May 29, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Aurora District Engineering Office |
Network Development Program - Off-Carriageway Improvement - Secondary Roads
Madella - Dinadiawan Rd - K0409 + (-489) - K0410+697, K0417+412 - K0418+164.80, K0423+660 - K0425+961
|
May 29, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Aurora District Engineering Office |
Network Development Program - Off-Carriageway Improvement - Secondary Road
Nueva Ecija - Aurora Rd - K0194+957.00 - K0196+100.00, K0198+700.00 - K0204+190.20, K0204+290.00 - K0205+800.00 |
May 29, 2023 |
2023 |
WIN3F07088 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads
A Castañeda - Ma. Aurora - Sn Luis RD - K0198+623 - K0198+660, K0202+376 - K0202+481, K0204+275 - K0204+358, K0204+533 - K0204+600, K0217+840 - K0219+000, K0225+623 - K0226+055 |
May 29, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Baler -Casiguran Rd (Dinadiawan - Casiguran) - K0342 +546 - K0342+808.60, K0343+170.50 - K0344+095 |
May 29, 2023 |
2023 |
WIN3F07089 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Baler-Casiguran Rd (Dinadiawan-Casiguran) - K0305+560 - K0306+117, K0312+160 - K0312+890 |
May 29, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Madella - Dinadiawan Rd - K0409+(-489) - K0409+025, K0417+412 - K0418+186, K0423+780 - K0424+112, K0424+299 - K0425+926 |
May 29, 2023 |
2023 |
WIN3F06983 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Baler-Casiguran Rd (Baler-Dinadiawan) - K0231+128 - K0231+701, K0288+(-106) - K0289+000 |
May 29, 2023 |
2023 |
WIN3F06981 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Nueva Ecija -Aurora Rd - K0175+884 - K0176+143.40, K0202+000 - K0202+096, K0202+300 - K0202+493.80, K0202+775.50 - K0202+796, K0203+132.50 - K0203+217, K0203+436 - K0203+938, K0212+000 - K0213+040, K0217+000 - K0217+691.30, K0219+650 - K0221+583.40 |
May 29, 2023 |
2023 |
WIN3F07062 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
A Castañeda - Ma. Aurora - Sn Luis Rd - K0214+360 - K0215+019 |
May 29, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
A Castañeda - Ma. Aurora - Sn Luis Rd - K0207+319 - K0207+658 |
May 29, 2023 |
2023 |
WIN3F06997 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
A. Castañeda - Ma. Aurora - Sn Luis Rd - K0198+655 - K0199+000 |
May 29, 2023 |
2023 |
WIN3F06986 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
A. Castañeda - Ma. Aurora - Sn Luis Rd - K0199+000 - K0201+055 |
May 29, 2023 |
2023 |
WIN3F07071 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Baler - Casiguran Rd (Dinadiawan - Casiguran Sect) - K0301+523.50 - K0301+645 |
May 29, 2023 |
2023 |
WIN3F07074 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Nueva Ecija - Aurora Rd - K0178+764 - K0179+023 |
May 29, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Aurora District Engineering Office |
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Public Water Supply System (Level II or III)
Construction of Water System So. Diotorin, Dibayabay, San Luis, Aurora |
May 29, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Aurora District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Multi-Purpose Buildings / Facilities to Support Social Services
Construction of Multi-Purpose Building (Covered Court), Dimotol Elementary School, So. Dimotol, Brgy. Dianawan, Maria Aurora, Aurora |
May 29, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Aurora District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Multi-Purpose Buildings / Facilities to Support Social Services
Construction of Multi-purpose Building (Covered Court), Dianawan Elementary School , Brgy. Dianawan, Maria Aurora, Aurora |
May 29, 2023 |
2023 |
WIN3F06990 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Aurora District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures / Facilities
Construction of Flood Control Structure, Brgy. Culat, Casiguran, Aurora |
May 29, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Aurora District Engineering Office |
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R. A. 11239
Installation of Road Safety Devices Baler-Casiguran Road (Baler-Dinadiawan) K0275+500 - K0281+512 (Intermittent Section) |
May 29, 2023 |
2023 |
WIN3F07168 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads
Arayat - Magalang Rd - K0088+(-965) - K0088+(-111) |
May 29, 2023 |
2023 |
WIN3F07400 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Regional Office III |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Baler-Cemento via Dicaloyungan - Sta. 0+000 - Sta. 0+142 |
May 29, 2023 |
2023 |
WIN3F07083 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 3rd Engineering Office |
Project ID : P00713297LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope, Collapse, and Landslide - Secondary Roads
Ligao - Tabaco Rd. - K0508 + 446 - K0508 + 551
TO: OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope, Collapse, and Landslide - Secondary Roads
Ligao - Tabaco Rd. - K0512 + 737 - K0512 + 838 |
May 29, 2023 |
2023 |
WIN3F07023 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 3rd Engineering Office |
Project ID : P00711994LZ
FROM: Convergence and Special Support Program (CSSP) - Network Development Program - Road Widening - Secondary Roads
Ligao - Tabaco Rd - K0503 + 050 - K0504 + 061
TO : Convergence and Special Support Program (CSSP) - Network Development Program - Road Widening - Secondary Roads
Ligao - Tabaco Rd - K0503 + 050 - K0503 + 690 |
May 29, 2023 |
2023 |
WIN3F07053 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 3rd Engineering Office |
Project ID : P00711998LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Road
Oas Poblacion Rd - K0496 + 552 - K0497 + 023, K0498 + 000 - K0498 + 049
TO :OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Roads
Oas Poblacion Rd - K0496 + (-290) - K0496 + 101, K0498 + (-073) - K0498 + 049 |
May 29, 2023 |
2023 |
WIN3F07054 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 3rd Engineering Office |
Project ID : P00711999LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
Daang Maharlika (LZ) - K0499 + 750 - K0499 + 950
TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
Daang Maharlika (LZ) - K0499 + 390 - K0499 + 542 |
May 29, 2023 |
2023 |
WIN3F07085 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Norte Sub-District Engineering Office |
Project ID : P00712760LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance Primary Roads
Daang Maharlika (LZ) - K0354 + 536 - K0355 + 568
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance Primary Roads
Daang Maharlika (LZ) - K0354 + 536 - K355 + 568 |
May 29, 2023 |
2023 |
WIN3F06991 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00713334LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Masbate - Milagros Rd - K0014 + 000 - K0014 + 520
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Masbate - Milagros Rd - K0014 + 360 - K0014 + 693 |
May 29, 2023 |
2023 |
WIN 3F07095 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 3rd District Engineering Office |
Project ID : P007144690LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Naga City Bdry - Calabanga - Balongay Road K00443 + 585 - K0449 + 000
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Naga City Bdry - Calabanga - Balongay Road K0443 + 686 - K0445 + 035.30 |
May 29, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00711507LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads
Camarines Sur Expressway Package 6, Camarines Sur
TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads
Camarines Sur Expressway Package 6, Camarines Sur |
May 29, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 4th District Engineering Office |
Project ID : P00713329LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Road with Slips, Slope Collapse, and Landslide - Secondary Roads
Tigaon - Goa - Sn Jose - Lagonoy - Guijalo via Sn Vicente Rd - K0568 + 366 - K0568 + 400
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Road with Slips, Slope Collapse, and Landslide - Secondary Roads
Tigaon - Goa - Sn Jose - Lagonoy - Guijalo via Sn Vicente Rd - K0568 + 360 - K0568 + 400
|
May 29, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00712242LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Masbate - Milagros Rd - K0003 + 152 - K0003 + 255
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Masbate - Milagros Rd - K0003 + 250 - K0003 + 420 |
May 29, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 5th District Engineering Office |
Project ID : P00712023LZ
FROM :
Physical Target : 1.032 Lane Km
TO :
Physical Target : 2.722 Lane Km
|
May 29, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 5th District Engineering Office |
Project ID : P00712020LZ
FROM : Ensure Safe and Reliable National Road System Network Development - Road Widening - Secondary Roads
Baao - Iriga City - Nabua Rd - K0467 + 000 - K0468 + 280
TO : Ensure Safe and Reliable National Road System Network Development - Road Widening - Secondary Roads
Baao - Iriga City - Nabua Rd - K0467 + 270- K0468 + 270 |
May 26, 2023 |
FY 2023 GAA |
WIN3E02924 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao de Oro 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika (MN) -
K1396+960 - K1397+021, K1403+150 - K1403+200
Physical Target:
CW1: 3,666.67 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 55,000,000.00
CW1: P 53,075,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,925,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika (MN) - K1396+936 - K1397+000
Physical Target:
CW1: 975.00 square meters (Construction of Road Slope Protection Structure)
CW2: 250.00 square meters (Off-Carriageway Improvement: Paving of Shoulders)
Allocation:
TOTAL: P 55,000,000.00
CW1: P 52,545,448.00 (Construction of Road Slope Protection Structure)
CW2: P 529.552.00 (Off-Carriageway Improvement: Paving of Shoulders)
EAO: P 1,925,000.00 |
May 26, 2023 |
FY 2023 GAA |
WIN3E02888 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1498+500 - K1501+180
Physical Target:
CW1: 5.280 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1495+194 - K1496+231
Physical Target:
CW1: 3.888 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00 |
May 26, 2023 |
FY 2023 GAA |
WIN3E02901 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Babak-Samal-Kaputian Rd - K1512+413 - K1514+942
Physical Target:
CW1: 4.970 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Babak-Samal-Kaputian Rd - K1513+182 - K1515+000
Physical Target:
CW1: 3.466 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00 |
May 26, 2023 |
FY 2023 GAA |
WIN3E02889 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1479+384 - K1480+956
Physical Target:
CW1: 4.233 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,796,000.00
CW1: P 49,018,140.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,777,860.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1479+384 - K1480+500
Physical Target:
CW1: 2.865 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,796,000.00
CW1: P 49,018,140.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,777,860.00 |
May 25, 2023 |
2023 |
P00706228MN |
SR2023-01-002072 |
January 30, 2023 |
Region XII |
Regional Office XII |
Contract ID:23M00117
Contract Name: REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - MIDSAYAP-DULAWAN- MAKAR RD , K1722+701.77 - K1723+266.77, MAGUINDANAO DEL SUR |
May 25, 2023 |
2023 |
p00707236MN |
SR2023-03-006402 |
March 3, 2023 |
Region XII |
Regional Office XII |
contract 23M00167-PREVENTIVE MAINTENANCE - COTABATO-LANAO ROAD (S01752MN), K1855+216 - K1856+226, SULTAN KUDARAT, MAGUINDANAO
|
May 25, 2023 |
2023 |
P00707751MN |
SR2023-03-006393 |
March 3, 2023 |
Region XII |
Regional Office XII |
CONTRACT: 23M00165 PREVENTIVE MAINTENANCE - COTABATO-LANAO ROAD, K1857+346 - K1857+739, K1857+739 - K1857+867, K1857+867 - K1858+526, SULTAN KUDARAT, MAGUINDANAO
|
May 25, 2023 |
2023 |
P00706229MN |
SR2023-01-002078 |
January 30, 2023 |
Region XII |
Regional Office XII |
CONTRACT 23M00118 REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - MIDSAYAP-DULAWAN- MAKAR RD, K1722+275 - K1722+701.77, MAGUINDANAO DEL SUR
|
May 25, 2023 |
2023 |
P00706062MN |
SR2023-01-002057 |
January 30, 2023 |
Region XII |
Regional Office XII |
CONTRACT 23M00116 PREVENTIVE MAINTENANCE - KIDAPAWAN-ALLAH JUNCTION RD - K1648+097-K1648+702, DATU PAGLAS, MAGUINDANAO
|
May 25, 2023 |
2023 |
P00707752MN |
SR2023-03-006398 |
March 3, 2023 |
Region XII |
Regional Office XII |
CONTRACT 23M00166 PREVENTIVE MAINTENANCE - COTABATO-LANAO ROAD, K1858+526 - K1859+642, SULTAN KUDARAT, MAGUINDANAO
|
May 24, 2023 |
2023 |
310109101299000 |
GAA 2023 |
January 3, 2023 |
Region II |
Batanes District Engineering Office |
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Basco-Mahatao-Ivana-Uyugan-Imnajbu Rd - K0004 + 165.50 - K0004 + 204 |
May 24, 2023 |
2023 |
310109101300000 |
GAA 2023 |
January 3, 2023 |
Region II |
Batanes District Engineering Office |
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Basco-Mahatao-Ivana-Uyugan-Imnajbu Rd - K0004 + 127 - K0004 + 165.50 |
May 24, 2023 |
2023 |
310101100969000 |
GAA 2023 |
January 3, 2023 |
Region II |
Cagayan 3rd District Engineering Office |
Asset Preservation - Preventive Maintenance - Primary Roads - Santiago- Tuguegarao Rd (Jct Kalinga- Tuguegarao Section)- K0437+500- K0437+885 |
May 24, 2023 |
2023 |
310201101148000 |
GAA 2023 |
January 3, 2023 |
Region II |
Cagayan 3rd District Engineering Office |
Network Development Program - Road Widening - Primary Roads
Cagayan Valley Rd - K0464+831 - K0464+903, K0464+995 - K0465+079, K0466+106 - K0466+300, K0466+313 - K0466+400, K0477+094 - K0477+194 |
May 24, 2023 |
2023 |
310201101065000 |
GAA 2023 |
January 3, 2023 |
Region II |
Isabela 3rd District Engineering Office |
Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0378 + 690 - K0380 + 000 |
May 24, 2023 |
2023 |
310104100542000 |
GAA 2023 |
January 3, 2023 |
Region II |
Nueva Vizcaya District Engineering Office |
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads - Daang Maharlika (LZ) - K0242 +(-645) – K0242 + 150, K0242 +(-839) – K0242 + (-645) |
May 24, 2023 |
2023 |
310104100544000 |
GAA 2023 |
January 3, 2023 |
Region II |
Nueva Vizcaya District Engineering Office |
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads - Daang Maharlika (LZ) K0251 + 812 – K0253+ 643 |
May 24, 2023 |
2023 |
310203100631000 |
GAA 2023 |
January 3, 2023 |
Region II |
Regional Office II |
Network Development Program - Road Widening - Tertiary Roads - Naguilian-San Mariano Road, Isabela - K0398+157 - K0402+303 |
May 23, 2023 |
2023 |
WIN3F07228 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Negros Occidental 1st District Engineering Office |
UACS No. 310207100269000
Project ID: P00705597VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Primary Roads
Bacolod North Rd - K0005 + 102 - K0005 + 107, K0005 + 172 - K0005 + 772, K0006 + (-174) - K0005 + 102
CW1- Off-Carriageway Improvement: Construction of Sidewalk: 4,452.00 sq. m. - 6,631.66
EAO - 135.34
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Primary Roads
Bacolod North Rd – K0030 + 870 – K0031 + 037
CW1- Off-Carriageway Improvement: Construction of Sidewalk: 303.00 sq. m. - 6,631.66
EAO - 135.34
|
May 23, 2023 |
2023 |
WIN3F07231 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Negros Occidental 1st District Engineering Office |
UACS No. 310207100270000
Project ID: P00705598VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Primary Roads
Bacolod North Rd - K0007 + (-793) - K0008 + 224
CW1- Off-Carriageway Improvement: Construction of Sidewalk: 4,718.40 sq. m. - 7,074.62
EAO - 144.38
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Primary Roads
Bacolod North Rd – K0031 + 037 – K0031 +146
CW1- Off-Carriageway Improvement: Construction of Sidewalk: 327.00 sq. m. - 7,074.62
EAO - 144.38 |
May 23, 2023 |
2023 |
WIN3F07254 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Negros Occidental 1st District Engineering Office |
UACS No. 310101101030000
Project ID: P00705823VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Bacolod North Rd - K0053 + 733 - K0055 + 000
CW1- Preventive Maintenance of Road: Asphalt Overlay: 4.852 lane km - 43,336.58
EAO - 884.42
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Bacolod North Rd - K0053 + 000 - K0055 + 000, K0079 + 500 - K0080 + 075
CW1- Preventive Maintenance of Road: Asphalt Overlay: 2.976 lane km - 43,336.58
EAO - 884.42
|
May 23, 2023 |
2023 |
WIN3F07288 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Negros Occidental 1st District Engineering Office |
UACS No. 310103101290000
Project ID: P00705828VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Jct New Sagay-Old Sagay Rd - K0084 + (-828) - K0085 + 000
CW1- Preventive Maintenance of Road: Asphalt Overlay: 7.007 lane km - 39,416.58
EAO - 804.42
TO:
OO1: Ensure Safe and Reliable National Road System
Jct New Sagay-Old Sagay Rd - K0084 + (-828) - K0084 + 092
CW1- Preventive Maintenance of Road: Asphalt Overlay: 3.571 lane km - 25,957.89
CW2 - Construction of Drainage Structure along Road: 836 Lineal Meter - 13,458.69
EAO - 804.42 |
May 23, 2023 |
2023 |
|
SARO2023-BMB-A-23-0014255 |
March 13, 2023 |
Region VI |
Iloilo City District Engineering Office |
UACS No. 310107100473000
Project ID: P00705968VS
FROM:
Convergence and Special Support Program
Basic Infrastructure Program - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Rehabilitation of Roads, Petalsville Subdivisiion, Jaro Iloilo City
CW1- Rehabilitation of Concrete Road: 0.468 lane km - 4,950.00
EAO - 50.00
TO:
Convergence and Special Support Program
Basic Infrastructure Program - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Rehabilitation of Roads, Petalsville Subdivision, Jaro Iloilo City
CW1- Rehabilitation of Concrete Road: 0.674 lane km - 4,950.00
EAO - 50.00 |
May 23, 2023 |
2023 |
|
SARO2023-BMB-A-23-0014255 |
March 13, 2023 |
Region VI |
Iloilo City District Engineering Office |
UACS No. 300225101328000
Project ID: P00733723VS
FROM:
Convergence and Special Support Program
Basic Infrastructure Program - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Rehabilitation of Drainage, Brgy. San Jose Jaro, Iloilo City
CW1- Rehabilitation/Major Repair of Drainage Structure: 46.678 lineal meters - 4,950.00
EAO - 50.00
TO:
Convergence and Special Support Program
Basic Infrastructure Program - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Rehabilitation of Drainage, Brgy. San Jose Jaro, Iloilo City
CW1- Rehabilitation/Major Repair of Drainage Structure: 175.00 lineal meters - 4,950.00
EAO - 50.00 |
May 23, 2023 |
2023 |
|
SARO-BMB-A-23-0014745 |
March 22, 2023 |
Region VI |
Iloilo City District Engineering Office |
UACS No. 300226107699000
Project ID: P00734028VS
FROM:
Convergence and Special Support Program
Basic Infrastructure Program - Multi-Purpose Buildings/ Facilities to support Social Services
Construction/Improvement of Multi-Purpose Bldg. (Pavilion) at Brgy. San Lorenzo, Lapuz, Iloilo City
CW1- Construction of Multipurpose Building – 1 number of building - 4,950.00
EAO - 50.00
TO:
OO1: Ensure Safe and Reliable National Road System
Convergence and Special Support Program
Basic Infrastructure Program - Multi-Purpose Buildings/ Facilities to support Social Services
Construction/Improvement of Multi-Purpose Bldg. (Pavilion) at Brgy. Loboc, Lapuz, Iloilo City
CW1- Construction of Multipurpose Building – 1 number of building - 4,950.00
EAO - 50.00 |
May 23, 2023 |
2023 |
WIN3F07212 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Negros Occidental 1st District Engineering Office |
UACS No. 310103101291000
Project ID: P00705829VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Jct New Sagay-Old Sagay Rd - K0085 + 675 - K0087 + 585
CW1- Preventive Maintenance of Road: Asphalt Overlay: 7.484 lane km - 42,099.82
EAO - 859.18
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Jct New Sagay-Old Sagay Rd - K0085 + 675 - K0086 + 642
CW1- Preventive Maintenance of Road: Asphalt Overlay: 7.484 lane km - 25,579.85
CW2- Construction of Drainage Structure along Road: 1,194 Lineal meter - 16,519.97
EAO - 859.18 |
May 23, 2023 |
2023 |
|
SR2023-03-008105 |
March 22, 2023 |
Region VI |
Negros Occidental 2nd District Engineering Office |
UACS No. 300219101658000
Project ID: P00733230VS
FROM:
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Binalbagan River Bank Slope Protection Downstream of Binalbagan (Bagacay) Bridge along Hinigaran-Isabela Road, Barangay Aranda, (Phase IV, Right Bank), Hinigaran, Negros Occidental
CW1- Construction of Slope Protection Structure: 3,169.97 Square Meters - 96,500.00
EAO - 3,500.00
TO:
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Binalbagan River Bank Slope Protection Downstream of Binalbagan (Bagacay) Bridge along Hinigaran-Isabela Road, Barangay Aranda, (Phase V, Left Bank), Hinigaran, Negros Occidental
CW1- Construction of Slope Protection Structure: 3,172.06 Square Meters - 96,500.00
EAO - 3,500.00 |
May 23, 2023 |
2023 |
WIN3F07296 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo 2nd District Engineering Office |
UACS No. 310109101340000
Project ID: P00706030VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Baje-Ngi-ngi-an-Bingawan Rd - K0060 + 390 - K0063 + 453, K0063 + 500 - K0063 + 527, K0071 + 200 - K0071 + 227
CW1- Construction of Road Slope Protection Structure: 3,001.00 sq.m - 29,400.98
EAO - 600.02
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Baje-Ngi-ngi-an-Bingawan Rd - K0063 + 390 - K0063 + 453, K0063 + 500 - K0063 + 527, K0067 + 280 - K0067 + 340, K0071 + 200 - K0071 + 227
CW1- Construction of Road Slope Protection Structure: 805.035 sq.m - 29,400.98
EAO - 600.02 |
May 23, 2023 |
2023 |
|
SR2023-03-005975 |
March 2, 2023 |
Region VI |
Iloilo 1st District Engineering Office |
UACS No. 320101109141000
Project ID: P00721866VS
FROM:
OO2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Jarao River Flood Mitigation Structure including Access Road, Guimbal, Iloilo
CW1- Construction of Flood Mitigation Structure:
424.00 lineal meters - 62,725.00
EAO - 2,275.00
TO:
OO2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Jarao River Flood Mitigation Structure including Access Road, Guimbal, Iloilo
CW1- Construction of Flood Mitigation Structure:
410.52 lineal meters - 62,725.00
EAO - 2,275.00
|
May 23, 2023 |
2023 |
|
SARO-BMB-A-23-0014251 |
March 14, 2023 |
Region VI |
Iloilo 1st District Engineering Office |
UACS No. 300225101320000
Project ID: P00733715VS
FROM:
Convergence and Special Support Program
Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of San Joaquin River Control, San Joaquin, Iloilo
CW1- Construction of Flood Mitigation Structure:
80.00 lineal meters - 9,900.00
EAO - 100.00
TO:
Convergence and Special Support Program
Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public
Infrastructures/Facilities
Construction of San Joaquin River Control, San Joaquin, Iloilo
CW1- Construction of Flood Mitigation Structure:
191.00 lineal meters - 9,900.00
EAO - 100.00 |
May 23, 2023 |
2023 |
|
SARO-BMB-A-23-0014285 |
March 13, 2023 |
Region VI |
Negros Occidental 2nd District Engineering Office |
UACS No. 300221103837000
Project ID: P00733533VS
FROM:
Convergence and Special Support Program
Basic Infrastructure Program - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Road at Proper Payao to Pallacon 2 to Sitio Mangahoycahoy, Barangay Santo, Binalbagan, Negros Occidental
CW1- Construction of Concrete Road:
2.692 lane km - 36,000.00
EAO - 400.00
TO:
Convergence and Special Support Program
Basic Infrastructure Program - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Road at Proper Payao to Pallacon 2 to Sitio Mangahoycahoy, Barangay Santol, Binalbagan, Negros Occidental
CW1- Construction of Concrete Road:
2.670 lane km - 36,000.00
EAO - 400.00 |
May 23, 2023 |
2023 |
|
SARO-BMB-A-23-0014743 |
March 21, 2023 |
Region VI |
Iloilo 3rd District Engineering Office |
UACS No. 300226107631000
Project ID: P00733984VS
FROM:
Convergence and Special Support Program
Basic Infrastructure Program - Multi-Purpose Buildings/ Facilities to support Social Services
Construction of Multi-Purpose Building, Siemprevv, San Dionisio, Iloilo
CW1- Construction of Multi-Purpose Building: 1 No. of Building - 4,950.00
EAO - 50.00
TO:
Convergence and Special Support Program
Basic Infrastructure Program - Multi-Purpose Buildings/ Facilities to support Social Services
Construction of Multi-Purpose Building, Siempreviva, San Dionisio, Iloilo
CW1- Construction of Multi-Purpose Building: 1 No. of Building - 4,950.00
EAO - 50.00 |
May 23, 2023 |
2023 |
WIN3F07361 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Negros Occidental 1st District Engineering Office |
UACS No. 310209100437000
Project ID: P00705603VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Tertiary Roads
Jct Murcia-Cansilayan-Damsite-Abuanan-Bago City Rd - K0017 + (-386) - K0025 + 305
CW1 - Off-Carriageway Improvement: Paving of Shoulders: 20,023.20 sq. m. - 29,238.30
EAO - 596.70
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Tertiary Roads
Jct Murcia-Cansilayan-Damsite-Abuanan-Bago City Rd - K0017 + (-386) - K0025 + 305
CW1 - Off-Carriageway Improvement: Paving of Shoulders: 12,763.76 sq. m. - 29,238.30
EAO - 596.70 |
May 23, 2023 |
2023 |
WIN3F07360 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Negros Occidental 1st District Engineering Office |
UACS No. 310102101367000
Project ID: P00705836VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program – Preventive Maintenance - Secondary Roads
Silay-Lantawan Rd - K0017 + 526 - K0019 + 500
CW1 - Preventive Maintenance: Concrete Reblocking: 8.325 Lane Km - 39,778.20
EAO - 811.80
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program – Preventive Maintenance - Secondary Roads
Silay-Lantawan Rd - K0017 + 526 - K0019 + 500
CW1 - Preventive Maintenance: Concrete Reblocking: 3.242 Lane Km - 39,778.20
EAO - 811.80 |
May 23, 2023 |
2023 |
WIN3F07314 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Regional Office VI |
UACS No. 300203102296000
Project ID: P00731197VS
FROM:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
Barangay Comon-San Pedro Coastal Road leading to San Jose Port and Beaches, Resorts and Sunset Viewing, San Jose, Antique
CW1- Construction of Concrete Road:
1.133 lane km - 32,810.00
EAO - 1,190.00
TO:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
Barangay Comon-San Pedro Coastal Road leading to San Jose Port and Beaches, Resorts and Sunset Viewing, San Jose, Antique
CW1- Construction of Concrete Road:
0.33236 lane km - 15,102.382
CW2- Construction of Road Slope Protection Structure: 947.23 sq.m. - 17,707.618
EAO - 1,190.00 |
May 23, 2023 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Bacolod City District Engineering Office |
UACS No. 310207100267000
Project ID: P00705573VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Primary Roads
Bacolod South Rd (S00421NR) - Chainage 0 - Chainage 442
CW1- Off-Carriageway Improvement: Paving of Shoulders: 1,326 sq.m - 5,906.00
EAO - 104.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Primary Roads
Bacolod South Rd (S00421NR) - Chainage 0 - Chainage 442
CW1- Off-Carriageway Improvement: Improvement of Intersections : 1 No of Intersection - 5,906.00
EAO - 104.00 |
May 23, 2023 |
2023 |
WIN3F07186 |
SR2023-03-008111 |
March 23, 2023 |
Region VI |
Regional Office VI |
UACS No. 300219101661000
Project ID: P00733233VS
FROM:
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Control Along Sibalom River, Sibalom, Antique
CW1- Construction of Flood Mitigation Structure:
2,198.66 l.m. - 360,573.215
EAO - 13,077.785
TO:
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Control Along Sibalom River, Sibalom, Antique
CW1- Construction of Flood Mitigation Structure:
2,207.80 l.m. - 360,573.215
EAO - 13,077.785 |
May 23, 2023 |
2023 |
310101100972000 |
GAA 2023 |
January 3, 2023 |
Region II |
Isabela 1st District Engineering Office |
Asset Preservation - Preventive Maintenance - Primary Roads – Daang Maharlika (LZ) - K0432 + 000 - K0433 + 533 |
May 23, 2023 |
2023 |
310101100973000 |
GAA 2023 |
January 3, 2023 |
Region II |
Isabela 1st District Engineering Office |
Asset Preservation - Preventive Maintenance - Primary Roads – Daang Maharlika (LZ) - K0437 + 560 - K0438 + 200 |
May 23, 2023 |
2023 |
310104100539000 |
GAA 2023 |
January 3, 2023 |
Region II |
Isabela 1st District Engineering Office |
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads – Daang Maharlika (LZ) - K0443 + 590 - K0444 + 198 |
May 22, 2023 |
2023 |
WIN3F07381 |
SR2023-01-003055 |
January 31, 2023 |
Region VIII |
Regional Office VIII |
OO2: Protect Lives and Properties Against Major Floods
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Shoreline Protection Structure -Daang Maharlika Rd. (S00223LT) – along Sogod Section, Southern Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 90.710 M
Structure: 669.877 Lineal meters
EAO P 3.290 M
Total P 94.00 M
AS MODIFIED:
Construction of Shoreline Protection Structure -Daang Maharlika Rd. (S00223LT) – along Sogod Section, Southern Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 90.710 M
Structure: 350.00 Lineal meters
EAO P 3.290 M
Total P 94.00 M
|
May 19, 2023 |
2023 |
WIN3F07355 |
SR2023-03-007238 |
March 15, 2023 |
Region VIII |
Regional Office VIII |
Convergence and Special Support Program
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
AS PER GAA/ORIGINAL:
Installation of Solar Street Lights along Jct. Taft-Oras-San Policarpo-Arteche Road - K0928+779 - K0939+948 (S00167SM)
Physical Target: Allocation:
CW1-Road Safety: Street Lighting : P 96.500 M
11.202 Km
EAO P 3.500 M
Total P 100.00 M
AS MODIFIED:
Installation of Solar Street Lights along Jct. Taft-Oras-San Policarpo-Arteche Road - K0928+813 - K0939+948 (S00167SM)
Physical Target: Allocation:
CW1-Road Safety: Street Lighting : P 96.500 M
652.00 Number of Streetlights
EAO P 3.500 M
Total P 100.00 M
|
May 19, 2023 |
FY 2023 GAA |
WIN3E02887 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Rehabilitation of Daang Maharlika (MN) - K1457+892 - K1450+326, Tagum City, Davao del Norte
Physical Target:
CW1: 15.108 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 52,000,000.00
CW1: P 50,180,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,820,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Rehabilitation of Daang Maharlika (MN) -
K1453+397 - K1453+972.50, K1454+023.50 - K1454+599,
K1458+162 - K1458+326, K1458+(-326) - K1458 + (-162), Tagum City, Davao Del Norte
Physical Target:
CW1: 4.437 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 52,000,000.00
CW1: P 50,180,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,820,000.00 |
May 19, 2023 |
FY 2023 GAA |
WIN3E02920 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1515+100 - K1516+301
Physical Target:
CW1: 1.648 lane km (Road Widening)
Allocation:
TOTAL: P 62,852,000.00
CW1: P 60,652,180.00 (Road Widening)
EAO: P 2,199,820.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1515+986 - K1516+042, K1520+253 - K1520+285, K1520+761 - K1520+830,
K1520+852 - K1520+921, K1521+077 - K1521+150, K1523+055 - K1523+373, K1524+160 - K1524+471,
Chainage 96 - Chainage 151, Chainage 215 - Chainage 265
Physical Target:
CW1: 1.613 lane km (Road Widening)
CW2: 754.80 square meters (Off-Carriageway Improvement: Construction of Traffic Island)
CW3: 3.00 number of laybys (Off-Carriageway Improvement: Construction of Laybys)
ROW: 223.68 square meters (ROW Acquisition)
Allocation:
TOTAL: P 62,852,000.00
CW1: P 30,862,980.00 (Road Widening)
CW2: P 6,851,500.00 (Off-Carriageway Improvement: Construction of Traffic Island)
CW3: P 2,200,2000.00 (Off-Carriageway Improvement: Construction of Laybys)
ROW: P 20,747,500.00 (ROW Acquisition)
EAO: P 2,199,820.00 |
May 19, 2023 |
FY 2023 GAA |
WIN3E02921 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Mitigation Structure along Bunawan River Sta. 5+575 - Sta. 6+175, East Side, Right Bank, Davao City
Physical Target:
CW1: 600.00 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
TO: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Mitigation Structure along Bunawan River Sta. 5+610 - Sta. 5+940, East Side, Right Bank, Davao City
Physical Target:
CW1: 330.00 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00 |
May 19, 2023 |
FY 2023 GAA |
P00705596MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) -
K1565+615 - K1566+000, K1567+177 - K1568+200
Physical Target:
CW1: 2.674 lane km (Road Widening)
Allocation:
TOTAL: P 69,594,000.00
CW1: P 67,158,210.00 (Road Widening)
EAO: P 69,594,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1567+177 - K1568+200
Physical Target:
CW1: 2.034 lane km (Road Widening)
ROW: 1,550.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 69,594,000.00
CW1: P 47,933,210 (Road Widening)
ROW: P 19,225,000.00 (ROW Acquisition)
EAO: P 69,594,000.00 |
May 18, 2023 |
2023 |
310101100977000 |
GAA FY 2023 |
December 26, 2022 |
Region II |
Isabela 3rd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Cauayan-Cabatuan Rd - K0378+(-229) - K0378+090 |
May 18, 2023 |
2023 |
310103101200000 |
GAA FY 2023 |
December 26, 2022 |
Region II |
Isabela 3rd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Tertiary Roads - Naguilian - Sn Mariano Rd - K0404+016 - K0404+993 |
May 18, 2023 |
2023 |
310207100235000 |
GAA FY 2023 |
December 26, 2022 |
Region II |
Isabela 3rd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0381+664 - K0382+000, K0382+939 - K0383+098, K0383+131 - K0383+150, K0383+160 - K0383+174, K0383+235 - K0383+668, K0383+841 - K0384+099, K0384+162 - K0384+861, K0384+918 - K0384+960, K0385+122 - K0385+393, K0385+396 - K0385+441, K0385+742 - K0386+014, K0386+102 - K0386+105, K0386+272 - K0386+292, K0386+329 - K0386+373, K0386+425 - K0386+616, K0386+671 - K0388+033, K0388+047 - K0388+782, K088+962 - K0389+002, K0389+181 - K0390+204, K0390+490 - K0390+765, K0390+966 - K0391+271, K0391+368 - K0392+261 |
May 18, 2023 |
2023 |
WIN07359 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Regional Office III |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Daang Maharlika (LZ) - K0104+211 - K0104+300, K0104+300 - K0104+960 |
May 18, 2023 |
2023 |
310101100974000 |
GAA FY 2023 |
December 26, 2022 |
Region II |
Isabela 3rd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0387+824 - K0388+105 |
May 18, 2023 |
2023 |
310201101063000 |
GAA FY 2023 |
December 26, 2022 |
Region II |
Isabela 3rd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0374+185 - K0374+841 |
May 18, 2023 |
2023 |
310104100540000 |
GAA FY 2023 |
December 26, 2022 |
Region II |
Isabela 3rd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Daang Maharlika (LZ) - K0348+136 - K0348+424 |
May 18, 2023 |
FY 2023 GAA |
WIN3E02880 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao City 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Bayabas-Eden Road - K1529+002 - K1538+281
Physical Target:
CW1: 18.288 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Bayabas-Eden Road - K1531+830 - K1536+567
Physical Target:
CW1: 9.396 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00 |
May 18, 2023 |
2023 |
310101100976000 |
GAA FY 2023 |
December 26, 2022 |
Region II |
Isabela 3rd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads - Santiago-Tuguegarao Rd - K0334+000 - K0335+066 |
May 18, 2023 |
2023 |
310203100666000 |
GAA FY 2023 |
December 26, 2022 |
Region II |
Isabela 3rd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads - Gamu-Roxas Rd - K0392+461 - K0393+343 |
May 18, 2023 |
FY 2023 GAA |
P00705594MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) -
K1535+347 - K1535+356, K1535+411 - K1535+430,
K1535+443 - K1536+673, K1537+091 - K1537+761
Physical Target:
CW1: 3.868 lane km (Road Widening)
Allocation:
TOTAL: P 94,982,000.00
CW1: P 91,657,630.00 (Road Widening)
EAO: P 3,324,370.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) -
K1535+347 - K1535+356, K1535+411 - K1535+430,
K1535+443 - K1536+673, K1537+091 - K1537+761
Physical Target:
CW1: 2.696 lane km (Road Widening)
ROW: 9,575.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 94,982,000.00
CW1: P 62,387,630 (Road Widening)
ROW: P 29,270,000.00 (ROW Acquisition)
EAO: P 3,324,370.00 |
May 18, 2023 |
FY 2023 GAA |
P00705595MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1537+761 - K1538+294, K1538+924 - K1538+952, K1538+960 - K1538+966,
K1538+975 - K1539+011, K1539+042 - K1539+087, K1539+240 - K1539+256, K1539+274 - K1539+381, K1539+828 - K1539+837,
K1539+879 - K1539+922, K1539+971 - K1539+997, K1540+016 - K1540+029, K1540+043 - K1540+074, K1541+295 - K1541+310,
K1552+537 - K1552+544, K1552+612 - K1552+627, K1552+652 - K1552+667, K1552+711 - K1552+721, K1552+741 - K1552+766,
K1555+167 - K1555+191, K1555+900 - K1555+1044, K1556+064 - K1556+093, K1556+179 - K1556+183, K1556+682 - K1556+691,
K1556+970 - K1556+988, K1561+833 - K1561+845, K1561+860 - K1561+872, K1561+885 - K1561+913, K1563+000 - K1563+198
Physical Target:
CW1: 2.934 lane km (Road Widening)
Allocation:
TOTAL: P 62,606,000.00
CW1: P 60,414,790.00 (Road Widening)
EAO: P 2,191,210.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1537+761 - K1538+002, K1538+002 - K1538+028, K1538+028 - K1538+294,
K1538+924 - K1538+952, K1538+960 - K1538+966, K1538+975 - K1539+011, K1539+042 - K1539+087, K1539+240 - K1539+256,
K1539+274 - K1539+381, K1539+828 - K1539+837, K1539+879 - K1539+922, K1539+971 - K1539+997, K1540+016 - K1540+029,
K1540+043 - K1540+074, K1541+295 - K1541+310, K1552+537 - K1552+544, K1552+612 - K1552+627, K1552+652 - K1552+667,
K1552+711 - K1552+721, K1552+741 - K1552+766, K1555+167 - K1555+191, K1555+900 - K1555+1044, K1556+064 - K1556+073,
K1556+179 - K1556+183, K1556+682 - K1556+691, K1556+970 - K1556+988, K1561+833 - K1561+845, K1561+860 - K1561+872,
K1561+885 - K1561+913, K1563+000 - K1563+190
Physical Target:
CW1: 1.579 lane km (Road Widening)
ROW: 6,918.53 square meters (ROW Acquisition)
Allocation:
TOTAL: P 62,606,000.00
CW1: P 60,414,790.00 (Road Widening)
ROW: P 29,500,000.00 (ROW Acquisition)
EAO: P 2,191,210.00 |
May 18, 2023 |
2023 |
WIN3E02623 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310102101217000
Project ID: P00707532MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads
FROM:
Surigao-Davao Coastal Rd - K1339 + 583 - K1342 + 952, K1343 + 182 - K1344 + 305, K1344 + 380 - K1345 + 641, K1345 + 657 - K1345 + 726, K1345 + 742 - K1352 + 152, K1352 + 164 - K1352 + 276, K1352 + 295 - K1354 + 886, K1354 + 898 - K1355 + 765
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 31.604 Lane Km
Allocation:
TOTAL: P 250,000,000
CW1: P 241,250,000
EAO: P 8,750,000
Unit Cost:
CW1: P 7,633,527.40/Lane Km
TO:
Surigao-Davao Coastal Rd - K1339 + 583 - K1342 + 952, K1343 + 182 - K1343 + 537, K1343 + 637 - K1350 + 310
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 24.794 Lane Km
Allocation:
TOTAL: P 250,000,000
CW1: P 241,250,000
EAO: P 8,750,000
Unit Cost:
CW1: P 9,730,176.66/Lane Km |
May 18, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 300221104507000
Project ID: P00734341MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of San Luis - Bincalan - Zamboangauita Road, Bgy Mahayahay, San Luis Agusan Del Sur (Package 1)
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 12.440 Lane Km
Allocation:
TOTAL: P 250,000,000
CW1: P 247,500,000
EAO: P 2,500,000
Unit Cost:
CW1: P 19,895,498.39/Lane Km
TO:
Construction of San Luis - Binicalan - Zamboanguita Road, Brgy. Mahayahay, San Luis Agusan Del Sur (Package 1)
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 12.440 Lane Km
Allocation:
TOTAL: P 250,000,000
CW1: P 247,500,000
EAO: P 2,500,000
Unit Cost:
CW1: P 19,895,498.39/Lane Km
|
May 18, 2023 |
2023 |
WIN3E02860 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 300221104510000
Project ID: P00734344MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Circumferential Road Along Agusan Marsh Road , Bgy San Gabriel and Bgy Nueva Gracia, Loreto, Agusan Del Sur (Package 11)
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 2.146 Lane Km
CW2- 19742.13 Square meters
Allocation:
TOTAL: P 150,000,000
CW1: P 100,272,150
CW2: P 48,227,850
EAO: P 1,500,000
Unit Cost:
CW1: P 46,725,139.79/Lane Km
CW2: P 2,442.89/Square meters
TO:
Construction of Circumferential Road Along Agusan Marsh Road , Brgy. San Gabriel and Brgy. Nueva Gracia, Loreto, Agusan Del Sur (Package 11)
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 2.146 Lane Km
CW2- 19742.13 Square meters
Allocation:
TOTAL: P 150,000,000
CW1: P 100,272,150
CW2: P 48,227,850
EAO: P 1,500,000
Unit Cost:
CW1: P 46,725,139.79/Lane Km
CW2: P 2,442.89/Square meters
|
May 18, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 300221104511000
Project ID: P00734345MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Circumferential Road Along Agusan Marsh Road, Bgy San Gabriel and Bgy Nueva Gracia, Loreto, Agusan Del Sur (Package 12)
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 2.974 Lane Km
CW2- 11672.53 Square meters
Allocation:
TOTAL: P 150,000,000
CW1: P 108,156,510
CW2: P 40,343,490
EAO: P 1,500,000
Unit Cost:
CW1: P 36,367,353.73/Lane Km
CW2: P 3,456.28/Square meters
TO:
Construction of Circumferential Road Along Agusan Marsh Road, Brgy. San Gabriel and Brgy. Nueva Gracia, Loreto, Agusan Del Sur (Package 12)
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 2.974 Lane Km
CW2- 11672.53 Square meters
Allocation:
TOTAL: P 150,000,000
CW1: P 108,156,510
CW2: P 40,343,490
EAO: P 1,500,000
Unit Cost:
CW1: P 36,367,353.73/Lane Km
CW2: P 3,456.28/Square meters
|
May 18, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Surigao del Norte 1st District Engineering Office |
UACS No. : 310102101213000
Project ID: P00707771MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads
FROM:
Jct Del Carmen-Sta Monica-San Isidro Rd (S00009SG) - K0045 + 000 - K0047 + 700
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 5.424 Lane Km
Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000
Unit Cost:
CW1: P 17,791,297.94/ Lane Km
TO:
Jct Del Carmen-Sta Monica-San Isidro Rd (S00009SG) - K0046 + 438 - K0049 + 115
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 5.424 Lane Km
Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000
Unit Cost:
CW1: P 17,791,297.94/ Lane Km |
May 18, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Surigao del Norte 1st District Engineering Office |
UACS No. : 310102101213000
Project ID: P00707771MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads
FROM:
Jct Del Carmen-Sta Monica-San Isidro Rd (S00009SG) - K0045 + 000 - K0047 + 700
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 5.424 Lane Km
Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000
Unit Cost:
CW1: P 17,791,297.94/ Lane Km
TO:
Jct Del Carmen-Sta Monica-San Isidro Rd (S00009SG) - K0046 + 438 - K0049 + 115
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 5.424 Lane Km
Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000
Unit Cost:
CW1: P 17,791,297.94/ Lane Km |
May 18, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Surigao del Norte 1st District Engineering Office |
UACS No. : 310102101213000
Project ID: P00707771MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads
FROM:
Jct Del Carmen-Sta Monica-San Isidro Rd (S00009SG) - K0045 + 000 - K0047 + 700
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 5.424 Lane Km
Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000
Unit Cost:
CW1: P 17,791,297.94/ Lane Km
TO:
Jct Del Carmen-Sta Monica-San Isidro Rd (S00009SG) - K0046 + 438 - K0049 + 115
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 5.424 Lane Km
Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000
Unit Cost:
CW1: P 17,791,297.94/ Lane Km |
May 18, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Surigao del Norte 1st District Engineering Office |
UACS No. : 310106101017000
Project ID: P00706339MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
FROM:
Jct Del Carmen-Sta Monica-Sn Isidro Rd - K0055 + 278 - K0055 + 791
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 1.026 Lane Km
Allocation:
TOTAL: P 15,796,000
CW1: P 15,480,080
EAO: P 315,920
Unit Cost:
CW1: P 15,087,797.27/ Lane Km
TO:
Jct Del Carmen-Sta Monica-Sn Isidro Rd - K0045 + 075 - K0045 + 600
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 1.050 Lane Km
Allocation:
TOTAL: P 15,796,000
CW1: P 15,480,080
EAO: P 315,920
Unit Cost:
CW1: P 14,742,933.33/ Lane Km |
May 18, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Surigao del Norte 1st District Engineering Office |
UACS No. : 310102101215000
Project ID: P00707773MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads
FROM:
Jct Del Carmen-Sta Monica-San Isidro Rd (S00009SG) - K0019 + 200 - K0022 + 500
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 6.000 Lane Km
Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000
Unit Cost:
CW1: P 16,083,333.33/ Lane Km
TO:
Jct Del Carmen-Sta Monica-San Isidro Rd (S00009SG) - K0019 + 188 - K0020 + 120, K0022 + 440 - K0024 + 657
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 6.000 Lane Km
Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000
Unit Cost:
CW1: P 16,083,333.33/ Lane Km |