August 30, 2023 |
2023 |
P00733168MN |
SR2023-01-002106 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00050 CONSTRUCTION OF CONCRETE ROAD - MALALAG-KIAYAP-ZION-BATIAN ROAD LEADING TO ZION-BATIAN ECOSITES, STA. 10+460 - STA. 12+340, BRGY. BATI-AN, MAITUM, SARANGANI
|
August 29, 2023 |
2023 |
WIN3F07525 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00714721LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads
Daang Maharlika Jct - Legazpi - Sto Domingo - Tabaco - Camarines Sur Bdry Rd - K0580 + 040.00 - K0580 + 233.00
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 13611.11 Square meters
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads
Daang Maharlika Jct - Legazpi - Sto Domingo - Tabaco - Camarines Sur Bdry Rd - K0575 - 099.35 - K0575 + 242.89; K0583 + 244.50 - K0583 + 359.50
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 9530.03 Square meters |
August 29, 2023 |
2023 |
WIN3F07513 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00714722LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads
Daang Maharlika Jct - Legazpi - Sto Domingo - Tabaco - Camarines Sur Bdry Rd - K0580 + 640.00 - K0580 + 840.00
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 13611.11 Square meters
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads
Daang Maharlika Jct - Legazpi - Sto Domingo - Tabaco - Camarines Sur Bdry Rd - K0583 + 359.50 - K0583 + 575.50
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 9735.2 Square meters |
August 29, 2023 |
2023 |
WIN3F07510 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00725889LZ
FROM : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System
Construction of Milagros Seawall, Sta. 0 + 208.00 - Sta. 0 + 487.00, Milagros, Masbate
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 123,500 Lineal meters
TO : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System
Construction of Milagros Seawall, Sta. 0 + 217.00 - Sta. 0 + 340.50, Milagros, Masbate
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 123,500 Linea meters |
August 29, 2023 |
2023 |
WIN3F07506 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00725890LZ
FROM : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Calasuche Seawall, Sta. 0 + 642.00 - Sta. 0 + 921.00, Milagros, Masbate
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 75 Lineal meters
TO : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Calasuche Seawall, Sta. 1 - + 286.90 - Sta. 1 + 361.90, Milagros, Masbate
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 75 Lineal meters |
August 29, 2023 |
2023 |
WIN3F07519 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00725891LZ
FROM : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Poblacion East Seawall, Sta. 0 + 363.00 - Sta. 0 + 642, Milagros, Masbate
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 72 Lineal meters
TO : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Poblacion East Seawall, Sta. 0 + 250.00 - Sta. 0 + 322.00, Milagros, Masbate
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 72 Lineal meters |
August 29, 2023 |
2023 |
WIN3F07514 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID: P00725892LZ
FROM : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Poblacion East Seawall, Sta. 0 + 487.00 - Sta. 0 + 766.00, Milagros, Masbate
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 103 Lineal meters
TO : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Poblacion East Seawall, Sta. 0 + 114.00 - Sta. 0 + 217.00, Milagros, Masbate |
August 29, 2023 |
2023 |
WIN3F07535 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00726292LZ
FROM : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment, Barangay San Gabriel, Pamplona, Camarines Sur
Physical Target :
CW1 - Construction of Revetment - 382.002 Lineal meters
TO : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment, Barangay San Gabriel, Pamplona, Camarines Sur
Physical Target :
CW1 - Construction of Revetment - 205.00 Lineal meters |
August 25, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00712062LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Mabolo - Almeda Bypass Rd (Package 1), Camarines Sur
Physical Target :
CW1 - Construction of Concrete Bridge - 979 Square meters
TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Mabolo - Almeda Bypass Rd (Package 1), Camarines Sur
Physical Target :
CW1 - Construction of Concrete Bridge - 1642.25 Square meters |
August 25, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 2nd Engineering Office |
Project ID : P00712230LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads - Daang Maharlika (LZ) - K0528 + 000 - K0528 + 284
Physical Target :
CW1 - Construction of Drainage Structure along Road - 284 Lineal Meters
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads - Daang Maharlika (LZ) - K0519 + 844 - K0520 + 073, K0521 + 600, K0522 + 160 - K0522 + 330
Physical Target
CW1 - Rehabilitation/ Major Repair of Drainage Structure along Road - 558 Lineal Meters |
August 25, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 2nd Engineering Office |
Project ID : P00712232LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads - Legazpi Access Rd - (S05853LZ) Chainage 000 - Chainage 181
Physical Target :
CW1 - Construction of Drainage Structure along Road - 362 Lineal Meters
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads - Legazpi Access Rd - (S05853LZ) Chainage 000 - Chainage 415
Physical Target :
CW1 - Rehabilitation/ Maj or Repairr of Drainage Structures along road - 415 Lineal Meters |
August 25, 2023 |
2023 |
P00705736MN |
SR2023-01-002516 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00065 ROAD WIDENING - SURALLAH-LAKE SEBU-MAITUM RD, K1745+221 - K1747+084, LAKE SEBU, SOUTH COTABATO |
August 24, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00711498LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Daraga - Urban Tourism Eco Route Road, Albay
Physical Target :
CW1 - Construction of Concrete Road - 1.97 Lane Km
Row Acquisition - 39300.299 Square meters
TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Daraga - Urban Tourism Eco Route Road, Albay
Physical Target :
CW1 - Construction of Concrete Road - 1.1216 Lane Km
CW2 - Construction of Drainage Structure along Road - 388.9 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 3829.02 Square meters
Row Acquisition - 5608 Square Meters |
August 24, 2023 |
2023 |
WIN3F07556 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00711499LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Legazpi City Coastal Road, Access Road, Albay
Physical Target :
CW1 - Construction of Concrete Road - 0.304 Lane Km
TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Legazpi City Coastal Road, Access Road, Albay
Physical Target :
CW1 - Construction of Concrete Road - 1.23 Lane Km
|
August 24, 2023 |
2023 |
WIN3F07541 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00712006LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads - Milaor - Pili Bypass Road, Package 1, Camarines Sur
Physical Target :
CW1 - Construction of Concrete Road - 2.664 Lane Km
TO : OO1 Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads - Milaor - Pili Bypass Road, Package 1, Camarines Sur
Physical Target :
CW1 - Construction of Concret Road - 2.080 Lane Km
|
August 24, 2023 |
2023 |
WIN3F07540 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00712009LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Pamplona - San Fernando Bypass Road, Package 2, Camarines Sur
Physical Target :
CW1 - Construction of Concrete Road - 3.000 Lane Km
TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Pamplona - San Fernando Bypass Road, Package 2, Camarines Sur
Physical Target :
CW1 - Construction of Concrete Road - 2.000 Lane Km |
August 22, 2023 |
2023 |
WIN3F07571 |
FY 2023 GAA |
February 17, 2022 |
Region III |
Regional Office III |
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road /s leading to Major/Strategic Public Buildings / Facilities
Construction of bypass road at Donia Remedios Trinidad to San Jose Del Monte Bulacan (Phase 5) |
August 22, 2023 |
2023 |
WIN3F07570 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Regional Office III |
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road /s leading to Major/Strategic Public Buildings / Facilities
Construction of Road, Barangay Liyang, Pilar to Barangay Bilolo, Orion, Bataan (Package 2) |
August 11, 2023 |
CY 2023 |
WIN3F07495 |
UACS No. 300221102455000 |
March 14, 2023 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 300221102455000
Project ID.: P00741280LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Basic Infrastructure Program (BIP) – Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Rehabilitation or Road including Alleys and Drainages along T Sulit Street and Laterals (Pascual Area, Kalye Otso, Sarap Buhay, Aguho Boundary, and Tangco Area) Barangay Aguho Pateros
Physical Target: CW1 = Rehabilitation of Paved Road 2.445 lane km
Unit Cost (P’000) = P 4,032.59/lane km.
Allocation (P,000) = P 9,900.00
EAO (P’000) = P 100.00
Total (P’000) = P 10,000.00
As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Basic Infrastructure Program (BIP) – Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Rehabilitation of Road including Alleys and Drainages along T Sulit Street and Laterals (Pascual Area, Kalye Otso, Sarap Buhay, Aguho Boundary, and Tangco Area) Barangay Aguho Pateros
Physical Target: CW1 = Rehabilitation of Paved Road 0.375 lane km
CW2 = Rehabilitation/Major Repair of Drainage Structure along Road 0.349 lane km
Unit Cost (P’000) = P 14,180.35/lane km. P 28.2 M/Km
= P 13.13 Lane Km
Allocation (P’000) = P 5,317.63
= P 4,582.37
EAO (P’000) = P 100.00
Total (P’000) = P 10,000.00
WIN3F07495
|
August 8, 2023 |
2023 |
310204101961000 |
GAA 2023 |
January 3, 2023 |
Region II |
Cagayan 3rd District Engineering Office |
Network Development - Construction of Bypass and Diversion Roads
Tuguegarao North Diversion Road, Tuguegarao City, Cagayan |
August 8, 2023 |
2023 |
310104100460000 |
GAA 2023 |
January 3, 2023 |
Region II |
Cagayan 3rd District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Santiago- Tuguegarao Rd (Jct Kalinga- Tuguegarao Sect)- K0437+047- K0437+092, K0437+286- K0437+350, K0438+197- K0438+350, K0438+444- K0438+480, K0438+590- K0438+635, K0438+673- K0438+700, K0438+900- K0438+913.5, K0438+950- K0438+968, K0439+315- K0439+450, K0439+480- K0439+609, K0440+083- K0440+137, K0440+250- K0440+277, K0440+470- K0440+488, K0440+550- K0440+604, K0440+680- K0440+689, K0441+000- K0441+009, K0441+095- K0441+122, K0441+150- K0441+159, K0441+160- K0441+178, K0442+130- K0442+166, K0442+234- K0442+511, K0442+811- K0442+833.5, K0443+000- K0443+383, K0443+390- K0443+403.5, K0443+427- K0443+440.5, K0443+452- K0443+465.5, K0443+472- K0443+494.5, K0443+498- K0443+516, K0443+541- K0443+580, K0443+753- K0444+018, K0444+049- K0444+076, K0444+381- K0446+000, K0446+400- K0446+505, K0446+592- K0448+298 |
August 7, 2023 |
2023 |
WIN3E03100 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 300215102829000
Project ID: P00733870MN
CSSP - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of NRJ Barangay Sta. Fe - Barangay Osmeña Bypass Road, Package 1
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 25.153 Lane Km
Allocation:
TOTAL: P 300,000,000
CW1: P 289,500,000
EAO: P 10,500,000
Unit Cost:
CW1: P 11,509,561.48/Lane Km
TO:
Construction of NRJ Barangay Sta. Fe - Barangay Osmeña Bypass Road, Package 1
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 7.88 Lane Km
CW2- 23901.27 Square meters
Allocation:
TOTAL: P 300,000,000
CW1: P 250,815,080
CW1: P 38,684,920
EAO: P 10,500,000
Unit Cost:
CW1: P 31,829,324.87/Lane Km
CW1: P 1,618.53/Square meters
|
August 7, 2023 |
2023 |
WIN3E03096 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 300215102830000
Project ID: P00733871MN
CSSP - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of NRJ Barangay Sta. Fe - Barangay Osmeña Bypass Road, Package 2
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 25.153 Lane Km
Allocation:
TOTAL: P 300,000,000
CW1: P 289,500,000
EAO: P 10,500,000
Unit Cost:
CW1: P 11,509,561.48/Lane Km
TO:
Construction of NRJ Barangay Sta. Fe - Barangay Osmeña Bypass Road, Package 2
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 7.620 Lane Km
CW2- 23,225.67 Square meters
Allocation:
TOTAL: P 300,000,000
CW1: P 251,708,670
CW1: P 37,791,330
EAO: P 10,500,000
Unit Cost:
CW1: P 33,032,633.86/Lane Km
CW1: P 1,627.14/Square meters
|
August 3, 2023 |
2023 |
WIN3E03066 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From:
Sagada-Besao-Quirino (via Laylaya) Road, Mountain Province;
Type of Work: Construction of Concrete Road;
Physical Target: 2.838 Lane Km;
Allocation: Php 35,000,000.000
To:
Sagada-Besao-Quirino (via Laylaya) Road, Mountain Province;
Type of Work:
CW1:Construction of Concrete Road
CW2: Construction of Road Slope Protection Structure ;
Physical Target:
CW1: 0.936 Lane Km
CW2: 1,545.19 Square Meters ;
Allocation: Php 35,000,000.000
|
August 2, 2023 |
2023 |
WIN3E02997 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From:
Dantay-Sagada Rd – K0390+1026 – K0391+036, K0390+874 – K0390+1026, K0394+500 – K0394+728, K0397+024 – K0397+078;
Type of Work: Off-Carriageway Improvement: Paving of Shoulders;
Physical Target: 1180.5 Square Meters;
Allocation: Php 14,525,000.000
To:
Dantay-Sagada Rd – K0390+1026 – K0391+036, K0390+874 – K0390+1026, K0394+500 – K0394+728, K0397+024 – K0397+078;
Type of Work:
CW1: Off-Carriageway Improvement: Paving of Shoulders
CW2: Construction of Road Slope Protection Structure ;
Physical Target:
CW1: 515.10 Square Meters
CW2: 823.00 Square Meters ;
Allocation: Php 14,525,000.000
|
August 2, 2023 |
2023 |
WIN3E03012 |
SR2023-01-002118 |
January 1, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From:
Construction of Caluttit-Pakkil Flood Control, Sta. 28+350 - Sta. 28+850 (LS) along Chico River, Bontoc, Mountain Province;
Physical Target: 500 Lineal meters;
Allocation: Php 80,000,000.000
To:
Construction of Caluttit-Pakkil Flood Control, Sta. 28+242 - Sta. 28+440 (LS) along Chico River, Bontoc, Mountain Province;
Physical Target: 198 Lineal meters;
Allocation: Php 80,000,000.000
|
August 2, 2023 |
2023 |
WIN3E03021 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From:
Besao-Tubo (via Tamboan), Mountain Province;
Type of Work: Construction of Concrete Road;
Physical Target: 0.857 Lane Km;
Allocation: Php 20,000,000.000
To:
Besao-Tubo (via Tamboan), Mountain Province;
Type of Work:
CW1:Construction of Concrete Road
CW2: Construction of Road Slope Protection Structure
CW3: Construction of Drainage Structure along Road;
Physical Target:
CW1: 0.482 Lane Km
CW2: 758.19 Square Meters
CW2: 242.40 Lineal Meters ;
Allocation: Php 20,000,000.000
|
August 2, 2023 |
2023 |
|
SR2023-01-001510 |
January 30, 2023 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
From:
Construction of Flood Control Structure along Apayao River Basin, Cadaclan Section, Calanasan, Apayao;
Physical Target: 820.497 Lineal Meters;
Allocation: Php 10,000,000.000
To:
Construction of Flood Control Structure along Apayao River Basin, Cadaclan Section, Calanasan, Apayao;
Physical Target: 1080 Lineal Meters;
Allocation: Php 10,000,000.000
|
August 2, 2023 |
2023 |
WIN3E02904 |
SR2023-01-001791 |
January 30, 2023 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From:
Construction of Mapacopaco Flood Control, Sta. 41 + 670 - Sta. 42 + 170 (RS), Sta. 42 + 667 - Sta 43+527(RS), Posnaan, Aguinaldo, Ifugao;
Physical Target: 1,360 Linear Meters;
Allocation: Php 60,000,000.000
To:
Construction of Mapacopaco Flood Control, Sta. 41 + 902 - Sta. 42 + 170 (RS), Sta. 42 + 667 - Sta 43+527(RS), Posnaan, Aguinaldo, Ifugao;
Physical Target: 1,128 Linear Meters;
Allocation: Php 60,000,000.000
|
August 2, 2023 |
2023 |
WIN3E02949 |
SR2023-01-000702 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0472 + 967 - K0473 + 090;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000
To:
Abra-Kalinga Rd - K0472 + 967 - K0473 + 090;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000
|
August 2, 2023 |
2023 |
WIN3E02952 |
SR2023-01-000707 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0473 + 120 - K0473 + 250;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000
To:
Abra-Kalinga Rd - K0473 + 120 - K0473 + 250;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000
|
August 2, 2023 |
2023 |
WIN3E02948 |
SR2023-01-000719 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0473 + 300 - K0473 + 400;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000
To:
Abra-Kalinga Rd - K0473 + 300 - K0473 + 400;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000
|
August 2, 2023 |
GAA 2023 |
P00705724MN |
SR2023-01-001398 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00027 ROAD WIDENIG - MATALAM-LAMPAYAN-ANTIPAS RD, K1646+739 - K1649+907, K1649+1057 - K1649+1344, MATALAM, NORTH COTABATO
|
August 2, 2023 |
2023 |
WIN3E02936 |
SR2023-01-000722 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0473 + 450 - K0473 + 600;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000
To:
Abra-Kalinga Rd - K0473 + 450 - K0473 + 600;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000
|
August 2, 2023 |
GAA 2023 |
P00705718MN |
SR2023-03-006413 |
March 3, 2023 |
Region XII |
Regional Office XII |
23M00014 ROAD WIDENING - DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT) - K1629 + 000 - K1630 + 986.05, KIDAPAWAN CITY
|
August 2, 2023 |
2023 |
WIN3E02971 |
SR2023-01-000726 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0474 + 000 - K0474 + 100;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000
To:
Abra-Kalinga Rd - K0474 + 000 - K0474 + 100;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000
|
August 2, 2023 |
2023 |
WIN3E02946 |
SR2023-01-000729 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0474 + 600 - K0474 + 700;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000
To:
Abra-Kalinga Rd - K0474 + 600 - K0474 + 700;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000
|
August 2, 2023 |
2023 |
WIN3E02967 |
SR2023-01-000734 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0474 + 720 - K0474 + 850;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000
To:
Abra-Kalinga Rd - K0474 + 720 - K0474 + 850;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000
|
August 2, 2023 |
2023 |
WIN3E02932 |
SR2023-01-000741 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0474 + 900 - K0475 + 090;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000
To:
Abra-Kalinga Rd - K0474 + 900 - K0475 + 090;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000
|
August 2, 2023 |
2023 |
WIN3E02972 |
SR2023-01-000692 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0466 + 550 - K0466 + 700;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000
To:
Abra-Kalinga Rd - K0466 + 550 - K0466 + 700;
Physical Target: 3576 Square meters;
Allocation: Php 99,980,000.000
|
August 2, 2023 |
2023 |
WIN3E02950 |
SR2023-01-000697 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0466 + 800 - K0466 + 950;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000
To:
Abra-Kalinga Rd - K0466 + 800 - K0466 + 950;
Physical Target: 3576 Square meters;
Allocation: Php 99,980,000.000
|
August 2, 2023 |
2023 |
|
SR2023-01-000750 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0483 + 500 - K0483 + 575;
Physical Target: 3036.77 Square meters;
Allocation: Php 74,735,000.000
To:
Abra-Kalinga Rd - K0483 + 500 - K0483 + 575;
Physical Target: 2662 Square meters;
Allocation: Php 74,735,000.000
|
August 2, 2023 |
2023 |
WIN3E02947 |
SR2023-03-005656 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0484 + 340 - K0484 + 440;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0484 + 340 - K0484 + 440;
Physical Target: 3576.6 Square meters;
Allocation: Php 100,000,000.000
|
August 2, 2023 |
2023 |
WIN3E02935 |
SR2023-03-005658 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0487 + 650 - K0487 + 800;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0487 + 650 - K0487 + 800;
Physical Target: 3576.6 Square meters;
Allocation: Php 100,000,000.000
|
August 2, 2023 |
2023 |
WIN3E02981 |
SR2023-03-005649 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0468 + 736 - K0468 + 800;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0468 + 736 - K0468 + 800;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000 |
August 2, 2023 |
2023 |
WIN3E02937 |
SR2023-03-005652 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0482 + 450 - K0482 + 600;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0482 + 450 - K0482 + 600;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000
|
August 2, 2023 |
2023 |
WIN3E02966 |
SR2023-03-005654 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0482 + 650 - K0482 + 750;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0482 + 650 - K0482 + 750;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000
|
August 2, 2023 |
2023 |
WIN3E02953 |
SR2023-03-005636 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0459 + 650 - K0459 + 800;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0459 + 650 - K0459 + 800;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000
|
August 2, 2023 |
2023 |
WIN3E02955 |
SR2023-03-005638 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0466 + 031 - K0466 + 168;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0466 + 031 - K0466 + 168;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000
|
August 2, 2023 |
2023 |
WIN3E02964 |
SR2023-03-005643 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0466 + 188 - K0466 + 267;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0466 + 188 - K0466 + 267;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000
|
August 2, 2023 |
2023 |
WIN3E02965 |
SR2023-03-005645 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0466 + 317 - K0466 + 500;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0466 + 317 - K0466 + 500;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000
|
August 2, 2023 |
2023 |
WIN3E02944 |
SR2023-03-005646 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0467 + 200 - K0467 + 320;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0467 + 200 - K0467 + 320;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000
|
August 2, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 310212100239000
Project ID: P00705684MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System -Network Development Program - Paving of Unpaved Roads - Tertiary Roads
FROM:
Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1317 + 164 - K1317 + 287, K1317 + 620 - K1318 + 719, K1319 + 066 - K1319 + 519
Type of Work:
CW1- Paving of Unpaved Roads
Physical Target:
CW1- 3.368 Lane Km
Allocation:
TOTAL: P 126,180,000
CW1: P 121,763,700
EAO: P 4,416,300
Unit Cost:
CW1: P 36,153,117.58/Lane Km
TO:
Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1317 + 164 - K1317 + 287, K1317 + 620 - K1318 + 719, K1319 + 066 - K1319 + 380
Type of Work:
CW1- Paving of Unpaved Roads
Physical Target:
CW1- 3.040 Lane Km
CW2- 540 Square meters
Allocation:
TOTAL: P 126,180,000
CW1: P 107,650,930
CW2: P 14.112,770
EAO: P 4,416,300
Unit Cost:
CW1: P 35,411,490.13/Lane Km
CW2: P 26,134.759/Square meters
|
August 2, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 310212100239000
Project ID: P00705684MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System -Network Development Program - Paving of Unpaved Roads - Tertiary Roads
FROM:
Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1317 + 164 - K1317 + 287, K1317 + 620 - K1318 + 719, K1319 + 066 - K1319 + 519
Type of Work:
CW1- Paving of Unpaved Roads
Physical Target:
CW1- 3.368 Lane Km
Allocation:
TOTAL: P 126,180,000
CW1: P 121,763,700
EAO: P 4,416,300
Unit Cost:
CW1: P 36,153,117.58/Lane Km
TO:
Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1317 + 164 - K1317 + 287, K1317 + 620 - K1318 + 719, K1319 + 066 - K1319 + 380
Type of Work:
CW1- Paving of Unpaved Roads
Physical Target:
CW1- 3.040 Lane Km
CW2- 540 Square meters
Allocation:
TOTAL: P 126,180,000
CW1: P 107,650,930
CW2: P 14.112,770
EAO: P 4,416,300
Unit Cost:
CW1: P 35,411,490.13/Lane Km
CW2: P 26,134.759/Square meters
|
August 2, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 310212100238000
Project ID: P00705683MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Tertiary Roads
FROM:
Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1314 + 819 - K1316 + 975
Type of Work:
CW1- Paving of Unpaved Roads
Physical Target:
CW1- 4.160 Lane Km
Allocation:
TOTAL: P 124,800,000
CW1: P 120,432,000
EAO: P 4,368,000
Unit Cost:
CW1: P 28,950,000/Lane Km
TO:
Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K314 + 819.00 - K1316 + 930.00, K1319 + 380.00 - K1319 + 519.00
Type of Work:
CW1- Paving of Unpaved Roads
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 4.140 Lane Km
CW2- 3000 Square meters
Allocation:
TOTAL: P 124,800,000
CW1: P 63,768,620
CW2: P 56,663,380
EAO: P 4,368,000
Unit Cost:
CW1: P 15,403,048.31/Lane Km
CW2: P 18,887.79/Square meters
|
August 1, 2023 |
2023 |
310204101962000 |
GAA FY 2023 |
December 26, 2022 |
Region II |
Regional Office II |
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads - Tuguegarao-Solana Diversion Road (Tuguegarao-Solana Bridge and Approaches) - Phase I |
July 31, 2023 |
CY 2023 |
|
UACS No. 300215102946000 |
March 14, 2023 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300215102946000
Project ID.: P00739938LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabiliation or Road along F. Roxas Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.127 Lane Km
Unit Cost (P’000) = P 61,732.28/Lane Km.
Allocation (P,000) = P 7,840
EAO (P’000) = P 160.00
Total (P’000) = P 8,000.00
As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabilitation or Road along F. Roxas Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.127 Lane Km
Unit Cost (P’000) = P 61,732.28/Lane Km. P 122 M/Km
Allocation (P,000) = P 7,840
EAO (P’000) = P 160.00
Total (P’000) = P 8,000.00
|
July 31, 2023 |
CY 2023 |
WIN3F07497 |
UACS No. 300215102951000 |
March 14, 2023 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300215102951000
Project ID.: P00739943LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabiliation or Road along Nadurata Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.141 Lane Km
Unit Cost (P’000) = P 83,404.26/Lane Km.
Allocation (P,000) = P 11,760
EAO (P’000) = P 240.00
Total (P’000) = P 12,000.00
As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabilitation or Road along Nadurata Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.141 Lane Km
Unit Cost (P’000) = P 83,404.26/Lane Km. P 166 M/Km
Allocation (P,000) = P 11,760
EAO (P’000) = P 240.00
Total (P’000) = P 12,000.00
WIN3F07497
|
July 31, 2023 |
CY 2023 |
WIN3F07518 |
UACS No. 300215102947000 |
March 14, 2023 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300215102947000
Project ID.: P00739939LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabiliation or Road along J. Teodoro Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.117 Lane Km
Unit Cost (P’000) = P 58,632.48/Lane Km.
Allocation (P,000) = P 6,860
EAO (P’000) = P 140.00
Total (P’000) = P 7,000.00
As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabilitation or Road along J. Teodoro Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.117 Lane Km
Unit Cost (P’000) = P 58,632.48/Lane Km. P 116 M/Km
Allocation (P,000) = P 6,860
EAO (P’000) = P 140.00
Total (P’000) = P 7,000.00
WIN3F07518
|
July 31, 2023 |
CY 2023 |
WIN3F07518 |
UACS No. 300215102947000 |
March 14, 2023 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300215102947000
Project ID.: P00739939LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabiliation or Road along J. Teodoro Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.117 Lane Km
Unit Cost (P’000) = P 58,632.48/Lane Km.
Allocation (P,000) = P 6,860
EAO (P’000) = P 140.00
Total (P’000) = P 7,000.00
As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabilitation or Road along J. Teodoro Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.117 Lane Km
Unit Cost (P’000) = P 58,632.48/Lane Km. P 116 M/Km
Allocation (P,000) = P 6,860
EAO (P’000) = P 140.00
Total (P’000) = P 7,000.00
WIN3F07518
|
July 31, 2023 |
CY 2023 |
WIN3F07518 |
UACS No. 300215102947000 |
March 14, 2023 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300215102947000
Project ID.: P00739939LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabiliation or Road along J. Teodoro Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.117 Lane Km
Unit Cost (P’000) = P 58,632.48/Lane Km.
Allocation (P,000) = P 6,860
EAO (P’000) = P 140.00
Total (P’000) = P 7,000.00
As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabilitation or Road along J. Teodoro Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.117 Lane Km
Unit Cost (P’000) = P 58,632.48/Lane Km. P 116 M/Km
Allocation (P,000) = P 6,860
EAO (P’000) = P 140.00
Total (P’000) = P 7,000.00
WIN3F07518
|
July 22, 2023 |
GAA 2023 |
P00721476MN |
SR2023-01-000540 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00002 CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PULANGI RIVER, BARANGAY NABUNDAS SECTION - PHASE II, STA. 001+500 - STA. 001+755.5, PIKIT, COTABATO
|
July 22, 2023 |
GAA 2023 |
P00721451MN |
SR2023-01-000559 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00004 CONSTRUCTION OF FLOOD CONTROL STRUCTURE, RIO GRANDE DE MINDANAO (LIBUNGAN TORETA SECTION) LIBUNGAN TORETA, STA 0+000 - STA 0+238, PIGCAWAYAN, COTABATO
|
July 22, 2023 |
GAA 2023 |
P00732143MN |
SR2023-01-000594 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00023 CONSTRUCTION OF MAGPET (PANGAO-AN - DON PANACA) TO DAVAO CITY VIA SALAYSAY (INDAWHONG-BALLAH-MASAWANG) TO LUMONDAO (JUNCTION BUKIDNON TO DAVAO) ROAD, COTABATO, STA. 1+874 - STA. 3+990.27, MAGPET, NORTH COTABATO
|
July 22, 2023 |
GAA 2023 |
P00732142MN |
SR2023-001-000606 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00025 CONSTRUCTION OF ROAD, NAPANLAHAN-DALLAG ROAD, STA. 7+439 - STA. 8+369, STA. 8+394 - STA. 10+259, ARAKAN, NORTH COTABATO
|
July 22, 2023 |
GAA 2023 |
P00721585MN |
SR2023-03-006448 |
March 3, 2023 |
Region XII |
Regional Office XII |
23M00042 CONSTRUCTION OF RIVER CONTROL, PACKAGE A, STA. 0+000 - STA. 0+767.5, ALABEL, SARANGANI
|
July 22, 2023 |
GAA 2023 |
P00721303MN |
SR2023-01-002279 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00047 CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SITIO BUENAVISTA, BARANGAY PAG- ASA, STA. 0+000 - STA. 0+353, ALABEL, SARANGANI
|
July 22, 2023 |
GAA 2023 |
P00721471MN |
SR2023-01-002618 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00083 CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ALA RIVER ROAD DIKE, PACKAGE A - PHASE 4, STA. 0+000 - STA. 0+555, LAMBAYONG, SULTAN KUDARAT
|
July 22, 2023 |
GAA 2023 |
P00721304MN |
SR2023-01-002282 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00048 CONSTRUCTION OF GLAN RIVER CONTROL, PACKAGE A, STA 0+000 - STA 0+413, GLAN, SARANGANI
|
July 22, 2023 |
GAA 2023 |
P00721305MN |
SR2023-01-002285 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00049 CONSTRUCTION OF TAMADANG RIVER CONTROL, PACKAGE B, STA 0+000-STA 0+548, KIAMBA, SARANGANI
|
July 22, 2023 |
GAA 2023 |
P00721468MN |
SR2023-01-002537 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00072 CONSTRUCTION OF RIVER BANK PROTECTION ALONG ALA RIVER, PUROK RIZAL II, STA. 001+257.5 - STA. 001+504.5, BARANGAY PANAY, SANTO NIÑO, SOUTH COTABATO
|
July 22, 2023 |
2023 |
P00721467MN |
SR2023-01-002541 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00073 CONSTRUCTION OF RIVER BANK PROTECTION ALONG ALA RIVER, STA. 001+504.5 - STA. 002+050, SANTO NIÑO, SOUTH COTABATO
|
July 22, 2023 |
2023 |
P00721472MN |
SR2023-01-002615 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00082 CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ALA RIVER ROAD DIKE, PACKAGE A - PHASE 3, STA. 0+000 - STA. 0+606, LAMBAYONG, SULTAN KUDARAT
|
July 22, 2023 |
2023 |
P00707256MN |
SR2023-03-006423 |
March 3, 2023 |
Region XII |
Regional Office XII |
23M00175 ROAD WIDENING - COTABATO-ALLAH VALLEY-MARBEL RD, K1848 + 511 - K1848 + 615 & K1852 + 770 - K1852 + 900, COTABATO CITY
|
July 22, 2023 |
2023 |
P00705721MN |
SR2023-01-000941 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00017 CONSTRUCTION OF MISSING LINKS/ NEW ROADS - DOROLUMAN-ARAKAN-PRES. ROXAS-KADINGILAN ROAD PACKAGE 2, STA. 0+990 - STA. 1+098, ARAKAN, NORTH COTABATO
|
July 22, 2023 |
2023 |
P00734034MN |
SR2023-06-011477 |
June 26, 2023 |
Region XII |
Regional Office XII |
23M00174 CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, STA.49+884.00 - STA. 49+950.23,STA. 49+972.00 -STA. 50+117.35, STA. 51+162.00 - STA. 51+208.90, STA. 51+491.00 - STA. 51+604.09, BANGA-TUPI-MALUNGON, TUPI, SOUTH COTABATO
|
July 22, 2023 |
2023 |
P00706206MN |
SR2023-01-002476 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00064 PREVENTIVE MAINTENANCE - COTABATO-MARBEL RD, K1724+054 - K1725+452, BANGA, SOUTH COTABATO
|
July 22, 2023 |
2023 |
P00733173MN |
SR2023-01-002289 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00062 CONSTRUCTION OF CONCRETE ROAD - BLAGAN-DATAL LAGUH SAN JOSE-PAO PAO SINAWAL ROAD CONNECTING TO GENSAN DIVERSION ROAD IN SUPPORT OF THE AGRIBUSINESS INDUSTRY, STA. 0+000 - STA. 0+196, STA. 0+356 - STA. 2+142.9, GENERAL SANTOS CITY, SOUTH COTABATO
|
July 22, 2023 |
2023 |
P00705752MN |
SR2023-01-002603 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00080 CONSTRUCTION OF MISSING LINKS/NEW ROADS - COLUMBIO - LUTAYAN - KORONADAL ROAD, PACKAGE D, STA.1682+470.00 - STA.1682+520.00 ; STA. 1683+080.00 - STA.1683+147.00, COLUMBIO, SULTAN KUDARAT
|
July 22, 2023 |
2023 |
P00721583MN |
SR2023-03-006642 |
March 3, 2023 |
Region XII |
Regional Office XII |
23M00152 CONSTRUCTION OF MALITUBOG RIVER BANK PROTECTION (DOWNSTREAM OF MALITUBOG BRIDGE, LEFT BANK), STA 0+000 - STA 0+244.56, BARANGAY POBLACION, BANISILAN, NORTH COTABATO
|
July 22, 2023 |
2023 |
P00734168MN |
SR2023-03-008630 |
March 27, 2023 |
Region XII |
Regional Office XII |
23M00214 CONSTRUCTION OF ROAD, BRGY. GUINIBON-BRGY. MALATIMON (PHASE 2), STA 0+000 - STA 0+758, DATU ABDULLAH SANGKI, MAGUINDANAO
|
July 22, 2023 |
2023 |
P00734169MN |
SR2023-03-008631 |
March 27, 2023 |
Region XII |
Regional Office XII |
23M00215 CONSTRUCTION OF ROAD, BRGY. KAKAL TO CROSSING GUINIBON ROAD, DATU ABDULLAH SANGKI, MAGUINDANAO (PHASE 1), STA 0+000 - STA 1+120, DATU ABDULLAH SANGKI, MAGUINDANAO
|
July 22, 2023 |
2023 |
P00734167MN |
SR2023-03-008629 |
March 27, 2023 |
Region XII |
Regional Office XII |
23M00213 CONSTRUCTION OF ROAD IN BRGY. MAITUMAIG TO BRGY. MACALAG, IN THE MUNICIPALITY OF DATU UNSAY, MAGUINDANAO
|
July 22, 2023 |
2023 |
P00734170MN |
SR2023-01-008632 |
March 27, 2023 |
Region XII |
Regional Office XII |
23M00216 "CONSTRUCTION OF TUKANALUGONG TO MALANDING ROAD, STA. 0+000 - STA. 0+755, DATU ABDULLAH SANGKI, MAGUINDANAO "
|
July 22, 2023 |
2023 |
P00721473MN |
SR2023-01-002623 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00084 CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ALA RIVER ROAD DIKE, PACKAGE B - PHASE 3, STA. 0+000 - STA. 0+600, LAMBAYONG, SULTAN KUDARAT
|
July 21, 2023 |
2023 |
WIN3F07517 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Regional Office III |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and / or Bridges from the National Road/s leading to Major / Strategic Public Buildings / Facilities
Construction of Road, Barangay Liyang, Pilar to Barangay Bilolo, Orion, Bataan (Package 1)
|
July 21, 2023 |
2023 |
WIN3F07522 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Regional Office III |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Jose Abad Santos Ave (JASA) - K0109+467 - K0110+000; K0115+600 - K0116+353; K0110+900 - K0111+170 |
July 17, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 300215102840000
Project ID: P00733875MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Bugta - Balatakan Road, Buenavista, Agusan del Norte
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Gravel Road
Physical Target:
CW1- 4.440 Lane Km
CW2- 2.440 Lane Km
Allocation:
TOTAL: P 200,000,000
CW1: P 111,693,925
CW2: P 81,306,075
EAO: P 7,000,000
Unit Cost:
CW1: P 25,156,289.41/Lane Km
CW2: P 36,297,354.91/Lane Km
TO:
Construction of Bugta - Balatakan Road, Buenavista, Agusan del Norte
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Gravel Road
CW3- Construction of Road Slope Protection Structure
Physical Target:
CW1- 2.000 Lane Km
CW2- 2.932 Lane Km
CW3- 1,936 Square meters
Allocation:
TOTAL: P 200,000,000
CW1: P 59,864,740
CW2: P 84,797,445
CW3: P 48,337,815
EAO: P 7,000,000
Unit Cost:
CW1: P 29,932,370/Lane Km
CW2: P 28,921,365.96/Lane Km
CW3: P 24,967.88/Square meters
|
July 14, 2023 |
2023 |
WIN3F07478 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Pampanga 2nd District Engineering Office |
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road /s leading to Major/Strategic Public Buildings / Facilities
Construction of Bridge including road approaches, Brgy. Jalung, Porac, Pampanga |
July 13, 2023 |
FY 2023 |
WIN3E02891 |
310101100860000 |
April 25, 2023 |
Region IX |
Regional Office IX |
UACS No. 310101100860000
Project ID: P00707600MN
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Preventive Maintenance - Primary Roads
Pagadian City-Zamboanga City Rd - K1910 + 832.69 - K1911 + 140.00, K1911 + 160.80 - K1915 + 484.75
CW1- Preventive Maintenance of Road: Asphalt Overlay / 9.26 lane-km
Unit Cost: ₱ 15,631,749.46 /lane-km
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00 |
July 13, 2023 |
FY 2023 |
WIN3E02912 |
310102101178000 |
April 25, 2023 |
Region IX |
Regional Office IX |
UACS No. 310102101178000
Project ID: P00707601MN
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Preventive Maintenance - Secondary Roads
Liloy-Siocon Rd - K1980 + 535.69 - K1984 + 575.75
CW1- Preventive Maintenance of Road: Asphalt Overlay / 8.080 lane-km
Unit Cost: ₱ 17,765,315.59 /lane-km
EAO: ₱ 5,206,250.00
Allocation: ₱ 148,750,000.00 |
July 13, 2023 |
FY 2023 |
WIN3E02913 |
310107100488000 |
April 25, 2023 |
Region IX |
Regional Office IX |
UACS No. 310107100488000
Project ID: P00707606MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Pagadian City-Zamboanga City Rd - K1878 + 550.00 - K1878 + 610.00
CW1- Construction of Road Slope Protection Structure/ 4,546.00 sq. m.
Unit Cost: ₱ 31,841.18/sq. m.
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00 |
July 13, 2023 |
FY 2023 |
WIN3E02987 |
310107100489000 |
May 8, 2023 |
Region IX |
Regional Office IX |
UACS No. 310107100489000
Project ID: P00707607MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Pagadian City-Zamboanga City Rd - Package 2, K1871 + 020 - K1871 + 060.00
CW1- Construction of Road Slope Protection Structure/ 4,503.00
sq. m.
Unit Cost: ₱ 32,145.24 /sq. m.
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00 |
July 13, 2023 |
FY 2023 |
WIN3E03025 |
310107100490000 |
May 8, 2023 |
Region IX |
Regional Office IX |
UACS No. 310107100490000
Project ID: P00707608MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Pagadian City-Zamboanga City Rd - Package 3, K1858+940.00 - K1858+960.00, K1859+170.00 – K1859+200.00, K1860+120.00 – K1860+300.00, K1860+487.01 – K1860+520.00
CW1- Construction of Road Slope Protection Structure/ 4,537.00 sq. m.
Unit Cost: ₱ 31,904.34 /sq. m.
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
|
July 13, 2023 |
FY 2023 |
WIN3E02989 |
310107100491000 |
April 25, 2023 |
Region IX |
Regional Office IX |
UACS No. 310107100491000
Project ID: P00707609MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Pagadian City-Zamboanga City Rd - K1868 + 400 - K1868 + 540, K1868 + 560 – K1868 + 672.82
CW1- Construction of Road Slope Protection Structure/ 3,627.00 sq. m.
Unit Cost: ₱ 31,927.21 /sq. m.
EAO: ₱ 4,200,000.00
Allocation: ₱ 120,000,000.00
|
July 13, 2023 |
FY 2023 |
WIN3E02980 |
310107100492000 |
April 25, 2023 |
Region IX |
Regional Office IX |
UACS No. 310107100492000
Project ID: P00707610MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Pagadian City-Zamboanga City Rd - K1869 + 037.04 - K1869 + 140.00
CW1- Construction of Road Slope Protection Structure/ 3,627.00
sq. m.
Unit Cost: ₱ 31,927.21 /sq. m.
EAO: ₱ 4,200,000.00
Allocation: ₱ 120,000,000.00
|
July 13, 2023 |
2023 |
P00706063MN |
SR2023-01-002024 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00092-PREVENTIVE MAINTENANCE - COTABATO-LANAO RD, K1882+424- K1882+860, K1882+880 - K1883+260, PARANG, MAGUINDANAO DEL NORTE
|
July 13, 2023 |
2023 |
P00706531MN |
SR2023-01-00681 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00013-CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - KIDAPAWAN-MAGPET-PANGAOAN RD, K1630+760.00 - K1630+857.3, MAGPET, NORTH COTABATO
|
July 13, 2023 |
2023 |
P007055753MN |
SR2023-01-002607 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00081-CONSTRUCTION OF MISSING LINKS/NEW ROADS - DATU PAGLAS - COLUMBIO - MATANAO ROAD, STA. 0+000 - STA. 0+030, STA. 0+095 - STA. 0+185, STA. 4+585 - STA. 4+630, COLUMBIO, SULTAN KUDARAT
|
July 13, 2023 |
2023 |
P00706202MN |
SR2023-01-001321 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00026-PREVENTIVE MAINTENANCE - DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT) - K1639+000-K1639+780, K1639+780-K1640+288, MATALAM, NORTH COTABATO
|