October 14, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00832295LZ
UACS : 300204101525000
FROM ;
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT) - Construction of Road leading to New Camarines Sur Iconic Capitol Building and Business Centers, Brgy. Cadlan, Pili, Camarines
Physical Target :
CW1 - Construction of Concrete Road - 6.667 Lane Km
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT) - Construction of Road leading to New Camarines Sur Iconic Capitol Building and Business Centers, Brgy. Cadlan, Pili, Camarines
Physical Target :
CW1 - Construction of Concrete Road - 3.127 Lane Km
CW2 - Construction of Drainage Structure along Road - 824.54 Lineal meters
CW3 - Construction of Slope Protection Structure - 6708.41 Square meters |
October 14, 2024 |
2024 |
WIN4XY00429 |
GAA 2024 |
January 19, 2024 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00837423LZ
UACS : 300214101181000
FROM :
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Lagta-Crossing Malinta Rd - K0099 + 225.60 - K0099 + 925
Physical Target :
CW1 - Rehabilitation of Paved Road - 1.399 Lane Km
TO :
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Lagta-Crossing Malinta Rd - K0099 + 235 - K0099 + 520
Physical Target :
CW1 - Rehabilitation of Paved Road - 0.57 Lane Km
CW2 - Construction of Drainage Structure along Road - 576 Lineal meters
CW3 - Road Safety : Street Lightning - 30 Number of Units |
October 14, 2024 |
2024 |
WIN4XY00387 |
GAA 202 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00842625LZ
UACS : 300215103855000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road, Marcial O. Rañola - Balanac, Guinobatan, Albay
Physical Target :
CW1 - Construction of Concrete Road - 4.64 Lane Km
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road, Marcial O. Rañola - Balanac, Guinobatan, Albay
Physical Target :
CW1 - Construction of Concrete Road - 3.096 Lane Km
CW2 - Construction of Gravel Road 0.0729 Lane Km |
October 14, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00846331LZ
UACS : 300226109804000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Buildings of TESDA Provincial Training Center Building, Ligao City, Albay (Phase 2)
Physical Target :
CW1 - Construction of Multi Purpose Building - 1 Number of Buldings
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Buildings of TESDA Provincial Training Center Building, Ligao City, Albay (Phase 2)
Physical Target :
CW1 - Construction of Multi Purpose Building - 2 Number of Buldings |
October 14, 2024 |
FY 2024 |
|
310111100640000 |
May 13, 2024 |
Region IX |
Regional Office IX |
UACS No. 310111100640000
Project ID: P00800392MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary Roads
Seit-Tayungan-Camp Andres Rd - (S00020SL) K38+000 - K39+830, K39+830 - K40+510
CW1- Construction of Drainage Structure along Road: 4,960.00 ln.m.
Unit Cost: ₱ 14,008.06/ ln.m.
EAO: ₱ 2,520,000.00
Allocation: ₱ 72,000,000.00 |
October 11, 2024 |
2024 |
WIN4XY00207 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Zambales 2nd District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Olongapo - Bugallon Rd - K0153+387 - K0153+944 |
October 11, 2024 |
CY 2024 |
WIN4F08126 |
CAA No. 2024-04-0035 |
April 29, 2024 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 310102101679000
Project ID.: P00801687LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Gen Santos Ave – K0025 + (-879) – K0025 + (-830), K0025 + (-830) – K0025 +
(-786), K0025 + (-786) – K0025 + (-528), K0025 + (-450) – K0025 + (-320)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 0.672 lane km
Unit Cost (P’000) = P 7,737.919/ lane km
Allocation = P 5,199,880.00
EAO = P 106,120.00
Total = P 5,306,000,00
As Modified
UACS No. 310102101679000
Project ID.: P00801687LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
General Santos Ave – K0025 + 480 – K0025 + 670 (Westbound), K0025 + 632 – K0025 +
668 (Eastbound)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 0.226 lane km
Unit Cost (P’000) = P 23,008.318/ lane km
Allocation = P 5,199,880.00
EAO = P 106,120.00
Total = P 5,306,000,00
Bar Code #WIN4F08126
|
October 11, 2024 |
CY 2024 |
WIN4XY00365 |
CAA No. 2024-04-0030 |
April 29, 2024 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 310102101678000
Project ID.: P00801686LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Gen Santos Ave – K0025 + (-180) – K0025 + (-060)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 0.240 lane km
Unit Cost = P 10,722.833/ lane km
Allocation = P 2,573, 480.00
EAO = P 52,520.00
Total = P 2,626,000,00
As Modified
As per GAA/Original
UACS No. 310102101678000
Project ID.: P00801686LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
General Santos Ave – K0025 + 480 – K0025 + 632
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 0.240 lane km
Unit Cost = P 16,930.789/ lane km
Allocation = P 2,573, 480.00
EAO = P 52,520.00
Total = P 2,626,000,00
Bar Code #WIN4XY00365
|
October 11, 2024 |
CY 2024 |
WIN4F08125 |
CAA No. 2024-04-0030 |
April 29, 2024 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 320101111513000
Project ID.: P00824584LZ
OO2: Protect Lives and Properties Against Major Floods
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Drainage System at Sta. Maria and Vicinity, Brgy. Dela Paz, Pasig City
Physical Target: CW1 = Rehabilitation/ Major Repair of Drainage Strcucture – 320 linear meters
Unit Cost (P’000) = P 36.75/linear meters
Allocation (P’000)= P 11,760.00
EAO (P’000) = P 240.00
Total (P’000) = P 12,000,00
As Modified
As per GAA/Original
UACS No. 320101111513000
Project ID.: P00824584LZ
OO2: Protect Lives and Properties Against Major Floods
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Drainage System at Sta. Maria and Vicinity, Brgy. Santolan, Pasig City
Physical Target: CW1 = Rehabilitation/ Major Repair of Drainage Strcucture – 188 linear meters
CW2 = Rehabilitation of Paved Road – 0.188 lane km
Unit Cost (P’000) = P 47.11/linear meters
= P 15,441.86/ lane km
Estimated Cost (P’000) = P 8,856.93
(P’000) = P 2,903.07
EAO (P’000) = P 240.00
Total (P’000) = P 12,000,00
Bar Code #WIN4F08125
|
October 10, 2024 |
2024 |
WIN4XY00407 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800891LZ
UACS : 310107100613000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) - K0520 + 720 - K0520 + 815
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 522.4 Square meters
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) - K0520 + 720 - K0520 + 815
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 127.32 Square meters
|
October 10, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Camarines Sur 5th District Engineering Office |
Project ID : P00800897LZ
UACS : 310109101589000
FROM :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Albay Diversion Rd - K0453 + 980 - K0454 + 042
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 200 Square meters
TO :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Albay Diversion Rd - K0444 + 255 - K0444 + 305
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 344.2 Square meters |
October 10, 2024 |
2024 |
WIN4XY00408 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00805162LZ
UACS : 310101101257000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0429 + 183 - K0429 + 250, K0429 + 264 - K0429 + 385, K0429 + 404 - K0429 + 440, K0429 + 450 - K0429 + 495, K0429 + 516 - K0429 + 570
Physical Target :
CW1 - Preventive Maintenance of Road - Concrete Reblocking - 1.019 Lane Km
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0429 + 183 - K0429 + 250, K0429 + 264 - K0429 + 385, K0429 + 404 - K0429 + 440, K0429 + 450 - K0429 + 495, K0429 + 516 - K0429 + 570
Physical Target :
CW1 - Preventive Maintenance of Road - Concrete Reblocking - 0.699 Lane Km |
October 10, 2024 |
2024 |
300207101112000 |
FY 2024 GAA |
January 2, 2024 |
Region II |
Regional Office II |
Construction/Improvement of Various Infrastructures in Support of National Security (Tatag ng Imprastraktura para sa Kapayapaan at Seguridad Program - TIKAS) - Construction of Road Network (Training Ground), Mt. Leson, San Vicente, Sta. Ana, Cagayan,
Phase III
|
October 9, 2024 |
FY 2024 GAA |
P00834662MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Road Safety Devices along Jct. Maniklin-Gov. Generoso Rd - K1744 + (-422) - K1722 + 596
Physical Target:
CW1: 9,005.00 lineal meters (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Road Safety: Pavement Markings)
EAO: P 1,000,000.00
TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Road Safety Devices along Jct. Maniklin-Gov. Generoso Rd - K1744 + (-422) - K1772 + 596
Physical Target:
CW1: 29,116.00 lineal meters (Road Safety: Pavement Markings)
CW2: 170.00 number of units (Road Safety: Roadway Lighting)
CW3: 341.00 number of signs (Road Safety: Road Signs)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 21,017,270.26 (Road Safety: Pavement Markings)
CW2: P 18,585,245.35 (Road Safety: Roadway Lighting)
CW2: P 9,397,484.39 (Road Safety: Road Signs)
EAO: P 1,000,000.00 |
October 8, 2024 |
2024 |
310204102803000 |
FY 2024 GAA |
January 2, 2024 |
Region II |
Regional Office II |
Network Development - Construction of By-Pass and Diversion Roads - Construction of Tuguegarao West Diversion Road (Jct. Carig-Linao-Atulayan-Bagay-Buntun) Cagayan, Package 4 |
October 8, 2024 |
2024 |
310106101100000 |
FY 2024 GAA |
January 2, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Peñablanca-Callao Cave Rd - K0483+550- K0484+020 |
October 8, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800390LZ
UACS : 310207100318000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0508 + 778, K0508 + 878
Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersection
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0502 + 575, K0509 + 805
Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersection |
October 8, 2024 |
2024 |
310203100798000 |
FY 2024 GAA |
January 2, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
FROM:
Network Development - Road Widening - Tertiary Roads - CVR Regional Govt Center Rd Network - (S00707LZ) Chainage 000 - Chainage 1434
TO:
Network Development - Road Widening - Tertiary Roads - CVR Regional Govt Center Rd Network - (S00707LZ) Chainage 000 - Chainage 297 |
October 8, 2024 |
2024 |
300215104458000 |
FY 2024 GAA |
January 2, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of La Suerte- Nabbialan- Cordova Road, Amulung, Cagayan (Phase V)
|
October 8, 2024 |
2024 |
300215104470000 |
FY 2024 GAA |
January 2, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road , Brgy. Maguirig, Solana, Cagayan |
October 8, 2024 |
2024 |
WIN4XY00411 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800400LZ
UACS :3102071003240000
FROM :
ORGANIZATIONAL OUTCOME 1- Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0636 + 777 - K0636 + 979, K0638 + 788 K0639 + 182
Physical Target :
CW1 - Off-Carriageway Improvement - Paving of Shoulders - 3282.7 Square meters
TO :
ORGANIZATIONAL OUTCOME 1- Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0636 + 777 - K0636 + 983
Physical Target :
CW1 - Off-Carriageway Improvement - Paving of Shoulders - 1236 Square meters
CW2 - Construction of Road Slope Protection Structure - 1407.85 Square meters |
October 8, 2024 |
FY 2024 GAA |
WIN4XW00156 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Tagum City Diversion Road, K1458 + 195 - K1459 + 000, K1459+ 310 - K1459 + 535,
K1460 + 001 - K1461 + 640, K1462 + 000 - K1462 + 705, K1463 + 000 - K1464 + 197, Davao del Norte
Physical Target:
CW1: 10.000 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Tagum City Diversion Road, K1458 + (-573) - K1456 + 135,
K1461 + 090 - K1461 + 115, Davao del Norte
Physical Target:
CW1: 3.589 lane km (Road Widening)
CW2: 3,589.00 lineal meters (Construction of Drainage Structure along Road)
CW3: 49.00 no. of units (Road Safety: Roadway Lighting)
ROW: 909.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 58,649,636.00 (Road Widening)
CW2: P 20,683,329.00 (Construction of Drainage Structure along Road)
CW3: P 9,212,035.00 (Road Safety: Roadway Lighting)
ROW: P 8,000,000.00 (ROW Acquisition)
EAO: P 3,500,000.00 |
October 8, 2024 |
2024 |
320101111776000 |
FY 2024 GAA |
January 2, 2024 |
Region II |
Isabela 3rd District Engineering Office |
FROM:
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Magat River Flood Control Project, Barangay Rang - Ay (Sta. 0+000 - Sta. 1+330), Cabatuan, Isabela
TO:
FROM:
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Magat River Flood Control Project, Barangay Rang - Ay (Sta. 0+000 - Sta. 0+674), Cabatuan, Isabela |
October 7, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800380LZ
UACS : 31020710031400
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0498 + 655, K0498 + 755
Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersections
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0498 + 759, K0500 + 655.50
Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersections
CW2 - Constructions of Drainage Structure along Road - 220 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 240 Square meters |
October 7, 2024 |
2024 |
WIN4XY00409 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800382LZ
UACS : 310207100315000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0499 + 390, K0499 + 490
Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersections
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0499 + 230, K0499 + 381
Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersections
CW2 - Construction of Drainage Structure along Road - 399 Lineal meters |
October 7, 2024 |
2024 |
WIN4F08211 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800389LZ
UACS : 310207100313000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0496 + 615, K0496 + 715, K0497 + 914
Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 3 Number of Intersections
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0489 + 695, K0490 + 853, K0490 + 914
Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 3 Number of Intersections
CW2 - Construction of Drainage Structure along Road - 305.82 Lineal meters |
October 4, 2024 |
2024 |
WIN4F08209 |
SR2024-01- 007243 |
January 31, 2024 |
Region VIII |
Southern Leyte Sub-District Engineering Office |
Convergence and Special Support Program
Basic Infrastruture Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Construction of Brgy. Dayanog Road, St. Bernard, Southern Leyte
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 9.900 M
0.197 Lane Km
EAO P .100 M
Total P 10.00 M
AS MODIFIED:
Construction of Brgy. Dayanog Road, San Juan, Southern Leyte
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 6.26864138 M
0.664 Lane Km
CW2- Construction of Drainage Structure P 2.31241121 M
along Road: 336.00 Lineal Meters
CW3- Construction of Road Slope Protection: P 1.31894741 M
267.36 Square Meters
EAO P .100 M
Total P 10.00 M
|
October 4, 2024 |
2024 |
WIN4XY00410 |
GAA FY 2024 |
March 21, 2024 |
Region VIII |
Eastern Samar District Engineering Office |
Convergence and Special Support Program
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
AS PER GAA/ORIGINAL:
Access Road leading to Tourist Destination from Borongan Airport to Hilangagan Beach, Borongan City, Eastern Samar
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 4.900 M
0.400 Lane Km
EAO P .100 M
Total P 5.00 M
AS MODIFIED:
Access Road leading to Tourist Destination from Borongan Airport to Hilangagan Beach, Borongan City, Eastern Samar
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 2.02132236 M
0.0556 Lane Km
CW2- Construction of Road Slope : P 2.87867764 M
Protection Structure 128.42 Square Meters
EAO P .100 M
Total P 5.00 M
|
October 4, 2024 |
2024 |
|
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services
AS PER GAA/ORIGINAL:
Rehabilitation of Multi-Purpose Building, Barangay 23, Tacloban City, Leyte
Physical Target: Allocation:
CW1- Rehabilitation/Major Repair of Multi P 4.950 M
Purpose Building: 1.00 Building
EAO P .50 M
Total P 5.00 M
AS MODIFIED:
Rehabilitation of Multi-Purpose Building, Barangay 23, Tacloban City, Leyte
Physical Target: Allocation:
CW1- Rehabilitation/Major Repair of Multi P 1.585 M
Purpose Building: 1.00 Building
EAO P .50 M
EXC P 3.365
Total P 5.00 M
|
October 4, 2024 |
2024 |
|
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
Local Program
Buildings and Other Structures – Multipurpose/ Facilities – National Building Program
AS PER GAA/ORIGINAL:
Repair/improvement of Multipurpose Building, DBM RO VIII, Tacloban City
Physical Target: Allocation:
CW1- Rehabilitation/Major Repair of Multi P 4.825 M
Purpose Building: 1.00 Building
EAO P .175 M
Total P 5.00 M
AS MODIFIED:
Repair/improvement of Multipurpose Building, DBM RO VIII, Tacloban City
Physical Target: Allocation:
CW1- Rehabilitation/Major Repair of Multi P 3.225 M
Purpose Building: 1.00 Building
EAO P .175 M
EXC P 1.6 M
Total P 5.00 M
|
October 4, 2024 |
2024 |
WIN4F08210 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bataan 1st District Engineering Office |
Network Development Program - Off-Carriageway Improvement - Secondary Road
Roman Expressway - K0102+173 - K0102+825 |
October 4, 2024 |
2024 |
WIN4XY00400 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Nueva Ecija 1st District Engineering Office |
Network Development Program - Construction of By-Pass and Diversion Roads
Sto. Rosario - Carmen Road, Zaragoza By-pass, Package 1, Nueva Ecija |
September 27, 2024 |
2024 |
WIN4XY00389 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bataan 2nd District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and / or Bridges from the National Road/s leading to Major / Strategic Public Buildings / Facilities
Construction of Bridge at Barangay Wawa, Pilar, Bataan |
September 27, 2024 |
2024 |
WIN4F08116 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 3rd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Along Eastern Bulacan Rd - K0075+416 - K0077+783, Doña Remedios Trinidad, Bulacan |
September 25, 2024 |
2024 |
P00800059MN |
GAA2024 |
January 1, 2024 |
Region X |
Bukidnon 3rd District Engineering Office |
P00800059MN
310202101759000
OO1: Ensure Safe and Reliable National Road System, Network Development- Road Widening-Secondary Road
FROM:
Barandias-Dominorog Rd - K1610 + (-219) - K1610 +736
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 1.91 Lane Km
Allocation:
CW1: Php 39,200,000.00
EAO: Php 800,000.00
TO:
Barandias-Dominorog Rd - K1610 + (-219) - K1610 + 551
Type of Work:
CW1- Road Widening
CW2- Construction of Drainage Structure along Road
Physical Target:
CW1- 1.54 Lane Km
CW2- 641.6 Linear Meter
Allocation:
CW1: Php 32,880,294.27
CW2: Php 6,319,705.73
EAO: Php 800,000.00 |
September 25, 2024 |
2024 |
P00800063MN |
GAA2024 |
January 1, 2024 |
Region X |
Bukidnon 3rd District Engineering Office |
P00800063MN
310203100884000
OO1: Ensure Safe and Reliable National Road System, Network Development- Road Widening-Tertiary Roads
FROM:
Jct SH-Aglayan-Alanib-Ticlaan Road (Ticlaan-Paganan Sect) - K1515 + 320 - K1516 +200
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 1.70 Lane Km
Allocation:
CW1: Php 33,138,700.00
EAO: Php 676,300.00
TO:
Jct SH-Aglayan-Alanib-Ticlaan Road (Ticlaan-Paganan Sect) - K1515 + 320 - K1516 + 720
Type of Work:
CW1- Road Widening
CW2- Construction of Slope Protection Structure
Physical Target:
CW1- 0.80 Lane Km
CW2- 553.94 Square Meter
Allocation:
CW1: Php 26,413,150.00
CW2: Php 6,725,550.00
EAO: Php 676,300.00 |
September 24, 2024 |
2024 |
P00803857MN |
SR2024-01-003689 |
January 29, 2024 |
Region X |
Regional Office X |
P00803857MN
310204102715000
OO1: Network Development Program - Construction of By-Pass and Diversion Roads
FROM:
Construction of Bypass Road Extension (Sugod-Kahaponan Section), Bukidnon, Package 10
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1-6.00 Lane Km
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00
TO:
Construction of Bypass Road Extension (Sugod-Kahaponan Section), Bukidnon, Package 10
Type of Work:
CW1- Construction of Concrete Bridge
CW2- Off-Carriageway Improvement: Paving of Shoulders
ROW- ROW Acquisition
Physical Target:
CW1-2,361.15 Square meters
CW2-15,360.00 Square meters
ROW-5,000.00 Square meters
Allocation:
Total: Php 200,000,000.00
CW1: Php 115,800,000.00
CW2: Php 67,550,000.00
ROW: Php 9,650,000.00
EAO: Php 7,000,000.00 |
September 24, 2024 |
2024 |
P00803888MN |
SR2024-03-013788 |
March 20, 2024 |
Region XII |
Regional Office XII |
Contract ID: 24M00217
Project Name: Saldua Bridge in Polomolok, South Cotabato
Type of Work: Replacement of Bridge
Physical Target
From: 333.900 Square meters
To: 477.0 Square meters |
September 23, 2024 |
2024 |
300219102208000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Isabela 4th District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities - Construction of Bucal Norte Flood Control Structure, Section 3, Dinapigue, Isabela |
September 23, 2024 |
2024 |
300219102201000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Isabela 4th District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities - Construction of Dimaluade Flood Control Structure, Section 1, Dinapigue, Isabela |
September 23, 2024 |
2024 |
300219102209000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Isabela 4th District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities - Construction of Bucal Norte Flood Control Structure, Section 4, Dinapigue, Isabela |
September 23, 2024 |
2024 |
300219102136000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Isabela 4th District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities - Construction of Dedekkel Flood Control Structure, Section 1, Dinapigue, Isabela |
September 20, 2024 |
CY 2024 |
WIN4F08181 |
UACS No. 300225101728000 |
March 20, 2024 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 300225101728000
Project ID.: P00845860LZ
Convergence and Special Support Program
Basic Infrastructure Program (BIP) – Flood Mitigation Structures protecting Major/Strategic Public Buildings/Facilities
Rehabilitation of Drainage System along C-5 Service Road (Phase II), Brgy. East Rembo, Makati City
Physical Target: CW1 = Rehabilitation/Major Repair of Drainage Structure along Road – 796 lineal meters
Unit Cost (P’000) = P 18.6558/lineal meters
Allocation (P’000) = P 14,850.000
EAO (P’000) = P 150.00
Total (P’000) = P 15,000,00
As Modified
UACS No. 300225101728000
Project ID.: P00845860LZ
Convergence and Special Support Program
Basic Infrastructure Program (BIP) – Flood Mitigation Structures protecting Major/Strategic Public Buildings/Facilities
Rehabilitation of Drainage System along C-5 Service Road (Phase II), Brgy. East Rembo, Taguig City
Physical Target: CW1 = Rehabilitation/Major Repair of Drainage Structure along Road – 515 lineal meters
CW2 = Rehabilitation of Paved Road = 1.03 lane km
Unit Cost (P’000) = P 23.5933/lineal meters
= P 2,601.154/lane km
Allocation (P’000)= P 12,150.539
P 2,679.188
Excess (P’000) = P 20.272
EAO (P’000) = P 150.00
Total (P’000) = P 15,000,00
Bar Code #WIN4F08181
|
September 20, 2024 |
CY 2024 |
WIN4XY00396 |
UACS No. 300221104954000 |
March 20, 2024 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 300221104954000
Project ID.: P00844960LZ
Convergence and Special Support Program
Basic Infrastructure Program (BIP) – Access Roads and/or Bridges from National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation of Xyris Street including Slope Protection of Xyris Creek, Brgy. Rizal, Makati City
Physical Target: CW1 = Rehabilitation of Paved Road – 1.4 lane km
Unit Cost (P’000) = P 10,607.142/lane km
Allocation (P’000)= P 14,850.00
EAO (P’000) = P 150.00
Total (P’000) = P 15,000,00
As Modified
UACS No. 300221104954000
Project ID.: P00844960LZ
Convergence and Special Support Program
Basic Infrastructure Program (BIP) – Access Roads and/or Bridges from National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation of Xyris Street including Slope Protection of Xyris Creek, Brgy. Rizal, Taguig City
Physical Target: CW1 = Rehabilitation of Paved Road – 0.571 lane km
CW2 = Rehabilitation/Major Repair of Slope Protection Structure = 2,568.87 sqm.
Unit Cost (P’000) = P 15,843.850/lane km
= P 2.258/sqm.
Estimated Cost (P’000)= P 9,046.838
P 5,800.578
Excess (P’000) = P 2.583
EAO (P’000) = P 150.00
Total (P’000) = P 15,000,00
Bar Code #WIN4XY00396
|
September 20, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00837418LZ
UACS :
FROM :
CONVERGENCE AND SPECIAL PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0524 + 480 - K0525 + 000, K0533 + 600 - K0534 + 300, K0536 + 190 - K0536 + 500, K0537 + 243 - K0537 + 840, K0537 + 847 - K0538 + 550
Physical Target :
CW1 - Rehabilitation of Paved Road - 4.542 Lane Km
CW2 - Preventive Maintenance of Road Asphalt Overlay - 1.032 Lane Km
TO :
CONVERGENCE AND SPECIAL PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0514 + 981 - K0515 + 248, K0524 + 480 - K0525 + 000, K0533 + 600 - K0534 + 300, K0536 + 190 - K0536 + 500, K0537 + 243 - K0537 + 840, K0537 + 847 - K0538 + 550
Physical Target :
CW1 - Rehabilitation of Paved Road - 5.574 Lane Km
CW2 - Preventive Maintenance of Road Asphalt Overlay - 1.032 Lane Km
|
September 20, 2024 |
2024 |
WIN4F08182 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00820435LZ
UACS : 320101111025000
FROM :
OO2 - Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System - Construction of Flood Control Matogdon River Flood Mitigation Structure in Brgy. Mabilo II, San Antonio, Labo, Camarines Norte
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 244.14 Lineal Meters
TO :
OO2 - Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System - Construction of Flood Control Matogdon River Flood Mitigation Structure in Brgy. Mabilo II and Brgy. San Antonio, Labo, Camarines Norte
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 227.26 Lineal Meters |
September 20, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00821005LZ
UACS : 320101111049000
FROM :
ORGANIZATIONAL OUTCOME 2 - Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Matogdon River Flood Mitigation Structure in Brgy. Mabilog 11, San Antonio, Labo (Phase II), Camarines Norte
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 137.49 Lineal meters
TO :
ORGANIZATIONAL OUTCOME 2 - Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Matogdon River Flood Mitigation Structure in Brgy. Mabilog II and Brgy. San Antonio, Labo (Phase II), Camarines Norte
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 143.88 Lineal meters
|
September 20, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00832311LZ
UACS : 300207101061000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Various Infrastructures in Support of National Security (Tatag ng Imprastraktura para sa Kapayapaan at Seguridad Program - TIKAS) - Construction/ Improvement of Various Infrastructure Projects 9th Infantry (Spear) Division, Philippine Army, Cap Elias Angeles, San Jose, Pili, Camarines Sur
Physical Target :
CW1 - Construction of Other Facilities - 1 Number of Facilities
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Various Infrastructures in Support of National Security (Tatag ng Imprastraktura para sa Kapayapaan at Seguridad Program - TIKAS) - Construction/ Improvement of Various Infrastructure Projects 9th Infantry (Spear) Division, Philippine Army, Cap Elias Angeles, San Jose, Pili, Camarines Sur
Physical Target :
CW1 - Construction of Other Facilities - 23 Number of Facilities |
September 19, 2024 |
2024 |
WIN4XY00406 |
SR2024-01-002054 |
January 24, 2024 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
AS PER GAA/ORIGINAL:
Palo – Pastrana – Sta Fe By-Pass Road, Leyte
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 144.750 M
15.00 Lane Km
EAO P 5.250 M
Total P 150.00 M
AS MODIFIED:
Palo – Pastrana – Sta Fe By-Pass Road, Leyte
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 107.97176206 M
4.20 Lane Km
CW2- Construction of Road Slope Protection P 36.77823794 M
Structure: 7,067.95 Square Meters
EAO P 5.250 M
Total P 150.00 M
|
September 19, 2024 |
2024 |
WIN4XW00153 |
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Baguio City District Engineering Office |
"From:
Installation of Road Safety Devices along
Govt Ctr Cut-Off Rd - K0249 + (-260) - K0249 + 100,
Loakan Rd - K0246 + 323 - K0246 + 940, K0249 + 875 - K0250 + 096, K0250 + 380 - K0250 + 842,
Magsaysay Ave. (Trinidad Rd) - K0251 + (-120) - K0251 + 180, (S00485LZ) Chainage 0 - Chainage 195,
Magsaysay Ave (Trinidad Rd) West Service Rd (S00486LZ) - Chainage 0 - Chainage 34,
Lt Tacay Rd - K0308 + 000 - K0308 + 400,
South Drive - K0251 + 120 - K0251 + 860,
Harrison Rd No 1 (S04713LZ) - Chainage 360 - Chainage 780, (S04714LZ) Chainage 0 - Chainage 780,
Legarda Rd - K0251 + (-160) - K0251 + 080;
Type of Work:
Road Safety: Solar / Reflectorized Pavement Studs;
Physical Target:
2761 Number of Units;
Allocation:
Php 45,000,000"
"To:
Installation of Road Safety Devices along
Govt Ctr Cut-Off Rd - K0249 + (-291) - K0249 + 284,
Loakan Rd - K0245 + (-162) - K0250 + 842
Magsaysay Ave. (Trinidad Rd) - K0251 + (-463) - K0252 + 444, (S00485LZ) Chainage 0 - Chainage 195,
Magsaysay Ave (Trinidad Rd) West Service Rd (S00486LZ) - Chainage 0 - Chainage 244,
Lt Tacay Rd - K0308 + (-599) - K0308 + 754,
South Drive - K0251 + (-295) - K0252 + 755,
Harrison Rd No 1 (S04713LZ) - Chainage 0 - Chainage 807, (S04714LZ) Chainage 0 - Chainage 807,
Legarda Rd - K0251 + (-360) - K0251 + 980;
Type of Work:
CW1: Road Safety: Roadway Lighting
CW2: Road Safety: Pavement markings;
Physical Target:
CW1: 124 Number of Units
CW2: 15,496 Lineal meters;
Allocation:
Php 45,000,000"
|
September 18, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Olongapo-Bugallon Rd - K0164+149 - K0164+930, K0232+000 - K0234+026, K0234+128 - K0235+000, K0243+000 - K0244+000 |
September 18, 2024 |
2024 |
WIN4XY00400 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Nueva Ecija 1st District Engineering Office |
Network Development Program - Construction of By-Pass and Diversion Roads
Sto. Rosario - Carmen Road, Zaragoza By-pass, Package 1, Nueva Ecija |
September 18, 2024 |
2024 |
WIN4XY00399 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Arayat-Magalang Rd - K0095+000 - K0097+308 |
September 18, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Pampanga 2nd District Engineering Office |
Network Development Program - Road Widening - Tertiary Roads
Lubao Div Rd - K0084+250 - K0084+447.84, K0084+499.84 - K0084+627.84, K0084+676.74 - K0084+760, K0084+780 - K0085+238 |
September 18, 2024 |
2024 |
WIN4XY00392 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Manila North Rd - K0040+726 - K0040+970 |
September 18, 2024 |
2024 |
WIN4XY00398 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Manila North Rd - K0044+500 - K0044+563, K0047+770 - K0047+860, K0047+885 - K0047+945, K0048+000 - K0048+090 |
September 18, 2024 |
2024 |
WIN4XY00401 |
SR2024-01-002085 |
January 27, 2024 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Tertiary Roads
AS PER GAA/ORIGINAL:
Bagahupi - Babatngon - Sta.Cruz-Barugo - Carigara Rd. (S00064LT) K0924+664 - K0924+800, K0925+154 - K0925+220
Physical Target: Allocation:
CW1- Off-Carriageway Improvement: P 144.750 M
Paving of Shoulders: 606 Square Meters
EAO P 5.250 M
Total P 150.00 M
AS MODIFIED:
Bagahupi - Babatngon - Sta.Cruz-Barugo - Carigara Rd. (S00064LT) K0924+664 - K0924+800, K0925+154 - K0925+220, K0925+1240-K0925+1280
Physical Target: Allocation:
CW1- Off-Carriageway Improvement P 1.749361 M
Paving of Shoulders: 726 Square Meters
CW2- Construction of Road Slope Protection P 143.000639 M
Structure: 5,611 Square Meters
EAO P 5.250 M
Total P 150.00 M
|
September 18, 2024 |
2024 |
WIN4XY00402 |
SR2024-01-004759 |
January 29, 2024 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Secondary Roads
AS PER GAA/ORIGINAL:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Road - K0810+751 - K0810+840
Physical Target: Allocation:
CW1- Off-Carriageway Improvement: P 144.750 M
Paving of Shoulders: 267 Square Meters
EAO P 5.250 M
Total P 150.00 M
AS MODIFIED:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Road - K0810+840 - K0810+948
Physical Target: Allocation:
CW1- Off-Carriageway Improvement P 4.328339 M
Paving of Shoulders: 216 Square Meters
CW2- Construction of Road Slope Protection P 140.421661 M
Structure: 6,026 Square Meters
EAO P 5.250 M
Total P 150.00 M
|
September 18, 2024 |
2024 |
WIN4XY00391 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Regional Office III |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (LZ) - K0085+065 - K0085+758, K0086+331 - K0087+076 |
September 18, 2024 |
2024 |
WIN4XY00403 |
SR2024-01-004759 |
January 29, 2024 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Secondary Roads
AS PER GAA/ORIGINAL:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Road - K0810+751 - K0810+840
Physical Target: Allocation:
CW1- Off-Carriageway Improvement: P 144.750 M
Paving of Shoulders: 267 Square Meters
EAO P 5.250 M
Total P 150.00 M
AS MODIFIED:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Road - K0812+312 - K0812+392
Physical Target: Allocation:
CW1- Off-Carriageway Improvement P 11.474981 M
Paving of Shoulders: 240 Square Meters
CW2- Construction of Road Slope Protection P 133.275019 M
Structure: 5,744 Square Meters
EAO P 5.250 M
Total P 150.00 M
|
September 18, 2024 |
2024 |
WIN4XY00390 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 1st District Engineering Office |
Network Development Program - Construction of By-Pass and Diversion Roads
Construction of Bypass/Alternate/Diversion Road - Baliuag Diversion Road in Baliuag, Bulacan (Phase 1) |
September 18, 2024 |
2024 |
WIN4XY00395 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 1st District Engineering Office |
Network Development Program - Construction of By-Pass and Diversion Roads
Construction of Bypass/Alternate/Diversion Road - Baliuag Diversion Road, Baliuag, Bulacan (Phase 2) |
September 18, 2024 |
FY 2024 GAA |
P00834654MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Road Safety: Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1564 + (-478) - K1593 + 057, Davao del Sur
Physical Target:
CW1: 29,696.00 lineal meters (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Road Safety: Pavement Markings)
EAO: P 1,750,000.00
TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Road Safety: Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1556 + 700 - K1556 + 885,
K1557 + 761 - K1559 + 201, K1560 + 002 - K1560 + 917, Davao del Sur
Physical Target:
CW1: 2,551.020 lineal meters (Road Safety: Pavement Markings)
CW2: 261.00 no. of road signs (Road Safety: Roadway Lighting)
CW3: 2,910.72 square meters (Off-Carriageway Improvement: Construction of Traffic Island)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 5,524,371.00 (Road Safety: Pavement Markings)
CW2: P 24,309,840.00 (Road Safety: Roadway Lighting)
CW3: P 18,415,790.00 (Off-Carriageway Improvement: Construction of Traffic Island)
EAO: P 1,750,000.00 |
September 18, 2024 |
FY 2024 GAA |
P00803811MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1497 + 500 - K1500 + 345
Physical Target:
CW1: 5.626 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1514 + 000 - K1515 + 670
Physical Target:
CW1: 6.592 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00 |
September 18, 2024 |
2024 |
P00834863MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Misamis Occidental 1st District Engineering Office |
P00834863MN
300215104031000
CSSP - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
FROM:
Construction of Barangay Macalibre Alto, Barangay Burgos, Barangay Piniel Road, Lopez Jaena, Misamis Occidental
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 2.25 Lane Km
Allocation:
CW1: Php 54,802,350.00
EAO: Php 1,987,650.00
TO:
Construction of Barangay Macalibre Alto, Barangay Burgos, Barangay Peniel Road, Lopez Jaena, Misamis Occidental
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection/Structure
Physical Target:
CW1- 4.120 Lane Km
CW2- 656.56 Square Meters
Allocation:
CW1: Php 48,984,803.36
CW2: Php 5,817,546.64
EAO: Php 1,987,650.00 |
September 18, 2024 |
2024 |
WIN4XY00405 |
SR2024-01-008099 |
January 31, 2024 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0971 + 035 - K0972 + 000, K0996 + 153 - K1000 + 000
Physical Target: Allocation:
CW1- Preventive Maintenance of Road P 113.897020 M
Asphalt Overlay: 9.628 Lane Km
EAO P 4.130980 M
Total P 118.028 M
AS MODIFIED:
Daang Maharlika (LT) - K0971 + 035 - K0972 + 000, K0996 + 153 - K0998 + 636
Physical Target: Allocation:
CW1- Preventive Maintenance of Road P 113.897020 M
Asphalt Overlay: 6.874 Lane Km
EAO P 4.130980 M
Total P 118.028 M
|
September 17, 2024 |
2024 |
P00830255MN |
SR2024-02-010018 |
February 13, 2024 |
Region X |
Regional Office X |
P00830255MN
300201100125000
CSSP:Construction/ Improvement of Access Roads leading to Airports (Kalsada Tungo sa Paliparan, Riles at Daungan Program - KATUPARAN)
FROM:
CConstruction of Access Road leading to Bukidnon Airport (Jct. KKK Road/Langcataon Pangantucan-Jct Don Carlos-Kdingilan Road/San Nicolas(Langcataon, Pangantucan-kawilihan-Mahayahay-Pualas, Don Carlos Section), Package 8, Bukidnon
Type of Work:
CW1- Construction of Concrete Bridge
Physical Target:
CW1-954.00 Square meters
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00
TO:
Construction of Access Road leading to Bukidnon Airport (Jct. KKK Road/Langcataon Pangantucan-Jct Don Carlos-Kdingilan Road/San Nicolas(Langcataon, Pangantucan-kawilihan-Mahayahay-Pualas, Don Carlos Section), Package 8, Bukidnon
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1-10.60 Lane Km
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00 |
September 17, 2024 |
2024 |
P00833225MN |
SR2024-01-005535 |
January 30, 2024 |
Region X |
Regional Office X |
P00833225MN
300215104036000
CSSP:Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Jct. Sayre Highway to Jct. Don Carlos-Kadingilan Rd (Poblacion, Kitaotao-Calao-calao, Don Carlos), Bukidnon, Package 2
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1-9.40 Lane Km
Allocation:
Total: Php 180,000,000.00
CW1: Php 173,700,000.00
EAO: Php 6,300,000.00
TO:
Construction of Jct. Sayre Highway to Jct. Don Carlos-Kadingilan Rd (Poblacion, Kitaotao-Calao-calao, Don Carlos), Bukidnon, Package 2
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1-5.088 Lane Km
CW2-5,950 Square meters
Allocation:
Total: Php 180,000,000.00
CW1: Php 143,952,301.32
CW2: Php 29,747,698.68
EAO: Php 6,300,000.00 |
September 16, 2024 |
2024 |
|
SR2024-02-011569 |
February 24, 2024 |
Region VIII |
Regional Office VIII |
Convergence and Special Support Program
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
AS PER GAA/ORIGINAL:
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0840 + 000 - K0840 + 200, K0846 + 081 - K0846 + 808
Physical Target: Allocation:
CW1- Reconstruction to Concrete Pavement: P 48.422735 M
1.854 Lane Km
EAO P 1.756265 M
Total P 50.179 M
AS MODIFIED:
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0840 + 000 - K0840 + 107, K0840 + 850 - K0841 + 400, K0841 + 900 - K0842 + 000, K0853 + 000 - K0853 +520, K0853 + 541 - K0854 + 000
Physical Target: Allocation:
CW1- Reconstruction to Concrete Pavement: P 48.422735 M
3.711 Lane Km
EAO P 1.756265 M
Total P 50.179 M
|
September 16, 2024 |
2024 |
|
SR2024-02-008265 |
February 24, 2024 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Bridge – Widening of Permanent Bridges
AS PER GAA/ORIGINAL:
Mayuga Br. (B00607LT) along Daang Maharlika (LT)
Physical Target: Allocation:
CW1- Widening of Bridge: P 28.950 M
146.400 Square Meters
EAO P 1.050 M
Total P 30.00 M
AS MODIFIED:
Mayuga Br. (B00607LT) along Daang Maharlika (LT)
Physical Target: Allocation:
CW1- Widening of Bridge: P 28.950 M
198.432 Square Meters
EAO P 1.050 M
Total P 30.00 M
|
September 16, 2024 |
2024 |
|
SR2024-02-008224 |
February 1, 2024 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads -Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0905 + 604 - K0906 + 505
Physical Target: Allocation:
CW1- Construction of Drainage Structure : P 45.208320 M
along Road: 1,580.00 Lineal Meters
EAO P 1.639680 M
Total P 46.848 M
AS MODIFIED:
Daang Maharlika (LT) – K0904 + 689 – K0905 + 007, K0905 + 984 - K0906 + 505, K0909 + 017 – K0909 + 274
Physical Target: Allocation:
CW1- Construction of Drainage Structure: P 45.208320 M
along Road: 1,707.50 Lineal Meters
EAO P 1.639680 M
Total P 46.848 M
|
September 16, 2024 |
2024 |
WIN4XY00376 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800541LZ
UACS : 310205101028000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - Palanas - San Isidro Road, Jovellar, Albay
Physical Target :
CW1 - Construction of Concrete Road - 12.192 Lane Km
TO
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - Palanas - San Isidro Road, Jovellar, Albay
Physical Target :
CW1 - Construction of Concrete Road - 7.9633 Lane Km
CW2 - Construction of Gravel Road - 5.31366 Lane Km
CW3 - Construction of Road Slope Protection Structure - 4017..18 Square meters |
September 16, 2024 |
2024 |
WIN4XY00370 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800684LZ
UACS : 310110100464000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road - System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads - Daang Maharlika (LZ) - K0521 + 100 - K0522 + 035
Physical Target :
CW1 - Construction of Drainage Structure along Road - 1868 Lineal meters
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road - System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads - Daang Maharlika (LZ) - K0521 + 090.50 - K0521 + 847.30
Physical Target :
CW1 - Construction of Drainage Structure along Road - 1510 Lineal meters
CW2 - Construction of Road Slope Protection Structure - 659 Square meters |
September 16, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00837430LZ
UACS : 300214100743000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road - Motor Vehicles User's Charge (MVUC) as per R..A 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0371 + (-260) - K0371 + (-191), K0392 + 000 - K0392 + 301, K0395 + 832 - K0395 + 897, K0396 + 473 - K0396 + 638
Physical Target :
CW1 - Rehabilitation of Paved Road - 1.2 Lane Km
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road - Motor Vehicles User's Charge (MVUC) as per R..A 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0371 + (-260) - K0371 + (-191), K0392 + 000 - K0392 + 301, K0395 + 832 - K0395 + 1089.65
Physical Target :
CW1 - Rehabilitation of Paved Road - 1.2553 Lane Km |
September 16, 2024 |
2024 |
WIN4XY00374 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00842597LZ
UACS : 300215103827000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major Strategic Public Buildings/ Facilities - Improvement of Cagbulacao - Tanagan Ridge Road (Package 1), Bacacay, Albay
Physical Target :
CW1 - Construction of Concrete Road - 5.2 Lane Km
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major Strategic Public Buildings/ Facilities - Improvement of Cagbulacao - Tanagan Ridge Road (Package 1), Bacacay, Albay
Physical Target :
CW1 - Construction of Concrete Road - 2.8 Lane Km
Cw2 - Construction of Road Slope Protection Structure - 12194.32 Square meters |
September 11, 2024 |
2024 |
WIN4XY00362 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads
Plaridel Bypass Rd - K0035+(-061) - K0035+(-034), K0036+195 - K0036+213, K0037+267 - K0037+276, K0039+226 - K0039+536, K0043+284.5 - K0043+302.5, K0043+380 - K0043+500, K0043+500 - K0044+390, K0046+291.5 - K0046+345.5 |
September 11, 2024 |
2024 |
WIN4XY00334 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 1st District Engineering Office |
Network Development Program - Off-Carriageway Improvement - Tertiary Roads
Sn Simon - Baliwag Rd - K0074+610 K0074+767.4 |
September 11, 2024 |
2024 |
WIN4F08140 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 1st District Engineering Office |
Network Development Program - Off-Carriageway Improvement - Tertiary Roads
Gen Alejo Santos Highway - K0050+521 - K0051+796 |
September 11, 2024 |
2024 |
WIN4XY00366 |
GAA FY 2024 |
January 24, 2024 |
Region VIII |
Leyte 1st District Engineering Office |
Convergence and Special Support Program
SIPAG – Flood Mitigation Structures Protecting Public
Infrastructures/Facilities
AS PER GAA/ORIGINAL:
Construction of Drainage System, Barangay Olot, Tolosa Leyte
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 9.8 M
: 757.522 Lineal Meters
EAO P 0.200 M
Total P 10.00 M
AS MODIFIED:
Construction of Drainage System, Barangay Olot, Tolosa Leyte
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 9.8 M
: 338.00 Lineal Meters
EAO P 0.200 M
Total P 10.00 M
|
September 11, 2024 |
2024 |
WIN4XY00386 |
GAA FY 2024 |
January 24, 2025 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0919 + 000 - K0920 + 000
Physical Target: Allocation:
CW1- Construction of Road Slope Protection P 49.00 M
Structure: 3,333.33 Square Meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0918 + 000 - K0920 + 000
Physical Target: Allocation:
CW1- Construction of Road Slope Protection P 31.91046066 M
Structure: 3,333.33 Square Meters
CW2- Upgrading of Drainage Structure along P 17.08953934 M
Road: 21.48 Lineal Meters
EAO P 1.00 M
Total P 50.00 M
|
September 11, 2024 |
2024 |
WIN4XY00380 |
GAA FY 2024 |
December 29, 2023 |
Region VIII |
Leyte 5th District Engineering Office |
Convergence and Special Support Program
SIPAG – Flood Mitigation Structures Protecting Major/Strategic Public Buildings/Facilities
AS PER GAA/ORIGINAL:
Construction of Flood Control Structure along Salog River, Brgy Tambis, Hilongos, Leyte
Physical Target: Allocation:
CW1- Construction of Flood Mitigation P 29.40 M
Structure: 468.00 Lineal Meters
EAO P .600M
Total P 30.00 M
AS MODIFIED:
Construction of Flood Control Structure along Salog River, Brgy Tambis, Hilongos, Leyte
Physical Target: Allocation:
CW1- Construction of Flood Mitigation P 29.15007534 M
Structure: 205.600 Lineal Meters
EXC P .24992466 M
EAO P .600M
Total P 30.00 M
|
September 6, 2024 |
FY 2024 GAA |
WIN4XW00133 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao de Oro 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1422 + 204 - K1425 + 000
Physical Target:
CW1: 5.546 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Reconstruction to Concrete Pavement)
EAO: P 5,250,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1422 + 204 - K1425 + 000
Physical Target:
CW1: 5.594 lane km (Reconstruction to Concrete Pavement)
CW2: 3,816.158 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 62,594,470.00 (Reconstruction to Concrete Pavement)
CW2: P 45,968,030.00 (Construction of Drainage Structure along Road)
EAO: P 3,937,500.00
EXC: P 37,500,000.00 (Excess) |
September 5, 2024 |
2024 |
WIN4S03642 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
(BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Rehabilitation of Road with Drainage, Tacloban North Resettlement, Guadalupe Heights 3, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 49.50 M
3.75 Lane Km
EAO P .500 M
Total P 50.00 M
AS MODIFIED:
Rehabilitation of Road with Drainage, Tacloban North Resettlement, Guadalupe Heights 3, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 8.85205908 M
1.269 Lane Km
CW2-Construction of Drainage Structure: P 40.64794092 M
1,214 Lineal Meters
EAO P .500 M
Total P 50.00 M
|
September 5, 2024 |
2024 |
WIN4S03646 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
(BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Rehabilitation of Road with Drainage, Tacloban North Resettlement, New Hope Village, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 49.50 M
3.75 Lane Km
EAO P .500 M
Total P 50.00 M
AS MODIFIED:
Rehabilitation of Road with Drainage, Tacloban North Resettlement, New Hope Village, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 14.03000831 M
1.560 Lane Km
CW2-Construction of Drainage Structure: P 35.46999169 M
1,520 Lineal Meters
EAO P .500 M
Total P 50.00 M
|
September 5, 2024 |
2024 |
P00800055MN |
GAA2024 |
January 1, 2024 |
Region X |
Bukidnon 3rd District Engineering Office |
P00800055MN
310201101449000
OO1: Ensure Safe and Reliable National Road System, Network Development- Road Widening- Primary Roads
FROM:
Sayre Highway - K1441+159 - K1441 + 358, K1444+480 - K1444+484
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 0.406 Lane Km
Allocation:
CW1: Php 9,947,000.00
EAO: Php 203,000.00
TO:
Sayre Highway - K1440+800 - K1440+890
Type of Work:
CW1- Road Widening
CW2- Construction of Slope Protection Structure
Physical Target:
CW1- 0.180 Lane Km
CW2- 365.66 Square Meters
Allocation:
CW1: Php 5,997,600.00
CW2: Php 3,949,400.00
EAO: Php 203,000.00 |
September 5, 2024 |
2024 |
WIN4S03648 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
(BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Rehabilitation of Road with Drainage, Tacloban North Resettlement, St. Francis 1 and St. Francis 2, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 49.50 M
3.75 Lane Km
EAO P .500 M
Total P 50.00 M
AS MODIFIED:
Rehabilitation of Road with Drainage, Tacloban North Resettlement, St. Francis 1 and St. Francis 2, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 1.44101465 M
0.120 Lane Km
CW2-Construction of Drainage Structure: P 48.05898535 M
2,075 Lineal Meters
EAO P .500 M
Total P 50.00 M
|
September 5, 2024 |
2024 |
WIN4XY00372 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
(SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Construction of Flood Control Stucture (Drainage), barangay 46, Tacloban City
Physical Target: Allocation:
CW1-Construction of Drainage Stucture: P 4.9 M
378.761 Lineal Meters
EAO P .100 M
Total P 5.00 M
AS MODIFIED:
Construction of Flood Control Stucture (Drainage), barangay 46, Tacloban City
Physical Target: Allocation:
CW1-Construction of Drainage Stucture: P 4.9 M
237 Lineal Meters
EAO P .100 M
Total P 5.00 M |
September 5, 2024 |
2024 |
WIN4S03645 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Apitong-Paterno Rd - K0908 + 902 - K0909 + 000
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 1.927660 M
Along Road: 208.00 Lineal Meters
EAO P 0.03934 M
Total P 1.967 M
AS MODIFIED:
Apitong-Paterno Rd - K0908 + 983 - K0909 + 061
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 1.927660 M
Along Road: 84.00 Lineal Meters
EAO P 0.03934 M
Total P 1.967 M
|
September 5, 2024 |
2024 |
WIN4S03644 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
OO2: Protect Lives and Properties
Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Shore Protection, Cancabato Bay (Astrodome Area), Tacloban City
Physical Target: Allocation:
CW1- Construction of Flood Mitigation P 144.750 M
Structure: 1,068.952 Lineal Meters
EAO P 5.250 M
Total P 150.00 M
AS MODIFIED:
Construction of Shore Protection, Cancabato Bay (Astrodome Area), Tacloban City
Physical Target: Allocation:
CW1- Construction of Flood Mitigation P 144.750 M
Structure: 515 Lineal Meters
EAO P 5.250 M
Total P 150.00 M
|
September 5, 2024 |
2024 |
WIN4XY00379 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
(SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Construction of Drainage System along Tigbao, Barangay 94, Tacloban City
Physical Target: Allocation:
CW1-Construction of Drainage Structure: P 49.00 M
2,300 Lineal Meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Construction of Drainage System along Tigbao, Barangay 94, Tacloban City
Physical Target: Allocation:
CW1-Construction of Drainage Structure: P 49.00 M
1,341 Lineal Meters
EAO P 1.00 M
Total P 50.00 M |
September 5, 2024 |
2024 |
WIN4XY00360 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 3rd District Engineering Office |
Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structures along San Miguel River, Sta. 19+805 - Sta. 20+002.43, Right Side, San Miguel, Bulacan |
September 5, 2024 |
2024 |
WIN4XY00351 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 3rd District Engineering Office |
Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structures along San Miguel River, Sta. 19+592.65 - Sta. 19+785, Right Side, San Miguel, Bulacan
|
September 5, 2024 |
2024 |
P00834883MN |
SR2024-04-015283 |
April 25, 2024 |
Region X |
Regional Office X |
P00834883MN
300215104058000
CSSP:Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Access Road, Jct. Don Carlos-Kadingilan Rd leading to Bukidnon Airport Terminal, Don Carlos, Bukidnon
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1-1.200 Lane Km
Allocation:
Total: Php 25,000,000.00
CW1: Php 24,125,000.00
EAO: Php 875,000.00
TO:
Construction of Access Road, Jct. Don Carlos-Kadingilan Rd leading to Bukidnon Airport Terminal, Don Carlos, Bukidnon
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection
Physical Target:
CW1-1.20 Lane Km
CW2-800.00 Square meters
Allocation:
Total: Php 25,000,000.00
CW1: Php 18,782,263.75
CW2: Php 5,342,736.25
EAO: Php 875,000.00 |
September 4, 2024 |
2024 |
WIN4XY00349 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800212LZ
UACS No : 310201101270000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Road - Daang Maharlika (LZ) - K0513 + (-344) - K0513 + 470
Physical Target :
CW1 - Road Widening - 1.628 Lane Km
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Road - Daang Maharlika (LZ) - K0513 + 870 - K0513 + 966, K0514 + 000 - K0514 + 440, K0518 + 706 - K0519 + 000
Physical Target :
CW1 - Road Widening - 1.084 Lane Km
ROW - ROW Acquisition - 4095 Square Meters
|
September 4, 2024 |
2024 |
WIN4XY00348 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00802039LZ
UACS No : 310101101270000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Road - Daang Maharlika (LZ) - K00478 + 537.11 - K0479 + 014
Physical Target :
CW1 - Preventive Maintenance of Road - Asphalt Overlay - 1.896 Lane Km
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Road - Daang Maharlika (LZ) - K0478 + 537.11 - K0478 + 861.00
Physical Target :
CW1 - Preventive Maintenance of Road - Asphalt Overlay - 1.296 Lane Km |
September 4, 2024 |
2024 |
WIN4F08102 |
GAA 2024 |
January 19, 2024 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00802546LZ
UACS No : 310105101165000
FROM :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Jct Tawad - Balud Rd - K0031 + 756 - K0031 + 876, K0031 + 926 - K0032 + 274
Physical Target :
CW1 - Rehabilitation of Paved Road - 0.836 Lane Km
TO :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Jct Tawad - Balud Rd - K0031 + 756 - K0031 + 876, K0031 + 926 - K0032 + 020
Physical Target :
CW1 - Rehabilitation of Paved Road - 0.328 Lane Km
CW2 - Construction of Road Slope Protection Structure - 1099 Square meters
CW3 - Road Safety - Street Lightning - 18 Number of Units |
September 4, 2024 |
2024 |
WIN4F08097 |
GAA 2024 |
January 19, 2024 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00802548LZ
UACS No : 310105101167000
FROM :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Jct Tawad - Balud Rd - K0039 + 796 - K0039 + 942
Physical Target :
CW1 - Rehabilitation of Paved Road - 0.294 Lane Km
TO :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Jct Tawad - Balud Rd - K0039 + 606 - K0039 + 670
Physical Target :
CW1 - Rehabilitation of Paved Road - 0.128 Lane Km
CW2 - Construction of Drainage Structure along Road - 128 Lineal meters
CW3 - Road Safety : Street Lightning - 6 Number of Units |
September 4, 2024 |
2024 |
WIN4F08098 |
GAA 2024 |
January 19, 2024 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00802552LZ
UACS No : 310105101163000
FROM :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Jct Milagros - Baleno - Lagta Rd - K0036 + 250 - K0036 + 419
Physical Target :
Rehabilitation of Paved Road - 0.338 Lane Km
TO
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Jct Milagros - Baleno - Lagta Rd - K0036 + 188 - K0036 + 252
Physical Target :
CW1 - Rehabilitation of Paved Road - 0.128 Lane Km
CW2 - Construction of Drainage Structure along Road - 128 Lineal meters
CW3 - Road Safety - Street Lightning - 6 Number of Units |
September 4, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00805183LZ
UACS No : 310105101025000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Catanduanes Cir Rd - K0115 + 000 - K0117 + 000
Physical Target :
CW1 - Rehabilitation of Paved Road - 3.214 Lane Km
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Catanduanes Cir Rd - K0115 + 000 - K0117 + 000
Physical Target :
CW1 - Rehabilitation of Paved Road - 3.846 Lane Km |
September 4, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00805193LZ
UACS No : 310105101157000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Catanduanes Cir Rd - K0006 + 658 - K0007 + 074, K0007 + 106 - K0007 + 749
Physical Target :
CW1 - Rehabilitation of Paved Road - 2.316 Lane Km
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Catanduanes Cir Rd - K0006 + 558 - K0007 + 074, K0007 + 106 - K0007 + 749
Physical Target :
CW1 - Rehabilitation of Paved Road - 2.316 Lane Km |