Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
June 19, 2020 2020 WIN0C03794 FY 2020 GAA January 7, 2020 Region III Aurora District Engineering Office
001 - Ensure Safe and Reliable National Road System

Network Development Program - Off-Carriageway Improvement - Secondary Roads

Baler-Casiguran Rd (Baler-Dinadiawan), K0266+140 - K0268+313, K0268+336 - K0271+168, K0271+248 - K0274+612
June 19, 2020 2020 WIN0F06056 FY 2020 GAA January 7, 2020 Region III Aurora District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Baler - Casiguran Rd ( Dinadiawan - Casiguran Sect), K0298+130 - K0298+165, K0298+330 - K0298+440
June 19, 2020 2020 WIN0C03802 FY 2020 GAA January 7, 2020 Region III Aurora District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads

Nueva Ecija - Aurora Rd, K0198+215 - K0198+275, K0206+000 - K0206+493
June 19, 2020 2020 WIN0C03800 FY 2020 GAA January 7, 2020 Region III Aurora District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads

Baler - Casiguran Rd (Dinadiawan - Casiguran Sect), K0308+426 - K0308+699, K0322+404 - K0322+851
June 19, 2020 2020 WIN0C03796 FY 2020 GAA January 7, 2020 Region III Aurora District Engineering Office
Local Program

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program

Construction of Multi-purpose Building, Brgy. Abuleg, Dinalungan, Aurora
June 19, 2020 2020 WIN0C03798 FY 2020 GAA January 7, 2020 Region III Zambales 2nd District Engineering Office
Local Program

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program

Construction of Health Care Center, Balic-Balic, Sta. Rita, Olongapo City, Zambales
June 19, 2020 2020 WIN0C03804 FY 2020 GAA January 7, 2020 Region III Zambales 2nd District Engineering Office
002 - Protect Lives and Properties Against Major Floods
Flood Management Program - Construction / Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Rehabilitation of Flood Mitigation Structures and Drainage System of Sta. Rita River, Sta. 7+155.40 to Sta. 7+433.20 (Right Side), Olongapo City
June 19, 2020 2020 WIN0C03799 FY 2020 GAA January 7, 2020 Region III Zambales 2nd District Engineering Office
002 - Protect Lives and Properties Against Major Floods
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation of Flood Mitigation Structures and Drainage System of Sta. Rita River, Sta. 3+993 - Sta. 4+291.60 (Left Side), Olongapo City
June 19, 2020 2020 WIN0C03831 FY 2020 GAA January 7, 2020 Region III Zambales 2nd District Engineering Office
002 - Protect Lives and Properties Against Major Floods
Flood Management Program - Construction / Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Rehabilitation of Flood Mitigation Structures and Drainage System of Sta. Rita River, Sta. 6+480.60 to Sta. 6+756 (Left Side), Olongapo City, Zambales
June 19, 2020 2020 WIN0C03808 FY 2020 GAA January 7, 2020 Region III Zambales 2nd District Engineering Office
Local Program

Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure Program

Rehabilitation of Sta. Rita River, Sta. 7+850 - Sta. 8+240 (Right Side) Olongapo City, Zambales
June 19, 2020 2020 WIN0C03807 FY 2020 GAA January 7, 2020 Region III Zambales 2nd District Engineering Office
Local Program

Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure Program

Rehabilitation of Sta. Rita River, Sta. 8+240 - Sta. 8+640 (Right Side), Olongapo , Zambales
June 19, 2020 2020 WIN0C03810 FY 2020 GAA January 7, 2020 Region III Zambales 2nd District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation of Flood Mitigation Structures and Drainage System of Sta. Rita River, Sta. 3+688 - Sta. 3+960 (Right Side), Olongapo City
June 18, 2020 FY 2020 GAA WIN0F06090 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Romblon District Engineering Office
UACS No.: 310105100400000
Project ID: P00401317LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads

FROM:
Tablas Circumferential Rd,
K0080+885 - K0081+460
Physical Target: CW1 - Reconstruction to Concrete Pavement:
1.162 Lane Km
Allocation: Php 16.229 Million

TO:
Tablas Circumferential Rd,
K0080+885.02 - K0081+360
Physical Target: CW1 - Reconstruction to Concrete Pavement:
0.96196 Lane Km
Allocation: Php 16.229 million
June 18, 2020 FY 2020 GAA WIN0F06094 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Romblon District Engineering Office
UACS No.: 310208100261000
Project ID: P00400733LZ

OO1: Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement -
Secondary Roads

FROM:
Tablas Circumferential Rd
K0092+396 - K0093+270,
K0093+855 - K0094+994
Physical Target: CW1 - Off-Carriageway Improvement:
Shoulder Paving/Construction:
6,084 square meters
Allocation: Php 18.252 Million

TO:
Tablas Circumferential Rd
K0092+396 - K0093+262,
K0093+855 - K0094+913
Physical Target: Cw1 - Off-Carriage Improvement:
Shoulder Paving/Construction:
5,855.10 square meters
Allocation: Php 18.252 Million
June 18, 2020 FY 2020 GAA WIN0F06093 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Romblon District Engineering Office
UACS No.: 310105100395000
Project ID: P00401312LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads

FROM:
Romblon - Cogon - Sablayan Rd,
K0016+150 - K0016+240
Physical Target: CW1 - Reconstruction to Concrete Pavement:
0.180 Lane Km
Allocation: Php 2.30 Millionn

TO:Romblon - Cogon - Sablayan Rd.,
K0016+150 - K0016+273.90
Physical Target: Cw1 - Reconstruction to Concrete Pavement:
0.2478 Lane Km
Allocation: Php 2.30 Million
June 18, 2020 FY 2020 GAA WIN0F06106 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Mindoro Occidental District Engineering Office
UACS No.: 300117206544000
Project ID: P00447562LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads

FROM:
Construction of road including Bridge, So. Pusog, Brgy. Burgos,
Sablayan, Occidental Mindoro
Sta. 0+000 - Sta 2+500
Physical Target: CW1 - Construction of Concrete Road -
0.200 lane km
CW2 - Construction of Bailey Bridge -
580.80 sq.m.
Allocation: Php 50.00 Million

TO:
Construction of road including Bridge, So. Pusog, Brgy. Burgos,
Sablayan, Occidental Mindoro
Sta. 0+000 - Sta. 2+500
Physical Target: CW1 - Construction of Concrete Road -
0.200 lane km
CW2 - Construction of Bailey Bridge -
672000 sq.m.
Allocation: Php 50.00 Million
June 18, 2020 FY 2020 GAA WIN0F06099 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Mindoro Occidental District Engineering Office
UACS No.: 300117206541000
Project ID: P00447555LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads

FROM:
Construction of Umbuyan Road including Bridge, Brgy. Pitogo,
Rizal, Occidental Mindoro
Sta. 0+000 - Sta.1+700
Physical Target - CW1 - Construction of Concrete Road -
3.35 lane km
CW2 - Construction of Bailey Bridge -
135.30 sq.m.
Allocation: Php 50.00 Million

TO:
Construction of Umbuyan Road including Bridge, Brgy. Pitogo,
Rizal, Occidental Mindoro
Sta. 0+000 - Sta. 1+700
Physical Target: CW1 - Construction of Concrete Road -
3.35 lane km
CW2 - Construction of Bailey Bridge -
150.00 sq.m.
Allocation: Php 50.00 Million

June 18, 2020 FY 2020 GAA WIN0F06100 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Mindoro Occidental District Engineering Office
UACS No.: 300117206543000
Project ID: P00447560LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads

FROM:
Construction of Nalbu Road including Bridge, Brgy. Pitogo,
Rizal, occidental Mindoro
Sta. 0+000 - Sta. 2+700
Physical Target: CW1 - Construction of Concrete Road -
5.369 lane km
CW2 - Construction of Bailey Bridge -
85.80 sq.m.
Allocation: Php 50.00 Million

TO:

Construction of Nalbu Road including Bridge, Brgy. Pitogo,
Rizal, Occidental Mindoro
Sta. 0+000 - Sta. 2+700
Physical Target: CW1 - Construction of Concrete Road -
5.369 lane km
CW2 - Construction of Bailey Bridge -
96.00 sq.m.
Allocation: Php 50.00 Million

June 18, 2020 FY 2020 GAA WIN0F06089 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Marinduque District Engineering Office
UACS No.: 300117206531000
Project ID: P00447537LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM:
Rehabilitation/Improvement of Brgy. Sayao Roa,
Sta. 3+191.30 - Sta. 3+561,
Sta. 4+175.10 - Sta. 4+660.10,
Sta. 5+609 - Sta.5+699,
Mogpog, Marinduque
Physical Target: CW1 - Rehabilitation of Paved Road -
7.181 lane km
Allocation: Php 60.00 Million

TO:
Rehabilitation/Improvement of Brgy. Sayao Road,
Sta. 3+191.30 - Sta. 3+561,
Sta. 4+175.10 - Sta. 4+660.10,
Sta. 5+609 - Sta. 8+345,
Mogpog, Marinduque
Physical Target: CW1 - Rehabilitation of Paved Road -
7.181 lane km
Allocation: Php 60.00 Million
June 18, 2020 FY 2020 GAA WIN0G02837 FY 2020 GAA RA 11465 January 1, 2020 Region XII Regional Office XII
MODIFICATION:

FROM: Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance along Davao City Div Rd -
K1506+980 - K1507+000, K1512+238 - K1513+775,
K1513+875 - K1515+911
Physical Target:
CW1: 8.706 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 140,000,000.00
CW1: P 135,100,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 4,900,000.00

TO: Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance along Davao City Div Rd -
K1514+103 - K1515+129, K1515+432 - K1515+832
Physical Target:
CW1: 8.706 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 140,000,000.00
CW1: P 135,100,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 4,900,000.00
June 18, 2020 2020 WIN0C03792 GAA FY 2020 (RA 11465) January 31, 2020 Region III Nueva Ecija 1st District Engineering Office
Network Development
Off-Carriageway Improvement
Tertiary Roads

Muñoz-Lupao Rd
K0156 + 000 - K0156 + 460,
K0156 + 602 - K0156 + 658,
K0156 + 740 - K0157 + 000,
K0158 + 235 - K0158 + 503,
K0162 + 646 - K0162 + 932.80

CW-1: Paving of Shoulders - 6,455 square meters - P15,167,460
EAO: P309,540
June 18, 2020 2020 WIN0C03794 FY 2020 GAA (RA 11465) February 20, 2020 Region III Aurora District Engineering Office
Network Development Program
Off-Carriageway Improvement
Secondary Roads

Baler-Casiguran Rd (Baler-Dinadiawan)
K0266 + 140 - K0268 + 313,
K0268 + 336 - K0271 + 168,
K0271 + 248 - K0274 + 612

CW-1: Off-Carriageway Improvement: Shoulder Paving/ Construction - 29,323.50 square meters - P46,790,100
EAO: P954,900
June 17, 2020 2020 WIN0G02897 FY 2020 RA 11465 January 24, 2020 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. 300204100005000
Project ID: P00431312MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones

FROM:

Access Road in support of Match Factory, Talacogon, Agusan del Sur

Type of Work: CW1 - Construction of Concrete Road

Physical Target: 0.720 Lane Km

Unit Cost: P24.500M/Lane Km

Allocation: P17.640M

EAO: 360.0T

TOTAL: P18.0M

TO:

Access Road in support of Match Factory, Talacogon, Agusan del Sur

Type of Work: CW1 - Construction of Concrete Road

Physical Target: 1.320 Lane Km

Unit Cost: P13.363636M/Lane Km

Allocation: P17.640M

EAO: 360.0T

TOTAL: P18.0M

June 17, 2020 2020 WIN0G02901 FY 2020 RA 11465 January 24, 2020 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. 310212100163000
Project ID: P00401421MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Tertiary Roads

FROM:

Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - (S00448MN) Chainage 7254 - Chainage 7682

Type of Work: Paving of Unpaved Roads

Physical Target: 0.856 Lane Km

Unit Cost: P13.394M/Lane Km

Allocation: P11.466M

EAO: P234.0T

TOTAL: P11.700M

TO:

Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - (S00448MN) Chainage 7254 - Chainage 7779

Type of Work: Paving of Unpaved Roads

Physical Target: 1.050 Lane Km

Unit Cost: P10.920M/Lane Km

Allocation: P11.466M

EAO: P234.0T

TOTAL: P11.700M
June 17, 2020 2020 WIN0G02899 FY 2020 RA 11465 January 24, 2020 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. 300117207556000
Project ID: P00444311MN

LOCAL PROGRAM - Local Roads and Bridges - Local Roads - Local Infrastructure Program

FROM:

Construction of Gravel Road, Brgy. Claro Cortez-Agon-onon-Brgy. Claro Cortez, Bayugan City, Agusan del Sur

Type of Work: Construction of Concrete Road

Physical Target: -

Unit Cost: -

Allocation: P14.850M

EAO: P150.0T

TOTAL: P15.0M

TO:

Construction of Gravel Road, Brgy. Claro Cortez-Agon-onon-Brgy. Claro Cortez, Bayugan City, Agusan del Sur

Type of Work: Construction of Gravel Road

Physical Target: P3.40 Lane Km

Unit Cost: P4.367647M/Lane Km

Allocation: P14.850M

EAO: P150.0T

TOTAL: P15.0M
June 17, 2020 2020 WIN0G02904 FY 2020 RA 11465 January 24, 2020 Region XIII Agusan del Sur 2nd District Engineering Office
UACS No. 310105100488000
Project ID: P00400661MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

FROM:

Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1389 + 165 - K1389 + 267, K1390 + 279 - K1390 + 785

Type of Work: Reconstruction to Concrete Pavement

Physical Target: 1.216 Lane Km

Unit Cost: P11,215,200/Lane Km

Allocation: P13,637,680

EAO: P278,320

TOTAL: P13,916,000

TO:

Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1390 + 500 - K1390 + 785

Type of Work: Reconstruction to Concrete Pavement

Physical Target: 1.14 Lane Km

Unit Cost: P11,962,880/Lane Km

Allocation: P13,637,680

EAO: P278,320

TOTAL: P13,916,000
June 17, 2020 2020 WIN0G02898 FY 2020 RA 11465 January 24, 2020 Region XIII Agusan del Sur 2nd District Engineering Office
UACS No. 310201100640000
Project ID: P00400345MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads

FROM:

Daang Maharlika (Agusan-Davao Sect) - K1343 + 006 - K1343 + 505, K1343 + 730 - K1343 + 832

Type of Work: Road Widening

Physical Target: 1.202 Lane Km

Unit Cost: P24,853,030/Lane Km

Allocation: P29,873,340

EAO: P609,660

TOTAL: P30,483,000

TO:

Daang Maharlika (Agusan-Davao Sect) - K1343 + 006 - K1343 + 559.4, K1343 + 647.86 - K1343 + 832

Type of Work: Road Widening

Physical Target: 1.47508 Lane Km

Unit Cost: P20,252,010/Lane Km

Allocation: P29,873,340

EAO: P609,660

TOTAL: P30,483,000
June 11, 2020 FY 2020 GAA WIN0F06013 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Mindoro Occidental District Engineering Office
UACS No.: 310212100148000
Project ID: P00400705LZ

OO1: Ensure Safe and Reliable National Roads System

Network Development Program - Paving of Unpaved Road -
Tertiary Roads

FROM:
Crossing MWCR (Pola) - Casague - Jct Alacaak Rd
(S00162MR) Chainage 175 - Chainage 885
Physical Target - CW1 - Construction of Concrete Road
1.42 lane km
Allocation: Php 17.750 Million

TO:
Crossing MWCR (Pola) - Casague - Jct Alacaak Rd
(S00162MR) Chainage 175 - Chainage 475
Physical Target - CW1 - Construction of Concrete Road
0.60 lane km
Allocation: Php 17.750 Million
June 11, 2020 FY 2020 GAA WIN0F06016 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Mindoro Occidental District Engineering Office
UACS No.: 300104215617000
Project ID: P00445484LZ

Local Program

Local Infrastructure Program - Buildings and Other Structures -
Multipurpose/Facilities

FROM:
Construction of Multi-Purpose Building, Brgy. San Agustin DZ,
San Jose, Occidental Mindoro
Physical Target - CW1 - Construction of Multipurpose Building
1 Building
Allocation: Php 3.00 Million

TO:
Construction of Multi-Purpose Building, Brgy. San Agustin,
San Jose, Occidental Mindoro
Physical Target - CW1 - Construction of Multipurpose Bulding
1 Building
Allocation: Php 3.00Million
June 11, 2020 FY 2020 GAA WIN0F06008 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 310202100475000
Project ID: P00400433LZ

OO1: Ensure Safe and Reliable National Roads System

Network Development - Road Widening - Secondary Roads

FROM:
Calapan South Rd
K0170+879 - K0171846,
K0172+116 - K0173+220,
K0173+415 - K0174+132,
K0174+496 - K0175+057,
K0177+000 - K0178+122,
K0178+300 - K0178+367,
K0178+559 - K0180+387
Physical Target - CW1 - Road Widening : 12.636 Lane km
Allocation : Php 150.00 Million

TO:
Calapan South Road
K0168+404 - K0169+104,
K0170+879 - K0171+846,
K0172+116 - K0173+220,
K0173+415 - K0174+132,
K0174+496 - K0175+057,
K0178+300 - K0178+367,
K0178+559 - K0180+727
Physical Target - CW1 - Road Widening: 12.542 Lane km
Allocation: Php 150.00 Million
June 11, 2020 FY 2020 GAA WIN0F06003 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 310203100274000
Project ID: P00400391LZ

OO1: Ensure Safe and Reliable National Roads System

Network Development - Road Widening - Tertiary Roads

FROM:
F.B. Reyes (Busuanga-Coron) Rd
K0018+160 - K0020+000
Physical target - CW1 - Road Widening: 3.680 lane km
Allocation: Php 50.00 Million

TO:
F.B. Reyes (Busuanga-Coron) Rd
K0020+815 - K0021+060,
K0021+245 - K0022+683
Physical Target - CW1 - Roadd Widening : 30366 lane km
Allocation: Php 50.00 Million
June 11, 2020 FY 2020 GAA WIN0F06001 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300111200183000
Project ID: P00449224LZ

LOCAL PROGRAM

National Roads and Bridges - National Roads - Construction/
Repair/Rehabilitation/Improvement of Various Infrastructure
including Local Projects

FROM:
Widening of Road, Palawan Circumferential Road (S00063PW)
K0253+205 - K0255+1004,
K0256+175 - K0256+669,
K0256+690 - K0258+500,
Palawan
Physical Target - CW1 - Road Widening: 7.51 Lane km
Allocation: Php 100.00 Million

TO:
Widening of Road, Palawan Circumferential Road (S00063PW)
K0252+1023 - K0255+768,
K000255+827 - K0255+1201,
K0256+099 - K0256+569,
Palawan
Physical Target - CW1 - Road Widening: 7.51 Lane km
Allocation: Php 100.00 Million
June 11, 2020 FY 2020 GAA WIN0F06095 FY 2020 GAA DPWH Infra Program January 6, 2019 Region IV-B Romblon District Engineering Office
UACS No.: 310108100389000
Project ID: P00400205LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM:
Tablas Circumferential Road
K0075+100 - K0075+127
Physical Target - CW1 - Construction of Road Slope
Protection Structure: 160 square meters
Allocation: Php 1.60 Million

TO:
Tablas Circumferential Road
K074+837.50 - K0074+900
Physical target - CW1 - Construction of Road Slope
Protection Structure: 250 square meters
Allocation: Php 1.60 Million
June 10, 2020 FY 2020 GAA WIN0F06019 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Mindoro Occidental District Engineering Office
UACS No.: 310109100408000
Project ID: P00400101LZ

OO1: Ensure Safe and Reliable National Roads System

Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads

FROM:
Tagbac - Lubang - Looc Rd.
K0033+641 - K0034+000,
K0034+529 - K0035+000
Physical Target: Cw1 - Construction of Slope Protection
Structure - 2,288.54 sqq.m.
Allocation: Php 50.00 Million

TO:
Tagbac - Lubang - Looc Rd
K0034+650 - K0034+760
Physical Target: CW1 - Construction of Slope Protection
Structure - 2,288.54 sq.m.
Allocation: Php 50.00 Million
June 10, 2020 FY 2020 GAA WIN0F06010 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Mindoro Occidental District Engineering Office
UACS No.: 300117206546000
Project ID: P00447567LZ

Local Program

Local Roads and Bridges - Local Roads

FROM:
Concreting of Jct. National Highway - So. Antipolo,
Brgy. Mangarin, San Jose, Occidental Mindoro
Sta. 0+000 - Sta. 2+700
Physical Target: CW1 - Construction of Concrete Road
3.256 lane km
Allocation: Php 35.00 Million

TO:
Concreting of Jct. National Highway - So. Antipolo,
Brgy. Mangarin, San Jose, Occidental Mindoro
Sta. 0+000 - Sta 1+628
Physical Target: CW1 - Construction of Concrete Road
3.256 lane km
Allocation: Php 35.00 Million
June 10, 2020 FY 2020 GAA WIN0F06011 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Mindoro Occidental District Engineering Office
UACS No.: 310208100260000
Project ID: P00400703LZ

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Off-Carriage Improvement -
Secondary Roads

FROM:
Mindoro West Coastal Rd
K0405+640 - K0405+700,
K0406+200 - K0406+260,
K0407+880 - K0407+940,
K0408+440 - K0408+500,
K0409+300 - K0409+360
Physical Target: CW1 - Construction of Lay-by
5 Number of Lay-by
Allocation: Php 10.00 Million

TO:
Mindoro West Coastal Rd
K0405+ 720 - K0405+780,
K0406+200 - K0406+260,
K0406+300 - K0406+360,
K0407+040 - K0407+100,
K0408+000 - K0408+060,
K0408+440 - K0408+500
Physical target: CW1 - Construction of Lay-by
6 Number of Lay-by
Allocation: Php 10.00 Million

June 10, 2020 FY 2020 GAA WIN0F06012 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Mindoro Occidental District Engineering Office
UACS No.: 300112200158000
Project ID: P00446467LZ

Local Program

National Roads and Bridges - National Roads

FROM:
Rehabilitation/Reconstruction of Jct MWCR (Sn Isidro) -
Penal Colony - Jct Yapang Rd
K0306+432 - K0306+805,
K0306+876 - K0307+301,
Brgy. Batong Buhay, Sablayan, Occidental Mindoro
Physical target: CW1 - Rehanilitation/Reconstruction of
Concrete Pavement - 2.385 lane km
Allocation: Php 28.00 Million

TO:
Rehabilitation/Reconstruction of Jct. MWCR (Sn Isidro) -
Penal Colony - Jct Yapang Rd
K0306+432 - K0306+736.94,
K0306+925.62 - K0307+294.98,
K0308+400 - K0308+918
Brgy. Batong Buhay, Sablayan, Occidental Mindoro
Physical Target: CW1 - Rehabilitation/Reconstruction of
Concrete Pavement - 2.385 lane km
Allocation: Php 28.00 Million
June 9, 2020 FY 2020 GAA WIN0F06023 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Palawan 1st District Engineering Office
UACS No.: 320101104933000
Project ID: P00421967LZ

OO2: Protect lives and Properties Against Major Floods

Construction/Maintenance of Flood Mitigation Structures
and Drainage System

FROM:
Construction of Omao Bridge Flood Control Project, Palawan
Physical Target: 170.00 lineal meters
Allocation: Php 10.00 Million

TO:
Construction of Omao Flood Control Project, Palawan
Physical Target: 170.00 lineal meters
Allocation: Php 10.00 Million
June 9, 2020 FY 2020 GAA WIN0F06055 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No.: 310111100201000
Project ID: P00400613LZ

Organizational Outcome 1:
Ensure Safe and Reliable National Road System

Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along National Roads - Secondary Roads

FROM:
Calapan South Road
K0008+630 - K0009+224,
K0035+691 - K0036+486
Physical Target : CW1 - Construction of Drainage Structure
along Road
2,055.00 Lineal meters (lm)
Allocation : Php 33.637 Million

TO;
Calapan South Road
K0008+643 - K0009+224,
K0009+224 - K0009+629,
K0011+100 - K0011+548,
K0016+346 - K0016+369.50,
K0035+691 - K0036+486
Physical Target: CW1 - Construction of Drainage Structure
along Road
2,905.50 Lineal meters (lm)
Allocation: Php 33.637 Million


June 9, 2020 FY 2020 GAA WIN0F06053 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No.: 310202100474000
Project ID: P00400430LZ

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:
Calapan South Road
K0132+350 - K0133+159,
K0136+185 - K0137+409
Physical Target: CW1 - Road Widening: 4.092 lane km
Allocation: Php 66.054 Million

TO:
Calapan South Road
K0132+350 - K0133+159,
K0136+185 - K0137+458
Physical Target: CW1 - Road Widening - 4.190 lane km
Allocation: Php 66.054 Million
June 9, 2020 FY 2020 GAA WIN0F06052 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No.: 310202100610000
Project ID: P00402583LZ

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:
Calapan South Road
K0142+726 - K0143+197
Physical Target: CW1 - Road Widening - 0.928 lane km
Allocation: Php 13.920 Million

TO;
Calapan South Road
K0142+726 - K0143+197,
K0148+570 - K0148+967
Physical Target: CW1 - Road Widening - 1.722 lane km
Allocation: Php 13.920 Million

June 9, 2020 FY 2020 GAA WIN0F06054 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No.: 310111100204000
Project ID: P00400614LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along National Roads
- Secondary Roads

FROM:
Calapan South Road
K0143+197 - K0143+546
Physical Target: CW1 - Construction of Drainage Structure
along Road - 669 lineal meters
Allocation - Php 13.380 Million

TO:
Calapan South Road
K0143+197 - K0143+546,
K0150+206.50 - K0150+362
Physical Target: CW1 - Construction of Drainage Structure
along Road - 824.70 lineal meters
Allocation: Php 13.380 Million
June 9, 2020 2020 WIN0G02864 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Regional Office XIII
UACS No. 310204100602000
Project ID: P00401173MN

OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads

FROM:

Lianga Coastal Bypass Road (SDCR Alternate Route), Surigao del Sur

Type of Work/Physical Target:

CW1- Construction of Gravel Road - 1.437 Lane Km

Unit Cost: P35,705,672/Lane Km

Allocation: P51,309,050

CW2- Construction of Concrete Road - 2.8 Lane Km

Unit Cost: P24,125,000/Lane Km

Allocation: P67,550,000

ROW- ROW Acquisition - 4120 sq.m.

Unit Cost: P1,575/sq.m

Allocation: P6,490,000

EAO: P4,310,950

TOTAL: P129,660,000

TO:

Lianga Coastal Bypass Road (SDCR Alternate Route), Surigao del Sur

Type of Work/Physical Target:

CW1- Construction of Gravel Road - 0.976 Lane Km

Unit Cost: P61,989,014/Lane Km

Allocation: P60,501,278

CW2- Construction of Concrete Road - 0.50 Lane Km

Unit Cost: P8,229,589/Lane Km

Allocation: P4,114,794

CW3- Construction of Slope Protection Structure - 5,052.37 sq.m.

Unit Cost: P11,976/sq.m

Allocation: P60,505,828

EAO: P4,538,100

TOTAL: P129,660,000
June 9, 2020 FY 2020 GAA WIN0F05982 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No.: 310202100606000
Project ID: P00402586LZ

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:
Bongabong-Sagana-Roxas-San Aquilino Road
K0114+000 - K0115+635
Physical Target: CW1 - Road Widening - 3.33 lane km
Allofcation: Php 49.950 Million

TO:
Bongabong-Sagana-Roxas-San Aquilino Road
K0114+268.20 - K0115+635
Physical Target: CW1 - Road Widening - 2.7936 lane km
Allocation: Php 49.950 Million
June 9, 2020 FY 2020 GAA WIN0F06022 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Mindoro Occidental District Engineering Office
UACS No.: 310108100381000
Project ID: P00400103LZ

OO1: Ensure Safe and Reliable National Roads System

Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and
Landslide - Secondary Roads

FROM:
Mindoro West Coastal Road
K0446+150 - K0446+540
Physical Target: CW1 - Construction of Slope Protection
Structure - 2,303 sq.m.
Allocation: Php 50.00 Million

TO:
Mindoro West Coastal Road
K0446+300 - K0446+380
Physical Target: CW1 - Construction of Slope Protection
Structure - 2,303 sq.m.
Allocation: Php 50.00 Million
June 5, 2020 FY2020 WIN0G02859 310201100479000 April 29, 2020 Region IX Regional Office IX
UACS No. 310201100479000
Project ID: P00400267MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Pagadian City - Zamboanga City Rd
K1861 + 336.00 - K1861 + 424.00,
K1861 + 436.00 - K1863 + 900.00,
K1871 + 000.00 - K1871 + 300.00

CW1 - Road Widening: 5.704 lane km.
Unit Cost: P 18,614,729.78/lane km.
ROW: 33,684.45553 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 3,716,244.65
Allocation: P 120,000,000.00
June 5, 2020 FY2020 WIN0G02861 310204100259000 April 29, 2020 Region IX Regional Office IX
UACS No. 310204100259000
Project ID: P00401267MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads

Sominot - Dumingag Road, Zamboanga del Sur

CW1 - Construction of Concrete Road: 6.36 lane km.
Unit Cost: P 12,997,571.49/lane km.
ROW: 19,118.16517 sq.m.
Unit Cost: P 300/sq. m.
EAO: P 3,356,772.24
Allocation: P 105,000,000.00
June 5, 2020 FY2020 WIN0G02858 310201100471000 April 29, 2020 Region IX Regional Office IX
UACS No. 310201100471000
Project ID: P00400231MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Dipolog - Punta - Dansullan - Sergio Osmeña - Zamboanga del Norte/Sur Bdry Rd
K1873 + 110.00 - K1874 + 479.00,
K1874 + 750.00 - K1877 + 700.00

CW1 - Road Widening: 8.639 lane km.
Unit Cost: P 16,087,116.28/lane km.
ROW: 20,530.7386 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 4,864,180.91
Allocation: P 150,000,000.00
June 5, 2020 2020 WIN0C03765 FY 2020 GAA January 7, 2020 Region III Regional Office III
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Jose Abad Santos Ave (JASA) - K0069+1010 - K0070+331, K0070+357 - K0071+1013, K0072+897 - K0073+204, K0074+474 - K0074+736, K0074+736 - K0074+917, K0074+917 - K0075+278.86, K0090+106.80 - K0090+402, K0090+402 - K0091+000
June 5, 2020 2020 WIN0G02860 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Regional Office XIII
UACS No. 310107100139000
Project ID: P00400109MN

OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

FROM:

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1275 + 600 - K1277 + 000

Type of Work/Physical Target:
CW1- Construction of Road Slope Protection Structure - 11,111.110 sq.m

Unit Cost: P17.370/sq.m

Allocation: P193.0M

EAO: P7.0M

TOTAL: P200.0M

TO:

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1275 + 860 - K1276 + 080

Type of Work/Physical Target:
CW1- Construction of Road Slope Protection Structure - 10,645.0 sq.m

Unit Cost: P18.131 M/sq.m

Allocation: P193.0M

EAO: P7.0M

TOTAL: P200.0M
June 5, 2020 2020 WIN0G02852 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Regional Office XIII
UACS No. 300119200420000
Project ID: P00444371MN

LOCAL PROGRAM - Local Roads and Bridges - Local Bridges - Local Infrastructure Program

FROM:

Construction of Las Nieves Bridge and Road Approaches, Cabadbaran City, Agusan del Norte

Type of Work/Physical Target:
CW1- Construction of Bridge - 0.00 sq.m

Unit Cost: P0.00/sq.m

Allocation: P39.600M

EAO: P400.0T

TOTAL: P40.0M

TO:

Construction of Las Nieves Bridge and Road Approaches, Las Nieves, Agusan del Norte (Phase II)

Type of Work/Physical Target:
CW1- Construction of Bridge - 5,234.598 sq.m

Unit Cost: P7.56505 M/sq.m

Allocation: P39.600M

EAO: P400.0T

TOTAL: P40.0M
June 4, 2020 FY 2020 WIN0F06002 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300111200254000
Project ID: P00449273LZ

LOCAL PROGRAM

National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Preventive Maintenance of Road:
Asphalt Overlay PPSR Jct.(Abo-Abo) - Quezon
K0129+500.00 - K0133+397
Palawan
Physical Target: 2.069 Lane Km
Allocation: Php 40.00 Million

TO:
Preventive Maintenance of Road:
Asphalt Overlay PPSR Jct.(Abo-Abo) - Quezon
K0129+500 - K0130+607
Palawan
Physical Target: 2.278 Lane Km
Allocation: Php 40.00 Million
June 4, 2020 FY 2020 GAA WIN0F06000 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 310202100484000
Project ID: P00402561LZ

Organizational Outcome 1:
Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:
Puerto Princesa South Road
K0086+331 - K0086+900,
K0087+060 - K0090+000
Physical Target: 7.030 Lane Km
Allocation: Php 121.469 Million

TO:
Puerto Princesa South Road
K0086+331 - K0086+900,
K0087+060 - K0090+016,
K0094+048 - K0094+564
Physical Target: 8.094 Lane Km
Allocation: Php 121.469 Million
June 4, 2020 FY 2020 GAA WIN0F05999 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300111200253000
Project ID: P00449272LZ

LOCAL PROGRAM

National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Preventive Maintenance of Road:
Asphalt Overlay of Quezon - Aramaywan
K0159+000 - K0172+635
Palawan
Physical Target: 0 Lane Km
Allocation: Php 50.00 Million

TO:
Preventive Maintenance of Road:
Asphalt Overlay of Quezon - Aramaywan
K0147+006 - K0148+334
Palawan
Physical Target: 2.746 Lane Km
Allocation: Php 50.00 Million
June 4, 2020 FY 2020 GAA WIN0F05998 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300111200252000
Project ID: P00449271LZ

LOCAL PROGRAM

National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Preventive Maintenance of Road:
Asphalt Overlay of Quezon - Aramaywan
K0146+(-150.00) - K0150+289.0Palawan
Physical Target: 0 Lane Km
Allocation: Php 50.00 Million

TO;
Preventive Maintenance of Road:
Asphalt Overlay of Quezon - Aramaywan
K0146+(-150.00) - K0147+006
Palawan
Physical Target: 2.492 Lane Km
Allocation: Php 50.00 Million
June 4, 2020 FY 2020 GAA WIN0F06009 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 310109100273000
Project ID: P00402590LZ

Organizational Outcome 1:
Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse,
and Landslide - Tertiary Roads

FROM:
F.B. Reyes (Busuanga - Coron) Rd.
K0015+550 - K0015+650,
K0015+750 - K0015+900
Physical Target: 4,021 square meters
Allocation: Php 80.00 Million

TO:
F.B. Reyes (Busuanga - Coron) Rd.
K0015+560 - K0015+711.70
Physical Target: 4,021.00 square meters
Allocation: Php 80.00 Million
June 4, 2020 2020 310201100432000 GAA FY 2020 February 11, 2020 Region II Regional Office II
Network Development - Road Widening - Primary Roads - Cagayan Valley Rd - K0480+872 - K0480+1172, K0486+000 - K0486+220, K0486+480 - K0487+506, K0487+586 - K0487+675.2
June 4, 2020 2020 310212100147000 GAA FY 2020 February 11, 2020 Region II Cagayan 2nd District Engineering Office
Network Development – Paving of Unpaved Roads – Tertiary Roads – Jct Logac-Lasam-Gagabutan Rd (S00656LZ) – Chainage 15419 – Chainage 15809, Chainage 15872 – Chainage 17288
June 4, 2020 FY 2020 GAA WIN0F6005 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300111200185000
Project ID: P00449226LZ

LOCAL PROGRAM

National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Widening of Road
Palawan Circumferential Road (S00063PW)
K0265+000 - K0269+820
Palawan
Physical Target: 7.404 Lane Km
Allocation: Php 100.00 Million

TO:
Widening of Road
Palawan Circumferential Road(S00063PW)
K0260+751 - K0263+514,
K0263+746 - K0265+598
Palawan
Physical Target: 7.404 Lane Km
Allocation: Php 100.00 Million


June 4, 2020 2020 310209100203000 GAA FY 2020 February 11, 2020 Region II Cagayan 3rd District Engineering Office
Network Development - Off-Carriageway Improvement - Tertiary Roads - Cagayan Valley Regional Center Rd – K0485 + (-504) – K0485 + 300
June 4, 2020 2020 310209100204000 GAA FY 2020 February 11, 2020 Region II Cagayan 3rd District Engineering Office
Network Development - Off-Carriageway Improvement - Tertiary Roads - CVR Regional Govt Center Rd Network – (S00762LZ) Chainage 000 – Chainage 1245
June 4, 2020 2020 310104100209000 GAA FY 2020 February 11, 2020 Region II Cagayan 3rd District Engineering Office
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Cagayan Valley Rd – K0475 + 000 – K0475 + 829
June 4, 2020 2020 310106100431000 GAA FY 2020 February 11, 2020 Region II Cagayan 3rd District Engineering Office
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Peñablanca-Callao Cave Rd – K0476 + 340 – K0477+268
June 4, 2020 FY 2020 GAA WIN0F06007 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 310202100485000
Project ID: P00402560LZ

Organizational Outcome 1:
Ensure safe and reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:
Puerto Princesa South Road
K0122+815 - K0126+342,
K0126+542 - K0127+500
Physical Target: 9.022 lane Km
Allocation: Php 146.432 Million

TO:
Puerto Princesa South Road
K0122+815 - K0126+342,
K0126+542 - K0127+893
Physical Target: 9.808 Lane Km
Allocation: Php 146.432 Million
June 4, 2020 2020 310203100321000 GAA FY 2020 February 11, 2020 Region II Isabela 4th District Engineering Office
Network Development – Road Widening – Tertiary Roads – Jct. Ipil-Quirino Bdry Rd – K0337+(-348) – K0337+(-198), K0338+603 – K0338+630
June 4, 2020 2020 310201100547000 GAA FY 2020 February 11, 2020 Region II Isabela 4th District Engineering Office
Network Development – Road Widening – Primary Roads – Daang Maharlika (LZ) – K0360 + 535 – K0361 + 850
June 4, 2020 2020 310201100435000 GAA FY 2020 February 11, 2020 Region II Nueva Vizcaya 2nd District Engineering Office
Network Development – Road Widening – Primary Roads – Daang Maharlika (LZ) – K0226 + 920 – K0229 + 894.50
June 4, 2020 2020 310202100575000 GAA FY 2020 February 11, 2020 Region II Nueva Vizcaya 2nd District Engineering Office
Network Development – Road Widening – Secondary Roads – Nueva Vizcaya-Benguet Road – K0249 + 560 – K0251 + 280
June 4, 2020 2020 310104100214000 GAA FY 2020 February 11, 2020 Region II Nueva Vizcaya 2nd District Engineering Office
Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Primary Roads, Daang Maharlika (LZ) – K0211 + 640 – K0211 + 829, K0214 + 000 – K0214 + 312, K0214 + 921.50 – K0215 + 395
June 4, 2020 FY 2020 GAA WIN0F06006 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 310202100480000
Project ID: P00402569LZ

Organizational Outcome 1:
Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:
Puerto Princesa North Rd
K0020+433 - K021+320,
K0028+000 - K0029+870,
K0029+886 - K0031+891,
K0031+950 - K0033+528
Physical Target: CW1 - Road Widening: 12.664 Lane Km
Allocation: Php 202.614 Million

TO:
Puerto Princesa North Rd
K0020+433 - K0021+307,
K0028+000 - K0029+871,
K0029+886 - K0031+890,
K0031+950 - K0033+453
Physical Target: CW1- Road Widening: 12.488 Lane Km
Allocation: Php 202.614 Million
June 4, 2020 FY 2020 GAA WIN0F05996 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300111200184000
Project ID: P00449225LZ

LOCAL PROGRAM

National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Widening of Road -
Palawan circumferential Road (S00063PW)
K0258+500 - K0260+257,
K0260+362 - K0263+888,
K0264+120 - K0265+000,
Palawan
Physical Target: 7.842 Lane Km
Allocation: Php 100.00 Million

TO:
Widening of Road -
Palawan Circumferential Road (S00066PW)
K0256+569 - K0259+507,
K0259+769 - K0260+751
Palawan
Physical Target: 7.842 Lane Km
Allocation: Php 100.00 Million
June 3, 2020 FY 2020 WIN0G02856 310204100260000 April 29, 2020 Region IX Regional Office IX
UACS NO. 310204100260000
Project ID: P00401269MN

OO1: Ensure Safe and Reliable National Road System

Network Development - Construction of Bypass and Diversion Roads

Sominot - Mahayag Road, Zamboanga del Sur

Physical Target:
CW1 - Construction of Concrete Road: 5.40 Lane km
ROW: 5,535.743567 sq.m.

Unit Cost:
CW1: P 18,489,761.49/Lane km
ROW: P 300.00/sq.m.

Component Cost:
CW1: P 99,844,712.01
ROW: P 1,660,723.07
EAO: P 3,494,564.92

Allocation: P 105,000,000.00
June 2, 2020 2020 WIN0G02834 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Regional Office XIII
UACS No. 310201100522000
Project ID: P00400342MN

FROM:

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads

NRJ Cuevas-Bislig Rd - K1379 + 800 - K1382 + 558, K1382 + 777.3 - K1384 + 020

Type of Work/Physical Target:
CW1- Road Widening - 8.095 Lane Km

Unit Cost: P16,646,637/Lane Km

Allocation: P134,754,530

EAO: P4,887,470

TOTAL: P139,642,000

TO:

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads

NRJ Cuevas-Bislig Rd - K1384 + 210 - K1387 + 200

Type of Work/Physical Target:
CW1- Road Widening - 6.066 Lane Km

Unit Cost: P22,214,726/Lane Km

Allocation: P134,754,530

EAO: P4,887,470

TOTAL: P139,642,000
June 1, 2020 2020 WIN0G02851 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Regional Office XIII
UACS No. 310202100559000
Project ID: P00400133MN

FROM:

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads

Mayor Democrito D. Plaza II Ave - K1240 + 440 - K1240 + 585, K1241 + 565 - K1242 + 439, K1246 + 440 - K1248 + 622, K1248 + 671 - K1248 + 907

Type of Work/Physical Target:
CW1- Road Widening - 6.874 Lane Km

Unit Cost: P23.219523M

Allocation: P159.611M

EAO: P5.789M

TOTAL: P165.400M

TO:

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads

Mayor Democrito D. Plaza II Ave - K1241 + 780 - K1242 + 439, K1246 + 440 - K1248 + 622, K1248 + 671 - K1248 + 907

Type of Work/Physical Target:
CW1- Road Widening - 6.154 Lane Km

Unit Cost: P25.936139M

Allocation: P159.611M

EAO: P5.789M

TOTAL: P165.400M
May 28, 2020 2020 WIN0C03797 FY 2020 GAA January 7, 2020 Region III Pampanga 3rd District Engineering Office Arayat - Magalang - Mabalacat Rd - K0102 + 400 - K0103 + 300
May 21, 2020 2020 WIN0C03770 GAA 2020 May 7, 2020 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Sta. Rosa Flood Control Project,Sta. 0+000 - Sta. 1+290 ,Bangued, Abra; Physical Target: CW1 : 485 Lineal meters; Allocation= Php 52,874,000

To: Construction of Sta. Rosa Flood Control Project,Sta. 0+000 - Sta. 0+485 ,Bangued, Abra; Physical Target: CW1 : 485 Lineal meters; Allocation= Php 52,874,000
May 21, 2020 2020 WIN0C03815 GAA 2020 May 7, 2020 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Cabuloan Flood Control Project, Sta. 0+000 - Sta. 1+133, Bangued, Abra; Physical Target: CW1 : 282 Lineal meters; Allocation= Php 50,580,000

To: Construction of Cabuloan Flood Control Project, Sta. 0+000 - Sta. 0+282, Bangued, Abra; Physical Target: CW1 : 282 Lineal meters; Allocation= Php 50,580,000


May 21, 2020 2020 WIN0C03816 GAA 2020 May 7, 2020 Cordillera Administrative Region CAR - Regional Office
From: Claveria-Calanasan-Kabugao Rd - K0699 + 000 - K0701 + 393; Physical Target: CW1 : 5.5 Lane Km; Allocation= Php 110,000,000

To: Claveria-Calanasan-Kabugao Rd - K0699 + 050 - K0701 + 393; Physical Target: CW1 : 5.4 Lane Km; Allocation= Php 110,000,000

May 21, 2020 2020 WIN0C03814 GAA 2020 May 7, 2020 Cordillera Administrative Region CAR - Regional Office
From: Kennon Rd - K0235 + 000 - K0235 + 095, K0235 + 095 - K0235 + 147, K0235 + 147 - K0235 + 208, K0235 + 406 - K0235 + 422, K0235 + 406 - K0235 + 494; Physical Target: CW1 : 10,035 Square meters; Allocation= Php 169,185,000

To: Kennon Rd - K0235+410 - K0235+480, K0235+834 - K0236+016; Physical Target: CW1 : 9,389.24 Square meters; Allocation= Php 169,185,000
May 20, 2020 2020 WIN0C03812 FY 2020 GAA January 7, 2020 Region III Bataan 1st District Engineering Office
OO-1 - Ensure Safe and Reliable National Road System - Network Development Program - Off - Carriageway Improvement - Tertiary Roads

Jct. Layac - Balanga - Mariveles Port Rd - K0103 + 180 - K0103 + 400, K0112 + 293 - K0112 + 840, K0116 + 193.50 - K0116 + 790.13
May 20, 2020 2020 WIN0C03812 FY 2020 GAA January 7, 2020 Region III Bataan 1st District Engineering Office
OO-1 - Ensure Safe and Reliable National Road System - Network Development Program - Off - Carriageway Improvement - Tertiary Roads

Jct. Layac - Balanga - Mariveles Port Rd - K0103 + 180 - K0103 + 400, K0112 + 293 - K0112 + 840, K0116 + 193.50 - K0116 + 790.13
May 20, 2020 2020 WIN0C03812 FY 2020 GAA January 7, 2020 Region III Bataan 1st District Engineering Office
OO-1 - Ensure Safe and Reliable National Road System - Network Development Program - Off - Carriageway Improvement - Tertiary Roads

Jct. Layac - Balanga - Mariveles Port Rd - K0103 + 180 - K0103 + 400, K0112 + 293 - K0112 + 840, K0116 + 193.50 - K0116 + 790.13
May 20, 2020 2020 WIN0C03812 FY 2020 GAA January 7, 2020 Region III Bataan 1st District Engineering Office
OO-1 - Ensure Safe and Reliable National Road System - Network Development Program - Off - Carriageway Improvement - Tertiary Roads

Jct. Layac - Balanga - Mariveles Port Rd - K0103 + 180 - K0103 + 400, K0112 + 293 - K0112 + 840, K0116 + 193.50 - K0116 + 790.13
May 18, 2020 2020 WIN0C03811 FY 2020 GAA January 7, 2020 Region III Bataan 1st District Engineering Office
OO-1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

Jose Abad Santos Ave (JASA) - K0102 + 000 - K0102 + 680, K0102 + 756 - K0103 + 184.80
May 18, 2020 2020 WIN0C03809 FY 2020 GAA January 7, 2020 Region III Bataan 1st District Engineering Office
OO-1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damage Paved Roads - Primary Roads

Jose Abad Santos Ave (JASA) - K0107 + 973 - K0108 + 070
May 15, 2020 2020 WIN0G02846 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Agusan del Norte District Engineering Office
FROM:

UACS No. 310106100534000
Project ID: P00400588MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Agusan-Malaybalay Rd - K1271 + (-756) - K1271 + 000, K1274 + 211 - K1275 + 000

Type of Work/Physical Target:
CW1- Reconstruction to Concrete Pavement - 3.156 Lane Km

Unit Cost: P12.110266M/Lane Km

Allocation: P38,220,000

EAO: P780,000

TOTAL: P39,000,000

TO:

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Agusan-Malaybalay Rd - K1271 + (-756) - K1271 + 054, K1271 + 104 - K1271 + 203 - K1274 + 211 - K1275 + 132

Type of Work/Physical Target:
CW1- Reconstruction to Concrete Pavement - 3.704 Lane Km

Unit Cost: P10.318574M/Lane Km

Allocation: P38,220,000

EAO: P780,000

TOTAL: P39,000,000
May 15, 2020 2020 WIN0G02840 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Agusan del Norte District Engineering Office
UACS No. 310201100635000
Project ID: P00401505MN

FROM:

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads

Daang Maharlika (Surigao-Agusan Section) - K1196 + 212 - K1196 + 633, K1196 + 851 - K1197 + 416

Type of Work/Physical Target:
CW1- Road Widening - 1.411 Lane Km

Unit Cost: P17.445528M/Lane Km

Allocation: P24,615,640

EAO: P502,360

TOTAL: P25,118,000

TO:

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Daang Maharlika (Surigao-Agusan Section) - S00399MN, K1196 + 212 - K1196 + 628, K1196 + 856 - K1197 + 416

Type of Work/Physical Target:
CW1- Road Widening - 1.467 Lane Km

Unit Cost: P16.779577M/Lane Km

Allocation: P24,615,640

EAO: P502,360

TOTAL: P25,118,000
May 15, 2020 2020 WIN0G02841 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Agusan del Norte District Engineering Office
UACS No. 310201100634000
Project ID: P00400136MN

FROM:

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1272 + 867 - K1274 + 000

Type of Work/Physical Target:
CW1- Road Widening - 2.276 Lane Km

Unit Cost: P17.223199M/Lane Km

Allocation: P39,200,000

ROW Acquisition: 13,656.00 sq.m.

Unit Cost: P732.28/sq.m.

Allocation: P10,000,000

EAO: P800,000

TOTAL: P50,000,000

TO:

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - S00391MN, K1269 + 004.50 - K1269 + 122 + K1272+867 - K1274+000

Type of Work/Physical Target:
CW1- Road Widening - 2.511 Lane Km

Unit Cost: P15.611310M/Lane Km

Allocation: P39,200,000

ROW Acquisition: 13,656.00 sq.m.

Unit Cost: P732.28/sq.m.

Allocation: P10,000,000

EAO: P800,000

TOTAL: P50,000,000
May 15, 2020 2020 WIN0G02845 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Agusan del Norte District Engineering Office
UACS No. 300103202967000
Project ID: P00442810MN

FROM:

LOCAL PROGRAM - Buildings And Other Structures - Multipurpose / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Two-Storey Battalion Office and Personnel Barracks, Santiago, Agusan del Norte

Type of Work/Physical Target:
CW1- Construction of Other Building - 1 Building

Unit Cost: P24.65680M/Building

Allocation: P24.65680 M

EAO: P503,200 T

TOTAL: P25.160 M

TO:

LOCAL PROGRAM - Buildings And Other Structures - Multipurpose / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Three-Storey Battalion Office and Personnel Barracks, Santiago, Agusan del Norte

Type of Work/Physical Target:
CW1- Construction of Other Building - 1 Building

Unit Cost: P24.65680M/Building

Allocation: P24.65680 M

EAO: P503,200 T

TOTAL: P25.160 M
May 15, 2020 2020 WIN0G02842 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Agusan del Norte District Engineering Office
UACS No. 310101100394000
Project ID: P00400481MN

FROM:

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - - Preventive Maintenance - Primary Roads

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1267 + 578 - K1268 + 000

Type of Work/Physical Target:
CW1- Preventive Maintenance of Road: Asphalt Overlay - 1.716 Lane Km

Unit Cost: P12.881632M/Lane Km

Allocation: P22,104.88M

EAO: P451.12T

TOTAL: P22.556M

TO:

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - - Preventive Maintenance - Primary Roads

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1267 + 578 - K1268 + 654

Type of Work/Physical Target:
CW1- Preventive Maintenance of Road: Asphalt Overlay - 3.024 Lane Km

Unit Cost: P7.309815M/Lane Km

Allocation: P22,104.88M

EAO: P451.12T

TOTAL: P22.556M
May 15, 2020 2020 WIN0G02848 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Agusan del Norte District Engineering Office
UACS No. 310106100535000
Project ID: P00400589MN

FROM:

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Buenavista-Bunaguit Rd - (S00390MN) Chainage 1713 - Chainage 2865

Type of Work/Physical Target:
CW1- Reconstruction to Concrete Pavement - 2.304 Lane Km

Unit Cost: P16.163M/Lane Km

Allocation: P37.240M

EAO: P760.0T

TOTAL: P38.0M

TO:

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Buenavista-Bunaguit Rd - (S00390MN) Chainage 1713 - Chainage 1925.68

Type of Work/Physical Target:
CW1- Reconstruction to Concrete Pavement - 1.879 Lane Km

Unit Cost: P19.819M/Lane Km

Allocation: P37.240M

EAO: P760.0T

TOTAL: P38.0M
May 15, 2020 2020 WIN0G02847 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Agusan del Norte District Engineering Office
UACS No. 310104100265000
Project ID: P00400586MN

FROM:

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1270 + 781 - K1271 + 000, K1272 + 172 - K1272 + 653, K1274 + 000 - K1274 + 800

Type of Work/Physical Target:
CW1- Reconstruction to Concrete Pavement - 3.008 Lane Km

Unit Cost: P11.513045M/Lane Km

Allocation: P34,631,240M

EAO: P760.760T

TOTAL: P35.3380M

TO:

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1261+179 - K1261+314, K1261+364 - K1261+445.50, K1270 + 781 - K1271 + 000, K1272 + 172 - K1272 + 653, K1274 + 000 - K1274 + 800

Type of Work/Physical Target:
CW1- Reconstruction to Concrete Pavement - 3.441 Lane Km

Unit Cost: P10,064.295M/Lane Km

Allocation: P34,631,24M

EAO: P760.760T

TOTAL: P35.3380M
May 11, 2020 2020 WIN0C03795 FY 2020 GAA January 7, 2020 Region III Tarlac 2nd District Engineering Office
OO-1 - Ensure Safe and Reliable National Road System - Network Development Program - Off Carriageway Improvement - Tertiary Roads

Tarlac - Zambales Rd - K0115 + 000 - K0115 + 840, K0116 + 740 - K0118 + 110, K0119 + 210 - K0119 + 280
May 11, 2020 2020 WIN0C03789 FY 2020 GAA January 7, 2020 Region III Tarlac 2nd District Engineering Office
Local Program - Local Infrastructure Program - Local Roads and Bridges - Local Roads -

Concreting of Local Road, Brgy. Balanoy - Brgy. Dumarais, La Paz, Tarlac
March 5, 2020 2020 WIN0C03763 FY 2020 GAA January 7, 2020 Region III Regional Office III
001 - Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads

Roman Expressway - K0133+000 - K0134+620, K0135+591 - K0135+959, K0142+728 - K0143+580
March 5, 2020 2020 WIN0C03760 FY 2020 GAA January 7, 2020 Region III Regional Office III
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Nueva Ecija - Aurora Road - K0156+160 - K0156+276
March 5, 2020 2020 WIN0C03762 FY 2020 GAA January 7, 2020 Region III Regional Office III
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Manila North Rd - K0044+500 - K0047+024.45
March 5, 2020 2020 WIN0C03761 FY 2020 GAA January 7, 2020 Region III Regional Office III
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads

Manila North Road - K0119+405.83 - K0122+897
March 5, 2020 2020 WIN0C03759 FY 2020 GAA January 7, 2020 Region III Regional Office III
001 - Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads

Roman Expressway - K0111+407 - K0111+751, K0111+813 - K0112+361, K0112+421 - K0112+670, K0112+730 - K0113+302, K0113+347 - K0113+665
December 6, 2019 CY 2019 WINF05967 UACS No. 300117202450000 May 2, 2019 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 300117202450000
Project ID: P00354148LZ

Local Program
Local-National Roads and Bridges – Local Roads – Local Infrastructure Program

Improvement of Roads Kaingin 1, Barangay Pansol, Quezon City
Physical Target – CW Rehabilitation of Paved Road – 0 lane km
Unit Cost (P’000):
Allocation (P’000): P1,980.00
EAO – P20.00
Total: P2,000,000.00

As Modified
Local Program

Local Program
Local-National Roads and Bridges – Local Roads – Local Infrastructure Program
Improvement of Roads Kaingin 1, Barangay Pansol, Quezon City
Physical Target – CW Rehabilitation of Paved Road – 0.121 lane km
Unit Cost (P’000): P16,363.64/lane km
Allocation (P’000): P1,980.00
EAO – P20.00
Total: P2,000,000.00
WIN9F05967

Pages