO 1 : NATIONAL ROAD NETWORK SERVICES;
Network Development, Improvement/Widening of National Roads - Tertiary, Hanawan-Consocep Rd (S03503LZ),
K0470+-594 - K0471+700 (Road Widening)
Physical Target: 4.698 Lane km.
Unit Cost (P'000): Road Widening: P6,696.8923/Lane km
Allocation (P'000): Php 31,462
As MODIFIED:
MFO 1 : NATIONAL ROAD NETWORK SERVICES;
Network Development, Improvement/Widening of National Roads - Tertiary, Hanawan-Consocep Rd (S03503LZ),
K0470+-594 - K0470+230 (Road Widening/Construction of Drainage Structure along Road)
Physical Target: Road Widening: 1.648 Lane km.
Const. of Drainage Structure along Road: 1,648 Lm
Unit Cost (P'000): Road Widening: P10,080.97/Lane km
Const. of Drainage Structure along Road: P9.01/Lm
Est. Cost (P'000): Php 31,462 |
April 26, 2017 |
2017 |
WIN7E01029 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 2nd District Engineering Office |
As per GAA:
MFO-I National Road: Network Services: Network Development: Improvement / Widening of National Roads:Tertiary Roads: Naga City Bdry — Calabanga — Balongay Rd (S03506LZ) K0446+675-K0447+588, K0448+200-K0448+556 (Road Widening)
Physical Target: 2.538 Lane km.
Unit Cost (P'000): P14,856.58/Lane km
Allocation (P'000): Php 37,706
As MODIFIED:
MFO-I National Road: Network Services: Network Development: Improvement / Widening of National Roads:Tertiary Roads: Naga City Bdry — Calabanga — Balongay Rd (S03506LZ) K0446+740-K0447+669, K0448+200-K0448+280 (Road Widening)
Physical Target: 2.018 Lane km.
Unit Cost (P'000): P18,684.83/Lane km
Est. Cost (P'000): Php 37,706
|
April 26, 2017 |
2017 |
WIN7E01033 |
FY 2017 GAA RA 10924 |
December 29, 2017 |
Region V |
Camarines Sur 2nd District Engineering Office |
As per GAA:
Locally-Funded Projects: Local Infrastructure Program,
Buildings and Other Structures, Multipurpose Facilities, Construction of Evacuation Center/Covered Court, Brgy. Sta. Cruz Quipayo, Calabanga, Camarines Sur (Construction of Other Building)
Physical Target: 1 Bldg.
Unit Cost: P3.0M/Bldg.
Allocation: Php 3.0M
As MODIFIED:
Locally-Funded Projects: Local Infrastructure Program,
Buildings and Other Structures, Multipurpose Facilities, Construction of Multipurpose Building (Covered Court), Brgy. Sta. Cruz Quipayo, Calabanga, Camarines Sur (Construction of Other Building)
Physical Target: 1 Bldg.
Unit Cost: P3.0M/Bldg.
Estimated Cost: Php 3.0M
|
April 26, 2017 |
2017 |
WIN7E01034 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 4th District Engineering Office |
As per GAA:
Locally-Funded Projects: Local Infrastructure Program:
Buildings and Other Structures: Multi-Purpose / Facilities:
Construction of Multi-Purpose Hall (Covered Court), Brgy. La Purisima, Quipayo, Calabanga, Camarines Sur(Construction of Other Building)
Physical Target: 1 Bldg.
Unit Cost: P2M/Bldg.
Allocation: Php 2M
As MODIFIED:
Locally-Funded Projects: Local Infrastructure Program:
Buildings and Other Structures: Multi-Purpose / Facilities:
Construction of Multi-Purpose Building (Covered Court), Brgy. La Purisima, Quipayo, Calabanga, Camarines Sur(Construction of Other Building)
Physical Target: 1 Bldg.
Unit Cost: P2M/Bldg.
Estimated Cost: Php 2M |
April 26, 2017 |
2017 |
WIN7E01038 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 2nd District Engineering Office |
As per GAA:
Locally-Funded Projects: Local Infrastructure Program,
Buildings and Other Structures, Multipurpose Facilities, Construction of Covered Court, Brgy. San Isidro, Calabanga, Camarines Sur (Construction of Other Building)
Physical Target: -
Unit Cost: -
Allocation: Php 3.0M
As MODIFIED:
Locally-Funded Projects: Local Infrastructure Program,
Buildings and Other Structures, Multipurpose Facilities, Construction of Multipurpose Building (Evacuation Center), Brgy. San Isidro, Calabanga, Camarines Sur (Construction of Other Building)
Physical Target: 1 Building
Unit Cost: P3.0M/Building
Est. Cost: Php 3.0M
|
April 26, 2017 |
2017 |
WIN7E01382 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Aurora District Engineering Office |
Asset Preservation of National roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including Drainage based on PMS/HDM-4 - Tertiary - Rehabilitation of Concrete Road - A. Castaneda - Ma. Aurora - San Luis Road, K0224+(-663) - K0224+(-613.5), K0225+132 - K0225+223, K0225+543.50 - K0225+858 (S01523LZ) |
April 26, 2017 |
2017 |
WIN7E01381 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Aurora District Engineering Office |
Asset Preservation of National Roads - Rehab/Reconst/Upgrading of Damaged Paved National Roads including Drainage based on PMS/HDM-4 - Secondary - Nueva Ecija - Aurora Road, K0180+229 - K0180+319, K0181+289 - K0181+311, K0181+366 - K0181+466, K0181+796 - K0181+915, K0182+474 - K0182+492, K0183+127 - K0183+177, K0183+505 - K0183+595, K0189+239 - K0189+360, K0189+543 - K0189+593. K0190+467 - K0190+539, K0197+160 - K0197+400, K0198+215 - K0198+354, K0198+522 - K0198+717, K0200+000 - K0200+054, K0200+600 - K0200+900, K0201+055 - K0201+000, K0201+610 - K0201+624, K0201+645 - K0201+700, K0203+368 - K0203+400, K0203+584 - K0203+657, K0203+775 - K0203+890, K0204+490 - K0204+750, K0205+100 - K0205+250, K0205+550 - K0205+700, K0206+-167 - K0206+-038, K0206+000 - K0206+171, K0206+200 - K0206+530, K0206+671 - K0206+930, K0207+100 - K0207+218, K0208+030 - K0208+100, K0208+190 - K0208+235, K0208+840 - K0208+885, K0214+212 - K0214+909 (S01516LZ) |
April 26, 2017 |
2017 |
WIN7E01065 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Masbate 1st District Engineering Office |
As per GAA:
MFO-1 National Road Network Services: Network
Development — Off-Carriageway Improvement including Drainage: Secondary Roads: Off-carriageway Improvement : Shoulder Paving / Construction — M.R. Espinosa Airport Rd (S00024MT) Chainage 060-Chainage 287 (Off-Carriageway Improvement: Shoulder Paving / Construction)
Physical Target: 1,362 Sq.m.
Unit Cost (P'000): P7.19/sq.m.
Allocation (P'000): P9,786
As MODIFIED:
MFO-1 National Road Network Services: Network
Development — Off-Carriageway Improvement including Drainage: Secondary Roads: Off-carriageway Improvement : Shoulder Paving / Construction — M.R. Espinosa Airport Rd (S00024MT) Chainage 060-Chainage 287 (Off-Carriageway Improvement: Shoulder Paving / Construction)
Physical Target: 1,332 Sq.m.
Unit Cost (P'000): P7.35/sq.m.
Est. Cost (P'000): P9,786 |
April 26, 2017 |
2017 |
WIN7E01384 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Aurora District Engineering Office |
Network Development - Road Upgrading (unpaved to paved) - Secondary - Baler - Casiguran Road (Dinadiawan - Casiguran Section), K0307+802.61 - K0307+410.17, K0308+669 - K0308+709.33, K0319+425.62 - K0319+798.09 (S04736LZ) |
April 26, 2017 |
2017 |
WIN7E01076 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Masbate 1st District Engineering Office |
As per GAA:
MFO-1 National Road Network Services: Network
Development — Off-Carriageway Improvement including Drainage: Secondary Roads: Off-carriageway Improvement : Shoulder Paving / Construction —Jct
Milagros — Baleno — Lagta Rd (S00016MT) K0046+287-K0047+517 (Off-Carriageway Improvement: Shoulder Paving / Construction)
Physical Target: 7,416 sq.m.
Unit Cost: P6.41T/sq.m.
Allocation: P47.560M
As MODIFIED:
MFO-1 National Road Network Services: Network
Development — Off-Carriageway Improvement including Drainage: Secondary Roads: Off-carriageway Improvement : Shoulder Paving / Construction —Jct
Milagros — Baleno — Lagta Rd (S00016MT) K0046+287-K0047+517 (Off-Carriageway Improvement: Shoulder Paving / Construction)
Physical Target: 7,380.90 sq.m.
Unit Cost: P6.44T/sq.m.
Est. Cost: P47.560M
|
April 26, 2017 |
2017 |
WIN7E01072 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Masbate 1st District Engineering Office |
As per GAA:
MFO-I National Road Network Services: Network
Development — Off-Carriageway Improvement including Drainage: Secondary Roads: Off-Carriageway Improvement : Shoulder Paving/Construction - Jct Crossing - Mandaon Rd (S00037MT) K0046+818 - K0047+283, K0047+300 - K0048+349 (Off-carriageway Improvement/ Shoulder Paving / Construction)
Physical Target: 9,000 Sq.m.
Unit Cost: P5.28/sq.m.
Allocation: Php 47.560M
As MODIFIED:
MFO-I National Road Network Services: Network
Development — Off-Carriageway Improvement including Drainage: Secondary Roads: Off-Carriageway Improvement : Shoulder Paving/Construction - Jct Crossing - Mandaon Rd (S00037MT) K0046+818 - K0047+283, K0047+300 - K0048+349 (Off-carriageway Improvement/ Shoulder Paving / Construction)
Physical Target: 8,760 Sq.m.
Unit Cost: P5.43/sq.m.
Est. Cost: Php 47.560M |
April 26, 2017 |
2017 |
165003014300286 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Quirino District Engineering Office |
Asset Preservation of National Roads
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4)
Tertiary Roads: Jct Abbag-Guingin Bdry Rd - K0381+(-256) - K0381+(-174), K0381+(-174) - K0381+000
|
April 26, 2017 |
FY 2017 |
WIN7E01369 |
FY 2017 APPROVED MODIFICATION |
April 12, 2017 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: MFO 2: Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Chogong-Danas Flood Control, Kabayan, Benguet (Construction of Flood Mitigation Structure)
Physical Target = 85 Lm
To: MFO 2: Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Chogong-Danas Flood Control, Kabayan, Benguet (Construction of Flood Mitigation Structure)
Physical Target = 150 Lm
|
April 26, 2017 |
FY 2017 |
WIN7E01367 |
FY 2017 APPROVED MODIFICATION |
April 12, 2017 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: MFO 2: Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Kabayan Barrio Flood Control, Kabayan, Benguet (Construction of Flood Mitigation Structure)
To: MFO 2: Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Kabayan Barrio Flood Control, Kabayan, Benguet (Construction of Flood Mitigation Structure)
Physical Target = 445 Lm
|
April 26, 2017 |
FY 2017 |
WIN7E01368 |
FY 2017 APPROVED MODIFICATION |
April 12, 2017 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: MFO 2: Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Poblacion Flood Control, Kabayan, Benguet (Construction of Flood Mitigation Structure)
To: MFO 2: Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Poblacion Flood Control, Kabayan, Benguet (Construction of Flood Mitigation Structure)
Physical Target = 310 Lm
|
April 26, 2017 |
2017 |
WIN7E01383 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Aurora District Engineering Office |
Asset Preservation of National Roads - Rehab/Reconst. of National Roads with Slips, Slope Collapse and Landslide - Secondary - Nueva Ecija - Aurora Road, K0181+210 - K0181+286, K0181+380 - K0181+448, K0182+509 - K0182+521, K0182+530 - K0182+732, K0182+732 - K0182+753, K0182+944 - K0182+962, K0183+250 - K0183+400, K0183+530 - K0183+730. K0184+037 - K0184+187, K0185+012 - K0185+042, K0185+204 - K0185+240, K0185+393 - K0185+417, K0185+492 - K0185+543, K0185+702 - K0185+717, K0185+000 - K0186+000, K0186+705 - K0186+759, K0186+700 - K0186+900, K0186+914 - K0186+962, K0187+240 - K0187+306, K0187+362 - K0187+395, K0187+691 - K0187+736, K0187+880 - K0187+910, K0188+420 - K0188+477, K0188+570 - K0188+651, K0188+670 - K0188+730, K0188+815 - K0188+842, K0188+855 - K0188+918, K0188+1018 - K0188+1033, K0190+000 - K0190+150, K0191+-100 - K0191+100, K0199+300 - K0199+400, K0201+100 - K0202+000, K0202+700 - K0202+950 (S01516LZ) |
April 26, 2017 |
2017 |
WIN7E01380 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction / Improvement of Covered Court at Tabang Elementary School, Plaridel, Bulacan |
April 26, 2017 |
2017 |
WIN7E01386 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction of Multi-Purpose Building, Barangay Balite, Malolos, Bulacan |
April 26, 2017 |
2017 |
WIN7E01387 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction of Multi-Purpose Building, Banga 2nd High School, Plaridel, Bulacan |
April 26, 2017 |
2017 |
WIN7E01408 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction of Multi-Purpose Building (Covered Court), Tampok, Hagonoy, Bulacan |
April 26, 2017 |
2017 |
WIN7E01403 |
FY 2017 GAA |
January 2, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure along Angat River, Banga 2nd Section, Plaridel, Bulacan |
April 26, 2017 |
2017 |
WIN7E01405 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Asset Preservation of National Roads - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary - Old Cagayan Valley Rd (S04493LZ), K0050+390 - K0050+989 |
April 26, 2017 |
2017 |
WIN7E01385 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System / Highway Development Management - 4 (HDM-4) - Tertiary - Gen Alejo Santos Highway, K0054+800 - K0055+000, K0055+000 - K0056+000, K0056+000 - K0056+443 |
April 25, 2017 |
CY 2017 |
WIN7E01412 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally-Funded Projects
Local Infrastructure Project (LIP)
- Buildings and Other Structures
- Multi-purpose Facilities
Construction of Multi-Purpose Building,
Bagy. Ambil, Looc, Occidental Mindoro
1 bldg.
Php 1.00M |
April 25, 2017 |
CY 2017 |
WIN7E01414 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally-Funded Projects
Local Infrastructure Project (LIP)
- Buildings and other Structures
- Multi-Purpose Facilities
- Construction of Multi-Purpose Building
Brgy. Mulawin, Sta. Cruz, Occidental Mindoro
1 Bldg.
Php 1.00 M |
April 25, 2017 |
CY 2017 |
WIN7E01419 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally-Funded Projwcts
Local Infrastructure Project (LIP)
- Buildings and other Structures
- Multi-Purpose Facilities
Construction of Multi-Purpose Building
Brgy. Pawican, San Jose, Occidental Mindoro
1 Bldg.
Php 1.00 M |
April 25, 2017 |
CY 2017 |
WIN7E01411 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally-Funded Projects
Local Infrastructure Project (LIP)
- Buildings and Other Structures
- Multi-Purpose Facilities
Construction of Multi-Purpose Building
Brgy. Maligaya, Lubang, Occidental Mindoro
1 Bldg.
Php 1.00 M |
April 25, 2017 |
CY 2017 |
WIn7E01409 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally-Funded Projects
Local Infrastructure Project (LIP)
- Buildings and Other Structures
- Multi-Purpose Facilities
Construction of Multi-Purpose Building
Brgy. Bulacan, Looc, Occidental Mindoro
1 Bldg.
Php 1.00 M |
April 25, 2017 |
CY 2017 |
WIN7E01410 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally- Funded Projects
Local Infrastructure Project (LIP)
- Buildings and Other Structures
- Multi-Purpose Facilities
Construction of Multi-Purpose Building
Brgy. Balikyas, Looc, Occidental Mindoro
1 Bldg.
Php 1.00 M |
April 25, 2017 |
CY 2017 |
WIN7E01417 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally-Funded Projects
Local Infrastructure Project (LIP)
- Buildings and Other Structures
- Multi-Purpose Facilities
Construction of Multi-Purpose Building
Mamburao, Occidental Mindoro
1 Bldg.
Php 10.00 M |
April 25, 2017 |
CY 2017 |
WIN7E01292 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Construction of Missing Gaps connecting National
Roads, including ROW
Mindoro Island Circumferential Road,
Abra de Ilog - Puerto Galera
(Sta. 2+465 - Sta. 4+421.70)
L = 3.9134 lane-km
Php 150,000,000.00 |
April 25, 2017 |
CY 2017 |
WIN7E01281 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Improvement/Widening of National Roads
Secondary Road
Tablas Circumferential Road
K0110+503 - K0111+000,
K0112+000 - K0113+000,
K0113+500 - K0115+000,
K0107+020 - K0107+952,
K0107+966 - K0108+500,
K0116+234 - K0118+000
( Road Widening )
L = 12.442 lane km
Php 150,000,000.00 |
April 25, 2017 |
CY 2017 |
WIN7E01295 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Palawan 2nd District Engineering Office |
as MODIFID:
MF01 - National Road Network Services
- Network Development
- Road Upgrading ( Unpaved to Paved )
- Secondary Road
Culandanum - Panalingaan Cross-Country Road
Chainage 16442 - Chainage 18683
( Construction of Concrete Road )
L = 4.482 lane km
Php 87,000,000.00 |
April 25, 2017 |
2017 |
WIN7G01325 |
FY 2017 (R.A. 10924) |
April 7, 2017 |
Region IX |
Isabela City District Engineering Office |
Roads and Bridges - National Roads - Rehabilitation of Concrete Road along Basilan Circumferential Road (BCR), Isabela - Maluso Road, Isabela City
K13+800.00 - K15+152.50
Allocation: Php 40.00 Million
Physical Target: 2.56 lane km.
Unit Cost: Php 15,625,000.00/lane km. |
April 25, 2017 |
CY 2017 |
WIN7E01256 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF03 - Construction and Maintenance Services of Other
Infrastructures
- Construction/Improvement of Access Roads leading
to Declared Tourist Destinations
Coron Town Proper to Borac RORO Port
Km 5+577 - Km 10+366
L = 9.578 lane km
Php 200,000,000.00 |
April 25, 2017 |
CY 2017 |
WIN7E01284 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF03 - Construction and Maintenance of Other infrastructures
- Construction/improvement of Access Roads leading to
Seaports
- Little Caramay - TDC - Pandanan leading to
Proposed Port, San Vicente, Palawan
Sta. 14+000 - Sta. 17+750
L = 7.50 lane km
Php 200,00,000.00 |
April 25, 2017 |
2017 |
WIN7G01328 |
FY 2017 (R.A. 10924) |
April 7, 2017 |
Region IX |
Isabela City District Engineering Office |
Roads and Bridges - National Roads - Rehabilitation of Concrete Road along Basilan Circumferential Road (BCR), Isabela - Maluso Road, Isabela City
K9+000.00 - K10+280.00
Allocation: Php 40.00 Million
Physical Target: 2.56 lane km.
Unit Cost: Php 15,625,000.00/lane km. |
April 25, 2017 |
CY 2017 |
WIN7E01280 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF03 - Construction and Maintenance Services of Other
Structures
- Construction/Improvement of Access Roads leading
to Airports
- Brgy. Port Barton - Brgy. Kemdeng -
Brgy. Poblacion Access Road leading to
San Vicente Airport
( Sta. 10+100 - Sta. 12+821 )
L = 5.442 lane km
Php 131,000,000.00 |
April 25, 2017 |
CY 2017 |
WIN7E01283 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Palawan 1st District Engineering Office |
as MODIFIED:
MF03 - Construction and Maintenance Services of
Other Infrastructures
- Construction/Improvement of Access Roads
leading to Declared Tourism Destinations
Guadalupe - San Nicolas - Decabobo leading
to Borac RORO Port
( Sta. 16+820 - Sta. 18+044,
Sta. 24+918.40 - Sta. 25+528.58 )
L = 3.668 lane km
Php 92,308,000.00
|
April 25, 2017 |
2017 |
WIN7G01332 |
FY 2017 (R.A. 10924) |
April 7, 2017 |
Region IX |
Isabela City District Engineering Office |
Roads and Bridges - National Roads - Rehabilitation of Concrete Road along Basilan Circumferential Road (BCR), Isabela - Maluso Road, Isabela City
K5+150.00 - K6+430.00
Allocation: Php 40.00 Million
Physical Target: 2.56 lane km.
Unit Cost: Php 15,625,000.00/lane km. |
April 25, 2017 |
2017 |
WIN7G01295 |
FY 2017 (R.A. 10924) |
April 7, 2017 |
Region IX |
Zamboanga del Norte 2nd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities - Completion of Siocon Public Market, Poblacion, Siocon, Zamboanga del Norte
Allocation: Php 2.00 Million
Physical Target: 1.00 Project
Unit Cost: Php 2.00 M/Project |
April 25, 2017 |
2017 |
WIN7G01324 |
FY 2017 (R.A. 10924) |
April 7, 2017 |
Region IX |
Zamboanga del Norte 2nd District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary
Construction of Slope Protection along Liloy - Siocon Road, Gutalac, Zamboanga Del Norte
K2029+140 - K2029+240, K2029+390 - K2029+432, K2032+810 - K2032+850, K2033+405 - K2033+450, K2035+570 - K2035+605, K2035+700 - K2035+725, K2036+260 - K2036+315, K2036+450 - K2036+497, K2036+913 - K2036+967, K2037+170 - K2037+176, K2037+340 - K2037+379, K2037+379 - K2037+430, K2037+970 - K2037+1000, K2038+310 - K2038+341, K2038+660 - K2038+700, K2039+000 - K2039+030,
Allocation: Php 36,376 Million
Physical Target: 13,145 sq. m.
Unit Cost: Php 2,767.29/sq.m. |
April 25, 2017 |
CY 2017 |
WIN7E01247 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Palawan 1st District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Construction and Maintenance of Bridges along
National Roads
- Replacement of Bridges
( Temporary to Permanent )
- Replacement of Bridge
( Temporary to Permanent )
Petek - Petekan Br. ( B00049CR ) along
F.B. Reyes ( Busuanga - Coron ) Road
L = 225.14 sq.m.
Php 20,000,000.00 |
April 25, 2017 |
2017 |
WIN7E01231 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction of Barangay Road, Kalikid Sur, Cabanatuan City, Nueva Ecija |
April 25, 2017 |
2017 |
WIN7E01268 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction of Road, Brgy. North Poblacion, Gabaldon, Nueva Ecija
(Construction of Concrete Road)
|
April 25, 2017 |
2017 |
WIN7E01228 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction of Barangay Road, Sto. Niño, Cabanatuan City, Nueva Ecija
(Construction of Concrete Road) |
April 25, 2017 |
2017 |
WIN7E01332 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction of Road, Brgy. Siclong, Laur, Nueva Ecija
(Construction of Concrete Road) |
April 25, 2017 |
2017 |
WIN7E01318 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Concreting of Road, Brgy. Canantong, Laur, Nueva Ecija
(Construction of Concrete Road) |
April 25, 2017 |
2017 |
WIN7E01335 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction of Drainage, Brgy. San Josef Sur, Cabanatuan City, Nueva Ecija
(Construction of Drainage Structure along Road) |
April 25, 2017 |
2017 |
WIN7E01334 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction of Barangay Road, Bagong Sikat, Cabanatuan City, Nueva Ecija
(Construction of Concrete Road) |
April 25, 2017 |
2017 |
WIN7E01333 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction of Road, Brgy. Ariendo, Bongabon, Nueva Ecija
(Construction of Concrete Road) |
April 25, 2017 |
2017 |
WIN7E01330 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction of Road, Brgy. Sapang Buho, Palayan City, Nueva Ecija
(Construction of Concrete Road) |
April 25, 2017 |
2017 |
WIN7E01269 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Concreting of Road, Brgy. Sagana, Laur, Nueva Ecija
(Construction of Concrete Road) |
April 25, 2017 |
2017 |
WIN7E01227 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction of Drainage, Brgy. Sumacab Norte, Cabanatuan City, Nueva Ecija
(Construction of Drainage Structure along Road) |
April 24, 2017 |
CY 2017 |
WIN7EO1219 |
GAA Cy 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED :
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslides - Secondary Road
- Mindoro West Coastal Road
K0340+180-K0340+300
K0338+(-679)-K0338+(-576)
K0343+350-K0343+850
K0348+100-K0348+250
K0356+514-K0356+555
Php 49.50M
3,317 sq.m. |
April 24, 2017 |
CY 2017 |
WIN7E01222 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Construction and Maintenance of Bridges along National Roads
- Widening of Permanent Bridges from 1 to 2 Lanes
- Madayang-dang Bridge (B00171MR) along Jct. MWCR
(Labangan)-Murtha-Jct. Iriron Road
Php 24.00M
196.77 sq.m. |
April 24, 2017 |
CY 2017 |
WIN7E01220 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Asset Preservation of National Roads
- Construction/Upgrading/Rehabilitation of Drainage along
National Roads - Secondary Road
- Mindoro Oriental/Occidental East Coastal Road
K0218+390-K0221+304
(S00094MR)
(Construction of Drainage Structure along Road)
Php 30.740 M
L = 5,740 lm |
April 24, 2017 |
Cy 2017 |
WIN7E01217 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Construction/Maintenance of Flood Mitigation Structures and
Drainage System
- Construction of Amnay Flood Control (Ilvita Section),
Sablayan, Occidental Mindoro
Php 20.00M
L = 295 lm |
April 24, 2017 |
cy 2017 |
WINE01218 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Asset Preservation of National Roads
- Construction/Upgrading/Rehabilitation of Drainage along
National Roads - Tertiary Road
- Crossing MWCR (Pola) - Casague - Jct. Alacaak Rd
K0378+(-180) - K0378+191(R/S),
K0378+763 - K0379+887.44(B/S),
K0390+900 - K0391+440(B/S),
K0392+408 - K0392+540(L/S),
(S00163MR)
(Construction of Drainage Structure along Road)
Php 27,691,960.58
L = 3,831.88 lm |
April 24, 2017 |
CY 2017 |
WIN7E01221 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Construction and Maintenance of Flood Mitigation Structures and Drainage Systems
- Construction of Busuanga Flood Control
( San Jose Section ) , San Jose, Occidental Mindoro
( Construction of Flood Mitigation Structure )
Php 30.00M
L = 388 lm |
April 24, 2017 |
GAA FY 2017 |
WIN7G01439 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Construction of By-passes/Diversion Roads, including ROW
Construction/Rehabilitation of Concrete Road/Road Widening-Bypass Road at Jct. Davao City Diversion Road-Tigatto Road-Jct. Davao City Diversion Road Including RROW, Davao City (Site B) (Package 4)
TO: MFO 1 - National Road Network Services
Network Development - Construction of By-passes/Diversion Roads, including RROW
Construction/Widening/Improvement of Bypass Road at Jct. Davao City Diversion Road-Tigatto Road-Jct. Davao City Diversion Road Including RROW, Davao City (Site B) (Package 4)
ALLOCATION: Php 189.040 Million |
April 24, 2017 |
2017 |
WIN7E01019 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 1st District Engineering Office |
AS per GAA:
Locally-Funded Project: Local Infrastructure Program, Roads and Bridges, Local Roads, Construction of Local Road, Phase II, Pasacao, Camarines Sur (Construction of Concrete Road)
Physical target: 0.40Lane Km
Unit Cost (P'000): 10,000/Lane Km
Allocation (P'000): Php 4.0M
AS MODIFIED:
Locally-Funded Project: Local Infrastructure Program, Roads and Bridges, Local Roads, Construction of Local Road at Barangay Caranan, Pasacao, Camarines Sur (Construction of Concrete Road)
Physical target: 0.63 Lane Km
Unit Cost (P'000): P6,349.206/Lane Km
Estimated Cost (P'000): Php 4.0M |
April 24, 2017 |
2017 |
WIN7E01083 |
GAA 2017 RA 10924 |
December 29, 2016 |
Region V |
Masbate 1st District Engineering Office |
As per GAA:
MFO 1-National Road Network Services-Asset Preservation of National Roads-Construction/Upgrading/Rehabilitation of Drainage along National Roads -Secondary-Construction of Drainage Structure along Road - Jct Milagros-Baleno-Lagta Road- K0025+550-K0025+636, K0090+860-K0092+109 (S000016MT) [Construction of Drainage Structure along Road]
Physical Target: 1,259 lm
Unit Cost ('000): P11.91/lm
Allocation ('000): Php 15,000
As MODIFIED:
MFO 1-National Road Network Services-Asset Preservation of National Roads-Construction/Upgrading/Rehabilitation of Drainage along National Roads -Secondary-Construction of Drainage Structure along Road - Jct Milagros-Baleno-Lagta Road- K0025+550-K0025+636, K0090+860-K0091+750(S000016MT) [Construction of Drainage Structure along Road]
Physical Target: 936 lm
Unit Cost(P'000): P16.03/lm
Est. Cost (P'000): Php 15,000 |
April 24, 2017 |
2017 |
WIN7E01080 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Masbate 1st District Engineering Office |
As per GAA:
MFO 1-National Road Network Services - Asset Preservation of National Roads - rehabilitation/Reconstruction/Upgrading - Secondary - Reconstruction fro Concrete to Concrete - Jct Tawad-Balud Rd. - K0035+202-K0036+055, K0061+012-K0061+391 (S00023MT) [Construction of Concrete Road]
Physical Target: 2.514 Lane Km
Unit Cost (P'000): P15,400.16/Lane Km
Allocation (P'000): P38,716
As MODIFIED:
MFO 1-National Road Network Services - Asset Preservation of National Roads - rehabilitation/Reconstruction/Upgrading - Secondary - Reconstruction fro Concrete to Concrete - Jct Tawad-Balud Rd. - K0035+202-K0036+000, K0061+012-K0061+199 (S00023MT) [Construction of Concrete Road]
Physical Target: 2.020 Lane Km
Unit Cost (P'000): P19,166.34/Lane Km
Est. Cost (P'000): P38,716 |
April 24, 2017 |
2017 |
WIN7E01061 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Masbate 1st District Engineering Office |
As per GAA:
MFO 1- National Road Network Services: Network Development, Off - Carriageway Improvement including drainage, Secondary, Masbate-Cataingan-Placer Rd - K0003+967 - K0003+ 1316, K0004+593 - K0005+815 (S00005MT) (Shoulder Paving/Construction)
Physical Target: 7,710 Sq.m.
Unit Cost (P'000): P6.17/Sq.m.
Allocation (P'000): Php 47.560M
As MODIFIED:
MFO 1- National Road Network Services: Network Development, Off - Carriageway Improvement including drainage, Secondary, Masbate-Cataingan-Placer Rd - K0003+967 - K0003+ 1316, K0004+593 - K0005+815 (S00005MT) (Shoulder Paving/Construction)
Physical Target: 7,521 Sq.m.
Unit Cost (P'000): P6.32/Sq.m.
Est. Cost (P'000): Php 47.560M |
April 24, 2017 |
2017 |
WIN7E01296 |
GAA 2017 RA 10924 |
January 1, 2017 |
Region III |
Regional Office III |
Network Development - Road Upgrading (unpaved to paved) - Tertiary Rd - Bagac - Mariveles Road, K0177+500 - K0180+535.70, K0180+655.70 - K0182+126 (S01252LZ)
[Road Upgrading Gravel to Paved] |
April 24, 2017 |
2017 |
WIN7E01074 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Masbate 1st District Engineering Office |
AS per GAA:
MFO 1- National Road Network Services — Asset Preservation of National Roads — Rehabilitation/ Reconstruction of National Roads with Slips, Slope
Collapse and Landslide —Secondary- Construction of Road Slope Protection Structure —Jct. Milagros-Baleno-Lagta Road — K0077+360 - K0077+453, K0079+895 - K0079+951, K0079+958 - 0080+082, K0089+439 -K0089+952
(S00016MT)
Physical Target: 2,320 Sq.m.
Unit Cost (P'000): P7.76/sq.m.
Allocation (P'000): Php 18,000
AS MODIFIED:
MFO 1- National Road Network Services — Asset Preservation of National Roads — Rehabilitation/ Reconstruction of National Roads with Slips, Slope
Collapse and Landslide —Secondary- Construction of Road Slope Protection Structure —Jct. Milagros-Baleno-Lagta Road — K0077+360 - K0077+453, K0089+439 - K0089+952 (S00016MT)
Physical Target: 1,578.63 Sq.m.
Unit Cost (P'000): P11.40/sq.m.
Est. Cost (P'000): Php 18,000
|
April 24, 2017 |
2017 |
165003015400225 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Batanes District Engineering Office |
Network Development
Construction of Missing Gaps connecting National Roads, including ROW San Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Road, BatanesLone District
Sta.00+00-Sta.00+601
|
April 24, 2017 |
2017 |
165003015800418 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Batanes District Engineering Office |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis), Tertiary Roads: Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - (S00002ST) Chainage 0 - Chainage 099, K0007 + 427 - K0007 + 485, K0008 + 032 - K0008 + 171
|
April 24, 2017 |
2017 |
WIN7E01099 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Masbate 1st District Engineering Office |
As per GAA:
MFO I- National Road Network Services — Asset Preservation of National Roads — Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide — Secondary- Construction of Road Slope Protection Structure — Masbate-Milagros Road — K0002+(-078) - K0002+315, K0003+423-K0004+1063, K0008+120 - K0008+319, K0008+373 - K0008+583, K0008+559 - K0008+573, K0008+635 - K0008+740, K0008+945 - K0009+069 (S00015MT)
Physical Target: 17,742 Sq.m.
Unit Cost (P'000): P2.25/sq.m.
Allocation (P'000): Php 40,000
As MODIFIED:
MFO I- National Road Network Services — Asset Preservation of National Roads — Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide — Secondary- Construction of Road Slope Protection Structure — Masbate-Milagros Road — K0002+(-078) - K0002+324, K0008+635- K0008+740 (S00015MT)
Physical Target: 3,587.45 Sq.m.
Unit Cost (P'000): P11.15/sq.m.
Est. Cost (P'000): Php 40,000
|
April 24, 2017 |
2017 |
165003030700086 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Batanes District Engineering Office |
Construction/ Improvement of Access Roads leading to Seaports
Access Road leading to Mauyen Port, Batanes
Sta.00+000-Sta.00+212 |
April 24, 2017 |
2017 |
1650030307000085 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Batanes District Engineering Office |
Construction/ Improvement of Access Roads leading to Seaports
Access Road leading to Chavayan Port, Batanes
Sta.000+000Sta.000+211
|
April 24, 2017 |
2017 |
WIN7C01640 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 2nd District Engineering Office |
Network Development - Off-Carriageway Improvement Including Drainage - Primary Roads, N. Bacalso Avenue (Cebu South Road) K0009+-570 - K0009+687.410; K0015+496 - K0015+830; K0053+266 - K0054+391
Allocation - ₱ 49,358,000.00
Physical Target - 7,431.07 sq.m.
Unit Cost - ₱ 6,642.11/ Square meter |
April 24, 2017 |
FY 2017 |
WIN7E01393 |
UACS No. 292003020401920 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation and Drainage Systems: Construction of Flood Mitigation Facility – Rehabilitation/ Construction of Pumping Station at Escolta Floodgate, Manila City (Construction of Flood Mitigation Structure)
UACS No. 292003020401920
Physical Target/Cost
Original: -
Unit Cost (P’000): P50,000
Allocation Cost (P’000): P50,000
WIN7E01393
As Modified
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems: Rehabilitation/ Construction at Escolta Pumping Station and Construction of Riverwall, Estero dela Reina, Manila City (Construction of Revetment)
UACS No. 292003020401920
Modified: 84.80 lineal meters
Unit Cost: P589.623/lineal meters
Estimated Cost (P’000): P50,000
WIN7E01393
|
April 24, 2017 |
2017 |
WIN7C01633 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 2nd District Engineering Office |
Network Development Improvement/Widening of National Roads - Other Primary
Improvement/Widening of National Roads Primary Roads - Other Primary Roads K0026+380 - K0026+921, K0027+220 - K0027+429 Natalio Bacalso Avenue (Cebu South Road), San Fernando, Cebu
Allocation - ₱ 50,000,000.00
CW1 - ₱ 47,500,000.00
ROW - ₱ 2,500,000.00
Physical Target -
CW1 - 3.0 lane km
ROW - 1,167.91 sq. m
Unit Cost -
CW1 - ₱ 15.83 Million / Lane km.
ROW - ₱ 2,140.57 sq.m. |
April 24, 2017 |
2017 |
WIN7C01638 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 2nd District Engineering Office |
Network Development - Off-Carriageway Improvement Including Drainage - Tertiary Roads, Sibonga-Dumanjug Road, Sibonga, Cebu
K0058+-598 - K0059+198; K0060+955 - K0061+020; K0061+031 - K0061+793; K0062+017 - K00062+491; K0062+559 - K0062+604; K0062+636 - K0062+751
Allocation - ₱ 42,327,000.00
Physical Target - 4,694.00 sq.m
Unit Cost - ₱ 9,017.25/ square meter |
April 24, 2017 |
GAA FY 2017 |
WIN7G01441 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City 2nd District Engineering Office |
MODIFICATION:
FROM: Locally Funded Projects:
LIP - Buildings and Other Structures - Multipurpose/Facilities
Construction of Small Multipurpose Building, Binugao, Toril, Davao City
TO: Locally Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Construction of Small Multi-Purpose Building, Toril Proper, Toril District, Davao City
ALLOCATION: Php 2.000 Million
|
April 24, 2017 |
2017 |
WIN7E01077 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Masbate 1st District Engineering Office |
As per GAA:
MFO 1 - National Road Network Services - Asset Preservation of National Roads — Construction/ Upgrading/ Rehabilitation of Drainage along National Roads — Secondary — Masbate— Cataingan — Placer Road
K0001+027 - K0001+198, K0014+165 - K0015+406
(S00005MT) [Const. of Drainage Structure along Road]
Physical Target: 1,411 l.m.
Unit Cost (P'000): P5.67/l.m.
Allocation (P'000): Php 8,000
As MODIFIED:
MFO 1 - National Road Network Services - Asset Preservation of National Roads — Construction/ Upgrading/ Rehabilitation of Drainage along National Roads — Secondary — Masbate— Cataingan — Placer Road, K0001+027 - K0001+198, K0014+946 - K0015+406
(S00005MT) [Const. of Drainage Structure along Road]
Physical Target: 630 l.m.
Unit Cost (P'000): P12.70/l.m.
Est. Cost (P'000): Php 8,000
|
April 24, 2017 |
GAA FY 2017 |
WIN7G01422 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: MFO 2 - Flood/Management Services:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure - Rehabilitation of Tuganay, Libuganon and Mag Creek Protection Dikes, Matin-ao and Madagundong River Dikes, Braulio E. Dujali, Davao del Norte
TO: MFO 2 - Flood Management Services:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Tuganay, Libuganon and Mag Creek Protection Dikes, Matin-ao and Madagundong River Dikes, Braulio E. Dujali, Davao del Norte
ALLOCATION: Php 30.000 Million |
April 24, 2017 |
2017 |
WIN7E01062 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Masbate 1st District Engineering Office |
AS per GAA:
MFO 1- National Road Network Services: Development, Off-Carriageway Improvement including drainage, Secondary, Masbate-Milagros Rd - K0024+810 - K0026+307 (S00015MT) (Shoulder Paving/Construction)
Physical Target: 8,148 Sq.m.
Unit Cost (P'000): P5.84/sq.m.
Allocation (P'000): Php 47,558
AS MODIFIED:
MFO 1- National Road Network Services: Development, Off-Carriageway Improvement including drainage, Secondary, Masbate-Milagros Rd - K0024+850 - K0026+313 (S00015MT) (Shoulder Paving/Construction)
Physical Target: 7,944 Sq.m.
Unit Cost (P'000): P5.99/sq.m.
Est. Cost (P'000): Php 47,558
|
April 24, 2017 |
GAA FY 2017 |
WIN7G01434 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Locally Funded Projects
LIP - Roads and Bridges - Local Roads
Construction of Barangay Road from Datu Balong to Brgy. Dacudao (length 4.5 km), San Isidro, Davao del Norte
TO: Locally Funded Projects
LIP - Roads and Bridges - Local Roads
Construction of Barangay Road from Datu Balong to Brgy. Dacudao (length = 2.566 km), San Isidro, Davao del Norte
ALLOCATION: Php 53.000 Million |
April 24, 2017 |
2017 |
WIN7E01082 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Masbate 1st District Engineering Office |
As per GAA:
MFO 1- National Road Network Services - Asset Preservation of National Roads — Rehabilitation/ Reconstruction/Upgrading Secondary- Reconstruction from Asphalt to Concrete — Masbate — Milagros Road
K0006+709 - K0007+075, K0008+000 - K0008+ 120,
K0013+242 - K0014+000 (S00015MT)
Physical Target: 2.426 Lane km.
Unit Cost (P'000): P18,854.08/Lane km.
Allocation (P'000): 45,740
As MODIFIED:
MFO 1- National Road Network Services - Asset Preservation of National Roads — Rehabilitation/ Reconstruction/Upgrading Secondary- Reconstruction from Asphalt to Concrete — Masbate — Milagros Road
K0006+709 - K0007+075, K0008+000 - K0008+ 120,
K0013+518 - K0014+000 (S00015MT)
Physical Target: 1.874 Lane km.
Unit Cost (P'000): P24,407.68/Lane km.
Est. Cost (P'000): 45,740
|
April 24, 2017 |
GAA FY 2017 |
WIN7G01436 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: National Road Network Services:
Network Development - Improvement/Widening of National Roads - Secondary
Road Widening including Construction of Drainage Structure along Road - Tagum City Diversion Rd. including RROW - K1464+640 - K1462+690,
K1461+177.411 - K1461+640,
K1462+690 - K1462+705
TO: National Road Network Services
Network Development - Improvement/Widening of National Roads - Secondary
Improvement/Widening along Tagum City Diversion Rd. including RROW, Davao del Norte -
K1461+177.411 - K1461+640,
K1461+640 - K1462+690,
K1462+690 - K1462+705
ALLOCATION: Php 49.000 Million |
April 24, 2017 |
GAA FY 2017 |
WIN7G01437 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Locally Funded Projects
LIP - Flood Control and Drainage - Flood Control Structures/Facilities
Construction of Flood Control, Ising River Upstream, Davao del Norte
TO: Locally Funded Projects
LIP - Flood Control and Drainage - Flood Control Structures/Facilities
Construction of Flood Control, Ising River Upstream, including ROW, Davao del Norte
ALLOCATION: Php 10.000 Million
|
April 24, 2017 |
2017 |
WIN7E01079 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Masbate 1st District Engineering Office |
As per GAA:
Locally-Funded Projects Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy.
Jabuyoan, Aroroy, Masbate 2nd LD [Construction of Concrete Road]
Physical Target: 1.0 lane km
Unit Cost (P'000): P5,000/ln-km
Allocation (P'000): Php 5,000
As Modified:
Locally-Funded Projects Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy.
Jabuyoan, Aroroy, Masbate [Construction of Concrete Road]
Physical Target: 0.96 lane km
Unit Cost (P'000): P5,208.33/ln-km
Est. Cost (P'000): Php 5,000 |
April 24, 2017 |
GAA FY 2017 |
WIN7G01408 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao Occidental District Engineering Office |
MODIFICATION:
FROM: Locally Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Construction of Multi-Purpose Building of Lorenzo Manuel Malita, Davao Occidental
TO: Locally Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Construction of Multi-Purpose Building of Lorenzo Manuel Elementary School, Malita, Davao Occidental
ALLOCATION: Php 0.700 Million |
April 24, 2017 |
2017 |
WIN7E01066 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Masbate 1st District Engineering Office |
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Jct. National Road — Brgy. Pinamarbuhan, Mobo, Masbate 2nd LD [Construction of Concrete
Road]
Physical Target: 1.0 Lane km.
Unit Cost (P'000): P5,000/lane km
Allocation (P'000): Php 5,000
As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Jct. National Road — Brgy. Pinamarbuhan, Mobo, Masbate [Construction of Concrete
Road]
Physical Target: 0.560 Lane km.
Unit Cost (P'000): P8,928.57/lane km
Est. Cost (P'000): Php 5,000
|
April 24, 2017 |
GAA FY 2017 |
WIN7G01409 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao Occidental District Engineering Office |
MODIFICATION:
FROM: Locally Funded Projects
LIP - Building and Other Structures - Multipurpose/Facilities
Construction of Day Care Center in Kolagsing Elementary School, Kolagsing, Davao Occidental
TO: Locally Funded Projects
LIP - Building and Other Structures - Multipurpose/Facilities
Construction of Barangay Day Care Center Building, Colagsing, Sta. Maria, Davao Occidental
ALLOCATION: Php 0.700 Million |
April 24, 2017 |
GAA FY 2017 |
WIN7G01410 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao Occidental District Engineering Office |
MODIFICATION:
FROM: Locally Funded Projects
LIP - Flood Control and Drainage - Flood Control Structures/Facilities
Construction of Concrete Revetment in Kolagsing Elementary School, Kolagsing, Davao Occidental
TO: Locally Funded Projects
LIP - Flood Control and Drainage - Flood Control Structures/Facilities
Construction of Concrete Revetment, Colagsing Flood Control, Sta. Maria, Davao Occidental
ALLOCATION: Php 1.500 Million |