July 2, 2021 |
2021 |
WIN1F06308 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd - K0147 + 000 - K0147 + 300
CW1- Reconstruction to Concrete Pavement: 0.60 lane km - 12,313.70
EAO - 251.30
Total: 12,565.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd - K0147 + 000 - K0147 + 805.5
CW1- Reconstruction to Concrete Pavement: 1.611 lane km - 12,313.70
EAO - 251.30
Total: 12,565.00
|
July 2, 2021 |
2021 |
WIN1F06245 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
LOCAL PROGRAM
Local – Buildings and Other Structures - Multipurpose / Facilities - National Building Program
Rehabilitation of Multi-Purpose Hall (Evacuation Center) with Artesian Well, Barangay San Pedro, Pontevedra, Capiz, Roxas City
CW1- Rehabilitation /Major Repair of Multi Purpose Building: 1.00 Building - 2,450.00
EAO - 50.00
Total: 2,500.00
TO:
LOCAL PROGRAM
Local – Buildings and Other Structures - Multipurpose / Facilities - National Building Program
Rehabilitation of Multi-Purpose Hall (Evacuation Center) with Artesian Well, Barangay San Pedro, Pontevedra, Capiz
CW1- Rehabilitation /Major Repair of Multi Purpose Building: 1.00 Building - 2,450.00
EAO - 50.00
Total: 2,500.00
|
July 2, 2021 |
2021 |
WIN1F06385 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
LOCAL PROGRAM
Local – Buildings and Other Structures - Multipurpose / Facilities - National Building Program
Rehabilitation of Multi-Purpose Hall (Evacuation Center) with Artesian Well, Barangay Tacas, Pontevedra, Capiz, Roxas City
CW1- Rehabilitation /Major Repair of Multi Purpose Building: 1.00 Building - 2,450.00
EAO - 50.00
Total: 2,500.00
TO:
LOCAL PROGRAM
Local – Buildings and Other Structures - Multipurpose / Facilities - National Building Program
Rehabilitation of Multi-Purpose Hall (Evacuation Center) with Artesian Well, Barangay Tacas, Pontevedra, Capiz
CW1- Rehabilitation /Major Repair of Multi Purpose Building: 1.00 Building - 2,450.00
EAO - 50.00
Total: 2,500.00
|
July 1, 2021 |
2021 |
WIN1F06323 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Jaime Cardinal Sin Ave - K0284 + 041 - K0286 + 367
CW1- Road Widening: 4.544 lane km - 50,075.78
EAO - 1,816.22
Total: 51,892.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Jaime Cardinal Sin Ave - K0284 + 075 - K0286 + 653
CW1- Road Widening: 5.048 lane km - 48,075.78
ROW Acquisition: 400 sq.m - 2,000.00
EAO - 1,816.22
Total: 51,892.00
|
July 1, 2021 |
2021 |
WIN1F06292 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Aklan East Rd - K0282 + 150 - K0282 + 186, K0282 + 912 - K0283 + 356, K0283 + 706 - K0283 + 806, K0286 + 720 - K0286 + 801, K0286 + 989 - K0287 + 048, K0287 + 114 - K0287 + 142, K0287 + 170 - K0287 + 214, K0287 + 670 - K0287 + 826, K0288 + 130 - K0288 + 290, K0288 + 990 - K0289 + 066, K0289 + 220 - K0289 + 296, K0289 + 300 - K0289 + 536
CW1- Construction of Drainage Structure along Road: 1,569 lineal meters - 26,209.12
EAO - 534.88
Total: 26,744.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Aklan East Rd - K0276 + 720 - K0277 + 282, K0283 + 181 - K0283 + 310, K0283 + 720 - K0283 + 820, K0286 + 716 - K0286 + 798, K0286 + 920 - K0286 + 960, K0287 + 170 - K0287 + 216, K0287 + 670 - K0287 + 822, K0288 + 130 - K0288 + 241, K0288 + 1017 - K0289 + 150, K0289 + 220 - K0289 + 282, K0289 + 302 - K0289 + 536, K0289 + 680 - K0289 + 698
CW1- Construction of Drainage Structure along Road: 1,636 lineal meters - 22,409.12
ROW Acquisition: 380 sq.m - 3,800.00
EAO - 534.88
Total: 26,744.00
|
July 1, 2021 |
2021 |
WIN1F06340 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Aklan District Engineering Office |
FROM:
LOCAL PROGRAM
Local - Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure Program
Construction of Revetment Wall along River/Creek, Barangay Lapnag, Banga, Aklan
CW1 - Construction of Revetment: 16.00 lineal meters - 1,980.00
EAO - 20.00
Total: 2,000.00
TO:
LOCAL PROGRAM
Local - Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure Program
Construction of Revetment Wall along River/Creek, Barangay Lapnag, Banga, Aklan
CW1 - Construction of Revetment: 60.00 lineal meters - 1,980.00
EAO - 20.00
Total: 2,000.00
|
July 1, 2021 |
FY 2021 GAA |
WIN1E02371 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1551+932 - K1551+967,
K1557+807 - K1557+814, K1558+895 - K1558+934,
K1559+167 - K1559+350, K1561+884 - K1561+917,
K1562+022 - K1562+061, K1562+568 - K1562+618
Physical Target:
CW1: 1,227.50 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: 940 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 6,202,000.00
CW1: P 3,537,800.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: P2,540,160.00 (ROW Acquisition)
EAO: P 124,040.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1551+932 - K1551+967,
K1557+807 - K1557+814, K1558+895 - K1558+934,
K1559+167 - K1559+350, K1561+884 - K1561+917,
K1562+022 - K1562+061, K1562+568 - K1562+618
Physical Target:
CW1: 1,185.00 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: 940 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 6,202,000.00
CW1: P 3,537,800.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: P2,540,160.00 (ROW Acquisition)
EAO: P 124,040.00 |
July 1, 2021 |
2021 |
WIN1F06325 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Aklan District Engineering Office |
FROM:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Barangay Road, Barangay Bulwang, Numancia, Aklan
CW1- Construction of Concrete Road: 0.179 lane km - 1,980.00
EAO - 20.00
Total: 2,000.00
TO:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Barangay Road, Barangay Bulwang, Numancia, Aklan
CW1- Construction of Concrete Road: 0.604 lane km - 1,980.00
EAO - 20.00
Total: 2,000.00
|
July 1, 2021 |
FY 2021 GAA |
WIN1E02405 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Road - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) -
K1543+450 - K1543+545, K1554+393 - K1554+854
Physical Target:
CW1: 2.034 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 19,220,000.00
CW1: P 18,835,600.00 (Reconstruction to Concrete Pavement)
EAO: P 384,400.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Road - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) -
K1543+450 - K1543+545, K1554+393 - K1554+854
Physical Target:
CW1: 1.112 Lane Km (Reconstruction to Concrete Pavement)
CW2: 0.556 Lan Km (Road Safety: Street Lights)
Allocation:
TOTAL: P 19,220,000.00
CW1: P 12,927,035.00 (Reconstruction to Concrete Pavement)
CW2: P 5,905,565.00 (Road Safety: Street Lights)
EAO: P 384,400.00 |
July 1, 2021 |
2021 |
WIN1F06395 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Aklan District Engineering Office |
FROM:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Barangay Road, Barangay Naile, Ibajay, Aklan
CW1- Construction of Concrete Road: 0.179 lane km - 1,980.00
EAO - 20.00
Total: 2,000.00
TO:
FROM:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Barangay Road, Barangay Naile, Ibajay, Aklan
CW1- Construction of Concrete Road: 0.616 lane km - 1,980.00
EAO - 20.00
Total: 2,000.00 |
July 1, 2021 |
2021 |
WIN1F06329 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Regional Office VI |
FROM:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction (Continuing)of Bridge Over Mayudmon River to Connect Barangay Oquendo And Barangay Guanko to Barangay Cortes, Balete, Aklan
CW1- Construction of Concrete Road: 0.00 lane km - 14,850.00
EAO - 150.00
Total: 15,000.00
TO:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction (Continuing)of Bridge Over Mayudmon River to Connect Barangay Oquendo And Barangay Guanko to Barangay Cortes, Balete, Aklan
CW1- Construction of Concrete Bridge: 228.96 sq.m - 14,850.00
EAO - 150.00
Total: 15,000.00
|
July 1, 2021 |
2021 |
WIN1F06362 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Aklan District Engineering Office |
FROM:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Road, Barangay Pudiot, Tangalan, Aklan
CW1- Construction of Concrete Road: 0.440 lane km - 1,980.00
EAO - 20.00
Total: 2,000.00
TO:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Road, Barangay Pudiot, Tangalan, Aklan
CW1- Construction of Concrete Road: 0.560 lane km - 1,980.00
EAO - 20.00
Total: 2,000.00
|
July 1, 2021 |
FY 2021 GAA |
WIN1E02404 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry‐Davao Or Coastal Rd ‐ K1635+165 ‐ K1635+210
Physical Target:
CW1: 1,210.00 sq. nm. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 12,100,000.00
CW1: P 11,858,000.00 (Construction of Road Slope Protection Structure)
EAO: P 242,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry‐Davao Or Coastal Rd ‐ K1633+190 - K1633+300
Physical Target:
CW1: 990.00 sq. nm. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 12,100,000.00
CW1: P 11,858,000.00 (Construction of Road Slope Protection Structure)
EAO: P 242,000.00 |
July 1, 2021 |
FY 2021 GAA |
WIN1E02421 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1596+664 - K1598+000
Physical Target:
CW1: 2.672 Lane Km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Road Widening)
EAO: P 1,750,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1596+664 - K1597+915
Physical Target:
CW1: 2.500 Lane Km (Road Widening)
ROW: 18,750.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 42,255,420.00 (Road Widening)
ROW: P 5,994,580.00 (ROW Acquisition)
EAO: P 1,750,000.00 |
July 1, 2021 |
FY 2021 GAA |
WIN1F06115 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 31010200582000
Project ID : P00516137LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM :
Calapan South Road,
K0001 + 850 - K0002 + 687,
K0022 + 438 - K0025 + 117,
K0039 + 048 - K0039 + 698,
K0048 + 480 - K0050 + 765
Physical Target - CW1 - Preventive Maintenance of Road -
Asphalt Overlay ; 13.124 Lane Km
Allocation : Php 106.813 million
TO :
Calapan South Road,
K0001 + 850 - K0002 + 698,
K0022 + 438 - K0024 + 778,
K0039 + 048 - K0040 + 583,
K0048 + 480 - K0050 + 750
Physical Target - CW1 - Preventive Maintenance of Road -
Asphalt Overlay : 13.884 Lane Km
Allocation : Php 106.813 Million
|
July 1, 2021 |
2021 |
310205100536000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Regional Office II |
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/ New Roads - Aritao - Quirino Road, Package 2, Quirino |
July 1, 2021 |
FY 2021 GAA |
WIN1E02415 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Esplanade along Davao River, Brgy. 1-A and 2-A section, Left Bank, Davao City (Sta. 1+840 - Sta. 2+169)
Physical Target:
CW1: 581.176 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Esplanade along Davao River, Brgy. 1-A and 2-A Section, Left Bank, Davao City (Sta. 2+173 - Sta. 2+478)
Physical Target:
CW1: 305.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00 |
July 1, 2021 |
2021 |
310101100426000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Cagayan Valley Rd - K0512+(-009) - K0513+033, K0513+282.5 - K0513+620, K0514+(-004.5) - K0514+290, K0515+811 - K0517+955.50, K0518+000 - K0518+588.50, K0524+041.5 - K0524+677 |
July 1, 2021 |
FY 2021 GAA |
WIN1F06307 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310208100348000
Project ID : P00505147LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement -
Secondary Roads
FROM :
Calapan South Road,
K0109 + 000 - K0109 + 525
Physical Target - CW1 - Shoulder Paving/Construction :
2,625.00 sq.m.
Allocation : Php 7.350 Million
TO :
Calapan South Road,
K0109 + 053 - K0109 + 480
Physical Target - CW1 - Shoulder Paving/Construction -
2,604.70 sq. m.
Allocation : Php 7.350 Million
|
July 1, 2021 |
2021 |
300211100065000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 3rd District Engineering Office |
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Installation of Road Safety Devices along Cagayan Valley Road (K0480+300 - K0484+800) |
July 1, 2021 |
FY 2021 GAA |
WIN1F06318 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310208100352000
Project ID : P00505151LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement -
Secondary Roads
FROM :
Mindoro Oriental/Occidental East Coastal Road,
K0199 + 000 - K0199 + 589
Physical Target - CW1 - Shoulder Paving/Construction -
2,356.00 sq. m.
Allocation : Php 6.479 Million
TO :
Mindoro Oriental/Occidental East Coastal Road,
K0199 + 000 - K0199 + 598
Physical Target - CW1 - Shoulder Paving/Construction :
2,813.00 sq. m.
Allocation : Php 6.479 Million |
July 1, 2021 |
FY 2021 GAA |
WIN1F06322 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 300116203388000
Project ID : P00561885LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Roads,
Gloria, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
12.00 Lane Km
Allocation : Php 72.00 Million
TO :
Concreting of Road,
Gloria, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
11.509 Lane Km
Allocation : Php 72.00 Million |
July 1, 2021 |
2021 |
300117208219000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 3rd District Engineering Office |
Local Program - Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Construction of Various Local Roads and Drainages in Tuguegarao City, Cagayan |
July 1, 2021 |
2021 |
WIN1C04026 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation - Preventive Maintenance - Primary Roads
Jose Abad Santos Ave (JASA) ,K0091+965.50 - K0093+000, K0095+000 - K0095+316 |
July 1, 2021 |
2021 |
300116203658000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 3rd District Engineering Office |
Local Program - Local - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects - Construction of Various Local Roads and Drainages in Tuguegarao City Phase III, Cagayan |
July 1, 2021 |
2021 |
310201100745000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 3rd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Cagayan Valley Rd - K0509+701 - K0510+892 |
July 1, 2021 |
2021 |
WIN1C04115 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads
San Antonio - Floridablanca Rd, K0082+281 - K0083+000, K0087+500 - K0088+222.40
|
July 1, 2021 |
FY 2021 GAA |
WIN1E02426 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Occidental District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) -
K1634+596 - K1637+039, K1646+092.50 - K1646+198,
K1646+223.10 - K1646+384, K1656+216 - K1656+503,
K1657+526 - K1657+846, K1657+906.53 - K1657+1029
Physical Target:
CW1: 7.443 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 52,931,000.00
CW1: P 51,078,415.00 (Reconstruction to Concrete Pavement)
EAO: P 1,852,585.00
TO: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1634+596 - K1637+039
Physical Target:
CW1: 5.514 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 52,931,000.00
CW1: P 51,078,415.00 (Reconstruction to Concrete Pavement)
EAO: P 1,852,585.00 |
July 1, 2021 |
FY 2021 GAA |
WIN1F06229 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 1st District Engineering Office |
UACS No. : 300211100135000
Project ID : P00534708LZ
Convergence and Special Support Program
Special Road Fund - Motor Vehicle User's Charge (MVUC)
as per R.A. 11239
FROM :
Concrete Reblocking along PPNR-Langogan-Roxas Road Section
K0084 + 000 - K0132 + 000 (Intermittent)(S00030PW)
Physical Target - CW1 - Preventive Maintenance of Road :
Concrete Reblocking : 0 Lane Km
Allocation : Php 16.2075 Million
TO :
Concrete Reblocking along PPNR-Langogan-Roxas Road Section
K0082 + 000 - K0131 + 000 (Intermittent)(S00030PW)
Physical Target - CW1 - Preventive Maintenance of Road :
Concrete Reblocking : 0.882 Lane Km
Allocation : Php 16.2075 Million
|
July 1, 2021 |
2021 |
300117208220000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 3rd District Engineering Office |
Local Program - Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Construction of Various Local Roads and Drainages in Municipality of Solana, Cagayan |
July 1, 2021 |
FY 2021 GAA |
WIN1F06304 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 300116204223000
Project ID : P00562484LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Bulalacao, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
7.00 Lane Km
Allocation : Php 42.00 Million
TO :
Concreting of Road,
Bulalacao, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
6.178 Lane Km
Allocation : Php 42.00 Million
|
July 1, 2021 |
FY 2021 GAA |
WIN1E02420 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Jct Manikling-Gov Generoso Rd - K1745+000 - K1745+800
Physical Target:
CW1: 1.600 Lane Km (Road Widening)
Allocation:
TOTAL: P 38,446,000.00
CW1: P 37,677,080.00 (Road Widening)
EAO: P 768,920.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Jct Manikling - Gov. Generoso Rd - K1745+200 - K1746+746
Physical Target:
CW1: 3.089 Lane Km (Road Widening)
Allocation:
TOTAL: P 38,446,000.00
CW1: P 37,677,080.00 (Road Widening)
EAO: P 768,920.00 |
July 1, 2021 |
FY 2021 GAA |
WIN1E02419 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1677+060 - K1679+000
Physical Target:
CW1: 3.880 Lane Km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Road Widening)
EAO: P 1,750,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1677+060 - K1678+336
Physical Target:
CW1: 2.560 Lane Km (Road Widening)
ROW: 19,200.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 42,257,350.00 (Road Widening)
ROW: P 5,992,650.00 (ROW Acquisition)
EAO: P 1,750,000.00 |
July 1, 2021 |
FY 2021 GAA |
WIN1E02422 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road (including Bridge), Butay, Barangay Pichon, Caraga, Davao Oriental
Physical Target:
CW1: 3.500 Lane Km (Construction of Concrete Road)
CW2: 238.50 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 130,000,000.00
CW1: P 101,325,000.00 (Construction of Concrete Road)
CW2: P 24,125,000.00 (Construction of Concrete Bridge)
EAO: P 4,550,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road (including Bridge), Butay, Barangay Pichon, Caraga, Davao Oriental
Physical Target:
CW1: 3.788 Lane Km (Construction of Gravel Road)
CW2: 429.30 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 130,000,000.00
CW1: P 65,903,000.00 (Construction of Gravel Road)
CW2: P 59,547,000.00 (Construction of Concrete Bridge)
EAO: P 4,550,000.00 |
July 1, 2021 |
FY 2021 GAA |
WIN1E02408 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road (including Bridge), from Sitio Sangab to Sitio Butay, Barangay Pichon, Caraga, Davao Oriental
Physical Target:
CW1: 3.160 Lane Km (Construction of Concrete Road)
CW2: 238.50 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 120,000,000.00
CW1: P 91,675,000.00 (Construction of Concrete Road)
CW2: P 24,125,000.00 (Construction of Concrete Bridge)
EAO: P 4,200,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road (including Bridge), from Sitio Sangab to Sitio Butay, Barangay Pichon, Caraga, Davao Oriental
Physical Target:
CW1: 5.564 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 120,000,000.00
CW1: P 115,800,000.00 (Construction of Gravel Road)
EAO: P 4,200,000.00 |
June 30, 2021 |
2021 |
310201100746000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 3rd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Cagayan Valley Rd - K0488+993 - K0489+218 |
June 30, 2021 |
2021 |
310201100742000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 3rd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Cagayan Valley Rd - K0465+175 - K0466+106 |
June 30, 2021 |
2021 |
300211100064000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 3rd District Engineering Office |
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Installation of Road Safety Devices along Cagayan - Apayao Road K0488+(-358) - K0513+000 (w/exception), K0519+(-1044) - K0530+603 (w/exception); Cagayan - Apayao Road (Tuao - Rizal Section) K0525+(-243) - K0529+195 (w/exception); Santiago - Tuguegarao Road K0434+(-754) - K0436+971 (w/exception), K0437+(-031) - K0448+298 (w/exception) |
June 30, 2021 |
2021 |
310202100772000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road - Network Development - Road Widening - Secondary Roads - Cagayan Valley Rd (Magapit - Jct Aparri Airport Sect) - K0580+000 - K0580+534.80 (BS), K580+534.80 - K0581+205.83 (RS), K0581+205.63 - K0581+512.74 (BS), K0581+512.74 - K0581+532 (RS) |
June 30, 2021 |
2021 |
300203101522000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 1st District Engineering Office |
Convergence and Special Support Program - Construction/ Improvement of Access Road leading to Declared Tourism Destinations - Access Road Leading to Bagsang Falls, Brgy. Santa Clara, Gonzaga, Cagayan |
June 30, 2021 |
2021 |
310202100773000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Magapit - Mission Rd - K0565+348 - K0565+600 |
June 30, 2021 |
2021 |
310106100582000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Jct. Na'tl. Road - Bitnong - Belance - NV Bdry. Road, - K0269+579 - K0270+447.50 |
June 30, 2021 |
2021 |
310104100287000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Daang Maharlika (LZ) - K0220+516.74 - K0220+624, K0220+655.50 - K0222+062.90 |
June 30, 2021 |
2021 |
310201100643000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0229+994.50 - K0232+105.50 |
June 30, 2021 |
2021 |
310106100581000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Aritao - Quirino Rd - K0256+373.50 - K0257+029.80 |
June 30, 2021 |
FY 2021 GAA |
WIN1E02401 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Jct. Davao - Bukidnon Road (Calinan Section) - Wangan - Subasta - Tagakpan - Tungkalan - Tagurano - Bayabas - Catigan - Baracatan - Sibulan - Tibolo - Kapatagan Road (Package 1), Davao del Sur
Physical Target:
CW1: 0.600 Lane Km (Construction of Concrete Road)
CW2: 1,192.50 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 28,950,000.00 (Construction of Concrete Road)
CW2: P 144,750,000.00 (Construction of Concrete Bridge)
EAO: P 6,300,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Jct. Davao - Bukidnon Road (Calinan Section) - Wangan - Subasta - Tagakpan - Tungkalan - Tagurano - Bayabas - Catigan - Baracatan - Sibulan - Tibolo - Kapatagan Road (Package 1), Davao del Sur
Physical Target:
CW1: 4.711 Lane Km (Construction of Gravel Road)
CW2: 715.50 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 96,444,778.00 (Construction of Gravel Road)
CW2: P 77,255,222.00 (Construction of Concrete Bridge)
EAO: P 6,300,000.00 |
June 30, 2021 |
2021 |
310110100214000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads - Daang Maharlika (LZ) - K0216+845 - K0217+508 |
June 30, 2021 |
FY 2021 GAA |
WIN1E02393 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Concrete Road R Campetea, Dama de Noche, Ixora, Plumeria, Lantana, Aster, Mansanitas, Lansones, Kasoy at Barangay Poblacion, Maragusan, Davao de Oro
Physical Target:
CW1: 0.882 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 9,230,000.00
CW1: P 9,137,700.00 (Construction of Concrete Road)
EAO: P 92,300.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Concrete Road R Campetea, Dama de Noche, Ixora, Plumeria, Lantana, Aster, Mansanitas, Lansones, Kasoy at Barangay Poblacion, Maragusan, Davao de Oro
Physical Target:
CW1: 1.240 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 9,230,000.00
CW1: P 9,137,700.00 (Construction of Concrete Road)
EAO: P 92,300.00 |
June 30, 2021 |
FY 2021 GAA |
WIN1E02381 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1580+000 - K1581+434
Physical Target:
CW1: 2.748 Lane Km (Road Widening)
Allocation:
TOTAL: P 72,500,000.00
CW1: P 69,962,500.00 (Road Widening)
EAO: P 2,537,500.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1579+685 - K1581+380
Physical Target:
CW1: 3.280 Lane Km (Road Widening)
Allocation:
TOTAL: P 72,500,000.00
CW1: P 69,962,500.00 (Road Widening)
EAO: P 2,537,500.00 |
June 29, 2021 |
FY 2021 GAA |
WIN1E02386 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1502+150 - K1502+961
Physical Target:
CW1: 3.244 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 32,950,000.00
CW1: P 32,291,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 659,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1502+150 - K1502+961
Physical Target:
CW1: 1.842 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 32,950,000.00
CW1: P 32,291,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 659,000.00 |
June 29, 2021 |
2021 |
WIN1C04018 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Aurora District Engineering Office |
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Malupa - Dian - Aguang River Control, Sta. 3+900 - Sta. 4+050, Sta. 6+200 - Sta. 6+326, Sta. 8+800 - Sta. 9+046.50, Sta. 9+138 - Sta. 9+185.50, Baler, Aurora |
June 29, 2021 |
2021 |
WIN1C03893 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation - Preventive Maintenance - Tertiary Roads
Calaguiman Vicinal Rd, K0129+000 - K0129+177.40 |
June 29, 2021 |
2021 |
WIN1C04024 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Jose Abad Santos Ave (JASA), K0108+070 - K0108+236, K0109+032 - K0109+455 |
June 29, 2021 |
2021 |
WIN1C03985 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Bataan Technical Park, Inc. Rd (BTPI), K0177+000 - K0177+801.976 |
June 28, 2021 |
2021 |
WIN1C03966 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bulacan 1st District Engineering Office |
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure, Sta. 0+000 - Sta. 0+266 along Bagna, Malolos, Bulacan |
June 28, 2021 |
2021 |
WIN1C04020 |
SR2021-03-006974 |
March 13, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Ampusongan Flood Control, Bakun, Benguet;
Physical Target: CW1 : 1,185 Lineal meters;
Allocation= Php 100,000,000
To: Construction of Ampusongan Flood Control, Bakun, Benguet;
Physical Target: CW1 : 1142 Lineal meters;
Allocation= Php 100,000,000
|
June 28, 2021 |
2021 |
WIN1C04031 |
GAA 2021 |
June 9, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Peñarrubia Road, Peñarrubia, Abra;
Physical Target: CW1: 1.76 Lane Km;
Allocation= Php 10,000,000
To: Construction of Peñarrubia Road, Peñarrubia, Abra;
Physical Target: CW1: 2.871 Lane Km;
Allocation= Php 10,000,000
|
June 28, 2021 |
2021 |
WIN1C04000 |
GAA 2021 |
June 9, 2021 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
From: Claveria-Calanasan-Kabugao Road – K0716 + 000 - K0716 + 040, K0716 + 070 - K0716 + 129;
Physical Target: CW1: 0.198 Lane Km;
Allocation= Php 5,600,000
To: Claveria-Calanasan-Kabugao Road – K0713 + 383 - K0713 + 503;
Physical Target: CW1: 0.240 Lane Km;
Allocation= Php 5,600,000
|
June 28, 2021 |
2021 |
WIN1C03996 |
GAA 2021 |
June 9, 2021 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
From: San Sebastian-San Jose-San Francisco Road in support of Handicraft, Furniture, Processed High Value Crops, Vegetable Rice and Corn Industries, Luna, Apayao;
Type of Work: CW1: Construction of Concrete Road;
Physical Target: CW1: 0.830 Lane Km;
Allocation= Php 50,233,000
To: San Sebastian-San Jose-San Francisco Road in support of Handicraft, Furniture, Processed High Value Crops, Vegetable Rice and Corn Industries, Luna, Apayao;
Type of Work: CW1: Construction of Concrete Road
CW2: Replacement of Bridge;
Physical Target: CW1: 0.360 Lane Km
CW2: 477 Square meters;
Allocation= Php 50,233,000
|
June 28, 2021 |
2021 |
WIN1C04036 |
GAA 2021 |
June 18, 2021 |
Cordillera Administrative Region |
Baguio City District Engineering Office |
From: Gov Pack Rd - (S04724LZ) Chainage 027 - Chainage 270;
Physical Target: CW1: 0.337 Lane Km;
Allocation= Php 10,935,000
To: Gov Pack Rd – (S00408LZ) Chainage 0 - Chainage 36, (S00521LZ) Chainage 0 - Chainage 100, (S04724LZ) Chainage 176 - Chainage 627;
Physical Target: CW1: 0.587 Lane Km;
Allocation= Php 10,935,000
|
June 28, 2021 |
2021 |
WIN1C03999 |
GAA 2021 |
June 17, 2021 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Construction of Madayag - Dagdag Access Road Lusod, Kabayan, Benguet;
Type of Work: Construction of Concrete Road;
Physical Target: CW1: 0.304 Lane Km;
Allocation= Php 3,000,000
To: Construction of Madayag - Dagdag Access Road Lusod, Kabayan, Benguet;
Type of Work: Construction of Gravel Road;
Physical Target: CW1: 1 Lane Km;
Allocation= Php 3,000,000
|
June 28, 2021 |
2021 |
WIN1C03991 |
GAA 2021 |
June 8, 2021 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Improvement of Local Road, Dangpa - Lengaoan Road, Barangay Amgaleyguey/Lengaoan, Buguias, Benguet;
Physical Target: CW1: : 0.7 Lane Km;
Allocation= Php 10,000,000
To: Improvement of Local Road, Dangpa - Lengaoan Road, Barangay Amgaleyguey/Lengaoan, Buguias, Benguet; Physical Target: CW1: 0.925 Lane Km; Allocation= Php 10,000,000
|
June 28, 2021 |
2021 |
WIN1C03998 |
GAA 2021 |
June 9, 2021 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Improvements and Road Opening of Sitio Upper Inlanded, Brgy Paoy, Atok, Benguet ;
Physical Target: CW1: : 0.3 Lane Km;
Allocation= Php 5,000,000
To: Improvements and Road Opening of Sitio Upper Englandad, Brgy Paoay, Atok, Benguet ;
Physical Target: CW1: 0.3 Lane Km;
Allocation= Php 5,000,000
|
June 28, 2021 |
2021 |
WIN1C04005 |
GAA 2021 |
June 11, 2021 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Banaue-Mayoyao-A Lista-Isabela Bdry Rd K407 + 000 – K0411 + 000, K0411 + 180 – K0411 + 400, K0411 + 700 – K0412 + 000, K0413 + 303 – K0415 + 000;
Physical Target: CW1: 9,318 Square meters;
Allocation= Php 27,954,000
To: Banaue-Mayoyao-A Lista-Isabela Bdry Rd K0407 + 000 – K0411 + 000, K0411 + 180 – K0411 + 400;
Physical Target: CW1: 4,954.50 Square meters;
Allocation= Php 27,954,000
|
June 28, 2021 |
2021 |
WIN1C03987 |
GAA 2021 |
June 11, 2021 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Nueva Vizcaya-Ifugao-Mt Province Rd K0335 + (-358) – K0337 + 334;
Physical Target: CW1: 5.446 Lane Km;
Allocation= Php 32,603,000
To: Nueva Vizcaya-Ifugao-Mt Province Rd K0335 + (-358) – K0336 + 752;
Physical Target: CW1: 4.270 Lane Km;
Allocation= Php 32,603,000
|
June 28, 2021 |
2021 |
WIN1C03995 |
GAA 2021 |
June 14, 2021 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Rizal Natl Rd (Liwan West-Babalag-Macutay Sect) - K0522 + 686 - K0522 + 741;
Physical Target: CW1: 0.110 Lane Km;
Allocation= Php 1,966,000
To: Rizal Natl Rd (Liwan West-Babalag-Macutay Sect) - K0522 + 445 - K0522 + 529.50, K0522 + 606 - K0522 + 669.50, K0522 + 686 - K0522 + 763.50;
Physical Target: CW1: 0.451 Lane Km;
Allocation= Php 1,966,000
|
June 28, 2021 |
2021 |
WIN1C03981 |
GAA 2021 |
June 14, 2021 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0496 + (-700) - K0496 + 000;
Physical Target: CW1: 1.40 Lane Km;
Allocation= Php 24,840,000
To: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0496+(-700) - K0496+475, K0508+189-K0508+654;
Physical Target: CW1: 3.28 Lane Km;
Allocation= Php 24,840,000
|
June 28, 2021 |
2021 |
WIN1C03905 |
GAA 2021 |
June 8, 2021 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: Lubuagan-Batongbuhay-Abra Bdry Rd - K0473 + 738-K0475 + 823;
Physical Target: CW1: 1.921 Lane Km;
Allocation= Php 38,428,000
To: Lubuagan-Batongbuhay-Abra Bdry Rd - K0473 + 738-K0474 + 690;
Physical Target: CW1: 1.708 Lane Km;
Allocation= Php 38,428,000
|
June 28, 2021 |
FY 2021 GAA |
WIN1E02348 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Buhangin-Lapanday - K1506+325 - K1506+423
Physical Target:
CW1: 0.588 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 4,305,000.00
CW1: P 4,218,900.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 86,100.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Buhangin-Lapanday - K1506+325 - K1506+397
Physical Target:
CW1: 0.288 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 4,305,000.00
CW1: P 4,218,900.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 86,100.00 |
June 28, 2021 |
FY 2021 GAA |
WIN1E02378 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance (Asphalt Overlay) - Davao-Cotabato Road (Davao City-Jct. Digos Sect.) - K1519+606 - K1520+151
Physical Target:
CW1: 3.511 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 42,060,000.00
CW1: P 40,587,900.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,472,100.00
TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance (Asphalt Overlay) - Davao-Cotabato Road (Davao City-Jct. Digos Sect.) - K1522+379 - K1522+764
Physical Target:
CW1: 2.310 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 42,060,000.00
CW1: P 40,587,900.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,472,100.00 |
June 28, 2021 |
FY 2021 GAA |
WIN1E02365 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd -
K1491+631 - K1491+985, K1492+474 - K1492+500,
K1504+989 - K1505+800, K1509+000 - K1510+000
Physical Target:
CW1: 8.148 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 29,168,000.00
CW1: P 28,584,640.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 583,360.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1491+593 - K1492+324
Physical Target:
CW1: 2.908 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 29,168,000.00
CW1: P 28,584,640.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 583,360.00 |
June 28, 2021 |
FY 2021 GAA |
WIN1E02380 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Carmen-DAPECOL Cmpd Rd - K1481+336 - K1482+297
Physical Target:
CW1: 1.896 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 17,064,000.00
CW1: P 16,722,720.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 341,280.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Carmen-DAPECOL Cmpd Rd - K1481+336 - K1482+292
Physical Target:
CW1: 1.886 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 17,064,000.00
CW1: P 16,722,720.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 341,280.00 |
June 28, 2021 |
FY 2021 GAA |
WIN1E02333 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1560+878 - K1560+1983
Physical Target:
CW1: 2.210 Lane Km (Road Widening)
ROW: 14,697.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 42,727,000.00
CW1: P 39,422,460.00 (Road Widening)
ROW: P 2,450,000.000 (ROW Acquisition)
EAO: P 854,540.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1560+807 - K1560+1912
Physical Target:
CW1: 2.210 Lane Km (Road Widening)
ROW: 14,697.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 42,727,000.00
CW1: P 39,422,460.00 (Road Widening)
ROW: P 2,450,000.000 (ROW Acquisition)
EAO: P 854,540.00 |
June 28, 2021 |
FY 2021 GAA |
WIN1E02383 |
FY 2021 GAA RA 11518 |
January 1, 2020 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Mapantad-Tagbobolo-Taguibo Road, Davao Oriental
Physical Target:
CW1: 1.960 Lane Km (Construction of Concrete Road)
CW2: 1.640 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 42,960,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
CW2: P 22,500,800.00 (Reconstruction to Concrete Pavement)
EAO: P 859,200.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Mapantad-Tagbobolo-Taguibo Road, Davao Oriental
Physical Target:
CW1: 1.000 Lane Km (Construction of Concrete Road)
CW2: 1.622 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 42,960,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
CW2: P 22,500,800.00 (Reconstruction to Concrete Pavement)
EAO: P 859,200.00 |
June 25, 2021 |
FY 2021 GAA |
WIN1F06255 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204155000
Project ID : P00562416LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Sitio Bulago, Palhi, Calapan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.486 Lane Km
Allocation : Php 3.00 Million
TO :
Concreting of Road,
Sitio Bulago, Palhi, Calapan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.604 Lane Km
Allocation : Php 3.00 Million
|
June 25, 2021 |
FY 2021 GAA |
WIN1F06256 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310202100814000
Project ID : P00505132LZ
001 : Ensure safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Calapan North Road
K0025 + 565 - K0026 + 030
Physical Target - CW1 - Network Development -
Road Widening : 0.324 Lane Km
Allocation : Php 4.966 Million
TO :
Calapan North Road
K0025 + 482 - K0026 + 030,
K0030 + 887 - K0030 + 969,
K0031 + 467 - K0031 + 504
Physical Target - CW1 - Network Development -
Road Widening : 0.628 Lane Km
Allocation : Php 4.966 Million |
June 25, 2021 |
FY 2021 |
WIN1C03770 |
FY 2021 GAA RA 11518 |
December 28, 2020 |
Region V |
Regional Office V |
UACS No.: 310204101087000
Project ID: P00506299LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Juban-Bulan Diversion Road, Juban Section, Sorsogon
Physical Target: CW1-Construction of Concrete Road – 2.596 Lane km.
ROW- ROW Acquisition- 0 sq.m.
Allocation: Php 100,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Juban-Bulan Diversion Road, Juban Section, Sorsogon
Physical Target: CW1-Construction of Concrete Road – 2.48 Lane km.
ROW- ROW Acquisition- 24,793.00 sq.m.
Allocation: Php 100,000,000.00
|
June 25, 2021 |
FY 2021 GAA |
WIN1F06230 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310202100824000
Project ID : P00505144LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Bongabong - Sagana - Roxas - San Aquilino Road
K0126 + 017 - K0126 + 553
Physical Target - CW1 - Road Widening : 1.072 Lane Km
Allocation : Php 16.20 Million
TO :
Bongabong - Sagana - Roxas - San Aquilino Road
K00125 + 915 - K0126 + 540
Physical Target - CW1 - Road Widening : 1.143 Lane Km
Allocation : Php 16.20 Million |
June 25, 2021 |
FY 2021 |
WIN1C03717 |
FY 2021 GAA RA 11518 |
December 28, 2020 |
Region V |
Regional Office V |
UACS No.: 310205100576000
Project ID: P00506301LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - Bacon-Manito Rd, Package 1, Sorsogon
Physical Target: CW1-Construction of Concrete Road – 2.083 Lane km.
CW2- Construction of Drainage Structure along Road – 2,082.667 Lineal meters
CW3- Construction of Road Slope Protection Structure – 5,085.711 Square meters
Allocation: Php 110,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - Bacon-Manito Rd, Package 1, Sorsogon
Physical Target: CW1-Construction of Concrete Road – 1.9754 Lane km.
CW2- Construction of Drainage Structure along Road – 1,962.65 Lineal meters
CW3- Construction of Road Slope Protection Structure – 5,269.76 Square meters
CW4- Construction of Gravel Road - 0.2835 Lane Km
Allocation: Php 110,000,000.00
|
June 25, 2021 |
FY 2021 |
WIN1C03790 |
FY 2021 GAA RA 11518 |
December 28, 2020 |
Region V |
Regional Office V |
UACS No.: 310205100577000
Project ID: P00506302LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - Bacon-Manito Rd, Package 2, Sorsogon
Physical Target: CW1- Construction of Road Slope Protection Structure – 3,702.6 Square meters
Allocation: Php 110,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - Bacon-Manito Rd, Package 1, Sorsogon
Physical Target: CW1- Construction of Road Slope Protection Structure – 7,164.3 Square meters
CW2-Construction of Concrete Road – 1.76 Lane km.
CW3- Construction of Gravel Road – 1.103 Lane Km
CW4- Construction of Drainage Structure along Road – 1,752.80 Lineal meters
Allocation: Php 110,000,000.00
|
June 25, 2021 |
FY 2021 GAA |
WIN1F06248 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310208100347000
Project ID : P00505146LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement
- Secondary Roads
FROM :
Calapan South Road
K0102 + 550 - K0102 + 934
Physical Target - CW1 - Shoulder Paving/Construction :
2,304.00 sq.m.
Allocation : Php 6.903 Million
TO :
Calapan South Road
K0102 + 550 - K0102 + 791
Physical Target - CW1 - Shoulder Paving/Construction :
1,470.10 sq.m.
Allocation : Php 6.903 Million
|
June 25, 2021 |
FY 2021 |
WIN1C03854 |
FY 2021 GAA RA 11518 |
December 28, 2020 |
Region V |
Regional Office V |
UACS No.: 310205100576000
Project ID: P00506301LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0441 + 150 - K0442 + 335
Physical Target: CW1- Road Widening – 1.88 Lane Km
Allocation: Php 55,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0441 + 150 - K0442 + 335
Physical Target: CW1- Road Widening – 1.60 Lane Km
CW2- Construction of Drainage Structure along Road – 1,591.40 Lineal meters
ROW - ROW Acquisition – 16,000 Square meters
Allocation: Php 55,000,000.00
|
June 25, 2021 |
FY 2021 |
WIN1C03816 |
FY 2021 GAA RA 11518 |
December 28, 2020 |
Region V |
Regional Office V |
UACS No.: 310201100657000
Project ID: P00505280LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0508 + 000 - K0508 + 258
Physical Target: CW1- Road Widening – 0.516 Lane Km
Allocation: Php 14,916,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0508 + 000 - K0508 + 169
Physical Target: CW1- Road Widening – 0.338 Lane Km
CW2- Construction of Drainage Structure along Road – 338.00 Lineal meters
CW3- Construction of Road Slope Protection Structure – 475.58 Square meters
ROW - ROW Acquisition – 3,380 Square meters
Allocation: Php 14,916,000.00
|
June 25, 2021 |
FY 2021 |
WIN1C03813 |
FY 2021 GAA RA 11518 |
December 28, 2020 |
Region V |
Regional Office V |
UACS No.: 310201100654000
Project ID: P00505281LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0353 + 930 - K0354 + 461
Physical Target: CW1- Road Widening – 1.05 Lane Km
Allocation: Php 20,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0354 + 021 - K0354 + 292.50
Physical Target: CW1- Road Widening – 0.543 Lane Km
CW2- Construction of Drainage Structure along Road – 338.00 Lineal meters
CW3- Construction of Road Slope Protection Structure – 529.16 Square meters
Allocation: Php 20,000,000.00
|
June 25, 2021 |
FY 2021 |
WIN1C03917 |
FY 2021 GAA RA 11518 |
December 28, 2020 |
Region V |
Regional Office V |
UACS No.: 310201100656000
Project ID: P00505291LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0472 + 556 - K0472 + 888
Physical Target: CW1- Road Widening – 0.664 Lane Km
Allocation: Php 10,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0472 + 556 - K0472 + 691
Physical Target: CW1- Road Widening – 0.27 Lane Km
CW2- Construction of Drainage Structure along Road – 195.00 Lineal meters
CW3- Construction of Road Slope Protection Structure – 303.63 Square meters
ROW - ROW Acquisition – 2,700 Square meters
Allocation: Php 10,000,000.00
|
June 25, 2021 |
FY 2021 |
WIN1C03805 |
FY 2021 GAA RA 11518 |
December 28, 2020 |
Region V |
Regional Office V |
UACS No.: 310201100658000
Project ID: P00505320LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Rolando A Andaya Highway - K0301 + 395 - K0301 + 840
Physical Target: CW1- Road Widening – 0.89 Lane Km
Allocation: Php 20,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Rolando A Andaya Highway - K0301 + 395 - K0301 + 628.60
Physical Target: CW1- Road Widening – 0.4672 Lane Km
CW2- Construction of Drainage Structure along Road – 467.20 Lineal meters
CW3- Construction of Road Slope Protection Structure – 422.44 Square meters
Allocation: Php 10,000,000.00
|
June 25, 2021 |
2021 |
WIN1C04047 |
SR2021-02-004549 |
February 15, 2021 |
Region VI |
Regional Office VI |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
President Corazon C. Aquino Ave. - (S00558PN) Chainage 1233.5 - Chainage 2467
CW1 - Construction of Drainage Structure along Road: 2,467 lineal meters
3.52 / lineal meter - 8,685.00
EAO - 315.00
Total: 9,000.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
President Corazon C. Aquino Ave. - (S00558PN) Chainage 1203 - Chainage 1857
CW1 - Construction of Drainage Structure along Road: 654 lineal meters
13.28 / lineal meter - 8,685.00
EAO - 315.00
Total: 9,000.00
|
June 25, 2021 |
2021 |
WIN1C03963 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bulacan 1st District Engineering Office |
Local - Flood Control and Drainage / Protection Works - Local Infrastructure Program
Construction / Rehabilitation of Flood Mitigation Structures and Drainage Systems, Sta. 00+000 - Sta. 02+281, Poblacion, Baliuag, Bulacan
|
June 25, 2021 |
2021 |
WIN1F06337 |
SR2021-04-008117 |
April 23, 2021 |
Region VI |
Regional Office VI |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/ New Roads
San Remigio - Bugo - Gen. Fullon - Valderrama Road, Antique
CW1- Construction of Gravel Road: 0.732 lane km
38,890.03 /lane km - 28,467.50
ROW Acquisition: 3,658 sq.m
0.132 / sq.m - 482.50
EAO - 1,050.00
Total: 30,000.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/ New Roads
San Remigio - Bugo - Gen. Fullon - Valderrama Road, Antique
CW1- Construction of Gravel Road: 1.515 lane km
18,778.88 /lane km - 28,450.00
ROW Acquisition: 7,567.70 sq.m
0.066 / sq.m - 500.00
EAO - 1,050.00
Total: 30,000.00
|
June 25, 2021 |
2021 |
WIN1E02336 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. 310201100856000
Project ID: P00501570MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1318 + 544 - K1319 + 641
Type of Work / Physical Target: CW1 - Road Widening: 2.194 lane km
Unit Cost: P13,400,182.32 / lane km
Allocation: P 29,400,000.00
EAO: P 600,000.00
TOTAL: P 30,000,000.00
TO:
Daang Maharlika (Agusan-Davao Sect) - K1318 + 544 - K1319 + 581
Type of Work / Physical Target: CW1 - Road Widening: 2.074 lane km
Unit Cost: P14,175,506.27 / lane km
Allocation: P 29,400,000.00
EAO: P 600,000.00
TOTAL: P 30,000,000.00
|
June 25, 2021 |
2021 |
WIN1E02343 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. 310204101277000
Project ID: P00502176MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
FROM:
Lianga Coastal Bypass Road (SDCR Alternate Route), Surigao del Sur
Type of Work / Physical Target:
CW1 - Construction of Gravel Road: 0.187 lane km
CW2 - Construction of Road Slope Protection Structure: 865.457 sq.m.
Unit Cost:
CW1: P283,823.53 / lane km
CW2: P55,750.89 / sq.m.
Allocation:
CW1: P53,075,000.00
CW2: P48,250,000.00
EAO: P 3,675,000.00
TOTAL: P 105,000,000.00
TO:
Lianga Coastal Bypass Road (SDCR Alternate Route), Surigao del Sur
Type of Work / Physical Target:
CW1 - Construction of Gravel Road: 1.442 lane km
CW2 - Construction of Road Slope Protection Structure: 3,052.30 sq.m.
Unit Cost:
CW1: P40,184,088.56 / lane km
CW2: P14,212.08 / sq.m.
Allocation:
CW1: P57,945,455.70
CW2: P43,379,544.30
EAO: P 3,675,000.00
TOTAL: P 105,000,000.00 |
June 24, 2021 |
FY 2021 GAA |
WIN1F06162 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310202100815000
Project ID : P00505128LZ
001: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Calapan South Road
K0047 + 986 - K0048 + 000
Physical Target - CW1 - Network Development - Road Widening
0.402 Lane Km
Allocation : Php 7.387 Million
TO :
Calapan South Road
K0047 + 986 - K0047 + 1178,
K0048 + 200 - K0048 + 327
Physical Target - CW1 - Network Development - Road Widening
0.634 Lane Km
Allocation : Php 7.387 Miilion |
June 24, 2021 |
FY 2021 GAA |
WIN1F06175 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310202100812000
Project ID : P00505130LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Calapan North Road
K0018 + 456 - K0018 + 690
Physical Target - CW1 - Network Development - Road Widening
0.468 Lane Km
Allocation : Php 4.345 Million
TO :
Calapan North Road
K0018 + 456 - K0018 + 680
Physical Target - CW1 - Network Development - Road Widening
0.448 Lane Km
Allocation : Php 40345 Million |
June 24, 2021 |
FY 2021 GAA |
WIN1F06175 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204171000
Project ID : P00562432LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road, Brgy. Sta. Rosa I - Mangangan II,
Baco, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
4.236 Lane Km
Allocation : Php 25.00 Million
TO :
Concreting of Road, Brgy. Sta. Rosa I - Mangangan II,
Baco, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
4.023 Lane Km
Allocation : Php 25.00 Million |
June 24, 2021 |
FY 2021 GAA |
WIN1F06189 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204173000
Project ID : P00562434LZ
LOCALPROGRAM
Local - Local Roads and Bridges - Local roads
Construction/Repair/Rehabilitation/Improvement
of Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Brgy. Tagumpay - Brgy. Misong,
Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
3.940 Lane Km
Allocation : Php 25.00 Million
TO;
Concreting of Road,
Brgy. Tagumpay - Brgy. Misong
Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.688 Lane Km
Allocation : Php 25.00 Million
|
June 24, 2021 |
2021 |
WIN1C04021 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bataan 2nd District Engineering Office |
Network Development - Road Widening - Secondary Roads
Roman Expressway - K0136+958 - K0137+246, K0144+600 - K0145+623 |
June 24, 2021 |
2021 |
WIN1C03969 |
FY 2021 GAA |
December 28, 2021 |
Region III |
Bataan 2nd District Engineering Office |
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Talisay River Cupang Proper Section, Sta. 0+000 - Sta. 0+419, Balanga City, Bataan
|
June 24, 2021 |
2021 |
WIN1C03962 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bataan 2nd District Engineering Office |
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure Talisay River, Ala-uli Section (Upstream), Sta. 0+000 - Sta. 0+419, Pilar, Bataan
|
June 24, 2021 |
2021 |
WIN1C03957 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bataan 2nd District Engineering Office |
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Sitio Gasile River Control, Sta. 0+000 - Sta. 0+350, Pilar, Bataan
|
June 24, 2021 |
FY 2021 GAA |
WIN1F06192 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204164000
Project ID : P00562425LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Brgy. Calima, Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.702 Lane Km
Allocation : Php 15.00 Million
TO :
Concreting of Road,
Brgy. Calima, Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
20456 Lane Km
Allocation : Php 15.00 Million
|