July 21, 2021 |
FY 2021 GAA |
WIN1E02615 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay - Bolton St., Davao City
Physical Target:
CW1: 1.100 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 33,775,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,225,300.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay - Bolton St., Davao City
Physical Target:
CW1: 1.516 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 33,775,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,225,300.00 |
July 21, 2021 |
FY 2021 GAA |
WIN1E02614 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Juna Ave - University St., Davao City
Physical Target:
CW1: 2.694 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 35,250,000.00
CW1: P 34,016,250.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,233,750.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Juna Ave - University St., Davao City
Physical Target:
CW1: 2.560 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 35,250,000.00
CW1: P 34,016,250.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,233,750.00 |
July 21, 2021 |
FY 2021 GAA |
WIN1F06393 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204154000
Project ID : P00562415LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Sitio Kili - kilo, Brgy. Palhi, Calapan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.906 Lane Km
Allocation : Php 5.00 Million
TO :
Concreting of Road,
Sitio Kilo - kilo, Brgy. Palhi, Calapan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.518 Lane Km
Allocation : Php 5.00 Million
|
July 21, 2021 |
FY 2021 GAA |
WIN1E02616 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete road (Opening) Elizalde to New Barili, Maco, Davao de Oro (Phase 1)
Physical Target:
CW1: 3.626 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 58,800,000.00 (Construction of Concrete Road)
EAO: P 1,200,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete road (Opening) Elizalde to New Barili, Maco, Davao de Oro (Phase 1)
Physical Target:
CW1: 4.194 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 58,800,000.00 (Construction of Concrete Road)
EAO: P 1,200,000.00 |
July 21, 2021 |
FY 2021 GAA |
WIN1E02617 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of road Boringot-Diat Road Pantukan (Phase 2)
Physical Target:
CW1: 2.236 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Concrete Road)
EAO: P 700,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of road Boringot-Diat Road Pantukan (Phase 2)
Physical Target:
CW1: 4.400 lane km (Construction of Gravel Road)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Gravel Road)
EAO: P 700,000.00 |
July 21, 2021 |
FY 2021 GAA |
WIN1E02602 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Rehabilitation of Mamay Creek, Davao City (Sta. 0+000 - Sta. 0+310)
Physical Target:
CW1: 327.054 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Flood Mitigation Structure)
EAO: P 600,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Rehabilitation of Mamay Creek, Davao City (Sta. 0+000 - Sta. 0+277)
Physical Target:
CW1: 277.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Flood Mitigation Structure)
EAO: P 600,000.00 |
July 19, 2021 |
FY 2021 GAA |
WIN1E02595 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum City Diversion Rd - K1459+491 - K1460+000
Physical Target:
CW1: 3.246 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 400,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum City Diversion Rd - K1456+111 - K1456+299.68, K1459+487 - K1459+990
Physical Target:
CW1: 2.012 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 400,000.00 |
July 19, 2021 |
FY 2021 GAA |
WIN1G02966 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Barangay Salapawan to Sitio Kinse-Kinse, Paquibato District, Davao City
Physical Target:
CW1: 3.600 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Barangay Salapawan to Sitio Kinse-Kinse, Paquibato District, Davao City
Physical Target:
CW1: 2.240 lane km (Construction of Gravel Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Gravel Road)
EAO: P 3,500,000.00 |
July 19, 2021 |
FY 2021 GAA |
WIN1E02597 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Ecowest Drive, Ecoland, Davao City
Physical Target:
CW1: 3.528 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Ecowest Drive, Ecoland, Davao City
Physical Target:
CW1: 2.408 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00 |
July 19, 2021 |
FY 2021 GAA |
WIN1E02601 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1511+764 - K1511+800 (L/S)
Physical Target:
CW1: 0.000 Sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 45,000,000.00
CW1: P 44,100,000.00 (Construction of Road Slope Protection Structure)
EAO: P 900,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1511+795 - K1511+820
Physical Target:
CW1: 1,073.00 Sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 45,000,000.00
CW1: P 44,100,000.00 (Construction of Road Slope Protection Structure)
EAO: P 900,000.00 |
July 19, 2021 |
2021 |
WIN1C04284 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 2nd District Engineering Office |
Network Development - Road Widening - Secondary Roads
Angeles - Porac - Floridablanca - Dinalupihan Rd, K0103+125 - K0104+205
|
July 19, 2021 |
2021 |
WIN1F06431 |
SR2021-02-001928 |
February 4, 2021 |
Region VI |
Negros Occidental 5th District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0054 + 500 - K0054 + 520, K0057 + 200 - K0057 + 212, K0059 + 100 - K0059 + 140, K0059 + 300 - K0059 + 380
CW1- Construction of Road Slope Protection Structure: 3,400 sq.m - 32,810.00
EAO - 1,190.00
Total: 34,000.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0054 + 500 - K0054 + 522.5, K0057 + 200 - K0057 + 227, K0057 + 240 - K0057 + 262, K0057 + 294 - K0057 + 330, K0057 + 437 - K0057 + 491, K0058 + 094.5 - K0058 + 157, K0059 + 100 - K0059 + 140.5, K0059 + 300 - K0059 + 479.5, K0059 + 865 - K0059 + 908
CW1- Construction of Road Slope Protection Structure: 3,763 sq.m - 32,810.00
EAO - 1,190.00
Total: 34,000.00
|
July 19, 2021 |
2021 |
WIN1F06431 |
SR2021-02-001928 |
February 4, 2021 |
Region VI |
Negros Occidental 5th District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0054 + 500 - K0054 + 520, K0057 + 200 - K0057 + 212, K0059 + 100 - K0059 + 140, K0059 + 300 - K0059 + 380
CW1- Construction of Road Slope Protection Structure: 3,400 sq.m - 32,810.00
EAO - 1,190.00
Total: 34,000.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0054 + 500 - K0054 + 522.5, K0057 + 200 - K0057 + 227, K0057 + 240 - K0057 + 262, K0057 + 294 - K0057 + 330, K0057 + 437 - K0057 + 491, K0058 + 094.5 - K0058 + 157, K0059 + 100 - K0059 + 140.5, K0059 + 300 - K0059 + 479.5, K0059 + 865 - K0059 + 908
CW1- Construction of Road Slope Protection Structure: 3,763 sq.m - 32,810.00
EAO - 1,190.00
Total: 34,000.00
|
July 19, 2021 |
2021 |
WIN1F06319 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Iloilo City District Engineering Office |
FROM:
LOCAL PROGRAM
Local – Flood Control and Drainage - Drainage / Protection Works - Local Infrastructure
Program
Construction/Rehabilitation of Drainage System in Barangay Banlantang, Jaro, Iloilo City, Iloilo
CW1- Construction of Drainage Structure : 486 lineal meters - 3,960.00
EAO - 40.00
Total: 4,000.00
TO:
LOCAL PROGRAM
Local – Flood Control and Drainage - Drainage / Protection Works - Local Infrastructure
Program
Construction/Rehabilitation of Drainage System in Barangay Balantang, Jaro, Iloilo City, Iloilo
CW1- Construction of Drainage Structure : 486 lineal meters - 3,960.00
EAO - 40.00
Total: 4,000.00
|
July 19, 2021 |
2021 |
WIN1F06319 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Iloilo City District Engineering Office |
FROM:
LOCAL PROGRAM
Local – Flood Control and Drainage - Drainage / Protection Works - Local Infrastructure
Program
Construction/Rehabilitation of Drainage System in Barangay Banlantang, Jaro, Iloilo City, Iloilo
CW1- Construction of Drainage Structure : 486 lineal meters - 3,960.00
EAO - 40.00
Total: 4,000.00
TO:
LOCAL PROGRAM
Local – Flood Control and Drainage - Drainage / Protection Works - Local Infrastructure
Program
Construction/Rehabilitation of Drainage System in Barangay Balantang, Jaro, Iloilo City, Iloilo
CW1- Construction of Drainage Structure : 486 lineal meters - 3,960.00
EAO - 40.00
Total: 4,000.00
|
July 19, 2021 |
2021 |
WIN1C04338 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 2nd District Engineering Office |
Network Development - Road Widening - Primary Roads
Jose Abad Santos Ave (JASA) , K0076+728.56 - K0077+159.69, K0077+410 - K0077+651, K0078+280 - K0078+448.50, K0079+495 - K0079+613.50, K0079+790 - K0080+240, K0087+197 - K0087+231, K0094+127 - K0094+443.61 |
July 19, 2021 |
2021 |
WIN1F06338 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 1st District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Jct New Sagay-Old Sagay Rd - K0085 + 361 - K0085 + 675
CW1- Road Widening: 0.628 lane km - 28,356.30
EAO - 578.70
Total: 28,935.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Network Development - Road Widening - Tertiary
Roads
Jct New Sagay-Old Sagay Rd - K0084 + 601 - K0085 + 055, K0085 + 361 - K0085 + 675, K0087 + 783 - K0087 + 978
CW1- Road Widening: 0.628 lane km - 11,187.791
CW2- Reconstruction to Concrete Pavement: 1.20 lane km - 10,353.509
ROW Acquisition: 6,813.80 sq.m - 6,815.00
EAO - 578.70
Total: 28,935.00
|
July 19, 2021 |
2021 |
WIN1F06339 |
SR2021-02-001874 |
February 4, 2021 |
Region VI |
Negros Occidental 1st District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Primary Roads
Bacolod North Rd - K0090 + 328 - K0091 + 457
CW1- Road Widening: 2.368 lane km - 38,325.458
ROW Acquisition: 22,496 sq.m - 21,658.943
EAO - 2,175.60
Total: 62,160.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Primary Roads
Bacolod North Rd – K0090 + 332 - K0091 + 461
CW1- Road Widening: 2.368 lane km - 37,539.90
ROW Acquisition: 22,496 sq.m - 22,444.50
EAO - 2,175.60
Total: 62,160.00
|
July 19, 2021 |
2021 |
WIN1F06122 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Aklan West Rd (Kalibo-Nabas) - K0269 + 469 - K0269 + 873
CW1- Road Widening: 0.808 lane km - 16,717.82
EAO - 341.18
Total: 17,059.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Aklan West Rd (Kalibo-Nabas) - K0269 + 590 - K0269 + 873
CW1- Road Widening: 0.566 lane km - 16,717.82
EAO - 341.18
Total: 17,059.00
|
July 19, 2021 |
2021 |
WIN1F06082 |
SR2021-02-000154 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Revetment Wall along Aklan River, Sta. 7+262.40 - Sta. 006+612.40, Brgy. Tigayon, Kalibo, Aklan
CW1- Construction of Flood Mitigation Structure: 572.25 lineal meters - 94,570.00
EAO - 3,430.00
Total: 98,000.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Revetment Wall along Aklan River, Sta. 8 + 107.75 - Sta. 8 + 680, Brgy. Tigayon, Kalibo, Aklan
CW1- Construction of Flood Mitigation Structure: 572.25 lineal meters - 94,570.00
EAO - 3,430.00
Total: 98,000.00
|
July 19, 2021 |
2021 |
WIN1F06170 |
SR2021-02-000113 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Aklan West Rd (Kalibo-Nabas) - K0234 + (-905) - K0234 + (-860), K0235 + 667 - K0236 + 000, K0245 + 063 - K0245 + 206, K0251 + 848 - K0252 + 134, K0261 + 873 - K0261 + 891, K0262 + 162 - K0262 + 214, K0272 + 260 - K0272 + 310, K0234 + (-933) - K0234 + (-877)
CW1- Reconstruction to Concrete Pavement: 2.472 lane km - 49,094.375
EAO - 1,780.625
Total: 50,875.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Aklan West Rd (Kalibo-Nabas) - K0234 + (-933) - K0234 + (-877), K0234 + (-905) - K0234 + (-860), K0235 + 667 - K0236 + 021, K0236 + 067 - K0236 + 245, K0236 + 410 - K0236 + 493, K0236 + 545 - K0236 + 560, K0236 + 588 - K0236 + 627, K0236 + 722 - K0236 + 790, K0237 + 950 - K0238 + 375, K0238 + 500 - K0239 + 150, K0241 + 495 - K0241 + 503, K0241 + 755 - K0241 + 763, K0245 + 050 - K0245 + 206, K0250 + 029 – K0250 + 116, K0250 + 193 – K0250 + 227, K0250 + 325 - K0250 + 394, K0250 + 440 - K0250 + 487, K0250 + 518 - K0250 + 697, K0250 + 734 - K0250 + 853, K0250 + 860 - K250 + 931, K0250 + 936 - K0250 + 996, K0251 + 047 - K0251 + 083, K0251 + 141 - K0251 + 192, K0251 + 435 - K0251 + 497, K0251 + 848 - K0252 + 134, K0261 + 873 - K0261 + 891, K0262 + 162 - K0262 + 214, K0272 + 106 - K0272 + 137, K0272 + 260 - K0272 + 310, K0273 + 623 - K0273 + 670
CW1- Reconstruction to Concrete Pavement: 6.340 lane km - 49,094.375
EAO - 1,780.625
Total: 50,875.00
|
July 19, 2021 |
2021 |
WIN1F06142 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Aklan District Engineering Office |
FROM:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Improvement/ Rehabilitation of Boracay Circumferential Road, Bolabog-24/7 Road and Bolabog-Ati Village Boardwalk, Aklan
CW1- Rehabilitation of Concrete Road: 3.047 lane km - 46,060.00
EAO - 940.00
Total: 47,000.00
TO:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Improvement/ Rehabilitation of Boracay Circumferential Road, Bolabog-24/7 Road and Bolabog-Ati Village Boardwalk, Aklan
CW1- Rehabilitation of Concrete Road: 2.276 lane km - 46,060.00
EAO - 940.00
Total: 47,000.00 |
July 16, 2021 |
FY 2021 GAA |
WIN1F06336 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300116203410000
Project ID : P00561891LZ
LOCAL PROGRAM
Local - National Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Construction of Parang - Palhi - Sapul - Bayanan bypass Road,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0 Lane Km
Allocation : Php 90.00 Million
TO :
Construction of parang - Palhi - Sapul - Bayanan Bypass Road,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
6.844 Lane Km
Allocation : Php 90.00 Million
|
July 16, 2021 |
FY 2021 GAA |
WIN1F06332 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Marinduque District Engineering Office |
UACS No. : 300116203713000
Project ID : P00561987LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Construction of Dampulan - Malibago Road,
Sta. Cruz, Marinduque
Physical Target - CW1 - Construction of Concrete Road :
2.40 Lane Km
Allocation : Php 40.00 Million
TO :
Construction of Dampulan - Malibago Road,
Torrijos, Marinduque
Physical Target - CW1 - Construction of Concrete Road :
3.20 Lane Km
Allocation : Php 40.00 Million
|
July 16, 2021 |
FY 2021 GAA |
WIN1F06364 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS NO. : 310202100813000
Project ID : P00505131LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Calapan North Road,
K0019 + 000 - K0019 +511
Physical Target - CW1 - Network Development - Road Widening :
1.022 Lane Km
Allocation : Php 7.832 Million
TO :
Calapan North Road,
K0008 + 575 - K0009 + 000,
K0019 + 000 - K0019 + 277
Physical Target - CW1 - Network Development - Road Widening :
0.699 Lane Km
Allocation : Php 7.832
|
July 16, 2021 |
FY 2021 GAA |
WIN1F06371 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310103100699000
Project ID : P00505606LZ
001 : Ensure and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM :
CSR Jct - Pola Road,
K0060 + (-1003) - K0062 + (-955),
K0062 + (-944) - K0062 + (-693),
K0062 + (-955) - K0062 + (-944)
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 1.122 Lane Km
Allocation : Php 7.290 Million
TO :
CSR Jct - pola Road,
K0062 + (-1003) - K0062 + (-692.5)
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 1.201 Lane Km
Allocation : Php 7.290 Million
|
July 16, 2021 |
FY 2021 GAA |
WIN1F06374 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310103100700000
Project ID : P00505607LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
FROM :
CSR Jct - Pola Road,
K0063 + 450 - K0063 + 622
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 0.688 Lane Km
Allocation : Php 4.465 Million
TO :
CSR Jct - Pola oad,
K0063 + 450 - K0063 + 628.75
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 0.715 Lane Km
Allocation : Php 4.465 million
|
July 16, 2021 |
FY 2021 GAA |
WIN1F06346 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No.: 310103100701000
Project ID : P00505608LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
FROM :
CSR Jct - Pola Road,
K0069 + 995 - K0070 + 150
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 0.620 Lane Km
Allocation : Php 4.021 Million
TO :
CSR Jct - Pola Road,
K0069 ++995 - K0070 + 156
Physical Target - CW1 - Preventive maintenance of Road :
Asphalt Overlay - 0.644 Lane Km
Allocation : Php 4.021 Million |
July 16, 2021 |
FY 2021 GAA |
WIN1E02603 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of road (Opening) Elizalde to New Barili, Maco, Mararag, Golden Valley, Mabini, Davao de Oro (Phase 2)
Physical Target:
CW1: 2.084 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Concrete Road)
EAO: P 700,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of road (Opening) Elizalde to New Barili, Maco, Mararag, Golden Valley, Mabini, Davao de Oro (Phase 2)
Physical Target:
CW1: 4.042 lane km (Construction of Gravel Road)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Gravel Road)
EAO: P 700,000.00 |
July 15, 2021 |
FY 2021 GAA |
WIN1F06251 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No. : 300103203517000
Project ID : P00557144LZ
LOCAL PROGRAM
Local - Buildings and Other Structures - Multipurpose/ Facilities
Construction/Repair/Rehabilitation/Improvement of Various
Infrastructures including Local Projects
FROM :
Construction of Multi-Purpose Building,
Manuel Austria Memorial Elementary School,
Barangay Maruyugon, Puerto Princes City, Palawan
Physical Target - CW1 - Construction of Multi-Purpose Building
1 Building
Allocation : Php 4.00 Million
TO :
Construction of Multi-Purpose Building,
Francisco Austria Memorial Elementary School,
Barangay Maruyugon, Puerto Princesa City, Palawan
Physical Target - CW1 - Construction of Multi-Purpose Building
1 Building
Allocation : Php 4.00 Million
|
July 15, 2021 |
2021 |
310212100186000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Quirino District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Tertiary Roads - Jct Victoria - Maddela - Alicia - Kasibu Bdry Rd - K0412+943 - K0413+958 |
July 15, 2021 |
FY 2021 GAA |
WIN1F06223 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. : 300103203454000
Project ID : P00557081LZ
LOCAL PROGRAM
Local Infrastructure Program - Buildings and Other Structures -
Multipurpose/Facilities
FROM :
Construction of Multi-Purpose Building ( Barangay Hall ),
at Barangay Bansalay, Mamburao, Occidental Mindoro
Physical Target - CW1 - Construction of Multi-Purpose Building
1 Number of Building
Allocation : Php 2.00 Million
TO :
Construction of Multi-Purpose Building ( Barangay Hall ),
at Barangay Balansay, Mamburao, Occidental Mindoro
Physical Target - CW1 - Construction of Multi-Purpose BUilding
1 Number of Building
Allocation : Php 2.00 Million
|
July 15, 2021 |
FY 2021 GAA |
WIN1F06186 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 310202100820000
Project ID : P00505138LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Tablas Circumferential Road,
K0026 + 546.21 - K0026 + 580,
K0029 + 000 - K0029 + 765
Physical Target - CW1 - Road Widening : 1.598 Lane Km
Allocation : Php 28.00 Million
TO :
Tablas Circumferential Road,
K0026 + 546.21 - K0026 +580,
K0029 + 000 - K0029 + 682.21
Physical Target - CW1 - Road Widening : 1.432 Lane Km
Allocation : Php 28.00 Million |
July 15, 2021 |
FY 2021 GAA |
WIN1F06167 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 310208100345000
Project ID : P00505161LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement -
Secondary Roads
FROM :
Tablas Circumferential Road,
K0001 + 243 - K0001 + 477,
K0010 + 000 - K0011 + 145,
K0011 + 182 - K0011 + 335,
K0011 + 351 - K0011 + 374
Physical Target - CW1 - Off-Carriageway Improvement :
Shoulder Paving/Construction -
4,656 sq. m.
Allocation : Php 13.965 Million
TO :
Tablas Circumferential Road,
K0001 + 243 - K0001 + 536,
K0009 + 991.80 - K0011 + 133
Physical target - CW1 - Off-Carriageway Improvement :
Shoulder Paving/Construction -
3,427.71 sq. m.
Allocation : Php 13.965 Million
|
July 15, 2021 |
FY 2021 GAA |
WIN1E02583 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Agusan River, Purok 3 Brgy.Osmeña to Purok 1, Poblacion Compostela, Davao de Oro (Sta. 1+000.000 - Sta. 1+780.000 RS)
Physical Target:
CW1: 342.650 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 48,232,000.00
CW1: P 47,267,360.00 (Construction of Flood Mitigation Structure)
EAO: P 964,640.00
TO: OO2: Protect Lives and Properties - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Agusan River, Purok 3 Brgy.Osmeña to Purok 1, Poblacion Compostela, Davao de Oro (Sta. 1+156.520 - Sta. 1+499.170 RS)
Physical Target:
CW1: 342.650 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 48,232,000.00
CW1: P 47,267,360.00 (Construction of Flood Mitigation Structure)
EAO: P 964,640.00 |
July 15, 2021 |
FY 2021 GAA |
WIN1E02582 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1817+934 - K1819+609
Physical Target:
CW1: 3.334 lane km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Road Widening)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1817+578 - K1819+226
Physical Target:
CW1: 3.280 lane km (Road Widening)
ROW: 32,800 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 44,000,000.00 (Road Widening)
ROW: P 5,000,000.00 (ROW Acquisition)
EAO: P 50,000.00 |
July 15, 2021 |
FY 2021 GAA |
WIN1E02586 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of MPB (Brgy. Hall) Panoraon, Maco, Davao de Oro
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,860,000.00 (Construction of Multi-Purpose Building)
EAO: P 140,000.00
TO: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of MPB (Brgy. Hall) Panoraon, Maco, Davao de Oro
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,860,000.00 (Construction of Multi-Purpose Building)
EAO: P 140,000.00 |
July 15, 2021 |
FY 2021 GAA |
WIN1E02557 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1496+000 - K1497+074
Physical Target:
CW1: 2.148 lane km (Road Widening)
Allocation:
TOTAL: P 33,502,000.00
CW1: P 32,831,960.00 (Road Widening)
EAO: P 670,040.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1496+104 - K1497+454
Physical Target:
CW1: 2.700 lane km (Road Widening)
ROW: 27,000 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 33,502,000.00
CW1: P 31,331,960.00 (Road Widening)
ROW: P 1,500,000.00 (ROW Acquisition)
EAO: P 670,040.00 |
July 15, 2021 |
FY 2021 GAA |
WIN1E02570 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: Local Program - Water Management Facilities - Water Supply - Local Infrastructure Program
Concreting of Water System Level II, Barangay Darong, Sta. Cruz, Davao del Sur
Physical Target:
CW1: 1 water system (Construction of Water Supply Systems)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Water Supply Systems)
EAO: P 30,000.00
TO: Local Program - Water Management Facilities - Water Supply - Local Infrastructure Program
Construction of Water System Level II, Barangay Darong, Sta. Cruz, Davao del Sur
Physical Target:
CW1: 1 water system (Construction of Water Supply Systems)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Water Supply Systems)
EAO: P 30,000.00 |
July 15, 2021 |
FY 2021 GAA |
WIN1F06153 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 310208100346000
Project ID : P00505139LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement -
Secondary Roads
FROM :
Tablas Circumferential Road,
K0016 + 1075 - K0017 + 114,
K0017 + 250 - K0017 + 876
Physical Target - CW1 - Off-Carriageway Improvement :
Shoulder Paving/Construction -
2,241 sq. m.
Allocation : Php 6.723 Million
TO :
Tablas Circumferential Road
K0016 + 1075 - K0017 + 117,
K0017 + 237 - K0018 + 023
Physical Target - CW1 - Off-Carriageway Improvement :
Shoulder Paving/Construction
2,307.98 sq. m.
Allocation : Php 6.723 Million
|
July 15, 2021 |
FY 2021 GAA |
WIN1E02571 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Secondary Roads
Ma-a Rd - K1509+(-300) - K1509+080,
K1509+557 - K1509+846, K1511+054 - K1511+103
Physical Target:
CW1: 633.750 sq. m. (Off-Carriageway Improvement: Shoulder Paving / Construction)
Allocation:
TOTAL: P 2,051,000.00
CW1: P 2,009,980.00 (Off-Carriageway Improvement: Shoulder Paving / Construction)
EAO: P 41,020.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Secondary Roads
Ma-a Rd - K1509+(-300) - K1509+070, K1509+557 - K1509+859,
K1510+191 - K1510+240, K1511+040 - K1511+105,
K1511+161 - K1511+230, K1510+706 - K1510+742
Physical Target:
CW1: 1,671.97 sq. m. (Off-Carriageway Improvement: Shoulder Paving / Construction)
Allocation:
TOTAL: P 2,051,000.00
CW1: P 2,009,980.00 (Off-Carriageway Improvement: Shoulder Paving / Construction)
EAO: P 41,020.00 |
July 15, 2021 |
FY 2021 GAA |
WIN1E02558 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concrete Road, 2nd Street, Ecoland Phase 1, Barangay Bucana, Davao City
Physical Target:
CW1: 1.046 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 6,000,000.00
CW1: P 5,880,000.00 (Construction of Concrete Road)
EAO: P 120,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concrete Road, 2nd Street, Ecoland Phase 1, Barangay Bucana, Davao City
Physical Target:
CW1: 0.534 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 6,000,000.00
CW1: P 5,880,000.00 (Construction of Concrete Road)
EAO: P 120,000.00 |
July 15, 2021 |
2021 |
WIN1E02337 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 310102100789000
Project ID: P00501880MN
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads
FROM:
Mayor Democrito D. Plaza II Ave - K1247 + 057 - K1247 + 558
Type of Work:
CW1- Preventive Maintenance of Road: Concrete Reblocking
Physical Target:
CW1- 1.002 Lane Km
Allocation:
TOTAL: P 4,800,000
CW1: P 4,704,000
EAO: P 96,000
Unit Cost:
CW1: P 4,694,610.78/Lane Km
TO:
Mayor Democrito D. Plaza II Ave - K1247 + 000.00 -K1247 + 022.50, K1247 + 067.50 - K1247 + 130.50, K1247 + 351.00 - K1247 + 373.50, K1247 + 483.00 - K1247 + 618
Type of Work:
CW1- Preventive Maintenance of Road: Concrete Reblocking
Physical Target:
CW1- 0.486 Lane Km
Allocation:
TOTAL: P 4,800,000
CW1: P 4,704,000
EAO: P 96,000
Unit Cost:
CW1: P 9,679,012.35/Lane Km |
July 15, 2021 |
2021 |
WIN1F06518 |
GAA FY 2021 |
February 11, 2021 |
Region VIII |
Leyte 3rd District Engineering Office |
Convergence and Special Support Program
Special Road Fund-Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
AS PER GAA/ORIGINAL:
Preventive Maintenance, Calubian Jct-Sn Isidro- Tabango- Villaba- Palompon Rd., K1056+150- K1058+355, Villaba, Leyte
Physical Target: Allocation:
CW1-Asphalt Overlay: 4.711 Lane Km P 48.250 M
EAO P 1.750 M
Total P 50.00 M
AS MODIFIED:
Preventive Maintenance, Calubian Jct-Sn Isidro- Tabango- Villaba- Palompon Rd., K1056+150- K1058+355, Villaba, Leyte
Physical Target: Allocation:
CW1-Asphalt Overlay: 4.438 Lane Km P 48.250 M
EAO P 1.750 M
Total P 50.00 M
|
July 15, 2021 |
2021 |
WIN1E02338 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 310106100645000
Project ID: P00501878MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
FROM:
Butuan City-Malaybalay Rd - K1252 + 000 - K1252 + 050
Type of Work:
CW1- Reconstruction to Concrete Pavement
Physical Target:
CW1- 0.100 Lane Km
Allocation:
TOTAL: P 2,107,000
CW1: P 2,064,860
EAO: P 42,140
Unit Cost:
CW1: P 20,648,600/Lane Km
TO:
Butuan City-Malaybalay Rd - K1252 + 030.50 - K1252 + 125.00
Type of Work:
CW1- Reconstruction to Concrete Pavement
Physical Target:
CW1- 0.189 Lane Km
Allocation:
TOTAL: P 2,107,000
CW1: P 2,064,860
EAO: P 42,140
Unit Cost:
CW1: P 10,925,185.19/Lane Km |
July 15, 2021 |
CY 2021 |
WIN1F06534 |
UACS NO. UACS No. 320101106446000 |
February 24, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106446000
Project ID.: P00525812LZ
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero dela Reina, Barangay 56, Sta. 0+730.50 to
Sta. 0+888.90, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P 328.30/ l.m.
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero dela Reina, Barangay 56, (LS) Sta. 0+783.60 to
Sta. 0+843.30; (RS) Sta. 0+792.30 to Sta. 0+852.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P 328.30/ l.m.
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00
WIN1F06534
|
July 15, 2021 |
2021 |
WIN1E02350 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 310103100773000
Project ID: P00501877MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
FROM:
Butuan City-Malaybalay Rd - K1258 + 000 - K1259 + 000, K1263 + 330.12 - K1263 + 826
Type of Work:
CW1- Preventive Maintenance of Road: Concrete Reblocking
Physical Target:
CW1- 2.990 Lane Km
Allocation:
TOTAL: P 13,893,000
CW1: P 13,615,140
EAO: P 277,860
Unit Cost:
CW1: P 4,553,558.53/Lane Km
TO:
Butuan City-Malaybalay Rd - K1258 + 000.00 - K1258 + 832.50
Type of Work:
CW1- Preventive Maintenance of Road: Concrete Reblocking
Physical Target:
CW1- 1.665 Lane Km
Allocation:
TOTAL: P 13,893,000
CW1: P 13,615,140
EAO: P 277,860
Unit Cost:
CW1: P 8,177,261.26/Lane Km |
July 15, 2021 |
CY 2021 |
WIN1F06535 |
UACS No. 320101106445000 |
February 24, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106445000
Project ID.: P00525811LZ
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Vitas, Barangay 94 & 147; Sta. 0+000.00 to
Sta. 0+138.40; Sta. 0+000.00 to Sta. 0+020.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 131.00 l.m.
Unit Cost (P’000) = P 319.198/ l.m.
Allocation (P’000) = P 41,813.66
EAO (P’000) = P 853.34
Total (P’000) = P 42,667.00
As Modified
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Vitas, Barangay 94 & 147; Sta. 0+000.00 to
Sta. 0+131.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 131.00 l.m.
Unit Cost (P’000) = P 319.198/ l.m.
Allocation (P’000) = P 41,813.66
EAO (P’000) = P 853.34
Total (P’000) = P 42,667.00
WIN1F06535
|
July 15, 2021 |
CY 2021 |
WIN1F06535 |
UACS No. 320101106445000 |
February 24, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106445000
Project ID.: P00525811LZ
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Vitas, Barangay 94 & 147; Sta. 0+000.00 to
Sta. 0+138.40; Sta. 0+000.00 to Sta. 0+020.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 131.00 l.m.
Unit Cost (P’000) = P 319.198/ l.m.
Allocation (P’000) = P 41,813.66
EAO (P’000) = P 853.34
Total (P’000) = P 42,667.00
As Modified
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Vitas, Barangay 94 & 147; Sta. 0+000.00 to
Sta. 0+131.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 131.00 l.m.
Unit Cost (P’000) = P 319.198/ l.m.
Allocation (P’000) = P 41,813.66
EAO (P’000) = P 853.34
Total (P’000) = P 42,667.00
WIN1F06535
|
July 15, 2021 |
CY 2021 |
WIN1F06536 |
UACS No. 320101106442000 |
February 24, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106442000
Project ID.: P00525808LZ
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Quiapo, Brgy. 394 (Phase II), (LS) Sta. 0+623.00 to
Sta. 0+680.00; (RS) Sta. 0+658.40 to 0+680.00; Sta. 0+685.00 to Sta. 0 0+692.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 92.40 l.m.
Unit Cost (P’000) = P 318.18/ l.m.
Allocation (P’000) = P 29,400.00
EAO (P’000) = P 600.00
Total (P’000) = P 30,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Quiapo, Brgy. 394 (Phase II), (LS) Sta. 0+617.00 to
Sta. 0+617.00 to Sta. 0+646.40; (RS) Sta. 0+616.80 to 0+680.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 92.40 l.m.
Unit Cost (P’000) = P 318.18/ l.m.
Allocation (P’000) = P 29,400.00
EAO (P’000) = P 600.00
Total (P’000) = P 30,000.00
WIN1F06536
|
July 15, 2021 |
2021 |
WIN1E02551 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 310103100771000
Project ID: P00501875MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
FROM:
Butuan City-Malaybalay Rd - K1240 + (-367) - K1240 + 000, K1240 + (-448) - K1240 + (-367), K1240 + (-535) - K1240 + (-448), K1240 + 000 - K1240 + 707, K1240 + 727.56 - K1241 + 183
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 4.793 Lane km
Allocation:
TOTAL: P 42,242,000
CW1: P 41,397,160
EAO: P 844,840
Unit Cost:
CW1: P 8,637,003.96/Lane Km
TO:
Butuan City-Malaybalay Rd - K1240 + (-471) - K1241 + 510
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 5.602 Lane km
Allocation:
TOTAL: P 42,242,000
CW1: P 41,397,160
EAO: P 844,840
Unit Cost:
CW1: P 7,389,710.82/Lane Km |
July 15, 2021 |
CY 2021 |
WIN1F06531 |
UACS No. 320101106447000 |
February 24, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106447000
Project ID.: P00525813LZ
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero dela Reina, Barangay 58, 52, Sta. 0+889.90 to
Sta. 0+944.90 (LS), Sta. 0+841.50 to Sta. 0+944.90 (RS), Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P 328.30/ l.m.
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero dela Reina, Barangay 58, 52 (LS) Sta. 0+843.30 to
Sta. 0+903.00: (RS) Sta. 0+852.00 to Sta. 0+911.70, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P 328.30/ l.m.
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00
WIN1F06531
|
July 15, 2021 |
FY 2021 GAA |
WIN1F06303 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310111100297000
Project ID : P00505357LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along National Roads - Secondary Roads
FROM :
Calapan South Road,
K0036 + 486 - K0036 + 741
Physical Target - CW1 - Construction of Drainage Structure
along Road : 255.00 Lineal Meters
Allocation : Php 5.907 Million
TO :
Calapan South Road,
K0062 + 649 - K0063 + 015
Physical Target - CW1 - Construction of Drainage Structure
along Road : 490.00 Lineal Meters
Allocation : Php 5.907 Million |
July 15, 2021 |
2021 |
WIN1E02555 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 310103100772000
Project ID: P00501876MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
FROM:
Butuan City-Malaybalay Rd - K1241 + (-098) - K1241 + 000, K1241 + (-131) - K1241 + (-098), K1241 + (-435) - K1241 + (-131), K1241 + (-490) - K1241 + (-435), K1241 + 000 - K1241 + 270, K1241 + 290 - K1241 + 723
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 3.405 Lane Km
Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000
Unit Cost:
CW1: P 8,634,361.23/Lane Km
TO:
Butuan City-Malaybalay Rd - K1241 + (-235) - K1240 + 257
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 4.282 Lane Km
Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000
Unit Cost:
CW1: P 6,865,950.49/Lane Km |
July 15, 2021 |
2021 |
WIN1E02566 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 320101107175000
Project ID: P00522267MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Bank Protection of Agusan River Protecting Sta. Josefa Bridge, Sta. 0 + 000 - Sta. 0 + 150, Agusan del Sur
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 160.000 Lineal meters
Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000
Unit Cost:
CW1: P 306,250/Lineal meters
TO:
Construction of Bank Protection of Agusan River Protecting Sta. Josefa Bridge, Sta. 0 + 000 - Sta. 0 + 160, Agusan del Sur
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 160.000 Lineal meters
Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000
Unit Cost:
CW1: P 306,250 Lineal meters |
July 15, 2021 |
2021 |
WIN1F06499 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Biliran District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Biliran Circumferential Rd - K1061 + 591 - K1063 + 188
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,446.500 Square Meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Biliran Circumferential Rd - K1061 + 591 - K1062 + 625
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,27100 Square Meters
EAO P 1.00 M
Total P 50.00 M
|
July 15, 2021 |
FY 2021 GAA |
WIN1F06341 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300203101397000
Project ID : P00534414LZ
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
FROM :
Concreting of Purok 4 Sto. Nino Road leading to Ombo Falls
via bato Ningning Site, Palawan
Physical Target - CW1 - Construction of Concrete Road :
8.40 Lane Km
Allocation : Php 105.00Million
TO :
Concreting of Purok 4, Sto. Nino Road leading to Ombo Falls
via Bato ningning Site, Palawan
Physical Target - CW1 - Construction of Concrete Road :
3.83 Lane Km
Allocation : Php 105.00 Million
|
July 15, 2021 |
2021 |
WIN1E02584 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Dinagat Islands District Engineering Office |
UACS No. : 300116204620000
Project ID: P00550970MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Construction of Road, Sta. Cruz to Santiago (Lauban to P2 Barangay Santiago), Barangay Sta. Cruz to Barangay Santiago, Loreto, Dinagat Islands
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 1.440 Lane Km
Allocation:
TOTAL: P 18,000,000
CW1: P 17,640,000
EAO: P 360,000
Unit Cost:
CW1: P 12,250,000/Lane Km
TO:
Construction of Road, Sta. Cruz to Santiago (Lauban to P2 Barangay Santiago), Barangay Sta. Cruz to Barangay Santiago, Loreto, Dinagat Islands
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Gravel Road
Physical Target:
CW1- 1.710 Lane Km
CW2- 1.240 Lane Km
Allocation:
TOTAL: P 18,000,000
CW1: P 16,522,250
CW2: P 1,117,750
EAO: P 360,000
Unit Cost:
CW1: P 9,662,134.50/Lane Km
CW2: P 901,410.48/Lane Km |
July 15, 2021 |
FY 2021 GAA |
WIN1F06370 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300106200565000
Project ID : P00561416LZ
LOCAL PROGRAM
Flood Control and Drainage - Flood Control Structures/Facilities -
Construction/Repair/Rehabilitation/Improvement of Various
Infrastructure including Local Projects
FROM :
Construction of Pili Flood Control, Looc, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
0 Lineal meter
Allocation : Php 90.00 Million
TO :
Construction of Pili Flood Control, Looc, Romblon
Physical Target - CW1 - 480.0 Lineal meter
Allocation : Php 90.00 Million
|
July 15, 2021 |
FY 2021 GAA |
WIN1F06369 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300106200574000
Project ID : P00561447LZ
Flood Control and Drainage - Flood Control Structures/Facilities -
Construction/Repair/Rehabilitation/Improvement of Various
Infrastructure including Local Projects
FROM :
Construction of Tuburan Flood Control,
Tuburan, Odiongan, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
0.00 Lineal meter
Allocation : Php 90.00 Million
TO :
Construction of Tuburan Flood Control,
Tuburan, Odiongan, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
486.00 Lineal meter
Allocation : Php 90.00 Million
|
July 15, 2021 |
FY 2021 GAA |
WIN1E02437 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1484+236 - K1487+000
Physical Target:
CW1: 5.528 Lane km (Road Widening)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Road Widening)
EAO: P 1,050,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1484+236 - K1485+276
Physical Target:
CW1: 2.080 Lane km (Road Widening)
ROW: 15,600.00 Sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 26,520,130.00 (Road Widening)
ROW: P 2,429,870.00 (ROW Acquisition)
EAO: P 1,050,000.00 |
July 15, 2021 |
FY 2021 GAA |
WIN1E02424 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Mabuhay-Panalum-Paquibato Rd -
K1528+288 - K1528+591, K1528+684 - K1530+100
Physical Target:
CW1: 3.680 Lane km (Road Widening)
Allocation:
TOTAL: P 124,634,000.00
CW1: P 120,271,810.00 (Road Widening)
EAO: P 4,362,190.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Mabuhay-Pañalum-Paquibato Rd -
K1524+811 - K1525+470, K1528+1032 - K1530+596
Physical Target:
CW1: 4.966 Lane km (Road Widening)
ROW: 37,245.00 Sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 124,634,000.00
CW1: P 85,139,055.00 (Road Widening)
ROW: P 17,971,195.00 (ROW Acquisition)
EAO: P 3,739,750.00
EXC: P 17,784,000.00 |
July 14, 2021 |
CY 2021 |
WIN1F06520 |
UACS NO. 320101106443000 |
March 11, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106443000
Project ID.: P00525809LZ
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de San Miguel Barangay 384 & Barangay 385,
Sta. 2+140.00 to Sta. 2+260.00; Sta. 2+081.60 to Sta. 2+120.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 152.80 l.m.
Unit Cost (P’000) = P 320.68/ l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de San Miguel Barangay 384 & Barangay 385,
Sta. 2+140.00 to Sta. 2+260.00; Sta. 1+930.40 to Sta. 1+963.20, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 152.80 l.m.
Unit Cost (P’000) = P 320.68/ l.m. P 320,680/LM
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN1F06520
|
July 14, 2021 |
CY 2021 |
WIN1F06522 |
UACS NO. 320101106444000 |
March 11, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106444000
Project ID.: P00525810LZ
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de San Miguel Barangay 386 (Phase I),
Sta. 1+461.00 to Sta. 0+560.00; Sta. 1+660.00 to Sta. 1+720.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 152.80 l.m.
Unit Cost (P’000) = P 320.68/ l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de San Miguel Barangay 386 (Phase I),
Sta. 1+467.20 to Sta. 1+560.00; Sta. 1+660.00 to Sta. 1+720.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 152.80 l.m.
Unit Cost (P’000) = P 320.68/ l.m. P 320,680/LM
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN1F06522
|
July 14, 2021 |
FY 2021 GAA |
WIN1E02536 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Brgy. Tibungco, Bunawan District, Davao City, Davao del Sur
Physical Target:
CW1: 0.500 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Concrete Road)
EAO: P 50,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Brgy. Tibungco, Bunawan District, Davao City, Davao del Sur
Physical Target:
CW1: 0.692 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Concrete Road)
EAO: P 50,000.00 |
July 14, 2021 |
FY 2021 GAA |
WIN1E02529 |
FY 2021 GAA RA 11518 |
January 1, 2020 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Surigao-Davao Coastal Rd - K1825+460 - K1825+747
Physical Target:
CW1: 574.000 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 17,086,000.00
CW1: P 16,744,280.00 (Construction of Drainage Structure along Road)
EAO: P 341,720.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Surigao-Davao Coastal Rd - K1826+683.72
Physical Target:
CW1: 256.000 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 17,086,000.00
CW1: P 16,744,280.00 (Construction of Drainage Structure along Road)
EAO: P 341,720.00 |
July 14, 2021 |
FY 2021 GAA |
WIN1E02539 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Carmen-DAPECOL Cmpd Rd - K1473+479 - K1475+000
Physical Target:
CW1: 3.012 lane km (Road Widening)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Road Widening)
EAO: P 400,00.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Carmen-DAPECOL Cmpd Rd - K1472+515 - K1472+850
Physical Target:
CW1: 0.670 lane km (Road Widening)
CW2: 0.670 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 11,654,958.00 (Road Widening)
CW2: P 7,945,042.00 (Reconstruction to Concrete Pavement)
EAO: P 400,00.00 |
July 14, 2021 |
FY 2021 GAA |
WIN1E02552 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
NRJ Sagayen-Sonlon Road connecting Asuncion Overland Transport Terminal in support of Coconut, Banana and Rice Industries, Tagum City, Davao del Norte
Physical Target:
CW1: 0.414 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 4,500,000.00
CW1: P 4,410,000.00 (Construction of Concrete Road)
EAO: P 90,000.00
TO: Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
NRJ Sagayen-Sonlon Road connecting Asuncion Overland Transport Terminal in support of Coconut, Banana and Rice Industries, Asuncion, Davao del Norte
Physical Target:
CW1: 0.440 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 4,500,000.00
CW1: P 4,410,000.00 (Construction of Concrete Road)
EAO: P 90,000.00 |
July 14, 2021 |
FY 2021 GAA |
WIN1E02528 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Rehabilitation of Multi-Purpose Building (Gym), Barangay Del Pilar, Maco, Davao de Oro
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00
TO: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Rehabilitation of Multi-Purpose Building (Gym), Barangay Del Pilar, Mabini, Davao de Oro
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00 |
July 14, 2021 |
FY 2021 GAA |
WIN1E02553 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Canidkid-New Calape, Phase 2, Montevista, Davao de Oro
Physical Target:
CW1: 2.401 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 24,000,000.00
CW1: P 23,520,000.00 (Construction of Concrete Road)
EAO: P 480,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Canidkid-New Calape, Phase 2, Montevista, Davao de Oro
Physical Target:
CW1: 1.912 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 24,000,000.00
CW1: P 23,520,000.00 (Construction of Concrete Road)
EAO: P 480,000.00 |
July 14, 2021 |
FY 2021 GAA |
WIN1E02548 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd -
K1511+124 - K1512+000, K1512+853 - K1513+068
Physical Target:
CW1: 2.612 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 300,00.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd -
K1511+124 - K1512+000, K1512+853 - K1513+068
Physical Target:
CW1: 2.182 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 300,00.00 |
July 14, 2021 |
2021 |
320102104062000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Regional Office II |
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers - Construction of Flood Control System, Package 2, Sta. 0+296 - Sta. 0+582 (Upstream), Balasig, Cabagan, Isabela |
July 14, 2021 |
FY 2021 GAA |
WIN1E02537 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1806+537 - K1807+462
Physical Target:
CW1: 1.978 lane km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Road Widening)
EAO: P 1,000,00.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1806+537 - K1808+152
Physical Target:
CW1: 3.330 lane km (Road Widening)
ROW: 33,300.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 44,000,000.00 (Road Widening)
ROW: P 5,000,000.00 (ROW Acquisition)
EAO: P 1,000,00.00 |
July 14, 2021 |
2021 |
310109100537000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Regional Office II |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Peñablanca - Callao Cave Road K0476+220 - K0476+677, K0477+407 - K0477+590, K0480+024 - K0480+200 |
July 14, 2021 |
2021 |
300211100067000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 1st District Engineering Office |
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Road Construction/ Concreting - Centro Norte - Taligan Road, Gattaran, Cagayan |
July 14, 2021 |
2021 |
320101106043000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 1st District Engineering Office |
OO2: Protect Lives and Properties Against Major Flood - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction/ Rehabilitation of River Bank Protection for Lower Cagayan River, Sta. Maria, Lal-lo, Cagayan, Sta. 0+000 - Sta. 0+024.40 |
July 14, 2021 |
2021 |
310201100751000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Daang Maharlika (LZ), K0277+250 - K0277+580 |
July 14, 2021 |
2021 |
310204101023000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads - Dupax Del Sur Bypass Road, Nueva Vizcaya |
July 14, 2021 |
2021 |
310109100640000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Nueva Vizcaya - Pangasinan Road, K0223+150 - K223+190, K0223+230 - K0223+280 |
July 14, 2021 |
2021 |
310108100610000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary Roads - Nueva Vizcaya - Benguet Road - K0242+900 - K0243+100, K0244+000 - K0244+200, K0244+300 - K0244+393 |
July 14, 2021 |
2021 |
310202100774000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Nueva Vizcaya - Benguet Rd - K0251+280.50 - K0251+887.50 |
July 14, 2021 |
2021 |
310109100639000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Tertiary Roads - Aritao - Quirino Road - K0258+405 - K0258+414, K0280+156 - K0280+192, K0286+053 - K0286+058, K0291+180 - K0291+189 |
July 14, 2021 |
FY 2021 GAA |
WIN1E02575 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure along Oregon Creek, Governor Generoso, Davao Oriental
Physical Target:
CW1: 2,000.00 ln. m. (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 75,00,000.00
CW1: P 72,375,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,625,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure along Oregon Creek, Governor Generoso, Davao Oriental
Physical Target:
CW1: 3,330.88 ln. m. (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 75,00,000.00
CW1: P 72,375,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,625,000.00 |
July 14, 2021 |
2021 |
310109100641000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Tertiary Roads - Nueva Vizcaya - Pangasinan Road, K0225+730 - K0225+832 |
July 14, 2021 |
2021 |
310203100435000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Quirino District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads - Jct Abbag - Nagtipunan - Nueva Vizcaya Rd via Dupax - K0398+600 - K0399+400 |
July 14, 2021 |
FY 2021 GAA |
WIN1E02579 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Road: Asphalt Overlay - Magsaysay Ave - (S01446MN) Chainage 000 - Chainage 118
Physical Target:
CW1: 0.835 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,650,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 350,000.00
TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Road: Asphalt Overlay - Magsaysay Ave - (S01446MN) Chainage 000 - Chainage 118
Physical Target:
CW1: 0.588 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,650,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 350,000.00 |
July 14, 2021 |
FY 2021 GAA |
WIN1E02578 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Sitio Marquez, Purok 6, Barangay San Isidro, Davao City
Physical Target:
CW1: 0.300 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Concrete Road)
EAO: P 30,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Sitio Marquez, Purok 6, Barangay San Isidro, Davao City
Physical Target:
CW1: 0.602 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Concrete Road)
EAO: P 30,000.00 |
July 14, 2021 |
2021 |
310202100776000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Quirino District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Cordon - Aurora Bdry Rd (Isabela Bdry - Jct Dumabato) K0365+000 - K0365+533, K0365+587 - K0365+700 |
July 14, 2021 |
FY 2021 GAA |
WIN1E02563 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1823+512 - K1824+527
Physical Target:
CW1: 2.048 lane km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Road Widening)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1825+460 - K1825+972
Physical Target:
CW1: 1.024 lane km (Road Widening)
CW2: 924.00 lm (Construction of Drainage Structure along Road)
ROW: 7,731.20 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 23,679,764.00 (Road Widening)
CW2: P 16,904,476.00 (Construction of Drainage Structure along Road)
ROW: P 8,415,760.00 (ROW Acquisition)
EAO: P 1,000,000.00 |
July 14, 2021 |
FY 2021 GAA |
WIN1E02556 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1456+784 - K1457+469
Physical Target:
CW1: 9,131.30 sq. m. (Off-Carriageway Improvement: Construction of Median/Center Island)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Off-Carriageway Improvement: Construction of Median/Center Island)
EAO: P 400,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1456+600 - K1456+788
Physical Target:
CW1: 4,600.88 sq. m. (Off-Carriageway Improvement: Construction of Bike Lanes)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Off-Carriageway Improvement: Construction of Bike Lanes)
EAO: P 400,000.00 |
July 13, 2021 |
FY 2021 GAA |
WIN1E02527 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Mati-Maragusan Rd - K1523+953 - K1524+228
Physical Target:
CW1: 0.552 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 8,228,000.00
CW1: P 8,063,440.00 (Reconstruction to Concrete Pavement)
EAO: P 164,560.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Mati-Maragusan Rd - K1524+128 - K1524+228
Physical Target:
CW1: 0.200 Lane Km (Reconstruction to Concrete Pavement)
CW2: 400.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 8,228,000.00
CW1: P 4,184,776.00 (Reconstruction to Concrete Pavement)
CW2: P 3,878,664.00 (Construction of Road Slope Protection Structure)
EAO: P 164,560.00 |
July 13, 2021 |
2021 |
WIN1F06428 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Regional Office VIII |
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods
Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Basey Tide Embankment, Basey, Samar
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 36.46735 M
Structure: 223.00 Lineal Meters
EAO P 1.32265 M
Total P 37.790 M
AS MODIFIED:
Construction of Basey Tide Embankment, Basey, Samar
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 36.46735 M
Structure: 73.00 Lineal Meters
EAO P 1.32265 M
Total P 37.790 M
|
July 13, 2021 |
FY 2021 GAA |
WIN1E02545 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Mati-Maragusan Rd -
K1503+670 - K1503+700, K1504+081 - K1504+122,
K1522+551 - K1522+560, K1523+063 - K1523+083.50
Physical Target:
CW1: 3,125.75 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 30,800,000.00
CW1: P 30,184,000.00 (Construction of Road Slope Protection Structure)
EAO: P 616,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Mati-Maragusan Rd -
K1502+510 - K1502+560, K1503+650 - K1503+700,
K1504+080 - K1504+110, K1522+550 - K1522+560,
K1523+045 - K1523+075, K1523+290 - K1523+310
Physical Target:
CW1: 934.622 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 30,800,000.00
CW1: P 30,184,000.00 (Construction of Road Slope Protection Structure)
EAO: P 616,000.00 |
July 13, 2021 |
FY 2021 GAA |
WIN1E02538 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building, Brgy. Tibanan, Governor Generoso, Davao Oriental
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Multi-Purpose Building)
EAO: P 100,000.00
TO: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building, Brgy. Tibanban, Governor Generoso, Davao Oriental
Physical Target:
CW1: 2 buildings (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Multi-Purpose Building)
EAO: P 100,000.00 |
July 13, 2021 |
2021 |
WIN1F06507 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
AS PER GAA/ORIGINAL:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0809 + 417 - K0809 + 917
Physical Target: Allocation:
CW1-Road Widening: 1.00 Lane Km P 19.600 M
EAO P 0.400 M
Total P 20.00 M
AS MODIFIED:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd, K0809+000 – K0809+480
Physical Target: Allocation:
CW1-Road Widening: 0.96 Lane Km P 19.600 M
EAO P 0.400 M
Total P 20.00 M
|
July 13, 2021 |
FY 2021 GAA |
WIN1E02534 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building (Tribal Hall), Gupitan, Kapalong, Davao de Oro
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00
TO: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building (Tribal Hall), Gupitan, Kapalong, Davao del Norte
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00 |
July 13, 2021 |
2021 |
WIN1F06497 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Justice Romualdez St - (S00005LT) – Chainage 200 – Chainage 554
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 19.600 M
along Road: 708 Lineal Meters
EAO P 0.400 M
Total P 20.00 M
AS MODIFIED:
Justice Romualdez St - (S00005LT) – Chainage 200 – Chainage 872
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 19.600 M
along Road: 672 Lineal Meters
EAO P 0.400 M
Total P 20.00 M
|
July 13, 2021 |
2021 |
WIN1F06514 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0810 + 640 - K0810 + 801
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 53.075 M
Structure: 5,500.00 Square Meters
EAO P 1.925 M
Total P 55.00 M
AS MODIFIED:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0810 + 650 - K0810 + 801
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 53.075 M
Structure: 2,567.00 Square Meters
EAO P 1.925 M
Total P 55.00 M
|
July 13, 2021 |
FY 2021 GAA |
WIN1E02554 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
R Castillo St - K1504+(-566) - K1504+000, K1504+(-607) - K1504+(-566)
Physical Target:
CW1: 1.296 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 14,232,000.00
CW1: P 13,947,360.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 284,640.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
R Castillo St - K1504+(-566) - K1504+000
Physical Target:
CW1: 1.132 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 14,232,000.00
CW1: P 13,947,360.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 284,640.00 |
July 13, 2021 |
FY 2021 GAA |
WIN1E02549 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Talomo River, Davao City (Sta. 5+400 - Sta. 6+110 Right Bank)
Physical Target:
CW1: 813.647 ln. m. (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 70,00,000.00
CW1: P 67,550,000.00 (Construction of Flood Mitigation Structure)
EAO: P 3,450,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Talomo River, Davao City (Sta. 5+330 - Sta. 5+595 Right Bank)
Physical Target:
CW1: 265.00 ln. m. (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 70,00,000.00
CW1: P 67,550,000.00 (Construction of Flood Mitigation Structure)
EAO: P 3,450,000.00 |