Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
May 25, 2018 f WIN8G02263 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation of Slope Protection along Porac River, Mabical Section, Floridablanca, Pampanga
May 25, 2018 FY 2018 WIN8G02260 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Infrastructure Program – Local Roads – Concreting of road, Sitio Kulitang, Barangay San Francisco, Lubao, Pampanga
May 25, 2018 FY 2018 WIN8G02243 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Revetment Along Labangan Channel at Iba O’ Este, Calumpit, Bulacan

May 25, 2018 FY 2018 WIN8G02242 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program – Buildings and Other Structures - Multipurpose / Facilities - Rehabilitation of Multi-Purpose Building, North 6, Santol, Balagtas, Bulacan
May 25, 2018 FY 2018 WIN8G02244 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program – Local Roads and Bridges - Local Roads - – Road Improvement of Local Road, Malibong Matanda, Pandi, Bulacan
May 25, 2018 FY 2018 WIN8G02273 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Road construction, Sitio Talatalan, Barangay San Agustin, Carranglan, Nueva Ecija
May 25, 2018 FY 2018 WIN8G02273 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Road construction, Sitio Talatalan, Barangay San Agustin, Carranglan, Nueva Ecija
May 25, 2018 FY 2018 WIN8G02245 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Primary Roads – San Jose – Lupao Rd, K0164+885 – K0165+000, K0166+000 – K0166+604, K0169+343 – K0169+782, K0169+822.60 – K0170+000, K0173+716.40 – K0175+394, K0175+422 – K0175+945, K0175+945 – K0176+869
May 25, 2018 FY 2018 WIN8G02272 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Construction of Roads, San Francisco, Sto. Domingo, Nueva Ecija
May 25, 2018 FY 2018 WIN8G02270 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Convergence and Special Support Program – Construction / Improvement of Access Roads leading to Declared Tourism Destinations – Access Road Leading to Ditabuyan Falls, Brgy. Cadaclan, Pantabangan, Nueva Ecija
May 25, 2018 FY 2018 WIN8G02275 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Local Infrastructure Program – Flood Control and Drainage – Flood Control Structures / Facilities – Rechanneling / Desilting of Talavera River (San Carlos Aliaga Section), San Carlos, Aliaga, Nueva Ecija
May 25, 2018 FY 2018 WIN8G02256 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Tertiary Roads – Jct. Pinagpanaan – Rizal – Pantabangan Rd, K0159+630 – K0159+740, K0160+099 – K0160+302.50, K0160+1087.40 – K0161+149, K0161+436 – K0161+523, K0162+310 – K0162+430, K0162+472 -K0162+683, K0163+000 – K0163+152, K0163+205 – K0163+387, K0163+478 – K0163+650, K0163+679 – K0163+780, K0163+792 – K0163+901.50, K0164+138 – K0164+293
May 25, 2018 FY 2018 WIN8G02276 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Local Program – Construction / Repair/Rehabilitation / Improvement of Various Infrastructure including Local Project - Local Roads – Construction of Gen. Luna, Carranglan – Conversion, Pantabangan Road, Nueva Ecija
May 25, 2018 FY 2018 WIN8G02253 FY 2018 GAA January 4, 2018 Region III Pampanga 3rd District Engineering Office
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Reinforced Concrete Slope Protection Works along Quitangil Creek, Brgy. San Ildefonso, Sitio Balibago – Sitio Balas, Magalang, Pampanga

May 25, 2018 FY 2018 WIN8G02255 FY 2018 GAA January 4, 2018 Region III Bataan 1st District Engineering Office
Asset Preservation Program – Preventive Maintenance – Secondary Roads – Repair / Rehabilitation / Improvement, Overlay with Pavement Markings along Angeles – Porac – Floridablanca – Dinalupihan Road, K0113+(-225) – K0115+810, K0117+800 – K0118+1215, Dinalupihan, Bataan
May 24, 2018 FY 2018 WIN8C02701 300117201981000 May 3, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No: 300117201981000
Project ID: P00251825MN

Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Malagutay, Zamboanga City
Physical Target: CW-1: Construction of Concrete Road: 0.62 lane km
Unit Cost: CW-1: Construction of Concrete Road: P 6,274,396.74/lane km
Physical Target: CW-2: Construction of Drainage Structure: 310 Ln.m
Unit Cost: CW-2: Construction of Drainage Structure: P 3,418.95/Ln.m
EAO: P 50,000.00
Allocation: P 5,000,000.00
May 24, 2018 FY 2018 GAA WIN8C03036 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support Program
Construction / Improvement of Access Roads leading to Declared Tourism Destinations
Mapawa Road leading to Miyaya Falls, Brgy. Mapawa, Maragusan, Compostela Valley
Physical Target:
CW1: 2.000 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Gravel Road)
EAO: P 800,000.00

TO: Convergence and Special Support Program
Construction / Improvement of Access Roads leading to Declared Tourism Destinations
Mapawa Road leading to Miyaya Falls, Brgy. Mapawa, Maragusan, Compostela Valley
Physical Target:
CW1: 4.516 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Gravel Road)
EAO: P 800,000.00
May 24, 2018 FY 2018 GAA WIN8C03058 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION:

FROM: Local Program - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Brgy. Anitapan-Golden Valley, Mabini, Compostela Valley
Physical target:
CW1: 2.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00

TO: Local Program - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Brgy. Anitapan-Golden Valley, Mabini, Compostela Valley
Physical Target:
CW1: 1.600 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00
May 24, 2018 FY 2018 WIN8C02566 320101102146000 April 16, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No: 320101102146000
Project ID: P00222069MN

OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structure along Ayala River, Ayala Section (both side) Zamboanga City
Physical Target:
CW-1: Construction of Flood Mitigation Structure: 640.00 ln.m.
Unit Cost: CW-1: Construction of Flood Mitigation Structure: P 28,762.72/ln.m
ROW Acquisition: 1,117 sq.m
Unit Cost: P 1,067.02/sq.m.
EAO: P 400,000
Allocation: P 20,000,000
May 24, 2018 FY 2018 GAA WIN8C03055 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION:

FROM: Local Program - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Concreting of Brgy. Road, Langgam-Mapaang, Maco, Compostela Valley
Physical Target:
CW1: 0.800 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 8,000,000.00
CW1: P 7,840,000.00 (Construction of Concrete Road)
EAO: P 160,000.00

TO: Local Program - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Concreting of Brgy. Road, Langgam-Mapaang, Maco, Compostela Valley
Physical Target:
CW1: 0.973 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 8,000,000.00
CW1: P 7,840,000.00 (Construction of Concrete Road)
EAO: P 160,000.00
May 24, 2018 FY 2018 GAA WIN8C03059 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Montevista-Compostela-Mati Bdry Rd - K1424+996.10 - K1434+482.90
Physical Target:
CW1: 10.600 lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Montevista-Compostela-Mati Bdry Rd - K1425+002 - K1429+923
Physical target:
CW1: 9.800 lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00
May 24, 2018 FY 2018 GAA WIN8C03031 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties - Flood Management -
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Tagbalaobao River, Pindasan, Mabini, Compostela Valley
Physical Target:
CW-1: 1,272 Lineal meters (Construction of Revetment)
CW-2: 17,341 Cubic meters (Channelization)
ROW: 2,486 Square meters
Allocation:
TOTAL: P 35,000,000.00
CW-1: P 28,651,915.00 (Construction of Revetment)
CW-2: P 5,158,085.00 (Channelization)
ROW: P 490,000.00
EAO: P 700,000.00

TO: OO2: Protect Lives and Properties - Flood Management -
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Tagbalaobao River, Pindasan, Mabini, Compostela Valley
Physical Target:
CW-1: 989.9 Lineal meters (Construction of Revetment)
CW-2: 17,341 Cubic meters (Channelization)
ROW: 2,486 Square meters
Allocation:
TOTAL: P 35,000,000.00
CW-1: P 29,562,243.00 (Construction of Revetment)
CW-2: P 4,247,758.00 (Channelization)
ROW: P 490,000.00
EAO: 700,000.00
May 24, 2018 FY 2018 GAA WIN8C03034 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Road and Widening, Mawab, Compostela Valley
Physical Target:
CW1: 1.500 Lane Km (Construction of Concrete Road)
ALLOCATION:
Total: P 15,000,000.00
CW1: P 14,475,000.00 (Construction of Concrete Road)
EAO: P 525,000.00

TO:Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Road and Widening, Mawab, Compostela Valley
Physical Target:
CW1: 2.180 Lane Km (Construction of Concrete Road)
Total: P 15,000,000.00
CW1: P 14,475,000.00 (Construction of Concrete Road)
EAO: P 525,000.00
May 24, 2018 FY 2018 GAA WIN8C03044 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Puroks Natural Creeks, Laak Poblacion, Laak, Compostela Valley
Physical Target:
CW-1 - 500 Lineal meters (Construction of Revetment)
ROW - 2,857 Square meters
Allocation:
TOTAL: P 35,000,000.00
CW-1 - P 33,810,000.00 (Construction of Revetment)
ROW - P 490,000.00
EAO - P 700,000.00

TO: OO2: Protect Lives and Properties - Flood Management -
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Puroks Natural Creeks, Laak Poblacion, Laak, Compostela Valley
Physical Target:
CW-1: 1,092.3 Lineal meters (Construction of Revetment)
ROW: 2,857 Square meters
ALLOCATION:
Total: P 35,000,000.00
CW-1: P 33,810,000.00 (Construction of Revetment)
ROW: P 490,000.00
EAO: P 700,000.00
May 24, 2018 FY 2018 GAA WIN8C03042 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment at Maoao Creek Maindrain leading to Agusan River, Brgy. Poblacion, Monkayo, Compostela Valley
Physical Target:
CW-1: 1,703 Lineal meters (Construction of Revetment)
CW-2: 6,700 Cubic meters (Channelization)
ROW: 526 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW-1: P 41,254,043.00 (Construction of Revetment)
CW-2: P 7,255,957.00 (Channelization)
ROW: P 490,000.00
EAO: P 1,000,000.00

TO: Protect Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment at Maoao Creek Maindrain leading to Agusan River, Brgy. Poblacion, Monkayo, Compostela Valley
Physical Target:
CW-1: 1,692.50 Lineal meters (Construction of Revetment)
CW-2: 6,700 Cubic meters (Channelization)
ROW: 526 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW-1: P 45,498,370.00 (Construction of Revetment)
CW-2: P 3,011,630.00 (Channelization
ROW: P 490,000.00
EAO: P 1,000,000.00
May 23, 2018 FY - 2018 WIN8F05494 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Mindoro Oriental District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

FROM:
Cadre Rd - (S00004MR ) Chainage 000 - Chainage 522

CW1: 1.044 lane Km ( Preventive Maintenance of Road:
Asphalt Overlay )
Allocation: 6,320,000 Php

TO:
Cadre Rd - ( S00004MR ) Chainage 000 - Chainage 340

CW1: .0680 Lane Km ( Preventive Maintenance of Road:
Asphalt Overlay )
Allocation: 6,320,000 Php

May 23, 2018 FY - 2018 WIN8F05489 FY - 2018 GAA DPWH Infra program December 19, 2017 Region IV-B Mindoro Oriental District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

FROM:
CSR Jct - Minas Rd
K0039+544 - K0039+649,
K0037+531 - K0038+204

CW1: 1.034 Lane Km ( Preventive Maintenance of Road:
Asphalt overlay )
Allocation: 6,259,000 Php

TO:
CSR Jct - Minas Rd
K0037+531 - K0038+202

CW1: 0.820 Lane Km ( Preventive Maintenance of Road:
Asphalt Overlay )
Allocation: 6,259,000 Php


May 23, 2018 FY 2018 WIN8G02191 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300202100001000
Project ID: P00230349LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Seaports - Access Road Leading to Bahao Port, Camarines Sur
Physical Target - CW1- Construction of Concrete Road/ 7.00 lane-km
Unit Cost: Php 20.68M/lane-km
Estimated Cost: Php 150.00M
(As Modified)
May 23, 2018 FY - 2018 WIN8F05499 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Mindoro Oriental District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

FROM:
CSR Jct - Pola Rd
K0065+914 - K0066+983

CW1: 2.088 Lane Km ( Preventive maintenance of Road:
Asphalt Overlay )
Allocation:12,645,000 Php

TO:
CSR Jct - Pola Rd
K0065+914 - K0066+748

CW1: 1.618 Lane Km ( Preventive Maintenance of Road:
Asphalt Overlay )
Allocation: 12,645,000 Php
May 23, 2018 FY 2018 WIN8G02164 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300204100015000
Project ID: P00230360LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones – Brgy. 3-Brgy. 4-Brgy.5 Road connecting Ligao-Pioduran Road and Albay West Coast Road in support to Agribusiness (Food Resource Based Processing) Pio-Duran, Albay
Physical Target - CW1 – Construction of Concrete Road/ 0.774 lane-km
CW2 - Construction of Road Slope Protection Structure/ 2,001.50 sq.m.
Unit Cost: CW1 – Php 25.444M /lane-km
CW2 – Php 23.910T/sq.m.
Estimated Cost: Php 70.0M
(As Modified)
May 23, 2018 FY 2018 WIN8G02161 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300203100061000
Project ID: P00230363LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Bulan-Matnog-Sta. Magdalena-Bulusan Road (Matnog Section) leading to Bulusan National Park, Sorsogon
Physical Target - CW1 – Construction of Concrete Road/ 4.54 lane-km
CW2 - Construction of Drainage Structure along Road/ 2,880.39 lm.
Unit Cost: CW1 – Php 17.373M /lane-km
CW2 – Php 12.82T/lm.
Estimated Cost: Php 120.0M
(As Modified)
May 23, 2018 FY - 2018 WIN8F05495 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
002 - Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage Systems

FROM:
Construction of Flood Control Structure along
Busuanga River ( Pitogo Section ), Rizal,
Occidental Mindoro

CW1: - ( Construction of Flood Mitigation Structure
Allocation: 150,000,000 Php

TO:
Construction of Flood Control Structure along
Busuanga River ( Pitogo Section ), Rizal,
Occidental Mindoro

CW1: 1,740 lineal meters ( Construction of Flood Mitigation
Structure )
Allocation: 150,000,000 Php

May 23, 2018 FY 2018 WIN8G02170 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300203100111000
Project ID: P00230388LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Matnog-Sta. Magdalena-Bulusan Road leading to Bulusan National Park, Sorsogon
Physical Target - CW1 – Construction of Concrete Road/ 4.16 lane-km
CW2 - Construction of Drainage Structure along Road/ 508.10 lm.
Unit Cost: CW1 – Php 16.648M /lane-km
CW2 – Php 91.600T/lm.
Estimated Cost: Php 120.0M
(As Modified)
May 23, 2018 FY 2018 WIN8G02189 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300203100113000
Project ID: P00230390LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Naga City (del Rosario)–Cararayan–Langon–San Isidro-Carolina Road leading to Mt. Isarog Natural Park and Est Highland Tourism Zone, Brgy. Del Rosario, Naga City, Camarines Sur
Physical Target - CW1 – Road Widening/ 6.72 lane-km
CW2 - Construction of Drainage Structure along Road/ 5,699.74 sq.m.
Unit Cost: CW1 – Php 12.910M /lane-km
CW2 – Php 10.05T/sq.m.
Estimated Cost: Php 149.25M
(As Modified)
May 23, 2018 FY 2018 GAA WIN8C03035 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Secondary Roads
Nabunturan-Maragusan Rd incl. ROW – K1456 + 060 - K1458 + 400
Physical Target:
CW1: 4.680 Lane Km (Road Widening)
ROW: 35,100.00 sq. m.
Allocation:
TOTAL: P 169,171,000.00
CW1: P 158,067,000.00 (Road Widening)
ROW: P 5,183,015.00
EAO: P 5,920,985.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Secondary Roads
Nabunturan-Maragusan Rd incl. ROW – K1450 + 567 - K1450 + 810
K1453 + 061 - K1453 + 312, K1456 + 315 - K1457 + 581
Physical Target:
CW1: 1.277 Lane Km (Road Widening)
CW2: 0.486 Lane Km (Paving of Unpaved Roads)
CW3: 1.749 Lane Km (Reconstruction to Concrete Pavement)
ROW: 35,100.00 sq. m.
Allocation:
TOTAL: P 169,171,000.00
CW1: P 87,250,982.32 (Road Widening)
CW2: P 34,675,665.96 (Paving of Unpaved Roads)
CW3: P 36,140,351.72 (Reconstruction to Concrete Pavement)
ROW: P 5,183,015.00
EAO: P 5,920,985.00
May 23, 2018 FY 2018 WIN8G02162 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300203100149000
Project ID: P00230396LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Polangui-Albay West Coast Road leading to Beaches (Sitio Balinsasayaw Libon, Sitio Cabugaw Libon, Sitio Imaco Oas, Catburawan Ligao), Maonon, Ligao, Albay
Physical Target - CW1 – Construction of Concrete Road/ 4.524 lane-km
CW2 - Construction of Road Slope Protection Structure/ 9,058.69 sq.m.
Unit Cost: CW1 – Php 15.5238M /lane-km
CW2 – Php 2,900/sq.m.
Estimated Cost: Php 100.0M
(As Modified)
May 23, 2018 FY 2018 WIN8G02162 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300203100149000
Project ID: P00230396LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Polangui-Albay West Coast Road leading to Beaches (Sitio Balinsasayaw Libon, Sitio Cabugaw Libon, Sitio Imaco Oas, Catburawan Ligao), Maonon, Ligao, Albay
Physical Target - CW1 – Construction of Concrete Road/ 4.524 lane-km
CW2 - Construction of Road Slope Protection Structure/ 9,058.69 sq.m.
Unit Cost: CW1 – Php 15.5238M /lane-km
CW2 – Php 2,900/sq.m.
Estimated Cost: Php 100.0M
(As Modified)
May 23, 2018 FY 2018 GAA WIN8C03029 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION

FROM: Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Antiquera - Nabunturan Road, Nabunturan, Compostela Valley
Physical Target:
CW1: 1.000 Lane Km (Construction of Concrete Road)
ALLOCATION:
Total: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00

TO: Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Antiquera - Nabunturan Road, Nabunturan, Compostela Valley
Physical Target:
CW1: 0.953 Lane Km (Construction of Concrete Road)
ALLOCATION:
Total: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
May 23, 2018 FY 2018 GAA WIN8C03006 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Flyovers/Interchanges/Underpasses/Long Span Bridges
Tagum City Flyover along Agusan-Davao Road, Package 1, Davao del Norte
Physical Target:
CW1: 3,960.00 sq. m. (Construction of Flyover)
Allocation:
TOTAL: P 570,000,000.00
CW1: P 550,050,000.00 (Construction of Flyover)
EAO: P 19,950,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Flyovers/Interchanges/Underpasses/Long Span Bridges
Tagum City Flyover along Agusan-Davao Road, Package 1, Davao del Norte
Physical Target:
CW1: 1 number of bridge (Construction of Substructure)
Allocation:
TOTAL: P 570,000,000.00
CW1: P 550,050,000.00 (Construction of Flyover)
EAO: P 19,950,000.00
May 23, 2018 FY 2018 WIN8G02163 FY 2018 GAA R.A. 10964 November 29, 2017 Region V Regional Office V
UACS No.: 300204100027000
Project ID: P00201065LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of By-Pass and Diversion Roads - Barcelona-Casiguran Diversion Road (Barcelona Section), Sorsogon
Physical Target - CW1 – Construction of Concrete Road/ lane-km
Unit Cost: Php 16.50M/lane-km
Estimated Cost: Php 100.0M
(As Modified)

May 23, 2018 FY 2018 WIN8G02166 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300204100156000
Project ID: P00201074LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of By-Pass and Diversion Roads - Juban-Bulan Diversion Road (Bulan Section), incl. ROW, Sorsogon
Physical Target - CW1 – Construction of Concrete Road/ 4.60 lane-km
Right-of-Way Acquisition (ROW)/46,000 sq.m.
Unit Cost: CW1 – Php 15.98M /lane-km
ROW Acquisition – Php 500.00/sq.m.
Estimated Cost: Php 100.0M
(As Modified)

May 23, 2018 FY 2018 WIN8G02169 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300204100210000
Project ID: P00201078LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of By-Pass and Diversion Roads - Nabua bypass Road, Camarines Sur
Physical Target - CW1 – Construction of Gravel Road/ 4.57 lane-km
Unit Cost: CW1 – Php 17.53M /lane-km
Estimated Cost: Php 83.00M
(As Modified)

May 23, 2018 FY 2018 WIN8G02168 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS: 310101100046000
Project ID: P00202693LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Preventive Maintenance - Primary Roads – Daang Maharlika (LZ) - K0585+431 - K0588+170, K0588+370 - K0590+181, K0593+922 - K0594+836
Physical Target - CW1 – Preventive Maintenance of Road: Asphalt Overlay/ 21.514 lane-km
Unit Cost: Php 13.456 M/lane-km
Estimated Cost: Php 300.0M
(As Modified)
May 23, 2018 FY 2018 WIN8G02160 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 320101100026000
Project ID: P00222430LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction and Improvement of Flood Control Dikes in Polangui, Albay for critical sections of barangays Kinale, Balangibang and Matacon, Albay
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 713.35 lm
Unit Cost: CW1 – Php 101.46T/lm.
Estimated Cost: Php 75.0M
(As Modified)
May 23, 2018 2018 310106100012000 GAA FY 2018 January 1, 2018 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System: Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Cagayan-Apayao Road - K0494+000 - K0495+000, K0495+000 - K0496+190, K0497+849 - K0498+777, K0519+121 - K0522+101, K0522+112 - K0523+351, K0523+367 - K0524+000
May 23, 2018 FY 2018 GAA WIN8C03008 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Flyovers/Interchanges/Underpasses/Long Span Bridges
Tagum City Flyover along Agusan-Davao Road, Package 2, Davao del Norte
Physical Target:
CW1: 0 sq. m. (Construction of Flyover)
Allocation:
TOTAL: P 500,000,000.00
CW1: P 482,500,000.00 (Construction of Flyover)
EAO: P 17,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Flyovers/Interchanges/Underpasses/Long Span Bridges
Tagum City Flyover along Agusan-Davao Road, Package 2, Davao del Norte
Physical Target:
CW1: 1 number of bridge (Construction of Substructure)
Allocation:
TOTAL: P 500,000,000.00
CW1: P 482,500,000.00 (Construction of Flyover)
EAO: P 17,500,000.00
May 23, 2018 FY 2018 GAA WIN8C03013 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Guadalupe-Lower Tuganay Road Connecting Carmen Overland Transport Terminal in Support of Banana and Coconut Industries, Davao del Norte
Physical Target:
CW1: 7.200 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 173,700,000.00 (Construction of Concrete Road)
EAO: P 6,300,000.00

TO: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Guadalupe-Lower Tuganay Road Connecting Carmen Overland Transport Terminal in Support of Banana and Coconut Industries, Davao del Norte
Physical Target:
CW1: 2.696 Lane Km (Construction of Concrete Road)
CW2: 6.586 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 39,700,642.33 (Construction of Concrete Road)
CW2: P 133,999,357.67 (Construction of Gravel Road)
EAO: P 6,300,000.00
May 23, 2018 FY 2018 GAA WIN8C03047 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Patel-Kapatagan Road Package 3, Davao del Norte
Physical Target:
CW1: 15.335 Lane Km (Construction of Gravel Road)
CW2: 18.890 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 400,000,000.00
CW1: P 221,959,650.00 (Construction of Gravel Road)
CW2: P 164,040,350.00 (Construction of Concrete Road)
EAO: P 14,000,000.00

TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Patel-Kapatagan Road Package 3, Davao del Norte
Physical Target:
CW1: 13.74836 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 400,000,000.00
CW1: P 386,000,000.00 (Construction of Gravel Road)
EAO: P 14,000,000.00
May 23, 2018 FY 2018 GAA WIN8C03043 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Island Garden City of Samal (IGACOS) Circumferential Road (West Side), Package 2, Davao del Norte
Physical Target:
CW1: 15.308 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 450,000,000.00
CW1: P 434,250,000.00 (Construction of Concrete Road)
EAO: P 15,750,000.00

TO: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Island Garden City of Samal (IGACOS) Circumferential Road (West Side), Package 2, Davao del Norte
Physical Target:
CW1: 213798 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 450,000,000.00
CW1: P 434,250,000.00 (Construction of Concrete Road)
EAO: P 15,750,000.00
May 23, 2018 FY 2018 GAA WIN8C03049 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides – Secondary Roads
Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) – K1672 + 675 - K1672 + 705,
K1673 + 600 - K1673 + 700, K1675 + 475 - K1679 + 048
Physical Target:
CW1: 3,900.00 sq. m. (Construction of Road Slope Protection Structure)
CW2: 6.860 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 145,878,000.00
CW1: P 87,815,000.00 (Construction of Road Slope Protection Structure)
CW2: P 52,957,270.00 (Asphalt Overlay)
EAO: P 5,105,730.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides – Secondary Roads
Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-Glan) –
K1670 + 650 - K1670 + 860, K1670 + 740 - K1670 + 760, K1672 + 660 - K1672 + 705,
K1673 + 600 - K1673 + 700, K1673 + 860 - K1673 + 960, K1675 + 475 - K1677 + 000
Physical Target:
CW1: 3,000.00 sq. m. (Construction of Road Slope Protection Structure)
CW2: 3.04744 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 145,878,000.00
CW1: P 100,301,497.80 (Construction of Road Slope Protection Structure)
CW2: P 40,470,772.22 (Asphalt Overlay)
EAO: P 5,105,730.00
May 23, 2018 FY 2018 GAA WIN8C03038 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Concreting of Bayabas - Handurumog Road Nabunturan, Compostela Valley
Physical Target:
CW1: 1.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 200,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Concreting of Bayabas - Handurumog Road Nabunturan, Compostela Valley
Physical Target:
CW1: 1.498 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
May 23, 2018 FY 2018 GAA WIN8C03033 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Bukidnon-Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon-Laak-Compostela Valley), Package 5, incl. ROW, Davao del Norte
Physical Target:
CW1: 13.428 Lane Km (Construction of Concrete Road)
ROW: 100,710.00 sq. m.
Allocation:
TOTAL: P 312,000,000.00
CW1: P 291,555,450.00 (Construction of Concrete Road)
ROW: P 9,524,550.00
EAO: P 10,920,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Bukidnon-Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon-Laak-Compostela Valley), Package 5, incl. ROW, Davao del Norte
Physical Target:
CW1: 8.49298 Lane Km (Construction of Concrete Road)
CW2: 821.2032 sq. m. (Construction of Concrete Bridge)
CW3: 381.60 sq. m. (Construction of Concrete Bridge)
ROW: 100,710.00 sq. m.
Allocation:
TOTAL: P 312,000,000.00
CW1: P 177,771,295.75 (Construction of Concrete Road)
CW2: P 80,450,661.34 (Construction of Concrete Bridge)
CW3: P 33,333,492.91 (Construction of Concrete Bridge)
ROW: P 9,524,550.00
EAO: P 10,920,000.00
May 23, 2018 FY 2018 GAA WIN8C03048 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road-Catalunan Road-Talandang-Sumimao-Pañalum-Tapak-Cabanglasan-Aglayan, Malaybalay), Package B, incl. ROW and Bridge, Davao del Norte
Physical Target:
CW1: 8.560 Lane Km (Construction of Gravel Road)
CW2: 286.20 sq. m. (Construction of Concrete Bridge)
CW3: 286.20 sq. m. (Construction of Concrete Bridge)
CW4: 286.20 sq. m. (Construction of Concrete Bridge)
CW5: 286.20 sq. m. (Construction of Concrete Bridge)
ROW: 65,535.60 sq. m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 103,225,000.00 (Construction of Gravel Road)
CW2: P 28,226,250.00 (Construction of Concrete Bridge)
CW3: P 28,226,250.00 (Construction of Concrete Bridge)
CW4: P 28,226,250.00 (Construction of Concrete Bridge)
CW5: P 28,226,250.00 (Construction of Concrete Bridge)
ROW: P 6,272,500.00
EAO: P 8,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road-Catalunan Road-Talandang-Sumimao-Pañalum-Tapak-Cabanglasan-Aglayan, Malaybalay), Package B, incl. ROW and Bridge, Davao del Norte
Physical Target:
CW1: 4.714 Lane Km (Construction of Gravel Road)
CW2: 429.30 sq. m. (Construction of Concrete Bridge)
CW3: 429.30 sq. m. (Construction of Concrete Bridge)
ROW: 65,535.60 sq. m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 140,000,544.17 (Construction of Gravel Road)
CW2: P 51,720,653.19 (Construction of Concrete Bridge)
CW3: P 43,234,302.64 (Construction of Concrete Bridge)
ROW: P 6,272,500.00
EAO: P 8,750,000.00
May 23, 2018 FY 2018 GAA WIN8C03041 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Apalaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 1, incl. Bridge, Davao City
Physical Target:
CW1: 2.380 Lane Km (Construction of Asphalt Road)
CW2: 3,460.00 sq. m. (Construction of Road Slope Protection Structure)
CW3: 292.95 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 250,000,000.00
CW1: P 172,445,500.00 (Construction of Asphalt Road)
CW2: P 49,504,500.00 (Construction of Road Slope Protection Structure)
CW3: P 19,300,000.00 (Construction of Concrete Bridge)
EAO: P 8,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Apalaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 1, incl. Bridge, Davao City
Physical Target:
CW1: 2.636Lane Km (Construction of Concrete Road)
CW2: 1,376.86 sq. m. (Construction of Road Slope Protection Structure)
CW3: 243.22 sq. m. (Construction of Concrete Bridge)
CW4: 1.028 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 250,000,000.00
CW1: P 179,640,110.18 (Construction of Asphalt Road)
CW2: P 23,337,474.65 (Construction of Road Slope Protection Structure)
CW3: P 35,313,018.57 (Construction of Concrete Bridge)
CW4: P 2,959,396.60 (Construction of Gravel Road)
EAO: P 8,750,000.00
May 23, 2018 FY 2018 GAA WIN8C03037 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support Program - Construction / Improvement of Access Roads leading to Declared Tourism Destinations
Bongkilaton Road leading to Mandaya Village, Pansan Falls, Bongkilaton Cave and Tagbubunlas Falls, Brgy. Ngan, Compostela Valley
Physical Target:
CW1: 1.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,0000.00 (Construction of Concrete Road)
EAO: P 400,000.00

TO: Convergence and Special Support Program - Construction / Improvement of Access Roads leading to Declared Tourism Destinations
Bongkilaton Road leading to Mandaya Village, Pansan Falls, Bongkilaton Cave and Tagbubunlas Falls, Brgy. Ngan, Compostela Valley
Physical Target:
CW1: 1.403 Lane Km (Construction of Concrete Road)
CW2: 348.000 Lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 14,787,930.00 (Construction of Concrete Road)
CW2: P 4,812,070.00 (Construction of Revetment)
EAO: P 400,000.00
May 23, 2018 FY 2018 GAA WIN8C03025 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road-Catalunan Road-Talandang-Sumimao-Pañalum-Tapak-Cabanglasan-Aglayan, Malaybalay, Package A, incl. ROW and Bridge, Davao City
Physical Target:
CW1: 2.500 Lane Km (Construction of Concrete Road)
CW2: 1,908.00 sq. m. (Construction of Concrete Bridge)
ROW: 11,627.907 sq. m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 48,250,000.00 (Construction of Concrete Road)
CW2: P 231,600,000.00 (Construction of Concrete Bridge)
ROW: P 9,650,000.00
EAO: P 10,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road-Catalunan Road-Talandang-Sumimao-Pañalum-Tapak-Cabanglasan-Aglayan, Malaybalay, Package A, incl. ROW and Bridge, Davao City
Physical Target:
CW1: 2.500 Lane Km (Construction of Concrete Road)
CW2: 381.60 sq. m. (Construction of Concrete Bridge)
CW3: 429.30 sq. m. (Construction of Concrete Bridge)
CW4: 10.34678 Lane Km (Construction of Gravel Road)
ROW: 11,627.907 sq. m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 56,183,759.92 (Construction of Concrete Road)
CW2: P 33,336,090.22 (Construction of Concrete Bridge)
CW3: P 39,477,236.29 (Construction of Concrete Bridge)
CW4: P 150,852,913.58 (Construction of Gravel Road)
ROW: P 9,650,000.00
EAO: P 10,500,000.00
May 23, 2018 FY 2018 WIN8G02165 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Catanduanes District Engineering Office
UACS No.: 300203100319000
Project ID: P00230346LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Access Road from Virac to Bagamanoc leading to Paday Falls, Bagamanoc, Catanduanes
Physical Target - CW1 – Construction of Concrete Road/ 0.94 lane-km
Unit Cost: CW1 – Php 16.68M /lane-km
Estimated Cost: Php 16.0M
(As Modified)
May 23, 2018 FY 2018 WIN8G01912 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Catanduanes District Engineering Office
UACS No.: 300203100320000
Project ID: P00230399LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – San Andres-Pandan-Hiyop Access Road leading to Hiyop Highlands and Su-nog Sea Cave, San Andres, Catanduanes
Physical Target - CW1 – Construction of Concrete Road/ 2.275 lane-km
Unit Cost: CW1 – Php 14.215M /lane-km
Estimated Cost: Php 33.0M
(As Modified)
May 23, 2018 FY 2018 WIN8G02167 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Catanduanes District Engineering Office
UACS No.: 300117201439000
Project ID: P00255760LZ
Local Program – Local Roads and Bridges – Local Roads – Local Infrastructure Program – Construction of Road, Brgy. Rizal, Viga, Catanduanes
Physical Target - CW1 – Construction of Concrete Road/ 0.2814 lane-km
Unit Cost: CW1 – Php 10.55M /lane-km
Estimated Cost: Php 3.0M
(As Modified)

May 23, 2018 FY 2018 GAA WIN8C03028 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Improvement/Concreting of Jct. Davao-Bukidnon Rd (Calinan Section)-Wangan-Subasta-Tagakpan-Tungkalan-Tagarano-Bayabas-Catigan-Baracatan-Sibulan Road, Davao City
Physical Target:
CW1: 6.220 Lane Km (Construction of Concrete Road)
CW2: 773.00 sq. m. (Construction of Concrete Bridge)
ROW: 24,105.00 sq. m.
Allocation:
TOTAL: P 200,000,000.00
CW1: P 91,573,675.00 (Construction of Concrete Road)
CW2: P 78,165,000.00 (Construction of Concrete Bridge)
ROW: P 23,261,325.00
EAO: P 7,000,000.00

TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Improvement/Concreting of Jct. Davao-Bukidnon Rd (Calinan Section)-Wangan-Subasta-Tagakpan-Tungkalan-Tagurano-Bayabas-Catigan-Baracatan-Sibulan Road, Davao City
Physical Target:
CW1: 3.774 Lane Km (Construction of Concrete Road)
CW2: 429.30 sq. m. (Construction of Concrete Bridge)
CW3: 200.34 sq. m. (Replacement of Bridge)
CW4: 0.591 Lane Km (Construction of Gravel Road)
ROW: 24,105.00 sq. m.
Allocation:
TOTAL: P 200,000,000.00
CW1: P 99,782,383.82 (Construction of Concrete Road)
CW2: P 44,040,342.13 (Construction of Concrete Bridge)
CW3: P 23,079,631.49 (Replacement of Bridge)
CW4: P 2,836,317.56 (Construction of Gravel Road)
ROW: P 23,261,325.00
EAO: P 7,000,000.00
May 23, 2018 FY 2018 WIN8G01913 FY 2018 GAA R.A. 10964 December 29, 2016 Region V Catanduanes District Engineering Office
UACS No.: 320101101708000
Project ID: P00220672LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Drainage Structure along Sibanhan River, Sta. 0+000 - Sta.0+952, Virac, Catanduanes
Physical Target - CW - Construction of Drainage Structure/ 952.0 lm.
Unit Cost: CW1 - Php 30,882.35/lm
Estimated Cost: Php 30.0M
(As Modified)
May 23, 2018 FY 2018 WIN8G02173 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Catanduanes District Engineering Office
UACS No.: 320101101720000
Project ID: P00223411LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of River Protection, Brgy. San Nicolas, Panganiban, Catanduanes
Physical Target - CW1 - Construction of Flood Mitigation Structure/ 452 lm
Unit Cost: Php 43,363/lm
Estimated Cost: Php 20.0M
(As Modified)
May 23, 2018 FY 2018 WIN8G01871 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Catanduanes District Engineering Office
UACS No.: 310111100045000
Project ID: P00202645LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Construction/Upgrading/Rehabilitation of Drainage along National Roads –Secondary Roads – Catanduanes Cir Rd - K0121+000 - K0122+000, K0122+000 - K0122+540
Physical Target - CW1 - Construction of Drainage Structure along Road/ 1,545.59 lm.
Unit Cost: CW1 – Php 11,316.11/lm.
Estimated Cost: Php 17.847M
(As Modified)
May 23, 2018 FY 2018 GAA WIN8C03026 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Carmen-Tagum City Coastal Road, incl. ROW, Carmen, Tagum City, Davao del Norte
Physical Target:
CW1: 9.596 Lane Km (Construction of Gravel Road)
ROW: 71,970.00 sq. m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 138,916,575.00 (Construction of Gravel Road)
ROW: P 5,833,425.00
EAO: P 5,250,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Carmen-Tagum City Coastal Road, incl. ROW, Carmen, Tagum City, Davao del Norte
Physical Target:
CW1: 5.184 Lane Km (Construction of Gravel Road)
CW2: 861.27 sq. m. (Construction of Concrete Bridge)
ROW: 71,970.00 sq. m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 37,115,676.61 (Construction of Gravel Road)
CW2: P 101,800,898.39 (Construction of Concrete Bridge)
ROW: P 5,833,425.00
EAO: P 5,250,000.00
May 23, 2018 FY 2018 WIN8G02049 FY 2018 GAA R.A. 10964 November 29, 2017 Region V Catanduanes District Engineering Office
UACS No.: 310111100046000
Project ID: P00202644LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Construction/Upgrading/Rehabilitation of Drainage along National Roads – Secondary Roads – Catanduanes Cir Rd – K0201+000 – K0201+811
Physical Target - CW1 - Construction of Drainage Structure along Road/ 115.58 lm.
Unit Cost: CW1 – Php 63,159.89/lm.
Estimated Cost: Php 7.449M
(As Modified)
May 23, 2018 FY 2018 WIN8G01911 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Catanduanes District Engineering Office
UACS No.: 310209100069000
Project ID: P00202648LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Off-Carriageway Improvement - Tertiary Roads - Jct Bato-Baras Rd incl. ROW - K0008+-003 - K0008+579, K0012+000 - K0012+940
Physical Target - CW1 - Off-Carriageway improvement: Shoulder Paving/Construction/ 6,566.00 sq.m.
Right-of-Way Acquisition (ROW)/ 3,492 sq.m.
Unit Cost: CW1 – Php 7,401.49/sq.m.
ROW Acquisition – Php 103.84/sq.m.
Estimated Cost: Php 49.960M
(As Modified)
May 23, 2018 FY 2018 GAA WIN8C03032 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION:

FROM: Local Roads - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Kao-Cabacungan-Dauis Road Phase 1, Nabunturan, Compostela Valley
Physical Target:
CW1: 1.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00

TO: Local Roads - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Kao-Cabacungan-Dauis Road Phase 1, Nabunturan, Compostela Valley
Physical Target:
CW1: 1.187 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
May 23, 2018 FY 2018 WIN8G01872 FY 2018 GAA R.A. 10964 November 29, 2017 Region V Catanduanes District Engineering Office
UACS No.: 310212100060000
Project ID: P00202650LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Paving of Unpaved Roads - Tertiary Roads - Baras-Gigmoto-Viga Rd - K0056+031.50 - K0056+146.50, K0056+502.62 - K0056+530.92, K0064+155 - K0064+582.50
Physical Target - CW1 - Paving of unpaved Roads/1.1416 lane-km
Unit Cost: CW1 - Php 13.091M/ lane-km
Estimated Cost: Php 15.25 M
(As Modified)
May 23, 2018 FY 2018 WIN8G01870 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Catanduanes District Engineering Office
UACS No.: 310109100088000
Project ID: P00200936LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide - Tertiary Roads - Baras-Gigmoto-Viga Rd - K0031+700 - K0032+052, K0081+440 - K0081+590
Physical Target - CW1 - Construction of Road Slope Protection Structure/ 4,057.09 sq.m.
Unit Cost: Php 4,831.05/sq.m.
Estimated Cost: Php 20.0M
(As Modified)

May 23, 2018 FY 2018 WIN8G02051 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Catanduanes District Engineering Office
UACS No.: 310106100148000
Project ID: P00202641LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads - Baras-Gigmoto-Viga Rd - K0027+185 - K0027+499, K0027+522 - K0027+651, K0040+900 - K0041+000, K0041+243 - K0041+473, K0083+550 - K0083+600
Physical Target - CW1 -Rehabilitation of Paved Road/ 1.44 lane-km
Unit Cost: Php 9.403 M/lane-km
Estimated Cost: Php 13.855M
(As Modified)
May 22, 2018 FY 2018 WIN8C02997 300203100521000 May 10, 2018 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 300203100521000
Project ID: P00230026MN

CSSP: Convergence and Special Support Program -
Construction/Improvement of Access Roads leading to Declared Tourism Destination
NRJ leading to Philippine Eagle Sanctuary, Brgy. Dakayakan, Midsalip, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Concrete Road: 1.60 lane km
Unit Cost: CW-1 - Construction of Concrete Road: P 13.781M/lane km
EAO: P 0.45M
Allocation: 22.5M
May 22, 2018 FY 2018 WIN8C02862 300204100202000 May 7, 2018 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No: 300204100202000
Project ID: P00230034MN

CSSP: Convergence and Special Support Program -
Construction/Improvement of Acces Roads leading to Trades, Industries and Economic Zones
NRJ to Brgy. Upper Timonan - Marangan - Kahayagan - Palili - Timbaboy in Support of Abaca Handicraft Processing, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Concrete Road: 2.286 lane km
Unit Cost: CW-1 - Construction of Concrete Road: P 8,573,930/lane km
EAO: P 0.40M
Allocation: P 20.0M
May 22, 2018 FY 2018 WIN8C02683 310101100111000 May 3, 2018 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No: 310101100111000
Project ID: P00200007MN

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Lanao - Pagadian - Zamboanga City Rd
K1786+786.00 - K1786+804.00, K1786+813.00 - K1786+826.50, K1786+890.50 - K1786+908.50, K1786+926.50 - K1786+967.00, K1787+004.50 - K1787+036.00, K1787+049.50 - K1787+103.50, K1787+113.50 - K1787+190.00, K1787+204.50 - K1787+213.50, K1787+218.00 - K1787+245.00, K1808+004.50 - K1808+067.50, K1808+085.50 - K1808+209.00, K1808+209.00 - K1808+227.00, K1808+227.00 - K1808+243.00, K1808+254.00 - K1808+263.00, K1808+288.00 - K1808+360.00, K1808+364.50 - K1808+387.00, K1808+400.50 - K1808+495.00, K1808+513.00 - K1808+576.00, K1808+667.50 - K1808+676.50, K1808+700.00 - K1808+704.50, K1808+726.00 - K1808+789.00, K1808+818.00 - K1808+863.00, K1808+874.50 - K1808+897.00, K1808+951.00 - K1808+973.50, K1810+460.00 - K1811+000.00, K1812+332.00 - K1812+458.00, K1812+471.50 - K1812+489.50, K1812+489.50 - K1812+507.50, K1812+507.50 - K1812+611.00, K1812+611.00 - K1812+665.00, K1812+692.00 - K1812+867.50, K1812+881.00 - K1812+890.00, K1812+894.50 - K1812+912.50, K1812+930.50 - K1813+000.00
Physical Target:
CW-1 - Concrete Reblocking: 3.3185 lane km
Unit Cost: CW-1 - Concrete Reblocking: P 9,261,642.31/lane km
EAO: P 0.62724M
Allocation: P 31.362M
May 22, 2018 FY 2018 WIN8C02721 300117201989000 May 3, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No: 300117201989000
Project ID: P00251836MN

Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Road Concreting, Brgy. Cawit, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.34 lane km
Unit Cost: CW-1 - Construction of Concrete Road: P 8,735,294.12 lane km
EAO: P 30,000.00
Allocation: P 3,000,000.00
May 22, 2018 FY 2018 WIN8C02935 300109200208000 May 3, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No: 300109200208000
Project ID: P00250071MN

Local Program:
Local - Flood Control and Drainage -
Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System, Sta. Catalina, Zamboanga City
Physical Target:
CW-1: Construction of Drainage System: 156.00 l.m.
Unit Cost: CW-1: Construction of Drainage System: P 9,519.23/l.m.
EAO: P 15,000.00
Allocation: P 1,500,000.00
May 22, 2018 FY 2018 WIN8C02674 300107200217000 May 3, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No: 300107200217000
Project ID: P00251832MN

Local Program:
Flood Control and Drainage - Flood Control Structures/Facilities - Local Infrastructure Program
Construction of Drainage Facilities at San Roque, Zamboanga City
Physical Target:
CW-1: Construction of Drainage Structure: 164.00 lm
Unit Cost: CW-1: Construction of Drainage Structure: P 18,109.76/lm
EAO: P 30,000.00
Allocation: P 3,000,000.00
May 22, 2018 FY 2018 WIN8C02702 300202100069000 May 3, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No: 300202100069000
Project ID: P00230005MN

Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Seaports
Acces Road leading to Panubigan Wharf, Zamboanga City
Physical Target:
CW-1: Construction of Concrete Road: 1.40 lane km
Unit Cost: CW-1: Construction of Concrete Road: P 17,220,000.00/lane km
EAO: P 492,000.00
Allocation: P 24,600,000.00
May 22, 2018 FY 2018 WIN8C02704 300117201975000 May 3, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No: 300117201975000
Project ID: P00250076MN

Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Cabaluay, Zamboanga City
Physical Target:
CW-1: Construction of Concrete Road: 0.21 lane km
Unit Cost: CW-1: Construction of Concrete Road: P 7,071.43/lane km
EAO: P 15,000.00
Allocation: P 1,500,000.00
May 21, 2018 FY - 2018 WIN8F05458 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
001 - Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:
Puerto Princesa North Rd
K0111+200 - K0112+284

CW1: 4.36 lane km ( Road Widening )
Allocation: 89,462,000 Php

TO:
Puerto Princesa North Rd
K0111+200 - K0112+878

CW1: 6.74 lane km ( Road Widening )
Allocation: 89,462,000 Php

May 21, 2018 FY - 2018 WIN8F05457 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
001 - Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement
- Secondary Road

FROM:
El Nido -Jct. New Ibahay Rd
K0273+583 - K0276+168,
K0276+337 - K0277+000

CW1: 7,440 sq.m. ( Off-Carriageway Improvement
Shoulder Paving/Construction )
Allocation: 66,960,000 Php

TO:
El Nido - Jct New Ibahay Rd
K0273+235.3 - K0276+168,
K0276+337.0 - K0277+000

CW1: 15,776030 sq.m. ( Off-Carriageway Improvement
Shoulder Paving/Construction )
Allocation: 66,960,000 Php
May 21, 2018 FY - 2018 WIN8F05461 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
002 - Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage Systems

FROM:
Construction of Flood Control Structure at Tapiken Bridge,
CBNR, Palawan

CW1: 260 lm ( Construction of Flood Control Mitigation
Structure )
Allocation: 10,000,000 Php

TO:
Construction of Flood Control Structure at Tapiken Bridge,
CBNR, Busuanga, Palawan

CW1: 227 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php


May 21, 2018 FY - 2018 WIN8F05459 FY _ 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
001 - Endure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:
Puerto Princesa North Rd.
K0220 + 000 - K02220 + 000

CW1: 4.008 lane km ( Road Widening )
Allocation: 75,818,000 Php

TO:
Puerto Princesa North Rd
K0219 + 015 - K0222 + 000

CW1: 6 lane km ( Road Widening )
Allocation: 75,818,00 Php
May 21, 2018 FY - 2018 WIN8F05462 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Convergence and Special Support -
Construction/Improvement of Access Roads leading to
Declared Tourism Destinations

FROM:
Mampio Road from Seaport to Cagayancillo Poblacion,
Brgy. Mampio, Cagayancillo, Palawan

CW1: 20 lane km ( Construction of Concrete Road )
Allocation : 60,000,000 Php

TO:
Mampio Road from Seaport to Cagayancillo Poblacion,
Brgy. Mampio, Cagayancillo, Palawan

CW1: 4.84 lane km ( Construction of Concrete Road )
Allocation: 60,000,000 Php
May 21, 2018 FY - 2018 WIN8F05463 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
002 - Protect Lives and Properties against Major Floods

Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage Systems

FROM:
Construction of Flood Control Structure at Caramay Bridge,
PPNR, Palawan

CW1: 715 lm ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php

TO:
Construction of Flood Control Structure at Caramay Bridge,
PPNR, Roxas, Palawan

CW1: 530 lm ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php
May 21, 2018 FY 2018 GAA WIN8C02989 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Samal Bridge leading to San Remigio, Samal Island, Davao City
Physical Target:
CW1: 19.430 Lane Km (Construction of Concrete Road)
ROW: 97,150.00
Allocation:
TOTAL: P 300,000,000.00
CW1: P 281,249,250.00 (Construction of Concrete Road)
ROW: P 8,250,750.00
EAO: P 10,500,000.00

TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Samal Bridge leading to San Remigio, Samal Island, Davao del Norte
Physical Target:
CW1: 17.388 Lane Km (Construction of Concrete Road)
ROW: 97,150.00
Allocation:
TOTAL: P 300,000,000.00
CW1: P 281,249,250.00 (Construction of Concrete Road)
ROW: P 8,250,750.00
EAO: P 10,500,000.00
May 21, 2018 FY - 2018 WIN8F05464 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
002 - Protect Lives and Properties against Major Floods

Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

FROM: Construction of Flood Control Structure at Dipuyai Bridge, Coron - Busuanga Road, Palawan

CW1: 261 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php

TO:
Construction of Flood Control Structure at Dipuyai Bridge, Coron - Busuanga Road, Coron, Palawan

CW1: 209.50 lm ( Construction of Flood Mitigation
Structure )
Allocation: 10,000,000 Php
May 21, 2018 FY 2018 GAA WIN8C03003 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Fatima-Malabog Road to Mabuhay-Pañalum-Paquibato Road, Package B, incl. ROW, Davao City
Physical Target:
CW1: 8.760 Lane Km (Construction of Concrete Road)
CW2: 2.654 Lane Km (Reconstruction from Paved to Concrete)
ROW: 9,096.00 sq. m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 231,327,870.00 (Construction of Concrete Road)
CW2: P 53,783,310.00 (Reconstruction from Paved to Concrete)
ROW: P 4,388,820.00
EAO: P 10,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Fatima-Malabog Road to Mabuhay-Pañalum-Paquibato Road, Package B, incl. ROW, Davao City
Physical Target:
CW1: 6.754 Lane Km (Construction of Concrete Road)
CW2: 2.213 Lane Km (Reconstruction from Paved to Concrete)
ROW: 9,096.00 sq. m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 147,061,491.59 (Construction of Concrete Road)
CW2: P 41,549,688.41 (Reconstruction from Paved to Concrete)
ROW: P 4,388,820.00
EAO: P 7,000,000.00
EXC: P 100,000,000.00 (Excess)
May 21, 2018 FY 2018 GAA WIN8C03000 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road-Catalunan Grande-Talandag-Sumimao-Panalum-Tapak-Cabanglasan-Aglayan, Malaybalay), Package A, incl. ROW and Bridge, Davao del Norte
Physical Target:
CW1: 10.320 Lane Km (Construction of Gravel Road)
CW2: 763.20 sq. m. (Construction of Concrete Bridge)
ROW: 78,163.20 sq. m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 124,485,000.00 (Construction of Gravel Road)
CW2: P 109,045,000.00 (Construction of Concrete Bridge)
ROW: P 7,720,000.00
EAO: P 8,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road-Catalunan Grande-Talandag-Sumimao-Panalum-Tapak-Cabanglasan-Aglayan, Malaybalay), Package A, incl. ROW and Bridge, Davao del Norte
Physical Target:
CW1: 12.212 Lane Km (Construction of Gravel Road)
CW2: 429.30 sq. m. (Construction of Concrete Bridge)
ROW: 78,163.20 sq. m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 194,396,985.49 (Construction of Gravel Road)
CW2: P 39,133,014.51 (Construction of Concrete Bridge)
ROW: P 7,720,000.00
EAO: P 8,750,000.00
May 21, 2018 FY 2018 GAA WIN8C02991 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides – Tertiary Road
Fatima-Malabog Rd – K1502 + 781 - K1502 + 811, K1503 + 100 - K1503 + 140,
K1503 + 950 - K1503 + 998, K1504 + 260 - K1504 + 300,
K1504 + 409 - K1504 + 436, K1504 + 800 - K1504 + 846
Physical Target:
CW1: 9,840.00 sq. m. (Construction of Slope Protection)
Allocation:
TOTAL: P 233,430,000.00
CW1: P 225,259,950.00
EAO: P 8,170,050.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides – Tertiary Road
Fatima-Malabog Rd – K1502 + 840 - K1502 + 886.3, K1503 + 797 - K1503 + 842.5,
K1504 + 132 - K1504 + 192, K1504 + 292 - K1504 + 310,
K1504 + 492 - K1504 + 579, K1504 + 595 - K1504 + 625,
K1504 + 723 - K1504 + 776
Physical Target:
CW1: 5,610.38 sq. m. (Construction of Slope Protection)
Allocation:
TOTAL: P 233,430,000.00
CW1: P 225,259,950.00
EAO: P 8,170,050.00
May 21, 2018 FY 2018 GAA WIN8C03002 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Demoloc-Little Baguio-Alabel Road, incl. ROW, Davao Occidental
Physical Target:
CW1: 8.474 Lane Km (Construction of Gravel Road)
ROW: 42,370.00 sq. m.
Allocation:
TOTAL: P 163,032,000.00
CW1: P 155,395,880.00 (Construction of Gravel Road)
ROW: P 1,930,000.00
EAO: P 5,706,120.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Demoloc-Little Baguio-Alabel Road, incl. ROW, Davao Occidental
Physical Target:
CW1: 4.39112 Lane Km (Construction of Gravel Road)
CW2: 333.90 sq. m. (Construction of Concrete Bridge)
ROW: 42,370.00 sq. m.
Allocation:
TOTAL: P 163,032,000.00
CW1: P 127,739,390.00 (Construction of Gravel Road)
CW2: P 27,656,490.00 (Construction of Concrete Bridge)
ROW: P 1,930,000.00
EAO: P 5,706,120.00
May 21, 2018 FY 2018 GAA WIN8C03004 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Improvement/Concreting of Jct. Calinan-Baguio-Cadalian Road (Baguio Proper-Wines-Magpet Bdry.), Davao City
Physical Target:
CW1: 15.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00

TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Improvement/Concreting of Jct. Calinan-Baguio-Cadalian Road (Baguio Proper-Wines-Magpet Bdry.), Davao City
Physical Target:
CW1: 3.150 Lane Km (Construction of Concrete Road)
CW2: 666.00 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 21,582,910.00 (Construction of Concrete Road)
CW2: P 74,917,090.00 (Construction of Concrete Bridge)
EAO: P 3,500,000.00
May 21, 2018 FY 2018 GAA WIN8C02994 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao Oriental 2nd District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Road from Junction Brgy. Sainz connecting to Sitio Licop in support of Cacao, Coffee, Corn and Mango Industries, Mati City, Davao Oriental
Physical Target:
CW1: 2.898 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 36,226,000.00
CW1: P 35,501,480.00 (Construction of Concrete Road)
EAO: P 724,520.00

TO: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Road from Junction Brgy. Sainz connecting to Sitio Licop in support of Cacao, Coffee, Corn and Mango Industries, Mati City, Davao Oriental
Physical Target:
CW1: 0.940 Lane Km (Construction of Concrete Road)
CW2: 0.940 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 36,226,000.00
CW1: P 35,501,480.00 (Construction of Concrete Road)
CW2: P 18,859,070.00 (Construction of Gravel Road)
EAO: P 724,520.00
May 21, 2018 FY 2018 GAA WIN8C02987 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao del Norte District Engineering Office

MODIFICATION:

FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Road, Brgy. Malinawon, Tagum City
Physical Target:
CW1: 2.220 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00

TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Road, Brgy. Malinawon, Tagum City
Physical Target:
CW1: 1.502 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
May 18, 2018 FY - 2018 WIN8F05460 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001 - Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:
Mindoro West Coastal Rd
K0409+000 - K0414+000

CW1: 9.99 lane km ( Road Widening )
Allocation: 150,000,000 Php

TO:
Mindoro West Coastal Rd
K0409+000 - K0410+056,
K0410+095 - K0413+676,
K0413+695 - K0414+000

CW1: 9.874 LANE KM ( Road Widening )
Allocation: 150,000,000 Php



May 18, 2018 FY - 2018 WIN8F05455 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001 - Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/
New Roads

FROM:
Palawan Circumferential Road ( Latud - Canipaan Section )
Package B, Palawan

CW1: 33 lane km
Allocation: 150,000,000 Php

TO:
Palawan Circumferential Road ( Latud - Canipaan Section )
Package B, Palawan

CW1: 16.6376 lane km ( Construction of Gravel Road )
CW2: 493.568 sq.m. ( Construction of Steel Bridge )
Allocation: 150,000,000 Php
May 18, 2018 FY - 2018 WIN8F05453 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001 - Ensure Safe and Reliable National Road System

Network Development -Road Widening - Secondary Roads

FROM:
Calapan South Road
K0072+026 - K0072+178,
K0072+191 - K0072+443,
K0072+822 - K0075+252,
K0075+283 - K0076+849,
K0077+348 - K0078+269,
K0078+466 - K0079+745

CW1: 13.220 lane km ( Road Widening )
Allocation: 160,000,000 Php

TO:
Calapan South Road
K0074+640 - K0075+239,
K0075+275 - K0079+714,
K0079+820 - K0080+609,
K0080+613 - K0082+639,
K0082+651 - K0083+114,
K0083+140 - K0083+511,
K0083+532 - K0084+064

CW1: 18.322 lane km ( Road Widening )
Allocation: 160,000,000 Php
May 18, 2018 FY - 2018 WIN8F05456 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
01 - Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement
- Secondary Roads

FROM:
Tablas Circumferential Rd
K0006+454-0K0007+000,
K0008+158 - K0009+000,
K0013+000-k0013+693,
K0015+000 - K0016+098,
K0016+528 - K0016912,
K0024+708 - K0025+597,
K0030+000 - K0030+934,
K0031+854 - K0032+570,
K0038+500 - K0038+700,
K0041+000 - k0042+000

CW1: 21,696 square meters
( Off-Carriageway Improvement :Shoulder Paving/
Construction )
Allocation; 69,878,000 Php

TO:
Tablas Circumferential Rd.
K0006+454.00 - K0007+000.00,
K0008+000.00 - K0008+984.09,
K0013+000.00 - K0013+580.00,
K0013+612.75 - K0013+672.75,
K0015+000.00 - K0016+086.15,
K0016+522.11 - K0016+920.00,
K0024+833.03 - K0025+594.27,
K0029+990.52 - K0030+686.70,
K0030+700.00 - K0030+940.00,
K0031+853.58 - K0032+572.25,
K0038+500.00 - K0038+700.00,
K0041+000.00 - K0041+958.02

CW1: 22,481.12 square meters
( Off-Carriageway Improvement: Shoulder Paving/
Construction )
Allocation: 69,878,000 Php
May 18, 2018 2018 WIN8C02984 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION

FROM: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Anibongan-Pangi Road, Maco, Compostela Valley
Physical Target:
CW1: 1.000 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00

TO: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Anibongan-Pangi Road, Maco, Compostela Valley
Physical Target:
CW1: 1.549 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
May 18, 2018 2018 WIN8C02979 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION

FROM: OO2 Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rechanneling/Construction of Revetment with Sheet Pile of Kingking River, Cebulida L/S, Pantukan, Compostela Valley
Physical Target:
CW1: 320 Lineal Meters (Construction of Revetment)
CW2: 17,697 Cubic Meters (Channelization)
ROW: 356 Square Meters
ALLOCATION:
TOTAL: P 35,000,000.00
CW1: P 28,933,909.00 (Construction of Revetment)
CW2: P 4,778,091.00 (Channelization)
ROW: P 588,000.00
EAO: P 700,000.00

TO: OO2 Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rechanneling/Construction of Revetment with Sheet Pile of Kingking River, Cebulida L/S, Pantukan, Compostela Valley
Physical Target:
CW1: 718.17 Lineal Meters (Construction of Revetment)
CW2: 15,055 Cubic Meters (Channelization)
ROW: 356 Square Meters
ALLOCATION:
TOTAL: P 35,000,000.00
CW1: P 29,736,949.00 (Construction of Revetment)
CW2: P 3,975,050.00 (Channelization)
ROW: P 588,000.00
EAO: P 700,000.00
May 18, 2018 2018 WIN8C02971 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: 001 Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd - K1456 + 250 - K1456 + 830
Physical Target:
CW1 - 1.160 Lane Km (Reconstruction from Paved to Concrete)
ALLOCATION:
TOTAL: P 35,000,000.00
CW1 - P 34,300,000.00 (Reconstruction from Paved to Concrete)
EAO - P 700,000.00

TO: 001 Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd - K1456 + 140 - K1456 + 934
Physical Target:
CW1 - 1.589 Lane Km (Reconstruction from Paved to Concrete)
ALLOCATION:
TOTAL: P 35,000,000.00
CW1 - P 34,300,000.00 (Reconstruction from Paved to Concrete)
EAO - P 700,000.00

Pages