Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
July 21, 2021 FY 2021 GAA WIN1E02615 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay - Bolton St., Davao City
Physical Target:
CW1: 1.100 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 33,775,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,225,300.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay - Bolton St., Davao City
Physical Target:
CW1: 1.516 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 33,775,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,225,300.00
July 21, 2021 FY 2021 GAA WIN1E02614 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Juna Ave - University St., Davao City
Physical Target:
CW1: 2.694 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 35,250,000.00
CW1: P 34,016,250.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,233,750.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Juna Ave - University St., Davao City
Physical Target:
CW1: 2.560 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 35,250,000.00
CW1: P 34,016,250.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,233,750.00
July 21, 2021 FY 2021 GAA WIN1F06393 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300116204154000
Project ID : P00562415LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Concreting of Road,
Sitio Kili - kilo, Brgy. Palhi, Calapan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.906 Lane Km
Allocation : Php 5.00 Million

TO :

Concreting of Road,
Sitio Kilo - kilo, Brgy. Palhi, Calapan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.518 Lane Km
Allocation : Php 5.00 Million

July 21, 2021 FY 2021 GAA WIN1E02616 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete road (Opening) Elizalde to New Barili, Maco, Davao de Oro (Phase 1)
Physical Target:
CW1: 3.626 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 58,800,000.00 (Construction of Concrete Road)
EAO: P 1,200,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete road (Opening) Elizalde to New Barili, Maco, Davao de Oro (Phase 1)
Physical Target:
CW1: 4.194 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 58,800,000.00 (Construction of Concrete Road)
EAO: P 1,200,000.00
July 21, 2021 FY 2021 GAA WIN1E02617 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of road Boringot-Diat Road Pantukan (Phase 2)
Physical Target:
CW1: 2.236 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Concrete Road)
EAO: P 700,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of road Boringot-Diat Road Pantukan (Phase 2)
Physical Target:
CW1: 4.400 lane km (Construction of Gravel Road)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Gravel Road)
EAO: P 700,000.00
July 21, 2021 FY 2021 GAA WIN1E02602 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Rehabilitation of Mamay Creek, Davao City (Sta. 0+000 - Sta. 0+310)
Physical Target:
CW1: 327.054 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Flood Mitigation Structure)
EAO: P 600,000.00

TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Rehabilitation of Mamay Creek, Davao City (Sta. 0+000 - Sta. 0+277)
Physical Target:
CW1: 277.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Flood Mitigation Structure)
EAO: P 600,000.00
July 19, 2021 FY 2021 GAA WIN1E02595 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum City Diversion Rd - K1459+491 - K1460+000
Physical Target:
CW1: 3.246 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 400,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum City Diversion Rd - K1456+111 - K1456+299.68, K1459+487 - K1459+990
Physical Target:
CW1: 2.012 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 400,000.00
July 19, 2021 FY 2021 GAA WIN1G02966 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Barangay Salapawan to Sitio Kinse-Kinse, Paquibato District, Davao City
Physical Target:
CW1: 3.600 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Barangay Salapawan to Sitio Kinse-Kinse, Paquibato District, Davao City
Physical Target:
CW1: 2.240 lane km (Construction of Gravel Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Gravel Road)
EAO: P 3,500,000.00
July 19, 2021 FY 2021 GAA WIN1E02597 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Ecowest Drive, Ecoland, Davao City
Physical Target:
CW1: 3.528 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Ecowest Drive, Ecoland, Davao City
Physical Target:
CW1: 2.408 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00
July 19, 2021 FY 2021 GAA WIN1E02601 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1511+764 - K1511+800 (L/S)
Physical Target:
CW1: 0.000 Sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 45,000,000.00
CW1: P 44,100,000.00 (Construction of Road Slope Protection Structure)
EAO: P 900,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1511+795 - K1511+820
Physical Target:
CW1: 1,073.00 Sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 45,000,000.00
CW1: P 44,100,000.00 (Construction of Road Slope Protection Structure)
EAO: P 900,000.00
July 19, 2021 2021 WIN1C04284 FY 2021 GAA December 28, 2020 Region III Pampanga 2nd District Engineering Office
Network Development - Road Widening - Secondary Roads

Angeles - Porac - Floridablanca - Dinalupihan Rd, K0103+125 - K0104+205

July 19, 2021 2021 WIN1F06431 SR2021-02-001928 February 4, 2021 Region VI Negros Occidental 5th District Engineering Office
FROM:


OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0054 + 500 - K0054 + 520, K0057 + 200 - K0057 + 212, K0059 + 100 - K0059 + 140, K0059 + 300 - K0059 + 380


CW1- Construction of Road Slope Protection Structure: 3,400 sq.m - 32,810.00

EAO - 1,190.00

Total: 34,000.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0054 + 500 - K0054 + 522.5, K0057 + 200 - K0057 + 227, K0057 + 240 - K0057 + 262, K0057 + 294 - K0057 + 330, K0057 + 437 - K0057 + 491, K0058 + 094.5 - K0058 + 157, K0059 + 100 - K0059 + 140.5, K0059 + 300 - K0059 + 479.5, K0059 + 865 - K0059 + 908


CW1- Construction of Road Slope Protection Structure: 3,763 sq.m - 32,810.00

EAO - 1,190.00

Total: 34,000.00





July 19, 2021 2021 WIN1F06431 SR2021-02-001928 February 4, 2021 Region VI Negros Occidental 5th District Engineering Office
FROM:


OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0054 + 500 - K0054 + 520, K0057 + 200 - K0057 + 212, K0059 + 100 - K0059 + 140, K0059 + 300 - K0059 + 380


CW1- Construction of Road Slope Protection Structure: 3,400 sq.m - 32,810.00

EAO - 1,190.00

Total: 34,000.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0054 + 500 - K0054 + 522.5, K0057 + 200 - K0057 + 227, K0057 + 240 - K0057 + 262, K0057 + 294 - K0057 + 330, K0057 + 437 - K0057 + 491, K0058 + 094.5 - K0058 + 157, K0059 + 100 - K0059 + 140.5, K0059 + 300 - K0059 + 479.5, K0059 + 865 - K0059 + 908


CW1- Construction of Road Slope Protection Structure: 3,763 sq.m - 32,810.00

EAO - 1,190.00

Total: 34,000.00





July 19, 2021 2021 WIN1F06319 FCR 2021 RA 11518 December 28, 2020 Region VI Iloilo City District Engineering Office
FROM:

LOCAL PROGRAM

Local – Flood Control and Drainage - Drainage / Protection Works - Local Infrastructure
Program

Construction/Rehabilitation of Drainage System in Barangay Banlantang, Jaro, Iloilo City, Iloilo

CW1- Construction of Drainage Structure : 486 lineal meters - 3,960.00

EAO - 40.00

Total: 4,000.00


TO:

LOCAL PROGRAM

Local – Flood Control and Drainage - Drainage / Protection Works - Local Infrastructure
Program

Construction/Rehabilitation of Drainage System in Barangay Balantang, Jaro, Iloilo City, Iloilo

CW1- Construction of Drainage Structure : 486 lineal meters - 3,960.00

EAO - 40.00

Total: 4,000.00
July 19, 2021 2021 WIN1F06319 FCR 2021 RA 11518 December 28, 2020 Region VI Iloilo City District Engineering Office
FROM:

LOCAL PROGRAM

Local – Flood Control and Drainage - Drainage / Protection Works - Local Infrastructure
Program

Construction/Rehabilitation of Drainage System in Barangay Banlantang, Jaro, Iloilo City, Iloilo

CW1- Construction of Drainage Structure : 486 lineal meters - 3,960.00

EAO - 40.00

Total: 4,000.00


TO:

LOCAL PROGRAM

Local – Flood Control and Drainage - Drainage / Protection Works - Local Infrastructure
Program

Construction/Rehabilitation of Drainage System in Barangay Balantang, Jaro, Iloilo City, Iloilo

CW1- Construction of Drainage Structure : 486 lineal meters - 3,960.00

EAO - 40.00

Total: 4,000.00
July 19, 2021 2021 WIN1C04338 FY 2021 GAA December 28, 2020 Region III Pampanga 2nd District Engineering Office
Network Development - Road Widening - Primary Roads

Jose Abad Santos Ave (JASA) , K0076+728.56 - K0077+159.69, K0077+410 - K0077+651, K0078+280 - K0078+448.50, K0079+495 - K0079+613.50, K0079+790 - K0080+240, K0087+197 - K0087+231, K0094+127 - K0094+443.61
July 19, 2021 2021 WIN1F06338 FCR 2021 RA 11518 December 28, 2020 Region VI Negros Occidental 1st District Engineering Office
FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

Jct New Sagay-Old Sagay Rd - K0085 + 361 - K0085 + 675

CW1- Road Widening: 0.628 lane km - 28,356.30

EAO - 578.70

Total: 28,935.00


TO:

OO1: Ensure Safe and Reliable National Road
System

Network Development - Road Widening - Tertiary
Roads

Jct New Sagay-Old Sagay Rd - K0084 + 601 - K0085 + 055, K0085 + 361 - K0085 + 675, K0087 + 783 - K0087 + 978

CW1- Road Widening: 0.628 lane km - 11,187.791

CW2- Reconstruction to Concrete Pavement: 1.20 lane km - 10,353.509

ROW Acquisition: 6,813.80 sq.m - 6,815.00

EAO - 578.70

Total: 28,935.00

July 19, 2021 2021 WIN1F06339 SR2021-02-001874 February 4, 2021 Region VI Negros Occidental 1st District Engineering Office
FROM:


OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Primary Roads

Bacolod North Rd - K0090 + 328 - K0091 + 457

CW1- Road Widening: 2.368 lane km - 38,325.458

ROW Acquisition: 22,496 sq.m - 21,658.943

EAO - 2,175.60

Total: 62,160.00

TO:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Primary Roads

Bacolod North Rd – K0090 + 332 - K0091 + 461

CW1- Road Widening: 2.368 lane km - 37,539.90

ROW Acquisition: 22,496 sq.m - 22,444.50

EAO - 2,175.60

Total: 62,160.00

July 19, 2021 2021 WIN1F06122 FCR 2021 RA 11518 December 28, 2020 Region VI Aklan District Engineering Office
FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Aklan West Rd (Kalibo-Nabas) - K0269 + 469 - K0269 + 873

CW1- Road Widening: 0.808 lane km - 16,717.82

EAO - 341.18

Total: 17,059.00

TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Aklan West Rd (Kalibo-Nabas) - K0269 + 590 - K0269 + 873

CW1- Road Widening: 0.566 lane km - 16,717.82

EAO - 341.18

Total: 17,059.00
July 19, 2021 2021 WIN1F06082 SR2021-02-000154 February 4, 2021 Region VI Aklan District Engineering Office
FROM:

ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods

Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Revetment Wall along Aklan River, Sta. 7+262.40 - Sta. 006+612.40, Brgy. Tigayon, Kalibo, Aklan

CW1- Construction of Flood Mitigation Structure: 572.25 lineal meters - 94,570.00

EAO - 3,430.00

Total: 98,000.00


TO:

ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods

Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Revetment Wall along Aklan River, Sta. 8 + 107.75 - Sta. 8 + 680, Brgy. Tigayon, Kalibo, Aklan

CW1- Construction of Flood Mitigation Structure: 572.25 lineal meters - 94,570.00

EAO - 3,430.00

Total: 98,000.00


July 19, 2021 2021 WIN1F06170 SR2021-02-000113 February 4, 2021 Region VI Aklan District Engineering Office
FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Aklan West Rd (Kalibo-Nabas) - K0234 + (-905) - K0234 + (-860), K0235 + 667 - K0236 + 000, K0245 + 063 - K0245 + 206, K0251 + 848 - K0252 + 134, K0261 + 873 - K0261 + 891, K0262 + 162 - K0262 + 214, K0272 + 260 - K0272 + 310, K0234 + (-933) - K0234 + (-877)

CW1- Reconstruction to Concrete Pavement: 2.472 lane km - 49,094.375

EAO - 1,780.625

Total: 50,875.00


TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Aklan West Rd (Kalibo-Nabas) - K0234 + (-933) - K0234 + (-877), K0234 + (-905) - K0234 + (-860), K0235 + 667 - K0236 + 021, K0236 + 067 - K0236 + 245, K0236 + 410 - K0236 + 493, K0236 + 545 - K0236 + 560, K0236 + 588 - K0236 + 627, K0236 + 722 - K0236 + 790, K0237 + 950 - K0238 + 375, K0238 + 500 - K0239 + 150, K0241 + 495 - K0241 + 503, K0241 + 755 - K0241 + 763, K0245 + 050 - K0245 + 206, K0250 + 029 – K0250 + 116, K0250 + 193 – K0250 + 227, K0250 + 325 - K0250 + 394, K0250 + 440 - K0250 + 487, K0250 + 518 - K0250 + 697, K0250 + 734 - K0250 + 853, K0250 + 860 - K250 + 931, K0250 + 936 - K0250 + 996, K0251 + 047 - K0251 + 083, K0251 + 141 - K0251 + 192, K0251 + 435 - K0251 + 497, K0251 + 848 - K0252 + 134, K0261 + 873 - K0261 + 891, K0262 + 162 - K0262 + 214, K0272 + 106 - K0272 + 137, K0272 + 260 - K0272 + 310, K0273 + 623 - K0273 + 670

CW1- Reconstruction to Concrete Pavement: 6.340 lane km - 49,094.375

EAO - 1,780.625

Total: 50,875.00

July 19, 2021 2021 WIN1F06142 FCR 2021 RA 11518 December 28, 2020 Region VI Aklan District Engineering Office
FROM:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Improvement/ Rehabilitation of Boracay Circumferential Road, Bolabog-24/7 Road and Bolabog-Ati Village Boardwalk, Aklan

CW1- Rehabilitation of Concrete Road: 3.047 lane km - 46,060.00

EAO - 940.00

Total: 47,000.00


TO:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Improvement/ Rehabilitation of Boracay Circumferential Road, Bolabog-24/7 Road and Bolabog-Ati Village Boardwalk, Aklan

CW1- Rehabilitation of Concrete Road: 2.276 lane km - 46,060.00

EAO - 940.00

Total: 47,000.00
July 16, 2021 FY 2021 GAA WIN1F06336 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 300116203410000
Project ID : P00561891LZ

LOCAL PROGRAM

Local - National Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Construction of Parang - Palhi - Sapul - Bayanan bypass Road,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0 Lane Km
Allocation : Php 90.00 Million

TO :

Construction of parang - Palhi - Sapul - Bayanan Bypass Road,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
6.844 Lane Km
Allocation : Php 90.00 Million
July 16, 2021 FY 2021 GAA WIN1F06332 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Marinduque District Engineering Office
UACS No. : 300116203713000
Project ID : P00561987LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Construction of Dampulan - Malibago Road,
Sta. Cruz, Marinduque
Physical Target - CW1 - Construction of Concrete Road :
2.40 Lane Km
Allocation : Php 40.00 Million

TO :

Construction of Dampulan - Malibago Road,
Torrijos, Marinduque
Physical Target - CW1 - Construction of Concrete Road :
3.20 Lane Km
Allocation : Php 40.00 Million
July 16, 2021 FY 2021 GAA WIN1F06364 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS NO. : 310202100813000
Project ID : P00505131LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Calapan North Road,
K0019 + 000 - K0019 +511
Physical Target - CW1 - Network Development - Road Widening :
1.022 Lane Km
Allocation : Php 7.832 Million

TO :

Calapan North Road,
K0008 + 575 - K0009 + 000,
K0019 + 000 - K0019 + 277
Physical Target - CW1 - Network Development - Road Widening :
0.699 Lane Km
Allocation : Php 7.832
July 16, 2021 FY 2021 GAA WIN1F06371 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310103100699000
Project ID : P00505606LZ

001 : Ensure and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM :

CSR Jct - Pola Road,
K0060 + (-1003) - K0062 + (-955),
K0062 + (-944) - K0062 + (-693),
K0062 + (-955) - K0062 + (-944)
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 1.122 Lane Km
Allocation : Php 7.290 Million

TO :

CSR Jct - pola Road,
K0062 + (-1003) - K0062 + (-692.5)
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 1.201 Lane Km
Allocation : Php 7.290 Million



July 16, 2021 FY 2021 GAA WIN1F06374 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310103100700000
Project ID : P00505607LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

FROM :

CSR Jct - Pola Road,
K0063 + 450 - K0063 + 622
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 0.688 Lane Km
Allocation : Php 4.465 Million

TO :

CSR Jct - Pola oad,
K0063 + 450 - K0063 + 628.75
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 0.715 Lane Km
Allocation : Php 4.465 million

July 16, 2021 FY 2021 GAA WIN1F06346 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No.: 310103100701000
Project ID : P00505608LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

FROM :

CSR Jct - Pola Road,
K0069 + 995 - K0070 + 150
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 0.620 Lane Km
Allocation : Php 4.021 Million

TO :

CSR Jct - Pola Road,
K0069 ++995 - K0070 + 156
Physical Target - CW1 - Preventive maintenance of Road :
Asphalt Overlay - 0.644 Lane Km
Allocation : Php 4.021 Million
July 16, 2021 FY 2021 GAA WIN1E02603 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of road (Opening) Elizalde to New Barili, Maco, Mararag, Golden Valley, Mabini, Davao de Oro (Phase 2)
Physical Target:
CW1: 2.084 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Concrete Road)
EAO: P 700,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of road (Opening) Elizalde to New Barili, Maco, Mararag, Golden Valley, Mabini, Davao de Oro (Phase 2)
Physical Target:
CW1: 4.042 lane km (Construction of Gravel Road)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Gravel Road)
EAO: P 700,000.00
July 15, 2021 FY 2021 GAA WIN1F06251 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Palawan 3rd District Engineering Office
UACS No. : 300103203517000
Project ID : P00557144LZ

LOCAL PROGRAM

Local - Buildings and Other Structures - Multipurpose/ Facilities
Construction/Repair/Rehabilitation/Improvement of Various
Infrastructures including Local Projects

FROM :

Construction of Multi-Purpose Building,
Manuel Austria Memorial Elementary School,
Barangay Maruyugon, Puerto Princes City, Palawan
Physical Target - CW1 - Construction of Multi-Purpose Building
1 Building
Allocation : Php 4.00 Million

TO :

Construction of Multi-Purpose Building,
Francisco Austria Memorial Elementary School,
Barangay Maruyugon, Puerto Princesa City, Palawan
Physical Target - CW1 - Construction of Multi-Purpose Building
1 Building
Allocation : Php 4.00 Million
July 15, 2021 2021 310212100186000 GAA FY 2021 January 25, 2021 Region II Quirino District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Tertiary Roads - Jct Victoria - Maddela - Alicia - Kasibu Bdry Rd - K0412+943 - K0413+958
July 15, 2021 FY 2021 GAA WIN1F06223 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Occidental District Engineering Office
UACS No. : 300103203454000
Project ID : P00557081LZ

LOCAL PROGRAM

Local Infrastructure Program - Buildings and Other Structures -
Multipurpose/Facilities

FROM :

Construction of Multi-Purpose Building ( Barangay Hall ),
at Barangay Bansalay, Mamburao, Occidental Mindoro
Physical Target - CW1 - Construction of Multi-Purpose Building
1 Number of Building
Allocation : Php 2.00 Million

TO :

Construction of Multi-Purpose Building ( Barangay Hall ),
at Barangay Balansay, Mamburao, Occidental Mindoro
Physical Target - CW1 - Construction of Multi-Purpose BUilding
1 Number of Building
Allocation : Php 2.00 Million
July 15, 2021 FY 2021 GAA WIN1F06186 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Romblon District Engineering Office
UACS No. : 310202100820000
Project ID : P00505138LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Tablas Circumferential Road,
K0026 + 546.21 - K0026 + 580,
K0029 + 000 - K0029 + 765
Physical Target - CW1 - Road Widening : 1.598 Lane Km
Allocation : Php 28.00 Million

TO :

Tablas Circumferential Road,
K0026 + 546.21 - K0026 +580,
K0029 + 000 - K0029 + 682.21
Physical Target - CW1 - Road Widening : 1.432 Lane Km
Allocation : Php 28.00 Million
July 15, 2021 FY 2021 GAA WIN1F06167 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Romblon District Engineering Office
UACS No. : 310208100345000
Project ID : P00505161LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement -
Secondary Roads

FROM :

Tablas Circumferential Road,
K0001 + 243 - K0001 + 477,
K0010 + 000 - K0011 + 145,
K0011 + 182 - K0011 + 335,
K0011 + 351 - K0011 + 374
Physical Target - CW1 - Off-Carriageway Improvement :
Shoulder Paving/Construction -
4,656 sq. m.
Allocation : Php 13.965 Million

TO :

Tablas Circumferential Road,
K0001 + 243 - K0001 + 536,
K0009 + 991.80 - K0011 + 133
Physical target - CW1 - Off-Carriageway Improvement :
Shoulder Paving/Construction -
3,427.71 sq. m.
Allocation : Php 13.965 Million
July 15, 2021 FY 2021 GAA WIN1E02583 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Agusan River, Purok 3 Brgy.Osmeña to Purok 1, Poblacion Compostela, Davao de Oro (Sta. 1+000.000 - Sta. 1+780.000 RS)
Physical Target:
CW1: 342.650 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 48,232,000.00
CW1: P 47,267,360.00 (Construction of Flood Mitigation Structure)
EAO: P 964,640.00

TO: OO2: Protect Lives and Properties - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Agusan River, Purok 3 Brgy.Osmeña to Purok 1, Poblacion Compostela, Davao de Oro (Sta. 1+156.520 - Sta. 1+499.170 RS)
Physical Target:
CW1: 342.650 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 48,232,000.00
CW1: P 47,267,360.00 (Construction of Flood Mitigation Structure)
EAO: P 964,640.00
July 15, 2021 FY 2021 GAA WIN1E02582 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1817+934 - K1819+609
Physical Target:
CW1: 3.334 lane km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Road Widening)
EAO: P 1,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1817+578 - K1819+226
Physical Target:
CW1: 3.280 lane km (Road Widening)
ROW: 32,800 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 44,000,000.00 (Road Widening)
ROW: P 5,000,000.00 (ROW Acquisition)
EAO: P 50,000.00
July 15, 2021 FY 2021 GAA WIN1E02586 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of MPB (Brgy. Hall) Panoraon, Maco, Davao de Oro
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,860,000.00 (Construction of Multi-Purpose Building)
EAO: P 140,000.00

TO: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of MPB (Brgy. Hall) Panoraon, Maco, Davao de Oro
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,860,000.00 (Construction of Multi-Purpose Building)
EAO: P 140,000.00
July 15, 2021 FY 2021 GAA WIN1E02557 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1496+000 - K1497+074
Physical Target:
CW1: 2.148 lane km (Road Widening)
Allocation:
TOTAL: P 33,502,000.00
CW1: P 32,831,960.00 (Road Widening)
EAO: P 670,040.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1496+104 - K1497+454
Physical Target:
CW1: 2.700 lane km (Road Widening)
ROW: 27,000 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 33,502,000.00
CW1: P 31,331,960.00 (Road Widening)
ROW: P 1,500,000.00 (ROW Acquisition)
EAO: P 670,040.00
July 15, 2021 FY 2021 GAA WIN1E02570 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: Local Program - Water Management Facilities - Water Supply - Local Infrastructure Program
Concreting of Water System Level II, Barangay Darong, Sta. Cruz, Davao del Sur
Physical Target:
CW1: 1 water system (Construction of Water Supply Systems)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Water Supply Systems)
EAO: P 30,000.00

TO: Local Program - Water Management Facilities - Water Supply - Local Infrastructure Program
Construction of Water System Level II, Barangay Darong, Sta. Cruz, Davao del Sur
Physical Target:
CW1: 1 water system (Construction of Water Supply Systems)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Water Supply Systems)
EAO: P 30,000.00
July 15, 2021 FY 2021 GAA WIN1F06153 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Romblon District Engineering Office
UACS No. : 310208100346000
Project ID : P00505139LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement -
Secondary Roads

FROM :

Tablas Circumferential Road,
K0016 + 1075 - K0017 + 114,
K0017 + 250 - K0017 + 876
Physical Target - CW1 - Off-Carriageway Improvement :
Shoulder Paving/Construction -
2,241 sq. m.
Allocation : Php 6.723 Million

TO :

Tablas Circumferential Road
K0016 + 1075 - K0017 + 117,
K0017 + 237 - K0018 + 023
Physical Target - CW1 - Off-Carriageway Improvement :
Shoulder Paving/Construction
2,307.98 sq. m.
Allocation : Php 6.723 Million
July 15, 2021 FY 2021 GAA WIN1E02571 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Secondary Roads
Ma-a Rd - K1509+(-300) - K1509+080,
K1509+557 - K1509+846, K1511+054 - K1511+103
Physical Target:
CW1: 633.750 sq. m. (Off-Carriageway Improvement: Shoulder Paving / Construction)
Allocation:
TOTAL: P 2,051,000.00
CW1: P 2,009,980.00 (Off-Carriageway Improvement: Shoulder Paving / Construction)
EAO: P 41,020.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Secondary Roads
Ma-a Rd - K1509+(-300) - K1509+070, K1509+557 - K1509+859,
K1510+191 - K1510+240, K1511+040 - K1511+105,
K1511+161 - K1511+230, K1510+706 - K1510+742
Physical Target:
CW1: 1,671.97 sq. m. (Off-Carriageway Improvement: Shoulder Paving / Construction)
Allocation:
TOTAL: P 2,051,000.00
CW1: P 2,009,980.00 (Off-Carriageway Improvement: Shoulder Paving / Construction)
EAO: P 41,020.00
July 15, 2021 FY 2021 GAA WIN1E02558 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concrete Road, 2nd Street, Ecoland Phase 1, Barangay Bucana, Davao City
Physical Target:
CW1: 1.046 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 6,000,000.00
CW1: P 5,880,000.00 (Construction of Concrete Road)
EAO: P 120,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concrete Road, 2nd Street, Ecoland Phase 1, Barangay Bucana, Davao City
Physical Target:
CW1: 0.534 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 6,000,000.00
CW1: P 5,880,000.00 (Construction of Concrete Road)
EAO: P 120,000.00
July 15, 2021 2021 WIN1E02337 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Butuan City District Engineering Office
UACS No. : 310102100789000
Project ID: P00501880MN

OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads

FROM:

Mayor Democrito D. Plaza II Ave - K1247 + 057 - K1247 + 558

Type of Work:
CW1- Preventive Maintenance of Road: Concrete Reblocking

Physical Target:
CW1- 1.002 Lane Km

Allocation:
TOTAL: P 4,800,000
CW1: P 4,704,000
EAO: P 96,000

Unit Cost:
CW1: P 4,694,610.78/Lane Km

TO:

Mayor Democrito D. Plaza II Ave - K1247 + 000.00 -K1247 + 022.50, K1247 + 067.50 - K1247 + 130.50, K1247 + 351.00 - K1247 + 373.50, K1247 + 483.00 - K1247 + 618

Type of Work:
CW1- Preventive Maintenance of Road: Concrete Reblocking

Physical Target:
CW1- 0.486 Lane Km

Allocation:
TOTAL: P 4,800,000
CW1: P 4,704,000
EAO: P 96,000

Unit Cost:
CW1: P 9,679,012.35/Lane Km
July 15, 2021 2021 WIN1F06518 GAA FY 2021 February 11, 2021 Region VIII Leyte 3rd District Engineering Office
Convergence and Special Support Program

Special Road Fund-Motor Vehicle User’s Charge (MVUC) as per R.A. 11239

AS PER GAA/ORIGINAL:

Preventive Maintenance, Calubian Jct-Sn Isidro- Tabango- Villaba- Palompon Rd., K1056+150- K1058+355, Villaba, Leyte

Physical Target: Allocation:

CW1-Asphalt Overlay: 4.711 Lane Km P 48.250 M

EAO P 1.750 M

Total P 50.00 M

AS MODIFIED:

Preventive Maintenance, Calubian Jct-Sn Isidro- Tabango- Villaba- Palompon Rd., K1056+150- K1058+355, Villaba, Leyte

Physical Target: Allocation:

CW1-Asphalt Overlay: 4.438 Lane Km P 48.250 M

EAO P 1.750 M

Total P 50.00 M
July 15, 2021 2021 WIN1E02338 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Butuan City District Engineering Office
UACS No. : 310106100645000
Project ID: P00501878MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

FROM:

Butuan City-Malaybalay Rd - K1252 + 000 - K1252 + 050

Type of Work:
CW1- Reconstruction to Concrete Pavement

Physical Target:
CW1- 0.100 Lane Km

Allocation:
TOTAL: P 2,107,000
CW1: P 2,064,860
EAO: P 42,140

Unit Cost:
CW1: P 20,648,600/Lane Km

TO:

Butuan City-Malaybalay Rd - K1252 + 030.50 - K1252 + 125.00

Type of Work:
CW1- Reconstruction to Concrete Pavement

Physical Target:
CW1- 0.189 Lane Km

Allocation:
TOTAL: P 2,107,000
CW1: P 2,064,860
EAO: P 42,140

Unit Cost:
CW1: P 10,925,185.19/Lane Km
July 15, 2021 CY 2021 WIN1F06534 UACS NO. UACS No. 320101106446000 February 24, 2021 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 320101106446000
Project ID.: P00525812LZ

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero dela Reina, Barangay 56, Sta. 0+730.50 to
Sta. 0+888.90, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P 328.30/ l.m.
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00


As Modified

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero dela Reina, Barangay 56, (LS) Sta. 0+783.60 to
Sta. 0+843.30; (RS) Sta. 0+792.30 to Sta. 0+852.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P 328.30/ l.m.
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00
WIN1F06534
July 15, 2021 2021 WIN1E02350 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Butuan City District Engineering Office
UACS No. : 310103100773000
Project ID: P00501877MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads

FROM:

Butuan City-Malaybalay Rd - K1258 + 000 - K1259 + 000, K1263 + 330.12 - K1263 + 826

Type of Work:
CW1- Preventive Maintenance of Road: Concrete Reblocking

Physical Target:
CW1- 2.990 Lane Km

Allocation:
TOTAL: P 13,893,000
CW1: P 13,615,140
EAO: P 277,860

Unit Cost:
CW1: P 4,553,558.53/Lane Km

TO:

Butuan City-Malaybalay Rd - K1258 + 000.00 - K1258 + 832.50

Type of Work:
CW1- Preventive Maintenance of Road: Concrete Reblocking

Physical Target:
CW1- 1.665 Lane Km

Allocation:
TOTAL: P 13,893,000
CW1: P 13,615,140
EAO: P 277,860

Unit Cost:
CW1: P 8,177,261.26/Lane Km
July 15, 2021 CY 2021 WIN1F06535 UACS No. 320101106445000 February 24, 2021 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 320101106445000
Project ID.: P00525811LZ

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Vitas, Barangay 94 & 147; Sta. 0+000.00 to
Sta. 0+138.40; Sta. 0+000.00 to Sta. 0+020.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 131.00 l.m.
Unit Cost (P’000) = P 319.198/ l.m.
Allocation (P’000) = P 41,813.66
EAO (P’000) = P 853.34
Total (P’000) = P 42,667.00


As Modified

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Vitas, Barangay 94 & 147; Sta. 0+000.00 to
Sta. 0+131.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 131.00 l.m.
Unit Cost (P’000) = P 319.198/ l.m.
Allocation (P’000) = P 41,813.66
EAO (P’000) = P 853.34
Total (P’000) = P 42,667.00
WIN1F06535
July 15, 2021 CY 2021 WIN1F06535 UACS No. 320101106445000 February 24, 2021 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 320101106445000
Project ID.: P00525811LZ

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Vitas, Barangay 94 & 147; Sta. 0+000.00 to
Sta. 0+138.40; Sta. 0+000.00 to Sta. 0+020.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 131.00 l.m.
Unit Cost (P’000) = P 319.198/ l.m.
Allocation (P’000) = P 41,813.66
EAO (P’000) = P 853.34
Total (P’000) = P 42,667.00


As Modified

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Vitas, Barangay 94 & 147; Sta. 0+000.00 to
Sta. 0+131.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 131.00 l.m.
Unit Cost (P’000) = P 319.198/ l.m.
Allocation (P’000) = P 41,813.66
EAO (P’000) = P 853.34
Total (P’000) = P 42,667.00
WIN1F06535
July 15, 2021 CY 2021 WIN1F06536 UACS No. 320101106442000 February 24, 2021 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 320101106442000
Project ID.: P00525808LZ

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Quiapo, Brgy. 394 (Phase II), (LS) Sta. 0+623.00 to
Sta. 0+680.00; (RS) Sta. 0+658.40 to 0+680.00; Sta. 0+685.00 to Sta. 0 0+692.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 92.40 l.m.
Unit Cost (P’000) = P 318.18/ l.m.
Allocation (P’000) = P 29,400.00
EAO (P’000) = P 600.00
Total (P’000) = P 30,000.00


As Modified

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Quiapo, Brgy. 394 (Phase II), (LS) Sta. 0+617.00 to
Sta. 0+617.00 to Sta. 0+646.40; (RS) Sta. 0+616.80 to 0+680.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 92.40 l.m.
Unit Cost (P’000) = P 318.18/ l.m.
Allocation (P’000) = P 29,400.00
EAO (P’000) = P 600.00
Total (P’000) = P 30,000.00
WIN1F06536
July 15, 2021 2021 WIN1E02551 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Butuan City District Engineering Office
UACS No. : 310103100771000
Project ID: P00501875MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads

FROM:

Butuan City-Malaybalay Rd - K1240 + (-367) - K1240 + 000, K1240 + (-448) - K1240 + (-367), K1240 + (-535) - K1240 + (-448), K1240 + 000 - K1240 + 707, K1240 + 727.56 - K1241 + 183

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 4.793 Lane km

Allocation:
TOTAL: P 42,242,000
CW1: P 41,397,160
EAO: P 844,840

Unit Cost:
CW1: P 8,637,003.96/Lane Km

TO:

Butuan City-Malaybalay Rd - K1240 + (-471) - K1241 + 510

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 5.602 Lane km

Allocation:
TOTAL: P 42,242,000
CW1: P 41,397,160
EAO: P 844,840

Unit Cost:
CW1: P 7,389,710.82/Lane Km
July 15, 2021 CY 2021 WIN1F06531 UACS No. 320101106447000 February 24, 2021 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 320101106447000
Project ID.: P00525813LZ

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero dela Reina, Barangay 58, 52, Sta. 0+889.90 to
Sta. 0+944.90 (LS), Sta. 0+841.50 to Sta. 0+944.90 (RS), Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P 328.30/ l.m.
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00


As Modified

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero dela Reina, Barangay 58, 52 (LS) Sta. 0+843.30 to
Sta. 0+903.00: (RS) Sta. 0+852.00 to Sta. 0+911.70, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P 328.30/ l.m.
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00
WIN1F06531
July 15, 2021 FY 2021 GAA WIN1F06303 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310111100297000
Project ID : P00505357LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along National Roads - Secondary Roads

FROM :

Calapan South Road,
K0036 + 486 - K0036 + 741
Physical Target - CW1 - Construction of Drainage Structure
along Road : 255.00 Lineal Meters
Allocation : Php 5.907 Million

TO :

Calapan South Road,
K0062 + 649 - K0063 + 015
Physical Target - CW1 - Construction of Drainage Structure
along Road : 490.00 Lineal Meters
Allocation : Php 5.907 Million
July 15, 2021 2021 WIN1E02555 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Butuan City District Engineering Office
UACS No. : 310103100772000
Project ID: P00501876MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads

FROM:

Butuan City-Malaybalay Rd - K1241 + (-098) - K1241 + 000, K1241 + (-131) - K1241 + (-098), K1241 + (-435) - K1241 + (-131), K1241 + (-490) - K1241 + (-435), K1241 + 000 - K1241 + 270, K1241 + 290 - K1241 + 723

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 3.405 Lane Km

Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000

Unit Cost:
CW1: P 8,634,361.23/Lane Km

TO:

Butuan City-Malaybalay Rd - K1241 + (-235) - K1240 + 257

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 4.282 Lane Km

Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000

Unit Cost:
CW1: P 6,865,950.49/Lane Km
July 15, 2021 2021 WIN1E02566 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Agusan del Sur 2nd District Engineering Office
UACS No. : 320101107175000
Project ID: P00522267MN

OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

FROM:

Construction of Bank Protection of Agusan River Protecting Sta. Josefa Bridge, Sta. 0 + 000 - Sta. 0 + 150, Agusan del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 160.000 Lineal meters

Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000

Unit Cost:
CW1: P 306,250/Lineal meters

TO:

Construction of Bank Protection of Agusan River Protecting Sta. Josefa Bridge, Sta. 0 + 000 - Sta. 0 + 160, Agusan del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 160.000 Lineal meters

Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000

Unit Cost:
CW1: P 306,250 Lineal meters
July 15, 2021 2021 WIN1F06499 GAA FY 2021 January 1, 2021 Region VIII Biliran District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Biliran Circumferential Rd - K1061 + 591 - K1063 + 188

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,446.500 Square Meters
EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Biliran Circumferential Rd - K1061 + 591 - K1062 + 625

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,27100 Square Meters
EAO P 1.00 M

Total P 50.00 M
July 15, 2021 FY 2021 GAA WIN1F06341 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 300203101397000
Project ID : P00534414LZ

Convergence and Special Support Program

Construction/Improvement of Access Roads leading to
Declared Tourism Destinations

FROM :

Concreting of Purok 4 Sto. Nino Road leading to Ombo Falls
via bato Ningning Site, Palawan
Physical Target - CW1 - Construction of Concrete Road :
8.40 Lane Km
Allocation : Php 105.00Million

TO :

Concreting of Purok 4, Sto. Nino Road leading to Ombo Falls
via Bato ningning Site, Palawan
Physical Target - CW1 - Construction of Concrete Road :
3.83 Lane Km
Allocation : Php 105.00 Million
July 15, 2021 2021 WIN1E02584 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Dinagat Islands District Engineering Office
UACS No. : 300116204620000
Project ID: P00550970MN

Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road, Sta. Cruz to Santiago (Lauban to P2 Barangay Santiago), Barangay Sta. Cruz to Barangay Santiago, Loreto, Dinagat Islands

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 1.440 Lane Km

Allocation:
TOTAL: P 18,000,000
CW1: P 17,640,000
EAO: P 360,000

Unit Cost:
CW1: P 12,250,000/Lane Km

TO:

Construction of Road, Sta. Cruz to Santiago (Lauban to P2 Barangay Santiago), Barangay Sta. Cruz to Barangay Santiago, Loreto, Dinagat Islands

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Gravel Road

Physical Target:
CW1- 1.710 Lane Km
CW2- 1.240 Lane Km

Allocation:
TOTAL: P 18,000,000
CW1: P 16,522,250
CW2: P 1,117,750
EAO: P 360,000

Unit Cost:
CW1: P 9,662,134.50/Lane Km
CW2: P 901,410.48/Lane Km
July 15, 2021 FY 2021 GAA WIN1F06370 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 300106200565000
Project ID : P00561416LZ

LOCAL PROGRAM

Flood Control and Drainage - Flood Control Structures/Facilities -
Construction/Repair/Rehabilitation/Improvement of Various
Infrastructure including Local Projects

FROM :

Construction of Pili Flood Control, Looc, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
0 Lineal meter
Allocation : Php 90.00 Million

TO :

Construction of Pili Flood Control, Looc, Romblon
Physical Target - CW1 - 480.0 Lineal meter
Allocation : Php 90.00 Million

July 15, 2021 FY 2021 GAA WIN1F06369 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 300106200574000
Project ID : P00561447LZ

Flood Control and Drainage - Flood Control Structures/Facilities -
Construction/Repair/Rehabilitation/Improvement of Various
Infrastructure including Local Projects

FROM :

Construction of Tuburan Flood Control,
Tuburan, Odiongan, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
0.00 Lineal meter
Allocation : Php 90.00 Million

TO :
Construction of Tuburan Flood Control,
Tuburan, Odiongan, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
486.00 Lineal meter
Allocation : Php 90.00 Million
July 15, 2021 FY 2021 GAA WIN1E02437 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1484+236 - K1487+000
Physical Target:
CW1: 5.528 Lane km (Road Widening)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Road Widening)
EAO: P 1,050,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1484+236 - K1485+276
Physical Target:
CW1: 2.080 Lane km (Road Widening)
ROW: 15,600.00 Sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 26,520,130.00 (Road Widening)
ROW: P 2,429,870.00 (ROW Acquisition)
EAO: P 1,050,000.00
July 15, 2021 FY 2021 GAA WIN1E02424 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Mabuhay-Panalum-Paquibato Rd -
K1528+288 - K1528+591, K1528+684 - K1530+100
Physical Target:
CW1: 3.680 Lane km (Road Widening)
Allocation:
TOTAL: P 124,634,000.00
CW1: P 120,271,810.00 (Road Widening)
EAO: P 4,362,190.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Mabuhay-Pañalum-Paquibato Rd -
K1524+811 - K1525+470, K1528+1032 - K1530+596
Physical Target:
CW1: 4.966 Lane km (Road Widening)
ROW: 37,245.00 Sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 124,634,000.00
CW1: P 85,139,055.00 (Road Widening)
ROW: P 17,971,195.00 (ROW Acquisition)
EAO: P 3,739,750.00
EXC: P 17,784,000.00
July 14, 2021 CY 2021 WIN1F06520 UACS NO. 320101106443000 March 11, 2021 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 320101106443000
Project ID.: P00525809LZ

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de San Miguel Barangay 384 & Barangay 385,
Sta. 2+140.00 to Sta. 2+260.00; Sta. 2+081.60 to Sta. 2+120.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 152.80 l.m.
Unit Cost (P’000) = P 320.68/ l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00


As Modified

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de San Miguel Barangay 384 & Barangay 385,
Sta. 2+140.00 to Sta. 2+260.00; Sta. 1+930.40 to Sta. 1+963.20, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 152.80 l.m.
Unit Cost (P’000) = P 320.68/ l.m. P 320,680/LM
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN1F06520
July 14, 2021 CY 2021 WIN1F06522 UACS NO. 320101106444000 March 11, 2021 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 320101106444000
Project ID.: P00525810LZ

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de San Miguel Barangay 386 (Phase I),
Sta. 1+461.00 to Sta. 0+560.00; Sta. 1+660.00 to Sta. 1+720.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 152.80 l.m.
Unit Cost (P’000) = P 320.68/ l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00


As Modified

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de San Miguel Barangay 386 (Phase I),
Sta. 1+467.20 to Sta. 1+560.00; Sta. 1+660.00 to Sta. 1+720.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 152.80 l.m.
Unit Cost (P’000) = P 320.68/ l.m. P 320,680/LM
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN1F06522
July 14, 2021 FY 2021 GAA WIN1E02536 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Brgy. Tibungco, Bunawan District, Davao City, Davao del Sur
Physical Target:
CW1: 0.500 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Concrete Road)
EAO: P 50,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Brgy. Tibungco, Bunawan District, Davao City, Davao del Sur
Physical Target:
CW1: 0.692 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Concrete Road)
EAO: P 50,000.00
July 14, 2021 FY 2021 GAA WIN1E02529 FY 2021 GAA RA 11518 January 1, 2020 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Surigao-Davao Coastal Rd - K1825+460 - K1825+747
Physical Target:
CW1: 574.000 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 17,086,000.00
CW1: P 16,744,280.00 (Construction of Drainage Structure along Road)
EAO: P 341,720.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Surigao-Davao Coastal Rd - K1826+683.72
Physical Target:
CW1: 256.000 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 17,086,000.00
CW1: P 16,744,280.00 (Construction of Drainage Structure along Road)
EAO: P 341,720.00
July 14, 2021 FY 2021 GAA WIN1E02539 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Carmen-DAPECOL Cmpd Rd - K1473+479 - K1475+000
Physical Target:
CW1: 3.012 lane km (Road Widening)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Road Widening)
EAO: P 400,00.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Carmen-DAPECOL Cmpd Rd - K1472+515 - K1472+850
Physical Target:
CW1: 0.670 lane km (Road Widening)
CW2: 0.670 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 11,654,958.00 (Road Widening)
CW2: P 7,945,042.00 (Reconstruction to Concrete Pavement)
EAO: P 400,00.00
July 14, 2021 FY 2021 GAA WIN1E02552 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
NRJ Sagayen-Sonlon Road connecting Asuncion Overland Transport Terminal in support of Coconut, Banana and Rice Industries, Tagum City, Davao del Norte
Physical Target:
CW1: 0.414 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 4,500,000.00
CW1: P 4,410,000.00 (Construction of Concrete Road)
EAO: P 90,000.00

TO: Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
NRJ Sagayen-Sonlon Road connecting Asuncion Overland Transport Terminal in support of Coconut, Banana and Rice Industries, Asuncion, Davao del Norte
Physical Target:
CW1: 0.440 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 4,500,000.00
CW1: P 4,410,000.00 (Construction of Concrete Road)
EAO: P 90,000.00
July 14, 2021 FY 2021 GAA WIN1E02528 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Rehabilitation of Multi-Purpose Building (Gym), Barangay Del Pilar, Maco, Davao de Oro
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00

TO: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Rehabilitation of Multi-Purpose Building (Gym), Barangay Del Pilar, Mabini, Davao de Oro
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00
July 14, 2021 FY 2021 GAA WIN1E02553 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Canidkid-New Calape, Phase 2, Montevista, Davao de Oro
Physical Target:
CW1: 2.401 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 24,000,000.00
CW1: P 23,520,000.00 (Construction of Concrete Road)
EAO: P 480,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Canidkid-New Calape, Phase 2, Montevista, Davao de Oro
Physical Target:
CW1: 1.912 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 24,000,000.00
CW1: P 23,520,000.00 (Construction of Concrete Road)
EAO: P 480,000.00
July 14, 2021 FY 2021 GAA WIN1E02548 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd -
K1511+124 - K1512+000, K1512+853 - K1513+068
Physical Target:
CW1: 2.612 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 300,00.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd -
K1511+124 - K1512+000, K1512+853 - K1513+068
Physical Target:
CW1: 2.182 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 300,00.00
July 14, 2021 2021 320102104062000 GAA FY 2021 January 25, 2021 Region II Regional Office II
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers - Construction of Flood Control System, Package 2, Sta. 0+296 - Sta. 0+582 (Upstream), Balasig, Cabagan, Isabela
July 14, 2021 FY 2021 GAA WIN1E02537 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1806+537 - K1807+462
Physical Target:
CW1: 1.978 lane km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Road Widening)
EAO: P 1,000,00.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1806+537 - K1808+152
Physical Target:
CW1: 3.330 lane km (Road Widening)
ROW: 33,300.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 44,000,000.00 (Road Widening)
ROW: P 5,000,000.00 (ROW Acquisition)
EAO: P 1,000,00.00
July 14, 2021 2021 310109100537000 GAA FY 2021 January 25, 2021 Region II Regional Office II
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Peñablanca - Callao Cave Road K0476+220 - K0476+677, K0477+407 - K0477+590, K0480+024 - K0480+200
July 14, 2021 2021 300211100067000 GAA FY 2021 January 25, 2021 Region II Cagayan 1st District Engineering Office
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Road Construction/ Concreting - Centro Norte - Taligan Road, Gattaran, Cagayan
July 14, 2021 2021 320101106043000 GAA FY 2021 January 25, 2021 Region II Cagayan 1st District Engineering Office
OO2: Protect Lives and Properties Against Major Flood - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction/ Rehabilitation of River Bank Protection for Lower Cagayan River, Sta. Maria, Lal-lo, Cagayan, Sta. 0+000 - Sta. 0+024.40
July 14, 2021 2021 310201100751000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Daang Maharlika (LZ), K0277+250 - K0277+580
July 14, 2021 2021 310204101023000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads - Dupax Del Sur Bypass Road, Nueva Vizcaya
July 14, 2021 2021 310109100640000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Nueva Vizcaya - Pangasinan Road, K0223+150 - K223+190, K0223+230 - K0223+280
July 14, 2021 2021 310108100610000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary Roads - Nueva Vizcaya - Benguet Road - K0242+900 - K0243+100, K0244+000 - K0244+200, K0244+300 - K0244+393
July 14, 2021 2021 310202100774000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Nueva Vizcaya - Benguet Rd - K0251+280.50 - K0251+887.50
July 14, 2021 2021 310109100639000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Tertiary Roads - Aritao - Quirino Road - K0258+405 - K0258+414, K0280+156 - K0280+192, K0286+053 - K0286+058, K0291+180 - K0291+189
July 14, 2021 FY 2021 GAA WIN1E02575 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure along Oregon Creek, Governor Generoso, Davao Oriental
Physical Target:
CW1: 2,000.00 ln. m. (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 75,00,000.00
CW1: P 72,375,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,625,000.00

TO: OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure along Oregon Creek, Governor Generoso, Davao Oriental
Physical Target:
CW1: 3,330.88 ln. m. (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 75,00,000.00
CW1: P 72,375,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,625,000.00
July 14, 2021 2021 310109100641000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Tertiary Roads - Nueva Vizcaya - Pangasinan Road, K0225+730 - K0225+832
July 14, 2021 2021 310203100435000 GAA FY 2021 January 25, 2021 Region II Quirino District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads - Jct Abbag - Nagtipunan - Nueva Vizcaya Rd via Dupax - K0398+600 - K0399+400
July 14, 2021 FY 2021 GAA WIN1E02579 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Road: Asphalt Overlay - Magsaysay Ave - (S01446MN) Chainage 000 - Chainage 118
Physical Target:
CW1: 0.835 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,650,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 350,000.00

TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Road: Asphalt Overlay - Magsaysay Ave - (S01446MN) Chainage 000 - Chainage 118
Physical Target:
CW1: 0.588 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,650,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 350,000.00
July 14, 2021 FY 2021 GAA WIN1E02578 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Sitio Marquez, Purok 6, Barangay San Isidro, Davao City
Physical Target:
CW1: 0.300 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Concrete Road)
EAO: P 30,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Sitio Marquez, Purok 6, Barangay San Isidro, Davao City
Physical Target:
CW1: 0.602 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Concrete Road)
EAO: P 30,000.00
July 14, 2021 2021 310202100776000 GAA FY 2021 January 25, 2021 Region II Quirino District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Cordon - Aurora Bdry Rd (Isabela Bdry - Jct Dumabato) K0365+000 - K0365+533, K0365+587 - K0365+700
July 14, 2021 FY 2021 GAA WIN1E02563 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1823+512 - K1824+527
Physical Target:
CW1: 2.048 lane km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Road Widening)
EAO: P 1,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1825+460 - K1825+972
Physical Target:
CW1: 1.024 lane km (Road Widening)
CW2: 924.00 lm (Construction of Drainage Structure along Road)
ROW: 7,731.20 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 23,679,764.00 (Road Widening)
CW2: P 16,904,476.00 (Construction of Drainage Structure along Road)
ROW: P 8,415,760.00 (ROW Acquisition)
EAO: P 1,000,000.00
July 14, 2021 FY 2021 GAA WIN1E02556 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1456+784 - K1457+469
Physical Target:
CW1: 9,131.30 sq. m. (Off-Carriageway Improvement: Construction of Median/Center Island)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Off-Carriageway Improvement: Construction of Median/Center Island)
EAO: P 400,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1456+600 - K1456+788
Physical Target:
CW1: 4,600.88 sq. m. (Off-Carriageway Improvement: Construction of Bike Lanes)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Off-Carriageway Improvement: Construction of Bike Lanes)
EAO: P 400,000.00
July 13, 2021 FY 2021 GAA WIN1E02527 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Mati-Maragusan Rd - K1523+953 - K1524+228
Physical Target:
CW1: 0.552 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 8,228,000.00
CW1: P 8,063,440.00 (Reconstruction to Concrete Pavement)
EAO: P 164,560.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Mati-Maragusan Rd - K1524+128 - K1524+228
Physical Target:
CW1: 0.200 Lane Km (Reconstruction to Concrete Pavement)
CW2: 400.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 8,228,000.00
CW1: P 4,184,776.00 (Reconstruction to Concrete Pavement)
CW2: P 3,878,664.00 (Construction of Road Slope Protection Structure)
EAO: P 164,560.00
July 13, 2021 2021 WIN1F06428 GAA FY 2021 February 2, 2021 Region VIII Regional Office VIII
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods

Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Basey Tide Embankment, Basey, Samar

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 36.46735 M
Structure: 223.00 Lineal Meters

EAO P 1.32265 M

Total P 37.790 M

AS MODIFIED:

Construction of Basey Tide Embankment, Basey, Samar

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 36.46735 M
Structure: 73.00 Lineal Meters

EAO P 1.32265 M

Total P 37.790 M
July 13, 2021 FY 2021 GAA WIN1E02545 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Mati-Maragusan Rd -
K1503+670 - K1503+700, K1504+081 - K1504+122,
K1522+551 - K1522+560, K1523+063 - K1523+083.50
Physical Target:
CW1: 3,125.75 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 30,800,000.00
CW1: P 30,184,000.00 (Construction of Road Slope Protection Structure)
EAO: P 616,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Mati-Maragusan Rd -
K1502+510 - K1502+560, K1503+650 - K1503+700,
K1504+080 - K1504+110, K1522+550 - K1522+560,
K1523+045 - K1523+075, K1523+290 - K1523+310
Physical Target:
CW1: 934.622 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 30,800,000.00
CW1: P 30,184,000.00 (Construction of Road Slope Protection Structure)
EAO: P 616,000.00
July 13, 2021 FY 2021 GAA WIN1E02538 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building, Brgy. Tibanan, Governor Generoso, Davao Oriental
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Multi-Purpose Building)
EAO: P 100,000.00

TO: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building, Brgy. Tibanban, Governor Generoso, Davao Oriental
Physical Target:
CW1: 2 buildings (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Multi-Purpose Building)
EAO: P 100,000.00
July 13, 2021 2021 WIN1F06507 GAA FY 2021 January 1, 2021 Region VIII Northern Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0809 + 417 - K0809 + 917

Physical Target: Allocation:

CW1-Road Widening: 1.00 Lane Km P 19.600 M

EAO P 0.400 M

Total P 20.00 M

AS MODIFIED:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd, K0809+000 – K0809+480

Physical Target: Allocation:

CW1-Road Widening: 0.96 Lane Km P 19.600 M

EAO P 0.400 M

Total P 20.00 M
July 13, 2021 FY 2021 GAA WIN1E02534 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building (Tribal Hall), Gupitan, Kapalong, Davao de Oro
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00

TO: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building (Tribal Hall), Gupitan, Kapalong, Davao del Norte
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00
July 13, 2021 2021 WIN1F06497 GAA FY 2021 January 1, 2021 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Justice Romualdez St - (S00005LT) – Chainage 200 – Chainage 554

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 19.600 M
along Road: 708 Lineal Meters

EAO P 0.400 M

Total P 20.00 M

AS MODIFIED:

Justice Romualdez St - (S00005LT) – Chainage 200 – Chainage 872

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 19.600 M
along Road: 672 Lineal Meters

EAO P 0.400 M

Total P 20.00 M

July 13, 2021 2021 WIN1F06514 GAA FY 2021 January 1, 2021 Region VIII Northern Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0810 + 640 - K0810 + 801

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 53.075 M
Structure: 5,500.00 Square Meters
EAO P 1.925 M

Total P 55.00 M

AS MODIFIED:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0810 + 650 - K0810 + 801

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 53.075 M
Structure: 2,567.00 Square Meters
EAO P 1.925 M

Total P 55.00 M
July 13, 2021 FY 2021 GAA WIN1E02554 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
R Castillo St - K1504+(-566) - K1504+000, K1504+(-607) - K1504+(-566)
Physical Target:
CW1: 1.296 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 14,232,000.00
CW1: P 13,947,360.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 284,640.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
R Castillo St - K1504+(-566) - K1504+000
Physical Target:
CW1: 1.132 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 14,232,000.00
CW1: P 13,947,360.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 284,640.00
July 13, 2021 FY 2021 GAA WIN1E02549 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Talomo River, Davao City (Sta. 5+400 - Sta. 6+110 Right Bank)
Physical Target:
CW1: 813.647 ln. m. (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 70,00,000.00
CW1: P 67,550,000.00 (Construction of Flood Mitigation Structure)
EAO: P 3,450,000.00

TO: OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Talomo River, Davao City (Sta. 5+330 - Sta. 5+595 Right Bank)
Physical Target:
CW1: 265.00 ln. m. (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 70,00,000.00
CW1: P 67,550,000.00 (Construction of Flood Mitigation Structure)
EAO: P 3,450,000.00