Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
May 29, 2023 2023 FY 2023 GAA February 17, 2023 Region III Aurora District Engineering Office
Network Development Program - Off-Carriageway Improvement - Secondary Roads

Madella - Dinadiawan Rd - K0409 + (-489) - K0410+697, K0417+412 - K0418+164.80, K0423+660 - K0425+961

May 29, 2023 2023 FY 2023 GAA February 17, 2023 Region III Aurora District Engineering Office
Network Development Program - Off-Carriageway Improvement - Secondary Road

Nueva Ecija - Aurora Rd - K0194+957.00 - K0196+100.00, K0198+700.00 - K0204+190.20, K0204+290.00 - K0205+800.00
May 29, 2023 2023 WIN3F07088 FY 2023 GAA February 17, 2023 Region III Aurora District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads

A Castañeda - Ma. Aurora - Sn Luis RD - K0198+623 - K0198+660, K0202+376 - K0202+481, K0204+275 - K0204+358, K0204+533 - K0204+600, K0217+840 - K0219+000, K0225+623 - K0226+055
May 29, 2023 2023 FY 2023 GAA February 17, 2023 Region III Aurora District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

Baler -Casiguran Rd (Dinadiawan - Casiguran) - K0342 +546 - K0342+808.60, K0343+170.50 - K0344+095
May 29, 2023 2023 WIN3F07089 FY 2023 GAA February 17, 2023 Region III Aurora District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

Baler-Casiguran Rd (Dinadiawan-Casiguran) - K0305+560 - K0306+117, K0312+160 - K0312+890
May 29, 2023 2023 FY 2023 GAA February 17, 2023 Region III Aurora District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

Madella - Dinadiawan Rd - K0409+(-489) - K0409+025, K0417+412 - K0418+186, K0423+780 - K0424+112, K0424+299 - K0425+926
May 29, 2023 2023 WIN3F06983 FY 2023 GAA February 17, 2023 Region III Aurora District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

Baler-Casiguran Rd (Baler-Dinadiawan) - K0231+128 - K0231+701, K0288+(-106) - K0289+000
May 29, 2023 2023 WIN3F06981 FY 2023 GAA February 17, 2023 Region III Aurora District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

Nueva Ecija -Aurora Rd - K0175+884 - K0176+143.40, K0202+000 - K0202+096, K0202+300 - K0202+493.80, K0202+775.50 - K0202+796, K0203+132.50 - K0203+217, K0203+436 - K0203+938, K0212+000 - K0213+040, K0217+000 - K0217+691.30, K0219+650 - K0221+583.40
May 29, 2023 2023 WIN3F07062 FY 2023 GAA February 17, 2023 Region III Aurora District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

A Castañeda - Ma. Aurora - Sn Luis Rd - K0214+360 - K0215+019
May 29, 2023 2023 FY 2023 GAA February 17, 2023 Region III Aurora District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

A Castañeda - Ma. Aurora - Sn Luis Rd - K0207+319 - K0207+658
May 29, 2023 2023 WIN3F06997 FY 2023 GAA February 17, 2023 Region III Aurora District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

A. Castañeda - Ma. Aurora - Sn Luis Rd - K0198+655 - K0199+000
May 29, 2023 2023 WIN3F06986 FY 2023 GAA February 17, 2023 Region III Aurora District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

A. Castañeda - Ma. Aurora - Sn Luis Rd - K0199+000 - K0201+055
May 29, 2023 2023 WIN3F07071 FY 2023 GAA February 17, 2023 Region III Aurora District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Baler - Casiguran Rd (Dinadiawan - Casiguran Sect) - K0301+523.50 - K0301+645
May 29, 2023 2023 WIN3F07074 FY 2023 GAA February 17, 2023 Region III Aurora District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Nueva Ecija - Aurora Rd - K0178+764 - K0179+023
May 29, 2023 2023 FY 2023 GAA February 17, 2023 Region III Aurora District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Public Water Supply System (Level II or III)

Construction of Water System So. Diotorin, Dibayabay, San Luis, Aurora
May 29, 2023 2023 FY 2023 GAA February 17, 2023 Region III Aurora District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Multi-Purpose Buildings / Facilities to Support Social Services

Construction of Multi-Purpose Building (Covered Court), Dimotol Elementary School, So. Dimotol, Brgy. Dianawan, Maria Aurora, Aurora
May 29, 2023 2023 FY 2023 GAA February 17, 2023 Region III Aurora District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Multi-Purpose Buildings / Facilities to Support Social Services

Construction of Multi-purpose Building (Covered Court), Dianawan Elementary School , Brgy. Dianawan, Maria Aurora, Aurora
May 29, 2023 2023 WIN3F06990 FY 2023 GAA February 17, 2023 Region III Aurora District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures / Facilities

Construction of Flood Control Structure, Brgy. Culat, Casiguran, Aurora
May 29, 2023 2023 FY 2023 GAA February 17, 2023 Region III Aurora District Engineering Office
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R. A. 11239

Installation of Road Safety Devices Baler-Casiguran Road (Baler-Dinadiawan) K0275+500 - K0281+512 (Intermittent Section)
May 29, 2023 2023 WIN3F07168 FY 2023 GAA February 17, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Arayat - Magalang Rd - K0088+(-965) - K0088+(-111)
May 29, 2023 2023 WIN3F07400 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Baler-Cemento via Dicaloyungan - Sta. 0+000 - Sta. 0+142
May 29, 2023 2023 WIN3F07083 FY 2023 GAA December 26, 2022 Region V Albay 3rd Engineering Office
Project ID : P00713297LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope, Collapse, and Landslide - Secondary Roads

Ligao - Tabaco Rd. - K0508 + 446 - K0508 + 551


TO: OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope, Collapse, and Landslide - Secondary Roads

Ligao - Tabaco Rd. - K0512 + 737 - K0512 + 838
May 29, 2023 2023 WIN3F07023 FY 2023 GAA December 26, 2022 Region V Albay 3rd Engineering Office
Project ID : P00711994LZ

FROM: Convergence and Special Support Program (CSSP) - Network Development Program - Road Widening - Secondary Roads

Ligao - Tabaco Rd - K0503 + 050 - K0504 + 061


TO : Convergence and Special Support Program (CSSP) - Network Development Program - Road Widening - Secondary Roads

Ligao - Tabaco Rd - K0503 + 050 - K0503 + 690
May 29, 2023 2023 WIN3F07053 FY 2023 GAA December 26, 2022 Region V Albay 3rd Engineering Office
Project ID : P00711998LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Road

Oas Poblacion Rd - K0496 + 552 - K0497 + 023, K0498 + 000 - K0498 + 049


TO :OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Roads

Oas Poblacion Rd - K0496 + (-290) - K0496 + 101, K0498 + (-073) - K0498 + 049
May 29, 2023 2023 WIN3F07054 FY 2023 GAA December 26, 2022 Region V Albay 3rd Engineering Office
Project ID : P00711999LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads

Daang Maharlika (LZ) - K0499 + 750 - K0499 + 950



TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads

Daang Maharlika (LZ) - K0499 + 390 - K0499 + 542
May 29, 2023 2023 WIN3F07085 FY 2023 GAA December 26, 2022 Region V Camarines Norte Sub-District Engineering Office
Project ID : P00712760LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance Primary Roads

Daang Maharlika (LZ) - K0354 + 536 - K0355 + 568



TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance Primary Roads

Daang Maharlika (LZ) - K0354 + 536 - K355 + 568
May 29, 2023 2023 WIN3F06991 FY 2023 GAA December 26, 2022 Region V Masbate 2nd District Engineering Office
Project ID : P00713334LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Masbate - Milagros Rd - K0014 + 000 - K0014 + 520


TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Masbate - Milagros Rd - K0014 + 360 - K0014 + 693
May 29, 2023 2023 WIN 3F07095 FY 2023 GAA December 26, 2022 Region V Camarines Sur 3rd District Engineering Office
Project ID : P007144690LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads

Naga City Bdry - Calabanga - Balongay Road K00443 + 585 - K0449 + 000



TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads

Naga City Bdry - Calabanga - Balongay Road K0443 + 686 - K0445 + 035.30
May 29, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00711507LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads

Camarines Sur Expressway Package 6, Camarines Sur



TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads

Camarines Sur Expressway Package 6, Camarines Sur
May 29, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Sur 4th District Engineering Office
Project ID : P00713329LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Road with Slips, Slope Collapse, and Landslide - Secondary Roads

Tigaon - Goa - Sn Jose - Lagonoy - Guijalo via Sn Vicente Rd - K0568 + 366 - K0568 + 400


TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Road with Slips, Slope Collapse, and Landslide - Secondary Roads

Tigaon - Goa - Sn Jose - Lagonoy - Guijalo via Sn Vicente Rd - K0568 + 360 - K0568 + 400
May 29, 2023 2023 FY 2023 GAA December 26, 2022 Region V Masbate 2nd District Engineering Office
Project ID : P00712242LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

Masbate - Milagros Rd - K0003 + 152 - K0003 + 255


TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

Masbate - Milagros Rd - K0003 + 250 - K0003 + 420
May 29, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Sur 5th District Engineering Office
Project ID : P00712023LZ

FROM :
Physical Target : 1.032 Lane Km


TO :
Physical Target : 2.722 Lane Km
May 29, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Sur 5th District Engineering Office
Project ID : P00712020LZ

FROM : Ensure Safe and Reliable National Road System Network Development - Road Widening - Secondary Roads

Baao - Iriga City - Nabua Rd - K0467 + 000 - K0468 + 280



TO : Ensure Safe and Reliable National Road System Network Development - Road Widening - Secondary Roads

Baao - Iriga City - Nabua Rd - K0467 + 270- K0468 + 270
May 26, 2023 FY 2023 GAA WIN3E02924 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao de Oro 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika (MN) -
K1396+960 - K1397+021, K1403+150 - K1403+200
Physical Target:
CW1: 3,666.67 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 55,000,000.00
CW1: P 53,075,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,925,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika (MN) - K1396+936 - K1397+000
Physical Target:
CW1: 975.00 square meters (Construction of Road Slope Protection Structure)
CW2: 250.00 square meters (Off-Carriageway Improvement: Paving of Shoulders)
Allocation:
TOTAL: P 55,000,000.00
CW1: P 52,545,448.00 (Construction of Road Slope Protection Structure)
CW2: P 529.552.00 (Off-Carriageway Improvement: Paving of Shoulders)
EAO: P 1,925,000.00
May 26, 2023 FY 2023 GAA WIN3E02888 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1498+500 - K1501+180
Physical Target:
CW1: 5.280 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1495+194 - K1496+231
Physical Target:
CW1: 3.888 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00
May 26, 2023 FY 2023 GAA WIN3E02901 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Babak-Samal-Kaputian Rd - K1512+413 - K1514+942
Physical Target:
CW1: 4.970 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Babak-Samal-Kaputian Rd - K1513+182 - K1515+000
Physical Target:
CW1: 3.466 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00
May 26, 2023 FY 2023 GAA WIN3E02889 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1479+384 - K1480+956
Physical Target:
CW1: 4.233 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,796,000.00
CW1: P 49,018,140.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,777,860.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1479+384 - K1480+500
Physical Target:
CW1: 2.865 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,796,000.00
CW1: P 49,018,140.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,777,860.00
May 25, 2023 2023 P00706228MN SR2023-01-002072 January 30, 2023 Region XII Regional Office XII
Contract ID:23M00117
Contract Name: REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - MIDSAYAP-DULAWAN- MAKAR RD , K1722+701.77 - K1723+266.77, MAGUINDANAO DEL SUR
May 25, 2023 2023 p00707236MN SR2023-03-006402 March 3, 2023 Region XII Regional Office XII
contract 23M00167-PREVENTIVE MAINTENANCE - COTABATO-LANAO ROAD (S01752MN), K1855+216 - K1856+226, SULTAN KUDARAT, MAGUINDANAO
May 25, 2023 2023 P00707751MN SR2023-03-006393 March 3, 2023 Region XII Regional Office XII
CONTRACT: 23M00165 PREVENTIVE MAINTENANCE - COTABATO-LANAO ROAD, K1857+346 - K1857+739, K1857+739 - K1857+867, K1857+867 - K1858+526, SULTAN KUDARAT, MAGUINDANAO
May 25, 2023 2023 P00706229MN SR2023-01-002078 January 30, 2023 Region XII Regional Office XII
CONTRACT 23M00118 REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - MIDSAYAP-DULAWAN- MAKAR RD, K1722+275 - K1722+701.77, MAGUINDANAO DEL SUR
May 25, 2023 2023 P00706062MN SR2023-01-002057 January 30, 2023 Region XII Regional Office XII
CONTRACT 23M00116 PREVENTIVE MAINTENANCE - KIDAPAWAN-ALLAH JUNCTION RD - K1648+097-K1648+702, DATU PAGLAS, MAGUINDANAO
May 25, 2023 2023 P00707752MN SR2023-03-006398 March 3, 2023 Region XII Regional Office XII
CONTRACT 23M00166 PREVENTIVE MAINTENANCE - COTABATO-LANAO ROAD, K1858+526 - K1859+642, SULTAN KUDARAT, MAGUINDANAO
May 24, 2023 2023 310109101299000 GAA 2023 January 3, 2023 Region II Batanes District Engineering Office
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Basco-Mahatao-Ivana-Uyugan-Imnajbu Rd - K0004 + 165.50 - K0004 + 204
May 24, 2023 2023 310109101300000 GAA 2023 January 3, 2023 Region II Batanes District Engineering Office
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Basco-Mahatao-Ivana-Uyugan-Imnajbu Rd - K0004 + 127 - K0004 + 165.50
May 24, 2023 2023 310101100969000 GAA 2023 January 3, 2023 Region II Cagayan 3rd District Engineering Office
Asset Preservation - Preventive Maintenance - Primary Roads - Santiago- Tuguegarao Rd (Jct Kalinga- Tuguegarao Section)- K0437+500- K0437+885
May 24, 2023 2023 310201101148000 GAA 2023 January 3, 2023 Region II Cagayan 3rd District Engineering Office
Network Development Program - Road Widening - Primary Roads

Cagayan Valley Rd - K0464+831 - K0464+903, K0464+995 - K0465+079, K0466+106 - K0466+300, K0466+313 - K0466+400, K0477+094 - K0477+194
May 24, 2023 2023 310201101065000 GAA 2023 January 3, 2023 Region II Isabela 3rd District Engineering Office
Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0378 + 690 - K0380 + 000
May 24, 2023 2023 310104100542000 GAA 2023 January 3, 2023 Region II Nueva Vizcaya District Engineering Office
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads - Daang Maharlika (LZ) - K0242 +(-645) – K0242 + 150, K0242 +(-839) – K0242 + (-645)
May 24, 2023 2023 310104100544000 GAA 2023 January 3, 2023 Region II Nueva Vizcaya District Engineering Office
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads - Daang Maharlika (LZ) K0251 + 812 – K0253+ 643
May 24, 2023 2023 310203100631000 GAA 2023 January 3, 2023 Region II Regional Office II
Network Development Program - Road Widening - Tertiary Roads - Naguilian-San Mariano Road, Isabela - K0398+157 - K0402+303
May 23, 2023 2023 WIN3F07228 FY 2023 GAA RA 11936 January 1, 2023 Region VI Negros Occidental 1st District Engineering Office
UACS No. 310207100269000
Project ID: P00705597VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Off-Carriageway Improvement - Primary Roads

Bacolod North Rd - K0005 + 102 - K0005 + 107, K0005 + 172 - K0005 + 772, K0006 + (-174) - K0005 + 102

CW1- Off-Carriageway Improvement: Construction of Sidewalk: 4,452.00 sq. m. - 6,631.66
EAO - 135.34


TO:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Off-Carriageway Improvement - Primary Roads

Bacolod North Rd – K0030 + 870 – K0031 + 037

CW1- Off-Carriageway Improvement: Construction of Sidewalk: 303.00 sq. m. - 6,631.66
EAO - 135.34


May 23, 2023 2023 WIN3F07231 FY 2023 GAA RA 11936 January 1, 2023 Region VI Negros Occidental 1st District Engineering Office
UACS No. 310207100270000
Project ID: P00705598VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Off-Carriageway Improvement - Primary Roads

Bacolod North Rd - K0007 + (-793) - K0008 + 224

CW1- Off-Carriageway Improvement: Construction of Sidewalk: 4,718.40 sq. m. - 7,074.62
EAO - 144.38


TO:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Off-Carriageway Improvement - Primary Roads

Bacolod North Rd – K0031 + 037 – K0031 +146

CW1- Off-Carriageway Improvement: Construction of Sidewalk: 327.00 sq. m. - 7,074.62
EAO - 144.38
May 23, 2023 2023 WIN3F07254 FY 2023 GAA RA 11936 January 1, 2023 Region VI Negros Occidental 1st District Engineering Office
UACS No. 310101101030000
Project ID: P00705823VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Preventive Maintenance - Primary Roads

Bacolod North Rd - K0053 + 733 - K0055 + 000

CW1- Preventive Maintenance of Road: Asphalt Overlay: 4.852 lane km - 43,336.58
EAO - 884.42


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Preventive Maintenance - Primary Roads

Bacolod North Rd - K0053 + 000 - K0055 + 000, K0079 + 500 - K0080 + 075

CW1- Preventive Maintenance of Road: Asphalt Overlay: 2.976 lane km - 43,336.58
EAO - 884.42
May 23, 2023 2023 WIN3F07288 FY 2023 GAA RA 11936 January 1, 2023 Region VI Negros Occidental 1st District Engineering Office
UACS No. 310103101290000
Project ID: P00705828VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Jct New Sagay-Old Sagay Rd - K0084 + (-828) - K0085 + 000

CW1- Preventive Maintenance of Road: Asphalt Overlay: 7.007 lane km - 39,416.58
EAO - 804.42


TO:

OO1: Ensure Safe and Reliable National Road System

Jct New Sagay-Old Sagay Rd - K0084 + (-828) - K0084 + 092

CW1- Preventive Maintenance of Road: Asphalt Overlay: 3.571 lane km - 25,957.89
CW2 - Construction of Drainage Structure along Road: 836 Lineal Meter - 13,458.69

EAO - 804.42
May 23, 2023 2023 SARO2023-BMB-A-23-0014255 March 13, 2023 Region VI Iloilo City District Engineering Office
UACS No. 310107100473000
Project ID: P00705968VS


FROM:

Convergence and Special Support Program

Basic Infrastructure Program - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Rehabilitation of Roads, Petalsville Subdivisiion, Jaro Iloilo City

CW1- Rehabilitation of Concrete Road: 0.468 lane km - 4,950.00
EAO - 50.00


TO:

Convergence and Special Support Program

Basic Infrastructure Program - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Rehabilitation of Roads, Petalsville Subdivision, Jaro Iloilo City

CW1- Rehabilitation of Concrete Road: 0.674 lane km - 4,950.00
EAO - 50.00
May 23, 2023 2023 SARO2023-BMB-A-23-0014255 March 13, 2023 Region VI Iloilo City District Engineering Office
UACS No. 300225101328000
Project ID: P00733723VS


FROM:

Convergence and Special Support Program

Basic Infrastructure Program - Flood Mitigation Structures protecting Public Infrastructures/Facilities

Rehabilitation of Drainage, Brgy. San Jose Jaro, Iloilo City

CW1- Rehabilitation/Major Repair of Drainage Structure: 46.678 lineal meters - 4,950.00
EAO - 50.00


TO:

Convergence and Special Support Program

Basic Infrastructure Program - Flood Mitigation Structures protecting Public Infrastructures/Facilities

Rehabilitation of Drainage, Brgy. San Jose Jaro, Iloilo City

CW1- Rehabilitation/Major Repair of Drainage Structure: 175.00 lineal meters - 4,950.00
EAO - 50.00
May 23, 2023 2023 SARO-BMB-A-23-0014745 March 22, 2023 Region VI Iloilo City District Engineering Office
UACS No. 300226107699000
Project ID: P00734028VS


FROM:

Convergence and Special Support Program

Basic Infrastructure Program - Multi-Purpose Buildings/ Facilities to support Social Services

Construction/Improvement of Multi-Purpose Bldg. (Pavilion) at Brgy. San Lorenzo, Lapuz, Iloilo City

CW1- Construction of Multipurpose Building – 1 number of building - 4,950.00
EAO - 50.00


TO:

OO1: Ensure Safe and Reliable National Road System

Convergence and Special Support Program

Basic Infrastructure Program - Multi-Purpose Buildings/ Facilities to support Social Services

Construction/Improvement of Multi-Purpose Bldg. (Pavilion) at Brgy. Loboc, Lapuz, Iloilo City

CW1- Construction of Multipurpose Building – 1 number of building - 4,950.00
EAO - 50.00
May 23, 2023 2023 WIN3F07212 FY 2023 GAA RA 11936 January 1, 2023 Region VI Negros Occidental 1st District Engineering Office
UACS No. 310103101291000
Project ID: P00705829VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Jct New Sagay-Old Sagay Rd - K0085 + 675 - K0087 + 585

CW1- Preventive Maintenance of Road: Asphalt Overlay: 7.484 lane km - 42,099.82
EAO - 859.18


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Jct New Sagay-Old Sagay Rd - K0085 + 675 - K0086 + 642

CW1- Preventive Maintenance of Road: Asphalt Overlay: 7.484 lane km - 25,579.85
CW2- Construction of Drainage Structure along Road: 1,194 Lineal meter - 16,519.97
EAO - 859.18
May 23, 2023 2023 SR2023-03-008105 March 22, 2023 Region VI Negros Occidental 2nd District Engineering Office
UACS No. 300219101658000
Project ID: P00733230VS


FROM:

Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/Facilities

Construction of Binalbagan River Bank Slope Protection Downstream of Binalbagan (Bagacay) Bridge along Hinigaran-Isabela Road, Barangay Aranda, (Phase IV, Right Bank), Hinigaran, Negros Occidental

CW1- Construction of Slope Protection Structure: 3,169.97 Square Meters - 96,500.00
EAO - 3,500.00


TO:

Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/Facilities

Construction of Binalbagan River Bank Slope Protection Downstream of Binalbagan (Bagacay) Bridge along Hinigaran-Isabela Road, Barangay Aranda, (Phase V, Left Bank), Hinigaran, Negros Occidental

CW1- Construction of Slope Protection Structure: 3,172.06 Square Meters - 96,500.00
EAO - 3,500.00
May 23, 2023 2023 WIN3F07296 FY 2023 GAA RA 11936 January 1, 2023 Region VI Iloilo 2nd District Engineering Office
UACS No. 310109101340000
Project ID: P00706030VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Baje-Ngi-ngi-an-Bingawan Rd - K0060 + 390 - K0063 + 453, K0063 + 500 - K0063 + 527, K0071 + 200 - K0071 + 227

CW1- Construction of Road Slope Protection Structure: 3,001.00 sq.m - 29,400.98
EAO - 600.02


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Baje-Ngi-ngi-an-Bingawan Rd - K0063 + 390 - K0063 + 453, K0063 + 500 - K0063 + 527, K0067 + 280 - K0067 + 340, K0071 + 200 - K0071 + 227

CW1- Construction of Road Slope Protection Structure: 805.035 sq.m - 29,400.98
EAO - 600.02
May 23, 2023 2023 SR2023-03-005975 March 2, 2023 Region VI Iloilo 1st District Engineering Office
UACS No. 320101109141000
Project ID: P00721866VS


FROM:

OO2: Protect Lives and Properties Against Major Floods

Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Jarao River Flood Mitigation Structure including Access Road, Guimbal, Iloilo

CW1- Construction of Flood Mitigation Structure:
424.00 lineal meters - 62,725.00
EAO - 2,275.00


TO:

OO2: Protect Lives and Properties Against Major Floods

Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Jarao River Flood Mitigation Structure including Access Road, Guimbal, Iloilo

CW1- Construction of Flood Mitigation Structure:
410.52 lineal meters - 62,725.00
EAO - 2,275.00
May 23, 2023 2023 SARO-BMB-A-23-0014251 March 14, 2023 Region VI Iloilo 1st District Engineering Office
UACS No. 300225101320000
Project ID: P00733715VS


FROM:

Convergence and Special Support Program

Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities

Construction of San Joaquin River Control, San Joaquin, Iloilo

CW1- Construction of Flood Mitigation Structure:
80.00 lineal meters - 9,900.00
EAO - 100.00


TO:

Convergence and Special Support Program

Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public
Infrastructures/Facilities

Construction of San Joaquin River Control, San Joaquin, Iloilo

CW1- Construction of Flood Mitigation Structure:
191.00 lineal meters - 9,900.00
EAO - 100.00
May 23, 2023 2023 SARO-BMB-A-23-0014285 March 13, 2023 Region VI Negros Occidental 2nd District Engineering Office
UACS No. 300221103837000
Project ID: P00733533VS


FROM:

Convergence and Special Support Program

Basic Infrastructure Program - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Road at Proper Payao to Pallacon 2 to Sitio Mangahoycahoy, Barangay Santo, Binalbagan, Negros Occidental

CW1- Construction of Concrete Road:
2.692 lane km - 36,000.00
EAO - 400.00


TO:

Convergence and Special Support Program

Basic Infrastructure Program - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Road at Proper Payao to Pallacon 2 to Sitio Mangahoycahoy, Barangay Santol, Binalbagan, Negros Occidental

CW1- Construction of Concrete Road:
2.670 lane km - 36,000.00
EAO - 400.00
May 23, 2023 2023 SARO-BMB-A-23-0014743 March 21, 2023 Region VI Iloilo 3rd District Engineering Office
UACS No. 300226107631000
Project ID: P00733984VS


FROM:

Convergence and Special Support Program

Basic Infrastructure Program - Multi-Purpose Buildings/ Facilities to support Social Services

Construction of Multi-Purpose Building, Siemprevv, San Dionisio, Iloilo

CW1- Construction of Multi-Purpose Building: 1 No. of Building - 4,950.00
EAO - 50.00


TO:

Convergence and Special Support Program

Basic Infrastructure Program - Multi-Purpose Buildings/ Facilities to support Social Services

Construction of Multi-Purpose Building, Siempreviva, San Dionisio, Iloilo

CW1- Construction of Multi-Purpose Building: 1 No. of Building - 4,950.00
EAO - 50.00
May 23, 2023 2023 WIN3F07361 FY 2023 GAA RA 11936 January 1, 2023 Region VI Negros Occidental 1st District Engineering Office
UACS No. 310209100437000
Project ID: P00705603VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Off-Carriageway Improvement - Tertiary Roads

Jct Murcia-Cansilayan-Damsite-Abuanan-Bago City Rd - K0017 + (-386) - K0025 + 305

CW1 - Off-Carriageway Improvement: Paving of Shoulders: 20,023.20 sq. m. - 29,238.30
EAO - 596.70


TO:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Off-Carriageway Improvement - Tertiary Roads

Jct Murcia-Cansilayan-Damsite-Abuanan-Bago City Rd - K0017 + (-386) - K0025 + 305

CW1 - Off-Carriageway Improvement: Paving of Shoulders: 12,763.76 sq. m. - 29,238.30
EAO - 596.70
May 23, 2023 2023 WIN3F07360 FY 2023 GAA RA 11936 January 1, 2023 Region VI Negros Occidental 1st District Engineering Office
UACS No. 310102101367000
Project ID: P00705836VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program – Preventive Maintenance - Secondary Roads

Silay-Lantawan Rd - K0017 + 526 - K0019 + 500

CW1 - Preventive Maintenance: Concrete Reblocking: 8.325 Lane Km - 39,778.20
EAO - 811.80


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program – Preventive Maintenance - Secondary Roads

Silay-Lantawan Rd - K0017 + 526 - K0019 + 500

CW1 - Preventive Maintenance: Concrete Reblocking: 3.242 Lane Km - 39,778.20
EAO - 811.80
May 23, 2023 2023 WIN3F07314 FY 2023 GAA RA 11936 January 1, 2023 Region VI Regional Office VI
UACS No. 300203102296000
Project ID: P00731197VS



FROM:

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)

Barangay Comon-San Pedro Coastal Road leading to San Jose Port and Beaches, Resorts and Sunset Viewing, San Jose, Antique

CW1- Construction of Concrete Road:
1.133 lane km - 32,810.00
EAO - 1,190.00


TO:

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)

Barangay Comon-San Pedro Coastal Road leading to San Jose Port and Beaches, Resorts and Sunset Viewing, San Jose, Antique

CW1- Construction of Concrete Road:
0.33236 lane km - 15,102.382
CW2- Construction of Road Slope Protection Structure: 947.23 sq.m. - 17,707.618
EAO - 1,190.00
May 23, 2023 2023 FY 2023 GAA RA 11936 January 1, 2023 Region VI Bacolod City District Engineering Office
UACS No. 310207100267000
Project ID: P00705573VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement - Primary Roads

Bacolod South Rd (S00421NR) - Chainage 0 - Chainage 442

CW1- Off-Carriageway Improvement: Paving of Shoulders: 1,326 sq.m - 5,906.00
EAO - 104.00


TO:

OO1: Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement - Primary Roads

Bacolod South Rd (S00421NR) - Chainage 0 - Chainage 442

CW1- Off-Carriageway Improvement: Improvement of Intersections : 1 No of Intersection - 5,906.00
EAO - 104.00
May 23, 2023 2023 WIN3F07186 SR2023-03-008111 March 23, 2023 Region VI Regional Office VI
UACS No. 300219101661000
Project ID: P00733233VS


FROM:

Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities

Construction of Flood Control Along Sibalom River, Sibalom, Antique

CW1- Construction of Flood Mitigation Structure:
2,198.66 l.m. - 360,573.215
EAO - 13,077.785


TO:

Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities

Construction of Flood Control Along Sibalom River, Sibalom, Antique

CW1- Construction of Flood Mitigation Structure:
2,207.80 l.m. - 360,573.215
EAO - 13,077.785
May 23, 2023 2023 310101100972000 GAA 2023 January 3, 2023 Region II Isabela 1st District Engineering Office
Asset Preservation - Preventive Maintenance - Primary Roads – Daang Maharlika (LZ) - K0432 + 000 - K0433 + 533
May 23, 2023 2023 310101100973000 GAA 2023 January 3, 2023 Region II Isabela 1st District Engineering Office
Asset Preservation - Preventive Maintenance - Primary Roads – Daang Maharlika (LZ) - K0437 + 560 - K0438 + 200
May 23, 2023 2023 310104100539000 GAA 2023 January 3, 2023 Region II Isabela 1st District Engineering Office
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads – Daang Maharlika (LZ) - K0443 + 590 - K0444 + 198
May 22, 2023 2023 WIN3F07381 SR2023-01-003055 January 31, 2023 Region VIII Regional Office VIII
OO2: Protect Lives and Properties Against Major Floods

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Shoreline Protection Structure -Daang Maharlika Rd. (S00223LT) – along Sogod Section, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 90.710 M
Structure: 669.877 Lineal meters

EAO P 3.290 M

Total P 94.00 M

AS MODIFIED:

Construction of Shoreline Protection Structure -Daang Maharlika Rd. (S00223LT) – along Sogod Section, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 90.710 M
Structure: 350.00 Lineal meters

EAO P 3.290 M

Total P 94.00 M
May 19, 2023 2023 WIN3F07355 SR2023-03-007238 March 15, 2023 Region VIII Regional Office VIII
Convergence and Special Support Program

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

AS PER GAA/ORIGINAL:

Installation of Solar Street Lights along Jct. Taft-Oras-San Policarpo-Arteche Road - K0928+779 - K0939+948 (S00167SM)

Physical Target: Allocation:

CW1-Road Safety: Street Lighting : P 96.500 M
11.202 Km

EAO P 3.500 M

Total P 100.00 M

AS MODIFIED:

Installation of Solar Street Lights along Jct. Taft-Oras-San Policarpo-Arteche Road - K0928+813 - K0939+948 (S00167SM)

Physical Target: Allocation:

CW1-Road Safety: Street Lighting : P 96.500 M
652.00 Number of Streetlights

EAO P 3.500 M

Total P 100.00 M
May 19, 2023 FY 2023 GAA WIN3E02887 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Rehabilitation of Daang Maharlika (MN) - K1457+892 - K1450+326, Tagum City, Davao del Norte
Physical Target:
CW1: 15.108 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 52,000,000.00
CW1: P 50,180,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,820,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Rehabilitation of Daang Maharlika (MN) -
K1453+397 - K1453+972.50, K1454+023.50 - K1454+599,
K1458+162 - K1458+326, K1458+(-326) - K1458 + (-162), Tagum City, Davao Del Norte
Physical Target:
CW1: 4.437 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 52,000,000.00
CW1: P 50,180,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,820,000.00
May 19, 2023 FY 2023 GAA WIN3E02920 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1515+100 - K1516+301
Physical Target:
CW1: 1.648 lane km (Road Widening)
Allocation:
TOTAL: P 62,852,000.00
CW1: P 60,652,180.00 (Road Widening)
EAO: P 2,199,820.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1515+986 - K1516+042, K1520+253 - K1520+285, K1520+761 - K1520+830,
K1520+852 - K1520+921, K1521+077 - K1521+150, K1523+055 - K1523+373, K1524+160 - K1524+471,
Chainage 96 - Chainage 151, Chainage 215 - Chainage 265
Physical Target:
CW1: 1.613 lane km (Road Widening)
CW2: 754.80 square meters (Off-Carriageway Improvement: Construction of Traffic Island)
CW3: 3.00 number of laybys (Off-Carriageway Improvement: Construction of Laybys)
ROW: 223.68 square meters (ROW Acquisition)
Allocation:
TOTAL: P 62,852,000.00
CW1: P 30,862,980.00 (Road Widening)
CW2: P 6,851,500.00 (Off-Carriageway Improvement: Construction of Traffic Island)
CW3: P 2,200,2000.00 (Off-Carriageway Improvement: Construction of Laybys)
ROW: P 20,747,500.00 (ROW Acquisition)
EAO: P 2,199,820.00
May 19, 2023 FY 2023 GAA WIN3E02921 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Mitigation Structure along Bunawan River Sta. 5+575 - Sta. 6+175, East Side, Right Bank, Davao City
Physical Target:
CW1: 600.00 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00

TO: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Mitigation Structure along Bunawan River Sta. 5+610 - Sta. 5+940, East Side, Right Bank, Davao City
Physical Target:
CW1: 330.00 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
May 19, 2023 FY 2023 GAA P00705596MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) -
K1565+615 - K1566+000, K1567+177 - K1568+200
Physical Target:
CW1: 2.674 lane km (Road Widening)
Allocation:
TOTAL: P 69,594,000.00
CW1: P 67,158,210.00 (Road Widening)
EAO: P 69,594,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1567+177 - K1568+200
Physical Target:
CW1: 2.034 lane km (Road Widening)
ROW: 1,550.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 69,594,000.00
CW1: P 47,933,210 (Road Widening)
ROW: P 19,225,000.00 (ROW Acquisition)
EAO: P 69,594,000.00
May 18, 2023 2023 310101100977000 GAA FY 2023 December 26, 2022 Region II Isabela 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Cauayan-Cabatuan Rd - K0378+(-229) - K0378+090
May 18, 2023 2023 310103101200000 GAA FY 2023 December 26, 2022 Region II Isabela 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Tertiary Roads - Naguilian - Sn Mariano Rd - K0404+016 - K0404+993
May 18, 2023 2023 310207100235000 GAA FY 2023 December 26, 2022 Region II Isabela 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0381+664 - K0382+000, K0382+939 - K0383+098, K0383+131 - K0383+150, K0383+160 - K0383+174, K0383+235 - K0383+668, K0383+841 - K0384+099, K0384+162 - K0384+861, K0384+918 - K0384+960, K0385+122 - K0385+393, K0385+396 - K0385+441, K0385+742 - K0386+014, K0386+102 - K0386+105, K0386+272 - K0386+292, K0386+329 - K0386+373, K0386+425 - K0386+616, K0386+671 - K0388+033, K0388+047 - K0388+782, K088+962 - K0389+002, K0389+181 - K0390+204, K0390+490 - K0390+765, K0390+966 - K0391+271, K0391+368 - K0392+261
May 18, 2023 2023 WIN07359 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Daang Maharlika (LZ) - K0104+211 - K0104+300, K0104+300 - K0104+960
May 18, 2023 2023 310101100974000 GAA FY 2023 December 26, 2022 Region II Isabela 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0387+824 - K0388+105
May 18, 2023 2023 310201101063000 GAA FY 2023 December 26, 2022 Region II Isabela 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0374+185 - K0374+841
May 18, 2023 2023 310104100540000 GAA FY 2023 December 26, 2022 Region II Isabela 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Daang Maharlika (LZ) - K0348+136 - K0348+424
May 18, 2023 FY 2023 GAA WIN3E02880 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao City 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Bayabas-Eden Road - K1529+002 - K1538+281
Physical Target:
CW1: 18.288 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Bayabas-Eden Road - K1531+830 - K1536+567
Physical Target:
CW1: 9.396 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
May 18, 2023 2023 310101100976000 GAA FY 2023 December 26, 2022 Region II Isabela 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads - Santiago-Tuguegarao Rd - K0334+000 - K0335+066
May 18, 2023 2023 310203100666000 GAA FY 2023 December 26, 2022 Region II Isabela 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads - Gamu-Roxas Rd - K0392+461 - K0393+343
May 18, 2023 FY 2023 GAA P00705594MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) -
K1535+347 - K1535+356, K1535+411 - K1535+430,
K1535+443 - K1536+673, K1537+091 - K1537+761
Physical Target:
CW1: 3.868 lane km (Road Widening)
Allocation:
TOTAL: P 94,982,000.00
CW1: P 91,657,630.00 (Road Widening)
EAO: P 3,324,370.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) -
K1535+347 - K1535+356, K1535+411 - K1535+430,
K1535+443 - K1536+673, K1537+091 - K1537+761
Physical Target:
CW1: 2.696 lane km (Road Widening)
ROW: 9,575.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 94,982,000.00
CW1: P 62,387,630 (Road Widening)
ROW: P 29,270,000.00 (ROW Acquisition)
EAO: P 3,324,370.00
May 18, 2023 FY 2023 GAA P00705595MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1537+761 - K1538+294, K1538+924 - K1538+952, K1538+960 - K1538+966,
K1538+975 - K1539+011, K1539+042 - K1539+087, K1539+240 - K1539+256, K1539+274 - K1539+381, K1539+828 - K1539+837,
K1539+879 - K1539+922, K1539+971 - K1539+997, K1540+016 - K1540+029, K1540+043 - K1540+074, K1541+295 - K1541+310,
K1552+537 - K1552+544, K1552+612 - K1552+627, K1552+652 - K1552+667, K1552+711 - K1552+721, K1552+741 - K1552+766,
K1555+167 - K1555+191, K1555+900 - K1555+1044, K1556+064 - K1556+093, K1556+179 - K1556+183, K1556+682 - K1556+691,
K1556+970 - K1556+988, K1561+833 - K1561+845, K1561+860 - K1561+872, K1561+885 - K1561+913, K1563+000 - K1563+198
Physical Target:
CW1: 2.934 lane km (Road Widening)
Allocation:
TOTAL: P 62,606,000.00
CW1: P 60,414,790.00 (Road Widening)
EAO: P 2,191,210.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1537+761 - K1538+002, K1538+002 - K1538+028, K1538+028 - K1538+294,
K1538+924 - K1538+952, K1538+960 - K1538+966, K1538+975 - K1539+011, K1539+042 - K1539+087, K1539+240 - K1539+256,
K1539+274 - K1539+381, K1539+828 - K1539+837, K1539+879 - K1539+922, K1539+971 - K1539+997, K1540+016 - K1540+029,
K1540+043 - K1540+074, K1541+295 - K1541+310, K1552+537 - K1552+544, K1552+612 - K1552+627, K1552+652 - K1552+667,
K1552+711 - K1552+721, K1552+741 - K1552+766, K1555+167 - K1555+191, K1555+900 - K1555+1044, K1556+064 - K1556+073,
K1556+179 - K1556+183, K1556+682 - K1556+691, K1556+970 - K1556+988, K1561+833 - K1561+845, K1561+860 - K1561+872,
K1561+885 - K1561+913, K1563+000 - K1563+190
Physical Target:
CW1: 1.579 lane km (Road Widening)
ROW: 6,918.53 square meters (ROW Acquisition)
Allocation:
TOTAL: P 62,606,000.00
CW1: P 60,414,790.00 (Road Widening)
ROW: P 29,500,000.00 (ROW Acquisition)
EAO: P 2,191,210.00
May 18, 2023 2023 WIN3E02623 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 310102101217000
Project ID: P00707532MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads

FROM:

Surigao-Davao Coastal Rd - K1339 + 583 - K1342 + 952, K1343 + 182 - K1344 + 305, K1344 + 380 - K1345 + 641, K1345 + 657 - K1345 + 726, K1345 + 742 - K1352 + 152, K1352 + 164 - K1352 + 276, K1352 + 295 - K1354 + 886, K1354 + 898 - K1355 + 765

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 31.604 Lane Km

Allocation:
TOTAL: P 250,000,000
CW1: P 241,250,000
EAO: P 8,750,000

Unit Cost:
CW1: P 7,633,527.40/Lane Km

TO:

Surigao-Davao Coastal Rd - K1339 + 583 - K1342 + 952, K1343 + 182 - K1343 + 537, K1343 + 637 - K1350 + 310

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 24.794 Lane Km

Allocation:
TOTAL: P 250,000,000
CW1: P 241,250,000
EAO: P 8,750,000

Unit Cost:
CW1: P 9,730,176.66/Lane Km
May 18, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 300221104507000
Project ID: P00734341MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of San Luis - Bincalan - Zamboangauita Road, Bgy Mahayahay, San Luis Agusan Del Sur (Package 1)

Type of Work:
CW1- Construction of Gravel Road

Physical Target:
CW1- 12.440 Lane Km

Allocation:
TOTAL: P 250,000,000
CW1: P 247,500,000
EAO: P 2,500,000

Unit Cost:
CW1: P 19,895,498.39/Lane Km

TO:

Construction of San Luis - Binicalan - Zamboanguita Road, Brgy. Mahayahay, San Luis Agusan Del Sur (Package 1)

Type of Work:
CW1- Construction of Gravel Road

Physical Target:
CW1- 12.440 Lane Km

Allocation:
TOTAL: P 250,000,000
CW1: P 247,500,000
EAO: P 2,500,000

Unit Cost:
CW1: P 19,895,498.39/Lane Km
May 18, 2023 2023 WIN3E02860 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 300221104510000
Project ID: P00734344MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of Circumferential Road Along Agusan Marsh Road , Bgy San Gabriel and Bgy Nueva Gracia, Loreto, Agusan Del Sur (Package 11)

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure

Physical Target:
CW1- 2.146 Lane Km
CW2- 19742.13 Square meters

Allocation:
TOTAL: P 150,000,000
CW1: P 100,272,150
CW2: P 48,227,850
EAO: P 1,500,000

Unit Cost:
CW1: P 46,725,139.79/Lane Km
CW2: P 2,442.89/Square meters

TO:

Construction of Circumferential Road Along Agusan Marsh Road , Brgy. San Gabriel and Brgy. Nueva Gracia, Loreto, Agusan Del Sur (Package 11)

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure

Physical Target:
CW1- 2.146 Lane Km
CW2- 19742.13 Square meters

Allocation:
TOTAL: P 150,000,000
CW1: P 100,272,150
CW2: P 48,227,850
EAO: P 1,500,000

Unit Cost:
CW1: P 46,725,139.79/Lane Km
CW2: P 2,442.89/Square meters
May 18, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 300221104511000
Project ID: P00734345MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of Circumferential Road Along Agusan Marsh Road, Bgy San Gabriel and Bgy Nueva Gracia, Loreto, Agusan Del Sur (Package 12)

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure

Physical Target:
CW1- 2.974 Lane Km
CW2- 11672.53 Square meters

Allocation:
TOTAL: P 150,000,000
CW1: P 108,156,510
CW2: P 40,343,490
EAO: P 1,500,000

Unit Cost:
CW1: P 36,367,353.73/Lane Km
CW2: P 3,456.28/Square meters

TO:

Construction of Circumferential Road Along Agusan Marsh Road, Brgy. San Gabriel and Brgy. Nueva Gracia, Loreto, Agusan Del Sur (Package 12)

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure

Physical Target:
CW1- 2.974 Lane Km
CW2- 11672.53 Square meters

Allocation:
TOTAL: P 150,000,000
CW1: P 108,156,510
CW2: P 40,343,490
EAO: P 1,500,000

Unit Cost:
CW1: P 36,367,353.73/Lane Km
CW2: P 3,456.28/Square meters
May 18, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Surigao del Norte 1st District Engineering Office
UACS No. : 310102101213000
Project ID: P00707771MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads

FROM:

Jct Del Carmen-Sta Monica-San Isidro Rd (S00009SG) - K0045 + 000 - K0047 + 700

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 5.424 Lane Km

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 17,791,297.94/ Lane Km

TO:

Jct Del Carmen-Sta Monica-San Isidro Rd (S00009SG) - K0046 + 438 - K0049 + 115

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 5.424 Lane Km

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 17,791,297.94/ Lane Km
May 18, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Surigao del Norte 1st District Engineering Office
UACS No. : 310102101213000
Project ID: P00707771MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads

FROM:

Jct Del Carmen-Sta Monica-San Isidro Rd (S00009SG) - K0045 + 000 - K0047 + 700

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 5.424 Lane Km

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 17,791,297.94/ Lane Km

TO:

Jct Del Carmen-Sta Monica-San Isidro Rd (S00009SG) - K0046 + 438 - K0049 + 115

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 5.424 Lane Km

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 17,791,297.94/ Lane Km
May 18, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Surigao del Norte 1st District Engineering Office
UACS No. : 310102101213000
Project ID: P00707771MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads

FROM:

Jct Del Carmen-Sta Monica-San Isidro Rd (S00009SG) - K0045 + 000 - K0047 + 700

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 5.424 Lane Km

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 17,791,297.94/ Lane Km

TO:

Jct Del Carmen-Sta Monica-San Isidro Rd (S00009SG) - K0046 + 438 - K0049 + 115

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 5.424 Lane Km

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 17,791,297.94/ Lane Km
May 18, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Surigao del Norte 1st District Engineering Office
UACS No. : 310106101017000
Project ID: P00706339MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

FROM:

Jct Del Carmen-Sta Monica-Sn Isidro Rd - K0055 + 278 - K0055 + 791

Type of Work:
CW1- Rehabilitation of Paved Road

Physical Target:
CW1- 1.026 Lane Km

Allocation:
TOTAL: P 15,796,000
CW1: P 15,480,080
EAO: P 315,920

Unit Cost:
CW1: P 15,087,797.27/ Lane Km

TO:

Jct Del Carmen-Sta Monica-Sn Isidro Rd - K0045 + 075 - K0045 + 600

Type of Work:
CW1- Rehabilitation of Paved Road

Physical Target:
CW1- 1.050 Lane Km

Allocation:
TOTAL: P 15,796,000
CW1: P 15,480,080
EAO: P 315,920

Unit Cost:
CW1: P 14,742,933.33/ Lane Km
May 18, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Surigao del Norte 1st District Engineering Office
UACS No. : 310102101215000
Project ID: P00707773MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads

FROM:

Jct Del Carmen-Sta Monica-San Isidro Rd (S00009SG) - K0019 + 200 - K0022 + 500

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 6.000 Lane Km

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 16,083,333.33/ Lane Km

TO:

Jct Del Carmen-Sta Monica-San Isidro Rd (S00009SG) - K0019 + 188 - K0020 + 120, K0022 + 440 - K0024 + 657

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 6.000 Lane Km

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 16,083,333.33/ Lane Km