April 19, 2017 |
2017 |
WIN7C01496 |
FY 2017 (R.A. 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Roads and Bridges - Local Roads
Road Upgrading (Gravel to Concrete) from Junction National Highway leading to Calolot Mountain Resort, Tambulig, Zamboanga Del Sur
Sta. 00+000 - Sta. 00+535.35
Allocation: P 10.00 Million
Physical Target: 1.07 lane km.
Unit Cost: Php 9,345,794.39/lane km |
April 19, 2017 |
2017 |
WIN7G01024 |
FY 2017 (R.A 10924) |
March 16, 2017 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure (Revetment Wall) along Sibuguey River,
Sta. 00+(-002) - Sta. 00+384,
Barangay Paradise, Diplahan, Zamboanga Sibugay - Construction of Revetment
Allocation: Php 42.199 Million
Physical Target: 386.00 lineal meters
Unit Cost: Php 109,323.83/lm |
April 19, 2017 |
2017 |
WIN7C01497 |
FY 2017 (R.A. 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Network Development - Improvement/Widening of National Roads
Road Widening including Drainage along Sindangan - Siayan - Dumingag - Mahayag Road (S01449MN)
K1670+761 - K1671+760,
K1672+358.40 - K1672+749.62
Allocation: P 30.00 Million
Physical Target: 2.78 lane km.
Unit Cost: Php 10,791,366.91/lane km. |
April 19, 2017 |
2017 |
WIN7C01498 |
FY 2017 (R.A. 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Usugan River, Brgy. Tungawan, Tambulig, Zamboanga Del Sur
Sta. 0+000 - Sta. 0+324
Allocation: P 45.00 Million
Physical Target: 324 lm.
Unit Cost: Php 138,888.89/lm |
April 19, 2017 |
2017 |
WIN7C01503 |
FY 2017 (R.A. 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Construction /Maintenance of Flood Mitigation Structures and Drainage System
Construction of Salug Daku Flood Control, Barangay Tumapic, Mahayag, Zamboanga Del Sur
Sta. 0+000 - Sta. 0+328 R/S
Allocation: P 45.00 Million
Physical Target: 328 lm.
Unit Cost: Php 137,195.12 |
April 19, 2017 |
2017 |
WIN7C01499 |
FY 2017 (R.A. 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Dipolo River Control, Barangay Katipunan, Ramon Magsaysay, Zamboanga Del Sur
Sta. 00+000 - Sta. 00+120
Allocation: P 20.00 Million
Physical Target: 120 lm.
Unit Cost: Php 166,666.67/lm. |
April 19, 2017 |
2017 |
WIN7G01128 |
FY 2017 (R.A 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Road Upgrading (gravel to paved) including RROW of Ma. Cristina - Pob. Sibutad Road, Dapitan City and Municipality of Sibutad, Zamboanga del Norte,
Sta. 0+000 - Sta. 2+227
Allocation:
Php 50.00 Million (Total)
Php 49.00 Million (Road)
Php 1.00 Million (ROW Acquisition)
Physical Target:
4.454 lane km. (Road)
26,724 sq.m. (ROW Acquisition)
Unit Cost:
Php 11,001,347.10/lane km (Road)
Php 37.420/sq.m. (ROW Acquisition) |
April 19, 2017 |
2017 |
WIN7C01502 |
FY 2017 (R.A. 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 Lanes
Widening of Lantian Bridge (B01202MN) along Lanao - Pagadian - Zamboanga City Road
Allocation: P 22.500 Million
K1655+806 - k1655+831
Physical Target: 183 sq.m.
Unit Cost: Php 122,950.82/sq.m. |
April 19, 2017 |
2017 |
WIN7G01123 |
FY 2017 (R.A 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Roads and Bridges - Local Roads -
Construction of Dapitan Sunrise Bypass Road, (including RROW), Dapitan City, Zamboanga del Norte,
Sta. 0+224.20 - Sta. 1+165
Allocation:
Php 50.00 Million (Total)
Php 49.00 Million (Concrete Road)
Php 1.00 Million (ROW Acquisition)
Physical Target:
1.882 lane km (Concrete Road)
18,815 sq.m. (ROW Acquisition)
Unit Cost:
Php 26,036,131.77/lane km (Concrete Road)
Php 53.15/sq.m. (ROW Acquisition) |
April 19, 2017 |
2017 |
WIN7C01518 |
FY 2017 (R.A 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Network Development - Improvement/Widening of National Roads - Tertiary Roads -
Road Widening - Dipolog - Polanco - Piñan - Jct. Oroquieta Rd including RROW
K1814+680 - k1815+694.50
Allocation:
Php 43.860 Million (Total)
Php 42,982,800.00 (Road)
Php 877,200.00 (ROW Acquisition)
Physical Target:
2.029 lane km (Road)
12,174 sq.m. (ROW Acquisition)
Unit Cost:
Php 21,184,228.68/ lane km (Road)
Php 72.06/sq.m. (ROW Acquisition) |
April 19, 2017 |
2017 |
WIN7C01517 |
FY 2017 (R.A 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Roads and Bridges - Local Roads -
Construction/Rehabilitation of Concrete Road, Sunset boulevard, (including RROW), Dapitan City, Zamboanga del Norte,
Sta. 0+003.05 - Sta. 1+260
Allocation:
Php 50.00 Million (Total)
Php 49.00 Million (Concrete Road)
Php 1.00 Million (ROW Acquisition)
Physical Target:
2.514 lane km (Concrete Road)
6,089.50 sq.m. (ROW Acquisition)
Unit Cost:
Php 19,490,851.23/ lane km (Concrete Road)
Php 164.22/sq.m. (ROW Acquisition) |
April 19, 2017 |
2017 |
WIN7G01336 |
FY 2017 (R.A 10924) |
February 10, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary Roads -
Road Upgrading Gravel to Paved - Ilaya - Isis - Polanco Rd including ROW -
K1819+218 - K1820+100
Allocation:
Php 19.075 Million (Total)
Php 18,884,250.00 (Road)
Php 190,750.00 (ROW Acquisition)
Physical Target:
1.764 lane km (Road)
10,584.00 sq.m. (ROW Acquisition)
Unit Cost:
Php 10,705,357.14/lane km (Road)
Php 18.02/sq.m. (ROW Acquisition) |
April 19, 2017 |
2017 |
WIN7G01339 |
FY 2017 (R.A 10924) |
February 10, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Roads and Bridges - Local Roads -
Concreting of Road including RROW, Barangay Bagong Baguio, Segio Osmeña, Zamboanga del Norte
Sta. 5+000 - Sta. 6+636
Allocation:
Php 30.00 Million (Total)
Php 29,400,000.00 (Road)
Php 600,000.00 (ROW Acquisition)
Physical Target:
3.272 lane km (Road)
6,544 sq.m. (ROW Acquisition)
Unit Cost:
Php 8,985,330.07/lane km (Road)
Php 91.69/sq.m. (ROW Acquisition) |
April 19, 2017 |
2017 |
WIN7E01299 |
GAA FY 2017 |
January 2, 2017 |
Region III |
Nueva Ecija 1st District Engineering Office |
Roads and Bridges - Local Roads:
Rehabiliattion of Pasong-Inchik-Pura Road, Guimba-Pura, Section, Guimba, Nueva Ecija |
April 19, 2017 |
2017 |
WIN7G01341 |
FY 2017 (R.A 10924) |
February 10, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Network Development - Improvement/Widening of National Roads - Other Primary Roads -
Road Widening - Dipolog - Oroquieta National Road including RROW
K1808+914 - K1809+843
Allocation:
Php 32.09 Million (Total)
Php 31,448,200.00 (Road)
Php 641,800.00 (ROW Acquisition)
Physical Target:
1.858 lane km (Road)
11,148 sq.m. (ROW Acquisition)
Unit Cost:
Php 16,925,834.23/ lane km (Road)
Php 57.57/sq.m. (ROW Acquisition) |
April 19, 2017 |
2017 |
165003015100257 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 4th District Engineering Office |
MFO 1 : NATIONAL ROAD NETWORK SERVICES
Network Development
Improvement/Widening of National Roads
Secondary Roads
Cordon-Diffun Rd - K0317 + -105 - K0318 + 288, K0318 + 304 - K0318 + 372, K0318 + 380 - K0318 + 985, K0318 + 997 - K0318 + 1064
|
April 19, 2017 |
2017 |
WIN7G01337 |
FY 2017 (R.A 10924) |
February 10, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4) Project Analysis - Tertiary -
Road Upgrading Gravel to Paved including RROW Piñan - Mutia Rd -
K1833+940 - K1834+068,
K1834+320 - K1834+580,
K1838+340 - K1838+562,
K1823+115 - K1823+539
Allocation:
Php 43.403 Million (Total)
Php 42,968,970.00 (Road)
Php 434,030.00 (ROW Acquisition)
Physical Target:
2.068 lane km (Road)
13,128 sq.m. (ROW Acquisition)
Unit Cost:
Php 20,778,031.91/lane km (Road)
Php 33.06/sq.m. (ROW Acquisition) |
April 19, 2017 |
2017 |
WIN7G01283 |
FY 2017 (R.A. 10924) |
April 7, 2017 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities
Rehabilitation/Major Repair of Public Market Roofing at Brgy. Don Andres, Ipil, Zamboanga Sibugay
Allocation: P 2.00 Million
Physical Target: 1 no. of building
Unit Cost: P 2,000,000/no. of building |
April 19, 2017 |
GAA FY 2017 |
WIN7G00995 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Secondary
Widening (4 into 6 Lanes) of Davao City Diversion Road including Slope Protection and RROW, Davao City,
K1511+950 - K1512+207,
K1512+207 - K1512+286,
K1512+286 - K1512+356,
K1512+356 - K1512+530,
K1512+530 - K1512+600
TO: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Secondary
Widening (4 into 6 Lanes) of Davao City Diversion Road including Slope Protection and RROW, Brgy. Matina Crossing, Davao City 1st LD,
K1511+950 - K1512+207,
K1512+207 - K1512+286,
K1512+286 - K1512+356,
K1512+356 - K1512+530,
K1512+530 - K1512+600,
(S00013MN)
ALLOCATION: Php 133.907 Million |
April 19, 2017 |
2017 |
WIN7G01131 |
FY 2017 (R.A 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Roads and Bridges - Local Roads -
Construction of Road including RROW, Barangay Dampalan - Barangay San Isidro Road, Sergio Osmeña, Zamboanga del Norte
Sta. 7+880.6 - Sta. 9+120
Allocation:
Php 25.00 Million (Total)
Php 24,750,000.00 (Road)
Php 250,000.00 (ROW Acquisition)
Physical Target:
2.478 lane km. (Road)
14,872.80 sq.m. (ROW Acquisition)
Unit Cost:
Php 9,987,893.46/lane km (Road)
Php 16.81 sq.m. (ROW Acquisition) |
April 19, 2017 |
2017 |
WIN7G01279 |
FY 2017 (R.A. 10924) |
April 7, 2017 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building (Barangay Hall), Brgy. Malungon, Tungawan, Zamboanga Sibugay
Allocation: P 2.00 Million
Physical Target: 1 no. of building
Unit Cost: P 2,000,000/no. of building |
April 19, 2017 |
GAA FY 2017 |
WIN7G01106 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 3 - Construction and Maintenance Services of Other Infrastructures:
Construction/Improvement of Access Roads Leading to Airports, Seaports and Declared Tourism Destinations-to Declared Tourism Destinations
Construction of Concrete Road-Davao del Norte-Compostela Valley-Agusan Del Sur Road leading to Various Tourism Sites, San Isidro, Davao del Norte
TO: MFO 3 - Construction and Maintenance Services of Other Infrastructures:
Construction/Improvement of Access Roads Leading to Airports, Seaports and Declared Tourism Destinations-to Declared Tourism Destinations
Concreting of Davao del Norte-Compostela Valley-Agusan del Sur Road leading to Various Tourism Sites, San Isidro, Davao del Norte
ALLOCATION: Php 200.00 Million |
April 19, 2017 |
2017 |
WIN7G01278 |
FY 2017 (R.A. 10924) |
April 7, 2017 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building (Gymnasium) Phase II, Poblacion, Kabasalan, Zamboanga Sibugay
Allocation: P 5.00 Million
Physical Target: 1 no. of building
Unit Cost: P 5,000,000/no. of building
|
April 19, 2017 |
GAA FY 2017 |
WIN7G01107 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 3 - Construction and Maintenance Services of Other Infrastructures:
Construction/Improvement of Access Roads Leading to Airports, Seaports and Declared Tourism Destinations-to Declared Tourism Destinations
Construction of Concrete Road-Kapatagan-Tibolo Road leading to Cultural/Tribal Communities and School of Living Tradition, Tibolo, Sta. Cruz, Davao del Sur
TO: MFO 3 - Construction and Maintenance Services of Other Infrastructures:
Construction/Improvement of Access Roads Leading to Airports, Seaports and Declared Tourism Destinations-to Declared Tourism Destinations
Concreting of Kapatagan-Tibolo Road Leading to Cultural/Tribal Communities and School of Living Tradition, Tibolo, Sta. Cruz, Davao del Sur
ALLOCATION: Php 94.000 Million |
April 19, 2017 |
GAA FY 2017 |
WIN7G01125 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Construction of By-passes/Diversion Roads, Including ROW
Construction of Concrete Road - Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan) Including RROW, Tagum City, Davao del Norte
TO: MFO 1 - National Road Network Services
Network Development - Construction of By-passes/Diversion Roads, Including RROW
Construction/Improvement of Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan) Including RROW, Tagum City, Davao del Norte
ALLOCATION: Php 487.000 Million |
April 19, 2017 |
GAA FY 2017 |
WIN7G01178 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services:
Network Development - Construction of By-passes/Diversion Roads, including RROW
Concreting/Widening/Improvement of Bypass Road at Buhangin-Tigatto-Mandug-Callawa-Fatima Road Including Bridge and RROW, Davao City (Package 5)
TO: MFO 1 - National Road Network Services:
Network Development - Construction of By-passes/Diversion Roads, including RROW
Concreting/Widenig/Improvement of Bypass Road at Buhangin-Tigatto-Mandug-Callawa-Fatima Road Including RROW, Davao City 2nd LD (Package 5)
ALLOCATION: Php 237.804 Million
|
April 19, 2017 |
GAA FY 2017 |
WIN7G01315 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary
Construction of Concrete Road and Construction of Road Slope Protection Structure - Compostela-Cateel Rd (Davao Or Side),
K1570+378 - K1570+838
TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary
Rehabilitation/Reconstruction of National Road with Slope Collapse and Landslides including Road Upgrading (Gravel to Concrete) of Compostela-Cateel Road (Davao Oriental Side), Davao Oriental,
K1570+289 - K1570+899
ALLOCATION: Php 150.00 Million |
April 18, 2017 |
2017 |
WIN7C01544 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Secondary
Tagbilaran North Rd. (Tagbilaran-Jetafe Sect), S00030BH - K0028+838 - K0030+500, K0033+725 - K0033+775
Allocation - ₱ 49.90 Million
Physical Target - 3.428 lane km
Unit Cost - ₱ 14,556,592.77/ lane km. |
April 18, 2017 |
2017 |
WIN7C01543 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary
Slope Protection Structure at Jct. (TNR) Maribojoc-Antequera-Catagbacan (Loon) - K0022+247.40 - K0022+630
Allocation - ₱ 9.565 Million
- ₱ 9.0724 Million (CW1)
- ₱ 0.4926 Million (CW2)
Physical Target - Slope Protection - 2,708.62 square meters
- Paved Shoulder - 197.80 square meters
Unit Cost - Slope Protection - ₱ 3,349.45/ square meters
- Paved Shoulder - ₱ 2,490.39/ square meters |
April 18, 2017 |
2017 |
WIN7C01535 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Tertiary
Slope Protection Structure - Tagbilaran City-Corella-Sikatuna-Loboc Rd - K0013+950 - K0014+100, K0018+300 - K0018+500, K0018+850 - K0018+900
Allocation - ₱ 13.435 Million
₱ 6.903 Million (CW1)
₱ 6.532 Million (CW2)
Physical Target
- Slope Protection - 2,031.90 square meters
- Paved Shoulder - 1,528.00 square meters
Unit Cost
- Slope Protection - ₱ 3,397.31/square meters
- Paved Shoulder - ₱ 4,274.87/ square meters
|
April 18, 2017 |
2017 |
WIN7C01539 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Netwrok Development - Off-Carriageway Improvement including drainage - Tertiary
Off-Carriageway Improvement including drainage at Jct. (TNR) Maribojoc-Antequera-Catagbacan (Loon) K0012+000 - K0013+931
Allocation - ₱ 49.90 Million
Physical Target - 6,088 square meters
Unit Cost - ₱ 8,196.45/ square meter |
April 18, 2017 |
2017 |
WIN7C01540 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Seaports
Construction of Concrete Road - Access Road leading to Baclayon Port, Bohol
Allocation - ₱ 1.10 Million
Physical Target - 0.1335 lane km
Unit Cost - ₱ 8,239,700.38/ lane km |
April 18, 2017 |
2017 |
WIN7C01448 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu City District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control and Mitigation Structures along Lahug River, Brgy. Camputhaw, Cebu City
Allocation - ₱ 50 Million
Physical Target - 1,500 lm.
Unit Cost - ₱ 33,333/ lm |
April 18, 2017 |
2017 |
WIN7C01536 |
R.A 10924 |
January 14, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Locally-Funded Projects - Roads and Bridges - Local Roads
Construction of Taloto-Ubujan-Manga Coastal Road, Tagbilaran City, Bohol
Allocation - ₱ 17.0 Million
Physical Target - 2.564 lane km
Unit Cost - ₱ 6,630,265.21/ lane km |
April 18, 2017 |
2017 |
WIN7C01541 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - To Seaports
Access Roads leading to Catagbacan International Cruise Ship Port, Loon, Bohol
Allocation - ₱ 42.0 Million
Physical Target - 2.028 lane km
Unit Cost - ₱ 20,710,059.17/ lane km |
April 18, 2017 |
2017 |
WIN7C01542 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destination - To Seaports
Construction of Concrete Road - Access Road leading to Alburquerque Port, Bohol
Allocation - ₱ 4.0 Million
Physical Target - 0.316 lane km
Unit Cost - ₱ 12,658,227.85/ lane km |
April 18, 2017 |
2017 |
WIN7G01256 |
165003014400099 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Primary
Jct. Lingig-Trento Rd - K1476+663 - K1476+703, K1477+320.40 - K1477+350.40
Allocation - Php 8.129 Million
Physical Target - 572 square meters |
April 18, 2017 |
2017 |
WIN7G01255 |
165003014500268 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary
Surigao-Davao Coastal Rd - K1453+430 - K1453+456.20, K1453+706.80 - K1453+722.50, K1453+893 - K1453+930, K1465+384 - K1465+486, K1476+677.50 - K1476+891, K1478+643 - K1478+652, K1478+652 - K1478+673.30, K1478+673.30 - K1478+682.30, K1500+624.80 - K1500+654.80, K1506+311 - K1506+329
Allocation - Php 45.347 Million
Physical Target - 3,666.70 square meters |
April 18, 2017 |
2017 |
WIN7G01251 |
165003015300148 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
Network Development - Construction of Bypasses/Diversion Roads, including ROW
Tagongon-Sta. Maria-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road
Allocation:
- Php 50.00 Million (Total)
- Php 48.40 Million (Concrete Road)
- Php 1.60 Million (ROW Acquisition)
Physical Target:
- 2.682 lane km (Concrete Road)
- 16,050 square meters (ROW Acquisition) |
April 18, 2017 |
2017 |
WIN7G01261 |
165003017100079 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 Lanes
Pagmam-an Br. (B01755MN) along Jct. Lingig-Trento Rd
Allocation - Php 52.00 Million
Physical Target - 239 square meters |
April 18, 2017 |
2017 |
WIN7C01573 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads Including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Tertiary
Reconstruction from Asphalt to Concrete - Jct (TNR) Cortes-Balilihan-Catigbian-Macaas Rd - K0032+600 - K0033+000
Allocation - ₱ 12.50 Million
Physical Target - 0.800 lane km
Unit Cost - ₱ 15,625,000.00/ lane km |
April 18, 2017 |
2017 |
WIN7G01260 |
165003030800297 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Declared Tourism Destinations
NRJ-Cumawas-Tinuy-an Falls Road (Mone Bridge), Borboanan, Bislig City, Surigao del Sur 2nd LD
Allocation:
- Php 34.00 Million (Total)
- Php 7,022,942.89 (Concrete Road)
- Php 26,977,057.11 (Concrete Bridge)
Physical Target:
- 0.18 lane km (Concrete Road)
- 351.07 square meters (Concrete Bridge) |
April 18, 2017 |
2017 |
WIN7G01263 |
103004010314019 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-purpose Building, Brgy. Mangagoy, Bislig City, Surigao del Sur
Allocation - Php 2.00 Million
Physical Target - 1 Building |
April 18, 2017 |
2017 |
WIN7G01303 |
103004010314014 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Anibongan, Lingig, Surigao del Sur (Phase II)
Allocation - ₱ 1.50 Million
Physical Target - 1 Building |
April 18, 2017 |
2017 |
WIN7G01310 |
103004010314017 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Bogac, Lingig, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7G01308 |
103004010314018 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities:
Construction of Multi-Purpose Building, Bongan, Lingig, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7G01266 |
103004010314020 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Cabacungan, Barobo, Surigao del Sur (Phase II)
Allocation : ₱ 1.50 Million
Physical Target : 1 Building |
April 18, 2017 |
2017 |
WIN7G01302 |
103004010314021 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Campa, Hinatuan, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7C01595 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Secondary
Tagbilaran North Rd. (Tagbilaran-Jetafe Sect), S00030BH - K0024+120 - K0025+000, K0028+330 - K0028+393
Allocation - ₱ 31.494 Million
Physical Target - 1.845 lane km
Unit Cost - ₱ 17,069,918.70/ lane km |
April 18, 2017 |
FY 2017 |
WIN7E01309 |
UACS No.165003015300123 |
January 1, 2017 |
National Capital Region |
NCR - Regional Office |
As per GAA
MFO 1 – National Road Network Services – Network Development – Construction of By-Passes/ Diversion Roas, including ROW: Rehabilitation of Concrete Road – C-6 Napindan-ML Quezon Ave, Taguig (Rehabilitation of concrete road)
UACS No. 165003015300123
Physical Target/Cost
Original: Reconst. Raising of Grade = 13.880 lane-km
Road Widening = 9.720 lane-km
Allocation Cost (P‘000): Reconst. Raising of Grade = P177,198
Road Widening = P171,000
Unit Cost (P‘000): Reconst. Raising of Grade = P13,290/lane-km
Road Widening = P17,593/lane-km
WIN7E01309
Modified
MFO 1 – National Road Network Services – Network Development – Construction of By-Passes/Diversion Roads, including ROW: C-6, Napindan-ML Quezon Ave, Taguig, Sta. 0+000-Sta. 1+500 (Right Side); Sta. 1+340 – Sta. 4+140 (Left Side) Reconstruction: Raising of Grade/Road Widening)
UACS No. 165003015300123
Physical Target/Cost
Modified: Reconst Raising of Grade = 5.60 lane-km
Road widening: 3.00 lane-km
Estimate Cost: (P’000): Raising of Grade = P180,140
Road Widening = P168,058
Unit Cost (P’000): Reconst Raising of Grade = P32,168/lane-km
Road Widening = P56,019/lane-km
WIN7E01309
|
April 18, 2017 |
2017 |
WIN7C01551 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Network Development, Off-Carriageway Improvement including drainage - Secondary
Tagbilaran East Rd (Tagbilaran-Jagna), K0254+748-K0256+732, K0257±274-K0257+900
Allocation - ₱ 47.715 Million
Physical Target: 12,547.42 sq.m
Unit Cost (P): 3,802.77/sq.m. |
April 18, 2017 |
2017 |
WIN7G01265 |
103004010314022 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Cumawas, Bislig City, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building |
April 18, 2017 |
2017 |
WIN7G01269 |
103004010314023 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Guinhalinan Elementary School, Barobo, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building |
April 18, 2017 |
2017 |
WIN7C01549 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Asset Preservation of National Roads - Preventive Maintenance based on Pavement Management System/Highway Development and Management-4 (HDM-4) - Tertiary
Jct. (TER) Dauis-Panglao Road, S00020BH - Chainage 0-Chainage 505
Allocation - ₱ 3.531 Million
Physical Target - 1.515 lane km
Unit Cost - ₱ 2,330,693.00/ lane km |
April 18, 2017 |
2017 |
WIN7C01574 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Tertiary -
Construction of Road Slope Protection Structure Jct. (TNR) Cortes-Balilihan-Catigbian-Macaas Rd - K0014+350-K0014+650, K0015+060-K0015+260, K0015+580-K0015+710, K0042+250-K0042+450, K0047+580-K0047+950 Allocation: P27.345 Million (CW1); P2.655 Million (CW2)
Physical Target: Slope Protection = 6,631.60 sq.m.; Paved Shoulder: 800.00 sq.m
Unit Cost (P): Slope Protection = 4,123.44/sq.m.; Paved Shoulder = 3,318.75/sq.m. |
April 18, 2017 |
2017 |
WIN7G01296 |
103004010314024 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Handamayan, Lingig, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building |
April 18, 2017 |
2017 |
WIN7C01555 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Tertiary -
Slope Protection at Antequera-San Isidro-Libertad (Tubigon) Rd - K0024+000-K0024+400
Allocation - ₱ 10.00 Million
Physical Target: 1,873.03 sq.m.
Unit Cost (P): 5,338.94/sq.m. |
April 18, 2017 |
2017 |
WIN7C01593 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Locally-Funded Projects - Roads and Bridges - Local Roads
Concreting of Toledo Street, Dao-San Isidro, Tagbilaran City, Bohol
Allocation - ₱ 10.0 Million
Physical Target - 1.14 lane km
Unit Cost - ₱ 8,771,929.82/sq.m. |
April 18, 2017 |
2017 |
WIN7C01455 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations
Construciton/Improvement of Access Roads leading to Seaports and Declared Tourism Destinations - To Seaports - Concreting of B.M. Dimataga St. with Drainage Facilities, Lapu-Lapu City
Allocation - ₱ 7.844 Million (CW1)
- ₱ 11.568 Million (CW2)
Total Allocation - ₱ 19.412 Million
Physical Target - 1.401 lane km (CW1)
- 780.30 lineal meters (CW2)
Unit Cost - 5.599 Million/lane km (CW1)
- 14,825/lineal meters (CW2) |
April 18, 2017 |
2017 |
WIN7C01445 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Locally Funded Projects - LIP - Roads and Bridges - Local Roads
Roads and Bridges - Local Roads - Improvement/Rehabilitation of Panoypoy Barangay Road, Panoypoy, Consolacion, Cebu
Allocation - ₱ 13.000 Million
Physical Target: 2.636 lane Km
Unit Cost: P4.932 Million/lane km |
April 18, 2017 |
FY 2017 |
WIN7E01317 |
UACS No.103004010310289 |
January 1, 2017 |
National Capital Region |
South Manila District Engineering Office |
As per GAA
Locally Funded Projects – Buildings and Other Structures – Multi-Purpose/Facilities: Construction of Multipurpose Building, Kalayaan National High School, Pasay City (Construction)
UACS No. 103004010310289
Physical Target/Cost
Original: 1 building
Allocation Cost: P800,000.00
Unit Cost: P800,000.00/building
WIN7E01317
As Modified
Locally Funded Projects – Building and Other Structures – Multipurpose/Facilities: Repair/Rehabilitation/ Improvement of Multipurpose Building, Kalayaan National High School, Pasay City (Kalayaan Village, Merville, Pasay City) (Rehabilitation/Major Repair Multi-Purpose Building)
UACS No. 103004010310289
Modified: 1 building
Estimated Cost: P800,000.00
Unit Cost: P800,000.00/building
WIN7E01317
|
April 18, 2017 |
2017 |
WIN7C01434 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement of Flood Control Structure and Bridge Waterways along Mahiga Creek, Phase III, Mandaue City, Cebu
Allocation - ₱ 28.031 Million (CW1)
- ₱ 11.969 Million (CW2)
Physical Target - 120 l.m. (CW1)
- 18,563.80 cu.m. (CW2)
Unit Cost - ₱ 233,594/l.m. (CW1)
- ₱ 645/cu.m. (CW2) |
April 18, 2017 |
FY 2017 |
WIN7E01314 |
UACS No. 103004010310292 |
January 1, 2017 |
National Capital Region |
South Manila District Engineering Office |
As per GAA
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Construction of Multipurpose Building, Barangay 183 and its vicinity, Pasay City (Construction)
UACS No. 103004010310292
Physical Target/Cost
Original: 1 building
Allocation Cost (P’000): P1,500
Unit Cost (P’000): P1,500/building
WIN7E01314
As Modified
Locally Funded Projects – Buildings and Other Structures – Multipurpose Building, Barangay 183 and its vicinity, Pasay City. (Andrew Avenue) (Rehabilitation/Major Repair Multi-Purpose Building)
UACS No. 103004010310292
Physical Target/Cost
Modified: 1 building
Estimated Cost (P’000): P1,500
Unit Cost (P’000): P1,500/building
WIN7E01314
|
April 18, 2017 |
FY 2017 |
WIN7E01316 |
UACS No. 103004010310290 |
January 1, 2017 |
National Capital Region |
South Manila District Engineering Office |
As per GAA
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Construction of Multipurpose Building, T. Paez Elementary School, Pasay City (Construction)
UACS No. 103004010310290
Physical Target/Cost
Original: 1 building
Allocation Cost (P’000): P1,000
Unit Cost (P’000): P1,000/building
WIN7E01316
As Modified
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Repair/Rehab./ Improvement of T. Paez E/S, Pasay City Lone District. Apelo Cruz St., Malibay, Pasay City. (Rehabilitation/Major Repair Multi-Purpose Building)
UACS No. 103004010310290
Physical Target/Cost
Modified: 1 building
Estimated Cost (P’000): P1,000
Unit Cost (P’000): P1,000/Building
WIN7E01316
|
April 18, 2017 |
2017 |
WIN7C01446 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Locally Funded Projects - LIP - Buildings and Other Structures - Multipurpose/Facilities
Phase I Construction of Barangay Casuntingan Multipurpose Gym, Casuntingan, Mandaue City, Cebu
Allocation - ₱ 2.00 Million
Physical Target - 1 building
Unit Cost (P): 2 Million/building |
April 18, 2017 |
2017 |
WIN7C01452 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading - Secondary
Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on PMS/HDM-4 - Secondary Roads - Consolacion-Tayud-Liloan Rd (S00372CB), Chainage 950-Chainage 2823, Consolacion, Cebu
Allocation - ₱ 18.777 Million (CW1)
- ₱ 31.123 Million (CW2)
Physical Target - 1.606 lane Km (CW1)
- 1,748 lm (CW2)
Unit Cost - ₱ 11.692 Million/lane Km (CW1)
- ₱ 17,805/lm (CW2) |
April 18, 2017 |
2017 |
WIN7C01437 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Locally Funded Projects - LIP - Buildings and Other Structures - School Buildings
Construction of 3-Storey/6-Classroom Building at Casili Elementary School, Casili, Mandaue City, Cebu
Allocation - ₱ 9.000 Million
Physical Target - 3 storey; 6 classroom
Unit Cost - ₱ 9 Million/ 3 Storey, 6 classroom |
April 18, 2017 |
2017 |
WIN7C01450 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary
Construction/Upgrading/Rehabilitation of Drainage along National Roads - Cebu North Hagnaya Wharf Road (S00161CB), K0005+(-060) - K0005+986, Mandaue City
Allocation - ₱ 19.210 Million
Physical Target - 832.03 l.m.
Unit Cost - ₱ 23,088/l.m. |
April 18, 2017 |
2017 |
WIN7C01451 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations
Construction/Improvement of Access Roads leading to Seaports and Declared Tourism Destinations - to Seaports - Mandaue-Mactan Access Road, Lapu-Lapu City
Allocation - ₱ 1.945 Million (CW1)
- ₱ 3.055 Million (CW2)
Physical Target - 0.154 lane Km (CW1)
- 236.68 lm (CW2)
Unit Cost - ₱ 12.63/lane Km (CW1)
- ₱ 12,907/lm (CW2) |
April 18, 2017 |
2017 |
WIN7C01473 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Construction and Maintenance of Bridges along National Roads - Rehabilitation/Major Repair of Permanent Bridges
Rehabilitation/Major Repair of Permanent Bridge - Pilipog Br. 1 (B00580CB) along Mactan Circumferential Road, Pilipog, Cordova, Cebu
Allocation - ₱ 2.400 Million
Physical Target - 1 Bridge
Unit Cost - 2.40 Million/Bridge |
April 18, 2017 |
FY 2017 |
WIN7E01320 |
UACS No. 165004050306310 |
January 1, 2017 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA
Locally Funded Projects – Roads and Bridges – Local Roads: Construction/ Improvement of Slope Protection with Concreting Lourdes Street, Fatima Subdivision, Barangay Zapote, Las Piñas City
UACS No. 165004050306310
Physical Target/Cost
Original: 0.20 km
Unit Cost (P’000): P10,000/km
Allocation Cost (P’000): P2,000
WIN7E01320
As Modified
Locally Funded Projects – Roads and Bridges – Local Roads: Construction/ Improvement of Lourdes Street, Fatima Subdivision, Barangay Zapote, Las Piñas City (Construction of Concrete Road)
UACS No. 165004050306310
Modified: 0.360 lane km
Unit Cost (P’000): P5,556/lane km
Estimated Cost (P’000): P2,000
WIN7E01320
|
April 18, 2017 |
2017 |
WIN7C01472 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Asset Preservation of National Roads - Preventive Maintenance based on Pavement Management System/Highway Development and Management-4 (HDM-4) - Primary
Preventive Maintenance based on Pavement Management System/Highway Development Management-4 (HDM-4) - Primary Roads - Cebu North Hagnaya Wharf Road (S00286CB), K0008+358-K0008+953, Mandaue City
Allocation - ₱ 24.000 Million
Physical Target - 2.380 lane Km
Unit Cost - ₱ 10.126 Million/Lane Km |
April 18, 2017 |
2017 |
WIN7C01471 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Seaports
Construction/Improvement of Access Roads leading to Seaports and Declared Tourism Destinations - to Seaports - Angasil Causeway, Lapu-Lapu City
Allocation (P) - ₱ 3,448.75 Million (CW1)
- ₱ 6,647.23 Million (CW2)
- ₱ 9,904.02 Million (CW3)
Physical Target - 0.180 lane Km (CW1)
- 91.00 l.m. (CW2)
- 1,371.30 sq.m. (CW3)
Unit Cost - ₱ 19.16/lane Km (CW1)
- ₱ 73,046/l.m. (CW2)
- ₱ 7,222/sq.m. (CW3) |
April 18, 2017 |
2017 |
WIN7C01467 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Locally Funded Projects - LIP - Buildings and Other Structures - Multipurpose/Facilities
Phase III Construction of Cordova Municipal Hospital, Pilipog, Cordova, Cebu
Allocation - ₱ 10.723 Million
Physical Target - 1.0 Hospital
Unit Cost - ₱ 10.723Million/Hospital |
April 18, 2017 |
2017 |
WIN7C01416 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 1st District Engineering Office |
Locally Funded Projects (LIP) - Building and other Structures - Multipurpose/Facilities
Construction of Multipurpose Building in Brgy. Libjo, Tabogon, Cebu
Allocation - ₱ 2.0 Million
Physical Target - 1 Building
Unit Cost - ₱ 2.0 Million/ Building |
April 18, 2017 |
2017 |
WIN7C01424 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 1st District Engineering Office |
Locally Funded Projects (LIP) - Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building Brgy. Sambag, Tabogon, Cebu
Allocation - ₱ 3.00 Million
Physical Target - 1 Project
Unit Cost - ₱ 3.0 Million/Project |
April 18, 2017 |
2017 |
WIN7C01418 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 1st District Engineering Office |
Locally Funded Projects (LIP) - Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building Brgy. Labangon, Tabogon, Cebu
Allocation - ₱ 3.00 Million
Physical Target - 1 Project
Unit Cost - ₱ 3.0 Million/ Project |
April 18, 2017 |
2017 |
WIN7G01301 |
103004010314025 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Harip, Hinatuan, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7C01419 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 1st District Engineering Office |
Locally Funded Projects (LIP) - Buildings and Other Structures - Multipurpose/Facities
Construction of Multipurpose Building Brgy. Somosa, Tabogon, Cebu
Allocation - ₱ 4.00 Million
Physical Target - 1 Project
Unit Cost - ₱ 4.0 Million/ Project |
April 18, 2017 |
2017 |
WIN7C01420 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 1st District Engineering Office |
Locally Funded Projects (LIP) - Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building Brgy Canao-Canao, Tabogon, Cebu
Allocation - ₱ 3.00 Million
Physical Target - 1 Project
Unit Cost - ₱ 3.0 Million/Project |
April 18, 2017 |
2017 |
WIN7C01421 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 1st District Engineering Office |
Locally Funded Projects (LIP) - Water Management - Water Supply
Construction of Water System (Level III), Bantayan, Cebu
Allocation - ₱ 5.0 MIllion
Physical Target - 1 Water System
Unit Cost - ₱ 5.0 Million/ Water System |
April 18, 2017 |
2017 |
WIN7C01423 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 1st District Engineering Office |
Locally Funded Projects (LIP) - Building and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building (Covered Court) in Brgy. Hilotongan, Bantayan, Cebu
Allocation - ₱ 3.0 Million
Physical Target - 1 Building
Unit Cost - ₱ 3.0 Million/Building |
April 18, 2017 |
2017 |
WIN7G01252 |
103004010314026 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Hinagdanan, Tagbina, Surigao del Sur (Phase II)
Allocation : ₱ 1.50 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7C01415 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 1st District Engineering Office |
Locally Funded Projects (LIP) - Building and other Structures - Multipurpose/Facilities
Construction of Multipurpose Building in Brgy. Calambua, San Remegio, Cebu
Allocation - ₱ 4.0 Million
Physical Target - 1 Building
Unit Cost - 4.0 Million/Building |
April 18, 2017 |
2017 |
WIN7C01417 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 1st District Engineering Office |
Locally Funded Projects (LIP) - Building and other Structures - Multipurpose/ Facilities
Completion of Multipurpose Building in Brgy. Pandan, Bogo City, Cebu
Allocation - ₱ 2.0 Million
Physical Target - 1 Building
Unit Cost- ₱ 2.0 Million/Building |
April 18, 2017 |
2017 |
WIN7G01319 |
103004010314028 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Mahayahay, Lingig, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7C01422 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 1st District Engineering Office |
MFO 2 - Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control of Bangon Bridge (Downstream), Poblacion, Medellin, Cebu - Flood Mitigation Structure
Allocation - ₱ 20.0 Million
Physical Target - 344 Lineal Meters
Unit Cost - ₱ 58,140/ Lineal Meter |
April 18, 2017 |
2017 |
WIN7G01305 |
103004010314029 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Maligaya Elementary School, Hinatuan, Surigao del Sur
Allocation : ₱ 2.00 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7G01306 |
103004010314030 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Mansailao, Lingig, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building.
|
April 18, 2017 |
2017 |
WIN7G01304 |
103004010314031 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Palo Alto, Lingig, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7G01298 |
103004010314032 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Rajah Cabungsuan, Lingig, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7G01264 |
103004010314033 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Rizal, Barobo, Surigao del Sur (Phase II)
Allocation : ₱ 1.50 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7G01267 |
103004010314035 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, San Vicente II, Tagbina, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7G01254 |
103004010314036 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Sta. Cruz, Tagbina, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building |
April 18, 2017 |
2017 |
WIN7G01271 |
103004010314037 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Sua, Barobo, Surigao del Sur (Phase II)
Allocation : ₱ 0.50 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7G01253 |
103004010314038 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Trinidad, Tagbina, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7G01262 |
103004010314039 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Tumanan, Bislig City, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building |
April 18, 2017 |
2017 |
WIN7G01300 |
103004010314040 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Ugoban, Tagbina, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building |
April 18, 2017 |
2017 |
WIN7G01268 |
103004010314041 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Wakat, Barobo, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building |
April 17, 2017 |
2017 |
WIN7G01164 |
165003015800465 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Road Upgrading (Unpaved to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary
Road Upgrading (Unpaved to Paved) along Buenavista-Bunaguit Road, Buenavista, Agusan del Norte, K1269+265 - K1271+178
Allocation:
- Php 38.820 Million (Total)
- Php 38,650,392.71 (Concrete Road)
- Php 169,607.29 (ROW Acquisition)
Physical Target:
- 3.790 lane km (Concrete Road)
- 37,900.00 square meters (ROW Acquisition) |