March 30, 2022 |
2022 |
WIN2F05879 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac 2nd District Engineering Office |
Network Development Program - Off-Carriageway Improvement - Primary Roads
Tarlac - Sta. Rosa Rd - K0133+954 - K0134+340 |
March 30, 2022 |
2022 |
WIN2F05942 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Madella - Dinadiawan Rd - K0418+690 - K0418+750 |
March 29, 2022 |
FY 2022 |
WIN2C03467 |
UACS No. 310106100696000 |
February 11, 2022 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 310106100696000
Project ID.: P00603572LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads
North Antipolo St – K0007+000 – K0007+044, K0008+931 – K0007+000
Physical Target: CW1 = Rehabilitation of Paved Road 0.226 lane km
Unit Cost = P 21,681,416/lane km
Allocation = P 4,900,000
EAO = P 100,000
Total = P 5,000,000
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads
North Antipolo St – K0009+(-267.80) – K0009+(129.30)
Physical Target: CW1 = Rehabilitation of Paved Road 0.277 lane km
Unit Cost = P 17,689,531/lane km
Allocation = P 4,900,000
EAO = P 100,000
Total = P 5,000,000
WIN2C03467
|
March 29, 2022 |
FY 2022 |
WIN2C03469 |
UACS No. 310102100868000 |
February 10, 2022 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 310102100868000
Project ID.: P00603562LZ
OO1: Ensure and Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
J Rizal Ave – K0003+(-168.80)– K0003+000, K0003+(-170) – K0003+(-168.80), K0003+(195.10) – K0003+(-170), K0003+000 – K0003+529
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay = 1.448 lane km
Unit Cost = P 6,767,956/lane km
Allocation = P 9,800,000
EAO = P 200,000
Total = P 10,000,000
As Modified
OO1: Ensure and Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
J Rizal Ave –K0003+(-529) – K0003+(-195.1)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay = 1.448 lane km
Unit Cost = P 5,871,779/lane km
Allocation = P 9,800,000
EAO = P 200,000
Total = P 10,000,000
WIN2C03469
|
March 29, 2022 |
FY 2022 |
WIN2C03477 |
UACS No. 3101022100872000 |
February 10, 2022 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 3101022100872000
Project ID.: P00603560LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Legarda St. – K0003+(-523)-K0003+(-320), K0003+(-603)-K0003+(-523), K0003+(-683)-
K0003+(-603), K0003+(-693)-K0003+(-683), K0003+(=752.70)-K0003+(-693)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 0.865 lane km
Unit Cost = P 16,994,219 / lane km.
Allocation = P 14,700,000
EAO = P 300,000
Total = P 15,000,000
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Legarda St. – K0003+(-655.3)-K0003+(-210.6)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 0.889 lane km
Unit Cost = P 16,535,433 / lane km.
Allocation = P 14,700,000
EAO = P 300,000
Total = P 15,000,000
WIN2C03477
|
March 29, 2022 |
2022 |
WIN2F05870 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads
Romulo H-way - K0160+390 - K0161+158 |
March 29, 2022 |
2022 |
WIN2F05821 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Manila North Rd - K0155+876 - K0156+210, K0159+721 - K0160+565 |
March 29, 2022 |
2022 |
WIN2F05830 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Manila North Rd - K0156+210 - K0156+350, K0157+081 - K0158+800
|
March 29, 2022 |
2022 |
WIN2F05837 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Tarlac - Sta. Rosa Rd - K0136+ (-404) - K0136+487, K0136+511 - K0137+093, K0137+384 - K0137+549
|
March 29, 2022 |
2022 |
WIN2F05832 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Romulo H-way - K0141+024 - K0141+361 |
March 29, 2022 |
2022 |
WIN2F05834 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Flood Control Structure along Tarlac River Control (Right Dike), Tagumbao - Dicolor Section (Package B), Sta. 0+000 - Sta. 0+313, Gerona, Tarlac |
March 29, 2022 |
2022 |
WIN2F05822 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Flood Control Structure along Camiling River (Left Bank), Libueg - Bacabac Section (Package D), Sta. 0+249 - Sta. 0+525, Camiling, Tarlac |
March 29, 2022 |
2022 |
WIN2F05833 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Flood Control Structure along Camiling River (Right Bank), Bilad Section (Package B), Sta. 0+000 - Sta. 0+194, Bilad, Camiling, Tarlac |
March 29, 2022 |
2022 |
WIN2F05824 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Flood Control Structure along Camiling River (Right Bank), Tambugan - Sawat Section (Package A), Sta. 0+567 - Sta. 0+863, Camiling, Tarlac |
March 29, 2022 |
2022 |
WIN2F05823 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Romulo H-way - K0140+361 - K0141+024, K0141+361 - K0141+810 |
March 29, 2022 |
2022 |
WIN2F05827 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Manila North Rd - K0131+605 - K0132+073 |
March 29, 2022 |
2022 |
WIN2F05831 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Manila North Rd - K0131+081 - K0131+605 |
March 29, 2022 |
2022 |
WIN2F05825 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Romulo H-way - K0132+599 - K0134+410 |
March 29, 2022 |
2022 |
WIN2F05826 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Manila North Rd - K0133+674 - K0134+173 |
March 24, 2022 |
2022 |
WIN2E01980 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. : 300214100095000
Project ID: P00633706MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
FROM:
Preventive Maintenance along Daang Maharlika (Surigao-Agusan Sect) - K1125 + 050 - K1680 + 546.25
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 3.910 Lane Km
Allocation:
TOTAL: P 60,000,000
CW1: P 57,900,000
EAO: P 2,100,000
Unit Cost:
CW1: P 14,808,184.14/ Lane Km
TO:
Preventive Maintenance along Daang Maharlika (Surigao-Agusan Sect) - K1125 + 000.00 - K1126+954.10
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 3.910 Lane Km
Allocation:
TOTAL: P 60,000,000
CW1: P 57,900,000
EAO: P 2,100,000
Unit Cost:
CW1: P 14,808,184.14/ Lane Km
|
March 24, 2022 |
2022 |
WIN2F05829 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Bataan 1st District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction / Rehabilitation of Flood Control Project along Colo River, Sta. (-) 0+739.50 - Sta. (-) 1+111.41, Palihan Section Phase 2AGP, Hermosa, Bataan |
March 24, 2022 |
2022 |
WIN2F05839 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Bataan 1st District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Rehabilitation of Flood Control Project along Colo River, Sta. 0+441.43 - Sta. (-)0+596.40, Palihan Section Phase 1AGP, Hermosa, Bataan
|
March 24, 2022 |
2022 |
WIN2F05838 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Bataan 1st District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Rehabilitation of Flood Control Project along Colo River, Sta. 0+495.50 - Sta. 0+846.62, Layac Section Phase 2AGP, Dinalupihan, Bataan |
March 24, 2022 |
2022 |
WIN2F05828 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Bataan 1st District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Rehabilitation of Flood Control Project along Colo River, Sta. (-)0+159 - Sta. 0+495.50. Layac Section Phase 1AGP, Dinalupihan, Bataan |
March 22, 2022 |
FY 2021 GAA |
WIN1G02575 |
DPWH Infra Program FY 2021 |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300202100197000
Project ID : P00534413LZ
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Seaports
FROM :
Concreting of Access Road leading to San Vicente Port Barton Docking Area MIMAROPA/Palawan/San Vicente/Port Barton, Palawan
Physical Target : CW1 - Construction of Concrete Road :
3.2 Lane Km
Allocation : Php 40.00 Million
TO :
Concreting of Access Road leading to San Vicente Port Barton Docking Area MIMAROPA/Palawan/San Vicente/Port Barton,
Palawan
Physical Target : CW1 - Construction of Concrete Road :
1.52978 Lane Km
CW2 - Road Safety : Pavement Markings :
1,923.0 Lineal Meters
Allocation : Php 40.00 Million
|
March 21, 2022 |
FY 2021 GAA |
WIN2G02604 |
DPWH FY 2021 GAA |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300116204189000
Project ID : P00562450LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/repair/Rehabilitation /Improvement of
Various Infrastructure including Local Projects
FROM :
Construction of Road leadinng to San Vicente Port Barton, Palawan
Physical Target : CW1 - Construction of Concrete road : 0 Lane km
Allocation : Php 20.00 Million
TO:
Construction of Road leading to San Vicente Port Barton, Palawan
Physical Target : CW1 - Construction of Concrete Road :
1.30 Lane Km
Allocation : Php 20.00 Million
|
March 21, 2022 |
FY 2021 GAA |
WIN2G02603 |
DPWH Infra Program FY 2021 |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300116204190000
Project ID : P00562451LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Construction/Improvement of Taradungan - Antonio Road,
Roxas, Palawan
Physical Target : CW1 - Construction of Concrete Road :
0 Lane Km
Allocation : Php 25.00 Million
TO :
Construction/Improvement of Taradungan - Antonio Road,
Roxas, Palawan
Physical Target : CW1 - Construction of Concrete Road :
1.90 Lane Km
Allocation : Php 25.00 Million
|
March 17, 2022 |
2022 |
WIN2E01979 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. : 300215100616000
Project ID: P00630154MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road, Sitio Puyawon, Barangay Mahanub - Sitio Buya, Barangay Camam-onan, Gigaquit, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 5.004 Lane Km
Allocation:
TOTAL: P 80,000,000
CW1: P 77,200,00
EAO: P 2,800,00
Unit Cost:
CW1: P 15,427,657.87/ Lane Km
TO:
Construction of Road, Sitio Puyawon, Sitio Buya, Barangay Camam-onan, Gigaquit, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 5.004 Lane Km
Allocation:
TOTAL: P 80,000,000
CW1: P 77,200,00
EAO: P 2,800,00
Unit Cost:
CW1: P 15,427,657.87/ Lane Km |
March 17, 2022 |
2022 |
WIN2E01978 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. : 300215100617000
Project ID: P00630663MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road in Barangay Ferlda - Sitio Puyawon, Barangay Mahanub, Gigaquit, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 4.020 Lane Km
Allocation:
TOTAL: P 80,000,000
CW1: P 77,200,00
EAO: P 2,800,00
Unit Cost:
CW1: P 19,203,024.73/ Lane Km
TO:
Construction of Road in Barangay Ferlda - Sitio Puyawon, Barangay Camam-onan, Gigaquit, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 4.020 Lane Km
Allocation:
TOTAL: P 80,000,000
CW1: P 77,200,00
EAO: P 2,800,00
Unit Cost:
CW1: P 19,203,024.73/ Lane Km
|
December 27, 2021 |
2021 |
WIN1F06705 |
SR2021-11-014754 |
November 18, 2021 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Rehabilitation/Reconstruction of Road with Slips, Slope Collapse, and Lanslide – Kananga – Tunongan Hot Spring Rd – K0996+000 – K0996+450
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 72.375 M
Structure: 0.00 square meters
EAO P 2.625 M
Total P 75.00 M
AS MODIFIED:
Rehabilitation/Reconstruction of Road with Slips, Slope Collapse, and Lanslide – Kananga – Tunongan Hot Spring Rd – K0996+304 – K0996+430; K0996+474 – K0996+777
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 72.375 M
Structure: 3, 065 square meters
EAO P 2.625 M
Total P 75.00 M
|
December 27, 2021 |
2021 |
WIN1F06649 |
SR2021-11-014756 |
November 18, 2021 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Rehabilitation/Reconstruction of Road with Slips, Slope Collapse, and Landslide – Kananga – Tungonan Hot Spring Rd – K0997+400 – K0997+800
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 72.375 M
Structure: 0.00 square meters
EAO P 2.625 M
Total P 75.00 M
AS MODIFIED:
Rehabilitation/Reconstruction of Road with Slips, Slope Collapse, and Landslide – Kananga – Tungonan Hot Spring Rd – K0997+040 – K0997+370; K0998+140 – K0998+222
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 72.375 M
Structure: 2,880 square meters
EAO P 2.625 M
Total P 75.00 M
|
December 27, 2021 |
2021 |
WIN1F06204 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Leyte-Samar Rd (via Guintigui-an) – K0899+048 – K0899+434, K0899+466 – K0899+555
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 10.62222 M
Asphalt Overlay: 1.891 Lane Km
EAO P 0.21678 M
Total P 10.839 M
AS MODIFIED:
Leyte-Samar Rd (via Guintigui-an) – K0899+048 – K0899+418, K0899+482 – K0899+547
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 10.62222 M
Asphalt Overlay: 1.740 Lane Km
EAO P 0.21678 M
Total P 10.839 M
|
December 27, 2021 |
2021 |
WIN1F06205 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
Convergence and Special Support - Construction/ Improvement of Access Roads leading to Airports
AS PER GAA/ORIGINAL:
Access Road from San Jose Road to the New Passenger Terminal Building, Daniel Z. Romualdez Airport, San Jose,Tacloban City
Physical Target: Allocation:
CW1-Construction of Concrete P 28.09366 M
Road: 2.668 Lane Km
EAO P 0.57334 M
Total P 28.667 M
AS MODIFIED:
(Kalsada Tungo sa Paliparan, Rules at Daungan Program – Katuparan) Access Road from San Jose Road to the New Passenger Terminal Building, Daniel Z. Romualdez Airport, San Jose, Tacloban City
Physical Target: Allocation:
CW1-Construction of Concrete P 28.09366 M
Road: 2.352 Lane Km
EAO P 0.57334 M
Total P 28.667 M
|
December 27, 2021 |
2021 |
WIN1F06183 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0687 + 964 - K0688 + 000
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 18.669 M
Structure: 3,883.891 square meters
EAO P 0.381 M
Total P 19.050 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0688 + 000 - K0688 + 033
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 18.669 M
Structure: 1,156.46 square meters
EAO P 0.381 M
Total P 19.050 M |
December 20, 2021 |
2021 |
WIN1C03407 |
GAA 2021 |
October 29, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Rehabilitation of Bucay North Road with Road Opening, San Miguel-Bancagan Section, Bucay, Abra;
Type of Work: Rehabilitation of Concrete Road;
Physical Target: CW1: 10.396 Lane Km;
Allocation= Php 100,000,000
To: Rehabilitation of Bucay North Road with Road Opening, San Miguel-Bancagan Section, Bucay, Abra;
Type of Work: CW1: Rehabilitation of Concrete Road
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 1.542 Lane Km
CW2: 13,878 Square meters;
Allocation= Php 100,000,000
|
December 20, 2021 |
2021 |
WIN1C03402 |
GAA 2021 |
October 29, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Pakiling-Banglolao Flood Control, Barangay Pakiling, Bucay, Abra;
Type of Work: Construction of Flood Mitigation Structure;
Physical Target: CW1: 293.20 Lineal meters;
Allocation= Php 50,000,000
To: Construction of Pakiling-Banglolao Flood Control, Barangay Pakiling, Bucay, Abra;
Type of Work: Construction of Flood Mitigation Structure;
Physical Target: CW1: 241.60 Lineal meters;
Allocation= Php 50,000,000
|
December 20, 2021 |
2021 |
WINC03404 |
GAA 2021 |
October 29, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Soot Flood Control, Barangay Mudeng, La Paz, Abra;
Type of Work: Construction of Flood Mitigation Structure;
Physical Target: CW1: 445.594 Lineal meters;
Allocation= Php 50,000,000
To: Construction of Soot Flood Control, Barangay Mudeng, La Paz, Abra;
Type of Work: Construction of Flood Mitigation Structure;
Physical Target: CW1: 219.20 Lineal meters;
Allocation= Php 50,000,000
|
December 15, 2021 |
FY 2021 |
WIN1E01932 |
300117210088000 |
November 9, 2021 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 300117210088000
Project ID : P00551097MN
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Rehabilitation/Improvement of Sindangan Rotonda, Sindangan, Zamboanga del Norte
CW1 - Rehabilitation of Concrete Road : 0.982 lane km
Unit Cost : P 10,481,280.52 /lane km
CW2 - Construction of Drainage Structure: 235.190 ln. m.
Unit Cost : P 8,854.04 /ln.m
EAO : P 125,000.00
Allocation : P 12,500,000.00 |
December 14, 2021 |
FY2021 |
WIN1B01184 |
300117210006000 |
April 23, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Concreting of Road at Sitio Ratag, Barangay Baligtang, Pandami, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.880 Lane Km.
Unit Cost: Php 11,250,000.00/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
December 2, 2021 |
2021 |
WIN1F06105 |
SARO-BMB-A-21-0010265 |
October 25, 2021 |
Region VIII |
Leyte 1st District Engineering Office |
Local Program
Local - Buildings And Other Structures - Multipurpose / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
AS PER GAA/ORIGINAL:
Construction of Covered Court-Regional Rehabilitation Center for Youth (RRCY) Brgy. Pawing, Palo, Leyte
Physical Target: Allocation:
CW1-Construction of Multi Purpose Building: P 9.800 M
1.00 Number of Building
EAO P 0.200 M
Total P 10.00 M
AS MODIFIED:
Construction of Covered Court-Regional Rehabilitation Center for Youth (RRCY) Brgy. Sto. Niño, Tanauan, Leyte
Physical Target: Allocation:
CW1-Construction of Multi Purpose Building: P 9.800 M
1.00 Number of Building
EAO P 0.200 M
Total P 10.00 M
|
December 2, 2021 |
2021 |
WIN1F06286 |
SARO-BMB-A-21-0010166 |
October 22, 2021 |
Region VIII |
Leyte 4th District Engineering Office |
Local Program
Local – Flood Control and Drainage – Drainage/Protection Works – Local Infrastructure Program
AS PER GAA/ORIGINAL:
Construction of Albuera Seawall, Albuera, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 49.00 M
Structure: 412.092 Lineal Meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Construction of Albuera Seawall, Albuera, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 49.00 M
Structure: 400.00 Lineal Meters
EAO P 1.00 M
Total P 50.00 M
|
December 2, 2021 |
2021 |
WIN1F06276 |
SR2021-09-012555 |
September 14, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Asphalt Overlay along National Road: Ormoc-Baybay Southern Leyte Boundary Road K1116+000 - K1117+000, K1118+000 - K1119+000, K1120+000 - K1120+857, K1121+000 - K1122+000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 38.60 M
Asphalt Overlay: 0.00 Lane Km
EAO P 1.40 M
Total P 40.00 M
AS MODIFIED:
Asphalt Overlay along National Road: Ormoc-Baybay Southern Leyte Boundary Road K1117+985 - K1119+000, K1120+000 - K1120+857, K1120+866 – K1121+672
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 38.60 M
Asphalt Overlay: 5.412 Lane Km
EAO P 1.40 M
Total P 40.00 M
|
December 2, 2021 |
2021 |
WIN1F06671 |
SARO-BMB-A-21-0010157 |
October 22, 2021 |
Region VIII |
Northern Samar 2nd District Engineering Office |
Local Program
Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
AS PER GAA/ORIGINAL:
Construction/Upgrading/Rehabilitation of Drainage along National Roads (Arteche – Jipapad – Las Navas – Rawis) at Barangay Gibuangan and Barangay Sagudsuron, Catubig, Northern Samar
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 32.340 M
: 0.00 Lineal Meters
EAO P 0.660 M
Total P 33.00 M
AS MODIFIED:
Construction/Upgrading/Rehabilitation of Drainage along National Roads (Arteche – Jipapad – Las Navas – Rawis) at Barangay Gibuangan and Barangay Sagudsuron, Catubig, Northern Samar
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 12.22309 M
: 625.00 Lineal Meters
CW2-Road Widening: 2.504 Lane Km P 20.11691 M
EAO P 0.660 M
Total P 33.00 M
|
December 2, 2021 |
2021 |
WIN1F06233 |
SARO-BMB-A-21-0008585 |
September 22, 2021 |
Region VIII |
Samar 1st District Engineering Office |
Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
AS PER GAA/ORIGINAL:
Concreting of Brgy. Talahid – Brgy. Rica Road, Costa, Almagro, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 49.00 M
: 6.478 Lane Km
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Concreting of Brgy. Talahid – Brgy. Costa Rica Road, Almagro, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 49.00 M
: 6.478 Lane Km
EAO P 1.00 M
Total P 50.00 M
|
December 2, 2021 |
2021 |
WIN1F06109 |
SARO-BMB-A-21-0007316 |
August 24, 2021 |
Region VIII |
Southern Leyte District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K1100 + 087 - K1100+177
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 0.00 Square Meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Daang Maharlika (LT) - K1006 + 801 - K1006+901
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 3000 Square Meters
EAO P 1.00 M
Total P 50.00 M
|
December 2, 2021 |
2021 |
WIN1E01921 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 310207100128000
Project ID: P00501573MN
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads
FROM:
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1233 + (-088) - K1234 + 124, K1235 + 335 - K1236 + 262
Type of Work:
CW1- Off-Carriageway Improvement: Shoulder Paving/Construction
Physical Target:
CW1- 10,501.920 Square meters
Allocation:
TOTAL: P 90,200,000
CW1: P 87,043,000
EAO: P 3,157,000
Unit Cost:
CW1: P 8,288.29/Square meters
TO:
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1233 + (-088) - K1233 + 244, K1243 + 060 - K1243 + 083, K1243 + 200 – K1243 + 746, K1243 + 1002 – K1244 +257
Type of Work:
CW1- Off-Carriageway Improvement: Shoulder Paving/Construction
CW2- Construction of Drainage Structure along Road
Physical Target:
CW1- 9,669.340 Square meters
CW2- 481.00 Lineal meters
Allocation:
TOTAL: P 90,200,000
CW1: P 49,167,337.59
CW2: P 37,875,662.41
EAO: P 3,157,000
Unit Cost:
CW1: P 5,084.87/Square meters
CW2: P 78,743.58/Lineal meters
|
December 2, 2021 |
2021 |
WIN1F06674 |
SARO-BMB-A-21-0010271 |
October 25, 2021 |
Region VIII |
Tacloban City District Engineering Office |
Local Program
Local - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
AS PER GAA/ORIGINAL:
Gov. Benjamin "Kokoy" Romualdez Diversion Road (S00253LT) Chainage 0-205, (S00255LT) K0908+946-K0909+030, (S00254LT) Chainage 0-55, Picas San Jose DZR Airport Road (S00257LT) K0910+-926-K0910+-857, (S00258LT) Chainage 0-094, Tacloban City
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 4.900 M
along Road: 117 Lineal Meters
EAO P 0.100 M
Total P 5.00 M
AS MODIFIED:
Gov. Benjamin "Kokoy" Romualdez Diversion Road (S00255LT) K0908+950-K0909+026 Tacloban Baybay South Road (S00244LT) K0913+977-K0914+017
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 4.950 M
along Road: 117 Lineal Meters
EAO P 0.050 M
Total P 5.00 M
|
December 2, 2021 |
2021 |
WIN1F06163 |
SARO-BMB-A-21-0010294 |
October 25, 2021 |
Region VIII |
Tacloban City District Engineering Office |
Local Program
Local - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
AS PER GAA/ORIGINAL:
Gov. Benjamin “Kokoy” Romualdez Diversion Road (S00255LT) K0908+825-K0908+755, Tacloban City
Physical Target: Allocation:
CW1-Asphalt Overlay: 0.800 Lane Km P 4.900 M
EAO P 0.100 M
Total P 5.00 M
AS MODIFIED:
Gov. Benjamin “Kokoy” Romualdez Diversion Road (S00255LT) K0908+265-K0908+472, Tacloban City
Physical Target: Allocation:
CW1-Asphalt Overlay: 0.800 Lane Km P 4.950 M
EAO P 0.050 M
Total P 5.00 M
|
December 2, 2021 |
2021 |
WIN1F06678 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Leyte-Samar Rd (via Guintigui-an) – K0904 +467 – K0904 +603
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 4.900 M
Road: 272 Lineal Meters
EAO P 0.100 M
Total P 5.00 M
AS MODIFIED:
Leyte-Samar Rd (via Guintigui-an) – K0904 + 459 – K0904 + 663, K0904 + 513 – K0904 + 536
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 4.900 M
Road: 227 Lineal Meters
EAO P 0.100 M
Total P 5.00 M
|
December 2, 2021 |
2021 |
WIN1F06321 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Ormoc-Baybay-Southern Leyte Bdry Rd - K1059 + 400 - K1059 + 610
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 1.6464 M
Road: 210.00 Lineal Meters
EAO P 0.0336 M
Total P 1.68 M
AS MODIFIED:
Ormoc-Baybay-Southern Leyte Bdry Rd - K1059 + 817 - K1060 + 019
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 1.6464 M
Road: 150.00 Lineal Meters
EAO P 0.0336 M
Total P 1.68 M
|
December 1, 2021 |
2021 |
WIN1C03417 |
GAA 2021 |
October 27, 2021 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Road - K0414 + 770 - K0414 +800, K0440 + 1020 - K0440 + 1080, K0441 + 810 - K0441 + 855, K0444 + 314 - K0444 + 344, K0446 + 036 - K0446 + 046, K0446 + 190 - K0446 + 220, K0446 + 240 - K0446 + 260;
Physical Target: CW1: 0 Square meters;
Allocation= Php 27,000,000
To: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Road - K0414 + 770 - K0414 +800, K0440 + 1020 - K0440 + 1080, K0441 + 810 - K0441 + 855, K0444 + 314 - K0444 + 344, K0446 + 036 - K0446 + 046, K0446 + 190 - K0446 + 220, K0446 + 240 - K0446 + 260;
Physical Target: CW1: 1,451 Square meters;
Allocation= Php 27,000,000
|
December 1, 2021 |
2021 |
WIN1C03419 |
GAA 2021 |
October 29, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Pagala Flood Control, Bucay, Abra;
Physical Target: CW1: 720 Lineal meters;
Allocation= Php 100,000,000
To: Construction of Pagala Flood Control, Bucay, Abra;
Physical Target: CW1: 536 Lineal meters;
Allocation= Php 100,000,000
|
November 23, 2021 |
FY 2021 GAA |
WIN1E01904 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Drainage Protection Works -Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Seawall at NHA Bangkal Relocation, Davao City
Physical Target:
CW1: 913.372 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Flood Mitigation Structure)
EAO: P 3,500,000.00
TO: Local Program - Flood Control and Drainage - Drainage Protection Works -Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Seawall at NHA Bangkal Relocation, Davao City
Physical Target:
CW1: 240.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Flood Mitigation Structure)
EAO: P 3,500,000.00 |
November 23, 2021 |
2021 |
WIN1E01922 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. : 320101106328000
Project ID: P00522129MN
OO2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Revetment along Agusan River Basin, Esperanza Section, Agusan del Sur
Type of Work:
CW1- Construction of Revetment
Physical Target:
CW1- 947.425 Lineal meters
Allocation:
TOTAL: P 120,000,000
CW1: P 115,800,000
EAO: P 4,200,000
Unit Cost:
CW1: P 122,226.03/Lineal meters
TO:
Construction of Revetment along Agusan River Basin, Esperanza Section, Agusan del Sur
Type of Work:
CW1- Construction of Revetment
Physical Target:
CW1- 258.2 Lineal meters
Allocation:
TOTAL: P 120,000,000
CW1: P 115,034,755
EAO: P 4,172,245
Excess: P 793,000
Unit Cost:
CW1: P 445,525.77/Lineal meters
|
November 18, 2021 |
2021 |
WIN1E01915 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. : 300116203535000
Project ID: P00550699MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Construction of Circumferential Road along Agusan Marsh Road, Bunawan Section (Phase 4), Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 12.151 Lane Km
Allocation:
TOTAL: P 130,000,000
CW1: P 125,450,000
EAO: P 4,550,000
Unit Cost:
CW1: P 10,324,253.15/Lane Km
TO:
Construction of Circumferential Road along Agusan Marsh Road, Bunawan Section (Phase 4), Agusan del Sur
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 1.84 Lane Km
Allocation:
TOTAL: P 130,000,000
CW1: P 125,297,576.51
EAO: P 4,544,471.69
Excess: P 157,951.80
Unit Cost:
CW1: P 68,096,508.97/Lane Km
|
November 17, 2021 |
2021 |
WIN1E01916 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. : 300116203509000
Project ID: P00550689MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Construction of Bunawan - Varuela Road (Phase 3), Bunawan, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 12.151 Lane Km
Allocation:
TOTAL: P 130,000,000
CW1: P 125,450,000
EAO: P 4,550,000
Unit Cost:
CW1: P 10,324,253.15/Lane Km
TO:
Construction of Bunawan - Veruela Road (Phase 3), Bunawan, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Slope Protection Structure
Physical Target:
CW1- 1.966 Lane Km
CW2- 19,349.57 Square meters
Allocation:
TOTAL: P 130,000,000
CW1: P 99,714,927.71
CW2: P 25,439,174.59
EAO: P 4,539,267.96
Excess: P 306,629.74
Unit Cost:
CW1: P 50,719,698.73/Lane Km
CW2: P 1,314.72/Square meters
|
November 17, 2021 |
2021 |
WIN1E01917 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. : 300116203536000
Project ID: P00550700MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Construction of Circumferential Road along Agusan Marsh Road, Bunawan Section (Phase 5), Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 12.151 Lane Km
Allocation:
TOTAL: P 130,000,000
CW1: P 125,450,000
EAO: P 4,550,000
Unit Cost:
CW1: P 10,324,253.15/Lane Km
TO:
Construction of Circumferential Road along Agusan Marsh Road, Bunawan Section (Phase 5), Agusan del Sur
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 2.08 Lane Km
Allocation:
TOTAL: P 130,000,000
CW1: P 125,387,861.76
EAO: P 4,547,746.28
Excess: 64,391.96
Unit Cost:
CW1: P 60,282,625.85/Lane Km
|
November 17, 2021 |
2021 |
WIN1C03394 |
SR2021-09-012382 |
September 9, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Cong. Andres Acop Cosalan Rd - K0315 + 115 - K0315 + 240;
Physical Target: CW1 : 3,970.5 Square meters;
Allocation= Php 100,000,000
To: Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Cong. Andres Acop Cosalan Rd - K0315 + 115 - K0315 + 240;
Physical Target: CW1 : 3,970.5 Square meters;
Allocation= Php 100,000,000
|
November 17, 2021 |
2021 |
WIN1C03398 |
GAA 2021 |
November 17, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Cong. Andres Acop Cosalan Rd - K0318 + 220 - K0318 + 410;
Physical Target: CW1 : 4,340 Square meters;
Allocation= Php 110,000,000
To: Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Cong. Andres Acop Cosalan Rd - K0318 + 220 - K0318 + 410;
Physical Target: CW1 : 4,340 Square meters;
Allocation= Php 110,000,000
|
November 17, 2021 |
2021 |
WIN1C03396 |
GAA 2021 |
November 17, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Benguet-Nueva Vizcaya Rd - K0276 + 040 - K0276 + 135, K0276 + 286 - K0276 + 386;
Physical Target: CW1 : 8,174 Square meters;
Allocation= Php 200,000,000
To: Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Benguet-Nueva Vizcaya Rd - K0276 + 040 - K0276 + 135, K0276 + 286 - K0276 + 386;
Physical Target: CW1 : 8,174 Square meters;
Allocation= Php 200,000,000
|
November 16, 2021 |
CY 2021 |
WIN1F05741 |
UACS No. 320101106000000 |
July 6, 2021 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 320101106000000
Project ID.: P00525520LZ
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Parañaque River Mouth (Phase I), Barangay Don Galo, Parañaque City
Physical Target: CW1 = Construction Flood Mitigation Structures 0 lineal meters
Unit Cost (P’000) = P 0 / l.m.
Allocation (P’000) = P 96,500.00
EAO (P’000) = P 3,500.00
Total (P’000) = P 100,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Parañaque River Mouth (Phase I), Barangay Don Galo, Parañaque City
Physical Target: CW1 = Construction Flood Mitigation Structures 1,018.75 lineal meters
Unit Cost (P’000) = P 94.72 / l.m.
Allocation (P’000) = P 96,500.00
EAO (P’000) = P 3,500.00
Total (P’000) = P 100,000.00
WIN1F05741
|
November 16, 2021 |
CY 2021 |
WIN1F05744 |
UACS No. 320101106001000 |
July 6, 2021 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 320101106001000
Project ID.: P00525521LZ
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Parañaque River Mouth (Phase II), Barangay Don Galo, Parañaque City
Physical Target: CW1 = Construction Flood Mitigation Structures 0 lineal meters
Unit Cost (P’000) = P 0 / l.m.
Allocation (P’000) = P 96,500.00
EAO (P’000) = P 3,500.00
Total (P’000) = P 100,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Parañaque River Mouth (Phase II), Barangay Don Galo, Parañaque City
Physical Target: CW1 = Construction Flood Mitigation Structures 1,642.53 lineal meters
Unit Cost (P’000) = P 58.75 / l.m.
Allocation (P’000) = P 96,500.00
EAO (P’000) = P 3,500.00
Total (P’000) = P 100,000.00
WIN1F05744
|
November 9, 2021 |
FY 2021 GAA |
WIN1F05736 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 320101106130000
Project ID : P00525650LZ
002 : Protect Lives and Properties
Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage Systems
FROM :
Construction of Carmen Shore Protection/Causeway Phase 2,
San Agustin, Romblon
Physical Target - CW1- Construction of Flood Mitigation Structure:
594.737 Lineal meters
Allocation - Php 60.00 Million
TO :
Construction of Carmen Shore Protection/Causeway,
San Agustin, Romblon
Physical Target - CW1- Construction of Flood Mitigation Structure:
89.29 Lineal meters
Allocation - Php 60.00 Million
|
November 9, 2021 |
FY 2021 GAA |
WIN1F05731 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300108200364000
Project ID : P00561190LZ
LOCAL PROGRAM
Local - Flood Control and Drainage - Drainage/Protection Works
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Constrion of Shore Protection leading to Seaport
along Poblacion, cajidiocan, Romblon
Physical Target - CW1- Construction of Flood Mitigation Structure:
117.398 Lineal meters
Allocation - Php 10.00 Million
TO :
Construction of Shore Protection leading to Seaport
along Poblacion, Cajidiocan, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure:
18.00 Lineal meters
Allocation - Php 10.00 Million
|
November 9, 2021 |
2021 |
WIN1C03401 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Regional Office III |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction /Improvement of Pantabangan - Canili Bypass Road, Aurora |
November 9, 2021 |
2021 |
WIN1C03400 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 1st District Engineering Office |
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Rehabilitation of Pampanga River, Sta. 0+000 - Sta. 0+017, Brgy. Lanang, Candaba, Pampanga
|
November 9, 2021 |
2021 |
WIN1C03403 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 1st District Engineering Office |
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Slope Protection along Pampanga River, Sta. 0+000 - Sta. 0+023, Candating Section, Arayat, Pampanga |
November 9, 2021 |
2021 |
WIN1C04492 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Zambales 1st District Engineering Office |
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection / Flood Control, Facilities at Tambak River Phase 3, Upstream, Sta. 0+869.55 - Sta. 1+012.55, Iba, Zambales |
November 5, 2021 |
FY 2021 GAA |
WIN1E01903 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Revetment along Talomo River, NHA Bangkal Section, Sta. 0+000 - Sta. 0+430, Left Bank, Davao City
Physical Target:
CW1: 430.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Revetment)
EAO: P 3,500,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Revetment along Talomo River, NHA Bangkal Section, Sta. 0+180 - Sta. 0+405, Left Bank, Davao City
Physical Target:
CW1: 255.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Revetment)
EAO: P 3,500,000.00 |
November 5, 2021 |
FY2021 |
WIN1B01276 |
300117210007000 |
April 23, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Brgy. Banting, Tapul, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.710 Lane Km.
Unit Cost: Php 13,943,661.97/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B00723 |
300117210008000 |
October 29, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Upper Tambaking-Duhol Kabbun Road, Brgy. Upper Tambaking, Maimbung, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.930 Lane Km.
Unit Cost: Php 10,645,161.29/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B01179 |
300117210009000 |
April 23, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Kan Hadjili-Sapang Road, Tandu-Bato, Luuk, Sulu
CW1: Construction of Concrete Road
Physical Target: 1.020 Lane Km.
Unit Cost: Php 9,705,882.353/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B00720 |
300117210010000 |
October 29, 2021 |
Region IX |
Regional Office IX |
Local - Local Road and Bridges - Local Roads - Local Infrastructure Program
Concreting of Labah Road, Brgy. Labah, Maimbung, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.960 Lane Km.
Unit Cost: Php 10,312,500.00
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B01175 |
300117210011000 |
April 17, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Brgy. Anuling, Patikul, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.734 Lane Km.
Unit Cost: Php 13,487,738.42/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B00707 |
300117210013000 |
October 26, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Brgy. Bualo Lahi, Maimbung, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.810 Lane Km.
Unit Cost: Php 11,000,000.00/lane km.
EAO: Php 90,000.00
Total Allocation: Php 9,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B01268 |
300117210014000 |
April 23, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Brgy, Buan, Siasi, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.910 Lane Km.
Unit Cost: 10,879,120.88/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B00719 |
300117210015000 |
October 29, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Brgy, Bulabog, Maimbung, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.780 Lane Km.
Unit Cost: 12,692,307.69/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B01182 |
300117210016000 |
April 23, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Brgy, Kalang, Tapul, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.700 Lane Km.
Unit Cost: 14,142,857.14/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B00722 |
300117210017000 |
October 29, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Brgy, Kandang and Brgy. Ratag Limpun, Maimbung, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.780 Lane Km.
Unit Cost: 11,423,076.92/lane km.
EAO: Php 90,000.00
Total Allocation: Php 9,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B00703 |
300117210018000 |
October 26, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Brgy, Kandang, Maimbung, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.820 Lane Km.
Unit Cost: 10,865,853.66/lane km.
EAO: Php 90,000.00
Total Allocation: Php 9,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B00702 |
300117210019000 |
October 26, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Brgy, Kapok Ponggol, Maimbung, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.894 Lane Km.
Unit Cost: 11,073,525.50/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B01185 |
300117210020000 |
April 23, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Brgy, Kihi, Pangutaran, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.828 Lane Km.
Unit Cost: 11,956,521.74/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B00721 |
300117210021000 |
October 29, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Brgy, Labah, Maimbung, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.968 Lane Km.
Unit Cost: 10,227,272.73/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B00705 |
300117210022000 |
October 26, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Brgy, Lagasan Asibih, Maimbung, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.820 Lane Km.
Unit Cost: 10,865,853.66/lane km.
EAO: Php 90,000.00
Total Allocation: Php 9,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B00711 |
300117210023000 |
October 29, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Brgy, Lower Tambaking and Brgy. Tabu-Bato, Maimbung, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.790 Lane Km.
Unit Cost: 11,278,481.01/lane km.
EAO: Php 90,000.00
Total Allocation: Php 9,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B00704 |
300117210024000 |
October 26, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Brgy, Lower Tambaking, Maimbung, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.900 Lane Km.
Unit Cost: 11,000,000.00/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B01180 |
300117210025000 |
April 23, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Brgy, Parian Kayawan, Lugus, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.860 Lane Km.
Unit Cost: 11,511,627.91/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B01181 |
300117210026000 |
April 23, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Brgy, Pitogo, Kalingalan Caluang, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.940 Lane Km.
Unit Cost: 10,531,914.89/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B01266 |
300117210027000 |
April 23, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Brgy, Ratag, Pandami, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.740 Lane Km.
Unit Cost: 13,378,378.38/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B01273 |
300117210028000 |
April 23, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Brgy, Siowing, Siasi, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.768 Lane Km.
Unit Cost: 12,890,625.00/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B01154 |
300117210029000 |
April 17, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Brgy, Tandoh, Patikul, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.860 Lane Km.
Unit Cost: 11,511,627.91/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B00725 |
300117210030000 |
October 29, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Brgy, Upper Tambaking, Maimbung, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.910 Lane Km.
Unit Cost: 10,879,120.88/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B00714 |
300117210031000 |
October 29, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Kan Pitak, Maimbung, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.890 Lane Km.
Unit Cost: 11,123,595.51/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B00712 |
300117210032000 |
October 29, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Laum Maimbung Housing, Maimbung, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.860 Lane Km.
Unit Cost: 11,511,627.91/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B01190 |
300117210033000 |
April 23, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Lukboh, Pata, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.660 Lane Km.
Unit Cost: 15,000,000.00/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B00706 |
300117210034000 |
October 26, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Main Road to Lagaklak, Maimbung, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.850 Lane Km.
Unit Cost: 11,647,058.82/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B00727 |
300117210036000 |
October 29, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Sultan Jamalul Kiram, Laum Maimbung, Maimbung, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.970 Lane Km.
Unit Cost: 10,206,185.57/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B00713 |
300117210037000 |
October 29, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Tambuang, Brgy. Tubig Samin, Maimbung, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.910 Lane Km.
Unit Cost: 10,879,120.88/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B01159 |
300117210038000 |
April 17, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road at Tanjung, Brgy. Kajatian, Indanan, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.930 Lane Km.
Unit Cost: 10,645,161.29/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
November 5, 2021 |
FY2021 |
WIN1B00715 |
300117210039000 |
October 29, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Darul Jambanganat Brgy. Matatal, Maimbung, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.654 Lane Km.
Unit Cost: 10,596,330.28/lane km.
EAO: Php 70,000.00
Total Allocation: Php 7,000,000.00 |