March 9, 2017 |
FY 2017 |
WIN7E01007 |
FY 2017 Approved Modification |
March 3, 2017 |
Cordillera Administrative Region |
CAR - Regional Office |
From: MFO 1 - Network Development - Off-Carriageway Improvement including Drainage - Secondary - Banaue-Mayoyao-A Lista-Isabela Bdry Road - K0426+092 - K0429+547, K0429+609 - K0441+187 (S00480LZ) [Paving of Shoulder/Construction]
Physical Target = 49,881 m2
To: MFO 1 - Network Development - Off-Carriageway Improvement including Drainage - Secondary - Banaue-Mayoyao-A Lista-Isabela Bdry Road - K0426+092 - K0429+547, K0429+609 - K0441+187 (S00480LZ) [Paving of Shoulder/Construction]
Physical Target = 63,347.5 m2 |
March 9, 2017 |
FY 2017 |
WIN7E00995 |
WIN7E00995 |
March 3, 2017 |
Cordillera Administrative Region |
CAR - Regional Office |
From : MFO 1 - Network Development - Off-Carriageway Improvement including Drainage - Secondary - Nueva Viscaya-Ifugao-Mt Province Road - K0335+-358 - K0356+344, K0356+355 - K0362+105 [Paving of Shoulder/Construction]; Physical Target = 45 sq. m.
To: MFO 1 - Network Development - Off-Carriageway Improvement including Drainage - Secondary - Nueva Viscaya-Ifugao-Mt Province Road - K0337+006 - K0356+334, K0356+355 - K0359+000 [Paving of Shoulder/Construction]; Physical Target = 24,165.07 m2 |
March 9, 2017 |
FY 2017 |
WIN7E01010 |
FY 2017 Approved Modification |
March 3, 2017 |
Cordillera Administrative Region |
CAR - Regional Office |
From: MFO 1 - Network Development - Off-Carriageway Improvement including Drainage - Tertiary - Jct. Potia-Mt Province Bdry Road - K0435+968 - K0438+444, K0438+516 - K0447+243, K0447+283 - K0449+653, K0449+653 - K0445+126 (S00488LZ) [ Shoulder Paving/ Construction]
Physical Target = 42,423.00 sq. m
To; MFO 1 - Network Development - Off-Carriageway Improvement including Drainage - Tertiary - Jct. Potia-Mt Province Bdry Road - K0435+968 - K0436+300, K0436+440 - K0436+780, K0437+739 - K0438+385, K0438+525 - K0444+833, K0444+873 - K0445+379 (S00488LZ) [ Shoulder Paving/ Construction]
Physical Target = 39072.40 sq.m |
March 9, 2017 |
FY 2017 |
WIN7E00983 |
FY 2017 Approved Modification |
March 3, 2017 |
Cordillera Administrative Region |
CAR - Regional Office |
From: MFO 1 - Network Development - Improvement/ Widening of National Roads - Kalinga - Cagayan Road (Calanan - Enrile Section) - K0502+022 - K0503+233, K0521+000 - K0522+000, K0523+000 - K0524+000, K0522+000 - K0523+000 (S00566LZ) [Road Widening]
Physical Target = 8.47 ln-km
To: MFO 1 - Network Development - Improvement/ Widening of National Roads - Kalinga - Cagayan Road (Calanan - Enrile Section) - K0502+022 - K0504+000, K0521+000 - K0524+131 (S00566LZ) [Road Widening]
Physical Target = 10.274 ln-km
|
March 9, 2017 |
FY 2017 |
WIN7E01006 |
FY 2017 Approved Modification |
March 3, 2017 |
Cordillera Administrative Region |
CAR - Regional Office |
From : MFO 1 - Network Development - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - Chainage 458 - Chainage 2720, Chainage 2940 - Chainage 3940 (S00594LZ) [Road Upgrading Gravel to Paved]; Physical Target = 6.524 ln-km
To : MFO 1 - Network Development - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - Chainage 458 - Chainage 2720, Chainage 2940 - Chainage 4480 (S00594LZ) [Road Upgrading Gravel to Paved] ; Physical Target = 7.604 ln-km |
March 9, 2017 |
FY 2017 |
WIN7E01004 |
FY 2017 Approved Modification |
March 3, 2017 |
Cordillera Administrative Region |
CAR - Regional Office |
From: MFO 1 - National Road Netword Services: Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4) Baguio-Bontoc Rd, (S00373LZ) K0275+800 - K0276+338.66, K0283+554 - K0283+611, K0283+611 - K0283+661, K0265+750 - K0266+000, K0266+000 - K0266+475, K0266+680 - K0266+840, K0267+290 - K0267+633, K0268+000 - K0269+000, K0274+000 - K0274+300, K0274+500 - K0274+900, K0275+000 - K0275+050, K0277+400 - K0277+450, K0278+000 - K0278+655, K0278+852 - K0279+000, K0281+900 - K0282+000, K0286+350 - K0286+650, K0286+900 - K0287+000, K0287+000 - K0287+200 (Reconstruction from concrete to concrete)
Physical Target = 10.35 lane km
To: MFO 1 - National Road Netword Services: Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4) Baguio-Bontoc Rd, (S00373LZ) K0265+750 - K0266+000, K0266+000 - K0266+475, K0266+680 - K0266+840, K0267+290 - K0267+633, K0268+000 - K0269+000, K0274+000 - K0274+300, K0274+500 - K0274+900, K0275+000 - K0275+050, K0275+800 - K0276+338.66, K0277+400 - K0277+450, K0278+000 - K0278+655, K0278+852 - K0279+000, K0281+900 - K0282+000, K0283+554 - K0283+611, K0283+611 - K0283+661, K0286+350 - K0286+515 (Reconstruction from concrete to concrete)
Physical Target = 9.432 lane km
|
March 9, 2017 |
FY 2017 |
WIN7E00986 |
FY 2017 Approved Modification |
March 3, 2017 |
Cordillera Administrative Region |
CAR - Regional Office |
From: MFO 1 - National Road Network Services: Network Development - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis): Tertiary Roads: Abra - Cervantes Rd (S00603LZ) - Chainage 1562 - Chainage 4462 (Road Upgrading Gravel to Paved)
Physical Target = 6.24 lane km (P100.875 M)
To: MFO 1 - National Road Network Services: Network Development - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis): Tertiary Roads: Abra - Cervantes Rd (S00603LZ) - Chainage 1562 - Chainage 4462 (Road Upgrading Gravel to Paved)
Physical Target = 6.24 lane km (P100.087 M)
|
March 9, 2017 |
FY 2017 |
WIN7E00994 |
FY 2017 Approved Modification |
March 3, 2017 |
Cordillera Administrative Region |
CAR - Regional Office |
From: MFO 1 - National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis): Tertiary Roads: Ayaga - Sta. Marcela - Flora - Lasam Rd - Chainage 12913 - Chainage 14620, Chainage 14694 - Chainage 16628, Chainage 16636 - Chainage 17995 (Road Upgrading Gravel to Paved)
Physical Target = 10 lane km
To: MFO 1 - National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis): Tertiary Roads: Ayaga - Sta. Marcela - Flora - Lasam Rd - Chainage 12937 - Chainage 14620, Chainage 14694 - Chainage 16628, Chainage 16636 - Chainage 18019 (Road Upgrading Gravel to Paved)
Physical Target = 10 lane km
|
March 9, 2017 |
FY 2017 |
WIN7E00992 |
FY 2017 Approved Modification |
March 3, 2017 |
Cordillera Administrative Region |
CAR - Regional Office |
From: MFO 1 : National Road Network Services : Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4), Tertiary Roads, Asin(KM 8)-Nangalisan-Sn Pascual,Tuba,Benguet-LU - K0275 + 2716 - K0275 + 5311 (Reconstruction from Concrete to Concrete)
Physical Target = 4.978 lane km
To: MFO 1 : National Road Network Services : Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4), Tertiary Roads, Asin(KM 8)-Nangalisan-Sn Pascual,Tuba,Benguet-LU - K0275 + 2716 - K0275 + 5226 (Concrete Reconstruction with 280 mm slab with Drainage and Road Safety features)
Physical Target = 4.808 lane km
|
March 9, 2017 |
FY 2017 |
WIN7E00989 |
FY 2017 Approved Modification |
March 3, 2017 |
Cordillera Administrative Region |
CAR - Regional Office |
From: MFO 1 : National Road Network Services : Network Development -Construction of By-Passes/ Diversion Roads, including ROW, Baguio-La Trinidad-Itogon-Sablan-Tuba-Tublay (BLISTT) Outer Ring Circumferential Road, incl. ROW, PHASE 1 (Baguio-Bauang Road-Kamog Jct. to Kamog-Banengbeng Bdry. Section, Sablan, Benguet), Benguet (Construction of Concrete Road/ Construction of Road Slope Protection Structure/ ROW Acquisition)
Physical Target = 4.475 lane km (concrete road); 11,175.00 sq. m. (slope protection); 15,040.00 sq.m. (ROW acquisition)
To: MFO 1 : National Road Network Services : Network Development -Construction of By-Passes/ Diversion Roads, including ROW, Baguio-La Trinidad-Itogon-Sablan-Tuba-Tublay (BLISTT) Outer Ring Circumferential Road, incl. ROW, PHASE 1 (Tuel-Balluay-Bagong-Calot-Kamog Section, Sablan and Tublay, Benguet), Benguet (Construction of Concrete Road)
Physical Target = 4.16 lane km (concrete road)
|
March 9, 2017 |
FY 2017 |
WIN7E01011 |
FY 2017 Approved Modification |
March 3, 2017 |
Cordillera Administrative Region |
CAR - Regional Office |
From: MFO 1 : National Road Network Services : Network Development - Construction of By-Passes/ Diversion Roads, including ROW, Baguio-La Trinidad-Itogon-Sablan-Tuba-Tublay (BLISTT) Outer Ring Circumferential Road, incl. ROW and Slope Protection, PHASE 3 (Labey-Lacamen Section, Bokod, Benguet), Benguet (Construction of Concrete Road/ Construction of Road Slope Protection Structure/ ROW Acquisition)
Physical Target = 4.494 lane km (concrete road); 10,450.00 sq. m. (slope protection); 15,000.00 sq.m. (ROW acquisition)
To: MFO 1 : National Road Network Services : Network Development - Construction of By-Passes/ Diversion Roads, including ROW, Baguio-La Trinidad-Itogon-Sablan-Tuba-Tublay (BLISTT) Outer Ring Circumferential Road, incl. ROW and Slope Protection, PHASE 3 (Labey-Lacamen Section, Bokod, Benguet), Benguet (Construction of Concrete Road)
Physical Target = 5.64 lane km (concrete road)
|
March 8, 2017 |
2017 |
165003016500072 |
SR2017-02-002324 |
February 2, 2017 |
Region XIII |
Regional Office XIII |
Network Development - Improvement/Widening of National Roads - Primary Road (N1) - Daang Maharlika (Surigao - Agusan Sect) - K1168+050 - K1168+344, K1168+-091 - K1168+009, K1168+368 - K1168+444, K1169+711 - K1170+200, K1177+340 - K1180+102 (S00399MN) |
March 8, 2017 |
2017 |
165003016500075 |
SR2017-02-002431 |
February 2, 2017 |
Region XIII |
Regional Office XIII |
Network Development - Improvement/Widening of National Roads - Primary Roads (N1) - Daang Maharlika (Surigao - Agusan Sect) - K1217+000 - K1217+331.80, K1217+365.88 - K1219+386.72, K1219+412.33 - K1219+621.67, K1219+647.71 - K1220+358.80, K1220+382.91 - K1221+560, K1221+580.63 - K1221+999.20 (S00399MN) |
March 8, 2017 |
2017 |
165003016500014 |
SR2017-02-002258 |
February 2, 2017 |
Region XIII |
Regional Office XIII |
Network Development - Improvement/Widening of National Roads - Primary Roads (N1) - Daang Maharlika (Agusan - Davao Sect) - K1361+000 - K1364+000 (S00439MN) |
March 8, 2017 |
2017 |
165003016500016 |
SR2017-02-002277 |
February 2, 2017 |
Region XIII |
Regional Office XIII |
Network Development - Improvement/Widening of National Roads - Primary Roads (N1) - Daang Maharlika (Agusan - Davao Sect) - K1372+615.83 - K1374+474.358, K1374+498.358 - K1375+540, K1375+580 - K1376+823.009, K1376+863.55 - K1376+895.43 (S00439MN) |
March 8, 2017 |
2017 |
165003016500015 |
SR2017-02-002263 |
February 2, 2017 |
Region XIII |
Regional Office XIII |
Network Development - Improvement/Widening of National Roads - Primary Roads (N1) - Daang Maharlika (Agusan - Davao Sect) - K1368+227 - K1372+166, K1372+200 - K1372+440 (S00439MN) |
March 8, 2017 |
2017 |
165003015300218 |
SR2017-02-002549 |
February 2, 2017 |
Region XIII |
Regional Office XIII |
Network Development - Construction of By-Passes/Diversion Roads, including ROW - NRJ SDCR - San Isidro - Quezon - Tandag Airport By-Pass Road incl. Bridge, Surigao del Sur 1st LD |
March 8, 2017 |
2017 |
165003015300217 |
SR2017-02-002544 |
February 2, 2017 |
Region XIII |
Regional Office XIII |
Network Development - Construction of By-Passes/Diversion Roads, including ROW - NRJ Daang Maharlika (Taguibo-Section) - Masao Port, (Banza - Maug Section), Package 1, Agusan del Norte |
March 8, 2017 |
2017 |
165003017100016 |
SR2017-02-002943 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes - Bayugan Br. 1 (B00904MN) along Daang Maharlika (Agusan - Davao Sect) |
March 8, 2017 |
2017 |
165003015700150 |
SR2017-02-002816 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary Roads - Road Upgrading (unpaved to paved) - Asuncion - San Isidro - Laak - Veruela Road - K1539+000 - K1542+125 (S00480MN) |
March 8, 2017 |
2017 |
165003015100173 |
SR2017-02-002486 |
February 2, 2017 |
Region XIII |
Regional Office XIII |
Network Development - Improvement/Widening of National Roads - Secondary Roads - Butuan City - Masao Port Rd - K1242+000 - K1243+220, K1243+300 - K1244+620 (S00434MN) |
March 8, 2017 |
2017 |
165003016700002 |
SR2017-02-002757 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Network Development - Off-Carriageway Improvement including drainage - Primary Roads - Butuan City - Cagayan de Oro City - Iligan City Road (Agusan-Misamis Or Rd) (S00421MN) - K1244+340 - K1246+633, K1246+920 - K1248+400 |
March 8, 2017 |
2017 |
165003016700009 |
SR2017-02-002766 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Network Development - Off-Carriageway Improvement including drainage - Primary Roads - Daang Maharlika (Surigao - Agusan Sect) - K1226+000 - K1228+192, K1228+290 - K1229+600, K1230+757 - K1231+364, K1231+385 - K1232+750, K1232+770 - K1232+787, K1237+000 - K1238+069 (S00419MN) |
March 8, 2017 |
2017 |
165003014700054 |
SR2017-02-002203 |
February 2, 2017 |
Region XIII |
Regional Office XIII |
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads - Butuan City - Cagayan de Oro City - Iligan City Road (Agusan - Misamis Or Rd) Jct. Ochoa Ave. - Butuan Doctor's Hospital, K1240+490 - K1241+900 (S00421MN) |
March 8, 2017 |
2017 |
165003015300098 |
SR2017-02-002516 |
February 2, 2017 |
Region XIII |
Regional Office XIII |
Network Development - Construction of By-Passes/Diversion Roads, including ROW - Butuan City By-Pass Road, (Bonbon - Bancasi Airport Section and Lemon-NRJ-Antongalon Section), incl. bridge, Agusan del Norte 1st LD |
March 8, 2017 |
2017 |
165003015300216 |
SR2017-02-002536 |
February 2, 2017 |
Region XIII |
Regional Office XIII |
Network Development - Construction of By-Passes/Diversion Roads, including ROW - NRJ Daang Maharlika (Taguibo-Section) - Masao Port incl. Bridge (Banza Bridge), Agusan del Norte 1st LD, Package 2 |
March 8, 2017 |
2017 |
165003015300166 |
SR2017-02-002531 |
February 2, 2017 |
Region XIII |
Regional Office XIII |
Network Development - Construction of By-Passes/Diversion Roads, including ROW - Daang Maharlika (Alternate Route) (NRJ-Mayor Democrito D. Plaza II Avenue-Las Nieves-Sibagat) Package 3 (Bilay-Mandamo Section), Agusan del Norte |
March 8, 2017 |
2017 |
165003015400102 |
SR2017-02-002608 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Network Development - Construction of Missing Gaps connecting National Roads, including ROW - Bdry. Bukidnon/Agusan Del Norte, Agusan del Norte 1st LD, Package 1 |
March 8, 2017 |
2017 |
165003016600023 |
SR2017-02-002444 |
February 2, 2017 |
Region XIII |
Regional Office XIII |
Network Development - Improvement/Widening of National Roads - Other Primary Roads - Butuan City - Cagayan de Oro City - Iligan City Road (Agusan-Misamis Or. Rd) - K1269+343 - K1272+000, K1274+000 - K1274+425 (S00391MN) |
March 8, 2017 |
2017 |
165003016600024 |
SR2017-02-002460 |
February 2, 2017 |
Region XIII |
Regional Office XIII |
Network Development - Improvement/Widening of National Roads - Other Primary Roads - Butuan City - Cagayan de Oro City - Iligan City Road (Agusan-Misamis Or Rd) - K1274+425 - K1276+000, K1276+000 - K1277+794.82 (S00391MN) |
March 8, 2017 |
2017 |
165003017100038 |
SR2017-02-002958 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes, including ROW, Guihao-an Br. (B00871MN) along Butuan City - Cagayan de Oro City - Iligan City Road (Agusan-Misamis Or. Rd) (Construction of Parallel Bridge) |
March 7, 2017 |
FY 2017 |
165003016800010 |
SR2017-01-000657 |
January 30, 2017 |
Region II |
Regional Office II |
Network Development: Off-Carriageway Improvement including drainage of Cordon-Aurora Boundary Rd (Isabela Boundary-Jct Dumabato) (S04192LZ) - K0322 + (-796) - K0323 + 634, K0323 + 700 - K0324 + 254.2, K0336 + 030 - K0337 + 389, K0337 + 493 - K0339 + 536, K0339+536-K0339+847.2, K0339+889.2-K0340+701.4 (Off-carriageway Improvement), K0323+000-K0323+634 (carriageway Reconstruction) |
March 7, 2017 |
FY 2017 |
165003016500002 |
SR2017-01-000554 |
January 25, 2016 |
Region II |
Regional Office II |
Network Development: Improvement/Widening of National Roads - Primary Roads along N1 Cagayan Valley Road (S04161LZ) - K0471+120 - K0473+520, K0485+000 - K0485+300, K0487+660 - K0488+700, K0488+900 - K0489+016.70 |
March 7, 2017 |
FY 2017 |
165003014100086 |
SR2017-01-000578 |
January 28, 2017 |
Region II |
Regional Office II |
Asset Preservation of National Roads: Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) Primary Roads: Daang Maharlika (LZ) (S00795LZ) - K0349+667 - K0350+238, K0354+522 - K0354+971, K0364+022.50 - K0364+708, K0364+730 - K0364+981, K0365+316 - K0365+527, K0374+000 - K0375+000, K0375+127 - K0376+000, K0378+712 - K0378+888 |
March 7, 2017 |
FY 2017 |
165003016500004 |
SR2017-01-000557 |
January 28, 2017 |
Region II |
Regional Office II |
Network Development: Improvement/Widening of National Roads Primary Roads along N1 - Cagayan Valley Road (S00887LZ) - K0511+(-104)–K0512+000, K0513+570–K0514+813.5, K0515+728-K0516+000, K0516+000-K0516+400, K0518+800-K0519+499 |
March 7, 2017 |
FY 2017 |
165003015200122 |
SR2017-01-000646 |
January 30, 2017 |
Region II |
Regional Office II |
Network Development: Improvement/Widening of National Roads Tertiary Roads Jct. Ipil-Quirino Boundary Road (S00821LZ) - K0337+(-152) – K0337+540, K0350+000 – K0352+620 |
March 7, 2017 |
FY 2017 |
165003016600104 |
SR2017-01-000639 |
January 30, 2017 |
Region II |
Regional Office II |
Network Development: Improvement/Widening of National Roads - Other Primary Roads along Santiago-Tuguegarao Road (S00755LZ), K0423+845.8 - K0429+159.30 |
March 7, 2017 |
FY 2017 |
292003020401506 |
SR2017-01-000722 |
January 30, 2017 |
Region II |
Regional Office II |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Control System, Dacal-la Fugu, Camalaniugan, Cagayan, Sta. 0+000 – Sta. 0+405 |
March 7, 2017 |
FY 2017 |
165003016500035 |
SR2017-01-000578 |
January 28, 2017 |
Region II |
Regional Office II |
Network Development: Improvement/Widening of National Roads Primary Roads along N1 - Daang Maharlika (LZ) (S00731LZ) - K0419+941 – K0423+249, K0435+000 – K0435+720 |
March 7, 2017 |
FY 2017 |
165003016600105 |
SR2017-01-000641 |
January 30, 2017 |
Region II |
Regional Office II |
Network Development: Improvement/Widening of National Roads - Other Primary Roads: Santiago-Tuguegarao Road (Jct Kalinga- Tuguegarao Sect) (S00725LZ) - K0437+060-K0442+122, K0442+409-K0442+880 |
March 7, 2017 |
FY 2017 |
165003016600103 |
SR2017-01-000597 |
January 28, 2017 |
Region II |
Regional Office II |
Network Development: Improvement/Widening of National Roads - Other Primary Roads: Santiago-Tuguegarao Road (S00755LZ) - K0419+100-K0423+845.8 |
March 7, 2017 |
FY 2017 |
165003015400168 |
SR2017-01-000652 |
January 30, 2017 |
Region II |
Regional Office II |
Network Development: Construction of Missing Gaps Connecting National Roads, including ROW, Jct. Abbag-Guingin Bdry Rd (Bucao-La Conwap Section) including Slope Protection - Sta. 000+000 - Sta. 001+680, Sta. 002+220 – Sta. 003+770. |
March 7, 2017 |
FY 2017 |
165003016600101 |
SR2017-01-000594 |
January 28, 2017 |
Region II |
Regional Office II |
Network Development: Improvement/Widening of National Roads Outside N1 along Santiago-Tuguegarao Road (S00760LZ) - K0399 + 000 - K0402 + 440 |
March 7, 2017 |
FY 2017 |
165003016500034 |
SR2017-01-000568 |
January 28, 2017 |
Region II |
Regional Office II |
Network Development: Improvement/Widening of National Roads Primary Roads along N1: Road Widening including Drainage & Slope Protection along Daang Maharlika (LZ) (S00795LZ) - K0356 + 929 - K0357 + 203, K0359 + 000 - K0359 + 765, K0359 + 880 - K0360 + 535 |
March 7, 2017 |
FY 2017 |
165003030600034 |
SR2017-01-000749 |
January 30, 2017 |
Region II |
Regional Office II |
Construction/Improvement of Access Roads leading to Airports, Itbayat Airport/NIA Circumferential Road, Itbayat, Batanes - Sta. 0+000 – Sta.1+235 |