July 11, 2018 FY 2018 WIN8G02475 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310204100074000
Project ID: P00201068LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Construction of By-Pass and Diversion Roads – Camarines Sur/Albay Diversion Road (Albay Section), incl. ROW, Albay
Physical Target: CW1 – Construction of Gravel Road/ 3.16 lane-km
CW2 - Construction of Drainage Structure along Road/ 1,890 lm.
CW3 - Construction of Road Slope Protection Structure/ 2,146.75 sq.m.
Right-of-Way Acquisition (ROW)/ 31,600 sq.m.
Unit Cost: CW1 – Php 22.55 M/lane-km
CW2 – Php 7,236.94/lm.
CW3 – Php 4,554.35/sq.m.
ROW Acquisition – Php 56.96/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02482 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310204100101000
Project ID: P00201072LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Construction of By-Pass and Diversion Road – Daraga Urban Traffic Eco Route (DUTERTE), Project, Albay incl. ROW and Dike
Physical Target: CW1 – Construction of Gravel Road/ 2.912lane-km
CW2 – Construction of Dike/ 518.60 lm
Right-of-Way Acquisition (ROW)/ 21,840 sq.m.
Unit Cost: CW1 – Php 13.19 M/lane-km
CW2 – Php 167,847.01/lm.
ROW Acquisition – Php 3,092.95/sq.m.
Estimated Cost: Php 200.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02467 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310104100009000
Project ID: P00200412LZ
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Primary Roads – Daang Maharlika (LZ) - K0396+441.10 - K0396+840
Physical Target: CW1 – Construction of Concrete Road/ 1.5956 lane-km
CW2 - Construction of Drainage Structure along Road/ 797.80 lm.
CW3 - Construction of Road Slope Protection Structure/ 1,790.20 sq.m.
Unit Cost: CW1 – Php 39.43 M/lane-km
CW2 – Php 8,280.20/lm.
CW3 – Php 4,287.60/sq.m.
Estimated Cost: Php 80.0 M
(As Modified)

July 11, 2018 FY 2018 WIN8G02471 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310201100076000
Project ID: P00201260LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Primary Roads – Daang Maharlika (LZ) – K0600+ -008 – K0602+683, K0605+000 – K0605+167
Physical Target: CW1 - Road Widening/ 5.727 lane-km
CW2 - Construction of Drainage Structure along Road/ 3,873 lm.
Unit Cost: CW1 – Php 8.67 M/lane-km
CW2 – Php 12.09T/lm.
Estimated Cost: Php 100.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02478 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310201100082000
Project ID: P00201259LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Primary Roads – Daang Maharlika (LZ) – K0530+360 – K0534+630
Physical Target: CW1 - Road Widening/ 8.91084 lane-km
Right-of-Way Acquisition (ROW)/ 22,277.10 sq.m.
Unit Cost: CW1 – Php 17.31 M/lane-km
CW2 – Php 849.68/sq.m.
Estimated Cost: Php 179.41 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02473 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310201100195000
Project ID: P00201263LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Primary Roads – Rolando A Andaya Highway – K0288+513.10 – K0290+720
Physical Target: CW1 – Construction of Concrete Road/ 4.415 lane-km
CW2 - Construction of Road Slope Protection Structure/ 9,689.93sq.m.
CW3 - Construction of Drainage Structure along Road/ 2,445lm
Unit Cost: CW1 – Php 18.16M/lane-km
CW2 – Php 3,586.47/sq.m.
CW3 – Php 12,198.99/lm.
Estimated Cost: Php 150.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02473 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310201100195000
Project ID: P00201263LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Primary Roads – Rolando A Andaya Highway – K0288+513.10 – K0290+720
Physical Target: CW1 – Construction of Concrete Road/ 4.415 lane-km
CW2 - Construction of Road Slope Protection Structure/ 9,689.93sq.m.
CW3 - Construction of Drainage Structure along Road/ 2,445lm
Unit Cost: CW1 – Php 18.16M/lane-km
CW2 – Php 3,586.47/sq.m.
CW3 – Php 12,198.99/lm.
Estimated Cost: Php 150.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02481 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310101100328000
Project ID: P00223278LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program –
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems –
Rehabilitation/Improvement of Busay Flood Control Dike, Busay, Sta. 7+267.00 - Sta. 7+462.73, Sta. 7+532 - Sta. 7+863.90, Sta. 7+991.67 - Sta. 8+321.80, Sta. 7+360 - Sta. 7+637, Daraga, Albay
Physical Target: CW1 – Construction of Dike/ 1,134.76 lm
Unit Cost: CW1 – Php 85.040 T/lm
Estimated Cost: Php 100.0 M
(As Modified)
July 10, 2018 FY - 2018 WINF05653 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
Local Program

Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including drainage
structures and other ancillary works,
K0139+800 - K0142+300,
Espanola

CW1: 10.072 lane km ( Road Widening )
Allocation: 150,000,000 Php

TO:
Widening of Puerto Proncesa South Road
from two (2) to six (6) lanes including drainage
structures and other ancillary works,
K0139+800 - K0141+891,
Espanola

CW1: 8.424 lane km ( Road Widening )
Allocation: 150,000,000 Php
July 10, 2018 FY - 2018 WIN8F05651 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
Local Program

Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including drainage
structures and other ancillary works,
K0105+100 - K0107+400,
Narra

CW1: 9.004 lane km ( Road Widening )
Allocation: 140,000,000 Php

TO:
Widening of Puerto Princesa South Road
from two (2) to six (6 lanes including drainage
structures and other ancillary works,
K0104+388 - K0105+742,
K0105+771 - K0106+922,
Narra

CW1: 10.064 lane km ( Road Widening )
Allocation: 140,000,000 Php
July 9, 2018 FY 2018 WIN8G02508 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Asset Preservation Program – Preventive Maintenance – Primary Roads – San Jose – Lupao Rd, K0160+000 – K0160+778, K0172+299.40 – K0172+565, K0172+592.20 – K0173+716.40
July 9, 2018 FY - 2018 WIN8F05649 FY - 2018 GAA DPWH Infra December 19, 2017 Region IV-B Southern Mindoro Engineering District Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation -
Rehabilitation/Reconstruction/Upgrading of Damaged
Paved Roads - Secondary Roads

FROM:
Calapan South Rd
( K0169+040 - K0169+121,
K0171+000 - K0171+845,
K0172+092 - K0172+700 )

CW1: 3.068 lane km ( Reconstruction from Paved
to Concrete )
Allocation: 40,000,000 Php

TO:
Calapan South Rd
( K0169+040 - K0169+123.50,
K0177+176 - K0178+000.00,
K0178+544 - K0179+000.00 )

CW1: 2.789 lane km ( Reconstruction from Paved
to Concrete )
Allocation : 40,000,000 Php
July 9, 2018 FY - 2018 WIN8F05689 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001 - Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/
New Roads

FROM:
Victoria Sablayan ( Mindoro Cross-Island Road ),
Package 2, Occidental Mindoro

CW1: 4.282 lane km ( Construction of Concrete Road )
Allocation: 150,000,000 Php

TO:
Victoria - Sablayan ( Mindoro Cross Island Road ),
Occidental Mindodo

CW1: 3.816 lane km ( Construction of Concrete Road )
Allocation : 150,000,000 Php
July 6, 2018 FY 2018 WIN8C03325 310206100006000 June 29, 2018 Region IX Regional Office IX
UACS No. 310206100006000
Project ID: P00200469MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Flyovers/Interchanges/Underpasses/ Long Span Bridges
Governor Camin/MCLL Highway and Veterans Avenue Flyover incl. ROW, Zamboanga City
Physical Target:
CW-1 - Construction of flyover: 7,659.925 sq.m
Unit Cost: CW-1 - Construction of flyover: P 31,266.62/sq.m
Physical Target:
ROW: 51,813.47 sq.m
Unit Cost: P 965.00/sq.m
EAO: P 10,500,000.00
Allocation: P 300,000,000.00
July 6, 2018 FY 2018 WIN8C03329 310206100007000 June 29, 2018 Region IX Regional Office IX
UACS No. 310206100007000
Project ID: P00200470MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Flyovers/Interchanges/Underpasses/Long Span Bridges
Jct. T. Taupan Street (Suterville/Gavilan) Flyover, incl. ROW, Zamboanga City
Physical Target:
CW-1 - Construction of Flyover: 8,225.00 sq.m
Unit Cost: CW-1 - Construction of Flyover: P 29,161.09/sq.m
Physical Target:
ROW: 41,450.78 sq.m
Unit Cost: P 965.00/sq.m
EAO: P 10,150,000.00
Allocation: P 290,000,000.00
July 6, 2018 FY 2018 WIN8C03326 310107100018000 June 29, 2018 Region IX Regional Office IX
UACS No. 310107100018000
Project ID: P00200186MN

OO1: Ensure Safe and Reliable National Road System
Asset Preservation/Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Primary Roads
Pagadian City - Zamboanga City Road
K1869+K950.00 - K1870+055.00,
K1870+240.00 - K1870+330.00,
K1870+520.00 - K1870+590.00,
K1870+680.00 - K1870+874.00,
K1894+220.00 - K1894+400.00,
K1911+910.00 - K1911+981.00
Physical Target:
CW-1 - Construction of Road Slope Protection: 11,091.47 sq.m
Unit Cost: CW-1 - Construction of Road Slope Protection: P 17,355.25/sq.m
Physical Target:
ROW: 1,682.48 sq.m
Unit Cost: P 300/sq.m
EAO: P 7,000,000.00
Allocation: P 200,000,000.00
July 6, 2018 FY 2018 WIN8C03317 310204100044000 June 29, 2018 Region IX Regional Office IX
UACS No. 310204100044000
Project ID: P00200294MN

OO1: Ensure Safe and Reliable National Road System
Network Development
Construction of Bypass and Diversion Roads
Buenavista - Bolong Coastal Bypass Road, (Curuan - Lubigan Section) Incl. Bridge, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 1.60 lane km
Unit Cost: CW-1 - Construction of Concrete Road: P 83,178,164.06/lane km
Physical Target:
ROW: 6,716.46 sq.m
Unit Cost: P 300/sq.m
EAO: P 4,900,000.00
Allocation: P 140,000,000.00
July 6, 2018 FY 2018 WIN8C03328 310211100026000 June 29, 2018 Region IX Regional Office IX
UACS No. 310211100026000
Project ID: P00200845MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Secondary Roads
Zamboanga West Coastal Road (Limpapa - Sibuco Section) - (S01166MN)
Chainage 4000 - Chainage 5411.66
Chainage 5441.53 - Chainage 9029.87
Physical Target:
CW-1 - Paving of Unpaved Road: 10.00 lane km
Unit Cost: CW-1 - Paving of Unpaved Road: P 24,049,209.30
Physical Target:
ROW: 2,526.36 sq.m
Unit Cost: P 300/sq.m
EAO: P 8,750,000.00
Allocation: P 250,000,000.00
July 5, 2018 GAA FY 2018 WIN8F05684 UACS No. 300116200391000 January 1, 2018 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 300116200391000
Project ID: P00240687LZ
WIN8F05684
Construction/ Repair/ Rehabilitation/ Improvements of Various Infrastructure including Local Projects
National Roads and Bridges
National Roads and Bridges – Local Roads
Rehabilitation of Road with Drainage Improvement at Zone 58 and 59, Manila City
Physical Target: CW1 Rehabilitation of Paved Road L=0.40 lane km
Unit Cost (P’000): P49,000.00/ lane km
Allocation: P 19,600,000.00
EAO P 400,000.00
Total: P 20,000,000.00

As Modified
UACS No. 300116200391000
Project ID: P00240687LZ
WIN8F05684
Construction/ Repair/ Rehabilitation/ Improvements of Various Infrastructure including Local Projects
National Roads and Bridges
National Roads and Bridges – Local Roads
Rehabilitation of Road with Drainage Improvement at Zone 58 and 59, Manila City
Physical Target: CW1 Rehabilitation of Paved Road L=3.2586 lane km
Unit Cost (P’000): P6,014.85/ lane km
Allocation: P 19,600,000.00
EAO P 400,000.00
Total: P 20,000,000.00
July 5, 2018 GAA FY 2018 WIN8F05685 UACS No. 310204100096000 January 1, 2018 National Capital Region NCR - Regional Office
UACS No. 310204100096000
Project ID: P00202375LZ
WIN8F05685
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
Construction of By-Pass Road (Marikina River Bank to J.P. Rizal St.), Marikina City
Physical Target: CW1-Construction of Concrete Road L= 0 lane km
Unit Cost (P’000): P 0/ lane km
Allocation: P 121.590 M
EAO (‘000): P 4.410 M
Total (‘000): P 126.00 M

As Modified
UACS No. 310204100096000
Project ID: P00202375LZ
WIN8F05685
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
Construction of By-Pass Road (Marikina River Bank to J.P. Rizal St.), Marikina City
Physical Target: CW1-Construction of Concrete Road L= 2.576 lane km
Unit Cost (P’000): P 16,393.09/ lane km
ROW Acquisition A=7883.28 SQ,M. = P10.07/sq.m.
Estimated Cost: P 42.236 M
P 79.354 M
EAO (‘000): P 4.410 M
Total (‘000): P 126.00 M
July 5, 2018 GAA FY 2018 WIN8F05691 UACS No. 300116200243000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 300116200243000
Project ID: P00257942LZ – CW1
WIN8F05691
Local Program – Local Roads –
Construction/ Repair/Rehabilitation/ Improvement of Various Infrastructure including Projects
Construction of Access Road from Letre to Gov. Pascual Cities of Malabon and Navotas, Sta. 1+055
Physical Target: CW1 – Construction of Concrete Road: 4.22 Lane KM
EAO = P 1 M
Unit Cost: P 11,611.37 / Lane KM
Allocation: P 49 M
Total: P 50 M

As Modified
UACS No. 300116200243000
Project ID: P00257942LZ – CW1
WIN8F05691
Local Program – Local Roads –
Construction/ Repair/Rehabilitation/ Improvement of Various Infrastructure including Projects
Construction of Access Road from Letre to Gov. W. Pascual Ave., Malabon City (Phase I) Sta. 0+000 – Sta. 0+790
Physical Target: CW1 – Construction of Concrete Road: 2.644 Lane KM
EAO = P 0.5 M
Excess = P 0.038 M
Unit Cost: P 11,611.37 / Lane KM
Allocation: P 49.462 M
Total: P 50 M
July 5, 2018 GAA FY 2018 WIN8F05690 UACS No. 300108200027000 January 1, 2018 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA/Original
UACS No. 300108200027000
Project ID: P00257470LZ
WIN8F05690
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects – Flood Control and Drainage
Flood Control and Drainage – Drainage Protection Works
Improvement/Sheet Piling along Baloc-Baloc Creek (Bicutan Section), Brgy. Don Bosco, Parañaque City
Physical Target: CW1 Construction of Revetment 200 lineal meters
Unit Cost (P’000): P 98.00/ l.m.
Allocation (‘000) : P 19,600.00
EAO (‘000) P 400.00
Total (‘000): P 20,000.00

As Modified
UACS No. 300108200027000
Project ID: P00257470LZ
WIN8F05690
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects – Flood Control and Drainage
Flood Control and Drainage – Drainage Protection Works
Improvement/Sheet Piling along Baloc-Baloc Creek, Brgy. Don Bosco, Parañaque City
Physical Target: CW1 Construction of Revetment 264 lineal meters
Unit Cost (P’000): P 74.24/ l.m.
Allocation (‘000) : P 19,600.00
EAO (‘000) P 400.00
Total (‘000): P 20,000.00
July 5, 2018 FY 2018 WIN8G02485 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Convergence and Special Support Program – Construction / Improvement of Access Roads leading to Declared Tourism Destinations – Access Road Leading to Pinsal Falls, Ecotourism Park, Nueva Ecija
July 5, 2018 FY 2018 WIN8G02498 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Primary Roads – Daang Maharlika (LZ), K0169+1216 – K0170+000, K0170+044 – K0170+070, K0170+231 – K0170+252, K0170+290 – K0170+415, K0171+150 – K0171+208, K0171+260 – K0171+440, K0171+955 – K0172+015, K0172+900 – K0172+992, K0173+390 – K0173+456, K0174+020 – K0174+140, K0177+375 – K0177+445, K0205+839.20 – K0205+890, K0205+890 – K0205+950
July 4, 2018 FY 2018 WIN8G02490 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Improvement of Road and Bailey Bridge at Sitio Camachile, Nabuclod, Floridablanca, Pampanga
July 4, 2018 FY 2018 WIN8G02443 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Improvement / Concreting of Road leading to Palacol (Summer Place), San Jose, Floridablanca, Pampanga
July 4, 2018 FY 2018 WIN8G02456 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – road Widening - Primary Roads – Jose Abad Santos Ave (JASA), K0087+526 – K0087+972.30, K0087+980 – K0088+364.50, K0088+374.50 – K0088+580
July 4, 2018 FY 2018 WIN8G02454 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Nabuclod, Sitio Camachile, Floridablanca, Pampanga
July 4, 2018 FY 2018 WIN8G02460 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting / Paving of Road, Sitio Santol and Purok 6 Road, San Jose, Floridablanca, Pampanga
July 4, 2018 FY 2018 WIN8G02359 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Network Development Project - Off-Carriageway Improvement – Tertiary Roads – San Fernando – Lubao Rd, K0083+153 – K0083+526, K0083+538.20 – K0083+846, K0083+852.20 – K0084+160 – K0084+188.60 – K0084+703.90 – K0084+713.60 – K0084+875
July 4, 2018 FY 2018 WIN8G02458 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Road, Benigno Aquino St., Sta. Cruz, Lubao, Pampanga
July 4, 2018 FY 2018 WIN8G02459 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Lubao – Guagua – Minalin – Sto. Tomas Road, Pampanga
July 4, 2018 FY 2018 WIN8G02452 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Bridges – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of RCDG Bridge at Sta. Catalina, Sta. Catalina, Lubao, Pampanga
July 4, 2018 FY 2018 WIN8G02442 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Road, Dalan Betis, San Juan Nepomuceno, Guagua, Pampanga
July 4, 2018 FY 2018 WIN8G02441 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction / Concreting of Road and Canalization, Barangay Jalung, Porac, Pampanga
July 4, 2018 FY 2018 WIN8G02457 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction / Concreting of Road, Sto. Domingo – San Roque, Dau, Lubao, Pampanga

July 4, 2018 FY 2018 WIN8G02444 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Angeles – Porac – By–Pass Road, Pampanga
July 4, 2018 FY 2018 WIN8G02446 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Bodega (Sitio Biglang Sibul), Floridablanca, Pampanga
July 4, 2018 FY 2018 WIN8G02436 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Mawacat, Floridablanca, Pampanga
July 4, 2018 FY 2018 WIN8G02433 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Manibaug, Porac, Pampanga
July 4, 2018 FY 2018 WIN8G02428 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Road, Sitio Pigulut, Sta. Lucia, Lubao, Pampanga
July 4, 2018 FY 2018 WIN8G02497 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Asset Preservation Program – Construction / Upgrading / Rehabilitation of Drainage along National Roads – Primary Roads - Jose Abad Santos Ave (JASA), K0094+314 - K0094+674, K0095+692 - K0096+245
July 4, 2018 FY 2018 WIN8G02449 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Purok 6, Pulong Visaya, Brgy. Sta. Catalina, Lubao, Pampanga
July 4, 2018 GAA FY 2018 WIN8F05655 UACS No. 300116200299000 January 1, 2018 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 300116200299000
Project ID: P00257953LZ
WIN8F05655
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Bridges
Rehabilitation/ Improvement of Roads including Drainage System, Regidor St., and T. Kalaw St., Brgy. Pedro Cruz, San Juan City
Physical Target: CW1-Rehabilitation of Concrete Road 1.6 Lane km
Unit Cost (P’000): P3,062.50/lane km.
Allocation (‘000): P 4,900.00
EAO (‘000) P 100.00 M
Total (‘000): P 5,000.00

As Modified
UACS No. 300116200299000
Project ID: P00257953LZ
WIN8F05655
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Bridges
Rehabilitation/ Improvement of Roads including Drainage System, Regidor St., and T. Kalaw St., Brgy. Tibagan, San Juan City
Physical Target: CW1-Rehabilitation of Concrete Road 0.217 Lane km
Unit Cost (P’000): P22,580.65/lane km.
Allocation (‘000): P 4,900.00
EAO (‘000) P 100.00 M
Total (‘000): P 5,000.00
July 4, 2018 GAA FY 2018 WIN8F05660 UACS No. 300103200102000 January 1, 2018 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 300103200102000
Project ID: P0024047LZ
WIN8F05660
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Buildings and Other Structures – Multipurpose/ Facilities
Construction of Valeriano Fugoso High School Multi-Purpose Building, Brgy. Fortune, Marikina City
Physical Target: CW1- Construction of Multi-Purpose Building 1 Bldg.
Unit Cost (P’000): P14,700/bldg.
Allocation (‘000): P 14,700.00
EAO (‘000) P 300.00 M
Total (‘000): P 15,000.00

As Modified
UACS No. 300103200102000
Project ID: P0024047LZ
WIN8F05660
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Buildings and Other Structures – Multipurpose/ Facilities
Construction of Valeriano Fugoso High School Multi-Purpose Buildings, Brgy. Fortune, Marikina City
Physical Target: CW1- Construction of Multi-Purpose Building 2 Bldg.
Unit Cost (P’000): P7,350.00/bldg.
Allocation (‘000): P 14,700.00
EAO (‘000) P 300.00 M
Total (‘000): P 15,000.00
July 4, 2018 GAA FY 2018 WIN8F05657 UACS No. 300116200262000 January 2, 2018 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 300103200102000
Project ID: P0024047LZ
WIN8F05657
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Roads
Construction of Laguna Lake Highway Access Road, Taguig City
Physical Target: CW1- Construction of Concrete Road L=0.95 Lane km
Unit Cost (P’000): P51,578/lane km
Allocation (‘000): P 49,000.00
EAO (‘000) P 1,000.00 M
Total (‘000): P 50,000.00

As Modified
UACS No. 300103200102000
Project ID: P0024047LZ
WIN8F05657
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Roads
Construction of Laguna Lake Highway Access Road, Taguig City
Physical Target: CW1- Construction of Concrete Road L=0.732 Lane km
RWOW – ROW Acquisition 4,828.57 m2 = P7,000/sq.m
Unit Cost (P’000): P20,765/lane km
Allocation (‘000): P 15,200.00
EAO (‘000) P 1,000.00 M
Total (‘000): P 50,000.00
July 4, 2018 GAA FY 2018 WIN8F05679 UACS No. 300107200004000 January 1, 2018 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 300107200004000
Project ID: P00257646LZ
WIN8F05679
Local Program – Local Infrastructure Program
Flood Control and Drainage – Flood Control Structures/ Facilities
Construction of Pumping Station, Barangay San Perfecto, San Juan City
Physical Target: CW1- Construction of Flood Mitigation Structure, 1 Facility
Unit Cost (P’000): P74,250/facility
Allocation (‘000): P 74,250.00
EAO (‘000) P 750.00
Total (‘000): P 75,000.00

As Modified
UACS No. 300103200102000
UACS No. 300107200004000
Project ID: P00257646LZ
WIN8F05679
Local Program – Local Infrastructure Program
Flood Control and Drainage – Flood Control Structures/ Facilities
Construction of Pumping Station for the Catchment Area of Barangay San Perfecto, San Juan City
Physical Target: CW1- Construction of Flood Mitigation Structure, 1 Facility
Unit Cost (P’000): P74,250/facility
Allocation (‘000): P 74,250.00
EAO (‘000) P 750.00
Total (‘000): P 75,000.00
July 4, 2018 GAA FY 2018 WIN8F05650 UACS No. 300104200117000 January 1, 2018 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA/Original
UACS No. 300104200117000
Project ID: P00253551LZ
WIN8F05650
Local Infrastructure Program – Building and Other Structures
Building and Other Structures – Multi Purpose/Facilties
Construction of Multi-Purpose Building at Sitio Fatima, Brgy. San Antonio, Parañaque City
Physical Target: CW1 Construction of Multi-Purpose Building 1 Building
Unit Cost (P’000): P4,950.00/bldg.
Allocation (‘000) : P 4,950.00
EAO (‘000) P 50.00
Total (‘000): P 5,000.00

As Modified
UACS No. 300104200117000
Project ID: P00253551LZ
WIN8F05650
Local Infrastructure Program – Building and Other Structures
Building and Other Structures – Multi Purpose/Facilties
Construction of Multi-Purpose Building at Brgy. San Antonio, Parañaque City
Physical Target: CW1 Construction of Multi-Purpose Building 1 Building
Unit Cost (P’000): P4,950.00/bldg.
Allocation (‘000) : P 4,950.00
EAO (‘000) P 50.00
Total (‘000): P 5,000.00
July 4, 2018 GAA FY 2018 WIN8F05661 UACS No. 320101100558000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 320101100558000
Project ID: P00220648LZ
WIN8F05661
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Box Culvert along its Road Approaches along Brgy. 170, Caloocan City
Physical Target: CW1- Construction of Drainage Structure 48.60 lineal meters
EAO (‘000) – P 600.00
Unit Cost (P’000): P604.94/ l.m.
Allocation (000): P 29,400.00
Total (‘000): P 30,000.00

As Modified
UACS No. 320101100558000
Project ID: P00220648LZ
WIN8F05661
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Box Culvert along its Road Approaches along Brgy. 170, Caloocan City
Physical Target: CW1- Construction of Drainage Structure 128.60 lineal meters
CW2 – Construction of Concrete Road = 0.160 lane km
CW3 – Construction of Flood Mitigation Structures 604.00 Lineal Meters
Unit Cost (P’000): CW1 - P32.15/ l.m.
CW2 - P7,788.50/ l.m.
CW3 – P39,77/l.m.
EAO (‘000) – P 600.00
Allocation (000): CW1 = P 4,135.00
CW2 = P1,246.00
CW3 = P24,019.00
Total (‘000): P 30,000.00
July 4, 2018 GAA FY 2018 WIN8F05678 UACS No. 300118200006000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300118200006000
Project ID: P00240563LZ
WIN8F05678
Local Program – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Bridges
Construction of Bridge connecting Camarin to Bagong Silang, Caloocan City
Physical Target: CW1-Construction of Bridge 732 sq.m.
EAO (‘000) – P 3,500.00
Unit Cost (P’000): P131.00/sq.m.
Allocation (‘000): P 96,500.00
Total (‘000): P 100,000.00

As Modified
UACS No. 300118200006000
Project ID: P00240563LZ
WIN8F05678
Local Program – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Bridges
Construction of Bridge connecting Camarin to Bagong Silang, Caloocan City
Physical Target: CW1 - Construction of Bridge 439.20 sq.m.
CW2 – Rehabilitation of Concrete Road 2.33 Lane km
EAO (‘000) – P 3,500.00
Unit Cost (P’000): CW1 = P134.96/sq.m.
CW2 = P15,977,25/ Lane km
Allocation (‘000): CW1 = P 59,273.00
CW2 = P 37,227.00
Total (‘000): P 100,000.00
July 4, 2018 GAA FY 2018 WIN8F05658 UACS No. 320101100561000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 320101100561000
Project ID: P00220369LZ
WIN8F05658
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Drainage System along Brgys. In 142 and 143, Caloocan City
Physical Target: CW1-Construction of Drainage Structure L=450 Lineal Meters
EAO (‘000) – P 200.00
Unit Cost (P’000): P21.78.00/l.m.
Allocation (‘000): P 9,800.00
Total (‘000): P 10,000.00

As Modified
UACS No. 320101100561000
Project ID: P00220369LZ
WIN8F05658
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Drainage System along Brgys. In 142 and 143, Caloocan City
Physical Target: CW1-Construction of Drainage Structure L=938 Lineal Meters
EAO (‘000) – P 200.00
Unit Cost (P’000): P10.45/l.m.
Allocation (‘000): P 9,800.00
Total (‘000): P 10,000.00
July 4, 2018 GAA FY 2018 WIN8F05659 UACS No. 300104200130000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300104200130000
Project ID: P00256422LZ
WIN8F05659
Local Program
Local – Buildings and Other Structures – Multi-Purpose/ Facilities – Local Infrastructure Program
Construction of Multipurpose Building (Covered Court), Brgy. 177, Phase 1 Bagong Silang, Caloocan City
Physical Target: CW1-Construction of Multipurpose Building 1 Bldg.
EAO (‘000) – P 30.00
Unit Cost (P’000): P2,970.00/bldg.
Allocation (‘000): P 2,970.00
Total (‘000): P 3,000.00

As Modified
UACS No. 300104200130000
Project ID: P00256422LZ
WIN8F05659
Local Program
Local – Buildings and Other Structures – Multi-Purpose/ Facilities – Local Infrastructure Program
Construction of Multipurpose Building (Covered Court), Brgy. 176, Phase 1 Bagong Silang, Caloocan City
Physical Target: CW1-Construction of Multipurpose Building 1 Bldg.
EAO (‘000) – P 30.00
Unit Cost (P’000): P2,970.00/bldg.
Allocation (‘000): P 2,970.00
Total (‘000): P 3,000.00
July 4, 2018 GAA FY 2018 WIN8F05647 UACS No. 320101100367000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101100367000
Project ID: P00220352LZ
WIN8F05647
Organizational Outcome 2: Protect Lives and Properties
Construction of Drainage Canal (Sta. 0+000 – Sta. 0+686, Right Side) along Babanse St., Brgy. NBBS, Navotas City
Physical Target: CW1 – Construction of Drainage Structure 686 lm
EAO = P 0.2 M
Unit Cost: P 14,285.71 / lm
Allocation: P 9.8 M
Total: P 10 M

As Modified
UACS No. 320101100367000
Project ID: P00220352LZ
WIN8F05647
Organizational Outcome 2: Protect Lives and Properties
Construction of Drainage Canal (Sta. 0+000 – Sta. 0+655, Right Side) along Babanse St., Brgy. NBBS, Navotas City
Physical Target: CW1 – Construction of Drainage Structure 655 lm
EAO = P 0.2 M
Unit Cost: P 14,961.83 / lm
Allocation: P 9.8 M
Total: P 10 M
July 4, 2018 FY 2018 WIN8G02461 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Repair / Rehab. of San Isidro – San Juan Road leading to Sta. Rita Eco Park, Pampanga
July 3, 2018 FY 2018 GAA WIN8C03311 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: Local Program
Local Roads and Bridges - Local Bridges- Construction/ Repair/Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Saug Bridge, Brgy. Cabaywa, Asuncion, Davao del Norte

Physical Target:
CW1: 239 Sq.m. (Construction of Bridge)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Bridge)
EAO: P 500,000.00

TO: Local Program
Local Roads and Bridges - Local Bridges- Construction/ Repair/Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Saug Bridge, Brgy. Cabaywa, Asuncion, Davao del Norte

Physical Target:
CW1: 1 Number of Bridge (Construction of Substructure)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Substructure)
EAO: P 500,000.00
July 3, 2018 FY 2018 WIN8G02506 SR2018-01-001406 January 29, 2018 Region III Regional Office III
OO-1: Ensure Safe and Reliable National Road System
Network Development Program
Construction of By-Pass and Diversion Roads

Tambubong Entrance / Exit to NLEX, Bulacan
July 2, 2018 2018 310112100019000 GAA FY 2018 January 1, 2018 Region II Isabela 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads

Ilagan - Delfin Albano - Mallig Rd (S00761LZ) - K0449+185-K0449+298
July 2, 2018 FY - 2018 WIN8F05608 FY - 2018 GAA D{WH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
Local Programs: Local Infrastructure Program

Local - Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Gravel Road -
Construction of Alcantara - Odiongan National Road
Cross Country Road leading to Tugdan Airport
(Phase 2), Alcantara, Romblon

CW1: 7.590 lane km ( Construction of Gravel Road )
Allocation: 100,000,000 Php

TO:
Construction of Gravel Road -
Construction of Alcantara - Odiongan National Road
Cross Country Road leading to Tugdan Airport
(Phase 2), Alcantara, Romblon

CW1: 2.5253 lane km ( Construction of Gravel Road )
Allocation: 100,000,000 Php
July 2, 2018 FY - 2018 WIN5F05588 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Flood Control Structures/Facilities
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Brgy. Laylay Flood Control,
Boac, Marinduque

CW1: 300.00 lin.m. ( Construction of Revetment )
Allocation: 4,000,000 Php

TO:
Construction of Brgy. Laylay Flood Control,
Boac, Marinduque

CW1: 200.00 lin.m. ( Construction of Revetment )
Allocation: 4,000,000 Php
July 2, 2018 FY - 2018 WIN8F05600 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Rehabilitation of Brgy. Mainit - Binuga - Canat Road,
Boac, Marinduque

CW1; 0.760 lane km ( Rehabilitation of Paved Road )
Allocation: 10,000,000 Php

TO:
Rehabilitation of Brgy. Mainit - Binuga - Canat Road
Boac, Marinduque

CW1: 1.520 lane km ( Rehabilitation of Paved Road )
Allocation: 10,000,000 Php
July 2, 2018 FY 2018 WIN8C03277 300106200043000 June 21, 2018 Region IX Regional Office IX
UACS No. 300106200043000
Project ID: P00257567MN

Local - Flood Control and Drainage - Flood Control Structures/Facilities -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure Including Local Projects
Construction of Flood Control Drainage at Isabela City Proper, Isabela City, Basilan
Physical Target:
CW - 1 - Construction of Drainage Structure: 4,370 ln.m
Unit Cost: P 29,811.21/ln.m
EAO: P 4,725,000
Allocation: P 135,000,000
July 2, 2018 FY 2018 WIN8C03289 320101100142000 June 21, 2018 Region IX Regional Office IX
UACS No. 320101100142000
Project ID: P00223228MN

OO2: Protect Lives and Properties Againsts Major Floods - Flood Management -
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of River/Flood Control Project along Dicayo River, Barangay Dr. Jose Rizal, Katipunan, Zamboanga del Norte
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 317.50 ln.m
Unit Cost: P 182,244.04/ln.m
Physical Target:
ROW: 125.05 sq.m
Unit Cost: P 300/sq.m
EAO: P 2,100,000.00
Allocation: P 60,000,000
July 2, 2018 FY 2018 WIN8C03287 310204100046000 June 21, 2018 Region IX Regional Office IX
UACS No. 310204100046000
Project ID: P00200296MN

OO1: Ensure Safe and Reliable National Road System - Network Development
Construction of Bypass and Diversion Roads
Buenavista - Bolong Coastal Bypass Road, (Buenavista - Curuan Section) Including Bridge, Zamboanga City
Physical Target:
CW - 1 - Construction of Concrete Road: 5.09 lane km
Unit Cost:
P 25,335,182.61/lane km
Physical Target:
ROW: 26,913.07 sq.m
Unit Cost: P 300/sq.m
EAO: P 4,970,000.00
Allocation: P 142,000,000
July 2, 2018 FY - 2018 WIN8F05599 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Construction/Concreting of Brgy. Argao Pathway
( Sitio Talaso - Tabia ), Mogpog, Marinduque

CW1: 0.176 lane km ( Construction of Concrete Road )
Allocation: 1,000,000 Php

TO:
Construction/Concreting of Brgy. Argao Pathway
( Sitio Talaso - Tabia ), Mogpog, Marinduque

CW1: 0.960 lane km ( Construction of Concrete Road )
Allocation: 1,000,000 Php
July 2, 2018 FY - 2018 WIN8F05617 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Flood Control Structures/Facilities
- Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Barangay Tampus Flood Control,
Boac, Marinduque

CW1: 298.00 lin.m. ( Construction of Revetment )
Allocation: 10,000,000 Php

TO:
Construction of Barangay Tampus Flood Control,
Boac, Marinduque

CW1: 80.00 lin.m. ( Construction of Revetment )
Allocation: 10,000,000 hp

July 2, 2018 FY - 2018 WIN8F05614 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
002 - Protect Lives and Properties Against Major Flood

Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

FROM:
Channelization ( Channel Improvement ) of
Lapu-Lapu River ( Lapu-Lapu Fishing Port to
Estuary Section ), Sta. Cruz, Marinduque

CW1: 0.000 lin.m.
Allocation: 100,000,000 Php

TO:
Channelization ( Channel Improvement ) of
Lapu-Lapu River ( Lapu-Lapu Fishing Port to
Estuary Section ), Sta. Cruz, Marinduque

CW1; 130.00 lin.m. ( Construction of Flood Mitigation
Structure )
CW2: 153,357.00 cu.m. ( Channelization )
Allocation: 100,000,000 Php

July 2, 2018 FY 2018 WIN8C03286 310204100047000 June 21, 2018 Region IX Regional Office IX
UACS No. 310204100047000
Project ID: P00200297MN

OO1: Ensure Safe and Reliable National Road System - Network Development
Construction of Bypass and Diversion Roads
Buenavista - Bolong Coastal Bypass Road, (Lubigan - Mala Section) Including Bridge, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 5.42 lane km
Unit Cost: P 23,797,833.15/lane km
Physical Target:
ROW: 20,385.81 sq.m
Unit Cost: P 300/sq.m
EAO: P 4,900,000.00
Allocation: P 140,000,000
July 2, 2018 FY 2018 WIN8C03275 310204100185000 June 21, 2018 Region IX Regional Office IX
UACS No: 310204100185000
Project ID: P00200302MN

OO1: Ensure Safe and Reliable National Road System - Network Development
Construction of Bypass and Diversion Roads
Mampang - Sta. Catalina Diversion Road, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 2.64 lane km
Unit Cost: P 50,735,430.72/lane km
Physical Target:
ROW: 3,861.54 sq.m
Unit Cost: P 300/sq,m
EAO: P 4,900,000.00
Allocation: P 140,000,000.00
July 2, 2018 FY 2018 WIN8G02440 FY 2018 GAA January 4, 2018 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Candaba – San Miguel Rd, K0074+141 – K0079+687
July 2, 2018 FY 2018 WIN8G02438 FY 2018 GAA January 4, 2018 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Tertiary Roads – Sto. Tomas – Minalin Rd (Minalin – Macabebe Section), K0064+392 – K0064+719.50, K0067+033 - K0067+099, K0067+160 – K0068+898, K0070+810 – K0072+130.4
July 2, 2018 FY 2018 WIN8C03290 300118200004000 June 21, 2018 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No: 300118200004000
Project ID: P00258922MN

LP: Local Roads and Bridges - Local Bridges

Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Bridge and Road Approaches-Brgy. Concepcion, Alicia, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Bridge: 365.38 sq.m
Unit Cost: P 109,852.71 sq.m
Physical Target:
CW-2 - Construction of Road Slope Protection Structure: 173.74 sq.m
Unit Cost: P 30,027.73 sq.m
EAO: P 1,645,000.00
Allocation: P 47,000,000.00
July 2, 2018 FY 2018 WIN8G02480 FY 2018 GAA January 4, 2018 Region III Pampanga 1st District Engineering Office
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage System – Improvement of Creek and Construction of Slope Protection and Formation of Dike at Parian to Lagundi, Sta. 0+000 to Sta. 0+531, Mexico, Pampanga
July 2, 2018 FY 2018 WIN8C03278 320101102154000 June 21, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 320101102154000
Project ID: P00220548MN

OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structure Vitali River, Vitali Section, Zamboanga City
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 1,690 l.m
Unit Cost: P 28,402.37/l.m
Physical Target:
ROW: 913 sq.m
Unit Cost: P 1,095.29/sq.m
EAO: P 1,000,000.00
Allocation: P 50,000,000.00
July 2, 2018 FY 2018 WIN8G02384 FY 2018 GAA January 4, 2018 Region III Pampanga 1st District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Improvement / Concreting of Banlic Cabalantian Barangay Road between MacArthur Highway and JASA Road, Bacolor, Pampanga
July 2, 2018 FY 2018 WIN8C03283 310108100151000 June 21, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310108100151000
Project ID: P00200217MN

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide Secondary Roads
Zamboanga City - Labuan -Limpapa Rd
Physical Target:
CW-1 - Construction of Road Slope Protection Structure: 1,030.82 sq.m
Unit Cost: P 20,109.60/sq.m
Physical Target:
ROW: 820.00 sq.m
Unit Cost: P 1012.95/sq.m
EAO: P 440,000.00
Allocation: P 22,000,000.00
July 2, 2018 FY 2018 WIN8G02383 FY 2018 GAA January 4, 2018 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Baliwag – Candaba – Sta. Ana Rd, K0063+867 – K0064+050
July 2, 2018 FY 2018 WIN8C03274 310202100056000 June 21, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310202100056000
Project ID: P00200707MN

OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
Gov. Camins Rd incl. ROW (S01201MN), Chainage 160 -Chainage 802
Physical Target:
CW-1: Road Widening: 1.750 lane km
Unit Cost: P 18,730,086.26/lane km
Physical Target:
ROW: 39,800.00 sq.m
Unit Cost: P 1,005.47962/sq.m
EAO: P 2,640,260.00
Allocation: P 75,436,000.00
July 2, 2018 FY 2018 WIN8G02439 FY 2018 GAA January 4, 2018 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide – Tertiary Roads – Candaba – San Miguel Rd, K0073+094.40 – K0073+408
July 2, 2018 FY 2018 WIN8C03276 300116201152000 June 21, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300116201152000
Project ID: P00258446MN

Local Program:

Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of 2nd and 4th St., Aurora Village, Guiwan, Zamboanga Cirty
Physical Target:
CW-1 - Construction of Concrete Road: 1.04528 lane km
Unit Cost: P 9,375,478.341/lane km
EAO: P 200,000.00
Allocation: P 10,000,000.00
July 2, 2018 FY 2018 GAA WIN8C03313 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Malagamot Road – Jct. Mudiang Road Bypass, incl. Bridge, Davao CIty
Physical Target:
CW1: 1.442 Lane Km (Road Widening)
CW2: 421.50 Sq.m. (Replacement of Bridge)
CW3: 354.06 Sq.m. (Replacement of Bridge)
CW4: 1.442 Lane Km (Reconstruction from Paved to Concrete)
CW5: 24,712 Sq.m. (Off-Carriageway Imrpovement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 297,674,000.00
CW1: P 13,915,300.00 (Road Widening)
CW2: P 38,600,000.00 (Replacement of Bridge)
CW3: P 32,424,000.00 (Replacement of Bridge)
CW4: P 35,901,860.00 (Reconstruction from Paved to Concrete)
CW5: P 166,414,590.00 (Off-Carriageway Imrpovement: Shoulder Paving/Construction)
EAO: P 10,418,590.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Malagamot Road – Jct. Mudiang Road Bypass, incl. Bridge, Davao CIty
Physical Target:
CW1: 0.334 Lane Km (Road Widening)
CW2: 421.50 Sq.m. (Replacement of Bridge)
CW3: 354.06 Sq.m. (Replacement of Bridge)
CW4: 2.216 Lane Km (Reconstruction from Paved to Concrete)
CW5: 155.826 Sq.m. (Off-Carriageway Imrpovement: Shoulder Paving/Construction)
ROW: 1,147.83 Sq.m.
Allocation:
TOTAL: P 297,674,000.00
CW1: P 4,806,235.90 (Road Widening)
CW2: P 57,758,887.25 (Replacement of Bridge)
CW3: P 43,701,227.87 (Replacement of Bridge)
CW4: P 75,438,256.92 (Reconstruction from Paved to Concrete)
CW5: P 2,610,392.06 (Off-Carriageway Imrpovement: Shoulder Paving/Construction)
ROW: P 3,860,000.00
EAO: P 10,418,590.00
EXC: P 102,674,000.00
July 2, 2018 FY 2018 WIN8C03288 300117201961000 June 21, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300117201961000
Project ID: P00251824MN

Local Program:

Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road including drainage facilities at Carillo Drive, Tumaga, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.12619 lane km
Unit Cost: P 31,381,250.50/lane km
EAO: P 40,000.00
Allocation: P 4,000,000.00
July 2, 2018 FY 2018 WIN8G02479 FY 2018 GAA January 4, 2018 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide – Tertiary Roads – Baliwag - Candaba – Sta. Ana Rd, K0066+155 – K0067+357
July 2, 2018 FY 2018 WIN8G02470 FY 2018 GAA January 4, 2018 Region III Pampanga 1st District Engineering Office
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage System – Rehabilitation / Improvement of Sapang Are Creek, Sta. 0+000 to Sta. 1+300 at Apalit, Pampanga
July 2, 2018 FY 2018 WIN8G02445 FY 2018 GAA January 4, 2018 Region III Pampanga 1st District Engineering Office
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage System – Rehabilitation / Improvement of Dawe River, Sta. 0+000 to Sta. 0+723.30 at Minalin, Pampanga
July 2, 2018 FY 2018 GAA WIN8C03312 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program
Convergence and Special Support – Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Jct. La Union – Mt. Hamiguitan Road leading to Nt. Hamiguitan, San Isidro, Davao Oriental

Physical Target:
CW1: 1.200 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00

TO: Convergence and Special Support Program
Convergence and Special Support – Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Jct. La Union – Mt. Hamiguitan Road leading to Nt. Hamiguitan, San Isidro, Davao Oriental

Physical Target:
CW1: 800 Sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Road Slope Protection Structure)
EAO: P 400,000.00
July 2, 2018 FY 2018 WIN8G02484 FY 2018 GAA January 4, 2018 Region III Pampanga 1st District Engineering Office
Network Development Program – Road Widening – Tertiary Roads - Candaba – San Miguel Rd, K0073+408 – K0073+674, K0074+000 – K0075+753
July 2, 2018 FY 2018 WIN8G02504 SR2018-01-000841 January 26, 2018 Region III Regional Office III
Network Development Program - Road Widening - Primary Roads - Daang Maharllika (LZ), K0124+-650 - K0128+450

Allotment: PHP 150M
July 2, 2018 FY 2018 WIN8G02501 SR2018-01-000936 January 26, 2018 Region III Regional Office III
Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) incl. ROW, K0105+419 - K0106+584, K0110+177 - K0110+868.36, K0119+113 - K0119+460, K0121+821 - K0121+838, K0121+964 - K0122+380, K0123+119 - K0123+324

ALLOTMENT: PHP 102.919M
July 2, 2018 FY 2018 WIN8G02507 FY 2018 GAA January 4, 2018 Region III Regional Office III
Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Ciudad de Victoria Interchange Overpass Bridge, Bocaue, Bulacan
July 2, 2018 FY 2018 WIN8G02455 FY 2018 GAA January 4, 2018 Region III Pampanga 1st District Engineering Office

Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage System – Rehabilitation of Channel and Slope Protection of Malisik River Control, Candaba, Pampanga
June 29, 2018 FY 2018 WIN8G02432 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads – Tertiary Roads – Old Cagayan Valley Rd, K0045+377 – K0050+390, K0051+800 – K0052+400
June 29, 2018 FY 2018 WIN8G02488 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Asset Preservation Program – Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads – Plaridel – Pulilan Div Rd, K0044+000 – K0045+000
June 29, 2018 FY 2018 WIN8G02435 FY 2018 GAA January 4, 2018 Region III Aurora District Engineering Office
Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Calantas Proper, Casiguran, Aurora
June 29, 2018 FY 2018 WIN8G02431 FY 2018 GAA January 4, 2018 Region III Aurora District Engineering Office
Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Laboy, Dipaculao, Aurora
June 29, 2018 FY 2018 WIN8G02437 FY 2018 GAA January 4, 2018 Region III Aurora District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Setan Flood Control, Baler, Aurora
June 29, 2018 FY 2018 WIN8G02469 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Secondary Roads - Paniqui Poblacion Rd - K0144 + (-040) - K0144 + 651.30
June 29, 2018 FY 2018 WIN8G02429 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Asset Preservation Program – Construction / Upgrading / Rehabilitation of Drainage along National Roads - Romulo H-way, K0150+812.10 - K0151+902, K0153+750.80 - K0154 + 667, K0154 + 689 - K0155 + 316.50
June 29, 2018 FY 2018 WIN8G02430 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Network Development Program - Road Widening - Primary Roads - Romulo H-way, K0130 + 590.00 - K0131 + 119.50, K0138 + 602.00 - K0139 + 349.00, K0147 + 756.70 - K0148 + 169.70, K0150 + 812.10 - K0151 + 902.00, K0153 + 750.80 - K0154 + 661.00, K0154 + 695.00 - K0155 + 457.60, K0159 + 900.00 - K0160 + 798.00
June 29, 2018 FY 2018 WIN8G02462 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Asset Preservation Program – Construction / Upgrading / Rehabilitation of Drainage along National Roads – Primary Roads - Romulo H-way, K0125 + 339 - K0125 + 492, K0128 + 882 - K0129 + 507, K0131 + 727.90 - K0132 + 859
June 29, 2018 FY 2018 WIN8G02453 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads - Romulo H-way - K0137+180.80 - K0138+602.00, K0143+000 - K0143+836, K0143+872 - K0145+464, K0148+800 -K0150+129