DPWH Completes Strengthening Works at Magallanes Interchange
Works to restore the structural integrity of the 41-year old Magallanes Interchange in Makati City has been completed by the Department of Public Works and Highways (DPWH).
DPWH-National Capital Region Director Melvin B. Navarro said series of repair works were done in five (5) stages at the 1,809.50-lineal meter flyover to be able to strengthen the structure that has served as a junction between the South Luzon Expressway (SLEX) and Epifanio de los Santos Avenue (EDSA) since 1975.