June 20, 2017 |
2017 |
WIN7E01645 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Bagong Sikat, Cabiao, Nueva Ecija |
June 20, 2017 |
2017 |
WIN7F04813 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Network Development - Improvement/Widening of National Roads - Secondary - Pulilan - Calumpit Road, Bulacan,
K0043+-442 to K0043+-196.20, K0043+-053.40 - K0043+547.18, K0045+288.50 - K0045+624.40, K0046+392.00 - K0047+104.00, K0048+138.30 - K0048+325.70, K0050+830.00 - K0052+786.00, K0053+100.00 - K0053+232.00 |
June 20, 2017 |
FY 2017 |
WIN7F04876 |
UACS No. 292003020401918 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
MFO 2 – Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Flood Mitigation Facility – Installation of Additional Pump Vitas Pumping Station, Tondo, Manila City (Construction of Flood Mitigation Structure)
UACS No. 292003020401918
Physical Target/Cost
Original: -
Unit Cost (P’000): -
Allocation Cost (P’000): P50,000
WIN7F04876
Modified
MFO 2 – Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Revetment Adjacent to Vitas, Manila City (Construction of Revetment)
UACS No. 292003020401918
Physical Target/Cost
Modified: 139.75 lineal meters
Unit Cost (P’000): P357.782T/Lineal meters
Estimated Cost (P’000): P50,000
WIN7F04876
|
June 20, 2017 |
FY 2017 |
WIN7F04871 |
UACS No. 103004010309812 |
January 1, 2017 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA
Locally Funded Project: Local Infrastructure Program – Buildings and Other Structures – Multipurpose/Facilities, Construction of Five (5) Storey with Basement Disability Resource and Development Center (DRDC), NCDA Compound, Isidora St., Barangay Holy Spirit, Quezon City (Construction of Purpose Building)
UACS No. 103004010309812
Physical Target / Cost
Per GAA/Original: 1 building
Unit Cost: P83.000M/Bldg.
Allocation: Php 83M
WIN7F04871
As Modified
Locally Funded Project: Local Infrastructure Program – Buildings and Other Structures – Multipurpose/Facilities, Construction of Seven (7) Storey Building Disability Resource and Development Center (DRDC), NCDA Compound, Isidora St., Barangay Holy Spirit, Quezon City (Construction of Purpose Building)
UACS No. 103004010309812
Physical Target / Cost
As Modified: 1 building
Unit Cost: P83.000M/Bldg.
Estimated: Php 83M
WIN7F04871
|
June 20, 2017 |
FY 2017 |
WIN7F04873 |
UACS No. 103004010310266 |
January 1, 2017 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA
Locally Funded Projects: Local Infrastructure Program – Buildings and Other Structures – Multi-Purpose Building, Brgy. Fairview, Quezon City (Construction of Multi-Purpose Building)
UACS No. 103004010310266
Physical Target / Cost
Per GAA/ Original: 1 Building
Unit Cost: P3.000M/Bldg.
Allocation: Php 3M
WIN7F04873
As Modified
Locally Funded Projects: Local Infrastructure Program – Buildings and Other Structures – Multi-Purpose Building/Facilities, Rehab./Major Repair of Multi-Purpose Building, Brgy. Fairview, Quezon City (Rehabilitation/Major Repair of Multi-Purpose Building)
UACS No. 103004010310266
Physical Target / Cost
As Modified: 1 Building
Unit Cost: P3.000M/Bldg.
Estimated Cost: Php 3M
WIN7F04873
|
June 20, 2017 |
FY 2017 |
WIN7F04900 |
UACS No. 103004010310243 |
January 1, 2017 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA
Locally Funded Projects, VILP – Buildings and Other Structures – Multi-Purpose /Facilities Construction of Multi-Purpose Building D/Antonio Street cor Commonwealth Avenue Holy Spirit, Quezon City (Construction of Multipurpose Building)
UACS No. 103004010310243
Physical Target/Cost
Per GAA/ Original: 1 bldg
Unit Cost: P2.0M/Bldg.
Allocation: Php 2.0M
WIN7F04900
As Modified
Locally Funded Projects, VILP – Buildings and Other Structures – Multi-Purpose /Facilities Construction of Multi-Purpose Building Holy Spirit Drive Corner Commonwealth Avenue Holy Spirit, Quezon City (Construction of Multipurpose Building)
UACS No. 103004010310243
Physical Target/Cost
Modified: 1 bldg
Unit Cost: P2.0M/Bldg.
Estimated Cost: Php 2.0M
WIN7F04900
|
June 20, 2017 |
2017 |
WIN7F04760 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Albay 3rd Engineering Office |
As per GAA:
MFO-1 National Road Network Services: Asset
Preservation of National Roads - Rehabilitation/
Reconstruction Of National Roads with Slips, Slope Collapse, and Landslide - Secondary, Construction of Road Slope Protection Structure - Ligao-Pio Duran Rd - K0518+468 - K0518+512, K0527+185 - K0527+210, K0527+253 - K0527+285 (Construction of Road Slope Protection Structure)
Physical Target: 675 Sq.m.
Unit Cost (P'000): P6.74/Sq.m.
Allocation: PhP 4.547M
As MODIFIED:
MFO-1 National Road Network Services: Asset
Preservation of National Roads - Rehabilitation/
Reconstruction Of National Roads with Slips, Slope Collapse, and Landslide - Secondary, Construction of Road Slope Protection Structure - Ligao-Pio Duran Rd - K0527+120 - K0527+185, K0527+185 - K0527+210, K0527+253 - K0527+285 (Construction of Road Slope Protection Structure)
Physical Target: 299.41 Sq.m.
Unit Cost (P'000): P15.19/Sq.m.
Estimated Cost: PhP 4.547M
|
June 20, 2017 |
FY 2017 |
WIN7E01751 |
UACS No. 268004010101299 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As Per GAA
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures – School Buildings: Construction of Four (4) Storey Twelve (12) Classroom School Building, San Juan City (Construction of Classroom School Building, San Juan City (Construction of Classrooms)
UACS No. 268004010101299
Physical Target/Cost
Per GAA/Original: Physical Target 12 Classrooms
Unit Cost: P2M/Classroom
Allocation: P24M
WIN7E01751
As Modified
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures – School Buildings: Construction of Four (4) Storey Twelve (12) Classroom School Building, Kabayanan Elementary School, San Juan City (Construction of Classroom School Building, San Juan City (Construction of Classrooms)
UACS No. 268004010101299
Physical Target/Cost
Per GAA/Original: Physical Target 12 Classrooms
Unit Cost: P2M/Classroom
Estimated Cost: P24M
WIN7E01751
|
June 20, 2017 |
2017 |
WIN7E01669 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally - Funded Projects - Roads and Bridges - Local Roads: Concreting of Barangay Road,
Brgy. Cabutagan, Lupi, Camarines Sur
Physical Target: 0.40 lane-km
Unit Cost (P'000): P3,750/lane-km
Allocation (P'000): P1,500
As MODIFIED:
Locally - Funded Projects - Roads and Bridges - Local Roads: Rehabilitation/Concreting of Barangay Road, Brgy. Cabutagan, Lupi, Camarines Sur (Construction of Concrete Road)
Physical Target: 0.2070 lane-km
Unit Cost (P'000): P7,246/lane-km
Estimated Cost(P'000): P1,500
|
June 20, 2017 |
2017 |
WIN7G01580 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Network Development - Construction of Bypasses/Diversion Roads, including ROW
Construction of Concrete Road - Talacogon Bypass Road, incl. ROW, Agusan del Sur
Allocation : ₱ 20.00 Million (Total)
: ₱ 18,320,000.00 (Concrete Road)
: ₱ 1,680,000.00 (ROW Acquisition)
Physical Target : 0.800 lane km (Concrete Road)
: 24,000.00 sq.m. (ROW Acquisition)
|
June 20, 2017 |
2017 |
WIN7G01579 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Network Development - Construction of Bypasses/Diversion Roads, including ROW
Construction of Gravel Road - Daang Maharlika (Alternate Route) (NRJ - Mayor Democrito D. Plaza II Avenue - Las Nieves - Sibagat), (ADN/ADS BDRY., Sibagat Section), Package 2, Sibagat, Agusan del Sur, Sta. 0+820 - Sta. 1+756
Allocation : ₱ 20.00 Million (Total)
: ₱ 16,500,000.00 (Gravel Road)
: ₱ 3,500,000.00 (ROW Acquisition)
Physical Target : 1.872 lane km (Gravel Road)
: 56,160.00 sq.m. (ROW Acquisition)
|
June 20, 2017 |
2017 |
WIN7G01574 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW
Construction of Concrete Road - Esperanza (Crossing Luna) - San Luis Section, Agusan del Sur
Allocation : ₱ 20.00 Million
Physical Target : 1.3462 lane km
|
June 20, 2017 |
2017 |
WIN7G01578 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW
Construction of Gravel Road - Completion of the East-West Lateral Road connecting Agusan del Sur/Agusan del Norte to Bukidnon San Miguel Proper (Surigao del Sur) - Calaitan, Package 2, Bayugan, Agusan del Sur, Sta. 1301+320 - Sta. 1301+880
Allocation : ₱ 20.00 Million
Physical Target : 1.12 lane km
|
June 20, 2017 |
2017 |
WIN7G01575 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Network Development - Construction of Bypasses/Diversion Roads, including ROW
Construction of Gravel Road - Daang Maharlika (Alternate Route) (NRJ - Mayor Democrito D. Plaza II Avenue - Las Nieves - Sibagat), (ADN/ADS BDRY., Sibagat Section), Package 1, Agusan del Sur, Sta. 0+005 - Sta. 0+820
Allocation : ₱ 20.00 Million (Total)
: ₱ 16,500,000.00 (Const.of Gravel Road)
: ₱ 3,500,000.00 (ROW Acquisition)
Physical Target
1.63 lane km (Const.of Gravel Road)
: 48,900.00 sq.m. (ROW Acquisition)
|
June 20, 2017 |
2017 |
WIN7G01576 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW
Construction of Gravel Road - Completion of the East-West Lateral Road connecting Agusan del Sur/Agusan del Norte to Bukidnon San Miguel Proper (Surigao del Sur) - Calaitan, Package 1, Bayugan, Agusan del Sur, Sta. 1300+920 - Sta. 1301+320
Allocation : ₱ 20.00 Million
Physical Target : 0.80 lane km
|
June 20, 2017 |
2017 |
WIN7G01572 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary
Road Upgrading Gravel to Paved - Butuan City-Talacogon-Loreto-Veruela-Sta. Josefa Road, San Luis, Agusan del Sur, Chainage 23,197.20 - Chainage 23,457.20
Allocation : ₱ 5.00 Million
Physical Target : 0.520 lane km
|
June 20, 2017 |
2017 |
WIN7G01577 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Construction and Maintenance of Bridges along National Roads - Replacement of Permanent Weak Bridges
Replacement of Permanent Weak Bridges - Capudlosan Bridge (B00846MN) along Daang Maharlika (Surigao-Agusan Section)
Allocation : ₱ 42.00 Million (Total)
: ₱ 39,449,963.89 (Bridge Replacement) : ₱ 2,550,036.11 (ROW Acquisition)
Physical Target : 289.80 sq.m. (Bridge Replacement)
: 200.00 sq.m. (ROW Acquisition)
|
June 20, 2017 |
2017 |
WIN7G01573 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Construction and Maintenance of Bridges along National Roads - Replacement of Permanent Weak Bridges
Replacement of Bridge to more than 2 lanes at Mina-ano Bridge (B00848MN) along Daang Maharlika (Surigao-Agusan Section)
Allocation : ₱ 36.00 Million (Total) : ₱ 33,218,401.95 (Bridge Replacement)
: ₱ 2,781,598.05 (ROW Acquisition)
Physical Target : 322.00 sq.m. (Bridge Replacement)
: 200.00 sq.m. (ROW Acquisition)
|
June 19, 2017 |
CY 2017 |
292003020402880 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
MF02 - Flood Management Services
- Construction/Maintenance of Flood Mitigation
Structures and Drainage Systems
- Construction of Panggalaan River Control
Brgy. San Nicolas Section, Naujan,
Oriental Mindoro
L = 413 lm
Php = 20,000,000.00 Million
( Construction of Flood Mitigation Structure ) |
June 19, 2017 |
CY 2017 |
292003020402878 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
MF02 - Flood Management Services
- Construction/Maintenance of Flood Mitigation
Structures and Drainage Systems
- Construction of Dulangan River Control (Gabion),
Baco, Oriental Mindoro
L = 509 lm
Php = 50,000,000.00 Million
( Construction of Flood Mitigation Structure ) |
June 19, 2017 |
CY 2017 |
WIN7F04816 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure Program
- Roads and Bridges
- National Roads
Repair/Rehabilitation/Improvement
CSR K0054+000 - K0054+419.50
Puerto Galera, Oriental Mindoro
CW1 = 2097.50 sq.m.
Php = 10,000,000.00 Million
( Shoulder Paving/Construction,
Construction of Road Slope Protection Structure )
|
June 19, 2017 |
CY 2017 |
WIN7F048156 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Roads and Bridges
- National Roads
Repair/Rehabilitation/Improvement
CNR
K0042+058 - K0042+270,
K0042+412 - K0042+476,
K0042+864.50 - K0043+574.50
Puerto Galera, oriental Mindoro
CW1 = 2495 sq.m.
Php = 10,000,000.00 million
( Shoulder Paving/Construction,
Construction of Road Slope Protection Structure )
|
June 19, 2017 |
CY 2017 |
WIN7F04823 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Roads and Bridges
- National Roads
Repair/Rehabilitation/Improvement
CSR Jct. Pola
K0069+000 - K0069+619
Pola, Oriental Mindoro
CW1 = 1,857 sq.m.
Php = 10,000,000.00 Million
( Shoulder Paving/Construction,
Construction of Road Slope Protection Structure )
|
June 19, 2017 |
2017 |
165003014900113 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads – Tertiary - San Fernando - Lubao Road, K0084+178 - K0085+020 |
June 19, 2017 |
2017 |
165003014200222 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation of National Roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System / Highway Development Management - 4 (HDM-4) – Secondary - Reconstruction from Asphalt to Concrete - Angeles - Porac - Floridablanca - Dinalupihan Road, K0095+160 - K0096+826 |
June 19, 2017 |
2017 |
165003014900114 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads – Tertiary - Sasmuan - Lubao Road, K0077+782 - K0078+047.30 |
June 19, 2017 |
2017 |
WIN7F04861 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads - Road Concreting in San Nicolas 1, Lubao, Pampanga |
June 19, 2017 |
2017 |
WIN7F04858 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Flood Control Works in Guagua River and Pasac Delta, Pampanga |
June 19, 2017 |
2017 |
WIN7F04801 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Flood Control and Drainage - Flood Control Structures/Facilities
Repair/Rehab of Calabasa Flood Control, Gabaldon, Nueva Ecija
(Construction of Flood Mitigation Structure) |
June 19, 2017 |
2017 |
WIN7F04845 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Flood Control and Drainage - Flood Control Structures/Facilities
Repair/Rehab of Sta. Rosa Flood Control, Sta. Rosa, Nueva Ecija
(Construction of Flood Mitigation Structure) |
June 19, 2017 |
2017 |
WIN7F04798 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Project - Local Infrastructure Program
Flood Control and Drainage - Flood Control Structures/Facilities
Construction/Maintenance of Flood Control Mitigation Structure and Drainage System/Rehabilitation/Improvement of Cabu River Flood Control
Sta. 6+901.40 - Sta. 7+256.40 (710.00 l.m.), Brgy. Cabu, Cabanatuan City, Nueva Ecija
(Construction of Flood Mitigation Structure) |
June 19, 2017 |
2017 |
WIN7F04822 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Project - Local Infrastructure Program
Flood Control and Drainage - Flood Control Structures/Facilities
Construction/Maintenance of Flood Control Mitigation Structure and Drainage System Coronel River Control, Brgy. San Vicente, Laur, Nueva Ecija
(Construction of Flood Mitigation Structure) |
June 19, 2017 |
2017 |
WIN7F04821 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Project - Local Infrastructure Program
Flood Control and Drainage - Flood Control Structures/Facilities
Construction/Maintenance of Flood Control Mitigation Structure and Drainage System Pampanga River Control, Brgy. Popolon, Palayan City, Nueva Ecija
(Construction of Flood Mitigation Structure) |
June 19, 2017 |
2017 |
WIN7F04800 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Improvement/Repair of Road, Brgy . Rajal Sur, Santa Rosa, Nueva Ecija
(CW-1: Rehabilitation of Concrete Road)
(CW-2: Construction of Slope Protection Structure) |
June 19, 2017 |
2017 |
WIN7F04657 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Road, Brgy. Padolina, General Tinio, Nueva Ecija
(Construction of Concrete Road) |
June 19, 2017 |
2017 |
WIN7F04660 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Reblocking/Asphalt Overlay of Road, Rizal St., Brgy. Castellano-Brgy. Nieves, San Leonardo, Nueva Ecija
(CW-1: Construction of Asphalt Road)
(CW-2: Rehabilitation of Concrete Road) |
June 19, 2017 |
2017 |
WIN7F04630 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Construction/Rehabilitation of Barangay Road leading to Municipal Hall, Jaen, Nueva Ecija, 4th LD
(Construction of Concrete Road) |
June 19, 2017 |
2017 |
WIN7F04830 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Construction/Repair/Improvement of Various Infrastructure including Local Projects
Roads and Bridges - Local Bridges
Reconstruction of Luyos-Biliran Bridge across Pampanga River (Phase II), San Antonio, Nueva Ecija
(Construction of Concrete Bridge) |
June 19, 2017 |
2017 |
WIN7F04799 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Buildings and Other Structures - Multipurpose/Facilities
Construction of Covered Court, Brgy. Calaanan, Bongabon, Nueva Ecija
(Construction of Multi-Purpose Building)
|
June 19, 2017 |
2017 |
WIN7F04636 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation of National Roads (Arterial)
Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development and Management-4 (HDM-4) - Primary Roads
Jose Abad Santos Ave. (JASA)
K0122+503.00-K0122+842.20,
K0114+318.00-K0114+413.50
(CW-1: Rehabilitation of Concrete Road)
(CW-2: Construction of Drainage Structure along Road) |
June 19, 2017 |
2017 |
WIN7F04826 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation of National Roads
Construction/Upgrading/Rehabilitation of Drainage along National Roads - Tertiary Road
Gapan-Fort Magsaysay Road
K0102+517.50 - K0103+800,
K0108+(-074.30) - K0108+730,
K0109+120 - K0109+588.00
(CW-1: Construction of Drainage Structure along Road)
(CW-2: Off-Carriageway Improvement: Shoulder Paving/Construction) |
June 19, 2017 |
2017 |
WIN7F04811 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges, including ROW to more than 2 -lanes
Baluarte Br. 1 (B01306LZ) along Daang Maharlika (LZ)
(Widening of Bridge)
|
June 19, 2017 |
2017 |
WIN7F04814 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges, including ROW to more than 2 -lanes
Cababao Br. (B01376LZ) along Daang Maharlika (LZ)
(Widening of Bridge) |
June 16, 2017 |
FY 2017 |
WIN7F04863 |
UACS No. 103004010309929 |
January 1, 2017 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA
Locally Funded, VIILP – Buildings and Other Structures – Multi-Purpose/Facilities: Construction of Multi-Purpose Building along St. Joseph, Brgy. Commonwealth, Q.C. (Construction of Multi-Purpose Building)
UACS No. 103004010309929
Physical Target/Cost
Per GAA/Original: 1 bldg
Unit Cost: P3,000.00/bldg.
Allocation: Php 3,000M
WIN7F04863
As Modified
Locally Funded Projects, VIILP – Buildings and Other Structures – Multipurpose/Facilities Rehabilitation and Major Repair of Multi-Purpose Building at Poinsettia St. Brgy. Commonwealth, Q.C.
UACS No. 103004010309929
Physical Target/Cost
As Modified: 1 bldg
Unit Cost: P3,000.00/bldg.
Estimated Cost: Php 3,000M
WIN7F04863
|
June 16, 2017 |
2017 |
WIN7G01540 |
FY 2017 (R.A 10924) |
May 16, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary -
Slope Protection along Lanao - Pagadian - Zamboanga City Road (S01450MN),
K1625+000 - K1625+150,
K1640+300 - K1640+798.46,
K1646+559.00 - K1646+820.
Allocation: P23.216 Million
Physical Target: 4,681.75 sq.m.
Unit Cost: P4,958.83/sq.m. |
June 16, 2017 |
2017 |
WIN7G01526 |
FY 2017 (R.A 10924) |
May 16, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary -
Slope Protection along Jct. Blancia - Molave - Josefina Road (S01105MN)
K1686+500 - K1686+900.
Allocation: P 4.00 Million
Physical Target: 2,051 sq.m.
Unit Cost: P1,950.27/sq.m. |
June 16, 2017 |
2017 |
WIN7G01523 |
FY 2017 (R.A 10924) |
May 16, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary -
Slope Protection along Jct. Switch - Jct. Monte Alegre Road (S01097MN),
K1648+200 - K1648+546.39.
Allocation: P 5.00 Million
Physical Target: 3,833.05 sq.m.
Unit Cost: P 1,304.44/sq.m. |
June 16, 2017 |
2017 |
WIN7G01522 |
FY 2017 (R.A 10924) |
May 16, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary -
Slope Protection along Jct. Aurora - Ozamis City Road (S01085MN)
K1631+700 - K1632+000.
Allocation: P5.00 Million
Physical Target: 1,096.46 sq.m.
Unit Cost: P4,560.13 /sq.m. |
June 16, 2017 |
2017 |
WIN7G01537 |
FY 2017 (R.A 10924) |
May 16, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary -
Slope Protection Structure along Sindangan - Siayan - Dumingag - Mahayag Road (S01449MN),
K1677+000 - K1678+000 (L/S),
K1685+300 - K1685+700 (R/S),
K1684+793 - K1684+993 (R/S).
Allocation: P22.381 Million
Physical Target: 6,032.02 sq.m.
Unit Cost: P3,710.37 /sq.m. |
June 16, 2017 |
2017 |
WIN7G01524 |
FY 2017 (R.A 10924) |
May 16, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Lower Landing Bridge (Downstream) along Mahayag - Dumingag Road, Dumingag, Zamboanga del Sur,
Sta. 00+000 - Sta. 00+201.70 (both sides)
Allocation: P 25.00 Million
Physical Target: 403.40 lm.
Unit Cost: P61,973.23/lm |
June 15, 2017 |
2017 |
WIN7G01551 |
FY 2017 (R.A 10924) |
May 16, 2017 |
Region IX |
Regional Office IX |
Network Development - Construction of By-Passes/Diversion Road, including ROW - Construction of Concrete Bridges - Zamboanga City By-Pass Road (Culianan - Patalon Section), Package 2, including ROW, Zamboanga City -
San Roque Bridge and Approaches:
Sta. 1982+580.00 - Sta. 1983+036.00
San Roque Br. (Length - 45.84 ln.m.)
Abutment A: Sta. 1982+770.00, Abutment B: Sta. 1982+815.84
Malagutay Br: (Length - 30.84 ln.m.)
Abutment A: Sta. 1980+057.60,
Abutment B: Sta. 1980+088.44
Allocation:
Php 200,000,000.00 (Total)
Php 163,394,227.72 (San Roque Br. & Approaches)
Php 34,574,088.76 (Malagutay Bridge)
Php 2,031,683.52 (ROW Acquisition)
Physical Target:
437.31 sq.m. (San Roque Br.)
294.21 sq.m. (Malagutay Br.)
1,015.84 sq.m. (ROW Acquisition)
Unit Cost:
Php 373,634.784/sq.m. (San Roque & Approaches)
Php 117,515.002/sq.m. (Malagutay Br.)
Php 2,000.00/sq.m. (ROW Acquisition) |
June 14, 2017 |
2017 |
WIN7F04642 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac 2nd District Engineering Office |
Locally-Funded Projects: Local Infrastructure Program
Buildings and Other Structures - Multipurpose Facilities
Construction of Multi-Purpose Building, Barangay Sto. Cristo, Concepcion, Tarlac
(Construction of Multi-Purpose Building) |
June 14, 2017 |
FY 2017 |
WIN7F04832 |
UACS No. 292003020401675 |
January 1, 2017 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
MFO 2 – Flood Management Services – Construction Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Structures and other improvement at Magdaong Creek towards Laguna de Bay, Muntinlupa City [Construction of Flood Mitigation Structure]
UACS No. 292003020401675
Physical Target/Cost
Original: 240 lm
Unit Cost (P’000): P83.333/lm
Allocation Cost (P’000): P20,000
WIN7F04832
As Modified
MFO 2 – Flood Management Services – Construction Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Structures and other improvement Muntinlupa Sports Complex along Laguna de Bay, Barangay Tunasan, Muntinlupa City [Construction of Flood Mitigation Structure]
UACS No. 292003020401675
Physical Target/Cost
New: 95 lm
Unit Cost (P’000): P210.53/lm
Estimated Cost (P’000): P20,000
WIN7F04832
|
June 14, 2017 |
FY 2017 |
WIN7F04862 |
UACS No. 292003020401796 |
January 1, 2017 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As Per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Flood Mitigation Structure – Bank Improvement, Removal/relocation of Informal Settlers, Installation of sluice gates on the creeks and Pumping stations of Parañaque River, Parañaque City (Construction of Flood Gate/Sluice Gate)
UACS No. 292003020401796
Physical Target/Cost (P’000):
Original: 390 lineal meters
Unit Cost (P’000): CW1 P 128.205T/lineal meters
Allocation (P’000): P50,000
WIN7F04862
As Modified
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems: Bank Improvement and Sheet Piling along Coastal Service Road (Phase II), Parañaque City Metro Manila (Construction of Flood Mitigation Structure)
UACS No. 292003020401796
Physical Target/Cost:
Modified: 366 lineal meters
Unit Cost (P’000): P136.612T/lineal meters
Estimated Cost (P’000): P50,000
WIN7F04862
|
June 14, 2017 |
FY 2017 |
WIN7E01539 |
FY 2017 APPROVED MODIFICATION |
April 20, 2017 |
Cordillera Administrative Region |
Apayao 1st District Engineering Office |
From: MFO-1: National Road Network Services, Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges, Igawe Bridge along Apayao-Ilocos Norte Road (Construction of Concrete Bridge)
Physical Target = 585.756 sq. m.
To: MFO-1 :National Road Network Services, Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges Igawe Bridge along Apayao-Ilocos Norte Road (Construction of Concrete Bridge)
Physical Target = 593.865 sq. m.
|
June 14, 2017 |
FY 2017 |
WIN7E01534 |
FY 2017 APPROVED MODIFICATION |
April 20, 2017 |
Cordillera Administrative Region |
Apayao 1st District Engineering Office |
From : MFO-1: National Road Network Services, Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges, Dibagat Bridge along Apayao-Ilocos Norte Road (Construction of Concrete Bridge)
Physical Target = 183.00 sq. m.
To: MFO-1: National Road Network Services, Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges Dibagat Bridge along Apayao-Ilocos Norte Road (Construction of Concrete Bridge)
Physical Target = 190.80 sq. m.
|
June 14, 2017 |
FY 2017 |
WIN7EO1533 |
FY 2017 APPROVED MODIFICATION |
April 20, 2017 |
Cordillera Administrative Region |
Apayao 1st District Engineering Office |
From: MFO-1: National Road Network Services, Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges, Anagdong Bridge along Apayao-Ilocos Norte Road (Construction of Concrete Bridge)
Physical Target = 585.756 sq. m.
To: MFO-1: National Road Network Services, Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges Anagdong Bridge along Apayao-Ilocos Norte Road (Construction of Concrete Bridge)
Physical Target = 593.865 sq. m.
|
June 14, 2017 |
FY 2017 |
WIN7E01535 |
FY 2017 APPROVED MODIFICATION |
April 20, 2017 |
Cordillera Administrative Region |
Apayao 1st District Engineering Office |
From: MFO-1: National Road Network Services, Network Development - Off- Carriageway Improvement including drainage -Secondary Network Development-Off-Carriageway Improvement Including Drainage-Secondary Roads, Abbut-Conner Road - K0540+(-375) - K0540+(-255), K0540+(-255)- K0540 + (-085), K0540 + (-085) - K0541 + 240, K0541 + 258 - K0541+534. (Shoulder Paving/ Construction)
Physical Target = 5,961.00 sq. m.
To: MFO-1: National Road Network Services, Network Development - Off- Carriageway Improvement including drainage -Secondary Network Development-Off-Carriageway Improvement Including Drainage-Secondary Roads, Abbut-Conner Road - K0540+(-375) - K0540+(-255), K0540+(-255)- K0540 + (-085), K0540 + (-085) - K0541 + 240, K0541 + 258 - K0541+534. (Shoulder Paving/ Construction)
Physical Target= 5,706.00 sq. m.
|
June 14, 2017 |
FY 2017 |
WIN7E01439 |
FY 2017 APPROVED MODIFICATION |
April 12, 2017 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: MFO1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) -Chainage 1347 - Chainage 1392, Chainage 2023 - Chainage 2035, Chainage 5345 - Chainage 5376, Chainage 6670 - Chainage 6720, Chainage 10889 - Chainage 10904, Chainage 11753 - Chainage 11791, Chainage 13144 - Chainage 13349, Chainage 12598 - Chainage 12630, Chainage 1707 - Chainage 1772, Chainage 2319 - Chainage 2374, Chainage 4327 - Chainage 4347, Chainage 9964 - Chainage 10054, Chainage 2749 - Chainage 2774, Chainage 23388 - Chainage 23458, Chainage 18145 - Chainage 18173, Chainage 17620 - Chainage 17680, Chainage 8876 - Chainage 9138, Chainage 11863 - Chainage 12063 [CW1 - Construction of Road Slope Potection Structure] [CW2 - Rehab/Major Repair of Road Slope Protection Structure]; Physical Target = CW1 - 5,173 sq. m.; CW2 - 3,058 sq. m.
MFO-1 National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) -Chainage 1347 - Chainage 1392, Chainage 2023 - Chainage 2035, Chainage 5345 - Chainage 5376, Chainage 6670 - Chainage 6720, Chainage 10889 - Chainage 10904, Chainage 11753 - Chainage 11791, Chainage 13144 - Chainage 13349, Chainage 12598 - Chainage 12630, Chainage 1707 - Chainage 1772, Chainage 2319 - Chainage 2374, Chainage 4327 - Chainage 4347, Chainage 9964 - Chainage 10054, Chainage 2749 - Chainage 2774, Chainage 23388 - Chainage 23458, Chainage 18145 - Chainage 18173, Chainage 18106 - Chainage 18146, Chainage 8876 - Chainage 9138, Chainage 11863 - Chainage 12063 [CW1 - Construction of Road Slope Potection Structure] [CW2 - Rehab/Major Repair of Road Slope Protection Structure]; Physical Target = CW1 - 5193.30 sq. m.; CW2 - 1,911.74 sq. m.
|
June 14, 2017 |
FY 2017 |
WIN7E01325 |
FY 2017 APPROVED MODIFICATION |
April 7, 2017 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: MFO-1 Ntional Road Network Development - Road Upgrading 9unpaved to paved0 based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM - 4 Project Analysis) -Balbalan - Pinukpuk Road - Chainage 1913 - Chainage 1949, Chainage 1970 - Chainage 2045, Chainage 2045 - Chainage 2102, Chainage 2167 - Chainage 2299 [Road Upgrading gravel to paved]; Physical Target = 0.411 ln-km
MFO-1 Ntional Road Network Development - Road Upgrading 9unpaved to paved0 based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM - 4 Project Analysis) -Balbalan - Pinukpuk Road - Chainage 1913 - Chainage 1949, Chainage 1970 - Chainage 2043.74, Chainage 2043.74 - Chainage 2100.75, Chainage 2167 - Chainage 2306.65 [Road Upgrading gravel to paved]; Physical Target = 0.427 ln-km
|
June 14, 2017 |
FY 2017 |
WIN7E01357 |
FY 2017 APPROVED MODIFICATION |
April 7, 2017 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: MFO1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary (Calanan - Pinukpuk Section) K0500 + 760 -K0500 + 1000, K0501 + 045 - K0501 + 090, K0515 + 127 - K0515 + 157, K0519 + 460 - K0519 + 495, K0600 + 460 - K0500 + 760, K0499 + 150 - K0499 +550 [Construction of Road Slope Protection Slope]; Physical Target = 3,350 sq.m
To: MFO-1 National Road Network Services - Asset Preservation of National Roads - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary (Calanan - Pinukpuk Section) K0500 + 760 -K0500 + 1000, K0501 + 045 - K0501 + 092, K0515 + 000 - K0515 + 320.50, K0519 + 502 - K0519 + 529.40, K0600 + 100 - K0500 + 250, K0499 + 150 - K0499 +550 [Construction of Road Slope Protection Slope]; Physical Target = 2,215.2 sq.m.
|
June 14, 2017 |
FY 2017 |
WIN7E01327 |
FY 2017 APPROVED MODIFICATION |
April 7, 2017 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: MFO 1 - National Roas Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary - Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0516 + 057 - K0516 + 087 (S00566LZ) [Construction of Road Slope Protection Structure]; Physical Target = 180.0 sq.m.
To: MFO 1 - National Roas Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary - Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0516 + 035 - K0516 + 078.5 (S00566LZ) [Construction of Road Slope Protection Structure]; Physical Target = 261.0 sq.m.
|
June 14, 2017 |
2017 |
WIN7F04810 |
RA 10924 |
January 27, 2017 |
Region III |
Pampanga 3rd District Engineering Office |
Locally-Funded Projects: Local Infrastructure Program
Buildings and Other Structures - School Buildings
Construction of Classroom - School Building, San Miguel Elementary School, Magalang, Pampanga
(Construction of 2 Classrooms) |
June 14, 2017 |
FY 2017 |
WIN7E01183 |
FY 2017 APPROVED MODIFICATION |
March 29, 2017 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: MFO1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0529 + 100 - K0529 + 240, K0528 + 850 - K0528 + 900, K0531 + 100 - K0531 + 121, K0531 + 800 - K0531 + 830, K0532 + 200 - K0532 + 325, K0533 + 600 - K0533 + 750, K0533 + 800 - K0533 + 830, K0534 + 000 - K0534 + 200, K0534 + 400 - K0534 + 430 [Construction of Road Slope Protection Structure]; Physical Target = 4,017 sq.m.
To: To: MFO-1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0529 + 100 - K0529 + 240, K0528 + 850 - K0528 + 900, K0531 + 100 - K0531 + 121, K0531 + 800 - K0531 + 830, K0532 + 200 - K0532 + 325, K0533 + 600 - K0533 + 750, K0533 + 800 - K0533 + 830, K0534 + 000 - K0534 + 200, K0534 + 400 - K0534 + 430 [Construction of Road Slope Protection Structure]; Physical Target = 4,063.59 sq. m.
|
June 14, 2017 |
FY 2017 |
WIN7E01185 |
FY 2017 APPROVED MODIFICATION |
March 29, 2017 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: MFO 1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary -Balbalan-Pinukpuk Rd - Chainage 15153 - Chainage 15198, Chainage 24752 - Chainage 24920, Chainage 13792 - Chainage 13817, Chainage 17761 - Chainage 17911, Chainage 17184 - Chainage 17284, Chainage 17366 - Chainage 17461, Chainage 17541 - Chainage 17691, Chainage 19473 - Chainage 19498, Chainage 20533 - Chainage 20603, Chainage 21578 - Chainage 21678, Chainage 24339 - Chainage 24354, Chainage 24439 - Chainage 24602 [Construction of Road Slope Protection Structure]; Physical Target = 3,320.50 sq.m.
To: MFO 1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Balbalan-Pinukpuk Rd - Chainage 14546 - Chainage 14653, Chainage 15830 - Chainage 15959, Chainage 17880 - Chainage 17993, Chainage 18062 - Chainage 18175, Chainage 18311 - Chainage 18422, Chainage 18531 - Chainage 18642, Chainage 20251 - Chainage 20286, Chainage 21283 - Chainage 21353, Chainage 22335 - Chainage 22435, Chainage 25036 - Chainage 25051, Chainage 25201 - Chainage 25246, Chainage 25639 - Chainage 25669, Chainage 25048 - Chainage 25168, Chainage 25168 - Chainage 25475 - Chainage 25475 - Chainage 25625 (S00537LZ) [Construction of Road Slope Protection]; Physical Target = 5,083.50 sq. m.
|
June 14, 2017 |
FY 2017 |
WIN7E01182 |
FY 2017 APPROVED MODIFICATION |
March 29, 2017 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: MFO 1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary - Bulanao-Paracelis Rd - K0505 + 220 - K0505 + 250, K0500 + 560 - K0500 + 610 [CW1 - Rehabilitation/Major Repair of Road Slope Protection Structure] [CW2 - Constrution of Road Slope Protection Structure]; Physical Target = CW1 - 300 sq. m. ; CW2 - 250 sq. m.
To: MFO 1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary - Bulanao-Paracelis Rd - K0505 + 229- K0505 + 275, K0500 + 560 - K0500 + 610 [CW1 - Rehabilitation/Major Repair of Road Slope Protection Structure] [CW2 - Constrution of Road Slope Protection Structure]; Physical Target = CW1 - 300 sq. m. ; CW2 - 250 sq. m.
|
June 14, 2017 |
FY 2017 |
WIN7E01186 |
FY 2017 APPROVED MODIFICATION |
March 29, 2017 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: MFO 1 - National Road Network Services -Asset Preservation of National Roads-Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on PMS/HDM-4 - Primary - Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0509 + 465 - K0510 + 000, K0510 + 000 - K0510 + 084 [Reconstruction from Concrete to Concrete]; Physical Target = 1.254 ln-km
To: MFO 1 - National Road Network Services -Asset Preservation of National Roads-Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on PMS/HDM-4 - Primary - Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0509 + 465 - K0510 + 000, K0510 + 000 - K0510 + 084 [Reconstruction from Concrete to Concrete]; Physical Target = 1.240 ln-km
|
June 14, 2017 |
FY 2017 |
WIN7E01149 |
FY 2017 APPROVED MODIFICATION |
March 27, 2017 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Locally - Funded Projects - Local Infrastucture Program - Roads and Bridges - Local Bridges - Construction of Slab Bridge [Construction of Bridge]
To: Locally - Funded Projects - Local Infrastucture Program - Roads and Bridges - Local Bridges - Construction of Slab Bridge [Construction of Bridge]; Physical Target = 27.14 sq. m.
|
June 14, 2017 |
FY 2017 |
WIN7E01150 |
FY 2017 APPROVED MODIFICATION |
March 27, 2017 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Wagud Flood Control along Mabaca River [Construction of Flood Mitigation Structure]; Physical Target = 380 lm
To: MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Wagud Flood Control along Mabaca River [Construction of Flood Mitigation Structure]; Physical Target = 510 lm
|
June 14, 2017 |
FY 2017 |
WIN7E01154 |
FY 2017 APPROVED MODIFICATION |
March 27, 2017 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction (Completion) of Poblacion Taga Flood Control along Saltan River [Construction of Flood Mitigation Structure]; Physical Target = 230 lm
To: MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction (Completion) of Poblacion Taga Flood Control along Saltan River [Construction of Flood Mitigation Structure]; Physical Target = 280 lm
|
June 14, 2017 |
FY 2017 |
WIN7E01148 |
FY 2017 APPROVED MODIFICATION |
March 27, 2017 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Calaocan - Babalag East Flood Control. [Construction of Flood Mitigation Structure]; Physical Target = 1000 lm
To: MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Calaocan - Babalag East Flood Control. [Construction of Flood Mitigation Structure]; Physical Target = 608.70 lm
|
June 14, 2017 |
FY 2017 |
WIN7E01147 |
FY 2017 APPROVED MODIFICATION |
March 27, 2017 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Rehbailitation of Taga Bridge Flood Control along Saltan River [Construction of Flood Mitigation Structure]; Physical Target = 200 lm
To: MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Rehbailitation of Taga Bridge Flood Control along Saltan River [Construction of Flood Mitigation Structure]; Physical Target = 218 lm
|
June 14, 2017 |
FY 2017 |
WIN7E01716 |
FY 2017 APPROVED MODIFICATION |
May 11, 2017 |
Cordillera Administrative Region |
Baguio City District Engineering Office |
From: Locally Funded Projects: Local Infrastructure Program, Roads and Bridges- Local Roads, Construction of Road from Purok 4 to Purok 1 (Ablao Residence To Ngaotoy Residence) with Continuation of Canal (Purok B), Lucnab, Baguio City, Benguet (Construction of Concrete Road)
To: Locally Funded Projects: Local Infrastructure Program, Roads and Bridges- Local Roads, Construction of Road from Purok 4 to Purok 1 with Continuation of Canal (Purok B), Lucnab, Baguio City, Benguet (Construction of Concrete Road); Physical Target = 0.400 Lane-Km
|
June 14, 2017 |
FY 2017 |
WIN7F04638 |
FY 2017 APPROVED MODIFICATION |
May 15, 2017 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: MFO-2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Cagaluan Flood Control, Kalinga (Construction of Revetment); Physical Target = 600 Lm
To: MFO-2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Cagaluan Flood Control, Kalinga (Construction of Revetment) ; Physical Target = 300 Lm
|
June 14, 2017 |
FY 2017 |
WIN7F04649 |
FY 2017 APPROVED MODIFICATION |
May 15, 2017 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: MFO-2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Maatop Flood Control along Saltan River, Kalinga (Construction of Revetment); Physical Target = 600 Lm
To:MFO-2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Maatop Flood Control along Saltan River, Kalinga (Construction of Revetment); Physical Target = 202 Lm
|
June 14, 2017 |
FY 2017 |
WIN7F04644 |
FY 2017 APPROVED MODIFICATION |
May 15, 2017 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: MFO-2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Ibong Flood Control along Saltan River, Kalinga (Construction of Revetment); Physical Target = 600 Lm
To:MFO-2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Ibong Flood Control along Saltan River, Kalinga (Construction of Revetment) ; Physical Target = 275 Lm
|
June 14, 2017 |
FY 2017 |
WIN7F04790 |
FY 2017 APPROVED MODIFICATION |
May 22, 2017 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: MFO-2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of STS Tinglayan Flood Control along Chico River, Kalinga (Construction of Revetment); Physical Target = 560 Lm
To:MFO-2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of STS Tinglayan Flood Control along Chico River, Kalinga (Construction of Revetment) ; Physical Target = 143 Lm
|
June 14, 2017 |
FY 2017 |
WIN7F04652 |
FY 2017 APPROVED MODIFICATION |
May 15, 2017 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: MFO-2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Talalang Flood Control along Saltan River, Kalinga (Construction of Revetment); Physical Target = 600 Lm
To:MFO-2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Talalang Flood Control along Saltan River, Kalinga (Construction of Revetment) ; Physical Target = 275 Lm
|
June 13, 2017 |
CY 2017 |
165003016000166 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Construction and Maintenance of Bridges
along National Roads
- Replacement of Permanent Weak Bridges
- Replacement of Bridge
Macatoc Bridge (B00026MR) along
CSr Jct. - Minas, Victoria
Oriental Mindoro
CW1= 343.13 sq.m.
Php 34,200,000.00 Million
( Replacement of Bridge ) |
June 13, 2017 |
CY 2017 |
292003020402879 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
MF02 - Flood Management Services
- Construction/Maintenance of Flood Mitigation
Structures and Drainage System
Construction of Mag-Asawang Tubig River Control
Pinagsabangan Section, Naujan, Oriental Mindoro
L = 288 lm
Php = 20,000,000.00
( Construction of Flood Mitigation Structure ) |
June 13, 2017 |
CY 2017 |
165003016800067 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Off-Carriageway Improvement including
Drainage
- Secondary :
Off-Carriageway Improvement including
Drainage Calapan North Road
K0019+511 - K0020+050,
K0020+850 - K0022+323,
K0022+423 - K0023+000,
K0024+089 - K0025+400,
K0026+749 - K0027+000,
K0031+739 - K0032+090,
K0032+319 - K0032+983,
K0034+303 - K0034+417,
Baco - San Teodoro, Oriental Mindoro
( Shoulder Paving/Construction/Construction
of Drainage Structure along Road/Construction
of Revetment )
CW1 = 19,733.22 sq.m.
Php = 45,765,000.00 million
|
June 13, 2017 |
CY 2017 |
292003020402877 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
MF02 - Flood Management Services
- Construction/Maintenance of Flood Mitigation
Structures and Drainage Systems :
Construction of Del Pilar River Control (Gabion)
Sta. 0+000 - Sta. 0+680,
Naujan, Oriental Mindoro
( Construction of Flood Mitigation Structure )
L = 660.0 lm
Php = 45,500,000.00 Million |
June 13, 2017 |
2017 |
WIN7F04786 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Albay 2nd Engineering Office |
As per GAA:
Locally Funded Project: Local Infrastructure Program
Buildings and Other Structures - Multipurpose/Facilities, Construction of Multi-Purpose
Building, Binitayan, Camalig, Albay (Construction of Multi-Purpose Building)
Physical Target: 1 Bldg.
Unit Cost: P5,000/Bldg.
Allocation: Php 5M
As MODIFIED:
Locally Funded Project: Local Infrastructure Program
Buildings and Other Structures - Multipurpose/Facilities, Construction of Multi-Purpose
Building, Brgy. Del Rosario, Camalig, Albay (Construction of Multi-Purpose Building)
Physical Target: 1 Bldg.
Unit Cost: P5,000/Bldg.
Estimated Cost: Php 5M
|
June 13, 2017 |
2017 |
WIN7F04782 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Albay 2nd Engineering Office |
As per GAA:
Locally Funded Project: Local Infrastructure Program Buildings and Other Structures - Multipurpose/Facilities, Construction of Multi-Purpose Building, Barangay Poblacion 2, Camalig, Albay(Construction of Multi-Purpose Building)
Physical Target: 1 Bldg.
Unit Cost: P5,000/Bldg.
Allocation: Php 5M
As MODIFIED:
Locally Funded Project: Local Infrastructure Program Buildings and Other Structures - Multipurpose/Facilities, Construction of Multi-Purpose Building, Camalig North Central School, Camalig, Albay (Construction of Multi-Purpose Building)
Physical Target: 1 Bldg.
Unit Cost: P5,000/Bldg.
Estimated Cost: Php 5M |
June 13, 2017 |
2017 |
WIN7F04787 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Albay 2nd Engineering Office |
As per GAA:
Locally Funded Projects: Local Infrastructure Program Buildings and Other Structures
Multipurpose/Facilities, Construction of Multi-Purpose Building, Barangay Budiao, Daraga, Albay (Construction of Multi Purpose Building)
Physical Target: 1 Bldg.
Unit Cost: P5,000/Bldg.
Allocation: Php 5M
As MODIFIED:
Locally Funded Projects: Local Infrastructure Program Buildings and Other Structures
- Multipurpose/Facilities, Construction of Multi-Purpose Building, Daraga Human Resource Development Center (DHRDC), Anislag, Daraga, Albay (Construction of Multi Purpose Building)
Physical Target: 1 Bldg.
Unit Cost: P5,000/Bldg.
Estimated Cost: Php 5M |
June 13, 2017 |
2017 |
WIN7F04775 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Albay 2nd Engineering Office |
As per GAA:
Locally Funded Projects: Local
Infrastructure Program - Roads and Bridges - Local Roads, Construction of Anoling - Miisi Road, Daraga, Albay (Construction of Concrete Road)
Physical Target: 5.00 Lane-km
Unit Cost: P5,000.00/Lane-km
Allocation: Php 25M
As MODIFIED:
Locally Funded Projects: Local
Infrastructure Program - Roads and Bridges - Local Roads, Construction of Anoling - Miisi Road, Camalig, Albay (Construction of Concrete Road)
Physical Target: 2.260 Lane-km
Unit Cost: P11,064.95/Lane-km
Estimated Cost: Php 25M
|
June 13, 2017 |
FY 2017 |
WIN7C01916 |
UACS NO. 165003014800163 |
January 1, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
MODIFICATION
FROM: MFO 1 – National Road Network Services
Asset Preservation of National Roads – Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary
Construction of Drainage Structure along Road – Toledo-Tabuelan-San Remigio Road- K0090+812-K0092+460, K0099+641-K0100+175
Physical Target: 4,346.00 l.m.
TO: MFO 1 – National Road Network Services
Asset Preservation of National Roads – Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary
Asset Preservation of National Roads – Construction/Upgrading/Rehabilitation of Drainage along National Roads-Secondary, Toledo-Tabuelan-San Remegio Road, 1. K0090+812-K0092+460, 2. K0099+641-K0100+175
Physical Target: 4,346.00 lm (CW1)
1,000.00 (ROW) |
June 13, 2017 |
FY 2017 |
WIN7C01914 |
UACS NO. 2920030204031147 |
January 1, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
MODIFICATION
FROM: Locally Funded Projects
Roads and Brides – Local Roads
Reconstruction of Geometric Alignment of Toledo-Pinamungajan-Aloguinsan-Mantalongon Rd, Poblacion, Aloguinsan, Cebu
Physical Target:
TO: Locally Funded Projects
Roads and Brides – Local Roads
Reconstruction of Geometric Alignment of Toledo-Pinamungajan-Aloguinsan-Mantalongon Rd, Poblacion, Aloguinsan, Cebu
Physical Target: 1.48 lane km (CW1)
2,000.00 sq.m. (ROW) |
June 13, 2017 |
FY 2017 |
WIN7C01919 |
UACS NO.: 165003016000185 |
January 1, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
MODIFICATION
FROM: MFO-1 National Road Network Services
Construction and Maintenance of Bridges along National Roads – Replacement of Permanent Weak Bridges
Replacement of Bridge – Aliwanay Br. (B00536CB) along Toledo-Tabuelan-Sn Remigio Rd
Physical Target: 183.00 sq.m.
TO: MFO-1 National Road Network Services
Construction and Maintenance of Bridges along National Roads – Replacement of Permanent Weak Bridges
Replacement of Aliwanay Bridge (B00536CB) along Toledo-Tabuelan- San Remegio Road, K0061+846 (S00245CB), L=20m
Physical Target: 186.80 sq.m. (CW1)
700.00 sq.m. (ROW) |
June 13, 2017 |
FY 2017 |
WIN7C01917 |
UACS NO.: 165003014200289 |
January 1, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
MODIFICATION
FROM: MFO 1 – National Road Network Services
Asset Preservation of National Roads – Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Secondary
Reconstruction from Concrete to Concrete – Toledo-Pinamungahan-Aloguinsan-Mantalongon Rd – K0085+207-K0085+884, K0086+906-K0087+637
Physical Target: 2.99 lane km
TO: MFO 1 – National Road Network Services
Asset Preservation of National Roads – Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Secondary
Reconstruction of Toledo-Pinamungajan-Aloguinsan-Mantalongon Rd (S00235CB) including Drainage, 1: K0085+207-K0085+884, Chainage 35937-36614, 2: K0086+906-K0087+637, Chainage 37634-38452
Physical Target: 2.99 lane km (CW1)
200.00 sq.m. (ROW) |
June 13, 2017 |
2017 |
WIN7C01914 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
Locally Funded Projects
Raods and Bridges - Local Roads
Reconstruction of Geometric Alignment of Toledo-Pinamungajan-Aloguinsan-Mantalongon Rd, Poblacion, Aloguinsan, Cebu
Allocation - ₱ 50,000,000.00
- ₱ 43,923,744.70 (CW1)
- ₱ 6,076,255.30 (ROW)
Physical Target - 1.48 lane km (CW1)
- 2,000.00 (ROW)
Unit Cost - ₱ 29,678,205.88/lane km (CW1)
- ₱ 3,038.13/sq. m. (ROW) |
June 13, 2017 |
2017 |
WIN7C01920 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
Off-Carriageway Improvement along Toledo-Tabuelan-San Remegio Rd (S00245CB) with Drainage, Section 1: K0048+(-409) - K0048+024, Section 2: K0048+055 - K0048+441, Section 3: K0048+454 - K0048+882, Section 4: K0049+000 - K0050+361, Section 5: K0055+361 - K0057+640
Allocation - ₱ 49,900,000.00
- ₱ 48,400,000.00 (CW1)
- ₱ 1,500,000.00 (ROW)
Physical Target - 14,526.00 sq. m. (CW1)
- 1,000.00 sq. m. (ROW)
Unit Cost - ₱ 3,331.96/ sq. m. (CW1)
- ₱ 1,500.00/ sq. m. (ROW) |
June 13, 2017 |
2017 |
WIN7C01918 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
Network Development - Off-Carriageway Improvement including drainage - Tertiary, Tapal (Carcar) Zaragosa-Olango-Aloguinsan Rd (S00235CB), K0080+(-340) - K0082+150
Allocation - ₱ 30,000,000.00
- ₱ 28,000,000.00 (CW1)
- ₱ 2,000,000.00 (ROW)
Physical Target - 7,320.00 sq. m. (CW1)
- 132.387 sq. m. (ROW)
Unit Cost - ₱ 3,825.14/ sq. m. (CW1)
- ₱ 15,107.22/ sq. m (ROW) |
June 13, 2017 |
2017 |
WIN7C01915 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System/Highway Development and Management 4 (HDM-4) of Toledo-Tabuelan-San Remegio Road (S00245CB), K0080+239 - K0080+356, K0085+945 - K0086+250, K0092+460 - K0092+580, K0095+497 - K0095+708
Allocation - ₱ 35,719,000.00
- ₱ 27,719,000.00 (CW1)
- ₱ 8,000,000.00 (ROW)
Physical Target - 1.498 lane km (CW1)
- 2,000.00 (ROW)
Unit Cost - ₱ 18,504,005.34 lane km (CW1)
- ₱ 4,000.00/ sq. m. (ROW) |
June 13, 2017 |
2017 |
WIN7C01917 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Secondary
Reconstruction of Toledo-Pinamungajan-Aloguinsan-Mantalongon Rd (S00235CB) including Drainage, 1: K0085+207 - K0085+884, Chainage 35937 - 36614, 2: K0086+906 - K0087+637, Chainage 37634 - 38452
Allocation - ₱ 44,394,000.00
- ₱ 43,894,000.00 (CW1)
- ₱ 500,000.00 (ROW)
Physical Target - 2.99 lane km (CW1)
- 200.00 sq. m. (ROW)
Unit Cost - ₱ 14,680,267.56/ lane km (CW1)
- ₱ 2,500.00/ sq. m. (ROW) |
June 13, 2017 |
2017 |
WIN7C01916 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary, Toledo-Tabuelan-San Remegio Road, 1. K0090+812 - K0092+460, 2. K0099+641 - K0100+175
Allocation - ₱ 28,000,000.00
- ₱ 26,500,000.00 (CW1)
- ₱ 1,500,000.00 (ROW)
Physical Target - 4,346.00 lm (CW1)
- 1,000.00 (ROW)
Unit Cost - ₱ 6,097.56/ l.m. (CW1)
- ₱ 1,500.00/ sq. m. (ROW) |
June 13, 2017 |
2017 |
WIN7C01919 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
Construction and Maintenance of Bridges along National Roads - Replacement of Permanent Weak Bridges
Replacement of Aliwanay Bridge (B00536CB) along Toledo-Tabuelan-San Remegio Road, K0061+846 (S00245CB), L=20m
Allocation - ₱ 40,000,000.00
- ₱ 38,000,000.00 (CW1)
- ₱ 2,000,000.00 (ROW)
Physical Target - 186.80 sq. m. (CW1)
- 700.00 sq. m. (ROW)
Unit Cost - ₱ 203,426.12/ sq. m. (CW1)
- ₱ 2,857.143/ sq. m. (ROW) |
June 13, 2017 |
FY 2017 |
WIN7C01915 |
UACS NO.: 165003014200290 |
January 1, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
MODIFICATION
FROM: MFO 1 – National Road Network Services
Asset Preservation of National Roads – Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Secondary
Reconstruction from Concrete to Concrete – Toledo-Tabuelan-Sn Remigio Rd – K0080+239-K0080+356, K0085+945-K0086+250, K0092+460-K0092+580, K0095+497-K0095+708
Physical Target: 1.498 lane km
TO: MFO 1 – National Road Network Services
Asset Preservation of National Roads – Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Secondary
Asset Preservation of National Roads – Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System/Highway Development and Management 4 (HDM-4) of Toledo-Tabuelan-San Remegio Road (S00245CB), K0080+239-K0080+356, K0085+945-K0086+250, K0092+460-K0092+580, K0095+497-K0095+708
Physical Target: 1.498 lane km (CW1)
2,000.00 (ROW)
|
June 13, 2017 |
FY 2017 |
WIN7C01918 |
UACS NO.: 165003016900096 |
January 1, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
MODIFICATION
FROM: MFO 1 – National Road Network Services
Network Development – Off-Carriageway Improvement including drainage-Tertiary
Off-Carriageway Improvement: Shoulder Paving/Construction – Tapal (Carcar) Zaragosa-Olango-Aloguinsan Rd – K0080+(-340) – K0082+150
Physical Target: 7,320.00 sq.m.
TO: MFO 1 – National Road Network Services
Network Development – Off-Carriageway Improvement including drainage-Tertiary
Network Development – Off-Carriageway Improvement including drainage – Tertiary, Tapal (Carcar) Zaragosa-Olango-Aloguinsan Rd (S00235CB0, K0080+(-340) – K0082+150
Physical Target: 7,320.00 sq.m. (CW1)
132.387 sq.m (ROW) |
June 13, 2017 |
2017 |
WIN7E01370 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 4th District Engineering Office |
As per GAA:
Locally Funded Projects: LIP - Buildings and Other Structures - Multipurpose/Facilities, Construction of Multi-Purpose Building, Brgy. Masoli, Bato, Camarines Sur (Construction of Multi Purpose Building)
Physical Target: -
Unit Cost: -
Allocation: Php 2.0M
As per GAA:
Locally Funded Projects: LIP - Buildings and Other Structures - Multipurpose/Facilities, Construction of Barangay Hall, Brgy. Agos, Bato, Camarines Sur (Construction of Other Building)
Physical Target: 1 bldg.
Unit Cost: P2,000/bldg.
Estimated Cost: Php 2.0M |