July 11, 2018 |
FY 2018 |
WIN8G02475 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310204100074000
Project ID: P00201068LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Construction of By-Pass and Diversion Roads – Camarines Sur/Albay Diversion Road (Albay Section), incl. ROW, Albay
Physical Target: CW1 – Construction of Gravel Road/ 3.16 lane-km
CW2 - Construction of Drainage Structure along Road/ 1,890 lm.
CW3 - Construction of Road Slope Protection Structure/ 2,146.75 sq.m.
Right-of-Way Acquisition (ROW)/ 31,600 sq.m.
Unit Cost: CW1 – Php 22.55 M/lane-km
CW2 – Php 7,236.94/lm.
CW3 – Php 4,554.35/sq.m.
ROW Acquisition – Php 56.96/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02482 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310204100101000
Project ID: P00201072LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Construction of By-Pass and Diversion Road – Daraga Urban Traffic Eco Route (DUTERTE), Project, Albay incl. ROW and Dike
Physical Target: CW1 – Construction of Gravel Road/ 2.912lane-km
CW2 – Construction of Dike/ 518.60 lm
Right-of-Way Acquisition (ROW)/ 21,840 sq.m.
Unit Cost: CW1 – Php 13.19 M/lane-km
CW2 – Php 167,847.01/lm.
ROW Acquisition – Php 3,092.95/sq.m.
Estimated Cost: Php 200.0 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02467 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310104100009000
Project ID: P00200412LZ
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Primary Roads – Daang Maharlika (LZ) - K0396+441.10 - K0396+840
Physical Target: CW1 – Construction of Concrete Road/ 1.5956 lane-km
CW2 - Construction of Drainage Structure along Road/ 797.80 lm.
CW3 - Construction of Road Slope Protection Structure/ 1,790.20 sq.m.
Unit Cost: CW1 – Php 39.43 M/lane-km
CW2 – Php 8,280.20/lm.
CW3 – Php 4,287.60/sq.m.
Estimated Cost: Php 80.0 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02471 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310201100076000
Project ID: P00201260LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Primary Roads – Daang Maharlika (LZ) – K0600+ -008 – K0602+683, K0605+000 – K0605+167
Physical Target: CW1 - Road Widening/ 5.727 lane-km
CW2 - Construction of Drainage Structure along Road/ 3,873 lm.
Unit Cost: CW1 – Php 8.67 M/lane-km
CW2 – Php 12.09T/lm.
Estimated Cost: Php 100.0 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02478 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310201100082000
Project ID: P00201259LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Primary Roads – Daang Maharlika (LZ) – K0530+360 – K0534+630
Physical Target: CW1 - Road Widening/ 8.91084 lane-km
Right-of-Way Acquisition (ROW)/ 22,277.10 sq.m.
Unit Cost: CW1 – Php 17.31 M/lane-km
CW2 – Php 849.68/sq.m.
Estimated Cost: Php 179.41 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02473 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310201100195000
Project ID: P00201263LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Primary Roads – Rolando A Andaya Highway – K0288+513.10 – K0290+720
Physical Target: CW1 – Construction of Concrete Road/ 4.415 lane-km
CW2 - Construction of Road Slope Protection Structure/ 9,689.93sq.m.
CW3 - Construction of Drainage Structure along Road/ 2,445lm
Unit Cost: CW1 – Php 18.16M/lane-km
CW2 – Php 3,586.47/sq.m.
CW3 – Php 12,198.99/lm.
Estimated Cost: Php 150.0 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02473 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310201100195000
Project ID: P00201263LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Primary Roads – Rolando A Andaya Highway – K0288+513.10 – K0290+720
Physical Target: CW1 – Construction of Concrete Road/ 4.415 lane-km
CW2 - Construction of Road Slope Protection Structure/ 9,689.93sq.m.
CW3 - Construction of Drainage Structure along Road/ 2,445lm
Unit Cost: CW1 – Php 18.16M/lane-km
CW2 – Php 3,586.47/sq.m.
CW3 – Php 12,198.99/lm.
Estimated Cost: Php 150.0 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02481 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310101100328000
Project ID: P00223278LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program –
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems –
Rehabilitation/Improvement of Busay Flood Control Dike, Busay, Sta. 7+267.00 - Sta. 7+462.73, Sta. 7+532 - Sta. 7+863.90, Sta. 7+991.67 - Sta. 8+321.80, Sta. 7+360 - Sta. 7+637, Daraga, Albay
Physical Target: CW1 – Construction of Dike/ 1,134.76 lm
Unit Cost: CW1 – Php 85.040 T/lm
Estimated Cost: Php 100.0 M
(As Modified)
|
July 10, 2018 |
FY - 2018 |
WINF05653 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
Local Program
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including drainage
structures and other ancillary works,
K0139+800 - K0142+300,
Espanola
CW1: 10.072 lane km ( Road Widening )
Allocation: 150,000,000 Php
TO:
Widening of Puerto Proncesa South Road
from two (2) to six (6) lanes including drainage
structures and other ancillary works,
K0139+800 - K0141+891,
Espanola
CW1: 8.424 lane km ( Road Widening )
Allocation: 150,000,000 Php
|
July 10, 2018 |
FY - 2018 |
WIN8F05651 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
Local Program
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including drainage
structures and other ancillary works,
K0105+100 - K0107+400,
Narra
CW1: 9.004 lane km ( Road Widening )
Allocation: 140,000,000 Php
TO:
Widening of Puerto Princesa South Road
from two (2) to six (6 lanes including drainage
structures and other ancillary works,
K0104+388 - K0105+742,
K0105+771 - K0106+922,
Narra
CW1: 10.064 lane km ( Road Widening )
Allocation: 140,000,000 Php |
July 9, 2018 |
FY 2018 |
WIN8G02508 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Asset Preservation Program – Preventive Maintenance – Primary Roads – San Jose – Lupao Rd, K0160+000 – K0160+778, K0172+299.40 – K0172+565, K0172+592.20 – K0173+716.40 |
July 9, 2018 |
FY - 2018 |
WIN8F05649 |
FY - 2018 GAA DPWH Infra |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation -
Rehabilitation/Reconstruction/Upgrading of Damaged
Paved Roads - Secondary Roads
FROM:
Calapan South Rd
( K0169+040 - K0169+121,
K0171+000 - K0171+845,
K0172+092 - K0172+700 )
CW1: 3.068 lane km ( Reconstruction from Paved
to Concrete )
Allocation: 40,000,000 Php
TO:
Calapan South Rd
( K0169+040 - K0169+123.50,
K0177+176 - K0178+000.00,
K0178+544 - K0179+000.00 )
CW1: 2.789 lane km ( Reconstruction from Paved
to Concrete )
Allocation : 40,000,000 Php
|
July 9, 2018 |
FY - 2018 |
WIN8F05689 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/
New Roads
FROM:
Victoria Sablayan ( Mindoro Cross-Island Road ),
Package 2, Occidental Mindoro
CW1: 4.282 lane km ( Construction of Concrete Road )
Allocation: 150,000,000 Php
TO:
Victoria - Sablayan ( Mindoro Cross Island Road ),
Occidental Mindodo
CW1: 3.816 lane km ( Construction of Concrete Road )
Allocation : 150,000,000 Php |
July 6, 2018 |
FY 2018 |
WIN8C03325 |
310206100006000 |
June 29, 2018 |
Region IX |
Regional Office IX |
UACS No. 310206100006000
Project ID: P00200469MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Flyovers/Interchanges/Underpasses/ Long Span Bridges
Governor Camin/MCLL Highway and Veterans Avenue Flyover incl. ROW, Zamboanga City
Physical Target:
CW-1 - Construction of flyover: 7,659.925 sq.m
Unit Cost: CW-1 - Construction of flyover: P 31,266.62/sq.m
Physical Target:
ROW: 51,813.47 sq.m
Unit Cost: P 965.00/sq.m
EAO: P 10,500,000.00
Allocation: P 300,000,000.00 |
July 6, 2018 |
FY 2018 |
WIN8C03329 |
310206100007000 |
June 29, 2018 |
Region IX |
Regional Office IX |
UACS No. 310206100007000
Project ID: P00200470MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Flyovers/Interchanges/Underpasses/Long Span Bridges
Jct. T. Taupan Street (Suterville/Gavilan) Flyover, incl. ROW, Zamboanga City
Physical Target:
CW-1 - Construction of Flyover: 8,225.00 sq.m
Unit Cost: CW-1 - Construction of Flyover: P 29,161.09/sq.m
Physical Target:
ROW: 41,450.78 sq.m
Unit Cost: P 965.00/sq.m
EAO: P 10,150,000.00
Allocation: P 290,000,000.00 |
July 6, 2018 |
FY 2018 |
WIN8C03326 |
310107100018000 |
June 29, 2018 |
Region IX |
Regional Office IX |
UACS No. 310107100018000
Project ID: P00200186MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation/Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Primary Roads
Pagadian City - Zamboanga City Road
K1869+K950.00 - K1870+055.00,
K1870+240.00 - K1870+330.00,
K1870+520.00 - K1870+590.00,
K1870+680.00 - K1870+874.00,
K1894+220.00 - K1894+400.00,
K1911+910.00 - K1911+981.00
Physical Target:
CW-1 - Construction of Road Slope Protection: 11,091.47 sq.m
Unit Cost: CW-1 - Construction of Road Slope Protection: P 17,355.25/sq.m
Physical Target:
ROW: 1,682.48 sq.m
Unit Cost: P 300/sq.m
EAO: P 7,000,000.00
Allocation: P 200,000,000.00 |
July 6, 2018 |
FY 2018 |
WIN8C03317 |
310204100044000 |
June 29, 2018 |
Region IX |
Regional Office IX |
UACS No. 310204100044000
Project ID: P00200294MN
OO1: Ensure Safe and Reliable National Road System
Network Development
Construction of Bypass and Diversion Roads
Buenavista - Bolong Coastal Bypass Road, (Curuan - Lubigan Section) Incl. Bridge, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 1.60 lane km
Unit Cost: CW-1 - Construction of Concrete Road: P 83,178,164.06/lane km
Physical Target:
ROW: 6,716.46 sq.m
Unit Cost: P 300/sq.m
EAO: P 4,900,000.00
Allocation: P 140,000,000.00 |
July 6, 2018 |
FY 2018 |
WIN8C03328 |
310211100026000 |
June 29, 2018 |
Region IX |
Regional Office IX |
UACS No. 310211100026000
Project ID: P00200845MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Secondary Roads
Zamboanga West Coastal Road (Limpapa - Sibuco Section) - (S01166MN)
Chainage 4000 - Chainage 5411.66
Chainage 5441.53 - Chainage 9029.87
Physical Target:
CW-1 - Paving of Unpaved Road: 10.00 lane km
Unit Cost: CW-1 - Paving of Unpaved Road: P 24,049,209.30
Physical Target:
ROW: 2,526.36 sq.m
Unit Cost: P 300/sq.m
EAO: P 8,750,000.00
Allocation: P 250,000,000.00 |
July 5, 2018 |
GAA FY 2018 |
WIN8F05684 |
UACS No. 300116200391000 |
January 1, 2018 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 300116200391000
Project ID: P00240687LZ
WIN8F05684
Construction/ Repair/ Rehabilitation/ Improvements of Various Infrastructure including Local Projects
National Roads and Bridges
National Roads and Bridges – Local Roads
Rehabilitation of Road with Drainage Improvement at Zone 58 and 59, Manila City
Physical Target: CW1 Rehabilitation of Paved Road L=0.40 lane km
Unit Cost (P’000): P49,000.00/ lane km
Allocation: P 19,600,000.00
EAO P 400,000.00
Total: P 20,000,000.00
As Modified
UACS No. 300116200391000
Project ID: P00240687LZ
WIN8F05684
Construction/ Repair/ Rehabilitation/ Improvements of Various Infrastructure including Local Projects
National Roads and Bridges
National Roads and Bridges – Local Roads
Rehabilitation of Road with Drainage Improvement at Zone 58 and 59, Manila City
Physical Target: CW1 Rehabilitation of Paved Road L=3.2586 lane km
Unit Cost (P’000): P6,014.85/ lane km
Allocation: P 19,600,000.00
EAO P 400,000.00
Total: P 20,000,000.00
|
July 5, 2018 |
GAA FY 2018 |
WIN8F05685 |
UACS No. 310204100096000 |
January 1, 2018 |
National Capital Region |
NCR - Regional Office |
UACS No. 310204100096000
Project ID: P00202375LZ
WIN8F05685
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
Construction of By-Pass Road (Marikina River Bank to J.P. Rizal St.), Marikina City
Physical Target: CW1-Construction of Concrete Road L= 0 lane km
Unit Cost (P’000): P 0/ lane km
Allocation: P 121.590 M
EAO (‘000): P 4.410 M
Total (‘000): P 126.00 M
As Modified
UACS No. 310204100096000
Project ID: P00202375LZ
WIN8F05685
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
Construction of By-Pass Road (Marikina River Bank to J.P. Rizal St.), Marikina City
Physical Target: CW1-Construction of Concrete Road L= 2.576 lane km
Unit Cost (P’000): P 16,393.09/ lane km
ROW Acquisition A=7883.28 SQ,M. = P10.07/sq.m.
Estimated Cost: P 42.236 M
P 79.354 M
EAO (‘000): P 4.410 M
Total (‘000): P 126.00 M
|
July 5, 2018 |
GAA FY 2018 |
WIN8F05691 |
UACS No. 300116200243000 |
January 1, 2018 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 300116200243000
Project ID: P00257942LZ – CW1
WIN8F05691
Local Program – Local Roads –
Construction/ Repair/Rehabilitation/ Improvement of Various Infrastructure including Projects
Construction of Access Road from Letre to Gov. Pascual Cities of Malabon and Navotas, Sta. 1+055
Physical Target: CW1 – Construction of Concrete Road: 4.22 Lane KM
EAO = P 1 M
Unit Cost: P 11,611.37 / Lane KM
Allocation: P 49 M
Total: P 50 M
As Modified
UACS No. 300116200243000
Project ID: P00257942LZ – CW1
WIN8F05691
Local Program – Local Roads –
Construction/ Repair/Rehabilitation/ Improvement of Various Infrastructure including Projects
Construction of Access Road from Letre to Gov. W. Pascual Ave., Malabon City (Phase I) Sta. 0+000 – Sta. 0+790
Physical Target: CW1 – Construction of Concrete Road: 2.644 Lane KM
EAO = P 0.5 M
Excess = P 0.038 M
Unit Cost: P 11,611.37 / Lane KM
Allocation: P 49.462 M
Total: P 50 M
|
July 5, 2018 |
GAA FY 2018 |
WIN8F05690 |
UACS No. 300108200027000 |
January 1, 2018 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As per GAA/Original
UACS No. 300108200027000
Project ID: P00257470LZ
WIN8F05690
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects – Flood Control and Drainage
Flood Control and Drainage – Drainage Protection Works
Improvement/Sheet Piling along Baloc-Baloc Creek (Bicutan Section), Brgy. Don Bosco, Parañaque City
Physical Target: CW1 Construction of Revetment 200 lineal meters
Unit Cost (P’000): P 98.00/ l.m.
Allocation (‘000) : P 19,600.00
EAO (‘000) P 400.00
Total (‘000): P 20,000.00
As Modified
UACS No. 300108200027000
Project ID: P00257470LZ
WIN8F05690
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects – Flood Control and Drainage
Flood Control and Drainage – Drainage Protection Works
Improvement/Sheet Piling along Baloc-Baloc Creek, Brgy. Don Bosco, Parañaque City
Physical Target: CW1 Construction of Revetment 264 lineal meters
Unit Cost (P’000): P 74.24/ l.m.
Allocation (‘000) : P 19,600.00
EAO (‘000) P 400.00
Total (‘000): P 20,000.00
|
July 5, 2018 |
FY 2018 |
WIN8G02485 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Convergence and Special Support Program – Construction / Improvement of Access Roads leading to Declared Tourism Destinations – Access Road Leading to Pinsal Falls, Ecotourism Park, Nueva Ecija |
July 5, 2018 |
FY 2018 |
WIN8G02498 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Primary Roads – Daang Maharlika (LZ), K0169+1216 – K0170+000, K0170+044 – K0170+070, K0170+231 – K0170+252, K0170+290 – K0170+415, K0171+150 – K0171+208, K0171+260 – K0171+440, K0171+955 – K0172+015, K0172+900 – K0172+992, K0173+390 – K0173+456, K0174+020 – K0174+140, K0177+375 – K0177+445, K0205+839.20 – K0205+890, K0205+890 – K0205+950 |
July 4, 2018 |
FY 2018 |
WIN8G02490 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Improvement of Road and Bailey Bridge at Sitio Camachile, Nabuclod, Floridablanca, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02443 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Improvement / Concreting of Road leading to Palacol (Summer Place), San Jose, Floridablanca, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02456 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – road Widening - Primary Roads – Jose Abad Santos Ave (JASA), K0087+526 – K0087+972.30, K0087+980 – K0088+364.50, K0088+374.50 – K0088+580 |
July 4, 2018 |
FY 2018 |
WIN8G02454 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Nabuclod, Sitio Camachile, Floridablanca, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02460 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting / Paving of Road, Sitio Santol and Purok 6 Road, San Jose, Floridablanca, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02359 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Network Development Project - Off-Carriageway Improvement – Tertiary Roads – San Fernando – Lubao Rd, K0083+153 – K0083+526, K0083+538.20 – K0083+846, K0083+852.20 – K0084+160 – K0084+188.60 – K0084+703.90 – K0084+713.60 – K0084+875 |
July 4, 2018 |
FY 2018 |
WIN8G02458 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Road, Benigno Aquino St., Sta. Cruz, Lubao, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02459 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Lubao – Guagua – Minalin – Sto. Tomas Road, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02452 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Bridges – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of RCDG Bridge at Sta. Catalina, Sta. Catalina, Lubao, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02442 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Road, Dalan Betis, San Juan Nepomuceno, Guagua, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02441 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction / Concreting of Road and Canalization, Barangay Jalung, Porac, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02457 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction / Concreting of Road, Sto. Domingo – San Roque, Dau, Lubao, Pampanga
|
July 4, 2018 |
FY 2018 |
WIN8G02444 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Angeles – Porac – By–Pass Road, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02446 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Bodega (Sitio Biglang Sibul), Floridablanca, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02436 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Mawacat, Floridablanca, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02433 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Manibaug, Porac, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02428 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Road, Sitio Pigulut, Sta. Lucia, Lubao, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02497 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation Program – Construction / Upgrading / Rehabilitation of Drainage along National Roads – Primary Roads - Jose Abad Santos Ave (JASA), K0094+314 - K0094+674, K0095+692 - K0096+245 |
July 4, 2018 |
FY 2018 |
WIN8G02449 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Purok 6, Pulong Visaya, Brgy. Sta. Catalina, Lubao, Pampanga |
July 4, 2018 |
GAA FY 2018 |
WIN8F05655 |
UACS No. 300116200299000 |
January 1, 2018 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 300116200299000
Project ID: P00257953LZ
WIN8F05655
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Bridges
Rehabilitation/ Improvement of Roads including Drainage System, Regidor St., and T. Kalaw St., Brgy. Pedro Cruz, San Juan City
Physical Target: CW1-Rehabilitation of Concrete Road 1.6 Lane km
Unit Cost (P’000): P3,062.50/lane km.
Allocation (‘000): P 4,900.00
EAO (‘000) P 100.00 M
Total (‘000): P 5,000.00
As Modified
UACS No. 300116200299000
Project ID: P00257953LZ
WIN8F05655
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Bridges
Rehabilitation/ Improvement of Roads including Drainage System, Regidor St., and T. Kalaw St., Brgy. Tibagan, San Juan City
Physical Target: CW1-Rehabilitation of Concrete Road 0.217 Lane km
Unit Cost (P’000): P22,580.65/lane km.
Allocation (‘000): P 4,900.00
EAO (‘000) P 100.00 M
Total (‘000): P 5,000.00
|
July 4, 2018 |
GAA FY 2018 |
WIN8F05660 |
UACS No. 300103200102000 |
January 1, 2018 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 300103200102000
Project ID: P0024047LZ
WIN8F05660
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Buildings and Other Structures – Multipurpose/ Facilities
Construction of Valeriano Fugoso High School Multi-Purpose Building, Brgy. Fortune, Marikina City
Physical Target: CW1- Construction of Multi-Purpose Building 1 Bldg.
Unit Cost (P’000): P14,700/bldg.
Allocation (‘000): P 14,700.00
EAO (‘000) P 300.00 M
Total (‘000): P 15,000.00
As Modified
UACS No. 300103200102000
Project ID: P0024047LZ
WIN8F05660
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Buildings and Other Structures – Multipurpose/ Facilities
Construction of Valeriano Fugoso High School Multi-Purpose Buildings, Brgy. Fortune, Marikina City
Physical Target: CW1- Construction of Multi-Purpose Building 2 Bldg.
Unit Cost (P’000): P7,350.00/bldg.
Allocation (‘000): P 14,700.00
EAO (‘000) P 300.00 M
Total (‘000): P 15,000.00
|
July 4, 2018 |
GAA FY 2018 |
WIN8F05657 |
UACS No. 300116200262000 |
January 2, 2018 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 300103200102000
Project ID: P0024047LZ
WIN8F05657
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Roads
Construction of Laguna Lake Highway Access Road, Taguig City
Physical Target: CW1- Construction of Concrete Road L=0.95 Lane km
Unit Cost (P’000): P51,578/lane km
Allocation (‘000): P 49,000.00
EAO (‘000) P 1,000.00 M
Total (‘000): P 50,000.00
As Modified
UACS No. 300103200102000
Project ID: P0024047LZ
WIN8F05657
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Roads
Construction of Laguna Lake Highway Access Road, Taguig City
Physical Target: CW1- Construction of Concrete Road L=0.732 Lane km
RWOW – ROW Acquisition 4,828.57 m2 = P7,000/sq.m
Unit Cost (P’000): P20,765/lane km
Allocation (‘000): P 15,200.00
EAO (‘000) P 1,000.00 M
Total (‘000): P 50,000.00
|
July 4, 2018 |
GAA FY 2018 |
WIN8F05679 |
UACS No. 300107200004000 |
January 1, 2018 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 300107200004000
Project ID: P00257646LZ
WIN8F05679
Local Program – Local Infrastructure Program
Flood Control and Drainage – Flood Control Structures/ Facilities
Construction of Pumping Station, Barangay San Perfecto, San Juan City
Physical Target: CW1- Construction of Flood Mitigation Structure, 1 Facility
Unit Cost (P’000): P74,250/facility
Allocation (‘000): P 74,250.00
EAO (‘000) P 750.00
Total (‘000): P 75,000.00
As Modified
UACS No. 300103200102000
UACS No. 300107200004000
Project ID: P00257646LZ
WIN8F05679
Local Program – Local Infrastructure Program
Flood Control and Drainage – Flood Control Structures/ Facilities
Construction of Pumping Station for the Catchment Area of Barangay San Perfecto, San Juan City
Physical Target: CW1- Construction of Flood Mitigation Structure, 1 Facility
Unit Cost (P’000): P74,250/facility
Allocation (‘000): P 74,250.00
EAO (‘000) P 750.00
Total (‘000): P 75,000.00
|
July 4, 2018 |
GAA FY 2018 |
WIN8F05650 |
UACS No. 300104200117000 |
January 1, 2018 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As per GAA/Original
UACS No. 300104200117000
Project ID: P00253551LZ
WIN8F05650
Local Infrastructure Program – Building and Other Structures
Building and Other Structures – Multi Purpose/Facilties
Construction of Multi-Purpose Building at Sitio Fatima, Brgy. San Antonio, Parañaque City
Physical Target: CW1 Construction of Multi-Purpose Building 1 Building
Unit Cost (P’000): P4,950.00/bldg.
Allocation (‘000) : P 4,950.00
EAO (‘000) P 50.00
Total (‘000): P 5,000.00
As Modified
UACS No. 300104200117000
Project ID: P00253551LZ
WIN8F05650
Local Infrastructure Program – Building and Other Structures
Building and Other Structures – Multi Purpose/Facilties
Construction of Multi-Purpose Building at Brgy. San Antonio, Parañaque City
Physical Target: CW1 Construction of Multi-Purpose Building 1 Building
Unit Cost (P’000): P4,950.00/bldg.
Allocation (‘000) : P 4,950.00
EAO (‘000) P 50.00
Total (‘000): P 5,000.00
|
July 4, 2018 |
GAA FY 2018 |
WIN8F05661 |
UACS No. 320101100558000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 320101100558000
Project ID: P00220648LZ
WIN8F05661
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Box Culvert along its Road Approaches along Brgy. 170, Caloocan City
Physical Target: CW1- Construction of Drainage Structure 48.60 lineal meters
EAO (‘000) – P 600.00
Unit Cost (P’000): P604.94/ l.m.
Allocation (000): P 29,400.00
Total (‘000): P 30,000.00
As Modified
UACS No. 320101100558000
Project ID: P00220648LZ
WIN8F05661
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Box Culvert along its Road Approaches along Brgy. 170, Caloocan City
Physical Target: CW1- Construction of Drainage Structure 128.60 lineal meters
CW2 – Construction of Concrete Road = 0.160 lane km
CW3 – Construction of Flood Mitigation Structures 604.00 Lineal Meters
Unit Cost (P’000): CW1 - P32.15/ l.m.
CW2 - P7,788.50/ l.m.
CW3 – P39,77/l.m.
EAO (‘000) – P 600.00
Allocation (000): CW1 = P 4,135.00
CW2 = P1,246.00
CW3 = P24,019.00
Total (‘000): P 30,000.00
|
July 4, 2018 |
GAA FY 2018 |
WIN8F05678 |
UACS No. 300118200006000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300118200006000
Project ID: P00240563LZ
WIN8F05678
Local Program – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Bridges
Construction of Bridge connecting Camarin to Bagong Silang, Caloocan City
Physical Target: CW1-Construction of Bridge 732 sq.m.
EAO (‘000) – P 3,500.00
Unit Cost (P’000): P131.00/sq.m.
Allocation (‘000): P 96,500.00
Total (‘000): P 100,000.00
As Modified
UACS No. 300118200006000
Project ID: P00240563LZ
WIN8F05678
Local Program – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Bridges
Construction of Bridge connecting Camarin to Bagong Silang, Caloocan City
Physical Target: CW1 - Construction of Bridge 439.20 sq.m.
CW2 – Rehabilitation of Concrete Road 2.33 Lane km
EAO (‘000) – P 3,500.00
Unit Cost (P’000): CW1 = P134.96/sq.m.
CW2 = P15,977,25/ Lane km
Allocation (‘000): CW1 = P 59,273.00
CW2 = P 37,227.00
Total (‘000): P 100,000.00
|
July 4, 2018 |
GAA FY 2018 |
WIN8F05658 |
UACS No. 320101100561000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 320101100561000
Project ID: P00220369LZ
WIN8F05658
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Drainage System along Brgys. In 142 and 143, Caloocan City
Physical Target: CW1-Construction of Drainage Structure L=450 Lineal Meters
EAO (‘000) – P 200.00
Unit Cost (P’000): P21.78.00/l.m.
Allocation (‘000): P 9,800.00
Total (‘000): P 10,000.00
As Modified
UACS No. 320101100561000
Project ID: P00220369LZ
WIN8F05658
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Drainage System along Brgys. In 142 and 143, Caloocan City
Physical Target: CW1-Construction of Drainage Structure L=938 Lineal Meters
EAO (‘000) – P 200.00
Unit Cost (P’000): P10.45/l.m.
Allocation (‘000): P 9,800.00
Total (‘000): P 10,000.00
|
July 4, 2018 |
GAA FY 2018 |
WIN8F05659 |
UACS No. 300104200130000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300104200130000
Project ID: P00256422LZ
WIN8F05659
Local Program
Local – Buildings and Other Structures – Multi-Purpose/ Facilities – Local Infrastructure Program
Construction of Multipurpose Building (Covered Court), Brgy. 177, Phase 1 Bagong Silang, Caloocan City
Physical Target: CW1-Construction of Multipurpose Building 1 Bldg.
EAO (‘000) – P 30.00
Unit Cost (P’000): P2,970.00/bldg.
Allocation (‘000): P 2,970.00
Total (‘000): P 3,000.00
As Modified
UACS No. 300104200130000
Project ID: P00256422LZ
WIN8F05659
Local Program
Local – Buildings and Other Structures – Multi-Purpose/ Facilities – Local Infrastructure Program
Construction of Multipurpose Building (Covered Court), Brgy. 176, Phase 1 Bagong Silang, Caloocan City
Physical Target: CW1-Construction of Multipurpose Building 1 Bldg.
EAO (‘000) – P 30.00
Unit Cost (P’000): P2,970.00/bldg.
Allocation (‘000): P 2,970.00
Total (‘000): P 3,000.00
|
July 4, 2018 |
GAA FY 2018 |
WIN8F05647 |
UACS No. 320101100367000 |
January 1, 2018 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 320101100367000
Project ID: P00220352LZ
WIN8F05647
Organizational Outcome 2: Protect Lives and Properties
Construction of Drainage Canal (Sta. 0+000 – Sta. 0+686, Right Side) along Babanse St., Brgy. NBBS, Navotas City
Physical Target: CW1 – Construction of Drainage Structure 686 lm
EAO = P 0.2 M
Unit Cost: P 14,285.71 / lm
Allocation: P 9.8 M
Total: P 10 M
As Modified
UACS No. 320101100367000
Project ID: P00220352LZ
WIN8F05647
Organizational Outcome 2: Protect Lives and Properties
Construction of Drainage Canal (Sta. 0+000 – Sta. 0+655, Right Side) along Babanse St., Brgy. NBBS, Navotas City
Physical Target: CW1 – Construction of Drainage Structure 655 lm
EAO = P 0.2 M
Unit Cost: P 14,961.83 / lm
Allocation: P 9.8 M
Total: P 10 M
|
July 4, 2018 |
FY 2018 |
WIN8G02461 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Repair / Rehab. of San Isidro – San Juan Road leading to Sta. Rita Eco Park, Pampanga |
July 3, 2018 |
FY 2018 GAA |
WIN8C03311 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program
Local Roads and Bridges - Local Bridges- Construction/ Repair/Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Saug Bridge, Brgy. Cabaywa, Asuncion, Davao del Norte
Physical Target:
CW1: 239 Sq.m. (Construction of Bridge)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Bridge)
EAO: P 500,000.00
TO: Local Program
Local Roads and Bridges - Local Bridges- Construction/ Repair/Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Saug Bridge, Brgy. Cabaywa, Asuncion, Davao del Norte
Physical Target:
CW1: 1 Number of Bridge (Construction of Substructure)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Substructure)
EAO: P 500,000.00
|
July 3, 2018 |
FY 2018 |
WIN8G02506 |
SR2018-01-001406 |
January 29, 2018 |
Region III |
Regional Office III |
OO-1: Ensure Safe and Reliable National Road System
Network Development Program
Construction of By-Pass and Diversion Roads
Tambubong Entrance / Exit to NLEX, Bulacan |
July 2, 2018 |
2018 |
310112100019000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Isabela 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
Ilagan - Delfin Albano - Mallig Rd (S00761LZ) - K0449+185-K0449+298 |
July 2, 2018 |
FY - 2018 |
WIN8F05608 |
FY - 2018 GAA D{WH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
Local Programs: Local Infrastructure Program
Local - Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Gravel Road -
Construction of Alcantara - Odiongan National Road
Cross Country Road leading to Tugdan Airport
(Phase 2), Alcantara, Romblon
CW1: 7.590 lane km ( Construction of Gravel Road )
Allocation: 100,000,000 Php
TO:
Construction of Gravel Road -
Construction of Alcantara - Odiongan National Road
Cross Country Road leading to Tugdan Airport
(Phase 2), Alcantara, Romblon
CW1: 2.5253 lane km ( Construction of Gravel Road )
Allocation: 100,000,000 Php |
July 2, 2018 |
FY - 2018 |
WIN5F05588 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Marinduque District Engineering Office |
Local Program
Flood Control Structures/Facilities
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Brgy. Laylay Flood Control,
Boac, Marinduque
CW1: 300.00 lin.m. ( Construction of Revetment )
Allocation: 4,000,000 Php
TO:
Construction of Brgy. Laylay Flood Control,
Boac, Marinduque
CW1: 200.00 lin.m. ( Construction of Revetment )
Allocation: 4,000,000 Php |
July 2, 2018 |
FY - 2018 |
WIN8F05600 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Marinduque District Engineering Office |
Local Program
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation of Brgy. Mainit - Binuga - Canat Road,
Boac, Marinduque
CW1; 0.760 lane km ( Rehabilitation of Paved Road )
Allocation: 10,000,000 Php
TO:
Rehabilitation of Brgy. Mainit - Binuga - Canat Road
Boac, Marinduque
CW1: 1.520 lane km ( Rehabilitation of Paved Road )
Allocation: 10,000,000 Php |
July 2, 2018 |
FY 2018 |
WIN8C03277 |
300106200043000 |
June 21, 2018 |
Region IX |
Regional Office IX |
UACS No. 300106200043000
Project ID: P00257567MN
Local - Flood Control and Drainage - Flood Control Structures/Facilities -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure Including Local Projects
Construction of Flood Control Drainage at Isabela City Proper, Isabela City, Basilan
Physical Target:
CW - 1 - Construction of Drainage Structure: 4,370 ln.m
Unit Cost: P 29,811.21/ln.m
EAO: P 4,725,000
Allocation: P 135,000,000 |
July 2, 2018 |
FY 2018 |
WIN8C03289 |
320101100142000 |
June 21, 2018 |
Region IX |
Regional Office IX |
UACS No. 320101100142000
Project ID: P00223228MN
OO2: Protect Lives and Properties Againsts Major Floods - Flood Management -
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of River/Flood Control Project along Dicayo River, Barangay Dr. Jose Rizal, Katipunan, Zamboanga del Norte
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 317.50 ln.m
Unit Cost: P 182,244.04/ln.m
Physical Target:
ROW: 125.05 sq.m
Unit Cost: P 300/sq.m
EAO: P 2,100,000.00
Allocation: P 60,000,000 |
July 2, 2018 |
FY 2018 |
WIN8C03287 |
310204100046000 |
June 21, 2018 |
Region IX |
Regional Office IX |
UACS No. 310204100046000
Project ID: P00200296MN
OO1: Ensure Safe and Reliable National Road System - Network Development
Construction of Bypass and Diversion Roads
Buenavista - Bolong Coastal Bypass Road, (Buenavista - Curuan Section) Including Bridge, Zamboanga City
Physical Target:
CW - 1 - Construction of Concrete Road: 5.09 lane km
Unit Cost:
P 25,335,182.61/lane km
Physical Target:
ROW: 26,913.07 sq.m
Unit Cost: P 300/sq.m
EAO: P 4,970,000.00
Allocation: P 142,000,000 |
July 2, 2018 |
FY - 2018 |
WIN8F05599 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Marinduque District Engineering Office |
Local Program
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction/Concreting of Brgy. Argao Pathway
( Sitio Talaso - Tabia ), Mogpog, Marinduque
CW1: 0.176 lane km ( Construction of Concrete Road )
Allocation: 1,000,000 Php
TO:
Construction/Concreting of Brgy. Argao Pathway
( Sitio Talaso - Tabia ), Mogpog, Marinduque
CW1: 0.960 lane km ( Construction of Concrete Road )
Allocation: 1,000,000 Php |
July 2, 2018 |
FY - 2018 |
WIN8F05617 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Marinduque District Engineering Office |
Local Program
Flood Control Structures/Facilities
- Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Barangay Tampus Flood Control,
Boac, Marinduque
CW1: 298.00 lin.m. ( Construction of Revetment )
Allocation: 10,000,000 Php
TO:
Construction of Barangay Tampus Flood Control,
Boac, Marinduque
CW1: 80.00 lin.m. ( Construction of Revetment )
Allocation: 10,000,000 hp
|
July 2, 2018 |
FY - 2018 |
WIN8F05614 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Marinduque District Engineering Office |
002 - Protect Lives and Properties Against Major Flood
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Channelization ( Channel Improvement ) of
Lapu-Lapu River ( Lapu-Lapu Fishing Port to
Estuary Section ), Sta. Cruz, Marinduque
CW1: 0.000 lin.m.
Allocation: 100,000,000 Php
TO:
Channelization ( Channel Improvement ) of
Lapu-Lapu River ( Lapu-Lapu Fishing Port to
Estuary Section ), Sta. Cruz, Marinduque
CW1; 130.00 lin.m. ( Construction of Flood Mitigation
Structure )
CW2: 153,357.00 cu.m. ( Channelization )
Allocation: 100,000,000 Php
|
July 2, 2018 |
FY 2018 |
WIN8C03286 |
310204100047000 |
June 21, 2018 |
Region IX |
Regional Office IX |
UACS No. 310204100047000
Project ID: P00200297MN
OO1: Ensure Safe and Reliable National Road System - Network Development
Construction of Bypass and Diversion Roads
Buenavista - Bolong Coastal Bypass Road, (Lubigan - Mala Section) Including Bridge, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 5.42 lane km
Unit Cost: P 23,797,833.15/lane km
Physical Target:
ROW: 20,385.81 sq.m
Unit Cost: P 300/sq.m
EAO: P 4,900,000.00
Allocation: P 140,000,000 |
July 2, 2018 |
FY 2018 |
WIN8C03275 |
310204100185000 |
June 21, 2018 |
Region IX |
Regional Office IX |
UACS No: 310204100185000
Project ID: P00200302MN
OO1: Ensure Safe and Reliable National Road System - Network Development
Construction of Bypass and Diversion Roads
Mampang - Sta. Catalina Diversion Road, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 2.64 lane km
Unit Cost: P 50,735,430.72/lane km
Physical Target:
ROW: 3,861.54 sq.m
Unit Cost: P 300/sq,m
EAO: P 4,900,000.00
Allocation: P 140,000,000.00 |
July 2, 2018 |
FY 2018 |
WIN8G02440 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Candaba – San Miguel Rd, K0074+141 – K0079+687 |
July 2, 2018 |
FY 2018 |
WIN8G02438 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Tertiary Roads – Sto. Tomas – Minalin Rd (Minalin – Macabebe Section), K0064+392 – K0064+719.50, K0067+033 - K0067+099, K0067+160 – K0068+898, K0070+810 – K0072+130.4 |
July 2, 2018 |
FY 2018 |
WIN8C03290 |
300118200004000 |
June 21, 2018 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No: 300118200004000
Project ID: P00258922MN
LP: Local Roads and Bridges - Local Bridges
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Bridge and Road Approaches-Brgy. Concepcion, Alicia, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Bridge: 365.38 sq.m
Unit Cost: P 109,852.71 sq.m
Physical Target:
CW-2 - Construction of Road Slope Protection Structure: 173.74 sq.m
Unit Cost: P 30,027.73 sq.m
EAO: P 1,645,000.00
Allocation: P 47,000,000.00 |
July 2, 2018 |
FY 2018 |
WIN8G02480 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 1st District Engineering Office |
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage System – Improvement of Creek and Construction of Slope Protection and Formation of Dike at Parian to Lagundi, Sta. 0+000 to Sta. 0+531, Mexico, Pampanga |
July 2, 2018 |
FY 2018 |
WIN8C03278 |
320101102154000 |
June 21, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 320101102154000
Project ID: P00220548MN
OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structure Vitali River, Vitali Section, Zamboanga City
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 1,690 l.m
Unit Cost: P 28,402.37/l.m
Physical Target:
ROW: 913 sq.m
Unit Cost: P 1,095.29/sq.m
EAO: P 1,000,000.00
Allocation: P 50,000,000.00 |
July 2, 2018 |
FY 2018 |
WIN8G02384 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 1st District Engineering Office |
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Improvement / Concreting of Banlic Cabalantian Barangay Road between MacArthur Highway and JASA Road, Bacolor, Pampanga |
July 2, 2018 |
FY 2018 |
WIN8C03283 |
310108100151000 |
June 21, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310108100151000
Project ID: P00200217MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide Secondary Roads
Zamboanga City - Labuan -Limpapa Rd
Physical Target:
CW-1 - Construction of Road Slope Protection Structure: 1,030.82 sq.m
Unit Cost: P 20,109.60/sq.m
Physical Target:
ROW: 820.00 sq.m
Unit Cost: P 1012.95/sq.m
EAO: P 440,000.00
Allocation: P 22,000,000.00 |
July 2, 2018 |
FY 2018 |
WIN8G02383 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Baliwag – Candaba – Sta. Ana Rd, K0063+867 – K0064+050 |
July 2, 2018 |
FY 2018 |
WIN8C03274 |
310202100056000 |
June 21, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310202100056000
Project ID: P00200707MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
Gov. Camins Rd incl. ROW (S01201MN), Chainage 160 -Chainage 802
Physical Target:
CW-1: Road Widening: 1.750 lane km
Unit Cost: P 18,730,086.26/lane km
Physical Target:
ROW: 39,800.00 sq.m
Unit Cost: P 1,005.47962/sq.m
EAO: P 2,640,260.00
Allocation: P 75,436,000.00 |
July 2, 2018 |
FY 2018 |
WIN8G02439 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide – Tertiary Roads – Candaba – San Miguel Rd, K0073+094.40 – K0073+408 |
July 2, 2018 |
FY 2018 |
WIN8C03276 |
300116201152000 |
June 21, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300116201152000
Project ID: P00258446MN
Local Program:
Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of 2nd and 4th St., Aurora Village, Guiwan, Zamboanga Cirty
Physical Target:
CW-1 - Construction of Concrete Road: 1.04528 lane km
Unit Cost: P 9,375,478.341/lane km
EAO: P 200,000.00
Allocation: P 10,000,000.00 |
July 2, 2018 |
FY 2018 GAA |
WIN8C03313 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Malagamot Road – Jct. Mudiang Road Bypass, incl. Bridge, Davao CIty
Physical Target:
CW1: 1.442 Lane Km (Road Widening)
CW2: 421.50 Sq.m. (Replacement of Bridge)
CW3: 354.06 Sq.m. (Replacement of Bridge)
CW4: 1.442 Lane Km (Reconstruction from Paved to Concrete)
CW5: 24,712 Sq.m. (Off-Carriageway Imrpovement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 297,674,000.00
CW1: P 13,915,300.00 (Road Widening)
CW2: P 38,600,000.00 (Replacement of Bridge)
CW3: P 32,424,000.00 (Replacement of Bridge)
CW4: P 35,901,860.00 (Reconstruction from Paved to Concrete)
CW5: P 166,414,590.00 (Off-Carriageway Imrpovement: Shoulder Paving/Construction)
EAO: P 10,418,590.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Malagamot Road – Jct. Mudiang Road Bypass, incl. Bridge, Davao CIty
Physical Target:
CW1: 0.334 Lane Km (Road Widening)
CW2: 421.50 Sq.m. (Replacement of Bridge)
CW3: 354.06 Sq.m. (Replacement of Bridge)
CW4: 2.216 Lane Km (Reconstruction from Paved to Concrete)
CW5: 155.826 Sq.m. (Off-Carriageway Imrpovement: Shoulder Paving/Construction)
ROW: 1,147.83 Sq.m.
Allocation:
TOTAL: P 297,674,000.00
CW1: P 4,806,235.90 (Road Widening)
CW2: P 57,758,887.25 (Replacement of Bridge)
CW3: P 43,701,227.87 (Replacement of Bridge)
CW4: P 75,438,256.92 (Reconstruction from Paved to Concrete)
CW5: P 2,610,392.06 (Off-Carriageway Imrpovement: Shoulder Paving/Construction)
ROW: P 3,860,000.00
EAO: P 10,418,590.00
EXC: P 102,674,000.00
|
July 2, 2018 |
FY 2018 |
WIN8C03288 |
300117201961000 |
June 21, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117201961000
Project ID: P00251824MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road including drainage facilities at Carillo Drive, Tumaga, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.12619 lane km
Unit Cost: P 31,381,250.50/lane km
EAO: P 40,000.00
Allocation: P 4,000,000.00 |
July 2, 2018 |
FY 2018 |
WIN8G02479 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide – Tertiary Roads – Baliwag - Candaba – Sta. Ana Rd, K0066+155 – K0067+357 |
July 2, 2018 |
FY 2018 |
WIN8G02470 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 1st District Engineering Office |
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage System – Rehabilitation / Improvement of Sapang Are Creek, Sta. 0+000 to Sta. 1+300 at Apalit, Pampanga |
July 2, 2018 |
FY 2018 |
WIN8G02445 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 1st District Engineering Office |
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage System – Rehabilitation / Improvement of Dawe River, Sta. 0+000 to Sta. 0+723.30 at Minalin, Pampanga |
July 2, 2018 |
FY 2018 GAA |
WIN8C03312 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program
Convergence and Special Support – Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Jct. La Union – Mt. Hamiguitan Road leading to Nt. Hamiguitan, San Isidro, Davao Oriental
Physical Target:
CW1: 1.200 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00
TO: Convergence and Special Support Program
Convergence and Special Support – Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Jct. La Union – Mt. Hamiguitan Road leading to Nt. Hamiguitan, San Isidro, Davao Oriental
Physical Target:
CW1: 800 Sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Road Slope Protection Structure)
EAO: P 400,000.00
|
July 2, 2018 |
FY 2018 |
WIN8G02484 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 1st District Engineering Office |
Network Development Program – Road Widening – Tertiary Roads - Candaba – San Miguel Rd, K0073+408 – K0073+674, K0074+000 – K0075+753 |
July 2, 2018 |
FY 2018 |
WIN8G02504 |
SR2018-01-000841 |
January 26, 2018 |
Region III |
Regional Office III |
Network Development Program - Road Widening - Primary Roads - Daang Maharllika (LZ), K0124+-650 - K0128+450
Allotment: PHP 150M |
July 2, 2018 |
FY 2018 |
WIN8G02501 |
SR2018-01-000936 |
January 26, 2018 |
Region III |
Regional Office III |
Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) incl. ROW, K0105+419 - K0106+584, K0110+177 - K0110+868.36, K0119+113 - K0119+460, K0121+821 - K0121+838, K0121+964 - K0122+380, K0123+119 - K0123+324
ALLOTMENT: PHP 102.919M |
July 2, 2018 |
FY 2018 |
WIN8G02507 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Regional Office III |
Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Ciudad de Victoria Interchange Overpass Bridge, Bocaue, Bulacan |
July 2, 2018 |
FY 2018 |
WIN8G02455 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 1st District Engineering Office |
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage System – Rehabilitation of Channel and Slope Protection of Malisik River Control, Candaba, Pampanga
|
June 29, 2018 |
FY 2018 |
WIN8G02432 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bulacan 1st District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads – Tertiary Roads – Old Cagayan Valley Rd, K0045+377 – K0050+390, K0051+800 – K0052+400 |
June 29, 2018 |
FY 2018 |
WIN8G02488 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bulacan 1st District Engineering Office |
Asset Preservation Program – Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads – Plaridel – Pulilan Div Rd, K0044+000 – K0045+000 |
June 29, 2018 |
FY 2018 |
WIN8G02435 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Calantas Proper, Casiguran, Aurora |
June 29, 2018 |
FY 2018 |
WIN8G02431 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Laboy, Dipaculao, Aurora |
June 29, 2018 |
FY 2018 |
WIN8G02437 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Setan Flood Control, Baler, Aurora |
June 29, 2018 |
FY 2018 |
WIN8G02469 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Secondary Roads - Paniqui Poblacion Rd - K0144 + (-040) - K0144 + 651.30 |
June 29, 2018 |
FY 2018 |
WIN8G02429 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program – Construction / Upgrading / Rehabilitation of Drainage along National Roads - Romulo H-way, K0150+812.10 - K0151+902, K0153+750.80 - K0154 + 667, K0154 + 689 - K0155 + 316.50 |
June 29, 2018 |
FY 2018 |
WIN8G02430 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Network Development Program - Road Widening - Primary Roads - Romulo H-way, K0130 + 590.00 - K0131 + 119.50, K0138 + 602.00 - K0139 + 349.00, K0147 + 756.70 - K0148 + 169.70, K0150 + 812.10 - K0151 + 902.00, K0153 + 750.80 - K0154 + 661.00, K0154 + 695.00 - K0155 + 457.60, K0159 + 900.00 - K0160 + 798.00 |
June 29, 2018 |
FY 2018 |
WIN8G02462 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program – Construction / Upgrading / Rehabilitation of Drainage along National Roads – Primary Roads - Romulo H-way, K0125 + 339 - K0125 + 492, K0128 + 882 - K0129 + 507, K0131 + 727.90 - K0132 + 859 |
June 29, 2018 |
FY 2018 |
WIN8G02453 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads - Romulo H-way - K0137+180.80 - K0138+602.00, K0143+000 - K0143+836, K0143+872 - K0145+464, K0148+800 -K0150+129 |