Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
July 5, 2017 2017 WIN7F04733 FY 2017 GAA RA 10924 December 29, 2016 Region V Sorsogon 2nd District Engineering Office
As per GAA:
Locally Funded Projects: Local Infrastructure Program - Roads and Bridges - Local Roads, Construction of Banuangdaan - Sta. Isabel - San Sebastian Coastal road, Matnog/Sta. Magdalena, Sorsogon
(Construction of Concrete Road)
Physical Target: 5 Lane-km
Unit Cost (P'000): P5,000/Lane-km
Allocation: PhP 25M

As MODIFIED:
Locally Funded Projects: Local Infrastructure Program - Roads and Bridges - Local Roads, Construction of Tinampo-Cogon Road, Bulusan, Sorsogon
(Construction of Concrete Road)
Physical Target: 2.724 Lane-km
Unit Cost : P9,177,679.88/Lane-km
Estimated Cost: PhP 25M
July 5, 2017 2017 WIN7E01492 FY 2017 GAA RA 10924 December 29, 2016 Region V Sorsogon 2nd District Engineering Office
As per GAA:
Locally Funded Projects - Flood Control and Drainage - Flood Control Structures/Facilities - Repair/Rehab of Flood Control Structure along Cadac-an river, Bacolod, Irosin, Sorsogon(Rehabilitation/Major Repair of Flood Control Structure)
Allocation: PhP 20.0M

As MODIFIED:
Locally Funded Projects: - Flood Control and Drainage - Flood Control Structures/Facilities - Repair/Rehab of Flood Control Structure along Cadac-an river, Bacolod, Irosin, Sorsogon (Upstream, Leftside), Sta. 0+781.70 - Sta. 0+936.10
(Rehabilitation/Major Repair of Flood Control Structure)
Physical Target: 154.40 Lm
Unit Cost (P'000): P129.53/Lm
Estimated Cost: PhP 20.0M
July 5, 2017 2017 165003014600176 GAA FY 2017 January 1, 2017 Region II Quirino District Engineering Office
Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary: along Jct Abbag-Guingin Bdry Rd - K0405+160 - K0405+185
July 5, 2017 2017 WIN7F04968 FY 2017 GAA January 1, 2017 Region III Zambales 1st District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads - Opening of Roads, Fleet - Marine Training Base (FMTB), San Narciso, Zambales
July 5, 2017 2017 WIN7F04969 FY 2017 GAA January 1, 2017 Region III Zambales 1st District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction of Multi-Purpose Building, Municipal Hall, Sta. Cruz, Zambales
July 5, 2017 FY 2017 WIN7F04972 UACS No. 165003014900079 January 1, 2017 National Capital Region NCR - Regional Office
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary: Rehabilitation/ Major Repair of Drainage Structure along Road – Katipunan St – K0017+789 – K0018+060 (Rehabilitation/ Major Repair of Drainage Structure along Road)
UACS No. 165003014900079
Physical Target/ Cost
Original: 540 lineal meter
Unit Cost: P120.37T/ lineal meter
Allocation Cost: P65.00M
WIN7F04972

As Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary: Sumulong Outfall (0+000 – 0+120), Sumulong Highway K0016+-780 – K0016+-615 (Construction of Drainage Structure along Road)
UACS No. 165003014900079
Physical Target/ Cost
Modified: 285 lineal meter
Unit Cost: P228.07T/ lineal meter
Estimated Cost: P65.00M
WIN7F04972
July 5, 2017 FY 2017 WIN7E01805 UACS No. 103004010310264 January 1, 2017 National Capital Region Quezon City 1st Engineering District Office
As Per GAA
Locally Funded Projects: Local Infrastructure Program – Buildings and Other Structures – Multipurpose/ Facilities, Construction of Multi-Purpose Building, Brgy. Bagong Kamuning, Quezon City (Construction of Multi-Purpose Building)
UACS No. 103004010310264
Physical Target/ Cost
Per GAA/ Original: 1 Bldg.
Unit Cost: P15M/Bldg.
Allocation: Php 15M
WIN7E01805

Per GAA
Locally Funded Projects: Local Infrastructure Program – Buildings and Other Structures – Multipurpose/ Facilities, Construction of Multi-Purpose Building, Brgy. Payatas, Quezon City (Construction of Multi-Purpose Building)
UACS No. 103004010310264
Physical Target/ Cost
As Modified: 1 Bldg.
Unit Cost: P15M/Bldg.
Estimated Cost: Php 15M
WIN7E01805
July 5, 2017 FY 2017 WIN7F05004 UACS No. 103004010310242 January 1, 2017 National Capital Region Quezon City 1st Engineering District Office
As per GAA
Locally Funded Projects, LIP – Buildings and Other Structures – Multipurpose/ Facilities Construction of Multi-Purpose Building Calachuchi Street, Brgy. Batasan Hills, Q.C. (Construction of Multi-Purpose Building)
UACS No. 103004010310242
Physical Target/ Cost
Per GAA/ Original: 1 bldg.
Unit Cost: P2.000M/bldg.
Allocation: Php 2.000M
WIN7F05004

As Modified
Locally Funded Projects, LIP – Buildings and Other Structures – Multipurpose/ Facilities Construction of Multi-Purpose Building at Brgy. Commonwealth, Q.C. (Construction of Multi-Purpose Building)
UACS No. 103004010310242
Physical Target/ Cost
As Modified: 1 bldg.
Unit Cost: P2.000M/bldg.
Estimated Cost: Php 2.000M
WIN7F05004
July 5, 2017 FY 2017 WIN7F05018 WIN7F05018 January 1, 2017 National Capital Region Quezon City 1st Engineering District Office
Per GAA
Locally-Funded Projects: Local Infrastructure Program: Roads and Bridges – Local Roads: Road Improvement (Reblocking) along Susano Road, from Barangay Novaliches Proper to Barangay San Agustin, Novaliches Quezon City – Preventive Maintenance of Road: Concrete Reblocking (Preventive Maintenance of Road: Concrete Reblocking)
UACS No. 165004050306820
Physical Target/ Cost
Per GAA/ Original: Physical Target 1.00 lane-km
Unit Cost: P20M/lane-km
Allocation: P20M
WIN7F05018

As Modified
Locally-Funded Projects: Local Infrastructure Program: Roads and Bridges – Local Roads: Road Improvement of Fairlane Street, Quezon City (Preventive Maintenance of Road: Concrete Reblocking)
UACS No. 165004050306820
Physical Target/ Cost
Per GAA/ Original: Physical Target 2.0358 lane-km
Unit Cost: P9.824M/lane-km
Estimated Cost: P20M
WIN7F05018
July 5, 2017 FY 2017 WIN7F05014 UACS No. 292003020401946 January 1, 2017 National Capital Region Quezon City 1st Engineering District Office
Per GAA
MFO-2 Flood Management Services: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Flood Mitigation Structure – Rehabilitation and Improvement of Kanlaon St., Quezon City (Construction of Flood Mitigation Structure)
UACS No. 292003020401946
Physical Target/ Cost
Per GAA/ Original: Physical Target 2,000 lm
Unit Cost: P10.00T/lm
Allocation: P20M
WIN7F05014

As Modified
MFO-2 Flood Management Services: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems: Rehabilitation and Improvement of Biak na Bato St., Quezon City (Upgrading of Drainage Structure along Road)
UACS No. 292003020401946
Physical Target/ Cost
Per GAA/ Original: Physical Target 1,410 lm
Unit Cost: P14.18T/lm
Estimated Cost: P20M
WIN7F05014
July 5, 2017 2017 WIN7E01787 FY 2017 GAA January 1, 2017 Region III Aurora District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Series of Groundsill along Baul River, Brgy. Dinadiawan, Dipaculao, Aurora
July 5, 2017 2017 WIN7E01788 FY 2017 GAA January 1, 2017 Region III Aurora District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Series of Groundsill along Diduan (Manglad) River, Barangay Dinadiawan, Dipaculao, Aurora
July 4, 2017 2017 WIN7F04817 SR2017-01-000287 January 28, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Services: Network Development - Construction of Missing Gaps connecting National Roads, including ROW, Bacon-Manito Road incl. Bridge and Slope Protection Sorsogon

(Construction of Concrete Bridge)
(Construction of Gravel Road)
(Construction of Road Slope Protection Structure)
Allocation: PhP 150M

As MODIFIED:
MFO-1 National Road Services: Network Development - Construction of Missing Gaps connecting National Roads, including ROW, Bacon-Manito Road incl. Bridge and Slope Protection, Sorsogon

Construction of Concrete Bridge (Banasi Bridge & Osiao Bridge)

Construction of Gravel Road (Osiao Bridge Approaches)

Construction of Road Slope Protection Structure
(Approaches of Banasi & Osiao Bridge)

Construction of Concrete Road (Banasi Bridge Approaches)

Construction of Drainage Structure along Road
(Approaches of Banasi Bridge)

ROW Acquisition
Estimated Cost: PhP 150M
July 4, 2017 2017 WIN7F04807 SR2017-01-000270 January 28, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Services: Network Development - Construction of By-passes/ Diversion Roads, including ROW, Camarines Sur/Albay Diversion Road incl. Bridge, Albay
(Construction of Concrete Bridge)
(Construction of Concrete Road)
Allocation: PhP 100M

As MODIFIED:
MFO-1 National Road Network Services: Network Development - Construction of By-Passes/ Diversion Roads, including ROW,
Camarines Sur/Albay Diversion Road incl. Bridge, Albay Sta. 486+035 - Sta. 488+940
(Construction of Concrete Road)
Physical Target: CW-1 Const. of concrete Road: 5.819 Lane-km
Unit Cost (P'000): CW-1 Const. of concrete Road: P17,185.083/Lane-km
Estimated Cost: PhP 100M
July 4, 2017 2017 WIN7F04841 SR2017-01-000281 January 28, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Network Services: Network Development - Construction of By-Passes/ Diversion Roads, including ROW,
Sorsogon City Coastal By-Pass Road incl. ROW and Bridge, Sorsogon
(Construction of Concrete Road)
(Construction of Gravel Road)
(Construction of Concrete Bridge)
(ROW Acquisition)
Allocation: PhP 300M

MFO-I National Road
MFO-1 National Road Network Services: Network Development - Construction of By-Passes/ Diversion Roads, including ROW,
Sorsogon City Coastal By-Pass Road incl. ROW and Bridge, Sorsogon
(Construction of Asphalt Road)
(Construction of Concrete Road)
(Construction of Two (2) Concrete Bridge)
Estimated Cost: PhP 300M


July 4, 2017 2017 WIN7G01619 FY 2017 (R.A 10924) June 15, 2017 Region IX Regional Office IX
Network Development - Construction of Missing Gaps connecting National Roads, including ROW -
Construction of Concrete Road at Zamboanga del Sur Coastal Road, Package 3, Zamboanga del Sur,
Sta. 0+000.00 - Sta. 3+160.00
Allocation:
Php 98,000,000.00 (Total)
Php 97,946,160.70 (Road Concreting)
Php 53,839.30 (ROW Acquisition)
Physical Target:
6.32 lane km (Road Concreting)
179.46 sq.m. (ROW Acquisition)
Unit Cost:
Php 15,497,810.24/lane km (Road Concreting)
Php 300.01/sq.m. (ROW Acquisition)
July 4, 2017 2017 WIN7F04839 SR2017-01-000536 January 28, 2017 Region V Regional Office V
As per GAA:
MFO-3 Construction and Maintenance Services of Other Infrastructures: Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism
Destinations - to Declared Tourism Destinations,
Construction of Concrete Road - Cagraray
Circumferential Road (Tambilagao-Langaton and Cabasan-Napao-Tanagan Section), Bacacay, Albay
(Construction of Concrete Road)
Physical Target: 12.80 Lane-km
Unit Cost (P'000): P15,625.00/Lane-km
Allocation: PhP 200M

As MODIFIED:
MFO-3 Construction and Maintenance Services of Other Infrastructures: Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism
Destinations - to Declared Tourism Destinations,
Construction of Concrete Road - Cagraray
Circumferential Road (Tambilagao-Langaton and Cabasan-Napao-Tanagan Section), Bacacay, Albay
(Construction of Concrete Road)
Physical Target: 11.80 Lane-km
Unit Cost (P'000): P16,949.1525/Lane-km
Estimated Cost: PhP 200M
July 4, 2017 2017 WIN7G01632 FY 2017 (R.A 10924) June 15, 2017 Region IX Regional Office IX
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary
Road Upgrading (Gravel to Paved) of Zamboanga del Sur Coastal Road, Zamboanga del Sur 2nd DEO
Chainage 0000.00 - Chainage 3107.63
Exception: Chainage 0915.00 - Chainage 1220.00
Allocation:
Php 100,000,000.00 (Total)
Php 95,152,129.57 (Road Concreting)
Php 4,847,870.43 (ROW Acquisition)
Physical Target:
5.61 lane km (Road Concreting)
16,159.567 sq.m. (ROW Acquisition)
Unit Cost:
Php 16,961,163.92/ lane kn (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition)
July 4, 2017 2017 WIN7F04909 RA 10924 January 1, 2017 Region III Nueva Ecija 1st District Engineering Office
Locally-Funded Projects: Local Infrastructure Program
Buildings and Other Structures - Multi-Purpose/Facilities

Construction of Multi-Purpose Building (OFW Center) Brgy. Sagaba, Sto. Domingo, Nueva Ecija
July 4, 2017 2017 WIN7F04891 RA 10924 January 1, 2017 Region III Nueva Ecija 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction/Rehabilitation of Flood Control Structures along Talavera River, Brgy. Pag-asa, Talavera, Nueva Ecija, Sta. 054+290.98 - Sta. 054+429.58
July 4, 2017 2017 WIN7F04934 RA 10924 January 1, 2017 Region III Nueva Ecija 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction/Rehabilitation of Flood Control Structures along Talavera River, Brgy. Sta. Monica, Aliaga, Nueva Ecija, Sta. 102+395.98 - Sta. 102+533.67, Sta. 103+206.99 - Sta. 103+262.50
July 4, 2017 CY 2017 UACS: 165003014800137 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Southern Mindoro Engineering District Office
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Construction/Upgrading/Rehabilitation of
Drainage along National Roads
- Secondary Road:
Construction of Drainage along
Calapan South Road ( S00063MR )
K0127+400 - K0127+560,
K0164+978 - K0165+170,
K0168+940 - K0169+086,
K0171+184 - K0171+422,
K0171+845 - K0172+242
( Road Widening/Construction of Drainage
Structure along Road )
CW1 = 0.3804 lane km
Road Widening

CW2 = 1,233.10 lm
Construction of Drainage Structure along Road

Total Php = 13.2498 Million
July 4, 2017 CY 2017 UACS: 165004050307782 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Southern Mindoro Engineering District Office
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Roads and Bridges
- Local Roads:
Concreting of Sagana - Luna - San Juan -
Hagupit Road
Bongabong, Oriental Mindoro
L = 10.5084 lane km
Php = 48.800 Million
( Construction of Concrete Road )

July 4, 2017 2017 WIN7F04818 FY 2017 GAA RA 10924 December 29, 2016 Region V Albay 2nd Engineering Office
As per GAA:
Locally Funded Projects: Local Infrastructure Program - Roads and Bridges - Local Roads, Construction of Road, Brgy. Albo-Burgos, Legazpi City, Albay
(Construction of Concrete Road)
Physical Target: 2.00 Lane-km
Unit Cost (P'000): P5,000.00/Lane-km
Allocation: PhP 10M

As MODIFIED
Locally Funded Projects: Local Infrastructure Program - Roads and Bridges - Local Roads, Construction of Road, Brgy. Alobo-Burgos, Daraga, Albay
(Construction of Concrete Road)
Physical Target: 1.020 Lane-km
Unit Cost (P'000): P9,803.92/Lane-km
Estimated Cost: PhP 10M
July 4, 2017 CY 2017 UACS : 165003030800336 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Southern Mindoro Engineering District Office
as MODIFIED :
MF03 - Construction and Maintenance Services of
Other Infrastructure
- Construction/Improvement of Access Roads
leading to Declared Tourism Destination :
San Roque - Libtong - Dangkalan Road
leading to Buyayao Island and Various Beaches,
including Bridge
Bulalacao, Oriental Mindoro
CW1 = 122.112 sq. m.
Replacement of Bridge

CW2 = 0.368 lane km
Road Upgrading Gravel to Paved

CW3 = 2,155 sq.m.
Shoulder Paving/Construction

Total Php = 24.00 Million
July 4, 2017 2017 WIN7F01289 FY 2017 GAA RA 10924 December 29, 2016 Region V Albay 2nd Engineering Office
As per GAA:
Locally Funded Project: Local Infrastructure Program - Roads and Bridges - National roads - Legazpi City-Punta De Jesus Road, K0529+-131 - K0533+000
Allocation: PhP 50.0M

As MODIFIED:
Locally Funded Project: Local Infrastructure Program - Roads and Bridges - National roads - Legazpi City-Punta De Jesus Road, K0529+-131 - K0533+000 (Preventive Maintenance of Road: Asphalt Overlay)
Physical Target: 4,810 Lane km
Unit Cost (P'000): P10,395.01/lane km
Estimated Cost: PhP 50.0M
July 4, 2017 2017 WIN7E01255 FY 2017 GAA RA 10924 December 29, 2016 Region V Albay 2nd Engineering Office
As per GAA:
MFO 1: National Road Network Services - Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management-4 (HDM-4) - Primary, Reconstruction from Asphalt to Concrete - Daang Maharlika (LZ) - (S03633LZ) K0523+980 - K0525+984 (Reconstruction from Asphalt to Concrete)
Physical Target: 4.0 Lane-km
Unit Cost (P'000): P12,375.00/Lane-km
Allocation: PhP 49.500M

As MODIFIED:
MFO 1: National Road Network Services - Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management-4 (HDM-4) - Primary, Reconstruction from Asphalt to Concrete - Daang Maharlika (LZ) - (S03633LZ) K0524+080 - K0525+510 (Reconstruction from Asphalt to Concrete)
Physical Target: 2.0316 Lane-km
Unit Cost (P'000): P24,365/Lane-km
Estimated Cost: PhP 49.500M
July 4, 2017 2017 WIN7E01291 FY 2017 GAA RA 10924 December 29, 2016 Region V Albay 2nd Engineering Office
As per GAA:
MFO 1: National Road Network Services - Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary, Rehabilitation / Major Repair of Drainage Structure along Road - Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco-Camarines Sur Bdry Rd - K0527+-877 - K0528+853, K0530+796 - K0531+147 (Rehabilitation / Major Repair of Drainage Structure along Road)
Physical Target: 6,170.00 Lm
Unit Cost (P'000): P7.98/Lm
Allocation: PhP 49.265M

As MODIFIED:
MFO 1: National Road Network Services - Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary, Rehabilitation / Major Repair of Drainage Structure along Road - Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco-Camarines Sur Bdry Rd - K0527+-305.50 - K0528+852, K0530+796 - K0531+127.50 (Rehabilitation / Major Repair of Drainage Structure along Road)
Physical Target: 4,116.70 Lm
Unit Cost (P'000): P11.97/Lm
Estimated Cost: PhP 49.265M
July 4, 2017 2017 WIN7E01373 FY 2017 GAA RA 10924 December 29, 2016 Region V Albay 2nd Engineering Office
As per GAA:
MFO 2: Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Cagsawa Ruins Protection Dike, Sta.0+000 - Sta. 0+153 (B/S), (Section "B" Tributary), Brgy. Cullat, Daraga, Albay (Construction of Dike)
Physical Target: 306 Lm
Unit Cost (P'000): P98.039/Lm
Allocation: PhP 30.0M

As MODIFIED:
MFO 2: Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Cagsawa Ruins Protection Dike, Sta.0+692 - Sta. 0+816 (L/S, Tributary "A"), Sta.0+000 - Sta. 0+040 (R/S, tributary "B"), Sta. 0+040 - Sta.0+062 (B/S, Tributary "B"), Brgy. Cullat, Daraga, Albay (Construction of Dike)
Physical Target: 208 Lm
Unit Cost (P'000): P144.23/Lm
Estimated Cost: PhP 30.0M
July 4, 2017 2017 WIN7E01376 FY 2017 GAA RA 10924 December 29, 2016 Region V Albay 2nd Engineering Office
As per GAA:
MFO 2: Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Cagsawa Ruins Protection Dike, Sta.0+756 - Sta. 0+861 (B/S), (Section "A" Main), Brgy. Bañag, Daraga, Albay (Construction of Dike)
Physical Target: 210 Lm
Unit Cost (P'000): P95.24/Lm
Allocation: PhP 20.0M

As MODIFIED:
MFO 2: Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Cagsawa Ruins Protection Dike, Sta.0+816 - Sta. 0+970 (L/S), (Section "A" Main), Brgy. Bañag, Daraga, Albay (Construction of Dike)
Physical Target: 154 Lm
Unit Cost (P'000): P129.87/Lm
Estimated Cost: PhP 20.0M
July 4, 2017 2017 WIN7E01379 FY 2017 GAA RA 10924 December 29, 2016 Region V Albay 2nd Engineering Office
As per GAA:
MFO 2: Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Cagsawa Ruins Protection Dike, Sta.0+861 - Sta. 0+966 (B/S), (Section "A" Main), Brgy. Bañag, Daraga, Albay (Construction of Dike)
Physical Target: 210 Lm
Unit Cost (P'000): P95.24/Lm
Allocation: PhP 20.0M

As MODIFIED:
MFO 2: Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Cagsawa Ruins Protection Dike, Sta.0+526.40 - Sta. 0+580 (R/S), & Sta. 0+900.80 - Sta. 0+990.20 (R/S) (Section "A" Main), Brgy. Bañag, Daraga, Albay (Construction of Dike)
Physical Target: 143 Lm
Unit Cost (P'000): P139.86/Lm
Estimated Cost: PhP 20.0M
July 4, 2017 2017 WIN7E01254 FY 2017 GAA RA 10924 December 29, 2016 Region V Albay 2nd Engineering Office
As per GAA:
MFO 2: Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Mitigation Structure - Rehabilitation of Flood Control System along Bañag River, Sta. 0+435 - Sta. 0+869.80 (R/S) Section A "Main", Sta. 0+689.80 - Sta. 0+756 (B/S Section A "Main", Daraga, Albay (Construction of Flood Mitigation Structure)
Physical Target: 326 Lm
Unit Cost (P'000): P117.81/Lm
Allocation: PhP 38.409M

As MODIFIED:
MFO 2: Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Mitigation Structure - Rehabilitation of Flood Control System along Bañag River, Sta. 0+970 - Sta. 1+245 (L/S) Section A "Main", Daraga, Albay (Construction of Flood Mitigation Structure)
Physical Target: 275 Lm
Unit Cost (P'000): P139.67/Lm
Estimated Cost: PhP 38.409M
July 4, 2017 2017 WIN7F04889 RA 10924 January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction/Maintenance of Flood Mitigation Structures and Drainage System, Coronel River Flood Control, Sta. 20+272.22 - Sta. 20+731.22, Barangay Calabasa, Gabaldon. Nueva Ecija

(Construction of Flood Mitigation Structure)
July 4, 2017 2017 WIN7F04905 RA 10924 January 27, 2017 Region III Nueva Ecija 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure along Pampanga River, Brgy. Ibabao Bana, Sta. 56+910.95 - Sta. 56+984.30, Cabanatuan City, Nueva Ecija

(Construction of Flood Mitigation Structure)
July 4, 2017 2017 WIN7F04911 RA 10924 January 27, 2017 Region III Nueva Ecija 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation/Improvement of Digmala River Control, Palomaria Section, Brgy. Palomaria, Sta. 2+496.22 - Sta. 2+944.22, Bongabon, Nueva Ecija

(Rahbilitation/Major Repair of Flood Control Structure)
July 4, 2017 2017 WIN7F04914 RA 10924 January 27, 2017 Region III Nueva Ecija 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure along Coronel River, Calabasa, Sta. 22+341.22 - Sta. 22+515.22, Gabaldon, Nueva Ecija

(Construction of Flood Mitigation Structure)
July 4, 2017 2017 WIN7F04931 RA 10924 January 27, 2017 Region III Nueva Ecija 2nd District Engineering Office
Locally-Funded Projects: Local Infrastructure Program
Flood Control and Drainage - Flood Control Structures/Facilities

Repair/Rehab of Ibabao Bana Flood Control, Cabanatuan City, Nueva Ecija

(Construction of Flood Mitigation Structure)
July 4, 2017 2017 WIN7F04664 SR2017-01-000264 January 28, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Network Services: Network Development - Improvement / Widening of National Roads — Secondary:
Road Widening - Sorsogon Diversion Rd, including RROW - K0577+475-K0578+956,
K0579+210-K0579+402, K0579+417-K0580+636, K0582+376-K0583+240
ROW Acquisition - Sorsogon Diversion Rd, including RROW - K0577+475-K0578+956,
K0579+210-K0579+402, K0579+417-K0580+636, K0582+376-K0583+240
(Road Widening / ROW Acquisition)
Physical Target:
Road Widening: 7.50 lane-km
ROW Acquisition: 14,776 sq.m.
Unit Cost:
Road Widening: P13.500M/lane-km
ROW Acquisition: P3.299T/sq.m.
Allocation:
Road Widening: P101.250M
ROW Acquisition: P48.750M

MFO-1 National Road Network Services: Network Development - Improvement / Widening of National Roads — Secondary: Sorsogon Diversion Rd including RROW
K0577+475-K0578+956, K0579+210-K0579+402, K0579+417-K0580+636, K0582+376-K0583+240
(Road Widening / ROW Acquisition)
Physical Target:
Road Widening: 6.413360 lane-km
ROW Acquisition: 1,500 sq.m.
Unit Cost:
Road Widening: P22,779.40T/lane-km
ROW Acquisition: P2.601T/sq.m.
Estimated Cost: P150M
July 4, 2017 GAA FY 2017 WIN7F04944 UACS No.292003020401873 January 1, 2017 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA
MFO – 2 Flood Management Services, Construction/ Maintenance of Flood Mitigation Structures and Drainage System: Rehabilitation of Talilong Creek, Brgy. 28, 31 and 35, Caloocan City (Construction of Flood Mitigation Structure)
UACS No.292003020401873
Physical Target/ Cost
Per GAA/ Original: 508 Lm
Unit Cost: P39.370T/Lm
Allocation: Php 20M
WIN7F04944

As Modified
MFO – 2 Flood Management Services, Construction/ Maintenance of Flood Mitigation Structures and Drainage System: Rehabilitation of Talilong Creek, Brgy. 28, 31 and 35, Caloocan City (Construction of Flood Mitigation Structure)
UACS No.292003020401873
Physical Target/ Cost
As Modified: 1,081 Lm
Unit Cost: P18.501T/Lm
Estimated Cost: Php 20M
WIN7F04944
July 4, 2017 FY 2017 WIN7F04940 UACS No. 292003020401868 January 1, 2017 National Capital Region Metro Manila 3rd District Engineering Office
As Per GAA
MFO-2 Flood Management Services, Construction/ Maintenance of Flood Mitigation Structure and Drainage Systems Rehabilitation of Canumay-Maysan Creek (Phase I), Brgy. Canumay, Valenzuela (Construction of Flood Mitigation Structure)
UACS No. 292003020401868
Physical Target/ Cost
Per GAA/ Original: 400 Lm
Unit Cost: P100.000T/Lm
Allocation: Php 40M
WIN7F04940

As Modified
MFO-2 Flood Management Services, Construction/ Maintenance of Flood Mitigation Structure and Drainage Systems Rehabilitation of Canumay-Maysan Creek (Phase I), Brgy. Canumay, Valenzuela (Construction of Flood Mitigation Structure)
UACS No. 292003020401868
Physical Target/ Cost
As Modified: 573 Lm
Unit Cost: P69.808T/Lm
Estimated Cost: Php 40M
WIN7F04940
July 4, 2017 FY 2017 WIN7F04939 UACS No. 292003020401872 January 1, 2017 National Capital Region Metro Manila 3rd District Engineering Office
As Per GAA
MFO-2 Flood Management Services, Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems Rehabilitation of Punturin-Bignay Creek (Phase 1), Brgy. Punturin, Valenzuela (Construction of Flood Mitigation Structure)
UACS No. 292003020401872
Physical Target/ Cost
Per GAA/ Original: 500 Lm
Unit Cost: P100.000T/Lm
Allocation: Php 50M
WIN7F04939

As Modified
MFO-2 Flood Management Services, Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems Rehabilitation of Punturin-Bignay Creek (Phase 1), Brgy. Punturin, Valenzuela (Construction of Flood Mitigation Structure)
UACS No. 292003020401872
Physical Target/ Cost
As Modified: 716 Lm
Unit Cost: P69.832T/Lm
Estimated Cost: Php 50M
WIN7F04939
July 4, 2017 FY 2017 WIN7F04942 UACS No. 292003020401869 January 1, 2017 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA
MFO-2 Flood Management Services, Construction/ Maintenance of Mitigation Structure and Drainage Systems Rehabilitation of De Castro-Bisalao Creek (Phase 1), Brgy. Mapulang Lupa, Valenzuela (Construction of Mitigation Structures)
UACS No. 292003020401869
Physical Target/ Cost
Per GAA/ Original: 460 Lm
Unit Cost: P100.000T/Lm
Allocation: Php 45M
WIN7F04942

As Modified
MFO-2 Flood Management Services, Construction/ Maintenance of Mitigation Structure and Drainage Systems Rehabilitation of De Castro-Bisalao Creek (Phase 1), Brgy. Mapulang Lupa, Valenzuela (Construction of Mitigation Structures)
UACS No. 292003020401869
Physical Target/ Cost
Per GAA/ Original: 644 Lm
Unit Cost: P69.875T/Lm
Estimated Cost: Php 45M
WIN7F04942
July 4, 2017 FY 2017 WIN7F04941 UACS No. 292003020401874 January 1, 2017 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA
MFO-2 Flood Management Services, Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems Rehabilitation of Viente Reales Creek (Phase 2), Brgy. Viente Reales, Valenzuela (Construction of Flood Mitigation Structure)
UACS No. 292003020401874
Physical Target/ Cost
Per GAA/ Original: 100 Lm
Unit Cost: P100.00T/Lm
Allocation: Php 10M
WIN7F04941

As Modified
MFO-2 Flood Management Services, Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems Rehabilitation of Viente Reales Creek (Phase 2), Brgy. Viente Reales, Valenzuela (Construction of Flood Mitigation Structure)
UACS No. 292003020401874
Physical Target/ Cost
Modified: 140 Lm
Unit Cost: P71.428T/Lm
Estimated Cost: Php 10M
WIN7F04941
July 4, 2017 FY 2017 WIN7F04963 UACS No. 292003020401870 January 1, 2017 National Capital Region Metro Manila 3rd District Engineering Office
As Per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation of Fortune Creek (Phase I), Brgy. Parada, Valenzuela [Construction of Flood Mitigation Structure]
UACS No. 292003020401870
Physical Target/ Cost (‘000)
Original: 300 lm
Unit Cost (‘000): P116.667/lm
Allocation: (‘000): P35,000.00
WIN7F04963

As Modified
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation of Fortune Creek (Phase I), Brgy. Parada, Valenzuela [Construction of Flood Mitigation Structure]
UACS No. 292003020401870
Physical Target/ Cost (‘000)
New: 501 lm
Unit Cost (‘000): P69.86/lm
Estimated Cost: (‘000): P35,000.00
WIN7F04963
July 4, 2017 FY 2017 WIN7F04999 UACS No. 165003014600141 January 1, 2017 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA
MFO-1 National Road Network Services: Asset Preservation of National Roads – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide-Tertiary, Rehabilitation/ Major Repair of Road Slope Protection Structure – Novaliches-Sn Jose Rd, K0026+834 – K0027+624 (Rehabilitation/Major Repair of Road Slope Protection Structure)
UACS No. 165003014600141
Physical Target/ Cost
Per GAA/ Original: CW-1 Rehab./Major Repair of Road Slope Protection Structure: 4,000.00 Sq.m.
Unit Cost: CW-1 Rehab./Major Repair of Road Slope Protection Structure: 5,000.00/Sq.m.
Allocation: Php 20M
WIN7F04999

As per GAA
MFO-1 National Road Network Services: Asset Preservation of National Roads – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide-Tertiary, Rehabilitation/ Major Repair of Road Slope Protection Structure – Novaliches-Sn Jose Rd, K0025+105 – K0025+178, K0025+591 – K0025++639, K0026+000 – K0026+180, K0027+690 – K0028+200 (Rehabilitation/Major Repair of Road Slope Protection Structure) (Construction of Drainage Structure)
UACS No. 165003014600141
Physical Target/ Cost
As Modified: CW-1 Rehab./Major Repair of Road Slope Protection Structure: 1,354.50 Sq.m.
CW-2 Const. of Drainage Structure: 500.00 lm
Unit Cost: CW-1 Rehab./Major Repair of Road Slope Protection Structure: 10.296T/Sq.m.
CW-2 Const. of Drainage Structure: P12.106T/Lm
Estimated Cost: Php 20M
WIN7F04999
July 3, 2017 GAA FY 2017 WIN7G00903 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Secondary
Road Widening Along Davao City Diversion Road Including RROW, K1512+600 - K1513+000, K1513+000 - K1513+575

TO: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Secondary
Road Widening Along Davao City Diversion Road Including RROW, K1512+600 - K1513+000, K1513+000 - K1513+575

ALLOCATION: Php 81.532 Million
July 3, 2017 CY 2017 WIN7F04886 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Improvement/Widening of National Roads
- Secondary Road :
Marinduque Circumferential road
K0070+420 - K0072+380,
K0092+000 - K0092+977,
K0098+060 - K0098+980
L = 7.914 lane km
Php = 150.00 Million
( Road Widening )
July 3, 2017 CY 2017 WIN7F04898 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF01 - National Road Network Services
- Construction and Maintenance of Bridges
along National Roads
- Replacement of Permanent Weak Bridges:
Malatgao Bridge along
Puerto Princesa South Road
CW1 = 1463.2 sq.m.
Php = 170.00 million
( Replacement of Bridge )
June 30, 2017 2017 165003016900037 FY 2017 GAA January 1, 2017 Region III Pampanga 2nd District Engineering Office
Network Development - Off-Carriageway Improvement including Drainage - Tertiary - San Antonio - Floridablanca Rd., K0081+000 - K0083+000, K0085+400 - K0085+667
(Shoulder Paving / Construction)
June 30, 2017 2017 WIN7F04866 FY 2017 GAA January 1, 2017 Region III Pampanga 2nd District Engineering Office
Network Development - Off-Carriageway Improvement including Drainage - Secondary - Angeles - Porac - Floridablanca - Dinalupihan Rd, K0089+320 - K0091+000

(Off-Carriageway Improvement : Shoulder Paving/Construction)
(Construction of Drainage Structure)
June 30, 2017 2017 WIN7F04867 FY 2017 GAA January 1, 2017 Region III Pampanga 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads – Road Construction in Purok 2, 5 & 6, San Juan, Lubao, Pampanga

(Construction of Concrete Road)

(Construction of Drainage Structure along Road)
June 30, 2017 2017 WIN7F04919 FY 2017 GAA January 1, 2017 Region III Pampanga 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads – Road Concreting in San Antonio - San Juan, Guagua, Pampanga

(Construction of Concrete Road)

(Construction of Drainage Structure along Road)
June 30, 2017 2017 WIN7E01766 FY 2017 GAA January 1, 2017 Region III Pampanga 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads – Road Concreting in Sto. Tomas, Lubao, Pampanga

June 30, 2017 2017 WIN7F04897 FY 2017 GAA January 1, 2017 Region III Pampanga 2nd District Engineering Office
Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction of Line Canal in Sta. Cruz, Lubao, Pampanga
June 30, 2017 2017 WIn7F04883 FY 2017 GAA January 1, 2017 Region III Pampanga 2nd District Engineering Office
Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction of Line Canal in Villamaria, Porac, Pampanga
June 30, 2017 2017 WIN7F04882 FY 2017 GAA January 1, 2017 Region III Pampanga 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads - Road Concreting in Sapang Uwak, Porac, Pampanga
June 30, 2017 2017 WIN7F04896 FY 2017 GAA January 1, 2017 Region III Pampanga 2nd District Engineering Office
Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities - Repair of Dike in Manuali, Porac, Pampanga
June 30, 2017 2017 WIN7F04947 FY 2017 GAA January 1, 2017 Region III Pampanga 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads - Road Concreting in San Vicente, Lubao, Pampanga
June 30, 2017 2017 WIN7F04920 FY 2017 GAA January 1, 2017 Region III Pampanga 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads - Road Concreting in Sta. Barbara, Lubao, Pampanga
June 30, 2017 2017 WIN7F04926 FY 2017 GAA January 1, 2017 Region III Pampanga 2nd District Engineering Office
Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction of Line Canal in San Juan 1, Guagua, Pampanga
June 30, 2017 GAA FY 2017 WIN7G01621 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Concrete Road and Construction of Road Slope Protection Structure - Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue (Bago Aplaya-Times Beach Section), including Bridge, Davao City (Package 3)

TO: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue (Bago Aplaya-Times Beach Section), Including Bridge Construction, Davao City (Package 3)

ALLOCATION: Php 300.000 Million
June 30, 2017 2017 WIN7F04893 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Repair/Rehabilitation of Multi-Purpose Building (Barangay Hall), Sto. Nino, Hagonoy, Bulacan
June 30, 2017 FY 2017 WIN7E01804 UACS No. 292003020401601 January 1, 2017 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As Per GAA
MFO 2 –Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Las Piñas River Improvement including ROW, Pulang Lupa/ Tramo Bridge to C-5 Bridge, Las Piñas City [Construction of Flood Mitigation Structure]
UACS No. 292003020401601
Physical Target/ Cost (‘000)
Original: 695 lm
Unit Cost (‘000): P143.885/lm
Allocation (‘000): 100,000.0
WIN7E01804

As Modified
MFO 2 –Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Structures & Other Improvement at Las Piñas River Tributaries including Right-of-Way (C-5 Bridge towards Naga Creek), Las Piñas City [Construction of Flood Mitigation Structure]
UACS No. 292003020401601
Physical Target/ Cost (‘000)
New: 540 lm
Unit Cost (‘000): P185.185/lm
Estimated Cost (‘000): 100,000.0
WIN7E01804

June 30, 2017 2017 WIN7F04895 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads - Construction of Roads, Brgy. Bonga Menor, Bustos, Bulacan
June 30, 2017 2017 WIN7F04936 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction/Improvement of Multi-Purpose Building, Biñang 1st, Bocaue, Bulacan
June 30, 2017 2017 WIN7F04958 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Improvement/Rehabilitation of Multi-Purpose Buildings in Bunlo and Duhat, Bocaue, Bulacan
June 30, 2017 2017 WIN7F04959 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction of Multi-Purpose Building (Covered Court) at Marcelo H. Del Pilar Memorial School, San Nicolas, Bulakan, Bulacan
June 30, 2017 2017 WIN7F04960 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Improvement/Rehabilitation of Multi-Purpose Building (Training Center), San Jose, Bulakan, Bulacan
June 30, 2017 FY 2017 WIN7F04993 UACS No. 292003020401672 January 1, 2017 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Mitigation Structure – Zapote River Improvement Works (C5 to Longos) Las Piñas City (Construction of Flood Mitigation Structure)
UACS No. 292003020401672
Physical Target/ Cost
Original: 1,300 lineal meter
Unit Cost (P’000): P76.923T/lineal meter
Allocation Cost (P’000): P100,000
WIN7F04993

As Modified
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Mitigation Structure: Zapote River Improvement Works (C5 to Almanza 2), Las Piñas City (Construction of Revetment)
UACS No. 292003020401672
Physical Target/ Cost
Modified: 452.1 lineal meter
Unit Cost (P’000): P76.923T/lineal meter
Estimated Cost (P’000): P100,000
WIN7F04993
June 30, 2017 2017 WIN7F04962 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Improvement/Repair/Rehabilitation of existing Multi-Purpose Building, Bulakan, Bulacan
June 30, 2017 2017 WIN7F04964 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction / Improvement of Barangay Hall, Sta. Barbara, Baliwag, Bulacan
June 30, 2017 FY 2017 WIN7F04907 UACS No. 292004020200471 January 1, 2017 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA
Locally Funded Projects – VIILP, Flood Control and Drainage – Drainage/Protection Works: Construction/ Improvement of Slope Protection along Balimbing Creek, Barangay Putatan, Muntinlupa City (Construction of Flood Mitigation Structure)
UACS No. 292004020200471
Physical Target/ Cost
Original: 124 lineal meter
Unit Cost (P’000): P80.645T/lineal meter
Allocation Cost (P’000): P10,000
WIN7F04907

As Modified
Locally Funded Projects – VIILP, Flood Control and Drainage – Drainage/Protection Works: Construction of Slope Protection along Balimbing Creek, Brgy. Poblacion, Muntinlupa City (Construction of Flood Mitigation Structure)
UACS No. 292004020200471
Physical Target/ Cost
Modified: 93.5 lineal meter
Unit Cost (P’000): P106.952T/lineal meter
Estimated Cost (P’000): P10,000
WIN7F04907
June 30, 2017 GAA FY 2017 WIN7G01628 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Concrete Road and Construction of Road Slope Protection Structure - Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue (Bago Aplaya-Times Beach Section), Davao City (Package 4)

TO: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue (Bago Aplaya-Times Beach Section), Davao City (Package 4)

ALLOCATION: Php 240.000 Million
June 30, 2017 GAA FY 2017 WIN7G01629 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Concrete Road and Construction of Road Slope Protection Structure - Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue (Bago Aplaya-Times Beach Section), including ROW, Davao City (Package 5)

TO: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue (Bago Aplaya-Times Beach Section), including RROW, Davao City (Package 5)

ALLOCATION: Php 440.000 Million
June 30, 2017 GAA FY 2017 WIN7G01634 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Concrete Road and Construction of Road Slope Protection Structure - Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue (Bago Aplaya-Times Beach Section), including RROW, Davao City (Package 1)

TO: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue (Bago Aplaya-Times Beach Section), including RROW, Davao City (Package 1)

ALLOCATION: Php 740.000 Million
June 29, 2017 2017 WIN7C01958 R.A 10924 January 12, 2017 Region VII Cebu 3rd District Engineering Office
Construction of Flood Control Structure at Mangoto River Basin along Toledo-Pinamungajan-Aloguinsan-Mantalongon Road, Sta. 00+110 - Sta. 01+560, Pinamungajan, Cebu

Allocation - ₱ 45,000,000 - CW1
Physical Target - 1,450 l.m. - CW1
Unit Cost - ₱ 31,034.48/l.m. - CW1
June 29, 2017 GAA FY 2017 WIN7G01624 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Locally-Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Completion of Multi-Purpose Building (PTV Complex), Davao City

TO: Locally-Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Construction of Multi-Purpose Building (PTV Complex), Davao City

ALLOCATION: Php 4.000 Million
June 29, 2017 FY 2017 WIN7F04921 UACS No. 292003020401919 January 1, 2017 National Capital Region North Manila District Engineering Office
As per GAA
MFO 2 – Flood Management Services – Construction/Maintenance of Flood Mitigation Structure and Drainage System: Construction of Flood Mitigation Structure-Proposed Feeder Channels for the Blumentritt Interceptors, Manila City (Construction of Flood Mitigation Structure)
UACS No. 292003020401919
Physical Target/ Cost
Original: 28.00 lineal meter
Unit Cost: P839.286T/lineal meter
Allocation Cost: P23.50M
WIN7F04921

Modified
MFO 2 – Flood Management Services – Construction/Maintenance of Flood Mitigation Structure and Drainage System: Proposed Feeder Channels for the Blumentritt Interceptors, Manila City (Construction of Flood Mitigation Structure)
UACS No. 292003020401919
Physical Target/ Cost
Modified: 169.50 lineal meter
Unit Cost: P138.643T/lineal meter
Estimated Cost: P23.50M
WIN7F04921
June 29, 2017 FY 2017 WIN7F04912 UACS No. 103004010310284 January 1, 2017 National Capital Region South Manila District Engineering Office
Per GAA
Locally Funded Projects: Local Infrastructure Program: Buildings and Other Structures – Multi-Purpose/ Facilities: Construction of Multi-Purpose Building (Center), Barangay 183, Pasay City (Construction of Multi-Purpose Building)
UACS No. 103004010310284
Physical Target/ Cost
Per GAA/ Original: Physical Target 1 Bldg.
Unit Cost: P5M/bldg.
Allocation: P5M
WIN7F04912

As Modified
Locally Funded Projects: Local Infrastructure Program: Buildings and Other Structures – Multi-Purpose/ Facilities: Construction of Multi-Purpose Building (center), Barangay 133, Zone 13, Pasay City (Construction of Multi-Purpose Building)
UACS No. 103004010310284
Physical Target/ Cost
As Modified: Physical Target 1 Bldg.
Unit Cost: P5M/bldg.
Estimated Cost: P5M
WIN7F04912
June 29, 2017 FY 2017 WIN7F04928 UACS No. 103004010310282 January 1, 2017 National Capital Region South Manila District Engineering Office
Per GAA
Locally Funded Projects: Local Infrastructure Program: Buildings and Other Structures – Multipurpose/ Facilities: Construction of Multipurpose Building (Center), Barangay 807, Manila City (Construction of Multi-Purpose Building)
UACS No. 103004010310282
Physical Target/ Cost
Per GAA/ Original: Physical Target 1 bldg.
Unit Cost: P5m/bldg..
Allocation: P5M
WIN7F04928

As Modified
Locally Funded Projects: Local Infrastructure Program: Buildings and Other Structures – Multipurpose/ Facilities: Construction of Multipurpose Building (Center), Paraiso ng Batang Maynila, Manila City (Construction of Multi-Purpose Building)
UACS No. 103004010310282
Physical Target/ Cost
As Modified: Physical Target 1 bldg.
Unit Cost: P5m/bldg..
Estimated Cost: P5M
WIN7F04928
June 29, 2017 GAA FY 2017 WIN7G01617 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Concrete Road and Construction of Road Slope Protection Structure - Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue (Bago Aplaya-Times Beach Section), Davao City (Package 2)

TO: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue (Bago Aplaya-Times Beach Section), Davao City (Package 2)

ALLOCATION: Php 240.000 Million
June 29, 2017 FY 2017 WIN7E001786 UACS No. 292004020100397 January 1, 2017 National Capital Region Metro Manila 3rd District Engineering Office
As Per GAA
Locally Funded Projects – LIP – Flood Control and Drainage – Flood Control Structures/ Facilities – Flood Control/ Mitigation Project: Construction/Rehabilitation of Riverwall along Tullahan River (Sta. 7+502 to Sta. 7+328) Marulas, 2nd District, Valenzuela City [Construction of Flood Mitigation Structure]
UACS No. 292004020100397
Physical Target/ Cost (‘000)
Original: 500 lm
Unit Cost (‘000): P100.0/lm
Allocation (‘000): P50,000.00
WIN7E001786

As Modified
Locally Funded Projects – LIP – Flood Control and Drainage – Flood Control Structures/ Facilities – Flood Control/ Mitigation Project: Construction/Rehabilitation of Riverwall along Tullahan River (Sta. 7+502 to Sta. 7+394) Marulas, 2nd District, Valenzuela City [Construction of Flood Mitigation Structure]
UACS No. 292004020100397
Physical Target/ Cost (‘000)
New: 108 lm
Unit Cost (‘000): P462.96/lm
Estimated Cost (‘000): P50,000.00
WIN7E001786
June 29, 2017 FY 2017 WIN7F04950 UACS No. 165003014000143 January 1, 2017 National Capital Region Quezon City 2nd Engineering District Office
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Preventive Maintenance based on Pavement Management System/ Highway Development and Management-4 (HDM-4) – Tertiary: Preventive Maintenance of Road: Concrete Reblocking – CP Garcia Ave – K0014+-660 – K0015+718 (Preventive Maintenance of Road: Concrete Reblocking)
UACS No. 165003014000143
Physical Target/ Cost
Original: 4.746 lane-km
Unit Cost: P4.21M/lane-km
Allocation Cost: P20.00M
WIN7F04950

As Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Preventive Maintenance based on Pavement Management System/ Highway Development and Management-4 (HDM-4) – Tertiary: Preventive Maintenance of Road: Concrete Reblocking – CP Garcia Ave – K0014+-660 – K0015+718, Quezon City (Preventive Maintenance of Road: Concrete Reblocking)
UACS No. 165003014000143
Physical Target/ Cost
Modified: 1.77 lane-km
Unit Cost: P11.30M/lane-km
Estimated Cost: P20.00M
WIN7F04950
June 29, 2017 2017 WIN7G01615 SR2017-02-002452 February 2, 2017 Region XIII Agusan del Norte District Engineering Office
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and declared Tourism Destinations - To declared Tourism Destinations

Construction/Improvement of Access Roads leading to Declared Tourism Destinations - Banza to Magallanes Road leading to Centennial Tree and Beaches, Magallanes, Agusan del Norte

Allocation : ₱ 100.00 Million (Total)
: ₱ 8,057,267.04 (Concrete Road)
: ₱ 91,942,732.96 (Gravel Road)

Physical Target : 0.712 lane km (Concrete Road)
: 1.720 lane km (Gravel Road)
June 29, 2017 2017 WIN7G01600 RA 10924 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Construction and Maintenance of Bridges along National Roads - Replacement of Permanent Weak Bridges

Replacement of Permanent Weak Bridges - Humilog Bridge (B00847MN) along Daang Maharlika (Surigao-Agusan Section), K1219+625 - K1219+643

Allocation : ₱ 40.00 Million (Total)
: ₱ 38,065,726.73 (Bridge Replacement)
: ₱ 1,934,273.27 (ROW Acquisition)

Physical Target : 289.80 sq.m. (Bridge Replacement)
: 200.00 sq.m. (ROW Acquisition)
June 29, 2017 2017 WIN7G01631 RA 10924 December 29, 2016 Region XIII Surigao del Norte 1st District Engineering Office
Modified:
LFP: VIILP - Roads and Bridges - Local Bridges

Rehabilitation/Repair of Bridges along San Francisco - Malimono Road, San Francisco - Malimono Section, Surigao del Norte, Gadong RCDG Br., Oslao Steel Truss Br., Duncilla Steel Truss Br., Balite Steel Girder Br., Tigbaw Steel Girder Br., Sabang Steel Truss Br., Taytay Steel Truss Br., Cuyangan Steel Truss Br., and Malimono RCDG Br.

Allocation : ₱ 50.00 Million (Total)
: ₱ 176,973.13 (Gadong RCDG Br.)
: ₱ 9,218,530.58 (Oslao Steel Truss Br.)
: ₱ 7,171,400.21 (Duncilla Steel Truss Br.)
: ₱ 4,760,824.07 (Balite Steel Girder Br.)
: ₱ 9,261,144.29 (Tigbaw Steel Girder Br.)
: ₱ 5,675,568.60 (Sabang Steel Truss Br.)
: ₱ 4,810,416.38 (Taytay Steel Truss Br.)
: ₱ 8,412,648.10 (Cuyangan Steel Truss Br.)
: ₱ 8,412,648.10 (Malimono RCDG Br.)

Physical Target :
: 1.00 Number of Bridge (Gadong RCDG Br.)
: 1.00 Number of Bridge (Oslao Steel Truss Br.)
: 1.00 Number of Bridge (Duncilla Steel Truss Br.)
: 1.00 Number of Bridge (Balite Steel Girder Br.)
: 1.00 Number of Bridge (Tigbaw Steel Girder Br.)
: 1.00 Number of Bridge (Sabang Steel Truss Br.)
: 1.00 Number of Bridge (Taytay Steel Truss Br.)
: 1.00 Number of Bridge (Cuyangan Steel Truss Br.)
: 1.00 Number of Bridge (Malimono RCDG Br.)
June 29, 2017 2017 WIN7F04864 FY 2017 GAA January 1, 2017 Region III Pampanga 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction / Improvement / Rehabilitation of Dike Slope Protection along Porac River, Sto. Cristo Section, Lubao, Pampanga
June 29, 2017 2017 165003014100132 FY 2017 GAA January 1, 2017 Region III Pampanga 2nd District Engineering Office
Asset Preservation of National Roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System / Highway Development Management - 4 (HDM-4) – Primary - Jose Abad Santos Avenue (JASA), K0077+160 - K0077+408, K0079+600 - K0079+760
June 28, 2017 CY 2017 UACS: 165003030600045 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Southern Mindoro Engineering District Office
as MODIFIED:
MF03 - Construction and maintenance Services
of Other Infrastructure
- Construction/Improvement of Access Road
leading to Airports
Construction/Improvement of Access Road
leading to Pinamalayan Airport Road
L = 2.6554 lane km
Php = 25.00 Million
( Construction of Concrete Road )
June 28, 2017 CY 2017 UACS: 165003030600044 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Southern Mindoro Engineering District Office
as MODIFIED:
MF03 - Construction and Maintenance Services
of Other Infrastructure
- Construction/Improvement of Access Roads
leading to Airports
Agos II Bridge along Pinamalayan Airport Road
Pinamalayan, Oriental Mindoro
CW1 = 122.112 sq.m.
Php = 6,858.59666 Million
( Construction of Concrete Bridge )
CW2 = 0.4504 lane km
Php = 5,741.40334 Million
( Construction of Concrete Road )
Total Php = 12.60 Million
June 28, 2017 CY 2017 UACS: 165003015100289 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Southern Mindoro Engineering District Office
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Improvement/Widening of National Roads
- Secondary Road Widening
Calapan South Road
K0181+191 - K0182+010
( Road Widening )
( Construction of Drainage Structure along
along Road )
CW1 = 1.6681 lane km
CW2 = 428.55 lm
Php = 20.00 Million
June 28, 2017 CY 2017 UACS: 165003030700097 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Southern Mindoro Engineering District Office
as MODIFIED:
MF03 - Construction and Maintenance Services of
Other Infrastructures
- Construction/Improvement of Access Road
leading to Seaports
- Construction/Improvement of Access road
leading to Roxas Port
CW1 = 2.61925 lane km
Php = 19.988 Million
( Road Widening )
CW2 = 2,322.25 lm
Php = 15.596 Million
( Construction of Drainage Structure along Road )
CW3 = 1.456 km
Php = 9.416 Million
( Road Safety: Street Lightning )
Total Php = 45.00 Million
June 28, 2017 FY 2017 P00121533VS-CW1 292003020403151 January 1, 2017 Region VII Cebu 3rd District Engineering Office
MODIFICATION:

FROM: MFO2 Flood Management Service

Construction of Flood Control Revetment at Bonbon River Basin along Toledo-Pinamungajan- Aloguinsan-Mantalongon Road, K0071 + 787, Poblacion, Aloguinsan, Cebu


TO: MFO2 Flood Management Service

Construction of Flood Control Structure at Mangoto River Basin along Toledo-Pinamungajan- Aloguinsan-Mantalongon Road, Sta. 00+110 – Sta. 01+560, Pinamungajan, Cebu
June 28, 2017 CY 2017 WIN7E01694 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Palawan 3rd District Engineering Office
as MODIFIED:
Locally Funded Projects
- VIILP
- Roads and Bridges
- Local Roads
Concreting of Socrates Road
( Malvar-Abanico-Jil),
Brgy. San Pedro, Puerto Princesa, Palawan
L = 2.7766 lane km
Php = 76.610 Million
( Construction of Concrete Road )
June 28, 2017 CY 2017 WIN7F04879 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Palawan 3rd District Engineering Office
as MODIFIED:
MF01 - National Road Network Services
- Construction and Maintenance of Bridges
along National Roads
- Replacement of Permanent Weak Bridges
Replacement of Tagburos Bridge ( B00081PW)
along Puerto Princesa North Road
CW1 = 351.54 sq m
Php = 35.720 Million
( Replacement of Bridge )
June 28, 2017 CY 2017 WIN7E01580 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Palawan 3rd District Engineering Office
AS MODIFIED:
Locally - Funded Projects :
- Roads and Bridges
- Local Roads
Abrea Road ( Rizal Ave. - Jacana Wharf )
Puerto Princesa City, Palawan
Sta. 1+316.50 - Sta. 2+868.40
( Construction of Local Road )
L = 3.104 lane km
Php = 79.00 Million
June 28, 2017 2017 WIN7G02610 RA 10924 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges

Construction of Concrete Bridge - Tagpulangao Bridge 2 along Bayugan -Esperanza Rd

Allocation : ₱ 16.020 Million

Physical Target : 168.12 sq.m.
June 28, 2017 2017 WIN7G01608 RA 10924 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges from 1 to 2 lanes

Widening of Dimasalang Bridge (B01795MN) from one to two lanes along Butuan City-Talacogon-Loreto-Veruela-Sta. Josefa Rd.

Allocation : ₱ 12.00 Million

Physical Target : 144.77 sq.m.
June 28, 2017 2017 WIN7G01614 RA 10924 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes

Widening of Bridge - Afga Bridge (B00894MN) along Daang Maharlika (Agusan - Davao Sect)

Allocation : ₱ 18.530 Million

Physical Target : 220.97 sq.m.
June 28, 2017 2017 WIN7G01616 RA 10924 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes

Widening of Bridge - Mambutay Bridge (B00898MN) along Daang Maharlika (Agusan - Davao Sect)

Allocation : ₱ 18.450 Million

Physical Target : 198.10 sq.m.

Pages