Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
May 10, 2018 2018 WIN8C02746 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION

FROM: Local Program
Building and Other Structures - Multipurpose/Facilities
Construction of Covered Court, Brgy. Sawangan, Andili,Mawab, Compostela Valley
Physical Target:
CW1 - 1 number of building (Const. of Multipurpose building)
ALLOCATION:
TOTAL: P 3,000,000.00
CW1 - P 2,970,000.00
EAO - P 30,000.00

TO: Local Program
Building and Other Structures - Multipurpose/Facilities
Construction of Covered Court, Brgy. Sawangan, Mawab, Compostela Valley
Physical Target:
CW1 - 1 number of building (Const. of Multipurpose building)
ALLOCATION:
TOTAL: P 3,000,000.00
CW1 - P 2,970,000.00
EAO - P 30,000.00
May 10, 2018 FY 2018 GAA WIN8C02585 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao del Sur District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Brgy. Astorga-Brgy. Jose Rizal Road connecting Sitio Central Rizal in support of Coffee Processing Production, Sta. Cruz, Davao del Sur
Physical Target:
CW1: 3.058 Lane Km (Construction of Concrete Road)
CW2: 3,951.948 sq. m. (Additional Lane Width)
Allocation:
TOTAL: P 99,453,000.00
CW1: P 55,442,145.00 (Construction of Concrete Road)
CW2: P 40,530,000.00 (Additional Lane Width)
EAO: P 3,480,855.00

TO: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Brgy. Astorga-Brgy. Jose Rizal Road connecting Sitio Central Rizal in support of Coffee Processing Production, Sta. Cruz, Davao del Sur
Physical Target:
CW1: 4.738 Lane Km (Construction of Concrete Road)
CW2: 6,233.80 sq. m. (Additional Lane Width)
Allocation:
TOTAL: P 99,453,000.00
CW1: P 55,442,145.00 (Construction of Concrete Road)
CW2: P 40,530,000.00 (Additional Lane Width)
EAO: P 3,480,855.00
May 10, 2018 2018 WIN8C02769 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Surigao del Norte 2nd District Engineering Office
OO1- Organizational Outcome 1
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

FROM:

Jct Osmeña –Pilar Rd – K0020 + 070 – K0020 + 167, K0020 + 218 – K0020 + 339

Project ID: P00201548MN
Scope of Work: Construction of Road Slope Protection Structure
Physical Target: 2,484 square meters

Amount : Php 46,888,000.00 (Total)
: Php 45,950,240.00 (Slope)
: Php 937,760.00 (EAO)

TO:

Jct Osmeña –Pilar Rd – K0020 + 070 – K0020 + 167, K0020 + 218 – K0020 + 339

Project ID: P00201548MN
Scope of Work: Construction of Road Slope Protection Structure
Physical Target: 2,526.74 square meters

Amount : Php 46,888,000.00 (Total)
: Php 45,950,240.00 (Slope)
: Php 937,760.00 (EAO)
May 10, 2018 FY 2018 GAA WIN8C02592 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao del Sur District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Construction of Concrete Road – Access Road leading to Lao Integrated Farms-Mt. Apo Trail-Balutakay Waterfalls, Brgy. Eman, Bansalan, Davao del Sur
Physical Target:
CW1: 3.000 Km / 6.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 85,000,000.00
CW1: P 82,025,000.00 (Construction of Concrete Road)
EAO: P 2,975,000.00

TO: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Construction of Concrete Road – Access Road leading to Lao Integrated Farms-Mt. Apo Trail-Balutakay Waterfalls, Brgy. Eman, Bansalan, Davao del Sur
Physical Target:
CW1: 3.6166 Km / 7.2332 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 85,000,000.00
CW1: P 82,025,000.00 (Construction of Concrete Road)
EAO: P 2,975,000.00
May 10, 2018 FY 2018 GAA WIN8C02570 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao del Sur District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development
Road Widening – Primary Road
Davao-Cotabato Rd (Jct Digos-Cotabato Sect) incl. ROW –
K1568+200 – K1568+491, K1568+529 – K1569+197, K1569+230 – K1569+338,
K1569+600 – K1569+727, K1581+434 – K1581+927, K1581+959 – K1582+027,
K1582+118 – K1583+259, (S00165MN) Chainage 000 – Chainage 201,
(S00165MN) Chainage 239 – Chainage 296, (S01465MN) Chainage 000 – Chainage 188,
(S01465MN) Chainage 226 – Chainage 316, (S01466MN) Chainage 000 – Chainage 197,
(S01466MN) Chainage 230 – Chainage 337
Physical Target:
CW1: 5.174 Lane Km (Road Widening)
ROW: 19,030 sq. m.
Allocation:
TOTAL: P 100,000,000.00
CW1: P 88,780,000.00 (Road Widening)
ROW: P 7,720,000.00
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development
Road Widening – Primary Road
Davao-Cotabato Rd (Jct Digos-Cotabato Sect) incl. ROW –
K1568+200 – K1568+491, K1568+529 – K1569+197, K1569+230 – K1569+338,
K1569+600 – K1569+727, K1581+434 – K1581+927, K1581+959 – K1582+027,
K1582+118 – K1583+259, (S00165MN) Chainage 000 – Chainage 201,
(S00165MN) Chainage 239 – Chainage 296, (S01465MN) Chainage 000 – Chainage 188,
(S01465MN) Chainage 226 – Chainage 316, (S01466MN) Chainage 000 – Chainage 197,
(S01466MN) Chainage 230 – Chainage 337
Physical Target:
CW1: 5.662 Lane Km (Road Widening)
ROW: 19,030 sq. m.
Allocation:
TOTAL: P 100,000,000.00
CW1: P 88,780,000.00 (Road Widening)
ROW: P 7,720,000.00
EAO: P 3,500,000.00
May 10, 2018 FY 2018 GAA WIN8C02656 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao Oriental 1st District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support
Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
Access Road Connecting Junction Tagduan Section, Brgy. San Jose to Sitio Lib-og, Brgy. Mercedes in support of Abaca and Coconut Industries, Caraga, Davao Oriental
Physical Target:
CW1: 8.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00

TO: Convergence and Special Support
Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
Access Road Connecting Junction Tagduan Section, Brgy. San Jose to Sitio Lib-og, Brgy. Mercedes in support of Abaca and Coconut Industries, Caraga, Davao Oriental
Physical Target:
CW1: 6.240 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00
May 10, 2018 FY 2018 GAA WIN8C02657 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao Oriental 1st District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
Road Connecting Sitio Mahayahay to Sitio Buko Buko sa Anay in support to Coffee, Cacao, Abaca & Coconut Industries, Boston, Davao Oriental
Physical Target:
CW1: 7.200 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Concrete Road)
EAO: P 3,150,000.00

TO: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
Road Connecting Sitio Mahayahay to Sitio Buko Buko sa Anay in support to Coffee, Cacao, Abaca & Coconut Industries, Boston, Davao Oriental
Physical Target:
CW1: 6.588 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Concrete Road)
EAO: P 3,150,000.00
May 10, 2018 FY 2018 GAA WIN8C02655 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao Oriental 1st District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment on Sheet Piles Foundation, Caraga, Davao Oriental
Physical Target:
CW1: 160 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 29,000,000.00
CW1: P 28,420,000.00 (Construction of Revetment)
EAO: P 580,000.00

TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment on Sheet Piles Foundation, Caraga, Davao Oriental
Physical Target:
CW1: 217.64 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 29,000,000.00
CW1: P 28,420,000.00 (Construction of Revetment)
EAO: P 580,000.00
May 10, 2018 FY 2018 GAA WIN8C02658 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao Oriental 1st District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry - Davao Or Costal Rd incl. ROW -
K1690 + 263 - K1693 + 341
Physical Target:
CW1: 6.156 Lane Km (Road Widening)
ROW: 27,000.00 Square Meters
Allocation:
TOTAL: P 96,120,000.00
CW1: P 89,108,100.00 (Road Widening)
EAO: P 3,364,200.00
ROW: P 3,647,700.00

TO: OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry - Davao Or Costal Rd incl. ROW -
K1690 + 700 - K1693 + 341
Physical Target:
CW1: 5.19708 Lane Km (Road Widening)
ROW: 27,000.00 Square Meters
Allocation:
TOTAL: P 96,120,000.00
CW1: P 89,108,100.00 (Road Widening)
EAO: P 3,364,200.00
ROW: P 3,647,700.00
May 10, 2018 FY 2018 GAA WIN8C02600 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao Oriental 1st District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment on Sheet Piles Foundation, Caraga River Bank Protection, Caraga, Davao Oriental
Physical Target:
CW1: 200.00 Lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 35,000,000.00 (Construction of Revetment)
CW1: P 34,300,000.00
EAO: P 700,000.00

TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment on Sheet Piles Foundation, Caraga River Bank Protection, Caraga, Davao Oriental
Physical Target:
CW1: 136.20 Lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 35,000,000.00 (Construction of Revetment)
CW1: P 34,300,000.00
EAO: P 700,000.00
May 10, 2018 FY 2018 GAA WIN8C02653 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao Oriental 2nd District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development
Paving of Unpaved Roads - Secondary Roads
Mati - Maragusan Rd -
K1502+120 - K1502+241, K1502+337 - K1503+660, K1504+518 - K1505+300
Physical Target:
CW1: 4.446 Lane Km (Paving of Unpaved Roads)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Paving of Unpaved Roads)
EAO: P 3,500,000.00

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development
Paving of Unpaved Roads - Secondary Roads
Mati - Maragusan Rd -
K1502+120 - K1502+241, K1502+337 - K1503+135, K1504+518 - K1505+300
Physical Target:
CW1: 3.609 Lane Km (Paving of Unpaved Roads)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Paving of Unpaved Roads)
EAO: P 3,500,000.00
May 10, 2018 FY 2018 GAA WIN8C02730 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao Occidental District Engineering Office

MODIFICATION:

FROM: Local Program – Local Road and Bridges – Local Roads
Local Infrastructure Program
Construction of Roads, Sitio Mote, Brgy. Pinalpalan, Malita, Davao Occidental
Physical Target:
CW1: 1.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 6,500,000.00
CW1: P 6,435,000.00 (Construction of Concrete Road)
EAO: P 65,000.00

TO: Local Program – Local Road and Bridges – Local Roads
Local Infrastructure Program
Construction of Roads, Sitio Mote, Brgy. Pinalpalan, Malita, Davao Occidental
Physical Target:
CW1: 1.262 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 6,500,000.00
CW1: P 6,435,000.00 (Construction of Gravel Road)
EAO: P 65,000.00
May 10, 2018 FY 2018 GAA WIN8C02885 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao Occidental District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Revetment (RC Cut-off Wall), Butulan, Jose Abad Santos, Davao Occidental
Physical Target:
CW1: 1,000.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Revetment)
EAO: P 700,000.00

TO: OO2: Protect Lives and Properties – Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Revetment (RC Cut-off Wall), Butulan, Jose Abad Santos, Davao Occidental
Physical Target:
CW1: 741.20 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,270,000.00 (Construction of Revetment)
ROW: P 30,000.00
EAO: P 700,000.00
May 10, 2018 FY 2018 GAA WIN8C02895 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao Occidental District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Revetment (RC Cut-off Wall), Buhangin, Malita, Davao Occidental
Physical Target:
CW1: 1,000.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Revetment)
EAO: P 700,000.00

TO: OO2: Protect Lives and Properties – Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Revetment (RC Cut-off Wall), Buhangin, Malita, Davao Occidental
Physical Target:
CW1: 1,051.82 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,280,000.00 (Construction of Revetment)
ROW: P 20,000.00
EAO: P 700,000.00
May 10, 2018 FY 2018 GAA WIN8C02914 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao Occidental District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Revetment (RC Cut-off Wall), Lamidan, Don Marcelino, Davao Occidental
Physical Target:
CW1: 860.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Revetment)
EAO: P 600,000.00

TO: OO2: Protect Lives and Properties – Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Revetment (RC Cut-off Wall), Lamidan, Don Marcelino, Davao Occidental
Physical Target:
CW1: 984.07 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,370,000.00 (Construction of Revetment)
ROW: P 30,000.00
EAO: P 600,000.00
May 10, 2018 FY 2018 GAA WIN8C02904 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao Occidental District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support Program
Construction /Improvement of Access Roads leading to Declared Tourism Destinations
Brgy. Pangyan Road leading to Tudaya Falls, Pangyan, Malita, Davao Occidental
Physical Target:
CW1: 2.000 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: 49,000,000.00 (Construction of Gravel Road)
EAO: P 1,000,000.00

TO: Convergence and Special Support Program
Construction /Improvement of Access Roads leading to Declared Tourism Destinations
Brgy. Pangyan Road leading to Tudaya Falls, Pangyan, Malita, Davao Occidental
Physical Target:
CW1: 1.630 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: 49,000,000.00 (Construction of Concrete Road)
EAO: P 1,000,000.00
May 9, 2018 2018 310209100034000 GAA FY 2018 January 1, 2018 Region II Cagayan 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement -Tertiary Roads -

Claveria-Diaballo-Luzon-Cagayan Bdry Rd-K0619+601-K0619+761
May 9, 2018 2018 300203100236000 GAA FY 2018 January 1, 2018 Region II Cagayan 2nd District Engineering Office
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations

Pacac-Binubongan Road leading to Pader Falls, Incl. Bridge, Brgy. Binobongan, Allacapan, Cagayan
May 9, 2018 2018 WIN8C02696 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION

FROM: Convergence and Special Support Program
Convergence and Special Support - Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Araibo Road leading to Salvosa Falls, Brgy. Araibo, Pantukan, Compostela Valley
Physical Target:
CW1: 1.600 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00
EAO: P 400,000.00

TO: Convergence and Special Support Program
Convergence and Special Support - Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Araibo Road leading to Salvosa Falls, Brgy. Araibo, Pantukan, Compostela Valley
Physical Target:
CW1: 1.247 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00
EAO: P 400,000.00
May 9, 2018 2018 WIN8C02693 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION

FROM: Local Program - Buildings and Other Structures - Multipurpose/Facilities - Local Infrastructure Program
Completion of Covered Court, Brgy. Katagan, Laak, Compostela Valley
Physical Target:
CW1: 1 number of buildings (Construction of Multi-Purpose Building)
ALLOCATION
TOTAL: P 1,000,000.00
CW1: P 1,000,000.00 (Construction of Multi-Purpose Building)

TO: Local Program - Buildings and Other Structures - Multipurpose/Facilities - Local Infrastructure Program
Completion of Covered Court, Brgy. Kapatagan, Laak, Compostela Valley
Physical Target:
CW1: 1 number of buildings (Construction of Multi-Purpose Building)
ALLOCATION
TOTAL: P 1,000,000.00
CW1: P 1,000,000.00 (Construction of Multi-Purpose Building)
May 9, 2018 2018 WIN8C02774 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support Program
Convergence and Special Support - Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Mapawa Road leading to Rafflesia Conservation Site, Brgy. Mapawa, Maragusan, Compostela Valley
Physical Target:
CW1: 0.980 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00
EAO: P 400,000.00

TO: Convergence and Special Support Program
Convergence and Special Support - Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Mapawa Road leading to Rafflesia Conservation Site, Brgy. Mapawa, Maragusan, Compostela Valley
Physical Target:
CW1: 2.190 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00
EAO: P 400,000.00
May 9, 2018 2018 WIN8C02740 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION

FROM: Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure Including Local Projects
Concreting of Road at Brgy. Nuevo Iloco to Brgy. Bawani Section Mawab, Compostele Valley
Physical Target:
CW1 - 1.500 Lane Km (Construction of Concrete Road)
ALLOCATION
TOTAL: P 15,000,000.00
CW1 - P 14,700,000.00 (Construction of Concrete Road)
EAO - P 300,000.00

TO: Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure Including Local Projects
Concreting of Road at Brgy. Nuevo Iloco, Mawab, Compostele Valley
Physical Target:
CW1 - 2.200 Lane Km (Construction of Concrete Road)
ALLOCATION
TOTAL: P 15,000,000.00
CW1 - P 14,700,000.00 (Construction of Concrete Road)
EAO - P 300,000.00
May 9, 2018 2018 WIN8C02697 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION

FROM: Local Program
Local - Buildings and Other Structures - Multipurpose/Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building (Mini Gym) at Banbanan ES, Laak, Compostela Valley
Physical Target:
CW1: 1 number of buildings (Construction of Multi-Purpose Building)
ALLOCATION
TOTAL: P 1,600,000.00
CW1: P 1,584,000.00
EAO: P 16,000.00

TO: Local Program
Local - Buildings and Other Structures - Multipurpose/Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building (Mini Gym) at Banbanon ES, Laak, Compostela Valley
Physical Target:
CW1: 1 number of buildings (Construction of Multi-Purpose Building)
ALLOCATION
TOTAL: P 1,600,000.00
CW1: P 1,584,000.00
EAO: P 16,000.00
May 9, 2018 2018 WIN8C02694 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION

FROM: Local Program
Local - Buildings and Other Structures - School Buildings - Local Infrastructure Program
Construction of Two (2) Classroom School Building with CR, Madrasah, Brgy. Bongabong, Pantukan, Compostela Valley
Physical Target:
CW1: 2 number of classrooms (Construction of Classrooms)
ALLOCATION
TOTAL: P 2,500,000.00
CW1: P 2,475,000.00
EAO: P 25,000.00

TO: Local Program
Local - Buildings and Other Structures - School Buildings - Local Infrastructure Program
Construction of Two (2) Classroom School Building with CR, Madrasah, Brgy. Bongbong, Pantukan, Compostela Valley
Physical Target:
CW1: 2 number of classrooms (Construction of Classrooms)
ALLOCATION
TOTAL: P 2,500,000.00
CW1: P 2,475,000.00
EAO: P 25,000.00
May 9, 2018 2018 WIN8C02700 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION

FROM: Local Program
Local - Buildings and Other Structure - Multipurpose / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of MPB (Brgy. Hall) Tambongan, Pantukan, Compostela
Physical Target:
CW1 - 1 number of buildings (Construction of Multi-Purpose Building)
ALLOCATION
TOTAL: P 4,500,000.00
CW1 - P 4,410,000.00 (Construction of Multi-Purpose Building)
EAO - P 90,000.00

TO: Local Program
Local - Buildings and Other Structure - Multipurpose / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of MPB (Brgy. Hall) Tambongon, Pantukan, Compostela
Physical Target:
CW1 - 1 number of buildings (Construction of Multi-Purpose Building)
ALLOCATION
TOTAL: P 4,500,000.00
CW1 - P 4,410,000.00 (Construction of Multi-Purpose Building)
EAO - P 90,000.00
May 9, 2018 2018 WIN8C02775 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION

FROM: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Linda Road leading to Ecotourism Park, Brgy. Linda, Nabunturan, Compostela Valley
Physical Target:
CW1: 1.638 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00
EAO: P 400,000.00

TO: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Linda Road leading to Ecotourism Park, Brgy. Linda, Nabunturan, Compostela Valley
Physical Target:
CW1: 2.784 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00
EAO: P 400,000.00
May 9, 2018 2018 WIN8C02742 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION

FROM: Convergence and Special Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Mampising Road leading to Mabini Protected Landscape and Seascape Marine Center and various Beach Resorts, Brgy. Tagnanan, Mabini, Compostela Valley
Physical Target
CW1 - 1.660 Lane Km (Construction of Concrete Road)
ALLOCATION
TOTAL: P 20,000,000.00
CW1 - P 19,600,000.00 (Construction of Concrete Road)
EAO - P 400,000.00

TO: Convergence and Special Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Mampising Road leading to Mabini Protected Landscape and Seascape Marine Center and various Beach Resorts, Brgy. Tagnanan, Mabini, Compostela Valley
Physical Target
CW1 - 3.000 Lane Km (Construction of Concrete Road)
ALLOCATION
TOTAL: P 20,000,000.00
CW1 - P 19,600,000.00 (Construction of Concrete Road)
EAO - P 400,000.00
May 9, 2018 2018 WIN8C02777 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION

FROM: OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/ New Roads
Montevista-DNAS Road (DNAS-Laak), Package 6, incl. ROW, Compostela Valley
Physical Target:
CW1: 2.500 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00
EAO: P 1,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/ New Roads
Montevista-DNAS Road (DNAS-Laak), Package 6, Compostela Valley
Physical Target:
CW1: 4.750 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00
EAO: P 1,000,000.00
May 9, 2018 2018 WIN8C02725 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION

FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
New Leyte Road leading to Lake Leonard, Brgy. New Leyte, Maco, Compostela Valley
Physical Target
CW1 - 1.604 Lane Km (Construction of Concrete Road)
ALLOCATION
TOTAL: 20,000,000.00
CW1 - P 19,600,000.00 (Construction of Concrete Road)
EAO - P 400,000.00

TO: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
New Leyte Road leading to Lake Leonard, Brgy. New Leyte, Maco, Compostela Valley
Physical Target
CW1 - 1.921 Lane Km (Construction of Concrete Road)
ALLOCATION
TOTAL: 20,000,000.00
CW1 - P 19,600,000.00 (Construction of Concrete Road)
EAO - P 400,000.00
May 9, 2018 2018 WIN8C02695 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION

FROM: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Ngan Road leading to Mandaya Village, Pansan Falls, Bongkilaton Cave and Tagbubunlas Falls, Compostela Valley
Physical Target:
CW1: 1.182 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Road)
EAO: P 300,000.00

TO: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Ngan Road leading to Mandaya Village, Pansan Falls, Bongkilaton Cave and Tagbubunlas Falls, Compostela Valley
Physical Target:
CW1: 1.380 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Road)
EAO: P 300,000.00
May 9, 2018 2018 WIN8C02773 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION

FROM: Convergence and Special Support Program
Convergence and Special Support - Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Pantukan Mariculture Park Access Road connecting to Pantukan Public Transport Terminal and Mariculture Park Landing Facility, Pantukan, Compostela Valley
Physical Target:
CW1 - 4.800 Lane Km (Construction of Concrete Road)
ALLOCATION
TOTAL: P 60,000,000.00
CW1 - P 57,900,000.00 (Construction of Concrete Road)
EAO - P 2,100,000.00

TO: Convergence and Special Support Program
Convergence and Special Support - Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Pantukan Mariculture Park Access Road connecting to Pantukan Public Transport Terminal and Mariculture Park Landing Facility, Pantukan, Compostela Valley
Physical Target:
CW1 - 4.800 Lane Km (Construction of Concrete Road)
ALLOCATION
TOTAL: P 60,000,000.00
CW1 - P 57,900,000.00 (Construction of Concrete Road)
EAO - P 2,100,000.00
May 9, 2018 2018 WIN8C02781 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION

FROM: OO2: Protect Lives and Properties - Flood Management
Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Rechanneling and Construction of Revetment, Languan Section, New Bataan along Montevista - Compostela, New Bataan - Maragusan - Mati Bdry Road, New Bataan, Compostela Valley
Physical Target:
CW1: 3,250 lm (Construction of Revetment)
CW2: 96, 200 cm (Channelization)
ALLOCATION:
TOTAL: P 90,000,000.00
CW1: P 40,350,822.00 (Construction of Revetment)
CW2: P 46,499,118.00 (Channelization)
EAO: P 3,150,000.00

TO: OO2: Protect Lives and Properties - Flood Management
Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Rechanneling and Construction of Revetment, Languan Section, New Bataan along Montevista - Compostela, New Bataan - Maragusan - Mati Bdry Road, New Bataan, Compostela Valley
Physical Target:
CW1: 3,478 lm (Construction of Revetment)
CW2: 145,767.49 cm (Channelization)
ALLOCATION:
TOTAL: P 90,000,000.00
CW1: P 65,452,226.00 (Construction of Revetment)
CW2: P 21,397,774.00 (Channelization)
EAO: P 3,150,000.00
May 9, 2018 2018 WIN8C02739 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION

FROM: OO2: Protect Lives and Properties - Flood Management
Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Rechanneling/Construction of Revetment with Sheet Pile of Kingking River, Mosahamat Section LS, Pantukan, Compostela Valley
Physical Target:
CW1: 487 lm (Construction of Revetment)
CW2: 1,590 cm (Channelization)
ROW: 1,143 sq.m.
ALLOCATION:
TOTAL: P 40,000,000.00
CW1: P 37,135,736.00 (Construction of Revetment)
CW2: P 1,868,264.00 (Channelization)
ROW: P 196,000.00
EAO: P 800,000.00

TO: OO2: Protect Lives and Properties - Flood Management
Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Rechanneling/Construction of Revetment with Sheet Pile of Kingking River, Mosahamat Section LS, Pantukan, Compostela Valley
Physical Target:
CW1: 580.33 lm (Construction of Revetment)
CW2: 5,711.00 cm (Channelization)
ROW: 1,143 sq.m.
ALLOCATION:
TOTAL: P 40,000,000.00
CW1: P 36,767,067.00 (Construction of Revetment)
CW2: P 2,236,933.00 (Channelization)
ROW: P 196,000.00
EAO: P 800,000.00
May 9, 2018 2018 WIN8C02699 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION

FROM: OO2: Protect lives and properties
Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rechanneling/Construction of Revetment with Steel Sheet Pile of Kingking River, Mosahamat R/S, Pantukan, Compostela Valley
Physical Target:
CW1 - 409 Lineal meters (Construction of Revetment)
CW2 - 4,357 Cubic meters (Channelization)
ROW - 1,143 Square meters
ALLOCATION
TOTAL: P 35,000,000.00
CW1 - P 31,921,384.00 (Construction of Revetment)
CW2 - P 2,182,616.00 (Channelization)
ROW - P 196,000.00
EAO - P 700,000.00

TO: OO2: Protect lives and properties
Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rechanneling/Construction of Revetment with Steel Sheet Pile of Kingking River, Mosahamat R/S, Pantukan, Compostela Valley
Physical Target:
CW1 - 421.32 Lineal meters (Construction of Revetment)
CW2 - 603 Cubic meters (Channelization)
ROW - 1,143 Square meters
ALLOCATION
TOTAL: P 35,000,000.00
CW1 - P 32,986,080.00 (Construction of Revetment)
CW2 - P 1,117,920.00 (Channelization)
ROW - P 196,000.00
EAO - P 700,000.00
May 9, 2018 2018 WIN8C02784 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION

FROM: Local Program
Local - Water Management Facilities - Water Supply - Local Infrastructure Program
Rehabilitation of Water System, Tapis, Brgy. Tambogon, Pantukan, Compostela Valley
Physical Target:
CW1: 1 number of Water Supply System (Rehabilitation of Water Supply Systems)
ALLOCATION
TOTAL: P 1,000,000.00
CW1: P 1,000,000.00

TO: Local Program
Local - Water Management Facilities - Water Supply - Local Infrastructure Program
Rehabilitation of Water System, Tapis, Brgy. Tambongon, Pantukan, Compostela Valley
Physical Target:
CW1: 1 number of Water Supply System (Rehabilitation of Water Supply Systems)
ALLOCATION
TOTAL: P 1,000,000.00
CW1: P 1,000,000.00
May 9, 2018 FY 2018 WIN8C02698 UACS No. 310108100152000 May 3, 2018 Region IX Zamboanga del Norte 1st District Engineering Office
UACS No. 310108100152000
Project ID: P00200218MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Sindangan - Siayan - Dumingag - Mahayag Rd (Sindangan - Siayan Section)
K1926+700.00 - K1926+880.00
K1929+150.00 - K1929+250.00
K1936+820.00 - K1936+880.00
K1939+5122.00 - K1939+5300.00
K1939+8431 - K1939+8700
K1939+11180 - K1939+11380
Physical Target:
CW-1- Construction of Road Slope Protection Structure: 10,639 sq.m
Unit Cost: P 4,145.13/ sq.m.
EAO: P 900,000.00
Allocation: P 45,000,000.00
May 9, 2018 FY 2018 GAA WIN8C02643 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
NRJ Sagayen-Sonlon Road, incl. bridge, connecting Asuncion Overland Transport Terminal in support of Coconut, Banana and Rice Industries, Tagum City, Davao del Norte
Physical Target:
CW1: 1.142 Lane Km (Construction of Concrete Road)
CW2: 954 sq.m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 140,000,000.00
CW1: P 19,300,000.00 (Construction of Concrete Road)
CW2: P 115,800,000.00 (Construction of Concrete Bridge)
EAO: P 4,900,000.00

TO: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
NRJ Sagayen-Sonlon Road, incl. bridge, connecting Asuncion Overland Transport Terminal in support of Coconut, Banana and Rice Industries, Tagum City, Davao del Norte
Physical Target:
CW1: 0.763832 Lane Km (Construction of Concrete Road)
CW2: 954 sq.m. (Construction of Concrete Bridge)
CW3: 1.850 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 140,000,000.00
CW1: P 24,165,704.22 (Construction of Concrete Road)
CW2: P 95,920,425.88 (Construction of Concrete Bridge)
CW3: P 15,013,869.90 (Construction of Gravel Road)
EAO: P 4,900,000.00
May 9, 2018 FY 2018 GAA WIN8C02641 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Construction of Missing Links/New Roads
Montevista-DNAS Road (DNAS-Laak), Package 3, incl. ROW, Compostela Valley
Physical Target:
CW1: 9.600 Lane Km (Construction of Concrete Road)
CW2: 81,632,653 sq. m.
Allocation:
TOTAL: P 200,000,000.00
CW1: P 185,280,000.00 (Construction of Concrete Road)
ROW: P 7,720,000.00
EAO: P 7,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Construction of Missing Links/New Roads
Montevista-DNAS Road (DNAS-Laak), Package 3, incl. ROW, Compostela Valley
Physical Target:
CW1: 6.74438 Lane Km (Construction of Gravel Road)
CW2: 954 sq. m. (Construction of Concrete Bridge)
CW2: 81,632,653 sq. m.
Allocation:
TOTAL: P 200,000,000.00
CW1: P 95,725,247.95 (Construction of Gravel Road)
CW2: P 89,554,752.05 (Construction of Concrete Bridge)
ROW: P 7,720,000.00
EAO: P 7,000,000.00
May 8, 2018 FY 2018 WIN8G02182 FY 2018 GAA January 4, 2018 Region III Aurora District Engineering Office
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects-Local Roads and Bridges-Local Roads - Concreting of Road, Brgy. Dibutunan, Dipaculao, Aurora
May 8, 2018 FY 2018 WIN8G02179 FY 2018 GAA January 4, 2018 Region III Aurora District Engineering Office
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects-Local Roads and Bridges-Local Roads - Concreting of Reviganza-Balante Road, Brgy. Nipoo, Dinalungan, Aurora
May 8, 2018 FY 2018 WIN8G02190 FY 2018 GAA January 4, 2018 Region III Aurora District Engineering Office
Construction/Maintenance of Flood Control Mitigation Structures and Drainage System - Construction of Flood Control along Bungo River, Dinalungan, Aurora
May 8, 2018 FY 2018 WIN8G02202 FY 2018 GAA January 4, 2018 Region III Aurora District Engineering Office
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects-Local Roads and Bridges-Local Roads - Concreting of Road, Brgy. Estevez, Casiguran, Aurora
May 8, 2018 FY 2018 WIN8G02185 FY 2018 GAA January 4, 2018 Region III Aurora District Engineering Office
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects-Local Roads and Bridges-Local Roads - Construction of Road, Brgy. Paltic to Dikapanikian, Dingalan, Aurora.
May 8, 2018 FY 2018 WIN8G02187 FY 2018 GAA January 4, 2018 Region III Aurora District Engineering Office
Local Infrastructure Program - Local Roads and Bridges - Local Roads - Construction of Road, Brgy. Dibutunan (Phase 2), Dipaculao, Aurora
May 8, 2018 FY 2018 WIN8G02197 FY 2018 GAA January 4, 2018 Region III Aurora District Engineering Office
Local Infrastructure Program - Local Roads and Bridges - Local Roads - Construction of Road, Brgy. Dibutunan (Phase 1), Dipaculao, Aurora
May 8, 2018 FY 2018 WIN8G02199 FY 2018 GAA January 4, 2018 Region III Aurora District Engineering Office
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - Local Roads and Bridges - Local Roads - Concreting of Bazal - ASCOT Road, Brgy. Bazal, Ma. Aurora, Aurora
May 8, 2018 GAA FY 2018 WIN8C02879 UACS No. 310111100018000 January 1, 2018 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 310111100018000
Project ID: P00202759LZ
WIN8C02879
Organizational Outcome 001: Ensure and Safe and Reliable National Road System
Asset Preservation – Construction/Upgrading/Rehabilitation of Drainage along National Road –
Secondary Roads
Zapote-Alabang Road – K0019+305 – K0020+912
Physical Target: CW1-Construction of Drainage Structure along Road = 3,200 lineal meters
EAO – P 800,000.00
Unit Cost (P’000): P12,250.00/ linear meter
Allocation: P 39,200,000.00
Total: P 40,000,000.00

As Modified
UACS No. 310111100018000
Project ID: P00202759LZ
WIN8C02879
Organizational Outcome 001: Ensure and Safe and Reliable National Road System
Asset Preservation – Construction/Upgrading/Rehabilitation of Drainage along National Road –
Secondary Roads
Zapote-Alabang Road – K0019+305 – K0022+061
Physical Target: CW1-Construction of Drainage Structure along Road = 3,260 lineal meters
EAO – P 800,000.00
Unit Cost (P’000): P12,024.54/ lineal meter
Allocation: P 39,200,000.00
Total: P 40,000,000.00
May 8, 2018 GAA FY 2018 WIN8F05465 UACS No. 310111100017000 January 1, 2018 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 310111100017000
Project ID: P00202758LZ
WIN8F05465
Organizational Outcome 001: Ensure and Safe and Reliable National Road System
Asset Preservation – Construction/Upgrading/Rehabilitation of Drainage along National Road –
Secondary Roads
Zapote-Alabang Road – K0015+595 – K0018+082
Physical Target: CW1-Construction of Drainage Structure along Road = 4,956 lineal meters
EAO – P 1,000,000.00
Unit Cost (P’000): 9,887/ lineal meter
Allocation: P 49,000,000.00
Total: P 50,000,000.00

As Modified
UACS No. 310111100017000
Project ID: P00202758LZ
WIN8F05465
Organizational Outcome 001: Ensure and Safe and Reliable National Road System
Asset Preservation – Construction/Upgrading/Rehabilitation of Drainage along National Road –
Secondary Roads
Zapote-Alabang Road – K0015+345 – K0018+082
Physical Target: CW1-Construction of Drainage Structure along Road = 3,496 lineal meters
EAO – P 1,000,000.00
Unit Cost (P’000): 9,887/ lineal meter
Allocation: P 49,000,000.00
Total: P 50,000,000.00
May 8, 2018 GAA FY 2018 WIN8F05467 UACS No. 310112100004000 January 1, 2018 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 310112100004000
Project ID: P00200699LZ
WIN8F05467
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads –
Tertiary Roads
Sumulong H-way – K0016+(-435) – K0016+(-075)
Physical Target: CW1-Construction of Drainage Structure along Road L=360 l.m.
Unit Cost (P’000): P268.06/l.m.
Allocation: P 96,500.00 M
EAO P 3,500.00 M
Total: P 100,000.00 M

As Modified
UACS No. 310112100004000
Project ID: P00200699LZ
WIN8F05467
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads –
Tertiary Roads
Sumulong H-way – K0016+(-283) – K0016+(123 )
Physical Target: CW1-Construction of Drainage Structure along Road L=360 l.m.
Unit Cost (P’000): P268.06/l.m.
Allocation: P 96,500.00 M
EAO P 3,500.00 M
Total: P 100,000.00 M
May 8, 2018 GAA FY 2018 WIN8F05469 UACS No. 310102100054000 January 1, 2018 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 310102100054000
Project ID: P00200071LZ
WIN8F05469
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
McArthur Bridge – K0002+-236 – K0002+126 (S02346LZ), Chainage 234 – Chainage 368
Physical Target: CW1 Preventive Maintenance of Roads: Asphalt Overlay L=.992 lane km
Unit Cost (P’000): P14,525.14/ lane km
Allocation: P 14,408,940.00 M
EAO P 294,060.00 M
Total: P 14,703,000.00

As Modified
UACS No. 310102100054000
Project ID: P00200071LZ
WIN8F05469
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
McArthur Bridge – K0002+-236 – K0002+126 (S02346LZ), Chainage 000 – Chainage 368
Physical Target: CW1 Preventive Maintenance of Roads: Asphalt Overlay L=1.46 lane km
Unit Cost (P’000): P9,869.14 lane km
Allocation: P 14,408,940.00 M
EAO P 294,060.00 M
Total: P 14,703,000.00
May 8, 2018 FY 2018 WIN8G 02171 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Becuran, Santa Rita, Pampanga
May 8, 2018 GAA FY 2018 WIN8F05468 UACS No. 320101100450000 January 1, 2018 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 320101100450000
Project ID: P00221378LZ
WIN8F05468
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement of Nangka River, Anastacia Village, Tierra Verde Subdivision, Marikina City
Physical Target: CW1-Construction of Flood Mitigation Structure L=193.20 l.m.
Unit Cost (P’000): P202.90/l.m.
Allocation: P 39,200.00 M
EAO P 800.00 M
Total: P 40,000.00 M

As Modified
UACS No. 320101100450000
Project ID: P00221378LZ
WIN8F05468
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement of Nangka River, Anastacia Village, Tierra Vista Subdivision, Marikina City
Physical Target: CW1-Construction of Flood Mitigation Structure L=193.20 l.m.
Unit Cost (P’000): P202.90/l.m.
Allocation: P 39,200.00 M
EAO P 800.00 M
Total: P 40,000.00 M
May 8, 2018 FY 2018 WIN8G02180 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. San Basilio, Zone 6, Santa Rita, Pampanga
May 8, 2018 GAA FY 2018 WIN8F05466 UACS No. 320101100369000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101100369000
Project ID: P00221393LZ
WIN8F05466
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and
Drainage Systems
Construction/Sealing of Riverwall along Malabon – Navotas River, Sta. 1+639 to Sta. 1+939, Brgy. Concepcion to Brgy. Baritan, Malabon City
Physical Target: CW1 – Construction of Revetment: 300 lm
EAO P 1 M
Unit Cost: P 163,333.33/ lm
Allocation: P 49 M
Total: P 50 M

As Modified
UACS No. 320101100369000
Project ID: P00221393LZ
WIN8F05466
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and
Drainage Systems
Construction/Sealing of Riverwall along Malabon – Navotas River, Sta. 1+639 to Sta. 1+909, Brgy. Concepcion to Brgy. Baritan, Malabon City
Physical Target: CW1 – Construction of Revetment: 270 lm
EAO P 1 M
Unit Cost: P 181,481.48/ lm
Allocation: P 49 M
Total: P 50 M
May 8, 2018 2018 WIN8C02776 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties - Flood Management
Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Rechanneling / Construction of Revetment of Hijo Bridge 2, Hijo River, Maco (Downstream), Compostela Valley
Physical Target:
CW1: 310 lm (Construction of Revetment)
ROW: 1,143 sq.m
ALLOCATION:
TOTAL: P 50,000,000.00
CW1: P 48,057,000.00 (Construction of Revetment)
ROW: P 193,000.00
EAO: P 1,750,000.00

TO: OO2: Protect Lives and Properties - Flood Management
Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Rechanneling / Construction of Revetment of Hijo Bridge 2, Hijo River, Maco (Downstream), Compostela Valley
Physical Target:
CW1: 364.20 lm (Construction of Revetment)
ROW: 1,143 sq.m
ALLOCATION:
TOTAL: P 50,000,000.00
CW1: P 48,057,000.00 (Construction of Revetment)
ROW: P 193,000.00
EAO: P 1,750,000.00
May 4, 2018 FY - 2018 WIN8F05341 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects -
Flood Control Structures/Facilities

FROM:
Concreting of Brgy. Mangiliol Flood Control,
Gasan, Marinduque

CW1: 60.00 lin.m. ( Construction of Revetment )
Allocation: 2,000,000 Php

TO:
Construction of Brgy. Mangiliol Flood Control,
Gasan, Marinduque

CW1: 44.00 lin.m. ( Construction of Revetment )
Allocation: 2,000,000 Php
May 4, 2018 FY - 2018 WIN8F05343 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Road, Brgy. Timbo ( Sanggulong ),
Mogpog, Marinduque

CW1: 0.352 Lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php

TO:
Construction of Road, Brgy. Timbo ( Sanggulong ),
Buenavista, Marinduque

CW1: 0.640 Lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php
May 4, 2018 FY - 2018 WIN8F05357 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Concreting of 900 m. Dampulan - Maulawin road,
Barangay Dampulan, Torrijos, Marinduque

CW1: 0.792 Lane km ( Construction of Concrete Road )
Allocation: 4,500,000 Php

TO:
Concreting of 0.900 lane km Dampulan - Maulawin road,
Barangay Dampulan, Torrijos, Marinduque

CW1: 0.900 Lane km ( Construction of Concrete Road )
Allocation: 4,500,000 Php
May 4, 2018 FY - 2018 WIN8F05374 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Construction/Concreting of Brgy. Bunganay FMR,
Boac, Marinduque

CW1: 0.352 Lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php

TO:
Construction/Concreting of Brgy. Bunganay, FMR,
Boac, Marinduque

CW1: 0.495 Lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php
May 4, 2018 FY - 2018 WIN8F05333 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Concreting of 300 m. road to White Beach,
Barangay Poctoy, Torrijos, Marinduque

CW1: 0.528 Lane km ( Construction of Concrete Road )
Allocation: 3,000,000 Php

TO:
Concreting of 300 m. road to White Beach,
Barangay Poctoy, Torrijos, Marinduque

CW1: 0.600 Lane km ( Construction of Concrete Road )
Allocation: 3,000,000 Php
May 4, 2018 FY 2018 GAA WIN8C02652 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Jct. Davao-Cotabato Road, San Antonio St.-4th St.-Kawayan Drive leading to Pasalubong Center (Apo ni Lola), Brgy. Matina Crossing, Davao City
Physical Target:
CW1: 0.94 Lane km (Reconstruction from Paved to Concrete)
Allocation:
TOTAL: P 17,860,000.00
CW1: P 17,502,800.00 (Reconstruction from Paved to Concrete)
EAO: P 357,200.00

TO: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Jct. Davao-Cotabato Road, San Antonio St.-4th St.-Kawayan Drive leading to Pasalubong Center (Apo ni Lola), Brgy. Matina Crossing, Davao City
Physical Target:
CW1: 1.772 Lane km (Reconstruction from Paved to Concrete)
Allocation:
TOTAL: P 17,860,000.00
CW1: P 17,502,800.00 (Reconstruction from Paved to Concrete)
EAO: P 357,200.00
May 4, 2018 FY - 2018 WIN8F05359 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Concreting of 700 m. Mabuhay - Duongan road,
Barangay mabuhay, Torrijos, Marinduque

CW1: 0.616 Lane km ( Construction of Concrete Road )
Allocation: 3,500,000 php

TO:
Concreting of 700 m. lane km Mabuhay - Duongan road,
Barangay Mabuhay, Torrijos, Marinduque

CW1: 0.700 Lane km ( Construction of Concrete Road )
Allocation: 3,500,000 Php
May 4, 2018 FY - 2018 WIN8F05356 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Concreting of 500 m.Road from Purok 7 to
Pulang Lupa road, Barangay Marlangga,
Torrijos, Marinduque

CW1: 0.440 Lane km ( Construction of Concrete Road )
Allocation; 2,500,000 Php

TO:
Concreting of 0.500 lane km Road from Purok 7 to
Pulang Lupa road, Barangay Marlangga,
Torrijos, Marinduque

CW1: 0.500 lane km ( Construction of Concrete Road )
Allocation: 2,500,000 Php
May 4, 2018 FY 2018 GAA WIN8C02569 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Jct. Acacia Road - Purok New Visayas leading to Safari Land Crocodile Park, Brgy. Acacia, Davao City
Physical Target:
CW1: 2.64 Lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 21,040,000.00
CW1: P 20,619,200.00 (Construction of Concrete Road)
EAO: P 420,800.00

TO: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Jct. Acacia Road - Purok New Visayas leading to Safari Land Crocodile Park, Brgy. Acacia, Davao City
Physical Target:
CW1: 1.98 Lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 21,040,000.00
CW1: P 20,619,200.00 (Construction of Concrete Road)
EAO: P 420,800.00
May 4, 2018 FY - 2018 WIN8F05336 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Concreting of 200 m. Bonliw - Ibaba road,
Barangay Bonliw, Torrijos, Marinduque

CW1: 0.176 Lane km ( Construction of Concrete Road )
Allocation: 1,000,000 Php

TO:
Concreting of 0.20 m. lane km Bonliw - Ibaba road,
Barangay Bonliw, Torrijos, Marinduque

CW1: 0.200 Lane km ( Construction of Concrete Road )
Allocation: 1,000,000 Php
May 4, 2018 FY 2018 GAA WIN8C02649 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Installation of Gabions and Mattresses along Bago River, Bago Aplaya Section, Davao City
Physical Target:
CW1: 500 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00

TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Installation of Gabions and Mattresses along Bago River, Bago Aplaya Section, Davao City
Physical Target:
CW1: 671 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
May 4, 2018 FY - 2018 WIN8F05334 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Concreting of 3.0 km Buangan - Bayakbakin road,
Barangay Bayakbakin, Torrijos, Marinduque

CW1: 2.639 lane km ( Construction of Concrete Road )
Allocation: 15,000,000 Php

TO:
Concreting of 3.0 lane km Buangan - Bayakbakin road,
Barangay Bayakbakin, Torrijos, Marinduque

CW1: 3.000 Lane km ( Construction of Concrete Road )
Allocation: 15,000,000 Php
May 4, 2018 FY - 2018 WIN8F05332 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Concreting of 800 m. Kay Bulik - Makuyasi road,
Barangay Kay Duke, Torrijos, Marinduque

CW1: 0.704 Lane km ( Construction of Concrete Road )
Allocation: 4,000,000 Php

TO:
Concreting of 0.800 lane km. Kay Bulik - Makuyasi road,
Barangay Kay Duke, Torrijos, Marinduque

CW1: 0.800 Lane km ( Construction of Concrete Road )
Allocation: 4,000,000 Php
May 4, 2018 FY 2018 GAA WIN8C02590 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Concrete Revetment along Davao River, Ma-a, Davao City
Physical Target:
CW1: 290 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00

TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Concrete Revetment along Davao River, Ma-a, Davao City
Physical Target:
CW1: 168 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00
May 4, 2018 FY 2018 GAA WIN8C02589 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Riverbank Protection & Installation of Gabions and Mattresses along Matina River, Matina Pangi, Davao Savings Portion, Davao City
Physical Target:
CW1: 200 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 18,000,000.00
CW1: P 17,640,000.00 (Construction of Flood Mitigation Structure)
EAO: P 360,000.00

TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Riverbank Protection & Installation of Gabions and Mattresses along Matina River, Matina Pangi, Davao Savings Portion, Davao City
Physical Target:
CW1: 182 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 18,000,000.00
CW1: P 17,640,000.00 (Construction of Flood Mitigation Structure)
EAO: P 360,000.00
May 4, 2018 FY 2018 GAA WIN8C02583 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Rehabilitation of Food Mitigation Facilities within Major River Basins and Principal Rivers
Installation of Gabions and Mattresses along Davao River Basin, Mandug Section, DDF Subdivision, Phase 5, Davao City
Physical Target:
CW1: 237 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 22,000,000.00
CW1: P 21,560,000.00 (Construction of Flood Mitigation Structure)
EAO: P 440,000.00

TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Rehabilitation of Food Mitigation Facilities within Major River Basins and Principal Rivers
Installation of Gabions and Mattresses along Davao River Basin, Mandug Section, DDF Subdivision, Phase 5, Davao City
Physical Target:
CW1: 203 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 22,000,000.00
CW1: P 21,560,000.00 (Construction of Flood Mitigation Structure)
EAO: P 440,000.00
May 4, 2018 FY 2018 GAA WIN8C02587 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Rehabilitation of Food Mitigation Facilities within Major River Basins and Principal Rivers
Installation of Gabions and Mattresses along Davao River, Mandug Section, DDF Subdivision, Brgy. Mandug, Davao City
Physical Target:
CW1: 400 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Flood Mitigation Structure)
EAO: P 800,000.00

TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Rehabilitation of Food Mitigation Facilities within Major River Basins and Principal Rivers
Installation of Gabions and Mattresses along Davao River, Mandug Section, DDF Subdivision, Brgy. Mandug, Davao City
Physical Target:
CW1: 375 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Flood Mitigation Structure)
EAO: P 800,000.00
May 4, 2018 FY 2018 GAA WIN8C02584 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Installation of Gabions and Mattresses along Malabog Creek Protecting Fatima-Malabog Road, Davao City
Physical Target:
CW1: 200 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Flood Mitigation Structure)
EAO: P 400,000.00

TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Installation of Gabions and Mattresses along Malabog Creek Protecting Fatima-Malabog Road, Davao City
Physical Target:
CW1: 317 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Flood Mitigation Structure)
EAO: P 400,000.00
May 4, 2018 FY 2018 GAA WIN8C02778 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Installation of Gabions and Mattresses along Bago River, Kaliraya Section, Sta. 1+008 – Sta. 1+587, Sta. 1+593 – Sta. 1+702 Left Bank, Davao City
Physical Target:
CW1: 688 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00

TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Installation of Gabions and Mattresses along Bago River, Kaliraya Section, Sta. 1+044 – Sta. 1+587, Sta. 1+593 – Sta. 1+702 Left Bank, Davao City
Physical Target:
CW1: 652 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
May 4, 2018 FY 2018 GAA WIN8C02780 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: Local Program - Flood Control and Drainage
Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Drainage along Lasang Creek, Davao City
Physical Target:
CW1: 600 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Construction of Drainage Structure)
EAO: P 1,750,000.00

TO: Local Program - Flood Control and Drainage
Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Drainage along Lasang Creek, Davao City
Physical Target:
CW1: 796 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Construction of Drainage Structure)
EAO: P 1,750,000.00
May 4, 2018 FY 2018 GAA WIN8C02744 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: Local Program
Flood Control and Drainage
Drainage/Protection Works - Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Improvement/Construction of Drainage along Jct. J.P. Cabaguio Ave.-Vinzon St.-Dacudao Ave., Davao City
Physical Target:
CW1: 480 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 16,800,000.00
CW1: P 16,212,000.00 (Construction of Drainage Structure)
EAO: P 588,000.00

TO: Local Program
Flood Control and Drainage
Drainage/Protection Works - Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Improvement/Construction of Drainage along Jct. J.P. Cabaguio Ave.-Vinzon St.-Dacudao Ave., Davao City
Physical Target:
CW1: 854 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 16,800,000.00
CW1: P 16,212,000.00 (Construction of Drainage Structure)
EAO: P 588,000.00
May 4, 2018 FY 2018 GAA WIN8C02750 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: Local Program - Flood Control and Drainage
Drainage/Protection Works - Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Improvement/Construction of Drainage along Jct. J.P. Cabaguio Ave.-Villamor St.-Dacudao Ave., Davao City
Physical Target:
CW1: 436 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 17,440,000.00
CW1: P 16,829,600.00 (Construction of Drainage Structure)
EAO: P 610,400.00

TO: Local Program - Flood Control and Drainage
Drainage/Protection Works - Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Improvement/Construction of Drainage along Jct. J.P. Cabaguio Ave.-Villamor St.-Dacudao Ave., Davao City
Physical Target:
CW1: 528 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 17,440,000.00
CW1: P 16,829,600.00 (Construction of Drainage Structure)
EAO: P 610,400.00
May 4, 2018 FY - 2018 WIN8F05328 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Concreting of 1.50 km. Pakaskasan - Bangwayin road,
Barangay Pakaskasan, Torrijos, Marinduque

CW1: 1.319 Lane km ( Construction of Concrete Road )
Allocation: 7,500,000 Php

TO:
Concreting of 1.5 lane km Pakaskasan - Bangwayin road,
Barangay Pakaskasan, Torrijos, Marinduque

CW1: 1.500 lane km ( Construction of Concrete Road )
Allocation: 7,500,000 Php
May 4, 2018 FY - 2018 WIN8F05352 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Road, Brgy. Bangbangalon,
Boac, Marinduque

CW1: 0.352 Lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php

TO:
Construction of Road, Brgy. Bangbangalon,
Boac, Marinduque

CW1: 0.520 Lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php
May 4, 2018 FY - 2018 WIN8F05354 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects -
Flood Control Structures/Facilities

FROM:
Construction of Brgy. Candahon Flood Control,
Mogpog, Marinduque

CW1: 30.00 lon.m. ( Construction of Revetment )
Allocation: 1,000,000 Php

TO:
Construction of Brgy. Candahon Flood Control,
Mogpog, Marinduque

CW1: 40.00 lin.m. ( Construction of Revetment )
Allocation: 1,000,000 Php
May 4, 2018 FY - 2018 WIN8F05358 FY - 2018 GAA DPWG Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects -
Flood Control Structures/Facilities

FROM:
Construction of Brgy. Janagdong ( Sitio Bato ) Flood Control, Mogpog, Marinduque

CW1: 238.00 lin.m. ( Construction of Revetment )
Allocation: 8,000,000 Php

TO:
Construction of Brgy. Janagdong ( Sitio Bato )
Flood Control, Mogpog, Marinduque

CW1: 210.00 lin.m. ( Construction of Revetment )
Allocation: 8,000,000 Php
May 4, 2018 FY 2018 GAA WIN8C02580 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Installation of Gabions and Mattresses along Davao River, Upstream, Maa Section, Davao City
Physical Target:
CW1: 450 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00

TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Installation of Gabions and Mattresses along Davao River, Upstream, Maa Section, Davao City
Physical Target:
CW1: 519 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
May 4, 2018 FY 2018 GAA WIN8C02581 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Installation of Gabions and Mattresses along Davao River Basin (Midland - Maa Section), Sta. 4+746 - Sta. 4+900, Sta. 4+915 – Sta. 5+211, Davao City
Physical Target:
CW1: 450 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 45,000,000.00
CW1: P 44,100,000.00 (Construction of Flood Mitigation Structure)
EAO: P 900,000.00


TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Installation of Gabions and Mattresses along Davao River Basin (Midland- Maa Section), Sta. 4+476 - Sta. 4+650, Sta. 4+670 – Sta. 4+986, Davao City
Physical Target:
CW1: 490 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 45,000,000.00
CW1: P 44,100,000.00 (Construction of Flood Mitigation Structure)
EAO: P 900,000.00
May 4, 2018 FY 2018 GAA WIN8C02578 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Installation of Gabions and Mattresses along Lasang River, Pañalum Section, Protecting Pañalum Bridge (Sta. 38+292 – Sta. 38+788), Left Bank, Davao City
Physical Target:
CW1: 496 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00

TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Installation of Gabions and Mattresses along Lasang River, Pañalum Section, Protecting Pañalum Bridge (Sta. 38+292 – Sta. 38+533, Sta. 38+548 – Sta. 38+999), Left Bank, Davao City
Physical Target:
CW1: 692 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
May 3, 2018 FY 2018 WIN8C02612 UACS No. 310201100122000 April 24, 2018 Region IX Zamboanga del Norte 1st District Engineering Office
UACS No. 310201100122000
Project ID: P00200583MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
Dipolog - Sindangan - Liloy Road
K1891+000 - K1892+460
K1885+820 - K1886+800
Physical Target:
CW-1- Road Widening: 4.8800 Lane km
Unit Cost: P 13,432,000/lane km
Physical Target:
ROW: 415.61 sq.m.
Unit Cost: P 4,810.00/sq.m.
EAO: P 2,450,000.00
Allocation: P 70,000,000.00
May 3, 2018 FY 2018 WIN8C02621 UACS No. 300204100038000 April 24, 2018 Region IX Zamboanga del Norte 1st District Engineering Office
UACS No. 300204100038000
Project ID: P00230009MN
Convergence and Special Support
Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
Jct. Dipolog- Sindangan - Road connecting to Bago-Dalongdong (Joaquin Macias) in Support of Rice, Rubber, Coconut, and Abaca Industries, Sindangan, Zamboanga del Norte
Physical Target:
CW-1- Construction of Concrete Road: 6.20 Lane km
Unit Cost: P 12,542,000.00/Lane km
EAO: P 2,800,000.00
Allocation: P 80,000,000.00
May 3, 2018 FY 2018` WIN8C02622 UACS No. 300204100050000 April 24, 2018 Region IX Zamboanga del Norte 1st District Engineering Office
UACS No. 300204100050000
Project ID: P00230017MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
NRJ Dipolog - Sindangan Road, Jose Dalman to Jct. Dinasan Provincial Road, 400m from Jct. Ilihan to Lopero Brgy. Road, in support of Agribusiness (Rubber and Coco) & Lopero Agrarian Reform Community (SIGILO) Jose Dalman Association, Zamboanga del Norte
Physical Target:
CW-1- Construction of Concrete Road: 6.286 Lane km
Unit Cost: P 12,281,000.00/Lane km
EAO: P 2,800,000.00
Allocation: P 80,000,000.00
May 3, 2018 FY 2018 WIN8C02624 UACS No. 300203100130000 April 24, 2018 Region IX Zamboanga del Norte 1st District Engineering Office
UACS No. 300203100130000
Project ID: P00230029MN
Convergence and Special Support
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
NRJ Leading to Zapanta- Gomez Cave, Brgy. Lipakan, Pres. Manuel Roxas, Zamboanga del Norte
Physical Target:
CW-1- Construction of Concrete Road: 7.2126 Lane km
Unit Cost: P 12,041,000.00/Lane km
EAO: P 3,150,000.00
Allocation: P 90,000,000.00
May 3, 2018 FY 2018 WIN8C02614 UACS No. 300203100127000 April 24, 2018 Region IX Zamboanga del Norte 1st District Engineering Office
UACS No. 300203100127000
Project ID: P00230025MN
Convergence and Special Support
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
NRJ Leading to Morias Falls, Brgy. Miatan, Katipunan, Zamboanga del Norte
Physical Target:
CW-1- Construction of Concrete Road: 7.5822 Lane km
Unit Cost: P 11,454,000.00/Lane km
EAO: P 3,150,000.00
Allocation: P 90,000,000.00
May 3, 2018 2018 WIN8F05446 R.A. 10964 December 19, 2017 Region VII Regional Office VII
Organizational Outcome 1: Ensure Safe and Reliable National Road System, Network Development Program -Road Widening -Tertiary Roads- Hernan Cortes St. incl. ROW (S00367CB) Chainage 000 - Chainaage 1374.54
May 3, 2018 FY 2018 WIN8G02054 UACS No. 31030510026800 November 29, 2017 Region V Camarines Sur 5th District Engineering Office
UACS No.: 31030510026800
Project ID: P00202283LZ
OO1: Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges - Malangog Br. (B00431LZ) along Rolando A Andaya Highway
CW1 - Widening OF Bridge / 295.740 sq.m.
Estimated Cost: Php 36.20M
May 3, 2018 FY 2018 WIN8G02147 FY 2018 GAA January 4, 2018 Region III Pampanga 3rd District Engineering Office
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Reinforced Concrete Slope Protection with Steel Sheet Piles Foundation along Sapangbato River, Brgy. Margot to Brgy. Anunas, Angeles City, Pampanga
May 3, 2018 FY 2018 WIN8G02062 UACS No. 300117201427000 December 29, 2017 Region V Camarines Sur 5th District Engineering Office
UACS No.: 300117201427000
Project ID: P00248789LZ
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Rehabilitation of Barangay Road, Andaya Highway Junction, Brgy. Sinuknipan I to Brgy. Domagongdong, Del Gallego, Camarines Sur
CW1 - Rehabilitation of Paved Road / 0.386 lane km
Unit Cost - P 5.126T/lane km
Estimated Cost; Php 2.0M
May 3, 2018 FY 2018 WIN8G02157 FY 2018 GAA January 4, 2018 Region III Pampanga 3rd District Engineering Office
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation of Quitangil Creek, Sta. 0+000 to Sta. 0+593 and Sta. 3+642 to Sta. 3+959, Magalang, Pampanga
May 3, 2018 FY 2018 WIN8G02016 UACS No. 310107100035000 December 29, 2017 Region V Camarines Sur 5th District Engineering Office
UACS No.: 310107100035000
Project ID: P00200763LZ
OO1: Ensure Safe and reliable National Road System - Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and landslide - Primary Roads - Rolando A Andaya Highway - K0314+010 - K0314+137, K0314+025 - K0314+102, K0315+000 - K0315+060, K0315+115 - K0315+260, K0315+200 - K0315+265, K0315+375 - K0315+465, K0316+769 - K0316+897, K0330+250 - K0330+304
May 3, 2018 FY 2018 GAA WIN8C02586 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Waan to Magtuod Road leading to Davao Crocodile Park, Brgy. Waan, Davao City
Physical Target:
CW1: 0.580 Lane km (Construction of Concrete Road)
CW2: 1.700 Lane km (Reconstruction from Paved to Concrete)
Allocation:
TOTAL: P 17,070,000.00
CW1: P 4,189,500.00 (Construction of Concrete Road)
CW2: P 12,539,100.00 (Reconstruction from Paved to Concrete)
EAO: P 341,400.00

TO: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Waan to Magtuod Road leading to Davao Crocodile Park, Brgy. Waan, Davao City
Physical Target:
CW1: 1.750 Lane km (Reconstruction from Paved to Concrete)
Allocation:
TOTAL: P 17,070,000.00
CW1: P 16,728,600.00 (Reconstruction from Paved to Concrete)
EAO: P 341,400.00
May 2, 2018 FY - 2018 WIN8F05304 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Concreting of 300 m. Bayanan to Mabuhay road,
Barangay Matuyatuya, Torrijos, Marinduque

CW1: 0.264 Lane km ( Construction of Concrete Road )
Allocation: 1,500,000 Php

TO:
Concreting of 0.300 lane km Bayanan to Mabuhay road,
Barangay Matuyatuya, Torrijos, Marinduque

CW1: 0.300 Lane km ( Construction of Concrete Road )
Allocation: 1,500,000 Php
May 2, 2018 FY 2018 WIN8C02620 UACS No. 300117201996000 April 24, 2018 Region IX Zamboanga del Norte 1st District Engineering Office
UACS No. 300117201996000
Project ID: P00251619MN
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Centro Gampis, Sindangan, Zamboanga del Norte
Physical Target:
CW-1- Construction of Concrete Road: 0.202 Lane km
Unit Cost: P 3,465,346.53/Lane km
Allocation: P 700,000.00
May 2, 2018 FY - 2018 WIN8F05307 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Concreting of 3 km Malibago - Sinambaan road,
Baragnay Malibago, Torrijos, Marinduque

CW1: 2.639 Lane km ( Construction of Concrete Road )
Allocation: 15,000,000 Php

TO:
Concreting of 3 lane km. Malibago - Sinambahan road,
Barangay Malibago, Torrijos, Marinduque

CW1: 3.000 Lane km ( Construction of Concrete Road )
Allocation : 15,000,000 Php
May 2, 2018 FY - 2018 WIN8F05318 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Concreting of 1 km. Sibuyao to Sitio Dando road at
Sitio Danao, Barangay Sibuyao, Torrijos, Marinduque

CW1: 0.880 Lane km ( Construction of Concrete Road )
Allocation; 5,000,000 Php

TO:
Concreting of 1 lane km. Sibuyao to Sitio Dando road at
Sitio Danao, Barangay Sibuyao, Torrijos, Marinduque

CW1: 1.000 Lane km ( Construction of Concrete Road )
Allocation: 5,000,000 Php

Pages