July 9, 2025 |
2025 |
|
GAA 2025 |
January 20, 2025 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"Project ID: P00914946LZ
UACS: 310205101489000
FROM:
Project Name:
Tabuk-Banawe via Tanudan-Barlig Road, Kalinga
Type of Work:
CW1 - Road Widening
Physical Target:
CW1 - 5.2 Lane Km
Allocation:
Php 50,000,000
TO:
Project Name:
Tabuk-Banawe via Tanudan-Barlig Road, Kalinga
Type of Work:
CW1 - Construction of Gravel Road
Physical Target:
CW1 - 5.2 Lane Km
Allocation:
Php 50,000,000"
|
July 9, 2025 |
2025 |
|
SR2025-03-008310 |
March 12, 2025 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
"Project ID: P00915519LZ
UACS: 310105101276000
FROM:
Project Name:
Baguio-Bontoc Rd - K0254+400 - K0254+411, K0255+000 - K0255+380, K0256 + 951 - K0257 + 683
Type of Work:
CW1 - Reconstruction to Concrete Pavement
Physical Target:
CW1 - 2.938 Lane Km
Allocation:
Php 67,600,000
TO:
Project Name:
Baguio-Bontoc Rd - K0254+279 - K0255+250
Type of Work:
CW1 - Reconstruction to Concrete Pavement
Physical Target:
CW1 - 3.720 Lane Km
Allocation:
Php 67,600,000"
|
July 9, 2025 |
2025 |
P00909392MN |
GAA2025 |
January 3, 2025 |
Region X |
Camiguin District Engineering Office |
P00909392MN
310202102027000
OO1: Ensure Safe and Reliable National Road System, Network Development- Road Widening-Secondary Road
FROM:
Camiguin Circumferential Rd - K0005+585 - K0005+858
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 0.546 Lane Km
Allocation:
CW1: Php 6,727,700.00
EAO: Php 137,300.00
TO:
Camiguin Circumferential Rd - K0011+118.50 - K0011+344, K0011+344 - K0011+402
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 0.509 Lane Km
Allocation:
CW1: Php 6,727,700.00
EAO: Php 137,300.00 |
July 9, 2025 |
2025 |
P00901564MN |
GAA2025 |
January 1, 2025 |
Region X |
Lanao del Norte 1st District Engineering Office |
P00901564MN
310104100867000
OO1: Ensure Safe and Reliable National Road System, Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
FROM:
Linamon-Zamboanga Road (S00914MN), K1590+408 - K1591+611, K1591+631 - K1593+488, K1593+504-K1593+774, Lanao Del Norte
Type of Work:
CW1- Reconstruction to Concrete Pavement
Physical Target:
CW1- 6.672 Lane Km
Allocation:
CW1: Php 96,500,000.00
EAO: Php 3,500,000.00
TO:
Linamon-Zamboanga Road (S00914MN) - K1556+961 - K1557+000, K1558+464 - K1560+096, K1560+134 - K1561+014, K1590+408 - K1591+531, Lanao Del Norte
Type of Work:
CW1- Reconstruction to Concrete Pavement
CW2- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 5.188 Lane Km
CW2- 3.778 Lane Km
Allocation:
CW1: Php 57,859,832.70
CW2: Php 38,640,167.30
EAO: Php 3,500,000.00
|
July 9, 2025 |
2025 |
P00901565MN |
GAA2025 |
January 1, 2025 |
Region X |
Lanao del Norte 1st District Engineering Office |
P00800059MN
310202101759000
OO1: Ensure Safe and Reliable National Road System, Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
FROM:
Linamon-Zamboanga Road (S00914MN) K1588+285-K1590+000, Lanao Del Norte
Type of Work:
CW1- Reconstruction to Concrete Pavement
Physical Target:
CW1- 5.184 Lane Km
Allocation:
CW1: Php 96,500,000.00
EAO: Php 3,500,000.00
TO:
Linamon-Zamboanga Road (S00914MN) K1580+691 - K1580+896, K1580+910 - K1580+933, K1582+000 - K1582+386, K1582+441 - K1583+137, K1583+503 - K1583+655, K1583+788 - K1584+293, K1585+871 - K1586+000, K1588+225 - K1588+813, Lanao Del Norte
Type of Work:
CW1- Reconstruction to Concrete Pavement
CW2- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 4.284 Lane Km
CW2- 3.048 Lane Km
Allocation:
CW1: Php 64,315,125.47
CW2: Php 32,184,874.53
EAO: Php 3,500,000.00 |
July 9, 2025 |
2025 |
P00901423MN |
GAA2025 |
January 1, 2025 |
Region X |
Misamis Oriental 1st District Engineering Office |
P00901423MN
310101101761000
OO1: Ensure Safe and Reliable National Road System, Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Butuan City-Cagayan de Oro City-Iligan City Rd - K1309 + 420 - K1309 + 700
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 3.920 Lane Km
Allocation:
CW1: Php 96,500,000.00
EAO: Php 3,500,000.00
TO:
Butuan City-Cagayan de Oro City-Iligan City Rd - K1308 + 814 - K1311 + 395
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 8.496 Lane Km
Allocation:
CW1: Php 96,500,000.00
EAO: Php 3,500,000.00 |
July 9, 2025 |
2025 |
P00909288MN |
GAA2025 |
January 3, 2025 |
Region X |
Lanao del Norte 2nd District Engineering Office |
P00800059MN
310209100560000
OO1: Ensure Safe and Reliable National Road System, Network Development - Off-Carriageway Improvement - Tertiary Roads
FROM:
Dobleston-Butadon Rd - K2002 + 915 - K2003 + 408
Type of Work:
CW1- Off-Carriageway Improvement: Paving of Shoulders
Physical Target:
CW1- 2,036.00 Square Meters
Allocation:
CW1: Php 7,482,300.00
EAO: Php 152,700.00
TO:
Dobleston-Butadon Rd - K2002 + 860 - K2003 + 408
Type of Work:
CW1- Off-Carriageway Improvement: Paving of Shoulders
Physical Target:
CW1- 2,046.00 Square Meters
Allocation:
CW1: Php 7,482,300.00
EAO: Php 152,700.00 |
July 9, 2025 |
2025 |
P00909510MN |
GAA2025 |
January 3, 2025 |
Region X |
Camiguin District Engineering Office |
P00909510MN
31020210203000
OO1: Ensure Safe and Reliable National Road System, Network Development Program - Road Widening - Secondary Roads
FROM:
Camiguin Circumferential Rd – K0006+918.53-K0007+585,K0007+600-K0007+972
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 2.077 Lane Km
Allocation:
CW1: Php 26,647,960.00
EAO: Php 522,300.00
TO:
Camiguin Circumferential Rd – K0011+402 - K0011+857, K11+857 - K0011+883.50, K0027+320-K0027+473, K0027+473 - K0027+852
Type of Work:
CW1- Road Widening
CW2- Construction of Drainage Structure along Road
Physical Target:
CW1- 1.193 Lane Km
CW2- 929.50 Linear Meter
Allocation:
CW1: Php 13,847,464.81
CW2: Php 11,745,235.19
EAO: Php 522,300.00 |
July 8, 2025 |
2025 |
WIN5F08556 |
GAA 2025 |
January 11, 2025 |
Region V |
Sorsogon 2nd District Engineering Office |
UACS : 310203100906000
Project ID : P00915098LZ
FROM :
ORGANIZATIONA OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Roads - Jct Abuyog - Gubat - Ariman Rd - K0597 + 091 - K0598 + 507, K0598 + 685 - K0600 + 818, K0600 + 844 - K0601 + 164
Physical Target :
CW1 - Road Widening - 7.59 Lane Km
TO :
ORGANIZATIONA OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Roads - Jct Abuyog - Gubat - Ariman Rd - K0596 + 000 - K0596 + 326, K0596 + 351 - K0598 + 507, K0600 + 514 - K0600 + 744, K0601 + 105 - K0601 + 160
Physical Target :
CW1 - Road Widening - 5.45 Lane Km
CW2 - Construction of Road Slope Protection Structure - 7,392.50 sq.m. |
July 8, 2025 |
2025 |
|
GAA 2025 |
January 11, 2025 |
Region V |
Camarines Norte District Engineering Office |
UACS : 310102102166300
Project ID : P00917320LZ
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads - Talobatib - Jose Panganiban Pob- Port Rd - K0321 + 137 - 322 + 177, K0334 + 871 - K0335 + 326
Physical Target :
CW1 - Preventive Maintenance of Road - Asphalt Overlay - 2.976 Lane Km
TO
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads - Talobatib - Jose Panganiban Pob- Port Rd - K0321 + 137 - K0322 + 177, K0334 + 940 - K0335 + 318
Physical Target :
CW1 - Preventive Maintenance of Road - Asphalt Overlay - 2.822 Lane Km |
July 8, 2025 |
2025 |
WIN5XY00561 |
GAA 2025 |
January 11, 2025 |
Region V |
Regional Office V |
UACS : 300237100218000
Project ID : P00941108LZ
FROM :
CONVERGE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities - Construction of Road Dike Structure along Quirangay River, Package 1, Barangay Quirangay, Camalig, Albay
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 232.50 Lineal meters
TO :
CONVERGE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities - Construction of Road Dike Structure along Quirangay River, Package 1, Barangay Quirangay, Camalig, Albay
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 108.18 Lineal meters
Allocation :
70,000.000 |
July 8, 2025 |
2025 |
WIN5XY00523 |
GAA 2025 |
January 11, 2025 |
Region V |
Regional Office V |
UACS : 300214101572000
Project ID : P00938033LZ
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Installation/ Application of Road Safety Facilities along Maharlika Highway - K0513 + (-194) - K0524 + 555
Physical Target :
CW1 - Road Safety Pavement Markings - 11759 Lineal meters
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Installation/ Application of Road Safety Facilities along Maharlika Highway - K0514 + 440 - K0515 + 248, K0515 + 493 - K0516 + 005. K0519 + 000 - K0520 + 251, K0522 + 560 - K0522 + 860
Physical Target :
CW1 - Road Safety - Road Lighting - 149 Number of Units
Allocation : 30,000.00 |
July 8, 2025 |
2025 |
WIN5XY00517 |
GAA 2025 |
January 11, 2025 |
Region V |
Regional Office V |
UACS : 310204103052000
Project ID : P00917157LZ
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Camarines Sur - Albay Diversion Road, Camarines Sur
Physical Target :
CW1 - Construction of Concrete Road - 3.754 Lane Km
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Camarines Sur - Albay Diversion Road, Camarines Sur
Physical Target :
CW1 - Construction of Concrete Road - 1.02 Lane Km
CW2 - Reconstruction to Concrete Pavement - 1.556 Lane Km
CW3 - Construction of Road Slope Protection Struction - 2931.66 Square meters
Allocation :
75,000.000 |
July 8, 2025 |
FY 2025 |
P00910026MN |
SR2025-02-001685 |
February 3, 2025 |
Region XII |
Regional Office XII |
Contract ID: 25M00113
UACS: 310305102406000
Amount: ₱ 37,200,000.00
OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
Project Name: Bugasan Br. (B02130MN) along Maharlika Highway (Cotabato-Lanao Rd)
Type of Work: Widening of Bridge
Physical Target:
From: 295.740 Square Meters
To: 572.400 Square Meters |
July 7, 2025 |
2025 |
|
SR2025-03-009507 |
March 17, 2025 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0797 + 660 - K0799 + 100
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 28.950 M
: 1.894 Lane Km
EAO P 1.050 M
Total P 30.00 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0790 + 200 - K0791 + 322
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 28.950 M
: 2.22 Lane Km
EAO P 1.050 M
Total P 30.00 M
|
July 7, 2025 |
2025 |
P00909520MN |
SR2025-02-001074 |
February 1, 2025 |
Region X |
Regional Office X |
P00909520MN
310103101893000
OO1:Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
FROM:
Jct SH Aglayan-Zamboanguita Rd - K1544 + 119 - K1549 + 109, K1554 + 462 - K1555 + 000, K1556 + 000 - K1557 + 029, K1564 + 146 - K1565 + 000, K1569 + 187 - K1570 + 000
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-17.396 Lane Km
Allocation:
Total: Php 164,300,000.00
CW1: Php 158,549,500.00
EAO: Php 5,750,500.00
TO:
Jct SH Aglayan-Zamboanguita Rd - K1544 + 119 - K1549 + 109, K1554 + 462 - K1555 + 000, K1556 + 000 - K1557 + 029, K1564 + 146 - K1564 + 841.53
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-14.527 Lane Km
Allocation:
Total: Php 164,300,000.00
CW1: Php 158,549,500.00
EAO: Php 5,750,500.00 |
July 7, 2025 |
2025 |
P00910049MN |
SR2025-02-001135 |
February 1, 2025 |
Region X |
Regional Office X |
P00910049MN
310204103126000
OO1:Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
FROM:
Sayre Highway Parallel Road II (Manolo Fortich-Valencia City Section) , Package 42, Bukidnon
Type of Work:
CW1-Construction of Concrete Road
Physical Target:
CW1-10.631 Lane Km
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00
TO:
Sayre Highway Parallel Road II (Manolo Fortich-Valencia City Section) , Package 42, Bukidnon
Type of Work:
CW1-Construction of Gravel Road
Physical Target:
CW1-18.520 Lane Km
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00 |
July 7, 2025 |
2025 |
P00910175MN |
SR2025-02-001099 |
February 1, 2025 |
Region X |
Regional Office X |
P00910175MN
310204102711000
OO1:Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
FROM:
Talakag Bypass Road, Bukidnon
Type of Work:
CW1-Off-Carriageway Improvement: Paving of Shoulders
CW2-Construction of Drainage Structure along Road
Physical Target:
CW1-6,511.628 Square meters
CW2-11,059.155 Square meters
Allocation:
Total: Php 65,000,000.00
CW1: Php 33,775,000.00
CW2: Php 28,950,000.00
EAO: Php 2,275,000.00
TO:
Talakag Bypass Road, Bukidnon
Type of Work:
CW1-Preventive Maintenance of Road : Asphalt Overlay
Physical Target:
CW1-5.708 Lane Km
Total: Php 65,000,000.00
CW1: Php 62,725,000.00
EAO: Php 2,275,000.00 |
July 3, 2025 |
2025 |
WIn5XY00547 |
FY2025 GAA |
December 21, 2024 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Jose Abad Santos Ave (JASA) - K0097+(-062) - K0097+(-044), K0097+792 - K0097+956 |
July 2, 2025 |
2025 |
WIN5XY00552 |
GAA FY 2025 |
January 1, 2025 |
Region VIII |
Leyte 5th District Engineering Office |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
AS PER GAA/ORIGINAL:
Ormoc-Baybay-Southern Leyte Bdry Rd - K1116 + 859 - K1118 + 326, K1119 + 447 - K1120 + 852, K1120 + 871 - K1121 + 500
Physical Target: Allocation:
CW1- Road Widening P 77.2 M
7.086 Lane Km
EAO P 2.8 M
Total P 80.00 M
AS MODIFIED:
Ormoc-Baybay-Southern Leyte Bdry Rd – K1116 + 859 - K1118 + 313, K1119 + 447 - K1120 + 731
Physical Target: Allocation:
CW1- Road Widening P 60.713102395 M
5.542 Lane Km
CW2- Construction of Road Slope Protection P 16.486897605 M
Structure: 3,102 Square meters
EAO P 2.8 M
Total P 80.00 M
|
July 2, 2025 |
2025 |
WIN5XY00553 |
SARO-BMB-A-25-0008176 |
March 27, 2025 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310201101685000
Project ID: P00906255VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development – Road Widening – Primary Roads
Iloilo-Capiz Rd (New Route) - K0089+531 - K0089+653, K0089+671 - K0089+707, K0089+880 - K0089+913, K0090+451 - K0090+500, K0093 + 425 - K0093+660
CW1- Road Widening: 10.140 lane km – 17,640.00
CW2-Construction of Road Slope Protection Structure: 2,924.36 sq. m. – 18,774.84
EAO – 743.16
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development – Road Widening – Primary Roads
Iloilo-Capiz Rd (New Route) - K0089+531 - K0089+653, K0089+671 - K0089+707, K0089+880 - K0089+913, K0090+451 - K0090+500, K0093 + 425 - K0093+660
CW1- Road Widening: 10.140 lane km – 13,924.46
CW2-Construction of Road Slope Protection Structure: 2,924.36 sq. m. – 18,774.84
ROW – ROW Acquisition: 895.84 sq.m. – 3,715.80
EAO – 743.16 |
July 2, 2025 |
2025 |
WIN5XY00555 |
SARO-BMB-A-25-0008122 |
April 14, 2025 |
Region VI |
Iloilo 1st District Engineering Office |
UACS No. 310111100781000
Project ID: P00907145VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Iloilo - Antique Rd - K0037 + 512- K0039 + 159
CW1- Construction of Drainage Structure along Road: 3,252 l.m. – 48,250.00
EAO – 1,750.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Iloilo - Antique Rd - K0037 + 512- K0039 + 159
CW1- Construction of Drainage Structure along Road: 1,626 l.m. – 46,250.00
ROW – ROW Acquisition: 1,333.33 sq.m. – 2,000.00
EAO – 1,750.00 |
July 1, 2025 |
FY 2025 GAA |
WIN5E03792 |
FY 2025 GAA RA 12116 |
January 1, 2025 |
Region XI |
Regional Office XI |
WIN5E03792 (Regional Office XI_09)
UACS No. 310101101794000
Project ID: P00909709MN
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Maharlika Highway - K1485 + 311.23 - K1485 + 975, K1490 + 000 - K1490 + 432,
K1490 + 654 - K1490 + 856, K1490 + 866 - K1491 + 082, K1491 + 102 - K1491 + 148,
K1491 + 176 - K1491 + 565, K1491 + 574 - K1491 + 806, K1491 + 811 - K1491 + 965
Physical Target:
CW1: 11.669 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 205,239,000.00
CW1: P 198,005,635.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 7,183,365.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Maharlika Highway - K1485 + 311 - K1486 + 100, K1487 + 205 - K1487 + 405, K1487 + 451 - K1487 + 481,
K1487 + 545 - K1487 + 708, K1490 + 000 - K1490 + 432, K1490 + 654 - K1490 + 856,
K1490 + 866 - K1491 + 965, K1494 + 392 - K1494 + 469, K1498 + 296 - K1498 + 529
Physical Target:
CW1: 10.020 lane km (Preventive Maintenance of Road: Asphalt Overlay)
CW2: 3.602 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 205,239,000.00
CW1: P 198,005,635.00 (Preventive Maintenance of Road: Asphalt Overlay)
CW2: P 45,050,938.00 (Reconstruction to Concrete Pavement)
EAO: P 7,183,365.00 |
July 1, 2025 |
2024 |
WIN4XY00444 |
GAA 2024 |
January 11, 2024 |
Region V |
Regional Office V |
UACS : 310204102058000
Project ID : P00801597LZ
FROM :
Organizational Outcome (OO1) - Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Daang Maharlika - Daet Mercedes Road Link, Camarines Norte
Physical Target :
CW1 - Construction of Concrete Road - 4 Lane Km
TO :
Organizational Outcome (OO1) - Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Daang Maharlika - Daet Mercedes Road Link, Camarines Norte
Physical Target :
CW1 - Construction of Concrete Road - 1.4908 Lane Km
Allication : 100,000,000.00 |
June 30, 2025 |
2025 |
WIN5F08600 |
SR2025-04-013519 |
April 24, 2025 |
National Capital Region |
South Manila District Engineering Office |
As per GAA/Original
UACS No. 300221107019000
Project ID.: P00948626LZ
Convergence and Special Support Program
Basic Infrastructure Program (BIP) Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation of Bridge Madel Street, Brgy. 875, Manila
Physical Target: CW1 = Rehabilitation/Major Repair of Bridge = 1 Bridge
Unit Cost (P’000) = P 9,900,000.00/no. of bridges
Allocation = P 9,900,000.00
EAO = P 100,000.00
Total = P 10,000,000.00
As Modified
Convergence and Special Support Program
Basic Infrastructure Program (BIP) Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation of Bridge Medel Street, Brgy. 875, Manila
Physical Target: CW1 = Rehabilitation/Major Repair of Bridge = 1 Bridge
Unit Cost (P’000) = P 9,900,000.00/no. of bridges
Allocation = P 9,900,000.00
EAO = P 100,000.00
Total = P 10,000,000.00 |
June 26, 2025 |
FY 2025 GAA |
P00901456MN |
FY 2025 GAA RA 12116 |
January 1, 2025 |
Region XI |
Regional Office XI |
P00901456MN (Regional Office XI_07)
UACS No. 310101101808000
Project ID: P00901456MN
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika, Davao de Oro K1278 + 50 - K1378 + 500, K1378 + 600 - K1378 + 700, K1378 + 700 - K1378 + 760,
K1379 + 200 - K1379 + 300 - K1379 + 450, K1379 + 850 - K1379 + 900
Physical Target:
CW1: 7.948 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,250,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika, Davao de Oro K1382 + 337 - K1383 + 942
Physical Target:
CW1: 9.660 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,250,000.00 |
June 26, 2025 |
FY 2025 GAA |
WIN5E03787 |
FY 2025 GAA RA 12116 |
January 1, 2025 |
Region XI |
Regional Office XI |
WIN5E03787 (Regional Office XI_08)
UACS No. 310207100391000
Project ID: P00909291MN
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Maharlika Highway (Digos-Makar Rd) - K1568 + 636 - K1569 + 039, K1570 + 042 - K1571 + 933, K1583 + 540 - K1584 + 266,
K1585 + 572 - K1585 + 597, K1585 + 845 - K1585 + 882, K1585 + 919 - K1586 + 107
Physical Target:
CW1: 12,786.00 square km (Off-Carriageway Improvement: Paving of Shoulders)
ROW: 31,965.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 20,308,000.00
CW1: P 18,655,380.00 (Off-Carriageway Improvement: Paving of Shoulders)
CW2: P 941,840.00 (ROW Acquisition)
EAO: P 710,780.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Maharlika Highway (Digos-Makar Rd) - K1568 + 636 - K1569 + 039,
K1570 + 042 - K1571 + 933, K1583 + 981 - K1584 + 266,
Physical Target:
CW1: 10,280.00 square km (Off-Carriageway Improvement: Paving of Shoulders)
ROW: 31,695.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 20,308,000.00
CW1: P 18,655,380.00 (Off-Carriageway Improvement: Paving of Shoulders)
CW2: P 941,840.00 (ROW Acquisition)
EAO: P 710,780.00 |
June 25, 2025 |
2025 |
WIN5E03788 |
GAA 2025 |
January 21, 2025 |
Cordillera Administrative Region |
Mountain Province 2nd District Engineering Office |
"Project ID: P00914690LZ
UACS: 310109000000000
FROM:
Project Name:
Mountain Province-Isabela Road- Chainage 4208 - Chainage 4216, Chainage 4250 - Chainage 4266, Chainage 8745 - Chainage 8754, Chainage 10895 - Chainage 10925, Chainage 11097 - Chainage 11110, Chainage 12321 - Chainage 12330, Chainage 13225 - Chainage 13262
Type of Work:
CW1 - Construction of Road Slope Protection Structures
Physical Target:
CW1 - 488.84 Square meters
Allocation:
Php 8,990,000
TO:
Project Name:
Mountain Province-Isabela Road- K0467+970 - K0467+997, K0470+337 - K0470+367, K0470+537 - K0470+552, K0472+242 - K0474+445 - K0474+475, K0474+677 - K0474+690, K0475+899 - K0475+919, K0476+795 - K0476+834
Type of Work:
CW1 - Construction of Road Slope Protection Structures
Physical Target:
CW1 - 742.5 Square meters
Allocation:
Php 8,990,000"
|
June 24, 2025 |
2025 |
WIN5XY00538 |
SR2025-03-009206 |
March 17, 2025 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0709 + 373 - K0710 + 840
Physical Target: Allocation:
CW1- Construction of Drainage Structure P 32.7135 M
along Road: 2,840 Lineal Meters
EAO P 1.1865 M
Total P 33.9 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0709 + 373 - K0709 + 911
Physical Target: Allocation:
CW1- Construction of Drainage Structure P 32.7135 M
along Road: 963 Lineal Meters
EAO P 1.1865 M
Total P 33.9 M
|
June 24, 2025 |
2025 |
WIN5XY00537 |
SR-2025-03-009666 |
March 18, 2025 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0768 + 000 - K0768 + 777
Physical Target: Allocation:
CW1- Road Widening P 23.287380 M
1.554 Lane Km
EAO P .844620 M
Total P 24.132 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0768 + 000 - K0768 + 512
Physical Target: Allocation:
CW1- Road Widening P 13.14107526 M
1.024 Lane Km
CW2- Construction of Road Slope Protection P 10.14630474 M
Structure: 934 Square meters
EAO P .844620 M
Total P 24.132 M
|
June 24, 2025 |
2025 |
WIN5XY00532 |
SR2025-03-009662 |
March 18, 2025 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0753 + 100 - K0753 + 284, K0757 + 000 - K0757 + 241
Physical Target: Allocation:
CW1- Road Widening P 13.756075 M
0.85 Lane Km
EAO P .498925 M
Total P 14.255 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0753 + 100 - K0753 + 284, K0757 + 000 - K0757 + 129
Physical Target: Allocation:
CW1- Road Widening P 8.17052369 M
0.626 Lane Km
CW2- Construction of Road Slope Protection P 5.58555131 M
Structure: 426 Square meters
EAO P .498925 M
Total P 14.255 M
|
June 23, 2025 |
2025 |
WIN5E03747 |
SARO-BMB-25-0008049 |
March 7, 2025 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
"Project ID: P00938052LZ
UACS: 300214101822000
FROM:
Project Name:
Installation/Application of Road Safety Facilities (Roadway Lighting) along Ayaga-Sta. Marcela-Flora-Lasam Rd - K0672 + (-945) - K0691+ 600
Type of Work:
CW1 - Road Safety: Roadway Lighting
Physical Target:
CW1- 390 Number of Units
Allocation:
Php 35,000,000
TO:
Project Name:
Installation/Application of Road Safety Facilities (Roadway Lighting) along Ayaga-Sta. Marcela-Flora-Lasam Rd - K0679+500 - K0686+875
Type of Work:
CW1 - Road Safety: Roadway Lighting
Physical Target:
CW1- 213 Number of Units
Allocation:
Php 35,000,000"
|
June 23, 2025 |
2025 |
WIN5E03745 |
SARO-BMB-25-0008049 |
March 7, 2025 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
"Project ID: P00938053LZ
UACS: 300214101823000
FROM:
Project Name:
Installation/Application of Road Safety Facilities (Roadway Lighting) along Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0640 + 000 - K0669 + 850
Type of Work:
CW1 - Road Safety: Roadway Lighting
Physical Target:
CW1 - 465 Number of Units
Allocation:
Php 40,000,000
TO:
Project Name:
Installation/Application of Road Safety Facilities (Roadway Lighting) along Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0669+850 - K0679+070
Type of Work:
CW1 - Road Safety: Roadway Lighting
Physical Target:
CW1 - 244 Number of Units
Allocation:
Php 40,000,000"
|
June 23, 2025 |
2025 |
|
GAA 2025 |
January 21, 2025 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
"Project ID: P00952137LZ
UACS: 300226118496000
FROM:
Project Name:
Construction of Multi-Purpose Building- Barangay Health Station, Barangay San Carlos/Marcela/Bagutong, Sta. Marcela/Flora, Apayao
Type of Work:
CW1 - Construction of Multi Purpose Building
Physical Target:
CW1 - 1 No. of Building
Allocation:
Php 8,000,000
TO:
Project Name:
Construction of Multi-Purpose Building- Barangay Health Station, Barangay San Carlos/Marcela/Bagutong, Sta. Marcela/Flora, Apayao
Type of Work:
CW1 - Construction of Multi Purpose Building
Physical Target:
CW1 - 3 No. of Buildings
Allocation:
Php 8,000,000"
|
June 19, 2025 |
2025 |
WIN5E03775 |
GAA 2025 |
January 20, 2025 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
"Project ID: P00915518LZ
UACS: 310104100888000
FROM:
Project Name:
Reconstruction to Concrete
Pavement - Baguio-Bauang Rd - K0291 + 150 - K0291 + 460
Type of Work:
CW1 - Reconstruction to Concrete Pavement
Physical Target:
CW1 - 0.620 Lane Km
Allocation:
Php 16,380,000
TO:
Project Name:
Reconstruction to Concrete
Pavement - Baguio-Bauang Rd - K0291 + 150 - K0291 + 480
Type of Work:
CW1 - Rehabilitation of Paved Road
Physical Target:
CW1 - 0.660 Lane Km
Allocation:
Php 16,380,000" |
June 19, 2025 |
2025 |
|
GAA 2025 |
January 20, 2025 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
"Project ID: P00914649LZ
UACS: 310111100801000
FROM:
Project Name:
Baguio-Bontoc Rd - K0257 + 512 - K0257 + 567, K0260 + 580 -K0261+572
Type of Work:
Construction of Drainage Structure along Road
Physical Target:
CW1 - 1091 Lineal meters
Allocation:
Php 19,000,000
TO:
Project Name:
Baguio-Bontoc Rd - K0257 + 500.00 - K0257 + 604.00, K0260 + 580 - K0260 + 853.25, K0260 + 894.89 - K0261 + 750.00
Type of Work:
CW1 - Construction of Drainage Structure along Road
Physical Target:
CW1 - 1760.29 Lineal meters
Allocation:
Php 19,000,000"
|
June 19, 2025 |
GAA 2025 |
P00909110MN |
GAA 2025 |
January 1, 2025 |
Region XII |
Cotabato 1st District Engineering Office |
Contract ID: 25MD0048
UACS: 310109101780000
Amount: ₱ 20,000,000.00
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Project Name:
From: Dualing-New Panay-Midsayap Rd - K1718 + 490 - K1718 + 540
To: Dualing-New Panay-Midsayap Rd - K1718 + 490.00 - K1718 + 540.50, K1714 + 072.20 – K1714 + 118.70
Type of Work: Construction of Road Slope Protection Structure
Physical Target:
From: 571.430 Square Meter
To: 1,429.86 Square Meter
|
June 19, 2025 |
2025 |
WIN5F08599 |
SR2025-02-003902 |
February 4, 2025 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 300105201538000
Project ID.: P00955008LZ
Local Program
Buildings and Other Structures - Multipurpose / Facilities - National Building Program
Construction (Completion) of National Labor Relations Commission (NLRC) Office Building,
Agham Road corner North Avenue, Quezon City
Physical Target: CW1 = Construction of Multipurpose Building = 1 bldg.
Unit Cost (P’000) = P 144,750,000.00/no. of bldgs..
Allocation = P 144,750,000.00
EAO = P 5,250,000.00
Total = P 150,000,000.00
As Modified
Local Program
Buildings and Other Structures - Multipurpose / Facilities - National Building Program
Construction of National Labor Relations Commission (NLRC) Office Building,
Senator Miriam P. Defensor-Santiago Avenue corner North Avenue, Quezon City
Physical Target: CW1 = Construction of Multipurpose Building = 1 bldg.
Unit Cost (P’000) = P 144,750,000.00/no. of bldgs..
Allocation = P 144,750,000.00
EAO = P 5,250,000.00
Total = P 150,000,000.00
WIN5F08599 |
June 19, 2025 |
GAA 2025 |
P00909108MN |
SR2025-02-000223 |
February 1, 2025 |
Region XII |
Cotabato 1st District Engineering Office |
Contract ID: 25MD0033
UACS: 310107100770000
Amount: ₱ 56,200,000.00
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Project Name:
From: Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1713 + 235 - K1713 + 355
To: Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1713 + 220.00 - K1713 + 325.00, K1682 + 370.00 - K1682 + 518.00
Type of Work: Construction of Road Slope Protection Structure
Physical target:
From: 2,248.00 Square Meter
To: 3,261.17 Square Meter
|
June 19, 2025 |
GAA 2025 |
P00935770MN |
GAA 2025 |
January 1, 2025 |
Region XII |
Cotabato 1st District Engineering Office |
Contract ID: 25MD0043
UACS: 300221109040000
Amount: ₱ 5,000,000.00
Convergence and Special Support Program: Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Project Name: Construction of Road Jct. Highway - Central Katingawan-San Isidro, Barangay Central Katingawan, Midsayap, North Cotabato
Type of Work: Construction of Concrete Road
Physical target:
From: 0.900 Lane Km
To: 0.736 Lane Km |
June 19, 2025 |
GAA 2025 |
P00937599MN |
SR2025-02-000338 |
February 1, 2025 |
Region XII |
Cotabato 1st District Engineering Office |
Contract ID:
UACS No.: 300204101669000
Amount: ₱ 70,000,000.00
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT)
Project Name: Jct. Davao-Cotabato (crossing Baguer)-Sitio Dalumangkom-Sitio Lampaki Road, Pigkawayan,North Cotabato
Type of Work/Physical Target:
From: CW1- Replacement of Bridge: 286.20 Square Meter
To: CW1- Construction of Concrete Bridge: 286.20 Square Meter, CW2- Construction of Concrete Road: 0.675 Lane Km
|
June 19, 2025 |
GAA 2025 |
P00909156MN |
SR2025-02-002539 |
February 3, 2025 |
Region XII |
Regional Office XII |
Contract ID: 25M00179
UACS: 310108102051000
Amount: ₱ 78,750,000.00
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Project Name:
From: General Santos City-T'Boli-Surallah Rd - K1681 + 969 - K1682 + 014
To: General Santos City-T'Boli-Surallah Rd - K1680 + 997 - K1681 + 030, K1681 + 050 - K1681 + 085, K1681 + 969 - K1682 + 014, K1681 + 986 - K1682 + 020
Type of Work: Construction of Road Slope Protection Structure
Physical target:
From: 3,150.00 Square meters
To: 2,120.00 Square meters
|
June 19, 2025 |
GAA 2025 |
P00909170MN |
SR2025-02-002496 |
February 3, 2025 |
Region XII |
Regional Office XII |
Contract ID: 25M00027
UACS: 310108102053000
Amount: ₱ 200,000,000.00
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Project Name:
From: General Santos City-T'Boli-Surallah Rd - (S01483MN) Chainage 17668 - Chainage 17683, Chainage 18484 - Chainage 18514, Chainage 18550 - Chainage 18595, Chainage 18692 - Chainage 18710
To: General Santos City-T'Boli-Surallah Rd - (S01483MN) K1682 + 674 – K1682 + 748.98, K1683 + 915 – K1684 + 012, K1685 + 106 – K1685 + 204, K1686 + 113 – K1686 + 136, K1686 + 184 – K1686 + 232
Type of Work: Construction of Road Slope Protection Structure
Physical target:
From: 8,000.00 Square meters
To: 6,432.50 Square meters
|
June 19, 2025 |
GAA 2025 |
P00909542MN |
SR2025-02-001036 |
February 1, 2025 |
Region XII |
Regional Office XII |
Contract ID:25M00161
UACS No. 310101101819000
Amount: ₱ 129,927,000.00
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Project Name:
From: Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1782 + 000 - K1785 + 000
To: Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) – K1781 + 598 - K1783 + 198
Type of Work: Preventive Maintenance of Road: Asphalt Overlay
Physical target:
From: 6.000 lane-km
To: 6.400 lane-km
|
June 19, 2025 |
GAA 2025 |
P00909543MN |
SR2025-02-001043 |
February 1, 2025 |
Region XII |
Regional Office XII |
Contract ID: 25M00162
UACS No. 310101101820000
Amount: ₱ 129,928,000.00
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
project Name:
From: Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1789 + 000 - K1792 + 000
To: Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1783 + 198 - K1784 + 798
Type of Work: Preventive Maintenance of Road: Asphalt Overlay
Physical target:
From: 6.000 lane-km
To: 6.400 lane-km |
June 18, 2025 |
FY 2025 |
P00909109MN |
GAA 2025 |
January 1, 2025 |
Region XII |
Cotabato 1st District Engineering Office |
Contract ID: 25MD0047
UACS: 310108102210000
Amount:₱ 18,600,000.00
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Project Name:
From: Banisilan-Guiling-Alamada-Libungan Rd - K1674 + 550 - K1674 + 860
To:Banisilan-Guiling-Alamada-Libungan Rd - K1675 + 339.00 - K1675 + 430.00, K1675 + 470.00 - K1675 + 560.00, K1675 + 570.00 - K1675 + 584.00, K1675 + 610.00 - K1675 + 640.00, K1675 + 680.00 - K1675 + 769.00
Type of Work: Construction of Road Slope Protection Structure
Physical target:
From:1,550.00 Square Meter
To: 1,579.15 Square Meter
|
June 18, 2025 |
2025 |
|
GAA 2025 |
January 1, 2025 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Govt Ctr Rd Network - K0913 + 395 - K0913 + 730
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 14.527520 M
Asphalt Overlay: 1.34 Lane Km
EAO P 0.296480 M
Total P 14.824 M
AS MODIFIED:
Govt Ctr Rd Network - K0913 + 344.9 - K0913 + 705
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 14.527520 M
Asphalt Overlay: 1.44 Lane Km
EAO P 0.296480 M
Total P 14.824 M
|
June 18, 2025 |
2025 |
WIN5XY00507 |
GAA FY 2025 |
January 31, 2025 |
Region VIII |
Samar 1st District Engineering Office |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Calbayog Diversion Rd - K0739 + 344 - K0740 + 467, K0740 + 619 - K0741 + 306
Physical Target: Allocation:
CW1- Reconstruction to Concrete P 34.475420 M
Pavement: 3.62 Lane Km
EAO P .703580 M
Total P 35.179 M
AS MODIFIED:
Calbayog Diversion Rd - K0739 + 000 - K0740 + 000
Physical Target: Allocation:
CW1- Reconstruction to Concrete P 27.71731589 M
Pavement: 2.00 Lane Km
CW2- Construction of Slope Protection P 6.75810392
Structure: 1,425.6 Square meter
EAO P .703580 M
Total P 35.179 M
|
June 18, 2025 |
FY 2025 |
P00935142MN |
GAA 2025 |
January 1, 2025 |
Region XII |
Cotabato 1st District Engineering Office |
Contract ID: 25MD0046
UACS: 300214102150000
Amount: ₱ 5,000,000.00
Convergence and Special Support Program: Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Project Name:
From: Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs, Guardrails) along Midsayap-Makar Rd - K1694 + (-327) - K1694 + 673
To: Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs, Guardrails) along Midsayap-Makar Rd - K1694 + (-902) - K1694 + 673
Type of Work: Road Safety: Pavement markings
Physical Target:
From: 348.00 Lineal Meter
To: 1,692.64 Lineal Meter |
June 17, 2025 |
2025 |
|
FY 2025 GAA, RA 12116 |
December 30, 2024 |
Region XIII |
Regional Office XIII |
UACS No. : 310107100778000
Project ID: P00909152MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
FROM:
Maharlika Highway (Surigao-Agusan Sect) - K1135 + 800 - K1135 + 850, K1152 + 000 - K1152 + 100
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 3635.53 Square meters
Allocation:
TOTAL: P 54,533,000
CW1: P 52,624,345
EAO: P 1,908,655
Unit Cost:
CW1: P 14,475.01327/Square meters
TO:
Maharlika Highway (Surigao-Agusan Sect) - K1135 + 580 - K1135 + 731
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 3,357.490 Square meters
Allocation:
TOTAL: P 54,533,000
CW1: P 52,624,345
EAO: P 1,908,655
Unit Cost:
CW1: P 15,673.71608/Square meters
|
June 17, 2025 |
2025 |
|
FY 2025 GAA, RA 12116 |
December 30, 2024 |
Region XIII |
Regional Office XIII |
UACS No. : 300214101694000
Project ID: P00935236MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
FROM:
Preventive Maintenance - Primary Roads along Maharlika Highway (Surigao-Agusan Sect) - K1160 + 600 - K1162 + 701
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 4.304 Lane Km
Allocation:
TOTAL: P 45,717,000
CW1: P 44,116,905
EAO: P 1,600,095
Unit Cost:
CW1: P 10,250,210.27/Lane Km
TO:
Preventive Maintenance - Primary Roads along Maharlika Highway (Surigao-Agusan Sect) - K1162 + 085 - K1163+ 335
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 4.820 Lane Km
Allocation:
TOTAL: P 45,717,000
CW1: P 44,116,905
EAO: P 1,600,095
Unit Cost:
CW1: P 9,152,884.85/Lane Km
|
June 17, 2025 |
2025 |
|
SR2025-03-009238 |
March 17, 2025 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0754 + 000 - K0755 + 059, K0761 + 936 - K0762 + 386
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 86.850 M
Road: 2,992 Lineal meters
EAO P 3.150 M
Total P 90.00 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0753 + 635 - K0754 + 125, K0754 + 305 - K0755 + 059, K0759 + 900 - K0760 + 200, K0760 + 220 - K0760 + 640
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 86.850 M
Road: 3,110.80 Lineal meters
EAO P 3.150 M
Total P 90.00 M
|
June 17, 2025 |
2025 |
|
SR2025-03-009213 |
March 17, 2025 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0731 + 220, K0731 + 187 - K0731 + 217
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 9.650 M
Road: 115 Lineal meters
EAO P 0.350 M
Total P 10.00 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0731 + 160 - K0731 + 220
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 9.650 M
Road: 145 Lineal meters
EAO P 0.350 M
Total P 10.00 M
|
June 17, 2025 |
2025 |
|
SR2025-02-002036 |
February 3, 2025 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0752 + 816 - K0753 + 000
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 5.790 M
Structure: 541.26 Square meters
EAO P 0.210 M
Total P 6.00 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0752 + 880 - K0753 + 000
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 5.790 M
Structure: 553.83 Square meters
EAO P 0.210 M
Total P 6.00 M
|
June 17, 2025 |
2025 |
|
SR2025-03-009343 |
March 17, 2025 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation -Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Mainit-Sn Miguel-Santol Rd - K0938 + 854 - K0941 + 726
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 134.284575 M
Asphalt Overlay: 9.004 Lane Km
EAO P 4.870425M
Total P 139.155 M
AS MODIFIED:
Mainit-Sn Miguel-Santol Rd - K0938 + 854 - K0942 + 208
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 134.284575 M
Asphalt Overlay: 10.924 Lane Km
EAO P 4.870425M
Total P 139.155 M |
June 17, 2025 |
FY 2025 GAA |
P00901443MN |
FY 2025 GAA RA 12116 |
January 1, 2025 |
Region XI |
Regional Office XI |
P00901443MN (Regional Office XI_05)
UACS No. 310101101789000
Project ID: P00901443MN
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1534 + 087 - K1535 + 550, Davao del Sur
Physical Target:
CW1: 5.868 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,250,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1537 + 200 - K1538 + 391,
K1538 + 985 - K1540 + 123, Davao del Sur
Physical Target:
CW1: 9.380 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,250,000.00 |
June 17, 2025 |
FY 2025 GAA |
P00909459MN |
FY 2025 GAA RA 12116 |
January 1, 2025 |
Region XI |
Regional Office XI |
P00909459MN (Regional Office XI_06)
UACS No. 310201101619000
Project ID: P00909459MN
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1554 + 464 - K1554 + 835, K1555 + 099 - K1555 + 133,
K1555 + 167 - K1555 + 191, K1557 + 466 - K1557 + 533, K1561 + 860 - K1561 + 872
Physical Target:
CW1: 1.250 lane km (Road Widening)
ROW: 5,203.50 square meters (ROW Acquisition)
Allocation:
TOTAL: P 64,240,000.00
CW1: P 30,995,800.00 (Road Widening)
CW2: P 6,424,000.00 (ROW Acquisition)
EAO: P 2,248,400.00
EXC: P 24,571,800.00 (Excess)
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1546 + 954 - K1547 + 499, K 1547 + 611 - K1548 + 178,
K1548 + 259 - K1548 + 280, K1554 + 464 - K1554 + 835, K1555 + 099 - K1555 + 133,
K1555 + 167 - K1555 + 191, K1557 + 466 - K1557 + 533, K1561 + 860 - K1561 + 872
Physical Target:
CW1: 2.929 lane km (Road Widening)
ROW: 15,408.11 square meters (ROW Acquisition)
Allocation:
TOTAL: P 64,240,000.00
CW1: P 55,792,440.00 (Road Widening)
ROW: P 6,119,160.00 (ROW Acquisition)
EAO: P 2,248,400.00 |
June 13, 2025 |
GAA 2025 |
P00909168MN |
SR2025-02-002826 |
February 3, 2025 |
Region XII |
Regional Office XII |
Contract ID: 25M00029
UACS: 310110100597000
Amount: ₱ 27,000,000.00
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads
Project Name:
From: Maharlika Highway( Digos-Makar Rd) - K1650 + 624 - K1651 + 196, K1650 + 525 - K1650 + 624
To: Maharlika Highway( Digos-Makar Rd) - K1643 + 705 - K1644 + 218, K1644 + 218 - K1644 + 300, K1647 + 010 - K1647 + 460
Type of Work: Construction of Drainage Structure along Road
Physical Target:
From: 450.00 Lineal meters
To: 1,129.00 Lineal meters |
June 13, 2025 |
GAA 2025 |
P00909448MN |
SR2025-02-003058 |
February 3, 2025 |
Region XII |
Regional Office XII |
Contract ID:25M00175
UACS: 310202101892000
Amount: ₱ 130,000,000.00
OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads
Project Name:
From: Banisilan-Guiling-Alamada-Libungan Rd - K1642 + 964 - K1645 + 062
To: Banisilan-Guiling-Alamada-Libungan Rd - K1642 + 1149 - K1645 + 057
Type of Work/ Physical Target:
From: CW1: Road Widening = 4.394 Lane Km
To: CW1: Road Widening = 3.956 Lane Km
CW2: Construction of Road Slope Protection Structure = 2,620.00 Square meters
CW3: Construction of Drainage Structure along Road = 2,886.00 lineal meters
|
June 13, 2025 |
GAA 2025 |
P00909163MN |
SR2025-02-002869 |
February 3, 2025 |
Region XII |
Regional Office XII |
Contract ID: 25M00064
UACS: 310110100594000
Amount: ₱ 71,127,000.00
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Project Name:
From: Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1768 + 314 - K1770 + 662
To: Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1768 + 314 - K1770 + 477
Type of Work: Construction of Drainage Structure along Road
Physical Target:
From: 2,371 Lineal meters
To: 2,186 Lineal meters
|
June 13, 2025 |
GAA 2025 |
P00920361MN |
SR2025-02-000300 |
February 1, 2025 |
Region XII |
Regional Office XII |
Contract ID:
UACS: 320102107688000
Amount: ₱ 179,139,000.00
OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Project Name: Construction of Pulangi Riverbank Protection (Downstream of Carmen Br., Right Bank), Phase II, Barangay Ugalingan, Carmen, Cotabato
Type of Work: Construction of Flood Mitigation Structure
Physical Target:
From: 683.700 Lineal meters
To: 652.5 Lineal meters
|
June 13, 2025 |
GAA 2025 |
P00920362MN |
SR2025-02-000329 |
February 1, 2025 |
Region XII |
Regional Office XII |
Contract ID:25M00007
UACS No.: 320102107689000
Amount: ₱ 179,139,000.00
OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Project Name: Construction of Pulangi Riverbank Protection (Downstream of Carmen Br., Right Bank), Phase III, Barangay Ugalingan, Carmen, Cotabato
Type of Work: Construction of Flood Mitigation Structure
Physical Target:
From: 683.700 Lineal meters
To: 634.000 Lineal meters
|
June 11, 2025 |
2025 |
|
SR2025-03-009235 |
March 17, 2025 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0764 + 400 - K0764 + 906
Physical Target: Allocation:
CW1- Construction of Drainage Structure P 31.684810 M
along Road: 1,012 Lineal Meters
EAO P 1.149190 M
Total P 32.834 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0761 + 978 - K0762 + 137, K0762 + 755 - K0763 + 140, K0764 + 700 - K0765 + 050
Physical Target: Allocation:
CW1- Construction of Drainage Structure P 31.684810 M
along Road: 1,180 Lineal Meters
EAO P 1.149190 M
Total P 32.834 M
|
June 11, 2025 |
2025 |
|
SR2025-03-009211 |
March 17, 2025 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0761 + 000 - K0761 + 936
Physical Target: Allocation:
CW1- Construction of Drainage Structure P 55.728750 M
along Road: 1,872 Lineal Meters
EAO P 2.021250 M
Total P 57.750 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0761 + 000 - K0761 + 978
Physical Target: Allocation:
CW1- Construction of Drainage Structure P 55.728750 M
along Road: 1,845.40 Lineal Meters
EAO P 2.021250 M
Total P 57.750 M
|
June 11, 2025 |
2025 |
|
SR2025-02-002360 |
February 3, 2025 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0765 + 000 - K0766 + 000
Physical Target: Allocation:
CW1- Construction of Drainage Structure P 62.801235 M
along Road: 2,004 Lineal Meters
EAO P 2.277765M
Total P 65.079 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0765 + 050 - K0766 + 036, K0766 + 366 - K0766 + 720, K0770 + 365 - K0770 + 690, K0770 + 740 - K0770 + 860, K0772 + 179 - K0772 + 300
Physical Target: Allocation:
CW1- Construction of Drainage Structure P 62.801235 M
along Road: 2,165 Lineal Meters
EAO P 2.277765M
Total P 65.079 M
|
June 9, 2025 |
2025 |
WIN5XY00506 |
SR2025-02-002968 |
February 3, 2025 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0865 + 000 - K0865 + 150, K0865 + 337 - K0865 + 779, K0865 + 804 - K0866 + 700, K0866 + 700 - K0866 + 795, K0866 + 838 - K0866 + 909, K0866 + 1005 - K0867 + 302, K0867 + 302 - K0868 + 000, K0868 + 000 - K0869 + 044, K0869 + 044 - K0869 + 130, K0869 + 130 - K0869 + 793
Physical Target: Allocation:
CW1- Road Widening P 139.611375 M
8.355 Lane Km
EAO P 5.063625 M
Total P 144.675 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0865 + 000 - K0865 + 150, K0865 + 337 - K0865 + 779, K0865 + 804 - K0866 + 795, K0866 + 838 - K0866 + 893, K0866 + 1005 - K0868 + 560
Physical Target: Allocation:
CW1- Road Widening P 76.78632325 M
5.966 Lane Km
CW2- Construction of Road Slope Protection P 62.82505175 M
Structure: 9,881.07 Square Meters
EAO P 5.063625 M
Total P 144.675 M
|
June 9, 2025 |
2025 |
WIN5XY00500 |
SR2025-03-009668 |
March 18, 2025 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0771 + 511 - K0771 + 971
Physical Target: Allocation:
CW1- Road Widening P 14.728795 M
0.920 Lane Km
EAO P 0.534205 M
Total P 15.263 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0771 + 511 - K0771 + 835
Physical Target: Allocation:
CW1- Road Widening P 8.51654151 M
0.648 Lane Km
CW2- Construction of Road Slope Protection P 6.21225349 M
Structure: 760.80 Square Meters
EAO P 0.534205 M
Total P 15.263 M
|
June 5, 2025 |
FY 2025 GAA |
P00901444MN |
FY 2025 GAA RA 12116 |
January 1, 2025 |
Region XI |
Regional Office XI |
P00901444MN (Regional Office XI_01)
UACS No. 310101101790000
Project ID: P00901444MN
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1535 + 500 - K1536 + 560, K1436 + 753 - K1537 + 200
Physical Target:
CW1: 5.880 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,250,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1540 + 123 - K1541 + 163,
K1541 + 767 - K1542 + 838, K1542 + 941 - K1543 + 130, Davao del Sur
Physical Target:
CW1: 9.488 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,250,000.00 |
June 5, 2025 |
FY 2025 GAA |
P00901453MN |
FY 2025 GAA RA 12116 |
January 1, 2025 |
Region XI |
Regional Office XI |
P00901453MN (Regional Office XI_02)
UACS No. 310101101805000
Project ID: P00901453MN
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1561 + 000 - K1562 + 410
Physical Target:
CW1: 5.680 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1560 + 746 - K1561 + 686
Physical Target:
CW1: 5.640 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00 |
June 5, 2025 |
FY 2025 GAA |
P00909742MN |
FY 2025 GAA RA 12116 |
January 1, 2025 |
Region XI |
Regional Office XI |
P00909742MN (Regional Office XI_03)
UACS No. 310101101797000
Project ID: P00909742MN
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1534 + 585 - K1534 + 813, K1535 + 886 - K1535 + 034
Physical Target:
CW1: 2.160 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 39,319,000.00
CW1: P 37,941,835.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,376,165.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1534 + 585 - K1534 + 813, K1534 + 886 - K1535 + 034
Physical Target:
CW1: 2.280 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 39,319,000.00
CW1: P 37,941,835.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,376,165.00 |
June 5, 2025 |
FY 2025 GAA |
P00935251MN |
FY 2025 GAA RA 12116 |
January 1, 2025 |
Region XI |
Regional Office XI |
P00935251MN (Regional Office XI_04)
UACS No. 300214101671000
Project ID: P00935251MN
MODIFICATION:
FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance - Primary Roads along Maharlika Highway - K1382 + 308 - K1384 + 352
Physical Target:
CW1: 4.070 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 45,422,000.00
CW1: P 43,832,230.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,589,770.00
TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance - Primary Roads along Maharlika Highway - K1403 + 897 - K1405 + 713
Physical Target:
CW1: 5.475 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 45,422,000.00
CW1: P 43,832,230.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,589,770.00 |
June 5, 2025 |
FY 2025 GAA |
P00935179MN |
FY 2025 GAA RA 12116 |
January 1, 2024 |
Region XI |
Davao Oriental 1st District Engineering Office |
P00935179MN (Davao Oriental 1st District Engineering Office_01)
UACS No. 300214102148000
Project ID: P00935179MN
MODIFICATION:
FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation/Application of Road Safety Facilities (Pavement Markings) along Surigao del Sur Bdry-Davao Or Coastal Rd - K1648 + 350 - K1649 + 350
Physical Target:
CW1: 992.00 lineal meters (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 650,000.00
CW1: P 650,000.00 (Road Safety: Pavement Markings)
TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation/Application of Road Safety Facilities (Pavement Markings) along Surigao del Sur Bdry-Davao Or Coastal Rd - K1657 + 000 - K1658 + 703
Physical Target:
CW1: 1,702.00 lineal meters (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 650,000.00
CW1: P 650,000.00 (Road Safety: Pavement Markings) |
June 5, 2025 |
CY 2024 |
WIN4F08103 |
UACS No. 300105201299000 |
July 10, 2024 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 300105201299000
Project ID.: P00855193LZ
Local Program
Buildings and Other Structures – Multipurpose/Facilities – National Building Program
Retrofitting of NTC Hostel and Vertical Expansion, NTC Agham Road, Quezon City
Physical Target: CW1 = Rehabilitation/Major Repair of Other Building – 1 building
Unit Cost (P’000) = P 39,200.00 / no. of building
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00
As Modified
As per GAA/Original
Local Program
Buildings and Other Structures – Multipurpose/Facilities – National Building Program
Retrofitting of NTC Hostel and Vertical Expansion, National Telecommunications Commission, Senator Miriam P. Defensor Santiago Avenue, Quezon City
Physical Target: CW1 = Rehabilitation/Major Repair of Other Building – 1 building
Unit Cost (P’000) = P 39,200.00 / no. of building
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00
Bar Code#WIN4F08103
|
June 5, 2025 |
2025 |
WIN5F08553 |
SR2025-04-012872 |
April 22, 2025 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 310103101726000
Project ID.: P00900368LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Preventive Maintenance (Asphalt Overlay) along H. Lopez Blvd., Manila City
K0006 + 949.00 – K0007 + 421.00
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay = 2.220 lane km
Unit Cost (P’000) = P 21,734.23/lane km
Allocation = P 48,250,000.00
EAO = P 1,750,000.00
Total = P 50,000,000.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Preventive Maintenance (Asphalt Overlay) along H. Lopez Blvd., Manila City
K0006 + 473.00 – K0007 + 945.00
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay = 1.888 lane km
Unit Cost (P’000) = P 25,556.14/lane km
Allocation = P 48,250,000.00
EAO = P 1,750,000.00
Total = P 50,000,000.00
WIN5F08553
|
June 5, 2025 |
2025 |
WIN5F08572 |
SR2025-03-011164 |
March 27, 2025 |
National Capital Region |
South Manila District Engineering Office |
As per GAA/Original
UACS No. 310303102045000
Project ID.: P00900759LZ
OO1: Ensure Safe and Reliable National Road System
Bridge - Retrofitting/Strengthening of Permanent Bridges
Liwasang Bonifacio West Overpass (Flvover) (B03377LZ), Manila City
Physical Target: CW1 = Retrofitting/Strengthening of Permanent Bridges = 1 Bridge
Unit Cost (P’000) = P 147,000.00/bridge
Allocation = P 147,000,000.00
EAO = P 3,000,000.00
Total = P 150,000,000.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Bridge - Retrofitting/Strengthening of Permanent Bridges
Liwasang Bonifacio West Overpass (Flvover) (B01348LZ), Manila City
Physical Target: CW1 = Retrofitting/Strengthening of Permanent Bridges = 1 Bridge
Unit Cost (P’000) = P 147,000.00/bridge
Allocation = P 147,000,000.00
EAO = P 3,000,000.00
Total = P 150,000,000.00
WIN5F08572
|
June 5, 2025 |
FY 2025 |
P00909522MN |
SR2025-03-009268 |
March 17, 2025 |
Region XII |
Regional Office XII |
Contract ID: 25M00051
UACS: 310101101811000
Amount: ₱ 200,000,000.00
Project Name:
From:Maharlika Highway( Cotabato-Marbel Rd) - K1740 + 000 - K1745 + 550
To: Maharlika Highway( Cotabato-Marbel Rd) - K1740 + 789 - K1741 + 279, K1742 + 333 – K1743 + 233
Type of Work: Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
From: 33.486 Lane Km
To: 8.580 Lane Km |
June 5, 2025 |
FY 2025 |
P00920354MN |
SR2025-02-000262 |
February 1, 2025 |
Region XII |
Regional Office XII |
Contract ID:25M00183
UACS Number: 320102107681000
Amount: ₱ 100,000,000.00
Project Name: Construction of Concrete Revetment, Lower Klinan-Mabuhay (Silway River Basin), Barangay Mabuhay, General Santos City, South Cotabato
Type of Work: Construction of Revetment
Physical Target:
From: 635.238 Lineal meters
To: 340.000 Lineal meters
|
June 5, 2025 |
FY 2025 |
P00936625MN |
GAA 2025 |
January 1, 2025 |
Region XII |
South Cotabato 1st District Engineering Office |
Contract ID:25MB0044
UACS: 300226123301000
Amount: 5,000,000.00
Project Name:
From: Construction of Multi-Purpose Building (Covered Court), Polo Creek Integrated School, Barangay Magsaysay, Polomolok, South Cotabato
To: Construction of Multi-Purpose Building (Covered Court), Polomolok Creek Integrated School, Barangay Magsaysay, Polomolok, South Cotabato
Type of Work: Construction of Multi-Purpose Building
Physical target: 1 Number of Buildings
|
June 4, 2025 |
2025 |
|
SR2025-03-009255 |
March 17, 2025 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
AS PER GAA/ORIGINAL:
Palo- Carigara - Ormoc Rd - K0919 + 205- K0926 + 800, K0927 + 221 - K0927 + 600
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 386.00 M
Asphalt Overlay: 31.808 Lane Km
EAO P 14.00 M
Total P 400.00 M
AS MODIFIED:
Palo- Carigara - Ormoc Rd - K0919 + 205 - K0923 + 000, K0926 + 000 - K0929 + 980
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 386.00 M
Asphalt Overlay: 31.166 Lane Km
EAO P 14.00 M
Total P 400.00 M
|
June 4, 2025 |
2025 |
|
SR2025-02-001487 |
February 3, 2025 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Mainit-Sn Miguel-Santol Rd - K0944 + 101 - K0945 + 000, K0945 + 865 - K0951 + 1278
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 146.34418 M
Asphalt Overlay: 14.626 Lane Km
EAO P 5.30782 M
Total P 151.652 M
AS MODIFIED:
Mainit-Sn Miguel-Santol Rd - K0944 + 101 - K0945 + 000, K0945 +937 - K0948 + 811, K0948 + 850 - K0949 + 730, K0949 + 762 - K0951 + 690
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 146.34418 M
Asphalt Overlay: 13.164 Lane Km
EAO P 5.30782 M
Total P 151.652 M
|
June 4, 2025 |
2025 |
|
SR2025-03-009669 |
March 18, 2025 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0778 + 000 - K0778 + 137
Physical Target: Allocation:
CW1- Road Widening P 5.042125 M
0.274 Lane Km
EAO P .182875 M
Total P 5.225 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0778 + 000 - K0778 + 180
Physical Target: Allocation:
CW1- Road Widening P 5.042125 M
0.36 Lane Km
EAO P .182875 M
Total P 5.225 M
|
June 4, 2025 |
2025 |
WIN5F08560 |
SR2025-03-009673 |
March 18, 2025 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway - K0975 + 155 - K0976 + 000, K0991 + 900 - K0992 + 432, K0996 + 148.60 - K0996 + 380, K0997 + 455 - K0997 + 610
Physical Target: Allocation:
CW1- Road Widening P 65.53122 M
3.587 Lane Km
EAO P 2.376780 M
Total P 67.908 M
AS MODIFIED:
Maharlika Highway - K0975+155 - K0976+000, K0991 + 900 - K0992 + 657, K0996 + 148.6 - K0996 + 155, K0997 + 455 - K0997 + 610
Physical Target: Allocation:
CW1- Road Widening P 39.59917708 M
3.587 Lane Km
CW2- Construction of Drainage Structure P12.35883216 M
along Road: 994 Lineal Meters
CW3- Construction of Road Slope P 13.57321076 M
Protection Structure: 1,990.018 Square Meters
EAO P 2.376780 M
Total P 67.908 M
|
June 4, 2025 |
2025 |
WIN5XY00479 |
SR2025-03-009405 |
March 17, 2025 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0783 + 089 - K0783 + 120, K0784 + 160 - K0784 + 172.30
Physical Target: Allocation:
CW1- Construction of Road Slope P 11.580 M
Protection Structure: 967.01 Square Meters
EAO P .420 M
Total P 12.00 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0783 + 089 - K0783 + 120
Physical Target: Allocation:
CW1- Construction of Road Slope P 11.580 M
Protection Structure: 703.53 Square Meters
EAO P .420 M
Total P 12.00 M
|
June 4, 2025 |
2025 |
|
SR2025-009236 |
March 17, 2025 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0770 + 051 - K0770 + 181
Physical Target: Allocation:
CW1- Construction of Drainage Structure P 8.170655 M
along Road: 260 Lineal Meters
EAO P .296345 M
Total P 8.467 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0772 + 300 - K0772 + 454
Physical Target: Allocation:
CW1- Construction of Drainage Structure P 8.170655 M
along Road: 308 Lineal Meters
EAO P .296345 M
Total P 8.467 M
|
June 4, 2025 |
2025 |
|
SR2025-03-009237 |
March 17, 2025 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0731 + 525, K0731 + 387 - K0731 + 522
Physical Target: Allocation:
CW1- Construction of Drainage Structure P 9.650 M
along Road : 185 Lineal Meters
EAO P .350 M
Total P 10.00 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0731 + 360 - K0731 + 525
Physical Target: Allocation:
CW1- Construction of Drainage Structure P 9.650 M
along Road : 215 Lineal Meters
EAO P .350 M
Total P 10.00 M
|
June 4, 2025 |
2025 |
|
SR2025-03-009738 |
March 18, 2025 |
Region VIII |
Regional Office VIII |
Convergence and Special Support Program (CSSP)
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
AS PER GAA/ORIGINAL:
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0758 +000 - K0758 + 200, K0758 + 640 - K0758 + 690, K0781 + 230 - K0781 + 610
Physical Target: Allocation:
CW1- Rehabilitation of Concrete Road P 20.009275 M
1.26 Lane Km
EAO P .725725 M
Total P 20.735 M
AS MODIFIED:
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Sn Isidro-Sn Juanico Br) -K0758 +000 - K0758 + 200, K0758 + 600 - K0758 + 690, K0759 + 210 - K0759 + 671
Physical Target: Allocation:
CW1- Reconstruction to Concrete Pavement P 20.009275 M
1.502 Lane Km
EAO P .725725 M
Total P 20.735 M
|
June 4, 2025 |
2025 |
|
SR2025-03-009402 |
March 17, 2025 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0777 + 138 - K0777 + 200
Physical Target: Allocation:
CW1- Construction of Road Slope P 14.475 M
Protection Structure: 1,094 Square Meters
EAO P .525 M
Total P 15.00 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0777 + 106 - K0777 + 159
Physical Target: Allocation:
CW1- Construction of Road Slope P 14.475 M
Protection Structure: 1,145.19 Square Meters
EAO P .525 M
Total P 15.00 M
|
June 4, 2025 |
2025 |
WIN5XY00494 |
SARO-BMB-A-25-0008178 |
March 7, 2025 |
Region VI |
Iloilo 1st District Engineering Office |
UACS No. 310202101995000
Project ID: P00906261VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development – Road Widening - Secondary Roads
Iloilo-Antique Rd - K0023 + 734 - K0023 + 757, K0023 + 912 - K0024 + 079, K0024 + 079 - K0024 + 123
CW1 - Road Widening: 0.456 lane km – 6,316.10
CW2 – Construction of Drainage Structure: 456 lineal meters – 2,503.90
ROW – ROW Acquisition: 549.33 Square Meters – 807.52
EAO – 196.48
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development – Road Widening - Secondary Roads
Iloilo-Antique Rd - K0023 + 734 - K0023 + 757, K0023 + 912 - K0024 + 079, K0024 + 079 - K0024 + 123
CW1 - Road Widening: 0.456 lane km – 8,803.52
ROW – ROW Acquisition: 549.33 Square Meters – 824.00
EAO – 196.48 |
June 3, 2025 |
2025 |
WIN5E0379 |
FY 2025 GAA, RA 12116 |
December 30, 2024 |
Region XIII |
Regional Office XIII |
UACS No. : 310110100603000
Project ID: P00909206MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads
FROM:
Maharlika Highway (Surigao-Agusan Sect) - K1234 + 534 - K1234 + 719
Type of Work:
CW1- Construction of Drainage Structure along Road
Physical Target:
CW1- 370 Lineal meters
Allocation:
TOTAL: P 3,869,000
CW1: P 3,733,585
EAO: P 135,415
Unit Cost:
CW1: P 10,090.77/Lineal meters
TO:
Maharlika Highway (Surigao-Agusan Sect) - K1222 + 647 - K1222 + 669
Type of Work:
CW1- Construction of Drainage Structure along Road
Physical Target:
CW1- 22 Lineal meters
Allocation:
TOTAL: P 3,869,000
CW1: P 3,733,585
EAO: P 135,415
Unit Cost:
CW1: P 169,708.41/Lineal meters
|
June 3, 2025 |
FY 2025 |
P00909745MN |
SR2025-02-002285 |
February 3, 2025 |
Region XII |
Regional Office XII |
Contract ID: 25M00056
Amount: ₱ 60,000,000.00
Project Name:
From: Maharlika Highway( Cotabato-Marbel Rd) - K1728 + 418 - K1730 + 270
To: Maharlika Highway( Cotabato-Marbel Rd) - K1728 + 418 - K1730 + 270
Type of Work: Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
From: 11.160 Lane Km
To: 3.720 Lane Km |
June 3, 2025 |
FY 2025 |
P00909452MN |
SR2025-03-009479 |
March 17, 2025 |
Region XII |
Regional Office XII |
Contract ID: 25M00061
Amount:₱ 78,882,000.00
Project Name:
From: Maharlika Highway( Cotabato-Marbel Rd) - K1754 + 495 - K1755 + 938
To: Maharlika Highway( Cotabato-Marbel Rd) - K1754 + 495 - K1756 + 488
Type of Work/ Physical target:
From: CW1- Road Widening = 2.900 Lane Km
To: CW1- Road Widening = 4.010 Lane Km
CW-2 - Construction of Road Slope Protection Structure = 23,406.00 square meters
|
June 2, 2025 |
2025 |
|
FY 2025 GAA, RA 12116 |
December 30, 2024 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. : 310305102499000
Project ID: P00909995MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
FROM:
Mat-i Br. (B01857MN) along Agusan-Malaybalay Rd
Type of Work:
CW1- Widening of Bridge
Physical Target:
CW1- 284.35 Square meters
Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000
Unit Cost:
CW1: P 172,322.841568/Square meters
TO:
Mat-i Br. (B01857MN) along Agusan-Malaybalay Rd
Type of Work:
CW1- Construction of Parallel Bridge
Physical Target:
CW1- 284.35 Square meters
Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000
Unit Cost:
CW1: P 172,322.841568/Square meters
|
June 2, 2025 |
2025 |
WIN5XY00473 |
FY2025 GAA |
December 20, 2024 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Romulo H-way - K0130+680 - K0131+000, K0135+900 - K0136+300, K0137+232 - K0137+920 |
June 2, 2025 |
2025 |
WIN5XY00474 |
FY2025 GAA |
November 20, 2024 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Tarlac City - San Jose via Tibag - Burgos Rd - K0139+736 - K0141+050 |
June 2, 2025 |
2025 |
WIN5XY00475 |
FY2025 GAA |
December 20, 2024 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Tarlac City - San Jose via Tibag - Burgos Rd - K0137+921 - K0138+517, K0139+000- K0139+736 |
June 2, 2025 |
2025 |
WIN5E03729 |
GAA 2025 |
January 20, 2025 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"Project ID: P00914687LZ
UACS: 310109101731000
FROM:
Project Name:
Bulo National Rd (Agbannawag-Bulo-Callagdao Sect) - K0502 + (-016) - K0502 + 001
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 153 Square meters
Allocation:
Php 2,500,000
TO:
Project Name:
Bulo National Rd (Agbannawag-Bulo-Callagdao Sect) - K0508+178 - K0508+208
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 180 Square meters
Allocation:
Php 2,500,000"
|
June 2, 2025 |
2025 |
WIN5E03729 |
GAA 2025 |
January 20, 2025 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"Project ID: P00914687LZ
UACS: 310109101731000
FROM:
Project Name:
Bulo National Rd (Agbannawag-Bulo-Callagdao Sect) - K0502 + (-016) - K0502 + 001
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 153 Square meters
Allocation:
Php 2,500,000
TO:
Project Name:
Bulo National Rd (Agbannawag-Bulo-Callagdao Sect) - K0508+178 - K0508+208
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 180 Square meters
Allocation:
Php 2,500,000"
|
June 2, 2025 |
2025 |
WIN5E03728 |
SR2025-03-008449 |
March 12, 2025 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"Project ID: P00923067LZ
UACS: 320102107103000
FROM:
Project Name:
Construction of Flood Control Structure along Chico River (Buenan), Sta. 115 + 741 - Sta. 115 + 941, Barangay Dupag, Tabuk City, Kalinga
Type of Work:
CW1 - Construction of Flood Mitigation Structure
Physical Target:
CW1 - 125 Lineal meters
Allocation:
Php 8,000,000
TO:
Project Name:
Construction of Flood Control Structure along Chico River (Buenan),Sta.115+786 - Sta. 115+866, Barangay Dupag, Tabuk City, Kalinga
Type of Work:
CW1 - Construction of Flood Mitigation Structure
Physical Target:
CW1 - 80 Lineal meters
Allocation:
Php 8,000,000"
|
June 2, 2025 |
2025 |
WIN5XY00472 |
FY2025 GAA |
December 20, 2024 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Tarlac City - San Jose via Tibag-Burgos Rd - K0129+301 - K0130+650 |
June 2, 2025 |
2025 |
win5f08555 |
FY2025 GAA |
December 20, 2024 |
Region III |
Regional Office III |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads
Maharlika Highway - K0039+000- K0039+740, K0041+653 - K0042+000, K0048+000 - K0048+500 |