Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
May 11, 2017 FY2017 WIN7C01567 SR2017-02-002152 February 1, 2017 Region VIII Regional Office VIII
As per GAA:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations-to Declared Tourism Destinations
Construction of Gravel Road - Ma. Clara-Cagnituan Road leading to Maasin City Tourism Loop (Monte Cueva, Danao Camp Tree Park), Maasin City, Southern Leyte
As Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations
Ma. Clara-Cagnituan Road leading to Maasin City Tourism Loop (Monte Cueva, Danao Camp Tree Park, St. Francis Javier Shrine, Maasin City Zoo Theme Park), Maasin City, Southern Leyte Lone District
May 11, 2017 CY 2017 WIN7E01494 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Locally - Funded Projects:
- Local Infrastructure Program
- Buildings and other Structures
- Multipurpose/Facilities:
Construction of Multi-Purpose Building
Brgy. Malpalon, Calintaan,
Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building )
May 11, 2017 FY2017 WIN7C01607 SR2017-02-001750 February 1, 2017 Region VIII Regional Office VIII
As per GAA:
Network Development - Improvement/Widening of National Roads - N1
Road Widening - Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) including RROW - K0692+400 - K0695+279
As Modified:
Network Development
Improvement/Widening of National Roads
Daang Maharlika (S00002SM) (Sn Isidro-Sn Juanico Br) including RROW - K0692+400 - K0695+279, Northern Samar, 1st LD
May 11, 2017 FY2017 WIN7C01550 SR2017-02-001654 February 1, 2017 Region VIII Regional Office VIII
As per GAA:
Network Development - Improvement/Widening of National Roads - N1
Road Widening - Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0682+740 - K0684+000, K0689+050 - K0690+000, K0682+450 - K0682+740, K0685+000 - K0685+200
As Modified:
Network Development
Improvement/Widening of National Roads (N1)
Daang Maharlika (S00001SM) (Sn Isidro-Sn Juanico Br) - K0682+740 - K0684+000, K0689+050 - K0690+000, K0682+450 - K0682+740, K0685+000 - K0685+200, Northern Samar 1st LD
May 11, 2017 FY2017 WIN7C01606 GAA2017 January 31, 2017 Region VIII Regional Office VIII
As per GAA:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment - Construction of Cadac-an Flood Control Structures (Cadac-an River Basin), Abuyog, Leyte
As Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment - Construction of Cadac-an Flood Control Structures (Cadac-an River Basin), Abuyog, Leyte 5th LD

May 11, 2017 FY 2017 WIN7E01557 UACS No. 165003014300247 January 1, 2017 National Capital Region North Manila District Engineering Office
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-)-Tertiary: Reconstruction from Asphalt to Concrete – M Roxas Service Rd – Chainage 195.25-Chainage 447 (Reconstruction from Asphalt to Concrete)
UACS No. 165003014300247
Physical Target / Cost
Original: .503 lane-km
Unit Cost (P’000): P15,905/lane-km
Allocation Cost (P’000): P8,000
WIN7E01557

As Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-)-Tertiary: M Roxas Service Rd – Chainage 000.00-Chainage 121.50 Chainage 247.60 to Chainage 273.30 (S02328LZ), Tondo, Manila City. (Reconstruction from Asphalt to Concrete)
UACS No. 165003014300247
Modified: 0.294 lane-km
Unit Cost: P27,211/lane-km
Estimated Cost (P’000): P8,000
WIN7E01557
May 11, 2017 FY2017 WIN7C01693 GAA2017 January 31, 2017 Region VIII Leyte 5th District Engineering Office
As per GAA:
Local Infrastructure Program - Water Management - Water Supply
Construction of Water System, Matalom, Leyte
Allocation(P) - 2.00 Million
Physical Target - 1 No. of Water Supply System
Unit Cost (P) 2.00 Million/No. of Water Supply System
As Modified:
Local Infrastructure Program - Water Management - Water Supply
Construction of Water Supply, Matalom, Leyte
Allocation(P) - 2.00 Million
Physical Target - 3 No. of Water Supply System
Unit Cost (P) 0.666 Million/No. of Water Supply System

May 11, 2017 FY2017 REG7XK01251 GAA2017 February 1, 2017 Region VIII Tacloban City District Engineering Office
As per GAA:
Locally Funded Projects
LIP - Roads and Bridges - Local Roads
Repair/Rehabilitation of Road including Drainage along Sto. Niño Street (Extn.) Barangay 6, Tacloban City, Leyte
Allocation (P) 5.000 Million
As Modified:
Locally Funded Projects
LIP - Roads and Bridges - Local Roads
Repair/Rehabilitation of Road including Drainage along Sto. Niño Street (Extn.) Barangay 6, Tacloban City, Leyte
Allocation (P) - 5.000 Million
Physical Target - 0.300 Lane Km
Unit Cost (P) - 16.6667Million/Lane Km
May 11, 2017 FY2017 REG7XK01254 GAA2017 February 1, 2017 Region VIII Tacloban City District Engineering Office
As per GAA:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structures along Burayan River, Tacloban City
Allocation (P) - 29.412 Million
Physical Target - 1 Lineal Meter
Unit Cost (P) - 29.412 Million/Lineal Meter
As Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structures along Burayan River, Tacloban City
Allocation (P) - 29.412 Million
Physical Target - 1,244 Lineal Meter
Unit Cost (P) - 23,643.0868/Lineal Meter
May 11, 2017 FY2017 REG7XK01255 GAA2017 February 1, 2017 Region VIII Tacloban City District Engineering Office
As per GAA:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structures along Tanghas Lirang Creek, Tacloban City
Allocation (P) - 17.281 Million
Physical Target - 1 Lineal Meter
Unit Cost (P) - 17.281 Million/Lineal Meter
As Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure at Tanghas-Lirang Creek, Tacloban City
Allocation (P) - 17.281 Million
Physical Target - 1, 577.00 Lineal Meter
Unit Cost (P) - 10,958.15/Lineal Meter


May 11, 2017 FY2017 REG7XK01250 GAA2017 February 1, 2017 Region VIII Tacloban City District Engineering Office
As per GAA:
Asset Preservation of National Roads - Preventive Maintenance based on Pavement Management System/Highway Development and Management-4 (HDM-4) - Tertiary
Preventive Maintenance of Road: Concrete Reblocking - Caibaan Road - K0913+-653 - K0913+515
Allocation(P) - 9.316 Million
Physical Target - 1.386 Lane Km
Unit Cost(P) - 6,721,500.72/Lane Km
As Modified:
Asset Preservation of National Roads - Preventive Maintenance based on Pavement Management System/Highway Development and Management-4 (HDM-4) - Tertiary
Preventive Maintenance along Caibaan Road (S00018LT), Tacloban City K0913+-643 - K0913+517, K0913+-458 - K0913+-449, K0913+-403 - K0913+-336, K0913+-323 - K0913+-209, K0913+-191 - K0913+-130 and K0913+015 - K0913+515
Allocation(P) - 9.316 Million
Physical Target - 1.399 Lane Km
Unit Cost(P) - 6,659,042.17/Lane Km
May 11, 2017 FY2017 REG7XK01253 GAA2017 February 1, 2017 Region VIII Tacloban City District Engineering Office
As per GAA:
Network Development-Improvement/Widening of National Roads - Tertiary
Road Widening - Sn Jose-Manlurip-MacArthur Park Rd - K0912+(-336) - K0912+331
As Modified:
Network Development-Improvement/Widening of National Roads - Tertiary
Improvement/Widening of Sn Jose-Manlurip-MacArthur Park Rd (S00021LT)
K0912+(-270) to K0912+400
Tacloban City
May 11, 2017 CY 2017 WIN7E01496 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities:
Construction of Multi-Purpose Building
Brgy. Ninikat ng Pag-asa (Poblacion),
Lubang, Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building )
May 11, 2017 FY2017 WIN7C01694 GAA2017 February 1, 2017 Region VIII Leyte 4th District Engineering Office
As per GAA:
Network Development - Off Carriageway Improvement including drainage - Primary
Off-Carriageway Improvement; Shoulder Paving/Construction - Palo-Carigara-Ormoc Road, K0994+345 - K0995+004, K0984+423 - K0984+733, K0986+114 - K0986+464

As Modified:
Network Development - Off Carriageway Improvement including drainage - Primary
Network Development - Off Carriageway Improvement including drainage - Primary, along Palo-Carigara-Ormoc Road, S00132LT K0994+345 - K0995+004, K0984+401 - K0984+727, K0986+114 - K0986+448

May 11, 2017 CY 2017 WIN7E01491 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. 6 Poblacion, San Jose,
Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building )

May 11, 2017 CY 2017 WIN7E01495 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. Tilik, Lubang, Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building )
May 11, 2017 FY2017 WIN7C01695 GAA2017 February 1, 2017 Region VIII Leyte 4th District Engineering Office
As per GAA:
Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary
Construction of Drainage Structure along Road - Palompon-Isabel-Merida-Ormoc Road, K1085+020 - K1086+349
Allocation(P) - 25.00 Million
Physical Target - 2,630 Lineal Meter (CW1)
Unit Cost (P) - 9,505.70/Lm.(CW1)
As Modified:
Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary
Construction/Upgrading/Rehabilitation of Drainage along National Roads, Palompon-Isabel-Merida-Ormoc Road, S00152LT, K1085+020 - K1086+669
Allocation(P) - 25.00 Million
Physical Target - 2,750 Lineal Meter (CW1)
Unit Cost (P) - 9,090.91/Lm.(CW1)
May 11, 2017 CY 2017 WIN7E01480 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Locally - funded projects
- Local Infrastructure Program
- Buildings and other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. Maginhawa (Poblacion), Lubang
Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building )
May 11, 2017 FY2017 WIN7C01697 GAA2017 February 1, 2017 Region VIII Leyte 1st District Engineering Office
As per GAA:
LIP - Roads and Bridges - National Roads
Repair/Rehabilitation/Improvement along Tigbao-Pulak-Sta. Fe Road, K0910+350 - K0910+875, K0911+800 - K0911+900, K0912+850 - K0913+150, Leyte
Allocation (P) - 10.00 Million
As Modified:
LIP - Roads and Bridges - National Roads
Off-Carriageway Improvement along Tigbao-Pulak-Sta. Fe Road (S0039LT) K0913+630 - K0914+080, Sta. Fe, Leyte
Allocation (P) - 10.00 Million
Physical Target - 2,745 Square Meters
Unit Cost (P) - 3,642.99/Square Meter
May 11, 2017 CY 2017 WIN7E01506 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. Lourdes, Magsaysay, Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building )
May 11, 2017 2017 WIN7G01462 FY 2017 (R.A 10924) April 26, 2017 Region IX Regional Office IX
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Primary - Reconstruction from (Asphalt to Concrete) including Drainage of Sindangan - Liloy Road, Zamboanga del Norte, 2nd DEO
K1948+000.00 - K1948+699.42,
K1948+738.84 - K1949+562.00,
K1950+000.00 - K1951+000.00,
K1951+158.00 - K1951+503.00
Allocation:
Php 59.613 M (Total)
Php 58,749,032.92 (Asphalt to Concrete)
Php 863,967.08 (ROW Acquisition)
Physical Target:
5.74 lane km (Asphalt to Concrete)
863.97 sq.m. (ROW Acquisition)
Unit Cost:
Php 10,235,023.16/lane km (Asphalt to Concrete)
Php 1,000.00/sq.m. (ROW Acquisition)
May 11, 2017 2017 WIN7G01463 FY 2017 (R.A 10924) April 26, 2017 Region IX Regional Office IX
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes -
Widening of San Ramon Bridge 2 (B01162MN) along Zamboanga City - Labuan - Limpapa Road, (P00117212MN) Zamboanga City
Beg. of Project: 1959+840.00
Abutment A: 1959+852.58
Abutment B: 1959+944.92
End of Project: 1959+960.00
Approaches Net Length: 27.66 lm
Bridge Length: 92.34 lm
River Control Length: 100.00 lm
Allocation: Php 102.000 Million
Physical Target: 880.924 sq.m./92.34 lm
Unit Cost: Php 115,787.51/sq.m.
May 11, 2017 FY2017 WIN7C01696 GAA2017 February 1, 2017 Region VIII Leyte 1st District Engineering Office
As per GAA:
LIP - Roads and Bridges - National Roads
Repair/Rehabilitation/Improvement along Daang Maharlika K0911+(-118) - K0919+499(S00024LT)Jct. Tacloban-Baybay South Road-Government Center Road Network (K0918+170 - K0918+510 (S00052LT); Tacloban-Baybay South Road (Pawing Section) K0917+(-778) - K0917+430
Allocation (P) - 7.00 Million
As Modified:
LIP - Roads and Bridges - National Roads
Construction/Upgrading/Rehabilitation of Drainage of National Roads along Daang Maharlika LT(S00024LT) K0912+470 - K0912+550 and K0912+560 - K0912+840
Allocation (P) - 7.00 Million
Physical Target - 379 Linear Meters
Unit Cost (P) - 18,469.66/Linear Meter
May 11, 2017 2017 WIN7G01468 FY 2017 (R.A 10924) April 26, 2017 Region IX Regional Office IX
Construction and Maintenance of Bridges along National Roads - Widening of Manicahan Bridge (B00574MN) along Pagadian City - Zamboanga City Road (P00117211MN) Zamboanga City
Beg. of Project: 1915+740.00
Abutment A: 1915+758.00
Abutment B: 1915+848.84
End of Project: 1915+870.00
Approaches Net Length: 39.16 lm
Bridge Length: 90.84 lm
River Control Length: 100.00 lm
Allocation:
Php 120.000 M (Total)
Php 115,083,011.91 (Widening of Bridge)
Php 4,916,988.09 (ROW Acquisition)
Physical Target:
866.614 sq.m./90.84 lm (Widening of Bridge)
4,916,988.09 (ROW Acquisition)
Unit Cost:
Php 132,796.16/sq.m. (Widening of Bridge)
Php 1,000/sq.m. (ROW Acquisition)
May 11, 2017 2017 WIN7G01444 SR2017-02-002535 February 2, 2017 Region XIII Metro Manila 3rd District Engineering Office
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes

Widening of Magalibobo Bridge (to more than 2 lanes) along Daang Maharlika (Agusan-Davao Section), (B00929MN), K1372+595 - K1372+621

Allocation : ₱ 27.574 Million (Total)
: ₱ 27,214,000.00 (Widening of Bridge)
: ₱ 360,000.00 (ROW Acquisition)

Physical Target : 245.44 sq.m. (Widening of Bridge)
Physical Target : 4,520.00 sq.m. (ROW Acquisition)
May 11, 2017 2017 WIN7G01451 GAA 2017 RA10924 December 29, 2016 Region XIII Agusan del Sur 2nd District Engineering Office
Modified:
Locally Funded Project: LIP - Buildings and Other Structures - Multipurpose/Facilities

Completion of Multi-Purpose Building, Brgy. Poblacion, Sta. Josefa, Agusan del Sur

Allocation : ₱ 2.000 Million

Physical Target : 1 Number of Building
May 11, 2017 2017 WIN7G01447 SR2017-02-002540 February 2, 2017 Region XIII Agusan del Sur 2nd District Engineering Office
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes - Primary

2. Widening of Onoman Bridge (to more than 2 lanes) along Daang Maharlika (Agusan-Davao Section), (B00930MN), K1374+485 - K1374+509

Allocation : ₱ 25.206 Million (Total)
₱ 25,056,000.00 (Widening of Bridge)
: ₱ 150,000.00 (ROW Acquisition)
:
Physical Target : 226.56 sq.m. (Widening of Bridge)
Physical Target : 4,480.00 sq.m. (ROW Acquisition)
May 11, 2017 2017 WIN7G01443 SR2017-02-002500 February 2, 2017 Region XIII Agusan del Sur 2nd District Engineering Office
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes - Primary

Widening of Langkilaan Bridge (to more than 2 lanes) along Daang Maharlika (Agusan-Davao Section), (B00931MN), K1376+845 - K1376+885.80

Allocation : ₱ 45.220 Million (Total)
: ₱ 44,970,000.00 (Widening of Bridge)
: ₱ 250,000.00 (ROW Acquisition)
:
Physical Target : 385.15 sq.m. (Widening of Bridge)
Physical Target : 4,820.00 sq.m. (ROW Acquisition)
May 10, 2017 FY 2017 WIN7E01122 FY 2017 APPROVED MODIFICATION March 21, 2017 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From : MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Siffu River, Bananao, Bitigue, Palitud, Anonat, Paracelis, Mountain Province [Construction of Flood Mitigation Structure]
Physical Target = 1,125 lm

To:MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Siffu River, Bananao, Butigue, Palitud, Anonat, Paracelis, Mountain Province [Construction of Flood Mitigation Structure]
Physical Target = 1,200 lm

May 10, 2017 FY 2017 WIN7E01119 FY 2017 APPROVED MODIFICATION March 21, 2017 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Locally - Funded Projects - Buildings and Other Structures - Multipurpose/ Facilities - Construction of Multi-Purpose Building (MPDEO-District Sub-Office Building), Poblacion, Natonin, Mt. Province [Construction of Multi-Purpose Building]

To: Locally - Funded Projects - Buildings and Other Structures - Multipurpose/ Facilities - Construction of Multi-Purpose Building (MPSDEO Building), Banawel, Natonin, Mt. Province [Construction of Multi-Purpose Building]
May 10, 2017 FY 2017 WIN7E01124 FY 2017 APPROVED MODIFICATION March 21, 2017 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: MFO 1 - National Road Network Services -Asset Preservation of National Roads - Rehabilitation/ Reconstruction from Concrete to Concrete - Mt. Province - Ifugao Road (Kiling - Paracelis Section) -K0456+753- K0457+000, K0459+300 - K0460+000 [Reconstruction from Concrete to Concrete]

To: MFO 1 - National Road Network Services -Asset Preservation of National Roads - Rehabilitation/ Reconstruction from Concrete to Concrete - Mt. Province - Ifugao Road (Kiling - Paracelis Section) -K0456+753- K0457+000, K0459+300 - K0460+000 [Reconstruction from Concrete to Concrete]
Physical Target = 1.90 ln-km


May 10, 2017 FY 2017 WIN7E01126 FY 2017 APPROVED MODIFICATION March 27, 2017 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Tanudan River, Sta. 027+010 - 027+055,027+065 - 027+300, 027+540 - 027+560, Barlig, Mountain Province [Construction of Flood Mitigation Structure]
Physical Target =288 lm

To:MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Tanudan River, Sta. 027+005 - 027+055,027+065 - 027+300, 027+500 - 027+560, Barlig, Mountain Province [Construction of Flood Mitigation Structure]
Physical Target = 358 lm


May 10, 2017 FY 2017 WIN7E01123 FY 2017 APPROVED MODIFICATION March 21, 2017 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: MFO 1 - National Road Network Services - Road Upgrading (unpaved to paved) - Tertiary - Road Upgrading Gravel to Paved - Mt Province - Isabela Road - Chainage 19243 - Chainage 19495, Chainage 19564 - Chainage 21883 [Road Upgrading Gravel to Paved]
Physical Target = 5.142 ln-km

To:MFO 1 - National Road Network Services - Road Upgrading (unpaved to paved) - Tertiary - Road Upgrading Gravel to Paved - Mt Province - Isabela Road - Chainage 19243 - Chainage 19495, Chainage 19564 - Chainage 21780 [Road Upgrading Gravel to Paved]
Physical Target = 4.936 ln-km
May 10, 2017 2017 WIN7E01545 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads - Concreting of Barangay Road, Bakod Bayan, Cabanatuan City, Nueva Ecija
(Construction of Concrete Road)
May 10, 2017 2017 WIN7E01453 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads - Improvement / Repair of Road, Bantog St., Brgy. Camatsile, Gabaldon, Nueva Ecija
(Construction of Concrete Road)
May 10, 2017 2017 WIN7E01057 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 1st District Engineering Office
As per GAA:
Locally-Funded Projects: Local Infrastructure Program: Roads and Bridges: Local Roads: Construction of Local Road, Phase I, Milaor, Camarines Sur (Construction of Concrete)
Physical Target: -
Unit Cost: -
Allocation: P6.0M

As MODIFIED:
Locally-Funded Projects: Local Infrastructure Program: Roads and Bridges: Local Roads: Construction/Rehabilitation/Improvement of Local Roads, Brgy. Dalipay, Brgy. Mayaopayawan and Brgy. Lipot, Milaor, Camarines Sur (Construction of Concrete Road/ Rehabilitation of Concrete Road)
Physical Target: Const. of Concrete Road: 0.804 lane.km
Rehab. of Concrete Road: 0.296 lane.km
Unit Cost: Const. of Concrete Road: P4,975T/ lane.km
Rehab. of Concrete Road: P6,757T/lane.km
Estimated Cost: P6.0M

May 10, 2017 2017 WIN7E01055 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 1st District Engineering Office
As per GAA:
MFO-2 Flood Management Services: Construction /
Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Dike (along the cut-off Channel) along Bicol River Basin, Barangay Del Carmen - Del Rosario, Sta.26+400-Sta.26+681, Minalabac, Camarines Sur (Construction of Flood Mitigation Structure)
Physical Target: 281 ln.m
Unit Cost: P169.32T/ln.m
Allocation: P47.580M

As MODIFIED:
MFO-2 Flood Management Services: Construction /
Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Dike (along the cut-off Channel) along Bicol River Basin, Barangay Del Carmen - Del Rosario, Sta.27+013 - Sta.27+445, Minalabac, Camarines Sur (Construction of Flood Mitigation Structure)
Physical Target: 432 ln.m
Unit Cost: P110.14T/ln.m
Estimated Cost: P47.580M
May 10, 2017 2017 WIN7E01054 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 1st District Engineering Office
As per GAA:
MFO-2 Flood Management Services: Construction /
Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Dike (along the cut-off Channel) along Bicol River Basin, Sta.27+000 - Sta.27+294, Barangay San Juan - San Lorenzo, Minalabac, Camarines Sur
(Construction of Flood Mitigation Structure)
Physical Target: 294 ln.m
Unit Cost: P156.50T/ln.m
Allocation: P46.010M

As MODIFIED:
MFO-2 Flood Management Services: Construction /
Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Dike (along the cut-off Channel) along Bicol River Basin, Sta.25+282 - Sta.25+698, Barangay San Juan - San Lorenzo, Minalabac, Camarines Sur
(Construction of Flood Mitigation Structure)
Physical Target: 416 ln.m
Unit Cost: P110.60T/ln.m
Estimated Cost: P46.010M
May 10, 2017 2017 WIN7E01352 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects - Roads and Bridges - Local Roads - Concreting of Barangay Road, Brgy. Pinagdapian, Del Gallego, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.48 ln.km
Unit Cost (P'000): P4,166.67/ln-km
Allocation (P'000): P2,000.00

As MODIFIED:
Locally-Funded Projects - Roads and Bridges - Local Roads - Concreting of Barangay Road, Brgy. Pinagdapian, Del Gallego, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.556 ln.km
Unit Cost (P'000): P3,597.12/ln-km
Allocation (P'000): P2,000.00


May 10, 2017 2017 WIN7E01355 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects - Roads and Bridges - Local Roads - Widening of Barangay Road, Barangay Salvacion, Del Gallego, Camarines Sur [Road Widening]
Physical Target: 0.3 ln-km
Unit Cost (P'000): P5,000.00/ln-km
Allocation (P'000): P1,500.00

As MODIFIED:
Locally-Funded Projects - Roads and Bridges - Local Roads - Widening of Barangay Road, Barangay Salvacion, Del Gallego, Camarines Sur [Road Widening]
Physical Target: 0.384 ln-km
Unit Cost (P'000): P3,906.25/ln-km
Estimated Cost (P'000): P1,500.00
May 10, 2017 2017 WIN7E01355 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects - Roads and Bridges - Local Roads - Widening of Barangay Road, Barangay Salvacion, Del Gallego, Camarines Sur [Road Widening]
Physical Target: 0.3 ln-km
Unit Cost (P'000): P5,000.00/ln-km
Allocation (P'000): P1,500.00

As MODIFIED:
Locally-Funded Projects - Roads and Bridges - Local Roads - Widening of Barangay Road, Barangay Salvacion, Del Gallego, Camarines Sur [Road Widening]
Physical Target: 0.384 ln-km
Unit Cost (P'000): P3,906.25/ln-km
Estimated Cost (P'000): P1,500.00
May 10, 2017 2017 WIN7E01086 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects - Roads and Bridges - Local Roads — Concreting of Barangay Road, Brgy. Binahian going to Brgy. Caima, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.480ln-km
Unit Cost (P'000): P4,166.6667/ln-km
Allocation (P'000): P2,000.00

As MODIFIED:
Locally-Funded Projects - Roads and Bridges - Local Roads — Concreting of Barangay Road, Brgy. Binahian going to Brgy. Caima, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.444 ln-km
Unit Cost (P'000): P4,504.5045/ln-km
Estimated Cost (P'000): P2,000.00
May 10, 2017 2017 WIN7E01087 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects - Roads and Bridges - Local Roads — Concreting of Barangay Road, Brgy. Buenasuerter Lupi, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.40 ln-km
Unit Cost (P'000): P3,750/ln-km
Allocation (P'000): P1,500.00

As MODIFIED:
Locally-Funded Projects - Roads and Bridges - Local Roads — Concreting of Barangay Road, Brgy. Buenasuerter Lupi, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.339 ln-km
Unit Cost (P'000): P4,424.7788/ln-km
Estimated Cost (P'000): P1,500.00
May 10, 2017 2017 WIN7E01348 FY 2017 GAA RA 10924 November 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects - Roads and Bridges - Local Roads — Concreting of Barangay Road, Barangay Cabugao, Ragay, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.40 ln-km
Unit Cost (P'000): P5,000.00/ln-km
Allocation (P'000): P2,000.00

As MODIFIED:
Locally-Funded Projects - Roads and Bridges - Local Roads — Concreting of Barangay Road, Barangay Cabugao, Ragay, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.528 ln-km
Unit Cost (P'000): P3,787.88/ln-km
Estimated Cost (P'000): P2,000.00
May 10, 2017 2017 WIN7E01345 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Comadogcadog, Del Gallego, Camarines Sur
[Construction of Concrete Road]
Physical Target: 0.4 ln-km
Unit Cost (P'000): P3,750.00/ln-km
Allocation (P'000): P1,500.00

As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Comadogcadog, Del Gallego, Camarines Sur
[Construction of Concrete Road]
Physical Target: 0.162 ln-km
Unit Cost (P'000): P9,259.26/ln-km
Estimated Cost (P'000): P1,500.00

May 10, 2017 2017 WIN7E01353 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Mabini, Del Gallego, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.4 ln-km
Unit Cost (P'000): P3,750.00/ln-km
Allocation (P'000): P1,500.00

As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Mabini, Del Gallego, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.376 ln-km
Unit Cost (P'000): P3,989.36/ln-km
Estimated Cost (P'000): P1,500.00

May 10, 2017 2017 WIN7E01078 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Mantila, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.48 ln-km
Unit Cost (P'000): P3,125/ln-km
Allocation (P'000): P1,500.00

As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Mantila, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.36 ln-km
Unit Cost (P'000): P4,166.667/ln-km
Estimated Cost (P'000): P1,500.00
May 10, 2017 GAA FY 2017 WIN7G01446 GAA FY R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: National Road Network Services:
Asset Preservation of National Roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) -Secondary
Reconstruction from Asphalt to Concrete/Off-Carriageway Improvement: Shoulder Paving / Construction - Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-Glan)
K1598+853 - K1599+000, K1599+000 - K1600+000, K1600+936 - K1601+100, K1609+081 - K1610+020, K1601+100 - K1602+000,
K1602+000 - K1602+564, K1604+972 - K1605+566, K1606+415 - K1608+050, K1608+476 - K1609+081, K1610+020 - K1610+081

TO: National Road Network Services:
Asset Preservation of National Roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) -Secondary
Rehabilitation/Reconstruction (Asphalt to Concrete) of Davao Sarangani Coastal Road (Malalag-Malita-JAS-Glan Road) Including Paving of Shoulders (Caputian-Basiawan Section), Davao Occidental
K1598+853 - K1599+000, K1599+000 - K1600+000, K1600+936 - K1601+100, K1601+100 - K1602+000, K1602+000 - K1602+564
K1604+972 - K1605+566, K1606+415 - K1608+050, K1608+476 - K1609+081, K1609+081 - K1610+020, K1610+020 - K1610+081

ALLOCATION: Php 169.255 Million
May 10, 2017 GAA FY 2017 WIN7G01449 GAA FY R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: National Road Network Services:
Asset Preservation of National Roads-Rehabilitation/Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Secondary
Reconstruction from Asphalt to Concrete/Off-Carriageway Improvement: Shoulder Paving/Construction and Construction of Road Slope Protection Structure - Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) -
K1618+355 - K1619+000, K1619+957 - K1620+300, K1620+300 - K1623+000, K1616+816 - K1617+000,
K1617+520 - K1617+804, K1619+199 - K1619+583, K1616+265 - K1616+405

TO: National Road Network Services:
Asset Preservation of National Roads -Rehabilitation/Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Secondary
Rehabilitation/Reconstruction (Asphalt to Concrete) of Davao-Sarangani Coastal Road (Malalag-Malita-JAS-Glan Road) Including Slope Protection and Paving of Shoulders (Buhangin-Lacaron Section), Davao Occidental
K1616+265 - K1616+405, K1616+816 - K1617+000, K1617+520 - K1617+804, K1618+355 - K1619+000,
K1619+199 - K1619+583, K1619+957 - K1620+300, K1620+300 - K1623+000

ALLOCATION: Php 132.605 Million
May 10, 2017 2017 WIN7E01343 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Barangay Port Junction Norte to Barangay Lohong, Ragay, Camarines Sur
[Construction of Concrete Road]
Physical target: 0.4 ln-km
Unit Cost (P'000): P5,000.00/ln-km
Allocation (P'000): P2,000.00

As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Barangay Port Junction Norte to Barangay Lohong, Ragay, Camarines Sur
[Construction of Concrete Road]
Physical target: 0.324 ln-km
Unit Cost (P'000): P6,172.84/ln-km
Estimated Cost (P'000): P2,000.00

May 10, 2017 2017 WIN7E01351 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Barangay Samay, Ragay, Camarines Sur [Construction of Concrete Road]
Physical target: 0.4 ln-km
Unit Cost (P'000): P5,000.00/ln-km
Allocation (P'000): P2,000.00

As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Barangay Samay, Ragay, Camarines Sur [Construction of Concrete Road]
Physical target: 0.456 ln-km
Unit Cost (P'000): P4,385.96/ln-km
Estimated Cost (P'000): P2,000.00
May 10, 2017 2017 WIN7E01090 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. San Rafael Sur, Lupi, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.40 ln-km
Unit Cost (P'000): P3,750/ln-km
Allocation (P'000): P1,500

As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. San Rafael Sur, Lupi, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.36 ln-km
Unit Cost (P'000): P4,166.6667/ln-km
Estimated Cost (P'000): P1,500


May 10, 2017 2017 WIN7E01084 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects — Roads and Bridges Local Roads — Concreting of Barangay Road, Brgy. South Centro, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.48 ln-km
Unit Cost (P'000): P4,166.667/ln-km
Allocation (P'000): P2,000

As MODIFIED:
Locally-Funded Projects — Roads and Bridges Local Roads — Concreting of Barangay Road, Brgy. South Centro, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.501 ln-km
Unit Cost (P'000): P3,992.02/ln-km
Estimated Cost (P'000): P2,000
May 10, 2017 2017 WIN7E01349 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Reblocking of Barangay Road, Brgy. Sta. Cruz, Cabusao, Camarines Sur [Preventive Maintenance of
Road: Concrete Reblocking]
Physical Target: 0.48 ln-km
Unit Cost (P'000): P4,166.67/ln-km
Allocation (P'000): P2,000.00

As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Reblocking of Barangay Road, Brgy. Sta. Cruz, Cabusao, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.525ln-km
Unit Cost (P'000): P3,809.52/ln-km
Estimated Cost (P'000): P2,000.00
May 10, 2017 2017 WIN7E01085 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Tible, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.48 ln-km
Unit Cost (P'000): P3,125/ln-km
Allocation (P'000): P1,500

As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Tible, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.36 ln-km
Unit Cost (P'000): P4,166.667/ln-km
Estimated Cost (P'000): P1,500

May 10, 2017 2017 WIN7E01356 FY 2017 GAA RA 10924 November 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects - Roads and Bridges - Local Roads - Reblocking of Barangay Road, Brgy. Poblacion Ilaod going to Brgy. Apad, Ragay, Camarines Sur [Preventive Maintenance of Road: Concrete Reblocking]
Physical Target: 1.20 ln-km
Unit Cost (P'000): P4,166.67/ln-km
Allocation (P'000): P5,000.00

As MODIFIED:
Locally-Funded Projects - Roads and Bridges - Local Roads - Reblocking of Barangay Road, Brgy. Poblacion Ilaod going to Brgy. Apad, Ragay, Camarines Sur [Preventive Maintenance of Road: Concrete Reblocking]
Physical Target: 1.287 ln-km
Unit Cost (P'000): P3,885.00/ln-km
Estimated Cost (P'000): P5,000.00
May 10, 2017 2017 WIN7E01527 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Flood Control and Drainage - Flood Control Structures/Facilities - Construction of Flood Control Structures, Angat River, Rueda Section, Plaridel, Bulacan
(Construction of Flood Mitigation Structure)
May 10, 2017 2017 WIN7E01350 FY 2017 GAA RA 10924 December 28, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Repair/Rehabilitation of Barangay Road, Barangay Sta. Rita Il, Del Gallego, Camarines Sur
[Rehabilitation of Concrete Road]
Physical Target: 0.30 ln-km
Unit Cost (P'000): P5,000.00/ln-km
Allocation (P'000): P1,500.00

As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Repair/Rehabilitation of Barangay Road, Barangay Sta. Rita Il, Del Gallego, Camarines Sur
[Rehabilitation of Concrete Road]
Physical Target: 0.366 ln-km
Unit Cost (P'000): P4,098.36/ln-km
Estimated Cost (P'000): P1,500.00
May 10, 2017 2017 WIN7E01212 FY 2017 GAA RA 10924 December 29, 2016 Region V Sorsogon 2nd District Engineering Office
As per GAA:
MFO 2 - Flood Management Services - Construction/
Maintenance of Flood Mitigation Structures and Drainage
Systems - Construction of Flood Mitigation Structure -
Construction of Flood Control Structure (Downstream, Right
Side) and Groundsill (Downstream), Macawayan Section, Irosin, Sorsogon [Construction of Food Mitigation Structure]
Physical Target: 300.0lm
Unit Cost (P'000): P150.0/lm
Allocation (P'000): P45,000.00

As MODIFIED:
MFO 2 - Flood Management Services - Construction/
Maintenance of Flood Mitigation Structures and Drainage
Systems - Construction of Flood Mitigation Structure -
Construction of Flood Control Structure along Cadac-an River, Barangay Macawayan, Irosin, Sorsogon [Construction of Flood Mitigation Structure]
Physical Target: 435.0lm
Unit Cost (P'000): P103.45/lm
Estimated Cost (P'000): P45,000.00
May 10, 2017 2017 WIN7E01210 FY 2017 GAA RA 10924 December 29, 2016 Region V Sorsogon 2nd District Engineering Office
MFO 2 — Flood Management Services — Construction/
Maintenance of Flood Mitigation Structures and Drainage
Systems — Construction of Flood Mitigation Structures —
Construction of Flood Control Structures along Cadac-an River, Barangay Carriedo, Irosin, Sorsogon [Construction of Flood Mitigation Structures]
Physical Target: 250 sq.m.
Unit Cost (P'000): P200.0/sq.m.
Allocation (P'000): P50,000.00

MFO 2 — Flood Management Services — Construction/
Maintenance of Flood Mitigation Structures and Drainage
Systems — Construction of Flood Mitigation Structures -
Reconstruction of Flood Control Structure along Cadac-an River, Barangay Carriedo, Irosin, Sorsogon(Upstream, Right Side) Sta. 1+578.70 - Sta. 1+932.70 [Reconstruction of Flood
Mitigation Structures]
Physical Target: 354 sq.m.
Unit Cost (P'000): P141.24/sq.m.
Estimated Cost (P'000): P50,000.00
May 10, 2017 FY 2017 WIN7C01568 SR2017-02-002147 February 1, 2017 Region VIII Regional Office VIII
As per GAA:
MFO 3 - Maintenance and Construction Services of Other Infrastructures
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Construction of Gravel Road - Junction Abuyog-Silago Road, Cadac-an-Malaguicay-Boundary Silago Road Section (Malaguicay Falls), including bridge, Abuyog, Leyte
As Modified:
MFO 3 - Construction and Maintenance Services of Other Infrastructures
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Junction Abuyog-Silago Road- Cadac-an-Malaguicay Road Section (Malaguicay Falls), including bridge, Abuyog, Leyte 5th LD
May 9, 2017 CY 2017 WIN7E01465 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Road Upgrading (unpaved to paved) based on
Gravel Road Strategies, Traffic Benchmark for
Upgrading to Paved Road Standards
( HDM-4 Project Analysis )
Secondary Road
Sibuyan Circumferential Road
K0051+317 -K0052+091,
K0052+353 - K0052+557,
K0061+466 - K0062+730,
K0062+809 - K0064+937,
K0065+261 - K0066+028,
K0066+167 - K0067+078,
K0068+155 - K0068+919
L = 13.742 lane km
Php 150,000,000.00
( Road Upgrading Gravel to Paved )
May 9, 2017 CY 2017 WIN7E01489 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Rehabilitation/Reconstruction of National Roads
with Slips, Slope Collapse, and Landslide
- Secondary Road
Tablas Circumferential Road
K0033+900 - K0034+743.60
7,200 sq m
Php 117,442,000.00
(Construction of Road Slope Protection Structure)
May 9, 2017 2017 WIN7E01036 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 2nd District Engineering Office
As per GAA:
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures: Multipurpose / Facilities: Construction of Barangay
Health Center, Brgy. Del Rosario, Canaman, Camarines Sur (Construction of Other Building)
Physical target: 1 Bldg.
Unit Cost: P3.0M/Bldg.
Allocation: P3.0M

As MODIFIED:
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures: Multipurpose / Facilities: Construction of Covered Court, Brgy. Del Rosario, Canaman, Camarines Sur (Construction of Other Building)
Physical target: 1 Bldg.
Unit Cost: P3.0M/Bldg.
Estimated Cost: P3.0M
May 9, 2017 2017 WIN7E01035 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 2nd District Engineering Office
As per GAA:
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures: Multipurpose / Facilities: Construction of Multipurpose Building with Tanod Outpost and Basketball Court, Pangpang, Canaman, Camarines Sur (Construction of Multipurpose Building)
Physical target: 1 Bldg.
Unit Cost: -
Allocation: P3.0M

As MODIFIED:
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures: Multipurpose / Facilities: Construction of Multipurpose Building of Multipurpose Building (Covered Court), Brgy.Mangayawan, Canaman, Camarines Sur (Construction of Multipurpose Building)
Physical target: 1 Bldg.
Unit Cost: -
Estimated Cost: P3.0M
May 9, 2017 2017 WIN7E01030 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 2nd District Engineering Office
As per GAA:
MFO 1 : NATIONAL ROAD NETWORK SERVICES;
Network Development, Improvement/Widening of
National Roads - Tertiary, Naga City Bdry-Calabanga-Balongay Rd - (S03506LZ) K0443+694 - K0445+283
(Road Widening)
Physical Target: 3.180 Lane km
Unit Cost: P14,858.17/Lane Km
Allocation: Php 47.249M

As MODIFIED:
MFO 1 : NATIONAL ROAD NETWORK SERVICES;
Network Development, Improvement/Widening of
National Roads - Tertiary, Naga City Bdry-Calabanga-Balongay Rd - (S03506LZ) K0443+686 - K0444+880(Road Widening/Construction of Drainage Structure along the Road)
Physical Target: Widening: 2.388 Lane km
Const. of drainage with sidewalk: 1.456ln.m.
Unit Cost: Widening: P9,014.60/Lane Km
Const. of drainage with sidewalk: P17,666.30/Ln.m.
Estimated Cost: PhP 47.249M

May 9, 2017 CY 2017 WIN7E01483 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Construction of Missing Gaps connecting
National Roads, including ROW
Victoria-Sablayan Road
Sta. 052+234.35 - Sta. 059+107
L = 12.545 lane km
Php 150,000,000.00
( Construction of Concrete Road )
May 9, 2017 2017 WIN7E01031 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 2nd District Engineering Office
As per GAA:
MFO-1 National Road Network Services: Network Development: Improvement / Widening of National Roads: Tertiary Roads: Naga - Carolina - Panicuason Rd (S03567LZ) K0439+500-K0440+951, K0443+000-K0443+219 (Road Widening)
Physical Target: 3.770 Lane km.
Unit Cost: P13,129.97T/lane km.
Allocation: P49.500M

As MODIFIED:
MFO-1 National Road Network Services: Network Development: Improvement / Widening of National Roads: Tertiary Roads: Naga - Carolina - Panicuason Rd (S03567LZ) K0439+469-K0440+549 (Road Widening/Construction of Drainage/Structure along Road/Reconstruction: Raising od Grade)
Physical Target: 2.160 lane km.
1.943 lm.
1,447.20 lane km.
Unit Cost: P5,820.35T/lane km.
P15,440.66T/lm.
P1,447.20T/lm.
Estimated Cost: P49.500M
May 9, 2017 CY 2017 WIN7E01490 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF01 - National Road Network Services
- Road Upgrading ( Unpaved to Paved )
- Secondary Road
Culandanum - Panalingaan Cross Country Road
Chainage 11980 - Chainage 12229,
Chainage 12251 - Chainage 14785,
Chainage 16169 - Chainage 16210
L = 5.648 lane km
Php 113,000,000.00
( Road Upgrading Gravel to Paved )
May 9, 2017 CY 2017 WIN7E01470 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF03 - Construction and Maintenance Services
of Other Infrastructures
- Construction/Improvement of Access Roads
leading to Declared Tourism destinations
Bacungan - Simpucan - Bagumbayan -
Napsan Road
Sta. 33+818 - Sta. 39+820
L = 12.534 lane km
Php 200,000,000.00
( Construction of Concrete Road )
May 9, 2017 CY 2017 WIN7E01466 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF03 - Construction and Maintenance Services
of Other Infrastructures
- Construction/Improvement of Access
Roads leading to Airports
Bantulan (Pamantolon) -
Sandoval Airport Access Road
Sta. 007+219.6 - Sta. 013+118
L = 11.742 lane km
Php 150,000,000.00
( Construction of Concrete Road )
May 9, 2017 2017 WIN7E01253 SR2017-01-000213 January 27, 2017 Region V Regional Office V
As per GAA:
MFO 1: National Road Network Services - Network
Development - Improvement /Widening of National Roads - Primary Roads along N1 Road Widening - Daang Maharlika (LZ) - K0302 + 646 - K0306 + 137, K0315 + 000 - K0315 + 749 (S03784LZ)
(Road Widening)
Physical Target: 8.534 Lane km
Unit Cost: P15,819.07/Lane km
Allocation: PhP 135.0M

As MODIFIED:
MFO 1: National Road Network Services - Network
Development - Improvement /Widening of National Roads - Primary Roads along N1 Road Widening - Daang Maharlika (LZ) - K0302+646 - K0305+440, K0315+000 - K0315+749 (S03784LZ)
(Road Widening/Construction of Drainage Structure along Road)
Physical Target:
Road Widening: 7.13 Lane km
Const.of Drainage Structure along Road: 3,635.20 Lm
Unit Cost:
Road Widening: P15,353.845T/Lane km
Const.of Drainage Structure along Road: P7.022T/Lm
Estimated: PhP 135.0M
May 9, 2017 2017 WIN7E01252 SR2017-01-000529 January 28, 2017 Region V Regional Office V
As per GAA:
MFO 3: Construction and Maintenance Services of
Other Infrastructures - Construction/Improvement of Access Roads leading to Airports, Seaports. and
Declared Tourism Destinations - to seaports,
Construction of Concrete Road - Jct. Morning, Cataingan- Esperanza Port Road, Masbate (Construction of Concrete Road)
Physical Target: 6.67 Lane km
Unit Cost: P14,992.50/Lane km
Allocation: Php 100.0M

As MODIFIED:
MFO 3: Construction and Maintenance Services of
Other Infrastructures - Construction/Improvement of Access Roads leading to Airports, Seaports. and
Declared Tourism Destinations - to seaports,
Construction of Concrete Road - Jct. Morning, Cataingan- Esperanza Port Road, Masbate K0109+000 - K0112+701.56 (Construction of Concrete Road)
Physical Target: 7.40312 Lane km
Unit Cost: P13,508.04/Lane km
Estimated Cost: Php 100.0M

May 8, 2017 2017 WIN7E01336 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
AS PER GAA:
MFO 1 — National Road Network Services - Asset Preservation of National Roads - Rehabilitation/
Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway
Development Management-4 (HDM-4)
— Secondary : Reconstruction from Concrete to Concrete – Presentacion - Maligaya Rd — K0534+100- K0534+300, K0534+400 -K0534+661,
K0535+700 - K0535+927, K0541+300 - K0541+524, K0542+691.40 - K0542+1013.9
( Reconstruction from Concrete to Concrete)
Physical Target; 2.475 Lane-km
Unit Cost (P'000): P20,000/lane-km
Allocation Cost (P'000): P49,500

AS MODIFIED:
MFO 1 — National Road Network Services - Asset Preservation of National Roads - Rehabilitation/
Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway
Development Management-4 (HDM-4)
— Secondary : Reconstruction from Concrete to Concrete – Presentacion - Maligaya Rd — K0534+100- K0534+300, K0534+400 -K0534+561,
K0535+700 - K0535+927, K0541+300 - K0541+514, K0542+691.40 - K0542+1013.9
( Rehabilitation of Concrete Road)
Physical Target; 2.249 Lane-km
Unit Cost (P'000): P22,009.78/lane-km
Estimated Cost (P'000): P49,500

May 8, 2017 CY 2017 WIN7E01497 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Romblon District Engineering Office
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Road Upgrading (Unpaved to Paved)
- Secondary Road
Sibuyan Circumferential Road
K0082+297 - K0084+943,
K0085+092 - K0087+042
L = 9.158 lane km
Php 100,000,000.00
( Road Upgrading Gravel to Paved )
May 8, 2017 2017 WIN7E01346 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
AS PER GAA:
MFO — National Road Network Services - Network
Development - Off-Carriageway Improvement including drainage — Tertiary : Off-Carriageway Improvement: Shoulder Paving / Construction - Jct Binalay (Tinambac)-Tamban Rd - K0513 + 850 - K0514 + 979, K0514 + 1007 - K0516 + 000
( Off-Carriageway Improvement: Shoulder Paving/
Construction)
Physical target: 8,496 sq.m.
Unit Cost (P'000): P5.720T/sq.m.
Allocation Cost (P'000): P48,597

AS MODIFIED:
MFO — National Road Network Services - Network
Development - Off-Carriageway Improvement including drainage — Tertiary : Off-Carriageway Improvement: Shoulder Paving / Construction - Jct Binalay (Tinambac)-Tamban Rd - K0513 + 850 - K0514 + 979, K0514 + 1007 - K0516 + 015 ( Shoulder Paving/Construction)
Physical target: 6,648.14 sq.m.
Unit Cost (P'000): P7.310T/sq.m.
Estimated Cost (P'000): P48,597


May 8, 2017 CY 2017 WIN7E01462 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Road Upgrading (unpaved to paved) based on
Gravel Road Strategies, Traffic Benchmark for
Upgrading to Paved Road Standards
( HDM-4 Project Analysis )
- Secondary Road
Sibuyan Circumferential Road
K0068+919 - K0070+194,
K0070+448 - K0071+283,
K0071+434 - K0071+490,
K0076+138 - K0078+633,
K0078+983 - K0079+249,
K0079+577 - K0081+060,
K0081+776 - K0082+297
L = 13.958 lane km
Php 150,000,000.00
( Road Upgrading Gravel to Paved )
May 8, 2017 2017 WIN7E01347 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
MFO 1 — National Road Network Service - Asset Preservation of National Roads - Rehabilitation/
Reconstruction of National Roads with Slips, Slope
Collapse, and Landslide — Secondary : Construction of Road Slope Protection Structure - Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd K0567 + 900 - K0567 + 1000
(Construction of Road Slope Protection Structure)
Physical Target: 1,400 sq.m.
Unit Cost (P'000): P6,789/sq.m.
Allocation Cost (P'000): P9,504

As MODIFIED:
MFO 1 — National Road Network Service - Asset Preservation of National Roads - Rehabilitation/
Reconstruction of National Roads with Slips, Slope
Collapse, and Landslide — Secondary : Construction of Road Slope Protection Structure - Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd K0567 + 900 - K0568 + 137.30
(Construction of Road Slope Protection Structure)
Physical Target: 1,173.90 sq.m.
Unit Cost (P'000): P8.096T/sq.m.
Estimated Cost (P'000): P9,504

May 8, 2017 2017 WIN7E01358 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
Locally — Funded Projects - Roads and Bridges - Local Roads : Construction of Local Road, Brgy.
Abo (Zone 7), Tigaon, Camarines Sur
Physical Target: -
Unit Cost (P'000): -
Allocation Cost (P'000): P1,500

As MODIFIED:
Locally — Funded Projects - Roads and Bridges - Local Roads : Construction of Local Road, PobIacion-Barangay Abo (Zone 7), Tigaon, Camarines Sur
Sta. 0+000 - sta. 0+100.00, Sta. 0+208.70 - Sta. 0+258.70 (Construction of Concrete Road)
Physical Target: 0.30 lane-km
Unit Cost (P'000): P5,000/lane-km
Estimated Cost (P'000): P1,500



May 8, 2017 CY 2017 WIN7E01463 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Road Upgrading ( unpaved to paved ) based on
Gravel Road Strategies, Traffic Benchmark for
Upgrading to Paved Road Standards
( HDM-4 Project Analysis )
- Secondary Road
Sibuyan Circumferential Road
K0044+032 - K0044+599,
K0044+731 - K0045+478,
K0045+610 - K0047+517,
K0047+718 - K0047+727,
K0047+859 - K0048+085,
K0048+217 - K0049+565,
K0049+743 - K0049+861,
K0049+993 - K0050+471,
K0050+471 - K0050+598
L = 12.482 lane km
Php 150,000,000.00
( Road Upgrading to Paved )
May 8, 2017 2017 WIN7E01340 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
Locally-Funded Projects - Buildings and Other Structures Multipurpose/Facilities : Construction of Multi-Purpose Building (Covered Court), Brgy. Gaao, Tigaon, Camarines Sur (Construction of Multi-Purpose Building)
Physical Target: 1 building
Unit Cost (P'000): P2,000
Allocation Cost (P'000): P2,000

As MODIFIED:
Locally-Funded Projects - Buildings and Other Structures Multipurpose/Facilities : Repair/ Improvement of Multi-Purpose Building (Covered Court), Brgy. Gaao, Tigaon, Camarines Sur (Rehabilitation/Major Repair Multi-Purpose Building)
Physical Target: 1 building
Unit Cost (P'000): P2,000
Estimated Cost (P'000): P2,000

May 8, 2017 2017 WIN7E012B7 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
Locally-Funded Projects - Flood Control and Drainage - Flood Control Structures/Facilities : Construction of Flood Control Structures (Rip Rap), Brgy. Tagas, San Jose, Camarines Sur
Physical Target: -
Unit Cost (P'000): -
Allocation Cost (P'000): P1,000

As MODIFIED:
Locally-Funded Projects - Flood Control and Drainage - Flood Control Structures/ Facilities :
Construction of Flood Control Structures, Brgy. Tagas, San Jose, Camarines Sur (Construction of Drainage Structure)
Physical Target: 13.50 lm
Unit Cost (P'000): P74.074T/lm
Estimated Cost (P'000): P1,000

May 8, 2017 2017 WIN7E01308 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
MFO 1 — National Road Network Services - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) — Tertiary : Road Upgrading Gravel to Paved Tinambac-Siruma Rd - K0521 + 1002 - K0521 + 1020, K0524 + 851.50 - K0524 +872.60, K0526 + 282.40 - K0526 + 598.10, K0526 + 643.25 - K0526 + 734.55, K0534 + 959 - K0535 + 000, K0536 + 793 - K0536+ 1014,
K0545 + 812 - K0546 + 079, K0546 + 949.43 - K0547 + 502.30, K0549 + 939.40 - K0550 + 503
( Road Upgrading Grave/ to Paved)
Physical Target: 4.138 lane-km
Unit Cost (P'000): P20,382/lane-km
Allocation Cost (P'000): P84,342


As MODIFIED:
MFO 1 — National Road Network Services - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) — Tertiary : Road Upgrading Gravel to Paved Tinambac-Siruma Rd - K0521 + 1002 - K0521 + 1020, K0524 + 851.50 - K0524 +872.60, K0526 + 282.40 - K0526 + 598.10, K0526 + 643.25 - K0526 + 734.55, K0534 + 959 - K0534 + 1008.00, K0536 + 793 - K0536+ 1014,
K0546 + 949.43 - K0547 + 502.30, K0549 + 939.40 - K0550 + 503 ( Road Upgrading Grave/ to Paved)
Physical Target: 3.638 lane-km
Unit Cost (P'000): P23,184/lane-km
Estimated Cost (P'000): P84,342
May 8, 2017 2017 WIN7E01290 FY 2017 RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
MFO 1 — National Road Network Services - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) — Tertiary : Road Upgrading Gravel to Paved - Tigaon-Goa-Sn Jose-Lagonoy-GuijaIo via Sn Vicente Rd - K0503 + 581 - K0504 + 792 ( Road Upgrading Grave/ to Paved)
Physical Target: 2.450 lane-km
Unit Cost (P'000): P20,000/lane-km
Allocation Cost (P'000):P49,000


As MODIFIED:
MFO 1 — National Road Network Services - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) — Tertiary : Road Upgrading Gravel to Paved - Tigaon-Goa-Sn Jose-Lagonoy-GuijaIo via Sn Vicente Rd - K0503 + 560 - K0504 + 360 (Road Upgrading Grave/ to Paved)
Physical Target: 1.628 lane-km
Unit Cost (P'000): P30,098/lane-km
Estimated Cost (P'000):P49,000
May 8, 2017 2017 WIN7E01286 FY 2017 GAA RA 10924 November 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
MFO 1 — National Road Network Services - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) — Secondary : Road Upgrading Gravel to Paved - Lagonoy-Presentacion Rd - K0498 + 870 - K0499 + 018, K0499 + 081 - K0499 + 256
( Road Upgrading Grave/ to Paved)
Physical target: 0.728 lane-km
Unit Cost (P'000): P54,176/lane km
Allocation Cost (P'000): P39,440

As MODIFIED:
MFO 1 — National Road Network Services - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) — Secondary : Road Upgrading Gravel to Paved - Lagonoy-Presentacion Rd - K0498 + 870 - K0499 + 018, K0499 + 081 - K0499 + 360
( Road Upgrading Grave/ to Paved)
Physical target: 0.934 lane-km
Unit Cost (P'000): P42,227/lane km
Estimated Cost (P'000): P39,440
May 8, 2017 2017 WIN7E01279 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
MFO 1 — National Road Network Service - Asset Preservation of National Roads - Rehabilitation/
Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) — Secondary : Reconstruction from Concrete to Concrete - Lagonoy- Presentacion Rd - K0508+621 - K0509+000, K0513+895 - K0514+097, K0518+009 - K0518+109, K0524+858 - K0525+015, K0526+300 - 0526+902 (Rehabilitation of Concrete Road)
Physical Target: 3,028 lane-km
Unit Cost (P'000): P16.182T/lane-km
Allocation Cost (P'000): P49,000

As MODIFIED:
MFO 1 — National Road Network Service - Asset Preservation of National Roads - Rehabilitation/
Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) — Secondary : Reconstruction from Concrete to Concrete - Lagonoy- Presentacion Rd - K0509+700-K0509+772, K0510+845-K0511+000, K0513+891-K0514+093.47,K0515+300-K0515+526,K0518+005-K0518+105, K0521+841-K0521+1023, K0524+286-K0524+387, K0524+858-K0525+015, K0526+563-K0526+660
(Rehabilitation of Concrete Road)
Physical Target: 2,989 lane-km
Unit Cost (P'000): P16.393T/lane-km
Estimated Cost (P'000): P49,000
May 8, 2017 2017 WIN7E01282 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
MFO 1 — National Road Network Services - Network
Development - Off-Carriageway Improvement including drainage — Secondary : Off-Carriageway Improvement: Shoulder Paving / Construction - Lagonoy-Presentacion Rd - K0498 + -817 - K0498 + 870, K0499 + 256 - K0500 + 888 (Shoulder Paving/Construction)
Physical Target: 13,260 sq.m.
Unit Cost (P'000): P3.763T/sq.m.
Allocation Cost (P'000): 49,900


As MODIFIED:
MFO 1 — National Road Network Services - Network
Development - Off-Carriageway Improvement including drainage — Secondary : Off-Carriageway Improvement: Shoulder Paving / Construction - Lagonoy-Presentacion Rd - K0498 + -817 - K0498 + 870, K0499 + 360 - K0501 + 032 (Shoulder Paving/Construction)
Physical Target: 8,796.24sq.m.
Unit Cost (P'000): P5.673T/sq.m.
Estimated Cost (P'000): 49,900
May 8, 2017 2017 WIN7E01341 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
Locally-Funded Projects - Flood Control and Drainage - Flood Control Structures/Facilities : Construction of Flood Control Structures, Brgy. Vinagre, Tigaon, Camarines Sur
Physical Target: -
Unit Cost (P'000): -
Allocation Cost (P'000): P1,500

As MODIFIED:
Locally-Funded Projects - Flood Control and Drainage - Flood Control Structures/Facilities .
Construction of Flood Control Structure Poblacion, Brgy. Vinagre, Tigaon, Camarines Sur - Sta. 0+000.00 - Sta. 0+115.00 (Construction of Drainage
Structure along Road)
Physical Target: 115.0 lm.
Unit Cost (P'000): P13.043T/lm
Estimated Cost (P'000): P1,500

May 8, 2017 2017 WIN7E01339 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
Locally —Funded Projects - Roads and Bridges - Local Roads . Construction of Local Road, Brgy.
Catalotoan, Sagñay, Garchitorena, Camarines Sur
Physical target: -
Unit Cost (P'000): -
Allocation Cost (P'000): P1,000

As MODIFIED:
Locally —Funded Projects - Roads and Bridges - Local Roads . Construction of Local Road, Brgy.
Catalotoan, Sagñay, Garchitorena, Camarines Sur
Physical target: 0.20 lane-km
Unit Cost (P'000): P5,000/lane-km
Estimated Cost (P'000): P1,000
May 8, 2017 2017 WIN7E01338 FY 2017 GAA RA 10924 December 28, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
Locally - Funded Projects - Roads and Bridges - Local Roads : Construction of Local Road, Brgy.
Antipolo, Tinambac, Garchitorena, Camarines Sur
Physical Target: -
Unit Cost (P'000): -
Allocation Cost (P'000): P1,000

As MODIFIED:
Locally - Funded Projects - Roads and Bridges - Local Roads : Construction of Local Road, Brgy.
Antipolo, Tinambac, Garchitorena, Camarines Sur
(Construction of Concrete Road)
Physical Target: 0.20 lane km.
Unit Cost (P'000): P5,000/ lane-km
Estimated Cost (P'000): P1,000

May 8, 2017 CY 2017 WIN7E01500 GAA CY 2017 RA 10924 December 29, 2016 Region IV-A Regional Office IV-A
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Rehabilitation/Reconstruction of National Roads
with Slips, Slope Collapse, and Landslide
- Secondary Road
Sibuyan Circumferential Road
K0003+615.71 - K0004+000
7,200 sq m.
Php 117,442,000.00
(Construction of Road Slope
Protection Structure )
May 8, 2017 2017 WIN7C01519 FY 2017 (R.A 10924) March 27, 2017 Region IX Zamboanga del Norte 1st District Engineering Office
Network Development -
Improvement/Widening of National Roads - Other Primary -
Dipolog - Sindangan - Liloy Rd
(S01057MN) -
K1847+544 - K1847+690,
K1847+(-576) - K1847+(-282.40),
K1848+060 - K1848+800
Allocation:
Php 35.367 Million
Physical Target: 2.3592 lane km
Unit Cost: Php 14,991,098.68/lane km
May 8, 2017 2017 WIN7C01511 FY 2017 (R.A 10924) March 27, 2017 Region IX Zamboanga del Norte 1st District Engineering Office
Asset Preservation of National Roads -
Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads - Dipolog - Sindangan - Liloy Rd (S01057MN)
K1917+913.60 - K1917+1400
Allocation: Php 7.200 Million
Physical Target: 952.80 lm.
Unit Cost: Php 7,556.68/lm
May 8, 2017 2017 WIN7C01509 FY 2017 (R.A 10924) March 27, 2017 Region IX Zamboanga del Norte 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction/Extension of Flood Control Structure along Dohinob River Roxas, Zamboanga del Norte, 2nd LD
Allocation: Php 45.000 Million
Physical Target: 647 lineal meters
Unit Cost: Php 69,551.78/lm
May 8, 2017 2017 WIN7C01512 FY 2017 (R.A 10924) March 27, 2017 Region IX Zamboanga del Norte 1st District Engineering Office
Roads and Bridges - Local Roads -
Road Concreting of Brgy. Road, Brgy. Poblacion, Siayan, Zamboanga del Norte, 2nd LD
Allocation: Php 4.000 Million
Physical Target: 0.880 lane km.
Unit Cost: Php 4,545,454.54/lane km
May 8, 2017 2017 WIN7C01521 FY 2017 (R.A 10924) March 27, 2017 Region IX Zamboanga del Norte 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure at Mandih, Sindangan, Zamboanga del Norte, 2nd LD
Allocation: Php 30.000 Million
Physical Target: 379 lineal meters (lm)
Unit Cost: Php 79,155.67/lm
May 8, 2017 2017 WIN7C01520 FY 2017 (R.A 10924) March 27, 2017 Region IX Zamboanga del Norte 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure along Piao River, Sindangan, Zamboanga del Norte, 2nd LD
Allocation: Php 20.000 Million
Physical Target: 212 lineal meters (lm)
Unit Cost: Php 94,339.62/lm
May 8, 2017 2017 WIN7C01514 FY 2017 (R.A 10924) March 27, 2017 Region IX Zamboanga del Norte 1st District Engineering Office
Network Development -
Improvement/Widening of National Roads,
Tertiary - Road Widening - Dipolog - Polanco - Piñan Jct. Oroquieta Rd including RROW,
K1833+860 - K1834+363 (S01054MN)
Allocation:
Php 22.657 MIllion (Total)
Php 18.1256 MIllion (Road Widening)
Php 4.5314 MIllion (ROW Acquisition)
Physical Target:
1.000 lane km (Road Widening)
886.00 sq.m. (ROW Acquisition)
Unit Cost:
Php 18,125,600/lane km (Road Widening)
Php 5,114.45/sq.m. (ROW Acquisition)
May 8, 2017 2017 WIN7C01515 FY 2017 (R.A 10924) March 27, 2017 Region IX Zamboanga del Norte 1st District Engineering Office
Asset Preservation of National Roads -
Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on PMS/HDM-4) - Primary Roads - Dipolog - Punta - Dansullan - S. Osmeña - Zamboanga del Norte/Sur Bdry Rd (S01056MN)
K1850+577.98 - K1850+699.54
Allocation: Php 2.004 Million
Physical Target: 0.24312 lane km
Unit Cost: Php 8,242,843.04/lane km
May 8, 2017 2017 WIN7C01510 FY 2017 (R.A 10924) March 27, 2017 Region IX Zamboanga del Norte 1st District Engineering Office
Asset Preservation of National Roads -
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslides - Secondary Roads -
Sindangan - Siayan - Dumingag - Mahayag (S01060MN) (Sindangan - Siayan Section)
K1929+920 - K1929+990, R/S
K1937+140 - K1937+660, L/S
K1939+9355 - K1939+9500, L/S
K1939+060 - K1939+090
Allocation: Php 17.269 Million
Physical Target: 5,849.09 sq.m.
Unit Cost: Php 2,952.42/sq.m.