Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
August 1, 2019 FY - 2019 WIN9F05761 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Palawan 2nd District Engineering Office
UACS No. 300107200470000
Project ID: P00353445LZ

Local Program

Local - Flood Control and Drainage -
Flood Control Structures/Facilities - Local Infrastructure Program

FROM:

Construction of Danadio Flood Control, Barangay Danadio,
Brooke's Point, Palawan
CW1 - Construction of Flood Mitigation Structure - 0 lineal meter
Unit Cost - php 0/lineal meter
Allocation - Php 5.00 Million

TO:

Construction of Danadio Flood Control, Barangay Danadio,
Brooke's Point, Palawan
CW1 - Construction of Flood Mitigation Structure:
220 lineal meters
Unit Cost - Php 22.50/lineal meters
Allocation - Php 5.00 Million
August 1, 2019 FY - 2019 WIN9F05768 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Palawan 2nd District Engineering Office
UACS No. 300107200472000
Project ID: P00353446LZ

Local Program

Local - flood Control and Drainage -
Flood Control Structures/Facilities - Local Infrastructure Program

FROM:

Construction of Lamikan River Flood Control, Sitio Tina Tagusao,
Barangay Tagusao, Quezon, Palawan
CW1 - Construction of Flood Mitigation Structure: 0 lineal meter
Unit Cost - Php 0/lineal meter
Allocation - Php 5.00 Million

TO:

Construction of Lamikan River Flood Control, Sitio Tina Tagusao,
Barangay Tagusao, Quezon, Palawan
CW1 - Construction of Flood Mitigation Structure -
80 lineal meters
Unit Cost - Php 61.8750/lineal meters
Allocation - Php 5.00 Million
August 1, 2019 FY - 2019 WIN9F05765 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Palawan 2nd District Engineering Office
UACS No. 300107200473000
Project ID: P00353447LZ

Local Program

Local - Flood Control and Drainage -
Flood Control Structures/Facilities - Local Infrastructure Program

FROM:

Construction of Panacan II Flood Control,
Barangay Panacan II, Narra, Plawan
CW1 - Construction of Flood Mitigation Structure: 0 lineal meter
Unit Cost Php 0/lineal meter
Allocation - Php 5.00 Million

TO:

Construction of Panacan II Flood Control,
Barangay Panacan II, Narra, Palawan
CW1 - Construction of Flood Mitigation Structure:
118 lineal maters
Unit Cost - Php 41.9492/lineal meters
Allocation - Php 5.00 Million




August 1, 2019 FY - 2019 WIN9F05766 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Palawan 2nd District Engineering Office
UACS No 300107200468000
Project ID: P00353443LZ

Local Program

Local - Flood Control and Drainage -
Flood Control Structures/Facilities - Local Infrastructure Program

FROM:

Construction of Bunog Flood Control, Barangay Bunog,
Rizal, Palawan
CW1 - Construction of Flood Mitigation Structure: 0 lineal meter
Unit Cost - Php 0/lineal meter
Allocation - Php 5.00 Million

TO:

Construction of Bunog Flood Control, Barangay Bunog,
Rizal, Palawan
CW1 - Construction of Flood Mitigation Structure:
50.35 lineal meters
Unit Cost - Php 98.3118/lineal meters
Allocation - Php 5.00 Million
August 1, 2019 FY - 2019 WIN9F05763 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Palawan 2nd District Engineering Office
UACS No. 300107200469000
Project ID: P00353444LZ

Local Program

Local - Flood Control and Drainage -
Flood Control Structures/Facilities - Local Infrastructure Program

FROM:

Construction of Culasian Flood Control, Barangay Culasian,
Rizal, Palawan
CW1 - Construction of Flood Mitigation Structure: 0 lineal meter
Unit Cost - Php 0/lineal meter
Allocation - php 5.00 million

TO:

Construction of Culasian Flood Control, Barangay Culasian,
Rizal, Palawan
CW1 - Construction of Flood Mitigation Structure:
50.35 lineal meters
Unit Cost - Php 98.3118/lineal meters
Allocation - Php 5.00 million
August 1, 2019 FY - 2019 WIN9F05764 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Palawan 2nd District Engineering Office
UACS No. 300107200474000
Project ID: P00353448LZ

Local Program

Local - Flood Control and Drainage -
Flood Control Structures/Facilities - Local Infrastructure Program

FROM:

Construction of Panitian Flood Contol, Barangay Panitian,
Quezon, Palawan
CW1 - Construction of Flood Mitigation Structure: 0 lineal meter
Unit Cost - Php 0/lineal meter
Allocation - php 5.00 million

TO:

Construction of Panitian Flood Control, Barangay Panitian
Quezon, Palawan
CW1 - Construction of Flood Mitigation Structure:
50.35 lineal meters
Unit Cost - Php 98.3118/lineal meters
Allocation - Php 5.00 Million
August 1, 2019 FY - 2019 WIN9F05767 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Palawan 2nd District Engineering Office
UACS No. 300111200073000
Project ID: P00345370LZ

Local Program

Local - National Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of Various infrastructure including Local Projects

FROM:

Rehabilitation/Improvement (Asphalt Overlay) along Quezon -
Punta Baja & PCR ( Rizal-Panalingan Section ),
K0196+976 - K0197+352,
K0201+377 - K0202+500,
K0204+770 - K0208+100,
Palawan
CW1 - Preventive maintenance of Road: Asphalt Overlay:
0 lane km
Unit Cost - Php 0/lane km
Allocation - Php 100.00 Million

TO:

Rehabilitation/Improvement (Asphalt Overlay) along Quezon -
Punta Baja & PCR ( Rizal - Panalingaan Section ),
K0196+976 - K0197+352,
K0201+377 - K0202+500,
K0204+770 - K0208+100,
Palawan
CW1 - Preventive maintenance of Road: Asphalt Overlay :
9.254 lane km
Unit Cost - Php 10,427.9231/lane km
Allocation - Php 100.00 Million



August 1, 2019 FY - 2019 WIN9F05779 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Palawan 2nd District Engineering Office
UACS No. 300203100050000
Project ID: P00330312LZ

Convergence and Special Support program

Convergence and Special Support - Construction/Improvement of Access Roads leading to Declared Tourism Destinations

FROM:

Balabac Circumferential Road, Balabac, Palawan
CW1 - Construction of Concrete Road: 3 lane km
Unit Cost - Php 16,333.333/lane km
Allocation - Php 50.00 Million

TO:

Balabac, Circumferential Road, Balabac, Palawan
CW1 - Construction of Concrete Road : 2.24 lane km
Unit Cost - Php 21,875.00/lane km
Allocation - Php 50.00 million
July 31, 2019 FY - 2019 WIN9F05775 FY - 2019 GAA DPWH Infra Program May 1, 2019 Region IV-B Regional Office IV-B
UACS No. 310203100155000
Project ID: P00303422LZ

Organizational Outcome 1:
Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

FROM:

F.B. Reyes (Busuanga - Coron) Rd
K0015+550 - K0017+550
CW1 - Road Widening: 4 Lane Km
Allocation: Php 150.00Million

TO:

F.B.Reyes (Busuanga - Coron) Rd
K0014+951.50 - K0015+200.00,
K0015+300.00 - K0016+029.00,
K0017+843.00 - K0020+855.00
CW1 - Road Widening: 7.0015 Lane Km
Allocation: Php 150.00 Million

July 31, 2019 FY - 2019 WIN9F05778 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Regional Office IV-B
UACS No. 310205100246000
Project ID: P00304063LZ

Organizational Outcome 1:
Ensure Safe and Reliable National Road System

Network Development - Construction Of Missing Links/New Roads

FROM:

Odiongan East - West Road, Romblom
CW1 - Construction of Concrete Roads: 2.942 Lane Km
Unit Cost: Php 36,654.91/Lane Km
Allocation: Php 122.526 Million

TO:

Odiongan East - West Road, Romblon
CW1 - Construction of Concrete Roads: 1.460 Lane Km
Unit Cost: Php 73,862.16/Lane Km
Allocation; Php 122.526.00 million
July 31, 2019 FY - 2019 WIN9F05776 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Regional Office IV-B
UACS No. 310108100191000
Project ID: P00300365LZ

Organizational Outcome 1:
Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads

FROM:

Tablas Circumferential Road
K0034+488 - K0034+760
CW1 - Construction of Road Slope Protection Structure: 9,520 sq.m
Unit Cost - Php 15.712/sq.m.
Allocation - Php 150.00 Million

TO:

Tablas Circumferential Road
K0034+185 - K0034+568
CW1 - Construction of Road Slope Protection Structure: 6,762 sq.m
Unit Cost - Php 22.120/sq.m.
Allocation - Php 150.00 Million
July 31, 2019 FY - 2019 WIN9F05775 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Palawan 2nd District Engineering Office
UACS No. 310306100111000
Project ID: P00301379LZ

Organizational Outcome 001:
Ensure Safe and Reliable National Road System

Bridge - Construction of New Bridges

FROM:

Punang Br. along Puerto Princesa South Rd.
CW1 - Construction of Concrete Bridge - 301 sq.m.
Unit Cost - Php 101.3737/sq.m.
Allocation - Php 30.00 Million

TO:

Punang Br. along Puerto Princesa South Rd.
CW1 - Construction of Concrete Bridge - 304.50 sq.m.
Unit Cost - Php 96.5517/sq.m.
Allocation - Php 30.00 Million
July 31, 2019 FY - 2019 WIN9F05754 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Palawan 2nd District Engineering Office
UACS No. 300107200476000
Project ID: O00353450LZ

Local Program

Local - Flood Control and Drainage -
Flood Control Control Structures/Facilities -
Local infrastructure Program

FROM:

Construction of Salungsong Flood Control, Rizal, Palawan
CW1 - Construction of Flood Mitigation Structure: 0 lineal meter
Unit Cost - Php 0/lineal meter
Allocation - Php 5.00 Million

TO:

Construction of Salungsong Flood Control, Rizal, Palawan
CW1 - Construction of Flood Mitigation Structure: 222 lineal meters
Unit Cost - Php 22.2973/lineal meters
Allocation - Php 5.00 Million
July 31, 2019 FY - 2019 WIN9F05756 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Palawan 2nd District Engineering Office
UACS No. 300107200475000
Project ID: P00353449 LZ

Local Program

Local - Flood Control and Drainage -
Flood Control Structures/Facilities -
Local Infrastructure Program

FROM:

Construction of Panitian Flood Control, Barangay Panitian, Sofronio Espanola, Palawan
CW1 - Construction of Flood Mitigation Structure: 0 lineal meter
Unit Coat - Php 0/lineal meter
Allocation - 5.00 Million

TO:

Construction of Panitian Flood Control, Barangay Panitian, Sofronio Espanola, Palawan
CW1 - Construction of Flood Mitigation Structure: 120 lineal meters\
Unit Cost - Php 41.25/lineal meters
Allocation - Php 5.00 Million
July 31, 2019 2019 WIN9F05759 UACS No. 310111100084000 May 5, 2019 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 310111100084000
Project ID.: P00300001LZ
001: Ensure Safe and Reliable National Road System
Assets Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads-
Secondary Roads
Zapote-Alabang Road (S03497LZ), K0021+-565 – K0022+386
Physical Target: CW1 = Upgrading of Drainage Structure along Road = 1,403 Lineal Meter
Unit Cost (P’000) = P12,024.73 /Lineal meter
Allocation = P 16,870,700.00
EAO = P 344,300.00
Total = P 17,215,000.00

As Modified
001: Ensure Safe and Reliable National Road System
Assets Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads-
Secondary Roads
Zapote-Alabang Road (S03497LZ), K0021+335 – K0022+190
Physical Target: CW1 = Upgrading of Drainage Structure along Road = 1,078 Lineal Meter
Unit Cost (P’000) = P15,650.00 /Lineal meter
Allocation = P 16,870,700.00
EAO = P 344,300.00
Total = P 17,215,000.00
WIN9F05759
July 31, 2019 2019 WIN9F05769 UACS No. 310103100224000 May 5, 2019 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 310103100224000
Project ID.: P00302554LZ
001: Ensure Safe and Reliable National Road System
Assets Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads-
Tertiary Road
International Receiver Road – K0019+330 = K0020+776
Physical Target: CW-Asphalt Overlay =8.456 Km
Unit Cost (P’000) = P6,145.83 /Lane km
EAO = P1,967,700.00
Total = P56,220,000.00

As Modified
001: Ensure Safe and Reliable National Road System
Assets Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads-
Tertiary Road
International Receiver Road – K0019+(-)330 = K0019+982
Physical Target: CW-Asphalt Overlay = 5.22 Km
Unit Cost (P’000) = P10,393.16 /Lane km
EAO = P1,967,700.00
Total = P56,220,000.00
WIN9F05769
July 25, 2019 2019 320101103144000 GAA FY2019 May 2, 2019 Region II Isabela 2nd District Engineering Office
OO2: Protect Lives and Properties - Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Mallig River Flood Control Project (Rang Ayan Section), Mallig, Isabela
October 17, 2018 FY 2018 WIN8C03350 310107100015000 May 14, 2018 Region IX Regional Office IX

UACS No. 310107100015000
Project ID: P002000185MN

OO1: Ensure Safe and Reliable National Road System
Asset Preservation/Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Primary Roads
Lanao - Pagadian - Zamboanga City Road
Physical Target:
CW 1 - Const. of Road Slope Protection: 6,959.80 sq.m
Unit Cost: P 15,857.70/sq.m
ROW: 2,028.61 sq.m
Unit Cost: P 300/sq.m
EAO: P 4,025,000.00
Allocation: P 115,000,000
October 17, 2018 FY 2018 WIN8C03350 310107100015000 May 14, 2018 Region IX Regional Office IX

UACS No. 310107100015000
Project ID: P002000185MN

OO1: Ensure Safe and Reliable National Road System
Asset Preservation/Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Primary Roads
Lanao - Pagadian - Zamboanga City Road
Physical Target:
CW 1 - Const. of Road Slope Protection: 6,959.80 sq.m
Unit Cost: P 15,857.70/sq.m
ROW: 2,028.61 sq.m
Unit Cost: P 300/sq.m
EAO: P 4,025,000.00
Allocation: P 115,000,000
October 17, 2018 FY 2018 WIN8C03350 310107100015000 May 14, 2018 Region IX Regional Office IX

UACS No. 310107100015000
Project ID: P002000185MN

OO1: Ensure Safe and Reliable National Road System
Asset Preservation/Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Primary Roads
Lanao - Pagadian - Zamboanga City Road
Physical Target:
CW 1 - Const. of Road Slope Protection: 6,959.80 sq.m
Unit Cost: P 15,857.70/sq.m
ROW: 2,028.61 sq.m
Unit Cost: P 300/sq.m
EAO: P 4,025,000.00
Allocation: P 115,000,000
August 23, 2018 FY 2018 REG8XL00910 UACS No. 310204100161000 May 10, 2018 Region IX Regional Office IX
UACS No. 310204100161000
Project ID: P00200301MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Bypass and Diversion Roads
Labangan-Pagadian City-Dumalinao ZDS Bypass Road, incl. ROW, Zamboanga del Sur
Physical Target:
CW1- Construction of Concrete Road: 12.80 lane km
Unit Cost: P 18,879,025.60/lane km
ROW: 159,494.91sq.m
Unit Cost: P 300/sq.m.
EAO: P 10,500,000.00
Allocation: P 300,000,000.00
August 4, 2018 2018 WIN8F05595 R.A. 10964 December 19, 2017 Region VII Regional Office VII
Organizational Outcome 1: Ensure Safe and Reliable National Road System, Network Development - Construction of Flyovers/ Interchanges/ Underpasses/ Long Span Bridges, Panglao-Tagbilaran City Offshore Connector, Bohol
August 4, 2018 2018 WIN8F05559 R.A. 10964 December 19, 2017 Region VII Cebu 4th District Engineering Office
Organizational Outcome 1: Ensure safe and Reliable National Road System, Network Development-Road Widening of Primary Roads, N. Bacalso Ave. (Cebu South Road) incl. ROW - K0131+000 - K0131+776
August 4, 2018 2018 WIN8F05611 R.A. 10964 December 19, 2017 Region VII Cebu 4th District Engineering Office
Organizational Outcome 1: Ensure safe and Reliable National Road System, Network Development-Road Widening of Secondary Roads, Santander-Barili-Toledo Rd. - K0214+884 - K0216+100
August 4, 2018 2018 WIN8F05683 R.A. 10964 December 19, 2017 Region VII Negros Oriental 1st District Engineering Office
LOCAL PROGRAM: Local Infrastructure Program- Local Roads and Bridges- Local Roads -Construction of Foot Bridge, Brgy. Solonggon-Mandapaton-Cangabo, La Libertad, Negros Oriental
August 4, 2018 2018 WIN8F05575 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/Improvement of Access Roads leading to Declared Tourism Destinations - Jct. TCSR Abucay Norte - Can-agong leading to Lake Linaw, Sikatuna Tree Park & Tarsier Conservation Area, Brgy.Can-agong, Sikatuna, Bohol
August 4, 2018 2018 WIN8F05584 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
LOCAL PROGRAM - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Local Roads and Bridges - Local Roads - Road Concreting Brgy. Dipatlong (1 KM), Maribojoc, Bohol
August 4, 2018 2018 WIN8F05577 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
LOCAL PROGRAM - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Water Management Facilities - Water Supply - Construction of Water Supply System Level III, Barangay Poblacion - Alegria - Candumayao - Baang - Liboron - Triple Union, Catigbian, Bohol
August 4, 2018 2018 WIN8F05579 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Jct.(TNR) Cortes-Balilihan-Catigbian Macaas Rd. K0009+(-090) - K0009+020, K0017+250 - K0017+330, K0027+550 - K0027+600, K0044+506.580 - K0044+521.900, K0045+600 - K0045+847
August 4, 2018 2018 WIN8F05582 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
LOCAL PROGRAM - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Road Concreting Brgy. Jandig (1KM), Maribojoc, Bohol
August 4, 2018 2018 WIN8F05583 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Tagbilaran North Rd (Tagbilaran-Jetafe Sect) - K0006+060 -K0006+237
August 4, 2018 2018 WIN8F05580 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
LOCAL PROGRAM - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Jct. San Isidro - Binayran - Dampas Road, Sta. 00+000 - Sta. 00+315.37, Sta. 00+435 - Sta. 01+225, Tagbiliaran City
August 4, 2018 2018 WIN8F05581 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
LOCAL PROGRAM - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Road Concreting, Tagbilaran City
August 4, 2018 2018 WIN8F05576 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
LOCAL PROGRAM - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road Bicahan-Bantolinao, Antequera, Bohol
August 4, 2018 2018 WIN8F05597 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Sal-ing River Control, Balilihan, Bohol
August 4, 2018 2018 WIN8F05688 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
LOCAL PROGRAM - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Widening and Concreting of Hangos Road, Tagbilaran City (Road leading to new Provincial Capitol
August 4, 2018 2018 WIN8F05687 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Flood Management Program -Construction /Maintenance of Flood Control Mitigation Structure and Drainage Systems - Construction of Cantomimbo River Control, Balilihan, Bohol
August 4, 2018 2018 WIN8F05686 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Flood Management Program -Construction /Maintenance of Flood Control Mitigation Structure and Drainage Systems - Construction of Antequera River Control, Antequera, Bohol
July 27, 2018 FY 2018 WIN8G02508 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Asset Preservation Program – Preventive Maintenance – Primary Roads – San Jose – Lupao Rd, K0160+000 – K0160+778, K0172+299.40 – K0172+565, K0172+592.20 – K0173+716.40
July 26, 2018 FY 2018 WIN8G02509 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Anao - Ramos Rd - K0159 + (-504.40) - K0160 + 624.60, K0162 + 303 - K0163 + 206.50, K0163 + 206.50 - K0163 + 374 , K0164 + 942 - K0166+800
July 24, 2018 2018 WIN8C02894 GAA FY 2018 January 1, 2018 Region VIII Tacloban City District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

FROM:

Daang Maharlika (LT) - K0901 + 1026 - K0902 + 929

Physical Target: Allocation:

CW1- Upgrading of Drainage Structure P 47.726 M
along Road -944 lineal meters
EAO P 0.974 M

Total Allocation: P 48.700 M


AS MODIFIED:

Daang Maharlika (LT) - K0901 + 1026 - K0902 + 933

Physical Target: Allocation:

CW1- Upgrading of Drainage Structure P 47.726 M
along Road -2,690 lineal meters
EAO P 0.974 M

Total Allocation: P 48.700 M
July 24, 2018 2018 WIN8C02415 GAA FY 2018 January 1, 2018 Region VIII Tacloban City District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:

Rizal Avenida Ext Rd - K0905 + -909 - K0905+-736, K0905+-485 - K0905+-440

Physical Target: Allocation:

CW1-Road Widening-0.436 Lane Km P 8.526 M
EAO- P 0.174 M

Total Allocation: P 8.700 M


AS MODIFIED:

Rizal Avenida Ext Rd - K0905 + -909 - K0905+-733, K0905+-733 - K0905+-705, K0905+-480-K0905+-471, K0905+-471-K0905+-440

Physical Target: Allocation:

CW1-Road Widening-0.451 Lane Km P 8.526 M
EAO- P 0.174 M

Total Allocation: P 8.700 M
July 24, 2018 2018 WIN8F05225 GAA FY 2018 January 1, 2018 Region VIII Tacloban City District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM:

Rizal Avenida Ext Rd - K0905+-836 - K0905+-736

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 2.254 M
Structure-321 Sq.m
EAO- P 0.046 M

Total Allocation: P 2.300 M


AS MODIFIED:

Rizal Avenida Ext Rd - K0905+-805 - K0905+-705

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 2.254 M
Structure-321.31 Sq.m
EAO- P 0.046 M

Total Allocation: P 2.300 M
July 24, 2018 2018 WIN8C02384 GAA FY 2018 January 1, 2018 Region VIII Tacloban City District Engineering Office
Local Program

Local Infrastructure Program-National Roads and Bridges-National Roads

FROM:

Improvement/Widening of San Jose-Manlurip-McArthur Park Road, K0913+000-K0914+056, Tacloban City

Physical Target: Allocation:

CW1-Improvement/Widening of P 36.630 M
Road-2.093 Lane Km
EAO- P 0.370 M

Total Allocation: P 37.00 M


AS MODIFIED:

Improvement/Widening of San Jose-Manlurip-McArthur Park Road, K0913+000-K0914+756, Tacloban City

Physical Target: Allocation:

CW1-Improvement/Widening of P 36.630 M
Road-3.498 Lane Km
EAO- P 0.370 M

Total Allocation: P 37.00 M
July 24, 2018 2018 WIN8C02893 GAA FY 2018 January 30, 2018 Region VIII Tacloban City District Engineering Office
Organizational Outcome 2: Protect lives and Properties Against Major Floods

Flood Management Program: Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

FROM:

Construction/Rehabilitation of Flood Control Structure at Tanghas-Lirang Creek, Mahayahay creek, Baruguan River, Kawayan River and Suhi River, Tacloban City

Physical Target: Allocation:

CW1- Construction of Flood Mitigation P 93.875 M
Structure- 850 lineal meters
EAO- P 3.405 M

Total Allocation: P 97.280 M


AS MODIFIED:

Construction/Rehabilitation of Flood Control Structure at Tanghas-Lirang Creek, Mahayahay Creek, Baruguan River, Kawayan River and Suhi River, Tacloban City

Physical Target: Allocation:

CW1- Construction of Flood Mitigation P 93.875 M
Structure- 2,180 lineal meters
EAO- P 3.405 M

Total Allocation: P 97.280 M
July 24, 2018 2018 WIN8C02382 GAA FY 2018 January 1, 2018 Region VIII Tacloban City District Engineering Office
Organizational Outcome1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

FROM:

Tigbao-Sta Fe-Sn Miguel Rd - K0912 + (-180) - K0912 + (-144), K0914 + 023 - K0914 + 080, K0914 + 056 - K0914 + 071, K0914 + 118 - K0914 + 163, K0914 + 153 - K0914 + 431, K0914 + 247 - K0914 + 431

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure-3,891 Sq.m
EAO- P 1.00 M

Total Allocation: P 50.00 M


AS MODIFIED:

Tigbao-Sta Fe-Sn Miguel Rd - K0912 + (-180) - K0912 + (-080), K0914 + (-300) - K0914 + (- 080), K0914 + 023 - K0914 + 080, K0914 + 056 - K0914 + 071, K0914 + 118 - K0914 + 163, K0914 + 153 - K0914 + 431, K0914 + 247 - K0914 + 431

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure-3,578.25 Sq.m
EAO- P 1.00 M

Total Allocation: P 50.00 M
July 24, 2018 2018 WIN8C02830 GAA FY 2018 January 1, 2018 Region VIII Tacloban City District Engineering Office

Organizational Outcome1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

FROM:

Tigbao-Sta Fe-Sn Miguel Rd - K0904 +194 - K0904 + 360, K0905 + (-215) - K0905 + (-131), K0905 + 450 - K0905 + 586, K0905 + 561 - K0905 + 586, K0908 + (-382) - K0908 + (-365), K0908 + (-484) - K0908 + (-370), K0908 + (-690) - K0908 + (-640)

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure-3,196 Sq.m
EAO- P 1.00 M

Total Allocation: P 50.00 M


AS MODIFIED:

Tigbao-Sta Fe-Sn Miguel Rd - K0904 +194 - K0904 + 360, K0905 + (-215) - K0905 + (-131), K0905 + 400 - K0905 + 586, K0905 + 561 - K0905 + 586, K0908 + (-549) - K0908 + (-476), K0908 + (-421) - K0908 + (-275), K0908 + (-382) - K0908 + (-365)

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure-3,694 Sq.m
EAO- P 1.00 M

Total Allocation: P 50.00 M
July 24, 2018 2018 WIN8C02878 GAA FY 2018 January 31, 2018 Region VIII Leyte 4th District Engineering Office
OO2: Protect Lives and Properties

Flood Management-Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers

FROM:

Improvement/Rehabilitation/Rechanneling of Pagsanga-an River including Dredging at Pagsanga-an River Mouth A, Brgy. San Juan, Ormoc City, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 96.500 M
Structure-600.00 Lineal Meter
EAO- P 3.500 M

Total Allocation: P 100.00 M


AS MODIFIED:

Improvement/Rehabilitation/Rechanneling of Pagsanga-an River including Dredging at Pagsanga-an River Mouth A, Brgy. San Juan, Ormoc City, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 96.500 M
Structure-500.00 Lineal Meter
EAO- P 3.500 M

Total Allocation: P 100.00 M

July 24, 2018 2018 WIN8C02418 GAA FY 2018 March 20, 2018 Region VIII Leyte 4th District Engineering Office
Organizational Outcome1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

FROM:

Asphalt Overlay with Thermoplastic Pavement Markings along Palo-Carigara-Ormoc Road K0994+850 - K0999+000

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 96.500 M
Asphalt Overlay-8.342 Lane Km
EAO- P 3.500 M

Total Allocation: P 100.00 M


AS MODIFIED:

Asphalt Overlay with Thermoplastic Pavement Markings along Palo-Carigara-Ormoc Road K0996+335 - K0998+916

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 96.500 M
Asphalt Overlay-10.556 Lane Km
EAO- P 3.500 M

Total Allocation: P 100.00 M
July 23, 2018 2018 WIN8F05693 GAA FY 2018 January 27, 2018 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development - Construction of By-Pass and Diversion Roads

FROM:

Ormoc City Diversion Road (Brgy. San Juan-Lao-Naungan) incl. ROW, Package C, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road- P 386.00 M
20.00 Lane Km
EAO P 14.00 M

Total Allocation: P 400.00 M


AS MODIFIED:

Ormoc City Diversion Road (Brgy. San Juan-Lao-Naungan) incl. ROW, Package C, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road- P 17.093 M
2.16 Lane Km
CW2-Construction of Gravel Road- P 113.059 M
6.504 Lane Km
CW3- Construction of Road Slope Protection P 240.848 M
Structure-5,400 Sq.m
ROW- ROW Acquisition-21,600 Sq.m P 15.00 M
EAO P 14.00 M

Total Allocation: P 400.00 M
July 23, 2018 2018 WIN8F05694 GAA FY 2018 January 29, 2018 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development - Construction of By-Pass and Diversion Roads

FROM:

Construction of Concrete Road-Ormoc City Diversion Road (Brgy. San Juan-Lao-Naungan) Package C, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road- P 193.00 M
10.00 Lane Km
EAO- P 7.00 M

Total Allocation: P 200.00 M


AS MODIFIED:

Construction of Concrete Road-Ormoc City Diversion Road (Brgy. San Juan-Lao-Naungan) Package C1, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road- P 12.176 M
1.32 Lane Km
CW2-Construction of Gravel Road- P 35.695 M
1.98 Lane Km
CW3-Construction of Road Slope Protection P 145.129 M
Structure-3,300 Sq.m
EAO- P 7.00 M

Total Allocation: P 200.00 M
July 23, 2018 2018 WIN8C02421 GAA FY 2018 January 1, 2018 Region VIII Tacloban City District Engineering Office
Organizational Outcome1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads

FROM:

Avenida Veteranos St - Chainage 197 - Chainage 535, Chainage 347 - Chainage 529

Physical Target: Allocation:

CW1-Construction of Drainage Structure- P 10.780 M
510 linear meters
EAO- P 0.220 M

Total Allocation: P 11.00 M


AS MODIFIED:

Avenida Veteranos St - Chainage 110 - Chainage 430

Physical Target: Allocation:

CW1-Construction of Drainage Structure- P 10.780 M
630 linear meters
EAO- P 0.220 M

Total Allocation: P 11.00 M
July 23, 2018 2018 WIN8C02877 GAA FY 2018 January 1, 2018 Region VIII Tacloban City District Engineering Office
Local-Flood Control and Drainage-Drainage/Protection Works

Construction/Repair/Rehabilitation/Improvement of various Infrastructure Including Local Projects

FROM:

Construction of Drainage System, along Main Road of Brgy. 110 Utap, Tacloban City

Physical Target: Allocation:

CW1-Construction of Drainage Structure- P 9.90 M
850 lineal meters
EAO- P 0.10 M

Total Allocation: P 10.00 M


AS MODIFIED:

Construction of Drainage System, along Main Road of Brgy. 110 Utap, Tacloban City

Physical Target: Allocation:

CW1-Construction of Drainage Structure- P 9.90 M
600 lineal meters
EAO- P 0.10 M

Total Allocation: P 10.00 M
July 20, 2018 FY 2018 WIN8G02514 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Improvement / Concreting of Sapang Uwak Road leading to Miyamit Falls, Porac Pampanga
July 20, 2018 FY 2018 WIN8G02513 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Reconstruction (Completion) of Sta. Ursula Bridge, Betis, Guagua, Pampanga
July 17, 2018 FY 2018 WIN8G02339 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Albay 2nd Engineering Office
UACS No.: 300106200017000
Project ID: P00257546LZ
LOCAL PROGRAM – Local - Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Flood Mitigation along Taysan River, Legazpi City
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 802.00 lm
Unit Cost: CW1 – Php 60.16T/lm.
Estimated Cost: Php 50.0 M
(As Modified)
July 17, 2018 FY 2018 WIN8G02348 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Albay 2nd Engineering Office
UACS No.: 300106200008000
Project ID: P00257537LZ
LOCAL PROGRAM – Flood Control and Drainage - Flood Control Structures/ Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Flood Control Structures along Matanag River (Upstream) - Sta. 0+460 - Sta. 0+910 (B/S), Legazpi City
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 900 lm
Unit Cost: CW1 – Php 107.22T/lm.
Estimated Cost: Php 100.0 M
(As Modified)
July 17, 2018 FY 2018 WIN8G02332 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Albay 2nd Engineering Office
UACS No.: 320102100424000
Project ID: P00221296LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction/Improvement of Quirangay River Course (Poblacion Section), Sta. 0+000 - Sta. 0+125.30, Sta. 0+005 - Sta. 0+063, Sta. 0+025 - Sta. 0+125.30, Sta. 0+005 - Sta. 0+063, Albay
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 341.60 lm
Unit Cost: CW1 – Php 71.721T/lm.
Estimated Cost: Php 25.00 M
(As Modified)
July 16, 2018 FY - 2018 WIN8F05662 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
Local Program

Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including drainage
and other ancillary works,
K0111+300 - K0113+800,
Narra

CW1: 9.812 lane km
Allocation: 150,000,000 Php

TO:
Widening of Puerto Princesa Road
from to (2) to six (6) lanes including drainage
and other ancillary works,
K0110+440 - K0110+740,
K0111+300 - K0111+439,
K0111+455 - K0111+677,
K0111+693 - K0113+714,
K0111+736 - K0113+770,
Narra

CW1: 10.892 lane km
Allocation: 150,000,000 Php
July 16, 2018 FY - 2018 WIN8F05663 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
Local Program

Local roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including
drainage and other ancillary works,
K0232+100 - K0234+300,
Bataraza

CW1: 9.248 lane km
Allocation: 135,000,000 Php

TO:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including
drainage and other ancillary works,
K0232+171 - K0234+460,
Bataraza

CW1: 9.604 lane km
Allocation: 135,000,000 Php
July 16, 2018 FY - 2018 Win8F05654 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
Local program

Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Widening of Puerto Princesa Road
from two (2) to six (6) lanes including
drainage and other ancillary works,
K0226+400 - K228+900,

CW1: 9.784 lane km
Allocation: 150,000,000 Php

TO:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including
drainage and other ancillary works,
K0226+400 - K0226+5378,
K0226+562 - K0228+954,
Bataraza

CW1: 10.00 lane km
Allocation: 150,000,000 Php

July 16, 2018 FY 2018 WIN8G02338 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 1st District Engineering Office
UACS No.: 300106200114000
Project ID: P00257615LZ
Local Infrastructure Program – Flood Control and Drainage - Flood control Structures / facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Seawall along the coast of Barangay Poblacion East to Brgy. Poblacion West, Milagros, Masbate
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 358.75 lm
Unit Cost: CW1 – Php 55.19 T/lm
Estimated Cost: Php 20.0 M
(As Modified)
July 16, 2018 FY 2018 WIN8G02502 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300201100014000
Project ID: P00230380LZ
Convergence and Special Support Program –
Construction/Improvement of Access Roads leading to Airports – Jct. DM (Tabon-tabon)-Mariawa-Homapon-Maslog-Lamba-Puro Road leading to Bicol International Airport, Albay
Physical Target: CW1 – Road Widening/ 5.998 lane-km
CW2 - Construction of Drainage Structure along Road/ 4,340 lm.
CW3 - Construction of Road Slope Protection Structure/ 6,687.65 sq.m
Unit Cost: CW1 – Php 16.85 M/lane-km
CW2 – Php 11,042.74/lm.
CW3 – Php 2,248.12/sq.m.
Estimated Cost: Php 170.0 M
(As Modified)

July 16, 2018 FY 2018 WIN8G02503 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310204100075000
Project ID: P00201069LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Construction of By-Pass and Diversion Roads - Camarines Sur-Albay Diversion Road (Camarines Sur Section), Camarines Sur
Physical Target: CW1 – Reconstruction of Concrete Road/ 4.8524 lane-km
CW2 - Construction of Road Slope Protection Structure/ 4,217.62 sq.m.
Right-of-Way Acquisition (ROW)/ 72,786 sq.m.
Unit Cost: CW1 – Php 30.10 M/lane-km
CW2 – Php 8,813.40/sq.m.
ROW Acquisition – Php 134.23/sq.m.
Estimated Cost: Php 200.0 M
(As Modified)
July 16, 2018 FY 2018 WIN8G02503 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310204100075000
Project ID: P00201069LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Construction of By-Pass and Diversion Roads - Camarines Sur-Albay Diversion Road (Camarines Sur Section), Camarines Sur
Physical Target: CW1 – Reconstruction of Concrete Road/ 4.8524 lane-km
CW2 - Construction of Road Slope Protection Structure/ 4,217.62 sq.m.
Right-of-Way Acquisition (ROW)/ 72,786 sq.m.
Unit Cost: CW1 – Php 30.10 M/lane-km
CW2 – Php 8,813.40/sq.m.
ROW Acquisition – Php 134.23/sq.m.
Estimated Cost: Php 200.0 M
(As Modified)
July 13, 2018 2018 WIN8F05501 GAA FY 2018 January 29, 2018 Region VIII Leyte 3rd District Engineering Office
Organizational Outcome1: Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement - Tertiary Roads

FROM:

Tabango-Catmon-La Fortuna-Manlawaan-Gimarco Rd - K1036 + 800 - K1038 + 445

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: P 96.50 M
Shoulder Paving / Construction-
10,004.00 sq.m.
EAO P 3.50 M

Total Allocation: P 100.00 M

AS MODIFIED:

Tabango-Catmon-La Fortuna-Manlawaan-Gimarco Rd - K1036 + 800 - K1038 + 000

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: P 25.483 M
Shoulder Paving / Construction-
7,959.50 sq.m.
CW2-Construction of Slope Protection P 71.017 M
Structure-4,605.00 sq.m.
EAO P 3.50 M

Total Allocation: P 100.00 M
July 13, 2018 2018 WIN8F05635 GAA FY 2018 January 30, 2018 Region VIII Samar 2nd District Engineering Office
Organizational Outcome1: Ensure Safe and Reliable National Road System

Bridge - Widening of Permanent Bridges

FROM:

Silaga Br. (B00397SM) along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br)

Physical Target: Allocation:

CW1-Widening of Bridge- 539.00 Square Meter P 38.208210 M
EAO P 1.385790 M

Total Allocation: P 39.594 M

AS MODIFIED:

Silaga Br. (B00397SM) along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br)

Physical Target: Allocation:

CW1-Widening of Bridge- 269.50 Square Meter P 38.208210 M
EAO P 1.385790 M

Total Allocation: P 39.594 M
July 13, 2018 2018 WIN8F05625 GAA FY 2018 January 27, 2018 Region VIII Samar 2nd District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road
System

Network Development - Construction of By-Pass and Diversion Roads

FROM:

Basey-Maydolong Road, Including ROW and Bridge, Samar

Physical Target: Allocation:

ROW Acquisition-80,000 square meters P 4.825 M
CW1-Construction of Gravel Road- P 24.125 M
8.00 Lane Km
CW2-Construction of Concrete Bridge- P 9.650 M
334.00 square meter
CW3-Construction of Concrete Road- P 9.650 M
4.00 Lane Km
EAO P 1.750 M

Total Allocation: P 50.00 M

AS MODIFIED:

Basey-Maydolong Road, Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road- - P 49.00 M
5.050 Lane Km
EAO P 1.00 M

Total Allocation: P 50.00 M
July 12, 2018 2018 WIN8G02500 SR2018-02-003215 February 1, 2018 Region III Regional Office III
Local Program - Local Roads and Bridges
LocaL Roads

Construction/Improvement/Upgrading of Lubao-Guagua-Minlain-Sto. Tomas Road, Pampanga

Allotment: PHP 1 BILLION

CW-1: Construction of Gravel Road / 55.000ln-km
CW-2: Construction of Drainage Structure along Road / 380 lm
ROW: ROW Acquisition / 466,666.67 sq.m.
July 12, 2018 2018 WIN8G02507 SR2018-02-003447 February 1, 2018 Region III Regional Office III
Local Program - Local Roads and Bridges
Local Bridges

Construction of Ciudad de Victoria Interchange Overpass Bridge, Bocaue, Bulacan

Allotment: PHP 300 MILLION

CW-1: Construction of Concrete Road / 6.399ln-km
CW-2: Construction of Concrete Bridge / 1,526.40sq.m.
ROW: ROW Acquisition / 51,152sq.m.
July 12, 2018 2018 WIN8F05215 GAA FY 2018 January 1, 2018 Region VIII Eastern Samar District Engineering Office
Local Projects

Local Roads and Bridges-Local Roads-Local Infrastructure Program

FROM:

Construction/Repair/Rehabilitation of Road, Barangay Nato to Barangay Bongdo, Borongan, Eastern Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road- P 9.900 M
0.967 Lane Km
EAO P 0.100 M

Total Allocation: P 10.00 M

AS MODIFIED:

Construction/Repair/Rehabilitation of Road, Barangay Nato to Barangay Bongdo, Taft, Eastern Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road- P 9.900 M
1.620 Lane Km
EAO P 0.100 M

Total Allocation: P 10.00 M
July 12, 2018 2018 WIN8F05502 GAA FY 2018 March 20, 2018 Region VIII Biliran District Engineering Office
Local Program

Local- National Roads and Bridges- Local Roads- Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

FROM:

Road Opening and Concreting of Access Road going to Germohenes Waterfalls, Biliran

Physical Target: Allocation:

CW1-Construction of Concrete Road- P 96.500 M
7.00 Lane Km
EAO P 3.500 M

Total Allocation: P 100.00 M

AS MODIFIED:

Road Opening and Concreting of Access Road going to Germohenes Waterfalls, Biliran

Physical Target: Allocation:

CW1-Construction of Concrete Road- P 96.500 M
5.80 Lane Km
EAO P 3.500 M

Total Allocation: P 100.00 M
July 12, 2018 2018 WIN8F05542 GAA FY 2018 January 1, 2018 Region VIII Biliran District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

FROM:

Naval-Caibiran Cross Country Rd - K1027+361 - K1027+660, K1027+788 - K1027+890, K1028 + 770 - K1029 + 740, K1030 + 150 - K1030 + 750, K1030 + 311 - K1030 + 920, K1030+930 - K1031+630, K1031+1000 - K1032+500

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 48.6864 M
along Road-3,794.0 Lineal meters
EAO P 0.9936 M

Total Allocation: P 49.680 M

AS MODIFIED:

Naval-Caibiran Cross Country Rd - K1027+361 - K1027+660, K1027+788 - K1027+890, K1028 + 770 - K1029 + 740, K1030 + 150 - K1030 + 750, K1030 + 311 - K1030 + 920, K1030+930 - K1031+630

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 46.9412 M
along Road-3,794.0 Lineal meters
ROW-ROW Acquisition- P 1.000 M
EAO P 0.9936 M
EXCESS P 0.7452 M

Total Allocation: P 49.680 M
July 12, 2018 2018 WIN8F05541 GAA FY 2018 January 1, 2018 Region VIII Biliran District Engineering Office
Convergence and Special Support Program

Convergence and Special Support-Construction/Improvement of Access Roads leading to Declared Tourism Destination

FROM:

Access Road leading to Tomalistis Falls, Brgy. Asug, Caibiran, Biliran

Physical Target: Allocation:

CW1-Reconstruction from Paved to Concrete- P 4.90 M
0.4 Lane Km
EAO P 0.10 M

Total Allocation: P 5.00 M

AS MODIFIED:

Access Road leading to Tomalistis Falls, Brgy. Asug, Caibiran, Biliran

Physical Target: Allocation:

CW1-Reconstruction from Paved to Concrete- P 2.86966 M
0.28 Lane Km
CW2- Construction of Slope Protection P 1.95534 M
Structure- 190 Square meters
EAO P 0.10 M
EXCESS P 0.075 M

Total Allocation: P 5.00 M
July 12, 2018 2018 WIN8F05073 GAA FY 2018 January 1, 2018 Region VIII Leyte 5th District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development - Off Carriageway Improvement - Secondary Roads

FROM:

Bato-Bontoc Rd - K1116+700 - K1117+851, K1118+030 - K1120+335

Physical Target: Allocation:

CW1 - Off Carriageway Improvement: P 42.614320 M
Shoulder Paving/ Construction-
13,876.00 Square meter
EAO P 0.869680 M

Total Allocation: P 43.484 M


AS MODIFIED:

Bato - Bontoc Rd - K1110 + 848 - K1111 + 000, K1111 + 000 - K1111 + 211, K1111 + 211 - K1111 + 441, K1111 + 441 - K1111 + 484, K1111 + 484 - K1111 + 726, K1111 + 726 - K1111 + 872, K1111 + 872 - K1112 + 000, K1112 + 000 - K1112 + 022, K1112 + 022 - K1112 + 130, K1112 + 130 - K1112 + 227, K1112 + 588 - K1112 + 615, K1112 + 615 - K1112 + 770, K1118 + 030 - K1120 + 335

Physical Target: Allocation:

CW1 - Off Carriageway Improvement: P 42.614320 M
Shoulder Paving/ Construction-
13,876.00 Square meter
EAO P 0.869680 M

Total Allocation: P 43.484 M
July 12, 2018 2018 WIN8F05503 GAA FY 2018 January 29, 2018 Region VIII Leyte 3rd District Engineering Office
Organizational Outcome1: Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement - Secondary Roads

FROM:

Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1011 + 947 - K1014 + 639

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: P 96.50 M
Shoulder Paving / Construction-
16,665.00 sq.m.
EAO- P 3.50 M

Total Allocation: P 100.00 M

AS MODIFIED:

Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1011 + 952 - K1013 + 700

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: P 39.574 M
Shoulder Paving / Construction-
10,821.40 sq.m.
CW2-Construction of Slope Protection P 56.926 M
Structure-4,275.65 sq.m.
EAO- P 3.50 M

Total Allocation: P 100.00 M
July 12, 2018 2018 WIN8F05592 GAA FY 2018 January 31, 2018 Region VIII Leyte 3rd District Engineering Office
Local Program

Local-National Roads and Bridges-Local Roads-Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Calubian-Jubay-Daja Road including Bridges, Calubian and San Isidro, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road- P 168.875 M
6.0 Lane Km
EAO P 6.125 M

Total Allocation: P 175.00 M

AS MODIFIED:

Construction of Calubian-Jubay-Daja Road including Bridges, Calubian and San Isidro, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road- P 61.438 M
6.566 Lane Km
CW2-Construction of Concrete Bridge- P 105.687 M
1,004.41 sq.m
ROW-ROW Acquisition-20,000 sq.m P 1.750 M
EAO P 6.125 M

Total Allocation: P 175.00 M
July 12, 2018 2018 WIN8F05543 GAA FY 2018 January 29, 2018 Region VIII Leyte 3rd District Engineering Office
Organizational Outcome1: Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement - Secondary Roads

FROM:

Sambulawan Jct-Calaguise-Calubian Rd - K0984 + (-300) - K0984 + 771, K0984 + 833 - K0986 + 596

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: P 96.50 M
Shoulder Paving / Construction-
16,671.00 sq.m.
EAO P 3.50 M

Total Allocation: P 100.00 M

AS MODIFIED:

Sambulawan Jct-Calaguise-Calubian Rd - K0984 + (-300) - K0984 + 766, K0984 + 838 - K0985 + 505

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: P 30.544 M
Shoulder Paving / Construction-
9,869.80 sq.m.
CW2-Construction of Slope Protection P 65.956 M
Structure-5,790.60 sq.m.
EAO P 3.50 M

Total Allocation: P 100.00 M
July 11, 2018 FY - 2018 WIN8F05648 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
Local Program

Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Widening of Puerto Princesa Road
from two (2)to six (6) lanes including
drainage structures and other ancillary works,
K0200+100 - K0202+300,
Bataraza

CW1: 8.024 lane km ( Road Widening )
Allocation: 135,000,000 Php

TO:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including drainage
structures and other ancillary works,
K0200+100 - K0201+147,
K0201+173 - K0202+200,
K0202+275 - K0202+435,
Bataraza

CW1: 8.576 lane km ( Road Widening )
Allocation: 135,000,000 Php
July 11, 2018 FY - 2018 WIN8F05652 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
Local Program

Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Widening of Puerto Princesa Road
from two (2) to six (6) lanes including drainage
structures and other ancillary works,
K0175+290 - K0177+600,
Brooke's Point

CW1: 9.176 lane km ( Road Widening )
Allocation: 140,000,000 Php

TO:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including drainage
structures and other ancillary works,
K0175+627 - K0176+185,
K0176+194 - K0177+880,
Brooke's Point

CW1: 9.024 lane km ( Road Widening )
Allocation: 140,000,000 Php
July 11, 2018 2018 WIN8F05112 GAA FY 2018 January 26, 2018 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Primary Roads

FROM:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) incl. ROW - K0870 + 000 - K0870 + 250, K0870 + 850 - K0871 + 445, K0879 + 680 - K0880 + 370, K0881 + 000 - K0881 + 880, K0882 + 100 - K0883 + 000, K0883 + 600 - K0885 + 177, K0885 + 209 - K0885 + 521

Physical Target: Allocation

CW1-Road Widening-10.434 Lane Km P 63.764 M
CW2- ROW Acquisition-53,665.00 Sq.m P 32.736 M
EAO P 3.500 M

Total Allocation: P 100.00 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0870 + 000 - K0870 + 250, K0870 + 850 - K0871 + 445, K0881 + 000 - K0881 + 880, K0883 + 600 - K0884 + 862

Physical Target: Allocation

CW1-Road Widening-6.00 Lane Km P 96.500 M
EAO P 3.500 M

Total Allocation: P 100.00 M
July 11, 2018 2018 WIN8F05113 GAA FY 2018 January 26, 2018 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Primary Roads

FROM:

Daang Maharlika (LT) - K0935 + 585.30 - K0936 + 000, K0935 + -634 - K0935 + 540, K0943 + 277 - K0944 + 225, K0945 + 222 - K0946 + 500

Physical Target: Allocation:

CW1-Road Widening-7.679 Lane Km P 193.00 M
EAO P 7.00 M

Total Allocation: P 200.00 M

AS MODIFIED:

Daang Maharlika (LT) - K0935 + 585.30 - K0936 + 000, K0935 + -634 - K0935 + 540, K0943 + 277 - K0944 + 225, K0945 + 222 - K0946 + 448

Physical Target: Allocation:

CW1-Road Widening-7.5754 Lane Km P 183.00 M
ROW Acquisition- 5,000.00 Sq.m P 10.00 M
EAO P 7.00 M

Total Allocation: P 200.00 M
July 11, 2018 2018 WIN8F05114 GAA FY 2018 January 26, 2018 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Primary Roads

FROM:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) incl. ROW - K0786 + 432 - K0787 + 000, K0789 + 000 - K0790 + 000, K0834 + 000 - K0835 + 000, K0841 + 300 - K0841 + 400, K0842 + 860 - K0844 + 000, K0845 + 000 - K0845 + 440, K0845 + 670 - K0846 + 814

Physical Target: Allocation:

CW1-Road Widening-10.786 Lane Km P 69.108 M
CW2-ROW Acquisition-55,449.00 Sq.m P 27.392 M
EAO P 3.500 M

Total Allocation: P 100.00 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0834 + 000 - K0835 + 000, K0842 + 860 - K0844 + 000, K0845 + 000 - K0845 + 440, K0845 + 670 - K0846 + 081

Physical Target: Allocation:

CW1-Road Widening-6.00 Lane Km P 96.500 M
EAO P 3.500 M

Total Allocation: P 100.00 M
July 11, 2018 2018 OUT8$85139 GAA FY 2018 January 26, 2018 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

FROM:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0680 + 790 - K0680 + 800, K0684 + 840 - K0685 + 020, K0687 + 550 - K0687 + 975, K0688 + 250 - K0688 + 350, K0691 + 800 - K0691 + 900

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 77.200 M
Structure-3,215 Sq.m
EAO P 2.800 M

Total Allocation: P 80.00 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - , K0688 + 250 - K0688 + 350, K0691 + 800 - K0691 + 920

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 77.200 M
Structure-3,534.95 Sq.m
EAO P 2.800 M

Total Allocation: P 80.00 M
July 11, 2018 2018 WIN8F05085 GAA FY 2018 January 26, 2018 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Primary Roads

FROM:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) incl. ROW - K0885 + 553 - K0886 + 036, K0886 + 058 - K0886 + 210, K0887 + 200 - K0887 + 550, K0887 + 800 - K0888 + 950, K0889 + 480 - K0890 + 460, K0890 + 600 - K0890 + 710, K0891 + 410 - K0891 + 800, K0892 + 000 - K0892 + 470, K0893 + 190 - K0894 + 000, K0894 + 100 - K0894 + 300

Physical Target: Allocation:

CW1-Road Widening-10.250 Lane Km P 66.900 M
CW2- ROW Acquisition-5,103.00 Sq.m P 29.600 M
EAO P 3.500 M

Total Allocation: P 100.00 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0888 + 000 - K0888 + 200, K0889 + 480 - K0890 + 000, K0890 + 000 - K0890 + 460, K0890 + 600 - K0890 + 710, K0891 + 410 - K0891 + 800, K0892 + 000 - K0892 + 470, K0893 + 190 - K0893 + 230, K0893 + 230 - K0894 + 000, K0894 + 100 - K0894 + 300

Physical Target: Allocation:

CW1-Road Widening-6.350 Lane Km P 96.500 M
EAO P 3.500 M

Total Allocation: P 100.00 M
July 11, 2018 2018 WIN8F05088 GAA FY 2018 January 26, 2018 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Primary Roads

FROM:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0679 + -056 - K0680 + 133, K0680 + 163.60 - K0680 + 572, K0680 + 596 - K0680 + 879, K0680 + 901.60 - K0682 + 330, K0682 + 345 - K0684 + 389, K0684 + 423 - K0685 + 000, K0690 + 000 - K0690 + 565

Physical Target: Allocation:

CW1-Road Widening-12.562 Lane Km P 193.00 M
EAO P 7.00 M

Total Allocation P 200.00 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0690 + 000 - K0690 + 565, K0679 + (-056) - K0680 + 133, K0680 + 163.60 - K0680 + 572, K0680 + 596 - K0680 + 879, K0680 + 909 - K0682 + 330, K0682 + 345 - K0684 + 389, K0684 + 423 - K0685 + 000,

Physical Target: Allocation:

CW1-Road Widening-12.5468 Lane Km P 193.00 M
EAO P 7.00 M

Total Allocation P 200.00 M
July 11, 2018 2018 WIN8F05087 GAA FY 2018 January 26, 2018 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

FROM:

Arteche-Jipapad-Las Navas-Rawis Rd - K0805 + -237 - K0806 + 748, K0806 + 778 - K0811 + 000

Physical Target: Allocation:

CW1-Asphalt Overlay-12.426 Lane Km P 59.151605 M
EAO P 2.145395 M

Total Allocation: P 61.297 M


AS MODIFIED:

Arteche-Jipapad-Las Navas-Rawis Rd - K0805 + -237 - K0806 + 748, K0806 + 778 - K0810 + 293

Physical Target: Allocation:

CW1-Asphalt Overlay-11.00 Lane Km P 59.151605 M
EAO P 2.145395 M

Total Allocation: P 61.297 M
July 11, 2018 FY 2018 WIN8G02477 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Sur 1st District Engineering Office
UACS No.: 300117201356000
Project ID: P00254194LZ
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Local Infrastructure Program – Construction of Patong-Cagbibi Road, Brgy. Patong, Pamplona, Camarines Sur
Physical Target - CW1 - Construction of Concrete Road / 0.252 lane-km
Unit Cost: Php 7.86M / lane km
Estimated Cost: Php 2.00M
(As Modified)
July 11, 2018 FY 2018 WIN8G02472 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Sur 1st District Engineering Office
UACS No.: 300117201357000
Project ID: P00255759LZ
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Local Infrastructure Program – Reconstruction of Tambo-Calawat Road, Brgy. Calawat, Pamplona, Camarines Sur
Physical Target - CW1 – reconstruction of Concrete Road / 0.24 lane km
Unit Cost: CW1 - Php 8.25 M/lane km
Estimated Cost: Php 2.00 M
(As Modified)
July 11, 2018 2018 WIN8F05587 GAA FY 2018 May 10, 2018 Region VIII Regional Office VIII
Organizational Outcome 2: Protect Lives and Properties Against Major Floods

Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

FROM:

Construction of Flood Control along Poblacion Kananga-Kanawagan River flood control and Protection Work, Kananga, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation Structure- P 48.250 M
870.00 Lineal Meters
EAO P 1.750 M

Total Allocation: P 50.00 M

AS MODIFIED:

Construction of Flood Control along Poblacion Kananga-Kanawagan River flood control and Protection Work, Kananga, Leyte

Physical Target: Allocation:

CW1-Construction of Revetment- P 48.250 M
350.00 Lineal Meters
EAO P 1.750 M

Total Allocation: P 50.00 M
July 11, 2018 FY 2018 WIN8G02486 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Catanduanes District Engineering Office
UACS No.: 320101101718000
Project ID: P00223409LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Bocon Seawall/Causeway, Caramoran, Catanduanes
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 88 lm
Unit Cost: CW1 – Php 556,818.18/lm.
Estimated Cost: Php 50.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02491 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Catanduanes District Engineering Office
UACS No.: 320101101700000
Project ID: P00220236LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program –
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Breakwater Rock Causeway, Brgy. Rawis, Sta. 0+000 - Sta. 0+091, Virac, Catanduanes
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 91 lm
Unit Cost: CW1 – Php 323.077 T/lm.
Estimated Cost: Php 30.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02492 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Catanduanes District Engineering Office
UACS No.: 320101101701000
Project ID: P00220237LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program –
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Breakwater Rock Causeway, Brgy. Rawis, Sta. 0+091 - Sta. 0+167, Virac, Catanduanes
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 76 lm
Unit Cost: CW1 – Php 386.842 T/lm.
Estimated Cost: Php 30.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02476 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300203100144000
Project ID: P00230392LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Pasacao-Balatan Tourism Coastal Highway leading to Pasacao Port to White San Beaches, Brgy. Odicon, Pasacao, Camarines Sur
Physical Target: CW1 – Construction of Gravel Road/ 8.5288 lane-km
CW2 - Construction of Drainage Structure along Road/ 6,272 lm.
CW3 - Construction of Road Slope Protection Structure/ 8,556.23 sq.m.
Unit Cost: CW1 Php 10.046 M/lane km
CW2 - Php 5,505.08/lm
CW3 - Php 2,868.55/sq.m.
Estimated Cost: Php 150.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02483 FY 2018 GAA R.A. 10964 December 28, 2017 Region V Regional Office V
UACS No.: 300204100075000
Project ID: P00230404LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Sta. Cruz-Pandan-Upland Central Economic Zone in Busac-Oma oma-Paulba Road connecting to Ligao-Pioduran Road, incl. bridge in support to Agribusiness (Food Resource Based Processing) Ligao City, Albay
Physical Target: CW1 – Reconstruction from Paved to Concrete/ 3.68 lane-km
CW2 – Construction of Gravel Road/1.029 lane-km
CW3 – Construction of Concrete Bridge/122.11 sq.m.
Unit Cost: CW1 – Php 13.28 M/lane-km
CW2 – Php 13.93 M/lane-km
CW3 – Php 35,671.61 T/sq.m.
Estimated Cost: Php 70.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02495 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300116200121000
Project ID: P00257842LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - Construction of Ariman - Panganiban Coastal Road and Shore Protection, Gubat, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.7332 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,887.99 sq.m.
Unit Cost: CW1 – Php 41.66 M/lane-km
CW2 – Php 34,932.92/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02494 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300116200144000
Project ID: P00257865LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Paghuliran – Poropandan Coastal Road and Shore Protection, Matnog, Sorsogon
Physical Target:CW1 – Construction of Concrete Road/ 0.6168 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,588.26 sq.m.
Unit Cost: CW1 – Php 48.16 M/lane-km
CW2 – Php 42,054.20/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02496 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300116200146000
Project ID: P00257867LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Poropandan – Culasi Coastal Road with Shore Protection, Matnog, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.6067 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,562.25 sq.m.
Unit Cost: CW1 – Php 49.44 M/lane-km
CW2 – Php 42,571.29/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02474 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310201100070000
Project ID: P00201255LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Primary Roads – Daang Maharlika (LZ) – K0376+006 – K0377+540
Physical Target: CW1 - Road Widening/ 3.078 lane-km
CW2 - Construction of Drainage Structure along Road/ 2,654 lm.
Unit Cost: CW1 – Php 20.10 M/lane-km
CW1 – Php 12.00 T/lm.
Estimated Cost: Php 97.122 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02468 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310102100040000
Project ID: P00202708LZ
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program – Preventive Maintenance – Secondary Roads –
Repair/Rehabilitation (Asphalt Overlay) Masbate-Uson-Placer Road (Buenavista-Cawayan Section), Masbate
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay/ 9.054 lane-km
Unit Cost: CW1 – Php 10.66 M/lane-km
Estimated Cost: Php 100.0 M
(As Modified)

Pages