Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
September 3, 2019 2019 WIN9C03492 FY 2019 GAA April 29, 2019 Region V Camarines Norte District Engineering Office
UACS No.: 30017203913000
Project ID: P00354943LZ
FROM:
Local Program - Local Roads and Bridges - Local Roads -Local Infrastructure Program - Road Opening (with concreting) of Laniton San Lorenzo Ruiz, Camarines Norte to Laniton, Basud, Camarines Norte
Physical Target:
CW1 - Construction of Gravel Road -
Unit Cost:
Allocation: P 10,000,000.00

TO:
Local Program - Local Roads and Bridges - Local Roads -Local Infrastructure Program - Road Opening (with concreting) of Laniton San Lorenzo Ruiz, Camarines Norte to Laniton, Basud, Camarines Norte
Physical Target:
CW1 - Construction of Concrete Road - 0.80Lane.Km
Unit Cost: P 12,375,000.00/ Lane Km
Allocation: P 10,000,000.00
September 3, 2019 2019 WIN9C03474 FY 2019 GAA April 29, 2019 Region V Masbate 1st District Engineering Office
UACS No.: 310108100246000
Project ID: P00304483LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Sn Fernando North Rd - K0005+160 - K0005+230, K0026+ 730 - K0026+ 795, K0026+849 - K0026+910
Physical Target:
CW1 - Construction of Road Slope Protection Structure -
Unit Cost:
Allocation: P 6,000,000.00

TO:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Sn Fernando North Rd - K0005+160 - K0005+230, K0026+ 730 - K0026+ 795, K0026+849 - K0026+910
Physical Target:
CW1 - Construction of Road Slope Protection Structure - 523.00 Sq.M.
Unit Cost: P11,243.00/Square Meter
Allocation: P 6,000,000.00
September 3, 2019 2019 WIN9C03485 FY 2019 GAA April 29, 2019 Region V Masbate 1st District Engineering Office
UACS No.: 310109100229000
Project ID: P00304495LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads -
Tertiary Roads - Sn Fernando-Talisay Rd- K0002+119 - K0002+191, K0005+657 - K0005+858
Physical Target:
CW1 - Construction of Road Slope Protection Structure -
Unit Cost:
Allocation: P 8,000,000.00

TO:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads -
Tertiary Roads - Sn Fernando-Talisay Rd- K0002+119 - K0002+191, K0005+657 - K0005+858
Physical Target:
CW1 - Construction of Road Slope Protection Structure - 719.00Sq.M.
Unit Cost: P 10,904.00/Square Meter
Allocation: P 8,000,000.00
September 3, 2019 2019 WIN9C03580 SR2019-07-006480 July 8, 2019 Region III Bataan 2nd District Engineering Office
Asset Preservation Program
Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads

Bagac-Mariveles Rd
K0182+600 - K0182+750, K0187+900 - K0188+100, K0188+800 - K0189+000, K0189+680 - K0190+220
September 3, 2019 2019 WIN9C03611 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation/ Improvement of Saplad River Sta. 0+000 - Sta. 0+320 at Minalin and Macabebe, Pampanga
September 3, 2019 2019 WIN9C03617 FY 2019 GAA (RA 11260) April 15, 2019 Region III Pampanga 1st District Engineering Office
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation/ Improvement of Dawe River Sta. 0+424 - Sta. 0+527 at Minalin, Pampanga
September 3, 2019 2019 WIN9C03615 SR2019-07-006622 July 8, 2019 Region III Pampanga 1st District Engineering Office
Asset Preservation Program
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Manila North Rd
K0057+920 - K0058+140, K0058+275 - K0059+000, K0063+800 - K0064+018
September 3, 2019 2019 WIN9C03613 FY 2019 GAA (RA 11260) April 15, 2019 Region III Pampanga 3rd District Engineering Office
Asset Preservation Program
Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

Friendship Circum Rd (West Circum Rd)
K0084+124 - K0084+315 (L/S),
K0086+600 - K0086+780 (R/S)
September 3, 2019 2019 WIN9C03593 FY 2019 GAA (RA 11260) April 15, 2019 Region III Pampanga 3rd District Engineering Office
Network Development Program - Construction of Bypass and Diversion Roads

Construction of Anunas By-pass Road
September 3, 2019 2019 WIN9C03596 FY 2019 GAA (RA 11260) April 15, 2019 Region III Pampanga 3rd District Engineering Office
Network Development Program - Construction of Bypass and Diversion Roads

Construction of Anunas-Cuayan By-pass Road
September 3, 2019 2019 WIN9C03607 FY 2019 GAA (RA 11260) April 15, 2019 Region III Pampanga 3rd District Engineering Office
Local Roads and Bridges - Local Bridges

Widening of Pulung Cutud Bridge along Angeles-Magalang Road, Angeles City, Pampanga
September 3, 2019 2019 WIN9C03576 FY 2019 GAA April 15, 2019 Region III Zambales 1st District Engineering Office
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Malabon-Malimanga-Sinabacan Flood Control Phase 1, Candelaria, Zambales
September 3, 2019 2019 WIN9C03635 FY 2019 GAA (RA 11260) April 15, 2019 Region III Zambales 1st District Engineering Office
Construction/ Rehabilitation o0f Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Slope Protection/ Flood Control at Nayum Upstream, South Approach, Sta. 0+338.50 - Sta. 0+760.50, Sta. Cruz, Zambales
September 3, 2019 2019 WIN9C03619 FY 2019 GAA (RA 11260) April 15, 2019 Region III Aurora District Engineering Office
Network Development - Off-Carriageway Improvement - Tertiary Roads

A. Castaneda-Ma. Aurora-Sn Luis Rd
K0199+150 - K0199+300, K0199+318 - K0199+865.60,
K0199+903 - K0200+064.75, K0200+252.30 - K0200+483,
K0202+560 - K0202+701.45, K0202+768 - K0203+178.60,
K0203+423 - K0203+671, K0203+687 - K0203+775,
K0204+727 - K0204+960, K0205+160 - K0205+574.40,
K0205+629 - K0205+958, K0205+975.70 - K0206+340
September 3, 2019 2019 WIN9C03623 SR2019-07-006419 July 6, 2019 Region III Regional Office III
Asset Preservation
Preventive Maintenance - Secondary Roads

Baler-Casiguran Rd (Baler-Dinadiawan)
K0231+(-382) - K0232+236, K0234+699 - K0237+371
September 3, 2019 2019 WIN9C03628 FY 2019 GAA (RA 11260) April 15, 2019 Region III Aurora District Engineering Office
Asset Preservation
Preventive Maintenance - Tertiary Roads

A. Castaneda-Ma Aurora-Sn Luis Rd
K0208+000 - K0209+374.80
September 3, 2019 FY 2019 GAA WIN9G02692 FY 2019 GAA RA 11260 January 1, 2019 Region XI Davao de Oro 1st District Engineering Office
FROM: Local Program - National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Repair/Rehabilitation/Improvement (Asphalt Overlay) along Daang Maharlika Road,
K1387+978 - K1392+000; K1386+000 - K1387+168.20;
K1382+654.40; K1385+168.20, Compostela Valley
Physical Target:
CW1: 15.478 Lane Km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Rehabilitation of Concrete Road)
EAO: P 3,500,000.00

TO: Local Program - National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Repair/Rehabilitation/Improvement (Asphalt Overlay) along Daang Maharlika Road,
K1396+251 - K1397+120; K1398+167 - K1401+776;
K1403+143 - K1406+603, Compostela Valley
Physical Target:
CW1: 15.922 Lane Km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Rehabilitation of Concrete Road)
EAO: P 3,500,000.00
September 3, 2019 FY 2019 GAA WIN9G02685 FY 2019 GAA RA 11260 January 1, 2019 Region XI Davao de Oro 1st District Engineering Office
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Secondary Roads
Compostela-Cateel Rd (Compostela Side) -
K1612+500 - K1613+540, K1613+700 - K1615+500,
K1615+690 - K1616+434
Physical Target:
CW1: 4.548 Lane Km (Road Widening)
ROW: 34,400.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 55,600,000.00
CW1: P 49,794,000.00 (Road Widening)
ROW: P 4,000,000.00 (ROW Acquisition)
EAO: P 1,806,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Secondary Roads
Compostela-Cateel Rd (Compostela Side) -
K1612+500 - K1613+540, K1613+700 - K1615+500,
K1615+690 - K1616+104
Physical Target:
CW1: 4.548 Lane Km (Road Widening)
ROW: 34,400.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 55,600,000.00
CW1: P 49,794,000.00 (Road Widening)
ROW: P 4,000,000.00 (ROW Acquisition)
EAO: P 1,806,000.00
September 2, 2019 2019 WIN9C03551 SR2019-07-005857 July 4, 2019 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Acop-Kapangan-Kibungan-Bakun Road K0345+600 – K0345+700;
Physical Target: CW1 : 5,168.523 Sq. M.
CW2 : 14,258.714 Sq. M.;
Allocation= Php 93,966,000

To: Acop-Kapangan-Kibungan-Bakun Road K0345+600 – K0345+700;
Physical Target: CW1 : 5,338.978 Sq. M.;
Allocation= Php 93,966,000

August 30, 2019 2019 WIN9C03540 FY 2019 GAA April 15, 2019 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Concreting of Road Palmayo, Floridablanca, Pampanga
August 30, 2019 2019 WIN9C03519 FY 2019 GAA April 15, 2019 Region III Zambales 2nd District Engineering Office
Flood Management Program - Construction / Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Repair / Rehabilitation / Improvement of Matain River Revetment, Subic, Zambales
August 30, 2019 2019 WIN9C03570 FY 2019 GAA April 15, 2019 Region III Zambales 2nd District Engineering Office
Flood Management Program - Construction / Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Repair / Rehabilitation / Improvement of Sta. Fe River Revetment, San Marcelino, Zambales
August 30, 2019 2019 WIN9G02707 FY2019 GAA RA 11260 April 29, 2019 Region XIII Butuan City District Engineering Office
UACS No. 310203100245000
Project ID: P00300287MN

FROM:

OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Roads

Butuan City-Malaybalay Rd - K1261 + 553 - K1261 + 952, K1261 + 989 - K1262 + 114, K1262 + 114 - K1263 + 119

CW1- Road Widening / 3.02 lane-km P12.81788M/lane-km P38.710M

ROW Acquisition / 30,200 sq.m. P38.84/sq.m. P1.173M

EAO- P790.0T

Total: P40.673M

TO:

OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Roads

Butuan City-Malaybalay Rd - K1261 + 841 - K1261 + 952, K1261 + 989 - K1263 + 119

CW1- Road Widening / 2.444 lane-km P15.83879M/lane-km P38.710M

ROW Acquisition / 24,440 sq.m. P47.99/sq.m. P1.173M

EAO- P790.0T

Total: P40.673M
August 30, 2019 2019 WIN9G02699 FY2019 GAA RA 11260 April 29, 2019 Region XIII Butuan City District Engineering Office
UACS No. 310109100173000
Project ID: P00300574MN

FROM:

OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Butuan City-Pianing-Tandag Rd - K1247 + 920 - K1247 + 942, K1248 + 360 - K1248 + 390, K1249 + 080 - K1249 + 110, K1248 + 480 - K1249 + 570.80

CW1 - Construction of Road Slope Protection Structure / 4,492.80 sq.m.

Unit Cost: P13.96T/sq.m.

Allocation: P62.7250M

EAO - P2.2750M

Total: P65.0M

TO:

OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Butuan City-Pianing-Tandag Rd - K1247 + 920 - K1247 + 942, K1248 + 360 - K1248 + 390, K1249 + 080 - K1249 + 110, K1249 + 480 - K1249 + 570.80

CW1 - Construction of Road Slope Protection Structure / 4,492.80 sq.m.

Unit Cost: P13.96T/sq.m.

Allocation: P62.7250M

EAO - P2.2750M

Total: P65.0M
August 29, 2019 2019 WIN9C03579 FY 2019 GAA April 15, 2019 Region III Bulacan 1st District Engineering Office
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads

Gen Alejo Santos Highway
K0047+300 - K0050+461.75
August 29, 2019 2019 WIN9C03586 FY 2019 GAA April 15, 2019 Region III Bulacan 1st District Engineering Office
Asset Preservation - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads

Plaridel - Pulilan Div Rd
K0042+013 - K0042+299
August 29, 2019 2019 WIN9C03581 FY 2019 GAA April 15, 2019 Region III Bulacan 1st District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads

Plaridel - Pulilan Div Rd
K0042+330 - K0042+533
August 29, 2019 2019 WIN9C03585 FY 2019 GAA April 15, 2019 Region III Bulacan 1st District Engineering Office
Construction / Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Repair / Rehabilitation / Improvement of Flood Control Structures along Bocaue River, Turo Section, Bocaue, Bulacan Sta. 0+000 - Sta. 0+152.40
August 28, 2019 FY - 2019 WIN9F05886 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Mindoro Occidental District Engineering Office
UACS No. 300116201795000
Project ID: P00353885LZ

Local program

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:

Concreting of Brgy. Road, Sitio Looban,
Brgy. San luis, Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road: 1.0 lane-Km
Unit Cost - Php 9,800/ lane-km
Allocation - Php 10.00 Million

TO:

Concreting of Brgy. Road, Sitio Looban,
Brgy. San Luis, Mamburao, Occidental Mindoro
CW1 - Concreting of Concrete Road : 1.564 Lane-Km
Unit Cost - Php 6,265.98/ Lane-km
Allocation - 10.00 Million
August 28, 2019 2019 300117203014000 GAA FY2019 May 2, 2019 Region II Isabela 4th District Engineering Office Concreting of Barangay Raniag to Barangay Villa Marcos in Ramon, Isabela
August 28, 2019 FY - 2019 WIN9F05887 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Mindoro Occidental District Engineering Office
UACS No. 300117203757000
Project ID: P00354834LZ

Local Program

Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM:

Concreting of Barangay Road, Farn1, Brgy. Tayamaan,
Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road: 0.450 Lane-Km
Unit Cost - Php 6,600/ Lane-km
Allocation - Php 3.00 Million

TO:

Concreting of Barangay Road, Farm1, Brgy. Tayamaan,
Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road : 0.600 Lane-Km
Unit Cost - Php 4,950/ lane-km
Allocation - Php 3.00 Million
August 28, 2019 FY - 2019 WIN9F05887 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Mindoro Occidental District Engineering Office
UACS No. 300117203757000
Project ID: P00354834LZ

Local Program

Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM:

Concreting of Barangay Road, Farn1, Brgy. Tayamaan,
Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road: 0.450 Lane-Km
Unit Cost - Php 6,600/ Lane-km
Allocation - Php 3.00 Million

TO:

Concreting of Barangay Road, Farm1, Brgy. Tayamaan,
Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road : 0.600 Lane-Km
Unit Cost - Php 4,950/ lane-km
Allocation - Php 3.00 Million
August 28, 2019 FY - 2019 WIN9F05888 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Mindoro Occidental District Engineering Office
UACS No. 300112200051000
Project ID: P00353637LZ

Local Program

National Roads and Bridges - National Roads -
Local Infrastructure Program

FROM:

Construction/Rehabilitation/Concreting of
Poblacion - Ipol - Canturay Road, Paluan,
Occidental Mindoro
CW1 - Construction of Concrete Road ; 7.53 Lane-Km
Unit Cost - Php 13,147.41/ Lane-km
Allocation - 100.00 Million

TO:

Construction/Rehabilitation/Concreting of
Poblacion - Ipol - Canturay Road, Paluan,
Occidental Mindoro
CW1 - 6.88 Lane-km
Unit Cost - Php 14,389.53/ lane-km
Allocation - Php 100.00 Million
August 28, 2019 2019 WIN9C03467 FY 2019 GAA April 15, 2019 Region III Zambales 2nd District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads

Olongapo - Bugallon Rd - K0139+000 - K0139+714, K0140+000 - K0141+757, K0141+981 - K0142+320, K0142+562 - K0143+060, K0143+287 - K0143+660, K0146+180 - K0146+798.4, K0149+877 - K0150+303
August 28, 2019 FY - 2019 WIN9F05861 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Marinduque District Engineering Office
UACS No. 300112200050000
Project ID: P00353636LZ

Local Program

National Roads and Bridges - National Roads -
Local infrastructure Program

Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse, and Landslide
Tigwi - Dampulan - Lipata - Yook - Buenaventura Road,
K0092+402 - K0092+654,
Torrijos, Marinduque
CW1 - Construction of Road Slope Protection Structure
3,840.00 sq.m.
Unit Cost - Php 25.781/ sq.m.
Allocation - Php 100.00 Million

TO:

Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse, and Landslide
Tigwi - Dampulan - Lipata - Yook - Buenavista Road
K0092+402 - K0092+840,
Buenavista, Marinduque
CW1 - Construction of Road Slope Protection Structure
4,336.00 sq.m.
Unit Cost - Php 22.832/ sq.m.
Allocation - Php 100.00 Million



August 28, 2019 FY - 2019 WIN9F05893 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Marinduque District Engineering Office
UACS No. 300112200045000
Project ID: P00353631LZ

Local program

National Roads and Bridges - National Roads -
Local Infrastructure Program

FROM:

Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse, and Landslide
Marinduque Circumferential Road,
K0013+750 - K0013+830,
K0015+800 - K0015+880,
Mogpog, Marinduque
CW1 - Construction of Road Slope Protection Structure
2,840.00 sq.m.
Unit Cost - Php 25.796/ sq.m.
Allocation - Php 74.00 Million

TO:

Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse, and Landslide
Marinduque Circumferential Road,
K0010+462 - K0010+581,
K0015+875 - K0015+932,
K0016+040 - K0016+100,
Mogpog, Marinduque
CW1 - Construction of Road Slope Protection Structure
3,311.00 sq.m.
Unit Cost - Php 22.126/ sq.m.
Allocation - Php 74.00 Million
August 28, 2019 2019 WIN9C03483 FY 2019 GAA April 15, 2019 Region III Zambales 2nd District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

Jose Abad Santos Ave. - K0125+000 - K0125+888
August 28, 2019 2019 WIN9C03468 FY 2019 GAA April 15, 2019 Region III Zambales 2nd District Engineering Office
Network Development Program - Off-Carriageway Improvement - Secondary Roads

Olongapo - Bugallon Rd - K0134+071 - K0134+980, K0137+980 - K0139+000
August 27, 2019 2019 WIN9C03578 FY 2019 GAA April 15, 2019 Region III Nueva Ecija 1st District Engineering Office
Asset Preservation - Preventive Maintenance - Secondary Roads

Nueva Ecija - Pangasinan Rd - K0157+241 - K0157+781, K0155+265 - K0155+555, K0138+(-006) - K0138+877, K0139+000 - K0139+703, K0146+403 - K0146+802, K0149+034 - K0149+297
August 27, 2019 FY 2019 WIN9G02708 320101102705000 July 30, 2019 Region IX Regional Office IX
UACS No. 320101102705000
Project ID: P00320226MN

OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Channelization of Putik River with Major Training Works, Zamboanga City

Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 507.64 ln.m.
Unit Cost: P 117,582.27/ln.m.
EAO: P 2,165,450.00
Excess: P 15,088.33
Allocation: P 61,870,000.00
August 27, 2019 FY 2019 WIN9G02714 310204100492000 July 18, 2019 Region IX Regional Office IX
UACS No. 310204100492000
Project ID: P00303797MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads

Labangan-Pagadian City-Dumalinao By-Pass Road, Package 2, Zamboanga del Sur

Physical Target:
CW-1 - Construction of Concrete Road: 4.36 lane km.
Unit Cost: P 13,680,000.00/lane km.
Physical Target:
ROW: 16,666.667 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 2,087,656.89
Excess: P 265,003.53
Allocation: P 67,000,000.00
August 27, 2019 FY 2019 WIN9G02698 310212100089000 July 18, 2019 Region IX Regional Office IX
UACS No. 310212100089000
Project ID: P00300030MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Tertiary Roads

Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road -
Ch. 1800 - Ch. 2440

Physical Target:
CW-1 - Paving of Unpaved Roads: 1.28 lane km.
Unit Cost: P 22,620,000.00/lane km.
EAO: P 1,013,250.00
Excess: P 36,750.00
Allocation: P 30,000,000.00
August 23, 2019 FY 2019 GAA WIN9G02710 FY 2019 GAA RA 11260 January 1, 2019 Region XI Davao Oriental 1st District Engineering Office
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation -
Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd -
K1514+(-267) - K1514+581, K1521+620 - K1521+825,
K1523+000 - K1524+000, K1528+000 - K528+579
Physical Target:
CW1: 5.636 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 99,323,000.00
CW1: P 95,846,695.00 (Reconstruction to Concrete Pavement)
EAO: P 3,476,305.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation -
Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd -
K1514+(-267) - K1514+(-192), K1514+(-912) - K1514+182,
K1514+182 - K1514+581, K1521+620 - K1521+825,
K1523+000 - K1524+000, K1528+000 - K528+579
Physical Target:
CW1: 5.226 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 99,323,000.00
CW1: P 95,846,695.00 (Reconstruction to Concrete Pavement)
EAO: P 3,476,305.00
August 23, 2019 FY 2019 GAA WIN9G02709 FY 2019 GAA RA 11260 January 1, 2019 Region XI Davao Oriental 2nd District Engineering Office
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program -
Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way -
K1769+000 - K1771+979, K1702+192 - K1703+484
Physical Target:
CW1: 4.300 Lane Km (Road Widening)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Road Widening)
EAO: P 2,100,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program -
Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way -
K1769+200 - K1769+600, K1770+200 - K1771+000,
K1772+600 - K1773+603
Physical Target:
CW1: 4.485 Lane Km (Road Widening)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Road Widening)
EAO: P 2,100,000.00
August 23, 2019 FY 2019 GAA WIN9G02687 FY 2019 GAA RA 11260 January 1, 2019 Region XI Davao del Sur District Engineering Office
FROM: Local Program - Local Roads and Bridges - Local Roads -
Local Infrastructure Program
Concreting of Road with Drainage (500m), Poblacion, Bansalan, Davao del Sur
Physical Target:
CW1: 0.400 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Concrete Road)
EAO: P 30,000.00

TO: Local Program - Local Roads and Bridges - Local Roads -
Local Infrastructure Program
Concreting of Road with Drainage, Poblacion, Bansalan, Davao del Sur
Physical Target:
CW1: 0.400 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Concrete Road)
EAO: P 30,000.00
August 23, 2019 FY - 2019 WIN9F05858 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Marinduque District Engineering Office
UACS No. 300112200049000
Project ID: P00353635LZ

Local Program

National Roads and Bridges - National Roads -
Local Infrastructure Program

FROM:

Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse, and Landslide
Tigwi - Dampulan - Lipata - Yook - Buenaventura Road
K0092+150 - K0092+402
Torrijos, Marinduque
CW1 - Construction of Road Slope Protection Structure
3,840.00 sq.m.
Unit Cost - Php 25.781/ sq.m.
Allocation - Php 100.00 Million

TO:

Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse, and Landslide
Tigwi - Dampulan - Yook - Lipata - Buenavista Road
K0092+110 - K0092+402
Buenavista, Marinduque
CW1 - Construction of Road Slope Protection Structure
4,644.00 sq.m.
Unit Cost - Php 21.318/ sq.m.
Allocation - Php 100.00 Million
August 23, 2019 FY - 2019 WIN9F05854 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Romblon District Engineering Office
UACS No. 300117203813000
Project ID: P00354869LZ

Local Program

Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM:

Concreting of Sitio Suong Barangay Carmen Access Road,
Brgy. Carmen, San Agustin, Romblon
CW1 - Construction of Concrete Road: 0.320 Lane-km
Unit Cost - Php 10,828.13/ Lane-km
Allocation - 3.50 Million

TO:

Concreting of Sitio Suong Barangay Carmen Access Road,
Brgy. Carmen, San Agustin, Romblon
CW1 - Concreting of Concrete Road : 0.260 lane-km
Unit Cost - Php 13,326.92/ Lane-km
Allocation - Php 3.50 Million

August 23, 2019 FY - 2019 WIN9F05851 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Romblon District Engineering Office
UACS No. 300107200477000
Project ID: P00353451LZ

Local Program

Flood Control and Drainage - Flood Control Structures/Facilities
Local Infrastructure Program

FROM:

Construction of Seawall in Sto. Sapangpalay,
Brgy. Masudsud, Concepcion, Romblon
CW1 - Construction of Flood Mitigation Structure :
30.00 linear meters
Unit Cost - Php 165.00/ linear meters
Allocation - Php 5.00 Million

TO:

Construction of Seawall in Sto. Sapangpalay,
Brgy. Masudsud, Concepcion, Romblon
CW1 - Construction of Flood Mitigation Structure :
51.00 linear meters
Unit Cost - Php 97.06/ linear meters
Allocation - Php 5.00 Million


August 23, 2019 FY 2019 GAA WIN9G02691 FY 2019 GAA RA 11260 January 1, 2019 Region XI Davao del Norte District Engineering Office
FROM: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Multi-Purpose Building, Sitio Bagale, Barangay Dujali, B.E. Dujali, Davao del Norte
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 2,500,000.00
CW1: P 2,450,000.00 (Construction of Multi-Purpose Building)
EAO: P 50,000.00

TO: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Multi-Purpose Building, Sitio Bacali, Barangay Dujali, B.E. Dujali, Davao del Norte
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 2,500,000.00
CW1: P 2,450,000.00 (Construction of Multi-Purpose Building)
EAO: P 50,000.00
August 22, 2019 FY - 2019 WIN9F05840 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Marinduque District Engineering Office
UACS No. 300112200046000
Project ID: P00353632LZ

Local Program

National Roads and Bridges - National Roads -
Local Infrastructure Program

FROM:

Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse, and Landslides
Marinduque Circumferential road
K0021+883 - K0022+020,
Sta. Cruz, Marinduque
CW1 - Construction of Road Slope Protection Structure
2,265.00 sq.m.
Unit Cost - Php 25.788/ sq.m.
Allocation - 59.00 Million

TO;

Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse, and Landslides
Marinduque Circumferential Road
K0021+820 - K0022+020
Sta. Cruz, Marinduque
CW1 - Construction of Road Slope Protection Structure
2,588.00 sq.m.
Unit Cost - Php 22.579/sq.m.
Allocation - Php 59.00 Million
August 22, 2019 FY - 2019 WIN9F05844 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Romblon District Engineering Office
UACS No. 300203100698000
Project ID: P00330310LZ

Convergence and Special Support Program

Convergence and Special Support -
Construction/Improvement of Access Roads leading to
Declared Tourism Destination

FROM:

Malbog Junction Sta. Fe - Guinbirayan Provincial Road
leading to Sta. Fe Beaches, Sta. Fe, Romblon
CW1 - Construction of Concrete Road ; 5.18 lane-km
Unit Cost - Php 13,040.54/Lane-km
Allocation - 70.00 Million

TO:

Malbog Junction Sta. Fe - Guibirayan Provincial Road
leading to Sta. Fe Beaches, Sta. Fe, Romblon
CW1 - Construction of Concrete Road : 3.032 Lane-km
Unit Cost - Php 22,279.02/Lane-km
Allocation - Php 70.00 Million
August 22, 2019 2019 310212100084000 GAA FY2019 May 2, 2019 Region II Regional Office II
Network Development - Paving of Unpaved Roads - Tertiary Roads - Jct. Abbag-Nagtipunan-Nueva Vizcaya Rd via Dupax Quirino - (S04764LZ) Chainage 2373.22 - Chainage 3598, Chainage 4019 - Chainage 5216
August 22, 2019 2019 310205100341000 GAA FY2019 May 2, 2019 Region II Regional Office II
Network Development - Construction of Missing Links/ New Roads - Roxas - Paracelis Road, Isabela
August 22, 2019 2019 300117202949000 GAA FY2019 May 2, 2019 Region II Isabela 1st District Engineering Office
Local Roads and Bridges - Local Roads - Local Infrastructure Program - Rehabilitation of Barangay Paliueg Road, Brgy. Paliueg, Ilagan City, Isabela
August 22, 2019 FY - 2019 WIN9F05843 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Romblon District Engineering Office
UACS No. 300106200213000
Project ID: P00340235LZ

Local Program

Flood Control and Drainage - Flood Control Structures/Facilities -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:

Construction of Seawall along Tablas Circumferential Road,
KM 33+520 - Km 34+450
CW1 - Construction of Flood Mitigation Structure :
378.70 linear meters
Unit Cost _ Php 129.39/linear meters
Allocation - Php 50.00 Million

TO:

Construction of Seawall along Tablas Circumferential Road
K0033+520 - K0033+898.70
CW1 - Construction of Flood Mitigation Structure :
378.70 linear meters
Unit Cost - 129.39/linear meters
Allocation - 50.00 Million
August 22, 2019 2019 300117202947000 GAA FY2019 May 2, 2019 Region II Isabela 1st District Engineering Office
Local Roads and Bridges - Local Roads - Local Infrastructure Program - Rehabilitation of Barangay Cabisera 6-24, City of Ilagan - Sitio Yeban, Benito Soliven, Isabela
August 22, 2019 2019 320102100615000 GAA FY2019 May 2, 2019 Region II Cagayan 2nd District Engineering Office
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers - Construction of Abulug River Control, Lucban, Abulug, Cagayan
August 22, 2019 FY - 2019 WIN9F05841 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Marinduque District Engineering Office
UACS No. 300104208488000
Project ID: P00350505LZ

Local Program

Buildings and Other Structures - Multipurpose/Facilities -
National Building Program

FROM:

Construction of Multi-Purpose Building (Covered Court),
Barangay Bintakay, Mopog, Marinduque
CW1 - Number of Buildings
Unit Cost - Php 6,435.00/building
Allocation - Php 6.00Million

TO:

Construction of Multi-Purpose Building (Covered Court),
Barangay Bintakay, Mogpog, Marinduque
CW1 - Number of Buildings
Unit Cost - Php 6,435.22/building
Allocation - 6.50 Million
August 22, 2019 2019 310212100102000 GAA FY2019 May 2, 2019 Region II Cagayan 2nd District Engineering Office
Network Development - Paving of Unpaved Roads - Tertiary Roads - Jct Logac-Lasam-Gagabutan Rd - (S00654LZ) - K0742+188 - K0742+904, K0743+857 - K0744+800
August 22, 2019 2019 310212100083000 GAA FY2019 May 2, 2019 Region II Cagayan 2nd District Engineering Office
Network Development - Paving of Unpaved Roads - Tertiary Roads - Jct Logac-Lasam-Gagabutan Rd (S00656LZ) - Chainage 17288 - Chainage 17408, Chainage 17656 - Chainage 20581, Chainage 20994 - Chainage 21138
August 22, 2019 FY - 2019 WIN9F05837 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Marinduque District Engineering Office
UACS No. 320101103505000
Project ID: P00322862LZ

002: Protect Lives and Properties Against Major Floods

Construction/Maintenance of Flood Mitigation Structures
and Drainage Systems

FROM:

Construction of Cabuyo Flood Control Structure,
Sta, 0+970.00 - Sta. 1+770.00
Torrijos, Marinduque
CW1 - Construction of Flood Mitigation/ 434.00 lm
Unit Cost - Php 67.7423/lm
Allocation - 30.00 Million

TO:

Construction of Cabuyo Flood Control Structure
Sta. 0+970.00 - Sta. 1+370.00
Torrijos, Marinduque
CW1 - Construction of Flood Mitigation/ 434.00 lm
Unit Cost - Php 67.742/ lm
Allocation - Php 30.00 Million

August 22, 2019 2019 320102100614000 GAA FY2019 May 2, 2019 Region II Cagayan 2nd District Engineering Office
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers - Construction of Abulug River Control at Sta. Rosa, Abulug, Cagayan
August 22, 2019 2019 300119200173000 GAA FY2019 May 2, 2019 Region II Cagayan 2nd District Engineering Office
Local Roads and Bridges - Local Bridges - Local Infrastructure Program - Construction of Kapanikian Bridge, Sitio Makatagaw, Brgy. Kapanikian, Allacapan, Cagayan
August 22, 2019 2019 320102100267000 GAA FY2019 May 2, 2019 Region II Isabela 3rd District Engineering Office
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Project, Sta. 0+208.80 - Sta. 0+338.80, Centro I, Angadanan, Isabela
August 22, 2019 FY - 2019 WIN9F05847 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Mindoro Occidental District Engineering Office
UACS No. 300103201154000
Project ID: P00340510LZ

Local Program

Buildings and Other Structures - Multipurpose/Facilities -
construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:

Construction of Multi-Purpose Building,
Barahan, San Jose, Occidental Mindoro
CW1 - Construction of Multi-Purpose Building: 1 Bldg.
Unit Cost - Php 2,000.00/ bldg.
Allocation - Php 2.00Million

TO:

Construction of Multi-Purpose Building,
Barahan, Sta. Cruz, Occidental Mindoro
CW1 - Construction of Multi-Purpose Building : 1 Bldg.
Unit Cost - Php 2,000/ bldg
Allocation - php 2.00 Million

August 22, 2019 2019 300117202907000 GAA FY2019 May 2, 2019 Region II Cagayan 3rd District Engineering Office
Local Roads and Bridges - Local Roads - Local Infrastructure Program - Concreting of Road, Brgy. Libag Sur, Tuguegarao City, Cagayan
August 22, 2019 FY - 2019 WIN9F05836 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Mindoro Occidental District Engineering Office
UACS No. 320101101552000
Project ID: P00321120LZ

002: Protect Lives and properties Against major Floods

Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage Systems

FROM:

Construction of Flood Control Structures,
Amnay FC (Kabangkalan Section), Sablayan,
Occidental Mindoro
CW1 - Construction of Flood Mitigation Structure : 186.29 LM
Unit Cost - Php 99.31/Lm
Allocation - Php 18.50 Million

TO:

Construction of Flood Control Structure,
Amnay FC ( Kabangkalan Section ), Sablayan,
Occidental Mindoro
CW1 - Construction of Flood Mitigation Structure : 158.0 Lm
Unit Cost - Php 117.09/Lm
Allocation - Php 18.50 Million
August 22, 2019 2019 310201100376000 GAA FY2019 May 2, 2019 Region II Cagayan 3rd District Engineering Office
Network Development - Road Widening - Primary Roads - Santiago-Tuguegarao Rd - K0436+237 - K0436+264.40, K0436+285.7 - K0436+368
August 22, 2019 2019 300104206951000 GAA FY2019 May 2, 2019 Region II Isabela 1st District Engineering Office
Local - Buildings and Other Structures - Multipurpose/ Facilities - Local Infrastructure Program - Construction of Multi-purpose Building (Covered Court), at Calamagui West, Sta. Maria, Isabela
August 22, 2019 2019 300104206950000 GAA FY2019 May 2, 2019 Region II Isabela 1st District Engineering Office
Local - Buildings and Other Structures - Multipurpose / Facilities - Local infrastructure Program - Construction of LGU Multi-purpose Building, Barangay San Pedro, Tumauini, Isabela
August 22, 2019 2019 300104206953000 GAA FY2019 May 2, 2019 Region II Isabela 1st District Engineering Office
Local - Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of Multi-purpose Building (Covered Court), at Calamagui North, Sta. Maria, Isabela
August 22, 2019 2019 300104206955000 GAA FY2019 May 2, 2019 Region II Isabela 1st District Engineering Office
Local - Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of Multi-purpose Building (Covered Court), at Barangay San Jose, San Pablo, Isabela
August 22, 2019 2019 300117202955000 GAA FY2019 May 2, 2019 Region II Isabela 1st District Engineering Office
Local Roads and Bridges - Local Roads - Local Infrastructure Program - Concreting of Barangay Cabisera 7 to Barangay Paliueg Road, Ilagan City, Isabela
August 22, 2019 2019 300116201627000 GAA FY2019 May 2, 2019 Region II Isabela 1st District Engineering Office
Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects - Concreting of Brgy. Canogan Sur - Brgy. Canogan Norte, Sto. Tomas, Isabela
August 22, 2019 2019 300116201635000 GAA FY2019 May 2, 2019 Region II Isabela 1st District Engineering Office
Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects - Concreting of Mangcuram - Siffu Road, City of Ilagan, Isabela
August 22, 2019 2019 300104206952000 GAA FY2019 May 2, 2019 Region II Isabela 1st District Engineering Office
Local - Buildings and Other Structures - Multipurpose/ Facilities - Local Infrastructure Program - Construction of Multi-purpose Building (Covered Court), at Calamagui East, Sta. Maria, Isabela
August 22, 2019 2019 310110100065000 GAA FY2019 May 2, 2019 Region II Isabela 1st District Engineering Office
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads - Daang Maharlika (LZ) - K0426+764 - K0427+012, K0427+012 - K0427+331, K0427+745 - K0428+192, K0429+819 - K0430+173, K0430+173 - K0430+255, K0430+255 - K0430+377
August 22, 2019 2019 300104206932000 GAA FY2019 May 2, 2019 Region II Isabela 1st District Engineering Office
Local - Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of Multi-purpose Building (Covered Court), Brgy. Colunguan, Sto. Tomas, Isabela
August 22, 2019 2019 300117202852000 GAA FY2019 May 2, 2019 Region II Cagayan 1st District Engineering Office
Local Roads and Bridges - Local Roads - Local infrastructure Program - Concreting of Barangay Road of Tubungan Este - Claoagan Dakkel Road via Tagumay and Palagao Sur, Gattaran, Cagayan
August 22, 2019 2019 320102100811000 GAA FY2019 May 2, 2019 Region II Isabela 4th District Engineering Office
Flood Management - Construction / Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers - Construction of Echague Flood Control Project, Barangay Mabuhay, Municipality of Echague
August 21, 2019 FY 2019 WIN9G02689 320102100666000 July 15, 2019 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 320102100666000
Project ID: P00321935MN

OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Rehabilitation of Flood Control Structure (Bridge Abutment) along Sibuguey River, Sta. 0+000 to Sta. 0+684.50, Barangay Paradise, Diplahan, Zamboanga Sibugay

Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 684.50 lm
Unit Cost: P 116,717.77/lm
EAO: P 2,897,685.00
Allocation: P 82,791,000.00
August 21, 2019 FY 2019 WIN9G02680 300117204903000 July 22, 2019 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300117204903000
Project ID: P00355532MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Road, Brgy. Baluno, Zamboanga City

Physical Target:
CW-1 - Construction of Concrete Road: 1.48 lane km.
Unit Cost: P 6,020,000.00/lane km
EAO: P 90,000.00
Allocation: P 9,000,000.00
August 21, 2019 FY 2019 WIN9G02595 310108100272000 July 11, 2019 Region IX Zamboanga del Norte 2nd District Engineering Office
UACS No. 310108100272000
Project ID: P00300492MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Liloy-Siocon Rd -
K2010 + 946 - K2011 + 080,
K2011 + 100 - K2011 + 249

Physical Target:
CW-1 - Construction of Road Slope Protection Structure: 1,667 sq.m.
Unit Cost: P 14,980.00/sq.m.
EAO: P 509,680.00
Allocation: P 25,484,000.00
August 21, 2019 FY 2019 WIN9G02673 310201100408000 July 24, 2019 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310201100408000
Project ID: P00304407MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Jct. Aurora-Ozamis City Road (S01085MN), K1630 + (-771) - K1631 + 229, Zamboanga Del Sur

Physical Target:
CW-1 - Road Widening: 4.00 lane km.
Unit Cost: P 12,250,000/lane km.
EAO: P 1,000,000.00
Allocation: P 50,000,000.00
August 21, 2019 FY 2019 WIN9G02663 310305100715000 July 3, 2019 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310305100715000
Project ID: P00304427MN

OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges

Nipaan Br. along Dipolog-Polanco-Piñan-Jct Oroquieta Rd (Phase II)

Physical Target:
CW-1 - Widening of Bridge: 75.557 sq.m.
Unit Cost: P 127,109.33/sq.m.
Physical Target:
ROW: 666.67 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 196,000.00
Allocation: P 10,000,000.00
August 21, 2019 FY 2019 WIN9G02706 320101103907000 July 3, 2019 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 320101103907000
Project ID: P00322941MN

OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Rockfall Protection System along Rizal-Dakak-Dapitan Coastal Loop Road, Canlucani Section, Dapitan City, Zamboanga del Norte

Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 1,079.73 sq.m.
Unit Cost: P 17,148.73/sq.m.
EAO: P 400,000.00
Allocation: P 20,000,000.00
August 21, 2019 FY 2019 WIN9G02599 300117204969000 July 9, 2019 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 300117204969000
Project ID: P00347634MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction/Concreting of Road leading to Veterans Multipurpose Center at Purok Nangka, Veterans, Ipil, Zamboanga Sibugay

Physical Target:
CW-1 - Construction of Concrete Road: 1.41086 lane km.
Unit Cost: P 7,017,000/lane km
EAO: P 100,000.00
Allocation: P 10,000,000.00
August 21, 2019 FY 2019 WIN9G02632 300104211421000 July 8, 2019 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 300104211421000
Project ID: P00352029MN

Local Program - Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program

Construction of MPB (Barangay Hall), Brgy. Sandayong, Municipality of Naga, Zamboanga
Sibugay

Physical Target:
CW-1 - Construction of Multi Purpose Building: 1 bldg.
Unit Cost: P 1,485,000.00/bldg.
EAO: P 15,000.00
Allocation: P 1,500,000.00
August 21, 2019 FY 2019 WIN9G02638 310109100247000 July 9, 2019 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 310109100247000
Project ID: P00300034MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Crossing Sta. Clara - Sandayong Rd - K1810 + 175 - K1810 + 240

Physical Target:
CW-1 - Construction of Road Slope Protection Structure: 976.30 sq.m.
Unit Cost: P 5,897.00/sq.m.
EAO: P 117,500.00
Allocation: P 5,875,000.00
August 21, 2019 FY 2019 WIN9G02630 310104100156000 July 9, 2019 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 310104100156000
Project ID: P00300035MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Ipil-Liloy-Sindangan Rd -
K2003 + 731 - K2004 + 427.03,
K2004 + 704.69 - K2005 + 022.21,
K2005 + 314.72 - K2005 + 858.70,
K2013 + 160.00 - K2013 + 380.00

Physical Target:
CW-1 - Reconstruction to Concrete Pavement: 3.613 lane km.
Unit Cost: P 10,651,700.00/lane km
EAO: P 785,400.00
Allocation: P 39,270,000.00
August 21, 2019 FY 2019 WIN9G02652 310107100103000 July 8, 2019 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 310107100103000
Project ID: P00300489MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Lanao-Pagadian-Zamboanga City Rd -
K1757 + (-640) - K1757 + (-528),
K1757 + 150 - K1757 + 180,
K1850 + 250 - K1850 + 280

Physical Target:
CW-1 - Construction of Road Slope Protection Structure: 1,243.69 sq.m.
Unit Cost: P 6,697.80/sq.m.
EAO: P 170,000.00
Allocation: P 8,500,000.00
August 21, 2019 FY 2019 WIN9G02693 320102100943000 July 15, 2019 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 320102100943000
Project ID: P00321929MN

OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control for prevention and mitigation along Sibuguey River, Brgy. Balugo-Poblacion Imelda, Sta 0+000 - Sta 0+274.50, Imelda, Zamboanga Sibugay

Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 274.50 lm.
Unit Cost: P 63,148.62/lm.
Physical Target:
CW-2 - Construction of Slope Protection Structure: 564.825 sq.m.
Unit Cost: P 28,413.09/sq.m.
EAO: P 681,280.00
Allocation: P 34,064,000.00
August 21, 2019 FY 2019 WIN9G02607 310201100320000 June 27, 2019 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 310201100320000
Project ID: P00303624MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Lanao-Pagadian-Zamboanga City Rd -
K1746 + 067 - K1746 + 986.90
K1752 + 000 - K1752 + 817.10

Physical Target:
CW-1 - Road Widening: 3.474 lane km.
Unit Cost: P 16,666,666.67/lane km.
EAO: P 2,100,000.00
Allocation: P 60,000,000.00
August 21, 2019 FY 2019 WIN9G02684 310107100102000 July 15, 2019 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 310107100102000
Project ID: P00300487MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Lanao-Pagadian-Zamboanga City Rd -
K1724 + 122 - K1724 + 326,
K1724 + 585 - K1724 + 737,
K1724 + 814 - K1725 + 087

Physical Target:
CW-1 - Construction of Road Slope Protection Structure: 17,840.901 sq.m.
Unit Cost: P 1,922.55/sq.m.
EAO: P 700,000.00
Allocation: P 35,000,000.00
August 21, 2019 FY 2019 WIN9G02700 300116202011000 July 22, 2019 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300116202011000
Project ID: P00346121MN

Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects

Concreting of Perimeter Road inside Westmincom, Upper Calarian, Zamboanga City, Zamboanga del Sur

Physical Target:
CW-1 - Construction of Concrete Road: 1.55 lane km.
Unit Cost: P 5,370,000.00/lane km
EAO: P 170,000.00
Allocation: P 8,500,000.00
August 21, 2019 FY 2019 GAA WIN9G02650 FY 2019 GAA RA 11260 January 1, 2019 Region XI Regional Office XI
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Tertiary Roads
Fatima-Malabog Rd -
K1501+(-442) - K1501+200, K1501+500 - K1502+200,
K1505+400 - K1506+000, K1506+340 - K1507+010
Physical Target:
CW1: 3.950 Lane Km (Road Widening)
CW2: 753.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 105,000,000.00
CW1: P 63,291,455.00 (Road Widening)
CW2: P 38,033,545.00 (Construction of Road Slope Protection Structure)
EAO: P 3,675,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Tertiary Roads
Fatima-Malabog Rd -
K1501+(-442) - K1501+200, K1501+500 - K1502+200,
K1506+340 - K1507+010
Physical Target:
CW1: 3.950 Lane Km (Road Widening)
CW2: 753.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 105,000,000.00
CW1: P 63,291,455.00 (Road Widening)
CW2: P 38,033,545.00 (Construction of Road Slope Protection Structure)
EAO: P 3,675,000.00
August 21, 2019 FY 2019 GAA WIN9G02649 FY 2019 GAA RA 11260 January 1, 2019 Region XI Regional Office XI
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Paving of Unpaved Roads - Tertiary Roads
H-way Jct Mana-Ticulon-Lagumit-Little Baguio Rd -
K1668+251 - K1668+285, K1673+958 - K1675+087,
K1675+112 - K1675+451, K1675+717 - K1675+1103
Physical Target:
CW1: 5.470 Lane Km (Paving of Unpaved Roads)
ROW: 35,865.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 103,000,000.00
CW1: P 98,729,150.00 (Paving of Unpaved Roads)
ROW: P 690,000.00 (ROW Acquisition)
EAO: P 3,580,850.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Paving of Unpaved Roads - Tertiary Roads
H-way Jct Mana-Ticulon-Lagumit-Little Baguio Rd -
K1668+251 - K1668+285, K1673+958 - K1675+087,
K1675+112 - K1675+306, K1675+306 - K1675+451,
K1675+451 - K1675+717, K1675+717 - K1675+1103
Physical Target:
CW1: 5.470 Lane Km (Paving of Unpaved Roads)
CW2: 0.539 Lane Km (Reconstruction to Concrete Pavement)
CW3: 0.539 Lane Km (Road Widening)
ROW: 35,865.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 103,000,000.00
CW1: P 84,021,500.00 (Paving of Unpaved Roads)
CW2: P 6,800,690.00 (Reconstruction to Concrete Pavement)
CW3: P 7,906,960.00 (Road Widening)
ROW: P 690,000.00 (ROW Acquisition)
EAO: P 3,580,850.00
August 21, 2019 FY 2019 GAA WIN9G02686 FY 2019 GAA RA 11260 January 1, 2019 Region XI Regional Office XI
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Road Widening (2-4 lanes) along Surigao del Sur Bdry-Davao Or. Coastal Road -
K1562+000 - K1565+000
Physical Target:
CW1: 6.002 Lane Km (Road Widening)
Allocation:
TOTAL: P 77,000,000.00
CW1: P 74,305,000.00 (Road Widening)
EAO: P 2,695,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Road Widening (2-4 lanes) along Surigao del Sur Bdry-Davao Or. Coastal Road -
K1562+000 - K1562+863, K1563+000 - K1564+533
Physical Target:
CW1: 4.792 Lane Km (Road Widening)
ROW: 31,866.80 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 77,000,000.00
CW1: P 67,067,500.00 (Road Widening)
ROW: P 7,500,000.00 (ROW Acquisition)
EAO: P 2,432,500.00
August 21, 2019 FY 2019 WIN9G02681 300117204906000 July 22, 2019 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300117204906000
Project ID: P00355534MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Road Concreting, Barangay Dita, Zamboanga City

Physical Target:
CW-1 - Construction of Concrete Road: 0.316 lane km.
Unit Cost: P 6,266,000.00/lane km
EAO: P 20,000.00
Allocation: P 2,000,000.00
August 21, 2019 FY 2019 WIN9G02702 300109200475000 July 22, 2019 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300109200475000
Project ID: P00345239MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Local Infrastructure Program

Construction of Drainage System, Barangay Guiwan, Zamboanga City

Physical Target:
CW-1 - Construction of Drainage Structure: 178 ln.m.
Unit Cost: P 11,123.60/ln.m.
EAO: P 20,000.00
Allocation: P 2,000,000.00