Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
June 13, 2017 2017 WIN7E01556 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 4th District Engineering Office
As per GAA:
MFO 1: National Road Network Services - Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary - Construction of Road Slope Protection Structure - Nabua-Balatan Rd - K0481+032 - K0481+316, K0488+506 - K0488+560, K0489+000 - K0489+590, K0491+148 - K0491+332, K0491+660 - K0491+760 (S03549LZ) (Construction of Road Slope Protection Structure)
Physical Target: 15,448 Sq.m.
Unit Cost: P2.195T/Sq.m.
Allocation: PhP 33.913M

As MODIFIED:
MFO 1: National Road Network Services - Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary - Construction of Road Slope Protection Structure - Nabua-Balatan Rd - K0481+032 - K0481+120, K0488+506 - K0488+560, K0491+148 - K0491+301, K0491+660 - K0491+760 (S03549LZ) (Construction of Road Slope Protection Structure)
Physical Target: 7,408.00 Sq.m.
Unit Cost: P4.577T/Sq.m.
Estimated Cost: PhP 33.913M
June 13, 2017 2017 WIN7E01461 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 4th District Engineering Office
As per GAA:
MFO 1: National Road Network Services - Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National roads including Drainage based on Pavement Management System/Highway Development Management - 4 (HDM-4) - Secondary - Reconstruction from Concrete to Concrete - Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd - K0486+333 - K0487+000 (S05802LZ) (Reconstruction of Concrete Road)
Physical Target: 1.330 Lane-km
Unit Cost: P15,000.00/Lane-km
Allocation: PhP 19.950M

As MODIFIED:
MFO 1: National Road Network Services - Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National roads including Drainage based on Pavement Management System/Highway Development Management - 4 (HDM-4) - Secondary - Reconstruction from Concrete to Concrete - Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd - K0484 + (-031.40) - K0484 + 455, K0485+ (-020.80) - K0485 + 108.80, K0486 + 333 - K0487 + 000 (S05802LZ) (Reconstruction of Concrete Road)
Physical Target: 1.503 Lane-km
Unit Cost: P13,273.45/Lane-km
Estimated Cost: PhP 19.950M
June 13, 2017 2017 WIN7E01503 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 4th District Engineering Office
As per GAA:
MFO 1: National Road Network Services - Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Construction of Road Slope Protection Structure - Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd - K0478+000 - K0478+1000, K0480+672 - K0480+865.40 (S05802LZ) (Construction of Road Slope Protection Structure)
Physical Target: 2,534 Sq.m.
Unit Cost: P8.120T/Sq.m.
Allocation: PhP 20.577M

As MODIFIED:
MFO 1: National Road Network Services - Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Construction of Road Slope Protection Structure - Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd - K0477+782.70 - K0478+1000, K0480+672 - K0480+865.40(S05802LZ) (Construction of Road Slope Protection Structure)
Physical Target: 10,857.21 Sq.m.
Unit Cost: P1.895T/Sq.m.
Estimated Cost: PhP 20.577M
June 13, 2017 2017 WIN7E01547 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 4th District Engineering Office
As per GAA:
MFO 1: National Road Network Services - Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National roads including Drainage based on Pavement Management System/Highway Development Management - 4 (HDM-4) - Secondary - Reconstruction from Concrete to Concrete - Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd - K0470+367 - K0470+000, K0478+035 - K0479+000(S05802LZ) (Reconstruction of Concrete Road)
Physical Target: 2.684 Lane-km
Unit Cost: P7,451.56/Lane-km
Allocation: PhP 20.00M

As MODIFIED:
MFO 1: National Road Network Services - Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National roads including Drainage based on Pavement Management System/Highway Development Management - 4 (HDM-4) - Secondary - Reconstruction from Concrete to Concrete - Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd - K0470+(-202.50) - K0470+000, K0478+035 - K0479+000(S05802LZ) (Reconstruction of Concrete Road)
Physical Target: 2.335 Lane-km
Unit Cost: P8,479.66/Lane-km
Estimated Cost: PhP 19.800M
June 13, 2017 2017 WIN7E01555 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 4th District Engineering Office
As per GAA:
MFO 1: National Road Network Services - Network Development - Improvement /Widening of National Roads - Tertiary, Road Widening - Nabua-Balatan Rd - K0483+591 - K0484+033, K0484+700 - K0487+637 (S03549LZ) (Road Widening)
Physical Target: 3.388 Lane-km
Unit Cost: P14,002.95/Lane-km
Allocation: PhP 47.442M

As MODIFIED:
MFO 1: National Road Network Services - Network Development - Improvement /Widening of National Roads - Tertiary, Road Widening - Nabua-Balatan Rd - K0483+591 - K0484+033, K0484+700 - K0486+000, K0488+506 - K0488+560, K0489+(-173) - K0489+(-126), K0491+(-084) - K0491+(-052), K0491+148 - K0491+301, K0491+660 - K0491+760, K0492+259 - K0492+329, K0493+154 - K0493+309 (S03549LZ) (Road Widening)
Physical Target: 2.353 Lane-km
Unit Cost: P20,162.35/Lane-km
Estimated Cost: PhP 47.442M
June 13, 2017 2017 WIN7E01521 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 4th District Engineering Office
As per GAA:
MFO 1: National Road Network Services - Network Development - Off-Carriageway Improvement including Drainage - Tertiary, Off-Carriageway Improvement: Shoulder Paving/Construction - Nabua-Balatan Rd - K0483 + 000 - K0483 + 591, K0488 + 649 - K0489 + 000, K0489 + 590 - K0489 + 800, K0491 + 332 - K0491 + 660, K0492 + 450 - K0493 + 000 (S035949LZ) (Shoulder Paving/Construction)
Physical Target: 12,354 Sq.m.
Unit Cost: P4,023/Sq.m.
Allocation: PhP 49.703M

As MODIFIED:
MFO 1: National Road Network Services - Network Development - Off-Carriageway Improvement including Drainage - Tertiary, Off-Carriageway Improvement: Shoulder Paving/Construction - Nabua-Balatan Rd - K0477+177 - K0477+440, K0483 + 000 - K0483 + 591, K0488 + 649 - K0488 + 801, K0489 + 590 - K0489 + 800, K0491 + 332 - K0491 + 622, K0492 + 450 - K0493 + 000 (S035949LZ) (Shoulder Paving/Construction)
Physical Target: 11,251 Sq.m.
Unit Cost: P4,417.65/Sq.m.
Estimated Cost: PhP 49.703M
June 13, 2017 2017 WIN7F04813 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Network Development - Improvement/Widening of National Roads - Secondary - Pulilan - Calumpit Road, Bulacan
K0043+-442 - K0043+-196.20, K0043+-053.40 - K0043+547.18, K0045+288.50 - K0045+624.40, K0046+392.00 - K0047+104.00, K0048+138.30 - K0048+325.70, K0050+830.00 - K0052+786.00, K0053+100.00 - K0053+232.00
June 13, 2017 FY 2017 WIN7C01920 UACS NO.: 165003016800113 January 1, 2017 Region VII Cebu 3rd District Engineering Office
MODIFICATION


FROM: MFO 1 – National Road Network Services
Network Development – Off-Carriageway Improvement including drainage-Secondary

Off-Carriageway Improvement: Shoulder Paving/Construction - Toledo -Tabuelan - San Remegio Rd, K0048+441, K0048+454 - K0048+882, K0049+000 - K0049+510, K0055+361 - K0057+640, K0055+732 - K0055+929


TO: MFO 1 – National Road Network Services
Network Development – Off-Carriageway Improvement including drainage-Secondary

Off-Carriageway Improvement along Toledo-Tabuelan-San Remegio Rd (S00245CB) with Drainage, Section 1: K0048+(-409) - K0048+024, Section 2: K0048+055 - K0048+441, Section 3: K0048+454 - K0048+882, Section 4: K0049+000 - K0050+361, Section 5: K0055+361 - K0057+640
June 13, 2017 2017 WIN7F04828 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Repair/Rehabilitation of Multi-Purpose Building, Brgy. Sto. Rosario, Hagonoy, Bulacan
June 13, 2017 2017 WIN7F04829 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads - Construction of Pathway with Slope Protection at Barangay Binacod, Paombong, Bulacan
June 13, 2017 2017 WIN7F04835 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Revetment along Angat River, Caniogan Section, Calumpit, Bulacan
June 13, 2017 2017 WIN7F04842 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction / Rehabilitation of Revetment, Brgy. Tampok, Hagonoy, Bulacan
June 13, 2017 2017 WIN7F04843 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction / Improvement of Classroom, Bambang, Bocaue, Bulacan
June 9, 2017 2017 165004050307383 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Macabaklay, Gapan City, Nueva Ecija
June 9, 2017 2017 165004050307382 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Mabuga, Gapan City, Nueva Ecija
June 9, 2017 2017 165004050307383 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Macabaklay, Gapan City, Nueva Ecija
June 9, 2017 2017 165004050307380 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Las Pinas, Peñaranda, Nueva Ecija
June 9, 2017 2017 165004050307379 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Dampulan, Jaen, Nueva Ecija
June 9, 2017 2017 165004050307375 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Bonifacio, San Leonardo, Nueva Ecija
June 9, 2017 2017 165004050307376 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Buliran, San Antonio, Nueva Ecija
June 9, 2017 2017 165004050306464 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads – Rehabilitation/Concreting of Access Road with drainage and Slope Protection going to San Antonio Terminal, Brgy. Maugat, San Antonio, Nueva Ecija
June 9, 2017 2017 165003017100192 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes - Baluarte Bridge 2 (B01307LZ) along Daang Maharlika (LZ)
June 9, 2017 2017 165004050307393 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. San Roque, Cabiao, Nueva Ecija
June 9, 2017 2017 165004050307392 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. San Mariano, Peñaranda, Nueva Ecija
June 9, 2017 2017 165004050307394 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Sapang, Jaen, Nueva Ecija
June 9, 2017 FY 2017 WIN7F04834 UACS No. 103004010310197 January 1, 2017 National Capital Region North Manila District Engineering Office
As Per GAA
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Construction of Multi-Purpose Building (OFW Center) Brgy. 191, Tondo, Manila (Construction of Multi-Purpose Building)
UACS No. 103004010310197
Physical Target/Cost
Original: 1 building
Unit Cost (P’000): P3,000
Allocation Cost (P’000): P3,000
WIN7F04834

As Modified
Locally Funded Projects – Buildings and Other Strucrtures – Multipurpose/Facilities: Construction of Multi-Purpose Building (OFW Center) Brgy. 91, Tondo, Manila (Construction of Multi-Purpose Building)
UACS No. 103004010310197
Physical Target/Cost
Modified: 1 building
Unit Cost (P’000): P3,000/building
Estimated Cost (P’000): P3,000
WIN7F04834
June 9, 2017 2017 165004050307396 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Sto. Cristo Norte, Gapan City, Nueva Ecija
June 9, 2017 2017 165004050307397 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Sto. Cristo Sur, Gapan City, Nueva Ecija
June 9, 2017 FY 2017 WIN7F04833 UACS No. 103004010310212 January 1, 2017 National Capital Region North Manila District Engineering Office
As per GAA
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Construction of Multi-Purpose Building, Barangay 105, City of Manila (Construction of Multi-Purpose Building)
UACS No. 103004010310212
Physical Target
Original: 1 building
Unit Cost (P’000): P6,500
Allocation Cost (P’000): P6,500
WIN7F04833

As Modified
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Construction of Multi-Purpose Building, J.P. Rizal Elementary School. Manila City (Construction of Multi-Purpose Building)
UACS No. 103004010310212
Physical Target
Modified: 1 building
Unit Cost (P’000): P6,500/building
Allocation Cost (P’000): P6,500
WIN7F04833
June 9, 2017 FY 2017 WIN7F04808 UACS No. 103004010310196 January 1, 2017 National Capital Region North Manila District Engineering Office
s per GAA
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Construction of Multipurpose Building (Center), Barangay 441, Manila City (Construction of Multi-Purpose Building)
UACS No. 103004010310196
Physical Target
Original: 1 building
Unit Cost (P’000): P5,000
Allocation Cost (P’000): P5,000
WIN7F04808

As Modified
Locally Funded Projects – Buildings and Other Structures Multipurpose/Facilities: Construction of Multipurpose Building (Center), Barangay 497, Manila City (Construction of Multi-Purpose Building)
UACS No. 103004010310196
Physical Target
Modified: 1 building
Unit Cost (P’000): P5,000/building
Estimated Cost (P’000): P5,000
WIN7F04808
June 9, 2017 FY 2017 WIN7F04831 UACS No. 103004010310187 January 1, 2017 National Capital Region North Manila District Engineering Office
As per GAA
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Renovation of Day Care, District 4, Zone 53, Brgy. 541, Manila City (Construction of Multi-Purpose Building)
UACS No. 103004010310187
Physical Target
Original: 1 building
Unit Cost (P’000): P2,000
Allocation Cost (P’000): P2,000
WIN7F04831

As Modified
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Construction of Day Care Center, District 4, Zone 53, Brgy. 541, Manila City (Construction of Multi-Purpose Building)
UACS No. 103004010310187
Physical Target
Modified: 1 building
Unit Cost (P’000): P2,000/building
Estimated Cost (P’000): P2,000
WIN7F04831
June 9, 2017 2017 292004020200529 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction of Drainage Canal, Brgy. Sto. Tomas, Peñaranda, Nueva Ecija
June 9, 2017 2017 165004050307449 FY 2017 GAA January 1, 2017 Region III Pampanga 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads - Concreting of Road - Brgy. San Roque Labac, Floridablanca, Pampanga

June 9, 2017 2017 165004050307449 FY 2017 GAA January 1, 2017 Region III Pampanga 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Retaining Wall at Malusac, Sasmuan, Pampanga

June 9, 2017 2017 292003020402570 FY 2017 GAA January 1, 2017 Region III Pampanga 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Dike - Construction / Rehabilitation of Dike Slope Protection along Porac River, Sta. Rita Section, Lubao, Pampanga

June 9, 2017 2017 292003020402563 FY 2017 GAA January 1, 2017 Region III Pampanga 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Slope Protection along Gumain River, Sta. 0+000 to Sta. 0+200, San Pedro Section, Floridablanca, Pampanga

June 9, 2017 2017 292003020402565 FY 2017 GAA January 1, 2017 Region III Pampanga 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Slope Protection along San Jose Creek, San Juan 1 Section, to Sapang Matulid San Isidro Section, Guagua, Pampanga
June 9, 2017 2017 292003020402566 FY 2017 GAA January 1, 2017 Region III Pampanga 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Slope Protection along San Jose Creek, San Vicente (EBUS) Section, Guagua, Pampanga
June 9, 2017 2017 165003014300310 FY 2017 GAA January 1, 2017 Region III Pampanga 2nd District Engineering Office
Asset Preservation of National Roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System / Highway Development Management - 4 (HDM-4) – Tertiary - San Antonio - Floridablanca Rd - K0081+(-149.20) - K0081+(-059.20), K0081+047.40 - K0081+(-022.60)
June 9, 2017 2017 165003014800119 FY 2017 GAA January 1, 2017 Region III Pampanga 2nd District Engineering Office
Asset Preservation of National Roads - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary - Construction of Drainage Structure along Road - Angeles - Porac - Floridablanca - Dinalupihan Road, K0096+698.50 - K0097+679

June 9, 2017 2017 WIN7F04767 FY 2017 GAA January 1, 2017 Region III Bataan 2nd District Engineering Office
Network Development - Improvement/Widening of National Roads - Secondary - Roman Expressway, K0132+786 - K0133+000, K0133+600 - K0134+000
June 9, 2017 2017 WIN7F04650 FY 2017 GAA January 1, 2017 Region III Bataan 2nd District Engineering Office
Network Development - Off-Carriageway Improvement including drainage - Tertiary - Enrique A. Garcia Ave.
K0124+-937 - K0125+345, K0125+-339 - K0124+936
June 9, 2017 2017 WIN7F04768 FY 2017 GAA January 1, 2017 Region III Bataan 2nd District Engineering Office
Construction and Maintenance of Bridges along National Roads - Replacement of Permanent Weak Bridges - Replacement of Bridge - Tuyo Bridge (B01593LZ) along Roman Expressway
June 9, 2017 2017 WIN7E01706 FY 2017 GAA January 1, 2017 Region III Bataan 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure with channel excavation of Talisay River, Cupang Section, Sta. 0+000 to Sta. 0+405, Balanga city, Bataan
June 9, 2017 2017 WIN7F04648 FY 2017 GAA January 1, 2017 Region III Bataan 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure and Channel Excavation of Talisay River, Diwa Nagwaling Section, Sta. 0+000 to Sta. 0+425, Pilar, Bataan
June 9, 2017 2017 WIN7E01663 FY 2017 GAA January 1, 2017 Region III Bataan 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads - Concreting of Roads, Sitio Damulog, Brgy. Daan Pare, Orion, Bataan

June 8, 2017 2017 165004050307390 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. San Anton, San Leonardo, Nueva Ecija
June 8, 2017 2017 165004050307388 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Pulong Matong, General, Tinio, Nueva Ecija
June 8, 2017 2017 165004050307387 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Poblacion West, General Tinio, Nueva Ecija
June 8, 2017 2017 165004050307386 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Pakul, Jaen, Nueva Ecija
June 8, 2017 2017 165004050307384 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Magsalisi, Jaen, Nueva Ecija
June 8, 2017 2017 WIN7G01482 RA 10924 December 29, 2016 Region XIII Butuan City District Engineering Office
Modified:
LFP: LIP - Roads and Bridges - Local Roads

Concreting of Local Road, Mahogany Bridge to Purok 6-A, Brgy. Mahogany, Sta. 0+000-Sta. 0+231.50 w/exception

Allocation : ₱ 2.000 Million

Physical Target : 0.402 lane km
June 8, 2017 2017 WIN7G01541 RA 10924 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Network Development - Improvement/Widening of National Roads - N1

Improvement/Widening of National Roads, N1, Daang Maharlika (Agusan-Davao Sect), Prosperidad, Agusan del Sur, K1283+973 - K1284+200

Allocation : ₱ 17.499 Million (Total)
: ₱ 9,097,896.15 (Road Widening)
: ₱ 8,401,103.85 (Construction of Road Slope Protection Structure)

Physical Target : 0.462 lane km (Road Widening)
: 1,513.60 sq.m. (Construction of Road Slope Protection Structure)
June 8, 2017 2017 WIN7G01542 RA 10924 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Network Development: Improvement/Widening of National Roads - N1

Improvement/Widening of National Roads, N1, Daang Maharlika (Agusan-Davao Sect), Prosperidad, Agusan del Sur, K1266+620 - K1268+003

Allocation : ₱ 29.931 Million

Physical Target : 2.804 lane km
June 8, 2017 2017 WIN7G01544 RA 10924 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Network Development: Improvement/Widening of National Roads - N1

Improvement/Widening of National Roads, N1, Daang Maharlika (Agusan-Davao Sect), Prosperidad, Agusan del Sur, K1272+000 - K1272+584

Allocation : ₱ 17.57 Million

Physical Target : 1.168 lane km
June 8, 2017 2017 WIN7G01525 RA 10924 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW

Construction of Gravel Road - Completion of the East-West Lateral Road connecting Agusan del Sur/Agusan del Norte to Bukidnon, Agusan-Malaybalay Road, Esperanza, Package 2, Agusan del Sur, Sta. 1306+420 - Sta. 1307+520

Allocation : ₱ 20.000 Million

Physical Target : 2.20 lane km
June 8, 2017 2017 WIN7G01530 RA 10924 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW

Construction of Gravel Road - Completion of the East-West Lateral Road connecting Agusan del Sur/Agusan del Norte to Bukidnon, Agusan-Malaybalay Road, Esperanza, Package 1, Agusan del Sur, Sta. 1305+420.90 - Sta. 1306+420

Allocation : ₱ 20.000 Million

Physical Target : 1.9982 lane km
June 8, 2017 2017 WIN7G01531 Ra 10924 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW

Construction of Gravel Road - Completion of the East-West Lateral Road connecting Agusan del Sur/Agusan del Norte to Bukidnon, Agusan-Malaybalay Road, Esperanza, Package 3, Agusan del Sur, Sta. 1307+520 - Sta. 1308+568

Allocation : ₱ 20.000 Million

Physical Target : 2.096 lane km
June 8, 2017 2017 WIN7G01538 RA 10924 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW

Construction of Gravel Road - Butuan City - Pianing - Tandag Rd (Brgy. Kolambogan - Padiay, Sibagat), Sta. 1257+600 - Sta. 1258+300

Allocation : ₱ 20.000 Million

Physical Target : 1.400 lane km
June 8, 2017 2017 WIN7G01557 RA 10924 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified;
Network Development: Construction of Missing Gaps connecting National Roads, including ROW

Construction of Missing Gaps connecting National Roads including ROW, along Bdry. Bukidnon/Agusan del Norte, Buenavista, (Lawan-lawan Section), Agusan del Norte, Sta. 0+000 - Sta. 1+1776

Allocation : ₱ 44.40 Million (Total)
: ₱ 43,684,605.87 (Construction of Concrete Road)
: ₱ 715,394.13 (ROW Acquisition)

Physical Target : 3.552 lane km (Construction of Concrete Road)
: 35,520.00 sq.m. (ROW Acquisition)
June 8, 2017 2017 WIN7G01554 RA 10924 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW

Construction of Missing Gaps connecting National Roads including ROW, along Agusan-Bukidnon Road, Agusan del Norte, Sta. 2+733 - Sta. 2+958

Allocation : ₱ 5.50 Million (Total)
: ₱ 5,140,692.66 (Construction of Concrete Road)
: ₱ 359,307.34 (ROW Acquisition)

Physical Target : 0.45 lane km (Construction of Concrete Road)
: 4,500.00 sq.m. (ROW Acquisition)
June 8, 2017 2017 WIN7G01558 RA 10924 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes

Widening of Permanent Bridges to more than 2 lanes at Sanghan Br. (B00845MN) along Daang Maharlika (Surigao-Agusan Section), Cabadbaran, Agusan del Norte

Allocation : ₱ 32.00 Million (Total)
: ₱ 29,811,415.26 (Bridge)
: ₱ 2,188,584.74 (ROW)

Physical Target : 238.00 sq.m. (Bridge)
: 266.00 sq.m. (ROW)
June 8, 2017 2017 WIN7G01552 RA 10924 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes

Widening of Permanent Bridges to more than 2 lanes, including ROW, Sta. Ana Bridge (B00838MN) along Daang Maharlika (Surigao-Agusan Section)

Allocation : ₱ 99.00 Million (Total) : ₱ 98,700,000.00 (Bridge)
: ₱ 300,500.00 (ROW)

Physical Target : 943.00 sq.m. (Bridge)
: 200.00 sq.m. (ROW)
June 8, 2017 2017 WIN7G01562 RA 10924 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes

Widening of Permanent Bridges to more than 2 lanes at Baleguian Br. (B00830MN) along Daang Maharlika (Surigao-Agusan Section), Jabonga, Agusan del Norte

Allocation : ₱ 27.96 Million (Total)
: ₱ 23,856,721.46 (Bridge)
: ₱ 4,103,278.54 (ROW)

Physical Target : 256.00 sq.m. (Bridge)
: 200.00 sq.m. (ROW)
June 8, 2017 2017 WIN7G01556 RA 10924 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes

Widening of Permanent Bridges to more than 2 lanes at Sayadion Br. (B00831MN) along Daang Maharlika (Surigao-Agusan Section), Jabonga, Agusan del Norte

Allocation : ₱ 18.00 Million (Total)
: ₱ 15,280,602.74 (Bridge)
: ₱ 2,719,397.26 (ROW)

Physical Target : 165.00 sq.m. (Bridge)
: 200.00 sq.m. (ROW)
June 8, 2017 2017 WIN7G01560 RA 10924 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Improvement of Sta. Ana River, Tubay, Agusan del Norte, Sta. 0+000 - Sta. 0+500

Allocation : ₱ 40.00 Million (Total)
: ₱ 39,958,714.27 (Construction of Flood Mitigation Structure)
: ₱ 41,285.73 (ROW Acquisition)

Physical Target : 500.00 l.m. (Construction of Flood Mitigation Structure)
: 5,000.00 sq.m. (ROW Acquisition)
June 8, 2017 2017 WIN7G01559 RA 10924 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction/Rehabilitation/Improvement of Magallanes River Dike, Magallanes, Agusan del Norte

Allocation : ₱ 45.00 Million (Total)
: ₱ 44,249,250.00 (Construction of Dike)
: ₱ 750,750.00 (ROW Acquisition)

Physical Target : 301.00 l.m. (Construction of Dike)
: 3,010.00 sq.m. (ROW Acquisition)
June 8, 2017 2017 WIN7G01555 Ra 10924 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Improvement/Construction of River Dike along Cabadbaran River, City of Cabadbaran, Agusan del Norte, Sta. 0+000 - Sta. 0+194

Allocation : ₱ 50.00 Million (Total)
: ₱ 49,842,843.17 (Construction of Dike)
: ₱ 157,156.83 (ROW Acquisition)

Physical Target : 194.00 l.m. (Construction of Dike)
: 1,940.00 sq.m. (ROW Acquisition)
June 8, 2017 2017 WIN7G01553 RA 10924 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Project in Karak-an River, City of Cabadbaran, Agusan del Norte, Sta. 0+000 - Sta. 0+180

Allocation : ₱ 45.00 Million (Total)
: ₱ 44,848,605.00 (Construction of Flood Mitigation Structure)
: ₱ 151,395.00 (ROW Acquisition)

Physical Target : 180.00 l.m. (Construction of Flood Mitigation Structure)
: 1,800.00 sq.m. (ROW Acquisition)
June 7, 2017 2017 WIN7F04776 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
Locally-Funded Projects - Buildings and Other Structures Multipurpose/Facilities : Construction of Multi-Purpose
Building (Covered Court), Brgy. Sumaoy, Garchitorena,
Camarines Sur ( Construction of Multi-Purpose Building)
Physical Target: 1 building
Unit Cost (P'000): P1,500/ building
Allocation Cost (P'000): P1,500

As MODIFIED:
Locally-Funded Projects - Buildings and Other Structures Multipurpose/Facilities : Construction of Multi-Purpose
Building, Brgy. Sumaoy, Garchitorena, Camarines Sur (Construction of Multi-Purpose Building)
Physical Target: 1 building
Unit Cost (P'000): P1,500/ building
Estimated Cost (P'000): P1,500
June 7, 2017 2017 WIN7F04599 SR2017-01-000420 January 28, 2017 Region V Regional Office V
As per GAA:
MFO-3 Construction and Maintenance Services of Other
Infra: Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations to Seaports: Construction Of Concrete Road - Cumadcad-Macalaya Port Road, Castilla, Sorsogon
(Construction of Concrete Road)
Physical target: 7.47 lane-km
Unit Cost (P'000): P18,741.63/lane-km
Allocation: P140M

As MODIFIED:
MFO-3 Construction and Maintenance Services of Other
Infra: Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations to Seaports: Construction Of Concrete Road - Cumadcad-Macalaya Port Road, Castilla, Sorsogon
(Construction of Concrete Road)
Physical target: 6.9582 lane-km
Unit Cost (P'000): P20,120.15/lane-km
Estimated Cost: P140M
June 7, 2017 2017 WIN7E01695 SR2017-01-000403 January 28, 2017 Region V Regional Office V
As per GAA:
MFO-2 Flood Management Services: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Drainage Structure - Legaspi City
Urban Drainage Project (Construction of Drainage Structure)
Physical Target: 500 Lm
Unit Cost: P200.00/lm
Allocation: Php 100M

As MODIFIED:
MFO-2 Flood Management Services: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Drainage Structure - Legaspi City
Urban Drainage Project Sta. 2+100 - Sta. 2+539.60 (Construction of Drainage Structure)
Physical Target: 439.60 Lm
Unit Cost: P227.479/lm
Estimated Cost: Php 100M
June 7, 2017 2017 WIN7F04594 SR2017-01-000317 January 28, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Network Services: Network
Development - Off-Carriageway Improvement including drainage — Secondary: Off-Carriageway Improvement:
Shoulder Paving / Construction - Masbate-Cataingan-Placer Rd K0036 + 862 - K0037 + 526, K0040 + 715 - K0041 + 478, K0041 + 491 - K0041 + 621, K0080 + 000 - K0081+ 521 (Off-Carriageway Improvement: Shoulder Paving / Construction)
Physical Target: 3,110 sq.m.
Unit Cost: P27.04T/sq.m.
Allocation: P84.107M

As MODIFIED:
MFO-1 National Road Network Services: Network
Development - Off-Carriageway Improvement including drainage — Secondary: Off-Carriageway Improvement:
Shoulder Paving / Construction - Masbate-Cataingan-Placer Rd K0036 + 862 - K0037 + 526, K0040 + 715 - K0041 + 478, K0041 + 491 - K0041 + 621, K0080 + 000 - K0081+ 521 (Shoulder Paving / Construction)
Physical Target: 24,535 sq.m.
Unit Cost: P3.428T/sq.m.
Estimated Cost: P84.107M
June 7, 2017 2017 WIN7F04606 SR2017-01-000308 January 28, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Network Services: Network
Development - Off-Carriageway Improvement including drainage — Secondary: Off-Carriageway Improvement:
Shoulder Paving / Construction - Masbate-Cataingan-Placer Rd - K0025 + 420 - K0026 + 160, K0027 + 040 - K0028 + 568, K0032 + 000 - K0032 + 686, K0032 + 723 - K0033 + 527, K0036 + 000 - K0036 + 850 (Off-Carriageway Improvement: Shoulder Paving / Construction)
Physical Target: 4,646 sq.m.
Unit Cost: P29.57T/sq.m.
Allocation: P137.408M

As MODIFIED:
MFO-1 National Road Network Services: Network
Development - Off-Carriageway Improvement including drainage — Secondary: Off-Carriageway Improvement:
Shoulder Paving / Construction - Masbate-Cataingan-Placer Rd - K0025 + 420 - K0026 + 160, K0027 + 040 - K0028 + 568, K0032 + 000 - K0032 + 686, K0032 + 723 - K0033 + 527, K0036 + 000 - K0036 + 850 (Shoulder Paving / Construction)
Physical Target: 34,292 sq.m.
Unit Cost: P4.0T/sq.m.
Estimated Cost: P137.408M
June 7, 2017 2017 WIN7E01703 SR2017-01-000248 January 27, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Network Services -Network
Development - Improvement / Widening Of National Roads
- Other Primary: Road Widening - Rolando A Andaya Highway - K0336 + 496 - K0338 + 000, K0339 + 000 - K0341 + 637 (Road Widening)
Physical target: 9.174 lane-km
Unit Cost (P'000): P14,768.80/lane km
Allocation: P135.489M

As MODIFIED:
MFO-1 National Road Network Services -Network
Development - Improvement / Widening Of National Roads
- Other Primary: Road Widening - Rolando A Andaya Highway - K0336 + 496 - K0337 + 700, K0340 + 520 - K0341 + 637(Road Widening / Construction of Drainage Structure)
Physical target:
Road Widening: 4.94080 lane-km
Const. of Drainage Structure: 2,064 lm
Unit Cost (P'000):
Road Widening: P18,182.76/lane-km
Const. of Drainage Structure: P22.11/lm
Estimated Cost: P135.489M

June 7, 2017 2017 WIN7E01702 SR2017-01-000244 January 27, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Network Services -Network
Development - Improvement / Widening Of National Roads
- Other Primary: Road Widening - Rolando A Andaya Highway - K0319+938 - K0320+961, K0320+992 - K0321+376, K0322 + 592 - K0324+000, K0324+000 - K0325+00, K0325+000 - K0326 + 196 (Road Widening)
Physical target: 10.076 lane-km
Unit Cost (P'000): P15,334.55/lane km
Allocation: P154.511M

As MODIFIED:
MFO-1 National Road Network Services -Network
Development - Improvement / Widening Of National Roads
- Other Primary: Road Widening - Rolando A Andaya Highway - K0319+938 - K0320+961, K0320+992 - K0321+376, K0322 + 592 - K0324+300 (Road Widening / Construction of Drainage Structure along Road)
Physical target:
Road Widening: 6.2604 lane-km
Const. of Drainage Structure: 1,659 lm
Unit Cost (P'000):
Road Widening: P18,576.91/lane-km
Const. of Drainage Structure: P23.03/lm
Estimated Cost: P154.511M
June 7, 2017 2017 WIN7F04607 SR2017-01-000152 January 27, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Network Services: Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Tertiary: Reconstruction from Concrete to Concrete - Sn PascuaI-CIaveria Rd - K0001+548 - K0001+706, K0001+776 - K0002+000, K0042+204 - K0042+927, K0044+523 - K0045+000, K0049+000 - K0049+025, K0049+130 - K0049+212, K0054+000 - K0055+310, K0014+407 - K0014+486, K0014+516 - K0014+521, K0014+536 - K0014+541, K0014+571 - K0014+617, K0022+854 - K0023+000(Reconstruction from Concrete to Concrete)
Physical Target: 6.99 lane-km
Unit Cost (P'000): P14,306.15/lane km
Allocation: P100M

As MODIFIED:
MFO-1 National Road Network Services: Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Tertiary: Reconstruction from Concrete to Concrete - Sn PascuaI-CIaveria Rd - K0001+548 - K0001+706, K0001+776 - K0002+000, K0014+407 - K0014+486, K0014+516 - K0014+521, K0014+536 - K0014+541, K0014+571 - K0014+617, K0022+854 - K0023+000, K0042+204 - K0042+927, K0044+523 - K0045+000, K0049+000 - K0049+025, K0049+130 - K0049+212, K0054+000 - K0054+320,
(Reconstruction from Concrete to Concrete)
Physical Target: 4.6332 lane-km
Unit Cost (P'000): P21,583.35/lane km
Estimated Cost: P100M
June 7, 2017 2017 WIN7E01583 SR2017-01-000170 January 27, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Network Services: Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Tertiary: Reconstruction from Concrete to Concrete - Sn Pascual-Claveria Rd - K0004+482 - K0005+017, K0049+212 - K0051+805, K0014+617 - K0015+000 (Reconstruction from Concrete to Concrete)
Physical Target: 7.062 lane-km
Unit Cost (P'000): P15,073.92/lane km
Allocation: P106.452M

As MODIFIED:
MFO-1 National Road Network Services: Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Tertiary: Reconstruction from Concrete to Concrete - Sn PascuaI-CIaveria Rd - Sn Pascual-Claveria Rd - K0004+482 - K0005+017, K0014+617 - K0015+000, K0049+212 - K0051+780 (Reconstruction from Concrete to Concrete / Construction of Drainange Structure)
Physical Target:
Reconst. form Concrete to Concrete: 4.6332 lane-km
Construction of Drainage: 2,095.70 lm.
Unit Cost (P'000):
Reconst. form Concrete to Concrete: P15,653.34/lane-km
Construction of Drainage: P13.21/ lm.
Estimated Cost: P106.452M
June 7, 2017 2017 WIN7F04623 SR2017-01-000196 January 27, 2017 Region V Regional Office V
As per GAA:
MFO 1 - National Road Network Services - Asset preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Construction of Road Slope Protection Structure — Masbate-Cataingan-Placer Rd - K0019+-258 - K0019+100, K0022+330 - K0022+667, K0023+500 - K0023+650, K0054+440 - K0054+510, K0062+900 - K0062+1000, K0064+400 - K0064+540, K0073+488 - K0073+538, K0075+496 - K0075+596, K0078+631 - K0078+681, K0086+227 - K0086+277[Construction of Slope Protection]
Physical Target: 8,037 sq.m.
Unit Cost (P'000): P9.283/sq.m.
Allocation (P'000): P74,563.00

As MODIFIED:
MFO 1 - National Road Network Services - Asset preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Construction of Road Slope Protection Structure — Masbate-Cataingan-Placer Rd - K0019+-258 - K0019+100, K0022+330 - K0022+667, K0023+500 - K0023+650, K0054+440 - K0054+510, K0062+900 - K0062+1000, K0064+400 - K0064+540, K0073+488 - K0073+538, K0075+496 - K0075+596, K0078+631 - K0078+681, K0086+227 - K0086+277[Construction of Slope Protection]
Physical Target: 5,143 sq.m.
Unit Cost (P'000): P14.50/sq.m.
Estimated Cost (P'000): P74,563.00


June 6, 2017 2017 165003030600040 FY 2017 GAA January 1, 2017 Region III Aurora District Engineering Office
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Airports - Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism - Baler Airport Access Road, San Luis, Aurora
June 6, 2017 2017 165003015200115 FY 2017 GAA January 1, 2017 Region III Tarlac District Engineering Office
Network Development - Improvement/Widening of National Roads - Tertiary - Road Widening including Slope Protection Capas - San Jose - Mayantoc - Malacampa Road
K0125+436 - K0128+000, K0141+000 - K0144+175
June 6, 2017 2017 WIN7F04626 FY 2017 GAA RA 10924 December 29, 2016 Region V Sorsogon District Engineering Office
As per GAA:
Locally Funded Projects: Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities, Construction of Aguada Norte River Control, Barangay Aguada Norte, Magallanes, Sorsogon (Construction of Flood Mitigation Structure)
Physical Target: 50 Lm.
Unit Cost: P60T/Lm
Allocation: Php 3M

As MODIFIED:
Locally Funded Projects: Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities, Construction of Aguada Norte Seawall, Barangay Aguada Norte, Magallanes, Sorsogon (Construction of Flood Mitigation Structure)
Physical Target: 35 Lm.
Unit Cost: P85.71T/Lm
Estimated Cost: Php 3M
June 6, 2017 2017 165003016900042 FY 2017 GAA January 1, 2017 Region III Tarlac District Engineering Office
Network Development - Off-Carriageway Improvement including drainage - Tertiary - Off-Carriageway Improvement including drainage Victoria - La Paz Rd
K0141+-433 - K0143+693
June 6, 2017 2017 WIN7F04627 FY 2017 GAA RA 10924 December 29, 2016 Region V Sorsogon District Engineering Office
As per GAA:
Locally Funded Projects: Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities, Construction of Aguada Sur River Control, Barangay Aguada Sur, Magallanes, Sorsogon (Construction of Flood Mitigation Structure)
Physical Target: 50 Lm.
Unit Cost: P60T/Lm
Allocation: Php 3M

As MODIFIED:
Locally Funded Projects: Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities, Construction of Aguada Sur Seawall, Barangay Aguada Sur, Magallanes, Sorsogon (Construction of Flood Mitigation Structure)
Physical Target: 65 Lm.
Unit Cost: P46.15T/Lm
Estimated Cost: Php 3M
June 6, 2017 2017 165003016800048 FY 2017 GAA January 1, 2017 Region III Tarlac District Engineering Office
Network Development - Off-Carriageway Improvement including drainage - Secondary - Paniqui - Camiling - Wawa Rd
K0157+650 - K0158+000, K0158+320 - K0159+855, K0167+745 - K0168+328, K0171+014 - K0171+867
June 6, 2017 2017 165003015200137 FY 2017 GAA January 1, 2017 Region III Tarlac District Engineering Office
Network Development - Improvement/Widening of National Roads - Tertiary - Victoria - Pura Rd
K0148+675 - K0151+336, K0151+431 - K0152+471, K0153+281 - K0153+611
June 6, 2017 2017 165003016900009 FY 2017 GAA January 1, 2017 Region III Tarlac District Engineering Office
Network Development - Off-Carriageway Improvement including drainage - Tertiary - Tarlac City - Sn Jose via Tibag - Burgos Rd
K0129+827 - K0129+202, K0129+214 - K0129+284, K0129+290 - K0131+000, K0131+000 - K0132+038, K0135+533 - K0136+464, K0136+476 - K0136+983
June 6, 2017 2017 WIN7E01698 FY 2017 GAA RA 10924 December 29, 2016 Region V Albay 3rd Engineering Office
As per GAA:
MFO 1: National Road Services Construction and Maintenance of Bridges along National Roads Retrofitting/Strengthening of Permanent Bridges, Retrofitting / Strengthening of Bridge - Guinobatan Br. (30029212) along Daang Maharlika (LZ) (Retrofitting/Strengthening of Bridge)
Physical Target:
CW-1 Retrofitting/Strengthening of Bridge : 1 Bridge
Unit Cost:CW-1 Retrofitting/Strengthening of Bridge : P16,500.00/Bridge
Allocation: Php 16.500M

As MODIFIED:
MFO 1: National Road
Network Services Construction and
Maintenance of Bridges along National Roads Retrofitting/Strengthening of Permanent Bridges, Retrofitting / Strengthening of Bridge - Guinobatan Br. (B00292LZ) along Daang Maharlika (LZ)
(Retrofitting/Strengthening of Bridge)
(Construction of Slope Protectjon Structure)
Physical Target:
CW-1 Retrofitting/Strengthening of Bridge : 1 Bridge
CW-2 Cost. of Slope Protection Structure: 1,519.95 Sq.m.
Unit Cost:CW-1 Retrofitting/Strengthening of Bridge : P5,979.00/Bridge
CW-2 Cost. of Slope Protection Structure: P6.92T/ Sq.m.
Estiamted Cost: Php 16.500M
June 6, 2017 2017 165003014200225 FY 2017 GAA January 1, 2017 Region III Tarlac 2nd District Engineering Office
Asset Preservation of National Roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System / Highway Development Management - 4 (HDM-4) – Secondary - PCWR
K0151+880 - K0153+196

June 6, 2017 2017 WIN7E01699 FY 2017 GAA RA 10924 December 29, 2016 Region V Albay 3rd Engineering Office
As per GAA:
MFO-2 Flood Management Services: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Mitigation Structure - Rehabilitation of Cabilogan Dam, Retaining Dike (Cavasi-Tagpo Section) and Bridge Elements, Ligao, Albay
(Construction of Flood Mitigation Structure)
Physical target: 100 Lm
Unit Cost: P400T/Lm
Allocation: Php 40M

As MODIFIED:
MFO-2 Flood Management Services: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Mitigation Structure - Rehabilitation of Cabilogan Dam, Retaining Dike (Cavasi-Tagpo Section) and Bridge Elements, Ligao, Albay
(Construction of Flood Mitigation Structure)
Physical target: 410 Lm
Unit Cost: P97.56T/Lm
Estimated Cost: Php 40M
June 6, 2017 2017 165003014300316 FY 2017 GAA January 1, 2017 Region III Tarlac District Engineering Office
Asset Preservation of National Roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System / Highway Development Management - 4 (HDM-4) – Tertiary - Capas - San Jose - Mayantoc - Malacampa Rd
K0154+000 - K0156+000
June 6, 2017 2017 103004010311170 FY 2017 GAA January 1, 2017 Region III Tarlac District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction of Multi-Purpose Building (Municipal Hall), Anao, Tarlac

June 6, 2017 2017 103001040311172 FY 2017 GAA January 1, 2017 Region III Tarlac District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction of 2 - Storey Multi-Purpose Building Hall, Barangay Quezon, Gerona, Tarlac
June 6, 2017 2017 268004010101408 FY 2017 GAA January 1, 2017 Region III Tarlac District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - School Buildings - Construction of Classrooms for the Balanti Integrated School, Brgy. Balanti, Tarlac City, Tarlac
June 6, 2017 2017 WIN7F04777 SR2017-01-000560 January 28, 2017 Region V Regional Office V
As per GAA:
MFO 3 - Construction and Maintenance of Other Infrastructures - Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations: Construction of concrete Road Matnog-Sta. Magdalena-Bulusan Road leading to Bulusan National Park (Section Il), Sorsogon (Construction of Concrete Road)
Physical Target: 5.000 lane-km
Unit Cost (P'000): P30,000/lane-km
Allocation Cost (P'000): P150,000

As MODIFIED:
MFO 3 - Construction and Maintenance of Other Infrastructures - Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations: Construction of concrete Road Matnog-Sta. Magdalena-Bulusan Road leading to Bulusan National Park (Section Il), Sorsogon (Construction of Concrete Road)
Physical Target: Road: 4.85584 lane-km
Drainage Structure: 3774.74 lm
Unit Cost (P'000): Road: P21,727/lane-km
Drainage Structure: P11.79T/ lm
Estiamated Cost (P'000): P150,000
June 6, 2017 2017 WIN7F04788 SR2017-01-000551 January 28, 2017 Region V Regional Office V
As per GAA:
MFO 3 - Construction and Maintenance of Other Infrastructures - Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations: Construction of concrete Road Matnog-Sta. Magdalena-Bulusan Road leading to Bulusan National Park (Section I), Sorsogon (Construction of Concrete Road)
Physical Target: 10.940 lane-km
Unit Cost (P'000): P13,711.15/lane-km
Allocation Cost (P'000): P150,000

As MODIFIED:
MFO 3 - Construction and Maintenance of Other Infrastructures - Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations: Construction of concrete Road Matnog-Sta. Magdalena-Bulusan Road leading to Bulusan National Park (Section l), Sorsogon (Construction of Concrete Road)
Physical Target:
CW1-Road: 6.21778 lane-km
CW2-Drainage Structure: 4059.12lm
Unit Cost (P'000):
CW1-Road: P16,909.38/ lane-km
CW2-Drainage Structure: p11.05T/ lm
Estimated Cost (P'000): P150,000
June 6, 2017 2017 WIN7F04783 SR2017-01-000567 January 28, 2017 Region V Regional Office V
As per GAA:
MFO 3 - Construction and Maintenance of Other Infrastructures - Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations: Construction of Concrete Road San Juan Alas-Tagpu-Dayao Road leading to Mandaon Ecotourism Sites, Mandaon, Masbate (Construction of Concrete Road)
Physical Target: 6.240 lane-km
Unit Cost (P'000): P16,025.64/lane-km
Allocation Cost (P'000): P100,000

As MODIFIED:
MFO 3 - Construction and Maintenance of Other Infrastructures - Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations: Construction of Concrete Road San Juan Alas-Tagpu-Dayao Road leading to Mandaon Ecotourism Sites including Bridge, Mandaon, Masbate
(Construction of Concrete Road)
(Construction of Concrete Bridge)
Physical Target:
CW1-Road: 3.87848 Lane-km
CW2-Bridge: 721.224 Sq.m.
Unit Cost (P'000):
CW1-Road: P12,389.04/ Lane-km
CW2-Bridge: P72.029T/ Sq.m.
Estimated Cost (P'000): P100,000
June 6, 2017 2017 WIN7F04789 SR2017-01-000337 January 28, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary, Road Upgrading Gravel to Paved - Jct Catanduanes Cir Rd-Panganiban-Sabloyon Rd - K0078 + 647 - K0082 + 000 (Road Upgrading Gravel to Paved)
Physical Target: 6.404 Lane-km
Unit Cost: P14,996.88/lane-km
Allocation: Php 96.040M

As MODIFIED:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary, Road Upgrading Gravel to Paved - Jct Catanduanes Cir Rd-Panganiban-Sabloyon Rd - K0078 + 647 - K0080 + 810 (Road Upgrading Gravel to Paved)
Physical Target: 4.30502 Lane-km
Unit Cost: P22,308.84/lane-km
Estimated Cost: Php 96.040M
June 6, 2017 2017 WIN7F04771 SR2017-01-000325 January 28, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary, Road Upgrading Gravel to Paved - Jct Catanduanes Cir Rd-Panganiban-Sabloyon Rd - K0066 + 585 - K0067 + 275, K0068 + 312 - K0068 + 352, K0069 + 000 - K0069 + 560, K0069 + 609 - K0071 + 191, K0071 + 245 - K0072 + 037, K0072 + 058 - K0072 + 338 (Road Upgrading Gravel to Paved)
Physical Target: 7.806 Lane-km
Unit Cost: P15,373/lane-km
Allocation: Php 120.00M

As MODIFIED:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary, Road Upgrading Gravel to Paved - Jct Catanduanes Cir Rd-Panganiban-Sabloyon Rd - K0069 + 086.00 - K0071 + 600 (Road Upgrading Gravel to Paved)
Physical Target: 4.84578 Lane-km
Unit Cost: P24,764/lane-km
Estimated Cost: Php 120.00M
June 6, 2017 2017 WIN7F04738 SR2017-01-000330 January 28, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary, Road Upgrading Gravel to Paved - Jct Catanduanes Cir Rd-Panganiban-Sabloyon Rd - K0073 + 481 - K0074 + 010, K0074 + 037 - K0074 + 826, K0074 + 855 - K0075 + 310 (S00037CN) (Road Upgrading Gravel to Paved)
Physical Target: 7.806 Lane-km
Unit Cost: P15,373/lane-km
Allocation: Php 50.960M

As MODIFIED:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary, Road Upgrading Gravel to Paved - Jct Catanduanes Cir Rd-Panganiban-Sabloyon Rd -K0073 + 481 - K0074 + 150 (S00037CN) (Road Upgrading Gravel to Paved)
Physical Target: 1.302 Lane-km
Unit Cost: P38,932.41/lane-km
Estimated Cost: Php 50.690M

Pages