June 28, 2017 |
2017 |
WIN7G01604 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified;
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes
Widening of Bridge - Taglatawan Bridge (B00901MN) along Daang Maharlika (Agusan - Davao Sect)
Allocation : ₱ 20.000 Million
Physical Target : 202.215 sq.m.
|
June 28, 2017 |
2017 |
WIN7G01607 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes
Widening of Hupas Bridge (B00895MN) from two to four lanes along Daang Maharlika (Agusan - Davao Sect)
Allocation : ₱ 31.00 Million
Physical Target : 331.57 sq.m.
|
June 28, 2017 |
2017 |
WIN7G01609 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Dike along Poblacion-Magtuyon-Talacogon Road, Poblacion, San Luis, Agusan del Sur, Sta. 0+070 - Sta. 0+107
Allocation : ₱ 19.99 Million
Physical Target : 37.00 lm
|
June 28, 2017 |
2017 |
WIN7G01623 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified;
Construction and Maintenance of Bridges along National Roads - Rehabilitation/Major Repair of Permanent Bridges
Rehabilitation/Major Repair of Bridge - Tugpan Bridge (B00595MN) along Butuan City-Talacogon-Loreto-Veruela-Sta. Josefa Rd.
Allocation : ₱ 19.00 Million
Physical Target : 1.00 number of Bridge
|
June 28, 2017 |
2017 |
WIN7E01737 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Rehabilitation of Flood Control Structures along Pampanga River, Sta. 018+000 to Sta. 018+330.80, Brgy. Poblacion Norte, Rizal, Nueva Ecija
(Construction of Flood Mitigation Structure) |
June 28, 2017 |
2017 |
WIN7E01736 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Improvement of Banco River Control, Brgy. Macapsing, Sta. 4+019-Sta.4+161.80, Rizal, Nueva Ecija
(Rehabilitation/Major Repair of Flood Control Structure) |
June 28, 2017 |
2017 |
103004010310697 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 3rd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities: Construction of Motorpool Office Warehouse and Repair Bay, Provincial Capitol Complex, Tuguegarao City, Cagayan |
June 28, 2017 |
2017 |
103004010310699 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 3rd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities: Construction of Provincial Engineers Office (Main Building), Provincial Capitol Complex, Tuguegarao City, Cagayan |
June 28, 2017 |
2017 |
103004010310694 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 3rd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities: Construction of Multi-purpose Building, Brgy. Carig Norte, Tuguegarao City, Cagayan |
June 28, 2017 |
2017 |
103004010310698 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 3rd District Engineering Office |
Buildings and Other Structures - Multi-purpose/Facilities: Construction of Provincial Engineering Warehouse, Provincial Capitol Center, Tuguegarao City, Cagayan |
June 27, 2017 |
2017 |
292003020401475 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Dike and Slope Protection along Tarlac River Control, Paniqui-Camiling Section (Left Dike), Paniqui and Camiling, Tarlac Sta. 0+000 to Sta. 0+771
(Construction of Dike) |
June 27, 2017 |
2017 |
292003020401674 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Dike and Slope Protection along Tarlac River Control, Paniqui-Camiling Section (Left Dike), Paniqui and Camiling, Tarlac
Sta. 0+771 to Sta. 1+542
(Construction of Flood Mitigation Structure) |
June 27, 2017 |
2017 |
292003020402619 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection along Camiling River Control, Libueg Section, Camiling, Tarlac 1st LD
(Construction of Flood Mitigation Structure) |
June 27, 2017 |
2017 |
292003020402642 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Improvement of Slope Protection along Tarlac River Control, Carangi-an-Cutcut I Section, Tarlac City, Tarlac 2nd LD
(Construction of Flood Mitigation Structure) |
June 27, 2017 |
2017 |
292003020402615 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection along Camiling River at Brgy. Telbang (Phase II), Camiling, Tarlac 1st LD
(Construction of Flood Mitigation Structure) |
June 27, 2017 |
2017 |
165003014300234 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Asset Preservation of National Roads
Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Tertiary
Tarlac-Guimba Rd via Victoria
K0127+(-654) - K0127+(-592), K0127+(-592)-K0127+(-219), K0127+(-219)-K0127+000, K0127+000-K0127+794, K0127+794-K0128+000, K0128+000-K0128+155, K0130+800-K0131+000, K0131+000-K0131+625, K0131+625-K0132+000, K0132+000-K0132+332, K0132+984-K0134+000, K0134+000-K0134+296
(Reconstruction from Concrete to Concrete) |
June 27, 2017 |
2017 |
165003015200134 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Network Development
Improvement/Widening of National Roads - Tertiary
Tarlac-Guimba Rd via Victoria
K0133+000 - K0136+000, K0144+989.80-K0146+963.80
(Road Widening) |
June 27, 2017 |
2017 |
165003015200157 |
RA 10294 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Network Development
Improvement/Widening of National Roads - Tertiary
Victoria-Pura Rd
K0152+481 - K0153+611
(CW-1: Road Widening)
(CW-2: Construction of Drainage Structure along Road) |
June 27, 2017 |
2017 |
165003014300317 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Asset Preservation of National Roads
Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4)-Tertiary
Tarlac City-Sn Jose via Tibag-Burgos Rd
K0129+290-K0131+000
(Reconstruction from Concrete to Concrete) |
June 27, 2017 |
2017 |
165003016900041 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Network Development - Off-Carriageway Improvement including drainage - Tertiary
Ramos-Pura Rd
K0155+290-K0156+858
(Off-Carriageway Improvement: Shoulder Paving/Construction) |
June 27, 2017 |
2017 |
292004020200539 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Flood Control and Drainage - Drainage/Protection Works
Construction of Slope Protection along Camiling River Control, Sawat Section, Camiling, Tarlac
(Construction of Slope Protection Structure) |
June 27, 2017 |
2017 |
103004010311171 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Locally-Funded Projects: Local Infrastructure Program
Buildings and Other Structures - Multipurpose/Facilities
Construction of Multi-Purpose Building (Covered Court), Ramos National High School, Brgy. Poblacion South, Ramos, Tarlac
(Construction of Multi-Purpose Building) |
June 27, 2017 |
2017 |
165004050307498 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Locally-Funded Projects: Local Infrastructure Program
Roads and Bridges - Local Roads
Improvement of Maliwalo to Ungot Road, Brgy. Maliwalo, Tarlac City, Tarlac
(Construction of Concrete Raoad) |
June 27, 2017 |
2017 |
165004050307501 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Brgy. Road at Palacpalac, Victoria, Tarlac
(Construction of Concrete Road) |
June 27, 2017 |
2017 |
165004050307496 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Locally-Funded Projects: Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Road Network at the NHA-LGU Housing Project, Brgy. estipona, Pura, Tarlac
(Construction of Concrete Road) |
June 27, 2017 |
2017 |
103004010310762 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 3rd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities, Construction of Activity Center/Covered Court, La Paz National High School, Brgy. La Paz, Cabatuan, Isabela |
June 27, 2017 |
2017 |
165003017100160 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 3rd District Engineering Office |
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes, Widening of Bridge - Burgos Br. (B01183LZ) along Daang Maharlika (LZ) |
June 23, 2017 |
FY 2017 |
WIN7E01746 |
UACS No. 103004010310052 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures-Multipurpose/Facilities – Construction of Bridge (RCBC)/Rehab along Buli Creek, Brgy. Pinagbuhatan, Pasig City [Construction of Multi-Purpose Bldg.]
UACS No. 103004010310052
Physical Target/Cost
Original: 1 bldg.
Unit Cost (‘000): P12,000.0/Bldg.
Allocation: P12,000.0
WIN7E01746
As Modified
Locally-Funded Projects – LIP – Buildings and Other Structures-Multipurpose/Facilities – Construction of Building at Barangay Dela Paz and Barangay Ugong, Pasig City [Construction of Multi-Purpose Bldg.]
UACS No. 103004010310052
Physical Target/Cost
New: 2 bldgs.
Unit Cost (‘000): P6,000.0/Bldg.
Estimated Cost: P12,000.0
WIN7E01746
|
June 23, 2017 |
FY 2017 |
WIN7E01747 |
UACS No. 103004010310057 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Magat Salamat Multi-Purpose Building, Barangay Concepcion Dos, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310057
Physical Target/Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P3,000.0/bldg.
Allocation (‘000): P3,000.0
WIN7E01747
As Modified
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building at Barangay Concepcion Uno, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310057
Physical Target/Cost (‘000)
New: 1 bldg.
Unit Cost (‘000): P3,000.0/bldg.
Estimated Cost (‘000): P3,000.0
WIN7E01747
|
June 23, 2017 |
FY 2017 |
WIN7E01750 |
UACS No. 103004010310117 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Barangay Concepcion Uno Multi-Purpose Buildings, Barangay Concepcion Uno, Marikina City [Construction of Multi-Purpose Bldg.]
UACS No. 103004010310117
Physical Target/Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P2,000.0/Bldg.
Allocation (‘000): P2,000.0
WIN7E01750
As Modified
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction/Completion of Marikit Multipurpose Buildings, Barangay Concepcion Uno, Marikina City [Construction of Multi-Purpose Bldg.]
UACS No. 103004010310117
Physical Target/Cost (‘000)
New: 1 bldg.
Unit Cost (‘000): P2,000.0/Bldg.
Estimated Cost (‘000): P2,000.0
WIN7E01750
|
June 23, 2017 |
FY 2017 |
WIN7E01748 |
UACS No. 103004010310077 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Rancho IV East Multi-Purpose Building, Brgy. Concepcion Dos, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310077
Physical Target/ Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P2,000.0/bldg.
Alloc. (‘000): P2,000.0
WIN7E01748
As Modified
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Rancho IV East Multi-Purpose Building including site Development, Brgy. Concepcion Dos, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310077
Physical Target/ Cost (‘000)
New: 1 bldg.
Unit Cost (‘000): P2,000.0/bldg.
Est. Const. (‘000): P2,000.0
WIN7E01748
|
June 23, 2017 |
FY 2017 |
WIN7E01749 |
UACS No. 103004010310062 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building at Sagad Elementary School, Sagad, Pasig City [Construction of Multipurpose Building]
UACS No. 103004010310062
Physical Target/ Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P3,000.0/bldg.
Allocation (‘000): P3,000.0
WIN7E01749
As Modified
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building at Eusebio Bliss, Brgy.Maybunga, Pasig City [Construction of Multipurpose Building]
UACS No. 103004010310062
Physical Target/ Cost (‘000)
New: 1 bldg.
Unit Cost (‘000): P3,000.0/bldg.
Estimated Cost (‘000): P3,000.0
WIN7E01749
|
June 23, 2017 |
FY 2017 |
WIN7E01752 |
UACS No. 292003020401765 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
MF0 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structure and Drainage System – Rehabilitation of Drainage System along Farmers 1, Brgy. Tumana, Marikina City 2nd LD [Construction of Drainage Structure]
UACS No. 292003020401765
Physical Target/ Cost (‘000)
Original: 2105 lm
Unit Cost (‘000): P9.501/lm
Allocation (‘000): P20,000.0
WIN7E01752
As Modified
MF0 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structure and Drainage System – Rehabilitation of Drainage System including laterals along Farmers 1, Brgy. Tumana, Marikina City 2nd LD [Construction of Drainage Structure]
UACS No. 292003020401765
Physical Target/ Cost (‘000)
New: 2105 lm
Unit Cost (‘000): P9.501/lm
Estimated Cost (‘000): P20,000.0
WIN7E01752
|
June 23, 2017 |
FY 2017 |
WIN7F04938 |
UACS No. 292003020401837 |
January 1, 2017 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As of GAA
MFO – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Drainage Structure – Upgrading of Drainage System along Kaingin Road, Brgy. Moonwalk, Parañaque City (Construction of Drainage Structure)
UACS No. 292003020401837
Physical Target/ Cost
Original: 480 lineal meters
Unit Cost: P25.000T/lineal meters
Allocation Cost: 12.00M
WIN7F04938
As Modified
MFO – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Drainage System along Orchid St., Road 5, Zinnia St, Cadena de Amor St., Waling-Waling St., Phase II, Brgy. Marcelo Green, Parañaque City, Metro Manila, Sta. 0+000 to Sta.0+520/ Sta.0+370 to Sta. 0+542 (Construction of Drainage Structure)
UACS No. 292003020401837
Physical Target/ Cost
Modified: 692 lineal meters
Unit Cost: P17.341T/lineal meters
Estimated Cost: 12.00M
WIN7F04938
|
June 23, 2017 |
2017 |
165003017100161 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 3rd District Engineering Office |
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes, Widening of Bridge - Marabulig Br. (B01187LZ) along Daang Maharlika (LZ) |
June 23, 2017 |
2017 |
165003017100162 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 3rd District Engineering Office |
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 Lanes, Widening of Bridge - Minante Br. (B01186LZ) along Daang Maharlika (LZ) |
June 23, 2017 |
2017 |
103004010310763 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 3rd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities, Construction of Activity Center/Covered Court, Faustino Elementary School, Brgy. Faustino, Cauayan City, Isabela |
June 23, 2017 |
20117 |
165003016500001 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 2nd District Engineering Office |
National Road Network Services - Network Development - Improvement/Widening of National Roads - N1 - Road Widening - Bangag - Magapit Road - K0688+400 - K0689+900, K0694+000 - K0695+000 |
June 23, 2017 |
2017 |
165003030700087 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 2nd District Engineering Office |
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - To Seaports - Off-carriageway Improvement: Shoulder Paving/Construction - Access Road leading to Claveria Port (Off-carriageway Improvement), Sta. 0+000 - Sta. 0+300 |
June 22, 2017 |
FY 2017 |
WIN7F04878 |
UACS No. 292003020402043 |
January 1, 2017 |
National Capital Region |
South Manila District Engineering Office |
As per GAA
MFO-2, Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Drainage Structure – Drainage improvement Brgy. 862, 863 and 864 Zone 98 and vicinity, Pandacan, Manila City (Construction of Drainage Structure)
UACS No. 292003020402043
Physical Target/Cost
Original: 1,240 lineal meter
Unit Cost (P’000): P16.129T/lineal meter
Allocation Cost (P’000): P20,000
WIN7F04878
Modified
MFO-2, Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Drainage Structure – Drainage improvement Brgy. 860, 861, 862, 863 and 864 Zone 94 and vicinity, Pandacan, Manila City (Repair/Rehabilitation of Drainage Structures)
UACS No. 292003020402043
Physical Target/Cost
Modified: 1,240 lineal meter
Unit Cost (P’000): P16.129T/lineal meter
Estimated Cost (P’000): P20,000
WIN7F04878
|
June 22, 2017 |
FY 2017 |
WINF04890 |
UACS No. 103004010310104 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally Funded Projects: Local Infrastructure Program – Buildings and Other Structures – Multi-Purpose/ Facilities, Construction of Multi-Level Multipurpose Building, Barangay Bagong Tanyag, Taguig City (Construction of Multi-Purpose Building)
UACS No. 103004010310104
Physical Target/Cost
Per GAA/Original: 1 bldg.
Unit Cost: P2M/Bldg.
Allocation: Php 2M
WINF04890
As Modified
Locally Funded Projects: Local Infrastructure Program – Buildings and Other Structures – Multi-Purpose/ Facilities, Construction/Rehabiltation of Multi-Purpose Building, at Brgy. Bagong Tanyag, Taguig City (Rehabilitation/Major Repair Multi Purpose Building)
UACS No. 103004010310104
Physical Target/Cost
As Modified: 1 bldg.
Unit Cost: P2M/Bldg.
Estimated Cost: Php 2M
WINF04890
|
June 22, 2017 |
FY 2017 |
WIN7F04884 |
UACS No. 103004010309902 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally Funded Projects, VIILP – Buildings and Other Structures – Multipurpose/ Facilities: Construction of Multi-Purpose Building (Covered Court) at Rosario 5 & 6, Brgy. Sta. Lucia, Pasig City
UACS No. 103004010309902
Physical Target/Cost
Per GAA/Original: 1 bldg.
Unit Cost (P’000): P7,000.00/bldg..
Allocation: Php7.000M
WIN7F04884
As Modified
Locally Funded Projects, VIILP – Buildings and Other Structures – Multipurpose/ Facilities: Construction of Multi-Purpose Building at Rose Marie Lane, Brgy. Kapitolyo, Pasig City
UACS No. 103004010309902
Physical Target/Cost
As modified: 1 bldg.
Unit Cost (P’000): P7,000.00/bldg..
Estimated Cost: Php7.000M
WIN7F04884
|
June 22, 2017 |
FY 2017 |
WIN7F04881 |
UACS No. 103004010310084 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
Per GAA
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures – Multipurpose/ Facilities: Rehabiltation of Samahang Magkapitbahay Multi-Purpose Bldg., Brgy. Marikina Heights, Marikina City (Rehabilitation/ Major Repair Multi Purpose Building)
UACS No. 103004010310084
Physical Target/Cost
Per GAA/Original: 1 Bldg.
Unit Cost: P3M/bldg.
Allocation: P3M
WIN7F04881
As Modified
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures – Multipurpose/ Facilities: Construction of Samahang Magkakapitbahay Multi-Purpose Bldg., Brgy. Marikina Heights, Marikina City (Construction of Repair Multi Purpose Building)
UACS No. 103004010310084
Physical Target/Cost
As Modified: 1 Bldg.
Unit Cost: P3M/bldg.
Estimated Cost: P3M
WIN7F04881
|
June 22, 2017 |
FY 2017 |
WIN7F04880 |
UACS No. 103004010310061 |
January 1, 2017 |
National Capital Region |
NCR - Regional Office |
Per GAA
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures – Multipurpose/ Facilities: Construction of Multi Purpose Bldg. at Jenny’s Ave. Rosario, Pasig City (Construction of Multi-Purpose Building)
UACS No. 103004010310061
Physical Target/Cost
Per GAA/Original: 1 bldg
Unit Cost: P6M/bldg.
Allocation: P6M
WIN7F04880
As Modified
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures – Multipurpose/ Facilities: Construction of Multi-Purpose Building at Metrogreen Ville, Brgy. Sta. Lucia, Pasig City (Construction of Multi-Purpose Building)
UACS No. 103004010310061
Physical Target/Cost
Per GAA/Original: 1 bldg
Unit Cost: P6M/bldg.
Estimated Cost: P6M
WIN7F04880
|
June 22, 2017 |
FY 2017 |
WIN7F04899 |
UACS No. 103004010310056 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally Funded Projects – LIP, Buildings and Other Structures – Multipurpose/Facilities: Construction of H. Bautista Elem School Multi-Purpose Bldg. including site de, Brgy. Concepcion, Marikina City (Construction of Multi Purpose Building)
UACS No. 103004010310056
Physical Target/Cost
Original: 1 building
Unit Cost (P’000): P2,000/building
Allocation Cost (P’000): P2,000
WIN7F04899
Modified
Locally Funded Projects – LIP, Buildings and Other Structures – Multipurpose/Facilities: Construction of Multi-Purpose Bldg. including site Development at Tierra Vista, , Brgy. Nangka, Marikina City (Construction of Multi-Purpose Building)
UACS No. 103004010310056
Physical Target/Cost
Modified: 1 building
Unit Cost (P’000): P2,000/building
Estimated Cost (P’000): P2,000
WIN7F04899
|
June 22, 2017 |
FY 2017 |
WIN7F04887 |
UACS No. 103004010310098 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally Funded Projects – LIP, Buildings and Other Structures – Multipurpose/ Facilities: Construction of Multi Building (Phase I), Barangay San Roque, Taguig City (Construction of Multi Purpose Building)
UACS No. 103004010310098
Physical Target / Cost
Original: 1 building
Unit Cost (P’000): P10,000/building
Allocation Cost (P’000): P10,000.00
WIN7F04887
Modified
Locally Funded Projects – LIP, Buildings and Other Structures – Multipurpose/ Facilities: Construction of Multi Building (Phase I), Barangay San Roque, Pateros, Pateros-Taguig City (Construction of Multi Purpose Building)
UACS No. 103004010310098
Physical Target / Cost
Original: 1 building
Unit Cost (P’000): P10,000/building
Estimated Cost (P’000): P10,000.00
WIN7F04887
|
June 22, 2017 |
FY 2017 |
WIN7F04901 |
UACS No. 103004010310136 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally Funded Projects – LIP, Buildings and Other Structures – Multi-Purpose Building/ Facilities, Construction of Multi-Purpose Building, Philippine Army Headquarters, Fort Bonifacio, Taguig City (Construction of Multi-Purpose Building)
UACS No. 103004010310136
Physical Target / Cost
Original: 1 building
Unit Cost (P’000): P5,000/building
Allocation Cost (P’000): P5,000.00
WIN7F04901
Modified
Locally Funded Projects – LIP, Buildings and Other Structures – Multi-Purpose Building/ Facilities, Rehabilitation of Multi-Purpose Building, Philippine Army Headquarters, Fort Bonifacio, Taguig City (Rehabilitation/Major Repair of Multi-Purpose Building)
UACS No. 103004010310136
Physical Target / Cost
Original: 1 building
Unit Cost (P’000): P5,000/building
Estimated Cost (P’000): P5,000.00
WIN7F04901
|
June 22, 2017 |
FY 2017 |
WIN7F04894 |
UACS No. 292003020401756 |
January 1, 2017 |
National Capital Region |
NCR - Regional Office |
As per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Mitigation Structure –Improvement of Creek Bed along Buli Creek, Brgy. Pinagbuhatan and Brgy. San Miguel, Pasig City (Construction of Flood Mitigation Structure)
UACS No. 292003020401756
Physical Target/ Cost
Original: 792 lineal meter
Unit Cost (P’000): P20,202T/lineal meter
Allocation Cost (P’000): P16,000
WIN7F04894
Modified
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structure and Drainage Systems: – Improvement of Creek Bed and Rehabilitation of Slope Protection along Buli Creek, Pasig City (Rehabilitation/Major Repair of Slope Protection Structure)
UACS No. 292003020401756
Physical Target/ Cost
Original: 792 lineal meter
Unit Cost (P’000): P24.502T/lineal meter
Estimated Cost (P’000): P16,000
WIN7F04894
|
June 22, 2017 |
CY 2017 |
WIn7E01550 |
GAA CY 2017 RA 10924 |
November 29, 2016 |
Region IV-B |
Palawan 2nd District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Road Upgrading (Unpaved to Paved )
based on Gravel Road Strategies, Traffic
Benchmark for Upgrading to Paved Road
Standards (HDM-4 Project Analysis)
- Secondary Road
Aramaywan - Berong - Puerto Princesa Road
K0176+(-1033) - K0176+(-878),
K0181+906 - K0182+000,
K0186+801 - K0186+1030,
K0197+960 - K0199+829
L = 4.612 lane km
Php = 100.00 Million
( Road Upgrading Gravel to Paved )
|
June 22, 2017 |
CY 2017 |
WIN7E01549 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Palawan 2nd District Engineering Office |
as MODIFIED:
MF03 - Construction and Maintenance Services of
Other Infrastructure
- Construction/Improvement of Access Roads
leading to Declared Tourism Destination
Balabac Circumferential Road
Catagupan-Melville Lighthouse Road
Sta. 10+545.54 - Sta. 13+593.54
Balabac, Palawan
L = 6.096 lane km
Php = 100.00 Million
( Construction of Concrete Road ) |
June 22, 2017 |
CY 2017 |
UACS # 165003015800380 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Palawan 2nd District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Road Upgrading (Unpaved to Paved) based on
Gravel Road Strategies, Traffic Benchmark for
Upgrading to Paved Road Standards
( HDM-4 Project Analysis) - Tertiary Road
Road Upgrading (Unpaved to Paved)
( Panalingaan - Tagbita - Latud)
K0256+561 - K0256+630,
K0257+815 - K0258+900,
K0259+093 - K0260+530
( Road Upgrading Gravel to Paved )
L = 5.276 lane km
Php = 100.00 Million
|
June 22, 2017 |
2017 |
WIN7F04868 |
FY 2017 GAA |
January 1, 2016 |
Region III |
Bulacan 1st District Engineering Office |
VIILP - Roads and Bridges - Local Roads - Construction / Rehabilitation / Improvement of Roads leading to NHA's Resettlement Site, Poblacion, Pandi, Bulacan |
June 22, 2017 |
2017 |
WIN7F04838 |
SR2017-01-000204 |
January 27, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-1 National Road Network Services, Asset Preservation Of National Roads — Rehabilitation/ Reconstructjon of National
Roads with Slips, Slope Collapse, and Landslide — Tertiary Construction of Road Slope Protection Structure - Sn Pascual-Claveria Rd
Physical Target: 8,492.5 Sq.m.
Unit Cost (P'000): P9.37/Sq.m.
Allocation (P'000): PhP 79,592
As MODIFIED:
MFO-1 National Road Network Services, Asset Preservation Of National Roads — Rehabilitation/ Reconstructjon of National
Roads with Slips, Slope Collapse, and Landslide — Tertiary Construction of Road Slope Protection Structure - Rehabilitation of Concrete Road - Construction of Drainage Structure along Road - Sn Pascual-Claveria Rd
Physical Target:
Const.of Road Slope Protection Structure -
8,443.60 Sq.m.
Rehab. of Concrete Road - 1.124 Lane Km
Const. of Drainage Structure along Road -
3,059.6 Lin.m.
Unit Cost (P'000):
Const.of Road Slope Protection Structure -
P4.203/Sq.m.
Rehab. of Concrete Road - P21,872.776/
Lane Km
Const. of Drainage Structure along Road -
P6.392/Lin.m.
Estimated Cost (P'000): PhP 79,592 |
June 22, 2017 |
2017 |
WIN7F04805 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 1st District Engineering Office |
Network Development - Off-Carriageway Improvement including drainage - Tertiary - Off-Carriageway Improvement including Drainage Cabanatuan City - Carmen Road
K0129+-570 - K0130+000. K0135+542 - K0135+941, K0138+000 - K0141+000 |
June 22, 2017 |
2017 |
WIN7F04859 |
SR2017-01-000274 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO 1 — National Road Network Services - Network Development Construction of By-passes/ Diversion Roads, including ROW :
1. Construction of Concrete Bridge - Camarines Sur-Albay Diversion Road, including Bridge and ROW, Camarines Sur (Construction of Concrete Bridge)
2. Construction of Concrete Road - Camarines Sur-Albay Diversion Road, including Bridge and ROW, Camarines
Sur (Construction of Concrete Road)
3. ROW Acquisition Camarines Sur-Albay Diversion Road, including Bridge and ROW, Camarines Sur (ROW Acquisition)
Physical Target:
Bridge - 183 Sq.m.
Road - 6.66 Lane-km
ROW Acquisition - 20,000 Sq.m.
Unit Cost (P'000):
Bridge - P10,929/Sq.m.
Road - P22,523/Lane-km
ROW Acquisition - P1.50/Sq.m.
Allocation Cost (P'000): Php 200,000
As MODIFIED:
MFO 1 — National Road Network Services - Network Development - Construction of By-Passes/ Diversion Roads, including ROW : Camarines Sur-Albay Diversion Road, including Bridge and ROW, Camarines Sur Sta. 437 + 407.39 - Sta 439 + 800 (Construction of Concrete Road) (ROW Acquisition)
Physical Target:
Road - 4.7997 Lane-km
ROW Acquisition - 47,998 Sq.m.
Unit Cost (P'000):
Road - P39,169/Lane-km
ROW Acquisition - P0.250/Sq.m.
Estimated Cost (P'000): Php 200,000
|
June 22, 2017 |
2017 |
WIN7F04806 |
SR2017-01-000520 |
January 28, 2017 |
Region V |
Regional Office V |
MFO 3 - Construction and Maintenance
Infrastructure - Construction/ of Access Roads leading Seaports, and Declared Destinations - to
Seaports:
1. Construction of Concrete Road - Guinobatan-Jovellar-Donsol Road leading to Pilar Port, including ROW and Bridge, Albay (Constructjon of Concrete Road)
2. Construction of Concrete Bridge - Guinobatan-JoveIIar-Donsol Road leading to Pilar Port, including ROW and Bridge, Albay P00130506LZ (Construction of Bridge)
3. ROW Acquisition - Guinobatan-Jovellar-Donsol Road leading to Pilar Port, including ROW and Bridge, Albay (ROW Acquisition)
Physical Target:
Road - 3.600 lane-km
Bridge - 366 sq.m.
ROW Acquisition - 4,000 sq.m.
Unit Cost (P'000):
Road - P30,000/lane-km
Bridge - P109.290T/sq.m.
ROW Acquisition - P0.50T/sq.m.
Estimated Cost (P'000): PhP150,000
MFO 3 —Construction and
Maintenance of Other Infrastructure
Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations — to Seaports : Construction of Concrete Road - Construction of
Concrete Bridge - ROW Acquisition Guinobatan-Jovellar-Donsol Road leading to Pilar Port, including ROW and Bridge, Albay
(Construction of Concrete Road)
(Construction of Concrete Bridge)
(ROW Acquisition)
Physical Target:
Road - 2.80098 lane-km
Bridge - 1,341.324 sq.m.
ROW Acquisition - 52,092 sq.m.
Unit Cost (P'000):
Road - P25,319/lane-km
Bridge - P58.214T/sq.m.
ROW Acquisition - P0.02T/sq.m.
Estimated Cost (P'000): PhP150,000
|
June 22, 2017 |
2017 |
WIN7F04804 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 1st District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Construction of Roads, Sta. Maria, Licab, Nueva Ecija |
June 22, 2017 |
2017 |
WIN7F04840 |
FY 2017 GAA |
February 1, 2017 |
Region III |
Nueva Ecija 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation of Flood Control Dikes along Banco River, San Esteban, Sta. 5+260 - Sta. 5+412.00, Rizal, Nueva Ecija |
June 22, 2017 |
GAA FY 2017 |
WIN7G01561 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary
Construction of Road Slope Protection Structure - Kapalong-Talaingod-Valencia (Bukidnon) Road -
K1515+(-)130 - K1515+(-)016.60, K1515+703 - K1515+726.70, K1516+245 - K1516+286, K1518+(-)215.40 - K1518+(-)184.50,
K1531+870-K1531+945, K1533+320 - K1533+370, K1533+430 - K1533+480
TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary
Rehabilitation/Reconstruction of National Road With Slips, Slope Collapse and Landslides Along Kapalong-Talaingod-Valencia (Bukidnon) Road, Davao del Norte
K1514+851.000 - K1514+969.000, K1515+706.250 - K1515+728.750, K1517+787.425 - K1517+811.275, K1524+540.000 - K1524+800.000
ALLOCATION: Php 112.000 Million |
June 22, 2017 |
GAA FY 2017 |
WIN7G01567 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary
Construction of Road Slope Protection Structure - Kapalong-Talaingod-Valencia (Bukidnon) Road -
K1486+(-)081 - K1486+(-) 065, K1495+064 - K1495+100, K1495+(-)612 - K1495+(-)394, K1496+075 - K1496+120, K1500+(-)173 - K1500+(-)150,
K1500+220 - K1500+276.50, K1503+120 - K1503+258.40, K1508+563.50 - K1508+590, K1513+240 - K1513+270
TO: Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary
Rehabilitation/Reconstruction of National Road With Slips, Slope Collapse and Landslides Along Kapalong-Talaingod-Valencia (Bukidnon) Road, Davao del Norte
K1485+923.619-K1485+933.619, K1494+460.000-K1494+560.000, K1496+078.750-K1496+122.621, K1498+178.875-K1498+261.025, K1499+828.075-K1499+851.925, K1500+495.500-K1500+504.500,
K1501+695.750-K1501+709.250, K1502+588.750-K1502+611.250, K1503+125.719-K1503+288.470, K1508+597.100-K1508+610.600, K1513+200.000-K1513+300.000
ALLOCATION: Php 116.000 Million |
June 22, 2017 |
FY 2017 |
WIN7E01763 |
UACS No. 103004010309908 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally-Funded Projects – VIILP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building including Site Development, Brgy. Parang, Marikina City [Construction of Multi-Purpose Bldg]
UACS No. 103004010309908
Physical Target/ Cost
Original: 1 bldg.
Unit Cost (‘000): P11,000.0/Bldg.
Allocation (‘000): P11,000.0
WIN7E01763
New
Locally-Funded Projects – VIILP – Buildings and Other Structures – Multipurpose/Facilities – Construction/Rehabilitation of Multi-Purpose Building including Site Development, Brgy. Parang, Marikina City [Rehabilitation/Major Repair of Multi-Purpose Building]
UACS No. 103004010309908
Physical Target/ Cost
New: 4 bldgs.
Unit Cost (‘000): P2,750.0/Bldg.
Estimated Cost (‘000): P11,000.0
WIN7E01763
|
June 22, 2017 |
FY 2017 |
WIN7E01757 |
UACS No. 103004010310071 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures Multipurpose/Facilities-Construction of Multi-Purpose Building, Sto. Niño, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310071
Physical Target/Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P3,000.0/bldg..
Allocation (‘000): P3,000.0
WIN7E01757
As Modified
Locally-Funded Projects – LIP – Buildings and Other Structures Multipurpose/Facilities-Construction of 2 units Multi-Purpose Building, Sto. Niño, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310071
Physical Target/Cost (‘000)
New: 2 bldgs.
Unit Cost (‘000): P1,500.0/bldg..
Estimated Cost (‘000): P3,000.0
WIN7E01757
|
June 22, 2017 |
FY 2017 |
WIN7E01765 |
UACS No. 103004010310126 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities-Construction of Multi-Purpose Building, Barangay Tumana, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310126
Physical Target/Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P1,000.0/bldg.
Allocation (‘000): P1,000.0
WIN7E01765
As Modified
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities-Construction of Multi-Purpose Building @ Nangka ES, Barangay Nangka, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310126
Physical Target/Cost (‘000)
New: 1 bldg.
Unit Cost (‘000): P1,000.0/bldg.
Estimated Cost (‘000): P1,000.0
WIN7E01765
|
June 22, 2017 |
FY 2017 |
WIN7E01538 |
FY 2017 APPROVED MODIFICATION |
April 20, 2017 |
Cordillera Administrative Region |
Apayao 1st District Engineering Office |
From: MFO-1: National Road Network Services, Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges, Baratan Bridge along Apayao-Ilocos Norte (Construction of Concrete Bridge)
Physical Target = 270.00 sq. m.
To: MFO-1: National Road Network Services, Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges Baratan Bridge along Apayao-Ilocos Norte (Construction of Concrete Bridge)
Physical Target = 286.20 sq. m.
|
June 22, 2017 |
FY 2017 |
WIN7E01714 |
FY 2017 APPROVED MODIFICATION |
May 11, 2017 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: MFO-1 National Road Network Services, Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Banaue Hungduan-Benguet Bdry Rd - K0360+030 - K0360 + 048, K0360 + 080 - K0360+200, K0360 + 090 - K0360 +115, K0361 + 500 - K0361 + 600, K0361 + 850 - K0361 + 918, K0362 + 550 - K0362 + 670, K0363 + 140 - K0363 + 172, K0363 + 200 - K0363 + 260, K0366 + 900 - K0366 + 950, K0367 + 200 - K0367 + 240, K0367 + 850 - K0367 + 870, K0369 + 450 - K0369 + 500, K0369 + 650 - K0369 + 695 (Construction of Road Slope Protection Structure)
Physical Target = 9,617.50 sq. m.
To: MFO-1 National Road Network Services, Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Banaue Hungduan-Benguet Bdry Rd - K0360+022 - K0360 + 043, K0360 + 089 - K0360+144 (LS) , K0360 + 080 - K0360 +195.50 (R.S.), K0361 + 418 - K0361 + 500, K0361 + 512 - K0361 + 534, K0361 + 747 - K0361 + 838, K0362 + 368 - K0362 + 517, K0363 + 098 - K0363 + 136, K0363 + 141 - K0363 + 200, K0366 + 814 - K0366 + 873, K0367 + 200 - K0367 + 260, K0367 + 594 - K0367 + 614, K0369 + 314 - K0369 + 372, K0369 + 525 - K0369 + 571 (Construction of Road Slope Protection Structure)
Physical Target = 8,841.19 sq. m
|
June 22, 2017 |
FY 2017 |
165003014300270 |
FY 2017 APPROVED MODIFICATION |
January 27, 2017 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From:MFO-1 National Road Network Services, Asset Preservation of National Roads - Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4)- Tertiary: Reconstruction from Concrete to Concrete- Kiangan-Tinoc-Buguias Rd-Ch. 3417-Ch.3967, Ch. 3967-Ch.4147, Ch.4147- Ch.6147 (Reconstruction from Concrete to Concrete)
Physical Target = 5.46 lane-km
To: MFO-1 National Road Network Services, Asset Preservation of National Roads - Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4)- Tertiary- Kiangan-Tinoc-Buguias Rd-Ch. 3417-Ch.3967, Ch. 3967-Ch.4147, Ch.4147- Ch.5607 (Rehabilitation of Concrete Road)
Physical Target=3.692 lane-km
|
June 22, 2017 |
FY 2017 |
165003014200206 |
FY 2017 APPROVED MODIFICATION |
January 27, 2017 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: "MFO-1 National Road Network Services, Asset Preservation of National Roads - Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4)- Secondary: Reconstruction from Asphalt to Concrete- Nueva Vizcaya-Ifugao-Mt Province Rd –
K0314+000 - K0314+870, K0324+025 - K0324+738 (Reconstruction from concrete to concrete) (Reconstruction from asphalt to concrete)
Physical Target = 3.166 lane-km
To: "MFO-1 National Road Network Services, Asset Preservation of National Roads - Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4)- Secondary- Nueva Vizcaya-Ifugao-Mt Province Rd –
K0314+000 - K0314+776, (Concrete to concrete) K0324+025 - K0324+489 (Asphalt to concrete) (Reconstruction from concrete to concrete) (Reconstruction from asphalt to concrete)
Physical Target = 2.48 lane-km
|
June 22, 2017 |
FY 2017 |
WIN7E01627 |
FY 2017 APPROVED MODIFICATION |
May 3, 2017 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: "MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment & Embankment Dike, and Channeling/Widening along Chico River, Kalinga [Construction of Flood Mitigation Structure]
To: "MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment & Embankment Dike, and Channeling/Widening along Chico River, Kalinga [Construction of Flood Mitigation Structure]"
Physical Target = 1,000 lm
|
June 22, 2017 |
FY 2017 |
WIN7E01625 |
FY 2017 APPROVED MODIFICATION |
May 3, 2017 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Tulyao Flood Control – Tulyao, Tabuk City, Kalinga [Construction of Flood Mitigation Structure]
To:MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Tulyao Flood Control – Tulyao, Tabuk City, Kalinga [Construction of Flood Mitigation Structure]
Physical Target = 480 lm
|
June 22, 2017 |
FY 2017 |
WIN7E01604 |
FY 2017 APPROVED MODIFICATION |
May 3, 2017 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Aliganggang Flood Control, Lower, Lubo, Tanudan along Tanudan River, Kalinga [Construction of Flood Mitigation Structure]
To: MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Aliganggang Flood Control, Lower, Lubo, Tanudan along Tanudan River, Kalinga [Construction of Flood Mitigation Structure]
Physical Target= 150 lm |
June 22, 2017 |
FY 2017 |
WIN7F04624 |
FY 2017 APPROVED MODIFICATION |
May 15, 2017 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: MFO-2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Bangad Flood Control along Chico River, Kalinga (Construction of Revetment)
Physical Target = 800 Lm
To: MFO-2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Bangad Flood Control along Chico River, Kalinga (Construction of Revetment)
Physical Target = 261.29 Lm |
June 22, 2017 |
FY 2017 |
WIN7E01712 |
FY 2017 APPROVED MODIFICATION |
May 15, 2017 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: MFO-2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Lup-Lupa Flood Control, Kalinga (Construction of Revetment)
Physical Target = 800 Lm
To: MFO-2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Lup-Lupa Flood Control, Kalinga (Construction of Revetment)
Physical Target = 428.50 Lm |
June 22, 2017 |
FY 2017 |
WIN7F04770 |
FY 2017 APPROVED MODIFICATION |
May 23, 2017 |
Cordillera Administrative Region |
CAR - Regional Office |
From: MFO 1 - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide- Tertiary - Banaue- Hungduan-Benguet Bdry Rd - K0347+945-K0347+960, K0348+036-K0348+083, K0348+095-K0348+122, K0348+160-K0348+266, K0348+303-K0348+472, K0348+890-K0348+905, K0350+596-K0350+606, K0350+591-K0350+606 (Construction of Road Slope Protection Structure)
Physical Target = 3,996 sq.m.
To: MFO 1 - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide- Tertiary - Banaue- Hungduan-Benguet Bdry Rd - K0347+750-K0347+783, K0347+830-K0347+845, K0348+722-K0348+768, K0348+803-K0348+846, K0348+846-K0348+905, K0349+231-K0349+472, K0350+594-K0350+615, K0350+596-K0351+000, K0350+615-K0350+683, K0350+683-K0350+717, K0350+735+K0350+770, K0350+873-K0350+888, K0351+020-K0351+040, K0351+040-K0351+088, K0351+088-K0351+147, K0352+155-K352+188, K0352+188-K0352+202, K00352+209-K0352+235, K0352+231-K0352+256, K0352+260-K0352+314, K0352+559-K0352+585, K0352+608-K0352+649, K0352+649-K0352+721, K0352+857-K0352+865, K0352+865-K0352+904
Physical Target = 6,834 sq.m. |
June 22, 2017 |
FY 2017 |
WIN7F04772 |
FY 2017 APPROVED MODIFICATION |
May 23, 2017 |
Cordillera Administrative Region |
CAR - Regional Office |
From: MFO 1 - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide- Tertiary - Banaue- Hungduan-Benguet Bdry Rd - K0342+517 - K0342+529, K0342+560 - K0342+570, K0343+788 - K0343+818, K0343+910 - K0343+923, K0343+966 - K0343+976, K0343+1000 - K0343+1030, K0345+117 - K0345+230, K0345+203 - K0345+226, K0345+508 - K0345+530, K0345+508 - K0345+620, K0345+562 - K0345+594, K0346+508 - K0346+586, K0346+592 - K0346+662, K0346+744 - K0346+760, K0346+840 - K0346+855, K0346+840 - K0346+924
Physical Target = 6,016 sq.m.
To: MFO 1 - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide- Tertiary - Banaue- Hungduan-Benguet Bdry Rd- K0342+517 - K0343+852.50, K0343+910 - K0343+940, K0343+966 - K0343+1030, K0343+1336 - K0343+1403, K0345+007 - K0345+020, K0345+203-K0345+226, K0345+508 - K0345+620, K0346+260 - K0346+292, K0346+510 - K0346+554, K0346+839 - K0346+860
Physical Target = 8,022.65 sq. m. |
June 22, 2017 |
GAA FY 2017 |
WIN7G01564 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Construction of Flyovers/Interchanges/Underpasses
Construction of Bridge - Tagum City Flyover along Davao-Agusan Road, Davao del Norte
TO: MFO 1 - National Road Network Services
Network Development - Construction of Flyovers/Interchanges/Underpasses
Construction of Tagum City Flyover along Agusan-Davao Agusan Road, Tagum City, Davao del Norte
ALLOCATION: Php 300.000 Million |
June 22, 2017 |
FY 2017 |
WIN7E01758 |
UACS No. 103004010310123 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities-Construction of Multi-Purpose Building, Brgy. Marikina Heights, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310123
Physical Target/ Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P3,000.0/bldg.
Allocation (‘000): P3,000.0
WIN7E01758
As Modified
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities-Construction of Herbosa Multi-Purpose Building, Brgy. Parang, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310123
Physical Target/ Cost (‘000)
New: 1 bldg.
Unit Cost (‘000): P3,000.0/bldg.
Estimated Cost (‘000): P3,000.0
WIN7E01758
|
June 22, 2017 |
FY 2017 |
WIN7E01764 |
UACS No. 103004010309904 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally-Funded Projects – VIILP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building including Site Development , Brgy. Concepcion Dos, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010309904
Physical Target/ Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P22,000.0/bldg.
Allocation (‘000): P22,000.0
WIN7E01764
New
Locally-Funded Projects – VIILP – Buildings and Other Structures – Multipurpose/Facilities – Construction/Rehabilitation of Multi-Purpose Building including Site Development , Brgy. Nangka, Marikina City [CW1 - Construction of Multipurpose Building][CW2-Rehabilitation/Major Repair of Multi-Purpose Building]
UACS No. 103004010309904
Physical Target/ Cost (‘000)
New: CW1 - 8 bldgs.
CW2 – 1 bldgs.
Unit Cost (‘000): CW1 - P2,612.50/bldg.
CW2 – P1,100.0/bldg.
Estimated Cost (‘000): P22,000.0
CW1-P20,900.0
CW2-P1,100.0
WIN7E01764
|
June 22, 2017 |
GAA FY 2017 |
WIN7G01569 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Locally-Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Completion and Improvement of Multipurpose Building (Brgy. Hall), Sumimao, Davao City
TO: Locally-Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building (Brgy. Hall), Sumimao, Davao City
ALLOCATION: Php 3.500 Million
|
June 22, 2017 |
GAA FY 2017 |
WIN7G01570 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Locally-Funded Projects
LIP - Building and Other Structures - Multipurpose/Facilities
Construction of Activity Center/Covered Court, Barangay Aliongto, Davao City
TO: Locally-Funded Projects
LIP - Building and Other Structures - Multipurpose/Facilities
Construction of Activity Center/Covered Court, Barangay Angliongto, Davao City
ALLOCATION: Php 5.000 Million |
June 22, 2017 |
GAA FY 2017 |
WIN7G01571 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Locally-Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Repair/Rehabilitation of Building Project, Bucana 76-A, Davao City
TO: Locally-Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Completion of Building Project, Bucana 76-A, Davao City
ALLOCATION: Php 3.000 Million |
June 22, 2017 |
GAA FY 2017 |
WIN7G01563 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Locally-Funded Projects
LIP - Roads and Bridges - National Roads
Rehabilitation of Brgy. Road connecting Prk. 8, 10, 13, 2-A, Barangay Sampao (Length: 2 km.), Kapalong, Davao del Norte
TO: Locally-Funded Projects
LIP - Roads and Bridges - Local Roads
Rehabilitation of Brgy. Road connecting Prk. 1, 2, 2-A, 3 & 10, Barangay Sampao (Length: 2.9155 km.), Kapalong, Davao del Norte
ALLOCATION: Php 24.000 Million |
June 22, 2017 |
GAA FY 2017 |
WIN7G01566 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Locally-Funded Projects
LIP - Buildings and Other Structures - School Buildings
Construction of One-Storey 2 Classrooms at Don Ricardo Briz ES, Brgy. Magugpo East, Tagum City, Davao del Norte
TO: Locally-Funded Projects
LIP - Buildings and Other Structures - School Buildings
Completion of One-Storey 2 Classrooms at Don Ricardo Briz ES, Brgy. Magugpo East, Tagum City, Davao del Norte
ALLOCATION: Php 1.000 Million
|
June 22, 2017 |
GAA FY 2017 |
WIN7G01568 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Locally-Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Improvement of Two-Storey Barangay Hall, Brgy. Madaum, Tagum City, Davao del Norte
TO: Locally-Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Construction of Two-Storey Barangay Hall, Brgy. Madaum, Tagum City, Davao del Norte
ALLOCATION: Php 2.500 Million
|
June 22, 2017 |
2017 |
WIN7F04860 |
SR2017-01-000283 |
January 28, 2017 |
Region III |
Regional Office III |
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations
-to Declared Tourism Destinations
Clark-Bamban-Capas Access Road leading to Clark City including bridge, Tarlac
(CW-1: Construction of Concrete Road)
(CW-2: Construction of Concrete Bridge) |
June 22, 2017 |
2017 |
WIN7F04874 |
SR2017-01-000272 |
January 28, 2017 |
Region III |
Regional Office III |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Almacen River Improvement Project, Hermosa and Orani, Bataan
(Construction of Flood Mitigation Structure) |
June 22, 2017 |
2017 |
165003017100015 |
SR2017-01-000254 |
January 27, 2017 |
Region III |
Regional Office III |
Construction and Maintenance of Bridges along National Roads
Widening of Permanent Bridges to more than 2 lanes
Barangobong Br. 1 (B01364LZ) along Paniqui-Camiling-Wawa Rd
(Widening of Bridge) |
June 21, 2017 |
CY 2017 |
WIN7E01732 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Romblon District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Construction/Upgrading/Rehabilitation of
Drainage along National Roads
- Secondary Roads
Tablas Circumferential Road
K0084+000 - K0090+210,
K0120+920 - K0124+010.11,
K0128+000 - K0129+020,
L = 20,640 lm
Php = 94.00 Million
( Construction of Drainage Structure along Road ) |
June 21, 2017 |
CY 2017 |
WIN7E01733 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Romblon District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Off-Carriageway Improvement including Drainage
- Secondary Roads
Sibuyan Circumferential Road
K0014+878.40 - K0015+680,
K0015+680 - K0016+000,
K0016+000 - K0016+515,
K0016+715 - K0016+900,
K0017+410 - K0017+983,
K0018+180 - K0018+240,
K0018+280 - K0018+730,
K0020+056 - K0020+725,
K0053+000 - K0053+900,
K0054+280 - K0054+450,
K0055+000 - K0056+132.25,
K0056+140 - K0057+343,
K0058+000 - K0060+560
CW1 = 28,985.67 sq.m.
Php = 47.00 Million |
June 21, 2017 |
CY 2017 |
WIN7E01734 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Romblon District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Rehabilitation/Reconstruction/Upgrading
- Secondary Roads
Tablas Circumferential Road
K0035+672 - K0036+458,
K0072+800 - K0072+900,
K0084+315 - K0084+562,
K0098+000 - K0098+128.50,
K0114+000 - K0114+300,
K0115+200 - K0115+360,
K0116+220 - K0116+360,
K0116+673.93 - K0116+820,
K0118+052 - K0118+600,
K0120+000 - K0120+560,
K0124+078.90 - K0124+620,
K0127+600 - K0128+020
CW1 = 7.647 lane km
CW2 = 0.494 lane km
Php CW1 = 85.371 Million
Php CW2 = 5.512 Million
Total = Php 90.883 Million |
June 20, 2017 |
FY 2017 |
WIN7E01753 |
UACS No. 292003020401761 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
MFO -2 Flood Management Services: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, - Improvement of Ermitaño Creek, Brgy. Salapan, San Juan City (Construction of Flood Mitigation Structure)
UACS No. 292003020401761
Physical Target:
Per GAA/Original: 600 lm
Unit Cost: P33,333.33/Lm
Allocation: Php 20M
WIN7E01753
As Modified
MFO -2 Flood Management Services: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, - Improvement of Ermitaño Creek, San Juan City (Construction of Flood Mitigation Structure)
UACS No. 292003020401761
Physical Target:
As Modified: 3,250 lm
Unit Cost: P6,153.85/Lm
Estimated Cost: Php 20M
WIN7E01753
|
June 20, 2017 |
FY 2017 |
WIN7F04870 |
UACS No. 103004010310142 |
January 1, 2017 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As Per GAA
Locally Funded Projects – LIP, Buildings and Other Structures – Multi-Purpose/Facilities: Construction of Multi-Purpose Building with Fencing Levitown, Brgy. Don Bosco, Parañaque City, Metro Manila (Construction of Multi-Purpose Building)
UACS No. 103004010310142
Physical Target/Cost
Original: 1 building
Unit Cost (P’000): P3,000/building
Allocation Cost (P’000): P3,000
WIN7F04870
As Modified
Locally Funded Projects – LIP, Buildings and Other Structures – Multi-Purpose/Facilities: Construction/ Completion of Multi-Purpose Building at Brgy. B.F. Homes Office/ Hall (Phase II), Brgy. B.F. Homes, Parañaque City 2nd LD, Metro Manila
UACS No. 103004010310142
Physical Target/Cost
Modified: 1 building
Unit Cost (P’000): P3,000/building
Estimante Cost (P’000): P3,000
WIN7F04870
|
June 20, 2017 |
FY 2017 |
WIN7F04865 |
UACS No. 292004020100401 |
January 1, 2017 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA
Locally Funded Projects: Local Infrastructure Program – Flood Control and Drainage – Flood Control Structures/Facilities, Construction of Flood Control (Aranan-Mariblo Creek – San Francisco San Juan River – Mindanao-Tullahan River) West Triangle, Quezon City (Construction of Flood Mitigation Structure)
UACS No. 292004020100401
Physical Target/ Cost
Per GAA / Original: 500 Lm
Unit Cost: P40,000.00/Lm
Allocation: Php 20M
WIN7F04865
As Modified
Locally Funded Projects: Local Infrastructure Program – Flood Control and Drainage – Flood Control Structures/Facilities, Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins & Principal Rivers at Culiat Creek, & Tributaries Brgy. Sto. Cristo, Quezon City (Construction of Slope Protection Structure)
UACS No. 292004020100401
Physical Target/ Cost
As Modified: 786 Lm
Unit Cost: P25,445.29/Lm
Estimated Cost: Php 20M
WIN7F04865
|
June 20, 2017 |
FY 2017 |
WIN7F04869 |
UACS No. 165003015300140 |
January 1, 2017 |
National Capital Region |
NCR - Regional Office |
As Per GAA
MFO -1 National Road Network Services: Network Development – Construction of By-Passes/ Diversion Roads, including ROW, Construction of Concrete Road-By-Pass Road (Marcos Highway to JP Rizal St.), Marikina City (Construction of Concrete Road)
UACS No. 165003015300140
Physical Target/Cost
Per GAA/Original: -
Unit Cost: -
Allocation: Php 100M
WIN7F04869
As Modified
MFO -1 National Road Network Services: Network Development – Construction of By-Passes/ Diversion Roads, including ROW, Construction of Concrete Road-By-Pass Road (Marcos Highway to JP Rizal St.), Marikina City (Construction of Concrete Road)
UACS No. 165003015300140
Physical Target/Cost
As Modified: 3.143 Lane-km
Unit Cost: P31,816,735.6/Lane-km
Estimated: Php 100M
WIN7F04869
|
June 20, 2017 |
2017 |
WIN7E01738 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bataan 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure with Channel Excavation of Abo-Abo River Dangcol Section, Brgy. Dangcol, Balanga City, Bataan |
June 20, 2017 |
2017 |
WIN7G01546 |
FY 2017 (R.A 10924) |
May 16, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System/Highway Development Management -4 (HDM-4) - Primary -
Rehabilitation/Reconstruction of Damaged Paved National Road, Pagadian City - Zamboanga City Road, Zamboanga City, K1903+322 - K1904+935.50.
Allocation: Php 9.00 Million
Physical Target: 0.75845 lane km
Unit Cost: P11,866,306.28/lane km |
June 20, 2017 |
2017 |
WIN7G01545 |
FY 2017 (R.A 10924) |
May 16, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System/Highway Development Management - 4 (HDM-4) - Secondary -
Rehabilitation/Reconstruction of Damaged Paved National Road Labuan Limpapa Road, Zamboanga City -
a. K1952+000 - K1953+000,
b. K1953+000 - K1953+963.80,
c. K1954+235.90 - K1954+930.10,
d. K1955+013.6 - K1955+105,
e. K1958+301.80 - K1958+745.70,
f. K1959+573 - K1959+762,
g. K1962+175.5 - K1963+000,
h. K1963+001.7 - K1963+271,
i. K1963+297 - K1963+990.2,
j. K1964+000 - K1965+291.90,
k. 1966+018.90 - K1966+963.4
Allocation: Php 49.90 Million
Physical Target: 4.9597 lane km
Unit Cost: Php 10,061,092.40/lane km |
June 20, 2017 |
2017 |
WIN7G01598 |
FY 2017 (R.A 10924) |
June 9, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes -
Widening of Permanent Bridge San Ramon Bridge 1 (B01161MN) along Zamboanga City - Labuan - Limpapa Road
Abutment A = Sta. 1959+241.37
Abutment B = Sta. 1959+282.07
Allocation: Php 35.00 Million
Physical Target: 388.278 sq.m.
Unit Cost: Php 90,141.60/sq.m. |
June 20, 2017 |
2017 |
WIN7G01603 |
FY 2017 (R.A 10924) |
June 9, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Concreting of Road Shoulder including Drainage of Cawit/Baluno Road at Brgy. Cawit, Zamboanga City,
Sta. 0+000 - Sta. 1+100 (Left Side)
Sta. 0+000 - Sta. 1+100 (Right Side)
Allocation: Php 4.00 Million
Physical Target: 2,200 lm
Unit Cost: Php 1,818.18/lm |
June 20, 2017 |
2017 |
WIN7G01602 |
FY 2017 (R.A 10924) |
June 9, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Repair/Improvement of Sinunuc Shoreline Protection, Sinunuc, Zamboanga City,
Seg. A Sta. 0+040 - Sta. 0+066
Seg. B Sta. 0+066 - Sta. 0+247
Seg. C Sta. 0+311 - Sta. 0+486
Allocation: Php 15.00 Million
Physical Target: 382.00 lm
Unit Cost: Php 39,267.02/lm |
June 20, 2017 |
2017 |
WIN7G01601 |
FY 2017 (R.A 10924) |
June 9, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure along Ayala River, Ayala Section (Both side), including Right of Way Acquisition, Zamboanga City
Seg. A Sta. 0+300 - Sta. 0+390 RS (Downstream)
Seg. B Sta. 0+370 - Sta. 0+400 LS (Downstream)
Seg. C Sta. 0+600 - Sta. 0+830 RS (Downstream)
Seg. D Sta. 0+000 - Sta. 0+407 RS (Upstream)
Seg. E Sta. 0+000 - Sta. 0+407 LS (Upstream)
Allocation: Php 35.00 Million
Physical Target: 1,164.00 lm.
Unit Cost: Php 30,068.73/lm. |