September 3, 2019 |
2019 |
WIN9C03492 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 30017203913000
Project ID: P00354943LZ
FROM:
Local Program - Local Roads and Bridges - Local Roads -Local Infrastructure Program - Road Opening (with concreting) of Laniton San Lorenzo Ruiz, Camarines Norte to Laniton, Basud, Camarines Norte
Physical Target:
CW1 - Construction of Gravel Road -
Unit Cost:
Allocation: P 10,000,000.00
TO:
Local Program - Local Roads and Bridges - Local Roads -Local Infrastructure Program - Road Opening (with concreting) of Laniton San Lorenzo Ruiz, Camarines Norte to Laniton, Basud, Camarines Norte
Physical Target:
CW1 - Construction of Concrete Road - 0.80Lane.Km
Unit Cost: P 12,375,000.00/ Lane Km
Allocation: P 10,000,000.00
|
September 3, 2019 |
2019 |
WIN9C03474 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 310108100246000
Project ID: P00304483LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Sn Fernando North Rd - K0005+160 - K0005+230, K0026+ 730 - K0026+ 795, K0026+849 - K0026+910
Physical Target:
CW1 - Construction of Road Slope Protection Structure -
Unit Cost:
Allocation: P 6,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Sn Fernando North Rd - K0005+160 - K0005+230, K0026+ 730 - K0026+ 795, K0026+849 - K0026+910
Physical Target:
CW1 - Construction of Road Slope Protection Structure - 523.00 Sq.M.
Unit Cost: P11,243.00/Square Meter
Allocation: P 6,000,000.00
|
September 3, 2019 |
2019 |
WIN9C03485 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 310109100229000
Project ID: P00304495LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads -
Tertiary Roads - Sn Fernando-Talisay Rd- K0002+119 - K0002+191, K0005+657 - K0005+858
Physical Target:
CW1 - Construction of Road Slope Protection Structure -
Unit Cost:
Allocation: P 8,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads -
Tertiary Roads - Sn Fernando-Talisay Rd- K0002+119 - K0002+191, K0005+657 - K0005+858
Physical Target:
CW1 - Construction of Road Slope Protection Structure - 719.00Sq.M.
Unit Cost: P 10,904.00/Square Meter
Allocation: P 8,000,000.00
|
September 3, 2019 |
2019 |
WIN9C03580 |
SR2019-07-006480 |
July 8, 2019 |
Region III |
Bataan 2nd District Engineering Office |
Asset Preservation Program
Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Bagac-Mariveles Rd
K0182+600 - K0182+750, K0187+900 - K0188+100, K0188+800 - K0189+000, K0189+680 - K0190+220 |
September 3, 2019 |
2019 |
WIN9C03611 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Pampanga 1st District Engineering Office |
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/ Improvement of Saplad River Sta. 0+000 - Sta. 0+320 at Minalin and Macabebe, Pampanga |
September 3, 2019 |
2019 |
WIN9C03617 |
FY 2019 GAA (RA 11260) |
April 15, 2019 |
Region III |
Pampanga 1st District Engineering Office |
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/ Improvement of Dawe River Sta. 0+424 - Sta. 0+527 at Minalin, Pampanga |
September 3, 2019 |
2019 |
WIN9C03615 |
SR2019-07-006622 |
July 8, 2019 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Manila North Rd
K0057+920 - K0058+140, K0058+275 - K0059+000, K0063+800 - K0064+018 |
September 3, 2019 |
2019 |
WIN9C03613 |
FY 2019 GAA (RA 11260) |
April 15, 2019 |
Region III |
Pampanga 3rd District Engineering Office |
Asset Preservation Program
Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Friendship Circum Rd (West Circum Rd)
K0084+124 - K0084+315 (L/S),
K0086+600 - K0086+780 (R/S) |
September 3, 2019 |
2019 |
WIN9C03593 |
FY 2019 GAA (RA 11260) |
April 15, 2019 |
Region III |
Pampanga 3rd District Engineering Office |
Network Development Program - Construction of Bypass and Diversion Roads
Construction of Anunas By-pass Road |
September 3, 2019 |
2019 |
WIN9C03596 |
FY 2019 GAA (RA 11260) |
April 15, 2019 |
Region III |
Pampanga 3rd District Engineering Office |
Network Development Program - Construction of Bypass and Diversion Roads
Construction of Anunas-Cuayan By-pass Road |
September 3, 2019 |
2019 |
WIN9C03607 |
FY 2019 GAA (RA 11260) |
April 15, 2019 |
Region III |
Pampanga 3rd District Engineering Office |
Local Roads and Bridges - Local Bridges
Widening of Pulung Cutud Bridge along Angeles-Magalang Road, Angeles City, Pampanga |
September 3, 2019 |
2019 |
WIN9C03576 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Zambales 1st District Engineering Office |
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Malabon-Malimanga-Sinabacan Flood Control Phase 1, Candelaria, Zambales |
September 3, 2019 |
2019 |
WIN9C03635 |
FY 2019 GAA (RA 11260) |
April 15, 2019 |
Region III |
Zambales 1st District Engineering Office |
Construction/ Rehabilitation o0f Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Slope Protection/ Flood Control at Nayum Upstream, South Approach, Sta. 0+338.50 - Sta. 0+760.50, Sta. Cruz, Zambales |
September 3, 2019 |
2019 |
WIN9C03619 |
FY 2019 GAA (RA 11260) |
April 15, 2019 |
Region III |
Aurora District Engineering Office |
Network Development - Off-Carriageway Improvement - Tertiary Roads
A. Castaneda-Ma. Aurora-Sn Luis Rd
K0199+150 - K0199+300, K0199+318 - K0199+865.60,
K0199+903 - K0200+064.75, K0200+252.30 - K0200+483,
K0202+560 - K0202+701.45, K0202+768 - K0203+178.60,
K0203+423 - K0203+671, K0203+687 - K0203+775,
K0204+727 - K0204+960, K0205+160 - K0205+574.40,
K0205+629 - K0205+958, K0205+975.70 - K0206+340 |
September 3, 2019 |
2019 |
WIN9C03623 |
SR2019-07-006419 |
July 6, 2019 |
Region III |
Regional Office III |
Asset Preservation
Preventive Maintenance - Secondary Roads
Baler-Casiguran Rd (Baler-Dinadiawan)
K0231+(-382) - K0232+236, K0234+699 - K0237+371 |
September 3, 2019 |
2019 |
WIN9C03628 |
FY 2019 GAA (RA 11260) |
April 15, 2019 |
Region III |
Aurora District Engineering Office |
Asset Preservation
Preventive Maintenance - Tertiary Roads
A. Castaneda-Ma Aurora-Sn Luis Rd
K0208+000 - K0209+374.80 |
September 3, 2019 |
FY 2019 GAA |
WIN9G02692 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao de Oro 1st District Engineering Office |
FROM: Local Program - National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Repair/Rehabilitation/Improvement (Asphalt Overlay) along Daang Maharlika Road,
K1387+978 - K1392+000; K1386+000 - K1387+168.20;
K1382+654.40; K1385+168.20, Compostela Valley
Physical Target:
CW1: 15.478 Lane Km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Rehabilitation of Concrete Road)
EAO: P 3,500,000.00
TO: Local Program - National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Repair/Rehabilitation/Improvement (Asphalt Overlay) along Daang Maharlika Road,
K1396+251 - K1397+120; K1398+167 - K1401+776;
K1403+143 - K1406+603, Compostela Valley
Physical Target:
CW1: 15.922 Lane Km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Rehabilitation of Concrete Road)
EAO: P 3,500,000.00 |
September 3, 2019 |
FY 2019 GAA |
WIN9G02685 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao de Oro 1st District Engineering Office |
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Secondary Roads
Compostela-Cateel Rd (Compostela Side) -
K1612+500 - K1613+540, K1613+700 - K1615+500,
K1615+690 - K1616+434
Physical Target:
CW1: 4.548 Lane Km (Road Widening)
ROW: 34,400.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 55,600,000.00
CW1: P 49,794,000.00 (Road Widening)
ROW: P 4,000,000.00 (ROW Acquisition)
EAO: P 1,806,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Secondary Roads
Compostela-Cateel Rd (Compostela Side) -
K1612+500 - K1613+540, K1613+700 - K1615+500,
K1615+690 - K1616+104
Physical Target:
CW1: 4.548 Lane Km (Road Widening)
ROW: 34,400.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 55,600,000.00
CW1: P 49,794,000.00 (Road Widening)
ROW: P 4,000,000.00 (ROW Acquisition)
EAO: P 1,806,000.00 |
September 2, 2019 |
2019 |
WIN9C03551 |
SR2019-07-005857 |
July 4, 2019 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Acop-Kapangan-Kibungan-Bakun Road K0345+600 – K0345+700;
Physical Target: CW1 : 5,168.523 Sq. M.
CW2 : 14,258.714 Sq. M.;
Allocation= Php 93,966,000
To: Acop-Kapangan-Kibungan-Bakun Road K0345+600 – K0345+700;
Physical Target: CW1 : 5,338.978 Sq. M.;
Allocation= Php 93,966,000
|
August 30, 2019 |
2019 |
WIN9C03540 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Concreting of Road Palmayo, Floridablanca, Pampanga |
August 30, 2019 |
2019 |
WIN9C03519 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Zambales 2nd District Engineering Office |
Flood Management Program - Construction / Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Repair / Rehabilitation / Improvement of Matain River Revetment, Subic, Zambales |
August 30, 2019 |
2019 |
WIN9C03570 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Zambales 2nd District Engineering Office |
Flood Management Program - Construction / Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Repair / Rehabilitation / Improvement of Sta. Fe River Revetment, San Marcelino, Zambales |
August 30, 2019 |
2019 |
WIN9G02707 |
FY2019 GAA RA 11260 |
April 29, 2019 |
Region XIII |
Butuan City District Engineering Office |
UACS No. 310203100245000
Project ID: P00300287MN
FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Roads
Butuan City-Malaybalay Rd - K1261 + 553 - K1261 + 952, K1261 + 989 - K1262 + 114, K1262 + 114 - K1263 + 119
CW1- Road Widening / 3.02 lane-km P12.81788M/lane-km P38.710M
ROW Acquisition / 30,200 sq.m. P38.84/sq.m. P1.173M
EAO- P790.0T
Total: P40.673M
TO:
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Roads
Butuan City-Malaybalay Rd - K1261 + 841 - K1261 + 952, K1261 + 989 - K1263 + 119
CW1- Road Widening / 2.444 lane-km P15.83879M/lane-km P38.710M
ROW Acquisition / 24,440 sq.m. P47.99/sq.m. P1.173M
EAO- P790.0T
Total: P40.673M |
August 30, 2019 |
2019 |
WIN9G02699 |
FY2019 GAA RA 11260 |
April 29, 2019 |
Region XIII |
Butuan City District Engineering Office |
UACS No. 310109100173000
Project ID: P00300574MN
FROM:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Butuan City-Pianing-Tandag Rd - K1247 + 920 - K1247 + 942, K1248 + 360 - K1248 + 390, K1249 + 080 - K1249 + 110, K1248 + 480 - K1249 + 570.80
CW1 - Construction of Road Slope Protection Structure / 4,492.80 sq.m.
Unit Cost: P13.96T/sq.m.
Allocation: P62.7250M
EAO - P2.2750M
Total: P65.0M
TO:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Butuan City-Pianing-Tandag Rd - K1247 + 920 - K1247 + 942, K1248 + 360 - K1248 + 390, K1249 + 080 - K1249 + 110, K1249 + 480 - K1249 + 570.80
CW1 - Construction of Road Slope Protection Structure / 4,492.80 sq.m.
Unit Cost: P13.96T/sq.m.
Allocation: P62.7250M
EAO - P2.2750M
Total: P65.0M
|
August 29, 2019 |
2019 |
WIN9C03579 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Bulacan 1st District Engineering Office |
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads
Gen Alejo Santos Highway
K0047+300 - K0050+461.75 |
August 29, 2019 |
2019 |
WIN9C03586 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Bulacan 1st District Engineering Office |
Asset Preservation - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads
Plaridel - Pulilan Div Rd
K0042+013 - K0042+299 |
August 29, 2019 |
2019 |
WIN9C03581 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Bulacan 1st District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Plaridel - Pulilan Div Rd
K0042+330 - K0042+533 |
August 29, 2019 |
2019 |
WIN9C03585 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Bulacan 1st District Engineering Office |
Construction / Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Repair / Rehabilitation / Improvement of Flood Control Structures along Bocaue River, Turo Section, Bocaue, Bulacan Sta. 0+000 - Sta. 0+152.40 |
August 28, 2019 |
FY - 2019 |
WIN9F05886 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. 300116201795000
Project ID: P00353885LZ
Local program
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Concreting of Brgy. Road, Sitio Looban,
Brgy. San luis, Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road: 1.0 lane-Km
Unit Cost - Php 9,800/ lane-km
Allocation - Php 10.00 Million
TO:
Concreting of Brgy. Road, Sitio Looban,
Brgy. San Luis, Mamburao, Occidental Mindoro
CW1 - Concreting of Concrete Road : 1.564 Lane-Km
Unit Cost - Php 6,265.98/ Lane-km
Allocation - 10.00 Million
|
August 28, 2019 |
2019 |
300117203014000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Isabela 4th District Engineering Office |
Concreting of Barangay Raniag to Barangay Villa Marcos in Ramon, Isabela |
August 28, 2019 |
FY - 2019 |
WIN9F05887 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. 300117203757000
Project ID: P00354834LZ
Local Program
Local Roads and Bridges - Local Roads -
Local Infrastructure Program
FROM:
Concreting of Barangay Road, Farn1, Brgy. Tayamaan,
Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road: 0.450 Lane-Km
Unit Cost - Php 6,600/ Lane-km
Allocation - Php 3.00 Million
TO:
Concreting of Barangay Road, Farm1, Brgy. Tayamaan,
Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road : 0.600 Lane-Km
Unit Cost - Php 4,950/ lane-km
Allocation - Php 3.00 Million |
August 28, 2019 |
FY - 2019 |
WIN9F05887 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. 300117203757000
Project ID: P00354834LZ
Local Program
Local Roads and Bridges - Local Roads -
Local Infrastructure Program
FROM:
Concreting of Barangay Road, Farn1, Brgy. Tayamaan,
Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road: 0.450 Lane-Km
Unit Cost - Php 6,600/ Lane-km
Allocation - Php 3.00 Million
TO:
Concreting of Barangay Road, Farm1, Brgy. Tayamaan,
Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road : 0.600 Lane-Km
Unit Cost - Php 4,950/ lane-km
Allocation - Php 3.00 Million |
August 28, 2019 |
FY - 2019 |
WIN9F05888 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. 300112200051000
Project ID: P00353637LZ
Local Program
National Roads and Bridges - National Roads -
Local Infrastructure Program
FROM:
Construction/Rehabilitation/Concreting of
Poblacion - Ipol - Canturay Road, Paluan,
Occidental Mindoro
CW1 - Construction of Concrete Road ; 7.53 Lane-Km
Unit Cost - Php 13,147.41/ Lane-km
Allocation - 100.00 Million
TO:
Construction/Rehabilitation/Concreting of
Poblacion - Ipol - Canturay Road, Paluan,
Occidental Mindoro
CW1 - 6.88 Lane-km
Unit Cost - Php 14,389.53/ lane-km
Allocation - Php 100.00 Million |
August 28, 2019 |
2019 |
WIN9C03467 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Zambales 2nd District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads
Olongapo - Bugallon Rd - K0139+000 - K0139+714, K0140+000 - K0141+757, K0141+981 - K0142+320, K0142+562 - K0143+060, K0143+287 - K0143+660, K0146+180 - K0146+798.4, K0149+877 - K0150+303 |
August 28, 2019 |
FY - 2019 |
WIN9F05861 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Marinduque District Engineering Office |
UACS No. 300112200050000
Project ID: P00353636LZ
Local Program
National Roads and Bridges - National Roads -
Local infrastructure Program
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse, and Landslide
Tigwi - Dampulan - Lipata - Yook - Buenaventura Road,
K0092+402 - K0092+654,
Torrijos, Marinduque
CW1 - Construction of Road Slope Protection Structure
3,840.00 sq.m.
Unit Cost - Php 25.781/ sq.m.
Allocation - Php 100.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse, and Landslide
Tigwi - Dampulan - Lipata - Yook - Buenavista Road
K0092+402 - K0092+840,
Buenavista, Marinduque
CW1 - Construction of Road Slope Protection Structure
4,336.00 sq.m.
Unit Cost - Php 22.832/ sq.m.
Allocation - Php 100.00 Million
|
August 28, 2019 |
FY - 2019 |
WIN9F05893 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Marinduque District Engineering Office |
UACS No. 300112200045000
Project ID: P00353631LZ
Local program
National Roads and Bridges - National Roads -
Local Infrastructure Program
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse, and Landslide
Marinduque Circumferential Road,
K0013+750 - K0013+830,
K0015+800 - K0015+880,
Mogpog, Marinduque
CW1 - Construction of Road Slope Protection Structure
2,840.00 sq.m.
Unit Cost - Php 25.796/ sq.m.
Allocation - Php 74.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse, and Landslide
Marinduque Circumferential Road,
K0010+462 - K0010+581,
K0015+875 - K0015+932,
K0016+040 - K0016+100,
Mogpog, Marinduque
CW1 - Construction of Road Slope Protection Structure
3,311.00 sq.m.
Unit Cost - Php 22.126/ sq.m.
Allocation - Php 74.00 Million |
August 28, 2019 |
2019 |
WIN9C03483 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Zambales 2nd District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads
Jose Abad Santos Ave. - K0125+000 - K0125+888 |
August 28, 2019 |
2019 |
WIN9C03468 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Zambales 2nd District Engineering Office |
Network Development Program - Off-Carriageway Improvement - Secondary Roads
Olongapo - Bugallon Rd - K0134+071 - K0134+980, K0137+980 - K0139+000 |
August 27, 2019 |
2019 |
WIN9C03578 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Nueva Ecija 1st District Engineering Office |
Asset Preservation - Preventive Maintenance - Secondary Roads
Nueva Ecija - Pangasinan Rd - K0157+241 - K0157+781, K0155+265 - K0155+555, K0138+(-006) - K0138+877, K0139+000 - K0139+703, K0146+403 - K0146+802, K0149+034 - K0149+297 |
August 27, 2019 |
FY 2019 |
WIN9G02708 |
320101102705000 |
July 30, 2019 |
Region IX |
Regional Office IX |
UACS No. 320101102705000
Project ID: P00320226MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Channelization of Putik River with Major Training Works, Zamboanga City
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 507.64 ln.m.
Unit Cost: P 117,582.27/ln.m.
EAO: P 2,165,450.00
Excess: P 15,088.33
Allocation: P 61,870,000.00 |
August 27, 2019 |
FY 2019 |
WIN9G02714 |
310204100492000 |
July 18, 2019 |
Region IX |
Regional Office IX |
UACS No. 310204100492000
Project ID: P00303797MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
Labangan-Pagadian City-Dumalinao By-Pass Road, Package 2, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Concrete Road: 4.36 lane km.
Unit Cost: P 13,680,000.00/lane km.
Physical Target:
ROW: 16,666.667 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 2,087,656.89
Excess: P 265,003.53
Allocation: P 67,000,000.00 |
August 27, 2019 |
FY 2019 |
WIN9G02698 |
310212100089000 |
July 18, 2019 |
Region IX |
Regional Office IX |
UACS No. 310212100089000
Project ID: P00300030MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Tertiary Roads
Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road -
Ch. 1800 - Ch. 2440
Physical Target:
CW-1 - Paving of Unpaved Roads: 1.28 lane km.
Unit Cost: P 22,620,000.00/lane km.
EAO: P 1,013,250.00
Excess: P 36,750.00
Allocation: P 30,000,000.00 |
August 23, 2019 |
FY 2019 GAA |
WIN9G02710 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao Oriental 1st District Engineering Office |
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation -
Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd -
K1514+(-267) - K1514+581, K1521+620 - K1521+825,
K1523+000 - K1524+000, K1528+000 - K528+579
Physical Target:
CW1: 5.636 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 99,323,000.00
CW1: P 95,846,695.00 (Reconstruction to Concrete Pavement)
EAO: P 3,476,305.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation -
Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd -
K1514+(-267) - K1514+(-192), K1514+(-912) - K1514+182,
K1514+182 - K1514+581, K1521+620 - K1521+825,
K1523+000 - K1524+000, K1528+000 - K528+579
Physical Target:
CW1: 5.226 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 99,323,000.00
CW1: P 95,846,695.00 (Reconstruction to Concrete Pavement)
EAO: P 3,476,305.00 |
August 23, 2019 |
FY 2019 GAA |
WIN9G02709 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao Oriental 2nd District Engineering Office |
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program -
Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way -
K1769+000 - K1771+979, K1702+192 - K1703+484
Physical Target:
CW1: 4.300 Lane Km (Road Widening)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Road Widening)
EAO: P 2,100,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program -
Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way -
K1769+200 - K1769+600, K1770+200 - K1771+000,
K1772+600 - K1773+603
Physical Target:
CW1: 4.485 Lane Km (Road Widening)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Road Widening)
EAO: P 2,100,000.00 |
August 23, 2019 |
FY 2019 GAA |
WIN9G02687 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao del Sur District Engineering Office |
FROM: Local Program - Local Roads and Bridges - Local Roads -
Local Infrastructure Program
Concreting of Road with Drainage (500m), Poblacion, Bansalan, Davao del Sur
Physical Target:
CW1: 0.400 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Concrete Road)
EAO: P 30,000.00
TO: Local Program - Local Roads and Bridges - Local Roads -
Local Infrastructure Program
Concreting of Road with Drainage, Poblacion, Bansalan, Davao del Sur
Physical Target:
CW1: 0.400 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Concrete Road)
EAO: P 30,000.00 |
August 23, 2019 |
FY - 2019 |
WIN9F05858 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Marinduque District Engineering Office |
UACS No. 300112200049000
Project ID: P00353635LZ
Local Program
National Roads and Bridges - National Roads -
Local Infrastructure Program
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse, and Landslide
Tigwi - Dampulan - Lipata - Yook - Buenaventura Road
K0092+150 - K0092+402
Torrijos, Marinduque
CW1 - Construction of Road Slope Protection Structure
3,840.00 sq.m.
Unit Cost - Php 25.781/ sq.m.
Allocation - Php 100.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse, and Landslide
Tigwi - Dampulan - Yook - Lipata - Buenavista Road
K0092+110 - K0092+402
Buenavista, Marinduque
CW1 - Construction of Road Slope Protection Structure
4,644.00 sq.m.
Unit Cost - Php 21.318/ sq.m.
Allocation - Php 100.00 Million
|
August 23, 2019 |
FY - 2019 |
WIN9F05854 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Romblon District Engineering Office |
UACS No. 300117203813000
Project ID: P00354869LZ
Local Program
Local Roads and Bridges - Local Roads -
Local Infrastructure Program
FROM:
Concreting of Sitio Suong Barangay Carmen Access Road,
Brgy. Carmen, San Agustin, Romblon
CW1 - Construction of Concrete Road: 0.320 Lane-km
Unit Cost - Php 10,828.13/ Lane-km
Allocation - 3.50 Million
TO:
Concreting of Sitio Suong Barangay Carmen Access Road,
Brgy. Carmen, San Agustin, Romblon
CW1 - Concreting of Concrete Road : 0.260 lane-km
Unit Cost - Php 13,326.92/ Lane-km
Allocation - Php 3.50 Million
|
August 23, 2019 |
FY - 2019 |
WIN9F05851 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Romblon District Engineering Office |
UACS No. 300107200477000
Project ID: P00353451LZ
Local Program
Flood Control and Drainage - Flood Control Structures/Facilities
Local Infrastructure Program
FROM:
Construction of Seawall in Sto. Sapangpalay,
Brgy. Masudsud, Concepcion, Romblon
CW1 - Construction of Flood Mitigation Structure :
30.00 linear meters
Unit Cost - Php 165.00/ linear meters
Allocation - Php 5.00 Million
TO:
Construction of Seawall in Sto. Sapangpalay,
Brgy. Masudsud, Concepcion, Romblon
CW1 - Construction of Flood Mitigation Structure :
51.00 linear meters
Unit Cost - Php 97.06/ linear meters
Allocation - Php 5.00 Million
|
August 23, 2019 |
FY 2019 GAA |
WIN9G02691 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao del Norte District Engineering Office |
FROM: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Multi-Purpose Building, Sitio Bagale, Barangay Dujali, B.E. Dujali, Davao del Norte
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 2,500,000.00
CW1: P 2,450,000.00 (Construction of Multi-Purpose Building)
EAO: P 50,000.00
TO: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Multi-Purpose Building, Sitio Bacali, Barangay Dujali, B.E. Dujali, Davao del Norte
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 2,500,000.00
CW1: P 2,450,000.00 (Construction of Multi-Purpose Building)
EAO: P 50,000.00 |
August 22, 2019 |
FY - 2019 |
WIN9F05840 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Marinduque District Engineering Office |
UACS No. 300112200046000
Project ID: P00353632LZ
Local Program
National Roads and Bridges - National Roads -
Local Infrastructure Program
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse, and Landslides
Marinduque Circumferential road
K0021+883 - K0022+020,
Sta. Cruz, Marinduque
CW1 - Construction of Road Slope Protection Structure
2,265.00 sq.m.
Unit Cost - Php 25.788/ sq.m.
Allocation - 59.00 Million
TO;
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse, and Landslides
Marinduque Circumferential Road
K0021+820 - K0022+020
Sta. Cruz, Marinduque
CW1 - Construction of Road Slope Protection Structure
2,588.00 sq.m.
Unit Cost - Php 22.579/sq.m.
Allocation - Php 59.00 Million |
August 22, 2019 |
FY - 2019 |
WIN9F05844 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Romblon District Engineering Office |
UACS No. 300203100698000
Project ID: P00330310LZ
Convergence and Special Support Program
Convergence and Special Support -
Construction/Improvement of Access Roads leading to
Declared Tourism Destination
FROM:
Malbog Junction Sta. Fe - Guinbirayan Provincial Road
leading to Sta. Fe Beaches, Sta. Fe, Romblon
CW1 - Construction of Concrete Road ; 5.18 lane-km
Unit Cost - Php 13,040.54/Lane-km
Allocation - 70.00 Million
TO:
Malbog Junction Sta. Fe - Guibirayan Provincial Road
leading to Sta. Fe Beaches, Sta. Fe, Romblon
CW1 - Construction of Concrete Road : 3.032 Lane-km
Unit Cost - Php 22,279.02/Lane-km
Allocation - Php 70.00 Million |
August 22, 2019 |
2019 |
310212100084000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Regional Office II |
Network Development - Paving of Unpaved Roads - Tertiary Roads - Jct. Abbag-Nagtipunan-Nueva Vizcaya Rd via Dupax Quirino - (S04764LZ) Chainage 2373.22 - Chainage 3598, Chainage 4019 - Chainage 5216 |
August 22, 2019 |
2019 |
310205100341000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Regional Office II |
Network Development - Construction of Missing Links/ New Roads - Roxas - Paracelis Road, Isabela |
August 22, 2019 |
2019 |
300117202949000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Isabela 1st District Engineering Office |
Local Roads and Bridges - Local Roads - Local Infrastructure Program - Rehabilitation of Barangay Paliueg Road, Brgy. Paliueg, Ilagan City, Isabela |
August 22, 2019 |
FY - 2019 |
WIN9F05843 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Romblon District Engineering Office |
UACS No. 300106200213000
Project ID: P00340235LZ
Local Program
Flood Control and Drainage - Flood Control Structures/Facilities -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Seawall along Tablas Circumferential Road,
KM 33+520 - Km 34+450
CW1 - Construction of Flood Mitigation Structure :
378.70 linear meters
Unit Cost _ Php 129.39/linear meters
Allocation - Php 50.00 Million
TO:
Construction of Seawall along Tablas Circumferential Road
K0033+520 - K0033+898.70
CW1 - Construction of Flood Mitigation Structure :
378.70 linear meters
Unit Cost - 129.39/linear meters
Allocation - 50.00 Million |
August 22, 2019 |
2019 |
300117202947000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Isabela 1st District Engineering Office |
Local Roads and Bridges - Local Roads - Local Infrastructure Program - Rehabilitation of Barangay Cabisera 6-24, City of Ilagan - Sitio Yeban, Benito Soliven, Isabela |
August 22, 2019 |
2019 |
320102100615000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Cagayan 2nd District Engineering Office |
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers - Construction of Abulug River Control, Lucban, Abulug, Cagayan |
August 22, 2019 |
FY - 2019 |
WIN9F05841 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Marinduque District Engineering Office |
UACS No. 300104208488000
Project ID: P00350505LZ
Local Program
Buildings and Other Structures - Multipurpose/Facilities -
National Building Program
FROM:
Construction of Multi-Purpose Building (Covered Court),
Barangay Bintakay, Mopog, Marinduque
CW1 - Number of Buildings
Unit Cost - Php 6,435.00/building
Allocation - Php 6.00Million
TO:
Construction of Multi-Purpose Building (Covered Court),
Barangay Bintakay, Mogpog, Marinduque
CW1 - Number of Buildings
Unit Cost - Php 6,435.22/building
Allocation - 6.50 Million
|
August 22, 2019 |
2019 |
310212100102000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Cagayan 2nd District Engineering Office |
Network Development - Paving of Unpaved Roads - Tertiary Roads - Jct Logac-Lasam-Gagabutan Rd - (S00654LZ) - K0742+188 - K0742+904, K0743+857 - K0744+800 |
August 22, 2019 |
2019 |
310212100083000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Cagayan 2nd District Engineering Office |
Network Development - Paving of Unpaved Roads - Tertiary Roads - Jct Logac-Lasam-Gagabutan Rd (S00656LZ) - Chainage 17288 - Chainage 17408, Chainage 17656 - Chainage 20581, Chainage 20994 - Chainage 21138 |
August 22, 2019 |
FY - 2019 |
WIN9F05837 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Marinduque District Engineering Office |
UACS No. 320101103505000
Project ID: P00322862LZ
002: Protect Lives and Properties Against Major Floods
Construction/Maintenance of Flood Mitigation Structures
and Drainage Systems
FROM:
Construction of Cabuyo Flood Control Structure,
Sta, 0+970.00 - Sta. 1+770.00
Torrijos, Marinduque
CW1 - Construction of Flood Mitigation/ 434.00 lm
Unit Cost - Php 67.7423/lm
Allocation - 30.00 Million
TO:
Construction of Cabuyo Flood Control Structure
Sta. 0+970.00 - Sta. 1+370.00
Torrijos, Marinduque
CW1 - Construction of Flood Mitigation/ 434.00 lm
Unit Cost - Php 67.742/ lm
Allocation - Php 30.00 Million
|
August 22, 2019 |
2019 |
320102100614000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Cagayan 2nd District Engineering Office |
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers - Construction of Abulug River Control at Sta. Rosa, Abulug, Cagayan |
August 22, 2019 |
2019 |
300119200173000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Cagayan 2nd District Engineering Office |
Local Roads and Bridges - Local Bridges - Local Infrastructure Program - Construction of Kapanikian Bridge, Sitio Makatagaw, Brgy. Kapanikian, Allacapan, Cagayan |
August 22, 2019 |
2019 |
320102100267000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Isabela 3rd District Engineering Office |
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Project, Sta. 0+208.80 - Sta. 0+338.80, Centro I, Angadanan, Isabela |
August 22, 2019 |
FY - 2019 |
WIN9F05847 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. 300103201154000
Project ID: P00340510LZ
Local Program
Buildings and Other Structures - Multipurpose/Facilities -
construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Multi-Purpose Building,
Barahan, San Jose, Occidental Mindoro
CW1 - Construction of Multi-Purpose Building: 1 Bldg.
Unit Cost - Php 2,000.00/ bldg.
Allocation - Php 2.00Million
TO:
Construction of Multi-Purpose Building,
Barahan, Sta. Cruz, Occidental Mindoro
CW1 - Construction of Multi-Purpose Building : 1 Bldg.
Unit Cost - Php 2,000/ bldg
Allocation - php 2.00 Million
|
August 22, 2019 |
2019 |
300117202907000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Cagayan 3rd District Engineering Office |
Local Roads and Bridges - Local Roads - Local Infrastructure Program - Concreting of Road, Brgy. Libag Sur, Tuguegarao City, Cagayan |
August 22, 2019 |
FY - 2019 |
WIN9F05836 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. 320101101552000
Project ID: P00321120LZ
002: Protect Lives and properties Against major Floods
Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Control Structures,
Amnay FC (Kabangkalan Section), Sablayan,
Occidental Mindoro
CW1 - Construction of Flood Mitigation Structure : 186.29 LM
Unit Cost - Php 99.31/Lm
Allocation - Php 18.50 Million
TO:
Construction of Flood Control Structure,
Amnay FC ( Kabangkalan Section ), Sablayan,
Occidental Mindoro
CW1 - Construction of Flood Mitigation Structure : 158.0 Lm
Unit Cost - Php 117.09/Lm
Allocation - Php 18.50 Million |
August 22, 2019 |
2019 |
310201100376000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Cagayan 3rd District Engineering Office |
Network Development - Road Widening - Primary Roads - Santiago-Tuguegarao Rd - K0436+237 - K0436+264.40, K0436+285.7 - K0436+368 |
August 22, 2019 |
2019 |
300104206951000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Isabela 1st District Engineering Office |
Local - Buildings and Other Structures - Multipurpose/ Facilities - Local Infrastructure Program - Construction of Multi-purpose Building (Covered Court), at Calamagui West, Sta. Maria, Isabela |
August 22, 2019 |
2019 |
300104206950000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Isabela 1st District Engineering Office |
Local - Buildings and Other Structures - Multipurpose / Facilities - Local infrastructure Program - Construction of LGU Multi-purpose Building, Barangay San Pedro, Tumauini, Isabela |
August 22, 2019 |
2019 |
300104206953000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Isabela 1st District Engineering Office |
Local - Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of Multi-purpose Building (Covered Court), at Calamagui North, Sta. Maria, Isabela |
August 22, 2019 |
2019 |
300104206955000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Isabela 1st District Engineering Office |
Local - Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of Multi-purpose Building (Covered Court), at Barangay San Jose, San Pablo, Isabela |
August 22, 2019 |
2019 |
300117202955000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Isabela 1st District Engineering Office |
Local Roads and Bridges - Local Roads - Local Infrastructure Program - Concreting of Barangay Cabisera 7 to Barangay Paliueg Road, Ilagan City, Isabela |
August 22, 2019 |
2019 |
300116201627000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Isabela 1st District Engineering Office |
Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects - Concreting of Brgy. Canogan Sur - Brgy. Canogan Norte, Sto. Tomas, Isabela |
August 22, 2019 |
2019 |
300116201635000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Isabela 1st District Engineering Office |
Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects - Concreting of Mangcuram - Siffu Road, City of Ilagan, Isabela |
August 22, 2019 |
2019 |
300104206952000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Isabela 1st District Engineering Office |
Local - Buildings and Other Structures - Multipurpose/ Facilities - Local Infrastructure Program - Construction of Multi-purpose Building (Covered Court), at Calamagui East, Sta. Maria, Isabela |
August 22, 2019 |
2019 |
310110100065000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Isabela 1st District Engineering Office |
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads - Daang Maharlika (LZ) - K0426+764 - K0427+012, K0427+012 - K0427+331, K0427+745 - K0428+192, K0429+819 - K0430+173, K0430+173 - K0430+255, K0430+255 - K0430+377 |
August 22, 2019 |
2019 |
300104206932000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Isabela 1st District Engineering Office |
Local - Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of Multi-purpose Building (Covered Court), Brgy. Colunguan, Sto. Tomas, Isabela |
August 22, 2019 |
2019 |
300117202852000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Cagayan 1st District Engineering Office |
Local Roads and Bridges - Local Roads - Local infrastructure Program - Concreting of Barangay Road of Tubungan Este - Claoagan Dakkel Road via Tagumay and Palagao Sur, Gattaran, Cagayan |
August 22, 2019 |
2019 |
320102100811000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Isabela 4th District Engineering Office |
Flood Management - Construction / Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers - Construction of Echague Flood Control Project, Barangay Mabuhay, Municipality of Echague |
August 21, 2019 |
FY 2019 |
WIN9G02689 |
320102100666000 |
July 15, 2019 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102100666000
Project ID: P00321935MN
OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Rehabilitation of Flood Control Structure (Bridge Abutment) along Sibuguey River, Sta. 0+000 to Sta. 0+684.50, Barangay Paradise, Diplahan, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 684.50 lm
Unit Cost: P 116,717.77/lm
EAO: P 2,897,685.00
Allocation: P 82,791,000.00 |
August 21, 2019 |
FY 2019 |
WIN9G02680 |
300117204903000 |
July 22, 2019 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117204903000
Project ID: P00355532MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Brgy. Baluno, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 1.48 lane km.
Unit Cost: P 6,020,000.00/lane km
EAO: P 90,000.00
Allocation: P 9,000,000.00 |
August 21, 2019 |
FY 2019 |
WIN9G02595 |
310108100272000 |
July 11, 2019 |
Region IX |
Zamboanga del Norte 2nd District Engineering Office |
UACS No. 310108100272000
Project ID: P00300492MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Liloy-Siocon Rd -
K2010 + 946 - K2011 + 080,
K2011 + 100 - K2011 + 249
Physical Target:
CW-1 - Construction of Road Slope Protection Structure: 1,667 sq.m.
Unit Cost: P 14,980.00/sq.m.
EAO: P 509,680.00
Allocation: P 25,484,000.00
|
August 21, 2019 |
FY 2019 |
WIN9G02673 |
310201100408000 |
July 24, 2019 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310201100408000
Project ID: P00304407MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Jct. Aurora-Ozamis City Road (S01085MN), K1630 + (-771) - K1631 + 229, Zamboanga Del Sur
Physical Target:
CW-1 - Road Widening: 4.00 lane km.
Unit Cost: P 12,250,000/lane km.
EAO: P 1,000,000.00
Allocation: P 50,000,000.00 |
August 21, 2019 |
FY 2019 |
WIN9G02663 |
310305100715000 |
July 3, 2019 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310305100715000
Project ID: P00304427MN
OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
Nipaan Br. along Dipolog-Polanco-Piñan-Jct Oroquieta Rd (Phase II)
Physical Target:
CW-1 - Widening of Bridge: 75.557 sq.m.
Unit Cost: P 127,109.33/sq.m.
Physical Target:
ROW: 666.67 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 196,000.00
Allocation: P 10,000,000.00 |
August 21, 2019 |
FY 2019 |
WIN9G02706 |
320101103907000 |
July 3, 2019 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 320101103907000
Project ID: P00322941MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Rockfall Protection System along Rizal-Dakak-Dapitan Coastal Loop Road, Canlucani Section, Dapitan City, Zamboanga del Norte
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 1,079.73 sq.m.
Unit Cost: P 17,148.73/sq.m.
EAO: P 400,000.00
Allocation: P 20,000,000.00 |
August 21, 2019 |
FY 2019 |
WIN9G02599 |
300117204969000 |
July 9, 2019 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300117204969000
Project ID: P00347634MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction/Concreting of Road leading to Veterans Multipurpose Center at Purok Nangka, Veterans, Ipil, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Concrete Road: 1.41086 lane km.
Unit Cost: P 7,017,000/lane km
EAO: P 100,000.00
Allocation: P 10,000,000.00 |
August 21, 2019 |
FY 2019 |
WIN9G02632 |
300104211421000 |
July 8, 2019 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300104211421000
Project ID: P00352029MN
Local Program - Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program
Construction of MPB (Barangay Hall), Brgy. Sandayong, Municipality of Naga, Zamboanga
Sibugay
Physical Target:
CW-1 - Construction of Multi Purpose Building: 1 bldg.
Unit Cost: P 1,485,000.00/bldg.
EAO: P 15,000.00
Allocation: P 1,500,000.00 |
August 21, 2019 |
FY 2019 |
WIN9G02638 |
310109100247000 |
July 9, 2019 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 310109100247000
Project ID: P00300034MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Crossing Sta. Clara - Sandayong Rd - K1810 + 175 - K1810 + 240
Physical Target:
CW-1 - Construction of Road Slope Protection Structure: 976.30 sq.m.
Unit Cost: P 5,897.00/sq.m.
EAO: P 117,500.00
Allocation: P 5,875,000.00 |
August 21, 2019 |
FY 2019 |
WIN9G02630 |
310104100156000 |
July 9, 2019 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 310104100156000
Project ID: P00300035MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Ipil-Liloy-Sindangan Rd -
K2003 + 731 - K2004 + 427.03,
K2004 + 704.69 - K2005 + 022.21,
K2005 + 314.72 - K2005 + 858.70,
K2013 + 160.00 - K2013 + 380.00
Physical Target:
CW-1 - Reconstruction to Concrete Pavement: 3.613 lane km.
Unit Cost: P 10,651,700.00/lane km
EAO: P 785,400.00
Allocation: P 39,270,000.00 |
August 21, 2019 |
FY 2019 |
WIN9G02652 |
310107100103000 |
July 8, 2019 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 310107100103000
Project ID: P00300489MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Lanao-Pagadian-Zamboanga City Rd -
K1757 + (-640) - K1757 + (-528),
K1757 + 150 - K1757 + 180,
K1850 + 250 - K1850 + 280
Physical Target:
CW-1 - Construction of Road Slope Protection Structure: 1,243.69 sq.m.
Unit Cost: P 6,697.80/sq.m.
EAO: P 170,000.00
Allocation: P 8,500,000.00 |
August 21, 2019 |
FY 2019 |
WIN9G02693 |
320102100943000 |
July 15, 2019 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102100943000
Project ID: P00321929MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control for prevention and mitigation along Sibuguey River, Brgy. Balugo-Poblacion Imelda, Sta 0+000 - Sta 0+274.50, Imelda, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 274.50 lm.
Unit Cost: P 63,148.62/lm.
Physical Target:
CW-2 - Construction of Slope Protection Structure: 564.825 sq.m.
Unit Cost: P 28,413.09/sq.m.
EAO: P 681,280.00
Allocation: P 34,064,000.00 |
August 21, 2019 |
FY 2019 |
WIN9G02607 |
310201100320000 |
June 27, 2019 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 310201100320000
Project ID: P00303624MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Lanao-Pagadian-Zamboanga City Rd -
K1746 + 067 - K1746 + 986.90
K1752 + 000 - K1752 + 817.10
Physical Target:
CW-1 - Road Widening: 3.474 lane km.
Unit Cost: P 16,666,666.67/lane km.
EAO: P 2,100,000.00
Allocation: P 60,000,000.00 |
August 21, 2019 |
FY 2019 |
WIN9G02684 |
310107100102000 |
July 15, 2019 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 310107100102000
Project ID: P00300487MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Lanao-Pagadian-Zamboanga City Rd -
K1724 + 122 - K1724 + 326,
K1724 + 585 - K1724 + 737,
K1724 + 814 - K1725 + 087
Physical Target:
CW-1 - Construction of Road Slope Protection Structure: 17,840.901 sq.m.
Unit Cost: P 1,922.55/sq.m.
EAO: P 700,000.00
Allocation: P 35,000,000.00 |
August 21, 2019 |
FY 2019 |
WIN9G02700 |
300116202011000 |
July 22, 2019 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300116202011000
Project ID: P00346121MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects
Concreting of Perimeter Road inside Westmincom, Upper Calarian, Zamboanga City, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Concrete Road: 1.55 lane km.
Unit Cost: P 5,370,000.00/lane km
EAO: P 170,000.00
Allocation: P 8,500,000.00 |
August 21, 2019 |
FY 2019 GAA |
WIN9G02650 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Regional Office XI |
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Tertiary Roads
Fatima-Malabog Rd -
K1501+(-442) - K1501+200, K1501+500 - K1502+200,
K1505+400 - K1506+000, K1506+340 - K1507+010
Physical Target:
CW1: 3.950 Lane Km (Road Widening)
CW2: 753.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 105,000,000.00
CW1: P 63,291,455.00 (Road Widening)
CW2: P 38,033,545.00 (Construction of Road Slope Protection Structure)
EAO: P 3,675,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Tertiary Roads
Fatima-Malabog Rd -
K1501+(-442) - K1501+200, K1501+500 - K1502+200,
K1506+340 - K1507+010
Physical Target:
CW1: 3.950 Lane Km (Road Widening)
CW2: 753.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 105,000,000.00
CW1: P 63,291,455.00 (Road Widening)
CW2: P 38,033,545.00 (Construction of Road Slope Protection Structure)
EAO: P 3,675,000.00 |
August 21, 2019 |
FY 2019 GAA |
WIN9G02649 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Regional Office XI |
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Paving of Unpaved Roads - Tertiary Roads
H-way Jct Mana-Ticulon-Lagumit-Little Baguio Rd -
K1668+251 - K1668+285, K1673+958 - K1675+087,
K1675+112 - K1675+451, K1675+717 - K1675+1103
Physical Target:
CW1: 5.470 Lane Km (Paving of Unpaved Roads)
ROW: 35,865.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 103,000,000.00
CW1: P 98,729,150.00 (Paving of Unpaved Roads)
ROW: P 690,000.00 (ROW Acquisition)
EAO: P 3,580,850.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Paving of Unpaved Roads - Tertiary Roads
H-way Jct Mana-Ticulon-Lagumit-Little Baguio Rd -
K1668+251 - K1668+285, K1673+958 - K1675+087,
K1675+112 - K1675+306, K1675+306 - K1675+451,
K1675+451 - K1675+717, K1675+717 - K1675+1103
Physical Target:
CW1: 5.470 Lane Km (Paving of Unpaved Roads)
CW2: 0.539 Lane Km (Reconstruction to Concrete Pavement)
CW3: 0.539 Lane Km (Road Widening)
ROW: 35,865.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 103,000,000.00
CW1: P 84,021,500.00 (Paving of Unpaved Roads)
CW2: P 6,800,690.00 (Reconstruction to Concrete Pavement)
CW3: P 7,906,960.00 (Road Widening)
ROW: P 690,000.00 (ROW Acquisition)
EAO: P 3,580,850.00 |
August 21, 2019 |
FY 2019 GAA |
WIN9G02686 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Regional Office XI |
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Road Widening (2-4 lanes) along Surigao del Sur Bdry-Davao Or. Coastal Road -
K1562+000 - K1565+000
Physical Target:
CW1: 6.002 Lane Km (Road Widening)
Allocation:
TOTAL: P 77,000,000.00
CW1: P 74,305,000.00 (Road Widening)
EAO: P 2,695,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Road Widening (2-4 lanes) along Surigao del Sur Bdry-Davao Or. Coastal Road -
K1562+000 - K1562+863, K1563+000 - K1564+533
Physical Target:
CW1: 4.792 Lane Km (Road Widening)
ROW: 31,866.80 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 77,000,000.00
CW1: P 67,067,500.00 (Road Widening)
ROW: P 7,500,000.00 (ROW Acquisition)
EAO: P 2,432,500.00 |
August 21, 2019 |
FY 2019 |
WIN9G02681 |
300117204906000 |
July 22, 2019 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117204906000
Project ID: P00355534MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Road Concreting, Barangay Dita, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.316 lane km.
Unit Cost: P 6,266,000.00/lane km
EAO: P 20,000.00
Allocation: P 2,000,000.00 |
August 21, 2019 |
FY 2019 |
WIN9G02702 |
300109200475000 |
July 22, 2019 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300109200475000
Project ID: P00345239MN
Local Program - Flood Control and Drainage - Drainage / Protection Works - Local Infrastructure Program
Construction of Drainage System, Barangay Guiwan, Zamboanga City
Physical Target:
CW-1 - Construction of Drainage Structure: 178 ln.m.
Unit Cost: P 11,123.60/ln.m.
EAO: P 20,000.00
Allocation: P 2,000,000.00 |