August 11, 2021 |
FY 2021 GAA |
WIN1E02729 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction Flood Mitigation Structure protecting Daang Maharlika (MN) at Brgy. Bunawan, Davao City
Physical Target:
CW1: 300.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Flood Mitigation Structure)
EAO: P 500,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction Flood Mitigation Structure protecting Daang Maharlika (MN) at Brgy. Bunawan, Davao City
Physical Target:
CW1: 209.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Flood Mitigation Structure)
EAO: P 500,000.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02744 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basin and Principal Rivers
Construction of Revetment along Talomo River, Sta. 3+800 to Sta. 4+060, Left Bank, Davao City
Physical Target:
CW1: 260.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 67,800,000.00
CW1: P 65,427,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,373,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basin and Principal Rivers
Construction of Revetment along Talomo River, Sta. 3+747 to Sta. 3+952, Left Bank, Davao City
Physical Target:
CW1: 205.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 67,800,000.00
CW1: P 65,427,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,373,000.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02726 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Talomo River, Sta. 3+542 to Sta. 3+880, Right Bank, Davao City
Physical Target:
CW1: 338.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 92,000,000.00
CW1: P 88,780,000.00 (Construction of Revetment)
EAO: P 3,220,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Talomo River, Sta. 3+542 to Sta. 3+817, Right Bank, Davao City
Physical Target:
CW1: 275.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 92,000,000.00
CW1: P 88,780,000.00 (Construction of Revetment)
EAO: P 3,220,000.00 |
August 10, 2021 |
CY 2021 |
WIN1F06627 |
UACS No. 300104219166000 |
February 8, 2021 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As per GAA/Original
UACS No. 300104219166000
Project ID.: P00557335LZ
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building (Covered Court), San Dionisio Village, Barangay San Dionisio,
Parañaque City, Metro Manila
Physical Target: CW1 = Construction of Multi-Purpose Building 1 bldg.
Unit Cost (P’000) = P 4,950.00 / No. of Bldg.
Allocation (P’000) = P 4,950.00
EAO (P’000) = P 50.00
Total (P’000) = P 5,000.00
As Modified
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building (Covered Court), San Dionisio Village, Brgy. San Isidro,
Parañaque City, Metro Manila
Physical Target: CW1 = Construction of Multi-Purpose Building 1 bldg.
Unit Cost (P’000) = P 4,950.00 / No. of Bldg.
Allocation (P’000) = P 4,950.00
EAO (P’000) = P 50.00
Total (P’000) = P 5,000.00
WIN1F06627
|
August 10, 2021 |
CY 2021 |
WIN1F06633 |
300104213662000 |
August 13, 2020 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
UACS No. 300104226574000
Project ID.: P00557336LZ
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of a New Hall of Justice (Phase 2) in Caloocan City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost (P’000) = P 16,434.00 / No. of Bldg.
Allocation (P’000) = P 16,434.00
EAO (P’000) = P 166.00
Total (P’000) = P 16,600.00
As Modified
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of New Hall of Justice, Caloocan City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost (P’000) = P 16,434.00 / No. of Bldg.
Allocation (P’000) = P 16,434.00
EAO (P’000) = P 166.00
Total (P’000) = P 16,600.00
WIN1F06633
|
August 10, 2021 |
CY 2021 |
WIN1F06634 |
UACS No. 300104226573000 |
April 7, 2021 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300104226573000
Project ID.: P00557364LZ
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of a New Hall of Justice (Phase 4) in Caloocan City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost (P’000) = P 12,325.50 / No. of Bldg.
Allocation (P’000) = P 12,325.50
EAO (P’000) = P 124.50
Total (P’000) = P 12,450.00
As Modified
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of a New Hall of Justice (Phase 1), Caloocan City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost (P’000) = P 12,325.50 / No. of Bldg.
Allocation (P’000) = P 12,325.50
EAO (P’000) = P 124.50
Total (P’000) = P 12,450.00
WIN1F06634
|
August 10, 2021 |
CY 2021 |
WIN1F06630 |
UACS No. 300104226572000 |
April 7, 2021 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300104226572000
Project ID.: P00557336LZ
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of a New Hall of Justice (Phase 3) in Caloocan City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost (P’000) = P 12,325.50 / No. of Bldg.
Allocation (P’000) = P 12,325.50
EAO (P’000) = P 124.50
Total (P’000) = P 12,450.00
As Modified
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of a New Hall of Justice in Caloocan City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost (P’000) = P 12,325.50 / No. of Bldg.
Allocation (P’000) = P 12,325.50
EAO (P’000) = P 124.50
Total (P’000) = P 12,450.00
WIN1F06630
|
August 10, 2021 |
2021 |
WIN1C04342 |
GAA 2021 |
June 19, 2021 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0481 + 710 - K0481 + 780;
Physical Target: CW1: 6,000 Square meters;
Allocation= Php 100,000,000
To: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0481 + 905 - K0481 + 949;
Physical Target: CW1: 5,148.18 Square meters;
Allocation= Php 100,000,000
|
August 10, 2021 |
2021 |
WIN1C04415 |
GAA 2021 |
August 2, 2021 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Tabuk-Banawe via Tanudan-Barlig Rd - K0513 + 427 - K0513 + 443, K0520 + 863 - K0520 + 893, K0523 + 032 - K0523 + 121, K0523 + 604 - K0523 + 608, K0523 + 611 - K0523 + 620, K0523 + 958 - K0523 + 1008, K0524 + 846 - K0524 + 899, K0525 + 151 - K0525 + 234, K0525 + 658 - K0525 + 998, K0533 + 720 - K0533 + 765;
Physical Target: CW1: 2,549.4 Square meters;
Allocation= Php 28,542,000
To: Tabuk-Banawe via Tanudan-Barlig Rd - K0513 + 427 - K0513 + 443, K0520 + 863 - K0520 + 893, K0522 + 670 - K0522 + 695, K0523 + 604 - K0523 + 608, K0523 + 611 - K0523 + 620, K0523 + 870 - K0523 + 895, K0523 + 958 - K0523 + 1008, K0524 + 846 - K0524 + 899, K0525 + 160 - K0525 + 320;
Physical Target: CW1: 1,818 Square meters;
Allocation= Php 28,542,000
|
August 9, 2021 |
2021 |
WIN1F06648 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Construction of Road Slope Protection Structure – Villaba-Palompon Rd. K1059+(-523) – K1059+ (-461), K1060+350 –K1060+400, K1061+(-080)
– K1061+000, K1062+(-077) – K1062+072, K1062+128 – K1062+269
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 4,556.305 Square Meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Construction of Road Slope Protection Structure – Villaba-Palompon Rd K1059+(-566.2) – K1059+(-460), K1060+295 – K1060+365, K1061+(-116) – K1061+000, K1062+(-048) – K1062+087, K1062+128 – K1062+269
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 4,556.305 Square Meters
EAO P 1.00 M
Total P 50.00 M
|
August 9, 2021 |
2021 |
WIN1F06589 |
GAA FY 2021 |
January 25, 2021 |
Region VIII |
Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Calbayog-Catarman Rd - K0809 + 686 - K0809 + 801
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 3,333.333 Square Meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Calbayog-Catarman Rd - K0809 + 645 - K0809 + 801
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 30.20 M
Structure: 2,897.20 Square Meters
CW2-Road Widening: 0.312 Lane Km P 7.20 M
CW3-Off-Carriageway Improvement: Shoulder P 6.70 M
Paving/Construction:
: 1,606.80 Square Meters
ROW-ROW Acquisition: 1,606.80 Square Meters P 5.00 M
EAO P 0.900 M
Total P 50.00 M
|
August 9, 2021 |
2021 |
WIN1G02972 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. : 300203101450000
Project ID: P00537675MN
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
NRJ Sitio Cansoan - Ganayon leading to White Sand Beach, Lianga, Surigao del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 8.746 Lane Km
Allocation:
TOTAL: P 131,190,000
CW1: P 126,598,350
EAO: P 4,591,650
Unit Cost:
CW1: P 14,475,000/Lane Km
TO:
NRJ Sitio Cansoan - Ganayon leading to White Sand Beach, Lianga, Surigao del Sur
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Gravel Road
CW3- Construction of Concrete Bridge
Physical Target:
CW1- 0.760 Lane Km
CW2- 1.44 Lane Km
CW3- 572.40 Square meters
Allocation:
TOTAL: P 131,190,000
CW1- P 33,480,315.45
CW2- P 7,802,641.26
CW3- P 85,315,393.29
EAO: P 4,591,650
Unit Cost:
CW1- P 44,053,046.64/Lane Km
CW2- P 5,418,500.875/Lane Km
CW3- P 149,048.56/Square meters
|
August 9, 2021 |
2021 |
WIN1E02635 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. : 310204101270000
Project ID: P00502138MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
FROM:
Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section), Butuan City
Type of Work:
CW1- Construction of Concrete Bridge
CW2- Construction of Concrete Road
Physical Target:
CW1- 421.500 Square meters
CW2- 2.650 Lane Km
Allocation:
TOTAL: P 103,000,000
CW1: P 48,250,000
CW2: P 51,145,000
EAO: P 3,605,000
Unit Cost:
CW1: P 114,472.12/Square meters
CW2: P 19,300,000/Lane Km
TO:
Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section), Butuan City
Type of Work:
CW1- Construction of Steel Bridge
Physical Target:
CW1- 1,391.7 Square meters
Allocation:
TOTAL: P 103,000,000
CW1: P 99,395,000
EAO: P 3,605,000
Unit Cost:
CW1: P 71,419.85/Square meters
|
August 9, 2021 |
2021 |
310109100535000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable national Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Nueva Vizcaya - Benguet Road, Sta. K0260 +675 - K0260 +805 |
August 9, 2021 |
FY 2021 GAA |
WIN1E02678 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Asset Preservation - Primary Roads
Daang Maharlika (MN) -
K1392+933 - K1393+022, K1412+702 - K1413+000,
K1424+000 - K1424+700, K1425+759 - K1425+908,
K1428+000 - K1428+290, K1431+000 - K1431+585
Physical Target:
CW1: 8.371 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 54,001,000.00
CW1: P 52,110,965.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,890,035.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Asset Preservation - Primary Roads
Daang Maharlika (MN) - K1392+961 - K1394+561
Physical Target:
CW1: 9.600 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 54,001,000.00
CW1: P 52,110,965.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,890,035.00 |
August 6, 2021 |
2021 |
WIN1E02511 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Surigao del Norte 1st District Engineering Office |
UACS No. : 310109100577000
Project ID: P00501911MN
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
FROM:
Jct Osmeña-Pilar Rd - K0019 + 000 - K0019 + 490
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 7,300.00 Square meters
Allocation:
TOTAL: P 73,000,000
CW1: P 70,445,000
EAO: P 2,555,000
Unit Cost:
CW1: P 9,650/Square meters
TO:
Jct Osmeña-Pilar Rd - K0019 + 632 - K0019 + 840
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 3,874.30 Square meters
Allocation:
TOTAL: P 73,000,000
CW1: P 70,445,000
EAO: P 2,555,000
Unit Cost:
CW1: P 18,182.64/Square meters |
August 6, 2021 |
2021 |
WIN1E02505 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. : 310108100756000
Project ID: P00502026MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
FROM:
Surigao-Davao Coastal Rd - K1180 + 150 - K1180 + 400
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 3,125.00 Square meters
Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000
Unit Cost:
CW1: P 15,680/Square meters
TO:
Surigao-Davao Coastal Rd - K1180 + 150 - K1180 + 180, K1180 + 226.225 – K1180 + 400, K1182 + 150 – K1182 + 290, K1196 + 180 – K1196 + 334.06, K1196 + 540 – K1196 + 660
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 4,010.83 Square meters
Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000
Unit Cost:
CW1: P 12,216.92/Square meters |
August 6, 2021 |
2021 |
WIN1G02963 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 300111200351000
Project ID: P00550590MN
Local Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Rehabilitation of Road along NRJ Bayugan-Calaitan-Tandag Rd, Bayugan, Agusan del Sur
Type of Work:
CW1- Rehabilitation of Concrete Road
Physical Target:
CW1- 9.406 Lane Km
Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000
Unit Cost:
CW1: P 10,259,408.89 / Lane Km
TO:
Rehabilitation of Road along NRJ Bayugan-Calaitan-Tandag Rd, Bayugan, Agusan del Sur
Type of Work:
CW1- Rehabilitation of Concrete Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 1.131 Lane Km
CW2- 7,836.4 Square meters
Allocation:
TOTAL: P 100,000,000
CW1: P 17,055,016
CW2: P 79,444,984
EAO: P 3,500,000
Unit Cost:
CW1: P 15,079,589.74 / Lane Km
CW2: P 10,137.944 / Square meters
|
August 6, 2021 |
2021 |
WIN1E02580 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Dinagat Islands District Engineering Office |
UACS No. : 300116204617000
Project ID: P00550967MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Concreting of Barangay Road, Brgy. Nazareth, Basilisa, Dinagat Islands
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.40 Lane Km
Allocation:
TOTAL: P 5,000,000
CW1: P 4,900,000
EAO: P 100,000
Unit Cost:
CW1: P 12,250,000/Lane Km
TO:
Concreting of Barangay Road, Brgy. Nazareth, Basilisa, Dinagat Islands
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.716 Lane Km
Allocation:
TOTAL: P 5,000,000
CW1: P 4,900,000
EAO: P 100,000
Unit Cost:
CW1: P 6,843,575.42/Lane Km |
August 6, 2021 |
2021 |
WIN1E02574 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Dinagat Islands District Engineering Office |
UACS No. : 300116204619000
Project ID: P00550969MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Construction of Road, Santiago to Cambinliw (Purok 3 to Bag-ao Village to Barangay Gym), Sitio Cambinliw-Barangay Santiago, Loreto, Dinagat Islands
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.96 Lane Km
Allocation:
TOTAL: P 12,000,000
CW1: P 11,760,000
EAO: P 240,000
Unit Cost:
CW1: P 12,250,000/Lane Km
TO:
Construction of Road, Santiago to Cambinliw (Purok 3 to Bag-ao Village to Barangay Gym), Sitio Cambinliw-Barangay Santiago, Loreto, Dinagat Islands
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 2.60 Lane Km
Allocation:
TOTAL: P 12,000,000
CW1: P 11,760,000
EAO: P 240,000
Unit Cost:
CW1: P 4,523,076.92/Lane Km |
August 6, 2021 |
2021 |
WIN1E02613 |
FY 2021 GAA RA 11518 |
January 21, 2021 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 320101106329000
Project ID: P00522130MN
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Revetment along Agusan River Basin, San Luis Bridge Approaches, Agusan del Sur
Type of Work:
CW1- Construction of Revetment
Physical Target:
CW1- 376.578 Lineal meters
Allocation:
TOTAL: P 47,697,000
CW1: P 46,027,605
EAO: P 1,669,395
Unit Cost:
CW1: P 122,225.95/Lineal meter
TO:
Construction of Revetment along Agusan River Basin, San Luis Bridge Approaches, Agusan del Sur
Type of Work:
CW1- Construction of Revetment
Physical Target:
CW1- 140 Lineal meters
Allocation:
TOTAL: P 47,697,000
CW1: P 46,027,605
EAO: P 1,669,395
Unit Cost:
CW1: P 328,768.61/Lineal meter |
August 6, 2021 |
2021 |
WIN1G02971 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Dinagat Islands District Engineering Office |
UACS No. : 310111100336000
Project ID: P00501691MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
FROM:
Dinagat-Loreto Rd - K0001 + 164 - K0001 + 292, K0003 + 210 - K0003 + 230, K0004 + 410 - K0004 + 747, K0005 + 589 - K0005 + 689, K0007 + 141 - K0007 + 142, K0007 + 158 - K0007 + 181, K0008 + 303 - K0008 + 409, K0013 + 263 - K0013 + 426
Type of Work:
CW1- Construction of Drainage Structure along Road
Physical Target:
CW1- 1,756.000 Lineal meters
Allocation:
TOTAL: P 25,037,000
CW1: P 24,536,260
EAO: P 500,740
Unit Cost:
CW1: P 13,972.81/Lineal meter
TO:
Dinagat-Loreto Rd - K0003 + 205 - K0003 + 221, K0004 + 160 - K0004 + 296, K0004 + 400 - K0004 + 747, K0006 + 203 - K0006 + 582, K0006 + 374 - K0006 + 451, K0009 + 447 - K0009 + 812, K0010 + 000 - K0010 + 408, K0010 + 447 - K0010 + 531, K0011 + 394 - K0011 + 731, K0021 + 118 - K0021 + 156, K0030 + 000 - K0030 + 431, K0032 + 585 - K0032 + 970, K0036 + 000 - K0036 + 073, K0037 + 291 - K0037 + 822, K0037 + 650 - K0037 + 861, K0057 + 349 - K0057 + 530, K0057 + 531 - K0057 + 793, K0061 + 072 - K0061 + 082
Type of Work:
CW1- Construction of Drainage Structure along Road
Physical Target:
CW1- 4,271.00 Lineal meters
Allocation:
TOTAL: P 25,037,000
CW1: P 24,536,260
EAO: P 500,740
Unit Cost:
CW1: P 5,744.85/Lineal meter
|
August 6, 2021 |
2021 |
WIN1C04424 |
GAA 2021 |
August 3, 2021 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: Construction of Slope Protection along Kalinga-Abra Road(Balbalan Section), KO494+000-KO494+150, Balbalan, Kalinga;
Physical Target: CW1: 2,848.6 Square meters;
Allocation= Php 55,000,000
To: Construction of Slope Protection along Kalinga-Abra Road(Balbalan Section), KO494+070-KO494+133.5, Balbalan, Kalinga;
Physical Target: CW1: 2,823.05 Square meters;
Allocation= Php 55,000,000
|
August 6, 2021 |
2021 |
WIN1C04426 |
GAA 2021 |
August 3, 2021 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Construction of Bulalacao Flood Control Sta. 1+149 - Sta. 1+389 (L.S.), Mankayan, Benguet;
Physical Target: CW1: 320 Lineal meters;
Allocation= Php 10,000,000
To: Construction of Bulalacao Flood Control Sta. 1+149 - Sta. 1+511 (B.S.), Mankayan, Benguet;
Physical Target: CW1: 320 Lineal meters;
Allocation= Php 10,000,000
|
August 6, 2021 |
2021 |
WIN1C04433 |
GAA 2021 |
August 3, 2021 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Construction of Road Slope Protection Project along Governor Bado Dangwa National Road at Ambalideng, Poblacion, Kibungan, Benguet, K0316+050 - K0316+150;
Physical Target: CW1: 1500 Square meter;
Allocation= Php 40,000,000
To: Construction of Road Slope Protection Project along Governor Bado Dangwa National Road at Ambalideng, Poblacion, Kibungan, Benguet, K0317+483 - K0317+670;
Physical Target: CW1: 2009.9 Square meter;
Allocation= Php 40,000,000
|
August 6, 2021 |
2021 |
WIN1C04432 |
GAA 2021 |
August 3, 2021 |
Cordillera Administrative Region |
Baguio City District Engineering Office |
From: Leonard Wood Rd (S00411LZ) – K0250 + (-404) – K0250 + (-344), K0250 + (-202) – K0250 + (-116), K0250 +110 – K0250 + 170;
Type of Work: Off-Carriageway Improvement: Construction of Laybys;
Physical Target: CW1: 3 No. of laybys;
Allocation= Php 22,250,000
To: Leonard Wood Rd (S00411LZ) – K0250+170 – K0251+416, (S00482LZ) – Chainage 000 – Chainage 169, (S00412LZ) –K0252 + 019 – K0252 + 213 ;
Type of Work: Off-Carriageway Improvement: Shoulder Paving;
Physical Target: CW1: 3,343 Square meters;
Allocation= Php 22,250,000
|
August 6, 2021 |
2021 |
WIN1C04431 |
GAA 2021 |
August 3, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Cervantes Rd - K0453 + 769 - K0459 + 000, K0462 + 260 - K0463 + 000, K0475 + 703 - K0477 + 500;
Physical Target: CW1: 30 Lane Km;
Allocation= Php 50,000,000
To: Abra-Cervantes Rd - K0456 + (-303) - K0459 + 000, K0462 + 260 - K0463 + 000, K0475 + 703 - K0477 + 187.30;
Physical Target: CW1: 11.0546 Lane Km;
Allocation= Php 50,000,000
|
August 6, 2021 |
2021 |
WIN1C04389 |
GAA 2021 |
August 3, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Mt Prov-Ilocos Sur via Tue Rd - K0387 + (-081) - K0387 + 200;
Physical Target: CW1 : 3,884 Square meters;
Allocation= Php 100,000,000
To: Mt Prov-Ilocos Sur via Tue Rd - K0387 + (-061) - K0387 + 010;
Physical Target: CW1 : 4,252.5 Square meters;
Allocation= Php 100,000,000
|
August 6, 2021 |
2021 |
WIN1C04434 |
GAA 2021 |
August 3, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Baguio-Bontoc Rd - K0294 + 381 - K0294 + 638, K0302 + 180 - K0302 + 300, K0314 + 104 - K0314 + 170;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 200,000,000
To: Baguio-Bontoc Rd - K0302 + 180 - K0302 + 300, K0314 + 104 - K0314 + 170;
Physical Target: CW1 : 8,216 Square meters;
Allocation= Php 200,000,000
|
August 6, 2021 |
2021 |
WIN1C04418 |
GAA 2021 |
August 3, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Mt Prov-Cagayan via Tabuk-Enrile Rd - K0418 + 050 - K0418 + 300;
Physical Target: CW1 : 3,910 Square meters;
Allocation= Php 100,000,000
To: Mt Prov-Cagayan via Tabuk-Enrile Rd - K0416 + 110 - K0416 + 190;
Physical Target: CW1 : 3,992 Square meters;
Allocation= Php 100,000,000
|
August 5, 2021 |
FY 2021 GAA |
WIN1F06375 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300202100181000
Project ID : P00534525LZ
Convergence and Special Support Program
Convergence and Special Support - Construction/Improvement
of Access Roads leading to Seaports
FROM :
Construction of Macalas - Sawang National Road,
Cross Country Road leading to Romblon Port
Physical Target - CW1 - Construction of Concrete Road :
6.600 Lane Km
Allocation : Php 100.00 Million
TO :
Construction of Macalas - Sawang National Road,
Cross Country Road leading to Romblon Port
Physical Target - CW1 - Construction of Concrete Road :
2.016 Lane Km
- CW2 - Construction of Gravel Road :
2.25984 Lane Km
Allocation : Php 100.00 Million
|
August 5, 2021 |
FY 2021 GAA |
WIN1F06272 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300109200957000
Project ID : P00561404LZ
LOCAL PROGRAM
Local - Flood Control and Drainage - Drainage/Protection Works -
Local Infrastructure Program
FROM :
Construction of Flood Control Structure along
Sitio Agnaga (Ibaba), Bachawan, San Agustin, Romblon
Physical Target - CW1 - Construction of Flood Mitigation
Structure : 95.272 Lineal Meters
Allocation : Php 10.00 Million
TO :
Construction of Flood Control Structure along
Sitio Agnaga (Ibaba), Bachawan, San Agustin, Romblon
Physical Target - CW1 - Construction of Flood Control Mitigation
Structure : 69.30 Lineal Meters
Allocation : Php 10.00 Millionm
|
August 5, 2021 |
FY 2021 GAA |
WIN1F06376 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300111200359000
Project ID : P00561861LZ
LOCAL PROGRAM
Local - National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Construction of Odiongan - Alcantara National Road,
Cross Country Road leading to Tugdan Airport (Phase 3),
Odiongan, Occidental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.700 Lane Km
Allocation : Php 30.00 Million
TO :
Construction of Odiongan - Alcantara National Road,
Cross Country Road leading to Tugdan Airport (Phase 3),
Odiongan, Romblon
Physical Target - CW1 - Construction of Concrete Road :
1.120 Lane Km
Allocation : Php 30.00 Million
|
August 5, 2021 |
FY 2021 GAA |
WIN1F06412 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204188000
Project ID : P00562449LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Brgy. Bethel, Victoria, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.374 Lane Km
Allocation : Php 2.00 Million
TO :
Concreting of Road,
Brgy. Bethel, Victoria, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.426 Lane Km
Allocation : Php 2.00 Million |
August 5, 2021 |
FY 2021 GAA |
WIN1E02667 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1636+624 - K1636+671
Physical Target:
CW1: 3,400.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 34,000,000.00
CW1: P 33,320,000.00 (Construction of Road Slope Protection Structure)
EAO: P 680,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1636+624 - K1636+671
Physical Target:
CW1: 3,400.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 34,000,000.00
CW1: P 33,320,000.00 (Construction of Road Slope Protection Structure)
EAO: P 680,000.00 |
August 5, 2021 |
FY 2021 GAA |
WIN1E02649 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Jct. Davao-Bukidnon Road (Calinan Section) - Wangan - Subasta - Tagakpan - Tungkalan - Taguranno - Bayabas - Catigan - Baracatan - Sibulan - Tibolo - Kapatagan Road (Package A)
Physical Target:
CW1: 2.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Jct. Davao-Bukidnon Road (Calinan Section) - Wangan - Subasta - Tagakpan - Tungkalan - Taguranno - Bayabas - Catigan - Baracatan - Sibulan - Tibolo - Kapatagan Road (Package A)
Physical Target:
CW1: 4.637 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Reconstruction to Concrete Pavement)
EAO: P 3,500,000.00 |
August 5, 2021 |
FY 2021 GAA |
WIN1E02627 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Bypass Road at MAA Radio Station-Datu Loho St.-Riverside - Jct. Bacaca Road, Barangay Maa and Barangay 19-B, Davao City
Physical Target:
CW1: 18.196 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 318,427,000.00
CW1: P 307,282,055.00 (Reconstruction to Concrete Pavement)
EAO: P 11,144,945.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Bypass Road at MAA Radio Station-Datu Loho St.-Riverside - Jct. Bacaca Road, Barangay Maa and Barangay 19-B, Davao City
Physical Target:
CW1: 5.927 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 318,427,000.00
CW1: P 100,360,000.00 (Reconstruction to Concrete Pavement)
EAO: P 3,640,000.00
EXC: P 214,427,000.00 |
August 5, 2021 |
FY 2021 GAA |
WIN1E02697 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1498+624 - K1499+822
Physical Target:
CW1: 2.395 lane km (Road Widening)
Allocation:
TOTAL: P 33,500,000.00
CW1: P 32,830,000.00 (Road Widening)
EAO: P 670,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1498+950 - K1500+000
Physical Target:
CW1: 2.100 lane km (Road Widening)
ROW: 21,000.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 33,500,000.00
CW1: P 31,330,000.00 (Road Widening)
ROW: P 1,500,000.00 (ROW Acquisition)
EAO: P 670,000.00 |
August 5, 2021 |
FY 2021 GAA |
WIN1E02605 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Road, Sitio Ayagon, Brgy. Lumiad to Sitio Salukadang, Brgy. Mapula, Paquibato District, Davao City
Physical Target:
CW1: 3.692 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 36,910,000.00
CW1: P 36,171,800.00 (Construction of Concrete Road)
EAO: P 738,200.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Road, Sitio Ayagon, Brgy. Lumiad to Sitio Salukadang, Brgy. Mapula, Paquibato District, Davao City
Physical Target:
CW1: 1.350 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 36,910,000.00
CW1: P 36,171,800.00 (Construction of Gravel Road)
EAO: P 738,200.00 |
August 5, 2021 |
FY 2021 GAA |
WIN1E02674 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd - K1502+667 - K1502+840,
K1502+886 - K1503+000, K1503+212 - K1503+363
Physical Target:
CW1: 12,825.000 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 75,029,000.00
CW1: P 72,402,985.00 (Construction of Road Slope Protection Structure)
EAO: P 2,626,015.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd -
K1501+880 - K1504+920, K1505+029 - K1505+092
Physical Target:
CW1: 3,552.660 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 75,029,000.00
CW1: P 72,402,985.00 (Construction of Road Slope Protection Structure)
EAO: P 2,626,015.00 |
August 4, 2021 |
FY 2021 GAA |
WIN1G02995 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) -
K1379+000 - K1379+411, K1380+686 - K1380+786,
K1381+693 - K1382+072, K1386+669 - K1387+944,
K1390+000 - K1390+244, K1390+1010 - K1391+158
Physical Target:
CW1: 9.482 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 74,265,000.00
CW1: P 74,599,275.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,599,275.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) -
K1399+977 - K1401+776, K1412+745 - K1413+564
Physical Target:
CW1: 12.140 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 74,265,000.00
CW1: P 74,599,275.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,599,275.00 |
August 4, 2021 |
FY 2021 GAA |
WIN1G02994 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Surigao-Davao Coastal Rd - K1788+819 - K1790+121
Physical Target:
CW1: 2.598 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 25,224,000.00
CW1: P 24,719,520.00 (Reconstruction to Concrete Pavement)
EAO: P 504,480.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Surigao-Davao Coastal Rd - K1788+420 - K1789+170
Physical Target:
CW1: 2.960 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 25,224,000.00
CW1: P 24,719,520.00 (Reconstruction to Concrete Pavement)
EAO: P 504,480.00 |
August 4, 2021 |
2021 |
WIN1C04246 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Regional Office III |
Asset Preservation - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Nueva Ecija - Aurora Rd - K0166+850 - K0166+950
|
August 4, 2021 |
2021 |
WIN1C04181 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bataan 2nd District Engineering Office |
Convergence and Special Support Program - Construction / Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
Access Road Leading to Mt. Samat Shrine of Valor, Brgy. Diwa, Pilar, Bataan |
August 4, 2021 |
2021 |
WIN1C04094 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bataan 2nd District Engineering Office |
Network Development - Road Widening - Secondary Roads
Jct Layac - Balanga - Mariveles Port Rd - K0159+120 - K0160+032 |
August 4, 2021 |
FY 2021 GAA |
WIN1F06388 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No. : 310108100637000
Project ID : P00505924LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
FROM :
Aramaywan - BVerong - Puerto Princesa South Road,
K0232 + 077 - K0232 + 179,
K0232 + 210 - K0232 + 330
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1128.0 Square Meters
Allocation : Php 22.20 Million
TO :
Aramaywan - Berong - Puerto Princesa South Road,
K0222 + 560 - K0222 + 660,
K0232 + 077 - K0232 + 179,
K0232 + 210 - K0232 + 330
Physical Target - CW1 - Construction of Road Slope Protection
Sreucture 1129.4 Square meters
Allocation : Php 22.20 Million |
August 4, 2021 |
2021 |
WIN1C04189 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation - Preventive Maintenance - Tertiary Roads
Bahay Pare - Sn Luis - Sto. Domingo Rd - K0068+425 - K0068+945 |
August 4, 2021 |
2021 |
WIN1C04255 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Zambales 1st District Engineering Office |
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection along Olongapo - Bugallon Road, Pagolingan Section, Palauig, Zambales
|
August 4, 2021 |
2021 |
WIN1C04373 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Zambales 1st District Engineering Office |
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection / Flood Control, Bangan Seawall, Sta. 0+455 - Sta. 0+929, Botolan, Zambales |
August 4, 2021 |
2021 |
WIN1C03993 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Olongapo - Bugallon Rd - K0248+570 - K0249+100
|
August 4, 2021 |
2021 |
WIN1C03982 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Olongapo - Bugallon Road - K0228+640 - K0230+560 |
August 4, 2021 |
FY 2021 GAA |
WIN1F06389 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No. : 300211100136000
Project ID : P00534709LZ
Convergence and Special Support Program
Special Road Fund - Motor Vehicle User's Charge (MVUC)
as per R.A. 11239
FROM :
Asphalt overlay along Puerto Princesa South Road,
K0003 + (-292) - K0006 + 000,
Puerto Princesa City
Physical Target - CW1 - Preventive maintenance of Road :
Asphalt Overlay - 3.90 Lane Km
Allocation : Php 30.00 Million
TO :
Asphalt Overlay along Puerto Princesa South Road,
K0003 + (-292) - K0003 + 683
Puerto Princesa City
Physical Target - CW1 - Preventive maintenance of Road :
Asphalt Overlay - 3.90 Lane Km
Allocation : Php 30.00 Million
|
August 4, 2021 |
FY 2021 GAA |
WIN1B01167 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 310111100304000
Project ID : P00505361LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along National Roads - Secondary Roads
FROM :
Tablas Circumferential Road,
K0125 + 000 - K0126 + 100
Physical Target - CW1 - Construction of Drainage Structure
along Road : 2,216.0 Lineal meters
Allocation : Php 26.289 Million
TO :
Tablas Circumferential Road
K0125 + 320 - K0126 + 732
Physical Target - CW1 - Construction of Drainage Structure
along Road : 1,420.0 Lineal meters
Allocation : Php 26.289 Million |
August 4, 2021 |
FY 2021 GAA |
WIN1G02979 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Daang Maharlika (MN) - K1444+500 - K1445+800
Physical Target:
CW1: 2.600 lane km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Road Widening)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Daang Maharlika (MN) -
K1439+835 - K1440+399, K1444+500 - K1444+988
Physical Target:
CW1: 2.113 lane km (Road Widening)
ROW: 21,130.000 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 46,500,000.00 (Road Widening)
ROW: P 2,500,000.00 (ROW Acquisition)
EAO: P 1,000,000.00 |
August 4, 2021 |
FY 2021 GAA |
WIN1E02675 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd - K1481+000 - K1483+000
Physical Target:
CW1: 3.972 lane km (Road Widening)
Allocation:
TOTAL: P 54,650,000.00
CW1: P 52,737,250.00 (Road Widening)
EAO: P 1,912,750.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd - K1481+955 - K1483+605
Physical Target:
CW1: 3.272 lane km (Road Widening)
ROW: 32,720.000 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 54,650,000.00
CW1: P 47,737,250.00 (Road Widening)
ROW: P 5,000,000.00 (ROW Acquisition)
EAO: P 1,912,750.00 |
August 4, 2021 |
FY 2021 GAA |
WIN1E02683 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Montevista-Compostela-Mati Bdry Rd - K1490+422 - K1490+902
Physical Target:
CW1: 0.960 lane km (Road Widening)
Allocation:
TOTAL: P 16,400,000.00
CW1: P 16,072,000.00 (Road Widening)
EAO: P 328,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Montevista-Compostela-Mati Bdry Rd - K1490+422 - K1490+902
Physical Target:
CW1: 3.272 lane km (Road Widening)
ROW: 32,720.000 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 54,650,000.00
CW1: P 14,072,000.00 (Road Widening)
ROW: P 2,000,000.00 (ROW Acquisition)
EAO: P 328,000.00 |
August 4, 2021 |
FY 2021 GAA |
WIN1F06348 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 310102100692000
Project ID : P00505613LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM :
Tablas Circumferential Road,
K0021 + 035 - K0021 + 591
Physical Target - CW1 - Preventive Maintenance of Road -
Concrete Reblocking : 1.112 Lane Km
Allocation : Php 5.359 Million
TO :
Tablas Circumferential Road,
K0021 + 035.60 - K0021 + 063.35 (L/S),
K0021 + 085.60 - K0021 + 438.00 (R/S)
Physical Target - CW1 - Preventive Maintenance of Road -
Concrete Reblocking : 0.43715 Lane Km
Allocation : Php 5.359 Million
|
August 4, 2021 |
FY 2021 GAA |
WIN1E02676 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Construction/Improvement of Various Infrastructures in Support of National Security (TIKAS)
Concreting of Camp General Manuel T Yan Sr road, Camp General Manuel T Yan Sr., Brgy. Tuboran, Mawab, Compostela Valley
Physical Target:
CW1: 4.009 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 57,500,000.00
CW1: P 55,487,500.00 (Construction of Concrete Road)
EAO: P 2,012,500.00
TO: Convergence and Special Support Program - Construction/Improvement of Various Infrastructures in Support of National Security (TIKAS)
Concreting of Camp General Manuel T Yan Sr road, Camp General Manuel T Yan Sr., Brgy. Tuboran, Mawab, Compostela Valley
Physical Target:
CW1: 3.987 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 57,500,000.00
CW1: P 55,487,500.00 (Construction of Concrete Road)
EAO: P 2,012,500.00 |
August 4, 2021 |
FY 2021 GAA |
WIN1F06358 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 310105100555000
Project ID : P00505614LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads
FROM :
Tablas Circumferential Road,
K0030 + 934 - K0031 + 293
Physical Target - CW1 - Reconstruction to Concrete Pavement :
0.722 Lane Km
Allocation : Php 15.60 Million
TO :
Tablas Circumferential Road,
K0030 + 934 - K0031 + 242
Physical Target - CW1 - Reconstruction to Concrete Pavement :
0.620 Lane Km
Allocation : Php 15.60 Million |
August 4, 2021 |
2021 |
WIN1C03927 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Zambales 1st District Engineering Office |
Network Development - Road Widening - Secondary Roads
Olongapo - Bugallon Road - K0182+823 - K0183+663.50
|
August 4, 2021 |
FY 2021 GAA |
WIN1E02677 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd - K1429+923 - K1433+387,
K1434+000 - K1434+059.50, K1434+870 - K1435+100,
K1446+000 - K1448+146, K1448+266 - K1449+000
Physical Target:
CW1: 19.440 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 99,997,000.00
CW1: P 96,497,105.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,499,895.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd - K1429+923 - K1433+367,
K1434+870 - K1435+100, K1435+237 - K1436+367,
K1446+479 - K1448+146, K1448+193 - K1448+826
Physical Target:
CW1: 14.396 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 99,997,000.00
CW1: P 96,497,105.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,499,895.000 |
August 4, 2021 |
2021 |
WIN1C04182 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Manila North Road - Apalit Section - K0052+706 - K0053+639 |
August 4, 2021 |
FY 2021 GAA |
WIN1F06399 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 310105100556000
Project No. : P00505615LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads
FROM :
Tablas Circumferential Road,
K0117 + 180 - K0117 + 312
Physical Target - CW1 - Reconstruction to Concrete Pavement :
0.264 Lane Km
Allocation : Php 6.20 Million
TO :
Tablas Circumferential Road,
K0117 + 187.70 - K0117 + 388.70
Physical Target - CW1- Reconstruction to Concrete Pavement :
0.402 Lane Km
Allocation : Php 6.20 Million |
August 4, 2021 |
FY 2021 GAA |
WIN1E02669 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1808+692 - K1809+735
Physical Target:
CW1: 2.060 lane km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Road Widening)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1809+324 - K1810+895
Physical Target:
CW1: 3.100 lane km (Road Widening)
ROW: 31,000.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 44,000,000.00 (Road Widening)
ROW: P 5,000,000.00 (ROW Acquisition)
EAO: P 1,000,000.00 |
August 4, 2021 |
FY 2021 GAA |
WIN1E02670 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway -
K1588+400 - K1588+418, K1589+200 - K1589+230,
K1590+000 - K1590+200, K1590+800 - K1590+830,
K1591+600 - K1591+650, K1592+050 - K1592+250,
K1595+290 - K1595+340, K1595+500 - K1595+600
Physical Target:
CW1: 6,566.666 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 53,000,000.00
CW1: P 51,145,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,855,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1587+718 - K1587+778,
K1587+843 - K1587+882, K1589+970 - K1590+012,
K1590+000 - K1590+200, K1591+560 - K1591+600,
K1592+110 - K1592+220, K1595+306 - K1595+339
Physical Target:
CW1: 6,489.912 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 53,000,000.00
CW1: P 51,145,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,855,000.00 |
August 4, 2021 |
FY 2021 GAA |
WIN1E02668 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Daang Maharlika (MN) -
K1389+350 - K1389+430, K1403+500 - K1403+600
Physical Target:
CW1: 2,877.690 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 37,112,000.00
CW1: P 36,369,760.00 (Construction of Road Slope Protection Structure)
EAO: P 742,240.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Daang Maharlika (MN) - K1385+896 - K1386+104
Physical Target:
CW1: 2,707.32 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 37,112,000.00
CW1: P 36,369,760.00 (Construction of Road Slope Protection Structure)
EAO: P 742,240.00 |
August 3, 2021 |
2021 |
WIN1F06590 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Picas-Sn Jose DZR Airport Rd – (S00258LT) Chainage 0 – Chainage 94
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement: P 4.188520 M
0.188 Lane Km
EAO P 0.085480 M
Total P 4.274.00 M
AS MODIFIED:
Picas-Sn Jose DZR Airport Rd - (S00258LT) Chainage 33 - Chainage 85, (S00257LT) K0910+-859-K0910+-813
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement: P 4.188520 M
0.196 Lane Km
EAO P 0.085480 M
Total P 4.274.00 M
|
August 3, 2021 |
2021 |
WIN1F06588 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0820 + 100 - K0820 + 494
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 72.375 M
Structure: 7,500 square meters
EAO P 2.625 M
Total P 75.00 M
AS MODIFIED:
Palapag-Mapanas-Gamay-Lapinig Rd - K0820 + 130 - K0820 + 460, K0820 + 820 - K0820 + 885
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 72.375 M
Structure: 1,975 square meters
EAO P 2.625 M
Total P 75.00 M
|
August 3, 2021 |
CY 2021 |
WIN1F06643 |
UACS No. 300209100002000 |
April 30, 2021 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 300209100002000
Project ID.: P00531623LZ
Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Railway Stations
Bahay Toro Ave. leading to Tandang Sora Station, Quezon City
Physical Target: CW1 = Construction of Drainage Structure 1600 l.m.
CW2 = Shoulder Paving / Construction 3206 sq.m.
Unit Cost (P’000) = P 5.97 / l.m.
= P 1.97/ sq.m.
Allocation (P’000) = P 9,557.36
= P 6,319.79
EAO (P’000) = P 575.855
Total (P’000) = P 16,453.00
As Modified
Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Railway Stations
Bahay Toro Ave. leading to Tandang Sora Station, Quezon City
Physical Target: CW1 = Shoulder Paving/Construction 1330 sq.m.
Unit Cost (P’000) = P 8.58 / sq.m.
Allocation (P’000) = P 11,408.39
EAO (P’000) = P 399.29
Total (P’000) = P 11,807.68
Excess Amount (P’000) = P 4,645.32
WIN1F06643
|
August 3, 2021 |
CY 2021 |
WIN1F06644 |
UACS No. 300209100004000 |
May 17, 2021 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 300209100004000
Project ID.: P00531627LZ
Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Railway Stations
Don Julio Gregorio St. leading to Quirino Highway Station, Quezon City
Physical Target: CW1 = Construction of Drainage Structure 1400 l.m.
CW2 = Shoulder Paving / Construction 2800 sq.m.
Unit Cost (P’000) = P 6.42 / l.m.
= P 2.12/ sq.m.
Allocation (P’000) = P 8,981.255
= P 5,927.995
EAO (P’000) = P 540.75
Total (P’000) = P 15,450.00
As Modified
Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Railway Stations
Don Julio Gregorio St. leading to Quirino Highway Station, Quezon City
Physical Target: CW1 = Shoulder Paving/ Construction 2846 sq.m.
Unit Cost (P’000) = P 5.24 / sq.m.
Allocation (P’000) = P 14,909.25
EAO (P’000) = P 540.75
Total (P’000) = P 15,450.00
WIN1F06644
|
August 3, 2021 |
CY 2021 |
WIN1F06297 |
UACS No. 320101106455000 |
April 28, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106455000
Project ID.: P00525821LZ
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Flood Control Structures and Facilities along Blumentritt, Sta. 0+000.00 to Sta. 0+297.20,
Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 214.40 l.m.
Unit Cost (P’000) = P 91.41/ l.m.
Allocation (P’000) = P 19,600.00
EAO (P’000) = P 400.00
Total (P’000) = P 20,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Flood Control Structures and Facilities along Blumentritt, Sta. 0+000.00 to Sta. 0+214.40,
Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 214.40 l.m.
Unit Cost (P’000) = P 91.41/ l.m.
Allocation (P’000) = P 19,600.00
EAO (P’000) = P 400.00
Total (P’000) = P 20,000.00
WIN1F06297
|
August 2, 2021 |
2021 |
WIN1C04262 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Aurora District Engineering Office |
Asset Preservation - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Baler - Casiguran Rd (Baler - Dinadiawan) (S04735LZ), K0274+895 - K0275+000
|
August 2, 2021 |
2021 |
WIN1C04420 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Regional Office III |
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as R. A. 11239
Improvement of Signages along Various Intersections of Roman Expressway |
August 2, 2021 |
2021 |
WIN1C04413 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Regional Office III |
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as R. A. 11239
Improvement of Signages along Various Intersections of Roman Expressway |
August 2, 2021 |
2021 |
WINC04403 |
GAA 2021 |
July 28, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Mt Prov-Cagayan via Tabuk-Enrile Rd - K0417 + 750 - K0418 + 050; Physical Target: CW1 : 3,870 Square meters; Allocation= Php 100,000,000
To: Mt Prov-Cagayan via Tabuk-Enrile Rd - K0416 + 005 - K0416 + 090;
Physical Target: CW1 : 4,002.50 Square meters;
Allocation= Php 100,000,000
|
August 2, 2021 |
2021 |
WIN1C04404 |
GAA 2021 |
July 28, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Labey-Lacamen Provincial Road (Section 4B of BLISTT Outer Ring Circumferential Road), Package 7, Benguet;
Physical Target: CW1 : 9,523.62 Square meters;
Allocation= Php 200,000,000
To: Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Labey-Lacamen Provincial Road (Section 4B of BLISTT Outer Ring Circumferential Road), Package 7, Benguet;
Physical Target: CW1 : 9,917 Square meters;
Allocation= Php 200,000,000
|
August 2, 2021 |
2021 |
WIN1C04390 |
GAA 2021 |
July 28, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Mt Prov-Ilocos Sur via Tue Rd - K0389 + 350 - K0389 + 460, K0389 + 950 - K0390 + 120;
Physical Target: CW1 : 3,875 Square meters;
Allocation= Php 100,000,000
To: Mt Prov-Ilocos Sur via Tue Rd - K0389 + 380 - K0389 +736;
Physical Target: CW1 : 4,647 Square meters;
Allocation= Php 100,000,000
|
August 2, 2021 |
2021 |
WIN1C04391 |
GAA 2021 |
July 28, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Amburayan Flood Control, Kapangan, Benguet;
Physical Target: CW1 : 0 Lineal meters;
Allocation= Php 100,000,000
To: Construction of Amburayan Flood Control, Kapangan, Benguet;
Physical Target: CW1 : 914 Lineal meters;
Allocation= Php 100,000,000
|
August 2, 2021 |
2021 |
WIN1C04392 |
GAA 2021 |
July 28, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Road Opening of Bolok - Adaoay - Bajen - Batan Access Road, Batan and Anchokey, Kabayan, Benguet;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 100,000,000
To: Road Opening of Bolok - Adaoay - Bajen - Batan Access Road, Batan and Achokey, Kabayan, Benguet;
Physical Target: CW1 : 6.4 Lane Km;
Allocation= Php 100,000,000
|
August 2, 2021 |
2021 |
WIN1C04399 |
GAA 2021 |
July 28, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Road Slope Protection along Governor Dangwa National Road at Ambalideng, Poblacion, Kibungan, Benguet, K0315+750 - K0315+820;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 60,000,000
To: Construction of Road Slope Protection along Governor Dangwa National Road at Ambalideng, Poblacion, Kibungan, Benguet, K0315+120 - K0315+175, K0315+650 - K0315+695;
Physical Target: CW1 : 2,365 Square meters;
Allocation= Php 60,000,000
|
August 2, 2021 |
2021 |
WIN1C04398 |
GAA 2021 |
July 28, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Labey-Lacamen Provincial Road (Section 4B of BLISTT Outer Ring Circumferential Road), Package 6, Benguet;
Physical Target: CW1 : 10,993 Square meters;
Allocation= Php 255,000,000
To: Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Labey-Lacamen Provincial Road (Section 4B of BLISTT Outer Ring Circumferential Road), Package 6, Benguet;
Physical Target: CW1 : 11,267 Square meters;
Allocation= Php 255,000,000
|
August 2, 2021 |
2021 |
WIN1C04411 |
GAA 2021 |
July 28, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Gov. Bado Dangwa National Rd - K0345 + 520 - K0345 + 664, K345 + 831 - K0345 + 890;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 105,000,000
To: Gov. Bado Dangwa National Rd - K0345 + 520 - K0345 + 650;
Physical Target: CW1 : 4,165 Square meters;
Allocation= Php 105,000,000
|
August 2, 2021 |
2021 |
WIN1C04410 |
GAA 2021 |
July 28, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Mt Prov-Ilocos Sur via Tue Rd - K0389 + 600 - K0389 + 900;
Physical Target: CW1 : 3,870 Square meters;
Allocation= Php 100,000,000
To: Mt Prov-Ilocos Sur via Tue Rd - K0389 + 876 - K0390 + 000;
Physical Target: CW1 : 4,487.5 Square meters;
Allocation= Php 100,000,000
|
August 2, 2021 |
2021 |
WINC04409 |
GAA 2021 |
July 28, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Gov. Bado Dangwa National Rd - K0288 + 382 - K0288 + 535, K0298 + 130 - K0298 + 352, K0298 + 460 - K0298 + 572;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 160,000,000
To: Gov. Bado Dangwa National Rd - K0288 + 382 - K0288 + 535, K0298 + 130 - K0298 + 200;
Physical Target: CW1 : 8,742 Square meters;
Allocation= Php 160,000,000
|
August 2, 2021 |
2021 |
WIN1C04393 |
GAA 2021 |
July 28, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Banaue-Hungduan-Benguet Bdry Rd - K0407 + 546 - K0407 + 846, K0401 + 430 - K0401 + 630;
Physical Target: CW1 : 4,000 Square meters;
Allocation= Php 118,187,000
To: Banaue-Hungduan-Benguet Bdry Rd - K0407 + 480 - K0407 + 850;
Physical Target: CW1 : 5,291.2 Square meters;
Allocation= Php 118,187,000
|
August 2, 2021 |
2021 |
WIN1C04401 |
GAA 2021 |
July 28, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Mt Prov-Cagayan via Tabuk-Enrile Rd - K0418 + 300 - K0418 + 600;
Physical Target: CW1 : 3,870 Square meters;
Allocation= Php 100,000,000
To: Mt Prov-Cagayan via Tabuk-Enrile Rd - K0418 + 230 - K0418 + 380;
Physical Target: CW1 : 3,901 Square meters;
Allocation= Php 100,000,000
|
August 2, 2021 |
2021 |
WIN1C04402 |
GAA 2021 |
July 28, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Mt Prov-Cagayan via Tabuk-Enrile Rd - K0404 + 800 - K0404 + 950, K0404 + 960 - K0405 + 060;
Physical Target: CW1 : 3,895 Square meters;
Allocation= Php 100,000,000
To: Mt Prov-Cagayan via Tabuk-Enrile Rd - K0404 + 800 - K0404 + 935;
Physical Target: CW1 : 3,927 Square meters;
Allocation= Php 100,000,000
|
August 2, 2021 |
2021 |
WIN1C04356 |
GAA 2021 |
July 22, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Road Slope Protection Structure along Governor Bado Dangwa National Road at Ampusongan, Bakun, Benguet, K0339+574 - K0339+660;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 60,000,000
To: Construction of Road Slope Protection Structure along Governor Dangwa National Road at Ampusongan, Bakun, Benguet, K0338+970 - K0339+050;
Physical Target: CW1 : 2,413 Square meters;
Allocation= Php 60,000,000
|
August 2, 2021 |
2021 |
WIN1C04385 |
GAA 2021 |
July 23, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Benguet (Asphalt Overlay) - Nueva Vizcaya Road K0303 + 000 - K0319 + 726; Physical Target: CW1 : 33.846 Lane Km; Allocation= Php 300,000,000
To: Benguet - Nueva Vizcaya Road K0254 + (-372) - K0281 + 800;
Physical Target: CW1 : 56.632 Lane Km;
Allocation= Php 300,000,000
|
August 2, 2021 |
2021 |
WIN1C04387 |
GAA 2021 |
July 23, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Cong. Andres Acop Cosalan Rd - K0356 + 630 - K0356 + 830;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 222,000,000
To: Cong. Andres Acop Cosalan Rd - K0356 + 680 - K0356 + 830;
Physical Target: CW1 : 9,346 Square meters;
Allocation= Php 222,000,000
|
August 2, 2021 |
2021 |
WIN1C04388 |
GAA 2021 |
July 23, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Gov. Bado Dangwa National Rd - K0315 + 721 - K0315 + 826, K0316 + 000 - K0316 + 082;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 120,000,000
To: Gov. Bado Dangwa National Rd - K0315 + 721 - K0315 + 826, K0316 + 045 - K0316 + 082;
Physical Target: CW1 : 5,062 Square meters;
Allocation= Php 120,000,000
|
August 2, 2021 |
2021 |
WIN1C04386 |
GAA 2021 |
July 23, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Mt Prov-Cagayan via Tabuk-Enrile Rd - K0419 + 100 - K0419 + 450;
Physical Target: CW1 : 3,830 Square meters;
Allocation= Php 100,000,000
To: Mt Prov-Cagayan via Tabuk-Enrile Rd - K0418 + 460 - K0418 + 580;
Physical Target: CW1 : 3,990 Square meters;
Allocation= Php 100,000,000
|
August 2, 2021 |
2021 |
WIN1C04380 |
GAA 2021 |
July 22, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0457+000 - K0458 + 100;
Type of Work: CW1: Reconstruction to Concrete Pavement ; Physical Target: CW1: 2.136 Lane Km;
Allocation= Php 99,000,000
To: Abra-Kalinga Rd - K0456+600 - K0458 + 100;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 2.894 Lane Km
CW2: 3,403.26 Square meters;
Allocation= Php 99,000,000
|
August 2, 2021 |
2021 |
WIN1C04312 |
GAA 2021 |
July 16, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0420 + 654 - K0421 + 600;
Physical Target: CW1: 1.778 Lane Km;
Allocation= Php 20,000,000
To: Abra-Kalinga Rd - K0419 + 484 - K0421 + 600;
Physical Target: CW1: 4.120 Lane Km;
Allocation= Php 20,000,000
|
August 2, 2021 |
2021 |
WIN1C04311 |
GAA 2021 |
July 16, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Cervantes Rd - K0438 + 182 - K0443 + 323;
Physical Target: CW1: 10 Lane Km;
Allocation= Php 50,000,000
To: Abra-Cervantes Rd - K0438 + 182 - K0443 + 323;
Physical Target: CW1: 10.492 Lane Km;
Allocation= Php 50,000,000
|
August 2, 2021 |
2021 |
WIN1C04375 |
GAA 2021 |
July 22, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Ilocos Norte Rd - K0431 + 710 - K0431 + 800;
Physical Target: CW1: 10,000 Square meters;
Allocation= Php 100,000,000
To: Abra-Ilocos Norte Rd - K0430 + 488 - K0430 + 647;
Physical Target: CW1: 4,064.27 Square meters;
Allocation= Php 100,000,000
|
August 2, 2021 |
2021 |
WIN1C04358 |
GAA 2021 |
July 22, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Ilocos Norte Rd - K0434 + 700 - K0435 + 850;
Physical Target: CW1: 10,000 Square meters;
Allocation= Php 100,000,000
To: Abra-Ilocos Norte Rd - K0434 + 870 - K0435 + 000;
Physical Target: CW1: 4,061.78 Square meters;
Allocation= Php 100,000,000
|
August 2, 2021 |
2021 |
WIN1C04370 |
GAA 2021 |
July 22, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Gucab - Demet Flood Control, La Paz, Abra;
Physical Target: CW1: 445.594 Lineal meters;
Allocation= Php 50,000,000
To: Construction of Gucab - Demet Flood Control, La Paz, Abra;
Physical Target: CW1: 395.2 Lineal meters;
Allocation= Php 50,000,000
|
August 2, 2021 |
2021 |
WIN1C04378 |
GAA 2021 |
July 22, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Riang Flood Control Structure, Sta. 30+700 - Sta. 31+200, Peñarrubia, Abra;
Physical Target: CW1: 600 Lineal meters;
Allocation= Php 50,000,000
To: Construction of Riang Flood Control Structure, Sta. 30+700 - Sta. 31+200, Peñarrubia, Abra;
Physical Target: CW1: 470 Lineal meters;
Allocation= Php 50,000,000
|
August 2, 2021 |
2021 |
WIN1C04372 |
GAA 2021 |
July 22, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Rehabilitation of Bucay North Road with Road Opening, Pagala Section, Bucay, Abra;
Type of Work: CW1: Rehabilitation of Concrete Road;
Physical Target: CW1: 10.396 Lane Km;
Allocation= Php 100,000,000
To: Rehabilitation of Bucay North Road with Road Opening, Pagala Section, Bucay, Abra;
Type of Work: CW1: Rehabilitation of Concrete Road
CW2: Construction of Road Slope Protection Stucture;
Physical Target: CW1: 4.2584 Lane Km
CW2: 10,674 Square Meters;
Allocation= Php 100,000,000
|