Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
October 3, 2023 2023 FY 2023 GAA December 22, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00714104LZ
UACS : 310302100432000

From :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Replacement of Permanent Weak Bridges - Antipolo Br. 2 along Camarines Sur - Albay Diversion Road

Physical Target :
CW1 - Replacement of Bridge - 0.000 Square meters


TO :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Replacement of Permanent Weak Bridges - Antipolo Br. 2 along Camarines Sur - Albay Diversion Road

Physical Target :
CW1 - Replacement of Bridge - 197.478 Square meters
October 3, 2023 2023 FY 2023 GAA December 22, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00714104LZ
UACS : 310302100432000

From :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Replacement of Permanent Weak Bridges - Antipolo Br. 2 along Camarines Sur - Albay Diversion Road

Physical Target :
CW1 - Replacement of Bridge - 0.000 Square meters


TO :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Replacement of Permanent Weak Bridges - Antipolo Br. 2 along Camarines Sur - Albay Diversion Road

Physical Target :
CW1 - Replacement of Bridge - 197.478 Square meters
October 3, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00732966LZ
UACS : 3002021100104000

From :
CSSP - Construction/ Improvement of Access Road leading to Seaports (Kalsada Tungo sa Paliparan, Riles at Daungan Program - KATUPARAN) - Jct. DM (Tabon-Tabon)-Mariawa-Homapon-Maslog - Lamba - Puro Road leading to Bicol International Airport, Legazpi City, Albay

Physical Target :
CW1 - Construction of Concrete Bridge - 570 Square meters
CW2 - Construction of Concrete Road 3.88 Lane Km


TO :
CSSP - Construction/ Improvement of Access Road leading to Seaports (Kalsada Tungo sa Paliparan, Riles at Daungan Program - KATUPARAN) - Jct. DM (Tabon-Tabon)-Mariawa-Homapon-Maslog - Lamba - Puro Road leading to Bicol International Airport, Legazpi City, Albay

Physical Target :
CW1 - Construction of Concrete Bridge - 660.02 Square meters
CW2 - Construction of Concrete Road - 2.6888 Lane Km
October 2, 2023 2023 WIN3F07520 SR2023-01-003114 January 31, 2023 Region VIII Regional Office VIII
OO2: Protect Lives and Properties Against Major Floods

Flood Management -Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Storm Surge Protection; Wave Wall, Subsection 3.19 (Sta. 4+530 to 4+750), Tacloban City, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 151.841785 M
Structure: 220.00 Lineal meters

EAO P 5.507215 M

Total P 157.349 M

AS MODIFIED:

Construction of Storm Surge Protection; Wave Wall, Subsection 3.19 (Sta. 4+686.50 to 4+866.50), Tacloban City, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 151.772 M
Structure: 180.00 Lineal meters

EXC P 0.072 M

EAO P 5.505000 M

Total P 157.349 M
October 2, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00712060LZ
UACS : 3102041015480000

From :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Naga - Jct. Magarao - Canaman - Libmanan Jct. PPH Road (Skybridge), Camarines Sur

Physical Target :
CW1 - Construction of Viaduct - 2404.08 Square meters


TO :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Naga - Jct. Magarao - Canaman - Libmanan Jct. PPH Road (Skybridge), Camarines Sur

Physical Target :
CW1 - Construction of Gravel Road - 2.095 Lane km
CW2 - Construction of Asphalt Road - 1.54 Lane km
October 2, 2023 2023 SR2023-01-000857 January 30, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Leyte-Samar Inter-Provl Rd- K0912 + 420 - K0912 + 603

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 144.750 M
Structure: 8,333.33 Square meters

EAO P 5.250 M

Total P 150.00 M

AS MODIFIED:

Leyte-Samar Inter-Provl Rd- K0908 + 000 - K0909 + 460, K0911 + 140 - K0912 +040, K0912 + 420 - K0912 + 603

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 88.45119680 M
Structure: 6,095.19 Square meters

CW2-Road Widening: 4.726 Lane Km P 56.29880320 M

EAO P 5.250 M

Total P 150.00 M
October 2, 2023 2023 WIN3F07559 SR2023-06-011340 June 21, 2023 Region VIII Regional Office VIII
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)-Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities

AS PER GAA/ORIGINAL:

Construction of Road, Barangay Nato-Bungdo-Pangabutan, Taft, Eastern Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 48.250 M
: 3.626 Lane Km

EAO P 1.750 M

Total P 50.00 M

AS MODIFIED:

Construction of Road, Barangay Nato-Bungdo-Pangabutan, Taft, Eastern Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 37.00202091 M
: 1.594 Lane Km

CW2-Construction of Road Slope Protection P 11.24797909 M
Structure: 1,676.89 Square meters

EAO P 1.750 M

Total P 50.00 M
October 2, 2023 2023 WIN3F07558 SR2023-06-011339 June 21, 2023 Region VIII Regional Office VIII
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)-Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities

AS PER GAA/ORIGINAL:

Construction of Road, Barangay Lumatod-Danao-Del Remending, Taft, Eastern Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 48.250 M
: 3.626 Lane Km

EAO P 1.750 M

Total P 50.00 M

AS MODIFIED:

Construction of Road, Barangay Lumatod-Danao-Del Remendios, Taft, Eastern Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 37.99028270 M
: 3.626 Lane Km

CW2-Construction of Road Slope Protection P 10.25971730 M
Structure: 1,656.11 Square meters

EAO P 1.750 M

Total P 50.00 M
October 2, 2023 2023 WIN3F07566 SR2023-06-011342 June 21, 2023 Region VIII Regional Office VIII
Convergence and Special Support Program (CSSP)

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)-Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities

AS PER GAA/ORIGINAL:

Improvement/Upgrading of access road & Construction of Multi-purpose bulding in Brgy. 06, Guiuan, Eastern Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 48.250 M
: 3.626 Lane Km

EAO P 1.750 M

Total P 50.00 M

AS MODIFIED:

Improvement/Upgrading of access road & Construction of Multi-purpose bulding in Brgy. 06, Guiuan, Eastern Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 26.98475773 M
: 0.60 Lane Km

CW2-Construction of Road Slope Protection P 13.56500127 M
Structure: 1,898 Square meters

CW3-Construction of Multi-Purpose Building P 7.700241 M
: 1.00 Number of Building

EAO P 1.750 M

Total P 50.00 M M
October 2, 2023 2023 WIN3F07648 FY 2023 GAA December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00713689LZ
UACS : 310305101939000

From :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges - Quitang Br, (B04479LZ) along Danao - Pasacao - Rd

Physical Target :
CW1 - Widening of Bridge - 305.2 Square Meters


TO :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges - Quitang Br, (B04479LZ) along Danao - Pasacao - Rd

Physical Target :
CW1 - Widening of Bridge - 206.064 Square Meters
October 2, 2023 2023 WIN3F07592 SR2023-06-011344 June 21, 2023 Region VIII Regional Office VIII
Convergence and Special Support Program (CSSP)

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)-Flood Mitigation Structures protecting Public Infrastructures/Facilities

AS PER GAA/ORIGINAL:

Construction of Flood Control Structure along Tarusan Creek, Abuyog, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 48.250 M
Structure: 356.317 Lineal meters
EAO P 1.750 M

Total P 50.00 M

AS MODIFIED:

Construction of Flood Control Structure along Tarusan Creek, Abuyog, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 48.250 M
Structure: 118.00 Lineal meters
EAO P 1.750 M

Total P 50.00 M
October 2, 2023 2023 WIN3F07628 SR2023-03-008153 March 23, 2023 Region VIII Regional Office VIII
Convergence and Special Support Program (CSSP)

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)- Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)

AS PER GAA/ORIGINAL:

Construction of Tacloban-Palo Diversion Road including Draiange System, Package B-Barangay Pawing, Palo, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road P 67.550 M
: 0.72 Lane Km

CW2-Construction of Drainage Structure P 77.200 M
along Road: 180 Lineal meters

EAO P 5.250 M

Total P 150.00 M

AS MODIFIED:

Construction of Tacloban-Palo Diversion Road including Draiange System, Package B-Barangay Pawing, Palo, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road P 85.25433551 M
: 0.60 Lane Km

CW2-Construction of Drainage Structure P 9.47596923 M
along Road: 744 Lineal meters

CW3-Construction of Flood Mitigation P 50.01969526 M
Structure: 300 Lineal meters

EAO P 5.250 M

Total P 150.00 M
October 2, 2023 2023 WIN3F07640 SR2023-06-011346 June 21, 2023 Region VIII Regional Office VIII
Convergence and Special Support Program (CSSP)

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)-Flood Mitigation Structures protecting Public Infrastructures/Facilities

AS PER GAA/ORIGINAL:

Construction of Flood Control Structure along Tunga River, Brgy. Astorga, Tunga, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 48.250 M
Structure: 356.317 Lineal meters

EAO P 1.750 M

Total P 50.00 M

AS MODIFIED:

Construction of Flood Control Structure along Tunga River, Brgy. Astorga, Tunga, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 48.250 M
Structure: 216.00 Lineal meters

EAO P 1.750 M

Total P 50.00 M
October 2, 2023 2023 300219101310000 GAA 2023 January 3, 2023 Region II Regional Office II
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructure/Facilities

Construction of Alicaocao Flood Control Project, Sta. 0+000 - Sta. 0+200, Cauayan City, Isabela
September 29, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00712007LZ
UACS : 310204101545000

From :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Milaor - Pili Bypass Road, Package 2, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Bridge - 324.8 Square meters


TO :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Milaor - Pili Bypass Road, Package 5, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Bridge - 424.886 Square meters
September 29, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00713687LZ
UACS : 310305101937000

From :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges - Batand Br. (B00448LZ) along Danao-Pasacao Rd

Physical Target :
CW1 - Widening of Bridge - 305.200 Square meters


TO :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges - Batang Br. (B00448LZ) along Danao-Pasacao Rd

Physical Target :
CW1 - Widening of Bridge - 384.888 Square meters
September 29, 2023 2023 WIN3F07649 FY 2023 GAA December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00713688LZ
UACS : 310305101938000

From :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges - Canal Br. (B00450LZ) along Danao-Pasacao Rd

Physical Target :
CW1 - Widening of Bridge - 401.800 Square Meters


TO :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges - Canal Br. (B00450LZ) along Danao-Pasacao Rd

Physical Target :
CW1 - Widening of Bridge - 272.844 Square Meters
September 27, 2023 2023 300215102464000 GAA 2023 January 3, 2023 Region II Cagayan 3rd District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities

Construction of Bridge Approaches at Sitio Maasin, Brgy. Iraga, Solana, Cagayan Phase II - Package II
September 26, 2023 2023 P00721453MN SR2023-01-000979 January 30, 2023 Region XII Regional Office XII
CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER L/S, STA 0+000 -STA. 0+159, BARANGAY DOLES, MAGPET, NORTH COTABATO
September 26, 2023 2023 P00721649MN SR2023-03-006477 March 3, 2023 Region XII Regional Office XII
CONSTRUCTION OF PULANGI RIVER FLOOD CONTROL PROJECT PHASE II (BARANGAY NABUNDAS SECTION), STA 0+800 - STA 1+068, PIKIT, NORTH COTABATO
September 26, 2023 2023 P00705729MN SR2023-01-002176; SR2023-01-002179; SR2023-01-002184; SR2023-01-002188; SR2023-01-002192 January 30, 2023 Region XII Regional Office XII
1. Paving of Unpaved Roads - Demoloc-Little Baguio-Alabel Rd, K1695+057 - K1695+146.50, Alabel, Sarangani
2. Paving of Unpaved Roads - Demoloc-Little Baguio-Alabel Rd, K1694+275 - K1694+349.6, Alabel, Sarangani
3. Paving of Unpaved Roads - Demoloc-Little Baguio-Alabel Rd, K1694+349.60 - K1694+442.90, Alabel, Sarangani
4. Paving of Unpaved Roads - Demoloc-Little Baguio-Alabel Rd, K1694+442.90 - K1694+587.70, Alabel, Sarangani
5. Paving of Unpaved Roads - Demoloc-Little Baguio-Alabel Rd, K1694+587.70 - K1694+727.80, Alabel, Sarangani
6. Paving of Unpaved Roads - Demoloc-Little Baguio-Alabel Rd, K1694+727.80 - K1695+057, Alabel, Sarangani
September 22, 2023 2023 WIN3F07213 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00739877LZ
UACS : 300215102674000

From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Caramoran Poblacion Bypass Road, Caramoran, Catanduanes

Physical Target :
CW1 - Construction of Concrete Road - 3.852 Lane Km


TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Caramoran Poblacion Bypass Road, Caramoran, Catanduanes

Physical Target :
CW1 - Construction of Concrete Road - 0.938 Lane Km
CW2 - Construction of Road Slope Protection Structure - 2,519.02 Square meters
September 22, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00740453LZ
UACS : 300219101535000

From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Rehabilitation of Revetment along San Francisco River, Downstream of Ponso Steel Bridge - Left Side, Brgy. Magurang-Alnay-Ponso Section, Polangui, Albay

Physical Target :
CW1 - Rehabilitation/ Major Repair of Flood Control Structure - 1081.37 Lineal meters


TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Rehabilitation of Revetment along San Francisco River, Downstream of Ponso Steel Bridge - Both Sides, Brgy. Magurang-Alnay-Ponso Section, Polangui, Albay

Physical Target :
CW1 - Rehabilitation/ Major Repair of Flood Control Structure - 1081.27 Lineal meters
September 22, 2023 2023 WIN3F07630 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00740684LZ
UACS : 300219102037000

From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Seawall in Batalay, Bato, Catanduanes

Physical Target :
CW1 - Construction of Flood Mitigation Structures - 229.201 Lineal meters


TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Seawall in Batalay, Bato, Catanduanes

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 116.4 Lineal meters
September 22, 2023 2023 WIN3F07629 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00742479LZ
UACS : 300225101292000

From :
CSSP - BIP - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Bato River Control (Phase II), Bato, Catanduanes

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 61 Lineal meters


TO :
CSSP - BIP - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Bato River Control (Phase II), Bato, Catanduanes

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 32.96 Lineal meters
September 20, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Norte Sub-District Engineering Office
Project ID : P00736154LZ
UACS : 300219101654000

From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Comprehensive Drainage System of Vinzons, Phase II, Vinzons, Camarines Norte

Physical Target :
CW1 - Construction of Drainage Structure - 710 Lineal Meters


TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Comprehensive Drainage System of Vinzons, Phase II, Vinzons, Camarines Norte

Physical Target :
CW1 - Construction of Drainage Structure - 1400 Lineal Meters
September 20, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Norte Sub-District Engineering Office
Project ID : P00736155LZ
UACS : 300219101655000

From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Comprehensive Drainage System of Daet, Phase II, Daet, Camarines Norte

Physical Target :
CW1 - Construction of Drainage Structure - 466.61 Lineal Meters


TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Comprehensive Drainage System of Daet, Phase II, Daet, Camarines Norte

Physical Target :
CW1 - Construction of Drainage Structure - 988.44 Lineal Meters
September 20, 2023 2023 FY 2023 GAA December 26, 2022 Region V Catanduanes District Engineering Office
Project ID : P00737328LZ
UACS : 300222100179000

From :
CSSP - BIP - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities - Construction of By-Pass Road, Barangay Osmeña and Brgy Bagong Sirang, Baras, Catanduanes

Physical Target :
CW1 - Construction of Concrete Road - 3.21 Lane kilometers


TO :
CSSP - BIP - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities - Construction of By-Pass Road, Barangay Osmeña and Brgy Bagong Sirang, Baras, Catanduanes

Physical Target :
CW1 - Construction of Concrete Road - 0.807 Lane kilometers
CW2 - Widening of Bridge - 131.76 Square meters
CW3 - Construction of Drainage Structure - 774 lineal-meters
September 20, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Norte Sub-District Engineering Office
Project ID : P00739858LZ
UACS : 300215102616000

From :
CSSP - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road (Cong. Elmer Panotes Boulevard), Barangay Mancamagong, Basuc, Camarines Norte

Physical Target :
CW1 - Construction of Concrete Road - 3.3 Lane Km


TO :
CSSP - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road (Cong. Elmer Panotes Boulevard), Barangay Mancamagong, Basuc, Camarines Norte

Physical Target :
CW1 - Construction of Concrete Road - 3.03 Lane Km
CW2 - Construction of Road Slope Structure - 4308.18 Square meters
September 20, 2023 2023 WIN3F06930 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00739875LZ
UACS : 300215102667000

From :
CSSP - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Maguisoc Road, Mercedes, Camarines Norte

Physical Target :
CW1 - Construction of Concrete Road - 3.210 Lane Km


TO :
CSSP - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Manguisoc Road, Mercedes, Camarines Norte

Physical Target :
CW1 - Construction of Concrete Road - 2.14 Lane Km
CW2 - Construction of Drainage Structure along Road - 456.4 Lineal meters
September 20, 2023 2023 WIN3F07457 SR2023-03-006094 March 2, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Tigbao-Sta. Fe-San Miguel Road

Physical Target: Allocation:

CW1-Rehabilitation of Concrete Road P 289.500 M
: 2.32 Lane Km

EAO P 10.500 M

Total P 300.00 M

AS MODIFIED:

Tigbao-Sta. Fe-San Miguel Road - K0908 + 060 - K0908 + 640

Physical Target: Allocation:

CW1-Rehabilitation of Concrete Road P 279.500 M
: 2.32 Lane Km

ROW-ROW Acquisition P 10.00 M
: 20,000.00 Square meters

EAO P 10.500 M

Total P 300.00 M
September 20, 2023 2023 WIN3F07449 SR2023-03-007293 March 15, 2023 Region VIII Regional Office VIII
Convergence and Special Support Program (CSSP)

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)-Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities

AS PER GAA/ORIGINAL:

Construction of Maydolong-Basey Road, Eastern Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 55.970 M
: 4.206 Lane Km

EAO P 2.030 M

Total P 58.00 M

AS MODIFIED:

Construction of Maydolong-Basey Road, Eastern Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 41.48176891 M
: 1.02 Lane Km

CW2-Construction of Drainage Structure P 14.48823109M
along Road: 930 Lineal meters

EAO P 2.030 M

Total P 58.00 M
September 19, 2023 2023 WIN3F07345 SR2023-03-006347 March 3, 2023 Region VIII Regional Office VIII
OO2: Protect Lives and Properties Against Major Floods

Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Revetment along Tigbao River, Phase 2, Tacloban City

Physical Target: Allocation:

CW1-Construction of Revetment: P 110.975 M
819.53 Lineal meters

EAO P 4.025 M

Total P 115.00 M

AS MODIFIED:

Construction of Revetment along Tigbao River, Phase 2, Tacloban City

Physical Target: Allocation:

CW1-Construction of Revetment: P 110.975 M
450.00 Lineal meters

EAO P 4.025 M

Total P 115.00 M
September 19, 2023 2023 WIN3F07396 SR2023-03-006191 February 3, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Network Development-Road Widening-Secondary Roads

AS PER GAA/ORIGINAL:

Arteche-Lapinig-Gamay-Mapanas-Palapag Road

Physical Target: Allocation:

CW1-Road Widening: 13.333 Lane Km P 193.00 M

EAO P 7.00 M

Total P 200.00 M

AS MODIFIED:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd-K0835+554-K0836+060, K0836+160-K0836+220,K0836+260-K0837+750,K0838+000-K0839+090,K0839+660-K0839+800,K0839+965-K0840+052.50

Physical Target: Allocation:

CW1-Road Widening: 6.745 Lane Km P 193.00 M

EAO P 7.00 M

Total P 200.00 M
September 19, 2023 2023 WIN3F07418 SR2023-03-006105 February 3, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd-K0925 + 250 -K0925 + 410

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 125.450 M
Structure: 7,222.22 Square meters

EAO P 4.550 M

Total P 130.00 M

AS MODIFIED:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd-K0925 + 250 -K0925 + 390

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 125.450 M
Structure: 3,743.60 Square meters

EAO P 4.550 M

Total P 130.00 M

September 19, 2023 2023 WIN3F07441 SR2023-01-003247 January 31, 2023 Region VIII Regional Office VIII
Convergence and Special Support Program (CSSP)

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)-Interjurisdictional Roads and/or Bridges ( or, roads that traverse multiple LGU jurisdictions)

AS PER GAA/ORIGINAL:

Construction of Tacloban-Palo Diversion Road including Drainage System, Brgy. 89, Tacloban City

Physical Target: Allocation:

CW1-Construction of Concrete Road P 96.500 M
: 1.965 Lane Km

EAO P 3.500 M

Total P 100.00 M

AS MODIFIED:

Construction of Tacloban-Palo Diversion Road including Drainage System, Brgy. 89, Tacloban City

Physical Target: Allocation:

CW1-Construction of Concrete Road P 58.493268 M
: 0.42 Lane Km

CW2-Construction of Drainage Structure P 38.006732 M
along Road: 105 Lineal meters

EAO P 3.500 M

Total P 100.00 M
September 18, 2023 2023 WIN3F07623 FY 2023 GAA December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00732943LZ
UACS : 300202100258000

From :
CSSP - Construction/ Improvement of Access Road leading to Seaports (Kalsada Tungo sa Paliparan, Riles at Daungan Program - KATUPARAN) - San Isidro-Bahao Road leading to Bahao Port, Libmanan, Camarines Sur

Physical Target :
CW1 - Reconstruction to Concrete Pavement - 0.816 Lane Km


TO :
CSSP - Construction/ Improvement of Access Road leading to Seaports (Kalsada Tungo sa Paliparan, Riles at Daungan Program - KATUPARAN) - San Isidro-Bahao Road leading to Bahao Port, Libmanan, Camarines Sur

Physical Target :
CW1 - Reconstruction to Concrete Pavement - 0.640 Lane Km
September 18, 2023 2023 WIN3F07273 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00736064LZ
UACS : 300219101565000

From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Bato Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Phase 1), Bato, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 513.2 Lineal meters


TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Bato Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Package 1), Bato, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 507.6 Lineal meters
September 18, 2023 2023 WIN3E03175 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 320101109466000
Project ID: P00721327MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

FROM:

Rehabiltation of Dike along Mandakpan-Bonbon Channel, Downstream Section, barangay Mandakpan, Butuan City, Agusan Del Norte

Type of Work:
CW1- Rehabilitation / Major Repair of Flood Control Structure

Physical Target:
CW1- 2,149.839 Lineal meters

Allocation:
TOTAL: P 150,000,00
CW1: P 144,750,000
EAO: P 5,250,000

Unit Cost:
CW1: P 67,330.62/Lineal meters

TO:

Rehabilitation of Dike along Mandakpan-Bonbon Channel, Downstream Section, Butuan City, Agusan Del Norte

Type of Work:
CW1- Rehabilitation / Major Repair of Flood Control Structure

Physical Target:
CW1- 577.800 Lineal meters

Allocation:
TOTAL: P 150,000,00
CW1: P 144,750,000
EAO: P 5,250,000

Unit Cost:
CW1: P 250,519.21/Lineal meters
September 18, 2023 2023 WIN3F07277 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00736065LZ
UACS : 300219101566000

From :
CSSP - SIPAG - Flood Mitigation Structure protecting Public Infrastructures/ Facilities - Construction of Bato Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Phase 2), Bato, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 509.5 Lineal meters


TO :
CSSP - SIPAG - Flood Mitigation Structure protecting Public Infrastructures/ Facilities - Construction of Bato Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Package 2), Bato, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 505 Lineal meters
September 18, 2023 2023 WIN3F07277 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00736066LZ
UACS : 300219101567000

From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Bato Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Phase 3), Bato, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 524.9 Lineal meters


TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Bato Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Package 3), Bato, Camarines Sur

Physical Target :
Construction of Flood Mitigation Structure - 512.5 Lineal meters
September 18, 2023 2023 WIN3F07279 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00736067LZ
UACS : 300219101568000

From :
CSSP - SIPAG - Flood Mitigation Structure protecting Public Infrastructures/ Facilities - Construction of Baao Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Phase 1), Baao, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 483.6 Lineal meters


TO :
CSSP - SIPAG - Flood Mitigation Structure protecting Public Infrastructures/ Facilities - Construction of Baao Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Package 2), Baao, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 500.6 Lineal meters
September 18, 2023 2023 WIN3F07274 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00736068LZ
UACS : 300219101569000

From :
CSSP - SIPAG - Flood Mitigation Structure protecting Public Infrastructures/ Facilities - Construction of Baao Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Phase 2), Baao, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 488.2 Lineal meters


TO :
CSSP - SIPAG - Flood Mitigation Structure protecting Public Infrastructures/ Facilities - Construction of Baao Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Package 2), Baao, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 505.8 Lineal meters
September 18, 2023 2023 WIN3F07278 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00736069LZ
UACS : 30021910157000

From :
CSSP - SIPAG - Flood Mitigation Structure protecting Public Infrastructures/ Facilities - Construction of Baao Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Phase 3), Baao, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 490.1 Lineal meters


TO :
CSSP - SIPAG - Flood Mitigation Structure protecting Public Infrastructures/ Facilities - Construction of Baao Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Package 3), Baao, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 506.1 Lineal meters
September 18, 2023 2023 WIN3F07264 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00736132LZ
UACS : 300219101632000

From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Lanot Seawall, Basud, Camarines Norte

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 179.7 Lineal meters
CW2 - Construction of Concrete Road - 0.359 Lane Km


TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Lanot Seawall, Mercedes, Camarines Norte

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 179.7 Lineal meters
CW2 - Construction of Concrete Road - 0.359 Lane Km
September 18, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Norte Sub-District Engineering Office
Project ID : P00736152LZ
UACS : 300219101652000

From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities Construction of Comprehensive Drainage System of Basud, Basud, Camarines Norte

Physical Target :
CW1 - Construction of Drainage Structure - 1349.18 Lineal Meters


TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Comprehensive Drainage System - Basud, Basuc, Camarines Norte

Physical Target :
CW1 - Construction of Drainage Structure - 2445.63 Lineal Meters
September 18, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Norte Sub-District Engineering Office
Project ID : P00736153LZ
UACS : 300219101653000

From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Comprehensive Drainage System of San Vicente, San Vicente, Camarines Norte

Physical Target :
CW1 - Construction of Drainage Structure - 814.44 Lineal Meters


TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Comprehensive Drainage System of San Vicente, San Vicente

Physical Target :
CW1 - Construction of Drainage Structure - 2445.63 Lineal Meters
September 15, 2023 2023 FY 2023 GAA December 26, 2022 Region V Albay 1st Engineering Office
Project ID : P00725903LZ
UACS : 320101109121000

From :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Rehabilitation/ Improvement of Revetment Wall Downstream at Sta. Teresita River, Iriga City, Camarines Sur, Sta. 9_304 - Sta. 9+529

Physical Target :
CW1 - Rehabilitation/ Major Repair of Flood Control Structure - 711.8 Lineal meters


TO :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Rehabilitation/ Improvement of Revetment Wall Downstream at Sta. Teresita River, Iriga City, Camarines Sur, Sta. 18+025.00 - 18+547.18, Sta, 18+620.00 - 18+809.62

Physical Target :
CW1 - Rehabilitation/ Major Repair of Flood Control Structure - 711.8 Lineal meters
September 15, 2023 2023 WIN3F07622 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00726605LZ
UACS : 320102105448000

From :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Pajo River Flood Control, Virac, Catanduanes

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 744.65 Lineal meters


TO :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Pajo River Flood Control, Virac, Catanduanes

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 780.94 Lineal meters
September 15, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00726616LZ
UACS : 320102105459000

From :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Rehabilitation of Revetment Wall along Bicol River (Right Side), Barangay Sto. Domingom Nabua, Camarines Sur

Physical Target :
CW1 - Rehabilitation/ Major Repair of Flood Control Structure - 502.4 Lineal meters


TO :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Rehabilitation of Revetment Wall along Bicol River (Right Side), Barangay Sto. Domingom Nabua, Camarines Sur

Physical Target :
CW1 - Rehabilitation/ Major Repair of Flood Control Structure - 500.2 Lineal meters
September 15, 2023 2023 WIN3F06975 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00726626LZ
UACS : 320102105469000

From :
OO2 Protect Lives and Properties Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Quinale A River Mitigation Structure (Polangui and Libon Section), Polangui, Albay

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 993.205 Lineal Meters


TO :
OO2 Protect Lives and Properties Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Quinale A River Mitigation Structure (Polangui and Libon Section), Polangui and Libon, Albay

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 569.67 Lineal Meters
September 15, 2023 2023 FY 2023 GAA December 26, 2022 Region V Masbate 3rd District Engineering Office
Project ID : P00727223LZ
UACS : 320101110061000

From :
OO2 Protect Lives and Properties - Flood Management - Construction// Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Mawig Creek Flood Control, Sta. 0+000 - Sta. 0+050.00, Upstream Right Side, Sta. 0+000 - Sta, 030, Upstream Left Side, Sta. 0+000 - Sta. 0+085, Both Sides Downstream, Barangay Poblacion, Dimasalang, Masbate

Physical Target :
CW1 - Construction of Flood Mitigation Structure


TO :
OO2 Protect Lives and Properties - Flood Management - Construction// Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Mawig Creek Flood Control, Upstream Bothsides - Sta. 0+000 - Sta. 0+126.00, Downstream Bothsides - Sta. 0+000 - Sta. 0+122.00, Barangay Poblacion, Dimasalang, Masbate

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 496 lineal meter
September 14, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00711509LZ
UACS : 310204102077000

From :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Camarines Sur Expressway Package 8, Camarines Sur

Physical Target :
CW1 - Construction of Concrete - 2.41 Lane Km

TO :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Camarines Sur Expressway Package 8, Camarines Sur

Physical Target :
CW1 - Construction of Road Slope Protection Structure - 5,126.34 Square meters
September 14, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00712049LZ
UACS : 310205101026000

From :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - San Fernando - San Jacinto - Monreal Road, Package 2, Masbate

Physical Target :
CW1 - Construction of Concrete Road/ 1.05 Lane Km


TO :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - San Fernando - San Jacinto - Monreal Road, Package 2, Masbate

Physical Target :
CW1 - Construction of Concrete Road - 0.628 Lane Km
CW2 - Construction of Drainage Structure along Road - 512.66 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 2410,8 Square meters
September 14, 2023 2023 WIN3F06971 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00712066LZ
UACS : 310201101071000

From :
OO1 Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Rolando A Andaya Highway - K0282 +758 - K0283 + 000, K0296 + 842 - K0296 + 974. K0297 + 582 - K0300 + 000, K0301 + 840 - K0302 + 250, K0302 + 283 - K0303 + 280

Physical Target :
CW1 - Road Widening - 8.228 Lane Km


TO :
OO1 Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Rolando A Andaya Highway - K0301 + 840 - K0302 + 250, K0302 + 283 - K0303 + 185

Physical Target :
CW1 - Road Widening - 2.636 Lane Km
CW2 - Construction of Drainage Structure along Road - 2628.02 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 1083.85 Square meters
September 14, 2023 2023 WIN3F07979 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00712067LZ
UACS : 310201101072000

From :
OO1 Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Rolando A. Andaya Highway - K0304 + 941 - K308 + 241, K0308 + 345 - K0308 + 942, K0308 +970 - K0309 + 162

Physical Target :
CW1 - Road Widening - 8.114 Lane Km


TO :
OO1 Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Rolando A. Andaya Highway - K0307 + 032 - K0308 + 000

Physical Target :
CW1 - Road Widening - 1.936 Lane Km
CW2 - Construction of Drainage Structure along Road - 1913.2 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 6119.48
September 14, 2023 2023 P00705729MN SR2023-01-002172 January 30, 2023 Region XII Regional Office XII
Paving of Unpaved Roads - Demoloc-Little Baguio-Alabel Rd, K1695+057 - K1695+146.50, Alabel, Sarangani
September 13, 2023 2023 WIN3F07565 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00741235LZ
UACS : 300221102303000

From :
CSSP - BIP - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Sta. Rosa Norte - San Rafael - Sitio Sugsugin - Parang Road, Jose Panganiban, Camarines Norte

Physical Target :
CW1 - Construction of Concrete Road - 6.419 Lane Km

TO :
CSSP - BIP - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Sta. Rosa Norte - San Rafael - Sitio Sugsugin - Parang Road, Jose Panganiban, Camarines Norte

Physical Target :
CW1 - Construction of Concrete Road - 2.4288 Lane Km
September 13, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00741978LZ
UACS : 300221103579000

From :
CSSP - BIP - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road Samaka, Barangay Camambugan, Daet, Camarines Norte

Physical Target :
CW1 - Construction of Concrete Road - 3.21 Lane Km

TO :
CSSP - BIP - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road Samaka, Barangay Camambugan, Daet, Camarines Norte

Physical Target :
CW1 - Construction of Concrete Road - 1.7933 Lane Km
CW2 - Construction of Drainage Structure along Road - 1610.86 Lineal meters
September 13, 2023 2023 WIN3F07529 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00742105LZ
UACS : 300224100021000

From :
CSSP - BIP - Coastal Roads/ Causeway for environmental protection/ conservation - Construction of Talisay Coastal Road, Masbate

Physical Target :
CW1 - Construction of Concrete Road - 6.419 Lane Km

TO :
CSSP - BIP - Coastal Roads/ Causeway for environmental protection/ conservation - Construction of Talisay Coastal Road, Masbate

Physical Target :
CW1 - Construction of Concrete Road - 0.8044 Lane Km
CW2 - Construction of Road Slope Protection Structure - 1467.1 Square meters
September 13, 2023 2023 FY 2023 GAA December 26, 2022 Region V Sorsogon District Engineering Office
Project ID : P00743960LZ
UACS : 300226107236000

From :
CSSP - BIP - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building, (Sorsogon Pilot Elementary School), Brgy. Macabog, Sorsogon City, Sorsogon

Physical Target :
CW1 - Construction of Multi-Purpose Building - 1 Number of Buildings

TO :
CSSP - BIP - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building, (Sorsogon Pilot Elementary School), Brgy. Sirangan, Sorsogon City, Sorsogon

Physical Target :
CW1 - Construction of Multi-Purpose Building - 1 Number of Buildings
September 13, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00744154LZ
UACS : 300229100277000

From :
CSSP - BIP - Public Water Supply System (Level II or III) - Construction of Solar Water System Level II at Barangay Cagbungan (Zone 4), Pamplona, Camarines Sur

Physical Target :
CW1 - Construction of Water Supply System - 1 Number of Water Supply System

TO :
CSSP - BIP - Public Water Supply System (Level II or III) - Construction of Solar Water System Level II at Barangay Cagbungan, Pamplona, Camarines Sur

Physical Target :
CW1 - Construction of Water Supply System - 1 Number of Water Supply System
September 12, 2023 2023 WIN3F07533 FY 2023 GAA December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00736096
UACS : 300219101597000

From :
CSSP - SIPAG - Flood Mitigation Structure protecting Public Infrastructure/ Facilities - Construction of Dike along Bicol River (Phase 2), Brgy. Bagongbong, Minalabac, Camarines Sur

Physical Target :
CW1 - Construction of Dike - 1,377.565 Lineal meters

TO :
CSSP - SIPAG - Flood Mitigation Structure protecting Public Infrastructure/ Facilities - Construction of Dike along Bicol River (Phase 2), Brgy. Bagongbong, Minalabac, Camarines Sur

Physical Target :
CW1 - Construction of Dike - 200 Lineal meters
September 12, 2023 2023 WIN3F07539 FY 2023 GAA December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00736128LZ
UACS : 300219101629000

From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Revetment along Libmanan River, Barangay Mambalite, Libmanan, Camarines Sur

Physical Target :
CW1 - Construction of Revetment - 534.803 Lineal meters

TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Revetment along Libmanan River, Barangay Mambalite, Libmanan, Camarines Sur

Physical Target :
CW1 - Construction of Revetment - 85.000 Lineal meters
September 12, 2023 2023 WIN3F07538 FY 2023 GAA December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00736362LZ
UACS : 300215102641000

From :
CSSP - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Rehabilitation of Road, Brgy. Sta. Rosa Del Sur, Pasacao, Camarines Sur

Physical Target :
CW1 - Rehabilitation of Paved Road - 16.536 Lane Km

TO :
CSSP - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Rehabilitation of Road, Brgy. Sta. Rosa Del Sur, Pasacao, Camarines Sur

Physical Target :
CW1 - Reconstruction to Concrete Pavement - 1.800 Lane Km
September 12, 2023 2023 WIN3F07532 FY 2023 GAA December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00736594LZ
UACS : 300215103314000

From :
CSSP - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Libmanan Cabusao Pump Irrigation System (LCPIS) Main Canal Service Road, Libmanan, Camarines Sur (KATUBIGAN - Kalsada Tungo sa Patubigan)

Physical Target :
CW1 - Construction of Concrete Road - 0.770 Lane km

TO :
CSSP - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Libmanan Cabusao Pump Irrigation System (LCPIS) Main Canal Service Road, Libmanan, Camarines Sur (KATUBIGAN - Kalsada Tungo sa Patubigan)

Physical Target :
CW1 - Construction Concrete Road - 0.400 Lane km
September 12, 2023 2023 WIN3F07534 FY 2023 GAA December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00737563LZ
UACS : 300225101280000

From :
CSSP - BIP - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Rehabilitation of Box Culvert, Barangay Alimbuyog, Milaor, Camarines Sur

Physical Target :
CW1 - Rehabilitation/ Major Repair of Flood Control Structure

TO :
CSSP - BIP - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Rehabilitation of Box Culvert, Barangay Alimbuyog, Milaor, Camarines Sur

Physical Target :
CW1 - Rehabilitation/ Major Repair of Drainage Structure - 6.100 Lineal meters

September 12, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00740452LZ
UACS : 300219101534000

From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Talisay River Control Structure, San Francisco Section, Talisay, Camarines Norte

Physical Target :
CW1 - Construction of Flood Mitigation/ Structure - 377.7 Lineal meters

TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Talisay River Control Structure, San Francisco Section, Talisay, Camarines Norte

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 356.2 Lineal meters
September 12, 2023 2023 WIN3F07511 FY 2023 GAA December 26, 2022 Region V Catanduanes District Engineering Office
Project ID : P00740683LZ
UACS : 300219102036000

From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Seawall, Comagaycay, San Andres, Catanduanes

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 382.002 Lineal meters

TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Seawall, Comagaycay, San Andres, Catanduanes

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 169 Lineal meters
September 12, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00740747LZ
UACS : 300220101152000

From :
CSSP - SIPAG - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building, Various Super Health Centers in the province of Albay

Physical Target :
CW1 - Construction of Multi Purpose Building - 1 Number of Buildings

TO :
CSSP - SIPAG - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building, Various Super Health Centers in the province of Albay

Physical Target :
CW1 - Construction of Multi-Purpose Buildings - 5 Number of Buildings
September 11, 2023 2023 FY 2023 GAA December 26, 2022 Region V Albay 3rd Engineering Office
Project ID : P00711995LZ
UACS : 310202101419000

From :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads - Ligao - Pio Duran Rd - K0537 + 160 - K0538 + 120

Physical Target :
CWL1 - Road Wiidening 1.932 Lane Km

TO :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads - Ligao - Pio Duran Rd - K0537 + 201 - K0538 + 110

Physical Target :
CW1 - Road Widening - 1.830 Lane Km
September 11, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00712063LZ
UACS : 310204102067000

From :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Mabolo - Almeda Bypass Rd (Package 2), Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 2.88 Lane Km

TO:
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Mabolo - Almeda Bypass Rd (Package 2), Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 1.944 Lane Km
CW2 - Construction of Gravel Road - 0.496 Lane Km
CW3 - Construction of Road Slope Protection Structure - 6860.82 Square meters
September 11, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00713718LZ
UACS : 310305101816000

From :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridge - Impig Br. 1 (B00378LZ) along Daang Maharlika (LZ)

Physical Target :
CW1 - Widening of Bridge - 209.88 Square meters

TO :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridge - Impig Br. 1 (B00378LZ) along Daang Maharlika (LZ)

Physical Target :
CW1 - Widening of Bridge - 232.34 Square meters
September 11, 2023 2023 WIN3F07479 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00713719LZ
UACS : 310305101817000

From :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges - Panaytayan Br. (B00438LZ) along Rolando A Andaya Highway (Phase II)

Physical Target :
CW1 - Widening of Bridge - 389.2 Square meters

TO :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges - Panaytayan Br. (B00438LZ) along Rolando A Andaya Highway (Phase II)
September 11, 2023 2023 WIN3F07306 FY 2023 GAA December 26, 2022 Region V Sorsogon District Engineering Office
Project ID : P00714704LZ
UACS : 310106100846000

From :
OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Construction of Jct Donsol - Banuang Gurang Rd - K0571 + 163 - K0572 + 161, K0576 + 827- K0576 + 890, K0588 + 140 - K0589 + 000, K0589 + 658 - K0590 + 000, K0590 + 388 - K0590 + 571

Physical Target :
CW1 - Reconstruction to Concrete Pavement - 4.026 Lane Km

TO :
OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Construction of Jct Donsol - Banuang Gurang Rd - K0588 + 140 - K0589 + 000

Physical Target :
CW1 - Reconstruction to Concrete Pavement - 1.551 Lane Km
CW2 - Construction Drainage along Road - 1197.23 Lineal Meters
CW3 - Construction of Road Slope Protection Structure - 1212.54 Square Meters
September 11, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00726772LZ
UACS : 320102105455000

From :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Daet River Flood Control Structure Phase II, Brgy. Bibirao and Calasgasan, Daet, Camarines Norte

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 307 Lineal meters

TO :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Daet River Flood Control Structure Phase II, Barangay Bibirao, Daet, Daet, Camarines Norte

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 307 Linea meters
September 11, 2023 2023 WIN3F07530 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00726965LZ
UACS : 320101109085000

From :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System - Construction of Shore PRotection and Seawall along Brgy. Caranan - Brgy. Sta. Rosa del Sur, Pasacao, Camarines Sur

Pysical Target:
CW1 - Construction of Flood Mitigation Structure - 1184.206 Lineal meters

TO:
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System - Construction of Shore Protection and Seawall along Brgy. Caranan - Brgy. Sta. Rosa del Sur, Pasacao, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 557.9 Lineal meters
September 11, 2023 2023 WIN3F07512 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00726966LZ
UACS : 320101109086000

From :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage - Construction of Shore Protection and Seawall along Brgy. Caranan - Brgy. Dalupaon, Pasacao, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 1184.206 Lineal meters

TO :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage - Construction of Shore Protection and Seawall along Brgy. Caranan - Brgy. Dalupaon, Pasacao, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 546.6 Lineal meters
September 11, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00727321LZ
UACS : 320102105441000

From :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Daet River Flood Control (Dogongan Section), Daet, Camarines Norte

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 611.51 Lineal meters

TO :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Daet River Flood Control (Dogongan Section), Daet, Camarines Norte

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 555.91 Lineal meters
September 11, 2023 2023 WIN3F07234 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00732950LZ
UACS : 300203102274000

From:
CSSP - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP) - Virac - Bato - Batalay - Bote - Bitaogan - Cororian - Cagraray - Radar Station Roads leading to Maribina Falls, Balongbong Falls, Mangrove Eco-Park, Sacahon Beach, Bote Lightdouse, Japanese Garrision (Mt. Arinawan), Bitaogan Beach, Carorian Wonders, Brgy. Cagraray, Bato, Catanduanes

Physical Target :
CW1 - Construction of Concrete Road - 0.25 Lane Km

TO :
CSSP - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP) - Virac - Bato - Batalay - Bote - Bitaogan - Cororian - Cagraray - Radar Station Roads leading to Maribina Falls, Balongbong Falls, Mangrove Eco-Park, Sacahon Beach, Bote Lighthouse, Japanese Garrision (Mt. Arinawan), Bitaogan Beach, Carorian Wonders, Brgy. Cagraray, Bato, Catanduanes

Physical Target :
CW1 - Construction of Concrete Road - 0.18 Lane Km
September 11, 2023 2023 WIN3F07042 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00732972LZ
UACS : 300204101247000

From :
CSSP - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - Roll-IT) - Brgy. 3 - Brgy. 5 Road connecting Ligao - Pioduran Road and Albay West Coast Road in support to Agribusiness (Food Resources Based Processing), Pio-Duran, Albay

Physical Target :
CW1 - Construction of Concrete Road - 1.5 Lane Km

TO :
CSSP - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - Roll-IT) - Brgy. 3 - Brgy. 5 Road connecting Ligao - Pioduran Road and Albay West Coast Road in support to Agribusiness (Food Resources Based Processing), Pio-Duran, Albay

Physical Target :
CW1 - Construction of Concrete Road - 0.3266 Lane Km
CW2 - Construction of Road Slope Protection Structure - 2,011.95 Square meters
September 8, 2023 2023 WIN3E02960 GAA 2023 January 24, 2023 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd – K0472 + 780 – K0474 + 000;
Physical Target: 4.376 Lane Km;
Allocation: Php 26,789,000.000

To:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd – K0472 + 350 – K0472 + 1830;
Physical Target: 2.96 Lane Km;
Allocation: Php 26,789,000.000

September 8, 2023 2023 WIN3E02970 GAA 2023 January 24, 2024 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd- K0408 + 741 - K0408 + 939, K0410 + 816 - K0410 + 942, K0416 + 126 - K0416 + 301;
Physical Target: 0.998 Lane Km;
Allocation: Php 24,950,000.000

To:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd- K0408 + 741 - K0408 + 939, K0410 + 816 - K0410 + 942;
Physical Target: CW1: 0.571 Lane Km
CW2: 583 Square meters
CW3: 957 Square meters Lane Km;
Allocation: Php 24,950,000.000
September 8, 2023 2023 WIN3E02996 SR2023-03-0007128 March 15, 2023 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From:
Improvement of Paracelis-Tabuk-Malig Road, Paracelis, Mountain Province;
Type of Work: Rehabilitation of Concrete Road;
Physical Target: 11.384 Lane Km;
Allocation: Php 100,000,000.000

To:
Improvement of Paracelis-Tabuk-Malig Road, Paracelis, Mountain Province;
Type of Work:
CW1: Construction of
Gravel Road
CW2: Construction of
Concrete Road;
Physical Target:
CW1: 8.480 Lane Km
CW2: 1.200 Lane Km ;
Allocation: Php 100,000,000.000

September 8, 2023 2023 WIN3E03010 SR2023-03-007131 March 15, 2023 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From:
Improvement of Aguinaldo-Natonin Road, Natonin, Mountain Province;
Type of Work: Rehabilitation of Concrete Road;
Physical Target: 11.384 Lane Km;
Allocation: Php 100,000,000.000

To:
Improvement of Aguinaldo-Natonin Road, Natonin, Mountain Province;
Type of Work: Paving of Unpaved Roads;
Physical Target: 2.4 Lane Km;
Allocation: Php 100,000,000.000

September 8, 2023 2023 WIN3E02998 SR2023-01-001690 March 28, 2024 Cordillera Administrative Region Benguet 2nd District Engineering Office
From:
Construction of Flood Mitigation Structure along Agno River, Poblacion Buguias Section, Sta. 7+724 - Sta. 8+724 (B.S), Buguias, Benguet;
Physical Target: 1920 Lineal meters;
Allocation: Php 100,000,000.000

To:
Construction of Flood Mitigation Structure along Agno River, Poblacion Buguias Section, Sta. 10+451 - 10+888 (L.S), STA. 10+506 - 10+689 (RS), Sta. 10+917 - 11+039 (L.S), Sta. 0+000 - 0+056 (LS), Sta. 0+000 - 0+075 (RS) and Sta. 11+152 - 11+392 (LS), Buguias, Benguet;
Physical Target: 1113 Lineal meters;
Allocation: Php 100,000,000.000

September 7, 2023 2023 WIN3F07522 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Jose Abad Santos Ave (JASA) - K0109+467 - K0110+000, K0115+600 - K0116+353, K0110+900 - K0111+170
September 7, 2023 2023 WIN3F07619 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Madella-Dinadiawan Rd - K0418+600 - K0418+690, K0418+790 - K0418+920, K0419+000 - K0419+120

September 7, 2023 2023 WIN3F07575 FY 2023 GAA February 17, 2023 Region III Regional Office III
Network Development Program - Construction of Missing Links / New Roads

Capas - Botolan Road, Package 2, Tarlac
September 7, 2023 2023 WIN3F07517 FY 2023 GAA February 17, 2023 Region III Regional Office III
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and / or Bridges from the National Road/s leading to Major / Strategic Public Buildings / Facilities

Construction of Road, Barangay Liyang, Pilar to Barangay Bilolo, Orion, Bataan (Package 1)
September 6, 2023 2023 WIN3F07593 FY 2023 GAA February 17, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Apalit-Macabebe-Masantol Rd - K0055+(-207) - K0055+475
September 5, 2023 CY 2023 UACS No. 300215102964000 February 22, 2023 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 300215102964000
Project ID.: P00739952LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major / Strategic Public Buildings/Facilities
Rehabilitation of Road, Maharlika St., Barangay Old Balara Capitol Site, Phase II, Quezon City
Physical Target: CW1 = Rehabilitation of Paved Road 0.205 lane km
Unit Cost (P’000) = P 95,609.76/lane km.
Allocation (P,000) = P 19,600.00
EAO (P’000) = P 400.00
Total (P’000) = P 20,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major / Strategic Public Buildings/Facilities
Rehabilitation of Road, Maharlika St., Barangay Old Capitol Site, Phase II, Quezon City
Physical Target: CW1 = Rehabilitation of Paved Road 0.562 lane km
CW2 = Construction of Drainage Structure along Road – 537 lineal meter
CW3 = Road Safety – Street Lighting – 21 units
Unit Cost (P’000) = P 15,565.836/lane km. P 31 M/Km
P 14,546.00/lineal meter
P 144,810/unit
Allocation (P,000) = P 8,748.00
P 7,811.00
P 3,041.00
EAO (P’000) = P 400.00
Total (P’000) = P 20,000.00
September 4, 2023 2023 WIN3E03094 GAA 2023 January 24, 2023 Cordillera Administrative Region Lower Kalinga District Engineering Office
From:
Construction of Dao Balbalan-Bullaguian Road, Tabuk City, Kalinga;
Type of Work: Construction of
Concrete Road;
Physical Target: 6.82 Lane Km;
Allocation: Php 100,000,000.000

To:
Construction of Dao Balbalan-Bullaguian Road, Balbalan, Kalinga;
Type of Work:
CW1: Construction of
Concrete Road
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 4.0 Lane Km
CW2: 2,172.58 Square meters ;
Allocation: Php 100,000,000.000

September 4, 2023 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region Lower Kalinga District Engineering Office
From:
Lacnog Br. (B00987LZ) along Nambaran-Isabela Rd;
Type of Work: Widening of Bridge;
Physical Target: 409.92 Square Meters;
Allocation: Php 48,800,000.00

To:
Lacnog Br. (B00987LZ) along Nambaran-Isabela Rd;
Type of Work: Construction of Parallel Bridge;
Physical Target: 667.8 Square Meters;
Allocation: Php 48,800,000.00

September 4, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 310104100506000
Project ID: P00706318MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

FROM:

Daang Maharlika (Agusan-Davao Sect) - K1265 + 605 - K1266 + 000, K1266 + 284 - K1267 + 569, K1268 + 003 - K1268 + 200, K1270 + 520 - K1271 + 580, K1271 + 629 - K1272 + 000, K1276 + 672 - K1276 + 994, K1278 + 000 - K1278 + 073

Type of Work:
CW1- Rehabilitation of Paved Road

Physical Target:
CW1- 12.756 Lane Km

Allocation:
TOTAL: P 156,304,000
CW1: P 150,833,360
EAO: P 5,470,640

Unit Cost:
CW1: P 11,824,502.98/Lane Km

TO:

Daang Maharlika (Agusan-Davao Sect) – K1270 + 520 – K1271 + 007, K1271 + 007 – K1271 + 580, K1271 + 629 – K1272 + 000, K1273 + 043 – K1273 + 892, K1276 + 672 – K1276 + 994, K1277 + 678 – K1278 + 000, K1278 + 000 – K1278 + 073, K1278 + 862 – K1279 + 800, K1292 + 000 – K1293 + 000, K1293 + 000 – K1294 + 000, K1298 + 912 – K1299 + 000, K1303 + 446 – K1303 + 600

Type of Work:
CW1- Rehabilitation of Paved Road

Physical Target:
CW1- 12.2745 Lane Km

Allocation:
TOTAL: P 156,304,000
CW1: P 150,833,360
EAO: P 5,470,640

Unit Cost:
CW1: P 12,288,350.64/Lane Km

September 1, 2023 2023 WIN3E03097 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 310104100619000
Project ID: P00706319MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

FROM:

Daang Maharlika (Agusan-Davao Sect) - K1292 + 763 - K1293 + 089

Type of Work:
CW1- Rehabilitation of Paved Road

Physical Target:
CW1- 1.304 Lane Km

Allocation:
TOTAL: P 15,955,000
CW1: P 15,635,900
EAO: P 319,100

Unit Cost:
CW1: P 11,990,720.86/Lane Km

TO:

Daang Maharlika (Agusan-Davao Sect) - K1250+098.00 - K1250+589.50

Type of Work:
CW1- Rehabilitation of Paved Road

Physical Target:
CW1- 1.00373 Lane Km

Allocation:
TOTAL: P 15,955,000
CW1: P 15,635,900
EAO: P 319,100

Unit Cost:
CW1: P 15,577,794.83/Lane Km

August 31, 2023 2023 300214100506000 GAA 2023 January 3, 2023 Region II Cagayan 3rd District Engineering Office
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Installation of LED Integrated Solar Streetlights along Municipality and Barangay Roads in Enrile, Cagayan
August 31, 2023 2023 300221102731000 GAA 2023 January 3, 2023 Region II Cagayan 3rd District Engineering Office
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities

Construction of Bridge at Barangay Mangga, Peñablanca, Cagayan
August 30, 2023 2023 P00721300MN SR2023-01-001425 December 30, 2023 Region XII Regional Office XII
23M00154 CONSTRUCTION OF REVETMENT ALONG BUAL RIVER, STA 0+000-STA0+303.7, BARANGAY MINAPAN, TULUNAN, NORTH COTABATO
August 30, 2023 2023 P00733163MN SR2023-01-000575 January 30, 2023 Region XII Regional Office XII
23M00020 CONSTRUCTION OF CONCRETE ROAD - BONGOLANON-KINARUM ROAD LEADING TO KIRUNGDONG WATERFALLS AND WILDLIFE RESCUE CENTER, STA. 1+642.0 - STA. 3+460, BRGY. KINARUM, MAGPET, NORTH COTABATO

Pages