May 11, 2017 |
FY2017 |
WIN7C01567 |
SR2017-02-002152 |
February 1, 2017 |
Region VIII |
Regional Office VIII |
As per GAA:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations-to Declared Tourism Destinations
Construction of Gravel Road - Ma. Clara-Cagnituan Road leading to Maasin City Tourism Loop (Monte Cueva, Danao Camp Tree Park), Maasin City, Southern Leyte
As Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations
Ma. Clara-Cagnituan Road leading to Maasin City Tourism Loop (Monte Cueva, Danao Camp Tree Park, St. Francis Javier Shrine, Maasin City Zoo Theme Park), Maasin City, Southern Leyte Lone District
|
May 11, 2017 |
CY 2017 |
WIN7E01494 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded Projects:
- Local Infrastructure Program
- Buildings and other Structures
- Multipurpose/Facilities:
Construction of Multi-Purpose Building
Brgy. Malpalon, Calintaan,
Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building ) |
May 11, 2017 |
FY2017 |
WIN7C01607 |
SR2017-02-001750 |
February 1, 2017 |
Region VIII |
Regional Office VIII |
As per GAA:
Network Development - Improvement/Widening of National Roads - N1
Road Widening - Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) including RROW - K0692+400 - K0695+279
As Modified:
Network Development
Improvement/Widening of National Roads
Daang Maharlika (S00002SM) (Sn Isidro-Sn Juanico Br) including RROW - K0692+400 - K0695+279, Northern Samar, 1st LD
|
May 11, 2017 |
FY2017 |
WIN7C01550 |
SR2017-02-001654 |
February 1, 2017 |
Region VIII |
Regional Office VIII |
As per GAA:
Network Development - Improvement/Widening of National Roads - N1
Road Widening - Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0682+740 - K0684+000, K0689+050 - K0690+000, K0682+450 - K0682+740, K0685+000 - K0685+200
As Modified:
Network Development
Improvement/Widening of National Roads (N1)
Daang Maharlika (S00001SM) (Sn Isidro-Sn Juanico Br) - K0682+740 - K0684+000, K0689+050 - K0690+000, K0682+450 - K0682+740, K0685+000 - K0685+200, Northern Samar 1st LD
|
May 11, 2017 |
FY2017 |
WIN7C01606 |
GAA2017 |
January 31, 2017 |
Region VIII |
Regional Office VIII |
As per GAA:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment - Construction of Cadac-an Flood Control Structures (Cadac-an River Basin), Abuyog, Leyte
As Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment - Construction of Cadac-an Flood Control Structures (Cadac-an River Basin), Abuyog, Leyte 5th LD
|
May 11, 2017 |
FY 2017 |
WIN7E01557 |
UACS No. 165003014300247 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-)-Tertiary: Reconstruction from Asphalt to Concrete – M Roxas Service Rd – Chainage 195.25-Chainage 447 (Reconstruction from Asphalt to Concrete)
UACS No. 165003014300247
Physical Target / Cost
Original: .503 lane-km
Unit Cost (P’000): P15,905/lane-km
Allocation Cost (P’000): P8,000
WIN7E01557
As Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-)-Tertiary: M Roxas Service Rd – Chainage 000.00-Chainage 121.50 Chainage 247.60 to Chainage 273.30 (S02328LZ), Tondo, Manila City. (Reconstruction from Asphalt to Concrete)
UACS No. 165003014300247
Modified: 0.294 lane-km
Unit Cost: P27,211/lane-km
Estimated Cost (P’000): P8,000
WIN7E01557
|
May 11, 2017 |
FY2017 |
WIN7C01693 |
GAA2017 |
January 31, 2017 |
Region VIII |
Leyte 5th District Engineering Office |
As per GAA:
Local Infrastructure Program - Water Management - Water Supply
Construction of Water System, Matalom, Leyte
Allocation(P) - 2.00 Million
Physical Target - 1 No. of Water Supply System
Unit Cost (P) 2.00 Million/No. of Water Supply System
As Modified:
Local Infrastructure Program - Water Management - Water Supply
Construction of Water Supply, Matalom, Leyte
Allocation(P) - 2.00 Million
Physical Target - 3 No. of Water Supply System
Unit Cost (P) 0.666 Million/No. of Water Supply System
|
May 11, 2017 |
FY2017 |
REG7XK01251 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Locally Funded Projects
LIP - Roads and Bridges - Local Roads
Repair/Rehabilitation of Road including Drainage along Sto. Niño Street (Extn.) Barangay 6, Tacloban City, Leyte
Allocation (P) 5.000 Million
As Modified:
Locally Funded Projects
LIP - Roads and Bridges - Local Roads
Repair/Rehabilitation of Road including Drainage along Sto. Niño Street (Extn.) Barangay 6, Tacloban City, Leyte
Allocation (P) - 5.000 Million
Physical Target - 0.300 Lane Km
Unit Cost (P) - 16.6667Million/Lane Km
|
May 11, 2017 |
FY2017 |
REG7XK01254 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structures along Burayan River, Tacloban City
Allocation (P) - 29.412 Million
Physical Target - 1 Lineal Meter
Unit Cost (P) - 29.412 Million/Lineal Meter
As Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structures along Burayan River, Tacloban City
Allocation (P) - 29.412 Million
Physical Target - 1,244 Lineal Meter
Unit Cost (P) - 23,643.0868/Lineal Meter
|
May 11, 2017 |
FY2017 |
REG7XK01255 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structures along Tanghas Lirang Creek, Tacloban City
Allocation (P) - 17.281 Million
Physical Target - 1 Lineal Meter
Unit Cost (P) - 17.281 Million/Lineal Meter
As Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure at Tanghas-Lirang Creek, Tacloban City
Allocation (P) - 17.281 Million
Physical Target - 1, 577.00 Lineal Meter
Unit Cost (P) - 10,958.15/Lineal Meter
|
May 11, 2017 |
FY2017 |
REG7XK01250 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Asset Preservation of National Roads - Preventive Maintenance based on Pavement Management System/Highway Development and Management-4 (HDM-4) - Tertiary
Preventive Maintenance of Road: Concrete Reblocking - Caibaan Road - K0913+-653 - K0913+515
Allocation(P) - 9.316 Million
Physical Target - 1.386 Lane Km
Unit Cost(P) - 6,721,500.72/Lane Km
As Modified:
Asset Preservation of National Roads - Preventive Maintenance based on Pavement Management System/Highway Development and Management-4 (HDM-4) - Tertiary
Preventive Maintenance along Caibaan Road (S00018LT), Tacloban City K0913+-643 - K0913+517, K0913+-458 - K0913+-449, K0913+-403 - K0913+-336, K0913+-323 - K0913+-209, K0913+-191 - K0913+-130 and K0913+015 - K0913+515
Allocation(P) - 9.316 Million
Physical Target - 1.399 Lane Km
Unit Cost(P) - 6,659,042.17/Lane Km
|
May 11, 2017 |
FY2017 |
REG7XK01253 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Network Development-Improvement/Widening of National Roads - Tertiary
Road Widening - Sn Jose-Manlurip-MacArthur Park Rd - K0912+(-336) - K0912+331
As Modified:
Network Development-Improvement/Widening of National Roads - Tertiary
Improvement/Widening of Sn Jose-Manlurip-MacArthur Park Rd (S00021LT)
K0912+(-270) to K0912+400
Tacloban City
|
May 11, 2017 |
CY 2017 |
WIN7E01496 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities:
Construction of Multi-Purpose Building
Brgy. Ninikat ng Pag-asa (Poblacion),
Lubang, Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building )
|
May 11, 2017 |
FY2017 |
WIN7C01694 |
GAA2017 |
February 1, 2017 |
Region VIII |
Leyte 4th District Engineering Office |
As per GAA:
Network Development - Off Carriageway Improvement including drainage - Primary
Off-Carriageway Improvement; Shoulder Paving/Construction - Palo-Carigara-Ormoc Road, K0994+345 - K0995+004, K0984+423 - K0984+733, K0986+114 - K0986+464
As Modified:
Network Development - Off Carriageway Improvement including drainage - Primary
Network Development - Off Carriageway Improvement including drainage - Primary, along Palo-Carigara-Ormoc Road, S00132LT K0994+345 - K0995+004, K0984+401 - K0984+727, K0986+114 - K0986+448
|
May 11, 2017 |
CY 2017 |
WIN7E01491 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. 6 Poblacion, San Jose,
Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building )
|
May 11, 2017 |
CY 2017 |
WIN7E01495 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. Tilik, Lubang, Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building )
|
May 11, 2017 |
FY2017 |
WIN7C01695 |
GAA2017 |
February 1, 2017 |
Region VIII |
Leyte 4th District Engineering Office |
As per GAA:
Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary
Construction of Drainage Structure along Road - Palompon-Isabel-Merida-Ormoc Road, K1085+020 - K1086+349
Allocation(P) - 25.00 Million
Physical Target - 2,630 Lineal Meter (CW1)
Unit Cost (P) - 9,505.70/Lm.(CW1)
As Modified:
Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary
Construction/Upgrading/Rehabilitation of Drainage along National Roads, Palompon-Isabel-Merida-Ormoc Road, S00152LT, K1085+020 - K1086+669
Allocation(P) - 25.00 Million
Physical Target - 2,750 Lineal Meter (CW1)
Unit Cost (P) - 9,090.91/Lm.(CW1)
|
May 11, 2017 |
CY 2017 |
WIN7E01480 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - funded projects
- Local Infrastructure Program
- Buildings and other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. Maginhawa (Poblacion), Lubang
Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building ) |
May 11, 2017 |
FY2017 |
WIN7C01697 |
GAA2017 |
February 1, 2017 |
Region VIII |
Leyte 1st District Engineering Office |
As per GAA:
LIP - Roads and Bridges - National Roads
Repair/Rehabilitation/Improvement along Tigbao-Pulak-Sta. Fe Road, K0910+350 - K0910+875, K0911+800 - K0911+900, K0912+850 - K0913+150, Leyte
Allocation (P) - 10.00 Million
As Modified:
LIP - Roads and Bridges - National Roads
Off-Carriageway Improvement along Tigbao-Pulak-Sta. Fe Road (S0039LT) K0913+630 - K0914+080, Sta. Fe, Leyte
Allocation (P) - 10.00 Million
Physical Target - 2,745 Square Meters
Unit Cost (P) - 3,642.99/Square Meter |
May 11, 2017 |
CY 2017 |
WIN7E01506 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. Lourdes, Magsaysay, Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building ) |
May 11, 2017 |
2017 |
WIN7G01462 |
FY 2017 (R.A 10924) |
April 26, 2017 |
Region IX |
Regional Office IX |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Primary - Reconstruction from (Asphalt to Concrete) including Drainage of Sindangan - Liloy Road, Zamboanga del Norte, 2nd DEO
K1948+000.00 - K1948+699.42,
K1948+738.84 - K1949+562.00,
K1950+000.00 - K1951+000.00,
K1951+158.00 - K1951+503.00
Allocation:
Php 59.613 M (Total)
Php 58,749,032.92 (Asphalt to Concrete)
Php 863,967.08 (ROW Acquisition)
Physical Target:
5.74 lane km (Asphalt to Concrete)
863.97 sq.m. (ROW Acquisition)
Unit Cost:
Php 10,235,023.16/lane km (Asphalt to Concrete)
Php 1,000.00/sq.m. (ROW Acquisition) |
May 11, 2017 |
2017 |
WIN7G01463 |
FY 2017 (R.A 10924) |
April 26, 2017 |
Region IX |
Regional Office IX |
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes -
Widening of San Ramon Bridge 2 (B01162MN) along Zamboanga City - Labuan - Limpapa Road, (P00117212MN) Zamboanga City
Beg. of Project: 1959+840.00
Abutment A: 1959+852.58
Abutment B: 1959+944.92
End of Project: 1959+960.00
Approaches Net Length: 27.66 lm
Bridge Length: 92.34 lm
River Control Length: 100.00 lm
Allocation: Php 102.000 Million
Physical Target: 880.924 sq.m./92.34 lm
Unit Cost: Php 115,787.51/sq.m. |
May 11, 2017 |
FY2017 |
WIN7C01696 |
GAA2017 |
February 1, 2017 |
Region VIII |
Leyte 1st District Engineering Office |
As per GAA:
LIP - Roads and Bridges - National Roads
Repair/Rehabilitation/Improvement along Daang Maharlika K0911+(-118) - K0919+499(S00024LT)Jct. Tacloban-Baybay South Road-Government Center Road Network (K0918+170 - K0918+510 (S00052LT); Tacloban-Baybay South Road (Pawing Section) K0917+(-778) - K0917+430
Allocation (P) - 7.00 Million
As Modified:
LIP - Roads and Bridges - National Roads
Construction/Upgrading/Rehabilitation of Drainage of National Roads along Daang Maharlika LT(S00024LT) K0912+470 - K0912+550 and K0912+560 - K0912+840
Allocation (P) - 7.00 Million
Physical Target - 379 Linear Meters
Unit Cost (P) - 18,469.66/Linear Meter
|
May 11, 2017 |
2017 |
WIN7G01468 |
FY 2017 (R.A 10924) |
April 26, 2017 |
Region IX |
Regional Office IX |
Construction and Maintenance of Bridges along National Roads - Widening of Manicahan Bridge (B00574MN) along Pagadian City - Zamboanga City Road (P00117211MN) Zamboanga City
Beg. of Project: 1915+740.00
Abutment A: 1915+758.00
Abutment B: 1915+848.84
End of Project: 1915+870.00
Approaches Net Length: 39.16 lm
Bridge Length: 90.84 lm
River Control Length: 100.00 lm
Allocation:
Php 120.000 M (Total)
Php 115,083,011.91 (Widening of Bridge)
Php 4,916,988.09 (ROW Acquisition)
Physical Target:
866.614 sq.m./90.84 lm (Widening of Bridge)
4,916,988.09 (ROW Acquisition)
Unit Cost:
Php 132,796.16/sq.m. (Widening of Bridge)
Php 1,000/sq.m. (ROW Acquisition) |
May 11, 2017 |
2017 |
WIN7G01444 |
SR2017-02-002535 |
February 2, 2017 |
Region XIII |
Metro Manila 3rd District Engineering Office |
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes
Widening of Magalibobo Bridge (to more than 2 lanes) along Daang Maharlika (Agusan-Davao Section), (B00929MN), K1372+595 - K1372+621
Allocation : ₱ 27.574 Million (Total)
: ₱ 27,214,000.00 (Widening of Bridge)
: ₱ 360,000.00 (ROW Acquisition)
Physical Target : 245.44 sq.m. (Widening of Bridge)
Physical Target : 4,520.00 sq.m. (ROW Acquisition)
|
May 11, 2017 |
2017 |
WIN7G01451 |
GAA 2017 RA10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
Modified:
Locally Funded Project: LIP - Buildings and Other Structures - Multipurpose/Facilities
Completion of Multi-Purpose Building, Brgy. Poblacion, Sta. Josefa, Agusan del Sur
Allocation : ₱ 2.000 Million
Physical Target : 1 Number of Building
|
May 11, 2017 |
2017 |
WIN7G01447 |
SR2017-02-002540 |
February 2, 2017 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes - Primary
2. Widening of Onoman Bridge (to more than 2 lanes) along Daang Maharlika (Agusan-Davao Section), (B00930MN), K1374+485 - K1374+509
Allocation : ₱ 25.206 Million (Total)
₱ 25,056,000.00 (Widening of Bridge)
: ₱ 150,000.00 (ROW Acquisition)
:
Physical Target : 226.56 sq.m. (Widening of Bridge)
Physical Target : 4,480.00 sq.m. (ROW Acquisition)
|
May 11, 2017 |
2017 |
WIN7G01443 |
SR2017-02-002500 |
February 2, 2017 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes - Primary
Widening of Langkilaan Bridge (to more than 2 lanes) along Daang Maharlika (Agusan-Davao Section), (B00931MN), K1376+845 - K1376+885.80
Allocation : ₱ 45.220 Million (Total)
: ₱ 44,970,000.00 (Widening of Bridge)
: ₱ 250,000.00 (ROW Acquisition)
:
Physical Target : 385.15 sq.m. (Widening of Bridge)
Physical Target : 4,820.00 sq.m. (ROW Acquisition)
|
May 10, 2017 |
FY 2017 |
WIN7E01122 |
FY 2017 APPROVED MODIFICATION |
March 21, 2017 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From : MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Siffu River, Bananao, Bitigue, Palitud, Anonat, Paracelis, Mountain Province [Construction of Flood Mitigation Structure]
Physical Target = 1,125 lm
To:MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Siffu River, Bananao, Butigue, Palitud, Anonat, Paracelis, Mountain Province [Construction of Flood Mitigation Structure]
Physical Target = 1,200 lm
|
May 10, 2017 |
FY 2017 |
WIN7E01119 |
FY 2017 APPROVED MODIFICATION |
March 21, 2017 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Locally - Funded Projects - Buildings and Other Structures - Multipurpose/ Facilities - Construction of Multi-Purpose Building (MPDEO-District Sub-Office Building), Poblacion, Natonin, Mt. Province [Construction of Multi-Purpose Building]
To: Locally - Funded Projects - Buildings and Other Structures - Multipurpose/ Facilities - Construction of Multi-Purpose Building (MPSDEO Building), Banawel, Natonin, Mt. Province [Construction of Multi-Purpose Building]
|
May 10, 2017 |
FY 2017 |
WIN7E01124 |
FY 2017 APPROVED MODIFICATION |
March 21, 2017 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: MFO 1 - National Road Network Services -Asset Preservation of National Roads - Rehabilitation/ Reconstruction from Concrete to Concrete - Mt. Province - Ifugao Road (Kiling - Paracelis Section) -K0456+753- K0457+000, K0459+300 - K0460+000 [Reconstruction from Concrete to Concrete]
To: MFO 1 - National Road Network Services -Asset Preservation of National Roads - Rehabilitation/ Reconstruction from Concrete to Concrete - Mt. Province - Ifugao Road (Kiling - Paracelis Section) -K0456+753- K0457+000, K0459+300 - K0460+000 [Reconstruction from Concrete to Concrete]
Physical Target = 1.90 ln-km
|
May 10, 2017 |
FY 2017 |
WIN7E01126 |
FY 2017 APPROVED MODIFICATION |
March 27, 2017 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Tanudan River, Sta. 027+010 - 027+055,027+065 - 027+300, 027+540 - 027+560, Barlig, Mountain Province [Construction of Flood Mitigation Structure]
Physical Target =288 lm
To:MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Tanudan River, Sta. 027+005 - 027+055,027+065 - 027+300, 027+500 - 027+560, Barlig, Mountain Province [Construction of Flood Mitigation Structure]
Physical Target = 358 lm
|
May 10, 2017 |
FY 2017 |
WIN7E01123 |
FY 2017 APPROVED MODIFICATION |
March 21, 2017 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: MFO 1 - National Road Network Services - Road Upgrading (unpaved to paved) - Tertiary - Road Upgrading Gravel to Paved - Mt Province - Isabela Road - Chainage 19243 - Chainage 19495, Chainage 19564 - Chainage 21883 [Road Upgrading Gravel to Paved]
Physical Target = 5.142 ln-km
To:MFO 1 - National Road Network Services - Road Upgrading (unpaved to paved) - Tertiary - Road Upgrading Gravel to Paved - Mt Province - Isabela Road - Chainage 19243 - Chainage 19495, Chainage 19564 - Chainage 21780 [Road Upgrading Gravel to Paved]
Physical Target = 4.936 ln-km
|
May 10, 2017 |
2017 |
WIN7E01545 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads - Concreting of Barangay Road, Bakod Bayan, Cabanatuan City, Nueva Ecija
(Construction of Concrete Road) |
May 10, 2017 |
2017 |
WIN7E01453 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads - Improvement / Repair of Road, Bantog St., Brgy. Camatsile, Gabaldon, Nueva Ecija
(Construction of Concrete Road) |
May 10, 2017 |
2017 |
WIN7E01057 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 1st District Engineering Office |
As per GAA:
Locally-Funded Projects: Local Infrastructure Program: Roads and Bridges: Local Roads: Construction of Local Road, Phase I, Milaor, Camarines Sur (Construction of Concrete)
Physical Target: -
Unit Cost: -
Allocation: P6.0M
As MODIFIED:
Locally-Funded Projects: Local Infrastructure Program: Roads and Bridges: Local Roads: Construction/Rehabilitation/Improvement of Local Roads, Brgy. Dalipay, Brgy. Mayaopayawan and Brgy. Lipot, Milaor, Camarines Sur (Construction of Concrete Road/ Rehabilitation of Concrete Road)
Physical Target: Const. of Concrete Road: 0.804 lane.km
Rehab. of Concrete Road: 0.296 lane.km
Unit Cost: Const. of Concrete Road: P4,975T/ lane.km
Rehab. of Concrete Road: P6,757T/lane.km
Estimated Cost: P6.0M
|
May 10, 2017 |
2017 |
WIN7E01055 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 1st District Engineering Office |
As per GAA:
MFO-2 Flood Management Services: Construction /
Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Dike (along the cut-off Channel) along Bicol River Basin, Barangay Del Carmen - Del Rosario, Sta.26+400-Sta.26+681, Minalabac, Camarines Sur (Construction of Flood Mitigation Structure)
Physical Target: 281 ln.m
Unit Cost: P169.32T/ln.m
Allocation: P47.580M
As MODIFIED:
MFO-2 Flood Management Services: Construction /
Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Dike (along the cut-off Channel) along Bicol River Basin, Barangay Del Carmen - Del Rosario, Sta.27+013 - Sta.27+445, Minalabac, Camarines Sur (Construction of Flood Mitigation Structure)
Physical Target: 432 ln.m
Unit Cost: P110.14T/ln.m
Estimated Cost: P47.580M
|
May 10, 2017 |
2017 |
WIN7E01054 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 1st District Engineering Office |
As per GAA:
MFO-2 Flood Management Services: Construction /
Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Dike (along the cut-off Channel) along Bicol River Basin, Sta.27+000 - Sta.27+294, Barangay San Juan - San Lorenzo, Minalabac, Camarines Sur
(Construction of Flood Mitigation Structure)
Physical Target: 294 ln.m
Unit Cost: P156.50T/ln.m
Allocation: P46.010M
As MODIFIED:
MFO-2 Flood Management Services: Construction /
Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Dike (along the cut-off Channel) along Bicol River Basin, Sta.25+282 - Sta.25+698, Barangay San Juan - San Lorenzo, Minalabac, Camarines Sur
(Construction of Flood Mitigation Structure)
Physical Target: 416 ln.m
Unit Cost: P110.60T/ln.m
Estimated Cost: P46.010M |
May 10, 2017 |
2017 |
WIN7E01352 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-Funded Projects - Roads and Bridges - Local Roads - Concreting of Barangay Road, Brgy. Pinagdapian, Del Gallego, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.48 ln.km
Unit Cost (P'000): P4,166.67/ln-km
Allocation (P'000): P2,000.00
As MODIFIED:
Locally-Funded Projects - Roads and Bridges - Local Roads - Concreting of Barangay Road, Brgy. Pinagdapian, Del Gallego, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.556 ln.km
Unit Cost (P'000): P3,597.12/ln-km
Allocation (P'000): P2,000.00
|
May 10, 2017 |
2017 |
WIN7E01355 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-Funded Projects - Roads and Bridges - Local Roads - Widening of Barangay Road, Barangay Salvacion, Del Gallego, Camarines Sur [Road Widening]
Physical Target: 0.3 ln-km
Unit Cost (P'000): P5,000.00/ln-km
Allocation (P'000): P1,500.00
As MODIFIED:
Locally-Funded Projects - Roads and Bridges - Local Roads - Widening of Barangay Road, Barangay Salvacion, Del Gallego, Camarines Sur [Road Widening]
Physical Target: 0.384 ln-km
Unit Cost (P'000): P3,906.25/ln-km
Estimated Cost (P'000): P1,500.00 |
May 10, 2017 |
2017 |
WIN7E01355 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-Funded Projects - Roads and Bridges - Local Roads - Widening of Barangay Road, Barangay Salvacion, Del Gallego, Camarines Sur [Road Widening]
Physical Target: 0.3 ln-km
Unit Cost (P'000): P5,000.00/ln-km
Allocation (P'000): P1,500.00
As MODIFIED:
Locally-Funded Projects - Roads and Bridges - Local Roads - Widening of Barangay Road, Barangay Salvacion, Del Gallego, Camarines Sur [Road Widening]
Physical Target: 0.384 ln-km
Unit Cost (P'000): P3,906.25/ln-km
Estimated Cost (P'000): P1,500.00 |
May 10, 2017 |
2017 |
WIN7E01086 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-Funded Projects - Roads and Bridges - Local Roads — Concreting of Barangay Road, Brgy. Binahian going to Brgy. Caima, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.480ln-km
Unit Cost (P'000): P4,166.6667/ln-km
Allocation (P'000): P2,000.00
As MODIFIED:
Locally-Funded Projects - Roads and Bridges - Local Roads — Concreting of Barangay Road, Brgy. Binahian going to Brgy. Caima, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.444 ln-km
Unit Cost (P'000): P4,504.5045/ln-km
Estimated Cost (P'000): P2,000.00 |
May 10, 2017 |
2017 |
WIN7E01087 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-Funded Projects - Roads and Bridges - Local Roads — Concreting of Barangay Road, Brgy. Buenasuerter Lupi, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.40 ln-km
Unit Cost (P'000): P3,750/ln-km
Allocation (P'000): P1,500.00
As MODIFIED:
Locally-Funded Projects - Roads and Bridges - Local Roads — Concreting of Barangay Road, Brgy. Buenasuerter Lupi, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.339 ln-km
Unit Cost (P'000): P4,424.7788/ln-km
Estimated Cost (P'000): P1,500.00
|
May 10, 2017 |
2017 |
WIN7E01348 |
FY 2017 GAA RA 10924 |
November 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-Funded Projects - Roads and Bridges - Local Roads — Concreting of Barangay Road, Barangay Cabugao, Ragay, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.40 ln-km
Unit Cost (P'000): P5,000.00/ln-km
Allocation (P'000): P2,000.00
As MODIFIED:
Locally-Funded Projects - Roads and Bridges - Local Roads — Concreting of Barangay Road, Barangay Cabugao, Ragay, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.528 ln-km
Unit Cost (P'000): P3,787.88/ln-km
Estimated Cost (P'000): P2,000.00
|
May 10, 2017 |
2017 |
WIN7E01345 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Comadogcadog, Del Gallego, Camarines Sur
[Construction of Concrete Road]
Physical Target: 0.4 ln-km
Unit Cost (P'000): P3,750.00/ln-km
Allocation (P'000): P1,500.00
As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Comadogcadog, Del Gallego, Camarines Sur
[Construction of Concrete Road]
Physical Target: 0.162 ln-km
Unit Cost (P'000): P9,259.26/ln-km
Estimated Cost (P'000): P1,500.00
|
May 10, 2017 |
2017 |
WIN7E01353 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Mabini, Del Gallego, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.4 ln-km
Unit Cost (P'000): P3,750.00/ln-km
Allocation (P'000): P1,500.00
As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Mabini, Del Gallego, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.376 ln-km
Unit Cost (P'000): P3,989.36/ln-km
Estimated Cost (P'000): P1,500.00
|
May 10, 2017 |
2017 |
WIN7E01078 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Mantila, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.48 ln-km
Unit Cost (P'000): P3,125/ln-km
Allocation (P'000): P1,500.00
As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Mantila, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.36 ln-km
Unit Cost (P'000): P4,166.667/ln-km
Estimated Cost (P'000): P1,500.00 |
May 10, 2017 |
GAA FY 2017 |
WIN7G01446 |
GAA FY R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: National Road Network Services:
Asset Preservation of National Roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) -Secondary
Reconstruction from Asphalt to Concrete/Off-Carriageway Improvement: Shoulder Paving / Construction - Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-Glan)
K1598+853 - K1599+000, K1599+000 - K1600+000, K1600+936 - K1601+100, K1609+081 - K1610+020, K1601+100 - K1602+000,
K1602+000 - K1602+564, K1604+972 - K1605+566, K1606+415 - K1608+050, K1608+476 - K1609+081, K1610+020 - K1610+081
TO: National Road Network Services:
Asset Preservation of National Roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) -Secondary
Rehabilitation/Reconstruction (Asphalt to Concrete) of Davao Sarangani Coastal Road (Malalag-Malita-JAS-Glan Road) Including Paving of Shoulders (Caputian-Basiawan Section), Davao Occidental
K1598+853 - K1599+000, K1599+000 - K1600+000, K1600+936 - K1601+100, K1601+100 - K1602+000, K1602+000 - K1602+564
K1604+972 - K1605+566, K1606+415 - K1608+050, K1608+476 - K1609+081, K1609+081 - K1610+020, K1610+020 - K1610+081
ALLOCATION: Php 169.255 Million |
May 10, 2017 |
GAA FY 2017 |
WIN7G01449 |
GAA FY R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: National Road Network Services:
Asset Preservation of National Roads-Rehabilitation/Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Secondary
Reconstruction from Asphalt to Concrete/Off-Carriageway Improvement: Shoulder Paving/Construction and Construction of Road Slope Protection Structure - Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) -
K1618+355 - K1619+000, K1619+957 - K1620+300, K1620+300 - K1623+000, K1616+816 - K1617+000,
K1617+520 - K1617+804, K1619+199 - K1619+583, K1616+265 - K1616+405
TO: National Road Network Services:
Asset Preservation of National Roads -Rehabilitation/Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Secondary
Rehabilitation/Reconstruction (Asphalt to Concrete) of Davao-Sarangani Coastal Road (Malalag-Malita-JAS-Glan Road) Including Slope Protection and Paving of Shoulders (Buhangin-Lacaron Section), Davao Occidental
K1616+265 - K1616+405, K1616+816 - K1617+000, K1617+520 - K1617+804, K1618+355 - K1619+000,
K1619+199 - K1619+583, K1619+957 - K1620+300, K1620+300 - K1623+000
ALLOCATION: Php 132.605 Million |
May 10, 2017 |
2017 |
WIN7E01343 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Barangay Port Junction Norte to Barangay Lohong, Ragay, Camarines Sur
[Construction of Concrete Road]
Physical target: 0.4 ln-km
Unit Cost (P'000): P5,000.00/ln-km
Allocation (P'000): P2,000.00
As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Barangay Port Junction Norte to Barangay Lohong, Ragay, Camarines Sur
[Construction of Concrete Road]
Physical target: 0.324 ln-km
Unit Cost (P'000): P6,172.84/ln-km
Estimated Cost (P'000): P2,000.00
|
May 10, 2017 |
2017 |
WIN7E01351 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Barangay Samay, Ragay, Camarines Sur [Construction of Concrete Road]
Physical target: 0.4 ln-km
Unit Cost (P'000): P5,000.00/ln-km
Allocation (P'000): P2,000.00
As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Barangay Samay, Ragay, Camarines Sur [Construction of Concrete Road]
Physical target: 0.456 ln-km
Unit Cost (P'000): P4,385.96/ln-km
Estimated Cost (P'000): P2,000.00 |
May 10, 2017 |
2017 |
WIN7E01090 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. San Rafael Sur, Lupi, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.40 ln-km
Unit Cost (P'000): P3,750/ln-km
Allocation (P'000): P1,500
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. San Rafael Sur, Lupi, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.36 ln-km
Unit Cost (P'000): P4,166.6667/ln-km
Estimated Cost (P'000): P1,500
|
May 10, 2017 |
2017 |
WIN7E01084 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-Funded Projects — Roads and Bridges Local Roads — Concreting of Barangay Road, Brgy. South Centro, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.48 ln-km
Unit Cost (P'000): P4,166.667/ln-km
Allocation (P'000): P2,000
As MODIFIED:
Locally-Funded Projects — Roads and Bridges Local Roads — Concreting of Barangay Road, Brgy. South Centro, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.501 ln-km
Unit Cost (P'000): P3,992.02/ln-km
Estimated Cost (P'000): P2,000 |
May 10, 2017 |
2017 |
WIN7E01349 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Reblocking of Barangay Road, Brgy. Sta. Cruz, Cabusao, Camarines Sur [Preventive Maintenance of
Road: Concrete Reblocking]
Physical Target: 0.48 ln-km
Unit Cost (P'000): P4,166.67/ln-km
Allocation (P'000): P2,000.00
As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Reblocking of Barangay Road, Brgy. Sta. Cruz, Cabusao, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.525ln-km
Unit Cost (P'000): P3,809.52/ln-km
Estimated Cost (P'000): P2,000.00
|
May 10, 2017 |
2017 |
WIN7E01085 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Tible, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.48 ln-km
Unit Cost (P'000): P3,125/ln-km
Allocation (P'000): P1,500
As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Tible, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.36 ln-km
Unit Cost (P'000): P4,166.667/ln-km
Estimated Cost (P'000): P1,500
|
May 10, 2017 |
2017 |
WIN7E01356 |
FY 2017 GAA RA 10924 |
November 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-Funded Projects - Roads and Bridges - Local Roads - Reblocking of Barangay Road, Brgy. Poblacion Ilaod going to Brgy. Apad, Ragay, Camarines Sur [Preventive Maintenance of Road: Concrete Reblocking]
Physical Target: 1.20 ln-km
Unit Cost (P'000): P4,166.67/ln-km
Allocation (P'000): P5,000.00
As MODIFIED:
Locally-Funded Projects - Roads and Bridges - Local Roads - Reblocking of Barangay Road, Brgy. Poblacion Ilaod going to Brgy. Apad, Ragay, Camarines Sur [Preventive Maintenance of Road: Concrete Reblocking]
Physical Target: 1.287 ln-km
Unit Cost (P'000): P3,885.00/ln-km
Estimated Cost (P'000): P5,000.00 |
May 10, 2017 |
2017 |
WIN7E01527 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Flood Control and Drainage - Flood Control Structures/Facilities - Construction of Flood Control Structures, Angat River, Rueda Section, Plaridel, Bulacan
(Construction of Flood Mitigation Structure) |
May 10, 2017 |
2017 |
WIN7E01350 |
FY 2017 GAA RA 10924 |
December 28, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Repair/Rehabilitation of Barangay Road, Barangay Sta. Rita Il, Del Gallego, Camarines Sur
[Rehabilitation of Concrete Road]
Physical Target: 0.30 ln-km
Unit Cost (P'000): P5,000.00/ln-km
Allocation (P'000): P1,500.00
As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Repair/Rehabilitation of Barangay Road, Barangay Sta. Rita Il, Del Gallego, Camarines Sur
[Rehabilitation of Concrete Road]
Physical Target: 0.366 ln-km
Unit Cost (P'000): P4,098.36/ln-km
Estimated Cost (P'000): P1,500.00 |
May 10, 2017 |
2017 |
WIN7E01212 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Sorsogon 2nd District Engineering Office |
As per GAA:
MFO 2 - Flood Management Services - Construction/
Maintenance of Flood Mitigation Structures and Drainage
Systems - Construction of Flood Mitigation Structure -
Construction of Flood Control Structure (Downstream, Right
Side) and Groundsill (Downstream), Macawayan Section, Irosin, Sorsogon [Construction of Food Mitigation Structure]
Physical Target: 300.0lm
Unit Cost (P'000): P150.0/lm
Allocation (P'000): P45,000.00
As MODIFIED:
MFO 2 - Flood Management Services - Construction/
Maintenance of Flood Mitigation Structures and Drainage
Systems - Construction of Flood Mitigation Structure -
Construction of Flood Control Structure along Cadac-an River, Barangay Macawayan, Irosin, Sorsogon [Construction of Flood Mitigation Structure]
Physical Target: 435.0lm
Unit Cost (P'000): P103.45/lm
Estimated Cost (P'000): P45,000.00
|
May 10, 2017 |
2017 |
WIN7E01210 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Sorsogon 2nd District Engineering Office |
MFO 2 — Flood Management Services — Construction/
Maintenance of Flood Mitigation Structures and Drainage
Systems — Construction of Flood Mitigation Structures —
Construction of Flood Control Structures along Cadac-an River, Barangay Carriedo, Irosin, Sorsogon [Construction of Flood Mitigation Structures]
Physical Target: 250 sq.m.
Unit Cost (P'000): P200.0/sq.m.
Allocation (P'000): P50,000.00
MFO 2 — Flood Management Services — Construction/
Maintenance of Flood Mitigation Structures and Drainage
Systems — Construction of Flood Mitigation Structures -
Reconstruction of Flood Control Structure along Cadac-an River, Barangay Carriedo, Irosin, Sorsogon(Upstream, Right Side) Sta. 1+578.70 - Sta. 1+932.70 [Reconstruction of Flood
Mitigation Structures]
Physical Target: 354 sq.m.
Unit Cost (P'000): P141.24/sq.m.
Estimated Cost (P'000): P50,000.00 |
May 10, 2017 |
FY 2017 |
WIN7C01568 |
SR2017-02-002147 |
February 1, 2017 |
Region VIII |
Regional Office VIII |
As per GAA:
MFO 3 - Maintenance and Construction Services of Other Infrastructures
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Construction of Gravel Road - Junction Abuyog-Silago Road, Cadac-an-Malaguicay-Boundary Silago Road Section (Malaguicay Falls), including bridge, Abuyog, Leyte
As Modified:
MFO 3 - Construction and Maintenance Services of Other Infrastructures
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Junction Abuyog-Silago Road- Cadac-an-Malaguicay Road Section (Malaguicay Falls), including bridge, Abuyog, Leyte 5th LD
|
May 9, 2017 |
CY 2017 |
WIN7E01465 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Road Upgrading (unpaved to paved) based on
Gravel Road Strategies, Traffic Benchmark for
Upgrading to Paved Road Standards
( HDM-4 Project Analysis )
Secondary Road
Sibuyan Circumferential Road
K0051+317 -K0052+091,
K0052+353 - K0052+557,
K0061+466 - K0062+730,
K0062+809 - K0064+937,
K0065+261 - K0066+028,
K0066+167 - K0067+078,
K0068+155 - K0068+919
L = 13.742 lane km
Php 150,000,000.00
( Road Upgrading Gravel to Paved ) |
May 9, 2017 |
CY 2017 |
WIN7E01489 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Rehabilitation/Reconstruction of National Roads
with Slips, Slope Collapse, and Landslide
- Secondary Road
Tablas Circumferential Road
K0033+900 - K0034+743.60
7,200 sq m
Php 117,442,000.00
(Construction of Road Slope Protection Structure)
|
May 9, 2017 |
2017 |
WIN7E01036 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 2nd District Engineering Office |
As per GAA:
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures: Multipurpose / Facilities: Construction of Barangay
Health Center, Brgy. Del Rosario, Canaman, Camarines Sur (Construction of Other Building)
Physical target: 1 Bldg.
Unit Cost: P3.0M/Bldg.
Allocation: P3.0M
As MODIFIED:
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures: Multipurpose / Facilities: Construction of Covered Court, Brgy. Del Rosario, Canaman, Camarines Sur (Construction of Other Building)
Physical target: 1 Bldg.
Unit Cost: P3.0M/Bldg.
Estimated Cost: P3.0M
|
May 9, 2017 |
2017 |
WIN7E01035 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 2nd District Engineering Office |
As per GAA:
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures: Multipurpose / Facilities: Construction of Multipurpose Building with Tanod Outpost and Basketball Court, Pangpang, Canaman, Camarines Sur (Construction of Multipurpose Building)
Physical target: 1 Bldg.
Unit Cost: -
Allocation: P3.0M
As MODIFIED:
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures: Multipurpose / Facilities: Construction of Multipurpose Building of Multipurpose Building (Covered Court), Brgy.Mangayawan, Canaman, Camarines Sur (Construction of Multipurpose Building)
Physical target: 1 Bldg.
Unit Cost: -
Estimated Cost: P3.0M
|
May 9, 2017 |
2017 |
WIN7E01030 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 2nd District Engineering Office |
As per GAA:
MFO 1 : NATIONAL ROAD NETWORK SERVICES;
Network Development, Improvement/Widening of
National Roads - Tertiary, Naga City Bdry-Calabanga-Balongay Rd - (S03506LZ) K0443+694 - K0445+283
(Road Widening)
Physical Target: 3.180 Lane km
Unit Cost: P14,858.17/Lane Km
Allocation: Php 47.249M
As MODIFIED:
MFO 1 : NATIONAL ROAD NETWORK SERVICES;
Network Development, Improvement/Widening of
National Roads - Tertiary, Naga City Bdry-Calabanga-Balongay Rd - (S03506LZ) K0443+686 - K0444+880(Road Widening/Construction of Drainage Structure along the Road)
Physical Target: Widening: 2.388 Lane km
Const. of drainage with sidewalk: 1.456ln.m.
Unit Cost: Widening: P9,014.60/Lane Km
Const. of drainage with sidewalk: P17,666.30/Ln.m.
Estimated Cost: PhP 47.249M
|
May 9, 2017 |
CY 2017 |
WIN7E01483 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Construction of Missing Gaps connecting
National Roads, including ROW
Victoria-Sablayan Road
Sta. 052+234.35 - Sta. 059+107
L = 12.545 lane km
Php 150,000,000.00
( Construction of Concrete Road ) |
May 9, 2017 |
2017 |
WIN7E01031 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 2nd District Engineering Office |
As per GAA:
MFO-1 National Road Network Services: Network Development: Improvement / Widening of National Roads: Tertiary Roads: Naga - Carolina - Panicuason Rd (S03567LZ) K0439+500-K0440+951, K0443+000-K0443+219 (Road Widening)
Physical Target: 3.770 Lane km.
Unit Cost: P13,129.97T/lane km.
Allocation: P49.500M
As MODIFIED:
MFO-1 National Road Network Services: Network Development: Improvement / Widening of National Roads: Tertiary Roads: Naga - Carolina - Panicuason Rd (S03567LZ) K0439+469-K0440+549 (Road Widening/Construction of Drainage/Structure along Road/Reconstruction: Raising od Grade)
Physical Target: 2.160 lane km.
1.943 lm.
1,447.20 lane km.
Unit Cost: P5,820.35T/lane km.
P15,440.66T/lm.
P1,447.20T/lm.
Estimated Cost: P49.500M |
May 9, 2017 |
CY 2017 |
WIN7E01490 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF01 - National Road Network Services
- Road Upgrading ( Unpaved to Paved )
- Secondary Road
Culandanum - Panalingaan Cross Country Road
Chainage 11980 - Chainage 12229,
Chainage 12251 - Chainage 14785,
Chainage 16169 - Chainage 16210
L = 5.648 lane km
Php 113,000,000.00
( Road Upgrading Gravel to Paved ) |
May 9, 2017 |
CY 2017 |
WIN7E01470 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF03 - Construction and Maintenance Services
of Other Infrastructures
- Construction/Improvement of Access Roads
leading to Declared Tourism destinations
Bacungan - Simpucan - Bagumbayan -
Napsan Road
Sta. 33+818 - Sta. 39+820
L = 12.534 lane km
Php 200,000,000.00
( Construction of Concrete Road ) |
May 9, 2017 |
CY 2017 |
WIN7E01466 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF03 - Construction and Maintenance Services
of Other Infrastructures
- Construction/Improvement of Access
Roads leading to Airports
Bantulan (Pamantolon) -
Sandoval Airport Access Road
Sta. 007+219.6 - Sta. 013+118
L = 11.742 lane km
Php 150,000,000.00
( Construction of Concrete Road ) |
May 9, 2017 |
2017 |
WIN7E01253 |
SR2017-01-000213 |
January 27, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO 1: National Road Network Services - Network
Development - Improvement /Widening of National Roads - Primary Roads along N1 Road Widening - Daang Maharlika (LZ) - K0302 + 646 - K0306 + 137, K0315 + 000 - K0315 + 749 (S03784LZ)
(Road Widening)
Physical Target: 8.534 Lane km
Unit Cost: P15,819.07/Lane km
Allocation: PhP 135.0M
As MODIFIED:
MFO 1: National Road Network Services - Network
Development - Improvement /Widening of National Roads - Primary Roads along N1 Road Widening - Daang Maharlika (LZ) - K0302+646 - K0305+440, K0315+000 - K0315+749 (S03784LZ)
(Road Widening/Construction of Drainage Structure along Road)
Physical Target:
Road Widening: 7.13 Lane km
Const.of Drainage Structure along Road: 3,635.20 Lm
Unit Cost:
Road Widening: P15,353.845T/Lane km
Const.of Drainage Structure along Road: P7.022T/Lm
Estimated: PhP 135.0M |
May 9, 2017 |
2017 |
WIN7E01252 |
SR2017-01-000529 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO 3: Construction and Maintenance Services of
Other Infrastructures - Construction/Improvement of Access Roads leading to Airports, Seaports. and
Declared Tourism Destinations - to seaports,
Construction of Concrete Road - Jct. Morning, Cataingan- Esperanza Port Road, Masbate (Construction of Concrete Road)
Physical Target: 6.67 Lane km
Unit Cost: P14,992.50/Lane km
Allocation: Php 100.0M
As MODIFIED:
MFO 3: Construction and Maintenance Services of
Other Infrastructures - Construction/Improvement of Access Roads leading to Airports, Seaports. and
Declared Tourism Destinations - to seaports,
Construction of Concrete Road - Jct. Morning, Cataingan- Esperanza Port Road, Masbate K0109+000 - K0112+701.56 (Construction of Concrete Road)
Physical Target: 7.40312 Lane km
Unit Cost: P13,508.04/Lane km
Estimated Cost: Php 100.0M
|
May 8, 2017 |
2017 |
WIN7E01336 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 3rd District Engineering Office |
AS PER GAA:
MFO 1 — National Road Network Services - Asset Preservation of National Roads - Rehabilitation/
Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway
Development Management-4 (HDM-4)
— Secondary : Reconstruction from Concrete to Concrete – Presentacion - Maligaya Rd — K0534+100- K0534+300, K0534+400 -K0534+661,
K0535+700 - K0535+927, K0541+300 - K0541+524, K0542+691.40 - K0542+1013.9
( Reconstruction from Concrete to Concrete)
Physical Target; 2.475 Lane-km
Unit Cost (P'000): P20,000/lane-km
Allocation Cost (P'000): P49,500
AS MODIFIED:
MFO 1 — National Road Network Services - Asset Preservation of National Roads - Rehabilitation/
Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway
Development Management-4 (HDM-4)
— Secondary : Reconstruction from Concrete to Concrete – Presentacion - Maligaya Rd — K0534+100- K0534+300, K0534+400 -K0534+561,
K0535+700 - K0535+927, K0541+300 - K0541+514, K0542+691.40 - K0542+1013.9
( Rehabilitation of Concrete Road)
Physical Target; 2.249 Lane-km
Unit Cost (P'000): P22,009.78/lane-km
Estimated Cost (P'000): P49,500
|
May 8, 2017 |
CY 2017 |
WIN7E01497 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Romblon District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Road Upgrading (Unpaved to Paved)
- Secondary Road
Sibuyan Circumferential Road
K0082+297 - K0084+943,
K0085+092 - K0087+042
L = 9.158 lane km
Php 100,000,000.00
( Road Upgrading Gravel to Paved )
|
May 8, 2017 |
2017 |
WIN7E01346 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 3rd District Engineering Office |
AS PER GAA:
MFO — National Road Network Services - Network
Development - Off-Carriageway Improvement including drainage — Tertiary : Off-Carriageway Improvement: Shoulder Paving / Construction - Jct Binalay (Tinambac)-Tamban Rd - K0513 + 850 - K0514 + 979, K0514 + 1007 - K0516 + 000
( Off-Carriageway Improvement: Shoulder Paving/
Construction)
Physical target: 8,496 sq.m.
Unit Cost (P'000): P5.720T/sq.m.
Allocation Cost (P'000): P48,597
AS MODIFIED:
MFO — National Road Network Services - Network
Development - Off-Carriageway Improvement including drainage — Tertiary : Off-Carriageway Improvement: Shoulder Paving / Construction - Jct Binalay (Tinambac)-Tamban Rd - K0513 + 850 - K0514 + 979, K0514 + 1007 - K0516 + 015 ( Shoulder Paving/Construction)
Physical target: 6,648.14 sq.m.
Unit Cost (P'000): P7.310T/sq.m.
Estimated Cost (P'000): P48,597
|
May 8, 2017 |
CY 2017 |
WIN7E01462 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Road Upgrading (unpaved to paved) based on
Gravel Road Strategies, Traffic Benchmark for
Upgrading to Paved Road Standards
( HDM-4 Project Analysis )
- Secondary Road
Sibuyan Circumferential Road
K0068+919 - K0070+194,
K0070+448 - K0071+283,
K0071+434 - K0071+490,
K0076+138 - K0078+633,
K0078+983 - K0079+249,
K0079+577 - K0081+060,
K0081+776 - K0082+297
L = 13.958 lane km
Php 150,000,000.00
( Road Upgrading Gravel to Paved ) |
May 8, 2017 |
2017 |
WIN7E01347 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 3rd District Engineering Office |
As per GAA:
MFO 1 — National Road Network Service - Asset Preservation of National Roads - Rehabilitation/
Reconstruction of National Roads with Slips, Slope
Collapse, and Landslide — Secondary : Construction of Road Slope Protection Structure - Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd K0567 + 900 - K0567 + 1000
(Construction of Road Slope Protection Structure)
Physical Target: 1,400 sq.m.
Unit Cost (P'000): P6,789/sq.m.
Allocation Cost (P'000): P9,504
As MODIFIED:
MFO 1 — National Road Network Service - Asset Preservation of National Roads - Rehabilitation/
Reconstruction of National Roads with Slips, Slope
Collapse, and Landslide — Secondary : Construction of Road Slope Protection Structure - Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd K0567 + 900 - K0568 + 137.30
(Construction of Road Slope Protection Structure)
Physical Target: 1,173.90 sq.m.
Unit Cost (P'000): P8.096T/sq.m.
Estimated Cost (P'000): P9,504
|
May 8, 2017 |
2017 |
WIN7E01358 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 3rd District Engineering Office |
As per GAA:
Locally — Funded Projects - Roads and Bridges - Local Roads : Construction of Local Road, Brgy.
Abo (Zone 7), Tigaon, Camarines Sur
Physical Target: -
Unit Cost (P'000): -
Allocation Cost (P'000): P1,500
As MODIFIED:
Locally — Funded Projects - Roads and Bridges - Local Roads : Construction of Local Road, PobIacion-Barangay Abo (Zone 7), Tigaon, Camarines Sur
Sta. 0+000 - sta. 0+100.00, Sta. 0+208.70 - Sta. 0+258.70 (Construction of Concrete Road)
Physical Target: 0.30 lane-km
Unit Cost (P'000): P5,000/lane-km
Estimated Cost (P'000): P1,500
|
May 8, 2017 |
CY 2017 |
WIN7E01463 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Road Upgrading ( unpaved to paved ) based on
Gravel Road Strategies, Traffic Benchmark for
Upgrading to Paved Road Standards
( HDM-4 Project Analysis )
- Secondary Road
Sibuyan Circumferential Road
K0044+032 - K0044+599,
K0044+731 - K0045+478,
K0045+610 - K0047+517,
K0047+718 - K0047+727,
K0047+859 - K0048+085,
K0048+217 - K0049+565,
K0049+743 - K0049+861,
K0049+993 - K0050+471,
K0050+471 - K0050+598
L = 12.482 lane km
Php 150,000,000.00
( Road Upgrading to Paved ) |
May 8, 2017 |
2017 |
WIN7E01340 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 3rd District Engineering Office |
As per GAA:
Locally-Funded Projects - Buildings and Other Structures Multipurpose/Facilities : Construction of Multi-Purpose Building (Covered Court), Brgy. Gaao, Tigaon, Camarines Sur (Construction of Multi-Purpose Building)
Physical Target: 1 building
Unit Cost (P'000): P2,000
Allocation Cost (P'000): P2,000
As MODIFIED:
Locally-Funded Projects - Buildings and Other Structures Multipurpose/Facilities : Repair/ Improvement of Multi-Purpose Building (Covered Court), Brgy. Gaao, Tigaon, Camarines Sur (Rehabilitation/Major Repair Multi-Purpose Building)
Physical Target: 1 building
Unit Cost (P'000): P2,000
Estimated Cost (P'000): P2,000
|
May 8, 2017 |
2017 |
WIN7E012B7 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 3rd District Engineering Office |
As per GAA:
Locally-Funded Projects - Flood Control and Drainage - Flood Control Structures/Facilities : Construction of Flood Control Structures (Rip Rap), Brgy. Tagas, San Jose, Camarines Sur
Physical Target: -
Unit Cost (P'000): -
Allocation Cost (P'000): P1,000
As MODIFIED:
Locally-Funded Projects - Flood Control and Drainage - Flood Control Structures/ Facilities :
Construction of Flood Control Structures, Brgy. Tagas, San Jose, Camarines Sur (Construction of Drainage Structure)
Physical Target: 13.50 lm
Unit Cost (P'000): P74.074T/lm
Estimated Cost (P'000): P1,000
|
May 8, 2017 |
2017 |
WIN7E01308 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 3rd District Engineering Office |
As per GAA:
MFO 1 — National Road Network Services - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) — Tertiary : Road Upgrading Gravel to Paved Tinambac-Siruma Rd - K0521 + 1002 - K0521 + 1020, K0524 + 851.50 - K0524 +872.60, K0526 + 282.40 - K0526 + 598.10, K0526 + 643.25 - K0526 + 734.55, K0534 + 959 - K0535 + 000, K0536 + 793 - K0536+ 1014,
K0545 + 812 - K0546 + 079, K0546 + 949.43 - K0547 + 502.30, K0549 + 939.40 - K0550 + 503
( Road Upgrading Grave/ to Paved)
Physical Target: 4.138 lane-km
Unit Cost (P'000): P20,382/lane-km
Allocation Cost (P'000): P84,342
As MODIFIED:
MFO 1 — National Road Network Services - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) — Tertiary : Road Upgrading Gravel to Paved Tinambac-Siruma Rd - K0521 + 1002 - K0521 + 1020, K0524 + 851.50 - K0524 +872.60, K0526 + 282.40 - K0526 + 598.10, K0526 + 643.25 - K0526 + 734.55, K0534 + 959 - K0534 + 1008.00, K0536 + 793 - K0536+ 1014,
K0546 + 949.43 - K0547 + 502.30, K0549 + 939.40 - K0550 + 503 ( Road Upgrading Grave/ to Paved)
Physical Target: 3.638 lane-km
Unit Cost (P'000): P23,184/lane-km
Estimated Cost (P'000): P84,342
|
May 8, 2017 |
2017 |
WIN7E01290 |
FY 2017 RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 3rd District Engineering Office |
As per GAA:
MFO 1 — National Road Network Services - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) — Tertiary : Road Upgrading Gravel to Paved - Tigaon-Goa-Sn Jose-Lagonoy-GuijaIo via Sn Vicente Rd - K0503 + 581 - K0504 + 792 ( Road Upgrading Grave/ to Paved)
Physical Target: 2.450 lane-km
Unit Cost (P'000): P20,000/lane-km
Allocation Cost (P'000):P49,000
As MODIFIED:
MFO 1 — National Road Network Services - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) — Tertiary : Road Upgrading Gravel to Paved - Tigaon-Goa-Sn Jose-Lagonoy-GuijaIo via Sn Vicente Rd - K0503 + 560 - K0504 + 360 (Road Upgrading Grave/ to Paved)
Physical Target: 1.628 lane-km
Unit Cost (P'000): P30,098/lane-km
Estimated Cost (P'000):P49,000 |
May 8, 2017 |
2017 |
WIN7E01286 |
FY 2017 GAA RA 10924 |
November 29, 2016 |
Region V |
Camarines Sur 3rd District Engineering Office |
As per GAA:
MFO 1 — National Road Network Services - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) — Secondary : Road Upgrading Gravel to Paved - Lagonoy-Presentacion Rd - K0498 + 870 - K0499 + 018, K0499 + 081 - K0499 + 256
( Road Upgrading Grave/ to Paved)
Physical target: 0.728 lane-km
Unit Cost (P'000): P54,176/lane km
Allocation Cost (P'000): P39,440
As MODIFIED:
MFO 1 — National Road Network Services - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) — Secondary : Road Upgrading Gravel to Paved - Lagonoy-Presentacion Rd - K0498 + 870 - K0499 + 018, K0499 + 081 - K0499 + 360
( Road Upgrading Grave/ to Paved)
Physical target: 0.934 lane-km
Unit Cost (P'000): P42,227/lane km
Estimated Cost (P'000): P39,440
|
May 8, 2017 |
2017 |
WIN7E01279 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 3rd District Engineering Office |
As per GAA:
MFO 1 — National Road Network Service - Asset Preservation of National Roads - Rehabilitation/
Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) — Secondary : Reconstruction from Concrete to Concrete - Lagonoy- Presentacion Rd - K0508+621 - K0509+000, K0513+895 - K0514+097, K0518+009 - K0518+109, K0524+858 - K0525+015, K0526+300 - 0526+902 (Rehabilitation of Concrete Road)
Physical Target: 3,028 lane-km
Unit Cost (P'000): P16.182T/lane-km
Allocation Cost (P'000): P49,000
As MODIFIED:
MFO 1 — National Road Network Service - Asset Preservation of National Roads - Rehabilitation/
Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) — Secondary : Reconstruction from Concrete to Concrete - Lagonoy- Presentacion Rd - K0509+700-K0509+772, K0510+845-K0511+000, K0513+891-K0514+093.47,K0515+300-K0515+526,K0518+005-K0518+105, K0521+841-K0521+1023, K0524+286-K0524+387, K0524+858-K0525+015, K0526+563-K0526+660
(Rehabilitation of Concrete Road)
Physical Target: 2,989 lane-km
Unit Cost (P'000): P16.393T/lane-km
Estimated Cost (P'000): P49,000 |
May 8, 2017 |
2017 |
WIN7E01282 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 3rd District Engineering Office |
As per GAA:
MFO 1 — National Road Network Services - Network
Development - Off-Carriageway Improvement including drainage — Secondary : Off-Carriageway Improvement: Shoulder Paving / Construction - Lagonoy-Presentacion Rd - K0498 + -817 - K0498 + 870, K0499 + 256 - K0500 + 888 (Shoulder Paving/Construction)
Physical Target: 13,260 sq.m.
Unit Cost (P'000): P3.763T/sq.m.
Allocation Cost (P'000): 49,900
As MODIFIED:
MFO 1 — National Road Network Services - Network
Development - Off-Carriageway Improvement including drainage — Secondary : Off-Carriageway Improvement: Shoulder Paving / Construction - Lagonoy-Presentacion Rd - K0498 + -817 - K0498 + 870, K0499 + 360 - K0501 + 032 (Shoulder Paving/Construction)
Physical Target: 8,796.24sq.m.
Unit Cost (P'000): P5.673T/sq.m.
Estimated Cost (P'000): 49,900 |
May 8, 2017 |
2017 |
WIN7E01341 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 3rd District Engineering Office |
As per GAA:
Locally-Funded Projects - Flood Control and Drainage - Flood Control Structures/Facilities : Construction of Flood Control Structures, Brgy. Vinagre, Tigaon, Camarines Sur
Physical Target: -
Unit Cost (P'000): -
Allocation Cost (P'000): P1,500
As MODIFIED:
Locally-Funded Projects - Flood Control and Drainage - Flood Control Structures/Facilities .
Construction of Flood Control Structure Poblacion, Brgy. Vinagre, Tigaon, Camarines Sur - Sta. 0+000.00 - Sta. 0+115.00 (Construction of Drainage
Structure along Road)
Physical Target: 115.0 lm.
Unit Cost (P'000): P13.043T/lm
Estimated Cost (P'000): P1,500
|
May 8, 2017 |
2017 |
WIN7E01339 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 3rd District Engineering Office |
As per GAA:
Locally —Funded Projects - Roads and Bridges - Local Roads . Construction of Local Road, Brgy.
Catalotoan, Sagñay, Garchitorena, Camarines Sur
Physical target: -
Unit Cost (P'000): -
Allocation Cost (P'000): P1,000
As MODIFIED:
Locally —Funded Projects - Roads and Bridges - Local Roads . Construction of Local Road, Brgy.
Catalotoan, Sagñay, Garchitorena, Camarines Sur
Physical target: 0.20 lane-km
Unit Cost (P'000): P5,000/lane-km
Estimated Cost (P'000): P1,000
|
May 8, 2017 |
2017 |
WIN7E01338 |
FY 2017 GAA RA 10924 |
December 28, 2016 |
Region V |
Camarines Sur 3rd District Engineering Office |
As per GAA:
Locally - Funded Projects - Roads and Bridges - Local Roads : Construction of Local Road, Brgy.
Antipolo, Tinambac, Garchitorena, Camarines Sur
Physical Target: -
Unit Cost (P'000): -
Allocation Cost (P'000): P1,000
As MODIFIED:
Locally - Funded Projects - Roads and Bridges - Local Roads : Construction of Local Road, Brgy.
Antipolo, Tinambac, Garchitorena, Camarines Sur
(Construction of Concrete Road)
Physical Target: 0.20 lane km.
Unit Cost (P'000): P5,000/ lane-km
Estimated Cost (P'000): P1,000
|
May 8, 2017 |
CY 2017 |
WIN7E01500 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-A |
Regional Office IV-A |
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Rehabilitation/Reconstruction of National Roads
with Slips, Slope Collapse, and Landslide
- Secondary Road
Sibuyan Circumferential Road
K0003+615.71 - K0004+000
7,200 sq m.
Php 117,442,000.00
(Construction of Road Slope
Protection Structure )
|
May 8, 2017 |
2017 |
WIN7C01519 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
Network Development -
Improvement/Widening of National Roads - Other Primary -
Dipolog - Sindangan - Liloy Rd
(S01057MN) -
K1847+544 - K1847+690,
K1847+(-576) - K1847+(-282.40),
K1848+060 - K1848+800
Allocation:
Php 35.367 Million
Physical Target: 2.3592 lane km
Unit Cost: Php 14,991,098.68/lane km |
May 8, 2017 |
2017 |
WIN7C01511 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
Asset Preservation of National Roads -
Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads - Dipolog - Sindangan - Liloy Rd (S01057MN)
K1917+913.60 - K1917+1400
Allocation: Php 7.200 Million
Physical Target: 952.80 lm.
Unit Cost: Php 7,556.68/lm |
May 8, 2017 |
2017 |
WIN7C01509 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction/Extension of Flood Control Structure along Dohinob River Roxas, Zamboanga del Norte, 2nd LD
Allocation: Php 45.000 Million
Physical Target: 647 lineal meters
Unit Cost: Php 69,551.78/lm |
May 8, 2017 |
2017 |
WIN7C01512 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
Roads and Bridges - Local Roads -
Road Concreting of Brgy. Road, Brgy. Poblacion, Siayan, Zamboanga del Norte, 2nd LD
Allocation: Php 4.000 Million
Physical Target: 0.880 lane km.
Unit Cost: Php 4,545,454.54/lane km |
May 8, 2017 |
2017 |
WIN7C01521 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure at Mandih, Sindangan, Zamboanga del Norte, 2nd LD
Allocation: Php 30.000 Million
Physical Target: 379 lineal meters (lm)
Unit Cost: Php 79,155.67/lm |
May 8, 2017 |
2017 |
WIN7C01520 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure along Piao River, Sindangan, Zamboanga del Norte, 2nd LD
Allocation: Php 20.000 Million
Physical Target: 212 lineal meters (lm)
Unit Cost: Php 94,339.62/lm |
May 8, 2017 |
2017 |
WIN7C01514 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
Network Development -
Improvement/Widening of National Roads,
Tertiary - Road Widening - Dipolog - Polanco - Piñan Jct. Oroquieta Rd including RROW,
K1833+860 - K1834+363 (S01054MN)
Allocation:
Php 22.657 MIllion (Total)
Php 18.1256 MIllion (Road Widening)
Php 4.5314 MIllion (ROW Acquisition)
Physical Target:
1.000 lane km (Road Widening)
886.00 sq.m. (ROW Acquisition)
Unit Cost:
Php 18,125,600/lane km (Road Widening)
Php 5,114.45/sq.m. (ROW Acquisition) |
May 8, 2017 |
2017 |
WIN7C01515 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
Asset Preservation of National Roads -
Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on PMS/HDM-4) - Primary Roads - Dipolog - Punta - Dansullan - S. Osmeña - Zamboanga del Norte/Sur Bdry Rd (S01056MN)
K1850+577.98 - K1850+699.54
Allocation: Php 2.004 Million
Physical Target: 0.24312 lane km
Unit Cost: Php 8,242,843.04/lane km |
May 8, 2017 |
2017 |
WIN7C01510 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
Asset Preservation of National Roads -
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslides - Secondary Roads -
Sindangan - Siayan - Dumingag - Mahayag (S01060MN) (Sindangan - Siayan Section)
K1929+920 - K1929+990, R/S
K1937+140 - K1937+660, L/S
K1939+9355 - K1939+9500, L/S
K1939+060 - K1939+090
Allocation: Php 17.269 Million
Physical Target: 5,849.09 sq.m.
Unit Cost: Php 2,952.42/sq.m. |