Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
April 5, 2017 2017 WIN7G00951 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Network Development - Improvement/Widening of National Roads - along N1: Road Widening including Drainage of National Roads along N1 of Lanao - Pagadian - Zamboanga City Road, Zamboanga Sibugay 2nd DEO, (S01113MN),
K1770+539.00 - K1773+295.87,
K1773+323.83 - K1775+094.29
Allocation:
Php 136.168 Million (Total)
Php 131,167,999.90 (Road Widening)
Php 5,000,000.00 (ROW Acquisition)
Physical Target:
9.054 lane km. (Road Widening)
16,666 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,487,298.42/lane km. (Road Widening)
Php 300.01/sq.m. (ROW Acquisition)
April 5, 2017 2017 WIN7G00928 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Road Upgrading (Unpaved to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Gravel to Paved) of Sindangan - Bayog - Lakewood Road, Zamboanga del Norte 1st DEO (S01059MN),
Chainage 15799 - Chainage 16899
(Sta. 1944+640 - Sta. 1945+740)
Allocation:
Php 120.00 Million (Total)
Php 119,532,198.60 (Road)
Php 467,801.37 (ROW Acquisition)
Physical Target:
2.20 lane km. (Road)
1,559.33 sq.m. (ROW Acquisition)
Unit Cost:
Php 54,332,817.55/lane km. (Road)
Php 300.00 sq.m. (ROW Acquisition)
April 5, 2017 2017 WIN7G00929 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Network Development - Asset Preservation of National Roads Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development and Management-4 (HDM-4) - Primary -
Upgrading (Asphalt to Concrete) including Drainage of Sindangan - Liloy Road, Zamboanga del Norte 2nd DEO, (S01142MN),
K1936+955.60 - K1937+779.11,
K1937+819.49 - K1938+030.02,
K1938+970.07 - K1941+015.65,
K1941+995.51 - K1943+485.54
Allocation:
Php 119.081 Million (Total)
Php 118,265,737.80 (Road Concreting)
Php 815,262.20 (ROW Acquisition)
Physical Target:
9.06 lane km. (Road Concreting)
2,717.54 sq.m. (ROW Acquisition)
Unit Cost:
Php 13,053,613.44/lane km. (Road Conreting)
Php 300/sq.m. (ROW Acquisition)
April 5, 2017 2017 WIN7G00965 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Network Development - Construction of By-Passes/Diversion Roads, including ROW:
Road Upgrading (Gravel to Paved) of Jct. Nat'l Highway Siocon - Jct. Nat'l Highway R.T. Lim, Poblacion Siocon - Brgy. Tagaytay Section, Zamboanga del Norte 2nd DEO,
Sect. 1: Sta. 0+000.00 - Sta. 3+279.38,
Sect. 2: Sta. 4+683.45 - Sta. 6+640.00
Allocation:
Php 150.000 Million (Total)
Php 147,954,500.40 (Road Concreting)
Php 2,045,499.60 (ROW Acquisition)
Physical Target:
10.472 lane km. (Road Concreting)
6,818 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,128,581.02/lane km. (Road Concreting)
Php 300.01 sq.m. (ROW Acquisition)
April 5, 2017 2017 WIN7G00938 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary -
Road Upgrading (Gravel to Paved) of Liloy – Siocon Road, Zamboanga del Norte 2nd DEO, (S01146MN)
K2029+550.00 – K2030+253.74,
K2030+386.83 – K2031+957.31,
K2032+367.31 – K2033+520.00,
Allocation:
Php 150.000 Million (Total)
Php 149,727,250.24 (Road Concreting)
Php 272,749.76 (ROW Acquisition)
Physical Target:
6.854 lane km (Road Concreting)
909.17 sq.m. (ROW Acquisition)
Unit Cost:
Php 21,845,236.39/lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition)
April 5, 2017 2017 WIN7G00906 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Labason River Control, Poblacion, Labason, Zamboanga del Norte 3rd LD,
Right Side - K0+000.00 - K0+441.32, K0+752.84 - K0+884.40,
Left Side - K0+540.00 - K0+878.28
Allocation:
Php 100.00 Million (Total)
Php 97,823,648.49 (Flood Mitigation Structure)
Php 2,176,351.51 (ROW Acquisition)
Physical Target:
911.16 lm (Flood Mitigation Structure)
7,254.50 sq.m. (ROW Acquisition)
Unit Cost:
Php 107,361.66/lm (Flood Mitigation Structure)
Php 300.00/sq.m. (ROW Acquisition)
April 5, 2017 2017 WIN7G00905 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of River Control along Kipit River, Brgy. Kipit, Labason, Zamboanga del Norte 3rd LD,
Upstream-Left Side - K0+270.00 - K0+785.00,
Downstream-Right Side - K0+000.00 - K0+400.00
Allocation:
Php 95.00 Million (Total)
Php 94,810,985.74 (Flood Mitigation Structure)
Php 189,014.26 (ROW Acquisition)
Physical Target:
915.00 lm (Flood Mitigation Structure)
630.05 sq.m. (ROW Acquisition)
Unit Cost:
Php 103,618.56/lm (Flood Mitigation Structure)
Php 300.00/sq.m. (ROW Acquisition)
April 5, 2017 2017 WIN7G00948 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Network Development - Improvement/Widening of National Roads - Other Primary Roads:
Road Widening including Drainage of Liloy - Ipil Road, Zamboanga del Norte, 2nd DEO, (S01153MN)
K1975+860 - K1978+860,
Allocation:
Php 89.711 Million (Total)
Php 87,994,572.86 (Road Widening)
Php 1,716,427.14 (ROW Acquisition)
Physical Target:
6.00 lane km. (Road Widening)
5,721.42 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,665,762.14/lane km. (Road Widening)
Php 300.00/sq.m. (ROW Acquisition)
April 5, 2017 2017 WIN7G00904 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Network Development - Improvement/Widening of National Roads - Secondary Road -
Improvements/Widening of National Roads of Zamboanga City - Labuan - Limpapa Rd., Zamboanga City 1st LD, (S01185MN)
K1957+427.00 - K1957+674.80,
K1957+750.00 - K1957+980.00,
K1964+400.00 - K1966+780.00
Allocation:
Php 71.73 Million (Total)
Php 69,395,311.78 (Road Widening)
Php 2,334,688.22 (ROW Acquisition)
Physical Target:
5.7156 lane kms. (Road Widening)
2,334.68 sq.m. (ROW Acquisition)
Unit Cost:
Php 12,141,387.04/lane km. (Road Widening)
Php 1,000.00/sq.m. (ROW Acquisition)
April 5, 2017 2017 WIN7G00945 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Network Development - Improvement/Widening of National Roads - Primary Roads:
Road Widening including Drainage of National Roads - N1 of Lanao - Pagadian - Zamboanga City Road, Zamboanga Sibugay 2nd DEO, (S01113MN),
K1775+158.78 - K1776+923.25,
K1776+950.55 - K1777+366.00
Allocation:
Php 63.832 Million (Total)
Php 58,911,369.76 (Road Widening)
Php 4,920,630.24 (ROW Acquisition)
Physical Target:
4.36 lane km. (Road Widening)
16,402 sq.m. (ROW Acquisition)
Unit Cost:
Php 13,511,782.06/ lane km. (Road Widening)
Php 300/sq.m. (ROW Acquisition)
April 5, 2017 GAA FY 2017 WIN7G01195 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City 2nd District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Tertiary
Road Widening - Davao-Cotabato Old Road including RROW -
K1526+(-)432 - K1526+301

TO: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Tertiary
Road Widening including Drainage and RROW at Davao-Cotabato Old Road, Toril District, Davao City
K1526+(-)432 - K1526+301

ALLOCATION: Php 33.00 Million
April 5, 2017 GAA FY 2017 WIN7G01196 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City 2nd District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary
Construction of Road Slope Protection Structure - Davao-Bukidnon Rd -
K1641+782 - K1641+792,
K1645+115 - K1645+135,
K1664+150 - K1664+190,
K1655+830 - K1655+850

TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary
Rehab./Reconstruction of National Roads with Slips, Slope Collapses and Landslide along Davao-Bukidnon Road -
K1641+890 - K1641+990(L/S),
K1645+090 - K1645+160(R/S),
K1645+120 - K1645+170(L/S),
K1655+890 - K1655+930(R/S),
K1664+130 - K1664+218(L/S)

ALLOCATION: Php 42.652 Million
April 5, 2017 GAA FY 2017 WIN7G01197 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City 2nd District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Tertiary
Off-Carriageway Improvement: Shoulder Paving/Construction - Bayabas-Eden Rd -
K1528+393 - K1530+295

TO: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Tertiary
Paving of Shoulder with Drainage Improvement at Bayabas-Eden Road, Toril District, Davao City
K1528+393 - K1530+280.715

ALLOCATION: Php 30.786 Million
April 5, 2017 GAA FY 2017 WIN7G01198 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City 2nd District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Tertiary
Road Widening - Bayabas-Eden Rd,
K1526+(-)368 - K1526+198

TO: MFO1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Tertiary
Road Widening including Drainage at Bayabas-Eden Road, Toril District, Davao City
K1526+(-)320 - K1526+035

ALLOCATION: Php 15.00 Million
April 4, 2017 FY 2017 WIN7E01120 FY 2017 APPROVED MODIFICATION March 16, 2017 Cordillera Administrative Region Benguet 2nd District Engineering Office
From : MFO 1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide along Gurel-Bokod-Kabayan-Buguias-Abatan Road. - K0351+970 - K0352+035, K0351+950 - K0352+055 [Construction of Slope Protection Structure] ; Physical Target = 2,565 sq.m.

To : MFO 1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide along Gurel-Bokod-Kabayan-Buguias-Abatan Road. - K0351+950 - K0352+363 [Construction of Slope Protection Structure] ; Physical Target = 4,706 sq.m.
April 4, 2017 FY 2017 WIN7E01121 FY 2017 APPROVED MODIFICATION March 16, 2017 Cordillera Administrative Region Benguet 2nd District Engineering Office
From : MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Datakan Flood Control, Datakan, Kapangan, Benguet [Construction of Flood Mitigation Structure] ; Physical Target = 500 lm

To : MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Datakan Flood Control, Datakan, Kapangan, Benguet [Construction of Flood Mitigation Structure] ; Physical Target = 406 lm
April 3, 2017 FY 2017 WIN7E01145 UACS No. 103004010310027 January 1, 2017 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As Per GAA
Locally-Funded Projects: Buildings and Other Structures: Multipurpose/Facilities: Construction of Multipurpose Building, (Police and Fire Station), and Other Improvements Ilaya, Las Piñas City
UACS No. 103004010310027
Physical Target/Cost (P’000):
Original: 1 bldg
Allocation (P’000): P4.000 M
Unit Cost (P’000): P 4,000/bldg..
Ref. No. WIN7E01145

As Modified
Locally-Funded Projects: Buildings/Other Structures: Multipurpose/Facilities: Completion of Multi-Purpose Building (Police and Fire Station) and Other Improvements Ilaya, Las Piñas City
UACS No. 103004010310027
Physical Target/Cost:
New: 1 bldg
Estimated Cost (P’000): P4.000 M
Unit Cost (P’000): P4,000/bldg.
Ref. No. WIN7E01145
April 3, 2017 FY 2017 WIN7E01143 UACS No. 103004010310029 January 1, 2017 National Capital Region Las Piñas - Muntinlupa District Engineering Office
Per GAA
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-purpose Building, Pulanglupa 2, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310029
Physical Target/Cost:
Original: 1 bldg
Unit Cost (P’000): P4,000.0
Allocation (P’000): P4,000.0
Ref. No. WIN7E01143

As Modified
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building at Doña Julita, Pulang Lupa 2, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310029
Physical Target/Cost:
New: 1 bldg
Unit Cost (P’000): P4,000.0
Estimated Cost : P4,000.0 M
Ref. No. WIN7E01143
April 3, 2017 FY 2017 WIN7E01134 UACS No. 103004010310031 January 1, 2017 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building (Covered Court), Talon 2, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310031
Physical Target/Cost:
Original: 1 Bldg.
Unit Cost (P’000): P4,000.0/Bldg
Allocation (P’000): P4,000.0
Ref. No. WIN7E01134

As Modified
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building at BF Phase 3, West Talon 2, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310031
Physical Target/Cost:
New: 1 bldg
Unit Cost (P’000): P4,000.0
Estimated Cost : P4,000.0 M
Ref. No. WIN7E01134
April 3, 2017 FY 2017 WIN7E01135 UACS No. 103004010310033 January 1, 2017 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building (Covered Court), Talon 5, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310033
Physical Target/Cost:
Original: 1 Bldg.
Unit Cost (P’000): P4,000.0/Bldg
Allocation (P’000): P4,000.0
Ref. No. WIN7E01135

As Modified
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building at Moonwalk Phase 2, Talon 5, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310033
Physical Target/Cost:
New: 1 bldg
Unit Cost (P’000): P4,000.0/Bldg.
Estimated Cost : P4,000.0 M
Ref. No. WIN7E01135
April 3, 2017 FY 2017 WIN7E01138 UACS No. 103004010309894 January 1, 2017 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building (Covered Court), Barangay Almanza Dos, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010309894
Physical Target/Cost:
Original: 1 Bldg
Unit Cost (P’000): P5,000/Bldg.
Estimated Cost : P5,000.0 M
Ref. No. WIN7E01138

As Modified
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building (Phase I), Barangay Almanza Dos, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010309894
Physical Target/Cost:
New: 1 Bldg
Unit Cost (P’000): P5,000/Bldg.
Estimated Cost : P5,000.0 M
Ref. No. WIN7E01138
April 3, 2017 2017 165003014100119 GAA FY 2017 January 1, 2017 Region II Isabela 1st District Engineering Office
MFO 1 : NATIONAL ROAD NETWORK SERVICES, Asset Preservation of National Roads, Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4) , SANTIAGO-TUGUEGARAO RD - K0 424+142 – K0424+670, K0425+000 - K0 425+721, K0 430+000 – K0 431+000, K0 431+298.4 - K0 431+ 348.4, K0 431+360 –K0431+400, K0 431+430 - K0 431+506, K0 431+520 - K0 431+ 542.50, K0 431+620 – K0 432+000, K0 432+240- K0 432+316, K0 432+379 – K0 432+430, K0 433+193.5- K0 433+260
April 3, 2017 2017 165003014700074 GAA FY 2017 January 1, 2017 Region II Isabela 1st District Engineering Office
Construction of Drainage Structure along Road-Daang Maharlika (LZ)- K0427+327-K0428+005 (R/S); K0427+327-K0427+617 (L/S)
April 3, 2017 2017 165003015100256 GAA FY 2017 January 1, 2017 Region II Isabela 1st District Engineering Office
MFO1: National Road Network Services, Network Development, Improvement/Widening of National Roads-Secondary, Road Widening and Reconstruction of Existing PCCP (thk. = 0.15m), Cabagan-Sta. Maria Road, K0452+282-K0452+400
April 3, 2017 2017 103004010310715 GAA FY 2017 January 1, 2017 Region II Isabela 1st District Engineering Office Completion of Multi-Purpose Building, Calinaoan Centro, Sto. Tomas, Isabela
March 31, 2017 2017 103004010310800 GAA FY 2017 January 1, 2017 Region II Nueva Vizcaya District Engineering Office
Locally Funded Project:
Local Infrastructure Program:
Buildings and Other Structures: Multipurpose/Facilities:
Construction of MultiPurpose Bldg., Ambaguio Central School, Ambaguio, Nueva Vizcaya
March 31, 2017 2017 WIN7E01102 GAA FY 2017 January 2, 2017 Region III Zambales 1st District Engineering Office
Asset Preservation of National Roads

Construction/Upgrading/Rehabilitation of Drainage along National Roads

Secondary Roads

Rehabilitation/Major Repair of Drainage Structure along Road - Olongapo - Bugallon Rd

K0181+563 - K0182+160
Cabangan, Zamabales

(Rehabilitation/Major Repair of Drainage Structure along Road)
March 31, 2017 2017 WIN7E01047 GAA FY 2017 January 2, 2017 Region III Zambales 1st District Engineering Office
Flood Control and Drainage

Drainage/Protection Works

Construction of Slope Protection/Flood Control at Sto. Niño River Dike,

Sta. 0+469 to Sta. 0+721
Cabangan, Zambales

(Construction of Slope Protection)
March 31, 2017 2017 WIN7E01104 GAA FY 2017 January 2, 2017 Region III Zambales 1st District Engineering Office
Roads and Bridges - Local Roads

Concreting of Namanaan Road located at San Narciso, Zambales

(Construction of Concrete Road)
March 31, 2017 2017 165003015200106 GAA FY 2017 January 1, 2017 Region II Cagayan 2nd District Engineering Office
Network Development - Improvement/Widening of National Roads - Tertiary – (Tuao-Rizal Section) K0530+(-1771)-K0531+499
March 31, 2017 2017 165003015800420 GAA FY 2017 January 1, 2017 Region II Cagayan 2nd District Engineering Office
MFO-1 National Road Network Services- Network Development - Road Upgrading (unpaved to paved) - Tertiary Road Upgrading Gravel to Paved- Ayaga-Sta. Marcela-Flora- Lasam Rd. K0670 +(-806) – K0670+311,K0670+314-K0671 + 047, Chainage 1292-Chainage 2368, Chainage 2388- Chainage 3472
March 31, 2017 2017 165003030800329 GAA FY 2017 January 1, 2017 Region II Cagayan 2nd District Engineering Office
Construction/ Improvement of Access Roads Leading to Declared Tourism Destination - Our Lady of Piat Diversion Road including Bridge and Approaches, Piat, Cagayan
March 31, 2017 2017 103004010310681 GAA FY 2017 January 1, 2017 Region II Cagayan 2nd District Engineering Office
Locally Funded Projects: Local Infrastructure Program: Buildings and Other Structures, Multipurpose Facilities, Construction/Completion of Multi-Purpose Building, Bilibigao, Claveria, Cagayan
March 31, 2017 GAA FY 2017 WIN7G00977 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao Occidental District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services: Network Development -
Off-Carriageway Improvement including drainage - Tertiary
Demoloc-Little Baguio-Alabel Road, Malita, Davao Occidental Lone District -
K1639+200 - K1639+621,
K1639+621 - K1642+442

TO: MFO 1 - National Road Network Services: Network Development -
Off-Carriageway Improvement including drainage -Tertiary
Demoloc Little Baguio-Alabel Road, Malita, Davao Occidental Lone District -
K1639+200 - K1639+621,
K1639+621 - K1642+280, (S00203MN)

ALLOCATION: Php 46.827 Million
March 31, 2017 GAA FY 2017 WIN7G00979 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao Occidental District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services:
Network Development - Road Upgrading (unpaved to paved) - Tertiary
Road Upgrading (Gravel to Concrete) of Demoloc-Little Baguio-Alabel Rd including RROW -
K1658+700 - K1660+347,
K1660+742 - K1662+000

TO: FROM: MFO 1 - National Road Network Services:
Network Development - Road Upgrading (unpaved to paved) - Tertiary
Road Upgrading (Gravel to Concrete) of Demoloc-Little Baguio-Alabel Road including RROW (Demoloc Section), Davao Occidental Lone District -
K1658+700 - K1660+347,
K1660+742 - K1661+372, (S00203MN)

ALLOCATION: Php 99.770 Million
March 31, 2017 GAA FY 2017 WIN7G00980 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao Occidental District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW -
Construction of Gravel Road - Demoloc-Little Baguio-Alabel Road including ROW, Davao Occidental

TO: MFO 1- National Road Network Services:
Network Development - Construction of Missing Gaps connecting National Roads, including RROW -
Demoloc-Little Baguio-Alabel Road including RROW, Malita, Davao Occidental Lone District


ALLOCATION: Php 49.90 Miliion
March 31, 2017 GAA FY 2017 WIN7G00981 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao Occidental District Engineering Office
MODIFICATION:

FROM: MFO 1- National Road Network Services: Network Development - Road Upgrading (unpaved to paved) - Tertiary
Road Upgrading (Gravel to Paved) of Demoloc-Little Baguio-Alabel Road including RROW,
K1663+000 - K1665+184

TO: MFO 1- National Road Network Services: Network Development - Road Upgrading (unpaved to paved) - Tertiary
Road Upgrading (Gravel to Concrete) of Demoloc-Little Baguio-Alabel Road including RROW (Demoloc Section), Davao Occidental Lone District -
K1661+372 - K1662+000,
K1663+000 - K1664+320 (S00203MN)

ALLOCATION: Php 87.360 Million
March 30, 2017 2017 165003015400138 SR2017-02-002711 February 3, 2017 Region XIII Regional Office XIII
Newtwork Development: Construction of Missing Gaps connecting National Roads, including ROW - Completion of the East-West Lateral Road connecting Agusan del Sur/Agusan del Norte to Bukidnon, San Miguel Proper (Surigao del Sur)-Calaitan (Bayugan), Package 2, Surigao del Sur
March 30, 2017 2017 165003030800298 SR2017-02-003040 February 3, 2017 Region XIII Regional Office XIII
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Declared Tourism Destinations : Construction/Improvement of Access Roads leading to Declared Tourism Destinations, NRJ-Cumawas-Tinuy-an Falls Road, Borboanan, Bislig City, Surigao del Sur
March 30, 2017 2017 165003015400103 SR2017-02-002610 February 3, 2017 Region XIII Regional Office XIII
Network Development: Construction of Missing Gaps connecting National Roads, including ROW - Bdry. Bukidnon/Agusan Del Norte, Agusan Del Norte 1st LD, Package 2
March 30, 2017 2017 165003015400104 SR2017-02-002613 February 3, 2017 Region XIII Regional Office XIII
Network Development: Construction of Missing Gaps connecting National Roads, including ROW - Bdry. Bukidnon/Agusan Del Norte, Agusan Del Norte 1st LD, Package 3
March 30, 2017 2017 165003017100102 SR2017-02-002963 February 3, 2017 Region XIII Regional Office XIII
Construction and Maintenance of Bridges along National Roads: Widening of Permanent Bridges to more than 2 lanes, including ROW - Taguibo Br. (B00820MN) along Daang Maharlika (Surigao-Agusan Sect.) (Phase II)
March 30, 2017 2017 165003015400114 SR2017-02-002616 February 3, 2017 Region XIII Regional Office XIII
Network Development: Construction of Missing Gaps connecting National Roads, including ROW - Butuan City-Pianing-Tandag Rd (Tandag Section), Surigao del Sur
March 30, 2017 2017 WIN7E01041 GAA 2017 January 2, 2017 Region III Tarlac 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation/Improvement of Existing Dike along Lucung Rive, Brgy. Sta. Cruz Section, Left Bank, Sta. 3+530 to Sta. 3+786.80, Concepcion, Tarlac (Rehabilitation/Major Repair of Flood Control Structure)
March 30, 2017 2017 WIN7E01070 GAA FY 2017 January 2, 2017 Region III Tarlac 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation/Improvement of Existing Dike along Lucung River, D/S of Santiago Bridge, R/S Sta. (-4) +589.20 - Sta. (-)5+000 (Construction of Dike)
March 30, 2017 2017 WIN7E01021 GAA FY 2017 January 2, 2017 Region III Tarlac 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation/Improvement of Existing Dike along Lucung River, Upstream of San Nicolas Section, R/S, Concepcion, Tarlac

Sta. (-)2+200 - Sta. (-)2+694.40

(Construction of Dike)
March 30, 2017 2017 WIN7E01095 GAA FY 2017 January 2, 2017 Region III Tarlac 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation/Improvement of Existing Dike along Parua River, Barangay San Vicente Section,

Sta. 8+865 to Sta. 9+165 and Sta. 9+186 to Sta. 9+370.80

(Rehabilitation/Major Repair of Flood Control Structure)
March 30, 2017 2017 WIN7E01063 GAA FY 2017 January 2, 2017 Region III Tarlac 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation/Improvement of Existing Dike along Lucung River (Left Bank)

Sta. 0+765 to Sta. 0+935.61

(Rehabilitation/Major Repair of Flood Control Structure)
March 30, 2017 2017 WIN7E01022 GAA FY 2017 January 2, 2017 Region III Tarlac 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Restoration of Eroded Embankment of Existing Dike along Maet Creek, Right Bank (San Isidro Section), La Paz, Tarlac

Sta. 0+000 - Sta. 0+27

(Construction of Flood Mitigation Structure)
March 30, 2017 2017 WIN7E01014 GAA FY 2017 January 2, 2017 Region III Tarlac 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Facilities along Major River Basins and Principal Rivers - Construction of Protective dike along Bangut River, Left Bank, U/S of Bangut Bridge, Sta. (-)1+152 - Sta. (-)1+766.40

(Construction of Dike)
March 30, 2017 2017 WIN7E01064 GAA FY 2017 January 2, 2017 Region III Tarlac 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation/Improvement of Existing Dike along Marimla River, Left Bank,

Sta. 0+258 - Sta. 0+630, Sta. 0+033 - Sta. 0+089.80,
Sta. 0+033 - Sta. 0+129

Bamban, Tarlac
(Rehabilitation/Major Repair of Flood Control Structure)
March 30, 2017 2017 WIN7E01023 GAA FY 2017 January 2, 2017 Region III Tarlac 2nd District Engineering Office
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along Manila North Road, K0102+799 - K0102+803; K0108+906 - K0110+000; K0111+000 - K0111+291

(Construction of Drainage Structure along Road)
March 30, 2017 2017 WIN7E01103 GAA FY 2017 January 2, 2017 Region III Tarlac 2nd District Engineering Office
Roads and Bridges - Locals Roads

Concreting of road at Brangay Cut-cut I, Capas, Tarlac

(Construction of Concrete Road)
March 28, 2017 FY 2017 WIN7E01060 UACS PAP 165003014300241 December 22, 2016 National Capital Region North Manila District Engineering Office
As Per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development and Management – 4 (HDM-4) – Tertiary Road: Reconstruction from Concrete to Concrete – Alfonso St., Chainage 489.0 – Chainage 696.0 (Reconstruction from concrete to concrete)
UACS No. 165003014300241
Physical Target/Cost:
Original: 0.414 lane km
Allocation (P’000): P7,000
Unit Cost (P’000): P16,908/lane km
Ref. No. WIN7E01060

As Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/Upgrading of Damaged Paved National Road including drainage based on Pavement Management System/Highway Development and Management – 4 (HDM-4) – Tertiary Road: Reconstruction from Concrete to Concrete – Alfonso Mendoza St. Chainage 508.90 – Chainage 688.60, Sta. Cruz, Manila, S02250LZ (Reconstruction: Concrete to Concrete including Raising of Grade)
UACS No. 165003014300241
Physical Target/Cost:
Modified: 0.53 lane km (179.7m – 3 lane km)
Allocation (P’000): P7,000
Unit Cost (P’000): P13,208/lane km
Ref. No. WIN7E01060
March 28, 2017 FY 2017 WIN7E01113 UACS PAP 165003014200193 December 22, 2016 National Capital Region North Manila District Engineering Office
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) – Secondary: Reconstruction from Concrete to Concrete – R-10 – K0005+424.90 – K0005+978.70 (Reconstruction from Concrete to Concrete)
UACS No. 165003014200193
Physical Target/Cost:
Original: 2.216 lane km
Allocation (P’000): P15,000
Unit Cost (P’000): P6,769/lane km
Ref. No. WIN7E01113

Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) – Secondary: Reconstruction from Concrete to Concrete – R-10 – K0005+424.90 – K0005+424.90 – K0005+641.90, S02379LZ, Tondo, Manila
(Reconstruction from concrete to concrete including drainage improvement)
UACS No. 165003014300241
Physical Target/Cost:
Modified: 1.32 lane km (217m – 6 lane)
Estimated Cost (P’000): P15,000
Unit Cost (P’000): P11,521/lane km
Ref. No. WIN7E01113
March 28, 2017 FY 2017 WIN7E01112 UACS PAP 165003014200190 December 22, 2016 National Capital Region North Manila District Engineering Office
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4) – Secondary: Reconstruction from Concrete to Concrete – J Rizal Ave – K0003+-195 – K0003+259.1 (Reconstruction from Concrete to Concrete)
UACS No. 165003014200190
Physical Target/Cost:
Original: 0.908 lane km
Allocation (P’000): P5,000
Unit Cost (P’000): P5,507/lane km
Ref. No. WIN7E01112
Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4) – Secondary: J Rizal Ave K0003+-168.80 – K0003+046.50, Sta. Cruz, Manila, S02407LZ (Reconstruction from Asphalt to Concrete, Repair/ Rehabilitation of Drainage Structures)
UACS No. 165003014200190
Physical Target/Cost:
Modified: 0.431 lane km
Estimated Cost (P’000): P5,000
Unit Cost (P’000): P11,601/lane km
Ref. No. WIN7E01112
March 28, 2017 FY 2017 WIN7E01114 UACS PAP 165003014300251 December 22, 2016 National Capital Region North Manila District Engineering Office
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4) – Tertiary Road: Reconstruction from Concrete to Concrete – Sn Rafael St – Chainage 0 + Chainage 197 (Reconstruction from Concrete to Concrete
UACS No. 165003014300251
Physical Target/Cost:
Original: 0.394 lane km
Allocation (P’000): P5,000
Unit Cost (P’000): P12,690/lane km
Ref. No. WIN7E01114
Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4) – Sn Rafael St. – Chainage 125.00 – Chainage 234.00, Tondo, Manila, S02334LZ
UACS No. 165003014300251
Physical Target/Cost:
Modified: 0.237 lane km (109 m – 3 lane)
Estimated Cost (P’000): P5,000
Unit Cost (P’000): P15,291/lane km
Ref. No. WIN7E01114
March 28, 2017 FY 2017 WIN7E0111 UACS PAP 165003014300249 December 22, 2016 National Capital Region North Manila District Engineering Office
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway-4 – Tertiary Road: Reconstruction from Concrete to Concrete – Muelle dela Industria – K0003+595 – K0004+472, San Nicolas, Manila S02261LZ (Reconstruction from concrete to concrete)
UACS No. 165003014300249
Physical Target/Cost:
Original: 1.754 lane km
Allocation (P’000): P27,027
Unit Cost (P’000): P15,409/lane km
Ref. No. WIN7E01111
Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4) – Tertiary Road: Muelle dela Industria – K0003+866.30 – K0004+470, San Nicolas, Manila, S02261LZ (Rehabilitation of Concrete Road, Repair/Rehabilitation of Drainage Structures)
UACS No. 165003014300249
Physical Target/Cost:
Modified: 1.21 lane km
Estimated Cost (P’000): P27,027
Unit Cost (P’000): P22,336/lane km
Ref. No. WIN7E01111
March 28, 2017 2017 165003016900024 GAA FY2017 January 1, 2017 Region II Cagayan 1st District Engineering Office
Network Development – Off-Carriageway Improvement including Drainage – Jct. Gattaran-Cumao-Capissayan-Sta Margarita- Bolos Point Rd, Barangay Dummun – Palagao Norte, Gattaran, Cagayan K0544+(-903.65) - K0544+(-835.37), K0544+(-832.85)-K0544+(-493.40), K0544+(-488.90)-K0544+(-359.58), K0544+(-355.92)-K0544+(-297.88), K0544+(-194.22)-K0544+044.75, K0544+555.05-K0544+776.05, K0544+780.35-K0544+917, K0544+966 - K0544+970.35, K0545+511.45-K0545+621.32, K0545+616.75-K0545+904.10, K0545+906-K0546+381.90, K0546+376.60-K0546+581.30, K0544+051.70-K0544+109 R/S, K0544+161 - K0544+214.95 (R/S), K0544+218.18-K0544+218.45 R/S, K0544+281.05-K0544+551.25 R/S, K0544+975.45-K0545+316.35 R/S, K0546+604.55-K0547+185 R/S, K0547+343-K0547+904.95 R/S, K0544+051.60-K0544+212.35 L/S, K0544+273-K0544+551.60 L/S, K0544+970.35-K0545+306.55 L/S, K0545+501-K0545+505.77 L/S, K0546+596.20-K0547+197.40 L/S, K0547+348.50-K0547+852.30 L/S, K0547+852.30-K0548+213.30, K0548+291-K0549+288, K0549+338-K0550+321, K0550+408-K0550+996, K0551+038-K0551+431, K0551+486-K0552+295
March 28, 2017 2017 165003016900023 GAA FY 2017 January 1, 2017 Region II Cagayan 1st District Engineering Office
Network Development – Off-Carriageway Improvement including Drainage – Baybayog – Baggao – Dalin – Sta Margarita Rd, Barangay Centro – Assasi, Baggao, Cagayan K0524+000-K0524+730, K0524+745.60-K0525+031, K0525+401-K0527+964.50 (L/S), K0525+401-K0527+694.50 (R/S), K0527+865.10-K0527+965.50 (R/S), K0532+635-K0533+160
March 28, 2017 2017 165003013800087 GAA FY 2017 January 1, 2017 Region II Isabela 3rd District Engineering Office
Asset Preservation of National Roads - Preventive Maintenance based on Pavement Management System/ Highway Development and Management-4 (HDM-4) - Primary Daang Maharlika (LZ) – K0348 + 456.30 - K0349 + 667, K0358 + 956.50 - K0359 + 005.50, K0360 + 806.60 - K0361 + 122, K0366 + 000 - K0366 + 211.50, K0373 + 180 - K0374 + 003.80, K0374 + 993.70 - K0375 + 054
March 28, 2017 2017 165003013800088 GAA FY 2017 January 1, 2017 Region II Isabela 3rd District Engineering Office
Asset Preservetion of National Roads – Preventive Maintenance based on Pavement Management System/ Highway Development and Management - 4 (HDM-4) – Primary Santiago-Tuguegarao Rd - K0346 + 751 - K0348 + 421.80
March 28, 2017 2017 165003014100123 GAA FY 2017 January 1, 2017 Region II Isabela 3rd District Engineering Office
Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Primary - Santiago-Tuguegarao Rd - K0356 + 611 - K0357 + 000
March 28, 2017 2017 165003016600123 GAA FY 2017 January 1, 2017 Region II Isabela 3rd District Engineering Office
Network Development - Improvement/Widening of National Roads - Santiago-Tuguegarao Rd - K0342 + -039 - K0343 +884
March 28, 2017 2017 165003016600122 GAA FY 2017 January 1, 2017 Region II Isabela 3rd District Engineering Office
Network Development – Improvement /Widening of National Roads – Cauayan - Cabatuan Rd – K0373 + 472 - K0375 + 549
March 27, 2017 FY 2017 WIN7E01115 PPA292003020402049 December 22, 2016 National Capital Region South Manila District Engineering Office
Per GAA
MFO-2 Flood Management Services: Construction / Maintenance of Flood Mitigation Structures and Drainage Systems: Improvement of MIA Road Outfall from Tambo Bridge to Nayong Pilipino Creek, Pasay City. (Construction of Flood Mitigation Structure)
UACS No.: 292003020402049
Physical Target/Cost:
Per GAA/Original
Physical Target: 588 lm
Unit Cost (P’000): P68.02T/lm
Allocation : P40.0 M
Ref. No. WIN7E01115

As Modified
MFO-2 Flood Management Services: Construction / Maintenance of Flood Mitigation Structures and Drainage Systems: Improvement of MIA Road and Vicinity and Outfall from Tambo Bridge to Nayong Pilipino Creek, Pasay City. (Construction of Flood Mitigation Structure)
Physical Target/Cost:
As Modified
Physical Target: 588 lm
Unit Cost (P’000): P68.02T/lm
Estimated Cost : P40.0 M
Ref. No. WIN7E01115
March 27, 2017 2017 WIN7E01059 Approved FY 2017 Modification March 14, 2017 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Control along Chico River, Balili, Bontoc Ili, Sta. 039+493 - 039+906, 040+270 - 040+534, 040+646 - 040+720, 040+740, Bontoc, Mountain Province (Construction of Flood Mitigation Structure)

Physical Target = 953.00 lm

To: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Control along Chico River, Balili, Bontoc Ili, Sta. 039+800 - 039+906, 040+270 - 040+530, 040+646 - 040+726, 040+740', 040+740 - 040+850, Bontoc, Mountain Province (Construction of Flood Mitigation Structure)

Physical Target = 648.00 lm
March 27, 2017 2017 WIN7E01052 Approved FY 2017 Modification March 13, 2017 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Flood Control along Chico River, Gonogon, Sta. 041+190 - 042+600, 041+520 - 041+620, 042+533 - 042+773, 045+203 - 045+583, Bontoc, Mt. Province (Construction of Flood Mitigation Structure) ; Physical Target = 941 ln.m

To: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Flood Control along Chico River, Gonogon, Sta. 041+190 - 041+500, 041+520 - 041+620, 042+533 - 042+773, 045+357 - 045+489, Bontoc, Mt. Province (Construction of Flood Mitigation Structure) ; Physical Target = 692 ln.m
March 27, 2017 2017 WIN7E01049 Approved FY 2017 Modification March 10, 2017 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Rehabilitation of Tay-ok Flood Control with Protection Wall, Poblacion, Bontoc, Mountain Province (Construction of Flood Mitigation Structure) ; Physical Target = 500 lm

To: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Rehabilitation of Tay-ok Drainagel with Protection Wall, Poblacion, Bontoc, Mountain Province (Construction of Flood Mitigation Structure) ; Physical Target = 200 lm
March 27, 2017 2017 WIN7E01050 Approved FY 2017 Modification March 13, 2017 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Control along Chico River, Taed, Sta. 030+060 - 032+378, Bontoc, Mountain Province (Construction of Flood Mitigation Structure) ; Physical Target = 297.00 lm

To: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Control along Chico River, Taed, Sta. 030+183 - 030+409, Bontoc, Mountain Province (Construction of Flood Mitigation Structure) ; Physical Target = 225 lm
March 27, 2017 2017 WIN7E01053 Approved FY 2017 Modification March 13, 2017 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Locally-Funded Projects: Local Infrastructure Program - Buildings and Other Structures, Multipurpose/ Facilities, Construction of Multi-Purpose Building, Abatan, Bauko, Mt Province (Construction of Multi-Purpose Building) ; Physical Target = 1 bldg

To: Locally-Funded Projects: Local Infrastructure Program - Buildings and Other Structures, Multipurpose/ Facilities, Construction (Completion) of Multi-Purpose Building, Abatan, Bauko, Mt Province (Construction of Multi-Purpose Building) ; Physical Target = 1 bldg
March 26, 2017 GAA FY 2017 WIN7G00978 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1- National Road Network Services:
Network Development - Improvement/Widening of National Roads - Other Primary
Widening (4 into 6 Lanes) of Davao-Bukidnon Road Including RROW, Davao City,
K1700+312 - K1701+000,
K1701+000 - K1701+450,
K1701+450 - K1701+970

TO: MFO 1- National Road Network Services:
Network Development - Improvement/Widening of National Roads - Other Primary
Widening (4 into 6 Lanes) of Davao-Bukidnon Road Including RROW, Brgy. Catalunan Pequeño-Brgy. Talomo Section, Davao City 1st LD
K1700+312 - K1700+838,
K1700+981 - K1701+945, (S01409MN)

ALLOCATION: Php 137.665 Million
March 26, 2017 GAA FY 2017 WIN7G00983 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1- National Road Network Services:
Network Development - Improvement/Widening of National Roads - Other Primary -
Road Widening including Slope Protection and RROW - Pres.Diosdado P. Macapagal Natl Hi-way -
K1725+860 - K1728+580

TO: MFO 1 - National Road Network Services:
Network Development - Improvement/Widening of National Roads - Other Primary -
Widening (2 into 4 lanes) of Pres. Diosdado P. Macapagal Natl Hi-way including Slope Protection and RROW, Brgy. Badas Section, Davao Oriental 2nd LD -
K1725+860 - K1727+572, (S01448MN)

ALLOCATION: Php 115.446 Million
March 26, 2017 GAA FY 2017 WIN7G00986 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services:
Network Development - Construction of ByPasses/ Diversion Roads, including ROW -
Construction of Concrete Road - Bypass Road at Buhangin-Tigatto-Mandug-Callawa-Fatima Road Including Bridge, Road Slope Protection, Rehabilitation of Concrete Road and RROW, Davao City (Package 6)

TO: MFO 1 - National Road Network Services:
Network Development - Construction of ByPasses/ Diversion Roads, including ROW -
Concreting/Widening/Improvement of Bypass Road at Buhangin-Tigatto-Mandug-Callawa-Fatima Road Including Construction of Udiongan Bridge and RROW, Davao City (Package 6)

ALLOCATION: Php 240.448 Million
March 26, 2017 GAA FY 2017 WIN7G00987 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services:
Network Development - Improvement/ Widening of National Roads - Secondary -
Widening (4-5 into 6 Lanes) of Davao City Diversion Road including Slope Protection and RROW, Davao City,
K1507+640 - K1507+850,
K1510+905 - K1510+937,
K1510+937 - K1511+200,
K1511+200 - K1511+780,
K1511+780 - K1511+950

TO: MFO 1 - National Road Network Services:
Network Development - Improvement/Widening of National Roads - Secondary -
Widening (4-5 into 6 Lanes) of Davao City Diversion Road including Slope Protection and RROW, Brgy. Ma-a-Brgy. Matina Crossing, Davao City 1st LD,
K1510+905 - K1510+937,
K1510+937 - K1511+200,
K1511+200 - K1511+780,
K1511+780 - K1511+950, (S00013MN)

ALLOCATION: Php 165.123 Million
March 26, 2017 GAA FY 2017 WIN7G00991 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services:
Network Development - Road Upgrading (unpaved to paved) - Tertiary
Road Upgrading (Gravel to Paved) of Montevista - DNAS Rd, Compostela Valley 1st LD
K1426+917 - K1428+090,
K1428+860 - K1430+286,
K1430+286 - K1431+753

TO: FROM: MFO 1 - National Road Network Services:
Network Development - Road Upgrading (unpaved to paved) - Tertiary
Road Upgrading (Gravel to Concrete) of Montevista-DNAS Road, Brgy. Camansi-Brgy.Prosperidad Section, Compostela Valley 1st LD
K1426+917 - K1428+090,
K1428+860 - K1430+286,
K1430+286 - K1431+140, (S00130MN)

ALLOCATION: Php 157.440 Million
March 26, 2017 GAA FY 2017 WIN7G00992 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services:
Network Development-Improvement/Widening of National Roads - Other Primary -
Road Widening - Davao-Bukidnon Road including Road Slope Protection and RROW, Davao City
K1621+708 - K1623+661

TO: MFO 1 - National Road Network Services:
Network Development-Improvement/Widening of National Roads- Other Primary -
Widening (2 into 4 lanes) of Davao-Bukidnon Road including RROW, Brgy. Buda Section, Davao City 3rd LD
K1621+708 - K1623+661, (S01406MN)

ALLOCATION: Php 112.973 Million
March 26, 2017 GAA FY 2017 WIN7G00993 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development-Construction of Missing Gaps connecting National Roads, including ROW -
Construction of Gravel Road - Mawab-Maragusan-Caraga Road, Sitio Tagdalongdong-Brgy. Langawisan Section incl. Bridge and ROW, Compostela Valley

TO: MFO 1 - National Road Network Services
Network Development-Construction of Missing Gaps connecting National Roads, including ROW -
Construction/Opening/Concreting of Mawab-Maragusan- Caraga Road, Sitio Tagdalongdong-Brgy. Langawisan Section Including Construction of Tagdalongdong I and II Bridges and ROW, Compostela Valley

ALLOCATION: Php 300.000 Million
March 26, 2017 GAA FY 2017 WIN7G00994 GAA FY 2017 R.A. 10924 January 1, 2016 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services:
Network Development - Improvement/Widening of National Roads - Primary Roads N1
Road Widening - Davao-Cotabato Road (Davao City - Jct. Digos Section) including Rehabilitation of Damaged Pavement and RROW, Davao Del Sur,
K1554+273 - K1554+393,
K1554+393 - K1555+150,
K1555+150 - K1555+1044

TO: MFO 1 - National Road Network Services:
Network Development - Improvement/Widening of National Roads - Primary Roads N1
Widening (2-4 into 6 lanes) of Davao-Cotabato Road (Davao City - Jct. Digos Section) including Rehabilitation/Reconstruction of Damaged Pavement and RROW, Tagabuli-Bato & Sinawilan Sections, Davao Del Sur Lone District,
K1554+273 - K1554+393,
K1554+393 - K1555+150,
K1555+150 - K1555+1044,
K1558+650 - K1559+350,
(S00162MN)

ALLOCATION: Php 235.488 Million
March 26, 2017 GAA FY 2017 WIN7G00996 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - N1
Road Widening - Daang Maharlika (MN) Including RROW, Davao City
K1484+-979 - K1484+-844, K1489+857 - K1489+1082, K1489+1082 - K1490+086, K1490+273 - K1490+378, K1490+378 - K1491+153, K1491+153 - K1491+660, K1491+660 - K1492+136, K1492+136 - K1492+456,
K1492+660 - K1492+714, K1492+714 - K1492+980, K1492+980 - K1493+316, K1494+390 - K1494+404, K1497+792 - K1498+000, K1501+608 - K1501+621, K1501+638 - K1501+706, K1501+706 - K1501+020,
K1501+020 - K1501+130, K1503+431 - K1504+056

TO: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - N1
Widening (4-5 into 6 Lanes) of Daang Maharlika (MN) Including RROW, Davao City 2nd LD
K1489+857 - K1489+1082, K1489+1082 - K1490+086, K1490+273 - K1490+378, K1490+378 - K1491+153, K1491+153 - K1491+660, K1491+660 - K1492+136, K1492+136 - K1492+456, K1492+660 - K1492+714,
K1492+714 - K1492+980, K1492+980 - K1493+316, K1497+792 - K1498+000, K1501+608 - K1501+621, K1501+638 - K1501+706, K1501+706 - K1502+020, K1502+020 - K1502+130, K1503+400 - K1504+056 (S00001MN)

ALLOCATION: Php 150.000 Million
March 26, 2017 GAA FY 2017 WIN7G00997 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Concrete Road - Slaughter House Road Until F. Torres Bridge including Road Slope Protection, Road Widening and RROW, Davao City (Package 2)

TO: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Reconstruction/Concreting/Widening of Slaughter House Road Until F. Torres Bridge including RROW, Davao City 1st LD (Package 2)

ALLOCATION: Php 167.632 Million
March 26, 2017 GAA FY 2017 WIN7G00998 GAA FY 2017 R.A. 10924 January 1, 2017 Region XII Regional Office XII
MODIFICATION:

FROM: MFO 1- National Road Network Services
Network Development - Improvement/Widening of National Roads - Secondary -
Road Widening - Surigao Del Sur Boundary- Davao Oriental Coastal Road including Rehabilitation of Concrete Road, Improvement of Junction/Intersection and RROW, Davao Oriental 1st LD -
K1525+140 - K1526+440.94,
K1526+440.94 - K1527+440.94

To: MFO 1- National Road Network Services
Network Development - Improvement/Widening of National Roads - Secondary -
Widening (2 into 4 lanes) of Surigao Del Sur Boundary-Davao Oriental Coastal Road including Rehabilitation/Reconstruction of Damaged Pavement, Improvement of Junction/Intersection and RROW, Brgy. Boston Poblacion Section, Davao Oriental 1st LD,
K1525+140 - K1526+940, (S00140MN)

ALLOCATION: Php 160.000 Million
March 26, 2017 GAA FY 2017 WIN7G01007 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1- National Road Network Services:
Network Development - Construction of By-Passes/ Diversion Roads, including ROW
Construction of Concrete Road including Construction of Road Slope Protection and ROW Acquisition - Bypass Road at Malagamot Road-Jct. Mudiang Road, Davao City,

TO: MFO 1 - National Road Network Services:
Network Development - Construction of By-Passes/ Diversion Roads, including ROW
Construction/Improvement/Widening of Bypass Road at Malagamot Road-Jct. Mudiang Road Including ROW, Davao City

ALLOCATION: Php 224.984 Million
March 26, 2017 GAA FY 2017 WIN7G01010 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services:
Road Upgrading (Unpaved to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary
Road Upgrading Gravel to Paved - Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) including RROW,
K1780+366 - K1781+000,
K1781+600 - K1785+252

TO: MFO 1 - National Road Network Services:
Road Upgrading (Unpaved to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary
Road Upgrading (Gravel to Concrete) of Davao-Sarangani Coastal Road (Malalag-Malita-JAS-Glan Road) including RROW (Bukid - Balangonan Section), Davao Occidental,
K1780+366 - K1784+059,
K1784+456 - K1784+620,
(S00223MN)

ALLOCATION: Php 150.000 Million
March 26, 2017 GAA FY 2017 WIN7G01011 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services:
Network Development - Off-Carriageway Improvement including drainage - Secondary
Off-Carriageway Improvement: Shoulder Paving/Construction - Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-Glan) including Reconstruction from Asphalt to Concrete,
K1591+156 - K1596+600,
K1596+600 - K1596+942,
K1596+942 - K1598+600

TO: MFO 1 - National Road Network Services:
Network Development - Off-Carriageway Improvement including drainage - Secondary
Improvement of Off-Carriageway along Davao-Sarangani Coastal Road (Malalag-Malita-JAS-Glan Road) Including Rehabilitation/Reconstruction (Asphalt to Concrete) of Damaged Paved National Road (Bagumbayan-Caputian Section), Davao Del Sur,
K1591+156 - K1596+600,
K1596+600 - K1596+942,
K1596+942 - K1598+600

ALLOCATION: Php 161.654 Million
March 26, 2017 GAA FY 2017 WIN7G01017 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1- NationaI Road Network Services:
Asset Preservation of National Roads - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary
Construction of Drainage Structure along Road - Daang Maharlika (MN)
K1453+264 - K1453+373.20,
K1461+552.35 - K1461+808.41,
K1461+808.41 - K1462+892

TO: MFO 1- NationaI Road Network Services:
Asset Preservation of National Roads - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary
Construction of Drainage (Including Length Going To Outfall) Along Daang Maharlika, Davao Del Norte,
K1453+000 - K1453+120,
K1461+600 - K1462+900,
(S00060MN)

ALLOCATION: Php 81.445 Million
March 26, 2017 GAA FY 2017 WIN7G01018 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1- National Road Network Services:
Network Development - Construction of By-Passes/ Diversion Roads, including ROW
Construction of Concrete Road - Bypass Road at Buhangin-Tigatto-Mandug-Callawa-Fatima Road Including RROW, Davao City (Package 4)

TO: MFO 1 - National Road Network Services:
Network Development - Construction of By-Passes/ Diversion Roads, including ROW
Concreting/Widening/Improvement of Bypass Road at Buhangin-Tigatto-Mandug-Callawa-Fatima Road Including Construction of Suadan Bridge and RROW, Davao City 2nd LD (Package 4)

ALLOCATION: Php 239.612 Million
March 26, 2017 GAA FY 2017 WIN7G00990 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO -1 National Road Network Services:
Network Development - Construction of By-Passes/ Diversion Roads, including ROW
Construction of Concrete Road - Fatima-Malabog Road to Mabuhay Pañalum-Paquibato Road Including ROW, Davao City

TO: MFO -1 National Road Network Services:
Network Development - Construction of By-Passes/ Diversion Roads, including ROW
Construction/Concreting Road - Fatima-Malabog Road to Mabuhay Pañalum-Paquibato Road Including RROW, Davao City

ALLOCATION: Php 163.506 Million
March 25, 2017 2017 WIN7G00947 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges - Construction of Kumalarang PSCG Br. 3 and Approaches along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Rd., Zamboanga del Sur,
Sta. 0+000 - Sta. 0+600.00,
Abutment A: Sta. 0+260.00,
Abutment B: Sta. 0+350.84,
River Protection Net Length: 280.00 ln.m./0.28 kms.,
Approaches Net Length: 509.16 ln.m./0.509 kms.,
Bridge Length: 90.84 ln.m./.091 kms.,
Allocation: Php 120.840 Million (Total),
Php 120,538,034.81 (Const. of PSCG Bridge),
Php 301,965.19 (ROW Acquisition)
Physical Target: 90.84 ln.m./866.61 sq.m. (Const. of PSCG Bridge),
1,006 sq.m. (ROW Acquisition),
Unit Cost: Php 1,326,926.85/lane km. (Const. of PSCG Bridge),
Php 300.16/sq.m. (ROW Acquisition)
March 25, 2017 2017 WIN7G00953 FY 2017 (R.A 10924) March 1, 2017 Region IX Regional Office IX
Network Development - Construction of By-Passes/Diversion Roads, including ROW: Construction of Diversion Road at Vitali - Sibulao - By-Pass Road Project (Alternate Road of N1), Zamboanga City 2nd LD,
K5+700.00 - K8+060.00,
K8+060.00 - K8+510.00,
Allocation:
Php 100.000 Million (Total)
Php 99,977,243.44 (Gravel Road)
Php 22,756.56 (ROW Acquisition)
Physical Target:
5.620 lane km (Gravel Road)
75.85 sq.m. (ROW Acquisition)
Unit Cost:
Php 17,789,545.10/lane km. (Gravel Road)
Php 300.02/sq.m. (ROW Acquisition)
March 25, 2017 2017 WIN7G00935 FY 2017 (R.A 10924) March 1, 2017 Region IX Regional Office IX
Network Development - Improvement/Widening of National Roads - Other Primary Roads -
Road Widening including Drainage of Dipolog - Sindangan - Liloy Road, Zamboanga del Norte 1st DEO, (S01057MN),
K1853+257 - K1854+295.87,
K1854+358.14 - K1855+100,
K1855+106.30 - K1856+200,
K1856+241.46 - K1857+000,
K1873+092.00 - K1873+780,
Allocation:
P160.222 Million (Total)
Php 154,545,902.24 (Widening of Road)
Php 5,676,097.76 (ROW Acquisition)
Physical Target:
8.642 lane km. (Widening of Road)
18,920 sq.m. (ROW Acquisition)
Unit Cost:
Php 17,883,117.59/lane km. (Widening of Road)
Php 300.01/sq.m. (ROW Acquisition)
March 25, 2017 2017 WIN7G00961 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Road Upgrading (Unpaved to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) -
Road Upgrading (Unpaved to Paved) of Rizal - Dakak - Dapitan Coastal Loop Rd., Zamboanga del Norte 3rd DEO, (S01038MN),
K1823+780 - K1824+392,
K1827+240 - K1829+437,
K1829+641 - K1830+055,
K1840+213 - K1840+308,
K1840+453 - K1840+557,
K1840+905 - K1841+984,
K1844+000 - K1844+200,
Allocation:
Php 150.000 Million (Total)
Php 149,422,265.00 (Gravel Road)
Php 577,735.00 (ROW Acquisition)
Physical Target:
9.40 lane km. (Gravel Road)
1,925.78 sq.m. (ROW Acquisition)
Unit Cost:
Php 15,895.64/lane km. (Gravel Road)
Php 300.00/sq.m. (ROW Acquisition)
March 24, 2017 2017 WIN7E01044 SR2017-01-000320 January 28, 2017 National Capital Region NCR - Regional Office
As Per GAA
Locally Funded Projects-Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local projects – Roads and Bridges – Local Roads:
Reconstruction/Rehabilitation of C-6 Road from M.L. Quezon to Napindan Bridgem, Taguig City (Sta. 0+000 – Sta. 6+940), Left Side only (Construction/Rehabilitation)
UACS No. 165004050306291
Physical Target/Cost:
Original: 5.60 lane km
Allocation (P’000): P168,000
Unit Cost (P’000): P24,207/lane km
Ref. No. WIN7E01044

As Modified
Locally Funded Projects-Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local projects – Roads and Bridges – Local Roads:
Reconstruction/Rehabilitation of C-6 Road from M.L. Quezon to Napindan Bridge, Taguig City (Sta.4+140 – Sta. 6+940) Left Side Only, C-6 Road, Taguig City (Reconstruction: Raising of Grade)
UACS No. 165004050306291
Physical Target/Cost:
Modified: 5.60 lane km
Allocation (P’000): P168,000
Unit Cost (P’000): P30,000/lane km
Ref. No. WIN7E01044
March 24, 2017 2017 WIN7E01013 GAA 2017 January 1, 2017 Region III Tarlac 2nd District Engineering Office
Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers - Construction of Protective Dike along Bangut River, (Sta. Lucia Section) U/S of Bangut Bridge, Sta. 0+000 to Sta. 0+600 (Construction of Dike)
March 24, 2017 GAA FY 2017 WIN7F04548 GAA R.A. 10924 December 23, 2016 National Capital Region Malabon-Navotas District Engineering Office
As Per GAA
Locally Funded Projects – Local Infrastructure Program – Roads and Bridges – Local Roads: Rehabilitation of Local Road, Ilang Ilang St., (from Waling Waling St., to Doña Aurora St.) Brgy. Tanza, Navotas City (Rehabilitation of Concrete Road)
UACS No. 165004050306754
Physical Target/Cost:
Original: 0.42 lane km
Allocation (P’000): P11,000
Unit Cost (P’000): P26,190.48/lane km
Ref. No. WIN7F04548

As Modified
Locally Funded Projects – Local Infrastructure Program – Roads and Bridges – Local Roads: Rehabilitation of Local Road, Ilang Ilang St., (from Waling Waling St., to Azucena St.), Brgy. Tanza, Navotas City C0+000 to C0+420 (Rehabilitation of Concrete Road)
UACS No. 165004050306754
Physical Target/Cost:
Modified: 0.42 lane km
Allocation (P’000): P11,000
Unit Cost (P’000): P26,190.48/lane km
Ref. No. WIN7F04548
March 24, 2017 FY 2017 WIN7E01051 103004010310291 December 22, 2016 National Capital Region South Manila District Engineering Office
As Per GAA
Locally-Funded Projects: Local Infrastructure Program: Buildings/Other Structures: Multipurpose/Facilities: Construction of Multipurpose Building, Barangay 68 and its vicinity, Pasay City, (Construction)
UACS No. 103004010310291
Physical Target/Cost:
Original: 1 bldg
Allocation (P’000): P1.2 M
Unit Cost (P’000): P
Ref. No. WIN7E01051

As Modified
Locally-Funded Projects: Local Infrastructure Program: Buildings/Other Structures: Multipurpose/Facilities: Repair/Rehabilitation/Improvement of Multi-Purpose Building, Barangay 68 and its vicinity, Pasay City (Rehabilitation/Major Repair Multi-Purpose Building)
UACS No. 103004010310291
Physical Target/Cost:
Modified: 1 building
Estimated Cost (P’000): P1.2M
Unit Cost (P’000): P1.2M/bldg.
Ref. No. WIN7E01051
March 15, 2017 GAA FY 2017 WIN7G00925 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao Occidental District Engineering Office
MODIFICATION:

FROM: MFO 3 - Maintenance and Construction Services of Other Infrastructures: Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - To Declared Tourism Destinations -
Brgy. Pangyan Road leading to Tudaya Falls, Pangyan, Malita, Davao Occidental

TO: MFO 3 - Maintenance and Construction Services of Other Infrastructures: Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - To Declared Tourism Destinations -
Brgy. Pangyan Road leading to Tudaya Falls, Malita, Davao Occidental Lone District,
Sta. 0004+929.390 -Sta. 0005+662.000

ALLOCATION: Php 41.500 Million
March 15, 2017 GAA FY 2017 WIN7G00926 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao Occidental District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Construction/ Upgrading/Rehabilitation of Drainage along National Roads - Secondary Roads -
Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) including RROW -
K1634+567 -K1637+039

TO: MFO 1 -National Road Network Services Asset Preservation of National Roads -
Construction/ Upgrading/Rehabilitation of Drainage along National Roads - Secondary Roads -
Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-Glan) including RROW -Malita, Davao Occidental Lone District, Brgy. Poblacion, Malita Section
K1634+490 - K1637+039, (S00207MN)

ALLOCATION: Php 49.500 Million
March 9, 2017 FY 2017 WIN7E01005 FY 2017 Approved Modification March 3, 2017 Cordillera Administrative Region CAR - Regional Office
From: MFO 1 - Network Development - Construction of By-Passes/ Diversion Road, including ROW - Baguio-La Trinidad-Itogon-Sablan-Tuba-Tublay (BLISTT) Outer Ring Circumferential Road, incl. ROW, Phase 2 (Labey-Lacamen Section, Tublay, Benguet), Benguet [Const. of Concrete Road/Road Slope Protection Structure/ROW] Physical Target = 6.0 ln-kms (PCCP); 6,250 m2 (Slope Protection); 5,000 m2 (ROW)

To: MFO 1 - Network Development - Construction of By-Passes/ Diversion Road, including ROW - Baguio-La Trinidad-Itogon-Sablan-Tuba-Tublay (BLISTT) Outer Ring Circumferential Road, incl. ROW, Phase 2 (Labey-Lacamen Section, Tublay, Benguet), Benguet [Const. of Concrete Road]
Physical Target = 8.44 ln-kms (PCCP)
March 9, 2017 FY 2017 WIN7E01008 FY 2017 Approved Modification March 3, 2017 Cordillera Administrative Region CAR - Regional Office
From : MFO 1 - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0344+339 - K0344+369, K0345+817 - K0345+837, K0346+694 - K0346+724, K0348+606 - K0348+628, K0350+498 - K0350+510, K0360+511 - K0360+557, K0360+690 - K0360+725, K0360+718 - K0360+728, K0360+742 - K0360+773, K0360+861 - K0360+915, K0360+867 - K0360+903, K0361+004 - K0361+038, K0361+004 - K0361+104, K0361+104 - K0361+136, K0361+200 - K0361+320, K0361+623 - K0361+855, K0361+813 - K0361+843, K0365+444 - K0365+466, K0367+693 - K0367+818, K0367+718 - K0367+760, K0367+713 - K0367+818, K0368+037 - K0368+050, K0368+100 - K0368+130, K0382+680 - K0382+740, K0382+730 - K0382+755, K0383+176 - K0383+350, K0400+250 - K0400+295, K0400+422 - K0400+451, K0401+429 - K0401+442, K0401+498 - K0401+527, K0401+527 - K0401+545, K0401+666 - K0401+687, K0401+726 - K0401+766, K0404+665 - K0404+693, K0407+033 - K0407+056, K0407+154 - K0407+168, K0407+205 - K0407+220, K0407+536 - K0407+556, K0407+572 - K0407+586, K0407+600 - K0407+659, K0410+041 - K0410+070, K0414+141 - K0414+174, K0414+379 - K0414+484, K0425+195 - K0425+245 (S00480LZ) [Construction of Slope Protection Structures] Physical Target = 12,541.59 m2 (Slope Protection)

To: MFO 1 - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0344+339 - K0344+369, K0345+817 - K0345+837, K0346+694 - K0346+724, K0348+606 - K0348+628, K0350+498 - K0350+510, K0360+511 - K0360+557, K0360+690 - K0360+725, K0360+718 - K0360+728, K0360+742 - K0360+773, K0360+867 - K0360+903, K0361+004 - K0361+015, K0360+994 - K0361+067, K0361+106 - K0361+122, K0361+695 - K0361+760, K0361+813 - K0361+839, K0365+444 - K0365+461, K0367+693 - K0367+818, K0367+718 - K0367+760, K0367+713 - K0367+818, K0368+037 - K0368+050, K0368+100 - K0368+130 (S00480LZ)
Physical Target = 12,623 m2 (Slope Protection)