Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
April 19, 2017 2017 WIN7C01496 FY 2017 (R.A. 10924) March 28, 2017 Region IX Zamboanga del Sur 1st District Engineering Office
Roads and Bridges - Local Roads
Road Upgrading (Gravel to Concrete) from Junction National Highway leading to Calolot Mountain Resort, Tambulig, Zamboanga Del Sur
Sta. 00+000 - Sta. 00+535.35
Allocation: P 10.00 Million
Physical Target: 1.07 lane km.
Unit Cost: Php 9,345,794.39/lane km
April 19, 2017 2017 WIN7G01024 FY 2017 (R.A 10924) March 16, 2017 Region IX Zamboanga Sibugay 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure (Revetment Wall) along Sibuguey River,
Sta. 00+(-002) - Sta. 00+384,
Barangay Paradise, Diplahan, Zamboanga Sibugay - Construction of Revetment
Allocation: Php 42.199 Million
Physical Target: 386.00 lineal meters
Unit Cost: Php 109,323.83/lm
April 19, 2017 2017 WIN7C01497 FY 2017 (R.A. 10924) March 28, 2017 Region IX Zamboanga del Sur 1st District Engineering Office
Network Development - Improvement/Widening of National Roads
Road Widening including Drainage along Sindangan - Siayan - Dumingag - Mahayag Road (S01449MN)
K1670+761 - K1671+760,
K1672+358.40 - K1672+749.62
Allocation: P 30.00 Million
Physical Target: 2.78 lane km.
Unit Cost: Php 10,791,366.91/lane km.
April 19, 2017 2017 WIN7C01498 FY 2017 (R.A. 10924) March 28, 2017 Region IX Zamboanga del Sur 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Usugan River, Brgy. Tungawan, Tambulig, Zamboanga Del Sur
Sta. 0+000 - Sta. 0+324
Allocation: P 45.00 Million
Physical Target: 324 lm.
Unit Cost: Php 138,888.89/lm
April 19, 2017 2017 WIN7C01503 FY 2017 (R.A. 10924) March 28, 2017 Region IX Zamboanga del Sur 1st District Engineering Office
Construction /Maintenance of Flood Mitigation Structures and Drainage System
Construction of Salug Daku Flood Control, Barangay Tumapic, Mahayag, Zamboanga Del Sur
Sta. 0+000 - Sta. 0+328 R/S
Allocation: P 45.00 Million
Physical Target: 328 lm.
Unit Cost: Php 137,195.12
April 19, 2017 2017 WIN7C01499 FY 2017 (R.A. 10924) March 28, 2017 Region IX Zamboanga del Sur 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Dipolo River Control, Barangay Katipunan, Ramon Magsaysay, Zamboanga Del Sur
Sta. 00+000 - Sta. 00+120
Allocation: P 20.00 Million
Physical Target: 120 lm.
Unit Cost: Php 166,666.67/lm.
April 19, 2017 2017 WIN7G01128 FY 2017 (R.A 10924) March 28, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Road Upgrading (gravel to paved) including RROW of Ma. Cristina - Pob. Sibutad Road, Dapitan City and Municipality of Sibutad, Zamboanga del Norte,
Sta. 0+000 - Sta. 2+227
Allocation:
Php 50.00 Million (Total)
Php 49.00 Million (Road)
Php 1.00 Million (ROW Acquisition)
Physical Target:
4.454 lane km. (Road)
26,724 sq.m. (ROW Acquisition)
Unit Cost:
Php 11,001,347.10/lane km (Road)
Php 37.420/sq.m. (ROW Acquisition)
April 19, 2017 2017 WIN7C01502 FY 2017 (R.A. 10924) March 28, 2017 Region IX Zamboanga del Sur 1st District Engineering Office
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 Lanes
Widening of Lantian Bridge (B01202MN) along Lanao - Pagadian - Zamboanga City Road
Allocation: P 22.500 Million
K1655+806 - k1655+831
Physical Target: 183 sq.m.
Unit Cost: Php 122,950.82/sq.m.
April 19, 2017 2017 WIN7G01123 FY 2017 (R.A 10924) March 28, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Roads and Bridges - Local Roads -
Construction of Dapitan Sunrise Bypass Road, (including RROW), Dapitan City, Zamboanga del Norte,
Sta. 0+224.20 - Sta. 1+165
Allocation:
Php 50.00 Million (Total)
Php 49.00 Million (Concrete Road)
Php 1.00 Million (ROW Acquisition)
Physical Target:
1.882 lane km (Concrete Road)
18,815 sq.m. (ROW Acquisition)
Unit Cost:
Php 26,036,131.77/lane km (Concrete Road)
Php 53.15/sq.m. (ROW Acquisition)
April 19, 2017 2017 WIN7C01518 FY 2017 (R.A 10924) March 28, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Network Development - Improvement/Widening of National Roads - Tertiary Roads -
Road Widening - Dipolog - Polanco - Piñan - Jct. Oroquieta Rd including RROW
K1814+680 - k1815+694.50
Allocation:
Php 43.860 Million (Total)
Php 42,982,800.00 (Road)
Php 877,200.00 (ROW Acquisition)
Physical Target:
2.029 lane km (Road)
12,174 sq.m. (ROW Acquisition)
Unit Cost:
Php 21,184,228.68/ lane km (Road)
Php 72.06/sq.m. (ROW Acquisition)
April 19, 2017 2017 WIN7C01517 FY 2017 (R.A 10924) March 28, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Roads and Bridges - Local Roads -
Construction/Rehabilitation of Concrete Road, Sunset boulevard, (including RROW), Dapitan City, Zamboanga del Norte,
Sta. 0+003.05 - Sta. 1+260
Allocation:
Php 50.00 Million (Total)
Php 49.00 Million (Concrete Road)
Php 1.00 Million (ROW Acquisition)
Physical Target:
2.514 lane km (Concrete Road)
6,089.50 sq.m. (ROW Acquisition)
Unit Cost:
Php 19,490,851.23/ lane km (Concrete Road)
Php 164.22/sq.m. (ROW Acquisition)
April 19, 2017 2017 WIN7G01336 FY 2017 (R.A 10924) February 10, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary Roads -
Road Upgrading Gravel to Paved - Ilaya - Isis - Polanco Rd including ROW -
K1819+218 - K1820+100
Allocation:
Php 19.075 Million (Total)
Php 18,884,250.00 (Road)
Php 190,750.00 (ROW Acquisition)
Physical Target:
1.764 lane km (Road)
10,584.00 sq.m. (ROW Acquisition)
Unit Cost:
Php 10,705,357.14/lane km (Road)
Php 18.02/sq.m. (ROW Acquisition)
April 19, 2017 2017 WIN7G01339 FY 2017 (R.A 10924) February 10, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Roads and Bridges - Local Roads -
Concreting of Road including RROW, Barangay Bagong Baguio, Segio Osmeña, Zamboanga del Norte
Sta. 5+000 - Sta. 6+636
Allocation:
Php 30.00 Million (Total)
Php 29,400,000.00 (Road)
Php 600,000.00 (ROW Acquisition)
Physical Target:
3.272 lane km (Road)
6,544 sq.m. (ROW Acquisition)
Unit Cost:
Php 8,985,330.07/lane km (Road)
Php 91.69/sq.m. (ROW Acquisition)
April 19, 2017 2017 WIN7E01299 GAA FY 2017 January 2, 2017 Region III Nueva Ecija 1st District Engineering Office
Roads and Bridges - Local Roads:

Rehabiliattion of Pasong-Inchik-Pura Road, Guimba-Pura, Section, Guimba, Nueva Ecija
April 19, 2017 2017 WIN7G01341 FY 2017 (R.A 10924) February 10, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Network Development - Improvement/Widening of National Roads - Other Primary Roads -
Road Widening - Dipolog - Oroquieta National Road including RROW
K1808+914 - K1809+843
Allocation:
Php 32.09 Million (Total)
Php 31,448,200.00 (Road)
Php 641,800.00 (ROW Acquisition)
Physical Target:
1.858 lane km (Road)
11,148 sq.m. (ROW Acquisition)
Unit Cost:
Php 16,925,834.23/ lane km (Road)
Php 57.57/sq.m. (ROW Acquisition)
April 19, 2017 2017 165003015100257 GAA FY 2017 January 1, 2017 Region II Isabela 4th District Engineering Office
MFO 1 : NATIONAL ROAD NETWORK SERVICES
Network Development
Improvement/Widening of National Roads
Secondary Roads
Cordon-Diffun Rd - K0317 + -105 - K0318 + 288, K0318 + 304 - K0318 + 372, K0318 + 380 - K0318 + 985, K0318 + 997 - K0318 + 1064
April 19, 2017 2017 WIN7G01337 FY 2017 (R.A 10924) February 10, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4) Project Analysis - Tertiary -
Road Upgrading Gravel to Paved including RROW Piñan - Mutia Rd -
K1833+940 - K1834+068,
K1834+320 - K1834+580,
K1838+340 - K1838+562,
K1823+115 - K1823+539
Allocation:
Php 43.403 Million (Total)
Php 42,968,970.00 (Road)
Php 434,030.00 (ROW Acquisition)
Physical Target:
2.068 lane km (Road)
13,128 sq.m. (ROW Acquisition)
Unit Cost:
Php 20,778,031.91/lane km (Road)
Php 33.06/sq.m. (ROW Acquisition)
April 19, 2017 2017 WIN7G01283 FY 2017 (R.A. 10924) April 7, 2017 Region IX Zamboanga Sibugay 2nd District Engineering Office
Buildings and Other Structures - Multipurpose/Facilities
Rehabilitation/Major Repair of Public Market Roofing at Brgy. Don Andres, Ipil, Zamboanga Sibugay
Allocation: P 2.00 Million
Physical Target: 1 no. of building
Unit Cost: P 2,000,000/no. of building
April 19, 2017 GAA FY 2017 WIN7G00995 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Secondary
Widening (4 into 6 Lanes) of Davao City Diversion Road including Slope Protection and RROW, Davao City,
K1511+950 - K1512+207,
K1512+207 - K1512+286,
K1512+286 - K1512+356,
K1512+356 - K1512+530,
K1512+530 - K1512+600

TO: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Secondary
Widening (4 into 6 Lanes) of Davao City Diversion Road including Slope Protection and RROW, Brgy. Matina Crossing, Davao City 1st LD,
K1511+950 - K1512+207,
K1512+207 - K1512+286,
K1512+286 - K1512+356,
K1512+356 - K1512+530,
K1512+530 - K1512+600,
(S00013MN)

ALLOCATION: Php 133.907 Million
April 19, 2017 2017 WIN7G01131 FY 2017 (R.A 10924) March 28, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Roads and Bridges - Local Roads -
Construction of Road including RROW, Barangay Dampalan - Barangay San Isidro Road, Sergio Osmeña, Zamboanga del Norte
Sta. 7+880.6 - Sta. 9+120
Allocation:
Php 25.00 Million (Total)
Php 24,750,000.00 (Road)
Php 250,000.00 (ROW Acquisition)
Physical Target:
2.478 lane km. (Road)
14,872.80 sq.m. (ROW Acquisition)
Unit Cost:
Php 9,987,893.46/lane km (Road)
Php 16.81 sq.m. (ROW Acquisition)
April 19, 2017 2017 WIN7G01279 FY 2017 (R.A. 10924) April 7, 2017 Region IX Zamboanga Sibugay 2nd District Engineering Office
Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building (Barangay Hall), Brgy. Malungon, Tungawan, Zamboanga Sibugay
Allocation: P 2.00 Million
Physical Target: 1 no. of building
Unit Cost: P 2,000,000/no. of building
April 19, 2017 GAA FY 2017 WIN7G01106 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 3 - Construction and Maintenance Services of Other Infrastructures:
Construction/Improvement of Access Roads Leading to Airports, Seaports and Declared Tourism Destinations-to Declared Tourism Destinations
Construction of Concrete Road-Davao del Norte-Compostela Valley-Agusan Del Sur Road leading to Various Tourism Sites, San Isidro, Davao del Norte

TO: MFO 3 - Construction and Maintenance Services of Other Infrastructures:
Construction/Improvement of Access Roads Leading to Airports, Seaports and Declared Tourism Destinations-to Declared Tourism Destinations
Concreting of Davao del Norte-Compostela Valley-Agusan del Sur Road leading to Various Tourism Sites, San Isidro, Davao del Norte

ALLOCATION: Php 200.00 Million
April 19, 2017 2017 WIN7G01278 FY 2017 (R.A. 10924) April 7, 2017 Region IX Zamboanga Sibugay 2nd District Engineering Office
Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building (Gymnasium) Phase II, Poblacion, Kabasalan, Zamboanga Sibugay
Allocation: P 5.00 Million
Physical Target: 1 no. of building
Unit Cost: P 5,000,000/no. of building
April 19, 2017 GAA FY 2017 WIN7G01107 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 3 - Construction and Maintenance Services of Other Infrastructures:
Construction/Improvement of Access Roads Leading to Airports, Seaports and Declared Tourism Destinations-to Declared Tourism Destinations
Construction of Concrete Road-Kapatagan-Tibolo Road leading to Cultural/Tribal Communities and School of Living Tradition, Tibolo, Sta. Cruz, Davao del Sur

TO: MFO 3 - Construction and Maintenance Services of Other Infrastructures:
Construction/Improvement of Access Roads Leading to Airports, Seaports and Declared Tourism Destinations-to Declared Tourism Destinations
Concreting of Kapatagan-Tibolo Road Leading to Cultural/Tribal Communities and School of Living Tradition, Tibolo, Sta. Cruz, Davao del Sur

ALLOCATION: Php 94.000 Million
April 19, 2017 GAA FY 2017 WIN7G01125 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Construction of By-passes/Diversion Roads, Including ROW
Construction of Concrete Road - Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan) Including RROW, Tagum City, Davao del Norte

TO: MFO 1 - National Road Network Services
Network Development - Construction of By-passes/Diversion Roads, Including RROW
Construction/Improvement of Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan) Including RROW, Tagum City, Davao del Norte

ALLOCATION: Php 487.000 Million
April 19, 2017 GAA FY 2017 WIN7G01178 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services:
Network Development - Construction of By-passes/Diversion Roads, including RROW
Concreting/Widening/Improvement of Bypass Road at Buhangin-Tigatto-Mandug-Callawa-Fatima Road Including Bridge and RROW, Davao City (Package 5)

TO: MFO 1 - National Road Network Services:
Network Development - Construction of By-passes/Diversion Roads, including RROW
Concreting/Widenig/Improvement of Bypass Road at Buhangin-Tigatto-Mandug-Callawa-Fatima Road Including RROW, Davao City 2nd LD (Package 5)

ALLOCATION: Php 237.804 Million
April 19, 2017 GAA FY 2017 WIN7G01315 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary
Construction of Concrete Road and Construction of Road Slope Protection Structure - Compostela-Cateel Rd (Davao Or Side),
K1570+378 - K1570+838

TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary
Rehabilitation/Reconstruction of National Road with Slope Collapse and Landslides including Road Upgrading (Gravel to Concrete) of Compostela-Cateel Road (Davao Oriental Side), Davao Oriental,
K1570+289 - K1570+899

ALLOCATION: Php 150.00 Million
April 18, 2017 2017 WIN7C01544 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Secondary

Tagbilaran North Rd. (Tagbilaran-Jetafe Sect), S00030BH - K0028+838 - K0030+500, K0033+725 - K0033+775

Allocation - ₱ 49.90 Million
Physical Target - 3.428 lane km
Unit Cost - ₱ 14,556,592.77/ lane km.
April 18, 2017 2017 WIN7C01543 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary

Slope Protection Structure at Jct. (TNR) Maribojoc-Antequera-Catagbacan (Loon) - K0022+247.40 - K0022+630

Allocation - ₱ 9.565 Million
- ₱ 9.0724 Million (CW1)
- ₱ 0.4926 Million (CW2)
Physical Target - Slope Protection - 2,708.62 square meters
- Paved Shoulder - 197.80 square meters
Unit Cost - Slope Protection - ₱ 3,349.45/ square meters
- Paved Shoulder - ₱ 2,490.39/ square meters
April 18, 2017 2017 WIN7C01535 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Tertiary

Slope Protection Structure - Tagbilaran City-Corella-Sikatuna-Loboc Rd - K0013+950 - K0014+100, K0018+300 - K0018+500, K0018+850 - K0018+900

Allocation - ₱ 13.435 Million
₱ 6.903 Million (CW1)
₱ 6.532 Million (CW2)
Physical Target
- Slope Protection - 2,031.90 square meters
- Paved Shoulder - 1,528.00 square meters
Unit Cost
- Slope Protection - ₱ 3,397.31/square meters
- Paved Shoulder - ₱ 4,274.87/ square meters
April 18, 2017 2017 WIN7C01539 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Netwrok Development - Off-Carriageway Improvement including drainage - Tertiary

Off-Carriageway Improvement including drainage at Jct. (TNR) Maribojoc-Antequera-Catagbacan (Loon) K0012+000 - K0013+931
Allocation - ₱ 49.90 Million
Physical Target - 6,088 square meters
Unit Cost - ₱ 8,196.45/ square meter
April 18, 2017 2017 WIN7C01540 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Seaports

Construction of Concrete Road - Access Road leading to Baclayon Port, Bohol

Allocation - ₱ 1.10 Million
Physical Target - 0.1335 lane km
Unit Cost - ₱ 8,239,700.38/ lane km
April 18, 2017 2017 WIN7C01448 R.A 10924 January 12, 2017 Region VII Cebu City District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control and Mitigation Structures along Lahug River, Brgy. Camputhaw, Cebu City
Allocation - ₱ 50 Million
Physical Target - 1,500 lm.
Unit Cost - ₱ 33,333/ lm
April 18, 2017 2017 WIN7C01536 R.A 10924 January 14, 2017 Region VII Bohol 1st District Engineering Office
Locally-Funded Projects - Roads and Bridges - Local Roads

Construction of Taloto-Ubujan-Manga Coastal Road, Tagbilaran City, Bohol

Allocation - ₱ 17.0 Million
Physical Target - 2.564 lane km
Unit Cost - ₱ 6,630,265.21/ lane km
April 18, 2017 2017 WIN7C01541 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - To Seaports

Access Roads leading to Catagbacan International Cruise Ship Port, Loon, Bohol

Allocation - ₱ 42.0 Million
Physical Target - 2.028 lane km
Unit Cost - ₱ 20,710,059.17/ lane km
April 18, 2017 2017 WIN7C01542 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destination - To Seaports

Construction of Concrete Road - Access Road leading to Alburquerque Port, Bohol

Allocation - ₱ 4.0 Million
Physical Target - 0.316 lane km
Unit Cost - ₱ 12,658,227.85/ lane km
April 18, 2017 2017 WIN7G01256 165003014400099 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Primary

Jct. Lingig-Trento Rd - K1476+663 - K1476+703, K1477+320.40 - K1477+350.40

Allocation - Php 8.129 Million

Physical Target - 572 square meters
April 18, 2017 2017 WIN7G01255 165003014500268 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary

Surigao-Davao Coastal Rd - K1453+430 - K1453+456.20, K1453+706.80 - K1453+722.50, K1453+893 - K1453+930, K1465+384 - K1465+486, K1476+677.50 - K1476+891, K1478+643 - K1478+652, K1478+652 - K1478+673.30, K1478+673.30 - K1478+682.30, K1500+624.80 - K1500+654.80, K1506+311 - K1506+329

Allocation - Php 45.347 Million

Physical Target - 3,666.70 square meters
April 18, 2017 2017 WIN7G01251 165003015300148 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
Network Development - Construction of Bypasses/Diversion Roads, including ROW

Tagongon-Sta. Maria-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road

Allocation:
- Php 50.00 Million (Total)
- Php 48.40 Million (Concrete Road)
- Php 1.60 Million (ROW Acquisition)

Physical Target:
- 2.682 lane km (Concrete Road)
- 16,050 square meters (ROW Acquisition)
April 18, 2017 2017 WIN7G01261 165003017100079 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 Lanes

Pagmam-an Br. (B01755MN) along Jct. Lingig-Trento Rd

Allocation - Php 52.00 Million

Physical Target - 239 square meters
April 18, 2017 2017 WIN7C01573 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads Including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Tertiary

Reconstruction from Asphalt to Concrete - Jct (TNR) Cortes-Balilihan-Catigbian-Macaas Rd - K0032+600 - K0033+000
Allocation - ₱ 12.50 Million
Physical Target - 0.800 lane km
Unit Cost - ₱ 15,625,000.00/ lane km
April 18, 2017 2017 WIN7G01260 165003030800297 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Declared Tourism Destinations

NRJ-Cumawas-Tinuy-an Falls Road (Mone Bridge), Borboanan, Bislig City, Surigao del Sur 2nd LD

Allocation:
- Php 34.00 Million (Total)
- Php 7,022,942.89 (Concrete Road)
- Php 26,977,057.11 (Concrete Bridge)

Physical Target:
- 0.18 lane km (Concrete Road)
- 351.07 square meters (Concrete Bridge)
April 18, 2017 2017 WIN7G01263 103004010314019 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-purpose Building, Brgy. Mangagoy, Bislig City, Surigao del Sur

Allocation - Php 2.00 Million

Physical Target - 1 Building
April 18, 2017 2017 WIN7G01303 103004010314014 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Anibongan, Lingig, Surigao del Sur (Phase II)

Allocation - ₱ 1.50 Million

Physical Target - 1 Building
April 18, 2017 2017 WIN7G01310 103004010314017 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Bogac, Lingig, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01308 103004010314018 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities:

Construction of Multi-Purpose Building, Bongan, Lingig, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01266 103004010314020 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Cabacungan, Barobo, Surigao del Sur (Phase II)

Allocation : ₱ 1.50 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01302 103004010314021 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Campa, Hinatuan, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7C01595 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Secondary

Tagbilaran North Rd. (Tagbilaran-Jetafe Sect), S00030BH - K0024+120 - K0025+000, K0028+330 - K0028+393

Allocation - ₱ 31.494 Million
Physical Target - 1.845 lane km
Unit Cost - ₱ 17,069,918.70/ lane km
April 18, 2017 FY 2017 WIN7E01309 UACS No.165003015300123 January 1, 2017 National Capital Region NCR - Regional Office
As per GAA
MFO 1 – National Road Network Services – Network Development – Construction of By-Passes/ Diversion Roas, including ROW: Rehabilitation of Concrete Road – C-6 Napindan-ML Quezon Ave, Taguig (Rehabilitation of concrete road)
UACS No. 165003015300123
Physical Target/Cost
Original: Reconst. Raising of Grade = 13.880 lane-km
Road Widening = 9.720 lane-km
Allocation Cost (P‘000): Reconst. Raising of Grade = P177,198
Road Widening = P171,000
Unit Cost (P‘000): Reconst. Raising of Grade = P13,290/lane-km
Road Widening = P17,593/lane-km
WIN7E01309

Modified
MFO 1 – National Road Network Services – Network Development – Construction of By-Passes/Diversion Roads, including ROW: C-6, Napindan-ML Quezon Ave, Taguig, Sta. 0+000-Sta. 1+500 (Right Side); Sta. 1+340 – Sta. 4+140 (Left Side) Reconstruction: Raising of Grade/Road Widening)
UACS No. 165003015300123
Physical Target/Cost
Modified: Reconst Raising of Grade = 5.60 lane-km
Road widening: 3.00 lane-km
Estimate Cost: (P’000): Raising of Grade = P180,140
Road Widening = P168,058
Unit Cost (P’000): Reconst Raising of Grade = P32,168/lane-km
Road Widening = P56,019/lane-km
WIN7E01309
April 18, 2017 2017 WIN7C01551 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Network Development, Off-Carriageway Improvement including drainage - Secondary
Tagbilaran East Rd (Tagbilaran-Jagna), K0254+748-K0256+732, K0257±274-K0257+900
Allocation - ₱ 47.715 Million
Physical Target: 12,547.42 sq.m
Unit Cost (P): 3,802.77/sq.m.
April 18, 2017 2017 WIN7G01265 103004010314022 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Cumawas, Bislig City, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01269 103004010314023 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Guinhalinan Elementary School, Barobo, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7C01549 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Asset Preservation of National Roads - Preventive Maintenance based on Pavement Management System/Highway Development and Management-4 (HDM-4) - Tertiary
Jct. (TER) Dauis-Panglao Road, S00020BH - Chainage 0-Chainage 505
Allocation - ₱ 3.531 Million
Physical Target - 1.515 lane km
Unit Cost - ₱ 2,330,693.00/ lane km
April 18, 2017 2017 WIN7C01574 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Tertiary -

Construction of Road Slope Protection Structure Jct. (TNR) Cortes-Balilihan-Catigbian-Macaas Rd - K0014+350-K0014+650, K0015+060-K0015+260, K0015+580-K0015+710, K0042+250-K0042+450, K0047+580-K0047+950 Allocation: P27.345 Million (CW1); P2.655 Million (CW2)
Physical Target: Slope Protection = 6,631.60 sq.m.; Paved Shoulder: 800.00 sq.m
Unit Cost (P): Slope Protection = 4,123.44/sq.m.; Paved Shoulder = 3,318.75/sq.m.
April 18, 2017 2017 WIN7G01296 103004010314024 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Handamayan, Lingig, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7C01555 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Tertiary -
Slope Protection at Antequera-San Isidro-Libertad (Tubigon) Rd - K0024+000-K0024+400
Allocation - ₱ 10.00 Million
Physical Target: 1,873.03 sq.m.
Unit Cost (P): 5,338.94/sq.m.
April 18, 2017 2017 WIN7C01593 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Locally-Funded Projects - Roads and Bridges - Local Roads
Concreting of Toledo Street, Dao-San Isidro, Tagbilaran City, Bohol
Allocation - ₱ 10.0 Million
Physical Target - 1.14 lane km
Unit Cost - ₱ 8,771,929.82/sq.m.
April 18, 2017 2017 WIN7C01455 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations

Construciton/Improvement of Access Roads leading to Seaports and Declared Tourism Destinations - To Seaports - Concreting of B.M. Dimataga St. with Drainage Facilities, Lapu-Lapu City

Allocation - ₱ 7.844 Million (CW1)
- ₱ 11.568 Million (CW2)
Total Allocation - ₱ 19.412 Million
Physical Target - 1.401 lane km (CW1)
- 780.30 lineal meters (CW2)
Unit Cost - 5.599 Million/lane km (CW1)
- 14,825/lineal meters (CW2)
April 18, 2017 2017 WIN7C01445 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Locally Funded Projects - LIP - Roads and Bridges - Local Roads

Roads and Bridges - Local Roads - Improvement/Rehabilitation of Panoypoy Barangay Road, Panoypoy, Consolacion, Cebu

Allocation - ₱ 13.000 Million
Physical Target: 2.636 lane Km
Unit Cost: P4.932 Million/lane km
April 18, 2017 FY 2017 WIN7E01317 UACS No.103004010310289 January 1, 2017 National Capital Region South Manila District Engineering Office
As per GAA
Locally Funded Projects – Buildings and Other Structures – Multi-Purpose/Facilities: Construction of Multipurpose Building, Kalayaan National High School, Pasay City (Construction)
UACS No. 103004010310289
Physical Target/Cost
Original: 1 building
Allocation Cost: P800,000.00
Unit Cost: P800,000.00/building
WIN7E01317

As Modified
Locally Funded Projects – Building and Other Structures – Multipurpose/Facilities: Repair/Rehabilitation/ Improvement of Multipurpose Building, Kalayaan National High School, Pasay City (Kalayaan Village, Merville, Pasay City) (Rehabilitation/Major Repair Multi-Purpose Building)
UACS No. 103004010310289
Modified: 1 building
Estimated Cost: P800,000.00
Unit Cost: P800,000.00/building
WIN7E01317
April 18, 2017 2017 WIN7C01434 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Improvement of Flood Control Structure and Bridge Waterways along Mahiga Creek, Phase III, Mandaue City, Cebu

Allocation - ₱ 28.031 Million (CW1)
- ₱ 11.969 Million (CW2)
Physical Target - 120 l.m. (CW1)
- 18,563.80 cu.m. (CW2)
Unit Cost - ₱ 233,594/l.m. (CW1)
- ₱ 645/cu.m. (CW2)
April 18, 2017 FY 2017 WIN7E01314 UACS No. 103004010310292 January 1, 2017 National Capital Region South Manila District Engineering Office
As per GAA
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Construction of Multipurpose Building, Barangay 183 and its vicinity, Pasay City (Construction)
UACS No. 103004010310292
Physical Target/Cost
Original: 1 building
Allocation Cost (P’000): P1,500
Unit Cost (P’000): P1,500/building
WIN7E01314

As Modified
Locally Funded Projects – Buildings and Other Structures – Multipurpose Building, Barangay 183 and its vicinity, Pasay City. (Andrew Avenue) (Rehabilitation/Major Repair Multi-Purpose Building)
UACS No. 103004010310292
Physical Target/Cost
Modified: 1 building
Estimated Cost (P’000): P1,500
Unit Cost (P’000): P1,500/building
WIN7E01314
April 18, 2017 FY 2017 WIN7E01316 UACS No. 103004010310290 January 1, 2017 National Capital Region South Manila District Engineering Office
As per GAA
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Construction of Multipurpose Building, T. Paez Elementary School, Pasay City (Construction)
UACS No. 103004010310290
Physical Target/Cost
Original: 1 building
Allocation Cost (P’000): P1,000
Unit Cost (P’000): P1,000/building
WIN7E01316

As Modified
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Repair/Rehab./ Improvement of T. Paez E/S, Pasay City Lone District. Apelo Cruz St., Malibay, Pasay City. (Rehabilitation/Major Repair Multi-Purpose Building)
UACS No. 103004010310290
Physical Target/Cost
Modified: 1 building
Estimated Cost (P’000): P1,000
Unit Cost (P’000): P1,000/Building
WIN7E01316
April 18, 2017 2017 WIN7C01446 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Locally Funded Projects - LIP - Buildings and Other Structures - Multipurpose/Facilities

Phase I Construction of Barangay Casuntingan Multipurpose Gym, Casuntingan, Mandaue City, Cebu

Allocation - ₱ 2.00 Million
Physical Target - 1 building
Unit Cost (P): 2 Million/building
April 18, 2017 2017 WIN7C01452 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading - Secondary

Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on PMS/HDM-4 - Secondary Roads - Consolacion-Tayud-Liloan Rd (S00372CB), Chainage 950-Chainage 2823, Consolacion, Cebu

Allocation - ₱ 18.777 Million (CW1)
- ₱ 31.123 Million (CW2)
Physical Target - 1.606 lane Km (CW1)
- 1,748 lm (CW2)
Unit Cost - ₱ 11.692 Million/lane Km (CW1)
- ₱ 17,805/lm (CW2)
April 18, 2017 2017 WIN7C01437 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Locally Funded Projects - LIP - Buildings and Other Structures - School Buildings

Construction of 3-Storey/6-Classroom Building at Casili Elementary School, Casili, Mandaue City, Cebu

Allocation - ₱ 9.000 Million
Physical Target - 3 storey; 6 classroom
Unit Cost - ₱ 9 Million/ 3 Storey, 6 classroom
April 18, 2017 2017 WIN7C01450 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary

Construction/Upgrading/Rehabilitation of Drainage along National Roads - Cebu North Hagnaya Wharf Road (S00161CB), K0005+(-060) - K0005+986, Mandaue City

Allocation - ₱ 19.210 Million
Physical Target - 832.03 l.m.
Unit Cost - ₱ 23,088/l.m.
April 18, 2017 2017 WIN7C01451 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations

Construction/Improvement of Access Roads leading to Seaports and Declared Tourism Destinations - to Seaports - Mandaue-Mactan Access Road, Lapu-Lapu City

Allocation - ₱ 1.945 Million (CW1)
- ₱ 3.055 Million (CW2)
Physical Target - 0.154 lane Km (CW1)
- 236.68 lm (CW2)
Unit Cost - ₱ 12.63/lane Km (CW1)
- ₱ 12,907/lm (CW2)
April 18, 2017 2017 WIN7C01473 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Construction and Maintenance of Bridges along National Roads - Rehabilitation/Major Repair of Permanent Bridges

Rehabilitation/Major Repair of Permanent Bridge - Pilipog Br. 1 (B00580CB) along Mactan Circumferential Road, Pilipog, Cordova, Cebu

Allocation - ₱ 2.400 Million
Physical Target - 1 Bridge
Unit Cost - 2.40 Million/Bridge
April 18, 2017 FY 2017 WIN7E01320 UACS No. 165004050306310 January 1, 2017 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA
Locally Funded Projects – Roads and Bridges – Local Roads: Construction/ Improvement of Slope Protection with Concreting Lourdes Street, Fatima Subdivision, Barangay Zapote, Las Piñas City
UACS No. 165004050306310
Physical Target/Cost
Original: 0.20 km
Unit Cost (P’000): P10,000/km
Allocation Cost (P’000): P2,000
WIN7E01320

As Modified
Locally Funded Projects – Roads and Bridges – Local Roads: Construction/ Improvement of Lourdes Street, Fatima Subdivision, Barangay Zapote, Las Piñas City (Construction of Concrete Road)
UACS No. 165004050306310
Modified: 0.360 lane km
Unit Cost (P’000): P5,556/lane km
Estimated Cost (P’000): P2,000
WIN7E01320
April 18, 2017 2017 WIN7C01472 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Asset Preservation of National Roads - Preventive Maintenance based on Pavement Management System/Highway Development and Management-4 (HDM-4) - Primary

Preventive Maintenance based on Pavement Management System/Highway Development Management-4 (HDM-4) - Primary Roads - Cebu North Hagnaya Wharf Road (S00286CB), K0008+358-K0008+953, Mandaue City

Allocation - ₱ 24.000 Million
Physical Target - 2.380 lane Km
Unit Cost - ₱ 10.126 Million/Lane Km
April 18, 2017 2017 WIN7C01471 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Seaports

Construction/Improvement of Access Roads leading to Seaports and Declared Tourism Destinations - to Seaports - Angasil Causeway, Lapu-Lapu City

Allocation (P) - ₱ 3,448.75 Million (CW1)
- ₱ 6,647.23 Million (CW2)
- ₱ 9,904.02 Million (CW3)
Physical Target - 0.180 lane Km (CW1)
- 91.00 l.m. (CW2)
- 1,371.30 sq.m. (CW3)
Unit Cost - ₱ 19.16/lane Km (CW1)
- ₱ 73,046/l.m. (CW2)
- ₱ 7,222/sq.m. (CW3)
April 18, 2017 2017 WIN7C01467 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Locally Funded Projects - LIP - Buildings and Other Structures - Multipurpose/Facilities

Phase III Construction of Cordova Municipal Hospital, Pilipog, Cordova, Cebu

Allocation - ₱ 10.723 Million
Physical Target - 1.0 Hospital
Unit Cost - ₱ 10.723Million/Hospital
April 18, 2017 2017 WIN7C01416 R.A 10924 January 12, 2017 Region VII Cebu 1st District Engineering Office
Locally Funded Projects (LIP) - Building and other Structures - Multipurpose/Facilities

Construction of Multipurpose Building in Brgy. Libjo, Tabogon, Cebu

Allocation - ₱ 2.0 Million
Physical Target - 1 Building
Unit Cost - ₱ 2.0 Million/ Building
April 18, 2017 2017 WIN7C01424 R.A 10924 January 12, 2017 Region VII Cebu 1st District Engineering Office
Locally Funded Projects (LIP) - Buildings and Other Structures - Multipurpose/Facilities

Construction of Multipurpose Building Brgy. Sambag, Tabogon, Cebu

Allocation - ₱ 3.00 Million
Physical Target - 1 Project
Unit Cost - ₱ 3.0 Million/Project
April 18, 2017 2017 WIN7C01418 R.A 10924 January 12, 2017 Region VII Cebu 1st District Engineering Office
Locally Funded Projects (LIP) - Buildings and Other Structures - Multipurpose/Facilities

Construction of Multipurpose Building Brgy. Labangon, Tabogon, Cebu

Allocation - ₱ 3.00 Million
Physical Target - 1 Project
Unit Cost - ₱ 3.0 Million/ Project
April 18, 2017 2017 WIN7G01301 103004010314025 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Harip, Hinatuan, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7C01419 R.A 10924 January 12, 2017 Region VII Cebu 1st District Engineering Office
Locally Funded Projects (LIP) - Buildings and Other Structures - Multipurpose/Facities

Construction of Multipurpose Building Brgy. Somosa, Tabogon, Cebu

Allocation - ₱ 4.00 Million
Physical Target - 1 Project
Unit Cost - ₱ 4.0 Million/ Project
April 18, 2017 2017 WIN7C01420 R.A 10924 January 12, 2017 Region VII Cebu 1st District Engineering Office
Locally Funded Projects (LIP) - Buildings and Other Structures - Multipurpose/Facilities

Construction of Multipurpose Building Brgy Canao-Canao, Tabogon, Cebu

Allocation - ₱ 3.00 Million
Physical Target - 1 Project
Unit Cost - ₱ 3.0 Million/Project
April 18, 2017 2017 WIN7C01421 R.A 10924 January 12, 2017 Region VII Cebu 1st District Engineering Office
Locally Funded Projects (LIP) - Water Management - Water Supply

Construction of Water System (Level III), Bantayan, Cebu

Allocation - ₱ 5.0 MIllion
Physical Target - 1 Water System
Unit Cost - ₱ 5.0 Million/ Water System
April 18, 2017 2017 WIN7C01423 R.A 10924 January 12, 2017 Region VII Cebu 1st District Engineering Office
Locally Funded Projects (LIP) - Building and Other Structures - Multipurpose/Facilities

Construction of Multipurpose Building (Covered Court) in Brgy. Hilotongan, Bantayan, Cebu

Allocation - ₱ 3.0 Million
Physical Target - 1 Building
Unit Cost - ₱ 3.0 Million/Building
April 18, 2017 2017 WIN7G01252 103004010314026 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Hinagdanan, Tagbina, Surigao del Sur (Phase II)

Allocation : ₱ 1.50 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7C01415 R.A 10924 January 12, 2017 Region VII Cebu 1st District Engineering Office
Locally Funded Projects (LIP) - Building and other Structures - Multipurpose/Facilities

Construction of Multipurpose Building in Brgy. Calambua, San Remegio, Cebu

Allocation - ₱ 4.0 Million
Physical Target - 1 Building
Unit Cost - 4.0 Million/Building
April 18, 2017 2017 WIN7C01417 R.A 10924 January 12, 2017 Region VII Cebu 1st District Engineering Office
Locally Funded Projects (LIP) - Building and other Structures - Multipurpose/ Facilities

Completion of Multipurpose Building in Brgy. Pandan, Bogo City, Cebu

Allocation - ₱ 2.0 Million
Physical Target - 1 Building
Unit Cost- ₱ 2.0 Million/Building
April 18, 2017 2017 WIN7G01319 103004010314028 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Mahayahay, Lingig, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7C01422 R.A 10924 January 12, 2017 Region VII Cebu 1st District Engineering Office
MFO 2 - Construction/Maintenance of Flood Mitigation Structures and Drainage System

Construction of Flood Control of Bangon Bridge (Downstream), Poblacion, Medellin, Cebu - Flood Mitigation Structure

Allocation - ₱ 20.0 Million
Physical Target - 344 Lineal Meters
Unit Cost - ₱ 58,140/ Lineal Meter
April 18, 2017 2017 WIN7G01305 103004010314029 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Maligaya Elementary School, Hinatuan, Surigao del Sur

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01306 103004010314030 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Mansailao, Lingig, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building.
April 18, 2017 2017 WIN7G01304 103004010314031 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Palo Alto, Lingig, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01298 103004010314032 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Rajah Cabungsuan, Lingig, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01264 103004010314033 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Rizal, Barobo, Surigao del Sur (Phase II)

Allocation : ₱ 1.50 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01267 103004010314035 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, San Vicente II, Tagbina, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01254 103004010314036 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Sta. Cruz, Tagbina, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01271 103004010314037 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Sua, Barobo, Surigao del Sur (Phase II)

Allocation : ₱ 0.50 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01253 103004010314038 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Trinidad, Tagbina, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01262 103004010314039 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Tumanan, Bislig City, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01300 103004010314040 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Ugoban, Tagbina, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01268 103004010314041 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Wakat, Barobo, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 17, 2017 2017 WIN7G01164 165003015800465 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Road Upgrading (Unpaved to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary

Road Upgrading (Unpaved to Paved) along Buenavista-Bunaguit Road, Buenavista, Agusan del Norte, K1269+265 - K1271+178

Allocation:
- Php 38.820 Million (Total)
- Php 38,650,392.71 (Concrete Road)
- Php 169,607.29 (ROW Acquisition)

Physical Target:
- 3.790 lane km (Concrete Road)
- 37,900.00 square meters (ROW Acquisition)

Pages