June 24, 2021 |
2021 |
300104220360000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya District Engineering Office |
Local Program - Local - Buildings and Other Structures - Multipurpose/ Facilities - Local Infrastructure Program - Construction (Phase 2) of Multi-Purpose Building, Municipality of Villaverde, Nueva Vizcaya |
June 24, 2021 |
2021 |
WIN1F06327 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
AS PER GAA/ORIGINAL:
Sn Policarpo-Arteche-Lapinig Rd - K0860 + 000 - K0861 + 000
Physical Target: Allocation:
CW1-Road Widening: 1.994 Lane Km P 20.2762 M
EAO P 0.4138 M
Total P 20.690M
AS MODIFIED:
Sn Policarpo-Arteche-Lapinig Rd - K0860 + 245 - K0861 + 000
Physical Target: Allocation:
CW1-Road Widening: 1.400 Lane Km P 20.2762 M
EAO P 0.4138 M
Total P 20.690M
|
June 24, 2021 |
2021 |
300117208326000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya District Engineering Office |
Local Program - Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Concreting of Road in Purok 5, Barangay Bagahabag, Solano, Nueva Vizcaya |
June 24, 2021 |
2021 |
320101106607000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Magat River Control, (Phase 1), Baretbet, Bagabag, Nueva Vizvaya |
June 24, 2021 |
2021 |
300117208320000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya District Engineering Office |
Local Program - Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Concreting of Road at Purok 1, Barangay Balete, Diadi, Nueva Vizcaya |
June 24, 2021 |
2021 |
WIN1F06301 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Road
AS PER GAA/ORIGINAL:
Preventive Maintenance of Road: Asphalt Overlay – Dayhagan-Salvacion-Coob-Libertad Road, K1009+363 – K1010+000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 14.700 M
Asphalt Overlay : 2.612 Lane Km
EAO P 0.300 M
Total P 15.00 M
AS MODIFIED:
Preventive Maintenance of Road: Asphalt Overlay – Dayhagan-Salvacion-Coob-Libertad Road, K1010+549 – K1010+982
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 14.700 M
Asphalt Overlay : 1.732 Lane Km
EAO P 0.300 M
Total P 15.00 M
|
June 24, 2021 |
2021 |
WIN1F06300 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
AS PER GAA/ORIGINAL:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0800 + 714 - K0802 + 000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 15.3223 M
Asphalt Overlay: 2.608 Lane Km
EAO P 0.3127 M
Total P 15.635 M
AS MODIFIED:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0800 + 714 - K0801 + 848
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 15.3223 M
Asphalt Overlay: 2.292 Lane Km
EAO P 0.3127 M
Total P 15.635 M
|
June 24, 2021 |
2021 |
WIN1F06295 |
GAA FY 2021 |
January 25, 2021 |
Region VIII |
Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0724 + 444 - K0724 + 659
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 3,333,333 Square Meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0724 + 447.5 – K0724 + 655, K0724 + 742.4 – K0724 + 840.4
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 46.55 M
Structure: 2,058.00 Square Meters
ROW- ROW Acquisition: 1,697.85 Square Meters P 2.50 M
EAO P 0.950 M
Total P 50.00 M
|
June 24, 2021 |
2021 |
WIN1F06302 |
GAA FY 2021 |
January 2, 2021 |
Region VIII |
Eastern Samar District Engineering Office |
Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
AS PER GAA/ORIGINAL:
Rehabilitation/Improvement of Road, Barangay Caiwasan, Balangkayan, Eastern Samar
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: 4.882 Lane Km P 24.50 M
EAO P 0.50 M
Total P 25.00 M
AS MODIFIED:
Rehabilitation/Improvement of Road, Barangay Caiwasan, Balangkayan, Eastern Samar
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: 4.37 Lane Km P 24.50 M
EAO P 0.50 M
Total P 25.00 M
|
June 24, 2021 |
FY 2021 GAA |
WIN1F06193 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310111100298000
Project ID : P00516191LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation
of Drainage along National Roads
- Secondary Roads
FROM ;
Calapan South Road,
K0010 + 521 - K0011 + 188
Physical Target - CW1 - Construction of Drainage Structure
along National Road :
1.332.00 Lineal meters
Allocation : Php 10.00 Million
TO :
Calapan South Road,
K0010 + 637 - K0011 + 188
Physical Target - CW1 - Construction of Drainage Structure
along National Road :
1,100.00 Lineal meters
Allocation : Php 10.00 Million |
June 24, 2021 |
2021 |
WIN1F06314 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
Local Program
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
AS PER GAA/ORIGINAL:
Concreting of Roads, Barangay Capilian, Abuyog, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road: 0.173 Lane Km P 1.98 M
EAO P 0.02 M
Total P 2.00 M
AS MODIFIED:
Concreting of Roads, Barangay Capilian, Abuyog, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road: 1.364 Lane Km P 1.98 M
EAO P 0.02 M
Total P 2.00 M
|
June 24, 2021 |
2021 |
WIN1F06311 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
Local Program
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
AS PER GAA/ORIGINAL:
Concreting of Roads, Barangay Guadalupe, Baybay City, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road: 0.086 Lane Km P1.00 M
Total P 1.00 M
AS MODIFIED:
Concreting of Roads, Barangay Guadalupe, Baybay City, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road: 0.326 Lane Km P1.00 M
Total P 1.00 M
|
June 24, 2021 |
2021 |
WIN1B01172 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
Local Program
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
AS PER GAA/ORIGINAL:
Concreting of Roads, Barangay Libertad, Abuyog, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road: 0.173 Lane Km P 1.980 M
EAO P 0.02 M
Total P 2.00 M
AS MODIFIED:
Concreting of Roads, Barangay Libertad, Abuyog, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road: 0.692 Lane Km P 1.980 M
EAO P 0.02 M
Total P 2.00 M
|
June 24, 2021 |
2021 |
WIN1F06330 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
Local Program
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
AS PER GAA/ORIGINAL:
Concreting of Roads, Barangay Maitum, Abuyog, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road: 0.173 Lane Km P 1.980 M
EAO P 0.02 M
Total P 2.00 M
AS MODIFIED:
Concreting of Roads, Barangay Maitum, Abuyog, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road: 0.664 Lane Km P 1.980 M
EAO P 0.02 M
Total P 2.00 M
|
June 24, 2021 |
FY 2021 GAA |
WIN1F06244 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS no. : 300116204176000
Project ID : P00562437LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Sitio Libtong, Brgy. Balatero, Puerto Galera, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.430 Lane Km
Allocation : Php 15.00 Million
TO :
Concreting of Road,
Sitio Libtong, Brgy. Balatero, Puerto Galera, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
1.936 Lane Km
Allocation : Php 15.00 Million
|
June 23, 2021 |
FY 2021 |
WIN1C03717 |
FY 2021 GAA RA 11518 |
December 28, 2020 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310108100528000
Project ID: P00505992LZ
AS PER GAA:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Secondary Roads - Jct Milagros-Baleno-Lagta Rd - K0038+110 - K0038+190
Physical Target : CW1-Construction of Road Slope Protection Structure - 2,050 sq.m.
Allocation: Php 100,000,000.00
AS MODIFIED:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Secondary Roads - Jct Milagros-Baleno-Lagta Rd - K0038+350 - K0038+478
Physical Target : CW1-Construction of Road Slope Protection Structure - 4,290 sq.m.
Allocation: Php 100,000,000.00 |
June 23, 2021 |
FY 2021 |
WIN1C03754 |
FY 2021 GAA RA 11518 |
December 28, 2020 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 300117209330000
Project ID: P00564883LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Concreting of Road, Junction National Road, Masbate Institute of Fisheries and Tech., Masbate City, Masbate
Physical Target: CW1-Construction of Concrete Road – 0.162 Lane km
Allocation: Php 3,000,000.00
AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Concreting of Road, Junction National Road, Masbate Institute of Fisheries and Tech., Milagros, Masbate
Physical Target: CW1-Construction of Concrete Road – 0.162 Lane km
Allocation: Php 3,000,000.00
|
June 23, 2021 |
FY 2021 |
WIN1C03719 |
FY 2021 GAA RA 11518 |
December 28, 2020 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 310111100306000
Project ID: P00505404LZ
AS PER GAA:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Construction/Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads – Tagas-Daet Poblacion-Magang Rd – K0341+587 – K0341+795
Physical Target: CW1-Construction of Drainage Structure along Road – 208 Ln.m.
Allocation: Php 10,000,000.00
AS MODIFIED:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Construction/Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads – Tagas-Daet Poblacion-Magang Rd – K0341+587 – K0341+795, K0343+397.50-K0343+780
Physical Target: CW1-Construction of Drainage Structure along Road – 590.5 Ln.m.
Allocation: Php 10,000,000.00
|
June 23, 2021 |
2021 |
320102104061000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Regional Office II |
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities along major River Basins and Principal Rivers - Construction of Flood Control System, Package 1, Sta. 0+000 - Sta. 0+296 (Upstream), Balasig, Cabagan, Isabela |
June 23, 2021 |
FY 2021 |
WIN1C03750 |
FY 2021 GAA RA 11518 |
December 28, 2020 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 300104222328000
Project ID: P00560858LZ
AS PER GAA:
Local Program – Buildings and Other Structures- Multipurpose/Facilities – Local Infrastructure Program – Construction of Multi-Purpose Building, Tarum elementary School, Barangay Tarum, Basud, Camarines Norte
Physical Target: CW1- Construction of Multi-Purpose Building – 1 Number of Buildings
Allocation: Php 2,500,000.00
AS MODIFIED:
Local Program – Buildings and Other Structures- Multipurpose/Facilities – Local Infrastructure Program – Construction of Multi-Purpose Building, Tarum elementary School, Barangay Tarum, Mercedes, Camarines Norte
Physical Target: CW1- Construction of Multi-Purpose Building – 1 Number of Buildings
Allocation: Php 2,500,000.00
|
June 23, 2021 |
2021 |
320102104063000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Regional Office II |
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers - Construction of Flood Control Systems, Barangay Salinas, Bambang, Nueva Vizcaya |
June 23, 2021 |
2021 |
310203100430000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Isabela 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Roads - Ilagan - Bigao - Palanan Rd - K0413+839 - K0414+382 |
June 23, 2021 |
FY 2021 GAA |
WIN1E02329 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Jct. ABS-CBN Quimpo Blvd. Div. Rd - Jct. Davao City Coastal Rd, Barangay Bucana, Davao City
Physical Target:
CW1: 32.223 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 322,096,000.00
CW1: P 310,822,640.00 (Reconstruction to Concrete Pavement)
EAO: P 11,273,360.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Jct. ABS-CBN Quimpo Blvd. Div. Rd - Jct. Davao City Coastal Rd, Barangay Bucana, Davao City
Physical Target:
CW1: 3.6915 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 322,096,000.00
CW1: P 52,592,500.00 (Reconstruction to Concrete Pavement)
EAO: P 1,907,500.00
EXC: P 267,596,000.00 |
June 23, 2021 |
FY 2021 GAA |
WIN1E02324 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Digos-Makar Rd - K1568+636 - K1570+960
Physical Target:
CW1: 11,685.00 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 23,372,000.00
CW1: P 22,904,560.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 467,440.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Digos-Makar Rd - K1569+040 - K1570+033
Physical Target:
CW1: 5,000.00 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
CW2: 0.860 km (Road Safety: Street Lighting)
Allocation:
TOTAL: P 23,372,000.00
CW1: P 14,957,198.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
CW2: P 7,947,362.00 (Road Safety: Street Lighting)
EAO: P 467,440.00 |
June 23, 2021 |
FY 2021 GAA |
WIN1E02331 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Carmen - Panabo Diversion Road
Physical Target:
CW1: 5.840 Lane Km (Construction to Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Construction to Concrete Road)
EAO: P 1,750,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Carmen - Panabo Diversion Road
Physical Target:
CW1: 5.190 Lane Km (Construction to Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Construction to Concrete Road)
EAO: P 1,750,000.00 |
June 23, 2021 |
FY 2021 GAA |
WIN1E02328 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of Road at Barangay Mambago-B to Sitio Maslob, Sto. Niño to Barangay Tagbitan-ag, Island Garden City of Samal, Davao Del Norte
Physical Target:
CW1: 6.160 Lane Km (Construction to Concrete Road)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction to Concrete Road)
EAO: P 2,450,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of Road at Barangay Mambago-B to Sitio Maslob, Sto. Niño to Barangay Tagbitan-ag, Island Garden City of Samal, Davao Del Norte
Physical Target:
CW1: 5.980 Lane Km (Construction to Concrete Road)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction to Concrete Road)
EAO: P 2,450,000.00 |
June 23, 2021 |
FY 2021 GAA |
WIN1E02330 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Surigao-Davao Coastal Rd -
K1781+692 - K1782+000, K1783+135 - K1783+550
Physical Target:
CW1: 2.702 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 12,007,000.00
CW1: P 11,766,860.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 240,140.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Surigao-Davao Coastal Rd -
K1781+692 - K1782+000, K1783+135 - K1783+550
Physical Target:
CW1: 1.872 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 12,007,000.00
CW1: P 11,766,860.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 240,140.00 |
June 23, 2021 |
2021 |
WIN1C03989 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Manila North Road - K0053+639 - K0053+810, K0059+000 - K0059+650
|
June 23, 2021 |
FY 2021 GAA |
WIN1E02326 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1585+000 - K1592+000
Physical Target:
CW1: 28.000 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 98,031,000.00
CW1: P 94,599,915.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,431,085.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1585+000 - K1592+000
Physical Target:
CW1: 14.000 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 98,031,000.00
CW1: P 94,599,915.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,431,085.00 |
June 23, 2021 |
2021 |
WIN1C04032 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 1st District Engineering Office |
Network Development - Off-Carriageway Improvement - Tertiary Roads
Baliwag - Candaba - Sta. Ana Rd - K0068+000 - K0068+017.30, K0068+477 - K0068+794 |
June 23, 2021 |
FY 2021 |
WIN1C03775 |
FY 2021 GAA RA 11518 |
December 28, 2020 |
Region V |
Regional Office V |
UACS No.: 300211100151000
Project ID: P00534724LZ
AS PER GAA:
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide, Catanduanes Cir Rd K0146+850-K0146+950, Catanduanes
Physical Target: CW1-Construction of Road Slope Protection Structure – 1,289.182 sq.m.
Allocation: Php 50,000,000.00
AS MODIFIED:
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide, Catanduanes Cir Rd K0146+910.76 - K0146+950.00, Catanduanes
Physical Target: CW1-Construction of Road Slope Protection Structure – 2,626.00 sq.m.
Allocation: Php 50,000,000.00
|
June 23, 2021 |
2021 |
WIN1C03948 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Manila North Rd, K0055+144 - K0055+291 |
June 23, 2021 |
2021 |
WIN1C03949 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Tulaoc - Sto. Domingo Rd, K0063+288 - K0063+713
|
June 23, 2021 |
FY 2021 GAA |
WIN1G02943 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Flood Mitigation Structure, F. Torres Bridge (Downstream), Davao River, Brgy. 9-A, Davao City
Physical Target:
CW1: 348.706 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Flood Mitigation Structure)
EAO: P 600,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Flood Mitigation Structure, F. Torres Bridge (Downstream), Davao River, Brgy. 9-A, Davao City
Physical Target:
CW1: 102.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Flood Mitigation Structure)
EAO: P 600,000.00 |
June 23, 2021 |
FY 2021 GAA |
WIN1G02944 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage, Barangay 22-C, Davao City
Physical Target:
CW1: 210.00 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Drainage Structure)
EAO: P 30,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage, Barangay 22-C, Davao City
Physical Target:
CW1: 80.00 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Drainage Structure)
EAO: P 30,000.00 |
June 23, 2021 |
FY 2021 GAA |
WIN1G02941 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Drainage and Protection Works - Local Infrastructure Program
Improvement of Drainage Structure, Barangay 2-A, Davao City
Physical Target:
CW1: 177.00 Lineal meters (Rehabilitation/Major Repair of Drainage Structure)
Allocation:
TOTAL: P 3,500,000.00
CW1: P 3,465,000.00 (Rehabilitation/Major Repair of Drainage Structure)
EAO: P 35,000.00
TO: Local Program - Flood Control and Drainage - Drainage and Protection Works - Local Infrastructure Program
Improvement of Drainage Structure, Barangay 2-A, Davao City
Physical Target:
CW1: 218.00 Lineal meters (Rehabilitation/Major Repair of Drainage Structure)
Allocation:
TOTAL: P 3,500,000.00
CW1: P 3,465,000.00 (Rehabilitation/Major Repair of Drainage Structure)
EAO: P 35,000.00 |
June 23, 2021 |
FY 2021 GAA |
WIN1G02942 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Road: Asphalt Overlay - Davao-Cotabato Old Rd -
K1523+518 - K1524+489, K1524+507 - K1525+570
Physical Target:
CW1: 13.638 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 163,400,000.00
CW1: P 157,681,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,719,000.00
TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Road: Asphalt Overlay - Davao-Cotabato Old Rd -
K1523+518 - K1524+489, K1524+507 - K1525+570
Physical Target:
CW1: 9.528 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 163,400,000.00
CW1: P 157,681,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,719,000.00 |
June 23, 2021 |
FY 2021 |
WIN1C03900 |
FY 2021 GAA RA 11518 |
December 28, 2020 |
Region V |
Sorsogon District Engineering Office |
UACS No.: 310106100607000
Project ID: P00505792LZ
AS PER GAA:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Tertiary Roads -Jct Donsol -Banuang Gurang Rd – K0590+169 – K0590+295
Physical Target: CW1-Reconstruction of Concrete Pavement – 0.252 Lane km.
Allocation: Php 5,000,000.00
AS MODIFIED:
Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Tertiary Roads -Jct Donsol -Banuang Gurang Rd – K0590+185 – K0590+325
Physical Target: CW1-Reconstruction of Concrete Pavement – 0.28 Lane km.
CW2-Construction of Drainage Structure along Road – 280 Ln.m.
Allocation: Php 5,000,000.00
|
June 23, 2021 |
FY 2021 GAA |
WIN1G02938 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Revetment along Kingking River, Ayan Section R/S, Brgy. Kingking, Pantukan, Davao de Oro (Sta. 3+500 - Sta. 4+983 RS)
Physical Target:
CW1: 666.050 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 55,000,000.00
CW1: P 53,075,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,925,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Revetment along Kingking River, Ayan Section R/S, Brgy. Kingking, Pantukan, Davao de Oro (Sta. 4+517.070 ‐ Sta. 4+727.280 RS, Sta. 4+741.699 ‐ Sta. 5+187.529 RS)
Physical Target:
CW1: 666.050 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 55,000,000.00
CW1: P 53,075,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,925,000.00 |
June 23, 2021 |
FY 2021 GAA |
WIN1G02950 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Revetment along Hijo River at Hijo Br.2 (Downstream) Brgy. Hijo, Maco, Davao de Oro (Sta. 1+560 - Sta. 2+180 LS)
Physical Target:
CW1: 411.180 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,100,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Revetment along Hijo River at Hijo Br.2 (Downstream) Brgy. Hijo, Maco, Davao de Oro (Sta. 1+569.233 - Sta. 1+980.413 LS)
Physical Target:
CW1: 411.180 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,100,000.00 |
June 23, 2021 |
FY 2021 GAA |
WIN1G02948 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Road, Brgy. Pangibiran, Mabini, Davao de Oro
Physical Target:
CW1: 0.900 Lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Road, Brgy. Pangibiran, Mabini, Davao de Oro
Physical Target:
CW1: 1.264 Lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00 |
June 23, 2021 |
2021 |
WIN1C04070 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 2nd District Engineering Office |
Network Development - Road Widening - Primary Roads
Jose Abad Santos Ave (JASA), K0080+240 - K0081+448, K0082+951.58 - K0083+348.43 |
June 23, 2021 |
2021 |
WIN1C03913 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bataan 2nd District Engineering Office |
Convergence and Special Support - Construction / Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructures Program - ROLL-IT)
Bagac - Mariveles By-pass Road connecting Bagac - Mariveles Road to Freeport Area of Bataan in support to Mix-Used Industry-Electronics, Garments, Fashion Bags, FAB, Mariveles, Bataan |
June 23, 2021 |
2021 |
WIN1C04027 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bataan 2nd District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Roman Expressway, K0143+100 - K0143+300, K0144+400 - K0144+900 |
June 23, 2021 |
2021 |
WIN1C04007 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bataan 2nd District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads\
Roman Expressway - K0130+640 - K0130+906, K0136+670 - K0136+958 |
June 23, 2021 |
FY 2021 GAA |
WIN1E02339 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way - K1702+192 - K1703+265
Physical Target:
CW1: 1.402 Lane Km (Road Widening)
Allocation:
TOTAL: P 21,808,000.00
CW1: P 21,371,840.00 (Road Widening)
EAO: P 436,160.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way - K1702+192 - K1703+447
Physical Target:
CW1: 1.402 Lane Km (Road Widening)
Allocation:
TOTAL: P 21,808,000.00
CW1: P 21,371,840.00 (Road Widening)
EAO: P 436,160.00 |
June 22, 2021 |
2021 |
WIN1F06293 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Regional Office VIII |
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods
Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
AS PER GAA/ORIGINAL:
Construction of Cadac-an Flood Control Structure along Cadac-an River, Cadac-an River Basin,Right Side Bank, Abuyog, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 96.500 M
Structure: 945.579 Lineal meters
EAO P 3.500 M
Total P 100.00 M
AS MODIFIED:
Construction of Cadac-an Flood Control Structure along Cadac-an River, Cadac-an River Basin,Right Side Bank, Abuyog, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 96.500 M
Structure: 360.00 Lineal meters
EAO P 3.500 M
Total P 100.00 M
|
June 22, 2021 |
2021 |
WIN1F06305 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Leyte 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Tertiary Roads
AS PER GAA/ORIGINAL:
La Paz-Javier-Bito Rd - K0952 + 710 - K0953 + 186
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: Shoulder P 9.80 M
Paving /Construction: 2,380.00 Square Meters
EAO P 0.20 M
Total P 10.00 M
AS MODIFIED:
La Paz-Javier-Bito Rd - K0953 + 120 - K0953 + 596
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: Shoulder P 9.80 M
Paving /Construction: 1,904.00 Square Meters
EAO P 0.20 M
Total P 10.00 M
|
June 22, 2021 |
2021 |
WIN1F06298 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Primary Roads
AS PER GAA/ORIGINAL:
Construction of Drainage Structure along Road – Palo-Carigara-Ormoc Rd – K0998+952.05 – K1000+126
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 9.800 M
Road: 2,265.900 Lineal Meters
EAO P 0.200 M
Total P 10.00 M
AS MODIFIED:
Construction of Drainage Structure along Road – Palo-Carigara-Ormoc Road, K0998+952.05 – K1000+126; K1002+303 – K1002+520
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 9.800 M
Road: 2,269.00 Lineal Meters
EAO P 0.200 M
Total P 10.00 M
|
June 22, 2021 |
FY 2021 GAA |
WIN1E02320 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Bukidnon Rd - K1692+117 - K1695+000
Physical Target:
CW1: 5.776 Lane Km (Road Widening)
Allocation:
TOTAL: P 171,686,000.00
CW1: P 165,852,620.00 (Road Widening)
EAO: P 6,015,380.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Bukidnon Rd - K1692+117 - K1695+000
Physical Target:
CW1: 2.770 Lane Km (Road Widening)
ROW: 13,850.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 171,686,000.00
CW1: P 90,875,980.00 (Road Widening)
ROW: P 74,976,640.00 (ROW Acquisition)
EAO: P 6,015,380.00 |
June 22, 2021 |
FY 2021 GAA |
WIN1E02309 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Road - Primary Roads
Daang Maharlika (MN) -
K1454+997 - K1456+620, K1635+157 - K1635+660
Physical Target:
CW1: 4.288 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Reconstruction to Concrete Pavement)
EAO: P 1,750,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Road - Primary Roads
Daang Maharlika (MN) - K1455+346 - K1456+010
Physical Target:
CW1: 2.526 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Reconstruction to Concrete Pavement)
EAO: P 1,750,000.00 |
June 22, 2021 |
2021 |
WIN1F06321 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Ormoc-Baybay-Southern Leyte Bdry Rd - K1059 + 400 - K1059 + 610
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 1.6464 M
Road: 210.00 Lineal Meters
EAO P 0.0336 M
Total P 1.68 M
AS MODIFIED:
Ormoc-Baybay-Southern Leyte Bdry Rd - K1059 + 817 - K1060 + 019
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 1.6464 M
Road: 150.00 Lineal Meters
EAO P 0.0336 M
Total P 1.68 M
|
June 22, 2021 |
2021 |
WIN1F06294 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0908 + (-797) – K0908 + (-515)
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 7.840 M
along Road: 282 Lineal Meters
EAO P 0.160 M
Total P 8.00 M
AS MODIFIED:
Daang Maharlika (S00022LT) - K0908 +(-830) - K0908 + (-446), K0908+043-K0908+051
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 7.840 M
along Road: 392 Lineal Meters
EAO P 0.160 M
Total P 8.00 M
|
June 22, 2021 |
2021 |
WIN1F06306 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Tertiary Roads
AS PER GAA/ORIGINAL:
Kananga-Tungonan Hot Spring Rd – K0993+300 – K0993+672
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement: P 16.575720 M
0.744 Lane Km
EAO P 0.338280 M
Total P 16.914 M
AS MODIFIED:
Reconstruction to Concrete Pavement – Kananga-Tungonan Hot Spring Rd – K0990+(-926) – K0990+(-913) (B); K0990+(-847) – K0990+(-781) – K0990+(-762) (B); K0990+(-227) – K0990+057 (B); K0990+066 – K0990+137(B); K0990+146 – K0990+227 (B); K0993+000 – K0993+285 (B); K0993+318 – K0993+336 (B); K0993+350 – K0993+370 (B); K0993+461 (B); K0993+480 – K0993+582 (B); K0993+592 – K0993+665 (B); K0996+056 – K0996+097 (B); K0996+316 - K0996+376 (B); K0997+127 – K0997+159 (B); K0997+214 – K0997+251 (B); K0997+271 – K0997+299 (B); K0997+324 – K0997+384 (B)
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement: P 16.575720 M
2.594 Lane Km
EAO P 0.338280 M
Total P 16.914 M
|
June 22, 2021 |
FY 2021 |
WIN1C03758 |
FY 2021 GAA RA 11518 |
December 28, 2020 |
Region V |
Sorsogon 2nd District Engineering Office |
AS PER GAA:
Construction of By-Pass Road, Barangay Carriedo-Liang-Hidhid, Irosin-Matnog, Sorsogon Sta. 4+608 – Sta. 5+424
Physical Target:
CW1 – Construction of Concrete Road
4.29 Lane km
Allocation: ₱50,000,000.00
AS MODIFIED:
Construction of By-Pass Road, Barangay Carriedo-Liang-Hidhid, Irosin-Matnog, Sorsogon Sta. 11+185 – Sta. 12+212
Physical Target:
CW1 – Construction of Concrete Road
2.64 Lane km
Allocation: ₱50,000,000.00 |
June 22, 2021 |
2021 |
WIN1B01166 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Tertiary Roads
AS PER GAA/ORIGINAL:
Kananga – Tungonan Hot Spring Rd – K0995+200 – K0995+305
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement: P 4.678520 M
0.210 Lane Km
EAO P 0.095480 M
Total P 4.774 M
AS MODIFIED:
Kananga – Tungonan Hot Spring Rd – K0995+200 – K0995+305 (B); K0996+103 – K0996+229 (B); K0998+063 – K0998+081 (B); K0998+142 – K0998+194 (B); K0998+239 – K0998+252 (B)
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement: P 4.678520 M
0.628 Lane Km
EAO P 0.095480 M
Total P 4.774 MM
|
June 22, 2021 |
2021 |
WIN1F06309 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Tacloban-Baybay South Rd - K0912 + 562 – K0912 + 673 , K0913 + 000 – K0913 + 796
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 19.13058 M
Asphalt Overlay: 3.406 Lane Km
EAO P 0.390420 M
Total P 19.521 M
AS MODIFIED:
Tacloban-Baybay South Rd - K0912 + 562 – K0912 + 673 , K0913 + 000 – K0913 + 925
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 19.13058 M
Asphalt Overlay: 2.726 Lane Km
EAO P 0.390420 M
Total P 19.521 M
|
June 22, 2021 |
FY 2021 |
WIN1C03762 |
FY 2021 GAA RA 11518 |
December 28, 2020 |
Region V |
Sorsogon District Engineering Office |
UACS No.: 310209100317000
PROJECT ID: P00505315LZ
AS PER GAA:
Bacon-Sawanga-Prieto Diaz Rd – K0596+497 – K0597+000, K0597+194 – K0597+460, K0604+421 – K0604+724
Physical Target:
CW1 – Off-Carriageway Improvement: Shoulder Paving / Construction - 3,887.77 sq.m.
Allocation: ₱20,000,000.00
AS MODIFIED:
Bacon-Sawanga-Prieto Diaz Rd – K0596+618 – K0597+000, K0597+194 – K0597+460, K0604+421 – K0605+000
Physical Target:
CW1 – Off-Carriageway Improvement: Shoulder Paving / Construction - 6,374.44 sq.m.
Allocation: ₱20,000,000.00 |
June 22, 2021 |
FY 2021 |
WIN1B01141 |
FY 2021 GAA RA 11518 |
December 28, 2020 |
Region V |
Sorsogon District Engineering Office |
UACS: 310209100277000
Project ID: P00505316LZ
AS PER GAA:
Bacon-Sawanga-Prieto Diaz Rd – K0605+395 – K0608+810
Physical Target:
CW1 – Off-Carriageway Improvement: Shoulder Paving / Construction - 13,660 sq.m.
Allocation: ₱70,000,000.00
AS MODIFIED:
Bacon-Sawanga-Prieto Diaz Rd – K0605+395 – K0609+106
Physical Target:
CW1 – Off-Carriageway Improvement: Shoulder Paving / Construction - 13,660 sq.m.
CW2 – Construction of Drainage Structure along Road - 373 Lineal Meters
Allocation: ₱70,000,000.00 |
June 22, 2021 |
FY 2021 |
WIN1C03888 |
FY 2021 GAA RA 11518 |
December 28, 2020 |
Region V |
Sorsogon District Engineering Office |
UACS No.: 310209100320000
Project ID: P00505318LZ
AS PER GAA:
OO1: Network Development - Off-carriageway Improvement - Tertiary Roads- Jct Putiao-Pilar-Donsol Rd - K0566 + 640 - K0567 + 098, K0567 + 125 - K0567 + 210
Physical Target:
CW1 – Off-Carriageway Improvement: Shoulder Paving / Construction - 1,152 sq.m.
Allocation: ₱5,902,000.00
AS MODIFIED:
OO1: Network Development - Off-carriageway Improvement - Tertiary Roads-Jct Putiao-Pilar-Donsol Rd - K0566 + 640 - K0567 + 098, K0567 + 125 - K0567 + 210
Physical Target:
CW1 – Off-Carriageway Improvement: Shoulder Paving / Construction - 1,144 sq.m.
CW2 – Construction of Road Slope Protection Structure - 1,168.05 sq.m.
Allocation: ₱5,902,000.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02301 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan) (Package C), Davao del Norte
Physical Target:
CW1: 3.502 Lane Km (Road Widening)
ROW: 26,265.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 198,000,000.00
CW1: P 170,033,000.00 (Road Widening)
ROW: P 21,037,000.00 (ROW Acquisition)
EAO: P 6,930,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan) (Package G), Davao del Norte
Physical Target:
CW1: 3.502 Lane Km (Road Widening)
ROW: 26,265.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 198,000,000.00
CW1: P 170,033,000.00 (Road Widening)
ROW: P 21,037,000.00 (ROW Acquisition)
EAO: P 6,930,000.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02298 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction/Improvement of Road, Doña Luisa Phase 1, Barangay Matina Crossing 74-A, Davao City
Physical Target:
CW1: 0.598 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,980,000.00
CW1: P 5,860,400.00 (Construction of Concrete Road)
EAO: P 119,600.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction/Improvement of Road, Doña Luisa Phase 1, Barangay Matina Crossing 74-A, Davao City
Physical Target:
CW1: 1.270 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,980,000.00
CW1: P 5,860,400.00 (Construction of Concrete Road)
EAO: P 119,600.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02312 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Jacinto St., Davao City
Physical Target:
CW1: 2.082 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,050,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Jacinto St., Davao City
Physical Target:
CW1: 1.702 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,050,000.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02318 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Asphalt Overlay along Calamansi St., Juna, Davao City
Physical Target:
CW1: 1.682 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 21,045,000.00
CW1: P 20,308,425.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 736,575.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Asphalt Overlay along Calamansi St., Juna, Davao City
Physical Target:
CW1: 1.552 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 21,045,000.00
CW1: P 20,308,425.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 736,575.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02299 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd -
K1510+000 - K1510+856, K1510+876.50 - K1518+006
Physical Target:
CW1: 0.350 Lane Km (Preventive Maintenance of Road: Concrete Reblocking)
Allocation:
TOTAL: P 1,583,000.00
CW1: P 1,551,340.00 (Preventive Maintenance of Road: Concrete Reblocking)
EAO: P 31,660.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1510+008.27 - K1512+149.48
Physical Target:
CW1: 0.210 Lane Km (Preventive Maintenance of Road: Concrete Reblocking)
Allocation:
TOTAL: P 1,583,000.00
CW1: P 1,551,340.00 (Preventive Maintenance of Road: Concrete Reblocking)
EAO: P 31,660.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02321 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Drainage Protection Works - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Rehabilitation of Concrete Revetment along Digos River, Purok Manga Section, Barangay Tres de Mayo, Digos City
Physical Target:
CW1: 228.500 lm (Rehabilitation/Major Repair of Flood Control Structure)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Rehabilitation/Major Repair of Flood Control Structure)
EAO: P 400,000.00
TO: Local Program - Flood Control and Drainage - Drainage Protection Works - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Rehabilitation of Concrete Revetment along Digos River, Purok Manga Section, Barangay Tres de Mayo, Digos City
Physical Target:
CW1: 300.000 lm (Rehabilitation/Major Repair of Flood Control Structure)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Rehabilitation/Major Repair of Flood Control Structure)
EAO: P 400,000.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02323 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Drainage Protection Works - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Rehabilitation of Concrete Revetment along Digos River, Aplaya Section, Barangay Aplaya, Digos City
Physical Target:
CW1: 420.000 lm (Rehabilitation/Major Repair of Flood Control Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Rehabilitation/Major Repair of Flood Control Structure)
EAO: P 1,750,000.00
TO: Local Program - Flood Control and Drainage - Drainage Protection Works - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Rehabilitation of Concrete Revetment along Digos River, Aplaya Section, Barangay Aplaya, Digos City
Physical Target:
CW1: 450.000 lm (Rehabilitation/Major Repair of Flood Control Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Rehabilitation/Major Repair of Flood Control Structure)
EAO: P 1,750,000.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02297 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction/Upgrading/Rehabilitation of Drainage Outfall - Jct. Digos-Makar, Balutakay Section, Hagonoy, Davao del Sur
Physical Target:
CW1: 1,806.638 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Flood Mitigation Structure)
EAO: P 700,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction/Upgrading/Rehabilitation of Drainage Outfall - Jct. Digos-Makar, Balutakay Section, Hagonoy, Davao del Sur
Physical Target:
CW1: 950.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Flood Mitigation Structure)
EAO: P 700,000.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02316 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Dacudao Rd - K1509+135 - K1509+499
Physical Target:
CW1: 364.000 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Drainage Structure along Road)
EAO: P 600,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Dacudao Rd - K1509+135 - K1509+665
Physical Target:
CW1: 530.000 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Drainage Structure along Road)
EAO: P 600,000.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02319 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Local Road, Barangay 6-A, Davao City
Physical Target:
CW1: 0.350 Lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 3,500,000.00
CW1: P 3,465,000.00 (Construction of Concrete Road)
EAO: P 35,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Local Road, Barangay 6-A, Davao City
Physical Target:
CW1: 0.264 Lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 3,500,000.00
CW1: P 3,465,000.00 (Construction of Concrete Road)
EAO: P 35,000.00
|
June 21, 2021 |
FY 2021 GAA |
WIN1E02310 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Road, Sitio Banban, Brgy. Lumiad to Brgy. Malabog, Paquibato District, Davao City
Physical Target:
CW1: 3.241 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 32,400,000.00
CW1: P 31,752,000.00 (Construction of Concrete Road)
EAO: P 648,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Road, Sitio Banban, Brgy. Lumiad to Brgy. Malabog, Paquibato District, Davao City
Physical Target:
CW1: 1.088 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 32,400,000.00
CW1: P 31,752,000.00 (Construction of Gravel Road)
EAO: P 648,000.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02317 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along V. Mapa St. (Jct. Daang Maharlika Rd-Jct. Lopez Jaena St.), Davao City
Physical Target:
CW1: 3.124 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 56,780,000.00
CW1: P 54,792,700.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,987,300.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along V. Mapa St. (Jct. Daang Maharlika Rd-Jct. Lopez Jaena St.), Davao City
Physical Target:
CW1: 2.984 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 56,780,000.00
CW1: P 54,792,700.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,987,300.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02303 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1452+000 - K1452+752
Physical Target:
CW1: 4.512 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1451+017 - K1451+994
Physical Target:
CW1: 5.862 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02306 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1450+681 - K1451+000
Physical Target:
CW1: 1.998 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 400,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1450+681 - K1451+017
Physical Target:
CW1: 2.100 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 400,000.00 |
June 18, 2021 |
FY 2021 GAA |
WIN1F06172 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300201100072000
Project ID : P00531946LZ
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Airports
FROM:
Access Road leading to Francisco B. Reyes Airport
( Brgy. San Nicolas to Brgy. Decalacho ),
Coron, Palawan
Physical Target - CW1 - Construction of Concrete Road :
0.606 Lane Km
Allocation : Php 10.00 Million
TO:
Access Road leading to Francisco B. Reyes Airport
( Brgy. San Nicolas - Brgy. Decalacho ),
Coron, Palawan
Physical Target - CW1 - Construction of Concrete Road :
0.720 Lsnr zKm
Allocation : Php 10.00 Million
|
June 18, 2021 |
FY 2021 GAA |
WIN1F06185 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300201100073000
Project ID : P00531985LZ
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Airports
FROM:
New Quezon - Cheey - San Jose - Decalacho Road
leading to Busuanga Airport, Busuanga, Palawan
Physical Target - CW1 - Construction of Concrete Road :
0.667 Lane Km
Allocation : Php 10.00 Million
TO:
New Quezon - Cheey - San Jose - Decalacho Road
leading to Busuanga Airport
Physical Target - CW1 - Construction of Concrete Road :
0.592 Lane Km
Allocation : Php 10.00 Million
|
June 18, 2021 |
FY 2021 GAA |
WIN1F06117 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310108100516000
Project ID : P00516170LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and
Landslide - Secondary Roads
FROM:
Puerto Princesa North Road
K0014 + 300 - K0014 + 550
Physical Target - CW1 - Construction of Road Slope Protection :
10,000.00 square meter
Allocation : Php 100.00 million
TO :
Puerto Princesa North Road
K0014 + 300 - K0014 + 409
Physical Target - CW1 - Construction of Road Slope Protection :
4,430.81 square meter
Allocation : Php 100.00 Million |
June 18, 2021 |
FY 2021 GAA |
WIN1F06116 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310108100517000
Project ID : P00516171LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and
Landslide - Secondary Roads
FROM:
Puerto Princesa North Road
K0014 + 700 - K0014 + 900
Physical Target - CW1 - Construction of Road Slope Protection :
10,000.00 square meter
Allocation : Php 100.00 Million
TO :
Puerto Princesa North Road
K0014 + 740 - K0014 + 900,
K0016 + 620 - K0016 + 670
Physical Target - CW1 - Construction of Road Slope Protection :
4,431.85 square meter
Allocation : Php 100.00 Million |
June 18, 2021 |
2021 |
WIN1C03952 |
GAA 2021 |
June 16, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Baguyos Flood Control at Barangay Colalo, Mankayan, Benguet ;
Physical Target: CW1 : 1375.16 Lineal meters;
Allocation= Php 100,000,000
To: Construction of Baguyos Flood Control at Barangay Colalo, Mankayan, Benguet ;
Physical Target: CW1 : 1537.47 Lineal meters;
Allocation= Php 100,000,000
|
June 18, 2021 |
2021 |
WIN1C03953 |
GAA 2021 |
June 16, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Flood Control along Lagawe River, Sta 0+020-Sta 0+860;
Physical Target: CW1 : 680 Lineal meters;
Allocation= Php 63,804,000
To: Construction of Flood Control along Lagawe River, Sta 0+000-Sta 0+680;
Physical Target: CW1 : 680 Lineal meters;
Allocation= Php 63,804,000
|
June 18, 2021 |
2021 |
WIN1C03961 |
GAA 2021 |
June 16, 2021 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Construction of Kapangan Flood Control Sta. 8+246 - 8+386 (R.S.), Sta. 8+294 - 8+394 (L.S.),Kapangan, Benguet;
Physical Target: CW1: : 280 Lineal meters;
Allocation= Php 11,887,000
To: Construction of Kapangan Flood Control Sta. 8+241 - Sta. 8+374 (R.S.), Sta. 8+243 - 8+374 (L.S.),Kapangan, Benguet;
Physical Target: CW1: 280 Lineal meters;
Allocation= Php 11,887,000
|
June 18, 2021 |
2021 |
WIN1C03954 |
SR2021-02-001253 |
February 3, 2021 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Construction of Flood Mitigation Structure within Naguillian River Basin: along Naguillian River Section 2 (Bolo Creek), Sta. 056+000 – Sta. 057+570, La Trinidad, Benguet;
Physical Target: CW1: 1,072.38 Lineal meters;
Allocation= Php 84,019,000
To: Construction of Flood Mitigation Structure within Naguillian River Basin: along Naguillian River Section 2 (Bolo Creek), Sta. 055+820 – Sta. 056+780, La Trinidad, Benguet;
Physical Target: CW1: 918 Lineal meters;
Allocation= Php 84,019,000
|
June 18, 2021 |
FY 2021 GAA |
WIN1F06115 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310102100582000
Project ID : P00516137LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM:
Calapan South Road
K0001 + 850 - K0002 + 687,
K0022 + 438 - K0025 +117,
K0039 + 048 - K0039 + 698,
K0048 + 480 - K0050 + 765
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 13.127 Lane Km
Allocation : Php 106.813.00 Million
TO:
Calapan South Road
K0001 + 850 - K0002 + 698,
K0022 + 438 + K0024 + 778,
K0039 + 048 - K0040 + 583,
K0048 + 480 - K0050 + 750
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt overlay : 13.884 Lane Km
Allocation : Php 106.813.00 Million
|
June 18, 2021 |
2021 |
WIN1C03920 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Zambales 2nd District Engineering Office |
Asset Preservation - Preventive Maintenance - Primary Roads
Jose Abad Santos Ave (JASA) K0123+000 - K0124+317 |
June 18, 2021 |
2021 |
WIN1F06287 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
AS PER GAA/ORIGINAL:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0802 + 956.40 - K0805 + 071
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 23.68954 M
Asphalt Overlay: 4.313 Lane Km
EAO P 0.48346 M
Total P 24.173 M
AS MODIFIED:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0802 + 956.40 - K0804 + 540
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 23.68954 M
Asphalt Overlay: 3.227 Lane Km
EAO P 0.48346 M
Total P 24.173 M
|
June 18, 2021 |
2021 |
WIN1E02291 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. 310201100722000
PROJECTS ID: P00501567MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
FROM:
Daang Maharlika (Surigao-Agusan Sect) - K1169 + 000 - K1170 + 000, K1174 + 701 - K1175 + 133
Type of Work / Physical Target: CW1 - Road Widening: 2.880 lane km
Unit Cost: P17,423,611.11lane km
Allocation: P50,180,000.00
EAO: P1,820,000.00
TOTAL: P52,000,000.00
TO:
Daang Maharlika (Surigao-Agusan Sect) - K1169 + 000 - K1169 + 793, K1174 + 701 - K1175 + 133
Type of Work / Physical Target: CW1 - Road Widening: 2.456 lane km
Unit Cost: P20,431,596.09 lane km
Allocation: P50,180,000.00
EAO: P1,820,000.00
TOTAL: P52,000,000.00 |
June 18, 2021 |
2021 |
WIN1E02296 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. 310201100719000
PROJECTS ID: P00501568MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
FROM:
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1268 + 000 - K1268 + 749, K1277 + 000 - K1277 + 795
Type of Work / Physical Target: CW1 - Road Widening: 3.088 lane km
Unit Cost: P15,855,000.00 lane km
Allocation: P48,960,240.00
EAO: P1,775,760.00
TOTAL: P50,736,000.00
TO:
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1267 + 938 - K1268 + 742, K1277 + 000 - K1277 + 387
Type of Work / Physical Target: CW1 - Road Widening: 2.396 lane km
Unit Cost: P20,434,156.93 lane km
Allocation: P48,960,240.00
EAO: P1,775,760.00
TOTAL: P50,736,000.00 |
June 17, 2021 |
FY 2021 GAA |
WIN1F06149 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310102100584000
Project ID : P00516139LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM ;
Calapan North Road
K0019 + 511 - K0020 + 000,
K0022 + 554 - K0025 + 468,
K0026 + 325 - K0026 + 1065,
K0027 + 311 - K0028 + 000
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 9.472 Lane Km
Allocation : Php 114.992 Million
TO :
Calapan North Road
K0019 + 511 - K0020 + 000,
K0022 + 554 - K0023 + 422,
K0023 + 465 - K0025 + 385,
K0026 + 325 - K0026 + 1065,
K0027 + 311 - K0028 + 002
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 9.224 Lane Km
Allocation : Php 114.992 Million |
June 17, 2021 |
FY 2021 GAA |
WIN1F06148 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310102100585000
Project ID : P00516140LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive maintenance - Secondary Roads
FROM:
Calapan South Road
K0027 + 548 - K0031 + 000
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 7.108 Lane Km
Allocation : Php 85.008 Million
TO:
Calapan South Road
K0027 + 547 - K0031 + 087
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 7.284 Lane Km
Allocation : Php 85.008 Million |
June 17, 2021 |
FY 2021 GAA |
WIN1F06187 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310108100515000
Project ID : P00516169LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse and
Landslide - Secondary Roads
FROM :
PPSR - Jct - Napsan - Apurawan Road
K0037 + 520 - K0037 + 720
Physical Target - CW1 - Construction of Road Slope Protection :
10,000.00 square meter
Allocation : Php 100.00 Million
TO :
PPSR Jct - Napsan - Apurawan Road
K0037 + 420 - K0037 + 620,
K0037 + 660 - K0037 + 720
Physical Target - CW1 - Construction of Road Slope Protection :
4,435.60 square meter
Allocation : Php 100.00 Million
|
June 17, 2021 |
FY 2021 GAA |
WIN1F06145 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310108100518000
Project ID : P00516172LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse and
Landslide - Secondary Roads
FROM:
Puerto Princesa North Road
K0016 + 610 - K0017 + 000,
K0017 + 660 - K0017 + 780
Physical Target - CW1 - Construction of Road Slope Protection :
0.00 square meter
Allocation : Php 100.00 Million
TO:
Puerto Princesa North Road
K0016 + 782 - K0016 + 980
Physical Target - CW1 - Construction of Road Slope Protection :
4,427.10 square meter
Allocation : Php 100.00 Million
|
June 17, 2021 |
FY 2021 GAA |
WIN1F06155 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 320102104115000
Project ID : P00526331LZ
002: Protect Lives and Properties
Flood Management - Construction/Rehabilitation of Flood
Mitigation Facilities along Major River
Basins and Principal Rivers
FROM:
Construction of Flood Control Structure along Pula River at Barangay Sto. Nino - Pagalagala - Sta. Maria and Pambisan Malaki, Pinamalayan, Oriental Mindoro
Sta. 0 + 000 - Sta. 2 + 000
Physical Target - CW1 - Construction of Flood Mitigation
Structure: 623.60 Linear Meters (lm)
Allocation : Php 100.00 Million
TO :
Construction of Flood Control Structure along Pula River at
Barangay Sto. Nino - Pagalagala - Sta. Maria and Pambisan Malaki, Oriental Mindoro
Sta. 0 + 376.40 - Sta. 1 + 000
Physical Target - CW1 - Construction of Flood Mitigation
Structure : 623.60 Lineal Meters (lm)
Allocation : Php 100.00 Million
|
June 17, 2021 |
2021 |
WIN1F06271 |
SR2021-02-002371 |
February 4, 2021 |
Region VI |
Regional Office VI |
FROM:
LOCAL PROGRAM
Local - Buildings and Other Structures Multipurpose / Facilities - National Building Program
Construction of Two Storey DPWH Regional Office VI Building, Fort San Pedro, Iloilo City
CW1- Construction of Multi Purpose Building: 1 Number of Building
193,000.00 / Number of Building - 193,000.00
EAO - 7,000.00
Total: 200,000.00
TO:
LOCAL PROGRAM
Local - Buildings and Other Structures Multipurpose / Facilities - National Building Program
Construction of Three Storey DPWH Regional Office VI Building, Fort San Pedro, Iloilo City
CW1- Construction of Multi Purpose Building: 1 Number of Building
193,000.00 / Number of Building - 193,000.00
EAO - 7,000.00
Total: 200,000.00 |
June 17, 2021 |
2021 |
310204101016000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Regional Office II |
OO1 : Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads - Aurora Bypass Road, Isabela |
June 16, 2021 |
FY 2021 GAA |
WIN1F06097 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. 310108100524000
Project ID : P00505931LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and
Landslide - Secondary Roads
FROM:
Sibuyan Circumferential Road
K0037 + 000 - K0037 + 300,
K0038 + 900 - K0039 + 498,
K0047 + 500 - K0047 + 865,
K0065 + 260 - K0066 + 047
Physical Target - CW1 - Construction of Road Slope Protection :
8,277.65 square meter
Allocation : Php 80.00 Million
TO:
Sibuyan Circumferential Road
K0037 + 000 - K0037 + 058,
K0065 + 320 - K0065 + 520
Physical Target - CW1 - Construction of Road Slope Protection :
3,506.70 square meter
Allocation : Php 80.00 Million
|
June 16, 2021 |
FY 2021 GAA |
WIN1F06083 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310108100526000
Project ID : P00505932LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and
Landslide - Secondary Roads
FROM:
Tablas Circumferential Road
K0062 + 500 - K0062 + 874
Physical Target - CW1 - Construction of Road Slope Protection :
8,139.125 square meter
Allocation : Php 149.00 Million
TO:
Tablas CIrcumferential Road
K0032+ 752.50 - K0033 + 193.00
Physical Target - CW1 - Construction of Road Slope Protection :
6,793.00 square meter
Allocation : Php 149.00 Million |
June 16, 2021 |
2021 |
WIN1F06242 |
GAA FY 2021 |
January 25, 2021 |
Region VIII |
Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0724 + 189 - K0724 + 312, K0724 + 460 -K0724 + 660, K0724 + 743 - K0724 + 843, K0726 + 929 - K0727 + 106
Physical Target: Allocation:
CW1-Road Widening: 1.17 Lane Km P 22.54 M
EAO P 0.46 M
Total P 23.00 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0724 + 186 - K0724 + 316, K0726 + 929 - K0727 + 106, K0734 + 168.6 - K0734 + 398
Physical Target: Allocation:
CW1-Road Widening: 0.39 Lane Km P 6.818 M
CW2-Construction of Road Slope Protection P 6.736 M
Structure : 833.20 Square Meters
CW3-Road Safety: Street Lighting: P 5.164 M
0.509 Kilometers
ROW-ROW Acquisition: 2,151.72 Square Meters P 3.900 M
EAO P 0.382 M
Total P 23.00 M
|
June 16, 2021 |
2021 |
WIN1F06257 |
GAA FY 2021 |
January 25, 2021 |
Region VIII |
Samar 1st District Engineering Office |
Local Program
Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program
AS PER GAA/ORIGINAL:
Construction of Multi-Purpose Building (Daycare Center), Mancol, San Jorge, Samar
Physical Target: Allocation:
CW1-Construction of Multi-Purpose P 1.98 M
Building: 1 Number of Buildings
EAO P 0.02 M
Total P 2.00 M
AS MODIFIED:
Construction of Multi-Purpose Building, Mancol, San Jorge, Samar
Physical Target: Allocation:
CW1-Construction of Multi-Purpose P 1.98 M
Building: 1 Number of Buildings
EAO P 0.02 M
Total P 2.00 M
|
June 16, 2021 |
FY 2021 GAA |
Win1F06178 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310108100525000
Project ID : P{00505933LZ
001: Ensure safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and
Landslide - Secondary Roads
FROM:
Tablas Circumferential Road
K0062 + 119 - K0062 + 500
Physical Target - CW1 - Construction of Road Slope Protection ;
12,639.36 square meter
Allocation : Php 232.00 Million
TO:
Tablas Circumferential Road
K0044 + 518 - K0044 + 791
Physical Target - CW1 - Construction of Road Slope Protection :
9,888.07 square meter
Allocation : Php 232.00 Million |
June 16, 2021 |
2021 |
WIN1F06253 |
GAA FY 2021 |
April 16, 2021 |
Region VIII |
Samar 1st District Engineering Office |
Local Program
Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program
AS PER GAA/ORIGINAL:
Construction (Completion) of Multi-purpose Building (Barangay Health Station), Dapdap, Talalora, Samar
Physical Target: Allocation:
CW1-Construction of Multipurpose Building: P 1.485 M
1.00 Number of Building
EAO P 0.015 M
Total P 1.500 M
AS MODIFIED:
Construction of Multi-purpose Building (Barangay Health Station), Dapdap, Tarangnan, Samar
Physical Target: Allocation:
CW1-Construction of Multipurpose Building: P 1.485 M
1.00 Number of Building
EAO P 0.015 M
Total P 1.500 M |