Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
July 2, 2021 2021 WIN1F06308 FCR 2021 RA 11518 December 28, 2020 Region VI Capiz 1st District Engineering Office
FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Iloilo East Coast-Capiz Rd - K0147 + 000 - K0147 + 300

CW1- Reconstruction to Concrete Pavement: 0.60 lane km - 12,313.70

EAO - 251.30

Total: 12,565.00

TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Iloilo East Coast-Capiz Rd - K0147 + 000 - K0147 + 805.5

CW1- Reconstruction to Concrete Pavement: 1.611 lane km - 12,313.70

EAO - 251.30

Total: 12,565.00
July 2, 2021 2021 WIN1F06245 FCR 2021 RA 11518 December 28, 2020 Region VI Capiz 1st District Engineering Office
FROM:

LOCAL PROGRAM

Local – Buildings and Other Structures - Multipurpose / Facilities - National Building Program

Rehabilitation of Multi-Purpose Hall (Evacuation Center) with Artesian Well, Barangay San Pedro, Pontevedra, Capiz, Roxas City

CW1- Rehabilitation /Major Repair of Multi Purpose Building: 1.00 Building - 2,450.00

EAO - 50.00

Total: 2,500.00


TO:

LOCAL PROGRAM

Local – Buildings and Other Structures - Multipurpose / Facilities - National Building Program

Rehabilitation of Multi-Purpose Hall (Evacuation Center) with Artesian Well, Barangay San Pedro, Pontevedra, Capiz

CW1- Rehabilitation /Major Repair of Multi Purpose Building: 1.00 Building - 2,450.00

EAO - 50.00

Total: 2,500.00
July 2, 2021 2021 WIN1F06385 FCR 2021 RA 11518 December 28, 2020 Region VI Capiz 1st District Engineering Office
FROM:

LOCAL PROGRAM

Local – Buildings and Other Structures - Multipurpose / Facilities - National Building Program

Rehabilitation of Multi-Purpose Hall (Evacuation Center) with Artesian Well, Barangay Tacas, Pontevedra, Capiz, Roxas City

CW1- Rehabilitation /Major Repair of Multi Purpose Building: 1.00 Building - 2,450.00

EAO - 50.00

Total: 2,500.00


TO:

LOCAL PROGRAM

Local – Buildings and Other Structures - Multipurpose / Facilities - National Building Program

Rehabilitation of Multi-Purpose Hall (Evacuation Center) with Artesian Well, Barangay Tacas, Pontevedra, Capiz

CW1- Rehabilitation /Major Repair of Multi Purpose Building: 1.00 Building - 2,450.00

EAO - 50.00

Total: 2,500.00
July 1, 2021 2021 WIN1F06323 FCR 2021 RA 11518 December 28, 2020 Region VI Aklan District Engineering Office
FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Jaime Cardinal Sin Ave - K0284 + 041 - K0286 + 367

CW1- Road Widening: 4.544 lane km - 50,075.78

EAO - 1,816.22

Total: 51,892.00

TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Jaime Cardinal Sin Ave - K0284 + 075 - K0286 + 653

CW1- Road Widening: 5.048 lane km - 48,075.78

ROW Acquisition: 400 sq.m - 2,000.00

EAO - 1,816.22

Total: 51,892.00
July 1, 2021 2021 WIN1F06292 FCR 2021 RA 11518 December 28, 2020 Region VI Aklan District Engineering Office
FROM:


ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

Aklan East Rd - K0282 + 150 - K0282 + 186, K0282 + 912 - K0283 + 356, K0283 + 706 - K0283 + 806, K0286 + 720 - K0286 + 801, K0286 + 989 - K0287 + 048, K0287 + 114 - K0287 + 142, K0287 + 170 - K0287 + 214, K0287 + 670 - K0287 + 826, K0288 + 130 - K0288 + 290, K0288 + 990 - K0289 + 066, K0289 + 220 - K0289 + 296, K0289 + 300 - K0289 + 536

CW1- Construction of Drainage Structure along Road: 1,569 lineal meters - 26,209.12

EAO - 534.88

Total: 26,744.00


TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

Aklan East Rd - K0276 + 720 - K0277 + 282, K0283 + 181 - K0283 + 310, K0283 + 720 - K0283 + 820, K0286 + 716 - K0286 + 798, K0286 + 920 - K0286 + 960, K0287 + 170 - K0287 + 216, K0287 + 670 - K0287 + 822, K0288 + 130 - K0288 + 241, K0288 + 1017 - K0289 + 150, K0289 + 220 - K0289 + 282, K0289 + 302 - K0289 + 536, K0289 + 680 - K0289 + 698

CW1- Construction of Drainage Structure along Road: 1,636 lineal meters - 22,409.12

ROW Acquisition: 380 sq.m - 3,800.00

EAO - 534.88

Total: 26,744.00
July 1, 2021 2021 WIN1F06340 FCR 2021 RA 11518 December 28, 2020 Region VI Aklan District Engineering Office
FROM:

LOCAL PROGRAM

Local - Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure Program

Construction of Revetment Wall along River/Creek, Barangay Lapnag, Banga, Aklan

CW1 - Construction of Revetment: 16.00 lineal meters - 1,980.00

EAO - 20.00

Total: 2,000.00


TO:

LOCAL PROGRAM

Local - Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure Program

Construction of Revetment Wall along River/Creek, Barangay Lapnag, Banga, Aklan

CW1 - Construction of Revetment: 60.00 lineal meters - 1,980.00

EAO - 20.00

Total: 2,000.00
July 1, 2021 FY 2021 GAA WIN1E02371 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1551+932 - K1551+967,
K1557+807 - K1557+814, K1558+895 - K1558+934,
K1559+167 - K1559+350, K1561+884 - K1561+917,
K1562+022 - K1562+061, K1562+568 - K1562+618
Physical Target:
CW1: 1,227.50 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: 940 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 6,202,000.00
CW1: P 3,537,800.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: P2,540,160.00 (ROW Acquisition)
EAO: P 124,040.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1551+932 - K1551+967,
K1557+807 - K1557+814, K1558+895 - K1558+934,
K1559+167 - K1559+350, K1561+884 - K1561+917,
K1562+022 - K1562+061, K1562+568 - K1562+618
Physical Target:
CW1: 1,185.00 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: 940 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 6,202,000.00
CW1: P 3,537,800.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: P2,540,160.00 (ROW Acquisition)
EAO: P 124,040.00
July 1, 2021 2021 WIN1F06325 FCR 2021 RA 11518 December 28, 2020 Region VI Aklan District Engineering Office
FROM:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Barangay Road, Barangay Bulwang, Numancia, Aklan

CW1- Construction of Concrete Road: 0.179 lane km - 1,980.00

EAO - 20.00

Total: 2,000.00


TO:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Barangay Road, Barangay Bulwang, Numancia, Aklan

CW1- Construction of Concrete Road: 0.604 lane km - 1,980.00

EAO - 20.00

Total: 2,000.00
July 1, 2021 FY 2021 GAA WIN1E02405 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Road - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) -
K1543+450 - K1543+545, K1554+393 - K1554+854
Physical Target:
CW1: 2.034 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 19,220,000.00
CW1: P 18,835,600.00 (Reconstruction to Concrete Pavement)
EAO: P 384,400.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Road - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) -
K1543+450 - K1543+545, K1554+393 - K1554+854
Physical Target:
CW1: 1.112 Lane Km (Reconstruction to Concrete Pavement)
CW2: 0.556 Lan Km (Road Safety: Street Lights)
Allocation:
TOTAL: P 19,220,000.00
CW1: P 12,927,035.00 (Reconstruction to Concrete Pavement)
CW2: P 5,905,565.00 (Road Safety: Street Lights)
EAO: P 384,400.00
July 1, 2021 2021 WIN1F06395 FCR 2021 RA 11518 December 28, 2020 Region VI Aklan District Engineering Office
FROM:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Barangay Road, Barangay Naile, Ibajay, Aklan


CW1- Construction of Concrete Road: 0.179 lane km - 1,980.00

EAO - 20.00

Total: 2,000.00


TO:

FROM:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Barangay Road, Barangay Naile, Ibajay, Aklan

CW1- Construction of Concrete Road: 0.616 lane km - 1,980.00

EAO - 20.00

Total: 2,000.00
July 1, 2021 2021 WIN1F06329 FCR 2021 RA 11518 December 28, 2020 Region VI Regional Office VI
FROM:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction (Continuing)of Bridge Over Mayudmon River to Connect Barangay Oquendo And Barangay Guanko to Barangay Cortes, Balete, Aklan

CW1- Construction of Concrete Road: 0.00 lane km - 14,850.00

EAO - 150.00

Total: 15,000.00


TO:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction (Continuing)of Bridge Over Mayudmon River to Connect Barangay Oquendo And Barangay Guanko to Barangay Cortes, Balete, Aklan

CW1- Construction of Concrete Bridge: 228.96 sq.m - 14,850.00

EAO - 150.00

Total: 15,000.00
July 1, 2021 2021 WIN1F06362 FCR 2021 RA 11518 December 28, 2020 Region VI Aklan District Engineering Office
FROM:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction of Road, Barangay Pudiot, Tangalan, Aklan

CW1- Construction of Concrete Road: 0.440 lane km - 1,980.00

EAO - 20.00

Total: 2,000.00

TO:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction of Road, Barangay Pudiot, Tangalan, Aklan

CW1- Construction of Concrete Road: 0.560 lane km - 1,980.00

EAO - 20.00

Total: 2,000.00
July 1, 2021 FY 2021 GAA WIN1E02404 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry‐Davao Or Coastal Rd ‐ K1635+165 ‐ K1635+210
Physical Target:
CW1: 1,210.00 sq. nm. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 12,100,000.00
CW1: P 11,858,000.00 (Construction of Road Slope Protection Structure)
EAO: P 242,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry‐Davao Or Coastal Rd ‐ K1633+190 - K1633+300
Physical Target:
CW1: 990.00 sq. nm. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 12,100,000.00
CW1: P 11,858,000.00 (Construction of Road Slope Protection Structure)
EAO: P 242,000.00
July 1, 2021 FY 2021 GAA WIN1E02421 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1596+664 - K1598+000
Physical Target:
CW1: 2.672 Lane Km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Road Widening)
EAO: P 1,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1596+664 - K1597+915
Physical Target:
CW1: 2.500 Lane Km (Road Widening)
ROW: 18,750.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 42,255,420.00 (Road Widening)
ROW: P 5,994,580.00 (ROW Acquisition)
EAO: P 1,750,000.00
July 1, 2021 FY 2021 GAA WIN1F06115 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 31010200582000
Project ID : P00516137LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM :

Calapan South Road,
K0001 + 850 - K0002 + 687,
K0022 + 438 - K0025 + 117,
K0039 + 048 - K0039 + 698,
K0048 + 480 - K0050 + 765
Physical Target - CW1 - Preventive Maintenance of Road -
Asphalt Overlay ; 13.124 Lane Km
Allocation : Php 106.813 million

TO :

Calapan South Road,
K0001 + 850 - K0002 + 698,
K0022 + 438 - K0024 + 778,
K0039 + 048 - K0040 + 583,
K0048 + 480 - K0050 + 750
Physical Target - CW1 - Preventive Maintenance of Road -
Asphalt Overlay : 13.884 Lane Km
Allocation : Php 106.813 Million
July 1, 2021 2021 310205100536000 GAA FY 2021 January 25, 2021 Region II Regional Office II
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/ New Roads - Aritao - Quirino Road, Package 2, Quirino
July 1, 2021 FY 2021 GAA WIN1E02415 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Esplanade along Davao River, Brgy. 1-A and 2-A section, Left Bank, Davao City (Sta. 1+840 - Sta. 2+169)
Physical Target:
CW1: 581.176 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00

TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Esplanade along Davao River, Brgy. 1-A and 2-A Section, Left Bank, Davao City (Sta. 2+173 - Sta. 2+478)
Physical Target:
CW1: 305.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
July 1, 2021 2021 310101100426000 GAA FY 2021 January 25, 2021 Region II Cagayan 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Cagayan Valley Rd - K0512+(-009) - K0513+033, K0513+282.5 - K0513+620, K0514+(-004.5) - K0514+290, K0515+811 - K0517+955.50, K0518+000 - K0518+588.50, K0524+041.5 - K0524+677
July 1, 2021 FY 2021 GAA WIN1F06307 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310208100348000
Project ID : P00505147LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement -
Secondary Roads

FROM :

Calapan South Road,
K0109 + 000 - K0109 + 525
Physical Target - CW1 - Shoulder Paving/Construction :
2,625.00 sq.m.
Allocation : Php 7.350 Million

TO :

Calapan South Road,
K0109 + 053 - K0109 + 480
Physical Target - CW1 - Shoulder Paving/Construction -
2,604.70 sq. m.
Allocation : Php 7.350 Million
July 1, 2021 2021 300211100065000 GAA FY 2021 January 25, 2021 Region II Cagayan 3rd District Engineering Office
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Installation of Road Safety Devices along Cagayan Valley Road (K0480+300 - K0484+800)
July 1, 2021 FY 2021 GAA WIN1F06318 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310208100352000
Project ID : P00505151LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement -
Secondary Roads

FROM :

Mindoro Oriental/Occidental East Coastal Road,
K0199 + 000 - K0199 + 589
Physical Target - CW1 - Shoulder Paving/Construction -
2,356.00 sq. m.
Allocation : Php 6.479 Million

TO :

Mindoro Oriental/Occidental East Coastal Road,
K0199 + 000 - K0199 + 598
Physical Target - CW1 - Shoulder Paving/Construction :
2,813.00 sq. m.
Allocation : Php 6.479 Million
July 1, 2021 FY 2021 GAA WIN1F06322 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 300116203388000
Project ID : P00561885LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Concreting of Roads,
Gloria, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
12.00 Lane Km
Allocation : Php 72.00 Million

TO :

Concreting of Road,
Gloria, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
11.509 Lane Km
Allocation : Php 72.00 Million
July 1, 2021 2021 300117208219000 GAA FY 2021 January 25, 2021 Region II Cagayan 3rd District Engineering Office
Local Program - Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Construction of Various Local Roads and Drainages in Tuguegarao City, Cagayan
July 1, 2021 2021 WIN1C04026 FY 2021 GAA December 28, 2020 Region III Pampanga 2nd District Engineering Office
Asset Preservation - Preventive Maintenance - Primary Roads

Jose Abad Santos Ave (JASA) ,K0091+965.50 - K0093+000, K0095+000 - K0095+316
July 1, 2021 2021 300116203658000 GAA FY 2021 January 25, 2021 Region II Cagayan 3rd District Engineering Office
Local Program - Local - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects - Construction of Various Local Roads and Drainages in Tuguegarao City Phase III, Cagayan
July 1, 2021 2021 310201100745000 GAA FY 2021 January 25, 2021 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Cagayan Valley Rd - K0509+701 - K0510+892
July 1, 2021 2021 WIN1C04115 FY 2021 GAA December 28, 2020 Region III Pampanga 2nd District Engineering Office
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads

San Antonio - Floridablanca Rd, K0082+281 - K0083+000, K0087+500 - K0088+222.40



July 1, 2021 FY 2021 GAA WIN1E02426 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao Occidental District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) -
K1634+596 - K1637+039, K1646+092.50 - K1646+198,
K1646+223.10 - K1646+384, K1656+216 - K1656+503,
K1657+526 - K1657+846, K1657+906.53 - K1657+1029
Physical Target:
CW1: 7.443 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 52,931,000.00
CW1: P 51,078,415.00 (Reconstruction to Concrete Pavement)
EAO: P 1,852,585.00

TO: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1634+596 - K1637+039
Physical Target:
CW1: 5.514 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 52,931,000.00
CW1: P 51,078,415.00 (Reconstruction to Concrete Pavement)
EAO: P 1,852,585.00
July 1, 2021 FY 2021 GAA WIN1F06229 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Palawan 1st District Engineering Office
UACS No. : 300211100135000
Project ID : P00534708LZ

Convergence and Special Support Program

Special Road Fund - Motor Vehicle User's Charge (MVUC)
as per R.A. 11239

FROM :

Concrete Reblocking along PPNR-Langogan-Roxas Road Section
K0084 + 000 - K0132 + 000 (Intermittent)(S00030PW)
Physical Target - CW1 - Preventive Maintenance of Road :
Concrete Reblocking : 0 Lane Km
Allocation : Php 16.2075 Million

TO :

Concrete Reblocking along PPNR-Langogan-Roxas Road Section
K0082 + 000 - K0131 + 000 (Intermittent)(S00030PW)
Physical Target - CW1 - Preventive Maintenance of Road :
Concrete Reblocking : 0.882 Lane Km
Allocation : Php 16.2075 Million
July 1, 2021 2021 300117208220000 GAA FY 2021 January 25, 2021 Region II Cagayan 3rd District Engineering Office
Local Program - Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Construction of Various Local Roads and Drainages in Municipality of Solana, Cagayan
July 1, 2021 FY 2021 GAA WIN1F06304 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 300116204223000
Project ID : P00562484LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Concreting of Road,
Bulalacao, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
7.00 Lane Km
Allocation : Php 42.00 Million

TO :

Concreting of Road,
Bulalacao, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
6.178 Lane Km
Allocation : Php 42.00 Million

July 1, 2021 FY 2021 GAA WIN1E02420 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Jct Manikling-Gov Generoso Rd - K1745+000 - K1745+800
Physical Target:
CW1: 1.600 Lane Km (Road Widening)
Allocation:
TOTAL: P 38,446,000.00
CW1: P 37,677,080.00 (Road Widening)
EAO: P 768,920.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Jct Manikling - Gov. Generoso Rd - K1745+200 - K1746+746
Physical Target:
CW1: 3.089 Lane Km (Road Widening)
Allocation:
TOTAL: P 38,446,000.00
CW1: P 37,677,080.00 (Road Widening)
EAO: P 768,920.00
July 1, 2021 FY 2021 GAA WIN1E02419 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1677+060 - K1679+000
Physical Target:
CW1: 3.880 Lane Km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Road Widening)
EAO: P 1,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1677+060 - K1678+336
Physical Target:
CW1: 2.560 Lane Km (Road Widening)
ROW: 19,200.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 42,257,350.00 (Road Widening)
ROW: P 5,992,650.00 (ROW Acquisition)
EAO: P 1,750,000.00
July 1, 2021 FY 2021 GAA WIN1E02422 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road (including Bridge), Butay, Barangay Pichon, Caraga, Davao Oriental
Physical Target:
CW1: 3.500 Lane Km (Construction of Concrete Road)
CW2: 238.50 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 130,000,000.00
CW1: P 101,325,000.00 (Construction of Concrete Road)
CW2: P 24,125,000.00 (Construction of Concrete Bridge)
EAO: P 4,550,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road (including Bridge), Butay, Barangay Pichon, Caraga, Davao Oriental
Physical Target:
CW1: 3.788 Lane Km (Construction of Gravel Road)
CW2: 429.30 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 130,000,000.00
CW1: P 65,903,000.00 (Construction of Gravel Road)
CW2: P 59,547,000.00 (Construction of Concrete Bridge)
EAO: P 4,550,000.00
July 1, 2021 FY 2021 GAA WIN1E02408 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road (including Bridge), from Sitio Sangab to Sitio Butay, Barangay Pichon, Caraga, Davao Oriental
Physical Target:
CW1: 3.160 Lane Km (Construction of Concrete Road)
CW2: 238.50 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 120,000,000.00
CW1: P 91,675,000.00 (Construction of Concrete Road)
CW2: P 24,125,000.00 (Construction of Concrete Bridge)
EAO: P 4,200,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road (including Bridge), from Sitio Sangab to Sitio Butay, Barangay Pichon, Caraga, Davao Oriental
Physical Target:
CW1: 5.564 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 120,000,000.00
CW1: P 115,800,000.00 (Construction of Gravel Road)
EAO: P 4,200,000.00
June 30, 2021 2021 310201100746000 GAA FY 2021 January 25, 2021 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Cagayan Valley Rd - K0488+993 - K0489+218
June 30, 2021 2021 310201100742000 GAA FY 2021 January 25, 2021 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Cagayan Valley Rd - K0465+175 - K0466+106
June 30, 2021 2021 300211100064000 GAA FY 2021 January 25, 2021 Region II Cagayan 3rd District Engineering Office
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Installation of Road Safety Devices along Cagayan - Apayao Road K0488+(-358) - K0513+000 (w/exception), K0519+(-1044) - K0530+603 (w/exception); Cagayan - Apayao Road (Tuao - Rizal Section) K0525+(-243) - K0529+195 (w/exception); Santiago - Tuguegarao Road K0434+(-754) - K0436+971 (w/exception), K0437+(-031) - K0448+298 (w/exception)
June 30, 2021 2021 310202100772000 GAA FY 2021 January 25, 2021 Region II Cagayan 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road - Network Development - Road Widening - Secondary Roads - Cagayan Valley Rd (Magapit - Jct Aparri Airport Sect) - K0580+000 - K0580+534.80 (BS), K580+534.80 - K0581+205.83 (RS), K0581+205.63 - K0581+512.74 (BS), K0581+512.74 - K0581+532 (RS)
June 30, 2021 2021 300203101522000 GAA FY 2021 January 25, 2021 Region II Cagayan 1st District Engineering Office
Convergence and Special Support Program - Construction/ Improvement of Access Road leading to Declared Tourism Destinations - Access Road Leading to Bagsang Falls, Brgy. Santa Clara, Gonzaga, Cagayan
June 30, 2021 2021 310202100773000 GAA FY 2021 January 25, 2021 Region II Cagayan 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Magapit - Mission Rd - K0565+348 - K0565+600
June 30, 2021 2021 310106100582000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Jct. Na'tl. Road - Bitnong - Belance - NV Bdry. Road, - K0269+579 - K0270+447.50
June 30, 2021 2021 310104100287000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Daang Maharlika (LZ) - K0220+516.74 - K0220+624, K0220+655.50 - K0222+062.90
June 30, 2021 2021 310201100643000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0229+994.50 - K0232+105.50
June 30, 2021 2021 310106100581000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Aritao - Quirino Rd - K0256+373.50 - K0257+029.80
June 30, 2021 FY 2021 GAA WIN1E02401 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Jct. Davao - Bukidnon Road (Calinan Section) - Wangan - Subasta - Tagakpan - Tungkalan - Tagurano - Bayabas - Catigan - Baracatan - Sibulan - Tibolo - Kapatagan Road (Package 1), Davao del Sur
Physical Target:
CW1: 0.600 Lane Km (Construction of Concrete Road)
CW2: 1,192.50 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 28,950,000.00 (Construction of Concrete Road)
CW2: P 144,750,000.00 (Construction of Concrete Bridge)
EAO: P 6,300,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Jct. Davao - Bukidnon Road (Calinan Section) - Wangan - Subasta - Tagakpan - Tungkalan - Tagurano - Bayabas - Catigan - Baracatan - Sibulan - Tibolo - Kapatagan Road (Package 1), Davao del Sur
Physical Target:
CW1: 4.711 Lane Km (Construction of Gravel Road)
CW2: 715.50 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 96,444,778.00 (Construction of Gravel Road)
CW2: P 77,255,222.00 (Construction of Concrete Bridge)
EAO: P 6,300,000.00
June 30, 2021 2021 310110100214000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads - Daang Maharlika (LZ) - K0216+845 - K0217+508
June 30, 2021 FY 2021 GAA WIN1E02393 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Concrete Road R Campetea, Dama de Noche, Ixora, Plumeria, Lantana, Aster, Mansanitas, Lansones, Kasoy at Barangay Poblacion, Maragusan, Davao de Oro
Physical Target:
CW1: 0.882 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 9,230,000.00
CW1: P 9,137,700.00 (Construction of Concrete Road)
EAO: P 92,300.00

TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Concrete Road R Campetea, Dama de Noche, Ixora, Plumeria, Lantana, Aster, Mansanitas, Lansones, Kasoy at Barangay Poblacion, Maragusan, Davao de Oro
Physical Target:
CW1: 1.240 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 9,230,000.00
CW1: P 9,137,700.00 (Construction of Concrete Road)
EAO: P 92,300.00
June 30, 2021 FY 2021 GAA WIN1E02381 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1580+000 - K1581+434
Physical Target:
CW1: 2.748 Lane Km (Road Widening)
Allocation:
TOTAL: P 72,500,000.00
CW1: P 69,962,500.00 (Road Widening)
EAO: P 2,537,500.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1579+685 - K1581+380
Physical Target:
CW1: 3.280 Lane Km (Road Widening)
Allocation:
TOTAL: P 72,500,000.00
CW1: P 69,962,500.00 (Road Widening)
EAO: P 2,537,500.00
June 29, 2021 FY 2021 GAA WIN1E02386 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1502+150 - K1502+961
Physical Target:
CW1: 3.244 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 32,950,000.00
CW1: P 32,291,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 659,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1502+150 - K1502+961
Physical Target:
CW1: 1.842 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 32,950,000.00
CW1: P 32,291,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 659,000.00
June 29, 2021 2021 WIN1C04018 FY 2021 GAA December 28, 2020 Region III Aurora District Engineering Office
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers

Construction of Malupa - Dian - Aguang River Control, Sta. 3+900 - Sta. 4+050, Sta. 6+200 - Sta. 6+326, Sta. 8+800 - Sta. 9+046.50, Sta. 9+138 - Sta. 9+185.50, Baler, Aurora
June 29, 2021 2021 WIN1C03893 FY 2021 GAA December 28, 2020 Region III Bataan 1st District Engineering Office
Asset Preservation - Preventive Maintenance - Tertiary Roads

Calaguiman Vicinal Rd, K0129+000 - K0129+177.40
June 29, 2021 2021 WIN1C04024 FY 2021 GAA December 28, 2020 Region III Bataan 1st District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads

Jose Abad Santos Ave (JASA), K0108+070 - K0108+236, K0109+032 - K0109+455
June 29, 2021 2021 WIN1C03985 FY 2021 GAA December 28, 2020 Region III Bataan 1st District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads

Bataan Technical Park, Inc. Rd (BTPI), K0177+000 - K0177+801.976
June 28, 2021 2021 WIN1C03966 FY 2021 GAA December 28, 2020 Region III Bulacan 1st District Engineering Office
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Mitigation Structure, Sta. 0+000 - Sta. 0+266 along Bagna, Malolos, Bulacan
June 28, 2021 2021 WIN1C04020 SR2021-03-006974 March 13, 2021 Cordillera Administrative Region CAR - Regional Office
From: Construction of Ampusongan Flood Control, Bakun, Benguet;
Physical Target: CW1 : 1,185 Lineal meters;
Allocation= Php 100,000,000

To: Construction of Ampusongan Flood Control, Bakun, Benguet;
Physical Target: CW1 : 1142 Lineal meters;
Allocation= Php 100,000,000

June 28, 2021 2021 WIN1C04031 GAA 2021 June 9, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Peñarrubia Road, Peñarrubia, Abra;
Physical Target: CW1: 1.76 Lane Km;
Allocation= Php 10,000,000

To: Construction of Peñarrubia Road, Peñarrubia, Abra;
Physical Target: CW1: 2.871 Lane Km;
Allocation= Php 10,000,000

June 28, 2021 2021 WIN1C04000 GAA 2021 June 9, 2021 Cordillera Administrative Region Apayao 2nd District Engineering Office
From: Claveria-Calanasan-Kabugao Road – K0716 + 000 - K0716 + 040, K0716 + 070 - K0716 + 129;
Physical Target: CW1: 0.198 Lane Km;
Allocation= Php 5,600,000

To: Claveria-Calanasan-Kabugao Road – K0713 + 383 - K0713 + 503;
Physical Target: CW1: 0.240 Lane Km;
Allocation= Php 5,600,000

June 28, 2021 2021 WIN1C03996 GAA 2021 June 9, 2021 Cordillera Administrative Region Apayao 2nd District Engineering Office
From: San Sebastian-San Jose-San Francisco Road in support of Handicraft, Furniture, Processed High Value Crops, Vegetable Rice and Corn Industries, Luna, Apayao;
Type of Work: CW1: Construction of Concrete Road;
Physical Target: CW1: 0.830 Lane Km;
Allocation= Php 50,233,000

To: San Sebastian-San Jose-San Francisco Road in support of Handicraft, Furniture, Processed High Value Crops, Vegetable Rice and Corn Industries, Luna, Apayao;
Type of Work: CW1: Construction of Concrete Road
CW2: Replacement of Bridge;
Physical Target: CW1: 0.360 Lane Km
CW2: 477 Square meters;
Allocation= Php 50,233,000

June 28, 2021 2021 WIN1C04036 GAA 2021 June 18, 2021 Cordillera Administrative Region Baguio City District Engineering Office
From: Gov Pack Rd - (S04724LZ) Chainage 027 - Chainage 270;
Physical Target: CW1: 0.337 Lane Km;
Allocation= Php 10,935,000

To: Gov Pack Rd – (S00408LZ) Chainage 0 - Chainage 36, (S00521LZ) Chainage 0 - Chainage 100, (S04724LZ) Chainage 176 - Chainage 627;
Physical Target: CW1: 0.587 Lane Km;
Allocation= Php 10,935,000
June 28, 2021 2021 WIN1C03999 GAA 2021 June 17, 2021 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Construction of Madayag - Dagdag Access Road Lusod, Kabayan, Benguet;
Type of Work: Construction of Concrete Road;
Physical Target: CW1: 0.304 Lane Km;
Allocation= Php 3,000,000

To: Construction of Madayag - Dagdag Access Road Lusod, Kabayan, Benguet;
Type of Work: Construction of Gravel Road;
Physical Target: CW1: 1 Lane Km;
Allocation= Php 3,000,000

June 28, 2021 2021 WIN1C03991 GAA 2021 June 8, 2021 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Improvement of Local Road, Dangpa - Lengaoan Road, Barangay Amgaleyguey/Lengaoan, Buguias, Benguet;
Physical Target: CW1: : 0.7 Lane Km;
Allocation= Php 10,000,000

To: Improvement of Local Road, Dangpa - Lengaoan Road, Barangay Amgaleyguey/Lengaoan, Buguias, Benguet; Physical Target: CW1: 0.925 Lane Km; Allocation= Php 10,000,000

June 28, 2021 2021 WIN1C03998 GAA 2021 June 9, 2021 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Improvements and Road Opening of Sitio Upper Inlanded, Brgy Paoy, Atok, Benguet ;
Physical Target: CW1: : 0.3 Lane Km;
Allocation= Php 5,000,000

To: Improvements and Road Opening of Sitio Upper Englandad, Brgy Paoay, Atok, Benguet ;
Physical Target: CW1: 0.3 Lane Km;
Allocation= Php 5,000,000

June 28, 2021 2021 WIN1C04005 GAA 2021 June 11, 2021 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Banaue-Mayoyao-A Lista-Isabela Bdry Rd K407 + 000 – K0411 + 000, K0411 + 180 – K0411 + 400, K0411 + 700 – K0412 + 000, K0413 + 303 – K0415 + 000;
Physical Target: CW1: 9,318 Square meters;
Allocation= Php 27,954,000

To: Banaue-Mayoyao-A Lista-Isabela Bdry Rd K0407 + 000 – K0411 + 000, K0411 + 180 – K0411 + 400;
Physical Target: CW1: 4,954.50 Square meters;
Allocation= Php 27,954,000

June 28, 2021 2021 WIN1C03987 GAA 2021 June 11, 2021 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Nueva Vizcaya-Ifugao-Mt Province Rd K0335 + (-358) – K0337 + 334;
Physical Target: CW1: 5.446 Lane Km;
Allocation= Php 32,603,000

To: Nueva Vizcaya-Ifugao-Mt Province Rd K0335 + (-358) – K0336 + 752;
Physical Target: CW1: 4.270 Lane Km;
Allocation= Php 32,603,000

June 28, 2021 2021 WIN1C03995 GAA 2021 June 14, 2021 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Rizal Natl Rd (Liwan West-Babalag-Macutay Sect) - K0522 + 686 - K0522 + 741;
Physical Target: CW1: 0.110 Lane Km;
Allocation= Php 1,966,000

To: Rizal Natl Rd (Liwan West-Babalag-Macutay Sect) - K0522 + 445 - K0522 + 529.50, K0522 + 606 - K0522 + 669.50, K0522 + 686 - K0522 + 763.50;
Physical Target: CW1: 0.451 Lane Km;
Allocation= Php 1,966,000

June 28, 2021 2021 WIN1C03981 GAA 2021 June 14, 2021 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0496 + (-700) - K0496 + 000;
Physical Target: CW1: 1.40 Lane Km;
Allocation= Php 24,840,000

To: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0496+(-700) - K0496+475, K0508+189-K0508+654;
Physical Target: CW1: 3.28 Lane Km;
Allocation= Php 24,840,000

June 28, 2021 2021 WIN1C03905 GAA 2021 June 8, 2021 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: Lubuagan-Batongbuhay-Abra Bdry Rd - K0473 + 738-K0475 + 823;
Physical Target: CW1: 1.921 Lane Km;
Allocation= Php 38,428,000

To: Lubuagan-Batongbuhay-Abra Bdry Rd - K0473 + 738-K0474 + 690;
Physical Target: CW1: 1.708 Lane Km;
Allocation= Php 38,428,000

June 28, 2021 FY 2021 GAA WIN1E02348 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Buhangin-Lapanday - K1506+325 - K1506+423
Physical Target:
CW1: 0.588 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 4,305,000.00
CW1: P 4,218,900.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 86,100.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Buhangin-Lapanday - K1506+325 - K1506+397
Physical Target:
CW1: 0.288 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 4,305,000.00
CW1: P 4,218,900.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 86,100.00
June 28, 2021 FY 2021 GAA WIN1E02378 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance (Asphalt Overlay) - Davao-Cotabato Road (Davao City-Jct. Digos Sect.) - K1519+606 - K1520+151
Physical Target:
CW1: 3.511 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 42,060,000.00
CW1: P 40,587,900.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,472,100.00

TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance (Asphalt Overlay) - Davao-Cotabato Road (Davao City-Jct. Digos Sect.) - K1522+379 - K1522+764
Physical Target:
CW1: 2.310 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 42,060,000.00
CW1: P 40,587,900.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,472,100.00
June 28, 2021 FY 2021 GAA WIN1E02365 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd -
K1491+631 - K1491+985, K1492+474 - K1492+500,
K1504+989 - K1505+800, K1509+000 - K1510+000
Physical Target:
CW1: 8.148 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 29,168,000.00
CW1: P 28,584,640.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 583,360.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1491+593 - K1492+324
Physical Target:
CW1: 2.908 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 29,168,000.00
CW1: P 28,584,640.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 583,360.00
June 28, 2021 FY 2021 GAA WIN1E02380 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Carmen-DAPECOL Cmpd Rd - K1481+336 - K1482+297
Physical Target:
CW1: 1.896 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 17,064,000.00
CW1: P 16,722,720.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 341,280.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Carmen-DAPECOL Cmpd Rd - K1481+336 - K1482+292
Physical Target:
CW1: 1.886 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 17,064,000.00
CW1: P 16,722,720.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 341,280.00
June 28, 2021 FY 2021 GAA WIN1E02333 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1560+878 - K1560+1983
Physical Target:
CW1: 2.210 Lane Km (Road Widening)
ROW: 14,697.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 42,727,000.00
CW1: P 39,422,460.00 (Road Widening)
ROW: P 2,450,000.000 (ROW Acquisition)
EAO: P 854,540.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1560+807 - K1560+1912
Physical Target:
CW1: 2.210 Lane Km (Road Widening)
ROW: 14,697.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 42,727,000.00
CW1: P 39,422,460.00 (Road Widening)
ROW: P 2,450,000.000 (ROW Acquisition)
EAO: P 854,540.00
June 28, 2021 FY 2021 GAA WIN1E02383 FY 2021 GAA RA 11518 January 1, 2020 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Mapantad-Tagbobolo-Taguibo Road, Davao Oriental
Physical Target:
CW1: 1.960 Lane Km (Construction of Concrete Road)
CW2: 1.640 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 42,960,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
CW2: P 22,500,800.00 (Reconstruction to Concrete Pavement)
EAO: P 859,200.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Mapantad-Tagbobolo-Taguibo Road, Davao Oriental
Physical Target:
CW1: 1.000 Lane Km (Construction of Concrete Road)
CW2: 1.622 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 42,960,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
CW2: P 22,500,800.00 (Reconstruction to Concrete Pavement)
EAO: P 859,200.00
June 25, 2021 FY 2021 GAA WIN1F06255 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300116204155000
Project ID : P00562416LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Concreting of Road,
Sitio Bulago, Palhi, Calapan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.486 Lane Km
Allocation : Php 3.00 Million

TO :

Concreting of Road,
Sitio Bulago, Palhi, Calapan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.604 Lane Km
Allocation : Php 3.00 Million

June 25, 2021 FY 2021 GAA WIN1F06256 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310202100814000
Project ID : P00505132LZ

001 : Ensure safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:

Calapan North Road
K0025 + 565 - K0026 + 030
Physical Target - CW1 - Network Development -
Road Widening : 0.324 Lane Km
Allocation : Php 4.966 Million

TO :

Calapan North Road
K0025 + 482 - K0026 + 030,
K0030 + 887 - K0030 + 969,
K0031 + 467 - K0031 + 504
Physical Target - CW1 - Network Development -
Road Widening : 0.628 Lane Km
Allocation : Php 4.966 Million
June 25, 2021 FY 2021 WIN1C03770 FY 2021 GAA RA 11518 December 28, 2020 Region V Regional Office V
UACS No.: 310204101087000
Project ID: P00506299LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Juban-Bulan Diversion Road, Juban Section, Sorsogon
Physical Target: CW1-Construction of Concrete Road – 2.596 Lane km.
ROW- ROW Acquisition- 0 sq.m.
Allocation: Php 100,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Juban-Bulan Diversion Road, Juban Section, Sorsogon
Physical Target: CW1-Construction of Concrete Road – 2.48 Lane km.
ROW- ROW Acquisition- 24,793.00 sq.m.
Allocation: Php 100,000,000.00
June 25, 2021 FY 2021 GAA WIN1F06230 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310202100824000
Project ID : P00505144LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Bongabong - Sagana - Roxas - San Aquilino Road
K0126 + 017 - K0126 + 553
Physical Target - CW1 - Road Widening : 1.072 Lane Km
Allocation : Php 16.20 Million

TO :

Bongabong - Sagana - Roxas - San Aquilino Road
K00125 + 915 - K0126 + 540
Physical Target - CW1 - Road Widening : 1.143 Lane Km
Allocation : Php 16.20 Million
June 25, 2021 FY 2021 WIN1C03717 FY 2021 GAA RA 11518 December 28, 2020 Region V Regional Office V
UACS No.: 310205100576000
Project ID: P00506301LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - Bacon-Manito Rd, Package 1, Sorsogon
Physical Target: CW1-Construction of Concrete Road – 2.083 Lane km.
CW2- Construction of Drainage Structure along Road – 2,082.667 Lineal meters
CW3- Construction of Road Slope Protection Structure – 5,085.711 Square meters
Allocation: Php 110,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - Bacon-Manito Rd, Package 1, Sorsogon
Physical Target: CW1-Construction of Concrete Road – 1.9754 Lane km.
CW2- Construction of Drainage Structure along Road – 1,962.65 Lineal meters
CW3- Construction of Road Slope Protection Structure – 5,269.76 Square meters
CW4- Construction of Gravel Road - 0.2835 Lane Km
Allocation: Php 110,000,000.00
June 25, 2021 FY 2021 WIN1C03790 FY 2021 GAA RA 11518 December 28, 2020 Region V Regional Office V
UACS No.: 310205100577000
Project ID: P00506302LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - Bacon-Manito Rd, Package 2, Sorsogon
Physical Target: CW1- Construction of Road Slope Protection Structure – 3,702.6 Square meters
Allocation: Php 110,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - Bacon-Manito Rd, Package 1, Sorsogon
Physical Target: CW1- Construction of Road Slope Protection Structure – 7,164.3 Square meters
CW2-Construction of Concrete Road – 1.76 Lane km.
CW3- Construction of Gravel Road – 1.103 Lane Km
CW4- Construction of Drainage Structure along Road – 1,752.80 Lineal meters
Allocation: Php 110,000,000.00
June 25, 2021 FY 2021 GAA WIN1F06248 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310208100347000
Project ID : P00505146LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement
- Secondary Roads

FROM :

Calapan South Road
K0102 + 550 - K0102 + 934
Physical Target - CW1 - Shoulder Paving/Construction :
2,304.00 sq.m.
Allocation : Php 6.903 Million

TO :

Calapan South Road
K0102 + 550 - K0102 + 791
Physical Target - CW1 - Shoulder Paving/Construction :
1,470.10 sq.m.
Allocation : Php 6.903 Million
June 25, 2021 FY 2021 WIN1C03854 FY 2021 GAA RA 11518 December 28, 2020 Region V Regional Office V
UACS No.: 310205100576000
Project ID: P00506301LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0441 + 150 - K0442 + 335
Physical Target: CW1- Road Widening – 1.88 Lane Km
Allocation: Php 55,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0441 + 150 - K0442 + 335
Physical Target: CW1- Road Widening – 1.60 Lane Km
CW2- Construction of Drainage Structure along Road – 1,591.40 Lineal meters
ROW - ROW Acquisition – 16,000 Square meters
Allocation: Php 55,000,000.00
June 25, 2021 FY 2021 WIN1C03816 FY 2021 GAA RA 11518 December 28, 2020 Region V Regional Office V
UACS No.: 310201100657000
Project ID: P00505280LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0508 + 000 - K0508 + 258
Physical Target: CW1- Road Widening – 0.516 Lane Km
Allocation: Php 14,916,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0508 + 000 - K0508 + 169
Physical Target: CW1- Road Widening – 0.338 Lane Km
CW2- Construction of Drainage Structure along Road – 338.00 Lineal meters
CW3- Construction of Road Slope Protection Structure – 475.58 Square meters
ROW - ROW Acquisition – 3,380 Square meters
Allocation: Php 14,916,000.00
June 25, 2021 FY 2021 WIN1C03813 FY 2021 GAA RA 11518 December 28, 2020 Region V Regional Office V
UACS No.: 310201100654000
Project ID: P00505281LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0353 + 930 - K0354 + 461
Physical Target: CW1- Road Widening – 1.05 Lane Km
Allocation: Php 20,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0354 + 021 - K0354 + 292.50
Physical Target: CW1- Road Widening – 0.543 Lane Km
CW2- Construction of Drainage Structure along Road – 338.00 Lineal meters
CW3- Construction of Road Slope Protection Structure – 529.16 Square meters
Allocation: Php 20,000,000.00
June 25, 2021 FY 2021 WIN1C03917 FY 2021 GAA RA 11518 December 28, 2020 Region V Regional Office V
UACS No.: 310201100656000
Project ID: P00505291LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0472 + 556 - K0472 + 888
Physical Target: CW1- Road Widening – 0.664 Lane Km
Allocation: Php 10,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0472 + 556 - K0472 + 691
Physical Target: CW1- Road Widening – 0.27 Lane Km
CW2- Construction of Drainage Structure along Road – 195.00 Lineal meters
CW3- Construction of Road Slope Protection Structure – 303.63 Square meters
ROW - ROW Acquisition – 2,700 Square meters
Allocation: Php 10,000,000.00
June 25, 2021 FY 2021 WIN1C03805 FY 2021 GAA RA 11518 December 28, 2020 Region V Regional Office V
UACS No.: 310201100658000
Project ID: P00505320LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Rolando A Andaya Highway - K0301 + 395 - K0301 + 840
Physical Target: CW1- Road Widening – 0.89 Lane Km
Allocation: Php 20,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Rolando A Andaya Highway - K0301 + 395 - K0301 + 628.60
Physical Target: CW1- Road Widening – 0.4672 Lane Km
CW2- Construction of Drainage Structure along Road – 467.20 Lineal meters
CW3- Construction of Road Slope Protection Structure – 422.44 Square meters
Allocation: Php 10,000,000.00
June 25, 2021 2021 WIN1C04047 SR2021-02-004549 February 15, 2021 Region VI Regional Office VI
FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

President Corazon C. Aquino Ave. - (S00558PN) Chainage 1233.5 - Chainage 2467

CW1 - Construction of Drainage Structure along Road: 2,467 lineal meters
3.52 / lineal meter - 8,685.00

EAO - 315.00

Total: 9,000.00

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

President Corazon C. Aquino Ave. - (S00558PN) Chainage 1203 - Chainage 1857

CW1 - Construction of Drainage Structure along Road: 654 lineal meters
13.28 / lineal meter - 8,685.00

EAO - 315.00

Total: 9,000.00
June 25, 2021 2021 WIN1C03963 FY 2021 GAA December 28, 2020 Region III Bulacan 1st District Engineering Office
Local - Flood Control and Drainage / Protection Works - Local Infrastructure Program

Construction / Rehabilitation of Flood Mitigation Structures and Drainage Systems, Sta. 00+000 - Sta. 02+281, Poblacion, Baliuag, Bulacan
June 25, 2021 2021 WIN1F06337 SR2021-04-008117 April 23, 2021 Region VI Regional Office VI
FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/ New Roads

San Remigio - Bugo - Gen. Fullon - Valderrama Road, Antique

CW1- Construction of Gravel Road: 0.732 lane km
38,890.03 /lane km - 28,467.50

ROW Acquisition: 3,658 sq.m
0.132 / sq.m - 482.50

EAO - 1,050.00

Total: 30,000.00

TO:

OO1: Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/ New Roads

San Remigio - Bugo - Gen. Fullon - Valderrama Road, Antique

CW1- Construction of Gravel Road: 1.515 lane km
18,778.88 /lane km - 28,450.00

ROW Acquisition: 7,567.70 sq.m
0.066 / sq.m - 500.00

EAO - 1,050.00

Total: 30,000.00
June 25, 2021 2021 WIN1E02336 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Agusan del Sur 2nd District Engineering Office
UACS No. 310201100856000
Project ID: P00501570MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

FROM:

Daang Maharlika (Agusan-Davao Sect) - K1318 + 544 - K1319 + 641

Type of Work / Physical Target: CW1 - Road Widening: 2.194 lane km

Unit Cost: P13,400,182.32 / lane km

Allocation: P 29,400,000.00

EAO: P 600,000.00

TOTAL: P 30,000,000.00

TO:

Daang Maharlika (Agusan-Davao Sect) - K1318 + 544 - K1319 + 581

Type of Work / Physical Target: CW1 - Road Widening: 2.074 lane km

Unit Cost: P14,175,506.27 / lane km

Allocation: P 29,400,000.00

EAO: P 600,000.00

TOTAL: P 30,000,000.00
June 25, 2021 2021 WIN1E02343 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Regional Office XIII
UACS No. 310204101277000
Project ID: P00502176MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads

FROM:

Lianga Coastal Bypass Road (SDCR Alternate Route), Surigao del Sur

Type of Work / Physical Target:
CW1 - Construction of Gravel Road: 0.187 lane km
CW2 - Construction of Road Slope Protection Structure: 865.457 sq.m.

Unit Cost:
CW1: P283,823.53 / lane km
CW2: P55,750.89 / sq.m.

Allocation:
CW1: P53,075,000.00
CW2: P48,250,000.00

EAO: P 3,675,000.00

TOTAL: P 105,000,000.00

TO:

Lianga Coastal Bypass Road (SDCR Alternate Route), Surigao del Sur

Type of Work / Physical Target:
CW1 - Construction of Gravel Road: 1.442 lane km
CW2 - Construction of Road Slope Protection Structure: 3,052.30 sq.m.

Unit Cost:
CW1: P40,184,088.56 / lane km
CW2: P14,212.08 / sq.m.

Allocation:
CW1: P57,945,455.70
CW2: P43,379,544.30

EAO: P 3,675,000.00

TOTAL: P 105,000,000.00
June 24, 2021 FY 2021 GAA WIN1F06162 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310202100815000
Project ID : P00505128LZ

001: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:

Calapan South Road
K0047 + 986 - K0048 + 000
Physical Target - CW1 - Network Development - Road Widening
0.402 Lane Km
Allocation : Php 7.387 Million

TO :

Calapan South Road
K0047 + 986 - K0047 + 1178,
K0048 + 200 - K0048 + 327
Physical Target - CW1 - Network Development - Road Widening
0.634 Lane Km
Allocation : Php 7.387 Miilion
June 24, 2021 FY 2021 GAA WIN1F06175 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310202100812000
Project ID : P00505130LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:

Calapan North Road
K0018 + 456 - K0018 + 690
Physical Target - CW1 - Network Development - Road Widening
0.468 Lane Km
Allocation : Php 4.345 Million

TO :

Calapan North Road
K0018 + 456 - K0018 + 680
Physical Target - CW1 - Network Development - Road Widening
0.448 Lane Km
Allocation : Php 40345 Million
June 24, 2021 FY 2021 GAA WIN1F06175 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300116204171000
Project ID : P00562432LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Concreting of Road, Brgy. Sta. Rosa I - Mangangan II,
Baco, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
4.236 Lane Km
Allocation : Php 25.00 Million

TO :

Concreting of Road, Brgy. Sta. Rosa I - Mangangan II,
Baco, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
4.023 Lane Km
Allocation : Php 25.00 Million
June 24, 2021 FY 2021 GAA WIN1F06189 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300116204173000
Project ID : P00562434LZ

LOCALPROGRAM

Local - Local Roads and Bridges - Local roads
Construction/Repair/Rehabilitation/Improvement
of Various Infrastructure including Local Projects

FROM :

Concreting of Road,
Brgy. Tagumpay - Brgy. Misong,
Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
3.940 Lane Km
Allocation : Php 25.00 Million

TO;

Concreting of Road,
Brgy. Tagumpay - Brgy. Misong
Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.688 Lane Km
Allocation : Php 25.00 Million
June 24, 2021 2021 WIN1C04021 FY 2021 GAA December 28, 2020 Region III Bataan 2nd District Engineering Office
Network Development - Road Widening - Secondary Roads

Roman Expressway - K0136+958 - K0137+246, K0144+600 - K0145+623
June 24, 2021 2021 WIN1C03969 FY 2021 GAA December 28, 2021 Region III Bataan 2nd District Engineering Office
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure along Talisay River Cupang Proper Section, Sta. 0+000 - Sta. 0+419, Balanga City, Bataan

June 24, 2021 2021 WIN1C03962 FY 2021 GAA December 28, 2020 Region III Bataan 2nd District Engineering Office
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure Talisay River, Ala-uli Section (Upstream), Sta. 0+000 - Sta. 0+419, Pilar, Bataan

June 24, 2021 2021 WIN1C03957 FY 2021 GAA December 28, 2020 Region III Bataan 2nd District Engineering Office
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Sitio Gasile River Control, Sta. 0+000 - Sta. 0+350, Pilar, Bataan

June 24, 2021 FY 2021 GAA WIN1F06192 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300116204164000
Project ID : P00562425LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Concreting of Road,
Brgy. Calima, Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.702 Lane Km
Allocation : Php 15.00 Million

TO :

Concreting of Road,
Brgy. Calima, Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
20456 Lane Km
Allocation : Php 15.00 Million

Pages