June 19, 2020 |
2020 |
WIN0C03794 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Aurora District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Secondary Roads
Baler-Casiguran Rd (Baler-Dinadiawan), K0266+140 - K0268+313, K0268+336 - K0271+168, K0271+248 - K0274+612 |
June 19, 2020 |
2020 |
WIN0F06056 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Aurora District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Baler - Casiguran Rd ( Dinadiawan - Casiguran Sect), K0298+130 - K0298+165, K0298+330 - K0298+440 |
June 19, 2020 |
2020 |
WIN0C03802 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Aurora District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads
Nueva Ecija - Aurora Rd, K0198+215 - K0198+275, K0206+000 - K0206+493
|
June 19, 2020 |
2020 |
WIN0C03800 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Aurora District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads
Baler - Casiguran Rd (Dinadiawan - Casiguran Sect), K0308+426 - K0308+699, K0322+404 - K0322+851 |
June 19, 2020 |
2020 |
WIN0C03796 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Aurora District Engineering Office |
Local Program
Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program
Construction of Multi-purpose Building, Brgy. Abuleg, Dinalungan, Aurora |
June 19, 2020 |
2020 |
WIN0C03798 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Zambales 2nd District Engineering Office |
Local Program
Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program
Construction of Health Care Center, Balic-Balic, Sta. Rita, Olongapo City, Zambales |
June 19, 2020 |
2020 |
WIN0C03804 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Zambales 2nd District Engineering Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management Program - Construction / Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Rehabilitation of Flood Mitigation Structures and Drainage System of Sta. Rita River, Sta. 7+155.40 to Sta. 7+433.20 (Right Side), Olongapo City |
June 19, 2020 |
2020 |
WIN0C03799 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Zambales 2nd District Engineering Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Flood Mitigation Structures and Drainage System of Sta. Rita River, Sta. 3+993 - Sta. 4+291.60 (Left Side), Olongapo City |
June 19, 2020 |
2020 |
WIN0C03831 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Zambales 2nd District Engineering Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management Program - Construction / Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Rehabilitation of Flood Mitigation Structures and Drainage System of Sta. Rita River, Sta. 6+480.60 to Sta. 6+756 (Left Side), Olongapo City, Zambales |
June 19, 2020 |
2020 |
WIN0C03808 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Zambales 2nd District Engineering Office |
Local Program
Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure Program
Rehabilitation of Sta. Rita River, Sta. 7+850 - Sta. 8+240 (Right Side) Olongapo City, Zambales |
June 19, 2020 |
2020 |
WIN0C03807 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Zambales 2nd District Engineering Office |
Local Program
Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure Program
Rehabilitation of Sta. Rita River, Sta. 8+240 - Sta. 8+640 (Right Side), Olongapo , Zambales |
June 19, 2020 |
2020 |
WIN0C03810 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Zambales 2nd District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Flood Mitigation Structures and Drainage System of Sta. Rita River, Sta. 3+688 - Sta. 3+960 (Right Side), Olongapo City |
June 18, 2020 |
FY 2020 GAA |
WIN0F06090 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No.: 310105100400000
Project ID: P00401317LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads
FROM:
Tablas Circumferential Rd,
K0080+885 - K0081+460
Physical Target: CW1 - Reconstruction to Concrete Pavement:
1.162 Lane Km
Allocation: Php 16.229 Million
TO:
Tablas Circumferential Rd,
K0080+885.02 - K0081+360
Physical Target: CW1 - Reconstruction to Concrete Pavement:
0.96196 Lane Km
Allocation: Php 16.229 million |
June 18, 2020 |
FY 2020 GAA |
WIN0F06094 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No.: 310208100261000
Project ID: P00400733LZ
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement -
Secondary Roads
FROM:
Tablas Circumferential Rd
K0092+396 - K0093+270,
K0093+855 - K0094+994
Physical Target: CW1 - Off-Carriageway Improvement:
Shoulder Paving/Construction:
6,084 square meters
Allocation: Php 18.252 Million
TO:
Tablas Circumferential Rd
K0092+396 - K0093+262,
K0093+855 - K0094+913
Physical Target: Cw1 - Off-Carriage Improvement:
Shoulder Paving/Construction:
5,855.10 square meters
Allocation: Php 18.252 Million |
June 18, 2020 |
FY 2020 GAA |
WIN0F06093 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No.: 310105100395000
Project ID: P00401312LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads
FROM:
Romblon - Cogon - Sablayan Rd,
K0016+150 - K0016+240
Physical Target: CW1 - Reconstruction to Concrete Pavement:
0.180 Lane Km
Allocation: Php 2.30 Millionn
TO:Romblon - Cogon - Sablayan Rd.,
K0016+150 - K0016+273.90
Physical Target: Cw1 - Reconstruction to Concrete Pavement:
0.2478 Lane Km
Allocation: Php 2.30 Million
|
June 18, 2020 |
FY 2020 GAA |
WIN0F06106 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No.: 300117206544000
Project ID: P00447562LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
FROM:
Construction of road including Bridge, So. Pusog, Brgy. Burgos,
Sablayan, Occidental Mindoro
Sta. 0+000 - Sta 2+500
Physical Target: CW1 - Construction of Concrete Road -
0.200 lane km
CW2 - Construction of Bailey Bridge -
580.80 sq.m.
Allocation: Php 50.00 Million
TO:
Construction of road including Bridge, So. Pusog, Brgy. Burgos,
Sablayan, Occidental Mindoro
Sta. 0+000 - Sta. 2+500
Physical Target: CW1 - Construction of Concrete Road -
0.200 lane km
CW2 - Construction of Bailey Bridge -
672000 sq.m.
Allocation: Php 50.00 Million
|
June 18, 2020 |
FY 2020 GAA |
WIN0F06099 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No.: 300117206541000
Project ID: P00447555LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
FROM:
Construction of Umbuyan Road including Bridge, Brgy. Pitogo,
Rizal, Occidental Mindoro
Sta. 0+000 - Sta.1+700
Physical Target - CW1 - Construction of Concrete Road -
3.35 lane km
CW2 - Construction of Bailey Bridge -
135.30 sq.m.
Allocation: Php 50.00 Million
TO:
Construction of Umbuyan Road including Bridge, Brgy. Pitogo,
Rizal, Occidental Mindoro
Sta. 0+000 - Sta. 1+700
Physical Target: CW1 - Construction of Concrete Road -
3.35 lane km
CW2 - Construction of Bailey Bridge -
150.00 sq.m.
Allocation: Php 50.00 Million
|
June 18, 2020 |
FY 2020 GAA |
WIN0F06100 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No.: 300117206543000
Project ID: P00447560LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
FROM:
Construction of Nalbu Road including Bridge, Brgy. Pitogo,
Rizal, occidental Mindoro
Sta. 0+000 - Sta. 2+700
Physical Target: CW1 - Construction of Concrete Road -
5.369 lane km
CW2 - Construction of Bailey Bridge -
85.80 sq.m.
Allocation: Php 50.00 Million
TO:
Construction of Nalbu Road including Bridge, Brgy. Pitogo,
Rizal, Occidental Mindoro
Sta. 0+000 - Sta. 2+700
Physical Target: CW1 - Construction of Concrete Road -
5.369 lane km
CW2 - Construction of Bailey Bridge -
96.00 sq.m.
Allocation: Php 50.00 Million
|
June 18, 2020 |
FY 2020 GAA |
WIN0F06089 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Marinduque District Engineering Office |
UACS No.: 300117206531000
Project ID: P00447537LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Local Infrastructure Program
FROM:
Rehabilitation/Improvement of Brgy. Sayao Roa,
Sta. 3+191.30 - Sta. 3+561,
Sta. 4+175.10 - Sta. 4+660.10,
Sta. 5+609 - Sta.5+699,
Mogpog, Marinduque
Physical Target: CW1 - Rehabilitation of Paved Road -
7.181 lane km
Allocation: Php 60.00 Million
TO:
Rehabilitation/Improvement of Brgy. Sayao Road,
Sta. 3+191.30 - Sta. 3+561,
Sta. 4+175.10 - Sta. 4+660.10,
Sta. 5+609 - Sta. 8+345,
Mogpog, Marinduque
Physical Target: CW1 - Rehabilitation of Paved Road -
7.181 lane km
Allocation: Php 60.00 Million |
June 18, 2020 |
FY 2020 GAA |
WIN0G02837 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XII |
Regional Office XII |
MODIFICATION:
FROM: Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance along Davao City Div Rd -
K1506+980 - K1507+000, K1512+238 - K1513+775,
K1513+875 - K1515+911
Physical Target:
CW1: 8.706 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 140,000,000.00
CW1: P 135,100,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 4,900,000.00
TO: Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance along Davao City Div Rd -
K1514+103 - K1515+129, K1515+432 - K1515+832
Physical Target:
CW1: 8.706 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 140,000,000.00
CW1: P 135,100,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 4,900,000.00 |
June 18, 2020 |
2020 |
WIN0C03792 |
GAA FY 2020 (RA 11465) |
January 31, 2020 |
Region III |
Nueva Ecija 1st District Engineering Office |
Network Development
Off-Carriageway Improvement
Tertiary Roads
Muñoz-Lupao Rd
K0156 + 000 - K0156 + 460,
K0156 + 602 - K0156 + 658,
K0156 + 740 - K0157 + 000,
K0158 + 235 - K0158 + 503,
K0162 + 646 - K0162 + 932.80
CW-1: Paving of Shoulders - 6,455 square meters - P15,167,460
EAO: P309,540 |
June 18, 2020 |
2020 |
WIN0C03794 |
FY 2020 GAA (RA 11465) |
February 20, 2020 |
Region III |
Aurora District Engineering Office |
Network Development Program
Off-Carriageway Improvement
Secondary Roads
Baler-Casiguran Rd (Baler-Dinadiawan)
K0266 + 140 - K0268 + 313,
K0268 + 336 - K0271 + 168,
K0271 + 248 - K0274 + 612
CW-1: Off-Carriageway Improvement: Shoulder Paving/ Construction - 29,323.50 square meters - P46,790,100
EAO: P954,900 |
June 17, 2020 |
2020 |
WIN0G02897 |
FY 2020 RA 11465 |
January 24, 2020 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. 300204100005000
Project ID: P00431312MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
FROM:
Access Road in support of Match Factory, Talacogon, Agusan del Sur
Type of Work: CW1 - Construction of Concrete Road
Physical Target: 0.720 Lane Km
Unit Cost: P24.500M/Lane Km
Allocation: P17.640M
EAO: 360.0T
TOTAL: P18.0M
TO:
Access Road in support of Match Factory, Talacogon, Agusan del Sur
Type of Work: CW1 - Construction of Concrete Road
Physical Target: 1.320 Lane Km
Unit Cost: P13.363636M/Lane Km
Allocation: P17.640M
EAO: 360.0T
TOTAL: P18.0M
|
June 17, 2020 |
2020 |
WIN0G02901 |
FY 2020 RA 11465 |
January 24, 2020 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. 310212100163000
Project ID: P00401421MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Tertiary Roads
FROM:
Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - (S00448MN) Chainage 7254 - Chainage 7682
Type of Work: Paving of Unpaved Roads
Physical Target: 0.856 Lane Km
Unit Cost: P13.394M/Lane Km
Allocation: P11.466M
EAO: P234.0T
TOTAL: P11.700M
TO:
Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - (S00448MN) Chainage 7254 - Chainage 7779
Type of Work: Paving of Unpaved Roads
Physical Target: 1.050 Lane Km
Unit Cost: P10.920M/Lane Km
Allocation: P11.466M
EAO: P234.0T
TOTAL: P11.700M |
June 17, 2020 |
2020 |
WIN0G02899 |
FY 2020 RA 11465 |
January 24, 2020 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. 300117207556000
Project ID: P00444311MN
LOCAL PROGRAM - Local Roads and Bridges - Local Roads - Local Infrastructure Program
FROM:
Construction of Gravel Road, Brgy. Claro Cortez-Agon-onon-Brgy. Claro Cortez, Bayugan City, Agusan del Sur
Type of Work: Construction of Concrete Road
Physical Target: -
Unit Cost: -
Allocation: P14.850M
EAO: P150.0T
TOTAL: P15.0M
TO:
Construction of Gravel Road, Brgy. Claro Cortez-Agon-onon-Brgy. Claro Cortez, Bayugan City, Agusan del Sur
Type of Work: Construction of Gravel Road
Physical Target: P3.40 Lane Km
Unit Cost: P4.367647M/Lane Km
Allocation: P14.850M
EAO: P150.0T
TOTAL: P15.0M
|
June 17, 2020 |
2020 |
WIN0G02904 |
FY 2020 RA 11465 |
January 24, 2020 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. 310105100488000
Project ID: P00400661MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
FROM:
Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1389 + 165 - K1389 + 267, K1390 + 279 - K1390 + 785
Type of Work: Reconstruction to Concrete Pavement
Physical Target: 1.216 Lane Km
Unit Cost: P11,215,200/Lane Km
Allocation: P13,637,680
EAO: P278,320
TOTAL: P13,916,000
TO:
Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1390 + 500 - K1390 + 785
Type of Work: Reconstruction to Concrete Pavement
Physical Target: 1.14 Lane Km
Unit Cost: P11,962,880/Lane Km
Allocation: P13,637,680
EAO: P278,320
TOTAL: P13,916,000 |
June 17, 2020 |
2020 |
WIN0G02898 |
FY 2020 RA 11465 |
January 24, 2020 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. 310201100640000
Project ID: P00400345MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1343 + 006 - K1343 + 505, K1343 + 730 - K1343 + 832
Type of Work: Road Widening
Physical Target: 1.202 Lane Km
Unit Cost: P24,853,030/Lane Km
Allocation: P29,873,340
EAO: P609,660
TOTAL: P30,483,000
TO:
Daang Maharlika (Agusan-Davao Sect) - K1343 + 006 - K1343 + 559.4, K1343 + 647.86 - K1343 + 832
Type of Work: Road Widening
Physical Target: 1.47508 Lane Km
Unit Cost: P20,252,010/Lane Km
Allocation: P29,873,340
EAO: P609,660
TOTAL: P30,483,000 |
June 11, 2020 |
FY 2020 GAA |
WIN0F06013 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No.: 310212100148000
Project ID: P00400705LZ
OO1: Ensure Safe and Reliable National Roads System
Network Development Program - Paving of Unpaved Road -
Tertiary Roads
FROM:
Crossing MWCR (Pola) - Casague - Jct Alacaak Rd
(S00162MR) Chainage 175 - Chainage 885
Physical Target - CW1 - Construction of Concrete Road
1.42 lane km
Allocation: Php 17.750 Million
TO:
Crossing MWCR (Pola) - Casague - Jct Alacaak Rd
(S00162MR) Chainage 175 - Chainage 475
Physical Target - CW1 - Construction of Concrete Road
0.60 lane km
Allocation: Php 17.750 Million |
June 11, 2020 |
FY 2020 GAA |
WIN0F06016 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No.: 300104215617000
Project ID: P00445484LZ
Local Program
Local Infrastructure Program - Buildings and Other Structures -
Multipurpose/Facilities
FROM:
Construction of Multi-Purpose Building, Brgy. San Agustin DZ,
San Jose, Occidental Mindoro
Physical Target - CW1 - Construction of Multipurpose Building
1 Building
Allocation: Php 3.00 Million
TO:
Construction of Multi-Purpose Building, Brgy. San Agustin,
San Jose, Occidental Mindoro
Physical Target - CW1 - Construction of Multipurpose Bulding
1 Building
Allocation: Php 3.00Million |
June 11, 2020 |
FY 2020 GAA |
WIN0F06008 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310202100475000
Project ID: P00400433LZ
OO1: Ensure Safe and Reliable National Roads System
Network Development - Road Widening - Secondary Roads
FROM:
Calapan South Rd
K0170+879 - K0171846,
K0172+116 - K0173+220,
K0173+415 - K0174+132,
K0174+496 - K0175+057,
K0177+000 - K0178+122,
K0178+300 - K0178+367,
K0178+559 - K0180+387
Physical Target - CW1 - Road Widening : 12.636 Lane km
Allocation : Php 150.00 Million
TO:
Calapan South Road
K0168+404 - K0169+104,
K0170+879 - K0171+846,
K0172+116 - K0173+220,
K0173+415 - K0174+132,
K0174+496 - K0175+057,
K0178+300 - K0178+367,
K0178+559 - K0180+727
Physical Target - CW1 - Road Widening: 12.542 Lane km
Allocation: Php 150.00 Million |
June 11, 2020 |
FY 2020 GAA |
WIN0F06003 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310203100274000
Project ID: P00400391LZ
OO1: Ensure Safe and Reliable National Roads System
Network Development - Road Widening - Tertiary Roads
FROM:
F.B. Reyes (Busuanga-Coron) Rd
K0018+160 - K0020+000
Physical target - CW1 - Road Widening: 3.680 lane km
Allocation: Php 50.00 Million
TO:
F.B. Reyes (Busuanga-Coron) Rd
K0020+815 - K0021+060,
K0021+245 - K0022+683
Physical Target - CW1 - Roadd Widening : 30366 lane km
Allocation: Php 50.00 Million |
June 11, 2020 |
FY 2020 GAA |
WIN0F06001 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300111200183000
Project ID: P00449224LZ
LOCAL PROGRAM
National Roads and Bridges - National Roads - Construction/
Repair/Rehabilitation/Improvement of Various Infrastructure
including Local Projects
FROM:
Widening of Road, Palawan Circumferential Road (S00063PW)
K0253+205 - K0255+1004,
K0256+175 - K0256+669,
K0256+690 - K0258+500,
Palawan
Physical Target - CW1 - Road Widening: 7.51 Lane km
Allocation: Php 100.00 Million
TO:
Widening of Road, Palawan Circumferential Road (S00063PW)
K0252+1023 - K0255+768,
K000255+827 - K0255+1201,
K0256+099 - K0256+569,
Palawan
Physical Target - CW1 - Road Widening: 7.51 Lane km
Allocation: Php 100.00 Million
|
June 11, 2020 |
FY 2020 GAA |
WIN0F06095 |
FY 2020 GAA DPWH Infra Program |
January 6, 2019 |
Region IV-B |
Romblon District Engineering Office |
UACS No.: 310108100389000
Project ID: P00400205LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse, and Landslide - Secondary Roads
FROM:
Tablas Circumferential Road
K0075+100 - K0075+127
Physical Target - CW1 - Construction of Road Slope
Protection Structure: 160 square meters
Allocation: Php 1.60 Million
TO:
Tablas Circumferential Road
K074+837.50 - K0074+900
Physical target - CW1 - Construction of Road Slope
Protection Structure: 250 square meters
Allocation: Php 1.60 Million |
June 10, 2020 |
FY 2020 GAA |
WIN0F06019 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No.: 310109100408000
Project ID: P00400101LZ
OO1: Ensure Safe and Reliable National Roads System
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads
FROM:
Tagbac - Lubang - Looc Rd.
K0033+641 - K0034+000,
K0034+529 - K0035+000
Physical Target: Cw1 - Construction of Slope Protection
Structure - 2,288.54 sqq.m.
Allocation: Php 50.00 Million
TO:
Tagbac - Lubang - Looc Rd
K0034+650 - K0034+760
Physical Target: CW1 - Construction of Slope Protection
Structure - 2,288.54 sq.m.
Allocation: Php 50.00 Million |
June 10, 2020 |
FY 2020 GAA |
WIN0F06010 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No.: 300117206546000
Project ID: P00447567LZ
Local Program
Local Roads and Bridges - Local Roads
FROM:
Concreting of Jct. National Highway - So. Antipolo,
Brgy. Mangarin, San Jose, Occidental Mindoro
Sta. 0+000 - Sta. 2+700
Physical Target: CW1 - Construction of Concrete Road
3.256 lane km
Allocation: Php 35.00 Million
TO:
Concreting of Jct. National Highway - So. Antipolo,
Brgy. Mangarin, San Jose, Occidental Mindoro
Sta. 0+000 - Sta 1+628
Physical Target: CW1 - Construction of Concrete Road
3.256 lane km
Allocation: Php 35.00 Million |
June 10, 2020 |
FY 2020 GAA |
WIN0F06011 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No.: 310208100260000
Project ID: P00400703LZ
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriage Improvement -
Secondary Roads
FROM:
Mindoro West Coastal Rd
K0405+640 - K0405+700,
K0406+200 - K0406+260,
K0407+880 - K0407+940,
K0408+440 - K0408+500,
K0409+300 - K0409+360
Physical Target: CW1 - Construction of Lay-by
5 Number of Lay-by
Allocation: Php 10.00 Million
TO:
Mindoro West Coastal Rd
K0405+ 720 - K0405+780,
K0406+200 - K0406+260,
K0406+300 - K0406+360,
K0407+040 - K0407+100,
K0408+000 - K0408+060,
K0408+440 - K0408+500
Physical target: CW1 - Construction of Lay-by
6 Number of Lay-by
Allocation: Php 10.00 Million
|
June 10, 2020 |
FY 2020 GAA |
WIN0F06012 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No.: 300112200158000
Project ID: P00446467LZ
Local Program
National Roads and Bridges - National Roads
FROM:
Rehabilitation/Reconstruction of Jct MWCR (Sn Isidro) -
Penal Colony - Jct Yapang Rd
K0306+432 - K0306+805,
K0306+876 - K0307+301,
Brgy. Batong Buhay, Sablayan, Occidental Mindoro
Physical target: CW1 - Rehanilitation/Reconstruction of
Concrete Pavement - 2.385 lane km
Allocation: Php 28.00 Million
TO:
Rehabilitation/Reconstruction of Jct. MWCR (Sn Isidro) -
Penal Colony - Jct Yapang Rd
K0306+432 - K0306+736.94,
K0306+925.62 - K0307+294.98,
K0308+400 - K0308+918
Brgy. Batong Buhay, Sablayan, Occidental Mindoro
Physical Target: CW1 - Rehabilitation/Reconstruction of
Concrete Pavement - 2.385 lane km
Allocation: Php 28.00 Million |
June 9, 2020 |
FY 2020 GAA |
WIN0F06023 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Palawan 1st District Engineering Office |
UACS No.: 320101104933000
Project ID: P00421967LZ
OO2: Protect lives and Properties Against Major Floods
Construction/Maintenance of Flood Mitigation Structures
and Drainage System
FROM:
Construction of Omao Bridge Flood Control Project, Palawan
Physical Target: 170.00 lineal meters
Allocation: Php 10.00 Million
TO:
Construction of Omao Flood Control Project, Palawan
Physical Target: 170.00 lineal meters
Allocation: Php 10.00 Million |
June 9, 2020 |
FY 2020 GAA |
WIN0F06055 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No.: 310111100201000
Project ID: P00400613LZ
Organizational Outcome 1:
Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along National Roads - Secondary Roads
FROM:
Calapan South Road
K0008+630 - K0009+224,
K0035+691 - K0036+486
Physical Target : CW1 - Construction of Drainage Structure
along Road
2,055.00 Lineal meters (lm)
Allocation : Php 33.637 Million
TO;
Calapan South Road
K0008+643 - K0009+224,
K0009+224 - K0009+629,
K0011+100 - K0011+548,
K0016+346 - K0016+369.50,
K0035+691 - K0036+486
Physical Target: CW1 - Construction of Drainage Structure
along Road
2,905.50 Lineal meters (lm)
Allocation: Php 33.637 Million
|
June 9, 2020 |
FY 2020 GAA |
WIN0F06053 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No.: 310202100474000
Project ID: P00400430LZ
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Calapan South Road
K0132+350 - K0133+159,
K0136+185 - K0137+409
Physical Target: CW1 - Road Widening: 4.092 lane km
Allocation: Php 66.054 Million
TO:
Calapan South Road
K0132+350 - K0133+159,
K0136+185 - K0137+458
Physical Target: CW1 - Road Widening - 4.190 lane km
Allocation: Php 66.054 Million |
June 9, 2020 |
FY 2020 GAA |
WIN0F06052 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No.: 310202100610000
Project ID: P00402583LZ
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Calapan South Road
K0142+726 - K0143+197
Physical Target: CW1 - Road Widening - 0.928 lane km
Allocation: Php 13.920 Million
TO;
Calapan South Road
K0142+726 - K0143+197,
K0148+570 - K0148+967
Physical Target: CW1 - Road Widening - 1.722 lane km
Allocation: Php 13.920 Million
|
June 9, 2020 |
FY 2020 GAA |
WIN0F06054 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No.: 310111100204000
Project ID: P00400614LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along National Roads
- Secondary Roads
FROM:
Calapan South Road
K0143+197 - K0143+546
Physical Target: CW1 - Construction of Drainage Structure
along Road - 669 lineal meters
Allocation - Php 13.380 Million
TO:
Calapan South Road
K0143+197 - K0143+546,
K0150+206.50 - K0150+362
Physical Target: CW1 - Construction of Drainage Structure
along Road - 824.70 lineal meters
Allocation: Php 13.380 Million |
June 9, 2020 |
2020 |
WIN0G02864 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Regional Office XIII |
UACS No. 310204100602000
Project ID: P00401173MN
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads
FROM:
Lianga Coastal Bypass Road (SDCR Alternate Route), Surigao del Sur
Type of Work/Physical Target:
CW1- Construction of Gravel Road - 1.437 Lane Km
Unit Cost: P35,705,672/Lane Km
Allocation: P51,309,050
CW2- Construction of Concrete Road - 2.8 Lane Km
Unit Cost: P24,125,000/Lane Km
Allocation: P67,550,000
ROW- ROW Acquisition - 4120 sq.m.
Unit Cost: P1,575/sq.m
Allocation: P6,490,000
EAO: P4,310,950
TOTAL: P129,660,000
TO:
Lianga Coastal Bypass Road (SDCR Alternate Route), Surigao del Sur
Type of Work/Physical Target:
CW1- Construction of Gravel Road - 0.976 Lane Km
Unit Cost: P61,989,014/Lane Km
Allocation: P60,501,278
CW2- Construction of Concrete Road - 0.50 Lane Km
Unit Cost: P8,229,589/Lane Km
Allocation: P4,114,794
CW3- Construction of Slope Protection Structure - 5,052.37 sq.m.
Unit Cost: P11,976/sq.m
Allocation: P60,505,828
EAO: P4,538,100
TOTAL: P129,660,000
|
June 9, 2020 |
FY 2020 GAA |
WIN0F05982 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No.: 310202100606000
Project ID: P00402586LZ
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Bongabong-Sagana-Roxas-San Aquilino Road
K0114+000 - K0115+635
Physical Target: CW1 - Road Widening - 3.33 lane km
Allofcation: Php 49.950 Million
TO:
Bongabong-Sagana-Roxas-San Aquilino Road
K0114+268.20 - K0115+635
Physical Target: CW1 - Road Widening - 2.7936 lane km
Allocation: Php 49.950 Million |
June 9, 2020 |
FY 2020 GAA |
WIN0F06022 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No.: 310108100381000
Project ID: P00400103LZ
OO1: Ensure Safe and Reliable National Roads System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and
Landslide - Secondary Roads
FROM:
Mindoro West Coastal Road
K0446+150 - K0446+540
Physical Target: CW1 - Construction of Slope Protection
Structure - 2,303 sq.m.
Allocation: Php 50.00 Million
TO:
Mindoro West Coastal Road
K0446+300 - K0446+380
Physical Target: CW1 - Construction of Slope Protection
Structure - 2,303 sq.m.
Allocation: Php 50.00 Million |
June 5, 2020 |
FY2020 |
WIN0G02859 |
310201100479000 |
April 29, 2020 |
Region IX |
Regional Office IX |
UACS No. 310201100479000
Project ID: P00400267MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pagadian City - Zamboanga City Rd
K1861 + 336.00 - K1861 + 424.00,
K1861 + 436.00 - K1863 + 900.00,
K1871 + 000.00 - K1871 + 300.00
CW1 - Road Widening: 5.704 lane km.
Unit Cost: P 18,614,729.78/lane km.
ROW: 33,684.45553 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 3,716,244.65
Allocation: P 120,000,000.00
|
June 5, 2020 |
FY2020 |
WIN0G02861 |
310204100259000 |
April 29, 2020 |
Region IX |
Regional Office IX |
UACS No. 310204100259000
Project ID: P00401267MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
Sominot - Dumingag Road, Zamboanga del Sur
CW1 - Construction of Concrete Road: 6.36 lane km.
Unit Cost: P 12,997,571.49/lane km.
ROW: 19,118.16517 sq.m.
Unit Cost: P 300/sq. m.
EAO: P 3,356,772.24
Allocation: P 105,000,000.00 |
June 5, 2020 |
FY2020 |
WIN0G02858 |
310201100471000 |
April 29, 2020 |
Region IX |
Regional Office IX |
UACS No. 310201100471000
Project ID: P00400231MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Dipolog - Punta - Dansullan - Sergio Osmeña - Zamboanga del Norte/Sur Bdry Rd
K1873 + 110.00 - K1874 + 479.00,
K1874 + 750.00 - K1877 + 700.00
CW1 - Road Widening: 8.639 lane km.
Unit Cost: P 16,087,116.28/lane km.
ROW: 20,530.7386 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 4,864,180.91
Allocation: P 150,000,000.00 |
June 5, 2020 |
2020 |
WIN0C03765 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Regional Office III |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Jose Abad Santos Ave (JASA) - K0069+1010 - K0070+331, K0070+357 - K0071+1013, K0072+897 - K0073+204, K0074+474 - K0074+736, K0074+736 - K0074+917, K0074+917 - K0075+278.86, K0090+106.80 - K0090+402, K0090+402 - K0091+000 |
June 5, 2020 |
2020 |
WIN0G02860 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Regional Office XIII |
UACS No. 310107100139000
Project ID: P00400109MN
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
FROM:
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1275 + 600 - K1277 + 000
Type of Work/Physical Target:
CW1- Construction of Road Slope Protection Structure - 11,111.110 sq.m
Unit Cost: P17.370/sq.m
Allocation: P193.0M
EAO: P7.0M
TOTAL: P200.0M
TO:
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1275 + 860 - K1276 + 080
Type of Work/Physical Target:
CW1- Construction of Road Slope Protection Structure - 10,645.0 sq.m
Unit Cost: P18.131 M/sq.m
Allocation: P193.0M
EAO: P7.0M
TOTAL: P200.0M |
June 5, 2020 |
2020 |
WIN0G02852 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Regional Office XIII |
UACS No. 300119200420000
Project ID: P00444371MN
LOCAL PROGRAM - Local Roads and Bridges - Local Bridges - Local Infrastructure Program
FROM:
Construction of Las Nieves Bridge and Road Approaches, Cabadbaran City, Agusan del Norte
Type of Work/Physical Target:
CW1- Construction of Bridge - 0.00 sq.m
Unit Cost: P0.00/sq.m
Allocation: P39.600M
EAO: P400.0T
TOTAL: P40.0M
TO:
Construction of Las Nieves Bridge and Road Approaches, Las Nieves, Agusan del Norte (Phase II)
Type of Work/Physical Target:
CW1- Construction of Bridge - 5,234.598 sq.m
Unit Cost: P7.56505 M/sq.m
Allocation: P39.600M
EAO: P400.0T
TOTAL: P40.0M |
June 4, 2020 |
FY 2020 |
WIN0F06002 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300111200254000
Project ID: P00449273LZ
LOCAL PROGRAM
National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Preventive Maintenance of Road:
Asphalt Overlay PPSR Jct.(Abo-Abo) - Quezon
K0129+500.00 - K0133+397
Palawan
Physical Target: 2.069 Lane Km
Allocation: Php 40.00 Million
TO:
Preventive Maintenance of Road:
Asphalt Overlay PPSR Jct.(Abo-Abo) - Quezon
K0129+500 - K0130+607
Palawan
Physical Target: 2.278 Lane Km
Allocation: Php 40.00 Million
|
June 4, 2020 |
FY 2020 GAA |
WIN0F06000 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310202100484000
Project ID: P00402561LZ
Organizational Outcome 1:
Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Puerto Princesa South Road
K0086+331 - K0086+900,
K0087+060 - K0090+000
Physical Target: 7.030 Lane Km
Allocation: Php 121.469 Million
TO:
Puerto Princesa South Road
K0086+331 - K0086+900,
K0087+060 - K0090+016,
K0094+048 - K0094+564
Physical Target: 8.094 Lane Km
Allocation: Php 121.469 Million
|
June 4, 2020 |
FY 2020 GAA |
WIN0F05999 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300111200253000
Project ID: P00449272LZ
LOCAL PROGRAM
National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Preventive Maintenance of Road:
Asphalt Overlay of Quezon - Aramaywan
K0159+000 - K0172+635
Palawan
Physical Target: 0 Lane Km
Allocation: Php 50.00 Million
TO:
Preventive Maintenance of Road:
Asphalt Overlay of Quezon - Aramaywan
K0147+006 - K0148+334
Palawan
Physical Target: 2.746 Lane Km
Allocation: Php 50.00 Million
|
June 4, 2020 |
FY 2020 GAA |
WIN0F05998 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300111200252000
Project ID: P00449271LZ
LOCAL PROGRAM
National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Preventive Maintenance of Road:
Asphalt Overlay of Quezon - Aramaywan
K0146+(-150.00) - K0150+289.0Palawan
Physical Target: 0 Lane Km
Allocation: Php 50.00 Million
TO;
Preventive Maintenance of Road:
Asphalt Overlay of Quezon - Aramaywan
K0146+(-150.00) - K0147+006
Palawan
Physical Target: 2.492 Lane Km
Allocation: Php 50.00 Million
|
June 4, 2020 |
FY 2020 GAA |
WIN0F06009 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310109100273000
Project ID: P00402590LZ
Organizational Outcome 1:
Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse,
and Landslide - Tertiary Roads
FROM:
F.B. Reyes (Busuanga - Coron) Rd.
K0015+550 - K0015+650,
K0015+750 - K0015+900
Physical Target: 4,021 square meters
Allocation: Php 80.00 Million
TO:
F.B. Reyes (Busuanga - Coron) Rd.
K0015+560 - K0015+711.70
Physical Target: 4,021.00 square meters
Allocation: Php 80.00 Million |
June 4, 2020 |
2020 |
310201100432000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Regional Office II |
Network Development - Road Widening - Primary Roads - Cagayan Valley Rd - K0480+872 - K0480+1172, K0486+000 - K0486+220, K0486+480 - K0487+506, K0487+586 - K0487+675.2 |
June 4, 2020 |
2020 |
310212100147000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Cagayan 2nd District Engineering Office |
Network Development – Paving of Unpaved Roads – Tertiary Roads – Jct Logac-Lasam-Gagabutan Rd (S00656LZ) – Chainage 15419 – Chainage 15809, Chainage 15872 – Chainage 17288 |
June 4, 2020 |
FY 2020 GAA |
WIN0F6005 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300111200185000
Project ID: P00449226LZ
LOCAL PROGRAM
National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Widening of Road
Palawan Circumferential Road (S00063PW)
K0265+000 - K0269+820
Palawan
Physical Target: 7.404 Lane Km
Allocation: Php 100.00 Million
TO:
Widening of Road
Palawan Circumferential Road(S00063PW)
K0260+751 - K0263+514,
K0263+746 - K0265+598
Palawan
Physical Target: 7.404 Lane Km
Allocation: Php 100.00 Million
|
June 4, 2020 |
2020 |
310209100203000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Cagayan 3rd District Engineering Office |
Network Development - Off-Carriageway Improvement - Tertiary Roads - Cagayan Valley Regional Center Rd – K0485 + (-504) – K0485 + 300 |
June 4, 2020 |
2020 |
310209100204000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Cagayan 3rd District Engineering Office |
Network Development - Off-Carriageway Improvement - Tertiary Roads - CVR Regional Govt Center Rd Network – (S00762LZ) Chainage 000 – Chainage 1245 |
June 4, 2020 |
2020 |
310104100209000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Cagayan 3rd District Engineering Office |
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Cagayan Valley Rd – K0475 + 000 – K0475 + 829 |
June 4, 2020 |
2020 |
310106100431000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Cagayan 3rd District Engineering Office |
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Peñablanca-Callao Cave Rd – K0476 + 340 – K0477+268 |
June 4, 2020 |
FY 2020 GAA |
WIN0F06007 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310202100485000
Project ID: P00402560LZ
Organizational Outcome 1:
Ensure safe and reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Puerto Princesa South Road
K0122+815 - K0126+342,
K0126+542 - K0127+500
Physical Target: 9.022 lane Km
Allocation: Php 146.432 Million
TO:
Puerto Princesa South Road
K0122+815 - K0126+342,
K0126+542 - K0127+893
Physical Target: 9.808 Lane Km
Allocation: Php 146.432 Million |
June 4, 2020 |
2020 |
310203100321000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Isabela 4th District Engineering Office |
Network Development – Road Widening – Tertiary Roads – Jct. Ipil-Quirino Bdry Rd – K0337+(-348) – K0337+(-198), K0338+603 – K0338+630 |
June 4, 2020 |
2020 |
310201100547000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Isabela 4th District Engineering Office |
Network Development – Road Widening – Primary Roads – Daang Maharlika (LZ) – K0360 + 535 – K0361 + 850 |
June 4, 2020 |
2020 |
310201100435000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
Network Development – Road Widening – Primary Roads – Daang Maharlika (LZ) – K0226 + 920 – K0229 + 894.50 |
June 4, 2020 |
2020 |
310202100575000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
Network Development – Road Widening – Secondary Roads – Nueva Vizcaya-Benguet Road – K0249 + 560 – K0251 + 280 |
June 4, 2020 |
2020 |
310104100214000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Primary Roads, Daang Maharlika (LZ) – K0211 + 640 – K0211 + 829, K0214 + 000 – K0214 + 312, K0214 + 921.50 – K0215 + 395 |
June 4, 2020 |
FY 2020 GAA |
WIN0F06006 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310202100480000
Project ID: P00402569LZ
Organizational Outcome 1:
Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Puerto Princesa North Rd
K0020+433 - K021+320,
K0028+000 - K0029+870,
K0029+886 - K0031+891,
K0031+950 - K0033+528
Physical Target: CW1 - Road Widening: 12.664 Lane Km
Allocation: Php 202.614 Million
TO:
Puerto Princesa North Rd
K0020+433 - K0021+307,
K0028+000 - K0029+871,
K0029+886 - K0031+890,
K0031+950 - K0033+453
Physical Target: CW1- Road Widening: 12.488 Lane Km
Allocation: Php 202.614 Million |
June 4, 2020 |
FY 2020 GAA |
WIN0F05996 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300111200184000
Project ID: P00449225LZ
LOCAL PROGRAM
National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Widening of Road -
Palawan circumferential Road (S00063PW)
K0258+500 - K0260+257,
K0260+362 - K0263+888,
K0264+120 - K0265+000,
Palawan
Physical Target: 7.842 Lane Km
Allocation: Php 100.00 Million
TO:
Widening of Road -
Palawan Circumferential Road (S00066PW)
K0256+569 - K0259+507,
K0259+769 - K0260+751
Palawan
Physical Target: 7.842 Lane Km
Allocation: Php 100.00 Million |
June 3, 2020 |
FY 2020 |
WIN0G02856 |
310204100260000 |
April 29, 2020 |
Region IX |
Regional Office IX |
UACS NO. 310204100260000
Project ID: P00401269MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Bypass and Diversion Roads
Sominot - Mahayag Road, Zamboanga del Sur
Physical Target:
CW1 - Construction of Concrete Road: 5.40 Lane km
ROW: 5,535.743567 sq.m.
Unit Cost:
CW1: P 18,489,761.49/Lane km
ROW: P 300.00/sq.m.
Component Cost:
CW1: P 99,844,712.01
ROW: P 1,660,723.07
EAO: P 3,494,564.92
Allocation: P 105,000,000.00 |
June 2, 2020 |
2020 |
WIN0G02834 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Regional Office XIII |
UACS No. 310201100522000
Project ID: P00400342MN
FROM:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
NRJ Cuevas-Bislig Rd - K1379 + 800 - K1382 + 558, K1382 + 777.3 - K1384 + 020
Type of Work/Physical Target:
CW1- Road Widening - 8.095 Lane Km
Unit Cost: P16,646,637/Lane Km
Allocation: P134,754,530
EAO: P4,887,470
TOTAL: P139,642,000
TO:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
NRJ Cuevas-Bislig Rd - K1384 + 210 - K1387 + 200
Type of Work/Physical Target:
CW1- Road Widening - 6.066 Lane Km
Unit Cost: P22,214,726/Lane Km
Allocation: P134,754,530
EAO: P4,887,470
TOTAL: P139,642,000
|
June 1, 2020 |
2020 |
WIN0G02851 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Regional Office XIII |
UACS No. 310202100559000
Project ID: P00400133MN
FROM:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads
Mayor Democrito D. Plaza II Ave - K1240 + 440 - K1240 + 585, K1241 + 565 - K1242 + 439, K1246 + 440 - K1248 + 622, K1248 + 671 - K1248 + 907
Type of Work/Physical Target:
CW1- Road Widening - 6.874 Lane Km
Unit Cost: P23.219523M
Allocation: P159.611M
EAO: P5.789M
TOTAL: P165.400M
TO:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads
Mayor Democrito D. Plaza II Ave - K1241 + 780 - K1242 + 439, K1246 + 440 - K1248 + 622, K1248 + 671 - K1248 + 907
Type of Work/Physical Target:
CW1- Road Widening - 6.154 Lane Km
Unit Cost: P25.936139M
Allocation: P159.611M
EAO: P5.789M
TOTAL: P165.400M |
May 28, 2020 |
2020 |
WIN0C03797 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Pampanga 3rd District Engineering Office |
Arayat - Magalang - Mabalacat Rd - K0102 + 400 - K0103 + 300 |
May 21, 2020 |
2020 |
WIN0C03770 |
GAA 2020 |
May 7, 2020 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Sta. Rosa Flood Control Project,Sta. 0+000 - Sta. 1+290 ,Bangued, Abra; Physical Target: CW1 : 485 Lineal meters; Allocation= Php 52,874,000
To: Construction of Sta. Rosa Flood Control Project,Sta. 0+000 - Sta. 0+485 ,Bangued, Abra; Physical Target: CW1 : 485 Lineal meters; Allocation= Php 52,874,000
|
May 21, 2020 |
2020 |
WIN0C03815 |
GAA 2020 |
May 7, 2020 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Cabuloan Flood Control Project, Sta. 0+000 - Sta. 1+133, Bangued, Abra; Physical Target: CW1 : 282 Lineal meters; Allocation= Php 50,580,000
To: Construction of Cabuloan Flood Control Project, Sta. 0+000 - Sta. 0+282, Bangued, Abra; Physical Target: CW1 : 282 Lineal meters; Allocation= Php 50,580,000
|
May 21, 2020 |
2020 |
WIN0C03816 |
GAA 2020 |
May 7, 2020 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Claveria-Calanasan-Kabugao Rd - K0699 + 000 - K0701 + 393; Physical Target: CW1 : 5.5 Lane Km; Allocation= Php 110,000,000
To: Claveria-Calanasan-Kabugao Rd - K0699 + 050 - K0701 + 393; Physical Target: CW1 : 5.4 Lane Km; Allocation= Php 110,000,000
|
May 21, 2020 |
2020 |
WIN0C03814 |
GAA 2020 |
May 7, 2020 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Kennon Rd - K0235 + 000 - K0235 + 095, K0235 + 095 - K0235 + 147, K0235 + 147 - K0235 + 208, K0235 + 406 - K0235 + 422, K0235 + 406 - K0235 + 494; Physical Target: CW1 : 10,035 Square meters; Allocation= Php 169,185,000
To: Kennon Rd - K0235+410 - K0235+480, K0235+834 - K0236+016; Physical Target: CW1 : 9,389.24 Square meters; Allocation= Php 169,185,000
|
May 20, 2020 |
2020 |
WIN0C03812 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Bataan 1st District Engineering Office |
OO-1 - Ensure Safe and Reliable National Road System - Network Development Program - Off - Carriageway Improvement - Tertiary Roads
Jct. Layac - Balanga - Mariveles Port Rd - K0103 + 180 - K0103 + 400, K0112 + 293 - K0112 + 840, K0116 + 193.50 - K0116 + 790.13 |
May 20, 2020 |
2020 |
WIN0C03812 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Bataan 1st District Engineering Office |
OO-1 - Ensure Safe and Reliable National Road System - Network Development Program - Off - Carriageway Improvement - Tertiary Roads
Jct. Layac - Balanga - Mariveles Port Rd - K0103 + 180 - K0103 + 400, K0112 + 293 - K0112 + 840, K0116 + 193.50 - K0116 + 790.13 |
May 20, 2020 |
2020 |
WIN0C03812 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Bataan 1st District Engineering Office |
OO-1 - Ensure Safe and Reliable National Road System - Network Development Program - Off - Carriageway Improvement - Tertiary Roads
Jct. Layac - Balanga - Mariveles Port Rd - K0103 + 180 - K0103 + 400, K0112 + 293 - K0112 + 840, K0116 + 193.50 - K0116 + 790.13 |
May 20, 2020 |
2020 |
WIN0C03812 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Bataan 1st District Engineering Office |
OO-1 - Ensure Safe and Reliable National Road System - Network Development Program - Off - Carriageway Improvement - Tertiary Roads
Jct. Layac - Balanga - Mariveles Port Rd - K0103 + 180 - K0103 + 400, K0112 + 293 - K0112 + 840, K0116 + 193.50 - K0116 + 790.13 |
May 18, 2020 |
2020 |
WIN0C03811 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Bataan 1st District Engineering Office |
OO-1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads
Jose Abad Santos Ave (JASA) - K0102 + 000 - K0102 + 680, K0102 + 756 - K0103 + 184.80 |
May 18, 2020 |
2020 |
WIN0C03809 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Bataan 1st District Engineering Office |
OO-1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damage Paved Roads - Primary Roads
Jose Abad Santos Ave (JASA) - K0107 + 973 - K0108 + 070 |
May 15, 2020 |
2020 |
WIN0G02846 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Agusan del Norte District Engineering Office |
FROM:
UACS No. 310106100534000
Project ID: P00400588MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Agusan-Malaybalay Rd - K1271 + (-756) - K1271 + 000, K1274 + 211 - K1275 + 000
Type of Work/Physical Target:
CW1- Reconstruction to Concrete Pavement - 3.156 Lane Km
Unit Cost: P12.110266M/Lane Km
Allocation: P38,220,000
EAO: P780,000
TOTAL: P39,000,000
TO:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Agusan-Malaybalay Rd - K1271 + (-756) - K1271 + 054, K1271 + 104 - K1271 + 203 - K1274 + 211 - K1275 + 132
Type of Work/Physical Target:
CW1- Reconstruction to Concrete Pavement - 3.704 Lane Km
Unit Cost: P10.318574M/Lane Km
Allocation: P38,220,000
EAO: P780,000
TOTAL: P39,000,000 |
May 15, 2020 |
2020 |
WIN0G02840 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. 310201100635000
Project ID: P00401505MN
FROM:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
Daang Maharlika (Surigao-Agusan Section) - K1196 + 212 - K1196 + 633, K1196 + 851 - K1197 + 416
Type of Work/Physical Target:
CW1- Road Widening - 1.411 Lane Km
Unit Cost: P17.445528M/Lane Km
Allocation: P24,615,640
EAO: P502,360
TOTAL: P25,118,000
TO:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Daang Maharlika (Surigao-Agusan Section) - S00399MN, K1196 + 212 - K1196 + 628, K1196 + 856 - K1197 + 416
Type of Work/Physical Target:
CW1- Road Widening - 1.467 Lane Km
Unit Cost: P16.779577M/Lane Km
Allocation: P24,615,640
EAO: P502,360
TOTAL: P25,118,000
|
May 15, 2020 |
2020 |
WIN0G02841 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. 310201100634000
Project ID: P00400136MN
FROM:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1272 + 867 - K1274 + 000
Type of Work/Physical Target:
CW1- Road Widening - 2.276 Lane Km
Unit Cost: P17.223199M/Lane Km
Allocation: P39,200,000
ROW Acquisition: 13,656.00 sq.m.
Unit Cost: P732.28/sq.m.
Allocation: P10,000,000
EAO: P800,000
TOTAL: P50,000,000
TO:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - S00391MN, K1269 + 004.50 - K1269 + 122 + K1272+867 - K1274+000
Type of Work/Physical Target:
CW1- Road Widening - 2.511 Lane Km
Unit Cost: P15.611310M/Lane Km
Allocation: P39,200,000
ROW Acquisition: 13,656.00 sq.m.
Unit Cost: P732.28/sq.m.
Allocation: P10,000,000
EAO: P800,000
TOTAL: P50,000,000 |
May 15, 2020 |
2020 |
WIN0G02845 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. 300103202967000
Project ID: P00442810MN
FROM:
LOCAL PROGRAM - Buildings And Other Structures - Multipurpose / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Two-Storey Battalion Office and Personnel Barracks, Santiago, Agusan del Norte
Type of Work/Physical Target:
CW1- Construction of Other Building - 1 Building
Unit Cost: P24.65680M/Building
Allocation: P24.65680 M
EAO: P503,200 T
TOTAL: P25.160 M
TO:
LOCAL PROGRAM - Buildings And Other Structures - Multipurpose / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Three-Storey Battalion Office and Personnel Barracks, Santiago, Agusan del Norte
Type of Work/Physical Target:
CW1- Construction of Other Building - 1 Building
Unit Cost: P24.65680M/Building
Allocation: P24.65680 M
EAO: P503,200 T
TOTAL: P25.160 M |
May 15, 2020 |
2020 |
WIN0G02842 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. 310101100394000
Project ID: P00400481MN
FROM:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - - Preventive Maintenance - Primary Roads
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1267 + 578 - K1268 + 000
Type of Work/Physical Target:
CW1- Preventive Maintenance of Road: Asphalt Overlay - 1.716 Lane Km
Unit Cost: P12.881632M/Lane Km
Allocation: P22,104.88M
EAO: P451.12T
TOTAL: P22.556M
TO:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - - Preventive Maintenance - Primary Roads
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1267 + 578 - K1268 + 654
Type of Work/Physical Target:
CW1- Preventive Maintenance of Road: Asphalt Overlay - 3.024 Lane Km
Unit Cost: P7.309815M/Lane Km
Allocation: P22,104.88M
EAO: P451.12T
TOTAL: P22.556M |
May 15, 2020 |
2020 |
WIN0G02848 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. 310106100535000
Project ID: P00400589MN
FROM:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Buenavista-Bunaguit Rd - (S00390MN) Chainage 1713 - Chainage 2865
Type of Work/Physical Target:
CW1- Reconstruction to Concrete Pavement - 2.304 Lane Km
Unit Cost: P16.163M/Lane Km
Allocation: P37.240M
EAO: P760.0T
TOTAL: P38.0M
TO:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Buenavista-Bunaguit Rd - (S00390MN) Chainage 1713 - Chainage 1925.68
Type of Work/Physical Target:
CW1- Reconstruction to Concrete Pavement - 1.879 Lane Km
Unit Cost: P19.819M/Lane Km
Allocation: P37.240M
EAO: P760.0T
TOTAL: P38.0M |
May 15, 2020 |
2020 |
WIN0G02847 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. 310104100265000
Project ID: P00400586MN
FROM:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1270 + 781 - K1271 + 000, K1272 + 172 - K1272 + 653, K1274 + 000 - K1274 + 800
Type of Work/Physical Target:
CW1- Reconstruction to Concrete Pavement - 3.008 Lane Km
Unit Cost: P11.513045M/Lane Km
Allocation: P34,631,240M
EAO: P760.760T
TOTAL: P35.3380M
TO:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1261+179 - K1261+314, K1261+364 - K1261+445.50, K1270 + 781 - K1271 + 000, K1272 + 172 - K1272 + 653, K1274 + 000 - K1274 + 800
Type of Work/Physical Target:
CW1- Reconstruction to Concrete Pavement - 3.441 Lane Km
Unit Cost: P10,064.295M/Lane Km
Allocation: P34,631,24M
EAO: P760.760T
TOTAL: P35.3380M
|
May 11, 2020 |
2020 |
WIN0C03795 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Tarlac 2nd District Engineering Office |
OO-1 - Ensure Safe and Reliable National Road System - Network Development Program - Off Carriageway Improvement - Tertiary Roads
Tarlac - Zambales Rd - K0115 + 000 - K0115 + 840, K0116 + 740 - K0118 + 110, K0119 + 210 - K0119 + 280 |
May 11, 2020 |
2020 |
WIN0C03789 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Tarlac 2nd District Engineering Office |
Local Program - Local Infrastructure Program - Local Roads and Bridges - Local Roads -
Concreting of Local Road, Brgy. Balanoy - Brgy. Dumarais, La Paz, Tarlac |
March 5, 2020 |
2020 |
WIN0C03763 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Regional Office III |
001 - Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Roman Expressway - K0133+000 - K0134+620, K0135+591 - K0135+959, K0142+728 - K0143+580 |
March 5, 2020 |
2020 |
WIN0C03760 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Regional Office III |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Nueva Ecija - Aurora Road - K0156+160 - K0156+276 |
March 5, 2020 |
2020 |
WIN0C03762 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Regional Office III |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Manila North Rd - K0044+500 - K0047+024.45
|
March 5, 2020 |
2020 |
WIN0C03761 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Regional Office III |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Manila North Road - K0119+405.83 - K0122+897
|
March 5, 2020 |
2020 |
WIN0C03759 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Regional Office III |
001 - Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Roman Expressway - K0111+407 - K0111+751, K0111+813 - K0112+361, K0112+421 - K0112+670, K0112+730 - K0113+302, K0113+347 - K0113+665 |
December 6, 2019 |
CY 2019 |
WINF05967 |
UACS No. 300117202450000 |
May 2, 2019 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 300117202450000
Project ID: P00354148LZ
Local Program
Local-National Roads and Bridges – Local Roads – Local Infrastructure Program
Improvement of Roads Kaingin 1, Barangay Pansol, Quezon City
Physical Target – CW Rehabilitation of Paved Road – 0 lane km
Unit Cost (P’000):
Allocation (P’000): P1,980.00
EAO – P20.00
Total: P2,000,000.00
As Modified
Local Program
Local Program
Local-National Roads and Bridges – Local Roads – Local Infrastructure Program
Improvement of Roads Kaingin 1, Barangay Pansol, Quezon City
Physical Target – CW Rehabilitation of Paved Road – 0.121 lane km
Unit Cost (P’000): P16,363.64/lane km
Allocation (P’000): P1,980.00
EAO – P20.00
Total: P2,000,000.00
WIN9F05967
|