July 26, 2021 |
2021 |
WIN1F06351 |
SR2021-02-001528 |
February 12, 2021 |
Region VI |
Guimaras District Engineering Office |
FROM:
LOCAL PROGRAM
Local – Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Salvacion-Lanipe-Oracon Road, Sta. 0+000 - Sta. 1+900, Sta. 3+710 - Sta. 3+805, Sta. 3+850 - Sta. 5+425, Sta. 5+650 - Sta. 5+670, Nueva Valencia, Guimaras
CW1- Construction of Concrete Road:
9.339 lane km - 99,000.00
EAO - 1,000.00
Total: 100,000.00
TO:
LOCAL PROGRAM
Local – Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Salvacion-Lanipe-Oracon Road, Sta. 0+000 - Sta. 1+080, Sta. 1+285 - Sta. 3+191, Sta. 3+710 - Sta. 3+803, Sta. 3+850 - Sta. 5+430, Sta. 5+650 - Sta. 5+666, Nueva Valencia, Guimaras
CW1- Construction of Concrete Road:
9.339 lane km - 99,000.00
EAO - 1,000.00
Total: 100,000.00
|
July 26, 2021 |
2021 |
WIN1F06345 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Guimaras District Engineering Office |
FROM:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Convergence and Special Support - Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Sitio Calog/Bubog, Cabano to Sitio Bantayan, Aguilar Road leading to San Lorenzo Wind Farm,
San Lorenzo, Guimaras
CW1- Construction of Concrete Road:
0.989 lane km - 41,022.80
- - -
EAO - 837.20
Total: 41,860.00
TO:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Convergence and Special Support - Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Sitio Calog/Bubog, Cabano to Sitio Bantayan, Aguilar Road leading to San Lorenzo Wind Farm,
San Lorenzo, Guimaras
CW1- Construction of Concrete Road:
0.553 lane km - 19,510.05
CW2- Construction of Concrete Bridge:
286.20 sq.m - 21,512.75
EAO - 837.20
Total: 41,860.00
|
July 26, 2021 |
2021 |
WIN1F06345 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Guimaras District Engineering Office |
FROM:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Convergence and Special Support - Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Sitio Calog/Bubog, Cabano to Sitio Bantayan, Aguilar Road leading to San Lorenzo Wind Farm,
San Lorenzo, Guimaras
CW1- Construction of Concrete Road:
0.989 lane km - 41,022.80
- - -
EAO - 837.20
Total: 41,860.00
TO:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Convergence and Special Support - Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Sitio Calog/Bubog, Cabano to Sitio Bantayan, Aguilar Road leading to San Lorenzo Wind Farm,
San Lorenzo, Guimaras
CW1- Construction of Concrete Road:
0.553 lane km - 19,510.05
CW2- Construction of Concrete Bridge:
286.20 sq.m - 21,512.75
EAO - 837.20
Total: 41,860.00
|
July 26, 2021 |
FY 2021 GAA |
WIN1E02642 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1490+000 - K1490+599
Physical Target:
CW1: 3.594 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 800,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1490+000 - K1490+551
Physical Target:
CW1: 2.204 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 800,000.00 |
July 26, 2021 |
FY 2021 GAA |
WIN1E02653 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Opening/Rehab. of road, crossing Benguet Sitio Pagara to Biasong, Pantukan, Davao de Oro
Physical Target:
CW1: 1.838 lane km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Rehabilitation of Concrete Road)
EAO: P 600,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Opening/Rehab. of road, crossing Benguet Sitio Pagara to Biasong, Pantukan, Davao de Oro
Physical Target:
CW1: 3.360 lane km (Construction of Gravel Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Gravel Road)
EAO: P 600,000.00 |
July 26, 2021 |
2021 |
WIN1C03964 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads
Jose Abad Santos Ave (JASA) - K0100+966.40 - K0100+986.70, K0101+000 - K0101+227.70, K0099+204.35 - K0099+829.60
|
July 26, 2021 |
2021 |
WIN1F06519 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 4th District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Secondary Roads
Jct Bagonawa-La Castellana-Isabela Rd - K0043 + 575 - K0044 + 345
CW1- Off-Carriageway Improvement: Shoulder Paving /
Construction: 1,542.00 sq.m - 4,533.48
EAO - 92.52
Total: 4,626.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Secondary Roads
Jct. Bagonawa- La Castellana- Isabela Rd- K0043 + 575 - K0044 + 320
CW1- Off-Carriageway Improvement:
Shoulder Paving / Construction: 1,775.44 sq.m - 4,533.48
EAO - 92.52
Total: 4,626.00
|
July 26, 2021 |
2021 |
WIN1C04288 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Network Development - Road Widening - Primary Roads
Daang Maharlika (LZ) - K0094+272.10 - K0094+842.60, K0094+866.60 - K0095+400.00 |
July 26, 2021 |
2021 |
WIN1C03965 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads
Gapan - Fort Magsaysay Rd - K0112+026.28 - K0113+000.00
|
July 26, 2021 |
2021 |
WIN1C03972 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (LZ) - K0101+314.00 - K0102+483.70
|
July 23, 2021 |
FY 2021 GAA |
WIN1F06435 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310202100703000
Project ID : P00515587LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Marinduque Circumferential Road,
K0021 + 000 - K0024 + 000,
K0032 + 000 - K0034 + 000
Physical Target - CW1 - Road Widening : 10.33 Lane Km
Allocation : Php 255.300 Million
TO :
Marinduque Circumferential Road,
K0018 + 351 - K0020 + 619,
K0020 + 644 - K0020 + 664,
k0020 + 704 - K0021 + 378,
K0021 + 398 - K0022 + 137
Physical Target - CW1 - Road Widening : 7.424 Lane Km
Allocation : Php 255.300 Million |
July 23, 2021 |
CY 2021 |
WIN1F06544 |
UACS NO. 320101106439000 |
February 24, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106439000
Project ID.: P0052580LZ
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Binondo, Barangay 281, Sta. 0+410.00 to
Sta. 0+568.40, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 149.50 l.m.
Unit Cost (P’000) = P 327.75/ l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Binondo, Barangay 281, Sta. 0+410.00 to
Sta. 0+559.50, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 149.50 l.m.
Unit Cost (P’000) = P 327.75/ l.m.m P327,750/LM
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN1F06544
|
July 23, 2021 |
2021 |
WIN1F06123 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Iloilo-Capiz Rd (New Route) - K0108 + 674 - K0109 + 198, K0109 + 700 - K0110 + 925
CW1- Preventive Maintenance of Road: Asphalt Overlay:
7.052 lane km - 37,775.08
EAO - 770.92
Total: 38,546.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Iloilo-Capiz Rd (New Route) - K0108 + 674 –
K0110 + 775
CW1- Preventive Maintenance of Road: Asphalt Overlay:
8.46 lane km - 37,775.08
EAO - 770.92
Total: 38,546.00
|
July 23, 2021 |
CY 2021 |
WIN1F06555 |
UACS NO. 310204100982000 |
May 4, 2021 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 310204100982000
Project ID.: P00515589LZ
OO1: Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
Alabang = Zapote Diversion Road, La Piñas City
Physical Target: CW1 = Construction Concrete Road 7.25 Lane Km
Unit Cost (P’000) = P 19,300.00 / Lane Km.
Allocation (P’000) = P 139,925.00
EAO (P’000) = P 5,075.00
Total (P’000) = P 145,000.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
Alabang = Zapote Diversion Road, La Piñas City
Physical Target: CW1 = Construction Concrete Road 3,100 sq.m.
CW2 = Construction of Concrete Bridge 1,200 sq.m.
Unit Cost (P’000) = P 28.38 sq.m
= P 43.29 sq.m.
Allocation (P’000) = P 87,973.00
= P 51,952.00
EAO (P’000) = P 5,075.00
Total (P’000) = P 145,000.00
WIN1F06555
|
July 23, 2021 |
FY 2021 GAA |
WIN1F06430 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310107100211000
Project No.: P00516151LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse, and Landslide -
Primary Roads
FROM :
Itabiak - San Vicente Road, Palawan
K0166 + 508 - K0166 + 673
Physical Target - CW1 - Construction of Road Slope Protection :
9,500.00 squre meter
Allocation : Php 95.00 Million
TO :
Itabiak - San Vicente Road, Palawan
K0166 + 480 - K0166 + 735
Physical Target - CW1 - Construction of Road Slope Protection :
4,432.00 square meter
Allocation : Php 95.00 Million
|
July 23, 2021 |
2021 |
WIN1F06124 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd - K0120 + 500 - K0120 + 921
CW1- Reconstruction to Concrete Pavement:
1.51 lane km - 30,973.88
EAO - 632.12
Total: 31,606.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd - K0120 + 500 - K0121 + 637, K0121 + 796 - K0122 + 240, K0147 + 805.5 - K0148 + 244.5
CW1- Reconstruction to Concrete Pavement:
4.086 lane km - 30,973.88
EAO - 632.12
Total: 31,606.00
|
July 23, 2021 |
2021 |
WIN1F06086 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Maayon-Jct Bailan Rd - K0125 + 713 - K0127 + 000
CW1- Road Widening: 2.606 lane km - 49,000.00
EAO - 1,000.00
Total: 50,000.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Maayon-Jct Bailan Rd – K0121 + 274 - K0121 + 738, K0125 + 351 - K0127 + 000
CW1- Road Widening: 4.258 lane km - 49,000.00
EAO - 1,000.00
Total: 50,000.00
|
July 23, 2021 |
2021 |
WIN1F06081 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Iloilo-Capiz Rd (New Route) - K0110 + 995 - K0111 + 556
CW1- Preventive Maintenance of Road: Asphalt Overlay: 2.272 lane km - 12,163.76
EAO - 248.24
Total: 12,412.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Iloilo-Capiz Rd (New Route) - K0110 + 995 - K0111 + 665
CW1- Preventive Maintenance of Road: Asphalt Overlay: 2.71 lane km - 12,163.76
EAO - 248.24
Total: 12,412.00
|
July 23, 2021 |
2021 |
WIN1F06080 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Iloilo-Capiz Rd (New Route) - K0106 + (-134) - K0106 + 020, K0106 + (-543) - K0106 + (-134), K0112 + 000 - K0113 + 632
CW1- Preventive Maintenance of Road: Asphalt Overlay:
8.027 lane km - 42,998.48
EAO - 877.52
Total: 43,876.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Iloilo-Capiz Rd (New Route) - K0106 + (-543) - K0106 + 179, K0111 + 665 - K0113 + 504
CW1- Preventive Maintenance of Road: Asphalt Overlay:
9.615 lane km - 42,998.48
EAO - 877.52
Total: 43,876.00
|
July 23, 2021 |
FY 2021 GAA |
WINF06423 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310108100522000
Project ID : P00505926LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads
FROM :
Sibuyan Circumferential Road,
K0005 + 250 - K0005 + 446
Physical Target - CW1 - Construction of Road Slope Protection :
3,875.00 Square meter
Allocation : Php 70.00 Million
TO :
Sibuyan Circumferential Road,
K0005 + 170 - K0005 + 234
Physical Target - CW1 - Construction of Road Slope Protection :
3,251.00 Square meter
Allocation P Php 70.00 Million |
July 23, 2021 |
2021 |
WIN1F06157 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
LOCAL PROGRAM
Local – Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Local Roads, Barangay Intampilan, President Roxas, Capiz
CW1- Construction of Concrete Road:
0.336 lane km - 2,970.00
EAO - 30.00
Total: 3,000.00
TO:
LOCAL PROGRAM
Local – Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Local Roads, Barangay Intampilan, Panitan, Capiz
CW1- Construction of Concrete Road:
0.336 lane km - 2,970.00
EAO - 30.00
Total: 3,000.00 |
July 23, 2021 |
2021 |
WIN1F06160 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Jct Natl Rd Cuartero-Tapulang-Maayon Rd - K0117 + 326 - K0119 + 146
CW1- Road Widening: 3.616 lane km - 49,000.00
EAO - 1,000.00
Total: 50,000.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Jct Natl Rd Cuartero-Tapulang-Maayon Rd – K0117 + 286.11 - K0119 + 630.11
CW1- Road Widening: 4.664 lane km - 49,000.00
EAO - 1,000.00
Total: 50,000.00
|
July 23, 2021 |
2021 |
WIN1F06154 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd - K0130 + 802 - K0131 + 117
CW1- Reconstruction to Concrete Pavement: 1.216 lane km - 24,953.74
EAO - 509.26
Total: 25,463.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd - K0130 + 802 - K0131 + 299, K0134 + 195.5 - K0134 + 453.5, K0134 + 741 - K0135 + 490
CW1- Reconstruction to Concrete Pavement:
2.964 lane km - 24,953.74
EAO - 509.26
Total: 25,463.00
|
July 23, 2021 |
2021 |
WIN1F06087 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 1st District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Bacolod North Rd - K0032 + 639 - K0032 + 992
CW1- Reconstruction to Concrete Pavement:
1.412 lane km - 28,989.38
EAO - 591.62
Total: 29,581.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Bacolod North Rd - K0013 + 843 - K0014 + 454, K0032 + 639 - K0032 + 992, K0032 + 992 - K0033 + 000, K0035 + 607 - K0035 + 841
CW1- Reconstruction to Concrete Pavement:
2.418 lane km - 28,989.38
EAO - 591.62
Total: 29,581.00
|
July 23, 2021 |
2021 |
WIN1F06110 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 1st District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Bacolod North Rd - K0013 + 402 - K0013 + 843, K0014 + 462 - K0014 + 680, K0014 + 927 - K0015 + 008
CW1- Preventive Maintenance of Road: Asphalt Overlay:
2.972 lane km - 24,691.10
EAO - 503.90
Total: 25,195.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Bacolod North Rd - K0013 + 402 - K0013 + 843, K0014 + 454 - K0014 + 680, K0014 + 927 - K0015 + 071
CW1- Preventive Maintenance of Road: Asphalt Overlay:
3.027 lane km - 24,691.10
EAO - 503.90
Total: 25,195.00 |
July 23, 2021 |
CY 2021 |
WIN1F06558 |
UACS NO. 320101106440000 |
February 24, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106440000
Project ID.: P00525806LZ
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Quiapo, Brgy. 394 (Phase I), Sta. 0+434.00 to
Sta. 470.00, Sta. 0+500.00 to 0+623.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 152.80 l.m.
Unit Cost (P’000) = P 320.68/ l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Quiapo, Brgy. 394 (Phase I), Sta. 0+434.00 to
Sta. 470.00, Sta. 0+500.00 to 0+616.80, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 152.80 l.m.
Unit Cost (P’000) = P 320.68/ l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN1F06558
|
July 23, 2021 |
2021 |
WIN1F06120 |
SR2021-02-001866 |
February 4, 2021 |
Region VI |
Negros Occidental 1st District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Vito Port Rd - K0092 + 000 - K0093 + 234, K0094 + 472 - K0096 + 000, K0097 + 000 - K0098 + 786
CW1- Preventive Maintenance of Road: Asphalt Overlay:
11.36 lane km - 59,918.78
EAO - 2,173.22
Total: 62,092.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Vito Port Rd - K0092 + (-173) - K0093 + 234, K0094 + 472 - K0096 + 000, K0097 + 000 - K0098 +786
CW1- Preventive Maintenance of Road: Asphalt Overlay:
9.274 lane km - 59,918.78
EAO - 2,173.22
Total: 62,092.00
|
July 23, 2021 |
2021 |
WIN1F06113 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Secondary Roads
Bacolod Silay Airport Access Rd - K0008 + (-774) - K0012 + 685
CW1- Off-Carriageway Improvement: Construction of Bike Lanes: 13,682.50 sq.m - 37,549.68
EAO - 766.32
Total: 38,316.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Secondary Roads
Bacolod Silay Airport Access Rd - K0008 + (-774) - K0010 + 134
CW1- Off-Carriageway Improvement: Construction of Bike Lanes: 6,229.32 sq.m - 37,549.68
EAO - 766.32
Total: 38,316.00
|
July 23, 2021 |
2021 |
WIN1F06174 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Iloilo 1st District Engineering Office |
FROM:
LOCAL PROGRAM
Local – Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Lanag Norte-Sitio Parapada Road Tubungan, Oton, Iloilo
CW1- Construction of Concrete Road: 0.250 lane km - 1,980.00
EAO - 20.00
Total: 2,000.00
TO:
LOCAL PROGRAM
Local – Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Lanag Norte-Sitio Parapada Road, Tubungan, Iloilo
CW1- Construction of Concrete Road: 0.250 lane km - 1,980.00
EAO - 20.00
Total: 2,000.00 |
July 23, 2021 |
2021 |
WIN1F06263 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Iloilo 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Tiolas-Sinugbuhan Rd - K0061 + 020 - K0061 + 324, K0061 + 581 - K0061 + 786, K0064 + 000 - K0064 + 560, K0065 + 300 - K0065 + 540
CW1- Construction of Drainage Structure along Road:
1,309 lineal meters - 6,414.10
EAO - 130.90
Total: 6,545.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Tiolas-Sinugbuhan Rd – K0061 + 020 – K0061 + 310, K0061 + 581 – K0061 + 698, K0064 + 000 – K0064 + 560
CW1- Construction of Drainage Structure along Road:
967 lineal meters - 6,414.10
EAO - 130.90
Total: 6,545.00 |
July 23, 2021 |
2021 |
WIN1F06158 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Iloilo 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Guimbal-Tubungan Rd - K0035 + 353 - K0035 + 653, K0036 + 367 - K0036 + 959
CW1- Reconstruction to Concrete Pavement:
1.784 lane km - 35,752.36
EAO - 729.64
Total: 36,482.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Guimbal-Tubungan Rd - K0035 + 353 - K0035 + 653, K0036 + 367 - K0036 + 959, K0038 + 488 -K0039 + 000
CW1- Reconstruction to Concrete Pavement:
2.806 lane km - 35,752.36
EAO - 729.64
Total: 36,482.00
|
July 23, 2021 |
2021 |
WIN1F06239 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Iloilo 2nd District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Pave Roads - Secondary Roads
Passi-Calinog Rd - K0060 + 200 - K0061 + 132
CW1- Reconstruction to Concrete Pavement:
1.538 lane km - 31,562.86
EAO - 644.14
Total: 32,207.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Pave Roads - Secondary
Roads
Passi-Calinog Rd - K0055 + 800 - K0056 + 300, K0057 + 000 - K0057 + 400, K0060 + 200 - K0061 + 132
CW1- Reconstruction to Concrete Pavement:
1.004 lane km - 12,512.36
CW2- Road Widening:
1.004 lane km - 11,559.31
CW3- Preventive Maintenance of Road: Concrete Reblocking: 0.792 lane km - 5,531.19
ROW Acquisition: 2,000 sq.m - 1,960.00
EAO - 644.14
Total: 32,207.00
|
July 23, 2021 |
2021 |
WIN1F06092 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Iloilo 2nd District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Iloilo-Capiz (New Route) - K0049 + 266 - K0049 + 666, K0050 + 900 - K0051 + 097
CW1- Preventive Maintenance of Road: Asphalt Overlay: 2.408 lane km - 12,905.62
EAO - 263.38
Total: 13,169.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Iloilo-Capiz (New Route) – K0036 + 443 - K0039 + 359
CW1- Preventive Maintenance of Road: Concrete Reblocking: 1.78832 lane km - 12,905.62
EAO - 263.38
Total: 13,169.00
|
July 23, 2021 |
2021 |
WIN1F06091 |
SR2021-02-001780 |
February 4, 2021 |
Region VI |
Iloilo 3rd District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Project, Barotac Viejo River Control, Barangay Natividad, Barotac Viejo, Iloilo, Sta. 3 + 630 - Sta. 2 + 839.07
CW1- Construction of Flood Mitigation Structure:
675.03 lineal meters - 71,275.865
EAO - 2,585.135
Total: 73,861.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Project, Barotac Viejo River Control, Barangay Natividad, Barotac Viejo, Iloilo, Sta. 3 + 514.10 - Sta 2 + 839.07
CW1- Construction of Flood Mitigation Structure:
675.03 lineal meters - 71,275.865
EAO - 2,585.135
Total: 73,861.00 |
July 23, 2021 |
2021 |
WIN1F06059 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Iloilo 3rd District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Iloilo East Coast-Estancia Wharf Rd - K0178 + (-242) - K0179 + 603, K0178 + (-556) - K0178 + (-264)
CW1- Construction of Drainage Structure along Road:
4,280 lineal meters - 46,138.40
EAO - 941.60
Total: 47,080.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Iloilo East Coast - Estancia Wharf Rd - K0178 + (-554) - K0179 + 759
CW1- Construction of Drainage Structure along Road:
4,626 lineal meters - 46,138.40
EAO - 941.60
Total: 47,080.00
|
July 23, 2021 |
2021 |
WIN1F06074 |
SR2021-02-001770 |
February 4, 2021 |
Region VI |
Iloilo 3rd District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Secondary Roads
Iloilo East Coast-Capiz Rd - K0177 + 290 - K0178 + 688, K0178 + 931 - K0182 + 469
CW1- Off-Carriageway Improvement: Shoulder Paving / Construction: 14,919 sq.m - 86,381.01
EAO - 3,132.99
Total: 89,514.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Secondary Roads
Iloilo East Coast-Capiz Rd - K0177 + 290 - K0178 + 688, K0178 + 931 - K0182 + 180
CW1- Off-Carriageway Improvement: Shoulder Paving / Construction: 14,052 sq.m - 86,381.01
EAO - 3,132.99
Total: 89,514.00 |
July 23, 2021 |
FY 2021 GAA |
WIN1F06343 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204165000
Project ID : P00562426LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Brgy. Calubasanhon, Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.778 Lane Km
Allocation : Php 4.00 million
TO :
Concreting of Road,
Brgy. Calubasanhon, Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.772 Lane Km
Allocation : Php 4.00 Million |
July 23, 2021 |
2021 |
WIN1F06069 |
SR2021-02-001743 |
February 4, 2021 |
Region VI |
Iloilo 3rd District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd - K0204 + 454 - K0205 + 088
CW1- Reconstruction to Concrete Pavement: 2.404 lane km - 48,549.15
EAO - 1,760.85
Total: 50,310.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd - K0204 + 230 - K0205 + 292, K0249 + 065-K0250 + 427
CW1- Reconstruction to Concrete Pavement:
4.840 lane km - 48,549.15
EAO - 1,760.85
Total: 50,310.00
|
July 23, 2021 |
2021 |
WIN1F06070 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Iloilo 3rd District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Balasan-Carles Rd - K0179 + 874 - K0180 + 508
CW1- Reconstruction to Concrete Pavement:
1.268 lane km - 25,400.62
EAO - 518.38
Total: 25,919.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Balasan-Carles Rd - K0179 + 560 - K0180 + 508, K0184 + 750 - K0185 + 251
CW1- Reconstruction to Concrete Pavement:
2.902 lane km - 25,400.62
EAO - 518.38
Total: 25,919.00 |
July 23, 2021 |
2021 |
WIN1F06141 |
SR2021-02-001777 |
February 4, 2021 |
Region VI |
Iloilo 3rd District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Barotac Viejo River Control, Barangay Poblacion Ilawod, Barotac Viejo, Iloilo, Sta. 3 + 598 - Sta. 2 + 948.46
CW1- Construction of Flood Mitigation Structure:
356.796 lineal meters - 77,200.00
EAO - 2,800.00
Total: 80,000.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Barotac Viejo River Control, Barangay Poblacion Ilawod, Barotac Viejo, Iloilo, Sta. 3 + 528.6 - Sta. 2 + 881.44
CW1- Construction of Flood Mitigation Structure:
647.16 lineal meters - 77,200.00
EAO - 2,800.00
Total: 80,000.00
|
July 23, 2021 |
2021 |
WIN1F06134 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Iloilo 3rd District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Passi-Sn Rafael-Lemery-Sara Rd - K0088 + 813 - K0089 + 207
CW1- Road Widening: 0.804 lane km - 13,788.60
EAO - 281.40
Total: 14,070.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Passi-Sn Rafael-Lemery-Sara Rd – K0086 + 971-K0087 + 304
CW1- Road Widening: 0.678 lane km - 11,338.60
ROW Acquisition: 3,390 sq.m - 2,450.00
EAO - 281.40
Total: 14,070.00
|
July 23, 2021 |
2021 |
WIN1F06361 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Iloilo 3rd District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Balasan-Carles Rd - K0179 + 874 - K0180 + 508
CW1- Reconstruction to Concrete Pavement:
1.268 lane km - 25,400.62
EAO - 518.38
Total: 25,919.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Balasan-Carles Rd - K0179 + 560 - K0180 + 508, K0184 + 750 - K0185 + 251
CW1- Reconstruction to Concrete Pavement:
2.902 lane km - 25,400.62
EAO - 518.38
Total: 25,919.00
|
July 23, 2021 |
2021 |
WIN1F06312 |
SR2021-02-001773 |
February 4, 2021 |
Region VI |
Iloilo 3rd District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Secondary Roads
Passi-Sn Rafael-Lemery-Sara Rd - K0069 + 714 - K0070 + 593, K0074 + 531 - K0076 + 034, K0076 + 256 - K0076 + 776, K0092 + 095 - K0092 + 531
CW1- Off-Carriageway Improvement: Shoulder Paving / Construction: 10,107 sq.m - 51,734.615
EAO - 1,876.385
Total: 53,611.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Secondary Roads
Passi-Sn Rafael-Lemery-Sara Rd - K0069 + 095 - K0069 + 531, K0069 + 701 - K0070 + 593, K0074 + 493 - K0076 + 034, K0076 + 360 - K0076 + 784
CW1- Off-Carriageway Improvement: Shoulder Paving / Construction: 8,319 sq.m - 51,734.615
EAO - 1,876.385
Total: 53,611.00
|
July 23, 2021 |
2021 |
WIN1F06126 |
SR2021-02-004157 |
February 11, 2021 |
Region VI |
Iloilo 4th District Engineering Office |
FROM:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Benigno S. Aquino Jr. Ave, K00131PN-K0007+000-K0008+500, K009+236-K0012+000 and K00477PN-K0015+(-504)-K0015+506, Iloilo
CW1 - Preventive Maintenance of Road: Asphalt Overlay:
16.317 lane km - 72,375.00
EAO - 2,625.00
Total: 75,000.00
TO:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Sen. Benigno S. Aquino Jr. Ave, S00131PN-K0007+000-K0008+500, K0009+236-K0012+123 and S00477PN-K0015+(-504)-K0015+506, Iloilo
CW1 - Preventive Maintenance of Road: Asphalt Overlay:
16.317 lane km - 72,375.00
EAO - 2,625.00
Total: 75,000.00
|
July 23, 2021 |
CY 2021 |
WIN1F06576 |
UACS NO. 310206100029000 |
May 5, 2021 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 310206100029000
Project ID.: P00402135LZ
OO1: Ensure Safe and Reliable National Road System
Network Development – Construction of Flyovers/Interchanges/Undepasses/Long Span Bridges
C-5 – Quirino Flyover, Parañaque City
Physical Target: CW1 = Construction of Flyover 4900 sq.m.
Unit Cost (P’000) = P 14.07 / Lane Km.
Allocation (P’000) = P 60,928.02
EAO (P’000) = P 2,499.98
Total (P’000) = P 71,428.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Network Development – Construction of Flyovers/Interchanges/Undepasses/Long Span Bridges
C-5 – Quirino Flyover, Parañaque City
Physical Target: CW1 = Construction of Flyover 4900 sq.m.
Unit Cost (P’000) = P 14.07 / Lane Km.
Allocation (P’000) = P 60,928.02
EAO (P’000) = P 2,499.98
Total (P’000) = P 71,428.00
WIN1F06576
|
July 23, 2021 |
2021 |
WIN1E02356 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. : 300202100222000
Project ID: P00537670MN
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Seaports
FROM:
NRJ Cagniog-Cayutan-Canlanipa Port Road leading to Surigao City Port, Surigao City, Surigao del Norte
Type of Work:
CW1- Off-Carriageway Improvement: Shoulder Paving / Construction
Physical Target:
CW1- 2,500.00 Square meters
Allocation:
TOTAL: P 15,000,000
CW1: P 14,700,000
EAO: P 300,000
Unit Cost:
CW1: P 5,880.00/ Square meters
TO:
NRJ Cagniog-Cayutan-Canlanipa Port Road leading to Surigao City Port, Surigao City, Surigao del Norte
Type of Work:
CW1- Off-Carriageway Improvement: Shoulder Paving / Construction
Physical Target:
CW1- 5,662.40 Square meters
Allocation:
TOTAL: P 15,000,000
CW1: P 14,700,000
EAO: P 300,000
Unit Cost:
CW1: P 2,596.07/ Square meters
|
July 23, 2021 |
2021 |
WIN1E02370 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. : 300116204629000
Project ID: P00550979MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects
FROM:
Concreting of Road, Barangay Mayag, Sison, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.748 Lane Km
Allocation:
TOTAL: P 8,000,000
CW1: P 7,840,000
EAO: P 160,000
Unit Cost:
CW1: P 10,481,283.42/ Lane Km
TO:
Concreting of Road, Barangay Mayag, Sison, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 1.121 Lane Km
Allocation:
TOTAL: P 8,000,000
CW1: P 7,840,000
EAO: P 160,000
Unit Cost:
CW1: P 6,993,755.58/ Lane Km |
July 23, 2021 |
2021 |
WIN1F06111 |
SR2021-04-008112 |
April 23, 2021 |
Region VI |
Negros Occidental 5th District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Bacolod North Rd - K0101 + 000 - K0101 + 380
CW1- Preventive Maintenance of Road: Asphalt Overlay:
1.236 lane km - 10,108.375
EAO - 366.625
Total: 10,475.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Bacolod North Rd - K0101 + 000 - K0101 + 504
CW1- Preventive Maintenance of Road: Asphalt Overlay:
1.008 lane km - 10,108.375
EAO - 366.625
Total: 10,475.00
|
July 23, 2021 |
2021 |
WIN1F06114 |
SR2021-02-001932 |
February 4, 2021 |
Region VI |
Negros Occidental 5th District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Jct DS Benedicto-Spur 16-Calatrava Rd - K0055 + 300 - K0055 + 318, K0055 + 500 - K0055 + 520, K0055 + 600 - K0055 + 610, K0057 + 700 - K0057 + 715
CW1- Construction of Road Slope Protection Structure:
2,685 sq.m - 25,910.25
EAO - 939.75
Total: 26,850.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Jct DS Benedicto-Spur 16-Calatrava Rd - K0055 + 300 - K0055 + 380, K0055 + 500 - K0055 + 520, K0055 + 600 - K0055 + 610, K0057 + 640 - K0057 + 658
CW1- Construction of Road Slope Protection Structure:
1,480 sq.m - 25,910.25
EAO - 939.75
Total: 26,850.00
|
July 23, 2021 |
2021 |
WIN1F06119 |
SR2021-02-001937 |
February 4, 2021 |
Region VI |
Negros Occidental 5th District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Jct DS Benedicto-Spur 16-Calatrava Rd - K0077 + 863 - K0078 + 000, K0078 + 300 - K0078 + 400, K0083 + 000 - K0083 + 005
CW1- Construction of Road Slope Protection Structure:
335.305 sq.m - 5,790.00
EAO - 210.00
Total: 6,000.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Jct DS Benedicto-Spur 16-Calatrava Rd - K0077 + 863 - K0078 + 000, K0078 + 227 - K0078 + 300, K0083 + 000 - K0083 + 042
CW1- Construction of Road Slope Protection Structure:
983.58 sq.m - 5,790.00
EAO - 210.00
Total: 6,000.00
|
July 23, 2021 |
2021 |
WIN1F06150 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 3rd District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod South Rd - K0085 + 070 - K0085 + 217, K0085 + 608 - K0086 + 000
CW1- Preventive Maintenance of Road: Asphalt
Overlay: 2.168 lane km - 11,613.00
EAO - 237.00
Total: 11,850.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod South Rd - K0085 + 070 – K0085 + 608, K0087 + 608 – K0087 + 718
CW1- Preventive Maintenance of Road: Asphalt
Overlay: 2.592 lane km - 11,613.00
EAO - 237.00
Total: 11,850.00 |
July 23, 2021 |
2021 |
WIN1F06344 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 2nd District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Primary Roads
Iloilo-Capiz Rd (New Route) - K0079 + 000 - K0079 + 855
CW1- Road Widening: 1.312 lane km - 23,398.48
EAO - 477.52
Total: 23,876.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Primary Roads
Iloilo-Capiz Rd (New Route) – K0079 + 981 - K0080 + 219
CW1- Road Widening: 0.478 lane km - 12,153.48
CW2- Construction of Road Slope Protection Structure: 1,250.83 sq.m - 8,500.00
ROW Acquisition: 498.79 sq.m - 2,745.00
EAO - 477.52
Total: 23,876.00
|
July 23, 2021 |
FY 2021 GAA |
WIN1E02638 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Bridge Program - Widening of Permanent Bridges
Pilan Br. (B00130MN) along Davao-Cotabato Rd (Davao City-Jct Digos Sect)
Physical Target:
CW1: 200.340 sq. m. (Widening of Bridge)
Allocation:
TOTAL: P 99,500,000.00
CW1: P 96,017,500.00 (Widening of Bridge)
EAO: P 3,482,500.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Bridge Program - Widening of Permanent Bridges
Pilan Br. (B01996MN) along Davao-Cotabato Rd (Davao City-Jct Digos Sect)
Physical Target:
CW1: 96.831 sq. m. (Widening of Bridge)
ROW: 3,195.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 99,500,000.00
CW1: P 17,716,600.00 (Widening of Bridge)
ROW: P 6,504,900.00 (ROW Acquisition)
EAO: P 878,500.00
EXC: P 74,400,000.00 |
July 23, 2021 |
2021 |
WIN1F06078 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 2nd District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Sigma-Mambusao-Jamindan Rd - K0090 + 837 - K0090 + 984, K0091 + 842 - K0092 + 139.50
CW1- Reconstruction to Concrete Pavement: 1.187 lane km - 24,358.88
EAO - 497.12
Total: 24,856.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Sigma-Mambusao-Jamindan Rd - K0090 + 837 - K0090 + 988, K0091 + 194 - K0091+248, K0091 + 779 - K0092 + 351, K0102 + 000 - K0102 + 160
CW1- Reconstruction to Concrete Pavement: 1.878 lane km - 24,358.88
EAO - 497.12
Total: 24,856.00 |
July 23, 2021 |
FY 2021 GAA |
WIN1E02575 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure along Bitaogan River, Lupon, Davao Oriental
Physical Target:
CW1: 337.00 ln. m. (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 10,00,000.00
CW1: P 9,800,000.00 (Construction of Flood Mitigation Structure)
EAO: P 200,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure along Bitaogan River, San Isidro, Davao Oriental
Physical Target:
CW1: 337.00 ln. m. (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 10,00,000.00
CW1: P 9,800,000.00 (Construction of Flood Mitigation Structure)
EAO: P 200,000.00 |
July 23, 2021 |
2021 |
WIN1F06118 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 2nd District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Capiz-Aklan Rd - K0338 + 972 - K0339 + 765
CW1- Reconstruction to Concrete Pavement:
1.598 lane km - 32,778.06
EAO - 668.94
Total: 33,447.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Capiz-Aklan Rd - K0338 + 972 - K0339 + 888
CW1- Reconstruction to Concrete Pavement:
1.838 lane km - 32,778.06
EAO - 668.94
Total: 33,447.00
|
July 23, 2021 |
2021 |
WIN1F06121 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 2nd District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Tapaz-Jamindan-Altavaz Rd - K0092 + 249 - K0092 + 843
CW1- Reconstruction to Concrete Pavement:
1.188 lane km - 24,364.76
EAO - 497.24
Total: 24,862.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Tapaz-Jamindan-Altavas Rd - K0092 + 510 - K0093 + 004
CW1- Reconstruction to Concrete Pavement:
0.948 lane km - 24,364.76
EAO - 497.24
Total: 24,862.00
|
July 23, 2021 |
FY 2021 GAA |
WIN1E02651 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Binondo-Sitio Mantapay Road, Baganga, Davao Oriental
Physical Target:
CW1: 2.736 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Gravel Road)
EAO: P 1,050,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Binondo-Sitio Mantapay Road, Baganga, Davao Oriental
Physical Target:
CW1: 2.736 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Concrete Road)
EAO: P 1,050,000.00 |
July 23, 2021 |
FY 2021 GAA |
WIN1E02643 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Jct. Salingcomot to Sitio Bobon, Brgy. Salingcomot, Baganga, Davao Oriental
Physical Target:
CW1: 2.400 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Concrete Road)
EAO: P 1,000,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Jct. Salingcomot to Sitio Bobon, Brgy. Salingcomot, Baganga, Davao Oriental
Physical Target:
CW1: 4.800 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Concrete Road)
EAO: P 1,000,000.00 |
July 23, 2021 |
FY 2021 GAA |
WIN1E02652 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete road, Fuentes, Pantukan, Davao de Oro
Physical Target:
CW1: 1.756 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete road, Fuentes, Pantukan, Davao de Oro
Physical Target:
CW1: 2.580 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00 |
July 23, 2021 |
FY 2021 GAA |
WIN1E02647 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) -
K1474+091 - K1474+109, K1475+747 - K1476+282
Physical Target:
CW1: 1,128 ln. m. (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 28,200,000.00
CW1: P 27,636,000.00 (Construction of Drainage Structure along Road)
EAO: P 564,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1475+747 - K1476+195
Physical Target:
CW1: 918 ln. m. (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 28,200,000.00
CW1: P 27,636,000.00 (Construction of Drainage Structure along Road)
EAO: P 564,000.00 |
July 22, 2021 |
FY 2021 GAA |
WIN1F06394 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204159000
Project ID : P00562420LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Brgy. Parang, Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.470 Lane Km
Allocation : Php 3.00 Million
TO :
Concreting of Road,
Brgy. Parang, Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.668 Lane Km
Allocation : Php 3.00 Million |
July 22, 2021 |
FY 2021 GAA |
WIN1F06384 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204160000
Project ID : P00562421LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Brgy. Aurora - Brgy. Evangelista Road,
Naujan, Oriental Mindoro
Physical Target - CW1- Construction of Concrete Road :
4.724 Lane Km
Allocation : Php 25.00 Million
TO :
Concreting of Road,
Brgy. Aurora - Brgy. Evangelista Road,
Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
3.480 Lane Km
Allocation : Php 25.00 Million
|
July 22, 2021 |
2021 |
WIN1F06464 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 4th District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Jct Sn Enrique-Pontevedra By-Pass Rd –
K0039 + 000 - K0039 + 325
CW1- Road Widening: 0.650 lane km - 13,709.22
EAO - 279.78
Total: 13,989.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Jct Sn Enrique-Pontevedra By-Pass Rd –
K0039 + 000- K0039 + 310
CW1- Road Widening: 0.620 lane km - 9,663.86
ROW Acquisition: 4,045.36 sq.m - 4,045.36
EAO - 279.78
Total: 13,989.00
|
July 22, 2021 |
2021 |
WIN1F06559 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0803 + 250 - K0803 + 300, K0830 + 650 - K0830 + 665, K0831 + 040 - K0831 + 090, K0840 + 847 - K0840 + 897
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 14.700 M
Structure: 1,500 Square Meters
EAO P 0.300 M
Total P 15.00 M
AS MODIFIED:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0829 + 865 - K0829 + 880, K0830 + 650 - K0830 + 665, K0831 + 031 - K0831 + 071, K0840 + 847 - K0840 + 897
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 14.850 M
Structure: 660.00 Square Meters
EAO P 0.150 M
Total P 15.00 M
|
July 22, 2021 |
2021 |
WIN1B01170 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 4th District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Don Jorge Araneta-Ayungon-Yungue-Gurrea-La Carlota City Rd - (S00208NR) Chainage 2900 -
Chainage 5150
CW1- Road Widening: 4.50 lane km - 49,000.00
EAO - 1,000.00
Total: 50,000.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Don Jorge Araneta-Ayungon-Yungue-Gurrea-La Carlota City Rd - (S00208NR) Chainage 2900 -
Chainage 4150
CW1- Road Widening: 2.50 lane km - 39,494.00
ROW Acquisition: 9,506 sq.m - 9,506.00
EAO - 1,000.00
Total: 50,000.00
|
July 22, 2021 |
2021 |
WIN1F06352 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 4th District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod South Rd - K0015 + 1006 - K0017 + 530
CW1- Preventive Maintenance of Road: Asphalt
Overlay: 6.288 lane km -33,678.68
EAO - 687.32
Total: 34,366.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod South Rd - K0012 + 000 – K0013 +
580
CW1- Preventive Maintenance of Road: Asphalt
Overlay: 6.288 lane km -33,678.68
EAO - 687.32
Total: 34,366.00 |
July 22, 2021 |
2021 |
WIN1F06445 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 4th District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved
Roads - Tertiary Roads
Bacolod South Rd (Old Road) - K0024 + (-034) - K0024 + 012, K0024 + (-038) - K0024 + (-034), K0024 + 012 - K0024 + 287
CW1- Reconstruction to Concrete Pavement: 0.650 lane km - 2,779.20
EAO - 260.80
Total: 13,040.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved
Roads - Tertiary Roads
Bacolod South Rd (Old Road) - K0024 + (-034) – K0024+287
CW1- Reconstruction to Concrete Pavement: 0.640 lane km - 12,779.20
EAO - 260.80
Total: 13,040.00
|
July 22, 2021 |
2021 |
WIN1F06467 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 4th District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved
Roads - Tertiary Roads
Bacolod South Rd (Old Road) - Chainage 0 - Chainage 342
CW1- Reconstruction to Concrete Pavement:
0.684 lane km - 13,447.56
EAO - 274.44
Total: 13,722.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved
Roads - Tertiary Roads
Bacolod South Rd (Old Road) - Chainage 0 - Chainage 337
CW1- Reconstruction to
Concrete Pavement: 0.674 lane km - 9,593.64
CW2- Construction of Drainage Structure along Road:
643 lineal meters - 3,853.92
EAO - 274.44
Total: 13,722.00
|
July 22, 2021 |
FY 2021 GAA |
WIN1F06372 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204162000
Project ID : P00562423LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Brgy. Buhangin, Naujan, Oriental Mindoro
Physical Target : CW1 - Construction of Concrete Road :
4.410 Lane Km
Allocation : Php 25.00 Million
TO :
Concreting of Road,
Brgy. Buhangin, Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
4.758 Lane Km
Allocation : Php 25.00 Million
|
July 22, 2021 |
2021 |
WIN1F06396 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 4th District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved
Roads - Tertiary Roads
Jct Pontevedra-La Castellana Rd - K0045 + 436 - K0046 + 000
CW1- Reconstruction to Concrete Pavement:
1.114 lane km - 21,902.02
EAO - 446.98
Total: 22,349.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved
Roads - Tertiary Roads
Jct Pontevedra-La Castellana Rd – K0045 + 436 – K0046 + 545
CW1- Reconstruction to Concrete Pavement:
2.204 lane km - 21,902.02
EAO - 446.98
Total: 22,349.00
|
July 22, 2021 |
2021 |
WIN1F06538 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Tacloban-Baybay South Rd - K0986 + 100 - K0986 + 240, K0986 + 285 - K0986 + 407
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 39.20 M
Structure: 4,000 Square Meters
EAO P 0.80 M
Total P 40.00 M
AS MODIFIED:
Tacloban-Baybay South Rd - K0985 + 190 - K0985 + 260
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 39.20 M
Structure: 1,439.00 Square Meters
EAO P 0.80 M
Total P 40.00 M
|
July 22, 2021 |
2021 |
WIN1F06264 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 4th District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved
Roads - Tertiary Roads
Jct Pontevedra-La Castellana Rd - K0056 + 204 - K0057 + 090
CW1- Reconstruction to Concrete Pavement:
1.768 lane km - 34,759.62
EAO - 709.38
Total: 35,469.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved
Roads - Tertiary Roads
Jct Pontevedra-La Castellana Rd - K0053 + 140-K0053 + 815, K0054 + 688 - K0054 + 812, K0056 + 204 - K0057 + 090
CW1- Reconstruction to
Concrete Pavement: 3.366 lane km - 34,759.62
EAO - 709.38
Total: 35,469.00
|
July 22, 2021 |
2021 |
WIN1F06299 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 2nd District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Binalbagan-Isabela Rd - K0064 + 1096 - K0064 + 1302, K0066 + 090 - K0066 + 140
CW1- Reconstruction to Concrete Pavement: 0.512 lane km - 10,242.96
EAO - 209.04
Total: 10,452.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Binalbagan-Isabela Rd - K0064+1096 - K0064+1302, K0066+090 - K0066+293, K0066+719 - K0066+889
CW1- Reconstruction to Concrete Pavement: 1.158 lane km - 10,242.96
EAO - 209.04
Total: 10,452.00
|
July 22, 2021 |
2021 |
WIN1F06057 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 2nd District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Vallehermoso-Canlaon City-La Castellana Rd - K0079 + 314 - K0079 + 497
CW1- Construction of Road Slope Protection Structure:
1,187.209 sq.m - 20,011.60
EAO - 408.40
Total: 20,420.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Vallehermoso-Canlaon City-La Castellana Rd - K0079 + 314 - K0079 + 349
CW1- Construction of Road Slope Protection Structure:
1,044.40 sq.m - 20,011.60
EAO - 408.40
Total: 20,420.00
|
July 22, 2021 |
2021 |
WIN1F06137 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 2nd District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Bacolod South Rd - K0070 + 385.70 - K0070 + 535.70
CW1- Reconstruction to Concrete Pavement: 0.600 lane km - 12,297.04
EAO - 250.96
Total: 12,548.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Bacolod South Rd - K0058+500 - K0058+738.8, K0059+080.7 - K0059+116.8, K0070+446 - K0070+600.2, K0070+640.9 - K0070+721.9, K0070+812.2 - K0071 + 042
CW1- Reconstruction to Concrete Pavement: 1.4898 lane km - 12,297.04
EAO - 250.96
Total: 12,548.00
|
July 22, 2021 |
2021 |
WIN1F06144 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 2nd District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Bacolod South Rd - K0071 + 632 - K0071 + 813
CW1- Reconstruction to Concrete Pavement:
0.724 - 14,254.10
EAO - 290.90
Total: 14,545.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Bacolod South Rd - K0071+ 847 - K0072+015, K0073+077-K0073+413
CW1- Reconstruction to Concrete Pavement:
1.69 lane km - 14,254.10
EAO - 290.90
Total: 14,545.00
|
July 22, 2021 |
2021 |
WIN1G02928 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. : 300116203636000
Project ID: P00550763MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Construction of Sta. Irene-San Miguel Road, Surigao del Sur
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 12.900 Lane Km
Allocation:
TOTAL: P 130,000,000
CW1: P 125,450,000
EAO: P 4,550,000
Unit Cost:
CW1: P 9,724,806.20/ Lane Km
TO:
Construction of Sta. Irene-San Miguel Road, Surigao del Sur
Type of Work:
CW1- Construction of Gravel Road
CW2- Construction of Slope Protection Structure
Physical Target:
CW1- 6.76 Lane Km
CW2- 20,025.3 Square meters
Allocation:
TOTAL: P 130,000,000
CW1: P 98,369,018.11
CW1: P 27,080,981.89
EAO: P 4,550,000
Unit Cost:
CW1: P 14,551,629.9/ Lane Km
CW2: P 1,352.34/ Square meters
|
July 22, 2021 |
2021 |
WIN1F06150 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 3rd District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod South Rd - K0085 + 070 - K0085 + 217, K0085 + 608 - K0086 + 000
CW1- Preventive Maintenance of Road: Asphalt
Overlay: - 2.168 lane km - 11,613.00
EAO - 237.00
Total: 11,850.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod South Rd - K0085 + 070 – K0085 + 608, K0087 + 608 – K0087 + 718
CW1- Preventive Maintenance of Road: Asphalt
Overlay: 2.592 lane km - 11,613.00
EAO - 237.00
Total: 11,850.00
|
July 22, 2021 |
FY 2021 GAA |
WIN1F06457 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310202100700000
Project ID : P00506162LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Calapan South Road,
K0064 + (-933) - K0064 + (-780),
K0087 + 678 - K0087 + 689,
K0087 + 832 - K0087 + 861,
K0091 + 197 - K0091 + 374,
K0102 + 237 - K0102 + 550,
K0141 + 136 - K0140 + 213,
K0141 + 502 - K0142 + 134,
K0142 + 371 - K0142 + 726,
K0143 + 197 - K0143 + 546,
K0146 + 750 - K0147 + 013,
K0148 + 568 - K0148 + 980,
K0149 + 680 - K0149 + 900,
K0149 + 960 - K0150 + 165,
K0150 + 240 - K0150 + 301,
K0152 + 030 - K0152 + 161
Physical Target - CW1 - Road Widening : 6.664 Lane Km
Allocation : Php 101.270 Million
TO :
Calapan South Road,
L0064 + (-933) - K0064 + (-780),
K0087 + 721 - K0087 + 863,
K0102 + 237 - K0102 + 550,
K0146 + 750 - K0147 + 064,
K0161 + 854 - K0163 + 000
Physical Target - CW1 - Road Widening : 4.114 Lane Km
Allocation : Php 101.270 Million
|
July 22, 2021 |
2021 |
WIN1E02335 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. : 300117210457000
Project ID: P00551466MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
FROM:
Construction of Road, Barangay Mapawa, Surigao City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.234 Lane Km
Allocation:
TOTAL: P 2,500,000
CW1: P 2,475,000
EAO: P 25,000
Unit Cost:
CW1: P 10,576,923.08/ Lane Km
TO:
Construction of Road, Barangay Mapawa, Surigao City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.2592 Lane Km
Allocation:
TOTAL: P 2,500,000
CW1: P 2,475,000
EAO: P 25,000
Unit Cost:
CW1: P 9,548,611.11/ Lane Km |
July 22, 2021 |
2021 |
WIN1E02360 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 310205100605000
Project ID: P00509760MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/ New Roads
FROM:
NRJ Maug - La Purisima - San Juan - New Tubigon Road, Package 1
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 2.00 Lane Km
Allocation:
TOTAL: P 40,000,000
CW1: P 38,600,000
EAO: P 1,400,000
Unit Cost:
CW1: P 19,300,000/ Lane Km
TO:
NRJ Maug - La Purisima - San Juan - New Tubigon Road, Package 1
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 4.32 Lane Km
Allocation:
TOTAL: P 40,000,000
CW1: P 38,600,000
EAO: P 1,400,000
Unit Cost:
CW1: P 8,935,185.19/ Lane Km
|
July 22, 2021 |
FY 2021 GAA |
WIN1F06436 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310102100580000
Project ID : P00515561LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM :
Marinduque Circumferential Road,
K0014 + 886 - K0015 + 861,
K0016 + 010 - K0019 + 300
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 8.472 Lane Km
Allocation : Php 79.637 Million
TO :
Marinduque Circumferential Road,
K0014 + 905
K0015 + 861,
K0016 + 010 - K0016 + 934,
K0016 + 961 - K0017 + 801,
K0017 + 835 - K0018 + 167
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 6.02 Lane Km
Allocation : Php 79.637 Million |
July 22, 2021 |
FY 2021 GAA |
WIN1E02618 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) -
K1486+000 - K1486+050, K1487+021 - K1487+109
Physical Target:
CW1: 1.356 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 7,473,000.00
CW1: P 7,323,540.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 149,460.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1486+000 - K1486+093
Physical Target:
CW1: 0.372 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 7,473,000.00
CW1: P 7,323,540.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 149,460.00 |
July 22, 2021 |
FY 2021 GAA |
WIN 1F06434 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310102100581000
Project ID : P00515562LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM :
Marinduque Circumferential Road,
K0078 + 511 - K0082 + 000,
K0087 + 000 - K0087 + 523
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt overlay : 8.058 Lane Km
Allocation : Php 75.745 Million
TO :
Marinduque Circumferential Road,
K0078 + 511 - K0081 + 684
Physical Target - CW1 - Preventive maintenance of Road :
Asphalt Overlay : 6.348 Lane Km
Allocation : Php 75.745 Million |
July 22, 2021 |
FY 2021 GAA |
WIN1F06409 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300203101398000
Project ID : P00534415LZ
Convergence and Special Support Program
]Convergence and Special Support -
Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
FROM :
Concreting of Road from Poblacion to Capri Cove, Palawan
Physical Target - CW1 - Construction of Concrete Road :
2.40 Lane Km
Allocation : Php 30.00 Million
TO :
Concreting of Road from Poblacion to Capri Cove, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.48 Lane Km
Allocation : Php 30.00 Million
|
July 22, 2021 |
2021 |
WIN1F06553 |
GAA FY 2021 |
January 2, 2021 |
Region VIII |
Eastern Samar District Engineering Office |
OO2: Protect Lives and Properties
Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Rehabilitation/Improvement of Flood Control Structures along Suribao River, Borongan City, Eastern Samar
Physical Target: Allocation:
CW1-Rehabilitation/Major Repair of Flood P 49.00 M
Control Structure: 478.444 Lineal Meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Rehabilitation/Improvement of Flood Control Structures along Suribao River, Borongan City, Eastern Samar
Physical Target: Allocation:
CW1-Rehabilitation/Major Repair of Flood P 49.00 M
Control Structure: 185.00 Lineal Meters
EAO P 1.00 M
Total P 50.00 M
|
July 22, 2021 |
2021 |
WIN1F06556 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 1st District Engineering Office |
OO2: Protect Lives and Properties
Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Flood Control Structure along Poblacion, Victoria, Northern Samar
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 10.246880 M
Structure:98.87 Lineal Meters
EAO P 0.209120 M
Total P 10.456M
AS MODIFIED:
Construction of Flood Control Structure along Poblacion, Victoria, Northern Samar
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 10.246880 M
Structure:38.50 Lineal Meters
EAO P 0.209120 M
Total P 10.456M
|
July 22, 2021 |
2021 |
310204101021000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Regional Office II |
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads - Cauayan City Alternate Route (Gov. Dy Bridge), Isabela |
July 22, 2021 |
2021 |
310305100796000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Regional Office II |
OO1: Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges - Naguilian Bridge (Parallel Bridge) along Daang Maharlika (LZ) |
July 22, 2021 |
FY 2021 GAA |
WIN1E02629 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of Road leading to Balutakay Holy Land (Way of the Cross), Managa, Bansalan, Davao del Sur
Physical Target:
CW1: 0.800 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of Road leading to Balutakay Holy Land (Way of the Cross), Managa, Bansalan, Davao del Sur
Physical Target:
CW1: 0.600 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00 |
July 22, 2021 |
FY 2021 GAA |
WIN1E02628 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: Local Program - Water Management Facilities - Water Supply - Local Infrastructure Program
Concreting of Water System Level II, Barangay La Suerte, Matanao, Davao del Sur
Physical Target:
CW1: 1 number of water supply system (Construction of Water Supply Systems)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Water Supply Systems)
EAO: P 30,000.00
TO: Local Program - Water Management Facilities - Water Supply - Local Infrastructure Program
Construction of Water System Level II, Barangay La Suerte, Matanao, Davao del Sur
Physical Target:
CW1: 1 number of water supply system (Construction of Water Supply Systems)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Water Supply Systems)
EAO: P 30,000.00 |
July 21, 2021 |
FY 2021 GAA |
WIN1F06310 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 310105100551000
Project ID : P00505610LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/
Upgrading of Damaged Paved Roads - Secondary Roads
FROM :
PPSR Jct (Abo-abo) - Quezon Road,
K0132 + 1014 - K0133 + 165
Physical Target - CW1 - Reconstruction to Concrete Pavement :
0.382 Lane Km
Allocation : Php 8.270 Million
TO :
PPSR Jct (Abo-abo) - Quezon Road,
K0132 + 1014 - K0133 + 450
Physical Target - CW1 - Reconstruction to Concrete Pavement :
0.450 Lane Km
Allocation : Php 8.270 Million
|
July 21, 2021 |
FY 2021 GAA |
WIN1B01163 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Marinduque District Engineering Office |
UACS No. : 310102100679000
Project ID : P00505586LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM :
Marinduque Circumferential Road,
K0017 + 000 - K0017 + 634
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 1.268 Lane Km
Allocation : Php 12.820 Million
TO :
Marinduque Circumferential Road,
K0043 + 263 - K0043 + 897
Physical Target - CW1 - Preventive maintenance of Road :
Asphalt Overlay - 1.268 Lane Km
Allocation : Php 12.820 Million
|
July 21, 2021 |
FY 2021 GAA |
WIN1F06074 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Marinduque District Engineering Office |
UACS No. : 310105100548000
Project ID : P00505587LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Road - Secondary Roads
FROM :
Marinduque Circumferential Road,
K0015 + 423 - K0015 + 585,
K0019 + 000 - K019 + 300
Physical Target - CW1 - Reconstruction to Concrete Pavement :
0.924 Lane Km
Allocation : Php 19.778 Million
TO :
Marinduque Circumferential Road,
K0054 + 000 - K0054 + 890
Physical Target - CW1 - Reconstruction to Concrete Pavement :
1.78 Lane Km
Allocation : Php 19.778 Million
|
July 21, 2021 |
FY 2021 GAA |
WIN1F06324 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 310111100303000
Project ID : P00505362LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along National Roads - Secondary Roads
FROM :
Tablas Circumferential Road,
K0020 + 300
Physical Target - CW1 - Construction of Drainage Structure
along Road : 350.00 lineal meters
Allocation : Php 10.00 Million
TO :
Tablas Circumferential Road,
K0020 + 300 - K0020 + 650
Physical Target - CW1 - Construction of Drainage Structure
along Road : 350.00 Lineal meters
Allocation : Php 10.00 Million |
July 21, 2021 |
FY 2021 GAA |
WIN1E02608 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 2nd District Engineering Office |
FROM: Local Program - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System (Canal), Purok Bougainvilla, 1-Sampaguita to Purok 8-Orchid, Tinablan, Governor Generoso, Davao Oriental
Physical Target:
CW1: 1,411.536 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 14,000,000.00
CW1: P 13,860,000.00 (Construction of Drainage Structure)
EAO: P 140,000.00
TO: Local Program - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System (Canal), Purok Bougainvilla, 1-Sampaguita to Purok 8-Orchid, Tibanban, Governor Generoso, Davao Oriental
Physical Target:
CW1: 1,080.000 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 14,000,000.00
CW1: P 13,860,000.00 (Construction of Drainage Structure)
EAO: P 140,000.00 |
July 21, 2021 |
FY 2021 GAA |
WIN1F06161 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. : 310102100686000
Project ID : P00505596LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM :
Mindoro West Coastal Road,
K0417 + 752 - K0419 + 000
Physical Target - CW1 - Preventive Maintenance of Road :
Concrete Reblocking - 2.492 Lane Km
Allocation : Php 12.008 Million
TO :
Mindoro West Coastal Road,
K0417 + 900 - K0419 + 000
Physical Target - CW1 - Preventive Maintenance of Road :
Concrete Reblocking - 2.196 Lane Km
Allocation : Php 12.008 Million
|
July 21, 2021 |
FY 2021 GAA |
WIN1F06335 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204153000
Project ID : P00562414LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Sitio Bagong Pook - Sitio Kilo - kilo,
Brgy. Palhi, Calapan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.310 Lane Km
Allocation : 12.00 Million
TO :
Concreting of Road,
Sitio Bagong Pook - Sitio Kilo-kilo,
Brgy, Palhi, Calapan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
3.460 Lane Km
Allocation : Php 12.00 Million |
July 21, 2021 |
FY 2021 GAA |
WIN1E02609 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties - Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control at Padada-Mainit River (Bulatukan River Section-Protecting Masalam Br. & NIA Dam), Hagonoy, Davao del Sur
Physical Target:
CW1: 1,162.352 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Flood Mitigation Structure)
EAO: P 3,500,000.00
TO: OO2: Protect Lives and Properties - Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control at Padada-Mainit River (Bulatukan River Section-Protecting Masalam Br. & NIA Dam), Hagonoy, Davao del Sur
Physical Target:
CW1: 500.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Flood Mitigation Structure)
EAO: P 3,500,000.00 |