Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
June 28, 2017 2017 WIN7G01604 RA 10924 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified;
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes

Widening of Bridge - Taglatawan Bridge (B00901MN) along Daang Maharlika (Agusan - Davao Sect)

Allocation : ₱ 20.000 Million

Physical Target : 202.215 sq.m.
June 28, 2017 2017 WIN7G01607 RA 10924 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes

Widening of Hupas Bridge (B00895MN) from two to four lanes along Daang Maharlika (Agusan - Davao Sect)

Allocation : ₱ 31.00 Million

Physical Target : 331.57 sq.m.
June 28, 2017 2017 WIN7G01609 RA 10924 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Concrete Dike along Poblacion-Magtuyon-Talacogon Road, Poblacion, San Luis, Agusan del Sur, Sta. 0+070 - Sta. 0+107

Allocation : ₱ 19.99 Million

Physical Target : 37.00 lm
June 28, 2017 2017 WIN7G01623 RA 10924 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified;
Construction and Maintenance of Bridges along National Roads - Rehabilitation/Major Repair of Permanent Bridges

Rehabilitation/Major Repair of Bridge - Tugpan Bridge (B00595MN) along Butuan City-Talacogon-Loreto-Veruela-Sta. Josefa Rd.

Allocation : ₱ 19.00 Million

Physical Target : 1.00 number of Bridge
June 28, 2017 2017 WIN7E01737 RA 10924 January 27, 2017 Region III Nueva Ecija 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction/Rehabilitation of Flood Control Structures along Pampanga River, Sta. 018+000 to Sta. 018+330.80, Brgy. Poblacion Norte, Rizal, Nueva Ecija

(Construction of Flood Mitigation Structure)
June 28, 2017 2017 WIN7E01736 RA 10924 January 27, 2017 Region III Nueva Ecija 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation/Improvement of Banco River Control, Brgy. Macapsing, Sta. 4+019-Sta.4+161.80, Rizal, Nueva Ecija

(Rehabilitation/Major Repair of Flood Control Structure)
June 28, 2017 2017 103004010310697 GAA FY 2017 January 1, 2017 Region II Cagayan 3rd District Engineering Office
Buildings and Other Structures - Multipurpose/Facilities: Construction of Motorpool Office Warehouse and Repair Bay, Provincial Capitol Complex, Tuguegarao City, Cagayan
June 28, 2017 2017 103004010310699 GAA FY 2017 January 1, 2017 Region II Cagayan 3rd District Engineering Office
Buildings and Other Structures - Multipurpose/Facilities: Construction of Provincial Engineers Office (Main Building), Provincial Capitol Complex, Tuguegarao City, Cagayan
June 28, 2017 2017 103004010310694 GAA FY 2017 January 1, 2017 Region II Cagayan 3rd District Engineering Office
Buildings and Other Structures - Multipurpose/Facilities: Construction of Multi-purpose Building, Brgy. Carig Norte, Tuguegarao City, Cagayan
June 28, 2017 2017 103004010310698 GAA FY 2017 January 1, 2017 Region II Cagayan 3rd District Engineering Office
Buildings and Other Structures - Multi-purpose/Facilities: Construction of Provincial Engineering Warehouse, Provincial Capitol Center, Tuguegarao City, Cagayan
June 27, 2017 2017 292003020401475 RA 10924 January 27, 2017 Region III Tarlac District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Dike and Slope Protection along Tarlac River Control, Paniqui-Camiling Section (Left Dike), Paniqui and Camiling, Tarlac Sta. 0+000 to Sta. 0+771

(Construction of Dike)
June 27, 2017 2017 292003020401674 RA 10924 January 27, 2017 Region III Tarlac District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Dike and Slope Protection along Tarlac River Control, Paniqui-Camiling Section (Left Dike), Paniqui and Camiling, Tarlac
Sta. 0+771 to Sta. 1+542

(Construction of Flood Mitigation Structure)
June 27, 2017 2017 292003020402619 RA 10924 January 27, 2017 Region III Tarlac District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Slope Protection along Camiling River Control, Libueg Section, Camiling, Tarlac 1st LD

(Construction of Flood Mitigation Structure)
June 27, 2017 2017 292003020402642 RA 10924 January 27, 2017 Region III Tarlac District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation/Improvement of Slope Protection along Tarlac River Control, Carangi-an-Cutcut I Section, Tarlac City, Tarlac 2nd LD

(Construction of Flood Mitigation Structure)
June 27, 2017 2017 292003020402615 RA 10924 January 27, 2017 Region III Tarlac District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Slope Protection along Camiling River at Brgy. Telbang (Phase II), Camiling, Tarlac 1st LD

(Construction of Flood Mitigation Structure)
June 27, 2017 2017 165003014300234 RA 10924 January 27, 2017 Region III Tarlac District Engineering Office
Asset Preservation of National Roads
Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Tertiary

Tarlac-Guimba Rd via Victoria

K0127+(-654) - K0127+(-592), K0127+(-592)-K0127+(-219), K0127+(-219)-K0127+000, K0127+000-K0127+794, K0127+794-K0128+000, K0128+000-K0128+155, K0130+800-K0131+000, K0131+000-K0131+625, K0131+625-K0132+000, K0132+000-K0132+332, K0132+984-K0134+000, K0134+000-K0134+296

(Reconstruction from Concrete to Concrete)
June 27, 2017 2017 165003015200134 RA 10924 January 27, 2017 Region III Tarlac District Engineering Office
Network Development
Improvement/Widening of National Roads - Tertiary

Tarlac-Guimba Rd via Victoria
K0133+000 - K0136+000, K0144+989.80-K0146+963.80

(Road Widening)
June 27, 2017 2017 165003015200157 RA 10294 January 27, 2017 Region III Tarlac District Engineering Office
Network Development
Improvement/Widening of National Roads - Tertiary

Victoria-Pura Rd
K0152+481 - K0153+611

(CW-1: Road Widening)
(CW-2: Construction of Drainage Structure along Road)
June 27, 2017 2017 165003014300317 RA 10924 January 27, 2017 Region III Tarlac District Engineering Office
Asset Preservation of National Roads
Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4)-Tertiary

Tarlac City-Sn Jose via Tibag-Burgos Rd
K0129+290-K0131+000

(Reconstruction from Concrete to Concrete)
June 27, 2017 2017 165003016900041 RA 10924 January 27, 2017 Region III Tarlac District Engineering Office
Network Development - Off-Carriageway Improvement including drainage - Tertiary

Ramos-Pura Rd
K0155+290-K0156+858

(Off-Carriageway Improvement: Shoulder Paving/Construction)
June 27, 2017 2017 292004020200539 RA 10924 January 27, 2017 Region III Tarlac District Engineering Office
Locally-Funded Projects - Local Infrastructure Program
Flood Control and Drainage - Drainage/Protection Works

Construction of Slope Protection along Camiling River Control, Sawat Section, Camiling, Tarlac

(Construction of Slope Protection Structure)
June 27, 2017 2017 103004010311171 RA 10924 January 27, 2017 Region III Tarlac District Engineering Office
Locally-Funded Projects: Local Infrastructure Program
Buildings and Other Structures - Multipurpose/Facilities

Construction of Multi-Purpose Building (Covered Court), Ramos National High School, Brgy. Poblacion South, Ramos, Tarlac

(Construction of Multi-Purpose Building)
June 27, 2017 2017 165004050307498 RA 10924 January 27, 2017 Region III Tarlac District Engineering Office
Locally-Funded Projects: Local Infrastructure Program
Roads and Bridges - Local Roads

Improvement of Maliwalo to Ungot Road, Brgy. Maliwalo, Tarlac City, Tarlac

(Construction of Concrete Raoad)
June 27, 2017 2017 165004050307501 RA 10924 January 27, 2017 Region III Tarlac District Engineering Office
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads

Concreting of Brgy. Road at Palacpalac, Victoria, Tarlac

(Construction of Concrete Road)
June 27, 2017 2017 165004050307496 RA 10924 January 27, 2017 Region III Tarlac District Engineering Office
Locally-Funded Projects: Local Infrastructure Program
Roads and Bridges - Local Roads

Concreting of Road Network at the NHA-LGU Housing Project, Brgy. estipona, Pura, Tarlac

(Construction of Concrete Road)
June 27, 2017 2017 103004010310762 GAA FY 2017 January 1, 2017 Region II Isabela 3rd District Engineering Office
Buildings and Other Structures - Multipurpose/Facilities, Construction of Activity Center/Covered Court, La Paz National High School, Brgy. La Paz, Cabatuan, Isabela
June 27, 2017 2017 165003017100160 GAA FY 2017 January 1, 2017 Region II Isabela 3rd District Engineering Office
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes, Widening of Bridge - Burgos Br. (B01183LZ) along Daang Maharlika (LZ)
June 23, 2017 FY 2017 WIN7E01746 UACS No. 103004010310052 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures-Multipurpose/Facilities – Construction of Bridge (RCBC)/Rehab along Buli Creek, Brgy. Pinagbuhatan, Pasig City [Construction of Multi-Purpose Bldg.]
UACS No. 103004010310052
Physical Target/Cost
Original: 1 bldg.
Unit Cost (‘000): P12,000.0/Bldg.
Allocation: P12,000.0
WIN7E01746

As Modified
Locally-Funded Projects – LIP – Buildings and Other Structures-Multipurpose/Facilities – Construction of Building at Barangay Dela Paz and Barangay Ugong, Pasig City [Construction of Multi-Purpose Bldg.]
UACS No. 103004010310052
Physical Target/Cost
New: 2 bldgs.
Unit Cost (‘000): P6,000.0/Bldg.
Estimated Cost: P12,000.0
WIN7E01746
June 23, 2017 FY 2017 WIN7E01747 UACS No. 103004010310057 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Magat Salamat Multi-Purpose Building, Barangay Concepcion Dos, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310057
Physical Target/Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P3,000.0/bldg.
Allocation (‘000): P3,000.0
WIN7E01747

As Modified
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building at Barangay Concepcion Uno, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310057
Physical Target/Cost (‘000)
New: 1 bldg.
Unit Cost (‘000): P3,000.0/bldg.
Estimated Cost (‘000): P3,000.0
WIN7E01747
June 23, 2017 FY 2017 WIN7E01750 UACS No. 103004010310117 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Barangay Concepcion Uno Multi-Purpose Buildings, Barangay Concepcion Uno, Marikina City [Construction of Multi-Purpose Bldg.]
UACS No. 103004010310117
Physical Target/Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P2,000.0/Bldg.
Allocation (‘000): P2,000.0
WIN7E01750

As Modified
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction/Completion of Marikit Multipurpose Buildings, Barangay Concepcion Uno, Marikina City [Construction of Multi-Purpose Bldg.]
UACS No. 103004010310117
Physical Target/Cost (‘000)
New: 1 bldg.
Unit Cost (‘000): P2,000.0/Bldg.
Estimated Cost (‘000): P2,000.0
WIN7E01750
June 23, 2017 FY 2017 WIN7E01748 UACS No. 103004010310077 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Rancho IV East Multi-Purpose Building, Brgy. Concepcion Dos, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310077
Physical Target/ Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P2,000.0/bldg.
Alloc. (‘000): P2,000.0
WIN7E01748

As Modified
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Rancho IV East Multi-Purpose Building including site Development, Brgy. Concepcion Dos, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310077
Physical Target/ Cost (‘000)
New: 1 bldg.
Unit Cost (‘000): P2,000.0/bldg.
Est. Const. (‘000): P2,000.0
WIN7E01748
June 23, 2017 FY 2017 WIN7E01749 UACS No. 103004010310062 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building at Sagad Elementary School, Sagad, Pasig City [Construction of Multipurpose Building]
UACS No. 103004010310062
Physical Target/ Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P3,000.0/bldg.
Allocation (‘000): P3,000.0
WIN7E01749

As Modified
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building at Eusebio Bliss, Brgy.Maybunga, Pasig City [Construction of Multipurpose Building]
UACS No. 103004010310062
Physical Target/ Cost (‘000)
New: 1 bldg.
Unit Cost (‘000): P3,000.0/bldg.
Estimated Cost (‘000): P3,000.0
WIN7E01749
June 23, 2017 FY 2017 WIN7E01752 UACS No. 292003020401765 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
As per GAA
MF0 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structure and Drainage System – Rehabilitation of Drainage System along Farmers 1, Brgy. Tumana, Marikina City 2nd LD [Construction of Drainage Structure]
UACS No. 292003020401765
Physical Target/ Cost (‘000)
Original: 2105 lm
Unit Cost (‘000): P9.501/lm
Allocation (‘000): P20,000.0
WIN7E01752

As Modified
MF0 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structure and Drainage System – Rehabilitation of Drainage System including laterals along Farmers 1, Brgy. Tumana, Marikina City 2nd LD [Construction of Drainage Structure]
UACS No. 292003020401765
Physical Target/ Cost (‘000)
New: 2105 lm
Unit Cost (‘000): P9.501/lm
Estimated Cost (‘000): P20,000.0
WIN7E01752
June 23, 2017 FY 2017 WIN7F04938 UACS No. 292003020401837 January 1, 2017 National Capital Region Metro Manila 2nd District Engineering Office
As of GAA
MFO – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Drainage Structure – Upgrading of Drainage System along Kaingin Road, Brgy. Moonwalk, Parañaque City (Construction of Drainage Structure)
UACS No. 292003020401837
Physical Target/ Cost
Original: 480 lineal meters
Unit Cost: P25.000T/lineal meters
Allocation Cost: 12.00M
WIN7F04938

As Modified
MFO – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Drainage System along Orchid St., Road 5, Zinnia St, Cadena de Amor St., Waling-Waling St., Phase II, Brgy. Marcelo Green, Parañaque City, Metro Manila, Sta. 0+000 to Sta.0+520/ Sta.0+370 to Sta. 0+542 (Construction of Drainage Structure)
UACS No. 292003020401837
Physical Target/ Cost
Modified: 692 lineal meters
Unit Cost: P17.341T/lineal meters
Estimated Cost: 12.00M
WIN7F04938
June 23, 2017 2017 165003017100161 GAA FY 2017 January 1, 2017 Region II Isabela 3rd District Engineering Office
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes, Widening of Bridge - Marabulig Br. (B01187LZ) along Daang Maharlika (LZ)
June 23, 2017 2017 165003017100162 GAA FY 2017 January 1, 2017 Region II Isabela 3rd District Engineering Office
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 Lanes, Widening of Bridge - Minante Br. (B01186LZ) along Daang Maharlika (LZ)
June 23, 2017 2017 103004010310763 GAA FY 2017 January 1, 2017 Region II Isabela 3rd District Engineering Office
Buildings and Other Structures - Multipurpose/Facilities, Construction of Activity Center/Covered Court, Faustino Elementary School, Brgy. Faustino, Cauayan City, Isabela
June 23, 2017 20117 165003016500001 GAA FY 2017 January 1, 2017 Region II Cagayan 2nd District Engineering Office
National Road Network Services - Network Development - Improvement/Widening of National Roads - N1 - Road Widening - Bangag - Magapit Road - K0688+400 - K0689+900, K0694+000 - K0695+000
June 23, 2017 2017 165003030700087 GAA FY 2017 January 1, 2017 Region II Cagayan 2nd District Engineering Office
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - To Seaports - Off-carriageway Improvement: Shoulder Paving/Construction - Access Road leading to Claveria Port (Off-carriageway Improvement), Sta. 0+000 - Sta. 0+300
June 22, 2017 FY 2017 WIN7F04878 UACS No. 292003020402043 January 1, 2017 National Capital Region South Manila District Engineering Office
As per GAA
MFO-2, Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Drainage Structure – Drainage improvement Brgy. 862, 863 and 864 Zone 98 and vicinity, Pandacan, Manila City (Construction of Drainage Structure)
UACS No. 292003020402043
Physical Target/Cost
Original: 1,240 lineal meter
Unit Cost (P’000): P16.129T/lineal meter
Allocation Cost (P’000): P20,000
WIN7F04878

Modified
MFO-2, Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Drainage Structure – Drainage improvement Brgy. 860, 861, 862, 863 and 864 Zone 94 and vicinity, Pandacan, Manila City (Repair/Rehabilitation of Drainage Structures)
UACS No. 292003020402043
Physical Target/Cost
Modified: 1,240 lineal meter
Unit Cost (P’000): P16.129T/lineal meter
Estimated Cost (P’000): P20,000
WIN7F04878
June 22, 2017 FY 2017 WINF04890 UACS No. 103004010310104 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
As per GAA
Locally Funded Projects: Local Infrastructure Program – Buildings and Other Structures – Multi-Purpose/ Facilities, Construction of Multi-Level Multipurpose Building, Barangay Bagong Tanyag, Taguig City (Construction of Multi-Purpose Building)
UACS No. 103004010310104
Physical Target/Cost
Per GAA/Original: 1 bldg.
Unit Cost: P2M/Bldg.
Allocation: Php 2M
WINF04890

As Modified
Locally Funded Projects: Local Infrastructure Program – Buildings and Other Structures – Multi-Purpose/ Facilities, Construction/Rehabiltation of Multi-Purpose Building, at Brgy. Bagong Tanyag, Taguig City (Rehabilitation/Major Repair Multi Purpose Building)
UACS No. 103004010310104
Physical Target/Cost
As Modified: 1 bldg.
Unit Cost: P2M/Bldg.
Estimated Cost: Php 2M
WINF04890
June 22, 2017 FY 2017 WIN7F04884 UACS No. 103004010309902 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
As per GAA
Locally Funded Projects, VIILP – Buildings and Other Structures – Multipurpose/ Facilities: Construction of Multi-Purpose Building (Covered Court) at Rosario 5 & 6, Brgy. Sta. Lucia, Pasig City
UACS No. 103004010309902
Physical Target/Cost
Per GAA/Original: 1 bldg.
Unit Cost (P’000): P7,000.00/bldg..
Allocation: Php7.000M
WIN7F04884

As Modified
Locally Funded Projects, VIILP – Buildings and Other Structures – Multipurpose/ Facilities: Construction of Multi-Purpose Building at Rose Marie Lane, Brgy. Kapitolyo, Pasig City
UACS No. 103004010309902
Physical Target/Cost
As modified: 1 bldg.
Unit Cost (P’000): P7,000.00/bldg..
Estimated Cost: Php7.000M
WIN7F04884
June 22, 2017 FY 2017 WIN7F04881 UACS No. 103004010310084 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
Per GAA
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures – Multipurpose/ Facilities: Rehabiltation of Samahang Magkapitbahay Multi-Purpose Bldg., Brgy. Marikina Heights, Marikina City (Rehabilitation/ Major Repair Multi Purpose Building)
UACS No. 103004010310084
Physical Target/Cost
Per GAA/Original: 1 Bldg.
Unit Cost: P3M/bldg.
Allocation: P3M
WIN7F04881

As Modified
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures – Multipurpose/ Facilities: Construction of Samahang Magkakapitbahay Multi-Purpose Bldg., Brgy. Marikina Heights, Marikina City (Construction of Repair Multi Purpose Building)
UACS No. 103004010310084
Physical Target/Cost
As Modified: 1 Bldg.
Unit Cost: P3M/bldg.
Estimated Cost: P3M
WIN7F04881
June 22, 2017 FY 2017 WIN7F04880 UACS No. 103004010310061 January 1, 2017 National Capital Region NCR - Regional Office
Per GAA
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures – Multipurpose/ Facilities: Construction of Multi Purpose Bldg. at Jenny’s Ave. Rosario, Pasig City (Construction of Multi-Purpose Building)
UACS No. 103004010310061
Physical Target/Cost
Per GAA/Original: 1 bldg
Unit Cost: P6M/bldg.
Allocation: P6M
WIN7F04880

As Modified
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures – Multipurpose/ Facilities: Construction of Multi-Purpose Building at Metrogreen Ville, Brgy. Sta. Lucia, Pasig City (Construction of Multi-Purpose Building)
UACS No. 103004010310061
Physical Target/Cost
Per GAA/Original: 1 bldg
Unit Cost: P6M/bldg.
Estimated Cost: P6M
WIN7F04880
June 22, 2017 FY 2017 WIN7F04899 UACS No. 103004010310056 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
As per GAA
Locally Funded Projects – LIP, Buildings and Other Structures – Multipurpose/Facilities: Construction of H. Bautista Elem School Multi-Purpose Bldg. including site de, Brgy. Concepcion, Marikina City (Construction of Multi Purpose Building)
UACS No. 103004010310056
Physical Target/Cost
Original: 1 building
Unit Cost (P’000): P2,000/building
Allocation Cost (P’000): P2,000
WIN7F04899

Modified
Locally Funded Projects – LIP, Buildings and Other Structures – Multipurpose/Facilities: Construction of Multi-Purpose Bldg. including site Development at Tierra Vista, , Brgy. Nangka, Marikina City (Construction of Multi-Purpose Building)
UACS No. 103004010310056
Physical Target/Cost
Modified: 1 building
Unit Cost (P’000): P2,000/building
Estimated Cost (P’000): P2,000
WIN7F04899
June 22, 2017 FY 2017 WIN7F04887 UACS No. 103004010310098 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
As per GAA
Locally Funded Projects – LIP, Buildings and Other Structures – Multipurpose/ Facilities: Construction of Multi Building (Phase I), Barangay San Roque, Taguig City (Construction of Multi Purpose Building)
UACS No. 103004010310098
Physical Target / Cost
Original: 1 building
Unit Cost (P’000): P10,000/building
Allocation Cost (P’000): P10,000.00
WIN7F04887

Modified
Locally Funded Projects – LIP, Buildings and Other Structures – Multipurpose/ Facilities: Construction of Multi Building (Phase I), Barangay San Roque, Pateros, Pateros-Taguig City (Construction of Multi Purpose Building)
UACS No. 103004010310098
Physical Target / Cost
Original: 1 building
Unit Cost (P’000): P10,000/building
Estimated Cost (P’000): P10,000.00
WIN7F04887
June 22, 2017 FY 2017 WIN7F04901 UACS No. 103004010310136 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
As per GAA
Locally Funded Projects – LIP, Buildings and Other Structures – Multi-Purpose Building/ Facilities, Construction of Multi-Purpose Building, Philippine Army Headquarters, Fort Bonifacio, Taguig City (Construction of Multi-Purpose Building)
UACS No. 103004010310136
Physical Target / Cost
Original: 1 building
Unit Cost (P’000): P5,000/building
Allocation Cost (P’000): P5,000.00
WIN7F04901

Modified
Locally Funded Projects – LIP, Buildings and Other Structures – Multi-Purpose Building/ Facilities, Rehabilitation of Multi-Purpose Building, Philippine Army Headquarters, Fort Bonifacio, Taguig City (Rehabilitation/Major Repair of Multi-Purpose Building)
UACS No. 103004010310136
Physical Target / Cost
Original: 1 building
Unit Cost (P’000): P5,000/building
Estimated Cost (P’000): P5,000.00
WIN7F04901
June 22, 2017 FY 2017 WIN7F04894 UACS No. 292003020401756 January 1, 2017 National Capital Region NCR - Regional Office
As per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Mitigation Structure –Improvement of Creek Bed along Buli Creek, Brgy. Pinagbuhatan and Brgy. San Miguel, Pasig City (Construction of Flood Mitigation Structure)
UACS No. 292003020401756
Physical Target/ Cost
Original: 792 lineal meter
Unit Cost (P’000): P20,202T/lineal meter
Allocation Cost (P’000): P16,000
WIN7F04894

Modified
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structure and Drainage Systems: – Improvement of Creek Bed and Rehabilitation of Slope Protection along Buli Creek, Pasig City (Rehabilitation/Major Repair of Slope Protection Structure)
UACS No. 292003020401756
Physical Target/ Cost
Original: 792 lineal meter
Unit Cost (P’000): P24.502T/lineal meter
Estimated Cost (P’000): P16,000
WIN7F04894
June 22, 2017 CY 2017 WIn7E01550 GAA CY 2017 RA 10924 November 29, 2016 Region IV-B Palawan 2nd District Engineering Office
as MODIFIED:
MF01 - National Road Network Services
- Road Upgrading (Unpaved to Paved )
based on Gravel Road Strategies, Traffic
Benchmark for Upgrading to Paved Road
Standards (HDM-4 Project Analysis)
- Secondary Road
Aramaywan - Berong - Puerto Princesa Road
K0176+(-1033) - K0176+(-878),
K0181+906 - K0182+000,
K0186+801 - K0186+1030,
K0197+960 - K0199+829
L = 4.612 lane km
Php = 100.00 Million
( Road Upgrading Gravel to Paved )
June 22, 2017 CY 2017 WIN7E01549 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Palawan 2nd District Engineering Office
as MODIFIED:
MF03 - Construction and Maintenance Services of
Other Infrastructure
- Construction/Improvement of Access Roads
leading to Declared Tourism Destination
Balabac Circumferential Road
Catagupan-Melville Lighthouse Road
Sta. 10+545.54 - Sta. 13+593.54
Balabac, Palawan
L = 6.096 lane km
Php = 100.00 Million
( Construction of Concrete Road )
June 22, 2017 CY 2017 UACS # 165003015800380 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Palawan 2nd District Engineering Office
as MODIFIED:
MF01 - National Road Network Services
- Road Upgrading (Unpaved to Paved) based on
Gravel Road Strategies, Traffic Benchmark for
Upgrading to Paved Road Standards
( HDM-4 Project Analysis) - Tertiary Road
Road Upgrading (Unpaved to Paved)
( Panalingaan - Tagbita - Latud)
K0256+561 - K0256+630,
K0257+815 - K0258+900,
K0259+093 - K0260+530
( Road Upgrading Gravel to Paved )
L = 5.276 lane km
Php = 100.00 Million

June 22, 2017 2017 WIN7F04868 FY 2017 GAA January 1, 2016 Region III Bulacan 1st District Engineering Office
VIILP - Roads and Bridges - Local Roads - Construction / Rehabilitation / Improvement of Roads leading to NHA's Resettlement Site, Poblacion, Pandi, Bulacan
June 22, 2017 2017 WIN7F04838 SR2017-01-000204 January 27, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Network Services, Asset Preservation Of National Roads — Rehabilitation/ Reconstructjon of National
Roads with Slips, Slope Collapse, and Landslide — Tertiary Construction of Road Slope Protection Structure - Sn Pascual-Claveria Rd
Physical Target: 8,492.5 Sq.m.
Unit Cost (P'000): P9.37/Sq.m.
Allocation (P'000): PhP 79,592

As MODIFIED:
MFO-1 National Road Network Services, Asset Preservation Of National Roads — Rehabilitation/ Reconstructjon of National
Roads with Slips, Slope Collapse, and Landslide — Tertiary Construction of Road Slope Protection Structure - Rehabilitation of Concrete Road - Construction of Drainage Structure along Road - Sn Pascual-Claveria Rd
Physical Target:
Const.of Road Slope Protection Structure -
8,443.60 Sq.m.
Rehab. of Concrete Road - 1.124 Lane Km
Const. of Drainage Structure along Road -
3,059.6 Lin.m.
Unit Cost (P'000):
Const.of Road Slope Protection Structure -
P4.203/Sq.m.
Rehab. of Concrete Road - P21,872.776/
Lane Km
Const. of Drainage Structure along Road -
P6.392/Lin.m.
Estimated Cost (P'000): PhP 79,592
June 22, 2017 2017 WIN7F04805 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 1st District Engineering Office
Network Development - Off-Carriageway Improvement including drainage - Tertiary - Off-Carriageway Improvement including Drainage Cabanatuan City - Carmen Road
K0129+-570 - K0130+000. K0135+542 - K0135+941, K0138+000 - K0141+000
June 22, 2017 2017 WIN7F04859 SR2017-01-000274 January 28, 2017 Region V Regional Office V
As per GAA:
MFO 1 — National Road Network Services - Network Development Construction of By-passes/ Diversion Roads, including ROW :
1. Construction of Concrete Bridge - Camarines Sur-Albay Diversion Road, including Bridge and ROW, Camarines Sur (Construction of Concrete Bridge)
2. Construction of Concrete Road - Camarines Sur-Albay Diversion Road, including Bridge and ROW, Camarines
Sur (Construction of Concrete Road)
3. ROW Acquisition Camarines Sur-Albay Diversion Road, including Bridge and ROW, Camarines Sur (ROW Acquisition)
Physical Target:
Bridge - 183 Sq.m.
Road - 6.66 Lane-km
ROW Acquisition - 20,000 Sq.m.
Unit Cost (P'000):
Bridge - P10,929/Sq.m.
Road - P22,523/Lane-km
ROW Acquisition - P1.50/Sq.m.
Allocation Cost (P'000): Php 200,000

As MODIFIED:
MFO 1 — National Road Network Services - Network Development - Construction of By-Passes/ Diversion Roads, including ROW : Camarines Sur-Albay Diversion Road, including Bridge and ROW, Camarines Sur Sta. 437 + 407.39 - Sta 439 + 800 (Construction of Concrete Road) (ROW Acquisition)
Physical Target:
Road - 4.7997 Lane-km
ROW Acquisition - 47,998 Sq.m.
Unit Cost (P'000):
Road - P39,169/Lane-km
ROW Acquisition - P0.250/Sq.m.
Estimated Cost (P'000): Php 200,000

June 22, 2017 2017 WIN7F04806 SR2017-01-000520 January 28, 2017 Region V Regional Office V
MFO 3 - Construction and Maintenance
Infrastructure - Construction/ of Access Roads leading Seaports, and Declared Destinations - to
Seaports:
1. Construction of Concrete Road - Guinobatan-Jovellar-Donsol Road leading to Pilar Port, including ROW and Bridge, Albay (Constructjon of Concrete Road)
2. Construction of Concrete Bridge - Guinobatan-JoveIIar-Donsol Road leading to Pilar Port, including ROW and Bridge, Albay P00130506LZ (Construction of Bridge)
3. ROW Acquisition - Guinobatan-Jovellar-Donsol Road leading to Pilar Port, including ROW and Bridge, Albay (ROW Acquisition)
Physical Target:
Road - 3.600 lane-km
Bridge - 366 sq.m.
ROW Acquisition - 4,000 sq.m.
Unit Cost (P'000):
Road - P30,000/lane-km
Bridge - P109.290T/sq.m.
ROW Acquisition - P0.50T/sq.m.
Estimated Cost (P'000): PhP150,000


MFO 3 —Construction and
Maintenance of Other Infrastructure
Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations — to Seaports : Construction of Concrete Road - Construction of
Concrete Bridge - ROW Acquisition Guinobatan-Jovellar-Donsol Road leading to Pilar Port, including ROW and Bridge, Albay
(Construction of Concrete Road)
(Construction of Concrete Bridge)
(ROW Acquisition)
Physical Target:
Road - 2.80098 lane-km
Bridge - 1,341.324 sq.m.
ROW Acquisition - 52,092 sq.m.
Unit Cost (P'000):
Road - P25,319/lane-km
Bridge - P58.214T/sq.m.
ROW Acquisition - P0.02T/sq.m.
Estimated Cost (P'000): PhP150,000


June 22, 2017 2017 WIN7F04804 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 1st District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads – Construction of Roads, Sta. Maria, Licab, Nueva Ecija
June 22, 2017 2017 WIN7F04840 FY 2017 GAA February 1, 2017 Region III Nueva Ecija 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation of Flood Control Dikes along Banco River, San Esteban, Sta. 5+260 - Sta. 5+412.00, Rizal, Nueva Ecija
June 22, 2017 GAA FY 2017 WIN7G01561 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary
Construction of Road Slope Protection Structure - Kapalong-Talaingod-Valencia (Bukidnon) Road -
K1515+(-)130 - K1515+(-)016.60, K1515+703 - K1515+726.70, K1516+245 - K1516+286, K1518+(-)215.40 - K1518+(-)184.50,
K1531+870-K1531+945, K1533+320 - K1533+370, K1533+430 - K1533+480

TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary
Rehabilitation/Reconstruction of National Road With Slips, Slope Collapse and Landslides Along Kapalong-Talaingod-Valencia (Bukidnon) Road, Davao del Norte
K1514+851.000 - K1514+969.000, K1515+706.250 - K1515+728.750, K1517+787.425 - K1517+811.275, K1524+540.000 - K1524+800.000

ALLOCATION: Php 112.000 Million
June 22, 2017 GAA FY 2017 WIN7G01567 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary
Construction of Road Slope Protection Structure - Kapalong-Talaingod-Valencia (Bukidnon) Road -
K1486+(-)081 - K1486+(-) 065, K1495+064 - K1495+100, K1495+(-)612 - K1495+(-)394, K1496+075 - K1496+120, K1500+(-)173 - K1500+(-)150,
K1500+220 - K1500+276.50, K1503+120 - K1503+258.40, K1508+563.50 - K1508+590, K1513+240 - K1513+270

TO: Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary
Rehabilitation/Reconstruction of National Road With Slips, Slope Collapse and Landslides Along Kapalong-Talaingod-Valencia (Bukidnon) Road, Davao del Norte
K1485+923.619-K1485+933.619, K1494+460.000-K1494+560.000, K1496+078.750-K1496+122.621, K1498+178.875-K1498+261.025, K1499+828.075-K1499+851.925, K1500+495.500-K1500+504.500,
K1501+695.750-K1501+709.250, K1502+588.750-K1502+611.250, K1503+125.719-K1503+288.470, K1508+597.100-K1508+610.600, K1513+200.000-K1513+300.000

ALLOCATION: Php 116.000 Million
June 22, 2017 FY 2017 WIN7E01763 UACS No. 103004010309908 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
As per GAA
Locally-Funded Projects – VIILP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building including Site Development, Brgy. Parang, Marikina City [Construction of Multi-Purpose Bldg]
UACS No. 103004010309908
Physical Target/ Cost
Original: 1 bldg.
Unit Cost (‘000): P11,000.0/Bldg.
Allocation (‘000): P11,000.0
WIN7E01763

New
Locally-Funded Projects – VIILP – Buildings and Other Structures – Multipurpose/Facilities – Construction/Rehabilitation of Multi-Purpose Building including Site Development, Brgy. Parang, Marikina City [Rehabilitation/Major Repair of Multi-Purpose Building]
UACS No. 103004010309908
Physical Target/ Cost
New: 4 bldgs.
Unit Cost (‘000): P2,750.0/Bldg.
Estimated Cost (‘000): P11,000.0
WIN7E01763
June 22, 2017 FY 2017 WIN7E01757 UACS No. 103004010310071 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures Multipurpose/Facilities-Construction of Multi-Purpose Building, Sto. Niño, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310071
Physical Target/Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P3,000.0/bldg..
Allocation (‘000): P3,000.0
WIN7E01757

As Modified
Locally-Funded Projects – LIP – Buildings and Other Structures Multipurpose/Facilities-Construction of 2 units Multi-Purpose Building, Sto. Niño, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310071
Physical Target/Cost (‘000)
New: 2 bldgs.
Unit Cost (‘000): P1,500.0/bldg..
Estimated Cost (‘000): P3,000.0
WIN7E01757
June 22, 2017 FY 2017 WIN7E01765 UACS No. 103004010310126 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities-Construction of Multi-Purpose Building, Barangay Tumana, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310126
Physical Target/Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P1,000.0/bldg.
Allocation (‘000): P1,000.0
WIN7E01765

As Modified
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities-Construction of Multi-Purpose Building @ Nangka ES, Barangay Nangka, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310126
Physical Target/Cost (‘000)
New: 1 bldg.
Unit Cost (‘000): P1,000.0/bldg.
Estimated Cost (‘000): P1,000.0
WIN7E01765
June 22, 2017 FY 2017 WIN7E01538 FY 2017 APPROVED MODIFICATION April 20, 2017 Cordillera Administrative Region Apayao 1st District Engineering Office
From: MFO-1: National Road Network Services, Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges, Baratan Bridge along Apayao-Ilocos Norte (Construction of Concrete Bridge)
Physical Target = 270.00 sq. m.

To: MFO-1: National Road Network Services, Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges Baratan Bridge along Apayao-Ilocos Norte (Construction of Concrete Bridge)
Physical Target = 286.20 sq. m.



June 22, 2017 FY 2017 WIN7E01714 FY 2017 APPROVED MODIFICATION May 11, 2017 Cordillera Administrative Region Ifugao 1st District Engineering Office
From: MFO-1 National Road Network Services, Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Banaue Hungduan-Benguet Bdry Rd - K0360+030 - K0360 + 048, K0360 + 080 - K0360+200, K0360 + 090 - K0360 +115, K0361 + 500 - K0361 + 600, K0361 + 850 - K0361 + 918, K0362 + 550 - K0362 + 670, K0363 + 140 - K0363 + 172, K0363 + 200 - K0363 + 260, K0366 + 900 - K0366 + 950, K0367 + 200 - K0367 + 240, K0367 + 850 - K0367 + 870, K0369 + 450 - K0369 + 500, K0369 + 650 - K0369 + 695 (Construction of Road Slope Protection Structure)
Physical Target = 9,617.50 sq. m.

To: MFO-1 National Road Network Services, Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Banaue Hungduan-Benguet Bdry Rd - K0360+022 - K0360 + 043, K0360 + 089 - K0360+144 (LS) , K0360 + 080 - K0360 +195.50 (R.S.), K0361 + 418 - K0361 + 500, K0361 + 512 - K0361 + 534, K0361 + 747 - K0361 + 838, K0362 + 368 - K0362 + 517, K0363 + 098 - K0363 + 136, K0363 + 141 - K0363 + 200, K0366 + 814 - K0366 + 873, K0367 + 200 - K0367 + 260, K0367 + 594 - K0367 + 614, K0369 + 314 - K0369 + 372, K0369 + 525 - K0369 + 571 (Construction of Road Slope Protection Structure)
Physical Target = 8,841.19 sq. m


June 22, 2017 FY 2017 165003014300270 FY 2017 APPROVED MODIFICATION January 27, 2017 Cordillera Administrative Region Ifugao 1st District Engineering Office
From:MFO-1 National Road Network Services, Asset Preservation of National Roads - Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4)- Tertiary: Reconstruction from Concrete to Concrete- Kiangan-Tinoc-Buguias Rd-Ch. 3417-Ch.3967, Ch. 3967-Ch.4147, Ch.4147- Ch.6147 (Reconstruction from Concrete to Concrete)
Physical Target = 5.46 lane-km

To: MFO-1 National Road Network Services, Asset Preservation of National Roads - Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4)- Tertiary- Kiangan-Tinoc-Buguias Rd-Ch. 3417-Ch.3967, Ch. 3967-Ch.4147, Ch.4147- Ch.5607 (Rehabilitation of Concrete Road)
Physical Target=3.692 lane-km


June 22, 2017 FY 2017 165003014200206 FY 2017 APPROVED MODIFICATION January 27, 2017 Cordillera Administrative Region Ifugao 1st District Engineering Office
From: "MFO-1 National Road Network Services, Asset Preservation of National Roads - Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4)- Secondary: Reconstruction from Asphalt to Concrete- Nueva Vizcaya-Ifugao-Mt Province Rd –
K0314+000 - K0314+870, K0324+025 - K0324+738 (Reconstruction from concrete to concrete) (Reconstruction from asphalt to concrete)
Physical Target = 3.166 lane-km

To: "MFO-1 National Road Network Services, Asset Preservation of National Roads - Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4)- Secondary- Nueva Vizcaya-Ifugao-Mt Province Rd –
K0314+000 - K0314+776, (Concrete to concrete) K0324+025 - K0324+489 (Asphalt to concrete) (Reconstruction from concrete to concrete) (Reconstruction from asphalt to concrete)
Physical Target = 2.48 lane-km

June 22, 2017 FY 2017 WIN7E01627 FY 2017 APPROVED MODIFICATION May 3, 2017 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: "MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment & Embankment Dike, and Channeling/Widening along Chico River, Kalinga [Construction of Flood Mitigation Structure]

To: "MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment & Embankment Dike, and Channeling/Widening along Chico River, Kalinga [Construction of Flood Mitigation Structure]"
Physical Target = 1,000 lm

June 22, 2017 FY 2017 WIN7E01625 FY 2017 APPROVED MODIFICATION May 3, 2017 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Tulyao Flood Control – Tulyao, Tabuk City, Kalinga [Construction of Flood Mitigation Structure]

To:MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Tulyao Flood Control – Tulyao, Tabuk City, Kalinga [Construction of Flood Mitigation Structure]
Physical Target = 480 lm

June 22, 2017 FY 2017 WIN7E01604 FY 2017 APPROVED MODIFICATION May 3, 2017 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Aliganggang Flood Control, Lower, Lubo, Tanudan along Tanudan River, Kalinga [Construction of Flood Mitigation Structure]

To: MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Aliganggang Flood Control, Lower, Lubo, Tanudan along Tanudan River, Kalinga [Construction of Flood Mitigation Structure]
Physical Target= 150 lm
June 22, 2017 FY 2017 WIN7F04624 FY 2017 APPROVED MODIFICATION May 15, 2017 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: MFO-2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Bangad Flood Control along Chico River, Kalinga (Construction of Revetment)
Physical Target = 800 Lm

To: MFO-2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Bangad Flood Control along Chico River, Kalinga (Construction of Revetment)
Physical Target = 261.29 Lm
June 22, 2017 FY 2017 WIN7E01712 FY 2017 APPROVED MODIFICATION May 15, 2017 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: MFO-2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Lup-Lupa Flood Control, Kalinga (Construction of Revetment)
Physical Target = 800 Lm

To: MFO-2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Lup-Lupa Flood Control, Kalinga (Construction of Revetment)
Physical Target = 428.50 Lm
June 22, 2017 FY 2017 WIN7F04770 FY 2017 APPROVED MODIFICATION May 23, 2017 Cordillera Administrative Region CAR - Regional Office
From: MFO 1 - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide- Tertiary - Banaue- Hungduan-Benguet Bdry Rd - K0347+945-K0347+960, K0348+036-K0348+083, K0348+095-K0348+122, K0348+160-K0348+266, K0348+303-K0348+472, K0348+890-K0348+905, K0350+596-K0350+606, K0350+591-K0350+606 (Construction of Road Slope Protection Structure)
Physical Target = 3,996 sq.m.

To: MFO 1 - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide- Tertiary - Banaue- Hungduan-Benguet Bdry Rd - K0347+750-K0347+783, K0347+830-K0347+845, K0348+722-K0348+768, K0348+803-K0348+846, K0348+846-K0348+905, K0349+231-K0349+472, K0350+594-K0350+615, K0350+596-K0351+000, K0350+615-K0350+683, K0350+683-K0350+717, K0350+735+K0350+770, K0350+873-K0350+888, K0351+020-K0351+040, K0351+040-K0351+088, K0351+088-K0351+147, K0352+155-K352+188, K0352+188-K0352+202, K00352+209-K0352+235, K0352+231-K0352+256, K0352+260-K0352+314, K0352+559-K0352+585, K0352+608-K0352+649, K0352+649-K0352+721, K0352+857-K0352+865, K0352+865-K0352+904
Physical Target = 6,834 sq.m.
June 22, 2017 FY 2017 WIN7F04772 FY 2017 APPROVED MODIFICATION May 23, 2017 Cordillera Administrative Region CAR - Regional Office
From: MFO 1 - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide- Tertiary - Banaue- Hungduan-Benguet Bdry Rd - K0342+517 - K0342+529, K0342+560 - K0342+570, K0343+788 - K0343+818, K0343+910 - K0343+923, K0343+966 - K0343+976, K0343+1000 - K0343+1030, K0345+117 - K0345+230, K0345+203 - K0345+226, K0345+508 - K0345+530, K0345+508 - K0345+620, K0345+562 - K0345+594, K0346+508 - K0346+586, K0346+592 - K0346+662, K0346+744 - K0346+760, K0346+840 - K0346+855, K0346+840 - K0346+924
Physical Target = 6,016 sq.m.

To: MFO 1 - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide- Tertiary - Banaue- Hungduan-Benguet Bdry Rd- K0342+517 - K0343+852.50, K0343+910 - K0343+940, K0343+966 - K0343+1030, K0343+1336 - K0343+1403, K0345+007 - K0345+020, K0345+203-K0345+226, K0345+508 - K0345+620, K0346+260 - K0346+292, K0346+510 - K0346+554, K0346+839 - K0346+860
Physical Target = 8,022.65 sq. m.
June 22, 2017 GAA FY 2017 WIN7G01564 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Construction of Flyovers/Interchanges/Underpasses
Construction of Bridge - Tagum City Flyover along Davao-Agusan Road, Davao del Norte

TO: MFO 1 - National Road Network Services
Network Development - Construction of Flyovers/Interchanges/Underpasses
Construction of Tagum City Flyover along Agusan-Davao Agusan Road, Tagum City, Davao del Norte

ALLOCATION: Php 300.000 Million
June 22, 2017 FY 2017 WIN7E01758 UACS No. 103004010310123 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities-Construction of Multi-Purpose Building, Brgy. Marikina Heights, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310123
Physical Target/ Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P3,000.0/bldg.
Allocation (‘000): P3,000.0
WIN7E01758

As Modified
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities-Construction of Herbosa Multi-Purpose Building, Brgy. Parang, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310123
Physical Target/ Cost (‘000)
New: 1 bldg.
Unit Cost (‘000): P3,000.0/bldg.
Estimated Cost (‘000): P3,000.0
WIN7E01758
June 22, 2017 FY 2017 WIN7E01764 UACS No. 103004010309904 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
As per GAA
Locally-Funded Projects – VIILP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building including Site Development , Brgy. Concepcion Dos, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010309904
Physical Target/ Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P22,000.0/bldg.
Allocation (‘000): P22,000.0
WIN7E01764

New
Locally-Funded Projects – VIILP – Buildings and Other Structures – Multipurpose/Facilities – Construction/Rehabilitation of Multi-Purpose Building including Site Development , Brgy. Nangka, Marikina City [CW1 - Construction of Multipurpose Building][CW2-Rehabilitation/Major Repair of Multi-Purpose Building]
UACS No. 103004010309904
Physical Target/ Cost (‘000)
New: CW1 - 8 bldgs.
CW2 – 1 bldgs.
Unit Cost (‘000): CW1 - P2,612.50/bldg.
CW2 – P1,100.0/bldg.
Estimated Cost (‘000): P22,000.0
CW1-P20,900.0
CW2-P1,100.0
WIN7E01764
June 22, 2017 GAA FY 2017 WIN7G01569 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Locally-Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Completion and Improvement of Multipurpose Building (Brgy. Hall), Sumimao, Davao City

TO: Locally-Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building (Brgy. Hall), Sumimao, Davao City

ALLOCATION: Php 3.500 Million
June 22, 2017 GAA FY 2017 WIN7G01570 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Locally-Funded Projects
LIP - Building and Other Structures - Multipurpose/Facilities
Construction of Activity Center/Covered Court, Barangay Aliongto, Davao City

TO: Locally-Funded Projects
LIP - Building and Other Structures - Multipurpose/Facilities
Construction of Activity Center/Covered Court, Barangay Angliongto, Davao City

ALLOCATION: Php 5.000 Million
June 22, 2017 GAA FY 2017 WIN7G01571 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Locally-Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Repair/Rehabilitation of Building Project, Bucana 76-A, Davao City

TO: Locally-Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Completion of Building Project, Bucana 76-A, Davao City

ALLOCATION: Php 3.000 Million
June 22, 2017 GAA FY 2017 WIN7G01563 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: Locally-Funded Projects
LIP - Roads and Bridges - National Roads
Rehabilitation of Brgy. Road connecting Prk. 8, 10, 13, 2-A, Barangay Sampao (Length: 2 km.), Kapalong, Davao del Norte

TO: Locally-Funded Projects
LIP - Roads and Bridges - Local Roads
Rehabilitation of Brgy. Road connecting Prk. 1, 2, 2-A, 3 & 10, Barangay Sampao (Length: 2.9155 km.), Kapalong, Davao del Norte

ALLOCATION: Php 24.000 Million
June 22, 2017 GAA FY 2017 WIN7G01566 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: Locally-Funded Projects
LIP - Buildings and Other Structures - School Buildings
Construction of One-Storey 2 Classrooms at Don Ricardo Briz ES, Brgy. Magugpo East, Tagum City, Davao del Norte

TO: Locally-Funded Projects
LIP - Buildings and Other Structures - School Buildings
Completion of One-Storey 2 Classrooms at Don Ricardo Briz ES, Brgy. Magugpo East, Tagum City, Davao del Norte

ALLOCATION: Php 1.000 Million
June 22, 2017 GAA FY 2017 WIN7G01568 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: Locally-Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Improvement of Two-Storey Barangay Hall, Brgy. Madaum, Tagum City, Davao del Norte

TO: Locally-Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Construction of Two-Storey Barangay Hall, Brgy. Madaum, Tagum City, Davao del Norte

ALLOCATION: Php 2.500 Million
June 22, 2017 2017 WIN7F04860 SR2017-01-000283 January 28, 2017 Region III Regional Office III
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations
-to Declared Tourism Destinations

Clark-Bamban-Capas Access Road leading to Clark City including bridge, Tarlac

(CW-1: Construction of Concrete Road)
(CW-2: Construction of Concrete Bridge)
June 22, 2017 2017 WIN7F04874 SR2017-01-000272 January 28, 2017 Region III Regional Office III
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Almacen River Improvement Project, Hermosa and Orani, Bataan

(Construction of Flood Mitigation Structure)
June 22, 2017 2017 165003017100015 SR2017-01-000254 January 27, 2017 Region III Regional Office III
Construction and Maintenance of Bridges along National Roads
Widening of Permanent Bridges to more than 2 lanes

Barangobong Br. 1 (B01364LZ) along Paniqui-Camiling-Wawa Rd

(Widening of Bridge)
June 21, 2017 CY 2017 WIN7E01732 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Romblon District Engineering Office
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Construction/Upgrading/Rehabilitation of
Drainage along National Roads
- Secondary Roads
Tablas Circumferential Road
K0084+000 - K0090+210,
K0120+920 - K0124+010.11,
K0128+000 - K0129+020,
L = 20,640 lm
Php = 94.00 Million
( Construction of Drainage Structure along Road )
June 21, 2017 CY 2017 WIN7E01733 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Romblon District Engineering Office
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Off-Carriageway Improvement including Drainage
- Secondary Roads
Sibuyan Circumferential Road
K0014+878.40 - K0015+680,
K0015+680 - K0016+000,
K0016+000 - K0016+515,
K0016+715 - K0016+900,
K0017+410 - K0017+983,
K0018+180 - K0018+240,
K0018+280 - K0018+730,
K0020+056 - K0020+725,
K0053+000 - K0053+900,
K0054+280 - K0054+450,
K0055+000 - K0056+132.25,
K0056+140 - K0057+343,
K0058+000 - K0060+560
CW1 = 28,985.67 sq.m.
Php = 47.00 Million
June 21, 2017 CY 2017 WIN7E01734 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Romblon District Engineering Office
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Rehabilitation/Reconstruction/Upgrading
- Secondary Roads
Tablas Circumferential Road
K0035+672 - K0036+458,
K0072+800 - K0072+900,
K0084+315 - K0084+562,
K0098+000 - K0098+128.50,
K0114+000 - K0114+300,
K0115+200 - K0115+360,
K0116+220 - K0116+360,
K0116+673.93 - K0116+820,
K0118+052 - K0118+600,
K0120+000 - K0120+560,
K0124+078.90 - K0124+620,
K0127+600 - K0128+020
CW1 = 7.647 lane km
CW2 = 0.494 lane km
Php CW1 = 85.371 Million
Php CW2 = 5.512 Million
Total = Php 90.883 Million
June 20, 2017 FY 2017 WIN7E01753 UACS No. 292003020401761 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
As per GAA
MFO -2 Flood Management Services: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, - Improvement of Ermitaño Creek, Brgy. Salapan, San Juan City (Construction of Flood Mitigation Structure)
UACS No. 292003020401761
Physical Target:
Per GAA/Original: 600 lm
Unit Cost: P33,333.33/Lm
Allocation: Php 20M
WIN7E01753

As Modified
MFO -2 Flood Management Services: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, - Improvement of Ermitaño Creek, San Juan City (Construction of Flood Mitigation Structure)
UACS No. 292003020401761
Physical Target:
As Modified: 3,250 lm
Unit Cost: P6,153.85/Lm
Estimated Cost: Php 20M
WIN7E01753
June 20, 2017 FY 2017 WIN7F04870 UACS No. 103004010310142 January 1, 2017 National Capital Region Metro Manila 2nd District Engineering Office
As Per GAA
Locally Funded Projects – LIP, Buildings and Other Structures – Multi-Purpose/Facilities: Construction of Multi-Purpose Building with Fencing Levitown, Brgy. Don Bosco, Parañaque City, Metro Manila (Construction of Multi-Purpose Building)
UACS No. 103004010310142
Physical Target/Cost
Original: 1 building
Unit Cost (P’000): P3,000/building
Allocation Cost (P’000): P3,000
WIN7F04870

As Modified
Locally Funded Projects – LIP, Buildings and Other Structures – Multi-Purpose/Facilities: Construction/ Completion of Multi-Purpose Building at Brgy. B.F. Homes Office/ Hall (Phase II), Brgy. B.F. Homes, Parañaque City 2nd LD, Metro Manila
UACS No. 103004010310142
Physical Target/Cost
Modified: 1 building
Unit Cost (P’000): P3,000/building
Estimante Cost (P’000): P3,000
WIN7F04870
June 20, 2017 FY 2017 WIN7F04865 UACS No. 292004020100401 January 1, 2017 National Capital Region Quezon City 1st Engineering District Office
As per GAA
Locally Funded Projects: Local Infrastructure Program – Flood Control and Drainage – Flood Control Structures/Facilities, Construction of Flood Control (Aranan-Mariblo Creek – San Francisco San Juan River – Mindanao-Tullahan River) West Triangle, Quezon City (Construction of Flood Mitigation Structure)
UACS No. 292004020100401
Physical Target/ Cost
Per GAA / Original: 500 Lm
Unit Cost: P40,000.00/Lm
Allocation: Php 20M
WIN7F04865


As Modified
Locally Funded Projects: Local Infrastructure Program – Flood Control and Drainage – Flood Control Structures/Facilities, Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins & Principal Rivers at Culiat Creek, & Tributaries Brgy. Sto. Cristo, Quezon City (Construction of Slope Protection Structure)
UACS No. 292004020100401
Physical Target/ Cost
As Modified: 786 Lm
Unit Cost: P25,445.29/Lm
Estimated Cost: Php 20M
WIN7F04865
June 20, 2017 FY 2017 WIN7F04869 UACS No. 165003015300140 January 1, 2017 National Capital Region NCR - Regional Office
As Per GAA
MFO -1 National Road Network Services: Network Development – Construction of By-Passes/ Diversion Roads, including ROW, Construction of Concrete Road-By-Pass Road (Marcos Highway to JP Rizal St.), Marikina City (Construction of Concrete Road)
UACS No. 165003015300140
Physical Target/Cost
Per GAA/Original: -
Unit Cost: -
Allocation: Php 100M
WIN7F04869

As Modified
MFO -1 National Road Network Services: Network Development – Construction of By-Passes/ Diversion Roads, including ROW, Construction of Concrete Road-By-Pass Road (Marcos Highway to JP Rizal St.), Marikina City (Construction of Concrete Road)
UACS No. 165003015300140
Physical Target/Cost
As Modified: 3.143 Lane-km
Unit Cost: P31,816,735.6/Lane-km
Estimated: Php 100M
WIN7F04869
June 20, 2017 2017 WIN7E01738 FY 2017 GAA January 1, 2017 Region III Bataan 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure with Channel Excavation of Abo-Abo River Dangcol Section, Brgy. Dangcol, Balanga City, Bataan
June 20, 2017 2017 WIN7G01546 FY 2017 (R.A 10924) May 16, 2017 Region IX Zamboanga City 2nd District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System/Highway Development Management -4 (HDM-4) - Primary -
Rehabilitation/Reconstruction of Damaged Paved National Road, Pagadian City - Zamboanga City Road, Zamboanga City, K1903+322 - K1904+935.50.
Allocation: Php 9.00 Million
Physical Target: 0.75845 lane km
Unit Cost: P11,866,306.28/lane km
June 20, 2017 2017 WIN7G01545 FY 2017 (R.A 10924) May 16, 2017 Region IX Zamboanga City 2nd District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System/Highway Development Management - 4 (HDM-4) - Secondary -
Rehabilitation/Reconstruction of Damaged Paved National Road Labuan Limpapa Road, Zamboanga City -
a. K1952+000 - K1953+000,
b. K1953+000 - K1953+963.80,
c. K1954+235.90 - K1954+930.10,
d. K1955+013.6 - K1955+105,
e. K1958+301.80 - K1958+745.70,
f. K1959+573 - K1959+762,
g. K1962+175.5 - K1963+000,
h. K1963+001.7 - K1963+271,
i. K1963+297 - K1963+990.2,
j. K1964+000 - K1965+291.90,
k. 1966+018.90 - K1966+963.4
Allocation: Php 49.90 Million
Physical Target: 4.9597 lane km
Unit Cost: Php 10,061,092.40/lane km
June 20, 2017 2017 WIN7G01598 FY 2017 (R.A 10924) June 9, 2017 Region IX Zamboanga City 2nd District Engineering Office
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes -
Widening of Permanent Bridge San Ramon Bridge 1 (B01161MN) along Zamboanga City - Labuan - Limpapa Road
Abutment A = Sta. 1959+241.37
Abutment B = Sta. 1959+282.07
Allocation: Php 35.00 Million
Physical Target: 388.278 sq.m.
Unit Cost: Php 90,141.60/sq.m.
June 20, 2017 2017 WIN7G01603 FY 2017 (R.A 10924) June 9, 2017 Region IX Zamboanga City 2nd District Engineering Office
Concreting of Road Shoulder including Drainage of Cawit/Baluno Road at Brgy. Cawit, Zamboanga City,
Sta. 0+000 - Sta. 1+100 (Left Side)
Sta. 0+000 - Sta. 1+100 (Right Side)
Allocation: Php 4.00 Million
Physical Target: 2,200 lm
Unit Cost: Php 1,818.18/lm
June 20, 2017 2017 WIN7G01602 FY 2017 (R.A 10924) June 9, 2017 Region IX Zamboanga City 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Repair/Improvement of Sinunuc Shoreline Protection, Sinunuc, Zamboanga City,
Seg. A Sta. 0+040 - Sta. 0+066
Seg. B Sta. 0+066 - Sta. 0+247
Seg. C Sta. 0+311 - Sta. 0+486
Allocation: Php 15.00 Million
Physical Target: 382.00 lm
Unit Cost: Php 39,267.02/lm
June 20, 2017 2017 WIN7G01601 FY 2017 (R.A 10924) June 9, 2017 Region IX Zamboanga City 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure along Ayala River, Ayala Section (Both side), including Right of Way Acquisition, Zamboanga City
Seg. A Sta. 0+300 - Sta. 0+390 RS (Downstream)
Seg. B Sta. 0+370 - Sta. 0+400 LS (Downstream)
Seg. C Sta. 0+600 - Sta. 0+830 RS (Downstream)
Seg. D Sta. 0+000 - Sta. 0+407 RS (Upstream)
Seg. E Sta. 0+000 - Sta. 0+407 LS (Upstream)
Allocation: Php 35.00 Million
Physical Target: 1,164.00 lm.
Unit Cost: Php 30,068.73/lm.