May 25, 2018 |
f |
WIN8G02263 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation of Slope Protection along Porac River, Mabical Section, Floridablanca, Pampanga |
May 25, 2018 |
FY 2018 |
WIN8G02260 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Infrastructure Program – Local Roads – Concreting of road, Sitio Kulitang, Barangay San Francisco, Lubao, Pampanga |
May 25, 2018 |
FY 2018 |
WIN8G02243 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bulacan 1st District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Revetment Along Labangan Channel at Iba O’ Este, Calumpit, Bulacan
|
May 25, 2018 |
FY 2018 |
WIN8G02242 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bulacan 1st District Engineering Office |
Local Infrastructure Program – Buildings and Other Structures - Multipurpose / Facilities - Rehabilitation of Multi-Purpose Building, North 6, Santol, Balagtas, Bulacan |
May 25, 2018 |
FY 2018 |
WIN8G02244 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bulacan 1st District Engineering Office |
Local Infrastructure Program – Local Roads and Bridges - Local Roads - – Road Improvement of Local Road, Malibong Matanda, Pandi, Bulacan |
May 25, 2018 |
FY 2018 |
WIN8G02273 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Road construction, Sitio Talatalan, Barangay San Agustin, Carranglan, Nueva Ecija |
May 25, 2018 |
FY 2018 |
WIN8G02273 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Road construction, Sitio Talatalan, Barangay San Agustin, Carranglan, Nueva Ecija |
May 25, 2018 |
FY 2018 |
WIN8G02245 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Primary Roads – San Jose – Lupao Rd, K0164+885 – K0165+000, K0166+000 – K0166+604, K0169+343 – K0169+782, K0169+822.60 – K0170+000, K0173+716.40 – K0175+394, K0175+422 – K0175+945, K0175+945 – K0176+869 |
May 25, 2018 |
FY 2018 |
WIN8G02272 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Construction of Roads, San Francisco, Sto. Domingo, Nueva Ecija |
May 25, 2018 |
FY 2018 |
WIN8G02270 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Convergence and Special Support Program – Construction / Improvement of Access Roads leading to Declared Tourism Destinations – Access Road Leading to Ditabuyan Falls, Brgy. Cadaclan, Pantabangan, Nueva Ecija |
May 25, 2018 |
FY 2018 |
WIN8G02275 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Local Infrastructure Program – Flood Control and Drainage – Flood Control Structures / Facilities – Rechanneling / Desilting of Talavera River (San Carlos Aliaga Section), San Carlos, Aliaga, Nueva Ecija |
May 25, 2018 |
FY 2018 |
WIN8G02256 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Tertiary Roads – Jct. Pinagpanaan – Rizal – Pantabangan Rd, K0159+630 – K0159+740, K0160+099 – K0160+302.50, K0160+1087.40 – K0161+149, K0161+436 – K0161+523, K0162+310 – K0162+430, K0162+472 -K0162+683, K0163+000 – K0163+152, K0163+205 – K0163+387, K0163+478 – K0163+650, K0163+679 – K0163+780, K0163+792 – K0163+901.50, K0164+138 – K0164+293 |
May 25, 2018 |
FY 2018 |
WIN8G02276 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Local Program – Construction / Repair/Rehabilitation / Improvement of Various Infrastructure including Local Project - Local Roads – Construction of Gen. Luna, Carranglan – Conversion, Pantabangan Road, Nueva Ecija |
May 25, 2018 |
FY 2018 |
WIN8G02253 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 3rd District Engineering Office |
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Reinforced Concrete Slope Protection Works along Quitangil Creek, Brgy. San Ildefonso, Sitio Balibago – Sitio Balas, Magalang, Pampanga
|
May 25, 2018 |
FY 2018 |
WIN8G02255 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation Program – Preventive Maintenance – Secondary Roads – Repair / Rehabilitation / Improvement, Overlay with Pavement Markings along Angeles – Porac – Floridablanca – Dinalupihan Road, K0113+(-225) – K0115+810, K0117+800 – K0118+1215, Dinalupihan, Bataan |
May 24, 2018 |
FY 2018 |
WIN8C02701 |
300117201981000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No: 300117201981000
Project ID: P00251825MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Malagutay, Zamboanga City
Physical Target: CW-1: Construction of Concrete Road: 0.62 lane km
Unit Cost: CW-1: Construction of Concrete Road: P 6,274,396.74/lane km
Physical Target: CW-2: Construction of Drainage Structure: 310 Ln.m
Unit Cost: CW-2: Construction of Drainage Structure: P 3,418.95/Ln.m
EAO: P 50,000.00
Allocation: P 5,000,000.00
|
May 24, 2018 |
FY 2018 GAA |
WIN8C03036 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction / Improvement of Access Roads leading to Declared Tourism Destinations
Mapawa Road leading to Miyaya Falls, Brgy. Mapawa, Maragusan, Compostela Valley
Physical Target:
CW1: 2.000 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Gravel Road)
EAO: P 800,000.00
TO: Convergence and Special Support Program
Construction / Improvement of Access Roads leading to Declared Tourism Destinations
Mapawa Road leading to Miyaya Falls, Brgy. Mapawa, Maragusan, Compostela Valley
Physical Target:
CW1: 4.516 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Gravel Road)
EAO: P 800,000.00 |
May 24, 2018 |
FY 2018 GAA |
WIN8C03058 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Brgy. Anitapan-Golden Valley, Mabini, Compostela Valley
Physical target:
CW1: 2.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00
TO: Local Program - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Brgy. Anitapan-Golden Valley, Mabini, Compostela Valley
Physical Target:
CW1: 1.600 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00 |
May 24, 2018 |
FY 2018 |
WIN8C02566 |
320101102146000 |
April 16, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No: 320101102146000
Project ID: P00222069MN
OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structure along Ayala River, Ayala Section (both side) Zamboanga City
Physical Target:
CW-1: Construction of Flood Mitigation Structure: 640.00 ln.m.
Unit Cost: CW-1: Construction of Flood Mitigation Structure: P 28,762.72/ln.m
ROW Acquisition: 1,117 sq.m
Unit Cost: P 1,067.02/sq.m.
EAO: P 400,000
Allocation: P 20,000,000 |
May 24, 2018 |
FY 2018 GAA |
WIN8C03055 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Concreting of Brgy. Road, Langgam-Mapaang, Maco, Compostela Valley
Physical Target:
CW1: 0.800 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 8,000,000.00
CW1: P 7,840,000.00 (Construction of Concrete Road)
EAO: P 160,000.00
TO: Local Program - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Concreting of Brgy. Road, Langgam-Mapaang, Maco, Compostela Valley
Physical Target:
CW1: 0.973 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 8,000,000.00
CW1: P 7,840,000.00 (Construction of Concrete Road)
EAO: P 160,000.00 |
May 24, 2018 |
FY 2018 GAA |
WIN8C03059 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Montevista-Compostela-Mati Bdry Rd - K1424+996.10 - K1434+482.90
Physical Target:
CW1: 10.600 lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Montevista-Compostela-Mati Bdry Rd - K1425+002 - K1429+923
Physical target:
CW1: 9.800 lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00 |
May 24, 2018 |
FY 2018 GAA |
WIN8C03031 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties - Flood Management -
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Tagbalaobao River, Pindasan, Mabini, Compostela Valley
Physical Target:
CW-1: 1,272 Lineal meters (Construction of Revetment)
CW-2: 17,341 Cubic meters (Channelization)
ROW: 2,486 Square meters
Allocation:
TOTAL: P 35,000,000.00
CW-1: P 28,651,915.00 (Construction of Revetment)
CW-2: P 5,158,085.00 (Channelization)
ROW: P 490,000.00
EAO: P 700,000.00
TO: OO2: Protect Lives and Properties - Flood Management -
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Tagbalaobao River, Pindasan, Mabini, Compostela Valley
Physical Target:
CW-1: 989.9 Lineal meters (Construction of Revetment)
CW-2: 17,341 Cubic meters (Channelization)
ROW: 2,486 Square meters
Allocation:
TOTAL: P 35,000,000.00
CW-1: P 29,562,243.00 (Construction of Revetment)
CW-2: P 4,247,758.00 (Channelization)
ROW: P 490,000.00
EAO: 700,000.00 |
May 24, 2018 |
FY 2018 GAA |
WIN8C03034 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Road and Widening, Mawab, Compostela Valley
Physical Target:
CW1: 1.500 Lane Km (Construction of Concrete Road)
ALLOCATION:
Total: P 15,000,000.00
CW1: P 14,475,000.00 (Construction of Concrete Road)
EAO: P 525,000.00
TO:Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Road and Widening, Mawab, Compostela Valley
Physical Target:
CW1: 2.180 Lane Km (Construction of Concrete Road)
Total: P 15,000,000.00
CW1: P 14,475,000.00 (Construction of Concrete Road)
EAO: P 525,000.00 |
May 24, 2018 |
FY 2018 GAA |
WIN8C03044 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Puroks Natural Creeks, Laak Poblacion, Laak, Compostela Valley
Physical Target:
CW-1 - 500 Lineal meters (Construction of Revetment)
ROW - 2,857 Square meters
Allocation:
TOTAL: P 35,000,000.00
CW-1 - P 33,810,000.00 (Construction of Revetment)
ROW - P 490,000.00
EAO - P 700,000.00
TO: OO2: Protect Lives and Properties - Flood Management -
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Puroks Natural Creeks, Laak Poblacion, Laak, Compostela Valley
Physical Target:
CW-1: 1,092.3 Lineal meters (Construction of Revetment)
ROW: 2,857 Square meters
ALLOCATION:
Total: P 35,000,000.00
CW-1: P 33,810,000.00 (Construction of Revetment)
ROW: P 490,000.00
EAO: P 700,000.00 |
May 24, 2018 |
FY 2018 GAA |
WIN8C03042 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment at Maoao Creek Maindrain leading to Agusan River, Brgy. Poblacion, Monkayo, Compostela Valley
Physical Target:
CW-1: 1,703 Lineal meters (Construction of Revetment)
CW-2: 6,700 Cubic meters (Channelization)
ROW: 526 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW-1: P 41,254,043.00 (Construction of Revetment)
CW-2: P 7,255,957.00 (Channelization)
ROW: P 490,000.00
EAO: P 1,000,000.00
TO: Protect Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment at Maoao Creek Maindrain leading to Agusan River, Brgy. Poblacion, Monkayo, Compostela Valley
Physical Target:
CW-1: 1,692.50 Lineal meters (Construction of Revetment)
CW-2: 6,700 Cubic meters (Channelization)
ROW: 526 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW-1: P 45,498,370.00 (Construction of Revetment)
CW-2: P 3,011,630.00 (Channelization
ROW: P 490,000.00
EAO: P 1,000,000.00 |
May 23, 2018 |
FY - 2018 |
WIN8F05494 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Oriental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
FROM:
Cadre Rd - (S00004MR ) Chainage 000 - Chainage 522
CW1: 1.044 lane Km ( Preventive Maintenance of Road:
Asphalt Overlay )
Allocation: 6,320,000 Php
TO:
Cadre Rd - ( S00004MR ) Chainage 000 - Chainage 340
CW1: .0680 Lane Km ( Preventive Maintenance of Road:
Asphalt Overlay )
Allocation: 6,320,000 Php
|
May 23, 2018 |
FY - 2018 |
WIN8F05489 |
FY - 2018 GAA DPWH Infra program |
December 19, 2017 |
Region IV-B |
Mindoro Oriental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
FROM:
CSR Jct - Minas Rd
K0039+544 - K0039+649,
K0037+531 - K0038+204
CW1: 1.034 Lane Km ( Preventive Maintenance of Road:
Asphalt overlay )
Allocation: 6,259,000 Php
TO:
CSR Jct - Minas Rd
K0037+531 - K0038+202
CW1: 0.820 Lane Km ( Preventive Maintenance of Road:
Asphalt Overlay )
Allocation: 6,259,000 Php
|
May 23, 2018 |
FY 2018 |
WIN8G02191 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300202100001000
Project ID: P00230349LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Seaports - Access Road Leading to Bahao Port, Camarines Sur
Physical Target - CW1- Construction of Concrete Road/ 7.00 lane-km
Unit Cost: Php 20.68M/lane-km
Estimated Cost: Php 150.00M
(As Modified)
|
May 23, 2018 |
FY - 2018 |
WIN8F05499 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Oriental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
FROM:
CSR Jct - Pola Rd
K0065+914 - K0066+983
CW1: 2.088 Lane Km ( Preventive maintenance of Road:
Asphalt Overlay )
Allocation:12,645,000 Php
TO:
CSR Jct - Pola Rd
K0065+914 - K0066+748
CW1: 1.618 Lane Km ( Preventive Maintenance of Road:
Asphalt Overlay )
Allocation: 12,645,000 Php
|
May 23, 2018 |
FY 2018 |
WIN8G02164 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300204100015000
Project ID: P00230360LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones – Brgy. 3-Brgy. 4-Brgy.5 Road connecting Ligao-Pioduran Road and Albay West Coast Road in support to Agribusiness (Food Resource Based Processing) Pio-Duran, Albay
Physical Target - CW1 – Construction of Concrete Road/ 0.774 lane-km
CW2 - Construction of Road Slope Protection Structure/ 2,001.50 sq.m.
Unit Cost: CW1 – Php 25.444M /lane-km
CW2 – Php 23.910T/sq.m.
Estimated Cost: Php 70.0M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G02161 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300203100061000
Project ID: P00230363LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Bulan-Matnog-Sta. Magdalena-Bulusan Road (Matnog Section) leading to Bulusan National Park, Sorsogon
Physical Target - CW1 – Construction of Concrete Road/ 4.54 lane-km
CW2 - Construction of Drainage Structure along Road/ 2,880.39 lm.
Unit Cost: CW1 – Php 17.373M /lane-km
CW2 – Php 12.82T/lm.
Estimated Cost: Php 120.0M
(As Modified)
|
May 23, 2018 |
FY - 2018 |
WIN8F05495 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
002 - Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Control Structure along
Busuanga River ( Pitogo Section ), Rizal,
Occidental Mindoro
CW1: - ( Construction of Flood Mitigation Structure
Allocation: 150,000,000 Php
TO:
Construction of Flood Control Structure along
Busuanga River ( Pitogo Section ), Rizal,
Occidental Mindoro
CW1: 1,740 lineal meters ( Construction of Flood Mitigation
Structure )
Allocation: 150,000,000 Php
|
May 23, 2018 |
FY 2018 |
WIN8G02170 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300203100111000
Project ID: P00230388LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Matnog-Sta. Magdalena-Bulusan Road leading to Bulusan National Park, Sorsogon
Physical Target - CW1 – Construction of Concrete Road/ 4.16 lane-km
CW2 - Construction of Drainage Structure along Road/ 508.10 lm.
Unit Cost: CW1 – Php 16.648M /lane-km
CW2 – Php 91.600T/lm.
Estimated Cost: Php 120.0M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G02189 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300203100113000
Project ID: P00230390LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Naga City (del Rosario)–Cararayan–Langon–San Isidro-Carolina Road leading to Mt. Isarog Natural Park and Est Highland Tourism Zone, Brgy. Del Rosario, Naga City, Camarines Sur
Physical Target - CW1 – Road Widening/ 6.72 lane-km
CW2 - Construction of Drainage Structure along Road/ 5,699.74 sq.m.
Unit Cost: CW1 – Php 12.910M /lane-km
CW2 – Php 10.05T/sq.m.
Estimated Cost: Php 149.25M
(As Modified)
|
May 23, 2018 |
FY 2018 GAA |
WIN8C03035 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Secondary Roads
Nabunturan-Maragusan Rd incl. ROW – K1456 + 060 - K1458 + 400
Physical Target:
CW1: 4.680 Lane Km (Road Widening)
ROW: 35,100.00 sq. m.
Allocation:
TOTAL: P 169,171,000.00
CW1: P 158,067,000.00 (Road Widening)
ROW: P 5,183,015.00
EAO: P 5,920,985.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Secondary Roads
Nabunturan-Maragusan Rd incl. ROW – K1450 + 567 - K1450 + 810
K1453 + 061 - K1453 + 312, K1456 + 315 - K1457 + 581
Physical Target:
CW1: 1.277 Lane Km (Road Widening)
CW2: 0.486 Lane Km (Paving of Unpaved Roads)
CW3: 1.749 Lane Km (Reconstruction to Concrete Pavement)
ROW: 35,100.00 sq. m.
Allocation:
TOTAL: P 169,171,000.00
CW1: P 87,250,982.32 (Road Widening)
CW2: P 34,675,665.96 (Paving of Unpaved Roads)
CW3: P 36,140,351.72 (Reconstruction to Concrete Pavement)
ROW: P 5,183,015.00
EAO: P 5,920,985.00 |
May 23, 2018 |
FY 2018 |
WIN8G02162 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300203100149000
Project ID: P00230396LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Polangui-Albay West Coast Road leading to Beaches (Sitio Balinsasayaw Libon, Sitio Cabugaw Libon, Sitio Imaco Oas, Catburawan Ligao), Maonon, Ligao, Albay
Physical Target - CW1 – Construction of Concrete Road/ 4.524 lane-km
CW2 - Construction of Road Slope Protection Structure/ 9,058.69 sq.m.
Unit Cost: CW1 – Php 15.5238M /lane-km
CW2 – Php 2,900/sq.m.
Estimated Cost: Php 100.0M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G02162 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300203100149000
Project ID: P00230396LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Polangui-Albay West Coast Road leading to Beaches (Sitio Balinsasayaw Libon, Sitio Cabugaw Libon, Sitio Imaco Oas, Catburawan Ligao), Maonon, Ligao, Albay
Physical Target - CW1 – Construction of Concrete Road/ 4.524 lane-km
CW2 - Construction of Road Slope Protection Structure/ 9,058.69 sq.m.
Unit Cost: CW1 – Php 15.5238M /lane-km
CW2 – Php 2,900/sq.m.
Estimated Cost: Php 100.0M
(As Modified)
|
May 23, 2018 |
FY 2018 GAA |
WIN8C03029 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION
FROM: Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Antiquera - Nabunturan Road, Nabunturan, Compostela Valley
Physical Target:
CW1: 1.000 Lane Km (Construction of Concrete Road)
ALLOCATION:
Total: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
TO: Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Antiquera - Nabunturan Road, Nabunturan, Compostela Valley
Physical Target:
CW1: 0.953 Lane Km (Construction of Concrete Road)
ALLOCATION:
Total: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00 |
May 23, 2018 |
FY 2018 GAA |
WIN8C03006 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Flyovers/Interchanges/Underpasses/Long Span Bridges
Tagum City Flyover along Agusan-Davao Road, Package 1, Davao del Norte
Physical Target:
CW1: 3,960.00 sq. m. (Construction of Flyover)
Allocation:
TOTAL: P 570,000,000.00
CW1: P 550,050,000.00 (Construction of Flyover)
EAO: P 19,950,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Flyovers/Interchanges/Underpasses/Long Span Bridges
Tagum City Flyover along Agusan-Davao Road, Package 1, Davao del Norte
Physical Target:
CW1: 1 number of bridge (Construction of Substructure)
Allocation:
TOTAL: P 570,000,000.00
CW1: P 550,050,000.00 (Construction of Flyover)
EAO: P 19,950,000.00 |
May 23, 2018 |
FY 2018 |
WIN8G02163 |
FY 2018 GAA R.A. 10964 |
November 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300204100027000
Project ID: P00201065LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of By-Pass and Diversion Roads - Barcelona-Casiguran Diversion Road (Barcelona Section), Sorsogon
Physical Target - CW1 – Construction of Concrete Road/ lane-km
Unit Cost: Php 16.50M/lane-km
Estimated Cost: Php 100.0M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G02166 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300204100156000
Project ID: P00201074LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of By-Pass and Diversion Roads - Juban-Bulan Diversion Road (Bulan Section), incl. ROW, Sorsogon
Physical Target - CW1 – Construction of Concrete Road/ 4.60 lane-km
Right-of-Way Acquisition (ROW)/46,000 sq.m.
Unit Cost: CW1 – Php 15.98M /lane-km
ROW Acquisition – Php 500.00/sq.m.
Estimated Cost: Php 100.0M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G02169 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300204100210000
Project ID: P00201078LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of By-Pass and Diversion Roads - Nabua bypass Road, Camarines Sur
Physical Target - CW1 – Construction of Gravel Road/ 4.57 lane-km
Unit Cost: CW1 – Php 17.53M /lane-km
Estimated Cost: Php 83.00M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G02168 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS: 310101100046000
Project ID: P00202693LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Preventive Maintenance - Primary Roads – Daang Maharlika (LZ) - K0585+431 - K0588+170, K0588+370 - K0590+181, K0593+922 - K0594+836
Physical Target - CW1 – Preventive Maintenance of Road: Asphalt Overlay/ 21.514 lane-km
Unit Cost: Php 13.456 M/lane-km
Estimated Cost: Php 300.0M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G02160 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 320101100026000
Project ID: P00222430LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction and Improvement of Flood Control Dikes in Polangui, Albay for critical sections of barangays Kinale, Balangibang and Matacon, Albay
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 713.35 lm
Unit Cost: CW1 – Php 101.46T/lm.
Estimated Cost: Php 75.0M
(As Modified)
|
May 23, 2018 |
2018 |
310106100012000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Cagayan 3rd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System: Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Cagayan-Apayao Road - K0494+000 - K0495+000, K0495+000 - K0496+190, K0497+849 - K0498+777, K0519+121 - K0522+101, K0522+112 - K0523+351, K0523+367 - K0524+000 |
May 23, 2018 |
FY 2018 GAA |
WIN8C03008 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Flyovers/Interchanges/Underpasses/Long Span Bridges
Tagum City Flyover along Agusan-Davao Road, Package 2, Davao del Norte
Physical Target:
CW1: 0 sq. m. (Construction of Flyover)
Allocation:
TOTAL: P 500,000,000.00
CW1: P 482,500,000.00 (Construction of Flyover)
EAO: P 17,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Flyovers/Interchanges/Underpasses/Long Span Bridges
Tagum City Flyover along Agusan-Davao Road, Package 2, Davao del Norte
Physical Target:
CW1: 1 number of bridge (Construction of Substructure)
Allocation:
TOTAL: P 500,000,000.00
CW1: P 482,500,000.00 (Construction of Flyover)
EAO: P 17,500,000.00 |
May 23, 2018 |
FY 2018 GAA |
WIN8C03013 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Guadalupe-Lower Tuganay Road Connecting Carmen Overland Transport Terminal in Support of Banana and Coconut Industries, Davao del Norte
Physical Target:
CW1: 7.200 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 173,700,000.00 (Construction of Concrete Road)
EAO: P 6,300,000.00
TO: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Guadalupe-Lower Tuganay Road Connecting Carmen Overland Transport Terminal in Support of Banana and Coconut Industries, Davao del Norte
Physical Target:
CW1: 2.696 Lane Km (Construction of Concrete Road)
CW2: 6.586 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 39,700,642.33 (Construction of Concrete Road)
CW2: P 133,999,357.67 (Construction of Gravel Road)
EAO: P 6,300,000.00 |
May 23, 2018 |
FY 2018 GAA |
WIN8C03047 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Patel-Kapatagan Road Package 3, Davao del Norte
Physical Target:
CW1: 15.335 Lane Km (Construction of Gravel Road)
CW2: 18.890 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 400,000,000.00
CW1: P 221,959,650.00 (Construction of Gravel Road)
CW2: P 164,040,350.00 (Construction of Concrete Road)
EAO: P 14,000,000.00
TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Patel-Kapatagan Road Package 3, Davao del Norte
Physical Target:
CW1: 13.74836 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 400,000,000.00
CW1: P 386,000,000.00 (Construction of Gravel Road)
EAO: P 14,000,000.00 |
May 23, 2018 |
FY 2018 GAA |
WIN8C03043 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Island Garden City of Samal (IGACOS) Circumferential Road (West Side), Package 2, Davao del Norte
Physical Target:
CW1: 15.308 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 450,000,000.00
CW1: P 434,250,000.00 (Construction of Concrete Road)
EAO: P 15,750,000.00
TO: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Island Garden City of Samal (IGACOS) Circumferential Road (West Side), Package 2, Davao del Norte
Physical Target:
CW1: 213798 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 450,000,000.00
CW1: P 434,250,000.00 (Construction of Concrete Road)
EAO: P 15,750,000.00 |
May 23, 2018 |
FY 2018 GAA |
WIN8C03049 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides – Secondary Roads
Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) – K1672 + 675 - K1672 + 705,
K1673 + 600 - K1673 + 700, K1675 + 475 - K1679 + 048
Physical Target:
CW1: 3,900.00 sq. m. (Construction of Road Slope Protection Structure)
CW2: 6.860 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 145,878,000.00
CW1: P 87,815,000.00 (Construction of Road Slope Protection Structure)
CW2: P 52,957,270.00 (Asphalt Overlay)
EAO: P 5,105,730.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides – Secondary Roads
Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-Glan) –
K1670 + 650 - K1670 + 860, K1670 + 740 - K1670 + 760, K1672 + 660 - K1672 + 705,
K1673 + 600 - K1673 + 700, K1673 + 860 - K1673 + 960, K1675 + 475 - K1677 + 000
Physical Target:
CW1: 3,000.00 sq. m. (Construction of Road Slope Protection Structure)
CW2: 3.04744 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 145,878,000.00
CW1: P 100,301,497.80 (Construction of Road Slope Protection Structure)
CW2: P 40,470,772.22 (Asphalt Overlay)
EAO: P 5,105,730.00 |
May 23, 2018 |
FY 2018 GAA |
WIN8C03038 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Concreting of Bayabas - Handurumog Road Nabunturan, Compostela Valley
Physical Target:
CW1: 1.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Concreting of Bayabas - Handurumog Road Nabunturan, Compostela Valley
Physical Target:
CW1: 1.498 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 200,000.00 |
May 23, 2018 |
FY 2018 GAA |
WIN8C03033 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Bukidnon-Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon-Laak-Compostela Valley), Package 5, incl. ROW, Davao del Norte
Physical Target:
CW1: 13.428 Lane Km (Construction of Concrete Road)
ROW: 100,710.00 sq. m.
Allocation:
TOTAL: P 312,000,000.00
CW1: P 291,555,450.00 (Construction of Concrete Road)
ROW: P 9,524,550.00
EAO: P 10,920,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Bukidnon-Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon-Laak-Compostela Valley), Package 5, incl. ROW, Davao del Norte
Physical Target:
CW1: 8.49298 Lane Km (Construction of Concrete Road)
CW2: 821.2032 sq. m. (Construction of Concrete Bridge)
CW3: 381.60 sq. m. (Construction of Concrete Bridge)
ROW: 100,710.00 sq. m.
Allocation:
TOTAL: P 312,000,000.00
CW1: P 177,771,295.75 (Construction of Concrete Road)
CW2: P 80,450,661.34 (Construction of Concrete Bridge)
CW3: P 33,333,492.91 (Construction of Concrete Bridge)
ROW: P 9,524,550.00
EAO: P 10,920,000.00 |
May 23, 2018 |
FY 2018 GAA |
WIN8C03048 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road-Catalunan Road-Talandang-Sumimao-Pañalum-Tapak-Cabanglasan-Aglayan, Malaybalay), Package B, incl. ROW and Bridge, Davao del Norte
Physical Target:
CW1: 8.560 Lane Km (Construction of Gravel Road)
CW2: 286.20 sq. m. (Construction of Concrete Bridge)
CW3: 286.20 sq. m. (Construction of Concrete Bridge)
CW4: 286.20 sq. m. (Construction of Concrete Bridge)
CW5: 286.20 sq. m. (Construction of Concrete Bridge)
ROW: 65,535.60 sq. m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 103,225,000.00 (Construction of Gravel Road)
CW2: P 28,226,250.00 (Construction of Concrete Bridge)
CW3: P 28,226,250.00 (Construction of Concrete Bridge)
CW4: P 28,226,250.00 (Construction of Concrete Bridge)
CW5: P 28,226,250.00 (Construction of Concrete Bridge)
ROW: P 6,272,500.00
EAO: P 8,750,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road-Catalunan Road-Talandang-Sumimao-Pañalum-Tapak-Cabanglasan-Aglayan, Malaybalay), Package B, incl. ROW and Bridge, Davao del Norte
Physical Target:
CW1: 4.714 Lane Km (Construction of Gravel Road)
CW2: 429.30 sq. m. (Construction of Concrete Bridge)
CW3: 429.30 sq. m. (Construction of Concrete Bridge)
ROW: 65,535.60 sq. m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 140,000,544.17 (Construction of Gravel Road)
CW2: P 51,720,653.19 (Construction of Concrete Bridge)
CW3: P 43,234,302.64 (Construction of Concrete Bridge)
ROW: P 6,272,500.00
EAO: P 8,750,000.00 |
May 23, 2018 |
FY 2018 GAA |
WIN8C03041 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Apalaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 1, incl. Bridge, Davao City
Physical Target:
CW1: 2.380 Lane Km (Construction of Asphalt Road)
CW2: 3,460.00 sq. m. (Construction of Road Slope Protection Structure)
CW3: 292.95 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 250,000,000.00
CW1: P 172,445,500.00 (Construction of Asphalt Road)
CW2: P 49,504,500.00 (Construction of Road Slope Protection Structure)
CW3: P 19,300,000.00 (Construction of Concrete Bridge)
EAO: P 8,750,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Apalaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 1, incl. Bridge, Davao City
Physical Target:
CW1: 2.636Lane Km (Construction of Concrete Road)
CW2: 1,376.86 sq. m. (Construction of Road Slope Protection Structure)
CW3: 243.22 sq. m. (Construction of Concrete Bridge)
CW4: 1.028 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 250,000,000.00
CW1: P 179,640,110.18 (Construction of Asphalt Road)
CW2: P 23,337,474.65 (Construction of Road Slope Protection Structure)
CW3: P 35,313,018.57 (Construction of Concrete Bridge)
CW4: P 2,959,396.60 (Construction of Gravel Road)
EAO: P 8,750,000.00 |
May 23, 2018 |
FY 2018 GAA |
WIN8C03037 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Construction / Improvement of Access Roads leading to Declared Tourism Destinations
Bongkilaton Road leading to Mandaya Village, Pansan Falls, Bongkilaton Cave and Tagbubunlas Falls, Brgy. Ngan, Compostela Valley
Physical Target:
CW1: 1.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,0000.00 (Construction of Concrete Road)
EAO: P 400,000.00
TO: Convergence and Special Support Program - Construction / Improvement of Access Roads leading to Declared Tourism Destinations
Bongkilaton Road leading to Mandaya Village, Pansan Falls, Bongkilaton Cave and Tagbubunlas Falls, Brgy. Ngan, Compostela Valley
Physical Target:
CW1: 1.403 Lane Km (Construction of Concrete Road)
CW2: 348.000 Lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 14,787,930.00 (Construction of Concrete Road)
CW2: P 4,812,070.00 (Construction of Revetment)
EAO: P 400,000.00 |
May 23, 2018 |
FY 2018 GAA |
WIN8C03025 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road-Catalunan Road-Talandang-Sumimao-Pañalum-Tapak-Cabanglasan-Aglayan, Malaybalay, Package A, incl. ROW and Bridge, Davao City
Physical Target:
CW1: 2.500 Lane Km (Construction of Concrete Road)
CW2: 1,908.00 sq. m. (Construction of Concrete Bridge)
ROW: 11,627.907 sq. m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 48,250,000.00 (Construction of Concrete Road)
CW2: P 231,600,000.00 (Construction of Concrete Bridge)
ROW: P 9,650,000.00
EAO: P 10,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road-Catalunan Road-Talandang-Sumimao-Pañalum-Tapak-Cabanglasan-Aglayan, Malaybalay, Package A, incl. ROW and Bridge, Davao City
Physical Target:
CW1: 2.500 Lane Km (Construction of Concrete Road)
CW2: 381.60 sq. m. (Construction of Concrete Bridge)
CW3: 429.30 sq. m. (Construction of Concrete Bridge)
CW4: 10.34678 Lane Km (Construction of Gravel Road)
ROW: 11,627.907 sq. m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 56,183,759.92 (Construction of Concrete Road)
CW2: P 33,336,090.22 (Construction of Concrete Bridge)
CW3: P 39,477,236.29 (Construction of Concrete Bridge)
CW4: P 150,852,913.58 (Construction of Gravel Road)
ROW: P 9,650,000.00
EAO: P 10,500,000.00 |
May 23, 2018 |
FY 2018 |
WIN8G02165 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 300203100319000
Project ID: P00230346LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Access Road from Virac to Bagamanoc leading to Paday Falls, Bagamanoc, Catanduanes
Physical Target - CW1 – Construction of Concrete Road/ 0.94 lane-km
Unit Cost: CW1 – Php 16.68M /lane-km
Estimated Cost: Php 16.0M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G01912 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 300203100320000
Project ID: P00230399LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – San Andres-Pandan-Hiyop Access Road leading to Hiyop Highlands and Su-nog Sea Cave, San Andres, Catanduanes
Physical Target - CW1 – Construction of Concrete Road/ 2.275 lane-km
Unit Cost: CW1 – Php 14.215M /lane-km
Estimated Cost: Php 33.0M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G02167 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 300117201439000
Project ID: P00255760LZ
Local Program – Local Roads and Bridges – Local Roads – Local Infrastructure Program – Construction of Road, Brgy. Rizal, Viga, Catanduanes
Physical Target - CW1 – Construction of Concrete Road/ 0.2814 lane-km
Unit Cost: CW1 – Php 10.55M /lane-km
Estimated Cost: Php 3.0M
(As Modified)
|
May 23, 2018 |
FY 2018 GAA |
WIN8C03028 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Improvement/Concreting of Jct. Davao-Bukidnon Rd (Calinan Section)-Wangan-Subasta-Tagakpan-Tungkalan-Tagarano-Bayabas-Catigan-Baracatan-Sibulan Road, Davao City
Physical Target:
CW1: 6.220 Lane Km (Construction of Concrete Road)
CW2: 773.00 sq. m. (Construction of Concrete Bridge)
ROW: 24,105.00 sq. m.
Allocation:
TOTAL: P 200,000,000.00
CW1: P 91,573,675.00 (Construction of Concrete Road)
CW2: P 78,165,000.00 (Construction of Concrete Bridge)
ROW: P 23,261,325.00
EAO: P 7,000,000.00
TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Improvement/Concreting of Jct. Davao-Bukidnon Rd (Calinan Section)-Wangan-Subasta-Tagakpan-Tungkalan-Tagurano-Bayabas-Catigan-Baracatan-Sibulan Road, Davao City
Physical Target:
CW1: 3.774 Lane Km (Construction of Concrete Road)
CW2: 429.30 sq. m. (Construction of Concrete Bridge)
CW3: 200.34 sq. m. (Replacement of Bridge)
CW4: 0.591 Lane Km (Construction of Gravel Road)
ROW: 24,105.00 sq. m.
Allocation:
TOTAL: P 200,000,000.00
CW1: P 99,782,383.82 (Construction of Concrete Road)
CW2: P 44,040,342.13 (Construction of Concrete Bridge)
CW3: P 23,079,631.49 (Replacement of Bridge)
CW4: P 2,836,317.56 (Construction of Gravel Road)
ROW: P 23,261,325.00
EAO: P 7,000,000.00 |
May 23, 2018 |
FY 2018 |
WIN8G01913 |
FY 2018 GAA R.A. 10964 |
December 29, 2016 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 320101101708000
Project ID: P00220672LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Drainage Structure along Sibanhan River, Sta. 0+000 - Sta.0+952, Virac, Catanduanes
Physical Target - CW - Construction of Drainage Structure/ 952.0 lm.
Unit Cost: CW1 - Php 30,882.35/lm
Estimated Cost: Php 30.0M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G02173 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 320101101720000
Project ID: P00223411LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of River Protection, Brgy. San Nicolas, Panganiban, Catanduanes
Physical Target - CW1 - Construction of Flood Mitigation Structure/ 452 lm
Unit Cost: Php 43,363/lm
Estimated Cost: Php 20.0M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G01871 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310111100045000
Project ID: P00202645LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Construction/Upgrading/Rehabilitation of Drainage along National Roads –Secondary Roads – Catanduanes Cir Rd - K0121+000 - K0122+000, K0122+000 - K0122+540
Physical Target - CW1 - Construction of Drainage Structure along Road/ 1,545.59 lm.
Unit Cost: CW1 – Php 11,316.11/lm.
Estimated Cost: Php 17.847M
(As Modified)
|
May 23, 2018 |
FY 2018 GAA |
WIN8C03026 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Carmen-Tagum City Coastal Road, incl. ROW, Carmen, Tagum City, Davao del Norte
Physical Target:
CW1: 9.596 Lane Km (Construction of Gravel Road)
ROW: 71,970.00 sq. m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 138,916,575.00 (Construction of Gravel Road)
ROW: P 5,833,425.00
EAO: P 5,250,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Carmen-Tagum City Coastal Road, incl. ROW, Carmen, Tagum City, Davao del Norte
Physical Target:
CW1: 5.184 Lane Km (Construction of Gravel Road)
CW2: 861.27 sq. m. (Construction of Concrete Bridge)
ROW: 71,970.00 sq. m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 37,115,676.61 (Construction of Gravel Road)
CW2: P 101,800,898.39 (Construction of Concrete Bridge)
ROW: P 5,833,425.00
EAO: P 5,250,000.00 |
May 23, 2018 |
FY 2018 |
WIN8G02049 |
FY 2018 GAA R.A. 10964 |
November 29, 2017 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310111100046000
Project ID: P00202644LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Construction/Upgrading/Rehabilitation of Drainage along National Roads – Secondary Roads – Catanduanes Cir Rd – K0201+000 – K0201+811
Physical Target - CW1 - Construction of Drainage Structure along Road/ 115.58 lm.
Unit Cost: CW1 – Php 63,159.89/lm.
Estimated Cost: Php 7.449M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G01911 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310209100069000
Project ID: P00202648LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Off-Carriageway Improvement - Tertiary Roads - Jct Bato-Baras Rd incl. ROW - K0008+-003 - K0008+579, K0012+000 - K0012+940
Physical Target - CW1 - Off-Carriageway improvement: Shoulder Paving/Construction/ 6,566.00 sq.m.
Right-of-Way Acquisition (ROW)/ 3,492 sq.m.
Unit Cost: CW1 – Php 7,401.49/sq.m.
ROW Acquisition – Php 103.84/sq.m.
Estimated Cost: Php 49.960M
(As Modified)
|
May 23, 2018 |
FY 2018 GAA |
WIN8C03032 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Roads - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Kao-Cabacungan-Dauis Road Phase 1, Nabunturan, Compostela Valley
Physical Target:
CW1: 1.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
TO: Local Roads - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Kao-Cabacungan-Dauis Road Phase 1, Nabunturan, Compostela Valley
Physical Target:
CW1: 1.187 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00 |
May 23, 2018 |
FY 2018 |
WIN8G01872 |
FY 2018 GAA R.A. 10964 |
November 29, 2017 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310212100060000
Project ID: P00202650LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Paving of Unpaved Roads - Tertiary Roads - Baras-Gigmoto-Viga Rd - K0056+031.50 - K0056+146.50, K0056+502.62 - K0056+530.92, K0064+155 - K0064+582.50
Physical Target - CW1 - Paving of unpaved Roads/1.1416 lane-km
Unit Cost: CW1 - Php 13.091M/ lane-km
Estimated Cost: Php 15.25 M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G01870 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310109100088000
Project ID: P00200936LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide - Tertiary Roads - Baras-Gigmoto-Viga Rd - K0031+700 - K0032+052, K0081+440 - K0081+590
Physical Target - CW1 - Construction of Road Slope Protection Structure/ 4,057.09 sq.m.
Unit Cost: Php 4,831.05/sq.m.
Estimated Cost: Php 20.0M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G02051 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310106100148000
Project ID: P00202641LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads - Baras-Gigmoto-Viga Rd - K0027+185 - K0027+499, K0027+522 - K0027+651, K0040+900 - K0041+000, K0041+243 - K0041+473, K0083+550 - K0083+600
Physical Target - CW1 -Rehabilitation of Paved Road/ 1.44 lane-km
Unit Cost: Php 9.403 M/lane-km
Estimated Cost: Php 13.855M
(As Modified)
|
May 22, 2018 |
FY 2018 |
WIN8C02997 |
300203100521000 |
May 10, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300203100521000
Project ID: P00230026MN
CSSP: Convergence and Special Support Program -
Construction/Improvement of Access Roads leading to Declared Tourism Destination
NRJ leading to Philippine Eagle Sanctuary, Brgy. Dakayakan, Midsalip, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Concrete Road: 1.60 lane km
Unit Cost: CW-1 - Construction of Concrete Road: P 13.781M/lane km
EAO: P 0.45M
Allocation: 22.5M |
May 22, 2018 |
FY 2018 |
WIN8C02862 |
300204100202000 |
May 7, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No: 300204100202000
Project ID: P00230034MN
CSSP: Convergence and Special Support Program -
Construction/Improvement of Acces Roads leading to Trades, Industries and Economic Zones
NRJ to Brgy. Upper Timonan - Marangan - Kahayagan - Palili - Timbaboy in Support of Abaca Handicraft Processing, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Concrete Road: 2.286 lane km
Unit Cost: CW-1 - Construction of Concrete Road: P 8,573,930/lane km
EAO: P 0.40M
Allocation: P 20.0M |
May 22, 2018 |
FY 2018 |
WIN8C02683 |
310101100111000 |
May 3, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No: 310101100111000
Project ID: P00200007MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Lanao - Pagadian - Zamboanga City Rd
K1786+786.00 - K1786+804.00, K1786+813.00 - K1786+826.50, K1786+890.50 - K1786+908.50, K1786+926.50 - K1786+967.00, K1787+004.50 - K1787+036.00, K1787+049.50 - K1787+103.50, K1787+113.50 - K1787+190.00, K1787+204.50 - K1787+213.50, K1787+218.00 - K1787+245.00, K1808+004.50 - K1808+067.50, K1808+085.50 - K1808+209.00, K1808+209.00 - K1808+227.00, K1808+227.00 - K1808+243.00, K1808+254.00 - K1808+263.00, K1808+288.00 - K1808+360.00, K1808+364.50 - K1808+387.00, K1808+400.50 - K1808+495.00, K1808+513.00 - K1808+576.00, K1808+667.50 - K1808+676.50, K1808+700.00 - K1808+704.50, K1808+726.00 - K1808+789.00, K1808+818.00 - K1808+863.00, K1808+874.50 - K1808+897.00, K1808+951.00 - K1808+973.50, K1810+460.00 - K1811+000.00, K1812+332.00 - K1812+458.00, K1812+471.50 - K1812+489.50, K1812+489.50 - K1812+507.50, K1812+507.50 - K1812+611.00, K1812+611.00 - K1812+665.00, K1812+692.00 - K1812+867.50, K1812+881.00 - K1812+890.00, K1812+894.50 - K1812+912.50, K1812+930.50 - K1813+000.00
Physical Target:
CW-1 - Concrete Reblocking: 3.3185 lane km
Unit Cost: CW-1 - Concrete Reblocking: P 9,261,642.31/lane km
EAO: P 0.62724M
Allocation: P 31.362M |
May 22, 2018 |
FY 2018 |
WIN8C02721 |
300117201989000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No: 300117201989000
Project ID: P00251836MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Road Concreting, Brgy. Cawit, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.34 lane km
Unit Cost: CW-1 - Construction of Concrete Road: P 8,735,294.12 lane km
EAO: P 30,000.00
Allocation: P 3,000,000.00 |
May 22, 2018 |
FY 2018 |
WIN8C02935 |
300109200208000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No: 300109200208000
Project ID: P00250071MN
Local Program:
Local - Flood Control and Drainage -
Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System, Sta. Catalina, Zamboanga City
Physical Target:
CW-1: Construction of Drainage System: 156.00 l.m.
Unit Cost: CW-1: Construction of Drainage System: P 9,519.23/l.m.
EAO: P 15,000.00
Allocation: P 1,500,000.00 |
May 22, 2018 |
FY 2018 |
WIN8C02674 |
300107200217000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No: 300107200217000
Project ID: P00251832MN
Local Program:
Flood Control and Drainage - Flood Control Structures/Facilities - Local Infrastructure Program
Construction of Drainage Facilities at San Roque, Zamboanga City
Physical Target:
CW-1: Construction of Drainage Structure: 164.00 lm
Unit Cost: CW-1: Construction of Drainage Structure: P 18,109.76/lm
EAO: P 30,000.00
Allocation: P 3,000,000.00 |
May 22, 2018 |
FY 2018 |
WIN8C02702 |
300202100069000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No: 300202100069000
Project ID: P00230005MN
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Seaports
Acces Road leading to Panubigan Wharf, Zamboanga City
Physical Target:
CW-1: Construction of Concrete Road: 1.40 lane km
Unit Cost: CW-1: Construction of Concrete Road: P 17,220,000.00/lane km
EAO: P 492,000.00
Allocation: P 24,600,000.00 |
May 22, 2018 |
FY 2018 |
WIN8C02704 |
300117201975000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No: 300117201975000
Project ID: P00250076MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Cabaluay, Zamboanga City
Physical Target:
CW-1: Construction of Concrete Road: 0.21 lane km
Unit Cost: CW-1: Construction of Concrete Road: P 7,071.43/lane km
EAO: P 15,000.00
Allocation: P 1,500,000.00 |
May 21, 2018 |
FY - 2018 |
WIN8F05458 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Puerto Princesa North Rd
K0111+200 - K0112+284
CW1: 4.36 lane km ( Road Widening )
Allocation: 89,462,000 Php
TO:
Puerto Princesa North Rd
K0111+200 - K0112+878
CW1: 6.74 lane km ( Road Widening )
Allocation: 89,462,000 Php
|
May 21, 2018 |
FY - 2018 |
WIN8F05457 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement
- Secondary Road
FROM:
El Nido -Jct. New Ibahay Rd
K0273+583 - K0276+168,
K0276+337 - K0277+000
CW1: 7,440 sq.m. ( Off-Carriageway Improvement
Shoulder Paving/Construction )
Allocation: 66,960,000 Php
TO:
El Nido - Jct New Ibahay Rd
K0273+235.3 - K0276+168,
K0276+337.0 - K0277+000
CW1: 15,776030 sq.m. ( Off-Carriageway Improvement
Shoulder Paving/Construction )
Allocation: 66,960,000 Php |
May 21, 2018 |
FY - 2018 |
WIN8F05461 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Control Structure at Tapiken Bridge,
CBNR, Palawan
CW1: 260 lm ( Construction of Flood Control Mitigation
Structure )
Allocation: 10,000,000 Php
TO:
Construction of Flood Control Structure at Tapiken Bridge,
CBNR, Busuanga, Palawan
CW1: 227 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php
|
May 21, 2018 |
FY - 2018 |
WIN8F05459 |
FY _ 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
001 - Endure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Puerto Princesa North Rd.
K0220 + 000 - K02220 + 000
CW1: 4.008 lane km ( Road Widening )
Allocation: 75,818,000 Php
TO:
Puerto Princesa North Rd
K0219 + 015 - K0222 + 000
CW1: 6 lane km ( Road Widening )
Allocation: 75,818,00 Php |
May 21, 2018 |
FY - 2018 |
WIN8F05462 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Convergence Special Support Program
Convergence and Special Support -
Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
FROM:
Mampio Road from Seaport to Cagayancillo Poblacion,
Brgy. Mampio, Cagayancillo, Palawan
CW1: 20 lane km ( Construction of Concrete Road )
Allocation : 60,000,000 Php
TO:
Mampio Road from Seaport to Cagayancillo Poblacion,
Brgy. Mampio, Cagayancillo, Palawan
CW1: 4.84 lane km ( Construction of Concrete Road )
Allocation: 60,000,000 Php |
May 21, 2018 |
FY - 2018 |
WIN8F05463 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
002 - Protect Lives and Properties against Major Floods
Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Control Structure at Caramay Bridge,
PPNR, Palawan
CW1: 715 lm ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php
TO:
Construction of Flood Control Structure at Caramay Bridge,
PPNR, Roxas, Palawan
CW1: 530 lm ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php |
May 21, 2018 |
FY 2018 GAA |
WIN8C02989 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Samal Bridge leading to San Remigio, Samal Island, Davao City
Physical Target:
CW1: 19.430 Lane Km (Construction of Concrete Road)
ROW: 97,150.00
Allocation:
TOTAL: P 300,000,000.00
CW1: P 281,249,250.00 (Construction of Concrete Road)
ROW: P 8,250,750.00
EAO: P 10,500,000.00
TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Samal Bridge leading to San Remigio, Samal Island, Davao del Norte
Physical Target:
CW1: 17.388 Lane Km (Construction of Concrete Road)
ROW: 97,150.00
Allocation:
TOTAL: P 300,000,000.00
CW1: P 281,249,250.00 (Construction of Concrete Road)
ROW: P 8,250,750.00
EAO: P 10,500,000.00 |
May 21, 2018 |
FY - 2018 |
WIN8F05464 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
002 - Protect Lives and Properties against Major Floods
Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
FROM: Construction of Flood Control Structure at Dipuyai Bridge, Coron - Busuanga Road, Palawan
CW1: 261 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php
TO:
Construction of Flood Control Structure at Dipuyai Bridge, Coron - Busuanga Road, Coron, Palawan
CW1: 209.50 lm ( Construction of Flood Mitigation
Structure )
Allocation: 10,000,000 Php
|
May 21, 2018 |
FY 2018 GAA |
WIN8C03003 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Fatima-Malabog Road to Mabuhay-Pañalum-Paquibato Road, Package B, incl. ROW, Davao City
Physical Target:
CW1: 8.760 Lane Km (Construction of Concrete Road)
CW2: 2.654 Lane Km (Reconstruction from Paved to Concrete)
ROW: 9,096.00 sq. m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 231,327,870.00 (Construction of Concrete Road)
CW2: P 53,783,310.00 (Reconstruction from Paved to Concrete)
ROW: P 4,388,820.00
EAO: P 10,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Fatima-Malabog Road to Mabuhay-Pañalum-Paquibato Road, Package B, incl. ROW, Davao City
Physical Target:
CW1: 6.754 Lane Km (Construction of Concrete Road)
CW2: 2.213 Lane Km (Reconstruction from Paved to Concrete)
ROW: 9,096.00 sq. m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 147,061,491.59 (Construction of Concrete Road)
CW2: P 41,549,688.41 (Reconstruction from Paved to Concrete)
ROW: P 4,388,820.00
EAO: P 7,000,000.00
EXC: P 100,000,000.00 (Excess) |
May 21, 2018 |
FY 2018 GAA |
WIN8C03000 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road-Catalunan Grande-Talandag-Sumimao-Panalum-Tapak-Cabanglasan-Aglayan, Malaybalay), Package A, incl. ROW and Bridge, Davao del Norte
Physical Target:
CW1: 10.320 Lane Km (Construction of Gravel Road)
CW2: 763.20 sq. m. (Construction of Concrete Bridge)
ROW: 78,163.20 sq. m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 124,485,000.00 (Construction of Gravel Road)
CW2: P 109,045,000.00 (Construction of Concrete Bridge)
ROW: P 7,720,000.00
EAO: P 8,750,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road-Catalunan Grande-Talandag-Sumimao-Panalum-Tapak-Cabanglasan-Aglayan, Malaybalay), Package A, incl. ROW and Bridge, Davao del Norte
Physical Target:
CW1: 12.212 Lane Km (Construction of Gravel Road)
CW2: 429.30 sq. m. (Construction of Concrete Bridge)
ROW: 78,163.20 sq. m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 194,396,985.49 (Construction of Gravel Road)
CW2: P 39,133,014.51 (Construction of Concrete Bridge)
ROW: P 7,720,000.00
EAO: P 8,750,000.00 |
May 21, 2018 |
FY 2018 GAA |
WIN8C02991 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides – Tertiary Road
Fatima-Malabog Rd – K1502 + 781 - K1502 + 811, K1503 + 100 - K1503 + 140,
K1503 + 950 - K1503 + 998, K1504 + 260 - K1504 + 300,
K1504 + 409 - K1504 + 436, K1504 + 800 - K1504 + 846
Physical Target:
CW1: 9,840.00 sq. m. (Construction of Slope Protection)
Allocation:
TOTAL: P 233,430,000.00
CW1: P 225,259,950.00
EAO: P 8,170,050.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides – Tertiary Road
Fatima-Malabog Rd – K1502 + 840 - K1502 + 886.3, K1503 + 797 - K1503 + 842.5,
K1504 + 132 - K1504 + 192, K1504 + 292 - K1504 + 310,
K1504 + 492 - K1504 + 579, K1504 + 595 - K1504 + 625,
K1504 + 723 - K1504 + 776
Physical Target:
CW1: 5,610.38 sq. m. (Construction of Slope Protection)
Allocation:
TOTAL: P 233,430,000.00
CW1: P 225,259,950.00
EAO: P 8,170,050.00 |
May 21, 2018 |
FY 2018 GAA |
WIN8C03002 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Demoloc-Little Baguio-Alabel Road, incl. ROW, Davao Occidental
Physical Target:
CW1: 8.474 Lane Km (Construction of Gravel Road)
ROW: 42,370.00 sq. m.
Allocation:
TOTAL: P 163,032,000.00
CW1: P 155,395,880.00 (Construction of Gravel Road)
ROW: P 1,930,000.00
EAO: P 5,706,120.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Demoloc-Little Baguio-Alabel Road, incl. ROW, Davao Occidental
Physical Target:
CW1: 4.39112 Lane Km (Construction of Gravel Road)
CW2: 333.90 sq. m. (Construction of Concrete Bridge)
ROW: 42,370.00 sq. m.
Allocation:
TOTAL: P 163,032,000.00
CW1: P 127,739,390.00 (Construction of Gravel Road)
CW2: P 27,656,490.00 (Construction of Concrete Bridge)
ROW: P 1,930,000.00
EAO: P 5,706,120.00 |
May 21, 2018 |
FY 2018 GAA |
WIN8C03004 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Improvement/Concreting of Jct. Calinan-Baguio-Cadalian Road (Baguio Proper-Wines-Magpet Bdry.), Davao City
Physical Target:
CW1: 15.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00
TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Improvement/Concreting of Jct. Calinan-Baguio-Cadalian Road (Baguio Proper-Wines-Magpet Bdry.), Davao City
Physical Target:
CW1: 3.150 Lane Km (Construction of Concrete Road)
CW2: 666.00 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 21,582,910.00 (Construction of Concrete Road)
CW2: P 74,917,090.00 (Construction of Concrete Bridge)
EAO: P 3,500,000.00 |
May 21, 2018 |
FY 2018 GAA |
WIN8C02994 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Road from Junction Brgy. Sainz connecting to Sitio Licop in support of Cacao, Coffee, Corn and Mango Industries, Mati City, Davao Oriental
Physical Target:
CW1: 2.898 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 36,226,000.00
CW1: P 35,501,480.00 (Construction of Concrete Road)
EAO: P 724,520.00
TO: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Road from Junction Brgy. Sainz connecting to Sitio Licop in support of Cacao, Coffee, Corn and Mango Industries, Mati City, Davao Oriental
Physical Target:
CW1: 0.940 Lane Km (Construction of Concrete Road)
CW2: 0.940 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 36,226,000.00
CW1: P 35,501,480.00 (Construction of Concrete Road)
CW2: P 18,859,070.00 (Construction of Gravel Road)
EAO: P 724,520.00 |
May 21, 2018 |
FY 2018 GAA |
WIN8C02987 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Road, Brgy. Malinawon, Tagum City
Physical Target:
CW1: 2.220 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Road, Brgy. Malinawon, Tagum City
Physical Target:
CW1: 1.502 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00 |
May 18, 2018 |
FY - 2018 |
WIN8F05460 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Mindoro West Coastal Rd
K0409+000 - K0414+000
CW1: 9.99 lane km ( Road Widening )
Allocation: 150,000,000 Php
TO:
Mindoro West Coastal Rd
K0409+000 - K0410+056,
K0410+095 - K0413+676,
K0413+695 - K0414+000
CW1: 9.874 LANE KM ( Road Widening )
Allocation: 150,000,000 Php
|
May 18, 2018 |
FY - 2018 |
WIN8F05455 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/
New Roads
FROM:
Palawan Circumferential Road ( Latud - Canipaan Section )
Package B, Palawan
CW1: 33 lane km
Allocation: 150,000,000 Php
TO:
Palawan Circumferential Road ( Latud - Canipaan Section )
Package B, Palawan
CW1: 16.6376 lane km ( Construction of Gravel Road )
CW2: 493.568 sq.m. ( Construction of Steel Bridge )
Allocation: 150,000,000 Php |
May 18, 2018 |
FY - 2018 |
WIN8F05453 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Network Development -Road Widening - Secondary Roads
FROM:
Calapan South Road
K0072+026 - K0072+178,
K0072+191 - K0072+443,
K0072+822 - K0075+252,
K0075+283 - K0076+849,
K0077+348 - K0078+269,
K0078+466 - K0079+745
CW1: 13.220 lane km ( Road Widening )
Allocation: 160,000,000 Php
TO:
Calapan South Road
K0074+640 - K0075+239,
K0075+275 - K0079+714,
K0079+820 - K0080+609,
K0080+613 - K0082+639,
K0082+651 - K0083+114,
K0083+140 - K0083+511,
K0083+532 - K0084+064
CW1: 18.322 lane km ( Road Widening )
Allocation: 160,000,000 Php |
May 18, 2018 |
FY - 2018 |
WIN8F05456 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
01 - Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement
- Secondary Roads
FROM:
Tablas Circumferential Rd
K0006+454-0K0007+000,
K0008+158 - K0009+000,
K0013+000-k0013+693,
K0015+000 - K0016+098,
K0016+528 - K0016912,
K0024+708 - K0025+597,
K0030+000 - K0030+934,
K0031+854 - K0032+570,
K0038+500 - K0038+700,
K0041+000 - k0042+000
CW1: 21,696 square meters
( Off-Carriageway Improvement :Shoulder Paving/
Construction )
Allocation; 69,878,000 Php
TO:
Tablas Circumferential Rd.
K0006+454.00 - K0007+000.00,
K0008+000.00 - K0008+984.09,
K0013+000.00 - K0013+580.00,
K0013+612.75 - K0013+672.75,
K0015+000.00 - K0016+086.15,
K0016+522.11 - K0016+920.00,
K0024+833.03 - K0025+594.27,
K0029+990.52 - K0030+686.70,
K0030+700.00 - K0030+940.00,
K0031+853.58 - K0032+572.25,
K0038+500.00 - K0038+700.00,
K0041+000.00 - K0041+958.02
CW1: 22,481.12 square meters
( Off-Carriageway Improvement: Shoulder Paving/
Construction )
Allocation: 69,878,000 Php |
May 18, 2018 |
2018 |
WIN8C02984 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION
FROM: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Anibongan-Pangi Road, Maco, Compostela Valley
Physical Target:
CW1: 1.000 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
TO: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Anibongan-Pangi Road, Maco, Compostela Valley
Physical Target:
CW1: 1.549 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00 |
May 18, 2018 |
2018 |
WIN8C02979 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION
FROM: OO2 Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rechanneling/Construction of Revetment with Sheet Pile of Kingking River, Cebulida L/S, Pantukan, Compostela Valley
Physical Target:
CW1: 320 Lineal Meters (Construction of Revetment)
CW2: 17,697 Cubic Meters (Channelization)
ROW: 356 Square Meters
ALLOCATION:
TOTAL: P 35,000,000.00
CW1: P 28,933,909.00 (Construction of Revetment)
CW2: P 4,778,091.00 (Channelization)
ROW: P 588,000.00
EAO: P 700,000.00
TO: OO2 Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rechanneling/Construction of Revetment with Sheet Pile of Kingking River, Cebulida L/S, Pantukan, Compostela Valley
Physical Target:
CW1: 718.17 Lineal Meters (Construction of Revetment)
CW2: 15,055 Cubic Meters (Channelization)
ROW: 356 Square Meters
ALLOCATION:
TOTAL: P 35,000,000.00
CW1: P 29,736,949.00 (Construction of Revetment)
CW2: P 3,975,050.00 (Channelization)
ROW: P 588,000.00
EAO: P 700,000.00 |
May 18, 2018 |
2018 |
WIN8C02971 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: 001 Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd - K1456 + 250 - K1456 + 830
Physical Target:
CW1 - 1.160 Lane Km (Reconstruction from Paved to Concrete)
ALLOCATION:
TOTAL: P 35,000,000.00
CW1 - P 34,300,000.00 (Reconstruction from Paved to Concrete)
EAO - P 700,000.00
TO: 001 Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd - K1456 + 140 - K1456 + 934
Physical Target:
CW1 - 1.589 Lane Km (Reconstruction from Paved to Concrete)
ALLOCATION:
TOTAL: P 35,000,000.00
CW1 - P 34,300,000.00 (Reconstruction from Paved to Concrete)
EAO - P 700,000.00
|