July 8, 2021 |
2021 |
WIN1C04170 |
GAA 2021 |
June 30, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Isit Flood Control Phase III, Sta. 0+200 - Sta. 0+700, Dolores, Abra;
Physical Target: CW1: 94.80 Lineal meters;
Allocation= Php 20,000,000
To: Construction of Isit Flood Control Phase III, Sta. 0+200 - Sta. 0+700, Dolores, Abra;
Physical Target: CW1: 270 Lineal meters;
Allocation= Php 20,000,000
|
July 8, 2021 |
2021 |
WIN1C04167 |
GAA 2021 |
June 11, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Rehabilitation/Construction of Sinalang - Peñarrubia Road Phase II, Peñarrubia, Abra;
Physical Target: CW1: 9.27 Lane Km;
Allocation= Php 50,000,000
To: Rehabilitation/Construction of Sinalang - Peñarrubia Road Phase II, Peñarrubia, Abra;
Physical Target: CW1: 8.2 Lane Km;
Allocation= Php 50,000,000
|
July 8, 2021 |
CY 2021 |
WIN1F06504 |
UACS NO. 310205100511000 |
May 20, 2021 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 310205100511000
Project ID.: P00506023LZ
OO1: Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links/ New Roads
Laguna Lake Highway Extension (Phase 1), Taguig City
Physical Target: CW1 = Construction Concrete Road 1080 Lane Km
Unit Cost (P’000) = P 10,722.22 / Lane Km.
Allocation (P’000) = P 115,800.00
EAO (P’000) = P 4,200.00
Total (P’000) = P 120,000.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links/ New Roads
Laguna Lake Highway Extension (Phase 1), Taguig City
Physical Target: CW1 = Construction Concrete Road 2.06 Lane Km
CW2 = Construction of Concrete Bridge 124.20 sq.m.
RROW = 1,428.57 sq.m.
Unit Cost (P’000) = P 47,033.48 / Lane Km. P 94M/km
= P 71.75/ sq.m.
= P 7.00/ sq.m.
Allocation (P’000) = P 96,888.96
= P 8,911.04
= P10,000.00
EAO (P’000) = P 4,200.00
Total (P’000) = P 120,000.00
WIN1F06504
|
July 8, 2021 |
2021 |
WIN1E02378 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. 310201100721000
Project ID: P00501598MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1364 + 000 - K1367 + 000
Type of Work/Physical Target:
CW1 - Road Widening / 6.000 lane km.
Unit Cost: Php 16,887,500 / lane km.
Allocation: Php 101,325,000
EAO: Php 3,675,000
Total: Php 105,000,000
TO:
Daang Maharlika (Agusan-Davao Sect) - K1360 + 540 - K1361 + 000, K1364 + 000 - K1364 + 680
Type of Work/Physical Target:
CW1 - Road Widening / 2.280 lane km.
Unit Cost: Php 44,440,789.47 / lane km.
Estimated Cost: Php 101,325,000
EAO: Php 3,675,000
Total: Php 105,000,000
|
July 8, 2021 |
2021 |
WIN1C04187 |
GAA 2021 |
July 5, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Ilocos Norte Rd - K0430+180 - K0430 + 300;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 0.24 Lane Km;
Allocation= Php 100,000,000
To: Abra-Ilocos Norte Rd - K0450+000 - K0450 + 500;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 1 Lane Km
CW2: 3,782.34 Square meters;
Allocation= Php 100,000,000
|
July 8, 2021 |
CY 2021 |
WIN1F06429 |
UACS NO. 320101106449000 |
February 24, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106449000
Project ID.: P00525815LZ
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero dela Reina, Barangay 59, 52 Sta.0+944.90 to
Sta.0+982.30, Manila City
Physical Target: CW1 – Construction of Flood Mitigation Structure 92.50 l.m.
Unit Cost (P’000) = P 317.83 / l.m.
Allocation (P’000) = P 29,400.00
EAO (P’000) = P 600.00
Total (P’000) = P 30,000.00
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero dela Reina, Barangay 59, 52 (LS) Sta.0+903.00 to
Sta.0+949.00, (RS) Sta. 0+911.70 to Sta. 0+958.20, Manila City
Physical Target: CW1 – Construction of Flood Mitigation Structure 92.50 l.m.
Unit Cost (P’000) = P 317.83 / l.m.
Allocation (P’000) = P 29,400.00
EAO (P’000) = P 600.00
Total (P’000) = P 30,000.00
WIN1F06429
|
July 8, 2021 |
CY 2021 |
WIN1F06429 |
UACS NO. 320101106449000 |
February 24, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106449000
Project ID.: P00525815LZ
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero dela Reina, Barangay 59, 52 Sta.0+944.90 to
Sta.0+982.30, Manila City
Physical Target: CW1 – Construction of Flood Mitigation Structure 92.50 l.m.
Unit Cost (P’000) = P 317.83 / l.m.
Allocation (P’000) = P 29,400.00
EAO (P’000) = P 600.00
Total (P’000) = P 30,000.00
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero dela Reina, Barangay 59, 52 (LS) Sta.0+903.00 to
Sta.0+949.00, (RS) Sta. 0+911.70 to Sta. 0+958.20, Manila City
Physical Target: CW1 – Construction of Flood Mitigation Structure 92.50 l.m.
Unit Cost (P’000) = P 317.83 / l.m.
Allocation (P’000) = P 29,400.00
EAO (P’000) = P 600.00
Total (P’000) = P 30,000.00
WIN1F06429
|
July 8, 2021 |
2021 |
WIN1E02376 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. 320102104204000
Project ID: P00522339MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
FROM:
Rehabilitation of Flood Control Structure along Tago River(Package 2), San Miguel, Surigao del Sur
Type of Work/Physical Target:
CW1 - Rehabilitation / Major Repair of Flood Control Structure / 844.488 lm.
Unit Cost: Php 130,268.28 / lm.
Allocation: Php 110,010,000
EAO: Php 3,950,000
Total: Php 114,000,000
TO:
Rehabilitation of Flood Control Structure along Tago River(Package 2), San Miguel, Surigao del Sur
Type of Work/Physical Target:
CW1 - Major Repair of Flood Control Structure / 245 lm.
Unit Cost: Php 449,020.41 / lm.
Estimated Cost: Php 110,010,000
EAO: Php 3,950,000
Total: Php 114,000,000 |
July 8, 2021 |
2021 |
WIN1E02494 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. 300203101444000
Project ID: P00537633MN
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
New Tubigon leading to Pinandagatan Falls,Sibagat, Agusan del Sur
Type of Work/Physical Target:
CW1 - Construction of Concrete Road / 5.0 lane km.
Unit Cost: Php 19,725,565.00 / lane km.
Allocation: Php 98,627,825
EAO: Php 3,577,175
Total: Php 102,205,000
TO:
New Tubigon leading to Pinandagatan Falls,Sibagat, Agusan del Sur
Type of Work/Physical Target:
CW1 - Construction of Concrete Road / 0.40 lane km.
CW2 - Construction of Gravel Road / 1.28 lane km.
Unit Cost: CW1 Php 16,432,724.75 / lane km.
CW2 Php 71,917,761.80 / lane km.
Estimated Cost: CW1 Php 6,573,089.90
CW2 Php 92,054,735.11
EAO: Php 3,577,175
Total: Php 102,205,000
|
July 7, 2021 |
CY 2021 |
WIN1F06468 |
UACS NO. 300209100009000 |
April 5, 2021 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 300209100009000
Project ID.: P00531637LZ
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Railway Stations
Road 20 leading to Tandang Sora Station, Quezon City
Physical Target: CW1 = Construction of Drainage Structure 1600 l.m.
CW2 = Shoulder Paving / Construction 3200 sq.m.
Unit Cost (P’000) = P 6.13 / l.m.
= P 2.03 / sq.m.
Allocation (P’000) = P 9,557.36
= P 6,307.24
EAO (P’000) = P 575.40
Total (P’000) = P 16,440.00
As Modified
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Railway Stations
Road 20 leading to Tandang Sora Station, Quezon City
Physical Target: CW1 = Shoulder Paving/Construction 2484 sq.m.
Unit Cost (P’000) = P 5.61 / sq.m.
Allocation (P’000) = P 13,946.84
EAO (P’000) = P 488.14
Total (P’000) = P 14,434.98
Excess (P’000) = P 2,005.02
WIN1F06468
|
July 7, 2021 |
2021 |
WIN1F06454 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Tacloban-Baybay South Rd -K0911+000 – K0911+185
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 4.900 M
along Road: 370 Lineal Meters
EAO P 0.100 M
Total P 5.00 M
AS MODIFIED:
Tacloban-Baybay South Rd K0911+000 – K0911+185
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 4.900 M
along Road: 185 Lineal Meters
EAO P 0.100 M
Total P 5.00 M
|
July 7, 2021 |
2021 |
WIN1F06452 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Burgos St – (S00031LT) Chainage 000 – Chainage 845
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 22.540 M
along Road: 1,690 Lineal Meters
EAO P 0.460 M
Total P 23.00 M
AS MODIFIED:
Burgos St – (S00031LT) Chainage 000 – Chainage 688
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 22.540 M
along Road: 688 Lineal Meters
EAO P 0.460 M
Total P 23.00 M
|
July 7, 2021 |
2021 |
WIN1F06342 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Sn Policarpo-Arteche-Lapinig Rd - K0851 + 050 - K0851 + 200, K0851 + 350 - K0851 + 841
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement: P 28.572880 M
1.282 Lane Km
EAO P 0.583120 M
Total P 29.156 M
AS MODIFIED:
Sn Policarpo-Arteche-Lapinig Rd - K0851 + 050 - K0851 + 200, K0851 + 350 - K0852 + 176
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement: P 28.572880 M
1.960 Lane Km
EAO P 0.583120 M
Total P 29.156 M
|
July 7, 2021 |
2021 |
WIN1F06451 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Leyte 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Kiling-Tanauan-Tabontabon-Julita Rd - K0934 + 906 - K0935 + 000, K0936 + 000 - K0937 + 000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 10.29392 M
Concrete Reblocking: 2.188 Lane Km
EAO P 0.21008 M
Total P 10.504 M
AS MODIFIED:
Kiling-Tanauan-Tabontabon-Julita Rd - K0932 + (-638) - K0932 + 688, K0934 + 609 - K0935 + 000, K0936 + 000 - K0937 + 000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 10.29392 M
Concrete Reblocking: 1.0935 Lane Km
EAO P 0.21008 M
Total P 10.504 M
|
July 7, 2021 |
2021 |
WIN1F06474 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Leyte 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
La Paz-Javier-Bito Rd - K0066 + 000 - K0065 + 000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 9.80 M
Concrete Reblocking: 2.122 Lane Km
EAO P 0.20 M
Total P 10.00 M
AS MODIFIED:
La Paz-Javier-Bito Rd - K0066 + 000 - K0065 + 000, K0952 + 000 - K0953 + 142
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 9.80 M
Concrete Reblocking: 1.0215 Lane Km
EAO P 0.20 M
Total P 10.00 M
|
July 7, 2021 |
2021 |
WIN1F06439 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Leyte 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Mayorga-La Paz Rd - K0946 + 550 - K0947 + 215
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 6.05738 M
Concrete Reblocking: 1.246 Lane Km
EAO P 0.12362 M
Total P 6.181 M
AS MODIFIED:
Mayorga-La Paz Rd - K0946 + (-026) - K0947 + 221.60
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 6.05738 M
Concrete Reblocking: 1.278 Lane Km
EAO P 0.12362 M
Total P 6.181 M
|
July 7, 2021 |
2021 |
WIN1F06354 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
AS PER GAA/ORIGINAL:
Sn Policarpo-Arteche-Lapinig Rd - K0866 + 000 - K0866 + 959
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 10.77216 M
Asphalt Overlay: 1.918 Lane Km
EAO P 0.21984 M
Total P 10.992 M
AS MODIFIED:
Sn Policarpo-Arteche-Lapinig Rd - K0866 + 000 - K0866 + 839
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 10.77216 M
Asphalt Overlay: 1.678 Lane Km
EAO P 0.21984 M
Total P 10.992 M
|
July 7, 2021 |
2021 |
WIN1C04137 |
FY 2021 GAA |
December 1, 2020 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Manila North Road - K0065+357 - K0065+562 |
July 7, 2021 |
2021 |
WIN1C04116 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Baliwag - Candaba - Sta. Ana Rd, K0075+220 - K0075+650 (Sta. Ana Section) |
July 7, 2021 |
2021 |
WIN1F06450 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Rizal Avenida Ext Rd – K0905+(-440) – K0905+(-182), K0905+(-836) - K0905+(-440)
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 14.700 M
Asphalt Overlay: 2.616 Lane Km
EAO P 0.300 M
Total P 15.00 M
AS MODIFIED:
Rizal Avenida Ext Rd – (S00016LT) - K0905+(-836) - K0905+(-248)
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 14.700 M
Asphalt Overlay: 2.352 Lane Km
EAO P 0.300 M
Total P 15.00 M
|
July 7, 2021 |
2021 |
WIN1C04114 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation - Preventive Maintenance - Primary Roads
Manila North Road , K0063+355 - K0063+800 |
July 7, 2021 |
2021 |
WIN1F06392 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Burgos St – (S00008LT) Chainage 0 – Chainage 450
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 9.832340 M
Asphalt Overlay: 1.744 Lane Km
EAO P 0.200660 M
Total P 10.033 M
AS MODIFIED:
Burgos St – (S00008LT) Chainage 0 – Chainage 450
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 9.832340 M
Asphalt Overlay: 1.438 Lane Km
EAO P 0.200660 M
Total P 10.033 M
|
July 7, 2021 |
2021 |
WIN1F06391 |
GAA FY 2021 |
January 2, 2021 |
Region VIII |
Eastern Samar District Engineering Office |
OO2: Protect Lives and Properties
Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Balangiga Flood Control along Balangiga River, Balangiga, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Flood Mitigation Structure: P 49.00 M
472.789 Lineal Meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Construction of Balangiga Flood Control along Balangiga River, Balangiga, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Flood Mitigation Structure: P 49.00 M
127.00 Lineal Meters
EAO P 1.00 M
Total P 50.00 M
|
July 7, 2021 |
2021 |
WIN1F06462 |
SR2021-02-000134 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Ibajay Bypass Road, Aklan
CW1- Construction of Concrete Road: 2.600 lane km - 38,600.00
ROW Acquisition: 22,000 sq.m - 28,950.00
EAO - 2,450.00
Total: 70,000.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Ibajay Bypass Road, Aklan
CCW1- Construction of Concrete Road: 1.733 lane km - 39,200.00
ROW Acquisition: 22,000 sq.m - 28,350.00
EAO - 2,450.00
Total: 70,000.00
|
July 7, 2021 |
2021 |
WIN1F06326 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Leyte 2nd District Engineering Office |
OO2: Protect Lives and Properties
Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Binahaan Flood Control Structure and Drainage system, Binahaan River Basin, K002+847 - K003+622 (Left Side River Bank), Pastrana, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 49.00 M
Structure: 663.25 Lineal Meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Construction of Binahaan Flood Control Structure and Drainage system, Binahaan River Basin, K000+850 - K001+513.25 (Right Side River Bank), Pastrana, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 49.00 M
Structure: 663.25 Lineal Meters
EAO P 1.00 M
Total P 50.00 M
|
July 7, 2021 |
2021 |
WIN1F06475 |
SR2021-02-000156 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Tangalan Bypass Road, Aklan
CW1- Construction of Concrete Road: 3.00 lane km - 43,425.00
ROW Acquisition: 5,000 sq.m - 24,125.00
EAO - 2,450.00
Total: 70,000.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Tangalan Bypass Road, Aklan
CW1- Construction of Concrete Road: 1.64 lane km - 44,100.00
ROW Acquisition: 5,000 sq.m - 23,450.00
EAO - 2,450.00
Total: 70,000.00
|
July 7, 2021 |
2021 |
WIN1F06475 |
SR2021-02-000156 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Tangalan Bypass Road, Aklan
CW1- Construction of Concrete Road: 3.00 lane km - 43,425.00
ROW Acquisition: 5,000 sq.m - 24,125.00
EAO - 2,450.00
Total: 70,000.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Tangalan Bypass Road, Aklan
CW1- Construction of Concrete Road: 1.64 lane km - 44,100.00
ROW Acquisition: 5,000 sq.m - 23,450.00
EAO - 2,450.00
Total: 70,000.00
|
July 7, 2021 |
FY 2021 GAA |
WIN1F06315 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 1st District Engineering Office |
UACS No. : 300117209138000
Project ID : P00564691LZ
LOCAL PROGRAM
Local roads and Bridges - Local Roads
Local Infrastructure Program
FROM :
Construction of Road from
Sitio Tibonbon to San Teodoro, Brgyu. Poblacion 5,
Coron, Palawan
Physical Target - CW1 - Construction of Concrete Road :
0.506 Lane Km
Allocation : Php 3.00 Million
TO :
Construction of Road in Brgy. Poblacion 5,
Coron, Palawan
Physical Target - CW1 - Construction of Concrete Road :
0.506 Lane Km
Allocation : Php 3.00 Million |
July 7, 2021 |
FY 2021 GAA |
WIN1F06218 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 310202100817000
Project ID : P00505134LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
PPSR Lct ( Abo-abo ) - Quezon Road,
K0129 + (-572) - K0129 + 975
Physical Target - CW1 - Road Widening : 3.094 Lane Km
Allocation : Php 32.394 Million
TO :
PPSr Jct ( Abo - abo) - Quezon Road,
K0129 + (-572) - K0129 + 544
Physical Target - CW1 - Road Widening : 2.232 Lane Km
Allocation : Php 32.394 Million |
July 7, 2021 |
2021 |
WIN1F06466 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
Local Program
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
AS PER GAA/ORIGINAL:
Concreting of Roads (Barangay Hampipila, Barangay Burubud-an, Barangay Mag-atubang), Abuyog, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road: P 1.485 M
0.130 Lane Km
EAO P 0.015 M
Total P 1.500 M
AS MODIFIED:
Concreting of Roads (Barangay Hampipila, Barangay Burubud-an, Barangay Mag-atubang), Abuyog, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road: P 1.485 M
0.694 Lane Km
EAO P 0.015 M
Total P 1.500 M
|
July 7, 2021 |
2021 |
WIN1F06471 |
SR2021-02-000141 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 650.77 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 700.40 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
|
July 7, 2021 |
2021 |
WIN1F06471 |
SR2021-02-000141 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 650.77 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 700.40 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
|
July 7, 2021 |
2021 |
WIN1F06471 |
SR2021-02-000141 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 650.77 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 700.40 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
|
July 7, 2021 |
2021 |
WIN1F06471 |
SR2021-02-000141 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 650.77 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 700.40 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
|
July 7, 2021 |
2021 |
WIN1F06471 |
SR2021-02-000141 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 650.77 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 700.40 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
|
July 7, 2021 |
2021 |
WIN1F06471 |
SR2021-02-000141 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 650.77 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 700.40 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
|
July 7, 2021 |
2021 |
WIN1F06465 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
Local Program
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
AS PER GAA/ORIGINAL:
Rehabilitation of Barangay Road, Barangay Hinabay, Inopacan, Leyte
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 1.00 M
0.00 Lane Km
Total P 1.00 M
AS MODIFIED:
Rehabilitation of Barangay Road, Barangay Hinabay, Inopacan, Leyte
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 1.00 M
0.306 Lane Km
Total P 1.00 M
|
July 7, 2021 |
2021 |
WIN1F06471 |
SR2021-02-000141 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 650.77 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 700.40 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
|
July 7, 2021 |
2021 |
WIN1F06471 |
SR2021-02-000141 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 650.77 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 700.40 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
|
July 7, 2021 |
2021 |
WIN1F06471 |
SR2021-02-000141 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 650.77 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 700.40 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
|
July 7, 2021 |
2021 |
WIN1C04183 |
GAA 2021 |
June 30, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction/Improvement of Dada - Beyeng - Kayapa Road, Dada, Beyeng and Kayapa, Bakun, Benguet;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 100,000,000
To: Construction/Improvement of Dada - Beyeng - Kayapa Road, Dada, Beyeng and Kayapa, Bakun, Benguet;
Physical Target: CW1 : 5 Lane Km;
Allocation= Php 100,000,000
|
July 7, 2021 |
2021 |
WIN1F06471 |
SR2021-02-000141 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 650.77 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 700.40 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
|
July 7, 2021 |
2021 |
WIN1F06425 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Leyte 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0935 + (-414) - K0936 + 086
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 29.40 M
Structure: 6,706.408 Square Meters
EAO P 0.60 M
Total P 30.00 M
AS MODIFIED:
Daang Maharlika (LT) - K0935 + (-604) - K0935 + (-508)
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 29.40 M
Structure: 2,188.00 Square Meters
EAO P 0.60 M
Total P 30.00 M
|
July 7, 2021 |
CY 2021 |
WINF106427 |
UACS NO. 300104219173000 |
April 26, 2021 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
Local – Buildings And As per GAA/Original
UACS No. 300104219173000
Project ID.: P00557343LZ
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building (Covered Court) Phase 2, Barangay Parada, Valenzuela City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 4,950.0 / No. of Bldg.
Allocation (P’000) = P 4,950.00
EAO (P’000) = P 50.00
Total (P’000) = P 5,000.00
As Modified
Local Program
Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building (Covered Court) Phase 3, Barangay Parada, Valenzuela City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 4,950.0 / No. of Bldg.
Allocation (P’000) = P 4,950.00
EAO (P’000) = P 50.00
Total (P’000) = P 5,000.00
WIN1F06427
|
July 7, 2021 |
2021 |
WIN1C04160 |
GAA 2021 |
June 30, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Mt Prov-Cagayan via Tabuk-Enrile Rd - K0417 + 400 - K0417 + 750;
Physical Target: CW1 : 3,835 Square meters;
Allocation= Php 100,000,000
To: Mt Prov-Cagayan via Tabuk-Enrile Rd - K0404 + 955 - K0405 + 060;
Physical Target: CW1 : 4,135.50 Square meters;
Allocation= Php 100,000,000
|
July 7, 2021 |
CY 2021 |
WIN1F06420 |
UACS NO. 310103100643000 |
March 4, 2021 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 310103100643000
Project ID.: P00505520LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Kamias Road Rd – K0010+153 – K0010+730
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=2.308 lane km
Unit Cost (P’000) = P 4,336.54/ lane km
Allocation (P’000) = P 10,008.74
EAO (P’000) = P 204.26
Total (P’000) = P 10,213.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Kamias Road Rd – K0010+153 – K0010+506
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=1.412 lane km
Unit Cost (P’000) = P 7,088.34/ lane km P14M/km
Allocation (P’000) = P 10,008.74
EAO (P’000) = P 204.26
Total (P’000) = P 10,213.00
WIN1F06420
|
July 7, 2021 |
2021 |
WIN1F06421 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Leyte 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Palo-Carigara-Ormoc Rd - K0972 + 760 - K0973 + 280
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 33.026 M
Structure: 2,807.048 square meters
EAO P 0.674 M
Total P 33.700 M
AS MODIFIED:
Palo-Carigara-Ormoc Rd - K0972 + 776.13 - K0973 + 041.13
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 33.026 M
Structure: 1,883.00 square meters
EAO P 0.674 M
Total P 33.700 M
|
July 6, 2021 |
2021 |
WIN1E02290 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 300117210458000
Project ID: P00551467MN
FROM:
LOCAL PROGRAM - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction/Rehabilitation (Completion) of Local Road, Barangay Poblacion, Bacuag, Surigao Del Norte
Type of Work/Physical Target:
CW1 - Construction of Concrete Road / 0.187 lane km.
Unit Cost: Php 10,588,235.29 / lane km.
Allocation: Php 1,980,000.00
EAO: Php 20,000.00
Total: Php 2,000,000.00
TO:
LOCAL PROGRAM - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction/Rehabilitation (Completion) of Local Road, Barangay Poblacion, Bacuag, Surigao Del Norte
Type of Work/Physical Target:
CW1 - Construction of Concrete Road / 0.277 lane km.
Unit Cost: Php 7,148,014.44 / lane km.
Estimated Cost: Php 1,980,000.00
EAO: Php 20,000.00
Total: Php 2,000,000.00 |
July 6, 2021 |
FY 2021 GAA |
WIN1E02427 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Jct. Davao - Bukidnon Road (Calinan Section) - Wangan - Subasta - Tagakpan - Tungkalan - Tagurano - Catigan - Baracatan - Sibulan - Tibolo - Kapatagan Road, (Package C), Davao City
Physical Target:
CW1: 1.628 Lane Km (Construction of Concrete Road)
CW2: 0.772 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 120,967,000.00
CW1: P 42,460,000.00 (Construction of Concrete Road)
CW2: P 74,273,155.00 (Reconstruction to Concrete Pavement)
EAO: P 4,233,845.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Jct. Davao - Bukidnon Road (Calinan Section) - Wangan - Subasta - Tagakpan - Tungkalan - Tagurano - Catigan - Baracatan - Sibulan - Tibolo - Kapatagan Road, (Package C), Davao City
Physical Target:
CW1: 0.828 Lane Km (Construction of Concrete Road)
CW2: 0.772 Lane Km (Reconstruction to Concrete Pavement)
CW3: 286.20 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 120,967,000.00
CW1: P 31,321,129.00 (Construction of Concrete Road)
CW2: P 55,966,686.00 (Reconstruction to Concrete Pavement)
CW3: P 29,445,340.00 (Construction of Concrete Bridge)
EAO: P 4,233,845.00 |
July 6, 2021 |
FY 2021 GAA |
WIN1E02431 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Davao-Cotabato Old Rd - K1520+029 - K1521+361
Physical Target:
CW1: 7.932 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 37,281,000.00
CW1: P 36,535,380.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 745,620.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Davao-Cotabato Old Rd - K1520+029 - K1520+683
Physical Target:
CW1: 2.616 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 37,281,000.00
CW1: P 36,535,380.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 745,620.00 |
July 6, 2021 |
FY 2021 GAA |
WIN1E02453 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way -
K1728+730.167 - K1728+ 823.101, K1728+849.473 - K1728+911.375,
K1729+267.105 - K1729+ 287.105, K1735+820.448 - K1735+850
Physical Target:
CW1: 6,786.50 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 130,000,000.00
CW1: P 125,450,000.00 (Construction of Road Slope Protection Structure)
EAO: P 4,550,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way - K1729+001 - K1729+104
K1729+445 - K1729+521, K1729+932 - K1730+016
Physical Target:
CW1: 3,398.41 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 130,000,000.00
CW1: P 125,450,000.00 (Construction of Road Slope Protection Structure)
EAO: P 4,550,000.00 |
July 6, 2021 |
FY 2021 GAA |
WIN1E02428 |
FY 2021 GAA RA 11518 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
5th Ave - K1510+(-822) - K1510+(-512)
Physical Target:
CW1: 1.800 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 13,618,000.00
CW1: P 13,345,640.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 272,360.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
5th Ave - K1510+475 - K1510+599
Physical Target:
CW1: 0.890 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 13,618,000.00
CW1: P 13,345,640.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 272,360.00 |
July 6, 2021 |
FY 2021 GAA |
WIN1E02429 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road at Cebole, Sitio Galacia, Brgy. Colosas, Paquibato District, Davao City
Physical Target:
CW1: 7.951 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 79,476,000.00
CW1: P 76,694,340.00 (Construction of Concrete Road)
EAO: P 2,781,660.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road at Cebole, Sitio Galacia, Brgy. Colosas, Paquibato District, Davao City
Physical Target:
CW1: 2.640 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 79,476,000.00
CW1: P 76,694,340.00 (Construction of Concrete Road)
EAO: P 2,781,660.00 |
July 6, 2021 |
FY 2021 GAA |
WIN1E02439 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Revetment along Hijo River at Barangay New Asturias, Mawab, Davao de Oro
Physical Target:
CW1: 140.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Flood Mitigation Structure)
EAO: P 400,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Revetment along Hijo River at Barangay New Asturias, Maco, Davao de Oro
Physical Target:
CW1: 140.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Flood Mitigation Structure)
EAO: P 400,000.00 |
July 6, 2021 |
FY 2021 GAA |
WIN1E02435 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Prosperidad, Montevista to Casoon, Monkayo, Davao de Oro
Physical Target:
CW1: 3.380 Lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,500,000.00 (Construction of Concrete Road)
EAO: P 500,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Prosperidad, Montevista to Casoon, Monkayo, Davao de Oro
Physical Target:
CW1: 4.691 Lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,500,000.00 (Construction of Concrete Road)
EAO: P 500,000.00 |
July 5, 2021 |
2021 |
WIN1C04109 |
GAA 2021 |
June 25, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: City Limit-Sto Tomas Rd - K0262 + 005 - K0262 + 150, K0263 + 250 - K0263 + 400;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1 : 0.59 Lane Km;
Allocation= Php 200,000,000
To: City Limit-Sto Tomas Rd - K0255 + 1085 - K0255 + 1098.50, K0255 + 1806.50 - K0255 + 1857, K0258 + 454 – K0258 + 478.50, K0258 + 801 - K0258 + 847, K0259 + 065.50 - K0259 + 097.50, K0259 + 277 - K0259 + 292, K0259 + 336.50 - K0259 + 492, K0259 + 606 - K0259 + 612.50, K0259 + 684.50 - K0259 + 785, K0259 + 813 - K0259 + 840, K0259 + 927 - K0259 + 1093, K0260 + 000 - K0260 + 077, K0261 + 064 - K0261 + 088, K0261 + 693 - K0261 + 715.50, K0262 + 000 - K0262 + 180, K0262 + 522 - K0262 + 636, K0263 + 416 - K0263 + 478;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1 : 1.244 Lane Km
CW2: 6,754 Square meters;
Allocation= Php 200,000,000
|
July 5, 2021 |
2021 |
WIN1C04124 |
GAA 2021 |
June 25, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction/Improvement of Beyeng - Tacadang Road, Tacadang, Kibungan, Benguet;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 100,000,000
To: Construction/Improvement of Beyeng - Tacadang Road, Tacadang, Kibungan, Benguet;
Physical Target: CW1 : 6.36 Lane Km;
Allocation= Php 100,000,000
|
July 5, 2021 |
2021 |
WIN1C04091 |
GAA 2021 |
June 28, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Nueva Vizcaya-Ifugao-Mt. Province Bdry Rd - K0312 + 060 - K0314 + 000, K0321 + 232 - K0322 + 374, K0323 + 770 - K0334 + 500;
Physical Target: CW1 : 27.846 Lane Km;
Allocation= Php 20,000,000
To: Nueva Vizcaya-Ifugao-Mt. Province Bdry Rd - K0312 + 060 - K0313+ 677;
Physical Target: CW1 : 3.246 Lane Km;
Allocation= Php 20,000,000
|
July 5, 2021 |
2021 |
WIN1C04066 |
GAA 2021 |
June 22, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Ilocos Norte Rd - K0434+460 - K0434 + 550;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 0.18 Lane Km;
Allocation= Php 100,000,000
To: Abra-Ilocos Norte Rd - K0450 + 800 - K0451 + 000;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 0.4 Lane Km
CW2: 3,878.73 Square meters;
Allocation= Php 100,000,000
|
July 5, 2021 |
2021 |
WIN1C04061 |
GAA 2021 |
June 22, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Patoc Flood Control, Sta. 0+100 - 0+600, Bucay, Abra;
Physical Target: CW1: 500 Lineal meters;
Allocation= Php 30,000,000
To: Construction of Patoc Flood Control, Sta. 0+100 - 0+600, Bucay, Abra;
Physical Target: CW1: 665 Lineal meters;
Allocation= Php 30,000,000
|
July 5, 2021 |
2021 |
WIN1C04096 |
GAA 2021 |
June 28, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0455 + 500 - K0456 + 600;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 2.134 Lane Km;
Allocation= Php 99,000,000
To: Abra-Kalinga Rd - K0455 + 100 - K0456 + 600; Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 2.934 Lane Km
CW2: 2,922.93 Square meters;
Allocation= Php 99,000,000
|
July 5, 2021 |
2021 |
WIN1C04095 |
GAA 2021 |
June 28, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Ilocos Norte Rd - K0432+200 - K0432 + 500;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 0.60 Lane Km;
Allocation= Php 99,000,000
To: Abra-Ilocos Norte Rd - K0432+200 - K0432 + 500;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 0.60 Lane Km
CW2: 3,751.56 Square meters;
Allocation= Php 99,000,000
|
July 5, 2021 |
2021 |
WIN1C04099 |
GAA 2021 |
June 28, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Cervantes Rd - K0446 + 000 - K0453 + 769;
Physical Target: CW1: 15.622 Lane Km;
Allocation= Php 50,000,000
To: Abra-Cervantes Rd - K0446 + 000 - K0450 + 114;
Physical Target: CW1: 8.36 Lane Km;
Allocation= Php 50,000,000
|
July 5, 2021 |
2021 |
WIN1C04112 |
GAA 2021 |
June 28, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Ilocos Norte Rd - K0435+050 - K0435 + 250;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 0.40 Lane Km;
Allocation= Php 100,000,000
To: Abra-Ilocos Norte Rd - K0435 + 200 - K0435 + 350;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 0.30 Lane Km
CW2: 3,891.69 Square meters;
Allocation= Php 100,000,000
|
July 5, 2021 |
2021 |
WIN1C04139 |
GAA 2021 |
June 28, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Rehabilitation/Improvement of Villaviciosa Road Phase 1, Villaviciosa, Abra;
Physical Target: CW1: 10 Lane Km;
Allocation= Php 50,000,000
To: Rehabilitation/Improvement of Villaviciosa Road Phase 1, Villaviciosa, Abra;
Physical Target: CW1: 6 Lane Km;
Allocation= Php 50,000,000
|
July 5, 2021 |
2021 |
WIN1C04142 |
GAA 2021 |
June 28, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Danglas Barrio Road, Danglas, Abra;
Physical Target: CW1: 8 Lane Km;
Allocation= Php 50,000,000
To: Construction of Danglas Barrio Road, Danglas, Abra;
Physical Target: CW1: 7.122 Lane Km;
Allocation= Php 50,000,000
|
July 5, 2021 |
2021 |
WIN1C04098 |
GAA 2021 |
June 28, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0450 + 750 - K0451 + 800;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 2 Lane Km;
Allocation= Php 99,000,000
To: Abra-Kalinga Rd - K0449 + 000 - K0451 + 800;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 5.438 Lane Km
CW2: 2,121.84 Square meters;
Allocation= Php 99,000,000
|
July 5, 2021 |
2021 |
WIN1C04135 |
GAA 2021 |
June 25, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0451 + 800 - K0453 + 000;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 2.226 Lane Km;
Allocation= Php 99,000,000
To: Abra-Kalinga Rd - K0467 + 000 - K0468 + 000;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 1.922 Lane Km
CW2: 3,204 Square meters;
Allocation= Php 99,000,000
|
July 5, 2021 |
2021 |
WIN1C04111 |
GAA 2021 |
June 25, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Ilocos Norte Rd - K0435 + 600 - K0436 + 000;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 0.492 Lane Km;
Allocation= Php 99,000,000
To: Abra-Ilocos Norte Rd - K0435 + 420 - K0436 + 000;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 0.852 Lane Km
CW2: 3,566.74 Square meters;
Allocation= Php 99,000,000
|
July 5, 2021 |
2021 |
WIN1C04125 |
GAA 2021 |
June 25, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Rehabilitation/Improvement of Lagangilang Access Road, Abra - Kalinga Road Junction - Pagpagatpat, Aguet-Pagpagatpat, Lagangilang, Abra;
Physical Target: CW1: 0.978 Lane Km;
Allocation= Php 20,000,000
To: Rehabilitation/Improvement of Lagangilang Access Road, Abra - Kalinga Road Junction - Pagpagatpat, Aguet-Pagpagatpat, Lagangilang, Abra;
Physical Target: CW1: 2.746 Lane Km;
Allocation= Php 20,000,000
|
July 5, 2021 |
2021 |
WIN1C04126 |
GAA 2021 |
June 25, 2021 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: Construction of Regio Regimental Magulon, Lamut to Sitio Maloy, Cawayan, Asipulo Road, Magulon Cawayan, Lamut Asipulo, Ifugao;
Physical Target: CW1: 0.507 Lane Km;
Allocation= Php 5,000,000
To: Construction of Sitio Regimental, Magulon, Lamut to Sitio Maloy, Cawayan, Asipulo Road, Magulon, Lamut and Cawayan, Asipulo, Ifugao ;
Physical Target: CW1: 2.00 Lane Km;
Allocation= Php 5,000,000
|
July 5, 2021 |
2021 |
WIN1C04126 |
GAA 2021 |
June 25, 2021 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: Construction of Regio Regimental Magulon, Lamut to Sitio Maloy, Cawayan, Asipulo Road, Magulon Cawayan, Lamut Asipulo, Ifugao;
Physical Target: CW1: 0.507 Lane Km;
Allocation= Php 5,000,000
To: Construction of Sitio Regimental, Magulon, Lamut to Sitio Maloy, Cawayan, Asipulo Road, Magulon, Lamut and Cawayan, Asipulo, Ifugao ;
Physical Target: CW1: 2.00 Lane Km;
Allocation= Php 5,000,000
|
July 5, 2021 |
2021 |
WIN1C04068 |
GAA 2021 |
June 11, 2021 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Construction of Barangay Mapawoy to Barangay Bongan Road, Mapawoy, Mayoyao, Ifugao;
Type of Work: Construction of Gravel Road;
Physical Target: CW1: 0.72 Lane Km;
Allocation= Php 5,000,000
To: Construction of Barangay Mapawoy to Barangay Bongan Road, Mapawoy, Mayoyao, Ifugao;
Type of Work: Construction of Concrete Road;
Physical Target: CW1: 0.364 Lane Km;
Allocation= Php 5,000,000
|
July 5, 2021 |
2021 |
WIN1C04078 |
GAA 2021 |
June 23, 2021 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Construction of Katao Flood Control, Sta. 83 + 617 – Sta. 83 + 957 (R.S.), Paracelis, Mountain Province;
Physical Target: CW1: 245 Lineal meters;
Allocation= Php 20,000,000
To: Construction of Katao Flood Control, Sta. 82 + 580 – Sta. 82 + 720 (R.S.), Sta. 83 + 130 – Sta. 83 +192 (R.S.), Paracelis, Mountain Province;
Physical Target: CW1: 245 Lineal meters;
Allocation= Php 20,000,000
|
July 3, 2021 |
CY 2021 |
WIN1F06224 |
UACS NO. 310102100598000 |
May 5, 2021 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA/Original
UACS No. 310102100598000
Project ID.: P00505480LZ
Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Zapote – Alabang – K0019+319 – K0019+689, K0019+691 – K0019+813
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 1.968 km
Unit Cost (P’000) = P4,336.45 / lane km
Allocation = P 8,526,000.00
EAO = P 174,000.00
Total = P 8,700,000.00
As Modified
Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Zapote – Alabang – K0019+319 – K0019+493.03
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 0.696 km
Unit Cost (P’000) = P12,250 / lane km P24M/km.
Allocation = P 8,526,000.00
EAO = P 174,000.00
Total = P 8,700,000.00
WIN1F06224
|
July 3, 2021 |
CY 2021 |
WIN1F0632 |
UACS NO. 310102100574000 |
May 5, 2021 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA/Original
UACS No. 310102100574000
Project ID.: P00505479LZ
Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Zapote – Alabang – K0016+000 – K0016+424
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 1.696 km
Unit Cost (P’000) = P44,251.736 / lane km
Allocation = P 75,050,945.00
EAO = P 2,722,055.00
Total = P 77,773,000.00
As Modified
Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Zapote – Alabang – K0015+000 – K0016+232.71
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 4.931 km
Unit Cost (P’000) = P15,220.228 / lane km P30M/km.
Allocation = P 75,050,945.00
EAO = P 2,722,055.00
Total = P 77,773,000.00
WIN1F06238
|
July 3, 2021 |
CY 2021 |
WIN1F06237 |
UACS NO. 310101100412000 |
May 5, 2021 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA/Original
UACS No. 310101100412000
Project ID.: P00505481LZ
Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Parañaque – Sucat Road – Chainage 0 – Chainage 158
Physical Target: CW1 = Asphalt Overlay 0.632 Lane Km
Unit Cost (P’000) = P6,684.78 / lane km
Allocation = P 4,224,780.00
EAO = P 86,220.00
Total = P 4,311,000.00
As Modified
Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Parañaque – Sucat Road, Ch.0 – Ch. 95.17
Physical Target: CW1 = Asphalt Overlay 0.632 lane km
Unit Cost (P’000) = P6,684.78 / lane km P30M/km.
Allocation = P 4,224,780.00
EAO = P 86,220.00
Total = P 4,311,000.00
WIN1F06237
|
July 3, 2021 |
CY 2021 |
WIN1F06249 |
UACS NO. 300104219083000 |
May 5, 2021 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA/Original
UACS No. 300104219083000
Project ID.: P00557252LZ
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building Phase I, Barangay Pamplona 3, Las Piñas City
Physical Target: CW1 = Construction of Mult-Purpose Building 1 bldg
Unit Cost (P’000) = P 25,740.00 / bldg.
Allocation (P’000) = P25,740.00
EAO (P’000) = P 260.00
Total (P’000) = P 26,000.00
As Modified
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building Phase I, Barangay Pamplona 3, Las Piñas City
Physical Target: CW1 = Construction of Multi-Purpose Building 5 bldg.
Unit Cost (P’000) = P 5,148.00 / bldg.
Allocation (P’000) = P25,740.00
EAO (P’000) = P 260.00
Total (P’000) = P 26,000.00
WIN1F06249
|
July 3, 2021 |
CY 2021 |
WIN1B01169 |
UACS NO. 31011110026900 |
May 6, 2021 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA/Original
UACS No. 310111100269000
Project ID.: P00505332LZ
Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads-
Secondary Roads
PPTA Rd = K0024+(-416) – K0024+384, K0024+391 – K0024+840
Physical Target: CW1 = Construction of Drainage Structure along Road 1,249 Lineal Meters
Unit Cost (P’000) = P 13.60 / Lineal Meter
Allocation = P16,992,220.00
EAO = P 346,780.00
Total = P 17,339,000.00
As Modified
Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads-
Secondary Roads
PPTA Rd = K0027+346 – K0027+093
Physical Target: CW1 = Construction of Drainage Structure along Road 253 Lineal Meters
Unit Cost (P’000) = P 67.16 / Lineal Meter
Allocation = P16,992,220.00
EAO = P 346,780.00
Total = P 17,339,000.00
WIN1B01169
|
July 3, 2021 |
CY 2021 |
WIN1B01171 |
UACS NO. 310110100204000 |
May 6, 2021 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA/Original
UACS No. 310110100204000
Project ID.: P00505331LZ
Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads-
Primary Roads
Quirino Avenue – K0012+176 – K0013+044
Physical Target: CW1 = Construction of Drainage Structure along Road 1,722 Lineal Meters
Unit Cost (P’000) = P 45.16 / Lineal Meter
Allocation = P39,200,000.00
EAO = P 800,000.00
Total = P 40,000,000.00
As Modified
Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads-
Primary Roads
Quirino Avenue – K0012+176 – K0012+744
Physical Target: CW1 = Construction of Drainage Structure along Road 701 Lineal Meters
Unit Cost (P’000) = P 55.92 / Lineal Meter
Allocation = P39,200,000.00
EAO = P 800,000.00
Total = P 40,000,000.00
WIN1B01171
|
July 3, 2021 |
CY 2021 |
WIN1F06414 |
UACS NO. 310102100628000 |
May 6, 2021 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 310102100628000
Project ID.: P00515891LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Cordillera St. (S05361LZ) K0006+(-410) – K0006+528
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=1.876 lane km
Unit Cost (P’000) = P 6,268.66/ lane km
Allocation (P’000) = P 11,760.00
EAO (P’000) = P 240.00
Total (P’000) = P 12,000.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Cordillera St. (S05361LZ) K0006+(-155) – K0006+528
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=1.365 lane km
Unit Cost (P’000) = P 8,615.38/ lane km P 17.2 M/Km
Allocation (P’000) = P 11,760.00
EAO (P’000) = P 240.00
Total (P’000) = P 12,000.00
WIN1F06414
|
July 3, 2021 |
CY 2021 |
WIN1F06410 |
UACS NO. 310103100644000 |
May 6, 2021 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 310103100644000
Project ID.: P00505524LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Tomas Morato – K0009+(-090) – K0009+127, K0009+1073 – K0009+1172,
K0009+127-K0009+1073
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=4.952 lane km
Unit Cost (P’000) = P 4,336.18/ lane km
Allocation (P’000) = P 21,472.78
EAO (P’000) = P 438.22
Total (P’000) = P 21,911.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Tomas Morato – K0009+(-090) – K0009+653,
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=2.972 lane km
Unit Cost (P’000) = P 7,225.03/ lane km P 14.4 M/Km.
Allocation (P’000) = P 21,472.78
EAO (P’000) = P 438.22
Total (P’000) = P 21,911.00
WIN1F06410
|
July 3, 2021 |
CY 2021 |
WIN1F06417 |
UACS No. 320101106441000 |
May 7, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106441000
Project ID.: P00525827LZ
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of RCPC along Blumentritt Extension, Chainage 251.70 to Chainage 963.00, Manila City
Physical Target: CW1 – Construction of Flood Mitigation Structure 895.70 l.m.
CW2 – Construction of Concrete Road
Unit Cost (P’000) = P 31.75 / l.m.
= P 22.97/ l.m.
Allocation (P’000) = P 28,430.00
= P 20,570.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of RCPC along Blumentritt Extension, Chainage 251.70 to Chainage 948 and Chainage 435.20
to Chainage 634.60, Manila City
Physical Target: CW1 – Construction of Flood Mitigation Structure 895.70 l.m.
CW2 – Construction of Concrete Road P 44 M/Km
Unit Cost (P’000) = P 31.75 / l.m.
= P 22.97/ l.m.
Allocation (P’000) = P 28,430.00
= P 20,570.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN1F06417
|
July 2, 2021 |
FY 2021 GAA |
WIN1F06316 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 300117209177000
Project ID : P00564730LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Construction of Road,
Barangay Kaligtasan, Bongabong, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.00 Lane Km
Allocation : Php 1.00 Million
TO :
Construction of Road,
Barangay Kaligtasan, Bongabong, Otiental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.1948 Lane Km
Allocation : Php 1.00 Million |
July 2, 2021 |
CY 2021 |
WIN1B01165 |
UACS NO. 300209100008000 |
May 2, 2021 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 300209100008000
Project ID.: P00531635LZ
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Railway Stations
Old Sauyo Road leading to Quirino Highway Station, Quezon City
Physical Target: CW1 = Construction of Drainage Structure 1200 l.m.
CW2 = Shoulder Paving / Construction 2400 l.m.
Unit Cost (P’000) = P 6.13 / l.m.
= P 2.03 / sq.m.
Allocation (P’000) = P 7,365.85
= P 4,860.71
EAO (P’000) = P 443.35
Total (P’000) = P 12,670.00
As Modified
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Railway Stations
Old Sauyo Road leading to Quirino Highway Station, Quezon City
Physical Target: CW1 = Shoulder Paving / Construction 2965 sq.m.
Unit Cost (P’000) = P 4.12 / l.m.
Allocation (P’000) = P 12,226.55
EAO (P’000) = P 443.35
Total (P’000) = P 12,670.00
WIN1B01165
|
July 2, 2021 |
FY 2021 GAA |
WIN1F06246 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 300104222161000
Project ID : P00560691LZ
LOCAL PROGRAM
Local - Building and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
FROM :
Construction of Multi-Purpose Building (Phase 2),
Barangay Nasukob, Bulalacao, Oriental Mindoro
Physical Target - CW1 - Construction of Multi-Purpose Building :
1 No. of Building
Allocation : Php 4.00 Million
TO :
Construction of Multi-Purpose Building,
Barangay Nasukob, Bulalacao, Oriental Mindoro
Physical Target - CW1 - Construction of Multi-Purpose Building :
1 No. of Building
Allocation : Php 4.00 Million
|
July 2, 2021 |
CY 2021 |
WIN1F06359 |
UACS NO. 300209100005000 |
May 2, 2021 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 300209100005000
Project ID.: P00531629LZ
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Railway Stations
Genaral Ave. leading to Tandang Sora Station, Quezon City
Physical Target: CW1 = Construction of Drainage Structure 1038 l.m.
CW2 = Shoulder Paving / Construction 2092 l.m.
Unit Cost (P’000) = P 6.07 / l.m.
= P 2.01 / sq.m.
Allocation (P’000) = P 6,299.52
= P 4,199.68
EAO (P’000) = P 380.80
Total (P’000) = P 10,880.00
As Modified
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Railway Stations
Genaral Ave. leading to Tandang Sora Station, Quezon City
Physical Target: CW1 = Construction of Drainage Structure 2478 sq.m.
Unit Cost (P’000) = P 4.24 / sq.m.
Allocation (P’000) = P 10,499.20
EAO (P’000) = P 380.80
Total (P’000) = P 10,880.00
WIN1F06359
|
July 2, 2021 |
CY 2021 |
WIN1F06191 |
UACS NO. 320101106448000 |
May 2, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106448000
Project ID.: P00525814LZ
002: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet File) along Estero dela Reina, Barangay 58, 56 & 51 Sta. 0+628.60
to Sta. 0+702.60 (LS); Sta. 0+757.10 to Sta. 0+841.50 (RS), Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P328.30 / l.m.
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00
As Modified
002: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet File) along Estero dela Reina, Barangay 58, 56 & 51 (LS) Sta. 0+723.90
to Sta. 0+783.60; (RS) Sta. 0+732.60 to Sta. 0+792.30, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P328.300 M/ LM
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00
WIN1F06191
|
July 2, 2021 |
CY 2021 |
WIN1F06191 |
UACS NO. 320101106448000 |
May 2, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106448000
Project ID.: P00525814LZ
002: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet File) along Estero dela Reina, Barangay 58, 56 & 51 Sta. 0+628.60
to Sta. 0+702.60 (LS); Sta. 0+757.10 to Sta. 0+841.50 (RS), Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P328.30 / l.m.
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00
As Modified
002: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet File) along Estero dela Reina, Barangay 58, 56 & 51 (LS) Sta. 0+723.90
to Sta. 0+783.60; (RS) Sta. 0+732.60 to Sta. 0+792.30, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P328.300 M/ LM
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00
WIN1F06191
|
July 2, 2021 |
CY 2021 |
WIN1F06201 |
UACS NO. 310102100619000 |
May 2, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 310102100619000
Project ID.: P00505439LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
R-10 – K0004+1192 – K0004+1214, K0004+471 – K0004+1192
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=2.972 km
Unit Cost (P’000) = P8,160.18 / lane km
Allocation (P’000) = P 24,252,060.00
EAO = P 494,940.00
Total (P’000) = P 24,747,000.00
As Modified
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
R-10 – K0005+(-591.80) – K0006+(-065.80)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=2.972 km
Unit Cost (P’000) = P8,160.18 / lane km P16M/lm
Allocation (P’000) = P 24,252,060.00
EAO = P 494,940.00
Total (P’000) = P 24,747,000.00
WIN1F06201
|
July 2, 2021 |
CY 2021 |
WIN1F06207 |
UACS NO. 31010300630000 |
May 2, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 31010300630000
Project ID.: P00505500LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Rodriguez St – Chainage 0 – Chainage 399
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=1.039 lane km
Unit Cost (P’000) = P4,336.35 / lane km
Allocation (P’000) = P 4,501.14
EAO = P 91.86
Total (P’000) = P 4,593.00
As Modified
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Rodriguez St – Chainage 0 – Chainage 184.70
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=1.039 lane km
Unit Cost (P’000) = P4,336.35 / lane km P8.6M/lm
Allocation (P’000) = P 4,501.14
EAO = P 91.86
Total (P’000) = P 4,593.00
WIN1F06207
|
July 2, 2021 |
CY 2021 |
WIN1F06211 |
UACS NO. 310103100632000 |
May 2, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 310103100632000
Project ID.: P00505501LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Vitas St – Chainage 0 – Chainage 573
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=1.146 km
Unit Cost (P’000) = P4,336.45 / lane km
Allocation (P’000) = P 4,969.58
EAO = P 101.42
Total (P’000) = P 5,071.00
As Modified
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Vitas St – Chainage 0 – Chainage 289.40
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=1.146 km
Unit Cost (P’000) = P4,336.45 / lane km / P8.6/M
Allocation (P’000) = P 4,969.58
EAO = P 101.42
Total (P’000) = P 5,071.00
WIN1F06211
|
July 2, 2021 |
CY 2021 |
WIN1F06254 |
UACS NO. 310105100521000 |
May 2, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 310105100521000
Project ID.: P00505440LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Roads
R-10 – K0006 + 444 – K0006+516
Physical Target: CW1 = Rehabilitation of Paved Road L=0.216 lane km
Unit Cost (P’000) = P 18,801.48 / lane km
Allocation (P’000) = P 4,061.12
EAO (P’000) = P 82.88
Total (P’000) = P 4,144.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Roads
R-10 – K0006 + (-049.4) – K0006+010.6
Physical Target: CW1 = Rehabilitation of Paved Road L=0.216 lane km
Unit Cost (P’000) = P 18,801.48 / lane km P37.6 M/km
Allocation (P’000) = P 4,061.12
EAO (P’000) = P 82.88
Total (P’000) = P 4,144.
WIN1F06254
|
July 2, 2021 |
CY 2021 |
WIN1F06281 |
UACS NO. 320101106462000 |
May 2, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106462000
Project ID.: P00525828LZ
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of RCPC along Lardizabal Street, Chainage 000.00 to Chainage 2185.10, Manila City
Physical Target: CW1 – Construction of Flood Mitigation Structure 635.00 l.m.
Unit Cost (P’000) = P 77.16 / l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of RCPC along Lardizabal Street, Sta. 0+000.00 to Sta. 0+266.00 and
Sta. 0+000.00 to Sta. 0+369.00, Manila City
Physical Target: CW1 – Construction of Flood Mitigation Structure 635.00 l.m.
Unit Cost (P’000) = P 77.16 / l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN1F06281
|
July 2, 2021 |
CY 2021 |
WIN1F06320 |
UACS NO. 320101106441000 |
May 2, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106441000
Project ID.: P00525807LZ
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Quiapo, Brgy. 393 (Phase I), Sta. 0+500.00
to Sta. 0+658.40
Physical Target: CW1 – Construction of Flood Mitigation Structure 117.20 l.m.
Unit Cost (P’000) = P 324.321 / l.m.
Allocation (P’000) = P 38,010.28
EAO (P’000) = P 775.72
Total (P’000) = P 38,786.00
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Quiapo, Brgy. 393 (Phase I), Sta. 0+500.00
to Sta. 0+617.20
Physical Target: CW1 – Construction of Flood Mitigation Structure 117.20 l.m.
Unit Cost (P’000) = P 324.321 / l.m. P342,320/lm
Allocation (P’000) = P 38,010.28
EAO (P’000) = P 775.72
Total (P’000) = P 38,786.00
WIN1F06320
|
July 2, 2021 |
CY 2021 |
WIN1F06252 |
UACS NO. 310103100642000 |
May 5, 2021 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 310103100642000
Project ID.: P00505525LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Hemady St – K0009+(-615) – K0009+(-479), K0009+(-682) – K0009+(-615),
K0009+(-979) – K0009+(-682)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 1.364 lane km
Unit Cost (P’000) = P 4,336.71 / lane km
Allocation (P’000) = P 5,915.28
EAO (P’000) = P 120.72
Total (P’000) = P 6,036.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Hemady St – K0009+(-979) – K0009+(-698)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 0.843 lane km
Unit Cost (P’000) = P 7,016.94 / lane km
Allocation (P’000) = P 5,915.28
EAO (P’000) = P 120.72
Total (P’000) = P 6,036.00
WIN1F06252
|
July 2, 2021 |
CY 2021 |
WIN1F06355 |
UACS NO. 310105100494000 |
May 5, 2021 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 310105100494000
Project ID.: P00505527LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
South Ave (Timog Ave) K0010+(-890) – K0010+(-570),
K0010+(-964) - K0010+(-890)
Physical Target: CW1 = Reconstruction to concrete Pavement 2.02 lane km
Unit Cost (P’000) = P 34,836.5 / lane km
Allocation (P’000) = P 70,369.73
EAO (P’000) = P 2,552.270
Total (P’000) = P 72,922.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
South Ave (Timog Ave) K0010+(-964) – K0010+(-890),
K0010+(-890) - K0010+144, K0009+(-213) – K0009+119
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=2.02 lane km
Unit Cost (P’000) = P 11,354.79 / lane km P22M/km
Allocation (P’000) = P 70,369.73
EAO (P’000) = P 2,552.270
Total (P’000) = P 72,922.00
WIN1F06355
|
July 2, 2021 |
CY 2021 |
WIN1F06334 |
UACS NO. 310106100553000 |
May 5, 2021 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 310106100553000
Project ID.: P00505482LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Tertiary Roads
MH Del Pilar St (Malabon) –K0013+462 – K0013+496
Physical Target: CW1 = Rehabilitation of Paved Road: 0.068 lane km
Unit Cost = P 18,375.00 / lane km
Allocation (P’000) = P 1,249.50
EAO (P’000) = P 25.50
Total (P’000) = P 1,275.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Tertiary Roads
MH Del Pilar St (Malabon) –K0013+570 – K0013+601.50
Physical Target: CW1 = Rehabilitation of Paved Road: 0.063 lane km
Unit Cost = P 19,825.29714 / lane km P39.6M/km.
Allocation (P’000) = P 1,248.99
EAO (P’000) = P 25.50
Total (P’000) = P 1,275.00
WIN1F06334
|
July 2, 2021 |
2021 |
WIN1F06283 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Roxas City-Cagay-Sibaguan-Balijuagan-Cudian-Ivisan Rd - K0108 + 203 - K0108 + 887
CW1- Road Widening: 1.368 lane km - 17,428.32
EAO - 355.68
Total: 17,784.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Roxas City-Cagay-Sibaguan-Balijuagan-Cudian-Ivisan Rd - K0108 + 203 - K0108 + 879
CW1- Road Widening: 1.352 lane km - 17,428.32
EAO - 355.68
Total: 17,784.00
|
July 2, 2021 |
2021 |
WIN1F06406 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd - K0118 + 137 - K0118 + 288
CW1- Reconstruction to Concrete Pavement: 0.365 lane km - 7,491.12
EAO - 152.88
Total: 7,644.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd - K0118 + 137 - K0118 + 288
CW1- Reconstruction to Concrete Pavement: 0.302 lane km - 7,491.12
EAO - 152.88
Total: 7,644.00
|