September 4, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Catanduanes District Engineering Office |
Project ID : P00825144LZ
UACS No : 320102106473000
FROM :
ORGANIZATIONAL OUTCOME 2 - Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers - Construction of Flood Control Structure, Macutal River (Rizal Section), Barangay Rizal, Baras, Catanduanes
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 373 Lineal meters
TO :
ORGANIZATIONAL OUTCOME 2 - Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers - Construction of Flood Control Structure, Macutal River (Rizal Section), Barangay Rizal, Baras, Catanduanes
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 311 Lineal meters |
September 4, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00832416LZ
UACS No : 300214100757000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0500 + 210.00 - K0500 + 272.00, K0500 + 702.00 - K0501 + 313.00, K0501 + 313 - K0501 + 528.00 (L/S), ""501 + 600.00 - K0502 + 250.00, K0506 + 190.00 - K0506 + 961.00, K058 + 163.00 - K0508 + 382.00, K0483 + 000.00 - K0484 + 114.00, K0485 + 000.00 - K0485 + 959.00
Physical Target :
CW1 - Rehabilitation of Paved Road - 8.997 Lane Km
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0482 + 600 - K0482 + 800, K0485 + 680 - K0485 + 696, K0485 + 767 - K0485 + 804, K0485 + 884 - K0485 + 959, K0489 + 399 - K0489 + 500, K0489 + 800 - K0489 + 914, K0498 + 000 - K0498 + 602, K0501 + 280 - K0501 + 360, K0501 + 650 - K0502 + 738, K0504 + 370 - K0505 + 078, K0505 + 088 - K0505 + 419, K0506 + 392 - K0506 + 872
Physical Target :
CW1 - Rehabilitation of Paved Road - 9.872 Lane Km |
September 4, 2024 |
2024 |
WIN4XY00350 |
GAA 2024 |
January 19, 2024 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00837422LZ
UACS No : 300214100764000
FROM :
Convergence and Special Support Program - Special Road Fund = Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Masbate Cataingan - Placer Rd - K0006 + 060 - K0006 + 941
Physical Target :
CW1 - Rehabilitation of Paved Road - 3.524 Lane Km
TO
Convergence and Special Support Program - Special Road Fund = Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Masbate - Cataingan - Placer Rd - K0006 + 060 - K0007 + 141, K0016 + 443 - K0016 + 644
Physical Target :
CW1 - Rehabilitation of Paved Road - 2.494 Lane Km
CW2 - Construction of Drainage Structure along Road - 1172 Lineal meters
CW3 - Road Safety - Street Lightning - 81 Number of Units |
September 4, 2024 |
2024 |
WIN4XY00375 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800226LZ
UACS : 310201101262000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0373 + 910 - K0374 + 791, K0374 + 833 - K0375 + 712
Physical Target :
CW1 - Road Widening - 3.528 Lane Km
CW2 - Construction of Drainage Structure along Road - 2167 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 3469.19 Square meters
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0391 + 200 - K0392 + 301, K0392 + 323 - K0392 + 809
Physical Target :
CW1 - Road Widening - 3.12 Lane Km
CW2 - Construction of Drainage Structure along Road - 3120 Lineal meters |
September 4, 2024 |
2024 |
WIN4XY00378 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800227LZ
UACS : 310201101263000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0377 + 540 - K0377 + 756, K0384 + 1222 - K0385 + 012, K0386 + 239 - K0387 + 000, K0389 + 737 - K0389 + 876, K0391 + 000 - K0391 + 369
Physical Target :
CW1 - Road Widening - 3.102 Lane Km
CW2 - Construction of Drainage Structure along Road - 1809.76 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 4216.43 Square meters
ROW - ROW Acquisition - 31020 Square meters
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0384 + 1215 - K0385 + 012, K0386 + 239 - K0387 + 000, K389 + 737 - K0389 + 876, K0391 + 000 - K0391 + 200
Physical Target :
CW1 - Road Widening - 2.346 Lane Km
CW2 - Construction of Drainage Structure along Road - 2213.5 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 2512.09 Square meters
ROW - ROW Acquisition - 23460 Square Meters |
September 4, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800396LZ
UACS : 310207100320000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0604 + 452 - K0605 + 000, K0605 + 167 - K0605 + 211
Physical Target :
CW1 - Off-Carriageway Improvement - Paving of Shoulders - 945 Square meters
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0604 + 452 - K0605 + 000
Physical Target :
CW1 - Off-Carriageway Improvement - Paving of Shoulders - 788 Square meters
CW2 - Construction of Road Slope Protection Structure - 102.38 |
September 4, 2024 |
2024 |
P00834889MN |
SR2024-06-017216 |
June 14, 2024 |
Region X |
Regional Office X |
P00834889MN
300215104064000
CSSP:Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road and Bridge and Approaches (Jct. Bukidnon-Davao City Road, Brgy. Tawas- Sitio Balakbakan-Sitio Upper Narulasan-Sitio Lower Narulasan- Jct. (Sinuda - Omonay) Bypass Road, Kitaotao, Bukidnon (Package 1)
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1-9.694 Lane Km
Allocation:
Total: Php 130,000,000.00
CW1: Php 125,450,000.00
EAO: Php 4,550,000.00
TO:
Construction of Road (Jct. Bukidnon-Davao City Road, Brgy. Tawas- Sitio Balakbakan-Sitio Sumalil Road, Kitaotao, Bukidnon
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1-6.550 Lane Km
Allocation:
Total: Php 130,000,000.00
CW1: Php 125,450,000.00
EAO: Php 4,550,000.00 |
September 4, 2024 |
2024 |
P00834888MN |
SR2024-06-017206 |
June 14, 2024 |
Region X |
Regional Office X |
P00834888MN
300215104063000
CSSP:Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Jct. Sayre Highway (Jct. Bukidnon-Davao City Rd.- Cotabato Bdry) to Jct Sayre Highway Lourdes-Mc Arthur Road-Brgy. Kitaihon Road, Dangcagan, Bukidnon
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1-6.200 Lane Km
Allocation:
Total: Php 79,000,000.00
CW1: Php 76,235,000.00
EAO: Php 2,765,000.00
TO:
Construction of Jct. Sayre Highway (Jct. Bukidnon-Davao City Rd.- Cotabato Bdry) to Jct Sayre Highway Lourdes-Mc Arthur Road-Brgy. Kitaihon Road, Dangcagan, Bukidnon
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection
Physical Target:
CW1-4.00 Lane Km
CW2-1,680.00 Square meters
Allocation:
Total: Php 79,000,000.00
CW1: Php 68,148,174.47
CW2: Php 8,086,825.53
EAO: Php 2,765,000.00 |
September 4, 2024 |
2024 |
WIN4XY00377 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800399LZ
UACS : 310207100323000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0633 + 480 - K0633 + 480 - K0633 + 778, K0635 + 024 - K0635 + 884
Physical Target :
CW1 - Off-Carriageway Improvement - Paving of Shoulders - 4999.6 Square meters
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0633 + 480 - K0633 + 617, K0633 + 638 - K0633 + 778, K0633 + 820 - K0633 + 900, K0634 + 120 - K0634 + 471
Physical Target :
CW1 - Off-Carriageway Improvement - Paving of Shoulders - 2578.66 Square meters
CW2 - Construction of Drainage Structure along Road - 277 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 1143.69 |
September 4, 2024 |
2024 |
P00834900MN |
SR2024-07-018044 |
July 22, 2024 |
Region X |
Regional Office X |
P00834900MN
300215104075000
CSSP:Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Bridge including Approaches, Jct. Bukidnon Davao City Road-Palacapao-East Dalurong-West Dalurong-Sinaysayan Road (Crossing Rawari River, West Dalurong-Sinaysayan Section), Kitaotao, Bukidnon (Package 2)
Type of Work:
CW1- Construction of Concrete Bridge
CW2- Construction of Concrete Road
Physical Target:
CW1-572.400 Square meters
CW2-0.80 Lane Km
Allocation:
Total: Php 90,000,000.00
CW1: Php 69,480,000.00
CW2: Php 17,370,000.00
EAO: Php 3,150,000.00
TO:
Construction of Bridge including Approaches, Jct. Bukidnon Davao City Road-Palacapao-East Dalurong-West Dalurong-Sinaysayan Road (Crossing Rawari River, West Dalurong-Sinaysayan Section), Kitaotao, Bukidnon (Package 2)
Type of Work:
CW1- Construction of Concrete Bridge
Physical Target:
CW1-763.20 Square meters
Allocation:
Total: Php 90,000,000.00
CW1: Php 86,850,000.00
EAO: Php 3,150,000.00 |
September 4, 2024 |
2024 |
WIN4S03647 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
Asset Preservation – Preventive Maintenance – Tertiary Roads
AS PER GAA/ORIGINAL:
Burgos St - (S00031LT) Chainage 233 - Chainage 845
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 12.201 M
Asphalt Overlay: 2.448 Lane Km
EAO P .249 M
Total P 12.450 M
AS MODIFIED:
Burgos St - (S00031LT) Chainage 233 - Chainage 845
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 12.201 M
Asphalt Overlay: 1.224 Lane Km
EAO P .249 M
Total P 12.450 M
|
September 4, 2024 |
2024 |
P00835101MN |
SR2024-01-006005 |
January 30, 2024 |
Region X |
Regional Office X |
P00835101MN
300217100275000
CSSP:Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
FROM:
Construction of Road, Malaybalay City - Valencia City Bypass Link Road Package 1, Bukidnon
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1-14.914 Lane Km
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00
TO:
Construction of Road, Malaybalay City - Valencia City Bypass Link Road Package 1, Bukidnon
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1-8.00 Lane Km
CW2-8,484.79 Square meters
Allocation:
Total: Php 200,000,000.00
CW1: Php 146,750,311.28
CW2: Php 46,249,688.72
EAO: Php 7,000,000.00 |
September 4, 2024 |
2024 |
WIN4XY00368 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
OO2: Protect Lives and Properties
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Flood Control Structure along Tigbao River, Tacloban City
Physical Target: Allocation:
CW1- Construction of Flood Mitigation P 144.750 M
Structure: 1,074 Lineal Meters
EAO P 5.250 M
Total P 150.00 M
AS MODIFIED:
Construction of Flood Control Structure along Tigbao River, Tacloban City
Physical Target: Allocation:
CW1- Construction of Flood Mitigation P 144.750 M
Structure: 680 Lineal Meters
EAO P 5.250 M
Total P 150.00 M
|
September 4, 2024 |
2024 |
P00800317MN |
SR2024-01-004428 |
January 29, 2024 |
Region X |
Regional Office X |
P00800317MN
310205101268000
OO1:Network Development Program - Construction of Missing Links/ New Roads
FROM:
Tubod-Ganassi Road, Package 3, Lanao Del Norte
Type of Work:
CW1- Construction of Gravel Road
ROW- ROW Acquisition
Physical Target:
CW1-6.00 Lane Km
ROW-10,000.00 Square meters
Allocation:
Total: Php 122,492,000.00
CW1: Php 106,384,495.00
ROW: Php 11,820,285.00
EAO: Php 4,287,220.00
TO:
Tubod-Ganassi Road, Package 3, Lanao Del Norte
Type of Work:
CW1- Construction of Concrete Bridge
Physical Target:
CW1-1,144.80 Square meters
Allocation:
Total: Php 122,492,000.00
CW1: Php 118,204,780.00
EAO: Php 4,287,220.00 |
September 4, 2024 |
2024 |
WIN4XY00371 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
(SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities
AS PER GAA/ORIGINAL:
Construction of Road with Drainage, Purok 2, barangay 83-B, Cogon, San Jose, Tacloban City
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 19.6 M
1.00 Lane Km
EAO P .400 M
Total P 20.00 M
AS MODIFIED:
Construction of Road with Drainage, Purok 2, barangay 83-B, Cogon, San Jose, Tacloban City
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 3.31242646 M
0.510 Lane Km
CW2- Construction of Drainage Structure: P 16.28757354 M
715 Lineal Meters
EAO P .400 M
Total P 20.00 M
|
September 4, 2024 |
2024 |
WIN4XY00373 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
(SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities
AS PER GAA/ORIGINAL:
Rehabilitation of Road with Drainage, St. Francis Village 2, Tacloban City
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 4.9 M
0.213 Lane Km
EAO P .100 M
Total P 5.00 M
AS MODIFIED:
Rehabilitation of Road with Drainage, St. Francis Village 2, Tacloban City
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 1.25118460 M
0.160 Lane Km
CW2-Construction of Drainage Structure: P 3.64881540 M
158 Lineal Meters
EAO P .100 M
Total P 5.00 M
|
September 4, 2024 |
2024 |
WIN4F08139 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
(BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Rehabilitation of Road with Drainage, Tacloban North Resettlement, Greendale 1, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 49.50 M
3.75 Lane Km
EAO P .500 M
Total P 50.00 M
AS MODIFIED:
Rehabilitation of Road with Drainage, Tacloban North Resettlement, Greendale 1, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 9.49225583 M
1.495 Lane Km
CW2-Construction of Drainage Structure: P 40.00774417 M
1,350 Lineal Meters
EAO P .500 M
Total P 50.00 M
|
September 4, 2024 |
2024 |
WIN4XY00369 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
(BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Rehabilitation of Road with Drainage, Tacloban North Resettlement, Greendale 3, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 49.50 M
3.75 Lane Km
EAO P .500 M
Total P 50.00 M
AS MODIFIED:
Rehabilitation of Road with Drainage, Tacloban North Resettlement, Greendale 3, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 12.12191622 M
1.018 Lane Km
CW2-Construction of Drainage Structure: P 24.51115611 M
659 Lineal Meters
CW3-Construction of Road Slope Protection P 12.86692767 M
Structure: 100 Square Meters
EAO P .500 M
Total P 50.00 M
|
September 4, 2024 |
2024 |
WIN4S03643 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
(BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Rehabilitation of Road with Drainage, Tacloban North Resettlement, Guadalupe Heights 1, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 49.50 M
3.75 Lane Km
EAO P .500 M
Total P 50.00 M
AS MODIFIED:
Rehabilitation of Road with Drainage, Tacloban North Resettlement, Guadalupe Heights 1, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 13.86663107 M
2.283 Lane Km
CW2-Construction of Drainage Structure: P 35.63336893 M
1,490 Lineal Meters
EAO P .500 M
Total P 50.00 M
|
September 4, 2024 |
2024 |
WIN4XY00367 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
(BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Rehabilitation of Road with Drainage, Tacloban North Resettlement, Guadalupe Heights 2, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 49.50 M
3.75 Lane Km
EAO P .500 M
Total P 50.00 M
AS MODIFIED:
Rehabilitation of Road with Drainage, Tacloban North Resettlement, Guadalupe Heights 2, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 13.78269576 M
2.351 Lane Km
CW2-Construction of Drainage Structure: P 35.71730424 M
1,586 Lineal Meters
EAO P .500 M
Total P 50.00 M
|
September 3, 2024 |
FY 2024 GAA |
P00833130MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation/Application of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, and Pedestrian Island along Davao-Cotabato Rd (Davao City-Jct Digos Sect) (S00039MN) - K1516 + 632 - K1517 + 657, Talomo (Poblacion), Davao City
Physical Target:
CW1: 1,000.00 lineal meters (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 4,920,000.00
CW1: P 4,821,600.00 (Road Safety: Pavement Markings)
EAO: P 98,400.00
TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation/Application of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, and Pedestrian Island along Davao-Cotabato Rd (Davao City-Jct Digos Sect) (S00039MN) - K1512 + 223 - K1521 + 345, (S01455MN) Chainage 2488-3792, Talomo (Poblacion), Davao City
Physical Target:
CW1: 6,737.41 lineal meters (Road Safety: Pavement Markings)
CW2: 275.00 no. of road signs (Road Safety: Road Signs)
Allocation:
TOTAL: P 4,920,000.00
CW1: P 1,253,099.00 (Road Safety: Pavement Markings)
CW2: P 3,494,701.00 (Road Safety: Road Signs)
EAO: P 172,200.00 |
September 3, 2024 |
FY 2024 GAA |
WIN4E03649 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao de Oro 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1417 + 000 - K1419 + 835
Physical Target:
CW1: 5.546 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Reconstruction to Concrete Pavement)
EAO: P 5,250,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1414 + 267 - K1414 + 309,
K1414 + 837 - K1414 + 847, K1417 + 000 - K1522 + 204
Physical Target:
CW1: 10.385 lane km (Reconstruction to Concrete Pavement)
CW2: 1,700.00 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 117,276,389.00 (Reconstruction to Concrete Pavement)
CW2: P 27,473,611.00 (Construction of Drainage Structure along Road)
EAO: P 5,250,000.00 |
September 3, 2024 |
FY 2024 |
P00800366MN |
GAA 2024 |
January 1, 2024 |
Region XII |
Cotabato 2nd District Engineering Office |
From: Magpet-Nowa-Doroluman-Greenfield Rd –
K1632 + 080 - K1632 + 094
To: Magpet-Nowa-Doroluman-Greenfield Rd –
K1632 + 080 - K1632 + 094,
K1642 + 263 - K1642 + 277
Amount: ₱12,000,000.00 |
August 30, 2024 |
FY 2024 |
P00800267MN |
SR2024-01-000428 |
January 26, 2024 |
Region XII |
Regional Office XII |
From: Marbel-Makar Rd - K1688 + 370 - K1690 + 370
To: Marbel-Makar Rd - K1686 + 793 - K1690 + 800
Amount: 100,000,000.00 |
August 30, 2024 |
FY 2024 |
P00800505MN |
SR2024-01-004634 |
January 29, 2024 |
Region XII |
Regional Office XII |
From: General Santos City-T'Boli-Surallah Rd - (S01483MN) - K1686+701 - K1686+875
To: General Santos City-T'Boli-Surallah Rd - (S01483MN) - K1685 + 880 - K1685 + 950, K1685 + 910 - K1685 + 970, K1685 + 970 - K1686 + 040
Amount: 141,750,000.00 |
August 30, 2024 |
FY 2024 |
P00801203MN |
SR2024-01-004559 |
January 29, 2024 |
Region XII |
Regional Office XII |
From: Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1603 + 607 - K1605 + 863
To: Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1603+607 - K1605+863, K1623+389 - K1623+793, K1626+534 - K1626+854, K1628+400 - K1629+320, K1632+420 - K1633+393 |
August 30, 2024 |
FY 2024 |
P00800374MN |
SR2024-01-004667 |
January 29, 2024 |
Region XII |
Regional Office XII |
From: Marbel-Makar Rd - K1693 + 586 - K1695 + 596
To: Marbel-Makar Rd - K1692 + 000 - K1692 + 835, K1693 + 586 - K1693 + 827, K1694 + 414 - K1695 + 596 |
August 30, 2024 |
FY 2024 |
P00820925MN |
GAA 2024 |
January 1, 2024 |
Region XII |
Regional Office XII |
Improvement of Poblacion Alabel Drainage System, Alabel Sarangani Province
Amount: 80,000,000.00 |
August 28, 2024 |
2024 |
WIN4XY00343 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00801605LZ
UACS No: 310204102554000
FROM :
OO1 - Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Package 1, Camarines Sur
Physical Target :
CW1 - Construction of Viaduct - 7441.2 Square meters
CW1 - Construction of Asphalt Road - 4.183 Lane Km
TO :
OO1 - Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Package 1, Camarines Sur
Physical Target :
CW1 - Construction of Viaduct - 7441.2 Square meters
CW1 - Construction of Asphalt Road - 2.0917 Lane Km
|
August 28, 2024 |
2024 |
WIN4XY00344 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00802029LZ
UACS No : 310101101268000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0467 + 000 - K0467 + 541
Physical Target :
CW1 - Preventive Maintenance of Road : Asphalt Overlay - 2.164 Lane Km
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0467 + 000 - K0467 + 339.58
Physical Target :
CW1 - Preventive Maintenance of Road : Asphalt Overlay - 1.358 Lane Km |
August 28, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00805203LZ
UACS No : 3101081201874000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Catanduanes Cir Rd - K0156 + 550 - K0156 + 620
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 3500 Square meters
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Catanduanes Cir Rd - K0156 + 565 - K0156 + 680
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 3157.9 Square meters |
August 28, 2024 |
2024 |
WIN4XY00345 |
GAA 2024 |
January 19, 2024 |
Region V |
Albay 3rd Engineering Office |
Project ID : P00846111LZ
UACS No : 300225102074000
FROM :
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structure protecting Public Infrastructures/Facilities - Construction of Nasisi River Flood Mitigation Structure, Barangay Nabonoton, Ligao City, Albay
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 659.86 Lineal meters
TO :
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structure protecting Public Infrastructures/Facilities - Construction of Nasisi River Flood Mitigation Structure, Barangay Nabonton, Ligao City, Albay
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 659.86 Lineal meters |
August 28, 2024 |
2024 |
320102106233000 |
GAA 2024 |
January 3, 2024 |
Region II |
Isabela 3rd District Engineering Office |
FROM:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Magat River Flood Control Project, Barangay Ambatali (Sta. 0+000 - Sta. 1+500), Ramon, Isabela
TO:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Magat River Flood Control Project, Barangay Ambatali (Sta. 0+000 - Sta. 0+520.80), Ramon, Isabela |
August 28, 2024 |
2024 |
WIN4E03606 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310201101373000
Project ID: P00800153MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
FROM:
Daang Maharlika (Surigao-Agusan Sect) - K1183 + 843 - K1183 + 881, K1185 + 053 - K1185 + 154
Type of Work:
CW1: Road Widening
Physical Target:
CW1- 0.278 Lane Km
Allocation:
TOTAL: P 5,560,000
CW1: P 5,365,400
EAO: P 194,6000
Unit Cost:
CW1: P 19,300,000/Lane Km
TO:
Daang Maharlika (Surigao-Agusan Sect) - K1176 + 655 - K1176 + 750
Type of Work:
CW1: Road Widening
Physical Target:
CW1- 0.190 Lane Km
Allocation:
TOTAL: P 5,560,000
CW1: P 5,365,400
EAO: P 194,6000
Unit Cost:
CW1: P 28,328,947.37/Lane Km
|
August 28, 2024 |
2024 |
WIN4E03582 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 320102106736000
Project ID: P00821204MN
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
FROM:
Construction of Gibong River Bank Protection along Barangay La Suerte, Prosperidad, Agusan del Sur
Type of Work:
CW1: Construction of Flood Mitigation Structure
Physical Target:
CW1- 416.724 Lineal meters
Allocation:
TOTAL: P 60,000,000
CW1: P 57,900,000
EAO: P 2,100,000
Unit Cost:
CW1: P 138,940.88/Lineal meters
TO:
Construction of Gibong River Bank Protection along Barangay La Suerte, Prosperidad, Agusan del Sur
Type of Work:
CW1: Construction of Flood Mitigation Structure
Physical Target:
CW1- 91.600 Lineal meters
Allocation:
TOTAL: P 60,000,000
CW1: P 57,900,000
EAO: P 2,100,000
Unit Cost:
CW1: P 632,096.07/Lineal meters
|
August 28, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 300225102255000
Project ID: P00836196MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Riverbank Protection of Gibong River at Brgy. Ebro, San Francisco, Agusan del Sur
Type of Work:
CW1: Construction of Flood Mitigation Structure
Physical Target:
CW1- 138.908 Lineal meters
Allocation:
TOTAL: P 20,000,000
CW1: P 19,800,000
EAO: P 200,000
Unit Cost:
CW1: P 142,540.39/Lineal meters
TO:
Construction of Riverbank Protection of Gibong River at Brgy. Ebro, San Francisco, Agusan del Sur
Type of Work:
CW1: Construction of Flood Mitigation Structure
Physical Target:
CW1- 52 Lineal meters
Allocation:
TOTAL: P 20,000,000
CW1: P 19,800,000
EAO: P 200,000
Unit Cost:
CW1: P 380,769.23/Lineal meters
|
August 28, 2024 |
2024 |
WIN4E03581 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 320102107025000
Project ID: P00820426MN
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
FROM:
Construction of Bank Protection along Agusan River (Poblacion-Sibagat Section) Sibagat, Agusan del Sur
Type of Work:
CW1: Construction of Flood Mitigation Structure
Physical Target:
CW1- 242.547 Lineal meters
Allocation:
TOTAL: P 34,922,000
CW1: P 34,223,560
EAO: P 698,440
Unit Cost:
CW1: P 141,100.735/Lineal meters
TO:
Construction of Bank Protection along Agusan River (Poblacion-Sibagat Section) Sibagat, Agusan del Sur
Type of Work:
CW1: Construction of Flood Mitigation Structure
Physical Target:
CW1- 87.01 Lineal meters
Allocation:
TOTAL: P 34,922,000
CW1: P 34,223,560
EAO: P 698,440
Unit Cost:
CW1: P 393,329,0426/Lineal meters
|
August 28, 2024 |
2024 |
WIN4E03587 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Dinagat Islands District Engineering Office |
UACS No. : 310102101935000
Project ID: P00801071MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Preventive Maintenance - Secondary Roads
FROM:
Dinagat-Loreto Rd - K0018 + 552 - K0019 + 000
Type of Work:
CW1: Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 0.826 Lane Km
Allocation:
TOTAL: P 13,703,000
CW1: P 13,428,940
EAO: P 274,060,000
Unit Cost:
CW1: P 16,257,796.61/Lane Km
TO:
Dinagat-Loreto Rd - K0018 + 552 - K0019 + 000
Type of Work:
CW1: Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 0.826 Lane Km
Allocation:
TOTAL: P 13,703,000
CW1: P 13,428,940
EAO: P 274,060,000
Unit Cost:
CW1: P 16,257,796.61/Lane Km
|
August 28, 2024 |
2024 |
320102106901000 |
GAA 2024 |
January 3, 2024 |
Region II |
Isabela 3rd District Engineering Office |
FROM:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Ganano River Flood Control Project, Barangay Apanay (Sta 0 + 398 - Sta 0 + 796, Alicia, Isabela
TO:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Ganano River Flood Control Project, Barangay Apanay (Sta 0 + 000 - Sta 0 + 188.30), Alicia, Isabela |
August 28, 2024 |
2024 |
320102106143000 |
GAA 2024 |
January 3, 2024 |
Region II |
Isabela 3rd District Engineering Office |
FROM:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Project, Barangay Minanga Upstream, Sta.0+000 - Sta. 0+600, Naguillian, Isabela
TO:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Project, Barangay Minanga Upstream, Sta.0+000 - Sta. 0+398.30, Naguillian, Isabela |
August 28, 2024 |
2024 |
WIN4E03632 |
SR2024-01-003973 |
January 29, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Installation of Roadway Lighting Structures along Abatan - Mankayan - Cervantes Road K0334 + (-889) - K0355 + 467;
Type of Work:
Road Safety: Roadway Lighting;
Physical Target:
894 Number of Units;
Allocation:
Php 125,000,000"
"To:
Installation of Roadway Lighting Structures along Abatan - Mankayan - Cervantes Road K0334 + (-889) - K0347+000;
Type of Work:
Road Safety: Roadway Lighting;
Physical Target:
539 Number of Units;
Allocation:
Php 125,000,000"
|
August 28, 2024 |
2024 |
WIN4XW00132 |
SR2024-01-004588 |
January 29, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Malalao Nat'l RD (Agbannawag-Malalao-Bulo Sect) Road, K0514 + 000 -K0056 + 000, K0512 + 716 - K0513 + 000, K0516 + 415 - K0520 + 000, Tabuk City, Kalinga;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
27.214 Lane Km;
Allocation:
Php 150,000,000"
"To:
Malalao Nat'l RD (Agbannawag-Malalao-Bulo Sect) Road, K0514 + 000 -K0516 + 000, K0512 + 716 - K0513 + 000, K0516 + 415 - K0520 + 000, Tabuk City, Kalinga;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
8.03063 Lane Km;
Allocation:
Php 150,000,000"
|
August 28, 2024 |
2024 |
310205101188000 |
GAA 2024 |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Network Development - Construction of Missing Links/ New Roads - Sampaguita-Warat-La Suerte-Catarauan-Afusing Rd Phase II |
August 28, 2024 |
2024 |
WIN4XW00131 |
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Bulanao-Paracelis Rd, K0508 + 645 - K0513 + 1105;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
21.768 Lane Km;
Allocation:
Php 125,000,000"
"To:
Bulanao-Paracelis Rd, K0508 + 645 - K0513 + 1105;
Type of Work:
CW1: Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
6.93154 Lane Km;
Allocation:
Php 125,000,000"
|
August 28, 2024 |
2024 |
WIN4E03643 |
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect), K0512+000- K0513+398, K0514+000-K0515+000, K0515+265-K0518+000, Tabuk City, Kalinga;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
15.204 Lane Km;
Allocation:
Php 150,000,000"
"To:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect), K0512+000- K0513+398, K0514+000-K0515+000, K0515+265-K0518+000, Tabuk City, Kalinga;
Type of Work:
CW1: Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
8.13557 Lane Km;
Allocation:
Php 150,000,000"
|
August 28, 2024 |
2024 |
310106101031000 |
GAA 2024 |
January 3, 2024 |
Region II |
Cagayan 1st District Engineering Office |
FROM:
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Baybayog-Baggao-Dalin-Sta. Margarita Rd - K0519+330 - K0519+591, K0521+518 - K0521+803, K0522+469 - K0523+300 ,K0525+513 - K0525+720, K0533+222 - K0533+308, K0533+394 - K0533+508, K0541+123 - K0542+000, K0545+950 - K0548+000
TO:
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Baybayog-Baggao-Dalin-Sta. Margarita Rd - K0519+331 - K0519+600.5, K0521+381 - K0521+795, K0522+466.5 - K0523+322, K0531+375 - K0531+470, K0533+130 - K0533+290.46, K0533+376.14 - K0533+538.62, K0541+(-195.5) - K0541+1001.5, K0546+000 - K0547+1012.5 |
August 28, 2024 |
2024 |
310204102442000 |
GAA 2024 |
January 3, 2024 |
Region II |
Regional Office II |
Network Development - Construction of By-Pass and Diversion Roads - Ramon-Cordon-Diadi Bypass Road, Diadi, Nueva Vizcaya |
August 27, 2024 |
2024 |
WIN4F08105 |
SR2024-02-008173 |
February 1, 2024 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0702 + 483 - K0702 + 795, K0706 + 447 - K0706 + 504, K0707 + 108 - K0708 + 000, K0712 + 000 - K0712 + 050, K0718 + 637 - K0718 + 734, K0727 + (-355) - K0727 + 280, K0734 + 150 - K0734 + 558, K0734 + 595 - K0734 + 650, K0735 + 000 - K0735 + 526
Physical Target: Allocation:
CW1- Reconstruction to Concrete Pavement: P 76.578540 M
6.064 Lane Km
EAO P 2.777460 M
Total P 79.356 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0707 + 108 - K0707 + 808, K0734 + 137 - K0734 + 539, K0777 + 389 - K0778 + 000, K0781 + 240 - K0781 + 780
Physical Target: Allocation:
CW1- Reconstruction to Concrete Pavement: P 76.578540 M
4.516 Lane Km
EAO P 2.777460 M
Total P 79.356 M
|
August 22, 2024 |
FY 2024 GAA |
WIN4XW00118 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Rehabilitation of Davao-Cotabato Rd (Jct. Digos-Cotabato Sect) - K1576 + 768 - K1578 + 158
Physical Target:
CW1: 2.800 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Reconstruction to Concrete Pavement)
EAO: P 1,750,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Rehabilitation of Davao-Cotabato Rd (Jct. Digos-Cotabato Sect) - K1578 + 634 - K1578 + 929,
K1589 + 046 - K1589 + 096, K1590 + 000 - K1591 + 173, K1591 + 300 - K1591 + 522.50,
K1591 + 545 - K1591 + 600, K1591 + 654 - K1591 + 880
Physical Target:
CW1: 3.445 lane km (Reconstruction to Concrete Pavement)
CW2: 1.180 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 29,037,760.00 (Reconstruction to Concrete Pavement)
CW2: P 19,212,240.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00 |
August 22, 2024 |
FY 2024 GAA |
P00835786MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/Strategic Public Buildings/Facilities
Construction of Bank Protection Structure long Lasana River protecting Panabo City Coastal Road, Carmen
Physical Target:
CW1: 450.00 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Construction of Revetment)
EAO: P 5,250,000.00
TO: Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/Strategic Public Buildings/Facilities
Construction of Bank Protection Structure along Lasana River protecting Panabo City Coastal Road, Carmen
Physical Target:
CW1: 855.00 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Construction of Revetment)
EAO: P 5,250,000.00 |
August 21, 2024 |
FY 2024 GAA |
P00803806MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Preventive Maintenance of Road Asphalt Overlay with Road Safety Devices along Babak-Samal-Kaputian Road,
K1519 + 000 - K1522 + 000, Davao del Norte
Physical Target:
CW1: 6.558 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Preventive Maintenance of Road Asphalt Overlay with Road Safety Devices along Babak-Samal-Kaputian Road,
K1501 + 825 - K1504 + 140, Davao del Norte
Physical Target:
CW1: 6.852 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00 |
August 21, 2024 |
FY 2024 GAA |
WIN4XW00120 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Rehabilitation of Davao-Cotabato Rd (Jct. Digos-Cotabato Sect) - K1572 + 000 - K1573 + 400
Physical Target:
CW1: 2.810 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Reconstruction to Concrete Pavement)
EAO: P 1,750,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Rehabilitation of Davao-Cotabato Rd (Jct. Digos-Cotabato Sect) - K1578 + 339 - K1578 + 634,
K1583 + 237 - K1583 + 597, K1583 + 900 - K1584 + 058,
K1584 + 118 - K1584 + 763, K1588 + 009 - K1588 + 426
Physical Target:
CW1: 3.204 lane km (Reconstruction to Concrete Pavement)
CW2: 1.180 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 28,800,868.00 (Reconstruction to Concrete Pavement)
CW2: P 19,449,132.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00 |
August 16, 2024 |
2024 |
|
GAA FY 2024 |
January 15, 2024 |
Region VIII |
Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Basey-Marabut-Pinamitinan Rd - K0944 + 000 - K0945 + 000
Physical Target: Allocation:
CW1- Reconstruction to Concrete P 37.730 M
Pavement: 2.002 Lane Km
EAO P .770 M
Total P 38.50 M
AS MODIFIED:
Basey-Marabut-Pinamitinan Rd - K0947 + 240 - K0947 + 835, K0948 + 240 - K0948 + 1000
Physical Target: Allocation:
CW1- Reconstruction to Concrete P 37.730 M
Pavement: 2.71 Lane Km
EAO P .770 M
Total P 38.50 M
|
August 16, 2024 |
2024 |
|
SR2024-01-005072 |
January 30, 2024 |
Region VIII |
Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Basey-Marabut-Pinamitinan Rd - K0926 + 428 - K0927 + 700, K0928 + 524 - K0930 + 000
Physical Target: Allocation:
CW1- Reconstruction to Concrete P 53.075 M
Pavement: 5.36 Lane Km
EAO P 1.925 M
Total P 55.00 M
AS MODIFIED:
Basey-Marabut-Pinamitinan Rd – Basey-Marabut-Pinamitinan Rd - K0915 + 958 - K0916 + 020, K0916 + 580 - K0916 + 651, K0917 + 039 - K0917 + 055, K0917 + 384 - K0917 + 412, K0917 + 503 - K0917 + 512, K0917 + 538 - K0917 + 602, K0927 + 005 - K0927 + 180, K0927 + 220 - K0927 + 260, K0927 + 374 - K0927 + 460, K0927 + 620 - K0927 + 700, K0927 + 780 - K0928 + 400, K0928 + 420 - K0928 + 500, K0929 + 020 - K0929 + 414, K0929 + 420 - K0929 + 724, K0929 + 770 - K0929 + 994
Physical Target: Allocation:
CW1- Reconstruction to Concrete P 53.075 M
Pavement: 4.522 Lane Km
EAO P 1.925 M
Total P 55.00 M
|
August 16, 2024 |
2024 |
|
GAA FY 2024 |
January 15, 2024 |
Region VIII |
Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Sn Juanico-Basey-Sohoton Rd - K0916 + 000 - K0916 + 1009, K0914 + 000 - K0914 + 066
Physical Target: Allocation:
CW1- Reconstruction to Concrete P 34.30 M
Pavement: 2.15 Lane Km
EAO P .700 M
Total P 35.00 M
AS MODIFIED:
Sn Juanico-Basey-Sohoton Rd - K0913 + 480 - K0913 + 540, K0913 + 623 - K0913 + 663, K0913 + 740 - K0913 + 800, K0916 +180 - K0916 + 280, K0916 +360 - K0916 + 480, K0916 + 560 - K0916 + 951, K0917 + 849 - K0917 + 970, K0918 + 080 - K0918 + 340, K0918 + 420 - K0918 + 580, K0918 + 600 - K0918 + 620, K0918 + 640 - K0918 + 680, K0918 + 820 - K0918 + 860, K0918 + 940 - K0918 + 1013
Physical Target: Allocation:
CW1- Reconstruction to Concrete P 34.30 M
Pavement: 2.97 Lane Km
EAO P .700 M
Total P 35.00 M
|
August 16, 2024 |
2024 |
|
GAA FY 2024 |
January 15, 2024 |
Region VIII |
Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Basey-Marabut-Pinamitinan Rd - K0942 + 000 - K0943 + 000
Physical Target: Allocation:
CW1- Reconstruction to Concrete P 39.20 M
Pavement: 2.158 Lane Km
EAO P .800 M
Total P 40.00 M
AS MODIFIED:
Basey-Marabut-Pinamitinan Rd - K0936 + 803 - K0936 + 840, K0936 + 867 - K0936 + 1266, K0942 + 000 - K0942 + 634, K0946 + 078 - K0946 + 090, K0946 + 382 - K0946 + 434, K0947 +119 - K0947 + 240
Physical Target: Allocation:
CW1- Reconstruction to Concrete P 39.20 M
Pavement: 2.510 Lane Km
EAO P .800 M
Total P 40.00 M
|
August 16, 2024 |
2024 |
|
GAA FY 2024 |
January 15, 2024 |
Region VIII |
Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Basey-Marabut-Pinamitinan Rd - K0943 + 000 - K0944 + 000
Physical Target: Allocation:
CW1- Reconstruction to Concrete P 37.240 M
Pavement: 2.012 Lane Km
EAO P .760 M
Total P 38.00 M
AS MODIFIED:
Basey-Marabut-Pinamitinan Rd - K0932 + 028 - K0932 + 180, K0932 + 185 - K0932 + 286, K0932 + 317 - K0932 + 612, K0936 + 000 - K0936 + 803
Physical Target: Allocation:
CW1- Reconstruction to Concrete P 37.240 M
Pavement: 2.706 Lane Km
EAO P .760 M
Total P 38.00 M
|
August 16, 2024 |
2024 |
WIN4XY00354 |
SR2024-01-002132 |
January 24, 2024 |
Region VIII |
Leyte 1st District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Flood Control Structure along Binahaan River, Phase 2, barangay Balud to barangay Sta. Elena, Tanauan, Leyte
Physical Target: Allocation:
CW1- Construction of Flood Mitigation P 144.750 M
Structure: 1,068.952 Lineal Meters
EAO P 5.250 M
Total P 150.00 M
AS MODIFIED:
Construction of Flood Control Structure along Binahaan River, Phase 2, barangay Balud to barangay Sta. Elena, Tanauan, Leyte
Physical Target: Allocation:
CW1- Construction of Flood Mitigation P 144.750 M
Structure: 637.00 Lineal Meters
EAO P 5.250 M
Total P 150.00 M
|
August 16, 2024 |
2024 |
WIN4XY00355 |
SR2024-02-008114 |
February 1, 2024 |
Region VIII |
Regional Office VIII |
Convergence and Special Support Program (CSSP)
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Construction of Road, Sitio Kalawit - Barangay Cadian, Oras, Eastern Samar
Physical Target: Allocation:
CW1- Construction of Concrete P 168.875 M
Road: 3.439 Lane Km
EAO P 6.125 M
Total P 175.00 M
AS MODIFIED:
Construction of Road, Sitio Kalawit - Barangay Cadian, Oras, Eastern Samar
Physical Target: Allocation:
CW1- Construction of Concrete P 94.48471399 M
Road: 6.34 Lane Km
CW2- Construction of Road Slope Protection P 53.79930409 M
Structure: 31,891.80 Square Meters
CW3- Construction of Drainage Structure P 20.59098192 M
Along Road: 3,000 Lineal Meters
EAO P 6.125 M
Total P 175.00 M
|
August 16, 2024 |
2024 |
WIN4XY00358 |
SR2024-01-002141 |
January 27, 2024 |
Region VIII |
Leyte 1st District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Flood Control Structure along Calogcog River (Left Bank - Upstream), Brgy. Calogcog and Brgy. Atipolo, Tanauan, Leyte
Physical Target: Allocation:
CW1- Construction of Flood Mitigation P 144.750 M
Structure: 1,068.952 Lineal Meters
EAO P 5.520 M
Total P 150.00 M
AS MODIFIED:
Construction of Flood Control Structure along Calogcog River (Left Bank - Upstream), Brgy. Calogcog and Brgy. Atipolo, Tanauan, Leyte
Physical Target: Allocation:
CW1- Construction of Flood Mitigation P 144.750 M
Structure: 658.00 Lineal Meters
EAO P 5.520 M
Total P 150.00 M
|
August 16, 2024 |
2024 |
WIN4F08100 |
SR2024-02-008228 |
February 1, 2024 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) – K0908 + 605 – K0909 + 274
Physical Target: Allocation:
CW1- Construction of Drainage Structure P 26.502760 M
Along Road: 1,556 Lineal Meters
EAO P .961240 M
Total P 27.464 M
AS MODIFIED:
Daang Maharlika (LT) – K0908 + 605 – K0909 + 017
Physical Target: Allocation:
CW1- Construction of Drainage Structure P 26.502760 M
Along Road: 1,042 Lineal Meters
EAO P .961240 M
Total P 27.464 M
|
August 15, 2024 |
2024 |
WIN4XY00352 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Regional Office III |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
Construction of Dingalan-Doña Remedios Trinidad Road (Phase III), Aurora |
August 15, 2024 |
2024 |
WIN4XY00353 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Manila North Road - K0077+617 - K0078+990 |
August 15, 2024 |
2024 |
WIN4XY00356 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Manila North Rd - K0074+537 K0075+983, K0076+162 - K0076+374 |
August 15, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Manila North Road - K0069+410 - K0069+746, K0071+384 - K0071+614, K0074+351 - K0074+537, K0080+443.50 - K0080+837.60 |
August 15, 2024 |
FY 2024 |
P00820100MN |
GAA 2024 |
January 1, 2024 |
Region XII |
Cotabato 3rd District Engineering Office |
Construction of M'lang River Flood Control Project (Downstream of M'lang Bridge, Left Side), Barangay Poblacion A, M'lang, Cotabato
Amount: ₱ 132,000,000.00 |
August 15, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Manila North Road - K0078+990 - K0080+024 |
August 15, 2024 |
FY 2024 |
P00821224MN |
GAA 2024 |
January 1, 2024 |
Region XII |
Regional Office XII |
Construction of Riverbank Protection along Matampay River at Barangay Kabuntulan, Sultan Kudarat, Maguindanao del Norte
Amount: 50,000,000.00 |
August 15, 2024 |
2024 |
WIN4XY08080 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads
Sto. Tomas - Minalin Rd (Minalin-Macabebe Section) - K0064+748 - K0065+39350, K0065+740 - K0066+037.50 |
August 15, 2024 |
FY 2024 |
P00834938MN |
GAA 2024 |
January 1, 2024 |
Region XII |
Regional Office XII |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Buluan Bridge, Buluan, Maguindanao del Sur
Amount: ₱ 80,000,000.00
|
August 15, 2024 |
FY 2024 |
P00834939MN |
GAA 2024 |
January 1, 2024 |
Region XII |
Regional Office XII |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Kabulnan Bridge, Datu Hoffer Ampatuan, Maguindanao del Sur
Amount: ₱ 80,000,000.00 |
August 15, 2024 |
2024 |
WIN4XW00116 |
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Rizal Natl Rd (Liwan West-Babalag-Macutay Sect) - K0522 + (-569) - K0522 + 088;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
1.314 Lane Km;
Allocation:
Php 12,000,000"
"To:
Rizal Natl Rd (Liwan West-Babalag-Macutay Sect) - K0522 + (-569) - K0522 + (-092.871);
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
CW1: 0.96292 Lane Km;
Allocation:
Php 12,000,000"
|
August 15, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Construction of Pantar Road, Tabuk City, Kalinga;
Type of Work:
Construction of Concrete Road;
Physical Target:
0.087 Lane Km;
Allocation:
Php 5,000,000"
"To:
Construction of Pantar Road, Tabuk City, Kalinga;
Type of Work:
CW1: Construction of Concrete Road
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 0.552 Lane Km
CW2: 365 Square meters;
Allocation:
Php 5,000,000"
|
August 15, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Construction of Cudal River Flood Control Mitigation Structure along Magabangon Bridge, Sta.0+000 -Sta.0+500 (R/S Upstream) Sta.00+000-Sta.00+500(R/S), Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
820.497 Lineal meters;
Allocation:
Php 100,000,000"
"To:
Construction of Cudal River Flood Control Mitigation Structure along Magabangon Bridge, Sta.1+865 - Sta.2+228.33 (R/S Upstream), Sta. 0+915 - Sta. 1+833.87 (R/S), Sta. 1+862-Sta. 2+259.56 (L/S), Sta. 0+915 - Sta. 1+105 (L/S), Sta. 1+075 - Sta. 1+820 (L/S), Kalinga;
Type of Work:
CW1: Construction of Flood Mitigation Structure;
Physical Target:
2518.39 Lineal meters;
Allocation:
Php 100,000,000"
|
August 14, 2024 |
2024 |
WIN4E03606 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310201101373000
Project ID: P00800153MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
FROM:
Daang Maharlika (Surigao-Agusan Sect) - K1183 + 843 - K1183 + 881, K1185 + 053 - K1185 + 154
Type of Work:
CW1: Road Widening
Physical Target:
CW1- 0.278 Lane Km
Allocation:
TOTAL: P 5,560,000
CW1: P 5,365,400
EAO: P 194,6000
Unit Cost:
CW1: P 19,300,000/Lane Km
TO:
Daang Maharlika (Surigao-Agusan Sect) - K1176 + 655 - K1176 + 750
Type of Work:
CW1: Road Widening
Physical Target:
CW1- 0.190 Lane Km
Allocation:
TOTAL: P 5,560,000
CW1: P 5,365,400
EAO: P 194,6000
Unit Cost:
CW1: P 28,328,947.37/Lane Km
|
August 14, 2024 |
2024 |
WIN4E03580 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 320101112264000
Project ID: P00820210MN
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Andanan RIS Flood Control Structure, Bayugan City, Agusan del Sur
Type of Work:
CW1: Construction of Flood Mitigation Structure
Physical Target:
CW1- 208.362 Lineal meters
Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000,000
Unit Cost:
CW1: P 141,100.58/Lineal meters
TO:
Construction of Andanan RIS Flood Control Structure, Bayugan City, Agusan del Sur
Type of Work:
CW1: Construction of Flood Mitigation Structure
Physical Target:
CW1- 74.80 Lineal meters
Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000,000
Unit Cost:
CW1: P 393,048.13/Lineal meters
|
August 12, 2024 |
2024 |
WIN4E03633 |
SR2024-01-005298 |
January 30, 2024 |
Cordillera Administrative Region |
CAR - Regional Office |
"From:
Construction of Dalimuno, Bantay Flood Control Along Chico River (Sta. 1+160 - Sta. 2+110), Bantay, Tabuk City, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
869 Lineal meters;
Allocation:
Php 100,000,000"
"To:
Construction of Dalimuno, Bantay Flood Control along Chico River (Sta. 100+023 - Sta. 100+430) Bantay, Tabuk City, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
449 Lineal meters;
Allocation:
Php 100,000,000"
|
August 12, 2024 |
2024 |
WIN4XY00346 |
GAA FY 2024 |
January 31, 2024 |
Region VIII |
Samar 1st District Engineering Office |
Convergence and Special Support Program
SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Construction of Road, Brgy. San Agustin-Brgy. Hinogacan Road, Gandara, Samar
Physical Target: Allocation:
CW1- Construction of Gravel Road: P 20.7475 M
1.300 Lane Km
EAO P .7525 M
Total P 21.50 M
AS MODIFIED:
Construction of Road, Brgy. San Agustin-Brgy. Hinogacan Road, Gandara, Samar
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 17.28461259 M
1.258 Lane Km
CW2- Construction of Road Slope Protection: P 3.46288741 M
Structure: 1,736.00 Square Meters
EAO P .75250 M
Total P 21.50 M
|
August 10, 2024 |
2024 |
310204102804000 |
GAA 2024 |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Network Development - Construction of By-Pass and Diversion Roads - Solana Diversion Road Phase II, Solana, Cagayan |
August 9, 2024 |
2024 |
300215104469000 |
GAA 2024 |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road , Brgy. Sitio San Juan, Brgy. Villa Maria- Brgy. Batu, Enrile, Cagayan |
August 9, 2024 |
2024 |
300215104478000 |
GAA 2024 |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Bridge and Approaches, Brgy. Maguirig, Solana, Cagayan |
August 9, 2024 |
2024 |
310204102444000 |
GAA 2024 |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Network Development - Construction of By-Pass and Diversion Roads - Construction of Bypass/Diversion Road, Tuguegarao North Diversion Road |
August 9, 2024 |
2024 |
310203100761000 |
GAA 2024 |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
FROM:
Network Development - Road Widening - Tertiary Roads - Peñablanca-Callao Cave Rd - K0475 + (-582) - K0477 + 040
TO:
Network Development - Road Widening - Tertiary Roads - Peñablanca-Callao Cave Rd - K0475 + (-582) - K0476 + 220, K0476 + 220 - K0476 + 300 |
August 9, 2024 |
2024 |
310205101189000 |
GAA 2024 |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Network Development - Construction of Missing Links/ New Roads - Sampaguita-Warat-La Suerte-Catarauan-Afusing Rd Phase III |
August 9, 2024 |
2024 |
|
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Bridge – Widening of Permanent Bridges
AS PER GAA/ORIGINAL:
Apitong Br. (B00030LT) along Apitong – Paterno Rd
Physical Target: Allocation:
CW1- Widening of Bridge: P 19.6 M
24 Square Meters
EAO P .400 M
Total P 20.00 M
AS MODIFIED:
Apitong Br. (B00030LT) along Apitong – Paterno Rd
Physical Target: Allocation:
CW1- Widening of Bridge: P 19.6 M
123.84 Square Meters
EAO P .400 M
Total P 20.00 M
|
August 8, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Manuel S. Agyao Boulevard - K0496 + 501 - K0496 + 523, K0497 + 135 - K0497 + 469, K0497 + 497 - K0498 + 344, K0502 + 000 - K0503 + 104;
Type of Work:
Road Widening;
Physical Target:
4.566 Lane Km;
Allocation:
Php 74,648,000"
"To:
Manuel S. Agyao Boulevard - K0496 + 501 - K0496 + 638, K0497 + 135 - K0497 + 469, K0497 + 497 - K0498 + 344, K0502 + 000 - K0503 + 104;
Type of Work:
CW1: Road Widening
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 5.444 Lane Km
CW2: 2658 Square meters;
Allocation:
Php 74,648,000"
|
August 8, 2024 |
2024 |
WIN4E03592 |
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
"From:
Construction of Multi-Purpose Building, Barangay Payeo, Sagada, Mountain Province;
Type of Work:
Construction of Multi Purpose Building;
Physical Target:
1.0 Number of Building;
Allocation:
Php 5,000,000"
"To:
Construction of Multi-Purpose Building, Barangay Payeo, Besao, Mountain Province;
Type of Work:
Construction of Multi Purpose Building;
Physical Target:
1.0 Number of Building;
Allocation:
Php 5,000,000"
|
August 8, 2024 |
2024 |
WIN4E03627 |
SR2024-01-003964 |
January 1, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Installation of Road Safety Devices along Gov. Bado Dangwa (Palina-Poblacion Section) K0328+(-085)-K0338+731, Bakun, Benguet;
Type of Work:
Road Safety: Pavement Markings;
Physical Target:
11,442 Lineal meters;
Allocation:
Php 125,000,000"
"To:
Installation of Road Safety Devices along Gov. Bado Dangwa (Palina-Poblacion Section) K0328+(-085)-K0338+731, Bakun, Benguet;
Type of Work:
Road Safety: Roadway Lighting;
Physical Target:
536 Number of units;
Allocation:
Php 125,000,000"
|
August 8, 2024 |
2024 |
WIN4E03626 |
SR2024-01-003953 |
January 1, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Installation of Road Safety Devices along Abatan - Mankayan - Cervantes Road, K0334 + (-889) - K0353+2495 (S00387LZ);
Type of Work:
Road Safety: Pavement Markings;
Physical Target:
22,351 Lineal meters;
Allocation:
Php 100,000,000"
"To:
Installation of Road Safety Devices along Abatan - Mankayan - Cervantes Road, K0348 + 000 - K0351+000 (S00378LZ);
Type of Work:
Road Safety: Roadway Lighting;
Physical Target:
387 Number of Units;
Allocation:
Php 100,000,000"
|
August 8, 2024 |
2024 |
WIN4E03625 |
SR2024-01-003967 |
January 29, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Installation of Road Safety Devices along Abatan - Mankayan - Cervantes Road K0334 + (-889) - K0355 + 467, Mankayan, Benguet;
Type of Work:
Road Safety: Pavement Markings;
Physical Target:
22,351 Lineal meters;
Allocation:
Php 125,000,000"
"To:
Installation of Road Safety Devices along Abatan - Mankayan - Cervantes Road K0351+000 - K0353 + 2495, Mankayan, Benguet;
Type of Work:
Road Safety: Roadway Lighting;
Physical Target:
539 Number of units;
Allocation:
Php 125,000,000"
|
August 8, 2024 |
2024 |
WIN4E03607 |
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Manuel S. Agyao Boulevard - K0507 + 360 - K0507 + 737, K0510 + 015 - K0510 + 084;
Type of Work:
Road Widening;
Physical Target:
0.892 Lane Km;
Allocation:
Php 65,054,000"
"To:
Manuel S. Agyao Boulevard - K0507 + 360 - K0507 + 075;
Type of Work:
CW1: Road Widening
CW2: Construction of Drainage Structure along Road;
Physical Target:
CW1: 5.566 Lane Km
CW2: 1500 Lineal meters;
Allocation:
Php 65,054,000"
|
August 8, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Construction of Mallig River Flood Control Mitigation Structure along Cassag Bridge, Tabuk-Paracelis Mun. Baoundary (Tabuk Side), Sta.0+000 -Sta.0+930 (LS), Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
820.467 Lineal meters;
Allocation:
Php 100,000,000"
"To:
Construction of Mallig River Flood Control Mitigation Structure along Cassag Bridge, Tabuk-Paracelis Mun. Baoundary (Tabuk Side), Sta.0+000 -Sta.0+930 (LS), Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
930 Lineal meters;
Allocation:
Php 100,000,000"
|
August 8, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Tabuk-Banawe via Tanudan-Barlig Rd, Kalinga;
Type of Work:
Construction of Concrete Road;
Physical Target:
3.552 Lane Km;
Allocation:
Php 80,000,000"
"To:
Tabuk-Banawe via Tanudan-Barlig Rd, Kalinga;
Type of Work:
CW1: Construction of Gravel Road
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 5.2 Lane Km
CW2: 4566 Square meters;
Allocation:
Php 80,000,000"
|
August 8, 2024 |
2024 |
P00835023MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Misamis Occidental 1st District Engineering Office |
P00835023MN
300215105056000
Convergence and Special Support System - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
FROM:
Construction of Barangay Libertad Road, Sapang Dalaga, Misamis Occidental
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 2.50 Lane Km
Allocation:
CW1: Php 14,435,400.00
EAO: Php 736,500.00
TO:
Construction of Barangay Libertad Road, Sapang Dalaga, Misamis Occidental
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 1.40 Lane Km
CW2- 928.30 Square Meters
Allocation:
CW1: Php 26,594,164.94
CW2: Php 9,494,335.06
EAO: Php 736,500.00 |
August 8, 2024 |
2024 |
WIN4E03536 |
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Mountain Province 2nd District Engineering Office |
"From:
Construction of Drainage Structure, Barangay Alunogan, Natonin, Mountain Province;
Type of Work:
Construction of Drainage Structure;
Physical Target:
482.603 Lineal meters;
Allocation:
Php 5,000,000"
"To:
Construction of Drainage Structure, Barangay Alunogan, Natonin, Mountain Province;
Type of Work:
Construction of Drainage Structure;
Physical Target:
89 Linear Meters;
Allocation:
Php 5,000,000"
|
August 8, 2024 |
2024 |
WIN4E03598 |
SR2024-03-012867 |
March 5, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Construction of Conacon - Deckan - Payeo Road, Barangay Bedbed, Mankayan, Benguet;
Type of Work:
Construction of Gravel Road;
Physical Target:
16.938 Lane Km;
Allocation:
Php 153,000,000"
"To:
Construction of Conacon - Deckan - Payeo Road, Barangay Bedbed, Mankayan, Benguet;
Type of Work:
Construction of Gravel Road;
Physical Target:
8.154 Lane Km;
Allocation:
Php 153,000,000"
|
August 8, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Application of Pavement Markings along Baguio-Bontoc Road - K0262 + 000- K0263 + 183, Barangay Caponga, Tublay, Benguet;
Type of Work:
Road Safety: Pavement Markings;
Physical Target:
1200 Lineal meters;
Allocation:
Php 2,700,000"
"To:
Application of Pavement Markings along Baguio-Bontoc Road - K0262 + 000- K0265 + 353, Barangay Caponga, Tublay, Benguet;
Type of Work:
CW1: Road Safety: Pavement Markings
CW2: Road Safety: Guardrails;
Physical Target:
CW1: 3400 Lineal meters
CW2: 451 Lineal meters;
Allocation:
Php 2,700,000"
|
August 8, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
"From:
Construction of Flood Control Structure along Nayon River, Sta. 12+350 - Sta. 13+115 (Left Side), Nayon, Lamut, Ifugao;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
765 Lineal meters;
Allocation:
Php 50,000,000"
"To:
Construction of Flood Control Structure along Nayon River, Sta. 12+350 - Sta. 13+200, Nayon, Lamut, Ifugao;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
827 Lineal meters;
Allocation:
Php 50,000,000"
|
August 7, 2024 |
2024 |
WIN4XY00331 |
GAA 2024 |
January 19, 2024 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00800184LZ
UACS No : 310202101697000
FROM :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Masbate - Cataingan - Placer Rd - K0009 + 055 - K0009 + 159
Physical Target :
CW1 - Road Widening - 0.208 Lane Km
TO :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening Development - Road Widening - Secondary Roads - Masbate - Cataingan - Placer Rd - K0009 + 055 - K0009 + 076
Physical Target :
CW1 - Road Widening - 0.042 Lane Km
CW2 - Construction of Drainage Structure along Road - 42 Lineal meters |
August 7, 2024 |
2024 |
WIN4XY00330 |
GAA 2024 |
January 19, 2024 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00800186LZ
UACS No : 310202101699000
FROM :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Masbate - Cataingan - Placer Rd - K0009 + 264 - K0009 + 367
Physical Target :
CW1 - Road Widening - 0.103 Lane Km
TO :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Masbate - Cataingan - Placer Rd - K0009 + 091 - K0009 + 101.5
Physical Target :
CW1 - Road Widening - 0.021 Lane Km
CW2 - Construction of Drainage Structure along Road - 21 Linear meters |