Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
June 7, 2024 2024 GAA 2024 January 19, 2024 Region V Camarines Norte Sub-District Engineering Office
Project ID : P00800694LZ
UACS : 310111100634000

FROM :
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads - Daet Airport Rd - K0344 + 941 - K0346 + 014

Physical Target :
CW1 - Construction of Drainage Structure along Road - 991 Lineal Meters


TO :
ORGANIZATIONAL OUTCOME : Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads - Daet Airport Rd - K0344 + 941 - K0346 + 916

Physical Target :
CW1 - Construction of Drainage Structure along Road - 936 Lineal Meters
June 7, 2024 2024 GAA 2024 January 19, 2024 Region V Camarines Sur 4th District Engineering Office
Project ID : P00802536LZ
UACS : 310105101033000

FROM :
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd - K0573 + 089 - K0575 + 000, K0575 + 233 - K0578 + 522, K0575 + 522 - K0575 + 824, K0575 + 895 - K0576 + 000

Physical Target :
CW1 - Rehabilitation of Paved Road - 5.008 Lane Km


TO :
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd - K0573 + 089 - K0575 + 000, K0575 + 233 - K0578 + 522, K0575 + 522 - K0575 + 824, K0575 + 895 - K0576 + 1120

Physical Target :
CW1 - Rehabilitation of Paved Road - 7.248 Lane Km
June 7, 2024 2024 WIN4F07949 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00805212LZ
UACS : 310201101258000

FROM :
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0265 + 346 - K0266 + 470, K0267 + 053 - K0267 + 112

Physical Target :
CW1 - Road Widening - 2.372 Lane Km
CW2 - Construction of Drainage Structure along Road - 2825.4 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 5922
ROW - ROW Acquisition - 47, 440 Square meters


TO :
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0265 + 346 - K0266 + 470, K0267 + 053 - K0267 + 112

Physical Target :
CW1 - Road Widening - 2.372 Lane Km
CW2 - Construction of Road Slope Structure - 5588.9 Square meters
ROW - ROW Acquisition - 23720 Square meters
June 7, 2024 2024 310106101096000 FY 2024 GAA January 3, 2024 Region II Cagayan 1st District Engineering Office
FROM:

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved - Roads - Tertiary Roads - Jct Gattaran-Cumao-Capissayan-Sta Margarita-Bolos Point Rd - K0583 + 000 - K0584 + 591

TO:

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved - Roads - Tertiary Roads - Jct Gattaran-Cumao-Capissayan-Sta Margarita-Bolos Point Rd - K0583+328- K0583+1024, K0584+000-K0584+796.5, K0585+112.5- 0585+310.5, K0585+328.5-K0585+522, K0585+591- 0585+613.5, K0585+655.5-K0585+718.5, K0585+849-K0585+960
June 7, 2024 2024 310109101550000 FY 2024 GAA January 3, 2024 Region II Cagayan 1st District Engineering Office
FROM:

Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Baybayog-Baggao-Dalin-Sta. Margarita Rd - K0536 + 622 - K0536 + 800

TO:

Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - K0546+178.81 - K0546+429.06
June 7, 2024 2024 WIN4E03412 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Regional Office XIII
UACS No. : 310104100702000
Project ID: P00801248MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
- Primary Roads

FROM:

Daang Maharlika (Agusan-Davao Sect) - K1246 + 000 - K1246 + 389, K1247 + 000 - K1247 + 570, K1248 + 000 - K1248 + 550, K1254 + 000 - K1255 + 188, K1255 + 222 - K1256 + 002

Type of Work:
CW1- Rehabilitation of Paved Road

Physical Target:
CW1- 6.982 Lane Km

Allocation:
TOTAL: P 212,810,000
CW1: P 205,361,650
EAO: P 7,448,350

Unit Cost:
CW1: P 29,413,012.03/Lane Km

TO:

Daang Maharlika (Agusan-Davao Sect) - K1246 + 000 - K1246 + 389, K1247 + 030 - K1247 + 260, K1248 + 000 - K1248 + 212, K1248 + 261 - K1248 + 385, K1254 + 000 - K1254 + 720

Type of Work:
CW1- Rehabilitation of Paved Road
CW2- Construction of Road Slope Protection Structure

Physical Target:
CW1- 6.700 Lane Km
CW2- 2,208 Square meters

Allocation:
TOTAL: P 212,810,000
CW1: P 129,155,600
CW2: P 76,206,050
EAO: P 7,448,350

Unit Cost:
CW1: P 19,276,955.22/Lane Km
CW2: P 34,513.61 Square meters


June 7, 2024 2024 310203100757000 FY 2024 GAA January 3, 2024 Region II Isabela 3rd District Engineering Office
FROM:

Network Development - Road Widening - Tertiary Roads - Gamu-Roxas Rd - K0393 + 343 - K0394 + 630

TO:

Network Development - Road Widening - Tertiary Roads - Gamu-Roxas Rd - K0393 + 343 - K0394 + 1002
June 7, 2024 2024 WIN4E03411 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Regional Office XIII
UACS No. : 310104100703000
Project ID: P00801249MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
- Primary Roads

FROM:

Daang Maharlika (Agusan-Davao Sect) - K1256 + 002 - K1257 + 004, K1257 + 368 - K1257 + 481, K1260 + 000 - K1262 + 431, K1262 + 506 - K1265 + 000, K1265 + 500 - K1265 + 605, K1278 + 073 - K1278 + 272, K1278 + 696 - K1278 + 862

Type of Work:
CW1- Rehabilitation of Paved Road

Physical Target:
CW1- 13.116 Lane Km

Allocation:
TOTAL: P 393,480,000
CW1: P 379,708,200
EAO: P 13,771,800

Unit Cost:
CW1: P 28,950,000/Lane Km

TO:

Daang Maharlika (Agusan-Davao Sect) - K1254 + 720 - K1255 + 188, K1255 + 222 - K1257 + 004, K1260 + 000 - K1261 + 500

Type of Work:
CW1- Rehabilitation of Paved Road
CW2- Construction of Road Slope Protection Structure

Physical Target:
CW1- 15.140 Lane Km
CW2- 3,120 Square meters

Allocation:
TOTAL: P 393,480,000
CW1: P 285,080,300
CW2: P 94,627,900
EAO: P 13,771,800

Unit Cost:
CW1: P 18,829,610.30/Lane Km
CW2: P 30,329.46 Square meters
June 7, 2024 2024 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Regional Office XIII
UACS No. : 310104100704000
Project ID: P00801250MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
- Primary Roads

FROM:

Daang Maharlika (Agusan-Davao Sect) - K1273 + 043 - K1273 + 892, K1274 + 414 - K1276 + 000, K1276 + 360 - K1276 + 672, K1277 + 678 - K1278 + 000, K1292 + 000 - K1294 + 000, K1297 + 125 - K1297 + 959, K1298 + 912 - K1299 + 000, K1303 + 446 - K1303 + 600

Type of Work:
CW1- Rehabilitation of Paved Road

Physical Target:
CW1- 12.308 Lane Km

Allocation:
TOTAL: P 369,240,000
CW1: P 356,316,600
EAO: P 12,923,400

Unit Cost:
CW1: P 28,950,000/Lane Km

TO:

Daang Maharlika (Agusan-Davao Sect) - K1261 + 500 - K1262 + 431, K1262 + 506 - K1263 + 824.54, K1276 + 360 - K1276 + 672, K1278 + 073 - K1278 + 272, K1278 + 696 - K1278 + 862, K1297 + 125 - K1297 + 959

Type of Work:
CW1- Rehabilitation of Paved Road
CW2- Construction of Road Slope Protection Structure

Physical Target:
CW1- 11.285 Lane Km
CW2- 3,328 Square meters

Allocation:
TOTAL: P 369,240,000
CW1: P 260,057,850
CW2: P 96,258,750
EAO: P 12,923,400

Unit Cost:
CW1: P 23,044,559.15/Lane Km
CW2: P 29,819.93/Square meters


June 7, 2024 2024 WIN4E03413 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Butuan City District Engineering Office
UACS No. : 300204101643000
Project ID: P00832759MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT)

FROM:

Road connecting Brgys. Mat-i and E.G. Montilla, Butuan City, Agusan del Norte

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 0.636 Lane Km

Allocation:
TOTAL: P 15,000,000
CW1: P 14,700,000
EAO: P 300,000

Unit Cost:
CW1: P 23,113,207.55/Lineal meters

TO:

Road connecting Brgys. Mat-i and E.G. Montilla, Las Nieves, Agusan del Norte

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 0.636 Lane Km

Allocation:
TOTAL: P 15,000,000
CW1: P 14,700,000
EAO: P 300,000

Unit Cost:
CW1: P 23,113,207.55/Lineal meters
June 7, 2024 2024 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 310102101939000
Project ID: P00801078MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads

FROM:

Surigao-Davao Coastal Rd - K1181 + 304.7 - K1181 + 830

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 1.051 Lane Km

Allocation:
TOTAL: P 10,661,000
CW1: P 10,447,780
EAO: P 213,220

Unit Cost:
CW1: P 9,940,799.239/Lane Km

TO:

Surigao-Davao Coastal Rd - K1181 + 304.7 - K1181 + 776.56

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 0.920 Lane Km

Allocation:
TOTAL: P 10,661,000
CW1: P 10,447,780
EAO: P 213,220

Unit Cost:
CW1: P 11,356,282.609/Lane Km
June 7, 2024 2024 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300214101348000
Project ID: P00833103MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

FROM:

Installation of Road Safety Devices and Street Lights along Surigao-Davao Coastal Rd - K1195 + 000 - K1197 + 000, Claver, Surigao del Norte

Type of Work:
CW1- Road Safety: Roadway Lighting

Physical Target:
CW1- 150 Number of Units

Allocation:
TOTAL: P 43,950,000
CW1: P 42,718,200
EAO: P 871,8000

Unit Cost:
CW1: P 284,788/ Number of Units

TO:

Installation of Road Safety Devices and Street Lights along Surigao-Davao Coastal Rd - K1195 + 000 - K1197 + 000, Claver, Surigao del Norte

Type of Work:
CW1- Road Safety: Roadway Lighting

Physical Target:
CW1- 134 Number of Units

Allocation:
TOTAL: P 43,950,000
CW1: P 42,718,200
EAO: P 871,8000

Unit Cost:
CW1: P 318,792.537/ Number of Units

June 7, 2024 2024 WIN4E03424 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Surigao del Sur 1st District Engineering Office
UACS No. : 320101112267000
Project ID: P00820213MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

FROM:

Construction of Tago RIS Protection Works along Balisong River, Tago, Surigao del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 208.362 Lineal meters

Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000

Unit Cost:
CW1: P 141,100.58/Lineal meters

TO:

Construction of Tago RIS Protection Works along Balisong River, Tago, Surigao del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 157.600 Lineal meters

Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000

Unit Cost:
CW1: P 186,548.22/Lineal meters

June 7, 2024 2024 WIN4E03404 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Surigao del Sur 1st District Engineering Office
UACS No. : 300219102713000
Project ID: P00835814MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of Seawall at Barangay Matho, Cortes, Surigao del Sur

Type of Work:
CW1- Construction of Dike

Physical Target:
CW1- 347.20 Lineal meters

Allocation:
TOTAL: P 50,000,000
CW1: P 48,250,000
EAO: P 1,750,000

Unit Cost:
CW1: P 138,940.88/Lineal meters

TO:

Construction of Seawall at Barangay Matho, Cortes, Surigao del Sur

Type of Work:
CW1- Construction of Dike

Physical Target:
CW1- 286.000 Lineal meters

Allocation:
TOTAL: P 50,000,000
CW1: P 48,250,000
EAO: P 1,750,000

Unit Cost:
CW1: P 168,706.29/Lineal meters

June 7, 2024 2024 310201101248000 FY 2024 GAA January 3, 2024 Region II Regional Office II
FROM:

Network Development - Road Widening - Primary Roads - Manila North Rd - K0601 + 074 - K0603 + 724, K0611 + 1019 - K0615 + 000, K0669 + 000 - K0669 + 892, K0669 + 932 - K0671 + 690

TO:

Network Development - Road Widening - Primary Roads - Manila North Rd - K0601+074 - K0602+349, K0602+421 - K0603+724, K0611+1109 - K0612+729
June 7, 2024 2024 310104100631000 FY 2024 GAA January 3, 2024 Region II Regional Office II
FROM:

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved - Roads - Primary Roads - Daang Maharlika (LZ) - K0242 + 000 - K0245 + 970

TO:
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved - Roads - Primary Roads - Daang Maharlika (LZ) - K0242 + 150 - K0245 + 970, K0251+000 - K0251+812
June 7, 2024 2024 300214101002000 FY 2024 GAA January 3, 2024 Region II Regional Office II
FROM:

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Installation/Application of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, Zebra Pedestrian Crossing along Daang Maharlika (LZ) - K0267 + 123 - K0268 + 125, Bayombong, Nueva Vizcaya

TO:

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Installation/Application of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, Zebra Pedestrian Crossing along Daang Maharlika (LZ) - K0258 + 305 - K0260 + 024, Bayombong, Nueva Vizcaya
June 7, 2024 FY 2024 P00801104MN SR2024-01-004535 January 29, 2024 Region XII Regional Office XII
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Preventive Maintenance - Tertiary Roads
Contract ID: 24M00065
Amount: ₱ 100,000,000.00
From: Kidapawan-Magpet-Pangaoan Rd K1619 + (-645) - K1620 + 679
To: Kidapawan-Magpet-Pangaoan Rd K1619 + (-645) - K1620 + 415
June 7, 2024 FY 2024 P00800140MN SR2024-01-005261 January 30, 2024 Region XII Regional Office XII
OO1: Ensure Safe and Reliable National Road System – Network Development - Road Widening - Primary Roads
Contract ID: 24M00118
Amount: ₱ 53,734,000.00

From: Marbel-Makar Rd - K1661 + (-551) - K1661 + 348, K1663 + 825 - K1665 + 500, K1666 + 245 - K1667 + 698, K1667 + 744.60 - K1668 + 000
To: Marbel-Makar Rd - K1661 + (-551) - K1661 + 348, K1663 + 825 - K1665 + 492, K1666 + 120 - K1666 + 700
June 7, 2024 FY 2024 P00800219MN SR2024-01-005293 January 30, 2024 Region XII Regional Office XII
OO1: Ensure Safe and Reliable National Road System – Network Development - Road Widening - Primary Roads
Contract ID: 24M00119
Amount: ₱ 50,000,000.00
From: Marbel-Makar Rd - K1668 + 000 - K1669 + 600
To: Marbel-Makar Rd - K1668 + 000 - K1669 + 065
June 7, 2024 FY 2024 P00801143MN SR2024-01-004542 January 29, 2024 Region XII Regional Office XII
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Preventive Maintenance - Tertiary Roads
Contract ID: 24M00080
Amount: ₱ 108,880,000.00
TOW: Preventive Maintenance of Road: Asphalt Overlay

From: Matalam-Lampayan-Antipas Rd (S00709MN) - K1650 + 000 - K1652 + 607
Physical target: 5.200 lane-km
To: Matalam-Lampayan-Antipas Rd (S00709MN) - K1650 + 000.000 - K1652 + 180.800
Physical target: 4.360 lane-km
June 7, 2024 FY 2024 P00801088MN SR2024-03-004455 January 29, 2024 Region XII Regional Office XII
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Preventive Maintenance - Secondary Roads
Contract ID: 24M00012
Amount: ₱ 164,537,000.00
TOW: Preventive Maintenance of Road: Asphalt Overlay
From: Filipino-American Friendship Ave. - K1662 + (-574) - K1663 + 413
Physical target: 7.944 Lane km
To: Filipino-American Friendship Ave. - K1662 + (-574) - K1663 + 133
Physical target: 6.828 Lane km
June 7, 2024 FY 2024 P00801089MN SR2024-03-004487 January 29, 2024 Region XII Regional Office XII
Asset Preservation - Preventive Maintenance - Secondary Roads
Contract ID: 24M00013
Amount: ₱ 168,437,000.00
From: Jct Digos-Buayan Airport Rd - K1649 + (-683) - K1649 + 673
To: Jct Digos-Buayan Airport Rd - K1649 + (-683) - K1650 + 086
June 7, 2024 FY 2024 P00801048MN GAA 2024 January 1, 2024 Region XII Cotabato 3rd District Engineering Office
Amount: P71,076,000.00
TOW: Preventive Maintenance of Road: Asphalt Overlay
From: Matalam-Mlang-Bagontapay Jct Rd - K1641 + 592 - K1643+244
Physical Target: 6.512 Lane Km
To: Matalam-Mlang-Bagontapay Jct Rd - K1641 + 592 - K1643+181.7
Physical Target: 3.1314 Lane Km
June 6, 2024 2024 WIN4XY00209 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00800223LZ
UACS : 310201101269000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0500 + 000 - K0500 + 272, K0500 + 702 - K0501 + 000, K0501 + 180 - K0502 + 140, K0506 + 391.28 - K0506 + 861, K0508 + 163 - K0508 + 721.15, K0508 + 920 - K0509 + 145, K0509 + 297 - K0509 + 660

Physical Target :
CW1 - Road Widening - 6.301 Lane Km
CW2 - Construction of Drainage Structure along Road - 5310.74 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 1489 Square meters
ROW - ROW Acquisition - 2915 Square meters


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0500 + 000 - K0500 + 220, K0500 + 702 - K0501 + 000, K0501 + 720 - K0502 + 140, K0506 + 391.28 - K0506 + 861, K0508 + 163 - K0508 + 800, K0508 + 920 - K0509 + 145, K0509 + 297 - K0509 + 704

Physical Target
CW1 - Road Widening - 5.3634 Lane Km
CW2 - Construction of Drainage Structure along Road - 5243.44 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 2250 Square meters
ROW - ROW Acquisition - 13408.50 Square meters
June 6, 2024 2024 WIN4E03394 SR2024-01-004558 January 28, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0525 + 000- K0526 + 000, K0533 + 000- K0534 + 701;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
5.910 Lane Km;
Allocation:
Php 50,235,000"

"To:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0525 + 000- K0526 + 000, K0533 + 000- K0534 + 028.255;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
4.56451 Lane Km;
Allocation:
Php 50,235,000"
June 6, 2024 2024 WIN4E03397 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0470 + (-003) - K0470 + 000, K0470 + (-004) - K0470 + (-003), K0470 + 000 - K0471 + 000, K0473 + 353 - K0473 + 825, K0473 + 862 - K0474 + 153, K0476 + 000 - K0476 + 943;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
5.48 Lane Km;
Allocation:
Php 46,580,000"

"To:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0470 + (-003) - K0470 + 000, K0470 + (-004) - K0470 + (-003), K0470 + 000 - K0471 + 000, K0473 + 353 - K0473 + 825, K0473 + 862 - K0474 + 153, K0476 + 000 - K0476 + 452.455;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
4.49891 Lane Km;
Allocation:
Php 46,580,000"
June 6, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Construction of Nambucayan Highschool Flood Control along Mananig River, Nambucayan, Tabuk City, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
497 Lineal meters;
Allocation:
Php 36,000,000"

"To:
Construction of Nambucayan Highschool Flood Control along Mananig River, Nambucayan, Tabuk City, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
526 Lineal meters;
Allocation:
Php 36,000,000"
June 6, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Construction of Flood Control along Balani Creek Barangay Lucog, Tabuk City, Kalinga;
Type of Work:
Construction of Drainage Structure;
Physical Target:
82.05 Lineal meters;
Allocation:
Php 10,000,000"

"To:
Construction of Flood Control along Balani Creek Barangay Lucog, Tabuk City, Kalinga;
Type of Work:
Construction of Drainage Structure;
Physical Target:
320 Lineal meters;
Allocation:
Php 10,000,000"
June 6, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Construction of Kinama/ Bulbul- Panabang/ Macutay/ Liwan- Calaocan/ Calaminos RNSAT, in Barangays Kinama, Bulbul, Macutay and Liwan, Rizal, Kalinga;
Type of Work:
Construction of Concrete Road;
Physical Target:
0.2 Lane Km;
Allocation:
Php 8,000,000"

"To:
Construction of Kinama/ Bulbul- Panabang/ Macutay/ Liwan- Calaocan/ Calaminos RNSAT, in Barangays Kinama, Bulbul, Macutay and Liwan, Rizal, Kalinga;
Type of Work:
Construction of Concrete Road;
Physical Target:
1.3067 Lane Km;
Allocation:
Php 8,000,000"
June 6, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Construction of Mararut-Biga Sitio Allubaggan Flood Control along Biga River, Dupligan, Tanudan, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
110 Lineal meters;
Allocation:
Php 10,000,000"

"To:
Construction of Mararut-Biga Sitio Allubaggan Flood Control along Biga River, Dupligan, Tanudan, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
226 Lineal meters;
Allocation:
Php 10,000,000"
June 6, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Construction of Pantar Flood Control Bulanao, Tabuk City, Kalinga;
Type of Work:
Construction of Drainage Structure;
Physical Target:
41.025 Lineal meters;
Allocation:
Php 5,000,000"

"To:
Construction of Pantar Flood Control Bulanao, Tabuk City, Kalinga;
Type of Work:
Construction of Drainage Structure;
Physical Target:
48.68 Lineal meters;
Allocation:
Php 5,000,000"
June 6, 2024 2024 WIN4E03395 GAA 2024 January 1, 2024 Cordillera Administrative Region Apayao 1st District Engineering Office
"From:
Abbut-Conner Rd - K0548 + 913 - K0549 + 852;
Type of Work:
CW1: Off-Carriageway Improvement: Paving of Shoulders
CW2: Upgrading of Drainage Structure along Road;
Physical Target:
CW1: 3756 Square meters
CW2: 1878 Lineal meters;
Allocation:
Php 8,662,000"

"To:
Abbut-Conner Rd - K0548 + 796 - K0549 + 140;
Type of Work:
CW1: Off-Carriageway Improvement: Paving of Shoulders;
Physical Target:
CW1: 1555 Square meters;
Allocation:
Php 8,662,000"
June 6, 2024 2024 WIN4E03396 GAA 2024 January 1, 2024 Cordillera Administrative Region Mountain Province 2nd District Engineering Office
"From:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 1680 - Chainage 2130, Chainage 2586 - Chainage 3000;
Type of Work:
Paving of Unpaved Roads;
Physical Target:
0.864 Lane Km;
Allocation:
Php 9,029,000"

"To:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 563 - Chainage 763;
Type of Work:
CW1: Paving of Unpaved Roads
CW2: Construction of Road Slope Protection Structures;
Physical Target:
CW1: 0.400 Lane Km
CW2: 798 Square meters;
Allocation:
Php 9,029,000"
June 6, 2024 2024 300215104472000 FY 2024 GAA January 3, 2024 Region II Cagayan 3rd District Engineering Office
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Concreting of Brgy. Liwan Norte- San Antonio, Enrile- Ubong, Solana, Cagayan
June 6, 2024 2024 WIN4E03416 GAA 2024 January 1, 2024 Cordillera Administrative Region Mountain Province 2nd District Engineering Office
"From:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0440 + 968 - K0441 + 262;
Type of Work:
Reconstruction to Concrete Pavement;
Physical Target:
1.056 Lane Km;
Allocation:
Php 10,574,000"

"To:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0440 + 1002 - K0441 + 041;
Type of Work:
CW1: Reconstruction of Concrete Pavement
CW2: Construction of Road Slope Protection Structures;
Physical Target:
CW1: 0.546 Lane Km
CW2: 540 Square meters;
Allocation:
Php 10,574,000"
June 5, 2024 2024 WIN4XY00238 GAA 2024 December 29, 2023 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Primary Roads

AS PER GAA/ORIGINAL:

Ormoc-Baybay-Southern Leyte Bdry Rd - K1053 + 114 - K1053 + 168, K1055 + 080 - K1055 + 693, K1055 + 772 - K1056 + 070, K1057 + 708 - K1058 + 100

Physical Target: Allocation:

CW1-Road Widening: 2.508 Lane Km P 42.979860 M

EAO P 0.877140 M

Total P 43.857 M

AS MODIFIED:

Ormoc-Baybay Southern Leyte Bdry. Road - K1053+111-K1053+165 (R), K1055+107-K1055+684, K1055+768-K1056+052, K1056+052-K1056+070 (R), K1057+708-K1057+815 (L), K1057+815-K1057+945

Physical Target: Allocation:

CW1-Road Widening: 2.087 Lane Km P 27.54841134 M

CW2- Construction of Road Slope Protection P 9.52463802 M
Structure: 2,084 Square meters:

CW3-Construction of Drainage Structure P 5.90681064 M
along Road: 552 Lineal meters

EAO P 0.877140 M

Total P 43.857 M
June 5, 2024 2024 GAA 2024 January 23, 2024 Region VIII Leyte 4th District Engineering Office
Convergence and Special Support Program

Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services

AS PER GAA/ORIGINAL:

Rehabilitation (Completion) of Multi-Purpose Building, Barangay Guiana II, Palompon, Leyte

Physical Target: Allocation:

CW1-Construction of Multi Purpose Building P 12.341340 M
: 1.00 Number of Building

EAO P 0.124660 M

Total P 12.466 M

AS MODIFIED:

Rehabilitation (Completion) of Multi-Purpose Building, Barangay Guiwan II, Palompon, Leyte

Physical Target: Allocation:

CW1-Construction of Multi Purpose Building P 12.341340 M
: 1.00 Number of Building

EAO P 0.124660 M

Total P 12.466 M
June 5, 2024 2024 310201101249000 GAA 2024 January 3, 2024 Region II Regional Office II
FROM:

Network Development - Road Widening - Primary Roads - Cagayan Valley Rd - K0529 + 809 - K0530 + 864, K0535 + 325 - K0536 + 521


TO:

Network Development - Road Widening - Primary Roads - Cagayan Valley Rd - K0529 + 809 - K0530 + 811, K0535 + 325 - K0535 + 400
June 5, 2024 2024 310110100455000 GAA 2024 January 3, 2024 Region II Regional Office II
FROM:

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads - Daang Maharlika (LZ) - K0325 + 000 - K0326 + 537

TO

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads - Daang Maharlika (LZ) - K0325 + 040 - K0326 + 227.77
June 5, 2024 2024 310207100305000 GAA 2024 January 3, 2024 Region II Regional Office II
FROM:

Network Development - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0382 + 961 - K0382 + 973, K0382 + 989 - K0383 + 003, K0383 + 005 -
K0383 + 162, K0385 + 049 - K0385 + 098, K0385 + 120 - K0385 + 220, K0386 + 000 - K0386 + 167, K0386 + 291 - K0386 + 292, K0386 + 331 - K0386 + 374, K0389 + 000 - K0389 + 153, K0391
+ 271 - K0391 + 343, K0391 + 371 - K0391 + 400, K0391 + 960 - K0392 + 080, K0392 + 859 - K0392 + 939

TO:

Network Development - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0392+261.00 - K0392+476.90
June 4, 2024 2024 FY 2024 GAA December 20, 2023 Region III Bataan 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads

Calaguiman Vicinal Rd - K0117+515 - K0118+759
June 4, 2024 2024 WIN4XY00229 FY 2024 GAA December 20, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Tulauc- Sto. Domingo Rd - K0061+158 - K0061+558
June 4, 2024 2024 FY 2024 GAA December 20, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Sn Simon - Baliwag Rd - K0069+000 - K0069+525
June 4, 2024 FY 2024 GAA P00800467MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Bansalan-Mt. Apo Natl Rd - K1602 + 754 - K1602 + 792, K1603 + 000 - K1603 + 102
Physical Target:
CW1: 1,400.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Road Slope Protection Structure)
EAO: P 700,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Bansalan-Mt. Apo Natl Rd - K1602 + 754 - K1602 + 792, K1603 + 000 - K1603 + 177
Physical Target:
CW1: 1,400.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Road Slope Protection Structure)
EAO: P 700,000.00
June 4, 2024 FY 2024 GAA P00802411MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Digos-Makar Rd - K1564 + (-495) - K1564 + 805
Physical Target:
CW1: 2.600 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Digos-Makar Rd - K1564 + 099 - K1565 + 246
Physical Target:
CW1: 6.184 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
June 4, 2024 CY 2024 WIN4XY00228 UACS No. 310106101076000 January 31, 2024 National Capital Region Quezon City 1st Engineering District Office
As per GAA/Original
UACS No. 310106101076000
Project ID.: P00805513LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Tertiary Roads
Corregidor St. (S05159LZ)-Chainage 140 – Chainage 272
Physical Target: CW1 = Reconstruction to Concrete Pavement = 1.320 lane km
Unit Cost (P’000) = P 18,560.61/lane km
Allocation = P 24,500,000.00
EAO = P 500,000.00
Total = P 25,000,000.00

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Tertiary Roads
Corregidor St. (S05159LZ)-Chainage 0 – Chainage 272
Physical Target: CW1 = Reconstruction to Concrete Pavement = 1.088 lane km
Unit Cost (P’000) = P 22,518.38/lane km
Allocation = P 24,500,000.00
EAO = P 500,000.00
Total = P 25,000,000.00
WIN4XY00228
June 4, 2024 CY 2024 UACS No. 310105101004000 January 31, 2024 National Capital Region Quezon City 1st Engineering District Office
As per GAA/Original
UACS No. 310105101004000
Project ID.: P00805507LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Roads
Commonwealth Avenue (S05453LZ)-K0020+(-357) – K0020+305
Physical Target: CW1 = Reconstruction to Concrete Pavement = 1.324 lane km
Unit Cost (P’000) = P 109,327.79/lane km
Allocation = P 144,750,000.00
EAO = P 5,250,000.00
Total = P 150,000,000.00

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Roads
Commonwealth Avenue (S05646LZ)-K0018 + (730) – K0017+550
Physical Target: CW1 = Reconstruction to Concrete Pavement = 5.456 lane km
Unit Cost (P’000) = P 26,530.42/lane km
Allocation = P 144,750,000.00
EAO = P 5,250,00.00
Total = P 150,000,000.0
June 4, 2024 FY 2024 GAA P00800185MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Saturnino R. Silva Rd - K1474 + 087 - K1474 + 537
Physical Target:
CW1: 0.900 lane km (Road Widening)
CW2: 0.900 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 44,000,000.00
CW1: P 23,160,000.00 (Road Widening)
CW2: P 19,300,000.00 (Reconstruction to Concrete Pavement)
EAO: P 1,540,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Saturnino R. Silva Rd - K1474 + 087 - K1474 + 657
Physical Target:
CW1: 1.140 lane km (Road Widening)
CW2: 1.140 lane km (Reconstruction to Concrete Pavement)
ROW: 7,980.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 44,000,000.00
CW1: P 20,800,141.00 (Road Widening)
CW2: P 19,659,859.00 (Reconstruction to Concrete Pavement)
ROW: P 2,000,000.00 (ROW Acquisition)
EAO: P 1,540,000.00
June 4, 2024 2024 FY 2024 GAA December 20, 2023 Region III Bulacan 1st District Engineering Office
Network Development Program - Off-Carriageway Improvement - Tertiary Roads

Baliwag-Bustos Rd - K0051+485 - K0051+1235
June 4, 2024 FY 2024 GAA P00803818MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1515 + 895 - K1517 + 487
Physical Target:
CW1: 3.184 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 800,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1515 + 895 - K1518 + 000
Physical Target:
CW1: 4.388 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 800,000.00
June 4, 2024 FY 2024 GAA P00803778MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Digos-Makar Rd - K1585 + 370 - K1586 + 879
Physical Target:
CW1: 6.000 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Digos-Makar Rd - K1581 + 011 - K1584 + 066
Physical Target:
CW1: 6.140 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
June 4, 2024 2024 WIN4E03388 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Surigao del Sur 1st District Engineering Office
UACS No. : 300215105140000
Project ID: P00835094MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of Coastal Road from Sitio Hinaplian Balete to Purok 2, Bayabas, Surigao de Sur

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 3.081 Lane Km

Allocation:
TOTAL: P 35,000,000
CW1: P 34,300,000
EAO: P 700,000

Unit Cost:
CW1: P 11,132,749.11/Lane Km

TO:

Construction of Coastal Road from Sitio Hinaplian Balete to Purok 2, Bayabas, Surigao de Sur

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure

Physical Target:
CW1- 1.692 Lane Km
CW2- 7478.640 Square meters

Allocation:
TOTAL: P 35,000,000
CW1: P 25,919,847.68
CW2: P8,380,152.32
EAO: P 700,000

Unit Cost:
CW1: P 15,319,058.91/Lane Km
CW2: P 1,120.55/Square meters

June 4, 2024 FY 2024 GAA P00801269MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Daang Maharlika (MN) - K1452 + 263 - K1452 + 654
Physical Target:
CW1: 1.176 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 24,338,000.00
CW1: P 23,486,170.00 (Reconstruction to Concrete Pavement)
EAO: P 851,830.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Daang Maharlika (MN) - K1449 + 882 - K1450 + 681, K1454 + 617 - K1454 + 730
Physical Target:
CW1: 1.560 lane km (Reconstruction to Concrete Pavement)
CW2: 0.678 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 24,338,000.00
CW1: P 14,185,703.00 (Reconstruction to Concrete Pavement)
CW1: P 9,300,467.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 851,830.00
June 4, 2024 FY 2024 P00820923MN SR2024-03-013796 March 20, 2024 Region XII Regional Office XII
Contract ID: 24M00219
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Project Name: Construction of River Bank Protection, Lusanes, Brgy. Sulit, Polomolok, South Cotabato
Amount: ₱ 125,000,000.00

Physical target:
From: 595.000 Lineal Meters
To: 745.000 Lineal Meters
June 4, 2024 FY 2024 P00801063MN GAA 2024 January 1, 2024 Region XII Regional Office XII


From: Marbel-Allah Valley-Cotabato Rd - K1768 + 743 - K1769 + 130
TOW: CW-1- Preventive Maintenance of Road: Asphalt Overlay: 2.436 lane-km

To: Marbel-Allah Valley-Cotabato Rd - K1768 + 743 - K1769 + 152
June 3, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0505 + 000 - K0505 + 719, K0506 + 293 - K0508 + 008;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
4.814 Lane Km;
Allocation:
Php 41,739,000"

"To:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0505 + 000 - K0505 + 719, K0506 + 293 - K0507 + 616.115;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
4.11423;
Allocation:
Php 41,739,000"
June 3, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Babalag West-Liwan West-Alibangbang Access Road connecting Enrile-Tabuk National Road and Alibangbang Access Road in support to Veggie Noodles/Chips Processing and Sugarcane Processing, Rizal, Kalinga;
Type of Work:
Construction of Concrete Road;
Physical Target:
1.2 Lane Km;
Allocation:
Php 20,000,000"

"To:
Babalag West-Liwan West-Alibangbang Access Road connecting Enrile-Tabuk National Road and Alibangbang Access Road in support to Veggie Noodles/Chips Processing and Sugarcane Processing, Rizal, Kalinga;
Type of Work:
CW1: Construction of Drainage Structure;
Physical Target:
2.08 Lane Km;
Allocation:
Php 20,000,000"

June 3, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Construction of Manuel S. Agyao Boulevard-Ileb junc. -Dilag-San Julian-Balong-Tuao Circumferential Road;
Type of Work:
Construction of Concrete Road;
Physical Target:
0.522 Lane Km;
Allocation:
Php 30,000,000"

"To:
Construction of Manuel S. Agyao Boulevard-Ileb junc. -Dilag-San Julian-Balong-Tuao Circumferential Road;
Type of Work:
Construction of Concrete Road;
Physical Target:
4 Lane Km;
Allocation:
Php 30,000,000"
June 3, 2024 2024 SR2024-01-004552 January 29, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Manuel S. Agyao Boulevard - K0502 + 022 - K0503 + 140, K0506 + 000 - K0506 + 846, K0510 + 800 - K0512 + 444;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
7.252 Lane Km;
Allocation:
Php 78,132,000"

"To:
Manuel S. Agyao Boulevard - K0502 + 022 - K0503 + 140, K0506 + 000 - K0506 + 846, K0510 + 800 - K0511 + 311;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
6.924 Lane Km;
Allocation:
Php 78,132,000"
June 3, 2024 2024 WIN4XY00231 SR2024-01-007913 January 31, 2024 Region VIII Regional Office VIII
Convergence and Special Support Program (CSSP)

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities


AS PER GAA/ORIGINAL:

Construction of Barangay Tebalawon to Barangay Tawagan, Arteche, Eastern Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 45.355 M
:3.694 Lane Km

EAO P 1.645M

Total P 47.00 M

AS MODIFIED:

Construction of Barangay Tebalawon to Barangay Tawagan, Arteche, Eastern Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 24.49412523 M
:1.440060Lane Km

CW2-Construction of Road Slope Protection P 10.53578141 M
Structure: 1,240.69 Square meters

CW3-Construction of Drainage Structure P 10.32509336 M
along Road: 1,440.060 Lineal meters

EAO P 1.645M

Total P 47.00 M
June 3, 2024 2024 WIN4XY00232 GAA 2024 January 1, 2024 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

AS PER GAA/ORIGINAL:

Palo-Carigara-Ormoc Rd - K0937 + 000 - K0938 + 076

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 26.924520 M
Asphalt Overlay : 4.324 Lane Km

EAO P 0.549480 M

Total P 27.474 M

AS MODIFIED:

Palo-Carigara-Ormoc Rd - K0937 + 231 - K0938 + 076

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 26.924520 M
Asphalt Overlay : 3.400 Lane Km

EAO P 0.549480 M

Total P 27.474 M
June 3, 2024 2024 GAA 2024 December 29, 2023 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads

AS PER GAA/ORIGINAL:

Tacloban-Baybay South Rd - K0992 + 207 - K0992 + 268, K0992 + 330 - K0992 + 334.5, K0992 + 334.5 - K0992 + 339, K0992 + 339 - K0992 + 348, K0992 + 470 - K0992 + 505.5, K0992 + 550 - K0992 + 559, K0992 + 998.5 - K0993 + 000

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 2.163840 M
: 0.203 Lane Km

EAO P 0.44160 M

Total P 2.208 M

AS MODIFIED:

Tacloban - Baybay South Rd. - K0992+214.60 - K0992+261.90, K0992+406.20 - K0992+415.7, K0992+420.20 - K0992+434, K0992+530 - K0992+545.80, K0992+545.80 - K0992+554.10, K0992+563 - K0992+571.30, K0992+580 - K0992+584.20, K0992+678 - K0992+709.20, K0992+837.25 - K0992+846.25, K0992+850.75 - K0992+855.25, K0992+914.68 - K0992+926.88, K0992+998.60 - K0993+000

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 2.163840 M
: 0.2331 Lane Km

EAO P 0.44160 M

Total P 2.208 M
June 3, 2024 2024 GAA 2024 December 29, 2023 Region VIII Leyte 5th District Engineering Office
Convergence and Special Support Program

Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of Road, Sitio Caraga, Barangay Libertad, Hilongos, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road P 4.950 M
: 0.500 Lane Km

EAO P 0.050 M

Total P 5.00 M

AS MODIFIED:

Construction of Road, Sitio Carnaga, Barangay Libertad, Hilongos, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road P 4.950 M
: 0.500 Lane Km

EAO P 0.050 M

Total P 5.00 M
June 3, 2024 FY 2024 GAA P00802413MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Digos-Makar Rd - K1569 + 215 - K1570 + 708
Physical Target:
CW1: 3.000 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Digos-Makar Rd - K1569 + 240 - K1570 + 263
Physical Target:
CW1: 6.180 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
June 3, 2024 FY 2024 GAA P00803777MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Cotabato Rd (Jct. Digos-Cotabato Sect) - K1585 + 700 - K1586 + 700
Physical Target:
CW1: 3.928 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 75,000,000.00
CW1: P 72,375,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,625,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Cotabato Rd (Jct. Digos-Cotabato Sect) - K1585 + 700 - K1586 + 945
Physical Target:
CW1: 4.908 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 75,000,000.00
CW1: P 72,375,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,625,000.00
June 3, 2024 FY 2024 GAA P00803822MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao de Oro 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd - K1434 + 018 - K1438 + 000 (Section 2)
Physical Target:
CW1: 7.912 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,250,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd - K1434 + 000 - K1438 + 002,
K1470 + 773 - K1473 + 000, K1477 + 000 - K1478 + 794 (Section 2)
Physical Target:
CW1: 18.805 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,250,000.00
June 3, 2024 FY 2024 GAA P00803791MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Asphalt Overlay - Davao-Cotabato Road, Davao del Sur
Physical Target:
CW1: 6.000 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 98,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Asphalt Overlay - Davao-Cotabato Road, Davao del Sur
Physical Target:
CW1: 6.560 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 98,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,000,000.00
June 3, 2024 FY 2024 GAA P00802409MN FY 2024 GAA RA 11975 January 1, 2023 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Cotabato Rd (Davao City-Jct. Digos Sect) - K1526 + 385 - K1527 + 714.50
Physical Target:
CW1: 2.633 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Cotabato Rd (Davao City-Jct. Digos Sect) - K1526 + 385 - K1527 + 418
Physical Target:
CW1: 6.120 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
June 3, 2024 FY 2024 GAA P00803805MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao de Oro 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Nabunturan-Maragusan Rd - K1466 + 025 - K1466 + 527,
K1466 + 539 - K1473 + 093, K1473 + 118 - K1473 + 587
Physical Target:
CW1: 15.050 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Nabunturan-Maragusan Rd - K1466 + 025 - K1466 + 527, K1466 + 539 - K1472 + 264
Physical Target:
CW1: 12.130 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
May 31, 2024 2024 300226111464000 FY 2024 GAA January 3, 2024 Region II Cagayan 3rd District Engineering Office
FROM:

Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building, Barangay Parug- Parug, Peñablanca, Cagayan-
Package 2

TO:

Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building, Barangay Parug- Parug, Solana, Cagayan-
Package 2
May 31, 2024 2024 310101101182000 FY 2024 GAA January 3, 2024 Region II Cagayan 3rd District Engineering Office
Asset Preservation - Preventive Maintenance - Primary Roads - Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0437 + (-055) - K0441 + 576, K0441 + 600 - K0444 + 214, K0444 + 315 - K0445 + 676
May 31, 2024 2024 310101101183000 FY 2024 GAA January 3, 2023 Region II Cagayan 3rd District Engineering Office

Asset Preservation - Preventive Maintenance - Primary Roads - Santiago - Tuguegarao Rd (S00724LZ) -K0434 + (-754) - K0436 + 971
May 30, 2024 FY 2024 P00800009MN SR2024-01-005237 January 30, 2024 Bangsamoro Autonomous Region in Muslim Mindanao Maguindanao 2nd District Engineering Office
Contract ID:
Amount: ₱120,000,000.00
From: Marbel-Allah Valley- Cotabato Rd- K1814 + 000 - K1815 + 833, K1817 + 940 - K1821 + 800

To: Marbel-Allah Valley- Cotabato Rd- K1814 + 000 - K1815 + 000, K1817 + 940 - K1821 + 682
May 30, 2024 FY 2024 P00800011MN SR2024-01-000917 January 26, 2024 Bangsamoro Autonomous Region in Muslim Mindanao Maguindanao 2nd District Engineering Office
Contract ID:
Amount: ₱ 74,351,000.00
From: Marbel-Allah Valley-Cotabato Rd- K1781+598 - K1784+495
To: Marbel-Allah Valley-Cotabato Rd- K1781+598 - K1784+200
May 29, 2024 FY 2024 P00837257MN GAA 2024 January 24, 2024 Region XII Saranggani District Engineering Office
Contract ID:
Amount: ₱ 40,000,000.00
From: Construction of Road, Alkikan-Datal Bila-Datal Batong Road, Malungon, Sarangani
CW-1- Construction of Concrete Road: 3.352 lane km

To: Construction of Road, Alkikan-Datal Bila-Datal Batong Road, Malungon, Sarangani
CW-1- Construction of Concrete Road: 4.149 lane km
May 29, 2024 2024 FY 2024 GAA December 20, 2023 Region III Zambales 2nd District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

Olongapo - Bugallon Rd - K0133+040, K0133+223.30, K0133+305.15, K0133+353.70, K0133+404.45, K0133+550, K0135+300, K0135+332, K0135+372.70
May 29, 2024 2024 WIN4XY00182 FY 2024 GAA December 20, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Sta. Ignacia- Gerona - Pura - Guimba Rd - K0150+176 - k0151+680
May 29, 2024 2024 WIN4XY00181 FY 2024 GAA December 20, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Capas - San Jose -Mayantoc - Malacampa Road, Tarlac - K0162+070, K0163+508 - K0006+460
May 29, 2024 2024 WIN4F07942 FY 2024 GAA November 20, 2023 Region III Tarlac District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings / Facilities to Support Social Services

Construction (Completion) of Multi-Purpose Building at Barangay San Jacinto, Victoria, Tarlac
May 29, 2024 2024 WIN4F07941 FY 2024 GAA December 20, 2023 Region III Tarlac District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings / Facilities to Support Social Services

Construction (Completion) of Multi-Purpose Building at Barangay Maluid, Victoria, Tarlac
May 29, 2024 2024 FY 2024 GAA December 20, 2023 Region III Tarlac 2nd District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Tarlac - Zambales Rd - K0117+780 - K0118+631, K0121+000 - K0121+636
May 29, 2024 2024 FY 2024 GAA December 20, 2023 Region III Zambales 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads

Olongapo - Bugallon Rd - K0233+000 - K0233+530, K0243+900- K0244+619, K0245+619 - K0246+950

May 29, 2024 2024 FY 2024 GAA December 20, 2023 Region III Zambales 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Amungan - Palauig - Banlog Rd - K0213+878 - K0215+551, K0216+532 - K0217+077, K0223+000 - K0223+550
May 29, 2024 2024 FY 2024 GAA November 20, 2023 Region III Zambales 2nd District Engineering Office
Network Development Program - Road Widening - Secondary Roads

Olongapo - Bugallon Rd - K0151+047 - K0151+069, K0151+131 - K0151+380
May 29, 2024 2024 310209100481000 FY 2024 GAA January 3, 2024 Region II Batanes District Engineering Office
FROM:

Network Development - Off-Carriageway Improvement - Tertiary Roads - Mayan-Mauyen Port Rd - K0001 + 273 - K0002 + 120

TO:

Network Development - Off-Carriageway Improvement - Tertiary Roads - Mayan-Mauyen Port Rd - K0001 + 176.70 - K0001 + 626
May 29, 2024 2024 310106101101000 FY 2024 GAA January 4, 2024 Region II Cagayan 3rd District Engineering Office
FROM:

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Peñablanca-Callao Cave Rd - K0481+166 - K0482+558

TO:

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Peñablanca-Callao Cave Rd - Peñablanca- Callao Cave Rd- K0480+500- K0481+076, K0481+180- K0481+360, K0481+423- K0481+765, K0481+887- K0482+292, K0482+342- K0482+558
May 29, 2024 2024 310110100499000 FY 2024 GAA January 3, 2024 Region II Cagayan 3rd District Engineering Office
FROM:

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads - Santiago-Tuguegarao Rd (Jct Kalinga-Tuguegarao Sect) - K0437 + 500 - K0438 + 000

TO:

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads - Santiago-Tuguegarao Rd (Jct Kalinga-Tuguegarao Sect) - K0437 + 440 – K0438 + 010
May 29, 2024 2024 310203100803000 FY 2024 GAA January 3, 2024 Region II Nueva Vizcaya District Engineering Office
FROM:

Network Development - Road Widening - Tertiary Roads - Bagabag Div Rd -K0284 + (-565) - K284 + (-134)


TO:

Network Development - Road Widening - Tertiary Roads - Bagabag Div Rd - K0284 + 205 – K0284 + 480, K0285 + 472 – K0286 + 000
May 29, 2024 FY 2024 P00803751MN GAA 2024 January 24, 2024 Region XII Saranggani District Engineering Office
Contract ID:
Amount: ₱ 35,000,000.00
From: Widening of Aquino Bridge (B01053MN) along Sarangani - Sultan Kudarat Coastal Road
CW-1- Widening of Bridge 280.795 square meter

To: Widening of Aquino Bridge (B01053MN) along Sarangani - Davao del Sur Coastal Road
CW-1- Widening of Bridge 280.795 square meter
May 28, 2024 CY 2024 SR2024-01-005842 January 30, 2024 National Capital Region South Manila District Engineering Office
As per GAA/Original
UACS No. 320101110325000
Project ID.: P00823255LZ
OO2: Protect Lives and Properties Against Major Floods
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement Of Laagus Nilad Pumping Station, Manila City Phase 2
Physical Target: CW1 = Construction of Flood Mitigation Facility = 1 Facility
Unit Cost (P’000) = P 96,500,000.00/no. of facility
Allocation = P 96,500,000.00
EAO = P 3,500,000.00
Total = P 100,000,000.00

As Modified
OO2: Protect Lives and Properties Against Major Floods
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement Of Lagusnilad Pumping Station, Manila City Phase 2
Physical Target: CW1 = Construction of Flood Mitigation Facility = 1 Facility
Unit Cost (P’000) = P 96,500,000.00/no. of facility
Allocation = P 96,500,000.00
EAO = P 3,500,000.00
Total = P 100,000,000.00
May 28, 2024 CY 2024 UACS No. 320101110324000 January 30, 2024 National Capital Region South Manila District Engineering Office
As per GAA/Original
UACS No. 320101110324000
Project ID.: P00823254LZ
OO2: Protect Lives and Properties Against Major Floods
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection at Baseco Compound, Port Area Manila, Sta. 00 + 294.50 to Sa. 0 + 589, Phase 2, Manila San Andres, Manila
Physical Target: CW1 = Construction of Slope Protection Structure = 3,534.00 Square meters
Unit Cost (P’000) = P 27,306.17/square meters
Allocation = P 96,500,000.00
EAO = P 3,500,000.00
Total = P 100,000,000.00

As Modified
OO2: Protect Lives and Properties Against Major Floods
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection at Baseco Compound, Port Area Manila, Sta. 0 + 294.50 to Sta. 0 + 589, Phase 2
Physical Target: CW1 = Construction of Slope Protection Structure = 3,534.00 Square meters
Unit Cost (P’000) = P 27,306.17/square meters
Allocation = P 96,500,000.00
EAO = P 3,500,000.00
Total = P 100,000,000.00
May 28, 2024 2024 FY 2024 GAA December 20, 2023 Region III Bataan 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Enrique A. Garcia Ave. (S01421LZ), K0124+242 - K0125+338, (S01422LZ), K0125+(-332) - K0125+764
May 28, 2024 2024 WIN4XY00203 FY 2024 GAA December 20, 2023 Region III Bataan 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Roman Expressway - K0122+1007 - K0123+249
May 28, 2024 2024 WIN4XY00205 FY 2024 GAA December 20, 2023 Region III Bataan 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Roman Expressway - K0120+688 - K0121+200, K0121+400 - K0121+855, K0122+946 - K0122+1007
May 28, 2024 2024 WIN4E03344 GAA 2024 January 1, 2024 Cordillera Administrative Region Baguio City District Engineering Office
"From:
Kennon Rd - K0241 + 328 - K0241 + 529, K0242 + 850 - K0242 + 890;
Type of Work:
CW1: Construction of Road Slope Protection Structure
CW2: Road Widening;
Physical Target:
CW1: 1978 Square meters
CW2: 0.442 Lane Km ;
Allocation:
Php 44,376,000"

"To:
Kennon Rd - K0241 + 007 - K0241 + 192, K0241 + 328 - K0241 + 476;
Type of Work:
CW1: Construction of Road Slope Protection Structure
CW2: Road Widening;
Physical Target:
CW1: 1487 Square meters
CW2: 0.319 Lane Km;
Allocation:
Php 44,376,000"
May 28, 2024 2024 FY 2024 GAA December 20, 2023 Region III Zambales 2nd District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

Olongapo-Bugallon Rd- K0144+200 - K0144+340, K0144+560 - K0145+380
May 28, 2024 FY 2024 GAA P00802412MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Digos-Makar Rd - K1565 + 636 - K1567 + 400
Physical Target:
CW1: 3.266 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Digos-Makar Rd - K1565 + 636 - K1566 + 561
Physical Target:
CW1: 5.580 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
May 27, 2024 2024 310104100638000 FY 2024 GAA January 3, 2024 Region II Regional Office II
FROM:

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Manila North Rd - K0680 + 000 - K0682 + 000, K0684 + 817 - K0685 + 000, K0685 + 000 - K0685 + 495

TO:

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Manila North Rd - K0680 + 000 - K0682 + 000, K0684 + 000 - K0684 + 740, K0684 + 817 - K0685 + 495
May 27, 2024 2024 310101101188000 FY 2024 GAA January 3, 2024 Region II Regional Office II
FROM:

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0366 + 000 - K0366 + 481


TO:

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0366 + 000 - K0366 + 337