Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
June 24, 2021 2021 300104220360000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya District Engineering Office
Local Program - Local - Buildings and Other Structures - Multipurpose/ Facilities - Local Infrastructure Program - Construction (Phase 2) of Multi-Purpose Building, Municipality of Villaverde, Nueva Vizcaya
June 24, 2021 2021 WIN1F06327 GAA FY 2021 January 1, 2021 Region VIII Northern Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

Sn Policarpo-Arteche-Lapinig Rd - K0860 + 000 - K0861 + 000

Physical Target: Allocation:

CW1-Road Widening: 1.994 Lane Km P 20.2762 M

EAO P 0.4138 M

Total P 20.690M

AS MODIFIED:

Sn Policarpo-Arteche-Lapinig Rd - K0860 + 245 - K0861 + 000

Physical Target: Allocation:

CW1-Road Widening: 1.400 Lane Km P 20.2762 M

EAO P 0.4138 M

Total P 20.690M
June 24, 2021 2021 300117208326000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya District Engineering Office
Local Program - Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Concreting of Road in Purok 5, Barangay Bagahabag, Solano, Nueva Vizcaya
June 24, 2021 2021 320101106607000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Magat River Control, (Phase 1), Baretbet, Bagabag, Nueva Vizvaya
June 24, 2021 2021 300117208320000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya District Engineering Office
Local Program - Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Concreting of Road at Purok 1, Barangay Balete, Diadi, Nueva Vizcaya
June 24, 2021 2021 WIN1F06301 GAA FY 2021 February 1, 2021 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Road

AS PER GAA/ORIGINAL:

Preventive Maintenance of Road: Asphalt Overlay – Dayhagan-Salvacion-Coob-Libertad Road, K1009+363 – K1010+000


Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 14.700 M
Asphalt Overlay : 2.612 Lane Km

EAO P 0.300 M

Total P 15.00 M

AS MODIFIED:

Preventive Maintenance of Road: Asphalt Overlay – Dayhagan-Salvacion-Coob-Libertad Road, K1010+549 – K1010+982


Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 14.700 M
Asphalt Overlay : 1.732 Lane Km

EAO P 0.300 M

Total P 15.00 M
June 24, 2021 2021 WIN1F06300 GAA FY 2021 January 1, 2021 Region VIII Northern Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Roads

AS PER GAA/ORIGINAL:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0800 + 714 - K0802 + 000

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 15.3223 M
Asphalt Overlay: 2.608 Lane Km

EAO P 0.3127 M

Total P 15.635 M

AS MODIFIED:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0800 + 714 - K0801 + 848

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 15.3223 M
Asphalt Overlay: 2.292 Lane Km

EAO P 0.3127 M

Total P 15.635 M
June 24, 2021 2021 WIN1F06295 GAA FY 2021 January 25, 2021 Region VIII Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0724 + 444 - K0724 + 659

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure: 3,333,333 Square Meters
EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0724 + 447.5 – K0724 + 655, K0724 + 742.4 – K0724 + 840.4

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 46.55 M
Structure: 2,058.00 Square Meters

ROW- ROW Acquisition: 1,697.85 Square Meters P 2.50 M

EAO P 0.950 M

Total P 50.00 M
June 24, 2021 2021 WIN1F06302 GAA FY 2021 January 2, 2021 Region VIII Eastern Samar District Engineering Office
Local Program

Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

AS PER GAA/ORIGINAL:

Rehabilitation/Improvement of Road, Barangay Caiwasan, Balangkayan, Eastern Samar

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: 4.882 Lane Km P 24.50 M

EAO P 0.50 M

Total P 25.00 M

AS MODIFIED:

Rehabilitation/Improvement of Road, Barangay Caiwasan, Balangkayan, Eastern Samar

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: 4.37 Lane Km P 24.50 M

EAO P 0.50 M

Total P 25.00 M
June 24, 2021 FY 2021 GAA WIN1F06193 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310111100298000
Project ID : P00516191LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Construction/Upgrading/Rehabilitation
of Drainage along National Roads
- Secondary Roads

FROM ;

Calapan South Road,
K0010 + 521 - K0011 + 188
Physical Target - CW1 - Construction of Drainage Structure
along National Road :
1.332.00 Lineal meters
Allocation : Php 10.00 Million

TO :

Calapan South Road,
K0010 + 637 - K0011 + 188
Physical Target - CW1 - Construction of Drainage Structure
along National Road :
1,100.00 Lineal meters
Allocation : Php 10.00 Million
June 24, 2021 2021 WIN1F06314 GAA FY 2021 January 4, 2021 Region VIII Leyte 5th District Engineering Office
Local Program

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

AS PER GAA/ORIGINAL:

Concreting of Roads, Barangay Capilian, Abuyog, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road: 0.173 Lane Km P 1.98 M

EAO P 0.02 M

Total P 2.00 M

AS MODIFIED:

Concreting of Roads, Barangay Capilian, Abuyog, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road: 1.364 Lane Km P 1.98 M

EAO P 0.02 M

Total P 2.00 M
June 24, 2021 2021 WIN1F06311 GAA FY 2021 January 4, 2021 Region VIII Leyte 5th District Engineering Office
Local Program

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

AS PER GAA/ORIGINAL:

Concreting of Roads, Barangay Guadalupe, Baybay City, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road: 0.086 Lane Km P1.00 M

Total P 1.00 M

AS MODIFIED:

Concreting of Roads, Barangay Guadalupe, Baybay City, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road: 0.326 Lane Km P1.00 M

Total P 1.00 M
June 24, 2021 2021 WIN1B01172 GAA FY 2021 January 4, 2021 Region VIII Leyte 5th District Engineering Office
Local Program

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

AS PER GAA/ORIGINAL:

Concreting of Roads, Barangay Libertad, Abuyog, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road: 0.173 Lane Km P 1.980 M

EAO P 0.02 M

Total P 2.00 M

AS MODIFIED:

Concreting of Roads, Barangay Libertad, Abuyog, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road: 0.692 Lane Km P 1.980 M

EAO P 0.02 M

Total P 2.00 M
June 24, 2021 2021 WIN1F06330 GAA FY 2021 January 4, 2021 Region VIII Leyte 5th District Engineering Office
Local Program

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

AS PER GAA/ORIGINAL:

Concreting of Roads, Barangay Maitum, Abuyog, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road: 0.173 Lane Km P 1.980 M

EAO P 0.02 M

Total P 2.00 M

AS MODIFIED:

Concreting of Roads, Barangay Maitum, Abuyog, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road: 0.664 Lane Km P 1.980 M

EAO P 0.02 M

Total P 2.00 M
June 24, 2021 FY 2021 GAA WIN1F06244 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS no. : 300116204176000
Project ID : P00562437LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :
Concreting of Road,
Sitio Libtong, Brgy. Balatero, Puerto Galera, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.430 Lane Km
Allocation : Php 15.00 Million

TO :
Concreting of Road,
Sitio Libtong, Brgy. Balatero, Puerto Galera, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
1.936 Lane Km
Allocation : Php 15.00 Million

June 23, 2021 FY 2021 WIN1C03717 FY 2021 GAA RA 11518 December 28, 2020 Region V Masbate 2nd District Engineering Office
UACS No.: 310108100528000
Project ID: P00505992LZ
AS PER GAA:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Secondary Roads - Jct Milagros-Baleno-Lagta Rd - K0038+110 - K0038+190
Physical Target : CW1-Construction of Road Slope Protection Structure - 2,050 sq.m.
Allocation: Php 100,000,000.00

AS MODIFIED:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Secondary Roads - Jct Milagros-Baleno-Lagta Rd - K0038+350 - K0038+478
Physical Target : CW1-Construction of Road Slope Protection Structure - 4,290 sq.m.
Allocation: Php 100,000,000.00
June 23, 2021 FY 2021 WIN1C03754 FY 2021 GAA RA 11518 December 28, 2020 Region V Masbate 2nd District Engineering Office
UACS No.: 300117209330000
Project ID: P00564883LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Concreting of Road, Junction National Road, Masbate Institute of Fisheries and Tech., Masbate City, Masbate
Physical Target: CW1-Construction of Concrete Road – 0.162 Lane km
Allocation: Php 3,000,000.00

AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Concreting of Road, Junction National Road, Masbate Institute of Fisheries and Tech., Milagros, Masbate
Physical Target: CW1-Construction of Concrete Road – 0.162 Lane km
Allocation: Php 3,000,000.00
June 23, 2021 FY 2021 WIN1C03719 FY 2021 GAA RA 11518 December 28, 2020 Region V Camarines Norte District Engineering Office
UACS No.: 310111100306000
Project ID: P00505404LZ
AS PER GAA:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Construction/Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads – Tagas-Daet Poblacion-Magang Rd – K0341+587 – K0341+795
Physical Target: CW1-Construction of Drainage Structure along Road – 208 Ln.m.
Allocation: Php 10,000,000.00

AS MODIFIED:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Construction/Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads – Tagas-Daet Poblacion-Magang Rd – K0341+587 – K0341+795, K0343+397.50-K0343+780
Physical Target: CW1-Construction of Drainage Structure along Road – 590.5 Ln.m.
Allocation: Php 10,000,000.00
June 23, 2021 2021 320102104061000 GAA FY 2021 January 25, 2021 Region II Regional Office II
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities along major River Basins and Principal Rivers - Construction of Flood Control System, Package 1, Sta. 0+000 - Sta. 0+296 (Upstream), Balasig, Cabagan, Isabela
June 23, 2021 FY 2021 WIN1C03750 FY 2021 GAA RA 11518 December 28, 2020 Region V Camarines Norte District Engineering Office
UACS No.: 300104222328000
Project ID: P00560858LZ
AS PER GAA:
Local Program – Buildings and Other Structures- Multipurpose/Facilities – Local Infrastructure Program – Construction of Multi-Purpose Building, Tarum elementary School, Barangay Tarum, Basud, Camarines Norte
Physical Target: CW1- Construction of Multi-Purpose Building – 1 Number of Buildings
Allocation: Php 2,500,000.00

AS MODIFIED:
Local Program – Buildings and Other Structures- Multipurpose/Facilities – Local Infrastructure Program – Construction of Multi-Purpose Building, Tarum elementary School, Barangay Tarum, Mercedes, Camarines Norte
Physical Target: CW1- Construction of Multi-Purpose Building – 1 Number of Buildings
Allocation: Php 2,500,000.00
June 23, 2021 2021 320102104063000 GAA FY 2021 January 25, 2021 Region II Regional Office II
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers - Construction of Flood Control Systems, Barangay Salinas, Bambang, Nueva Vizcaya
June 23, 2021 2021 310203100430000 GAA FY 2021 January 25, 2021 Region II Isabela 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Roads - Ilagan - Bigao - Palanan Rd - K0413+839 - K0414+382
June 23, 2021 FY 2021 GAA WIN1E02329 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Jct. ABS-CBN Quimpo Blvd. Div. Rd - Jct. Davao City Coastal Rd, Barangay Bucana, Davao City
Physical Target:
CW1: 32.223 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 322,096,000.00
CW1: P 310,822,640.00 (Reconstruction to Concrete Pavement)
EAO: P 11,273,360.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Jct. ABS-CBN Quimpo Blvd. Div. Rd - Jct. Davao City Coastal Rd, Barangay Bucana, Davao City
Physical Target:
CW1: 3.6915 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 322,096,000.00
CW1: P 52,592,500.00 (Reconstruction to Concrete Pavement)
EAO: P 1,907,500.00
EXC: P 267,596,000.00
June 23, 2021 FY 2021 GAA WIN1E02324 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Digos-Makar Rd - K1568+636 - K1570+960
Physical Target:
CW1: 11,685.00 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 23,372,000.00
CW1: P 22,904,560.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 467,440.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Digos-Makar Rd - K1569+040 - K1570+033
Physical Target:
CW1: 5,000.00 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
CW2: 0.860 km (Road Safety: Street Lighting)
Allocation:
TOTAL: P 23,372,000.00
CW1: P 14,957,198.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
CW2: P 7,947,362.00 (Road Safety: Street Lighting)
EAO: P 467,440.00
June 23, 2021 FY 2021 GAA WIN1E02331 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Carmen - Panabo Diversion Road
Physical Target:
CW1: 5.840 Lane Km (Construction to Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Construction to Concrete Road)
EAO: P 1,750,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Carmen - Panabo Diversion Road
Physical Target:
CW1: 5.190 Lane Km (Construction to Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Construction to Concrete Road)
EAO: P 1,750,000.00
June 23, 2021 FY 2021 GAA WIN1E02328 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of Road at Barangay Mambago-B to Sitio Maslob, Sto. Niño to Barangay Tagbitan-ag, Island Garden City of Samal, Davao Del Norte
Physical Target:
CW1: 6.160 Lane Km (Construction to Concrete Road)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction to Concrete Road)
EAO: P 2,450,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of Road at Barangay Mambago-B to Sitio Maslob, Sto. Niño to Barangay Tagbitan-ag, Island Garden City of Samal, Davao Del Norte
Physical Target:
CW1: 5.980 Lane Km (Construction to Concrete Road)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction to Concrete Road)
EAO: P 2,450,000.00
June 23, 2021 FY 2021 GAA WIN1E02330 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Surigao-Davao Coastal Rd -
K1781+692 - K1782+000, K1783+135 - K1783+550
Physical Target:
CW1: 2.702 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 12,007,000.00
CW1: P 11,766,860.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 240,140.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Surigao-Davao Coastal Rd -
K1781+692 - K1782+000, K1783+135 - K1783+550
Physical Target:
CW1: 1.872 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 12,007,000.00
CW1: P 11,766,860.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 240,140.00
June 23, 2021 2021 WIN1C03989 FY 2021 GAA December 28, 2020 Region III Pampanga 1st District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads

Manila North Road - K0053+639 - K0053+810, K0059+000 - K0059+650

June 23, 2021 FY 2021 GAA WIN1E02326 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1585+000 - K1592+000
Physical Target:
CW1: 28.000 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 98,031,000.00
CW1: P 94,599,915.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,431,085.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1585+000 - K1592+000
Physical Target:
CW1: 14.000 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 98,031,000.00
CW1: P 94,599,915.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,431,085.00
June 23, 2021 2021 WIN1C04032 FY 2021 GAA December 28, 2020 Region III Pampanga 1st District Engineering Office
Network Development - Off-Carriageway Improvement - Tertiary Roads

Baliwag - Candaba - Sta. Ana Rd - K0068+000 - K0068+017.30, K0068+477 - K0068+794
June 23, 2021 FY 2021 WIN1C03775 FY 2021 GAA RA 11518 December 28, 2020 Region V Regional Office V
UACS No.: 300211100151000
Project ID: P00534724LZ
AS PER GAA:
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide, Catanduanes Cir Rd K0146+850-K0146+950, Catanduanes
Physical Target: CW1-Construction of Road Slope Protection Structure – 1,289.182 sq.m.
Allocation: Php 50,000,000.00

AS MODIFIED:
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide, Catanduanes Cir Rd K0146+910.76 - K0146+950.00, Catanduanes
Physical Target: CW1-Construction of Road Slope Protection Structure – 2,626.00 sq.m.
Allocation: Php 50,000,000.00
June 23, 2021 2021 WIN1C03948 FY 2021 GAA December 28, 2020 Region III Pampanga 1st District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads

Manila North Rd, K0055+144 - K0055+291
June 23, 2021 2021 WIN1C03949 FY 2021 GAA December 28, 2020 Region III Pampanga 1st District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads

Tulaoc - Sto. Domingo Rd, K0063+288 - K0063+713

June 23, 2021 FY 2021 GAA WIN1G02943 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Flood Mitigation Structure, F. Torres Bridge (Downstream), Davao River, Brgy. 9-A, Davao City
Physical Target:
CW1: 348.706 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Flood Mitigation Structure)
EAO: P 600,000.00

TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Flood Mitigation Structure, F. Torres Bridge (Downstream), Davao River, Brgy. 9-A, Davao City
Physical Target:
CW1: 102.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Flood Mitigation Structure)
EAO: P 600,000.00
June 23, 2021 FY 2021 GAA WIN1G02944 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage, Barangay 22-C, Davao City
Physical Target:
CW1: 210.00 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Drainage Structure)
EAO: P 30,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage, Barangay 22-C, Davao City
Physical Target:
CW1: 80.00 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Drainage Structure)
EAO: P 30,000.00
June 23, 2021 FY 2021 GAA WIN1G02941 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Drainage and Protection Works - Local Infrastructure Program
Improvement of Drainage Structure, Barangay 2-A, Davao City
Physical Target:
CW1: 177.00 Lineal meters (Rehabilitation/Major Repair of Drainage Structure)
Allocation:
TOTAL: P 3,500,000.00
CW1: P 3,465,000.00 (Rehabilitation/Major Repair of Drainage Structure)
EAO: P 35,000.00

TO: Local Program - Flood Control and Drainage - Drainage and Protection Works - Local Infrastructure Program
Improvement of Drainage Structure, Barangay 2-A, Davao City
Physical Target:
CW1: 218.00 Lineal meters (Rehabilitation/Major Repair of Drainage Structure)
Allocation:
TOTAL: P 3,500,000.00
CW1: P 3,465,000.00 (Rehabilitation/Major Repair of Drainage Structure)
EAO: P 35,000.00
June 23, 2021 FY 2021 GAA WIN1G02942 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Road: Asphalt Overlay - Davao-Cotabato Old Rd -
K1523+518 - K1524+489, K1524+507 - K1525+570
Physical Target:
CW1: 13.638 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 163,400,000.00
CW1: P 157,681,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,719,000.00

TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Road: Asphalt Overlay - Davao-Cotabato Old Rd -
K1523+518 - K1524+489, K1524+507 - K1525+570
Physical Target:
CW1: 9.528 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 163,400,000.00
CW1: P 157,681,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,719,000.00
June 23, 2021 FY 2021 WIN1C03900 FY 2021 GAA RA 11518 December 28, 2020 Region V Sorsogon District Engineering Office
UACS No.: 310106100607000
Project ID: P00505792LZ
AS PER GAA:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Tertiary Roads -Jct Donsol -Banuang Gurang Rd – K0590+169 – K0590+295
Physical Target: CW1-Reconstruction of Concrete Pavement – 0.252 Lane km.
Allocation: Php 5,000,000.00

AS MODIFIED:
Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Tertiary Roads -Jct Donsol -Banuang Gurang Rd – K0590+185 – K0590+325
Physical Target: CW1-Reconstruction of Concrete Pavement – 0.28 Lane km.
CW2-Construction of Drainage Structure along Road – 280 Ln.m.
Allocation: Php 5,000,000.00
June 23, 2021 FY 2021 GAA WIN1G02938 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Revetment along Kingking River, Ayan Section R/S, Brgy. Kingking, Pantukan, Davao de Oro (Sta. 3+500 - Sta. 4+983 RS)
Physical Target:
CW1: 666.050 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 55,000,000.00
CW1: P 53,075,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,925,000.00

TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Revetment along Kingking River, Ayan Section R/S, Brgy. Kingking, Pantukan, Davao de Oro (Sta. 4+517.070 ‐ Sta. 4+727.280 RS, Sta. 4+741.699 ‐ Sta. 5+187.529 RS)
Physical Target:
CW1: 666.050 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 55,000,000.00
CW1: P 53,075,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,925,000.00
June 23, 2021 FY 2021 GAA WIN1G02950 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Revetment along Hijo River at Hijo Br.2 (Downstream) Brgy. Hijo, Maco, Davao de Oro (Sta. 1+560 - Sta. 2+180 LS)
Physical Target:
CW1: 411.180 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,100,000.00

TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Revetment along Hijo River at Hijo Br.2 (Downstream) Brgy. Hijo, Maco, Davao de Oro (Sta. 1+569.233 - Sta. 1+980.413 LS)
Physical Target:
CW1: 411.180 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,100,000.00
June 23, 2021 FY 2021 GAA WIN1G02948 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Road, Brgy. Pangibiran, Mabini, Davao de Oro
Physical Target:
CW1: 0.900 Lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Road, Brgy. Pangibiran, Mabini, Davao de Oro
Physical Target:
CW1: 1.264 Lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00
June 23, 2021 2021 WIN1C04070 FY 2021 GAA December 28, 2020 Region III Pampanga 2nd District Engineering Office
Network Development - Road Widening - Primary Roads

Jose Abad Santos Ave (JASA), K0080+240 - K0081+448, K0082+951.58 - K0083+348.43
June 23, 2021 2021 WIN1C03913 FY 2021 GAA December 28, 2020 Region III Bataan 2nd District Engineering Office
Convergence and Special Support - Construction / Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructures Program - ROLL-IT)

Bagac - Mariveles By-pass Road connecting Bagac - Mariveles Road to Freeport Area of Bataan in support to Mix-Used Industry-Electronics, Garments, Fashion Bags, FAB, Mariveles, Bataan
June 23, 2021 2021 WIN1C04027 FY 2021 GAA December 28, 2020 Region III Bataan 2nd District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads

Roman Expressway, K0143+100 - K0143+300, K0144+400 - K0144+900
June 23, 2021 2021 WIN1C04007 FY 2021 GAA December 28, 2020 Region III Bataan 2nd District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads\

Roman Expressway - K0130+640 - K0130+906, K0136+670 - K0136+958
June 23, 2021 FY 2021 GAA WIN1E02339 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way - K1702+192 - K1703+265
Physical Target:
CW1: 1.402 Lane Km (Road Widening)
Allocation:
TOTAL: P 21,808,000.00
CW1: P 21,371,840.00 (Road Widening)
EAO: P 436,160.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way - K1702+192 - K1703+447
Physical Target:
CW1: 1.402 Lane Km (Road Widening)
Allocation:
TOTAL: P 21,808,000.00
CW1: P 21,371,840.00 (Road Widening)
EAO: P 436,160.00
June 22, 2021 2021 WIN1F06293 GAA FY 2021 February 2, 2021 Region VIII Regional Office VIII
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods

Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers

AS PER GAA/ORIGINAL:

Construction of Cadac-an Flood Control Structure along Cadac-an River, Cadac-an River Basin,Right Side Bank, Abuyog, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 96.500 M
Structure: 945.579 Lineal meters
EAO P 3.500 M

Total P 100.00 M

AS MODIFIED:

Construction of Cadac-an Flood Control Structure along Cadac-an River, Cadac-an River Basin,Right Side Bank, Abuyog, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 96.500 M
Structure: 360.00 Lineal meters
EAO P 3.500 M

Total P 100.00 M
June 22, 2021 2021 WIN1F06305 GAA FY 2021 February 2, 2021 Region VIII Leyte 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement - Tertiary Roads

AS PER GAA/ORIGINAL:

La Paz-Javier-Bito Rd - K0952 + 710 - K0953 + 186

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: Shoulder P 9.80 M
Paving /Construction: 2,380.00 Square Meters

EAO P 0.20 M

Total P 10.00 M

AS MODIFIED:

La Paz-Javier-Bito Rd - K0953 + 120 - K0953 + 596

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: Shoulder P 9.80 M
Paving /Construction: 1,904.00 Square Meters

EAO P 0.20 M

Total P 10.00 M
June 22, 2021 2021 WIN1F06298 GAA FY 2021 February 1, 2021 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Primary Roads

AS PER GAA/ORIGINAL:

Construction of Drainage Structure along Road – Palo-Carigara-Ormoc Rd – K0998+952.05 – K1000+126

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 9.800 M
Road: 2,265.900 Lineal Meters
EAO P 0.200 M

Total P 10.00 M

AS MODIFIED:

Construction of Drainage Structure along Road – Palo-Carigara-Ormoc Road, K0998+952.05 – K1000+126; K1002+303 – K1002+520

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 9.800 M
Road: 2,269.00 Lineal Meters
EAO P 0.200 M

Total P 10.00 M
June 22, 2021 FY 2021 GAA WIN1E02320 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Bukidnon Rd - K1692+117 - K1695+000
Physical Target:
CW1: 5.776 Lane Km (Road Widening)
Allocation:
TOTAL: P 171,686,000.00
CW1: P 165,852,620.00 (Road Widening)
EAO: P 6,015,380.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Bukidnon Rd - K1692+117 - K1695+000
Physical Target:
CW1: 2.770 Lane Km (Road Widening)
ROW: 13,850.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 171,686,000.00
CW1: P 90,875,980.00 (Road Widening)
ROW: P 74,976,640.00 (ROW Acquisition)
EAO: P 6,015,380.00
June 22, 2021 FY 2021 GAA WIN1E02309 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Road - Primary Roads
Daang Maharlika (MN) -
K1454+997 - K1456+620, K1635+157 - K1635+660
Physical Target:
CW1: 4.288 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Reconstruction to Concrete Pavement)
EAO: P 1,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Road - Primary Roads
Daang Maharlika (MN) - K1455+346 - K1456+010
Physical Target:
CW1: 2.526 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Reconstruction to Concrete Pavement)
EAO: P 1,750,000.00
June 22, 2021 2021 WIN1F06321 GAA FY 2021 January 4, 2021 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Ormoc-Baybay-Southern Leyte Bdry Rd - K1059 + 400 - K1059 + 610

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 1.6464 M
Road: 210.00 Lineal Meters

EAO P 0.0336 M

Total P 1.68 M

AS MODIFIED:

Ormoc-Baybay-Southern Leyte Bdry Rd - K1059 + 817 - K1060 + 019

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 1.6464 M
Road: 150.00 Lineal Meters

EAO P 0.0336 M

Total P 1.68 M
June 22, 2021 2021 WIN1F06294 GAA FY 2021 January 1, 2021 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0908 + (-797) – K0908 + (-515)

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 7.840 M
along Road: 282 Lineal Meters

EAO P 0.160 M

Total P 8.00 M

AS MODIFIED:

Daang Maharlika (S00022LT) - K0908 +(-830) - K0908 + (-446), K0908+043-K0908+051

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 7.840 M
along Road: 392 Lineal Meters

EAO P 0.160 M

Total P 8.00 M
June 22, 2021 2021 WIN1F06306 GAA FY 2021 February 1, 2021 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Tertiary Roads

AS PER GAA/ORIGINAL:

Kananga-Tungonan Hot Spring Rd – K0993+300 – K0993+672

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement: P 16.575720 M
0.744 Lane Km
EAO P 0.338280 M

Total P 16.914 M

AS MODIFIED:

Reconstruction to Concrete Pavement – Kananga-Tungonan Hot Spring Rd – K0990+(-926) – K0990+(-913) (B); K0990+(-847) – K0990+(-781) – K0990+(-762) (B); K0990+(-227) – K0990+057 (B); K0990+066 – K0990+137(B); K0990+146 – K0990+227 (B); K0993+000 – K0993+285 (B); K0993+318 – K0993+336 (B); K0993+350 – K0993+370 (B); K0993+461 (B); K0993+480 – K0993+582 (B); K0993+592 – K0993+665 (B); K0996+056 – K0996+097 (B); K0996+316 - K0996+376 (B); K0997+127 – K0997+159 (B); K0997+214 – K0997+251 (B); K0997+271 – K0997+299 (B); K0997+324 – K0997+384 (B)


Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement: P 16.575720 M
2.594 Lane Km
EAO P 0.338280 M

Total P 16.914 M
June 22, 2021 FY 2021 WIN1C03758 FY 2021 GAA RA 11518 December 28, 2020 Region V Sorsogon 2nd District Engineering Office
AS PER GAA:
Construction of By-Pass Road, Barangay Carriedo-Liang-Hidhid, Irosin-Matnog, Sorsogon Sta. 4+608 – Sta. 5+424
Physical Target:
CW1 – Construction of Concrete Road
4.29 Lane km
Allocation: ₱50,000,000.00

AS MODIFIED:
Construction of By-Pass Road, Barangay Carriedo-Liang-Hidhid, Irosin-Matnog, Sorsogon Sta. 11+185 – Sta. 12+212
Physical Target:
CW1 – Construction of Concrete Road
2.64 Lane km
Allocation: ₱50,000,000.00
June 22, 2021 2021 WIN1B01166 GAA FY 2021 February 1, 2021 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Tertiary Roads

AS PER GAA/ORIGINAL:

Kananga – Tungonan Hot Spring Rd – K0995+200 – K0995+305

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement: P 4.678520 M
0.210 Lane Km
EAO P 0.095480 M

Total P 4.774 M

AS MODIFIED:

Kananga – Tungonan Hot Spring Rd – K0995+200 – K0995+305 (B); K0996+103 – K0996+229 (B); K0998+063 – K0998+081 (B); K0998+142 – K0998+194 (B); K0998+239 – K0998+252 (B)

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement: P 4.678520 M
0.628 Lane Km
EAO P 0.095480 M

Total P 4.774 MM
June 22, 2021 2021 WIN1F06309 GAA FY 2021 January 1, 2021 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

AS PER GAA/ORIGINAL:

Tacloban-Baybay South Rd - K0912 + 562 – K0912 + 673 , K0913 + 000 – K0913 + 796

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 19.13058 M
Asphalt Overlay: 3.406 Lane Km

EAO P 0.390420 M

Total P 19.521 M

AS MODIFIED:

Tacloban-Baybay South Rd - K0912 + 562 – K0912 + 673 , K0913 + 000 – K0913 + 925

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 19.13058 M
Asphalt Overlay: 2.726 Lane Km

EAO P 0.390420 M

Total P 19.521 M
June 22, 2021 FY 2021 WIN1C03762 FY 2021 GAA RA 11518 December 28, 2020 Region V Sorsogon District Engineering Office
UACS No.: 310209100317000
PROJECT ID: P00505315LZ
AS PER GAA:
Bacon-Sawanga-Prieto Diaz Rd – K0596+497 – K0597+000, K0597+194 – K0597+460, K0604+421 – K0604+724
Physical Target:
CW1 – Off-Carriageway Improvement: Shoulder Paving / Construction - 3,887.77 sq.m.
Allocation: ₱20,000,000.00

AS MODIFIED:
Bacon-Sawanga-Prieto Diaz Rd – K0596+618 – K0597+000, K0597+194 – K0597+460, K0604+421 – K0605+000
Physical Target:
CW1 – Off-Carriageway Improvement: Shoulder Paving / Construction - 6,374.44 sq.m.
Allocation: ₱20,000,000.00
June 22, 2021 FY 2021 WIN1B01141 FY 2021 GAA RA 11518 December 28, 2020 Region V Sorsogon District Engineering Office
UACS: 310209100277000
Project ID: P00505316LZ
AS PER GAA:
Bacon-Sawanga-Prieto Diaz Rd – K0605+395 – K0608+810
Physical Target:
CW1 – Off-Carriageway Improvement: Shoulder Paving / Construction - 13,660 sq.m.
Allocation: ₱70,000,000.00

AS MODIFIED:
Bacon-Sawanga-Prieto Diaz Rd – K0605+395 – K0609+106
Physical Target:
CW1 – Off-Carriageway Improvement: Shoulder Paving / Construction - 13,660 sq.m.
CW2 – Construction of Drainage Structure along Road - 373 Lineal Meters
Allocation: ₱70,000,000.00
June 22, 2021 FY 2021 WIN1C03888 FY 2021 GAA RA 11518 December 28, 2020 Region V Sorsogon District Engineering Office
UACS No.: 310209100320000
Project ID: P00505318LZ
AS PER GAA:
OO1: Network Development - Off-carriageway Improvement - Tertiary Roads- Jct Putiao-Pilar-Donsol Rd - K0566 + 640 - K0567 + 098, K0567 + 125 - K0567 + 210
Physical Target:
CW1 – Off-Carriageway Improvement: Shoulder Paving / Construction - 1,152 sq.m.
Allocation: ₱5,902,000.00

AS MODIFIED:
OO1: Network Development - Off-carriageway Improvement - Tertiary Roads-Jct Putiao-Pilar-Donsol Rd - K0566 + 640 - K0567 + 098, K0567 + 125 - K0567 + 210
Physical Target:
CW1 – Off-Carriageway Improvement: Shoulder Paving / Construction - 1,144 sq.m.
CW2 – Construction of Road Slope Protection Structure - 1,168.05 sq.m.
Allocation: ₱5,902,000.00
June 21, 2021 FY 2021 GAA WIN1E02301 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan) (Package C), Davao del Norte
Physical Target:
CW1: 3.502 Lane Km (Road Widening)
ROW: 26,265.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 198,000,000.00
CW1: P 170,033,000.00 (Road Widening)
ROW: P 21,037,000.00 (ROW Acquisition)
EAO: P 6,930,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan) (Package G), Davao del Norte
Physical Target:
CW1: 3.502 Lane Km (Road Widening)
ROW: 26,265.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 198,000,000.00
CW1: P 170,033,000.00 (Road Widening)
ROW: P 21,037,000.00 (ROW Acquisition)
EAO: P 6,930,000.00
June 21, 2021 FY 2021 GAA WIN1E02298 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction/Improvement of Road, Doña Luisa Phase 1, Barangay Matina Crossing 74-A, Davao City
Physical Target:
CW1: 0.598 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,980,000.00
CW1: P 5,860,400.00 (Construction of Concrete Road)
EAO: P 119,600.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction/Improvement of Road, Doña Luisa Phase 1, Barangay Matina Crossing 74-A, Davao City
Physical Target:
CW1: 1.270 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,980,000.00
CW1: P 5,860,400.00 (Construction of Concrete Road)
EAO: P 119,600.00
June 21, 2021 FY 2021 GAA WIN1E02312 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Jacinto St., Davao City
Physical Target:
CW1: 2.082 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,050,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Jacinto St., Davao City
Physical Target:
CW1: 1.702 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,050,000.00
June 21, 2021 FY 2021 GAA WIN1E02318 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Asphalt Overlay along Calamansi St., Juna, Davao City
Physical Target:
CW1: 1.682 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 21,045,000.00
CW1: P 20,308,425.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 736,575.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Asphalt Overlay along Calamansi St., Juna, Davao City
Physical Target:
CW1: 1.552 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 21,045,000.00
CW1: P 20,308,425.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 736,575.00
June 21, 2021 FY 2021 GAA WIN1E02299 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd -
K1510+000 - K1510+856, K1510+876.50 - K1518+006
Physical Target:
CW1: 0.350 Lane Km (Preventive Maintenance of Road: Concrete Reblocking)
Allocation:
TOTAL: P 1,583,000.00
CW1: P 1,551,340.00 (Preventive Maintenance of Road: Concrete Reblocking)
EAO: P 31,660.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1510+008.27 - K1512+149.48
Physical Target:
CW1: 0.210 Lane Km (Preventive Maintenance of Road: Concrete Reblocking)
Allocation:
TOTAL: P 1,583,000.00
CW1: P 1,551,340.00 (Preventive Maintenance of Road: Concrete Reblocking)
EAO: P 31,660.00
June 21, 2021 FY 2021 GAA WIN1E02321 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Drainage Protection Works - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Rehabilitation of Concrete Revetment along Digos River, Purok Manga Section, Barangay Tres de Mayo, Digos City
Physical Target:
CW1: 228.500 lm (Rehabilitation/Major Repair of Flood Control Structure)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Rehabilitation/Major Repair of Flood Control Structure)
EAO: P 400,000.00

TO: Local Program - Flood Control and Drainage - Drainage Protection Works - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Rehabilitation of Concrete Revetment along Digos River, Purok Manga Section, Barangay Tres de Mayo, Digos City
Physical Target:
CW1: 300.000 lm (Rehabilitation/Major Repair of Flood Control Structure)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Rehabilitation/Major Repair of Flood Control Structure)
EAO: P 400,000.00
June 21, 2021 FY 2021 GAA WIN1E02323 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Drainage Protection Works - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Rehabilitation of Concrete Revetment along Digos River, Aplaya Section, Barangay Aplaya, Digos City
Physical Target:
CW1: 420.000 lm (Rehabilitation/Major Repair of Flood Control Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Rehabilitation/Major Repair of Flood Control Structure)
EAO: P 1,750,000.00

TO: Local Program - Flood Control and Drainage - Drainage Protection Works - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Rehabilitation of Concrete Revetment along Digos River, Aplaya Section, Barangay Aplaya, Digos City
Physical Target:
CW1: 450.000 lm (Rehabilitation/Major Repair of Flood Control Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Rehabilitation/Major Repair of Flood Control Structure)
EAO: P 1,750,000.00
June 21, 2021 FY 2021 GAA WIN1E02297 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction/Upgrading/Rehabilitation of Drainage Outfall - Jct. Digos-Makar, Balutakay Section, Hagonoy, Davao del Sur
Physical Target:
CW1: 1,806.638 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Flood Mitigation Structure)
EAO: P 700,000.00

TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction/Upgrading/Rehabilitation of Drainage Outfall - Jct. Digos-Makar, Balutakay Section, Hagonoy, Davao del Sur
Physical Target:
CW1: 950.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Flood Mitigation Structure)
EAO: P 700,000.00
June 21, 2021 FY 2021 GAA WIN1E02316 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Dacudao Rd - K1509+135 - K1509+499
Physical Target:
CW1: 364.000 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Drainage Structure along Road)
EAO: P 600,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Dacudao Rd - K1509+135 - K1509+665
Physical Target:
CW1: 530.000 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Drainage Structure along Road)
EAO: P 600,000.00
June 21, 2021 FY 2021 GAA WIN1E02319 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Local Road, Barangay 6-A, Davao City
Physical Target:
CW1: 0.350 Lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 3,500,000.00
CW1: P 3,465,000.00 (Construction of Concrete Road)
EAO: P 35,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Local Road, Barangay 6-A, Davao City
Physical Target:
CW1: 0.264 Lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 3,500,000.00
CW1: P 3,465,000.00 (Construction of Concrete Road)
EAO: P 35,000.00
June 21, 2021 FY 2021 GAA WIN1E02310 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Road, Sitio Banban, Brgy. Lumiad to Brgy. Malabog, Paquibato District, Davao City
Physical Target:
CW1: 3.241 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 32,400,000.00
CW1: P 31,752,000.00 (Construction of Concrete Road)
EAO: P 648,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Road, Sitio Banban, Brgy. Lumiad to Brgy. Malabog, Paquibato District, Davao City
Physical Target:
CW1: 1.088 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 32,400,000.00
CW1: P 31,752,000.00 (Construction of Gravel Road)
EAO: P 648,000.00
June 21, 2021 FY 2021 GAA WIN1E02317 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along V. Mapa St. (Jct. Daang Maharlika Rd-Jct. Lopez Jaena St.), Davao City
Physical Target:
CW1: 3.124 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 56,780,000.00
CW1: P 54,792,700.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,987,300.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along V. Mapa St. (Jct. Daang Maharlika Rd-Jct. Lopez Jaena St.), Davao City
Physical Target:
CW1: 2.984 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 56,780,000.00
CW1: P 54,792,700.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,987,300.00
June 21, 2021 FY 2021 GAA WIN1E02303 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1452+000 - K1452+752
Physical Target:
CW1: 4.512 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1451+017 - K1451+994
Physical Target:
CW1: 5.862 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00
June 21, 2021 FY 2021 GAA WIN1E02306 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1450+681 - K1451+000
Physical Target:
CW1: 1.998 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 400,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1450+681 - K1451+017
Physical Target:
CW1: 2.100 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 400,000.00
June 18, 2021 FY 2021 GAA WIN1F06172 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 300201100072000
Project ID : P00531946LZ

Convergence and Special Support Program

Construction/Improvement of Access Roads leading to Airports

FROM:

Access Road leading to Francisco B. Reyes Airport
( Brgy. San Nicolas to Brgy. Decalacho ),
Coron, Palawan
Physical Target - CW1 - Construction of Concrete Road :
0.606 Lane Km
Allocation : Php 10.00 Million

TO:

Access Road leading to Francisco B. Reyes Airport
( Brgy. San Nicolas - Brgy. Decalacho ),
Coron, Palawan
Physical Target - CW1 - Construction of Concrete Road :
0.720 Lsnr zKm
Allocation : Php 10.00 Million
June 18, 2021 FY 2021 GAA WIN1F06185 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 300201100073000
Project ID : P00531985LZ

Convergence and Special Support Program

Construction/Improvement of Access Roads leading to Airports

FROM:

New Quezon - Cheey - San Jose - Decalacho Road
leading to Busuanga Airport, Busuanga, Palawan
Physical Target - CW1 - Construction of Concrete Road :
0.667 Lane Km
Allocation : Php 10.00 Million

TO:

New Quezon - Cheey - San Jose - Decalacho Road
leading to Busuanga Airport
Physical Target - CW1 - Construction of Concrete Road :
0.592 Lane Km
Allocation : Php 10.00 Million
June 18, 2021 FY 2021 GAA WIN1F06117 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 310108100516000
Project ID : P00516170LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and
Landslide - Secondary Roads

FROM:

Puerto Princesa North Road
K0014 + 300 - K0014 + 550
Physical Target - CW1 - Construction of Road Slope Protection :
10,000.00 square meter
Allocation : Php 100.00 million

TO :

Puerto Princesa North Road
K0014 + 300 - K0014 + 409
Physical Target - CW1 - Construction of Road Slope Protection :
4,430.81 square meter
Allocation : Php 100.00 Million
June 18, 2021 FY 2021 GAA WIN1F06116 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 310108100517000
Project ID : P00516171LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and
Landslide - Secondary Roads

FROM:

Puerto Princesa North Road
K0014 + 700 - K0014 + 900
Physical Target - CW1 - Construction of Road Slope Protection :
10,000.00 square meter
Allocation : Php 100.00 Million

TO :

Puerto Princesa North Road
K0014 + 740 - K0014 + 900,
K0016 + 620 - K0016 + 670
Physical Target - CW1 - Construction of Road Slope Protection :
4,431.85 square meter
Allocation : Php 100.00 Million
June 18, 2021 2021 WIN1C03952 GAA 2021 June 16, 2021 Cordillera Administrative Region CAR - Regional Office
From: Construction of Baguyos Flood Control at Barangay Colalo, Mankayan, Benguet ;
Physical Target: CW1 : 1375.16 Lineal meters;
Allocation= Php 100,000,000

To: Construction of Baguyos Flood Control at Barangay Colalo, Mankayan, Benguet ;
Physical Target: CW1 : 1537.47 Lineal meters;
Allocation= Php 100,000,000

June 18, 2021 2021 WIN1C03953 GAA 2021 June 16, 2021 Cordillera Administrative Region CAR - Regional Office
From: Construction of Flood Control along Lagawe River, Sta 0+020-Sta 0+860;
Physical Target: CW1 : 680 Lineal meters;
Allocation= Php 63,804,000

To: Construction of Flood Control along Lagawe River, Sta 0+000-Sta 0+680;
Physical Target: CW1 : 680 Lineal meters;
Allocation= Php 63,804,000

June 18, 2021 2021 WIN1C03961 GAA 2021 June 16, 2021 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Construction of Kapangan Flood Control Sta. 8+246 - 8+386 (R.S.), Sta. 8+294 - 8+394 (L.S.),Kapangan, Benguet;
Physical Target: CW1: : 280 Lineal meters;
Allocation= Php 11,887,000

To: Construction of Kapangan Flood Control Sta. 8+241 - Sta. 8+374 (R.S.), Sta. 8+243 - 8+374 (L.S.),Kapangan, Benguet;
Physical Target: CW1: 280 Lineal meters;
Allocation= Php 11,887,000

June 18, 2021 2021 WIN1C03954 SR2021-02-001253 February 3, 2021 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Construction of Flood Mitigation Structure within Naguillian River Basin: along Naguillian River Section 2 (Bolo Creek), Sta. 056+000 – Sta. 057+570, La Trinidad, Benguet;
Physical Target: CW1: 1,072.38 Lineal meters;
Allocation= Php 84,019,000

To: Construction of Flood Mitigation Structure within Naguillian River Basin: along Naguillian River Section 2 (Bolo Creek), Sta. 055+820 – Sta. 056+780, La Trinidad, Benguet;
Physical Target: CW1: 918 Lineal meters;
Allocation= Php 84,019,000

June 18, 2021 FY 2021 GAA WIN1F06115 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 310102100582000
Project ID : P00516137LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM:

Calapan South Road
K0001 + 850 - K0002 + 687,
K0022 + 438 - K0025 +117,
K0039 + 048 - K0039 + 698,
K0048 + 480 - K0050 + 765
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 13.127 Lane Km
Allocation : Php 106.813.00 Million

TO:

Calapan South Road
K0001 + 850 - K0002 + 698,
K0022 + 438 + K0024 + 778,
K0039 + 048 - K0040 + 583,
K0048 + 480 - K0050 + 750
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt overlay : 13.884 Lane Km
Allocation : Php 106.813.00 Million




June 18, 2021 2021 WIN1C03920 FY 2021 GAA December 28, 2020 Region III Zambales 2nd District Engineering Office
Asset Preservation - Preventive Maintenance - Primary Roads

Jose Abad Santos Ave (JASA) K0123+000 - K0124+317
June 18, 2021 2021 WIN1F06287 GAA FY 2021 January 1, 2021 Region VIII Northern Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Roads

AS PER GAA/ORIGINAL:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0802 + 956.40 - K0805 + 071

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 23.68954 M
Asphalt Overlay: 4.313 Lane Km

EAO P 0.48346 M

Total P 24.173 M

AS MODIFIED:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0802 + 956.40 - K0804 + 540

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 23.68954 M
Asphalt Overlay: 3.227 Lane Km

EAO P 0.48346 M

Total P 24.173 M
June 18, 2021 2021 WIN1E02291 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Agusan del Norte District Engineering Office
UACS No. 310201100722000
PROJECTS ID: P00501567MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

FROM:

Daang Maharlika (Surigao-Agusan Sect) - K1169 + 000 - K1170 + 000, K1174 + 701 - K1175 + 133

Type of Work / Physical Target: CW1 - Road Widening: 2.880 lane km

Unit Cost: P17,423,611.11lane km

Allocation: P50,180,000.00

EAO: P1,820,000.00

TOTAL: P52,000,000.00

TO:

Daang Maharlika (Surigao-Agusan Sect) - K1169 + 000 - K1169 + 793, K1174 + 701 - K1175 + 133

Type of Work / Physical Target: CW1 - Road Widening: 2.456 lane km

Unit Cost: P20,431,596.09 lane km

Allocation: P50,180,000.00

EAO: P1,820,000.00

TOTAL: P52,000,000.00
June 18, 2021 2021 WIN1E02296 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Agusan del Norte District Engineering Office
UACS No. 310201100719000
PROJECTS ID: P00501568MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

FROM:

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1268 + 000 - K1268 + 749, K1277 + 000 - K1277 + 795

Type of Work / Physical Target: CW1 - Road Widening: 3.088 lane km

Unit Cost: P15,855,000.00 lane km

Allocation: P48,960,240.00

EAO: P1,775,760.00

TOTAL: P50,736,000.00

TO:

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1267 + 938 - K1268 + 742, K1277 + 000 - K1277 + 387

Type of Work / Physical Target: CW1 - Road Widening: 2.396 lane km

Unit Cost: P20,434,156.93 lane km

Allocation: P48,960,240.00

EAO: P1,775,760.00

TOTAL: P50,736,000.00
June 17, 2021 FY 2021 GAA WIN1F06149 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 310102100584000
Project ID : P00516139LZ

001: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM ;

Calapan North Road
K0019 + 511 - K0020 + 000,
K0022 + 554 - K0025 + 468,
K0026 + 325 - K0026 + 1065,
K0027 + 311 - K0028 + 000
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 9.472 Lane Km
Allocation : Php 114.992 Million

TO :

Calapan North Road
K0019 + 511 - K0020 + 000,
K0022 + 554 - K0023 + 422,
K0023 + 465 - K0025 + 385,
K0026 + 325 - K0026 + 1065,
K0027 + 311 - K0028 + 002
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 9.224 Lane Km
Allocation : Php 114.992 Million
June 17, 2021 FY 2021 GAA WIN1F06148 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 310102100585000
Project ID : P00516140LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Preventive maintenance - Secondary Roads

FROM:

Calapan South Road
K0027 + 548 - K0031 + 000
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 7.108 Lane Km
Allocation : Php 85.008 Million

TO:

Calapan South Road
K0027 + 547 - K0031 + 087
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 7.284 Lane Km
Allocation : Php 85.008 Million
June 17, 2021 FY 2021 GAA WIN1F06187 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 310108100515000
Project ID : P00516169LZ

001: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse and
Landslide - Secondary Roads

FROM :

PPSR - Jct - Napsan - Apurawan Road
K0037 + 520 - K0037 + 720
Physical Target - CW1 - Construction of Road Slope Protection :
10,000.00 square meter
Allocation : Php 100.00 Million

TO :

PPSR Jct - Napsan - Apurawan Road
K0037 + 420 - K0037 + 620,
K0037 + 660 - K0037 + 720
Physical Target - CW1 - Construction of Road Slope Protection :
4,435.60 square meter
Allocation : Php 100.00 Million



June 17, 2021 FY 2021 GAA WIN1F06145 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 310108100518000
Project ID : P00516172LZ

001: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse and
Landslide - Secondary Roads

FROM:

Puerto Princesa North Road
K0016 + 610 - K0017 + 000,
K0017 + 660 - K0017 + 780
Physical Target - CW1 - Construction of Road Slope Protection :
0.00 square meter
Allocation : Php 100.00 Million

TO:

Puerto Princesa North Road
K0016 + 782 - K0016 + 980
Physical Target - CW1 - Construction of Road Slope Protection :
4,427.10 square meter
Allocation : Php 100.00 Million

June 17, 2021 FY 2021 GAA WIN1F06155 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 320102104115000
Project ID : P00526331LZ

002: Protect Lives and Properties

Flood Management - Construction/Rehabilitation of Flood
Mitigation Facilities along Major River
Basins and Principal Rivers

FROM:

Construction of Flood Control Structure along Pula River at Barangay Sto. Nino - Pagalagala - Sta. Maria and Pambisan Malaki, Pinamalayan, Oriental Mindoro
Sta. 0 + 000 - Sta. 2 + 000
Physical Target - CW1 - Construction of Flood Mitigation
Structure: 623.60 Linear Meters (lm)
Allocation : Php 100.00 Million

TO :

Construction of Flood Control Structure along Pula River at
Barangay Sto. Nino - Pagalagala - Sta. Maria and Pambisan Malaki, Oriental Mindoro
Sta. 0 + 376.40 - Sta. 1 + 000
Physical Target - CW1 - Construction of Flood Mitigation
Structure : 623.60 Lineal Meters (lm)
Allocation : Php 100.00 Million
June 17, 2021 2021 WIN1F06271 SR2021-02-002371 February 4, 2021 Region VI Regional Office VI
FROM:

LOCAL PROGRAM

Local - Buildings and Other Structures Multipurpose / Facilities - National Building Program

Construction of Two Storey DPWH Regional Office VI Building, Fort San Pedro, Iloilo City


CW1- Construction of Multi Purpose Building: 1 Number of Building
193,000.00 / Number of Building - 193,000.00
EAO - 7,000.00

Total: 200,000.00


TO:

LOCAL PROGRAM

Local - Buildings and Other Structures Multipurpose / Facilities - National Building Program

Construction of Three Storey DPWH Regional Office VI Building, Fort San Pedro, Iloilo City


CW1- Construction of Multi Purpose Building: 1 Number of Building
193,000.00 / Number of Building - 193,000.00
EAO - 7,000.00

Total: 200,000.00
June 17, 2021 2021 310204101016000 GAA FY 2021 January 25, 2021 Region II Regional Office II
OO1 : Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads - Aurora Bypass Road, Isabela
June 16, 2021 FY 2021 GAA WIN1F06097 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. 310108100524000
Project ID : P00505931LZ

001: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and
Landslide - Secondary Roads

FROM:
Sibuyan Circumferential Road
K0037 + 000 - K0037 + 300,
K0038 + 900 - K0039 + 498,
K0047 + 500 - K0047 + 865,
K0065 + 260 - K0066 + 047
Physical Target - CW1 - Construction of Road Slope Protection :
8,277.65 square meter
Allocation : Php 80.00 Million

TO:
Sibuyan Circumferential Road
K0037 + 000 - K0037 + 058,
K0065 + 320 - K0065 + 520
Physical Target - CW1 - Construction of Road Slope Protection :
3,506.70 square meter
Allocation : Php 80.00 Million
June 16, 2021 FY 2021 GAA WIN1F06083 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 310108100526000
Project ID : P00505932LZ

001: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and
Landslide - Secondary Roads

FROM:

Tablas Circumferential Road
K0062 + 500 - K0062 + 874
Physical Target - CW1 - Construction of Road Slope Protection :
8,139.125 square meter
Allocation : Php 149.00 Million


TO:

Tablas CIrcumferential Road
K0032+ 752.50 - K0033 + 193.00
Physical Target - CW1 - Construction of Road Slope Protection :
6,793.00 square meter
Allocation : Php 149.00 Million
June 16, 2021 2021 WIN1F06242 GAA FY 2021 January 25, 2021 Region VIII Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0724 + 189 - K0724 + 312, K0724 + 460 -K0724 + 660, K0724 + 743 - K0724 + 843, K0726 + 929 - K0727 + 106

Physical Target: Allocation:

CW1-Road Widening: 1.17 Lane Km P 22.54 M

EAO P 0.46 M

Total P 23.00 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0724 + 186 - K0724 + 316, K0726 + 929 - K0727 + 106, K0734 + 168.6 - K0734 + 398

Physical Target: Allocation:

CW1-Road Widening: 0.39 Lane Km P 6.818 M

CW2-Construction of Road Slope Protection P 6.736 M
Structure : 833.20 Square Meters

CW3-Road Safety: Street Lighting: P 5.164 M
0.509 Kilometers

ROW-ROW Acquisition: 2,151.72 Square Meters P 3.900 M

EAO P 0.382 M

Total P 23.00 M
June 16, 2021 2021 WIN1F06257 GAA FY 2021 January 25, 2021 Region VIII Samar 1st District Engineering Office
Local Program

Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program

AS PER GAA/ORIGINAL:

Construction of Multi-Purpose Building (Daycare Center), Mancol, San Jorge, Samar

Physical Target: Allocation:

CW1-Construction of Multi-Purpose P 1.98 M
Building: 1 Number of Buildings

EAO P 0.02 M

Total P 2.00 M

AS MODIFIED:

Construction of Multi-Purpose Building, Mancol, San Jorge, Samar

Physical Target: Allocation:

CW1-Construction of Multi-Purpose P 1.98 M
Building: 1 Number of Buildings

EAO P 0.02 M

Total P 2.00 M
June 16, 2021 FY 2021 GAA Win1F06178 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 310108100525000
Project ID : P{00505933LZ

001: Ensure safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and
Landslide - Secondary Roads

FROM:

Tablas Circumferential Road
K0062 + 119 - K0062 + 500
Physical Target - CW1 - Construction of Road Slope Protection ;
12,639.36 square meter
Allocation : Php 232.00 Million

TO:

Tablas Circumferential Road
K0044 + 518 - K0044 + 791
Physical Target - CW1 - Construction of Road Slope Protection :
9,888.07 square meter
Allocation : Php 232.00 Million
June 16, 2021 2021 WIN1F06253 GAA FY 2021 April 16, 2021 Region VIII Samar 1st District Engineering Office
Local Program

Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program

AS PER GAA/ORIGINAL:

Construction (Completion) of Multi-purpose Building (Barangay Health Station), Dapdap, Talalora, Samar

Physical Target: Allocation:

CW1-Construction of Multipurpose Building: P 1.485 M
1.00 Number of Building
EAO P 0.015 M

Total P 1.500 M

AS MODIFIED:

Construction of Multi-purpose Building (Barangay Health Station), Dapdap, Tarangnan, Samar

Physical Target: Allocation:

CW1-Construction of Multipurpose Building: P 1.485 M
1.00 Number of Building
EAO P 0.015 M

Total P 1.500 M

Pages