Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
August 30, 2023 2023 P00733168MN SR2023-01-002106 January 30, 2023 Region XII Regional Office XII
23M00050 CONSTRUCTION OF CONCRETE ROAD - MALALAG-KIAYAP-ZION-BATIAN ROAD LEADING TO ZION-BATIAN ECOSITES, STA. 10+460 - STA. 12+340, BRGY. BATI-AN, MAITUM, SARANGANI
August 29, 2023 2023 WIN3F07525 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00714721LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads

Daang Maharlika Jct - Legazpi - Sto Domingo - Tabaco - Camarines Sur Bdry Rd - K0580 + 040.00 - K0580 + 233.00

Physical Target :
CW1 - Construction of Road Slope Protection Structure - 13611.11 Square meters


TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads

Daang Maharlika Jct - Legazpi - Sto Domingo - Tabaco - Camarines Sur Bdry Rd - K0575 - 099.35 - K0575 + 242.89; K0583 + 244.50 - K0583 + 359.50

Physical Target :
CW1 - Construction of Road Slope Protection Structure - 9530.03 Square meters
August 29, 2023 2023 WIN3F07513 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00714722LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads

Daang Maharlika Jct - Legazpi - Sto Domingo - Tabaco - Camarines Sur Bdry Rd - K0580 + 640.00 - K0580 + 840.00

Physical Target :
CW1 - Construction of Road Slope Protection Structure - 13611.11 Square meters


TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads

Daang Maharlika Jct - Legazpi - Sto Domingo - Tabaco - Camarines Sur Bdry Rd - K0583 + 359.50 - K0583 + 575.50

Physical Target :
CW1 - Construction of Road Slope Protection Structure - 9735.2 Square meters
August 29, 2023 2023 WIN3F07510 FY 2023 GAA December 26, 2022 Region V Masbate 2nd District Engineering Office
Project ID : P00725889LZ

FROM : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System

Construction of Milagros Seawall, Sta. 0 + 208.00 - Sta. 0 + 487.00, Milagros, Masbate

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 123,500 Lineal meters

TO : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System

Construction of Milagros Seawall, Sta. 0 + 217.00 - Sta. 0 + 340.50, Milagros, Masbate

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 123,500 Linea meters
August 29, 2023 2023 WIN3F07506 FY 2023 GAA December 26, 2022 Region V Masbate 2nd District Engineering Office
Project ID : P00725890LZ

FROM : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Calasuche Seawall, Sta. 0 + 642.00 - Sta. 0 + 921.00, Milagros, Masbate

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 75 Lineal meters

TO : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Calasuche Seawall, Sta. 1 - + 286.90 - Sta. 1 + 361.90, Milagros, Masbate

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 75 Lineal meters
August 29, 2023 2023 WIN3F07519 FY 2023 GAA December 26, 2022 Region V Masbate 2nd District Engineering Office
Project ID : P00725891LZ

FROM : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Poblacion East Seawall, Sta. 0 + 363.00 - Sta. 0 + 642, Milagros, Masbate

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 72 Lineal meters


TO : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Poblacion East Seawall, Sta. 0 + 250.00 - Sta. 0 + 322.00, Milagros, Masbate

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 72 Lineal meters
August 29, 2023 2023 WIN3F07514 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID: P00725892LZ

FROM : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Poblacion East Seawall, Sta. 0 + 487.00 - Sta. 0 + 766.00, Milagros, Masbate

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 103 Lineal meters

TO : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Poblacion East Seawall, Sta. 0 + 114.00 - Sta. 0 + 217.00, Milagros, Masbate
August 29, 2023 2023 WIN3F07535 FY 2023 GAA December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00726292LZ

FROM : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Revetment, Barangay San Gabriel, Pamplona, Camarines Sur

Physical Target :
CW1 - Construction of Revetment - 382.002 Lineal meters

TO : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Revetment, Barangay San Gabriel, Pamplona, Camarines Sur

Physical Target :
CW1 - Construction of Revetment - 205.00 Lineal meters
August 25, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00712062LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Mabolo - Almeda Bypass Rd (Package 1), Camarines Sur

Physical Target :
CW1 - Construction of Concrete Bridge - 979 Square meters


TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Mabolo - Almeda Bypass Rd (Package 1), Camarines Sur

Physical Target :
CW1 - Construction of Concrete Bridge - 1642.25 Square meters
August 25, 2023 2023 FY 2023 GAA December 26, 2022 Region V Albay 2nd Engineering Office
Project ID : P00712230LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads - Daang Maharlika (LZ) - K0528 + 000 - K0528 + 284

Physical Target :
CW1 - Construction of Drainage Structure along Road - 284 Lineal Meters


TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads - Daang Maharlika (LZ) - K0519 + 844 - K0520 + 073, K0521 + 600, K0522 + 160 - K0522 + 330

Physical Target
CW1 - Rehabilitation/ Major Repair of Drainage Structure along Road - 558 Lineal Meters
August 25, 2023 2023 FY 2023 GAA December 26, 2022 Region V Albay 2nd Engineering Office
Project ID : P00712232LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads - Legazpi Access Rd - (S05853LZ) Chainage 000 - Chainage 181

Physical Target :
CW1 - Construction of Drainage Structure along Road - 362 Lineal Meters

TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads - Legazpi Access Rd - (S05853LZ) Chainage 000 - Chainage 415

Physical Target :
CW1 - Rehabilitation/ Maj or Repairr of Drainage Structures along road - 415 Lineal Meters
August 25, 2023 2023 P00705736MN SR2023-01-002516 January 30, 2023 Region XII Regional Office XII
23M00065 ROAD WIDENING - SURALLAH-LAKE SEBU-MAITUM RD, K1745+221 - K1747+084, LAKE SEBU, SOUTH COTABATO
August 24, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00711498LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Daraga - Urban Tourism Eco Route Road, Albay

Physical Target :
CW1 - Construction of Concrete Road - 1.97 Lane Km
Row Acquisition - 39300.299 Square meters

TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Daraga - Urban Tourism Eco Route Road, Albay

Physical Target :
CW1 - Construction of Concrete Road - 1.1216 Lane Km
CW2 - Construction of Drainage Structure along Road - 388.9 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 3829.02 Square meters
Row Acquisition - 5608 Square Meters
August 24, 2023 2023 WIN3F07556 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00711499LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Legazpi City Coastal Road, Access Road, Albay

Physical Target :
CW1 - Construction of Concrete Road - 0.304 Lane Km

TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Legazpi City Coastal Road, Access Road, Albay

Physical Target :
CW1 - Construction of Concrete Road - 1.23 Lane Km
August 24, 2023 2023 WIN3F07541 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00712006LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads - Milaor - Pili Bypass Road, Package 1, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 2.664 Lane Km


TO : OO1 Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads - Milaor - Pili Bypass Road, Package 1, Camarines Sur

Physical Target :
CW1 - Construction of Concret Road - 2.080 Lane Km
August 24, 2023 2023 WIN3F07540 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00712009LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Pamplona - San Fernando Bypass Road, Package 2, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 3.000 Lane Km

TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Pamplona - San Fernando Bypass Road, Package 2, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 2.000 Lane Km
August 22, 2023 2023 WIN3F07571 FY 2023 GAA February 17, 2022 Region III Regional Office III
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road /s leading to Major/Strategic Public Buildings / Facilities

Construction of bypass road at Donia Remedios Trinidad to San Jose Del Monte Bulacan (Phase 5)
August 22, 2023 2023 WIN3F07570 FY 2023 GAA February 17, 2023 Region III Regional Office III
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road /s leading to Major/Strategic Public Buildings / Facilities

Construction of Road, Barangay Liyang, Pilar to Barangay Bilolo, Orion, Bataan (Package 2)
August 11, 2023 CY 2023 WIN3F07495 UACS No. 300221102455000 March 14, 2023 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 300221102455000
Project ID.: P00741280LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Basic Infrastructure Program (BIP) – Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Rehabilitation or Road including Alleys and Drainages along T Sulit Street and Laterals (Pascual Area, Kalye Otso, Sarap Buhay, Aguho Boundary, and Tangco Area) Barangay Aguho Pateros
Physical Target: CW1 = Rehabilitation of Paved Road 2.445 lane km
Unit Cost (P’000) = P 4,032.59/lane km.
Allocation (P,000) = P 9,900.00
EAO (P’000) = P 100.00
Total (P’000) = P 10,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Basic Infrastructure Program (BIP) – Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Rehabilitation of Road including Alleys and Drainages along T Sulit Street and Laterals (Pascual Area, Kalye Otso, Sarap Buhay, Aguho Boundary, and Tangco Area) Barangay Aguho Pateros
Physical Target: CW1 = Rehabilitation of Paved Road 0.375 lane km
CW2 = Rehabilitation/Major Repair of Drainage Structure along Road 0.349 lane km
Unit Cost (P’000) = P 14,180.35/lane km. P 28.2 M/Km
= P 13.13 Lane Km
Allocation (P’000) = P 5,317.63
= P 4,582.37
EAO (P’000) = P 100.00
Total (P’000) = P 10,000.00
WIN3F07495
August 8, 2023 2023 310204101961000 GAA 2023 January 3, 2023 Region II Cagayan 3rd District Engineering Office
Network Development - Construction of Bypass and Diversion Roads

Tuguegarao North Diversion Road, Tuguegarao City, Cagayan
August 8, 2023 2023 310104100460000 GAA 2023 January 3, 2023 Region II Cagayan 3rd District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads

Santiago- Tuguegarao Rd (Jct Kalinga- Tuguegarao Sect)- K0437+047- K0437+092, K0437+286- K0437+350, K0438+197- K0438+350, K0438+444- K0438+480, K0438+590- K0438+635, K0438+673- K0438+700, K0438+900- K0438+913.5, K0438+950- K0438+968, K0439+315- K0439+450, K0439+480- K0439+609, K0440+083- K0440+137, K0440+250- K0440+277, K0440+470- K0440+488, K0440+550- K0440+604, K0440+680- K0440+689, K0441+000- K0441+009, K0441+095- K0441+122, K0441+150- K0441+159, K0441+160- K0441+178, K0442+130- K0442+166, K0442+234- K0442+511, K0442+811- K0442+833.5, K0443+000- K0443+383, K0443+390- K0443+403.5, K0443+427- K0443+440.5, K0443+452- K0443+465.5, K0443+472- K0443+494.5, K0443+498- K0443+516, K0443+541- K0443+580, K0443+753- K0444+018, K0444+049- K0444+076, K0444+381- K0446+000, K0446+400- K0446+505, K0446+592- K0448+298
August 7, 2023 2023 WIN3E03100 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 300215102829000
Project ID: P00733870MN

CSSP - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of NRJ Barangay Sta. Fe - Barangay Osmeña Bypass Road, Package 1

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 25.153 Lane Km

Allocation:
TOTAL: P 300,000,000
CW1: P 289,500,000
EAO: P 10,500,000

Unit Cost:
CW1: P 11,509,561.48/Lane Km

TO:

Construction of NRJ Barangay Sta. Fe - Barangay Osmeña Bypass Road, Package 1

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure

Physical Target:
CW1- 7.88 Lane Km
CW2- 23901.27 Square meters

Allocation:
TOTAL: P 300,000,000
CW1: P 250,815,080
CW1: P 38,684,920
EAO: P 10,500,000

Unit Cost:
CW1: P 31,829,324.87/Lane Km
CW1: P 1,618.53/Square meters

August 7, 2023 2023 WIN3E03096 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 300215102830000
Project ID: P00733871MN

CSSP - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of NRJ Barangay Sta. Fe - Barangay Osmeña Bypass Road, Package 2

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 25.153 Lane Km

Allocation:
TOTAL: P 300,000,000
CW1: P 289,500,000
EAO: P 10,500,000

Unit Cost:
CW1: P 11,509,561.48/Lane Km

TO:

Construction of NRJ Barangay Sta. Fe - Barangay Osmeña Bypass Road, Package 2

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure

Physical Target:
CW1- 7.620 Lane Km
CW2- 23,225.67 Square meters

Allocation:
TOTAL: P 300,000,000
CW1: P 251,708,670
CW1: P 37,791,330
EAO: P 10,500,000

Unit Cost:
CW1: P 33,032,633.86/Lane Km
CW1: P 1,627.14/Square meters

August 3, 2023 2023 WIN3E03066 GAA 2023 January 24, 2023 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From:
Sagada-Besao-Quirino (via Laylaya) Road, Mountain Province;
Type of Work: Construction of Concrete Road;
Physical Target: 2.838 Lane Km;
Allocation: Php 35,000,000.000

To:
Sagada-Besao-Quirino (via Laylaya) Road, Mountain Province;
Type of Work:
CW1:Construction of Concrete Road
CW2: Construction of Road Slope Protection Structure ;
Physical Target:
CW1: 0.936 Lane Km
CW2: 1,545.19 Square Meters ;
Allocation: Php 35,000,000.000

August 2, 2023 2023 WIN3E02997 GAA 2023 January 24, 2023 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From:
Dantay-Sagada Rd – K0390+1026 – K0391+036, K0390+874 – K0390+1026, K0394+500 – K0394+728, K0397+024 – K0397+078;
Type of Work: Off-Carriageway Improvement: Paving of Shoulders;
Physical Target: 1180.5 Square Meters;
Allocation: Php 14,525,000.000

To:
Dantay-Sagada Rd – K0390+1026 – K0391+036, K0390+874 – K0390+1026, K0394+500 – K0394+728, K0397+024 – K0397+078;
Type of Work:
CW1: Off-Carriageway Improvement: Paving of Shoulders
CW2: Construction of Road Slope Protection Structure ;
Physical Target:
CW1: 515.10 Square Meters
CW2: 823.00 Square Meters ;
Allocation: Php 14,525,000.000

August 2, 2023 2023 WIN3E03012 SR2023-01-002118 January 1, 2023 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From:
Construction of Caluttit-Pakkil Flood Control, Sta. 28+350 - Sta. 28+850 (LS) along Chico River, Bontoc, Mountain Province;
Physical Target: 500 Lineal meters;
Allocation: Php 80,000,000.000

To:
Construction of Caluttit-Pakkil Flood Control, Sta. 28+242 - Sta. 28+440 (LS) along Chico River, Bontoc, Mountain Province;
Physical Target: 198 Lineal meters;
Allocation: Php 80,000,000.000

August 2, 2023 2023 WIN3E03021 GAA 2023 January 24, 2023 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From:
Besao-Tubo (via Tamboan), Mountain Province;
Type of Work: Construction of Concrete Road;
Physical Target: 0.857 Lane Km;
Allocation: Php 20,000,000.000

To:
Besao-Tubo (via Tamboan), Mountain Province;
Type of Work:
CW1:Construction of Concrete Road
CW2: Construction of Road Slope Protection Structure
CW3: Construction of Drainage Structure along Road;
Physical Target:
CW1: 0.482 Lane Km
CW2: 758.19 Square Meters
CW2: 242.40 Lineal Meters ;
Allocation: Php 20,000,000.000

August 2, 2023 2023 SR2023-01-001510 January 30, 2023 Cordillera Administrative Region Apayao 2nd District Engineering Office
From:
Construction of Flood Control Structure along Apayao River Basin, Cadaclan Section, Calanasan, Apayao;
Physical Target: 820.497 Lineal Meters;
Allocation: Php 10,000,000.000

To:
Construction of Flood Control Structure along Apayao River Basin, Cadaclan Section, Calanasan, Apayao;
Physical Target: 1080 Lineal Meters;
Allocation: Php 10,000,000.000

August 2, 2023 2023 WIN3E02904 SR2023-01-001791 January 30, 2023 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From:
Construction of Mapacopaco Flood Control, Sta. 41 + 670 - Sta. 42 + 170 (RS), Sta. 42 + 667 - Sta 43+527(RS), Posnaan, Aguinaldo, Ifugao;
Physical Target: 1,360 Linear Meters;
Allocation: Php 60,000,000.000

To:
Construction of Mapacopaco Flood Control, Sta. 41 + 902 - Sta. 42 + 170 (RS), Sta. 42 + 667 - Sta 43+527(RS), Posnaan, Aguinaldo, Ifugao;
Physical Target: 1,128 Linear Meters;
Allocation: Php 60,000,000.000

August 2, 2023 2023 WIN3E02949 SR2023-01-000702 January 30, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0472 + 967 - K0473 + 090;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000

To:
Abra-Kalinga Rd - K0472 + 967 - K0473 + 090;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000

August 2, 2023 2023 WIN3E02952 SR2023-01-000707 January 30, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0473 + 120 - K0473 + 250;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000

To:
Abra-Kalinga Rd - K0473 + 120 - K0473 + 250;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000

August 2, 2023 2023 WIN3E02948 SR2023-01-000719 January 30, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0473 + 300 - K0473 + 400;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000

To:
Abra-Kalinga Rd - K0473 + 300 - K0473 + 400;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000

August 2, 2023 GAA 2023 P00705724MN SR2023-01-001398 January 30, 2023 Region XII Regional Office XII
23M00027 ROAD WIDENIG - MATALAM-LAMPAYAN-ANTIPAS RD, K1646+739 - K1649+907, K1649+1057 - K1649+1344, MATALAM, NORTH COTABATO
August 2, 2023 2023 WIN3E02936 SR2023-01-000722 January 30, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0473 + 450 - K0473 + 600;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000

To:
Abra-Kalinga Rd - K0473 + 450 - K0473 + 600;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000

August 2, 2023 GAA 2023 P00705718MN SR2023-03-006413 March 3, 2023 Region XII Regional Office XII
23M00014 ROAD WIDENING - DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT) - K1629 + 000 - K1630 + 986.05, KIDAPAWAN CITY
August 2, 2023 2023 WIN3E02971 SR2023-01-000726 January 30, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0474 + 000 - K0474 + 100;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000

To:
Abra-Kalinga Rd - K0474 + 000 - K0474 + 100;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000
August 2, 2023 2023 WIN3E02946 SR2023-01-000729 January 30, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0474 + 600 - K0474 + 700;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000

To:
Abra-Kalinga Rd - K0474 + 600 - K0474 + 700;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000

August 2, 2023 2023 WIN3E02967 SR2023-01-000734 January 30, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0474 + 720 - K0474 + 850;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000

To:
Abra-Kalinga Rd - K0474 + 720 - K0474 + 850;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000

August 2, 2023 2023 WIN3E02932 SR2023-01-000741 January 30, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0474 + 900 - K0475 + 090;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000

To:
Abra-Kalinga Rd - K0474 + 900 - K0475 + 090;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000

August 2, 2023 2023 WIN3E02972 SR2023-01-000692 January 30, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0466 + 550 - K0466 + 700;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000

To:
Abra-Kalinga Rd - K0466 + 550 - K0466 + 700;
Physical Target: 3576 Square meters;
Allocation: Php 99,980,000.000

August 2, 2023 2023 WIN3E02950 SR2023-01-000697 January 30, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0466 + 800 - K0466 + 950;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000

To:
Abra-Kalinga Rd - K0466 + 800 - K0466 + 950;
Physical Target: 3576 Square meters;
Allocation: Php 99,980,000.000

August 2, 2023 2023 SR2023-01-000750 January 30, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0483 + 500 - K0483 + 575;
Physical Target: 3036.77 Square meters;
Allocation: Php 74,735,000.000

To:
Abra-Kalinga Rd - K0483 + 500 - K0483 + 575;
Physical Target: 2662 Square meters;
Allocation: Php 74,735,000.000

August 2, 2023 2023 WIN3E02947 SR2023-03-005656 March 2, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0484 + 340 - K0484 + 440;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000

To:
Abra-Kalinga Rd - K0484 + 340 - K0484 + 440;
Physical Target: 3576.6 Square meters;
Allocation: Php 100,000,000.000

August 2, 2023 2023 WIN3E02935 SR2023-03-005658 March 2, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0487 + 650 - K0487 + 800;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000

To:
Abra-Kalinga Rd - K0487 + 650 - K0487 + 800;
Physical Target: 3576.6 Square meters;
Allocation: Php 100,000,000.000

August 2, 2023 2023 WIN3E02981 SR2023-03-005649 March 2, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0468 + 736 - K0468 + 800;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000

To:
Abra-Kalinga Rd - K0468 + 736 - K0468 + 800;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000
August 2, 2023 2023 WIN3E02937 SR2023-03-005652 March 2, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0482 + 450 - K0482 + 600;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000

To:
Abra-Kalinga Rd - K0482 + 450 - K0482 + 600;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000

August 2, 2023 2023 WIN3E02966 SR2023-03-005654 March 2, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0482 + 650 - K0482 + 750;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000

To:
Abra-Kalinga Rd - K0482 + 650 - K0482 + 750;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000

August 2, 2023 2023 WIN3E02953 SR2023-03-005636 March 2, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0459 + 650 - K0459 + 800;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000

To:
Abra-Kalinga Rd - K0459 + 650 - K0459 + 800;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000

August 2, 2023 2023 WIN3E02955 SR2023-03-005638 March 2, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0466 + 031 - K0466 + 168;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000

To:
Abra-Kalinga Rd - K0466 + 031 - K0466 + 168;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000

August 2, 2023 2023 WIN3E02964 SR2023-03-005643 March 2, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0466 + 188 - K0466 + 267;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000

To:
Abra-Kalinga Rd - K0466 + 188 - K0466 + 267;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000

August 2, 2023 2023 WIN3E02965 SR2023-03-005645 March 2, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0466 + 317 - K0466 + 500;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000

To:
Abra-Kalinga Rd - K0466 + 317 - K0466 + 500;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000

August 2, 2023 2023 WIN3E02944 SR2023-03-005646 March 2, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0467 + 200 - K0467 + 320;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000

To:
Abra-Kalinga Rd - K0467 + 200 - K0467 + 320;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000

August 2, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 310212100239000
Project ID: P00705684MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System -Network Development Program - Paving of Unpaved Roads - Tertiary Roads

FROM:

Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1317 + 164 - K1317 + 287, K1317 + 620 - K1318 + 719, K1319 + 066 - K1319 + 519

Type of Work:
CW1- Paving of Unpaved Roads

Physical Target:
CW1- 3.368 Lane Km

Allocation:
TOTAL: P 126,180,000
CW1: P 121,763,700
EAO: P 4,416,300

Unit Cost:
CW1: P 36,153,117.58/Lane Km

TO:

Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1317 + 164 - K1317 + 287, K1317 + 620 - K1318 + 719, K1319 + 066 - K1319 + 380

Type of Work:
CW1- Paving of Unpaved Roads

Physical Target:
CW1- 3.040 Lane Km
CW2- 540 Square meters

Allocation:
TOTAL: P 126,180,000
CW1: P 107,650,930
CW2: P 14.112,770
EAO: P 4,416,300

Unit Cost:
CW1: P 35,411,490.13/Lane Km
CW2: P 26,134.759/Square meters
August 2, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 310212100239000
Project ID: P00705684MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System -Network Development Program - Paving of Unpaved Roads - Tertiary Roads

FROM:

Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1317 + 164 - K1317 + 287, K1317 + 620 - K1318 + 719, K1319 + 066 - K1319 + 519

Type of Work:
CW1- Paving of Unpaved Roads

Physical Target:
CW1- 3.368 Lane Km

Allocation:
TOTAL: P 126,180,000
CW1: P 121,763,700
EAO: P 4,416,300

Unit Cost:
CW1: P 36,153,117.58/Lane Km

TO:

Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1317 + 164 - K1317 + 287, K1317 + 620 - K1318 + 719, K1319 + 066 - K1319 + 380

Type of Work:
CW1- Paving of Unpaved Roads

Physical Target:
CW1- 3.040 Lane Km
CW2- 540 Square meters

Allocation:
TOTAL: P 126,180,000
CW1: P 107,650,930
CW2: P 14.112,770
EAO: P 4,416,300

Unit Cost:
CW1: P 35,411,490.13/Lane Km
CW2: P 26,134.759/Square meters
August 2, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 310212100238000
Project ID: P00705683MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Tertiary Roads

FROM:

Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1314 + 819 - K1316 + 975

Type of Work:
CW1- Paving of Unpaved Roads

Physical Target:
CW1- 4.160 Lane Km

Allocation:
TOTAL: P 124,800,000
CW1: P 120,432,000
EAO: P 4,368,000

Unit Cost:
CW1: P 28,950,000/Lane Km

TO:

Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K314 + 819.00 - K1316 + 930.00, K1319 + 380.00 - K1319 + 519.00

Type of Work:
CW1- Paving of Unpaved Roads
CW2- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4.140 Lane Km
CW2- 3000 Square meters

Allocation:
TOTAL: P 124,800,000
CW1: P 63,768,620
CW2: P 56,663,380
EAO: P 4,368,000

Unit Cost:
CW1: P 15,403,048.31/Lane Km
CW2: P 18,887.79/Square meters
August 1, 2023 2023 310204101962000 GAA FY 2023 December 26, 2022 Region II Regional Office II
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads - Tuguegarao-Solana Diversion Road (Tuguegarao-Solana Bridge and Approaches) - Phase I
July 31, 2023 CY 2023 UACS No. 300215102946000 March 14, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102946000
Project ID.: P00739938LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabiliation or Road along F. Roxas Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.127 Lane Km
Unit Cost (P’000) = P 61,732.28/Lane Km.
Allocation (P,000) = P 7,840
EAO (P’000) = P 160.00
Total (P’000) = P 8,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM

CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabilitation or Road along F. Roxas Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.127 Lane Km
Unit Cost (P’000) = P 61,732.28/Lane Km. P 122 M/Km
Allocation (P,000) = P 7,840
EAO (P’000) = P 160.00
Total (P’000) = P 8,000.00
July 31, 2023 CY 2023 WIN3F07497 UACS No. 300215102951000 March 14, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102951000
Project ID.: P00739943LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabiliation or Road along Nadurata Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.141 Lane Km
Unit Cost (P’000) = P 83,404.26/Lane Km.
Allocation (P,000) = P 11,760
EAO (P’000) = P 240.00
Total (P’000) = P 12,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM

CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabilitation or Road along Nadurata Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.141 Lane Km
Unit Cost (P’000) = P 83,404.26/Lane Km. P 166 M/Km
Allocation (P,000) = P 11,760
EAO (P’000) = P 240.00
Total (P’000) = P 12,000.00
WIN3F07497
July 31, 2023 CY 2023 WIN3F07518 UACS No. 300215102947000 March 14, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102947000
Project ID.: P00739939LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabiliation or Road along J. Teodoro Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.117 Lane Km
Unit Cost (P’000) = P 58,632.48/Lane Km.
Allocation (P,000) = P 6,860
EAO (P’000) = P 140.00
Total (P’000) = P 7,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM

CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabilitation or Road along J. Teodoro Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.117 Lane Km
Unit Cost (P’000) = P 58,632.48/Lane Km. P 116 M/Km
Allocation (P,000) = P 6,860
EAO (P’000) = P 140.00
Total (P’000) = P 7,000.00
WIN3F07518
July 31, 2023 CY 2023 WIN3F07518 UACS No. 300215102947000 March 14, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102947000
Project ID.: P00739939LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabiliation or Road along J. Teodoro Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.117 Lane Km
Unit Cost (P’000) = P 58,632.48/Lane Km.
Allocation (P,000) = P 6,860
EAO (P’000) = P 140.00
Total (P’000) = P 7,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM

CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabilitation or Road along J. Teodoro Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.117 Lane Km
Unit Cost (P’000) = P 58,632.48/Lane Km. P 116 M/Km
Allocation (P,000) = P 6,860
EAO (P’000) = P 140.00
Total (P’000) = P 7,000.00
WIN3F07518
July 31, 2023 CY 2023 WIN3F07518 UACS No. 300215102947000 March 14, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102947000
Project ID.: P00739939LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabiliation or Road along J. Teodoro Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.117 Lane Km
Unit Cost (P’000) = P 58,632.48/Lane Km.
Allocation (P,000) = P 6,860
EAO (P’000) = P 140.00
Total (P’000) = P 7,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM

CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabilitation or Road along J. Teodoro Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.117 Lane Km
Unit Cost (P’000) = P 58,632.48/Lane Km. P 116 M/Km
Allocation (P,000) = P 6,860
EAO (P’000) = P 140.00
Total (P’000) = P 7,000.00
WIN3F07518
July 22, 2023 GAA 2023 P00721476MN SR2023-01-000540 January 30, 2023 Region XII Regional Office XII
23M00002 CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PULANGI RIVER, BARANGAY NABUNDAS SECTION - PHASE II, STA. 001+500 - STA. 001+755.5, PIKIT, COTABATO
July 22, 2023 GAA 2023 P00721451MN SR2023-01-000559 January 30, 2023 Region XII Regional Office XII
23M00004 CONSTRUCTION OF FLOOD CONTROL STRUCTURE, RIO GRANDE DE MINDANAO (LIBUNGAN TORETA SECTION) LIBUNGAN TORETA, STA 0+000 - STA 0+238, PIGCAWAYAN, COTABATO
July 22, 2023 GAA 2023 P00732143MN SR2023-01-000594 January 30, 2023 Region XII Regional Office XII
23M00023 CONSTRUCTION OF MAGPET (PANGAO-AN - DON PANACA) TO DAVAO CITY VIA SALAYSAY (INDAWHONG-BALLAH-MASAWANG) TO LUMONDAO (JUNCTION BUKIDNON TO DAVAO) ROAD, COTABATO, STA. 1+874 - STA. 3+990.27, MAGPET, NORTH COTABATO
July 22, 2023 GAA 2023 P00732142MN SR2023-001-000606 January 30, 2023 Region XII Regional Office XII
23M00025 CONSTRUCTION OF ROAD, NAPANLAHAN-DALLAG ROAD, STA. 7+439 - STA. 8+369, STA. 8+394 - STA. 10+259, ARAKAN, NORTH COTABATO
July 22, 2023 GAA 2023 P00721585MN SR2023-03-006448 March 3, 2023 Region XII Regional Office XII
23M00042 CONSTRUCTION OF RIVER CONTROL, PACKAGE A, STA. 0+000 - STA. 0+767.5, ALABEL, SARANGANI
July 22, 2023 GAA 2023 P00721303MN SR2023-01-002279 January 30, 2023 Region XII Regional Office XII
23M00047 CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SITIO BUENAVISTA, BARANGAY PAG- ASA, STA. 0+000 - STA. 0+353, ALABEL, SARANGANI
July 22, 2023 GAA 2023 P00721471MN SR2023-01-002618 January 30, 2023 Region XII Regional Office XII
23M00083 CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ALA RIVER ROAD DIKE, PACKAGE A - PHASE 4, STA. 0+000 - STA. 0+555, LAMBAYONG, SULTAN KUDARAT
July 22, 2023 GAA 2023 P00721304MN SR2023-01-002282 January 30, 2023 Region XII Regional Office XII
23M00048 CONSTRUCTION OF GLAN RIVER CONTROL, PACKAGE A, STA 0+000 - STA 0+413, GLAN, SARANGANI
July 22, 2023 GAA 2023 P00721305MN SR2023-01-002285 January 30, 2023 Region XII Regional Office XII
23M00049 CONSTRUCTION OF TAMADANG RIVER CONTROL, PACKAGE B, STA 0+000-STA 0+548, KIAMBA, SARANGANI
July 22, 2023 GAA 2023 P00721468MN SR2023-01-002537 January 30, 2023 Region XII Regional Office XII
23M00072 CONSTRUCTION OF RIVER BANK PROTECTION ALONG ALA RIVER, PUROK RIZAL II, STA. 001+257.5 - STA. 001+504.5, BARANGAY PANAY, SANTO NIÑO, SOUTH COTABATO
July 22, 2023 2023 P00721467MN SR2023-01-002541 January 30, 2023 Region XII Regional Office XII
23M00073 CONSTRUCTION OF RIVER BANK PROTECTION ALONG ALA RIVER, STA. 001+504.5 - STA. 002+050, SANTO NIÑO, SOUTH COTABATO
July 22, 2023 2023 P00721472MN SR2023-01-002615 January 30, 2023 Region XII Regional Office XII
23M00082 CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ALA RIVER ROAD DIKE, PACKAGE A - PHASE 3, STA. 0+000 - STA. 0+606, LAMBAYONG, SULTAN KUDARAT
July 22, 2023 2023 P00707256MN SR2023-03-006423 March 3, 2023 Region XII Regional Office XII
23M00175 ROAD WIDENING - COTABATO-ALLAH VALLEY-MARBEL RD, K1848 + 511 - K1848 + 615 & K1852 + 770 - K1852 + 900, COTABATO CITY
July 22, 2023 2023 P00705721MN SR2023-01-000941 January 30, 2023 Region XII Regional Office XII
23M00017 CONSTRUCTION OF MISSING LINKS/ NEW ROADS - DOROLUMAN-ARAKAN-PRES. ROXAS-KADINGILAN ROAD PACKAGE 2, STA. 0+990 - STA. 1+098, ARAKAN, NORTH COTABATO
July 22, 2023 2023 P00734034MN SR2023-06-011477 June 26, 2023 Region XII Regional Office XII
23M00174 CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, STA.49+884.00 - STA. 49+950.23,STA. 49+972.00 -STA. 50+117.35, STA. 51+162.00 - STA. 51+208.90, STA. 51+491.00 - STA. 51+604.09, BANGA-TUPI-MALUNGON, TUPI, SOUTH COTABATO
July 22, 2023 2023 P00706206MN SR2023-01-002476 January 30, 2023 Region XII Regional Office XII
23M00064 PREVENTIVE MAINTENANCE - COTABATO-MARBEL RD, K1724+054 - K1725+452, BANGA, SOUTH COTABATO
July 22, 2023 2023 P00733173MN SR2023-01-002289 January 30, 2023 Region XII Regional Office XII
23M00062 CONSTRUCTION OF CONCRETE ROAD - BLAGAN-DATAL LAGUH SAN JOSE-PAO PAO SINAWAL ROAD CONNECTING TO GENSAN DIVERSION ROAD IN SUPPORT OF THE AGRIBUSINESS INDUSTRY, STA. 0+000 - STA. 0+196, STA. 0+356 - STA. 2+142.9, GENERAL SANTOS CITY, SOUTH COTABATO
July 22, 2023 2023 P00705752MN SR2023-01-002603 January 30, 2023 Region XII Regional Office XII
23M00080 CONSTRUCTION OF MISSING LINKS/NEW ROADS - COLUMBIO - LUTAYAN - KORONADAL ROAD, PACKAGE D, STA.1682+470.00 - STA.1682+520.00 ; STA. 1683+080.00 - STA.1683+147.00, COLUMBIO, SULTAN KUDARAT
July 22, 2023 2023 P00721583MN SR2023-03-006642 March 3, 2023 Region XII Regional Office XII
23M00152 CONSTRUCTION OF MALITUBOG RIVER BANK PROTECTION (DOWNSTREAM OF MALITUBOG BRIDGE, LEFT BANK), STA 0+000 - STA 0+244.56, BARANGAY POBLACION, BANISILAN, NORTH COTABATO
July 22, 2023 2023 P00734168MN SR2023-03-008630 March 27, 2023 Region XII Regional Office XII
23M00214 CONSTRUCTION OF ROAD, BRGY. GUINIBON-BRGY. MALATIMON (PHASE 2), STA 0+000 - STA 0+758, DATU ABDULLAH SANGKI, MAGUINDANAO
July 22, 2023 2023 P00734169MN SR2023-03-008631 March 27, 2023 Region XII Regional Office XII
23M00215 CONSTRUCTION OF ROAD, BRGY. KAKAL TO CROSSING GUINIBON ROAD, DATU ABDULLAH SANGKI, MAGUINDANAO (PHASE 1), STA 0+000 - STA 1+120, DATU ABDULLAH SANGKI, MAGUINDANAO
July 22, 2023 2023 P00734167MN SR2023-03-008629 March 27, 2023 Region XII Regional Office XII
23M00213 CONSTRUCTION OF ROAD IN BRGY. MAITUMAIG TO BRGY. MACALAG, IN THE MUNICIPALITY OF DATU UNSAY, MAGUINDANAO
July 22, 2023 2023 P00734170MN SR2023-01-008632 March 27, 2023 Region XII Regional Office XII
23M00216 "CONSTRUCTION OF TUKANALUGONG TO MALANDING ROAD, STA. 0+000 - STA. 0+755, DATU ABDULLAH SANGKI, MAGUINDANAO "
July 22, 2023 2023 P00721473MN SR2023-01-002623 January 30, 2023 Region XII Regional Office XII
23M00084 CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ALA RIVER ROAD DIKE, PACKAGE B - PHASE 3, STA. 0+000 - STA. 0+600, LAMBAYONG, SULTAN KUDARAT
July 21, 2023 2023 WIN3F07517 FY 2023 GAA February 17, 2023 Region III Regional Office III
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and / or Bridges from the National Road/s leading to Major / Strategic Public Buildings / Facilities

Construction of Road, Barangay Liyang, Pilar to Barangay Bilolo, Orion, Bataan (Package 1)
July 21, 2023 2023 WIN3F07522 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Jose Abad Santos Ave (JASA) - K0109+467 - K0110+000; K0115+600 - K0116+353; K0110+900 - K0111+170
July 17, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 300215102840000
Project ID: P00733875MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of Bugta - Balatakan Road, Buenavista, Agusan del Norte

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Gravel Road

Physical Target:
CW1- 4.440 Lane Km
CW2- 2.440 Lane Km

Allocation:
TOTAL: P 200,000,000
CW1: P 111,693,925
CW2: P 81,306,075
EAO: P 7,000,000

Unit Cost:
CW1: P 25,156,289.41/Lane Km
CW2: P 36,297,354.91/Lane Km

TO:

Construction of Bugta - Balatakan Road, Buenavista, Agusan del Norte

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Gravel Road
CW3- Construction of Road Slope Protection Structure

Physical Target:
CW1- 2.000 Lane Km
CW2- 2.932 Lane Km
CW3- 1,936 Square meters

Allocation:
TOTAL: P 200,000,000
CW1: P 59,864,740
CW2: P 84,797,445
CW3: P 48,337,815
EAO: P 7,000,000

Unit Cost:
CW1: P 29,932,370/Lane Km
CW2: P 28,921,365.96/Lane Km
CW3: P 24,967.88/Square meters
July 14, 2023 2023 WIN3F07478 FY 2023 GAA February 17, 2023 Region III Pampanga 2nd District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road /s leading to Major/Strategic Public Buildings / Facilities

Construction of Bridge including road approaches, Brgy. Jalung, Porac, Pampanga
July 13, 2023 FY 2023 WIN3E02891 310101100860000 April 25, 2023 Region IX Regional Office IX
UACS No. 310101100860000
Project ID: P00707600MN

OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Preventive Maintenance - Primary Roads

Pagadian City-Zamboanga City Rd - K1910 + 832.69 - K1911 + 140.00, K1911 + 160.80 - K1915 + 484.75

CW1- Preventive Maintenance of Road: Asphalt Overlay / 9.26 lane-km
Unit Cost: ₱ 15,631,749.46 /lane-km
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
July 13, 2023 FY 2023 WIN3E02912 310102101178000 April 25, 2023 Region IX Regional Office IX
UACS No. 310102101178000
Project ID: P00707601MN

OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Preventive Maintenance - Secondary Roads

Liloy-Siocon Rd - K1980 + 535.69 - K1984 + 575.75

CW1- Preventive Maintenance of Road: Asphalt Overlay / 8.080 lane-km
Unit Cost: ₱ 17,765,315.59 /lane-km
EAO: ₱ 5,206,250.00
Allocation: ₱ 148,750,000.00
July 13, 2023 FY 2023 WIN3E02913 310107100488000 April 25, 2023 Region IX Regional Office IX
UACS No. 310107100488000
Project ID: P00707606MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Pagadian City-Zamboanga City Rd - K1878 + 550.00 - K1878 + 610.00

CW1- Construction of Road Slope Protection Structure/ 4,546.00 sq. m.
Unit Cost: ₱ 31,841.18/sq. m.
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
July 13, 2023 FY 2023 WIN3E02987 310107100489000 May 8, 2023 Region IX Regional Office IX
UACS No. 310107100489000
Project ID: P00707607MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Pagadian City-Zamboanga City Rd - Package 2, K1871 + 020 - K1871 + 060.00

CW1- Construction of Road Slope Protection Structure/ 4,503.00
sq. m.
Unit Cost: ₱ 32,145.24 /sq. m.
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
July 13, 2023 FY 2023 WIN3E03025 310107100490000 May 8, 2023 Region IX Regional Office IX
UACS No. 310107100490000
Project ID: P00707608MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Pagadian City-Zamboanga City Rd - Package 3, K1858+940.00 - K1858+960.00, K1859+170.00 – K1859+200.00, K1860+120.00 – K1860+300.00, K1860+487.01 – K1860+520.00

CW1- Construction of Road Slope Protection Structure/ 4,537.00 sq. m.
Unit Cost: ₱ 31,904.34 /sq. m.
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00

July 13, 2023 FY 2023 WIN3E02989 310107100491000 April 25, 2023 Region IX Regional Office IX
UACS No. 310107100491000
Project ID: P00707609MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads


Pagadian City-Zamboanga City Rd - K1868 + 400 - K1868 + 540, K1868 + 560 – K1868 + 672.82

CW1- Construction of Road Slope Protection Structure/ 3,627.00 sq. m.
Unit Cost: ₱ 31,927.21 /sq. m.
EAO: ₱ 4,200,000.00
Allocation: ₱ 120,000,000.00
July 13, 2023 FY 2023 WIN3E02980 310107100492000 April 25, 2023 Region IX Regional Office IX
UACS No. 310107100492000
Project ID: P00707610MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Pagadian City-Zamboanga City Rd - K1869 + 037.04 - K1869 + 140.00

CW1- Construction of Road Slope Protection Structure/ 3,627.00
sq. m.
Unit Cost: ₱ 31,927.21 /sq. m.
EAO: ₱ 4,200,000.00
Allocation: ₱ 120,000,000.00
July 13, 2023 2023 P00706063MN SR2023-01-002024 January 30, 2023 Region XII Regional Office XII
23M00092-PREVENTIVE MAINTENANCE - COTABATO-LANAO RD, K1882+424- K1882+860, K1882+880 - K1883+260, PARANG, MAGUINDANAO DEL NORTE
July 13, 2023 2023 P00706531MN SR2023-01-00681 January 30, 2023 Region XII Regional Office XII
23M00013-CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - KIDAPAWAN-MAGPET-PANGAOAN RD, K1630+760.00 - K1630+857.3, MAGPET, NORTH COTABATO
July 13, 2023 2023 P007055753MN SR2023-01-002607 January 30, 2023 Region XII Regional Office XII
23M00081-CONSTRUCTION OF MISSING LINKS/NEW ROADS - DATU PAGLAS - COLUMBIO - MATANAO ROAD, STA. 0+000 - STA. 0+030, STA. 0+095 - STA. 0+185, STA. 4+585 - STA. 4+630, COLUMBIO, SULTAN KUDARAT
July 13, 2023 2023 P00706202MN SR2023-01-001321 January 30, 2023 Region XII Regional Office XII
23M00026-PREVENTIVE MAINTENANCE - DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT) - K1639+000-K1639+780, K1639+780-K1640+288, MATALAM, NORTH COTABATO