October 3, 2023 |
2023 |
|
FY 2023 GAA |
December 22, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00714104LZ
UACS : 310302100432000
From :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Replacement of Permanent Weak Bridges - Antipolo Br. 2 along Camarines Sur - Albay Diversion Road
Physical Target :
CW1 - Replacement of Bridge - 0.000 Square meters
TO :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Replacement of Permanent Weak Bridges - Antipolo Br. 2 along Camarines Sur - Albay Diversion Road
Physical Target :
CW1 - Replacement of Bridge - 197.478 Square meters |
October 3, 2023 |
2023 |
|
FY 2023 GAA |
December 22, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00714104LZ
UACS : 310302100432000
From :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Replacement of Permanent Weak Bridges - Antipolo Br. 2 along Camarines Sur - Albay Diversion Road
Physical Target :
CW1 - Replacement of Bridge - 0.000 Square meters
TO :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Replacement of Permanent Weak Bridges - Antipolo Br. 2 along Camarines Sur - Albay Diversion Road
Physical Target :
CW1 - Replacement of Bridge - 197.478 Square meters |
October 3, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00732966LZ
UACS : 3002021100104000
From :
CSSP - Construction/ Improvement of Access Road leading to Seaports (Kalsada Tungo sa Paliparan, Riles at Daungan Program - KATUPARAN) - Jct. DM (Tabon-Tabon)-Mariawa-Homapon-Maslog - Lamba - Puro Road leading to Bicol International Airport, Legazpi City, Albay
Physical Target :
CW1 - Construction of Concrete Bridge - 570 Square meters
CW2 - Construction of Concrete Road 3.88 Lane Km
TO :
CSSP - Construction/ Improvement of Access Road leading to Seaports (Kalsada Tungo sa Paliparan, Riles at Daungan Program - KATUPARAN) - Jct. DM (Tabon-Tabon)-Mariawa-Homapon-Maslog - Lamba - Puro Road leading to Bicol International Airport, Legazpi City, Albay
Physical Target :
CW1 - Construction of Concrete Bridge - 660.02 Square meters
CW2 - Construction of Concrete Road - 2.6888 Lane Km |
October 2, 2023 |
2023 |
WIN3F07520 |
SR2023-01-003114 |
January 31, 2023 |
Region VIII |
Regional Office VIII |
OO2: Protect Lives and Properties Against Major Floods
Flood Management -Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Storm Surge Protection; Wave Wall, Subsection 3.19 (Sta. 4+530 to 4+750), Tacloban City, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 151.841785 M
Structure: 220.00 Lineal meters
EAO P 5.507215 M
Total P 157.349 M
AS MODIFIED:
Construction of Storm Surge Protection; Wave Wall, Subsection 3.19 (Sta. 4+686.50 to 4+866.50), Tacloban City, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 151.772 M
Structure: 180.00 Lineal meters
EXC P 0.072 M
EAO P 5.505000 M
Total P 157.349 M
|
October 2, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00712060LZ
UACS : 3102041015480000
From :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Naga - Jct. Magarao - Canaman - Libmanan Jct. PPH Road (Skybridge), Camarines Sur
Physical Target :
CW1 - Construction of Viaduct - 2404.08 Square meters
TO :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Naga - Jct. Magarao - Canaman - Libmanan Jct. PPH Road (Skybridge), Camarines Sur
Physical Target :
CW1 - Construction of Gravel Road - 2.095 Lane km
CW2 - Construction of Asphalt Road - 1.54 Lane km |
October 2, 2023 |
2023 |
|
SR2023-01-000857 |
January 30, 2023 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Leyte-Samar Inter-Provl Rd- K0912 + 420 - K0912 + 603
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 144.750 M
Structure: 8,333.33 Square meters
EAO P 5.250 M
Total P 150.00 M
AS MODIFIED:
Leyte-Samar Inter-Provl Rd- K0908 + 000 - K0909 + 460, K0911 + 140 - K0912 +040, K0912 + 420 - K0912 + 603
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 88.45119680 M
Structure: 6,095.19 Square meters
CW2-Road Widening: 4.726 Lane Km P 56.29880320 M
EAO P 5.250 M
Total P 150.00 M
|
October 2, 2023 |
2023 |
WIN3F07559 |
SR2023-06-011340 |
June 21, 2023 |
Region VIII |
Regional Office VIII |
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)-Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
AS PER GAA/ORIGINAL:
Construction of Road, Barangay Nato-Bungdo-Pangabutan, Taft, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 48.250 M
: 3.626 Lane Km
EAO P 1.750 M
Total P 50.00 M
AS MODIFIED:
Construction of Road, Barangay Nato-Bungdo-Pangabutan, Taft, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 37.00202091 M
: 1.594 Lane Km
CW2-Construction of Road Slope Protection P 11.24797909 M
Structure: 1,676.89 Square meters
EAO P 1.750 M
Total P 50.00 M
|
October 2, 2023 |
2023 |
WIN3F07558 |
SR2023-06-011339 |
June 21, 2023 |
Region VIII |
Regional Office VIII |
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)-Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
AS PER GAA/ORIGINAL:
Construction of Road, Barangay Lumatod-Danao-Del Remending, Taft, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 48.250 M
: 3.626 Lane Km
EAO P 1.750 M
Total P 50.00 M
AS MODIFIED:
Construction of Road, Barangay Lumatod-Danao-Del Remendios, Taft, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 37.99028270 M
: 3.626 Lane Km
CW2-Construction of Road Slope Protection P 10.25971730 M
Structure: 1,656.11 Square meters
EAO P 1.750 M
Total P 50.00 M
|
October 2, 2023 |
2023 |
WIN3F07566 |
SR2023-06-011342 |
June 21, 2023 |
Region VIII |
Regional Office VIII |
Convergence and Special Support Program (CSSP)
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)-Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
AS PER GAA/ORIGINAL:
Improvement/Upgrading of access road & Construction of Multi-purpose bulding in Brgy. 06, Guiuan, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 48.250 M
: 3.626 Lane Km
EAO P 1.750 M
Total P 50.00 M
AS MODIFIED:
Improvement/Upgrading of access road & Construction of Multi-purpose bulding in Brgy. 06, Guiuan, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 26.98475773 M
: 0.60 Lane Km
CW2-Construction of Road Slope Protection P 13.56500127 M
Structure: 1,898 Square meters
CW3-Construction of Multi-Purpose Building P 7.700241 M
: 1.00 Number of Building
EAO P 1.750 M
Total P 50.00 M M
|
October 2, 2023 |
2023 |
WIN3F07648 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00713689LZ
UACS : 310305101939000
From :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges - Quitang Br, (B04479LZ) along Danao - Pasacao - Rd
Physical Target :
CW1 - Widening of Bridge - 305.2 Square Meters
TO :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges - Quitang Br, (B04479LZ) along Danao - Pasacao - Rd
Physical Target :
CW1 - Widening of Bridge - 206.064 Square Meters |
October 2, 2023 |
2023 |
WIN3F07592 |
SR2023-06-011344 |
June 21, 2023 |
Region VIII |
Regional Office VIII |
Convergence and Special Support Program (CSSP)
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)-Flood Mitigation Structures protecting Public Infrastructures/Facilities
AS PER GAA/ORIGINAL:
Construction of Flood Control Structure along Tarusan Creek, Abuyog, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 48.250 M
Structure: 356.317 Lineal meters
EAO P 1.750 M
Total P 50.00 M
AS MODIFIED:
Construction of Flood Control Structure along Tarusan Creek, Abuyog, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 48.250 M
Structure: 118.00 Lineal meters
EAO P 1.750 M
Total P 50.00 M
|
October 2, 2023 |
2023 |
WIN3F07628 |
SR2023-03-008153 |
March 23, 2023 |
Region VIII |
Regional Office VIII |
Convergence and Special Support Program (CSSP)
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)- Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
AS PER GAA/ORIGINAL:
Construction of Tacloban-Palo Diversion Road including Draiange System, Package B-Barangay Pawing, Palo, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road P 67.550 M
: 0.72 Lane Km
CW2-Construction of Drainage Structure P 77.200 M
along Road: 180 Lineal meters
EAO P 5.250 M
Total P 150.00 M
AS MODIFIED:
Construction of Tacloban-Palo Diversion Road including Draiange System, Package B-Barangay Pawing, Palo, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road P 85.25433551 M
: 0.60 Lane Km
CW2-Construction of Drainage Structure P 9.47596923 M
along Road: 744 Lineal meters
CW3-Construction of Flood Mitigation P 50.01969526 M
Structure: 300 Lineal meters
EAO P 5.250 M
Total P 150.00 M
|
October 2, 2023 |
2023 |
WIN3F07640 |
SR2023-06-011346 |
June 21, 2023 |
Region VIII |
Regional Office VIII |
Convergence and Special Support Program (CSSP)
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)-Flood Mitigation Structures protecting Public Infrastructures/Facilities
AS PER GAA/ORIGINAL:
Construction of Flood Control Structure along Tunga River, Brgy. Astorga, Tunga, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 48.250 M
Structure: 356.317 Lineal meters
EAO P 1.750 M
Total P 50.00 M
AS MODIFIED:
Construction of Flood Control Structure along Tunga River, Brgy. Astorga, Tunga, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 48.250 M
Structure: 216.00 Lineal meters
EAO P 1.750 M
Total P 50.00 M
|
October 2, 2023 |
2023 |
300219101310000 |
GAA 2023 |
January 3, 2023 |
Region II |
Regional Office II |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructure/Facilities
Construction of Alicaocao Flood Control Project, Sta. 0+000 - Sta. 0+200, Cauayan City, Isabela |
September 29, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00712007LZ
UACS : 310204101545000
From :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Milaor - Pili Bypass Road, Package 2, Camarines Sur
Physical Target :
CW1 - Construction of Concrete Bridge - 324.8 Square meters
TO :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Milaor - Pili Bypass Road, Package 5, Camarines Sur
Physical Target :
CW1 - Construction of Concrete Bridge - 424.886 Square meters |
September 29, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00713687LZ
UACS : 310305101937000
From :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges - Batand Br. (B00448LZ) along Danao-Pasacao Rd
Physical Target :
CW1 - Widening of Bridge - 305.200 Square meters
TO :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges - Batang Br. (B00448LZ) along Danao-Pasacao Rd
Physical Target :
CW1 - Widening of Bridge - 384.888 Square meters |
September 29, 2023 |
2023 |
WIN3F07649 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00713688LZ
UACS : 310305101938000
From :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges - Canal Br. (B00450LZ) along Danao-Pasacao Rd
Physical Target :
CW1 - Widening of Bridge - 401.800 Square Meters
TO :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges - Canal Br. (B00450LZ) along Danao-Pasacao Rd
Physical Target :
CW1 - Widening of Bridge - 272.844 Square Meters |
September 27, 2023 |
2023 |
300215102464000 |
GAA 2023 |
January 3, 2023 |
Region II |
Cagayan 3rd District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Construction of Bridge Approaches at Sitio Maasin, Brgy. Iraga, Solana, Cagayan Phase II - Package II |
September 26, 2023 |
2023 |
P00721453MN |
SR2023-01-000979 |
January 30, 2023 |
Region XII |
Regional Office XII |
CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER L/S, STA 0+000 -STA. 0+159, BARANGAY DOLES, MAGPET, NORTH COTABATO |
September 26, 2023 |
2023 |
P00721649MN |
SR2023-03-006477 |
March 3, 2023 |
Region XII |
Regional Office XII |
CONSTRUCTION OF PULANGI RIVER FLOOD CONTROL PROJECT PHASE II (BARANGAY NABUNDAS SECTION), STA 0+800 - STA 1+068, PIKIT, NORTH COTABATO |
September 26, 2023 |
2023 |
P00705729MN |
SR2023-01-002176; SR2023-01-002179; SR2023-01-002184; SR2023-01-002188; SR2023-01-002192 |
January 30, 2023 |
Region XII |
Regional Office XII |
1. Paving of Unpaved Roads - Demoloc-Little Baguio-Alabel Rd, K1695+057 - K1695+146.50, Alabel, Sarangani
2. Paving of Unpaved Roads - Demoloc-Little Baguio-Alabel Rd, K1694+275 - K1694+349.6, Alabel, Sarangani
3. Paving of Unpaved Roads - Demoloc-Little Baguio-Alabel Rd, K1694+349.60 - K1694+442.90, Alabel, Sarangani
4. Paving of Unpaved Roads - Demoloc-Little Baguio-Alabel Rd, K1694+442.90 - K1694+587.70, Alabel, Sarangani
5. Paving of Unpaved Roads - Demoloc-Little Baguio-Alabel Rd, K1694+587.70 - K1694+727.80, Alabel, Sarangani
6. Paving of Unpaved Roads - Demoloc-Little Baguio-Alabel Rd, K1694+727.80 - K1695+057, Alabel, Sarangani |
September 22, 2023 |
2023 |
WIN3F07213 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00739877LZ
UACS : 300215102674000
From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Caramoran Poblacion Bypass Road, Caramoran, Catanduanes
Physical Target :
CW1 - Construction of Concrete Road - 3.852 Lane Km
TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Caramoran Poblacion Bypass Road, Caramoran, Catanduanes
Physical Target :
CW1 - Construction of Concrete Road - 0.938 Lane Km
CW2 - Construction of Road Slope Protection Structure - 2,519.02 Square meters |
September 22, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00740453LZ
UACS : 300219101535000
From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Rehabilitation of Revetment along San Francisco River, Downstream of Ponso Steel Bridge - Left Side, Brgy. Magurang-Alnay-Ponso Section, Polangui, Albay
Physical Target :
CW1 - Rehabilitation/ Major Repair of Flood Control Structure - 1081.37 Lineal meters
TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Rehabilitation of Revetment along San Francisco River, Downstream of Ponso Steel Bridge - Both Sides, Brgy. Magurang-Alnay-Ponso Section, Polangui, Albay
Physical Target :
CW1 - Rehabilitation/ Major Repair of Flood Control Structure - 1081.27 Lineal meters |
September 22, 2023 |
2023 |
WIN3F07630 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00740684LZ
UACS : 300219102037000
From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Seawall in Batalay, Bato, Catanduanes
Physical Target :
CW1 - Construction of Flood Mitigation Structures - 229.201 Lineal meters
TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Seawall in Batalay, Bato, Catanduanes
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 116.4 Lineal meters |
September 22, 2023 |
2023 |
WIN3F07629 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00742479LZ
UACS : 300225101292000
From :
CSSP - BIP - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Bato River Control (Phase II), Bato, Catanduanes
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 61 Lineal meters
TO :
CSSP - BIP - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Bato River Control (Phase II), Bato, Catanduanes
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 32.96 Lineal meters |
September 20, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Norte Sub-District Engineering Office |
Project ID : P00736154LZ
UACS : 300219101654000
From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Comprehensive Drainage System of Vinzons, Phase II, Vinzons, Camarines Norte
Physical Target :
CW1 - Construction of Drainage Structure - 710 Lineal Meters
TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Comprehensive Drainage System of Vinzons, Phase II, Vinzons, Camarines Norte
Physical Target :
CW1 - Construction of Drainage Structure - 1400 Lineal Meters |
September 20, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Norte Sub-District Engineering Office |
Project ID : P00736155LZ
UACS : 300219101655000
From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Comprehensive Drainage System of Daet, Phase II, Daet, Camarines Norte
Physical Target :
CW1 - Construction of Drainage Structure - 466.61 Lineal Meters
TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Comprehensive Drainage System of Daet, Phase II, Daet, Camarines Norte
Physical Target :
CW1 - Construction of Drainage Structure - 988.44 Lineal Meters |
September 20, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Catanduanes District Engineering Office |
Project ID : P00737328LZ
UACS : 300222100179000
From :
CSSP - BIP - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities - Construction of By-Pass Road, Barangay Osmeña and Brgy Bagong Sirang, Baras, Catanduanes
Physical Target :
CW1 - Construction of Concrete Road - 3.21 Lane kilometers
TO :
CSSP - BIP - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities - Construction of By-Pass Road, Barangay Osmeña and Brgy Bagong Sirang, Baras, Catanduanes
Physical Target :
CW1 - Construction of Concrete Road - 0.807 Lane kilometers
CW2 - Widening of Bridge - 131.76 Square meters
CW3 - Construction of Drainage Structure - 774 lineal-meters |
September 20, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Norte Sub-District Engineering Office |
Project ID : P00739858LZ
UACS : 300215102616000
From :
CSSP - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road (Cong. Elmer Panotes Boulevard), Barangay Mancamagong, Basuc, Camarines Norte
Physical Target :
CW1 - Construction of Concrete Road - 3.3 Lane Km
TO :
CSSP - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road (Cong. Elmer Panotes Boulevard), Barangay Mancamagong, Basuc, Camarines Norte
Physical Target :
CW1 - Construction of Concrete Road - 3.03 Lane Km
CW2 - Construction of Road Slope Structure - 4308.18 Square meters |
September 20, 2023 |
2023 |
WIN3F06930 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00739875LZ
UACS : 300215102667000
From :
CSSP - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Maguisoc Road, Mercedes, Camarines Norte
Physical Target :
CW1 - Construction of Concrete Road - 3.210 Lane Km
TO :
CSSP - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Manguisoc Road, Mercedes, Camarines Norte
Physical Target :
CW1 - Construction of Concrete Road - 2.14 Lane Km
CW2 - Construction of Drainage Structure along Road - 456.4 Lineal meters |
September 20, 2023 |
2023 |
WIN3F07457 |
SR2023-03-006094 |
March 2, 2023 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Tigbao-Sta. Fe-San Miguel Road
Physical Target: Allocation:
CW1-Rehabilitation of Concrete Road P 289.500 M
: 2.32 Lane Km
EAO P 10.500 M
Total P 300.00 M
AS MODIFIED:
Tigbao-Sta. Fe-San Miguel Road - K0908 + 060 - K0908 + 640
Physical Target: Allocation:
CW1-Rehabilitation of Concrete Road P 279.500 M
: 2.32 Lane Km
ROW-ROW Acquisition P 10.00 M
: 20,000.00 Square meters
EAO P 10.500 M
Total P 300.00 M
|
September 20, 2023 |
2023 |
WIN3F07449 |
SR2023-03-007293 |
March 15, 2023 |
Region VIII |
Regional Office VIII |
Convergence and Special Support Program (CSSP)
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)-Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
AS PER GAA/ORIGINAL:
Construction of Maydolong-Basey Road, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 55.970 M
: 4.206 Lane Km
EAO P 2.030 M
Total P 58.00 M
AS MODIFIED:
Construction of Maydolong-Basey Road, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 41.48176891 M
: 1.02 Lane Km
CW2-Construction of Drainage Structure P 14.48823109M
along Road: 930 Lineal meters
EAO P 2.030 M
Total P 58.00 M
|
September 19, 2023 |
2023 |
WIN3F07345 |
SR2023-03-006347 |
March 3, 2023 |
Region VIII |
Regional Office VIII |
OO2: Protect Lives and Properties Against Major Floods
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Revetment along Tigbao River, Phase 2, Tacloban City
Physical Target: Allocation:
CW1-Construction of Revetment: P 110.975 M
819.53 Lineal meters
EAO P 4.025 M
Total P 115.00 M
AS MODIFIED:
Construction of Revetment along Tigbao River, Phase 2, Tacloban City
Physical Target: Allocation:
CW1-Construction of Revetment: P 110.975 M
450.00 Lineal meters
EAO P 4.025 M
Total P 115.00 M
|
September 19, 2023 |
2023 |
WIN3F07396 |
SR2023-03-006191 |
February 3, 2023 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Network Development-Road Widening-Secondary Roads
AS PER GAA/ORIGINAL:
Arteche-Lapinig-Gamay-Mapanas-Palapag Road
Physical Target: Allocation:
CW1-Road Widening: 13.333 Lane Km P 193.00 M
EAO P 7.00 M
Total P 200.00 M
AS MODIFIED:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd-K0835+554-K0836+060, K0836+160-K0836+220,K0836+260-K0837+750,K0838+000-K0839+090,K0839+660-K0839+800,K0839+965-K0840+052.50
Physical Target: Allocation:
CW1-Road Widening: 6.745 Lane Km P 193.00 M
EAO P 7.00 M
Total P 200.00 M
|
September 19, 2023 |
2023 |
WIN3F07418 |
SR2023-03-006105 |
February 3, 2023 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd-K0925 + 250 -K0925 + 410
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 125.450 M
Structure: 7,222.22 Square meters
EAO P 4.550 M
Total P 130.00 M
AS MODIFIED:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd-K0925 + 250 -K0925 + 390
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 125.450 M
Structure: 3,743.60 Square meters
EAO P 4.550 M
Total P 130.00 M
|
September 19, 2023 |
2023 |
WIN3F07441 |
SR2023-01-003247 |
January 31, 2023 |
Region VIII |
Regional Office VIII |
Convergence and Special Support Program (CSSP)
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)-Interjurisdictional Roads and/or Bridges ( or, roads that traverse multiple LGU jurisdictions)
AS PER GAA/ORIGINAL:
Construction of Tacloban-Palo Diversion Road including Drainage System, Brgy. 89, Tacloban City
Physical Target: Allocation:
CW1-Construction of Concrete Road P 96.500 M
: 1.965 Lane Km
EAO P 3.500 M
Total P 100.00 M
AS MODIFIED:
Construction of Tacloban-Palo Diversion Road including Drainage System, Brgy. 89, Tacloban City
Physical Target: Allocation:
CW1-Construction of Concrete Road P 58.493268 M
: 0.42 Lane Km
CW2-Construction of Drainage Structure P 38.006732 M
along Road: 105 Lineal meters
EAO P 3.500 M
Total P 100.00 M
|
September 18, 2023 |
2023 |
WIN3F07623 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00732943LZ
UACS : 300202100258000
From :
CSSP - Construction/ Improvement of Access Road leading to Seaports (Kalsada Tungo sa Paliparan, Riles at Daungan Program - KATUPARAN) - San Isidro-Bahao Road leading to Bahao Port, Libmanan, Camarines Sur
Physical Target :
CW1 - Reconstruction to Concrete Pavement - 0.816 Lane Km
TO :
CSSP - Construction/ Improvement of Access Road leading to Seaports (Kalsada Tungo sa Paliparan, Riles at Daungan Program - KATUPARAN) - San Isidro-Bahao Road leading to Bahao Port, Libmanan, Camarines Sur
Physical Target :
CW1 - Reconstruction to Concrete Pavement - 0.640 Lane Km |
September 18, 2023 |
2023 |
WIN3F07273 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00736064LZ
UACS : 300219101565000
From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Bato Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Phase 1), Bato, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 513.2 Lineal meters
TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Bato Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Package 1), Bato, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 507.6 Lineal meters |
September 18, 2023 |
2023 |
WIN3E03175 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 320101109466000
Project ID: P00721327MN
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Rehabiltation of Dike along Mandakpan-Bonbon Channel, Downstream Section, barangay Mandakpan, Butuan City, Agusan Del Norte
Type of Work:
CW1- Rehabilitation / Major Repair of Flood Control Structure
Physical Target:
CW1- 2,149.839 Lineal meters
Allocation:
TOTAL: P 150,000,00
CW1: P 144,750,000
EAO: P 5,250,000
Unit Cost:
CW1: P 67,330.62/Lineal meters
TO:
Rehabilitation of Dike along Mandakpan-Bonbon Channel, Downstream Section, Butuan City, Agusan Del Norte
Type of Work:
CW1- Rehabilitation / Major Repair of Flood Control Structure
Physical Target:
CW1- 577.800 Lineal meters
Allocation:
TOTAL: P 150,000,00
CW1: P 144,750,000
EAO: P 5,250,000
Unit Cost:
CW1: P 250,519.21/Lineal meters
|
September 18, 2023 |
2023 |
WIN3F07277 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00736065LZ
UACS : 300219101566000
From :
CSSP - SIPAG - Flood Mitigation Structure protecting Public Infrastructures/ Facilities - Construction of Bato Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Phase 2), Bato, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 509.5 Lineal meters
TO :
CSSP - SIPAG - Flood Mitigation Structure protecting Public Infrastructures/ Facilities - Construction of Bato Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Package 2), Bato, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 505 Lineal meters |
September 18, 2023 |
2023 |
WIN3F07277 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00736066LZ
UACS : 300219101567000
From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Bato Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Phase 3), Bato, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 524.9 Lineal meters
TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Bato Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Package 3), Bato, Camarines Sur
Physical Target :
Construction of Flood Mitigation Structure - 512.5 Lineal meters |
September 18, 2023 |
2023 |
WIN3F07279 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00736067LZ
UACS : 300219101568000
From :
CSSP - SIPAG - Flood Mitigation Structure protecting Public Infrastructures/ Facilities - Construction of Baao Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Phase 1), Baao, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 483.6 Lineal meters
TO :
CSSP - SIPAG - Flood Mitigation Structure protecting Public Infrastructures/ Facilities - Construction of Baao Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Package 2), Baao, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 500.6 Lineal meters |
September 18, 2023 |
2023 |
WIN3F07274 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00736068LZ
UACS : 300219101569000
From :
CSSP - SIPAG - Flood Mitigation Structure protecting Public Infrastructures/ Facilities - Construction of Baao Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Phase 2), Baao, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 488.2 Lineal meters
TO :
CSSP - SIPAG - Flood Mitigation Structure protecting Public Infrastructures/ Facilities - Construction of Baao Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Package 2), Baao, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 505.8 Lineal meters |
September 18, 2023 |
2023 |
WIN3F07278 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00736069LZ
UACS : 30021910157000
From :
CSSP - SIPAG - Flood Mitigation Structure protecting Public Infrastructures/ Facilities - Construction of Baao Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Phase 3), Baao, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 490.1 Lineal meters
TO :
CSSP - SIPAG - Flood Mitigation Structure protecting Public Infrastructures/ Facilities - Construction of Baao Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Package 3), Baao, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 506.1 Lineal meters |
September 18, 2023 |
2023 |
WIN3F07264 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00736132LZ
UACS : 300219101632000
From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Lanot Seawall, Basud, Camarines Norte
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 179.7 Lineal meters
CW2 - Construction of Concrete Road - 0.359 Lane Km
TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Lanot Seawall, Mercedes, Camarines Norte
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 179.7 Lineal meters
CW2 - Construction of Concrete Road - 0.359 Lane Km |
September 18, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Norte Sub-District Engineering Office |
Project ID : P00736152LZ
UACS : 300219101652000
From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities Construction of Comprehensive Drainage System of Basud, Basud, Camarines Norte
Physical Target :
CW1 - Construction of Drainage Structure - 1349.18 Lineal Meters
TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Comprehensive Drainage System - Basud, Basuc, Camarines Norte
Physical Target :
CW1 - Construction of Drainage Structure - 2445.63 Lineal Meters |
September 18, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Norte Sub-District Engineering Office |
Project ID : P00736153LZ
UACS : 300219101653000
From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Comprehensive Drainage System of San Vicente, San Vicente, Camarines Norte
Physical Target :
CW1 - Construction of Drainage Structure - 814.44 Lineal Meters
TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Comprehensive Drainage System of San Vicente, San Vicente
Physical Target :
CW1 - Construction of Drainage Structure - 2445.63 Lineal Meters |
September 15, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 1st Engineering Office |
Project ID : P00725903LZ
UACS : 320101109121000
From :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Rehabilitation/ Improvement of Revetment Wall Downstream at Sta. Teresita River, Iriga City, Camarines Sur, Sta. 9_304 - Sta. 9+529
Physical Target :
CW1 - Rehabilitation/ Major Repair of Flood Control Structure - 711.8 Lineal meters
TO :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Rehabilitation/ Improvement of Revetment Wall Downstream at Sta. Teresita River, Iriga City, Camarines Sur, Sta. 18+025.00 - 18+547.18, Sta, 18+620.00 - 18+809.62
Physical Target :
CW1 - Rehabilitation/ Major Repair of Flood Control Structure - 711.8 Lineal meters |
September 15, 2023 |
2023 |
WIN3F07622 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00726605LZ
UACS : 320102105448000
From :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Pajo River Flood Control, Virac, Catanduanes
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 744.65 Lineal meters
TO :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Pajo River Flood Control, Virac, Catanduanes
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 780.94 Lineal meters |
September 15, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00726616LZ
UACS : 320102105459000
From :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Rehabilitation of Revetment Wall along Bicol River (Right Side), Barangay Sto. Domingom Nabua, Camarines Sur
Physical Target :
CW1 - Rehabilitation/ Major Repair of Flood Control Structure - 502.4 Lineal meters
TO :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Rehabilitation of Revetment Wall along Bicol River (Right Side), Barangay Sto. Domingom Nabua, Camarines Sur
Physical Target :
CW1 - Rehabilitation/ Major Repair of Flood Control Structure - 500.2 Lineal meters |
September 15, 2023 |
2023 |
WIN3F06975 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00726626LZ
UACS : 320102105469000
From :
OO2 Protect Lives and Properties Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Quinale A River Mitigation Structure (Polangui and Libon Section), Polangui, Albay
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 993.205 Lineal Meters
TO :
OO2 Protect Lives and Properties Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Quinale A River Mitigation Structure (Polangui and Libon Section), Polangui and Libon, Albay
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 569.67 Lineal Meters |
September 15, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Masbate 3rd District Engineering Office |
Project ID : P00727223LZ
UACS : 320101110061000
From :
OO2 Protect Lives and Properties - Flood Management - Construction// Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Mawig Creek Flood Control, Sta. 0+000 - Sta. 0+050.00, Upstream Right Side, Sta. 0+000 - Sta, 030, Upstream Left Side, Sta. 0+000 - Sta. 0+085, Both Sides Downstream, Barangay Poblacion, Dimasalang, Masbate
Physical Target :
CW1 - Construction of Flood Mitigation Structure
TO :
OO2 Protect Lives and Properties - Flood Management - Construction// Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Mawig Creek Flood Control, Upstream Bothsides - Sta. 0+000 - Sta. 0+126.00, Downstream Bothsides - Sta. 0+000 - Sta. 0+122.00, Barangay Poblacion, Dimasalang, Masbate
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 496 lineal meter |
September 14, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00711509LZ
UACS : 310204102077000
From :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Camarines Sur Expressway Package 8, Camarines Sur
Physical Target :
CW1 - Construction of Concrete - 2.41 Lane Km
TO :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Camarines Sur Expressway Package 8, Camarines Sur
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 5,126.34 Square meters |
September 14, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00712049LZ
UACS : 310205101026000
From :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - San Fernando - San Jacinto - Monreal Road, Package 2, Masbate
Physical Target :
CW1 - Construction of Concrete Road/ 1.05 Lane Km
TO :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - San Fernando - San Jacinto - Monreal Road, Package 2, Masbate
Physical Target :
CW1 - Construction of Concrete Road - 0.628 Lane Km
CW2 - Construction of Drainage Structure along Road - 512.66 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 2410,8 Square meters |
September 14, 2023 |
2023 |
WIN3F06971 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00712066LZ
UACS : 310201101071000
From :
OO1 Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Rolando A Andaya Highway - K0282 +758 - K0283 + 000, K0296 + 842 - K0296 + 974. K0297 + 582 - K0300 + 000, K0301 + 840 - K0302 + 250, K0302 + 283 - K0303 + 280
Physical Target :
CW1 - Road Widening - 8.228 Lane Km
TO :
OO1 Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Rolando A Andaya Highway - K0301 + 840 - K0302 + 250, K0302 + 283 - K0303 + 185
Physical Target :
CW1 - Road Widening - 2.636 Lane Km
CW2 - Construction of Drainage Structure along Road - 2628.02 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 1083.85 Square meters |
September 14, 2023 |
2023 |
WIN3F07979 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00712067LZ
UACS : 310201101072000
From :
OO1 Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Rolando A. Andaya Highway - K0304 + 941 - K308 + 241, K0308 + 345 - K0308 + 942, K0308 +970 - K0309 + 162
Physical Target :
CW1 - Road Widening - 8.114 Lane Km
TO :
OO1 Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Rolando A. Andaya Highway - K0307 + 032 - K0308 + 000
Physical Target :
CW1 - Road Widening - 1.936 Lane Km
CW2 - Construction of Drainage Structure along Road - 1913.2 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 6119.48 |
September 14, 2023 |
2023 |
P00705729MN |
SR2023-01-002172 |
January 30, 2023 |
Region XII |
Regional Office XII |
Paving of Unpaved Roads - Demoloc-Little Baguio-Alabel Rd, K1695+057 - K1695+146.50, Alabel, Sarangani |
September 13, 2023 |
2023 |
WIN3F07565 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00741235LZ
UACS : 300221102303000
From :
CSSP - BIP - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Sta. Rosa Norte - San Rafael - Sitio Sugsugin - Parang Road, Jose Panganiban, Camarines Norte
Physical Target :
CW1 - Construction of Concrete Road - 6.419 Lane Km
TO :
CSSP - BIP - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Sta. Rosa Norte - San Rafael - Sitio Sugsugin - Parang Road, Jose Panganiban, Camarines Norte
Physical Target :
CW1 - Construction of Concrete Road - 2.4288 Lane Km |
September 13, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00741978LZ
UACS : 300221103579000
From :
CSSP - BIP - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road Samaka, Barangay Camambugan, Daet, Camarines Norte
Physical Target :
CW1 - Construction of Concrete Road - 3.21 Lane Km
TO :
CSSP - BIP - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road Samaka, Barangay Camambugan, Daet, Camarines Norte
Physical Target :
CW1 - Construction of Concrete Road - 1.7933 Lane Km
CW2 - Construction of Drainage Structure along Road - 1610.86 Lineal meters |
September 13, 2023 |
2023 |
WIN3F07529 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00742105LZ
UACS : 300224100021000
From :
CSSP - BIP - Coastal Roads/ Causeway for environmental protection/ conservation - Construction of Talisay Coastal Road, Masbate
Physical Target :
CW1 - Construction of Concrete Road - 6.419 Lane Km
TO :
CSSP - BIP - Coastal Roads/ Causeway for environmental protection/ conservation - Construction of Talisay Coastal Road, Masbate
Physical Target :
CW1 - Construction of Concrete Road - 0.8044 Lane Km
CW2 - Construction of Road Slope Protection Structure - 1467.1 Square meters |
September 13, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Sorsogon District Engineering Office |
Project ID : P00743960LZ
UACS : 300226107236000
From :
CSSP - BIP - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building, (Sorsogon Pilot Elementary School), Brgy. Macabog, Sorsogon City, Sorsogon
Physical Target :
CW1 - Construction of Multi-Purpose Building - 1 Number of Buildings
TO :
CSSP - BIP - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building, (Sorsogon Pilot Elementary School), Brgy. Sirangan, Sorsogon City, Sorsogon
Physical Target :
CW1 - Construction of Multi-Purpose Building - 1 Number of Buildings |
September 13, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00744154LZ
UACS : 300229100277000
From :
CSSP - BIP - Public Water Supply System (Level II or III) - Construction of Solar Water System Level II at Barangay Cagbungan (Zone 4), Pamplona, Camarines Sur
Physical Target :
CW1 - Construction of Water Supply System - 1 Number of Water Supply System
TO :
CSSP - BIP - Public Water Supply System (Level II or III) - Construction of Solar Water System Level II at Barangay Cagbungan, Pamplona, Camarines Sur
Physical Target :
CW1 - Construction of Water Supply System - 1 Number of Water Supply System |
September 12, 2023 |
2023 |
WIN3F07533 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00736096
UACS : 300219101597000
From :
CSSP - SIPAG - Flood Mitigation Structure protecting Public Infrastructure/ Facilities - Construction of Dike along Bicol River (Phase 2), Brgy. Bagongbong, Minalabac, Camarines Sur
Physical Target :
CW1 - Construction of Dike - 1,377.565 Lineal meters
TO :
CSSP - SIPAG - Flood Mitigation Structure protecting Public Infrastructure/ Facilities - Construction of Dike along Bicol River (Phase 2), Brgy. Bagongbong, Minalabac, Camarines Sur
Physical Target :
CW1 - Construction of Dike - 200 Lineal meters |
September 12, 2023 |
2023 |
WIN3F07539 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00736128LZ
UACS : 300219101629000
From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Revetment along Libmanan River, Barangay Mambalite, Libmanan, Camarines Sur
Physical Target :
CW1 - Construction of Revetment - 534.803 Lineal meters
TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Revetment along Libmanan River, Barangay Mambalite, Libmanan, Camarines Sur
Physical Target :
CW1 - Construction of Revetment - 85.000 Lineal meters |
September 12, 2023 |
2023 |
WIN3F07538 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00736362LZ
UACS : 300215102641000
From :
CSSP - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Rehabilitation of Road, Brgy. Sta. Rosa Del Sur, Pasacao, Camarines Sur
Physical Target :
CW1 - Rehabilitation of Paved Road - 16.536 Lane Km
TO :
CSSP - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Rehabilitation of Road, Brgy. Sta. Rosa Del Sur, Pasacao, Camarines Sur
Physical Target :
CW1 - Reconstruction to Concrete Pavement - 1.800 Lane Km |
September 12, 2023 |
2023 |
WIN3F07532 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00736594LZ
UACS : 300215103314000
From :
CSSP - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Libmanan Cabusao Pump Irrigation System (LCPIS) Main Canal Service Road, Libmanan, Camarines Sur (KATUBIGAN - Kalsada Tungo sa Patubigan)
Physical Target :
CW1 - Construction of Concrete Road - 0.770 Lane km
TO :
CSSP - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Libmanan Cabusao Pump Irrigation System (LCPIS) Main Canal Service Road, Libmanan, Camarines Sur (KATUBIGAN - Kalsada Tungo sa Patubigan)
Physical Target :
CW1 - Construction Concrete Road - 0.400 Lane km |
September 12, 2023 |
2023 |
WIN3F07534 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00737563LZ
UACS : 300225101280000
From :
CSSP - BIP - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Rehabilitation of Box Culvert, Barangay Alimbuyog, Milaor, Camarines Sur
Physical Target :
CW1 - Rehabilitation/ Major Repair of Flood Control Structure
TO :
CSSP - BIP - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Rehabilitation of Box Culvert, Barangay Alimbuyog, Milaor, Camarines Sur
Physical Target :
CW1 - Rehabilitation/ Major Repair of Drainage Structure - 6.100 Lineal meters
|
September 12, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00740452LZ
UACS : 300219101534000
From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Talisay River Control Structure, San Francisco Section, Talisay, Camarines Norte
Physical Target :
CW1 - Construction of Flood Mitigation/ Structure - 377.7 Lineal meters
TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Talisay River Control Structure, San Francisco Section, Talisay, Camarines Norte
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 356.2 Lineal meters
|
September 12, 2023 |
2023 |
WIN3F07511 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Catanduanes District Engineering Office |
Project ID : P00740683LZ
UACS : 300219102036000
From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Seawall, Comagaycay, San Andres, Catanduanes
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 382.002 Lineal meters
TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Seawall, Comagaycay, San Andres, Catanduanes
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 169 Lineal meters |
September 12, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00740747LZ
UACS : 300220101152000
From :
CSSP - SIPAG - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building, Various Super Health Centers in the province of Albay
Physical Target :
CW1 - Construction of Multi Purpose Building - 1 Number of Buildings
TO :
CSSP - SIPAG - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building, Various Super Health Centers in the province of Albay
Physical Target :
CW1 - Construction of Multi-Purpose Buildings - 5 Number of Buildings |
September 11, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 3rd Engineering Office |
Project ID : P00711995LZ
UACS : 310202101419000
From :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads - Ligao - Pio Duran Rd - K0537 + 160 - K0538 + 120
Physical Target :
CWL1 - Road Wiidening 1.932 Lane Km
TO :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads - Ligao - Pio Duran Rd - K0537 + 201 - K0538 + 110
Physical Target :
CW1 - Road Widening - 1.830 Lane Km |
September 11, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00712063LZ
UACS : 310204102067000
From :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Mabolo - Almeda Bypass Rd (Package 2), Camarines Sur
Physical Target :
CW1 - Construction of Concrete Road - 2.88 Lane Km
TO:
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Mabolo - Almeda Bypass Rd (Package 2), Camarines Sur
Physical Target :
CW1 - Construction of Concrete Road - 1.944 Lane Km
CW2 - Construction of Gravel Road - 0.496 Lane Km
CW3 - Construction of Road Slope Protection Structure - 6860.82 Square meters |
September 11, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00713718LZ
UACS : 310305101816000
From :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridge - Impig Br. 1 (B00378LZ) along Daang Maharlika (LZ)
Physical Target :
CW1 - Widening of Bridge - 209.88 Square meters
TO :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridge - Impig Br. 1 (B00378LZ) along Daang Maharlika (LZ)
Physical Target :
CW1 - Widening of Bridge - 232.34 Square meters |
September 11, 2023 |
2023 |
WIN3F07479 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00713719LZ
UACS : 310305101817000
From :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges - Panaytayan Br. (B00438LZ) along Rolando A Andaya Highway (Phase II)
Physical Target :
CW1 - Widening of Bridge - 389.2 Square meters
TO :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges - Panaytayan Br. (B00438LZ) along Rolando A Andaya Highway (Phase II) |
September 11, 2023 |
2023 |
WIN3F07306 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Sorsogon District Engineering Office |
Project ID : P00714704LZ
UACS : 310106100846000
From :
OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Construction of Jct Donsol - Banuang Gurang Rd - K0571 + 163 - K0572 + 161, K0576 + 827- K0576 + 890, K0588 + 140 - K0589 + 000, K0589 + 658 - K0590 + 000, K0590 + 388 - K0590 + 571
Physical Target :
CW1 - Reconstruction to Concrete Pavement - 4.026 Lane Km
TO :
OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Construction of Jct Donsol - Banuang Gurang Rd - K0588 + 140 - K0589 + 000
Physical Target :
CW1 - Reconstruction to Concrete Pavement - 1.551 Lane Km
CW2 - Construction Drainage along Road - 1197.23 Lineal Meters
CW3 - Construction of Road Slope Protection Structure - 1212.54 Square Meters |
September 11, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00726772LZ
UACS : 320102105455000
From :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Daet River Flood Control Structure Phase II, Brgy. Bibirao and Calasgasan, Daet, Camarines Norte
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 307 Lineal meters
TO :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Daet River Flood Control Structure Phase II, Barangay Bibirao, Daet, Daet, Camarines Norte
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 307 Linea meters |
September 11, 2023 |
2023 |
WIN3F07530 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00726965LZ
UACS : 320101109085000
From :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System - Construction of Shore PRotection and Seawall along Brgy. Caranan - Brgy. Sta. Rosa del Sur, Pasacao, Camarines Sur
Pysical Target:
CW1 - Construction of Flood Mitigation Structure - 1184.206 Lineal meters
TO:
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System - Construction of Shore Protection and Seawall along Brgy. Caranan - Brgy. Sta. Rosa del Sur, Pasacao, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 557.9 Lineal meters |
September 11, 2023 |
2023 |
WIN3F07512 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00726966LZ
UACS : 320101109086000
From :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage - Construction of Shore Protection and Seawall along Brgy. Caranan - Brgy. Dalupaon, Pasacao, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 1184.206 Lineal meters
TO :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage - Construction of Shore Protection and Seawall along Brgy. Caranan - Brgy. Dalupaon, Pasacao, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 546.6 Lineal meters |
September 11, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00727321LZ
UACS : 320102105441000
From :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Daet River Flood Control (Dogongan Section), Daet, Camarines Norte
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 611.51 Lineal meters
TO :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Daet River Flood Control (Dogongan Section), Daet, Camarines Norte
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 555.91 Lineal meters |
September 11, 2023 |
2023 |
WIN3F07234 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00732950LZ
UACS : 300203102274000
From:
CSSP - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP) - Virac - Bato - Batalay - Bote - Bitaogan - Cororian - Cagraray - Radar Station Roads leading to Maribina Falls, Balongbong Falls, Mangrove Eco-Park, Sacahon Beach, Bote Lightdouse, Japanese Garrision (Mt. Arinawan), Bitaogan Beach, Carorian Wonders, Brgy. Cagraray, Bato, Catanduanes
Physical Target :
CW1 - Construction of Concrete Road - 0.25 Lane Km
TO :
CSSP - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP) - Virac - Bato - Batalay - Bote - Bitaogan - Cororian - Cagraray - Radar Station Roads leading to Maribina Falls, Balongbong Falls, Mangrove Eco-Park, Sacahon Beach, Bote Lighthouse, Japanese Garrision (Mt. Arinawan), Bitaogan Beach, Carorian Wonders, Brgy. Cagraray, Bato, Catanduanes
Physical Target :
CW1 - Construction of Concrete Road - 0.18 Lane Km |
September 11, 2023 |
2023 |
WIN3F07042 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00732972LZ
UACS : 300204101247000
From :
CSSP - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - Roll-IT) - Brgy. 3 - Brgy. 5 Road connecting Ligao - Pioduran Road and Albay West Coast Road in support to Agribusiness (Food Resources Based Processing), Pio-Duran, Albay
Physical Target :
CW1 - Construction of Concrete Road - 1.5 Lane Km
TO :
CSSP - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - Roll-IT) - Brgy. 3 - Brgy. 5 Road connecting Ligao - Pioduran Road and Albay West Coast Road in support to Agribusiness (Food Resources Based Processing), Pio-Duran, Albay
Physical Target :
CW1 - Construction of Concrete Road - 0.3266 Lane Km
CW2 - Construction of Road Slope Protection Structure - 2,011.95 Square meters
|
September 8, 2023 |
2023 |
WIN3E02960 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd – K0472 + 780 – K0474 + 000;
Physical Target: 4.376 Lane Km;
Allocation: Php 26,789,000.000
To:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd – K0472 + 350 – K0472 + 1830;
Physical Target: 2.96 Lane Km;
Allocation: Php 26,789,000.000
|
September 8, 2023 |
2023 |
WIN3E02970 |
GAA 2023 |
January 24, 2024 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd- K0408 + 741 - K0408 + 939, K0410 + 816 - K0410 + 942, K0416 + 126 - K0416 + 301;
Physical Target: 0.998 Lane Km;
Allocation: Php 24,950,000.000
To:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd- K0408 + 741 - K0408 + 939, K0410 + 816 - K0410 + 942;
Physical Target: CW1: 0.571 Lane Km
CW2: 583 Square meters
CW3: 957 Square meters Lane Km;
Allocation: Php 24,950,000.000
|
September 8, 2023 |
2023 |
WIN3E02996 |
SR2023-03-0007128 |
March 15, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From:
Improvement of Paracelis-Tabuk-Malig Road, Paracelis, Mountain Province;
Type of Work: Rehabilitation of Concrete Road;
Physical Target: 11.384 Lane Km;
Allocation: Php 100,000,000.000
To:
Improvement of Paracelis-Tabuk-Malig Road, Paracelis, Mountain Province;
Type of Work:
CW1: Construction of
Gravel Road
CW2: Construction of
Concrete Road;
Physical Target:
CW1: 8.480 Lane Km
CW2: 1.200 Lane Km ;
Allocation: Php 100,000,000.000
|
September 8, 2023 |
2023 |
WIN3E03010 |
SR2023-03-007131 |
March 15, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From:
Improvement of Aguinaldo-Natonin Road, Natonin, Mountain Province;
Type of Work: Rehabilitation of Concrete Road;
Physical Target: 11.384 Lane Km;
Allocation: Php 100,000,000.000
To:
Improvement of Aguinaldo-Natonin Road, Natonin, Mountain Province;
Type of Work: Paving of Unpaved Roads;
Physical Target: 2.4 Lane Km;
Allocation: Php 100,000,000.000
|
September 8, 2023 |
2023 |
WIN3E02998 |
SR2023-01-001690 |
March 28, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From:
Construction of Flood Mitigation Structure along Agno River, Poblacion Buguias Section, Sta. 7+724 - Sta. 8+724 (B.S), Buguias, Benguet;
Physical Target: 1920 Lineal meters;
Allocation: Php 100,000,000.000
To:
Construction of Flood Mitigation Structure along Agno River, Poblacion Buguias Section, Sta. 10+451 - 10+888 (L.S), STA. 10+506 - 10+689 (RS), Sta. 10+917 - 11+039 (L.S), Sta. 0+000 - 0+056 (LS), Sta. 0+000 - 0+075 (RS) and Sta. 11+152 - 11+392 (LS), Buguias, Benguet;
Physical Target: 1113 Lineal meters;
Allocation: Php 100,000,000.000
|
September 7, 2023 |
2023 |
WIN3F07522 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Regional Office III |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Jose Abad Santos Ave (JASA) - K0109+467 - K0110+000, K0115+600 - K0116+353, K0110+900 - K0111+170 |
September 7, 2023 |
2023 |
WIN3F07619 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Regional Office III |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Madella-Dinadiawan Rd - K0418+600 - K0418+690, K0418+790 - K0418+920, K0419+000 - K0419+120
|
September 7, 2023 |
2023 |
WIN3F07575 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Regional Office III |
Network Development Program - Construction of Missing Links / New Roads
Capas - Botolan Road, Package 2, Tarlac |
September 7, 2023 |
2023 |
WIN3F07517 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Regional Office III |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and / or Bridges from the National Road/s leading to Major / Strategic Public Buildings / Facilities
Construction of Road, Barangay Liyang, Pilar to Barangay Bilolo, Orion, Bataan (Package 1) |
September 6, 2023 |
2023 |
WIN3F07593 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Apalit-Macabebe-Masantol Rd - K0055+(-207) - K0055+475 |
September 5, 2023 |
CY 2023 |
|
UACS No. 300215102964000 |
February 22, 2023 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 300215102964000
Project ID.: P00739952LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major / Strategic Public Buildings/Facilities
Rehabilitation of Road, Maharlika St., Barangay Old Balara Capitol Site, Phase II, Quezon City
Physical Target: CW1 = Rehabilitation of Paved Road 0.205 lane km
Unit Cost (P’000) = P 95,609.76/lane km.
Allocation (P,000) = P 19,600.00
EAO (P’000) = P 400.00
Total (P’000) = P 20,000.00
As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major / Strategic Public Buildings/Facilities
Rehabilitation of Road, Maharlika St., Barangay Old Capitol Site, Phase II, Quezon City
Physical Target: CW1 = Rehabilitation of Paved Road 0.562 lane km
CW2 = Construction of Drainage Structure along Road – 537 lineal meter
CW3 = Road Safety – Street Lighting – 21 units
Unit Cost (P’000) = P 15,565.836/lane km. P 31 M/Km
P 14,546.00/lineal meter
P 144,810/unit
Allocation (P,000) = P 8,748.00
P 7,811.00
P 3,041.00
EAO (P’000) = P 400.00
Total (P’000) = P 20,000.00
|
September 4, 2023 |
2023 |
WIN3E03094 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From:
Construction of Dao Balbalan-Bullaguian Road, Tabuk City, Kalinga;
Type of Work: Construction of
Concrete Road;
Physical Target: 6.82 Lane Km;
Allocation: Php 100,000,000.000
To:
Construction of Dao Balbalan-Bullaguian Road, Balbalan, Kalinga;
Type of Work:
CW1: Construction of
Concrete Road
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 4.0 Lane Km
CW2: 2,172.58 Square meters ;
Allocation: Php 100,000,000.000
|
September 4, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From:
Lacnog Br. (B00987LZ) along Nambaran-Isabela Rd;
Type of Work: Widening of Bridge;
Physical Target: 409.92 Square Meters;
Allocation: Php 48,800,000.00
To:
Lacnog Br. (B00987LZ) along Nambaran-Isabela Rd;
Type of Work: Construction of Parallel Bridge;
Physical Target: 667.8 Square Meters;
Allocation: Php 48,800,000.00
|
September 4, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310104100506000
Project ID: P00706318MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1265 + 605 - K1266 + 000, K1266 + 284 - K1267 + 569, K1268 + 003 - K1268 + 200, K1270 + 520 - K1271 + 580, K1271 + 629 - K1272 + 000, K1276 + 672 - K1276 + 994, K1278 + 000 - K1278 + 073
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 12.756 Lane Km
Allocation:
TOTAL: P 156,304,000
CW1: P 150,833,360
EAO: P 5,470,640
Unit Cost:
CW1: P 11,824,502.98/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) – K1270 + 520 – K1271 + 007, K1271 + 007 – K1271 + 580, K1271 + 629 – K1272 + 000, K1273 + 043 – K1273 + 892, K1276 + 672 – K1276 + 994, K1277 + 678 – K1278 + 000, K1278 + 000 – K1278 + 073, K1278 + 862 – K1279 + 800, K1292 + 000 – K1293 + 000, K1293 + 000 – K1294 + 000, K1298 + 912 – K1299 + 000, K1303 + 446 – K1303 + 600
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 12.2745 Lane Km
Allocation:
TOTAL: P 156,304,000
CW1: P 150,833,360
EAO: P 5,470,640
Unit Cost:
CW1: P 12,288,350.64/Lane Km
|
September 1, 2023 |
2023 |
WIN3E03097 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 310104100619000
Project ID: P00706319MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1292 + 763 - K1293 + 089
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 1.304 Lane Km
Allocation:
TOTAL: P 15,955,000
CW1: P 15,635,900
EAO: P 319,100
Unit Cost:
CW1: P 11,990,720.86/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1250+098.00 - K1250+589.50
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 1.00373 Lane Km
Allocation:
TOTAL: P 15,955,000
CW1: P 15,635,900
EAO: P 319,100
Unit Cost:
CW1: P 15,577,794.83/Lane Km
|
August 31, 2023 |
2023 |
300214100506000 |
GAA 2023 |
January 3, 2023 |
Region II |
Cagayan 3rd District Engineering Office |
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of LED Integrated Solar Streetlights along Municipality and Barangay Roads in Enrile, Cagayan |
August 31, 2023 |
2023 |
300221102731000 |
GAA 2023 |
January 3, 2023 |
Region II |
Cagayan 3rd District Engineering Office |
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Bridge at Barangay Mangga, Peñablanca, Cagayan |
August 30, 2023 |
2023 |
P00721300MN |
SR2023-01-001425 |
December 30, 2023 |
Region XII |
Regional Office XII |
23M00154 CONSTRUCTION OF REVETMENT ALONG BUAL RIVER, STA 0+000-STA0+303.7, BARANGAY MINAPAN, TULUNAN, NORTH COTABATO
|
August 30, 2023 |
2023 |
P00733163MN |
SR2023-01-000575 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00020 CONSTRUCTION OF CONCRETE ROAD - BONGOLANON-KINARUM ROAD LEADING TO KIRUNGDONG WATERFALLS AND WILDLIFE RESCUE CENTER, STA. 1+642.0 - STA. 3+460, BRGY. KINARUM, MAGPET, NORTH COTABATO
|