May 8, 2017 |
2017 |
WIN7E01071 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Masbate 1st District Engineering Office |
As per GAA:
MFO 1- National Road Network Services: Construction and Maintenance of Bridges along National Roads, Construction of New Permanent Bridges, Matungao Br. along Masbate-Cataingan-PIacer Rd (Phase II) (Construction of Concrete
Bridge)
Physical Target: 73.20 sq.m.
Unit Cost: P109.59T/Sq.m.
Allocation: Php 8.0M
As per GAA:
MFO 1- National Road Network Services: Construction and Maintenance of Bridges along National Roads, Construction of New Permanent Bridges, Matungao Br. along Masbate-Cataingan-PIacer Rd (Phase II) (Construction of Concrete
Bridge)
Physical Target: 2,010 sq.m.
Unit Cost: P3.98T/Sq.m.
Estimated Cost: Php 8.0M
|
May 8, 2017 |
2017 |
WIN7E01071 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Masbate 1st District Engineering Office |
As per GAA:
MFO 1- National Road Network Services: Construction and Maintenance of Bridges along National Roads, Construction of New Permanent Bridges, Matungao Br. along Masbate-Cataingan-PIacer Rd (Phase II) (Construction of Concrete
Bridge)
Physical Target: 73.20 sq.m.
Unit Cost: P109.59T/Sq.m.
Allocation: Php 8.0M
As per GAA:
MFO 1- National Road Network Services: Construction and Maintenance of Bridges along National Roads, Construction of New Permanent Bridges, Matungao Br. along Masbate-Cataingan-PIacer Rd (Phase II) (Construction of Concrete
Bridge)
Physical Target: 2,010 sq.m.
Unit Cost: P3.98T/Sq.m.
Estimated Cost: Php 8.0M
|
May 8, 2017 |
2017 |
WIN7E01071 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Masbate 1st District Engineering Office |
As per GAA:
MFO 1- National Road Network Services: Construction and Maintenance of Bridges along National Roads, Construction of New Permanent Bridges, Matungao Br. along Masbate-Cataingan-PIacer Rd (Phase II) (Construction of Concrete
Bridge)
Physical Target: 73.20 sq.m.
Unit Cost: P109.59T/Sq.m.
Allocation: Php 8.0M
As per GAA:
MFO 1- National Road Network Services: Construction and Maintenance of Bridges along National Roads, Construction of New Permanent Bridges, Matungao Br. along Masbate-Cataingan-PIacer Rd (Phase II) (Construction of Concrete
Bridge)
Physical Target: 2,010 sq.m.
Unit Cost: P3.98T/Sq.m.
Estimated Cost: Php 8.0M
|
May 8, 2017 |
2017 |
WIN7E01342 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Masbate 1st District Engineering Office |
As per GAA:
MFO-1 National Road Network Services: Construction and Maintenance of Bridges along National Roads — Construction of New Permanent Bridges: Construction of Concrete Bridge — Pinamangcaan Br. along Jct Tawad - Balud Rd (Construction of Concrete Bridge)
Physical target: 457.5 sq.m.
Unit Cost: P109.590T/sq.m.
Allocation: P49.900M
As MODIFIED:
MFO-1 National Road Network Services: Construction and Maintenance of Bridges along National Roads — Construction of New Permanent Bridges: Construction of Concrete Bridge — Pinamangcaan Br. along Jct Tawad - Balud Rd (Construction of Concrete Bridge)
Physical target: 486.54 sq.m.
Unit Cost: P102.560T/sq.m.
Estimated Cost: P49.900M
|
May 8, 2017 |
2017 |
WIN7E01310 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Masbate 1st District Engineering Office |
As per GAA:
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures Multipurpose / Facilities: Construction of DPWH Masbate 1st DEO Supply, Procurement and
General Services Building, Masbate City, Masbate
(Construction of Other Building)
Physical Target: 1 Bldg.
Unit Cost: P10M/Bldg.
Allocation: P10M
As MODIFIED:
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures Multipurpose / Facilities: Construction of DPWH Masbate 1st DEO Building (Annex), Masbate City, Masbate
(Construction of Other Building)
Physical Target: 1 Bldg.
Unit Cost: P10M/Bldg.
Estimated Cost: P10M
|
May 8, 2017 |
2017 |
WIN7C01513 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Dipolog River Flood Control Development Project, Barangay Turno, Dipolog City, Zamboanga del Norte, 2nd LD
Allocation: Php 45.000 Million
Physical Target: 261 lineal meters (lm)
Unit Cost: Php 172,413.79/lm |
May 8, 2017 |
GAA FY 2017 |
WIN7E01312 |
RA 10924 |
January 27, 2017 |
Region III |
Zambales 1st District Engineering Office |
Flood Control and Drainage:
Drainage/Protection Works
Construction of Slope Protection/Flood Control at Sto. Nino River Dike, Sta. 0+200 to Sta. 0+469 Cabangan, Zambales
(Construction of Slope Protection Structure) |
May 5, 2017 |
FY 2017 |
WIN7E01450 |
UACS No. 292003020401855 |
January 1, 2017 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA
MFO 2 - Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Wall along Meycauayn River, Sta. 1+530 to Sta. 1+745, Valenzuela [CW1-Construction of Revetment]
UACS No. 292003020401855
Physical Target/Cost
Original: CW1 – 215.00 lm
Unit Cost (‘000): CW1-P232.55814/lm
Allocation (‘000): P50,000.00
WIN7E01450
As Modified
MFO 2 –Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Wall along Meycauayan River, Sta. 1+725 to Sta. 1+870, Sta.1+915 to Sta. 1+985, Valenzuela [CW1 – Construction of Revetment]
UACS No. 292003020401855
New: CW1 – 215.00 lm
Unit Cost (‘000): CW1-P224.53419/lm
Est. Cost (‘000): P48,274.00
WIN7E01450
|
May 5, 2017 |
FY 2017 |
WIN7E01451 |
UACS No. 292003020401854 |
January 1, 2017 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Wall along Meycauayan River, Sta. 1+135 to Sta. 1+530, Valenzuela [CW1 – Construction of Revetment]
UACS No. 292003020401854
Physical Target/Cost
Original: CW1 – 215.00 lm
Unit Cost (‘000): CW1-P232.55814/lm
Allocation (‘000): P50,000.00
WIN7E01451
As Modified
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Wall along Meycauayan River, Sta. 1+135 to Sta. 1+345, Sta. 1+527 to Sta.1+672, Sta. 1+685 to Sta.1+685 to Sta. 1+725, Valenzuela [CW1 – Construction of Revetment]
UACS No. 292003020401854
New: CW1 – 215.00 lm
Unit Cost (‘000): CW1-P221.79474/lm
Est. Cost (‘000): P47,685.00
WIN7E01451
|
May 5, 2017 |
FY 2017 |
WIN7E01440 |
UACS No. 292003020401545 |
January 2, 2017 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA
MFO 2 – Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Slope Protection Structure – Construction of Slope Protection and Other Improvements including Removal of Informal Settlers along Talon Creek to Almirante Creek, Las Piñas City (Construction of Slope Protection Structure)
UACS No. 292003020401545
Physical Target/Cost
Original: 3,200 m2
Unit Cost (P’000): P18.750T/m2
Allocation Cost (P’000): P60,000
WIN7E01440
As Modified
MFO 2 – Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Slope Protection Structure – Construction of Flood Control and Other Improvements including Removal of Informal Settlers along Talon Creek to Almirante Creek, Las Piñas City (Construction of Slope of Flood Control Structure)
UACS No. 292003020401545
Physical Target/Cost
Modified: 920 lm
Unit Cost (P’000): P65.217T/lm
Allocation Cost (P’000): P60,000
WIN7E01440
|
May 5, 2017 |
2017 |
WIN7G01390 |
FY 2017 (R.A 10924) |
April 10, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building/Covered Court at Brgy. Baao, Dapitan City, Zamboanga del Norte
Allocation: Php 2.2 Million (Total)
Physical Target: 1 Project
Unit Cost: Php 2,200,000.00/project |
May 5, 2017 |
2017 |
WIN7G01388 |
FY 2017 (R.A 10924) |
April 12, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Buildings and Other Structures -
Multipurpose/Facilities
Construction of Multipurpose Building/Covered Court at Brgy. Princesa Lamaya, Sergio Osmeña, Zamboanga del Norte
Allocation: Php 2.2 Milllion (Total)
Physical Target: 1 Project
Unit Cost: Php 2,200,000.00/project |
May 5, 2017 |
2017 |
WIN7G01404 |
FY 2017 (R.A 10924) |
April 12, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Roads and Bridges - Local Bridges
Construction of Pitusan Bridge (Local Bridge), including RROW, Dapitan City, Zamboanga del Norte
Sta. 1828+133.58 - Sta. 1828+194.42
Allocation:
Php 50.000 Million (Total)
Php 49.365 Million (Bridge)
Php 0.635 MIllion (ROW Acquisition)
Physical Target:
580.41 sq.m. (Bridge)
1,810 sq.m. (ROW Acquisition)
Unit Cost:
Php 85,051.95/sq.m. (Bridge)
Php 350.83/sq.m. (ROW Acquisition) |
May 5, 2017 |
2017 |
WIN7G01397 |
FY 2017 (R.A 10924) |
April 12, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction/Extension of Flood Control Structure along Layawan River, Poblacion Section, Polanco, Zamboanga del Norte - Construction of Revetment including RROW
Sta. 0+260 - Sta. 0+428
Allocation:
Php 20.00 Million (Total)
Php 19.80 Million (Flood Control)
Php 0.2 Million (ROW Acquisition)
Physical Target:
168.00 lm. (Flood Control)
1,680 sq.m. (ROW Acquisition)
Unit Cost:
Php 117,857.14/lm (Flood Control)
Php 119.05/sq.m. (ROW Acquisition) |
May 5, 2017 |
2017 |
WIN7G01398 |
FY 2017 (R.A 10924) |
April 12, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Flood Control Structure (Poblacion Side) along Layawan River, Dapdap Section, Polanco, Zamboanga del Norte -
Construction of Revetment including RROW
Sta. 01+654.30 - Sta. 01+818.30
Allocation:
Php 20.000 Million (Total)
Php 19.800 MIllion (Flood Control)
Php 0.2 Million (ROW Acquisition)
Physical Target:
164 lm. (Flood Control)
1,640 sq.m. (ROW Acquisition)
Unit Cost:
Php 120,731.71/lm (Flood Control)
Php 121.95/sq.m. (ROW Acquisition) |
May 5, 2017 |
FY 2017 |
WIN7E01544 |
UACS No. 165003014300246 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4-Tertiary: Reconstruction from Asphalt to Concrete – Juan Luna St K0005+303.40-K0005+537.90, K0006+025.50-K0006+276.20, K0006+452.80-K0006+760 (Reconstruction from Asphalt to Concrete)
UACS No. 165003014300246
Physical Target/Cost
Original: 1.584 lane-km
Unit Cost (P’000): P12,626/lane-km
Allocation Cost (P’000): P20,000
WIN7E01544
As Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) -Tertiary: Juan Luna St - K0005+395.90-K0005+537.90, K0005+960.00-K0006+277.80, K0006+452.80-K0006+760 (S02304LZ) (Reconstruction from Asphalt to Concrete)
UACS No. 165003014300246
Physical Target/Cost
Modified: 3.068 lane-km
Unit Cost (P’000): P6,519/lane-km
Estimated Cost (P’000): P20,000
WIN7E01544
|
May 5, 2017 |
FY 2017 |
WIN7E01543 |
UACS No. 292003020401681 |
January 1, 2017 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA
MFO 2 – Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Slope Protection Structures – Construction of Slope Protection Structures and other Improvement along Dalig Creek including ROW along Perpetual to Tramo, Las Piñas City (Construction of Slope Protection Structure)
UACS No. 292003020401681
Physical Target/Cost
Original: 800 m2
Unit Cost (P’000): P62.500T/m2
Allocation Cost (P’000): P50,000
WIN7E01543
As Modified
MFO 2 – Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Slope Protection Structures – Construction of Flood Control Structures and other Improvement along Dalig Creek including ROW along Perpetual to Tramo, Las Piñas City (Construction of Slope Protection Structure)
UACS No. 292003020401681
Physical Target/Cost
Modified: 920 lm
Unit Cost (P’000): P54.348/lm
Allocation Cost (P’000): P50,000
WIN7E01543
|
May 5, 2017 |
2017 |
WIN7G01400 |
FY 2017 (R.A 10924) |
April 12, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Road Upgrading (unpaved to paved) based on gravel road strategies traffic Benchmark for Upgrading to paved road standards (HDM-4) Project Analysis Tertiary
Road Upgrading Gravel to Paved - Polanco - Macleodes Rd including RROW -
K1830+463.4 - K1830+505,
K1843+660 - K1844+085,
K1847+535 - K1847+915
Allocation:
Php 43.393 Million (Total)
Php 42,959,070 (Road)
Php 433,930 (ROW Acquisition)
Physical Target:
1.694 lane km. (Road)
13,128 sq.m. (ROW Acquisition)
Unit Cost:
Php 25,359,545.50/lane km (Road)
Php 33.05/sq.m. (ROW Acquisition) |
May 5, 2017 |
2017 |
WIN7G01387 |
FY 2017 (R.A 10924) |
April 12, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control
(Revetment/Dike) Structure along Dipolog River, Conacon-Guinles Section, Polanco, Zamboanga del Norte - Construction of Revetment including ROW,
Sta. 0+244.20 - Sta. 0+594
Allocation:
Php 50.000 Million (Total)
Php 49.050 MIllion (Flood Control)
Php 0.950 (ROW Acquisition)
Physical Target:
349.80 lm. (Flood Control)
3,500 sq.m. (ROW Acquisition)
Unit Cost:
Php 140,222.98/lm. (Flood Control)
Php 271.43/sq.m. (ROW Acquisition) |
May 5, 2017 |
2017 |
WIN7G01391 |
FY 2017 (R.A 10924) |
April 12, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Extension of Flood Control Structure along Dipolog River, Guineles (Downstream Section), Polanco, Zamboanga del Norte -
Construction of Revetment including ROW,
Sta. 00+000 - Sta. 00+244.10
Allocation:
Php 30.000 Million (Total)
Php 29.700 Million (Flood Control)
Php 0.300 (ROW Acquisition)
Physical Target:
244.10 lm. (Flood Control)
2,440 sq.m. (ROW Acquisition)
Unit Cost:
Php 121,671.45/lm (Flood Control)
Php 122.95/sq.m. (ROW Acquisition) |
May 4, 2017 |
CY 2017 |
WIN7E01375 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Palawan 1st District Engineering Office |
as MODIFIED:
MF03 - Construction and maintenance Services of
Other Infrastructures
- Construction/Improvement of Access Roads leading
to Airports
Construction of Concrete Bridge -
Jct. Itabiak - San Vicente Airport Access Road
(Bridge Replacement), San Vicente, Palawan
L = 177.44 sq.m
Php 19.00 Million |
May 4, 2017 |
Cy 2017 |
WIN7E01459 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Romblon District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Rehabilitation/Reconstruction/Upgrading of
Damaged Paved National Roads
- Secondary Road
Sibuyan Circumferential Road
K0031+733 - K0031+979
( S00008SY)
L = 0.4862 lane km
Php 4,710,000.00
( Reconstruction from Asphalt to Concrete )
|
May 4, 2017 |
CY 2017 |
WIN7E01457 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Romblon District Engineering Office |
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Improvement of Public Market
Brgy. Dapawan, Odiongan, Romblon
1 Bldg.
Php 1,000,000.00
( Construction of Multi-purpose Building )
|
May 4, 2017 |
CY 2017 |
WIN7E01456 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Romblon District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Off-Carriageway Improvement including Drainage
along National Roads
- Secondary Roads
Tablas Circumferential Road
K0003+348 - K0003+722.01,
K0003+851.50 - K0005+824,
K0081+968 - K0082+382
( S00013TL)
CW1 = 8,625.97 sq.m.
CW2 = 2,318.58 sq.m.
Php 24,500,000.00
CW1 = Php 14,228,000.00
CW2 = Php 10,272,000.00
( CW1 - Shoulder Paving/Construction )
( CW2 - Construction of Slope Protection
Structure ) |
May 4, 2017 |
2017 |
WIN7E01091 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Zambales 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Raising of Grade Maculcol Dike (Downstream), Sta. 1+650 to Sta. 2+160, San Narciso, Zambales |
May 4, 2017 |
2017 |
WIN7E01528 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities - Construction/Completion of Multi-Purpose Building, Balatong B, Pullilan, Bulacan |
May 3, 2017 |
CY 2017 |
WIN7E01430 |
GAA CY 2015 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure Program (LIP)
- Buildings and Other Structures
- Multipurpose Facilities
Construction of Multi-Purpose Building
Brgy. Bonbon (Poblacion), Looc,
Occidental Mindoro
1 Bldg.
Php 1,000,000.00
( Construction Of Multi-Purpose Building) |
May 3, 2017 |
CY 2017 |
WIN7E01432 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure Project ( LIP )
- Buildings and Other Structures
- Multipurpose Facilities
Construction of Multi-Purpose Building
Brgy. Talaotao, Looc,
Occidental Mindoro
1 Bldg
Php 1,000,000.00
( Construction of Multi-Purpose Building ) |
May 3, 2017 |
CY 2017 |
WIN7E01429 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure Project ( LIP )
- Buildings and Other Structures
- Multipurpose Facilities
Construction of Multi-purpose Building
Brgy. Ilin Proper, San Jose,
Occidental Mindoro
1 Bldg
Php 1,000,000.00
( Construction of Multi-purpose Building ) |
May 3, 2017 |
CY 2017 |
WIN7E01428 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure Program ( LIP )
- Buildings and Other Structures
- Multi-Purpose Facilities
Construction of Multi-Purpose Building
Brgy. Tagbac, Lubang,
Occidental Mindoro
1 Bldg
Php 1,000,000.00
( Construction of Multi-Purpose Building ) |
May 3, 2017 |
CY 2017 |
WIN7E01433 |
GAA CY 2014 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure project ( LIP )
- Buildings and Other Structures
- Multipurpose Facilities
Construction of Multi-Purpose Building
Brgy. Bagong Sikat ( Poblacion ), Lubang,
Occidental Mindoro
1 Bldg
Php 1,000,000.00
( Construction of Multi-Purpose Building ) |
May 3, 2017 |
Cy 2017 |
WIN7E01431 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure Project ( LIP )
- Buildings and Other Structures
- Multipurpose Facilities
Construction of Multi-Purpose Building
Brgy. Maliig, Lubang, Occidental Mindoro
1 Bldg
Php 1,000,000.00
( Construction of Multi-Purpose Building ) |
May 3, 2017 |
CY 2017 |
WIN7E01434 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Project ( LIP )
- Buildings and Other Structures
- Multipurpose facilities
Construction of Multi-Purpose Building
Brgy. Kanluran (Poblacion), Looc,
Occidental Mindoro
1 Bldg.
Php 1,000,000.00
( Construction of Multi-Purpose Building ) |
May 3, 2017 |
2017 |
WIN7C01682 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 5th District Engineering Office |
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Declared Tourism Destinations
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations at Pilar Circumferential Road leading to Beaches, Pilar, Cebu
Allocation - ₱ 20 Million
Physical Target - 1.716 lane km
Unit Cost - ₱ 11,655,011.66/ lane km |
May 3, 2017 |
2017 |
WIN7C01681 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 5th District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Control along Cebu North Hagnaya Wharf Road, Danao City, Cebu (K0035+800 - K0036+542), Danao City, Cebu
Allocation - ₱ 20 Million
Physical Target - 1,484 Linear meters (lm)
Unit Cost - ₱ 13,477.09/lm |
May 3, 2017 |
2017 |
WIN7C01670 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 5th District Engineering Office |
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary
Construction/Upgrading/Rehabilitation of Drainage along Cebu North Hagnaya Wharf Rd, K0025+700 - K0025+928 (Section 1), K0025+935 - K0026+000 (Section 2), K0026+662 - K0027+169 (Section 3), Compostela, Cebu
Allocation - ₱ 11.174 Million
Physical Target - 800.00 Linear meters (lm)
Unit Cost - ₱ 13,967.50/ lm |
May 3, 2017 |
2017 |
WIN7C01666 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 5th District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Control along Cebu North Hagnaya Wharf Road, Carmen, Cebu (K0039+000 - K0039+880)
Allocation - ₱ 20 Million
Physical Target - 1,760 Linear meters (lm)
Unit Cost - ₱ 11,363.64/lm |
May 3, 2017 |
2017 |
WIN7C01667 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 5th District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Control along Cebu North Hagnaya Wharf Road, Danao City, Cebu (K0036+551 - K0037+301)
Allocation - ₱ 20 Million
Physical Target - 1,260 Linear meters (lm)
Unit Cost - ₱ 15,873.02/lm |
May 3, 2017 |
2017 |
WIN7C01668 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 5th District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) along Cebu North Hagnaya Wharf Road (K0025+000 - K0025+604), Compostela, Cebu
Allocation - ₱ 15 Million
Physical Target - 1.130 Lane km
Unit Cost - ₱ 13,274,336.28/ lane km |
May 3, 2017 |
2017 |
WIN7C01665 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 5th District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Control along Cebu North Hagnaya Wharf Road, Compostela, Cebu (K0026+000 - K0026+662)
Allocation - ₱ 20 Million
Physical Target - 918.00 Linear meters (lm)
Unit Cost - ₱ 21,786.49/lm |
May 3, 2017 |
2017 |
WIN7C01664 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Locally Funded Projects
Construction of 1-Storey, 3-Classroom Building (ready for 4-storey), Kalawisan ES, Kalawisan, Lapu-lapu City (Phase I)
Allocation - ₱ 9.000 Million
Physical Target - 1 Storey 3 Classroom
Unit Cost - ₱ 9.000 Million/1 Storey 3 Classroom |
May 3, 2017 |
2017 |
WIN7C01680 |
R.A 10924 |
January 12, 2017 |
Region VII |
Siquijor District Engineering Office |
Construction of Flood Control Structure at Cangmunag, San Juan, Siquijor Lone District
Allocation - ₱ 15 Million
Physical Target - 356 linear meter
Unit Cost - ₱ 42,134.83/linear meter |
May 3, 2017 |
2017 |
WIN7C01612 |
R.A 10924 |
January 13, 2017 |
Region VII |
Siquijor District Engineering Office |
Construction of Flood Control Structure/Shore Protection at Lala-o, San Juan, Siquijor Lone District
Allocation - ₱ 15 Million
Physical Target - 490 linear meter
Unit Cost - ₱ 30,612.24/linear meter |
May 3, 2017 |
2017 |
WIN7C01611 |
R.A 10924 |
January 12, 2017 |
Region VII |
Siquijor District Engineering Office |
Construction of Flood Control Structure/Shore Protection at Cangmangki, Enrique Villanueva, Siquijor Lone District
Allocation - ₱ 10 Million
Physical Target - 291 linear meter
Unit Cost - ₱ 34,364.26/linear meter |
May 3, 2017 |
2017 |
WIN7C01646 |
R.A 10924 |
January 12, 2017 |
Region VII |
Siquijor District Engineering Office |
Construction of Flood Control Structure/Shore Protection at Poblacion, Enrique Villanueva, Siquijor Lone District
Allocation - ₱ 25 Million
Physical Target - 168.50 linear meter
Unit Cost - ₱ 148,367.95/linear meter |
May 2, 2017 |
Cy 2017 |
WIN7E01144 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF01 - National Road Network Services
- Network Services
- Improvement/Widening of National Roads
- Secondary
Puerto Princesa North Road
K0194+561 - K0196+558,
K0208+540 - K0209+915
( Road Widening )
L = 6.542 lane km
Php 100,888,000.00
|
May 2, 2017 |
CY 2017 |
WIN7E01146 |
GAA Cy 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Palawan 1st District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Improvement/Widening of National Roads
- Tertiary Road
Coron - Busuanga Road
K0010+356 - K0012+486,
K0012+539 - K0013+582
L = 6.416 lane km
Php 100,000,000.00
( Road Widening ) |
May 2, 2017 |
CY 2017 |
WIN7E01141 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Romblon District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Road Upgrading
( Unpaved to Paved )
Tertiary Road
- Parpagoha ( Marigondon ) - Binoog Rd.
K0023+585 - K0025+741
L = 4.184 lane km
Php 100,000,000.00
(Road Upgrading Gravel to Paved) |
May 2, 2017 |
Cy 2017 |
WIN7E01294 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally Funded Projects
- Various Infrastructure Including Local Projects
- Roads and Bridges
- Local Roads
Army Road ( Bagubag - Sorville - Gozar - Binakas )
leading to PAF Gozar Radar Station in Mt.Ambulong,
Brgy. Sorville, Lubang, Occidental Mindoro
Sta. 2+745.80 - Sta. 5+587.20,
Sta. 6+242 - Sta. 6+364
L = 5.9268 lane km
Php 100,000,000.00 |
May 2, 2017 |
CY 2017 |
WIN7E01241 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Southern Mindoro Engineering District Office |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
Improvement/Widening of National Roads
- Secondary
Calapan South Road
K0085+938 - K0086+336,
K0086+657 - K0086+846,
K0086+887 - K0087+364,
K0087+861 - K0088+690,
K0089+171 - K0089+764,
K0090+287 - K0090+390,
K0090+803 - K0091+127,
K0091+578 - K0091+920,
K0092+540 - K0092+720
K0093+460 - K0094+160
L = 8.228 lane km
Php 100,000,000.00
( Road Widening )
|
May 2, 2017 |
CY 2017 |
WIN7E01288 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Palawan 2nd District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Road Upgrading (Unpaved to Paved) based on
Gravel Road Strategies, Traffic Benchmark for
Upgrading to Paved Road Standards
( HDM-4 Project Analysis )
Secondary: Road Upgrading Gravel to Paved
Quezon - Aramaywan Rd
K0169+192 - K0172+150,
K0172+356 - K0172+635
( S00015PW )
L = 6.546 lane km
Php 100,000,000.00
( Road Upgrading Gravel to Paved )
|
May 2, 2017 |
2017 |
WIN7C01663 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Concreting of Barangay Roads, Nagtuang-Tubuan-Bongco, Loon Bohol Sta. 00+000.000 - Sta. 01+020.00
Allocation - ₱ 25.0 Million
Physical Target - 2.04 lane km
Unit Cost - ₱ 12,254,901.96/ lane km |
May 2, 2017 |
FY 2017 |
WIN7E01306 |
FY 2017 APPROVED MODIFICATION |
April 7, 2017 |
Cordillera Administrative Region |
Abra District Engineering Office |
From : Locally Funded Projects: Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/ Facilities, Construction of Buli Flood Control System, Tayum, Abra
To: Locally Funded Projects: Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/ Facilities, Construction of Buli Flood Control System, La Paz, Abra (Construction of Flood Mitigation Structure)
Physical Target = 588 Lm
|
May 2, 2017 |
FY 2017 |
WIN7E01378 |
FY 2017 APPROVED MODIFICATION |
April 7, 2017 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Locally Funded Projects: Local Infrastructure Program - Roads and Bridges - National Roads, Rehabilitation of Abra-Ilocos Norte Road, K0419+000 - K0422+500, Danglas, Abra
To: Locally Funded Projects: Local Infrastructure Program - Roads and Bridges - National Roads, Rehabilitation of Abra-Ilocos Norte Road, K0419+000 - K0422+900, La Paz, Abra and Danglas, Abra (Preventive Maintenance of Roads: Asphalt Overlay)
Physical Target = 7.850 Lane-km
|
May 2, 2017 |
2017 |
WIN7C01661 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 2nd District Engineering Office |
Network Development: Off-Carriageway Improvement including drainage at Tagbilaran East Rd (Tagbilaran-Jagna) K0122+136 - K0124+000, K0150+484 - K0152+000, K0153+000 - K0153+569 Trinidad and Ubay, Bohol
Allocation - ₱ 43,738,000.00
Physical Target - 15,211 square meter
Unit Cost - ₱ 2,875,42/ square meter |
May 2, 2017 |
2017 |
WIN7C01660 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction/Improvement of Inabanga Flood Control Brgys. Ondol and Bugang, Inabanga, Bohol
Allocation - ₱ 50,000,000.00
Physical Target - 849.00 lm
Unit Cost - ₱ 58,892.82/linear meter |
May 2, 2017 |
2017 |
WIN7C01659 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 2nd District Engineering Office |
Network Development - Off-Carriageway Improvement including drainage - Secondary
Network Development: Off-Carriageway Improvement including drainage at Loay Interior Road K0127+500 - K0128+361, K0136+158 - K0136+555, K0137+100 - K0137+350, K0137+991 - K0140+800, K0141+491 - K0141+500, Trinidad and San Miguel, Bohol
Allocation - ₱ 47,854,000.00
Physical Target - 17,304 square meter
Unit Cost - ₱ 2,765.49/ square meter |
May 2, 2017 |
2017 |
WIN7C01662 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 3rd District Engineering Office |
Network Development - Off-Carriageway Improvement including Drainage - Tertiary
Off-Carriageway Improvement: Shoulder Paving/Construction - Jct. Dat-an Carmen-Sierra Bullones-Pilar-Alicia Rd - K0072+-498 - K0072+000, K0091+262 - K0091+412, K0091+513 - K0091+797.74, K0091+1818 - K0091+2606
Allocation - ₱ 15.570 Million
Physical Target - 5,333.00 sq.m
Unit Cost - ₱ 2,919.56/sq.m |
May 2, 2017 |
2017 |
WIN7C01658 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 3rd District Engineering Office |
Network Development – Off-Carriageway Improvement including Drainage – Jct. Dat-an Carmen – Sierra Bullones – Pilar – Alicia Rd – K0062+-275 – K0062+085, K0062+113 – K0063+820, K0068+423 – K0069+500
Allocation - ₱ 29.430 Million
Physical Target - 12,303.00 sq.m
Unit Cost - ₱ 2,392.09/sq.m |
May 2, 2017 |
2017 |
WIN7C01669 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 1st District Engineering Office |
Locally Funded Projects (LIP) - Building and other Structures - Multi-Purpose/Facilities
Construction (Completion) of Multi-Purpose Building in Barangay Manlagtang, Tabogon, Cebu
Allocation - ₱ 5.0 Million
Physical Target - 1 Building
Unit Cost - 5.0 Million/Building |
May 2, 2017 |
GAA FY 2017 |
WIN7G01372 |
GAA FY R.A. 10924 |
January 1, 2017 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Construction and Maintenance of Bridges along National Roads-Widening of Permanent Bridges to more than 2 Lanes
Widening of Bridges including Off- Carriageway Improvement Shoulder Paving/Construction-Tigbawan Bridge (B00073MN) along Daang Maharlika (MN)
TO: Construction and Maintenance of Bridges along National Roads-Widening of Permanent Bridges to more than 2 Lanes
Widening of Tigbawan Bridge (B00073MN) inlcuding Approaches, Montevista along Daang Maharlika (MN)
ALLOCATION: Php 35.514 Million |
May 2, 2017 |
GAA FY 2017 |
WIN7G01374 |
GAA FY R.A. 10924 |
January 1, 2017 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Asset Preservation of National Roads- Construction/Upgrading/Rehabilitation of Drainage along National Roads-Primary
Construction of Drainage Structure along Road-Surigao-Davao Coastal Road - K1782+435 - K1782+445, K1805+940 - K1805+944
TO: Asset Preservation of National Roads- Construction/Upgrading/Rehabilitation of Drainage along National Roads-Primary
Construction of Drainage at Surigao - Davao Coastal Road, K1782+434 - K1782+448 - Tambongan Section
K1805+934 - K1805+943 - Mampising Section
ALLOCATION: Php 8.00 Million |
May 2, 2017 |
GAA FY 2017 |
WIN7G01350 |
GAA FY R.A. 10924 |
January 1, 2017 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Waterway/Revetment - Construction of Flood Mitigation Facilities along Agusan River, Sta. 0+760 - Sta. 1+370, Sta. 1+840 - Sta. 2+717, Brgy. Panag, Compostela Valley
TO: Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Facilities along Agusan River, Brgy. Panag, New Bataan, Compostela Valley 1st LD
Sta. 0+443 - Sta. 1+900
Sta. 0+444 - Sta. 2+000
ALLOCATION: Php 46.799 Million |
May 2, 2017 |
GAA FY 2017 |
WIN7G01373 |
GAA FY R.A. 10924 |
January 1, 2017 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 Lanes
Widening of Bridge including Retrofitting/Strengthening of Bridge - Magnaga Bridge (B00198MN) along Surigao - Davao Coastal Road
TO: Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 Lanes
Widening of Magnaga Bridge (B00198MN) including Approaches, Pantukan along Surigao - Davao Coastal Road
ALLOCATION: Php 51.09 Million |
May 2, 2017 |
GAA FY 2017 |
WIN7G01335 |
GAA FY R.A. 10924 |
January 1, 2017 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes
Widening of Bridge - Maitum Br. (B00061MN) including RROW along Daang Maharlika (MN)
TO: Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes
Widening of Maitum Br. (B00061MN) including Approaches along Daang Maharlika (MN)
ALLOCATION: Php 28.225 Million |
May 2, 2017 |
GAA FY 2017 |
WIN7G01375 |
GAA FY R.A. 10924 |
January 1, 2017 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Network Development- Improvement/Widening of National Roads - Secondary
Road Widening - Montevista - Compostela - Mati Bdry. Rd -K1416+211- K1417+488
TO: Network Development- Improvement/Widening of National Roads - Secondary
Widening of Road along Montevista - Compostela - Mati Bdry. Road, New Visayas Section, Montevista - K1416+216 - K1417+493
ALLOCATION: Php 25.947 Million |
May 2, 2017 |
GAA FY 2017 |
WIN7G01371 |
GAA FY R.A. 10924 |
January 1, 2017 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Asset Preservation of National Roads-Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Tertiary
Construction of Road Slope Protection Structure, Montevista - Compostela - Mati Bdry. Rd - K 1457+200 - K 1457+285
TO: Asset Preservation of National Roads-Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Tertiary
Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide at Montevista - Compostela - Mati Bdry. Road K 1456+700 - K 1457+200
ALLOCATION: Php 15.00 Million
|
April 28, 2017 |
2017 |
WIN7E01194 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-funded Projects: Local Infrastructure Program: Roads and Bridges: Local Roads: Concreting of Barangay Road, Barangay Barrera Jr., Lupi, Camarines Sur (Construction of Concrete Road)
Physical Target: 0.40 Lane km.
Unit Cost: P5.0M/Lane km
Allocation: P2.0M
As MODIFIED:
Locally-funded Projects: Local Infrastructure Program: Roads and Bridges: Local Roads: Concreting of Barangay Road, Barangay Barrera Jr., Lupi, Camarines Sur (Construction of Concrete Road)
Physical Target: 0.456 Lane km.
Unit Cost: P4,385.96M/Lane km
Est. Cost: P2.0M |
April 28, 2017 |
2017 |
WIN7E01193 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-Funded Projects: Local Infrastructure Program: Roads and Bridges: Local Roads: Concreting of Barangay Road, Barangay Bulan, Sipocot, Camarines Sur (Construction of Concrete Road)
Physical Target: 0.40 Lane km.
Unit Cost: P5.0M/Lane km.
Allocation: P2.0M
As MODIFIED:
Locally-Funded Projects: Local Infrastructure Program: Roads and Bridges: Local Roads: Concreting of Barangay Road, Barangay Bulan, Sipocot, Camarines Sur (Construction of Concrete Road)
Physical Target: 0.501 Lane km.
Unit Cost: P3,992.02M/Lane km.
Est. Cost: P2.0M |
April 28, 2017 |
2017 |
WIN7E01205 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-Funded Projects: Local Infrastructure Program: Roads and Bridges: Local Roads: Concreting of Barangay Road, Brgy. Carayrayan going to Brgy. Sirang, Sipocot, Camarines Sur (Construction of Concrete Road)
Physical Target: 0.48 Lane km.
Unit Cost: P4,166.67M/Lane km.
Allocation: P2.0M
As MODIFIED:
Locally-Funded Projects: Local Infrastructure Program: Roads and Bridges: Local Roads: Concreting of Barangay Road, Brgy. Carayrayan going to Brgy. Bagong Sirang, Sipocot, Camarines Sur (Construction of Concrete Road)
Physical Target: 0.48 Lane km.
Unit Cost: P4,166.67M/Lane km.
Est. Cost: P2.0M
|
April 28, 2017 |
2017 |
WIN7E01204 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-Funded Projects: Local Infrastructure Program:
Roads and Bridges: Local Roads: Concreting of Barangay Road, Brgy. Poblacion to Brgy. Barrera Jr., Lupi, Camarines Sur (Construction of Concrete Road)
Physical Target: 0.40 Lane km
Unit Cost: P3.750M/Lane km
Allocation: P1.5M
As MODIFIED:
Locally-Funded Projects: Local Infrastructure Program:
Roads and Bridges: Local Roads: Concreting of Barangay Road, Brgy. Poblacion to Brgy. Barrera Jr., Lupi, Camarines Sur (Construction of Concrete Road)
Physical Target: 0.30688 Lane km
Unit Cost: P4.8879M/Lane km
Est. Cost: P1.5M |
April 28, 2017 |
2017 |
WIN7E01236 |
FY 2017 GAA RA10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally Funded Projects, Local Infrastructure Program — Roads and Bridges — Local Roads Repair/ Rehabilitation of
Barangay Road, Barangay Poblacion, Lupi, Camarines Sur
Physical Target: -
Unit Cost: -
Allocation: P3.0M
As per GAA:
Locally Funded Projects, Local Infrastructure Program — Roads and Bridges — Local Roads Repair/ Rehabilitation of
Barangay Road, Barangay Poblacion, Lupi, Camarines Sur (Rehabilitation of Concrete Road)
Physical Target: 0.513 Lane km.
Unit Cost (P'000): P5,847.95/Lane km.
Est. Cost: P3.0M
|
April 28, 2017 |
2017 |
WIN7E01344 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-Funded Projects: Local Infrastructure Program: Roads and Bridges: Local Roads: Concreting of Barangay Road, Barangay Serranzana to Brgy. Salvacion, Sipocot, Camarines Sur (Construction of Concrete Road)
Physical Target: 0.40 Lane km.
Unit Cost: P5.0M/Lane km.
Allocation: P2.0M
As MODIFIED:
Locally-Funded Projects: Local Infrastructure Program: Roads and Bridges: Local Roads: Concreting of Barangay Road, Barangay Serranzana to Brgy. Salvacion, Sipocot, Camarines Sur (Construction of Concrete Road)
Physical Target: 0.527 Lane km.
Unit Cost: P3.79507M/Lane km.
Est. Cost: P2.0M
|
April 27, 2017 |
CY 2017 |
WIN7E01240 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Off-Carriageway Improvement including
Drainage
- Secondary Road
Tablas Circumferential Road
K0002+700 - K0002+937,
K0018+200 - K0019+003,
K0044+000 - K0045+129,
K0053+000 - K0053+643,
K0075+100 - K0076+304,
K0092+000 - K0092+076
(Off-Carriageway Improvement:
Shoulder Paving/Construction)
16,336 sq.m
Php 104,000,000.00 |
April 27, 2017 |
CY 2017 |
WIN7E01238 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF03 - Construction and Maintenance Services of
Other Infrastructure
- Construction/Improvement of Access Roads
leading to Declared Tourism Destinations
- San Jose Circumferential Road leading
to Various Beaches
Sta. 7+649 - Sta. 9+780,
Sta.10+220 - Sta.12+800
(Construction of Concrete Road)
L = 9.422 lane km
Php 200.00 Million |
April 27, 2017 |
CY 2017 |
WIN7E01285 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Palawan 3rd District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Construction of By-Passes/Diversion Roads
including ROW
Malvar - PPSR Road, Palawan
Sta. 0+000 - Sta. 1+871.70
L = 3.7434 lene km
Php 97,800,000.00 |
April 27, 2017 |
CY 2017 |
WIN7E01285 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF03 - Construction and Maintenance Services of
Other Infrastructure
- Construction/Improvement of Access Road
leading to Declared Tourism Destinations
Decabobo - Buenavista - Turda -
Borac RORO Port
( Sta. 24+918.40 - Sta. 27+620,
Sta. 27+670 - Sta. 28+740)
L = 7.543 lane km
Php 200.00 million
|
April 27, 2017 |
CY 2017 |
WIN7E01140 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Improvement/Widening of National Roads
Tertiary Road
- F.B. Reyes ( Busuanga - Coron ) Road
K0011+387 - K0012+180,
K0012+196 - K0014+278
( Road Widening)
L = 7.298 lane km
Php 135,000,000.00
|
April 27, 2017 |
2017 |
WIN7G01364 |
SR2017-02-002205 |
February 2, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary
Construction/Upgrading/Rehabilitation of Drainage along National Road - Daang Maharlika (Surigao-Agusan Sect), K1194+832 - K1196+580
Allocation:
- Php 140.00 Million (Total)
- Php 136.50 Million (Drainage Structure)
- Php 3.50 Million (ROW)
Physical Target:
- 3,560 lm (Drainage Structure)
- 1,400 sq.m. (ROW) |
April 27, 2017 |
CY 2017 |
WIN7E01213 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Road Upgrading ( Unpaved to Paved)
Secondary Road
Palawan Circumferential Road
K0224+503 - K0224+660,
K0224+800 - K0228+656
( Construction of Concrete Road )
L = 8.008 lane km
Php 150,000,000.00 |
April 27, 2017 |
2017 |
WIN7G01233 |
SR2017-02-002634 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW
Completion of the East-West Lateral Road connecting Agusan Del Sur/Agusan Del Norte to Bukidnon Agusan-Malaybalay Road including Bridge, Esperanza, Package 4, Agusan Del Sur, Sta. 0+000 to Sta. 2+125.60, Sta.2+125.60 to Sta.2+231.40, Sta. 2+231.40 to Sta. 2+264.15
Alocation:
- Php 150.00 Million (Total)
- Php 60.384892 Million (Gravel Road)
- Php 89.615108 Million (Concrete Bridge)
Physical Target:
- 4.380 lane km (Gravel Road)
- 857 sq.m. (Concrete Bridge) |
April 27, 2017 |
2017 |
WIN7G01365 |
SR2017-02-002421 |
February 2, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Network Development - Improvement/Widening of National Roads - N1
Improvement/Widening of National Roads, Daang Maharlika (Surigao-Agusan Section) - K1197+550 - K1199+289.40, K1202+000 - K1202+812.46, K1202+911.75 - K1203+238
Allocation - Php 111.415 Million
Physical Target - 5.77 lane km
|
April 27, 2017 |
CY 2017 |
WIN7E01293 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Palawan 1st District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Improvement/Widening of National Roads
- Secondary Road : Road Widening
Puerto Princesa North Road
K0241+000 - K0243+261
( Road Widening)
L = 4.544 lane km
Php 72,748,000.00
|
April 27, 2017 |
2017 |
WIN7G01366 |
SR2017-02-002986 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Road Dike along Daang Maharlika (Surigao-Agusan Section), K1183+880 - K1185+095
Allocation - Php 200.00 Million
Physical Target - 1,220.00 lm |
April 27, 2017 |
CY 2017 |
WIN7E01136 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Improvement/Widening of National Roads
- Secondary road
Puerto Princesa North Road
K0107+000 - K0107+600,
K0107+700 - K0108+679,
K0112+884 - K0114+195
( Road Widening )
L= 5.798 lane km
Php 109,468,000.00 |
April 27, 2017 |
2017 |
WIN7G01357 |
SR2017-02-003034 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - Declared Tourism Destinations
Circumferential Road leading to Lake Mainit, Jabonga, Agusan del Norte, Sta. 1183+8000 - Sta. 1187+000
Allocation - Php 150.00 Million
Physical Target - 6.40 lane km |
April 27, 2017 |
2017 |
WIN7G01368 |
SR2017-02-002423 |
February 2, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Network Development - Improvement/Widening of National Roads - N1
Improvement/Widening of National Roads, Daang Maharlika (Surigao-Agusan Sect), K1207+281 - K1208+259, K1208+297.10 - K1210+285
Allocation - Php 130.585 Million
Physical Target - 5.96 lane km |
April 27, 2017 |
CY 2017 |
WIN7E01127 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF03 - Construction and Maintenance Services of
Other Infrastructures
- Construction/Improvement of Access Road
Leading to Airports
New Ibajay - Manini - Sandoval Access Road
leading to Taytay Airport, Palawan
Sta 0+ 020 - Sta 0+300,
Sta 18+029.70 - Sta 19+529.78,
Sta 15+384.90 - Sta 18+029.70
L = 8085 lane km
Php 150,000,000.00
( Construction of Concrete Road ) |
April 27, 2017 |
CY 2017 |
WIN7E01223 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF01 - National Road Network Services
- Road Upgrading (Unpaved to Paved) based on
Gravel Road Strategies, Traffic Benchmark for
Upgrading to Paved Road Standards
( HDM-4 Project Analysis ) - Secondary:
Road Upgrading Gravel to Paved
Palawan Circumferential Road
K0228+656 - K0232+764,
K0233+025 - K0233+090
L = 8.618 lane km
Php 150,000,000.00
|
April 27, 2017 |
2017 |
WIN7G01355 |
165003014400094 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Asset Preservation of National Roads - Rehab/Recon of National Roads with Slips, Slope Collapse and Landslide - Primary Road
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide along Daang Maharlika (Agusan-Davao Sect), K1274+762.63 - K1274+840.30
Allocation - Php 9.900 Million
Physical Target - 388.35 sq.m. |
April 27, 2017 |
2017 |
WIN7G01353 |
165003015800470 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary Road
Road Upgrading (unpaved to paved) along NRJ Bayugan-Calaitan-Tandag Road, K1289+896 - K1289+995
Allocation - Php 5.00 Million
Physical Target - 0.198 lane km |
April 27, 2017 |
2017 |
WIN7G01354 |
165003014900172 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Asset Preservation of National Roads - Construction//Upgrading/Rehabilitation of Drainage along National Roads - Tertiary Road
Construction/Upgrading/Rehabilitation of Drainage along NRJ Bayugan - Calaitan - Tandag Road, K1273+000 - K1273+080
Allocation : ₱ 7.697 Million
Physical Target : 80.000 lm
|
April 27, 2017 |
2017 |
WIN7G01326 |
165003014200319 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Secondary Road
Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Road along NRJ Bahbah - Talacogon Road, K1311+-703 - K1311+-521
Allocation : ₱ 6.104 Million
Physical Target : 0.364 lane km
|
April 27, 2017 |
2017 |
WIN7G01370 |
165003016800153 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Network Development - Off-Carriageway Improvement including drainage - Secondary Road
Off-Carriageway Improvement including drainage along NJR Bahbah - Talacogon Road, K1294+500 - K1294+868 (RS), K1294+692 - K1294+731 (LS), K1294+809 - K1294+845 (LS), K1294+993 - K1295+633 (BS)
Allocation : ₱ 9.500 Million
Physical Target : 4,392.50 sq. m.
|
April 27, 2017 |
2017 |
WIN7G01369 |
165003015800468 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary Road
Road Upgrading (unpaved to paved) along Butuan City - Talacogon - Loreto - Veruela - Sta. Josefa Road, K1326+527 - K1326+774
Allocation : ₱ 7.000 Million
Physical Target : 0.494 lane km
|
April 27, 2017 |
2017 |
WIN7G01360 |
165003015200214 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Network Development - Improvement/Widening of National Roads - Tertiary Road
Improvement/Widening of National Road along Bayugan-Esperanza Road, K1270+-874 - K1270+-347
Allocation : ₱ 7.576 Million
Physical Target : 1.054 lane km
|
April 27, 2017 |
2017 |
WIN7G01359 |
165003014200318 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Asset Preservation of National Road - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Secondary Road
Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Road along NRJ Bahbah-Talacogon Road, K1304+600 - K1304+680.30, K1304+800 - K1304+835, K1305+000 - K1305+092, K1309+680 - K1309+780
Allocation : ₱ 7.896 Million
Physical Target : 0.6146 lane km
|
April 27, 2017 |
2017 |
WIN7G01358 |
165003014300422 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modfied:
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Tertiary Road
Rehabilitation/Reconstruction/Upgrading of National Roads including drainage along Bayugan-Esperanza Road
Allocation : ₱ 6.359 Million
Physical Target : 0.620 lane km
|
April 27, 2017 |
2017 |
WIN7G01329 |
165003015800466 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary Road
Road Upgrading (unpaved to paved) along Butuan City-Pianing-Tandag Road, K1252+184 - K1252+242, K1252+756 - K1252+938
Allocation : ₱ 9.000 Million
Physical Target : 0.480 lane km
|
April 27, 2017 |
2017 |
WIN7G01329 |
165003015800466 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary Road
Road Upgrading (unpaved to paved) along Butuan City-Pianing-Tandag Road, K1252+184 - K1252+242, K1252+756 - K1252+938
Allocation : ₱ 9.000 Million
Physical Target : 0.480 lane km
|