June 20, 2018 |
FY - 2018 |
WIN8F05562 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
Local Programs: Local Infrastructure Program
Local - National Roads and Bridges - Local Roads
- Local Infrastructure Program
FROM:
Construction of Road at Sitio Timbaon, Brgy. Tulay,
Odiongan, Romblon
CW1: 0.704 lane km ( Construction of Concrete Road )
Allocation: 4,000,000 Php
TO:
Construction of Road at Sitio Timbaon, Brgy. Tulay,
Odiongan, Romblon
CW1: 0.446 lane km ( Construction of Concrete Road )
Allocation: 4,000,000 Php |
June 20, 2018 |
FY 2018 GAA |
WIN8C03212 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System
Network Development Program - Construction of By-Pass and Diversion Roads
Alternate Road from Region XI to Region X (Jct Davao City Diversion Road-Catalunan Grande-Talandag-Sumimao-Panalum-Tapak-Cabanglasan-Aglayan, Malaybalay), Davao City
Physical Target:
CW1: 0.800 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 16,000,000.00
CW1: P 15,680,000.00 (Construction of Concrete Road)
EAO: P 320,000.00
TO: OO1: Ensure Safe and Reliable National Road System
Network Development Program - Construction of By-Pass and Diversion Roads
Alternate Road from Region XI to Region X (Jct Davao City Diversion Road-Catalunan Grande-Talandag-Sumimao-Panalum-Tapak-Cabanglasan-Aglayan, Malaybalay), Davao City
Physical Target:
CW1: 0.776 lane km (Construction of Concrete Road)
CW2: 114.48 square meters (Construction of Concrete Bridge)
CW3: 3,880 square meters (ROW Acquisition)
Allocation:
TOTAL: P 16,000,000.00
CW1: P 6,490,320.00 (Construction of Concrete Road)
CW2: P 6, 069,680.00 (Construction of Concrete Bridge)
CW3: P 3,120,000.00 (ROW Acquisition)
EAO: P 320,000.00 |
June 20, 2018 |
FY 2018 GAA |
WIN8C03220 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd - K1501 + 229 - K1501 + 267,
K1510 + 018 - K1510 + 041, K1510 + 081 - K1510 + 115, K1510 + 669 - K1510 + 704
Physical Target:
CW1: 4,950.00 Square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd - K1510 + 018 - K1510 + 041,
K1510 + 081 - K1510 + 115, K1510 + 669 - K1510 + 704,
K1510 + 920 - K1510 + 960
Physical Target:
CW1: 6,739.30 Square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00 |
June 20, 2018 |
FY 2018 GAA |
WIN8C03225 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2 : Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection along Lasang River, Pañalum Section, Protecting Pañalum Bridge (Sta. 38+798 - Sta. 39+293), Right Bank, Davao City
Physical Target:
CW1: 496 Lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
TO: OO2 : Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection along Lasang River, Pañalum Section, Protecting Pañalum Bridge,(Sta. 40+231 – Sta. 40+785, Sta. 40+924 – Sta. 41+078), Right Bank, Davao City
Physical Target:
CW1: 708 Lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00 |
June 20, 2018 |
FY 2018 GAA |
WIN8C03227 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2 : Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection along Lasang River, Pañalum Section, Protecting Pañalum Bridge (Sta. 38+798 - Sta. 39+290), Left Bank, Davao City
Physical Target:
CW1: 496 Lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
TO: OO2 : Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection along Lasang River, Pañalum Section, Protecting Pañalum Bridge, Sta. 38+999 – Sta. 39+464, Sta. 39+992 – Sta. 40+231), Left Bank, Davao City
Physical Target:
CW1: 704 Lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00 |
June 20, 2018 |
FY 2018 GAA |
WIN8C03238 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1 : Ensure Safe and Reliable National Road System
Network Development Program - Road Widening -
Secondary Roads
Construction of Jct. Davao-Cotabato Old Road (Bago Gallera Section), leading to Philippine Coconut Authority (PCA), Davao City
Physical Target:
CW1: 1.800 lane km (Road Widening)
Allocation:
TOTAL: P 89,100,000.00
CW1: P 85,981,500.00 (Road Widening)
EAO: P 3,118,500.00
TO: OO1 : Ensure Safe and Reliable National Road System
Network Development Program - Road Widening -
Secondary Roads
Construction of Jct. Davao-Cotabato Old Road (Bago Gallera Section), leading to Philippine Coconut Authority (PCA), Davao City
Physical Target:
CW1: 2.426 lane km (Road Widening)
ROW: 7,278 Square Meters (ROW Acquisition)
Allocation:
TOTAL: P 89,100,000.00
CW1: P 49,591,500.00 (Road Widening)
ROW: P 36,390,000.00 (ROW Acquisition)
EAO: P 3,118,500.00 |
June 20, 2018 |
FY 2018 GAA |
WIN8C03214 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program
Flood Control and Drainage
Drainage/Protection Works - Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects
Improvement/Rehabilitation of Drainage along
ABS-CBN Quimpo Blvd. Diversion Road (Jct. Tulip Drive-Jct. Ecoland Terminal), Davao City
Physical Target:
CW1: 2,040 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 61,200,000.00
CW1: P 59,058,000.00 (Construction of Drainage Structure)
EAO: P 2,142,000.00
TO: Local Program
Flood Control and Drainage
Drainage/Protection Works - Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects
Improvement/Rehabilitation of Drainage along
ABS-CBN Quimpo Blvd. Diversion Road (Jct. Tulip Drive-Jct. Ecoland Terminal), Davao City
Physical Target:
CW1: 2,609 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 61,200,000.00
CW1: P 59,058,000.00 (Construction of Drainage Structure)
EAO: P 2,142,000.00 |
June 20, 2018 |
FY 2018 GAA |
WIN8C03226 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program
Local Roads and Bridges - Local Roads – Local Infrastructure Program
Construction of Road, Brgy. Dumoy, Davao City
Physical Target:
CW1: 1.000 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,850,000.00 (Construction of Concrete Road)
EAO: P 150,000.00
TO: Local Program
Local Roads and Bridges - Local Roads – Local Infrastructure Program
Construction of Road, Brgy. Dumoy, Davao City
Physical Target:
CW1: 3.840 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,850,000.00 (Construction of Concrete Road)
EAO: P 150,000.00 |
June 20, 2018 |
FY 2018 GAA |
WIN8C03218 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program
Local Roads and Bridges - Local Roads – Local Infrastructure Program
Construction of Road, Brgy. Bago Gallera, Davao City
Physical Target:
CW1: 1.000 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 11,000,000.00
CW1: P 10,890,000.00 (Construction of Concrete Road)
EAO: P 110,000.00
TO: Local Program
Local Roads and Bridges - Local Roads – Local Infrastructure Program
Construction of Road, Brgy. Bago Gallera, Davao City
Physical Target:
CW1: 2.986 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 11,000,000.00
CW1: P 10,890,000.00 (Construction of Concrete Road)
EAO: P 110,000.00 |
June 19, 2018 |
FY - 2018 |
WIN8F05571 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
Local Programs: Local Infrastructure Program
Local - National Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Gravel Road -
Construction of barangay Punta - Barangay Limon Sur
Jct Looc - Odionga Road, Romblon
CW1: 4.072 lane km ( Construction of Gravel Road )
Allocation: 80,000,000 Php
TO:
Construction of Gravel Road -
Construction of Barangay Punta - Barangay Limon Sur
Jct Looc - Odiongan Road, Romblon
CW1: 5.71 lane km ( Construction of Gravel Road )
Allocation: 80,000,000 Php |
June 19, 2018 |
FY - 2018 |
WIN8F05563 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
Local Programs: Local Infrastructure Program
Local - National Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Roads -
Brgy. Tanagan and Brgy. Victoria,
San Andres, Romblon
CW1; 1.759 lane km ( Construction of Concrete Road )
Allocation; 10,000,000php
TO:
Construction of Roads -
Brgy. Tanagan and Brgy. Victoria,
San Andres, Romblon
CW1: 1.320 lane km ( Construction of Concrete Road )
Allocation; 10,000,000 Php |
June 19, 2018 |
FY - 2018 |
WIN8F05570 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
Local Programs: Local Infrastructure Program
Local - National Roads and Bridges - Local Roads
Construction/Repair/rehabilitation/Improvement of
Various Infrastructure including local Projects
FROM:
Construction of Gravel Road - Construction of Road,
Sitio Bariri, Hinag-oman, Ferrol, Romblon
CW1: 5.040 lane km ( Construction of Gravel Road )
Allocation: 85,500,000 Php
TO:
Construction of Gravel Road - Construction of Road,
Sitio Bariri, Hinag-oman, Ferrol, Romblon
CW1: 6.12 lane km ( Construction of Gravel Road )
Allocation: 85,500,000 Php |
June 19, 2018 |
FY 2018 GAA |
WIN8C03241 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road – Catalunan Grande – Talandag – Sumimao – Panalum – Tapak – Cabangsalan – Aglayan, Malaybalay), Package B, incl. ROW and Bridge, Davao City
Physical Target:
CW1: 14.704 Lane Km (Construction of Gravel Road)
CW2: 763.2 sq. m. (Construction of Concrete Bridge)
ROW: 28,046.512 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 157,179,200.00 (Construction of Gravel Road)
CW2: P 109,045,000.00 (Construction of Concrete Bridge)
ROW: P 23,275,800.00
EAO: P 10,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road – Catalunan Grande – Talandag – Sumimao – Panalum – Tapak – Cabangsalan – Aglayan, Malaybalay), Package B, incl. ROW and Bridge, Davao City
Physical Target:
Physical Target:
CW1: 6.251 Lane Km (Construction of Gravel Road)
CW2: 429.3 sq. m. (Construction of Concrete Bridge)
ROW: 28,046.512 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 157,179,200.00 (Construction of Gravel Road)
CW2: P 109,045,000.00 (Construction of Concrete Bridge)
ROW: P 23,275,800.00
EAO: P 10,500,000.00
|
June 19, 2018 |
FY 2018 |
WIN8C03208 |
UACS No. 300204100068000 |
June 6, 2018 |
Region IX |
Regional Office IX |
UACS No. 300204100068000
Project ID: P00230035MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
Road Network of the Philippine Halal Hub-The Asian Halal Center (Zamboanga Economic Zone), Talisayan, Zamboanga City
Physical Target:
CW-1- Construction of Concrete Road: 8.23 lane km
Unit Cost: P 14,656,743.61/lane km
EAO: P 4,375,000.00
Allocation: P 125,000,000.00 |
June 19, 2018 |
FY 2018 |
WIN8C03201 |
UACS No. 310204100147000 |
June 6, 2018 |
Region IX |
Regional Office IX |
UACS No. 310204100147000
Project ID: P00200300MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Bypass and Diversion Roads
Jct. Nat'l Highway R.T. Lim - Jct. Nat'l Highway Siocon Road, (Surabay - San Fernandino), Zamboanga Sibugay
Physical Target:
CW-1- Construction of Gravel Road: 17.15 lane km
Unit Cost: P 16,588,921.28/lane km
ROW: 16,666.67 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 10,500,000.00
Allocation: P 300,000,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03244 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 2, Davao City
Physical Target:
CW1: 1.884 Lane Km (Construction of Asphalt Road)
CW2: 2,926 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 250,470,000.00
CW1: P 145,444,800.00 (Construction of Asphalt Road)
CW2: P 96,258,750.00 (Construction of Road Slope Protection Structure)
EAO: P 8,766,450.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 2, Davao City
Physical Target:
CW1: 1.140 Lane Km (Construction of Asphalt Road)
CW2: 3,867.36 sq. m. (Construction of Road Slope Protection Structure)
CW3: 0.443 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 250,470,000.00
CW1: P 147,033,933.69 (Construction of Asphalt Road)
CW2: P 89,578,561.93 (Construction of Road Slope Protection Structure)
CW3: P 5,091,054.38 (Construction of Gravel Road)
EAO: P 8,766,450.00
|
June 19, 2018 |
FY 2018 |
WIN8C03200 |
UACS No. 310204100045000 |
June 6, 2018 |
Region IX |
Regional Office IX |
UACS No. 310204100045000
Project ID: P00200295MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Bypass and Diversion Roads
Buenavista - Bolong Coastal Bypass Road, (Mala - Bolong Section) including Bridge, Zamboanga City
Physical Target:
CW-1- Construction of Concrete Road:4.52 lane km
Unit Cost: P 25,012,754.78/ lane km
ROW: 9,141.16 sq.m.
Unit Cost: P 300/sq.m
EAO: P 4,200,000.00
Allocation: P 120,000,000.00 |
June 19, 2018 |
FY 2018 |
WIN8C03180 |
UACS No. 310203100125000 |
June 5, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310203100125000
Project ID: P00200780MN
OO1: Ensure Safe and Reliable National Road
Network Development - Road Widening - Tertiary Roads
Jct. Aurora- Monte Alegre - Jct. Labangan Rd
K1649+400 - K1650+281
Physical Target:
CW-1- Road Widening: 1.762 lane km
Unit Cost: P 22.247 M
EAO: 0.800 M
Allocation: P 40.0 M |
June 19, 2018 |
FY 2018 |
WIN8C03203 |
UACS No. 300104204148000 |
June 5, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300104204148000
Project ID: P00257128MN
Local Program
Local - Buildings and Other Structures
Multipurpose/ Facilities - Local Infrastructure Program
Construction of a Multi-purpose Building (Livelihood Center), Barangay Upper Salug Daku, Mahayag, Zamboanga del Sur
Physical Target:
CW-1- Construction of Multi Purpose Building: 1.0 Building
Unit Cost: P 1.980 M/ Building
EAO: P 0.020 M
Allocation: P 2.0 M |
June 19, 2018 |
FY - 2018 |
WIN8F05573 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
Local Programs: Local Infrastructure Program
Local - National Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Guinhayaan, Looc - Danao Norte -
Sta. Fe National Road leading to Malbog Port, Looc,
Romblon ( Phase 2 )
CW1: 7.590 lane km ( Construction of Gravel Road )
Allocation: 100,000,000 Php
TO:
Construction of Guinhayaan, Looc - Danao Norte -
Sta. Fe National Road leading to Malbog Port, Looc,
Romblon ( Phase 2 )
CW1: 4.25536 lane km ( Construction of Gravel Road )
Allocation: 100,000,000 Php |
June 19, 2018 |
FY 2018 |
WIN8C03202 |
UACS No. 310203100126000 |
June 5, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310203100126000
Project ID: P00201351MN
OO1: Ensure Safe and Reliable National Road
Network Development - Road Widening - Tertiary Roads
Jct. Aurora - Monte Alegre - Labangan Jct Rd
K1640+400 - K1641+320
Physical Target:
CW-1- Road Widening: 1.84 lane km
Unit Cost: P 13.848M/Lane km
EAO: P 0.520 M
Allocation: P 26.0 M |
June 19, 2018 |
FY 2018 GAA |
WIN8C03239 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 6, incl. ROW, Davao City
Physical Target:
CW1: 2.216 Lane Km (Construction of Asphalt Road)
CW2: 4,367 sq. m. (Construction of Road Slope Protection Structure)
ROW: 20,000 sq.m.
Allocation:
TOTAL: P 526,155,000.00
CW1: P 171,075,200.00 (Construction of Asphalt Road)
CW2: P 143,664,375.00 (Construction of Road Slope Protection Structure)
ROW: 193,000,000.00
EAO: P 18,415,425.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 6, incl. ROW, Davao City
Physical Target:
CW1: 1.516 Lane Km (Construction of Asphalt Road)
CW2: 7,332.134 sq. m. (Construction of Road Slope Protection Structure)
CW3: 0.400 Lane Km (Construction of Gravel Road)
ROW: ROW: 20,000 sq.m.
Allocation:
TOTAL: P 526,155,000.00
CW1: P 173,410,201.12 (Construction of Asphalt Road)
CW2: P 138,012,372.97 (Construction of Road Slope Protection Structure)
CW3: P 3,317,000.91 (Construction of Gravel Road)
ROW: 193,000,000.00
EAO: P 18,415,425.00
|
June 19, 2018 |
FY 2018 GAA |
WIN8C03211 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Brgy. Mahayahay, Maragusan – Brgy. Singapore – Brgy. Anitapan – Brgy. Mascareg – Brgy. Cabuyuan, incl. ROW, Mabini Compostela Valley
Physical Target:
CW1: 3.381 Lane Km (Construction of Gravel Road)
CW2: 286 sq.m. (Construction of Concrete Bridge)
ROW: 20,408 sq.m.
Allocation:
TOTAL: P 110,000,000.00
CW1: P 83,955,000.00 (Construction of Concrete Road)
CW2: P 20,265,000.00 (Construction of Concrete Bridge)
ROW: P 1,930,000.00
EAO: P 3,850,000.00
TO: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Brgy. Mahayahay, Maragusan – Brgy. Singapore – Brgy. Anitapan – Brgy. Mascareg – Brgy. Cabuyuan, incl. ROW, Mabini Compostela Valley
Physical Target:
CW1: 4.20 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 110,000,000.00
CW1: P 104,220,000.00 (Construction of Concrete Road)
ROW: P 1,930,000.00
EAO: P 3,850,000.00
|
June 19, 2018 |
FY 2018 |
WIN8C03123 |
UACS No. 310110100040000 |
June 4, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310110100040000
Project ID: P00201582MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation: Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Pagadian City - Zamboanga City Road
K1866+000 - K1866+079
K1866+307 - K1866+366
K1866+497 - K1866+621
K1866+788 - K1867+336
K1867+561 - K1867+727
K1867+851 - K1868+000
K1869+800 - K1870+675
Physical Target:
CW-1- Construction of Drainage Structure along Road: 2,000.00 l.m
Unit Cost: P 6,571.80/l.m.
ROW: 395 sq.m
Unit Cost: P 1,012.66/sq.m.
EAO: P 276,400.00
Allocation: P 13,820,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03179 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program
Local - National Local Roads and Bridges - Local Roads – Local Infrastructure Program
Construction of Road, Brgy. 9-A, Davao City
Physical Target:
CW1: 0.400 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,930,000.00 (Construction of Concrete Road)
EAO: P 70,000.00
TO: Local Program
Local - National Local Roads and Bridges - Local Roads – Local Infrastructure Program
Construction of Road, Brgy. 9-A, Davao City
Physical Target:
CW1: 1.860 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,930,000.00 (Construction of Concrete Road)
EAO: P 70,000.00
|
June 19, 2018 |
FY 2018 |
WIN8C03120 |
UACS No. 300109200206000 |
June 4, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300109200206000
Project ID: P00250069MN
Local Program
Local - Flood Control and Drainage
Drainage/ Protection Works - Local Infrastructure Program
Construction of Drainage System, Kasanyangan, Zamboanga City
Physical Target:
CW-1- Construction of Drainage Structure: 300.00 l.m.
Unit Cost: P 6,600.00/ l.m.
EAO: P 20,000.00
Allocation: P 2,000,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03191 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program
Local - Flood Control and Drainage - Drainage / Protection Works – Local Infrastructure Program
Construction of Drainage System, Brgy. 8-A, Davao City
Physical Target:
CW1: 160 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Drainage Structure)
EAO: P 30,000.00
TO: Local Program
Local - Flood Control and Drainage - Drainage / Protection Works – Local Infrastructure Program
Construction of Drainage System, Brgy. 8-A, Davao City
Physical Target:
CW1: 489 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Drainage Structure)
EAO: P 30,000.00 |
June 19, 2018 |
FY 2018 |
WIN8C03215 |
UACS No. 300109200204000 |
June 6, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300109200204000
Project ID: P00250055MN
Local Program
Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System, Brgy. Boalan, Zamboanga City
Physical Target:
CW-1- Construction of Drainage Structure: 170.00 l.m.
Unit Cost: P 5,882.35/ l.m.
Allocation: P 1,000,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03181 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program
Local - Flood Control and Drainage - Drainage / Protection Works – Local Infrastructure Program
Construction of Drainage System, Brgy. Baliok, Davao City
Physical Target:
CW1: 300 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 6,000,000.00
CW1: P 5,994,000.00 (Construction of Drainage Structure)
EAO: P 60,000.00
TO: Local Program
Local - Flood Control and Drainage - Drainage / Protection Works – Local Infrastructure Program
Construction of Drainage System, Brgy. Baliok, Davao City
Physical Target:
CW1: 1,061 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 6,000,000.00
CW1: P 5,994,000.00 (Construction of Drainage Structure)
EAO: P 60,000.00 |
June 19, 2018 |
FY 2018 |
WIN8C03209 |
UACS No. 300107200219000 |
June 6, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300107200219000
Project ID: P00250064MN
Local Program
Flood Control and Drainage - Flood Control Structures/ Facilities - Local Infrastructure Program
Construction of Flood Control, Brgy. Boalan, Zamboanga City
Physical Target:
CW-1- Construction of Drainage Structure: 44.00 l.m.
Unit Cost: P 22,727.27/ l.m
Allocation: P 1,000,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03184 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: : Local Program
Local - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System, Brgy. Bucana 76-A, Davao City
Physical Target:
CW1: 400 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 8,000,000.00
CW1: P 7,920,000.00 (Construction of Drainage Structure)
EAO: P 80,000.00
TO: Local Program
Local - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System, Brgy. Bucana 76-A, Davao City
Physical Target:
CW1: 1,150 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 8,000,000.00
CW1: P 7,920,000.00 (Construction of Drainage Structure)
EAO: P 80,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03195 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program
Local - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System, Brgy. Maa, Davao City
Physical Target:
CW1: 130 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,980,000.00 (Construction of Drainage Structure)
EAO: P 20,000.00
TO: Local Program
Local - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System, Brgy. Maa, Davao City
Physical Target:
CW1: 236 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,980,000.00 (Construction of Drainage Structure)
EAO: P 20,000.00 |
June 19, 2018 |
FY 2018 |
WIN8C03124 |
UACS No. 300109200207000 |
June 4, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300109200207000
Project ID: P00250070MN
Local Program
Local - Flood Control and Drainage
Drainage/Slope Protection Works - Local Infrastructure Program
Construction of Drainage System, Sangali, Zamboanga City
Physical Target:
CW-1- Construction of Drainage Structure: 110.00 l.m.
Unit Cost: P 18,000.00/ l.m.
EAO: P 20,000.00
Allocation: P 2,000,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03030 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1 : Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Slaughter House Road until F. Torres Bridge, Package 4, Davao City
Physical Target:
CW1: 0.860 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 17,194,000.00
CW1: P 16,850,120.00 (Construction of Concrete Road)
EAO: P 343,880.00
TO: OO1 : Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Slaughter House Road until F. Torres Bridge, Package 4, Davao City
Physical Target:
CW1: 0.664 lane km (Reconstruction to Concrete Pavement)
CW2: 1,640.84 sq.m. (Additional Lane Width)
Allocation:
TOTAL: P 17,194,000.00
CW1: P 9,782,360.00 ((Reconstruction to Concrete Pavement)
CW2: P 7,067,760.00 (Additional Lane Width)
EAO: P 343,880.00 |
June 19, 2018 |
FY 2018 |
WIN8C03217 |
UACS No. 300108200063000 |
June 6, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300108200063000
Projecct ID: P00257487MN
Local Program
Flood Control and Drainage
Drainage/ Protection Works - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage Facilities at Villahermosa Housing, Luyahan, Pasonanca, Zamboanga City
Physical Target:
CW-1- Construction of Drainage Structure: 631.55 l.m.
Unit Cost: P 7,758.68894/ l.m.
EAO: P 100,000.00
Allocation: P 5,000,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03046 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Jct. Davao City Diversion Road-Matina Pangi Road leading to Jaca (Mountain) Resort and DECA Wakeboard Park, Brgy. Matina Pangi, Davao City
Physical Targets:
CW1: 0.510 lane kilometers (Construction of Concrete Road)
CW2: 3.164 lane kilometers (Reconstruction from Paved to Concrete)
Allocation:
TOTAL: P 28,090,000.00
CW1: P 4,272,800.00 (Construction of Concrete Road)
CW2: P 23,255,400.00 (Reconstruction from Paved to Concrete)
EAO: P 561,800.00
TO: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Jct. Davao City Diversion Road-Matina Pangi Road leading to Jaca (Mountain) Resort and DECA Wakeboard Park, Brgy. Matina Pangi, Davao City
Physical Targets:
CW1: 3.392 lane kilometers (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 28,090,000.00
CW1: P 27,528,200.00 (Reconstruction from Paved to Concrete)
EAO: P 561,800.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03243 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Bukidnon – Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon – Laak COmpostela Valley), Package 3, incl. ROW, Davao del Norte
Physical Target:
CW1: 12.912 Lane Km (Construction of Concrete Road)
ROW: 96,840 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800.00 (Construction of Concrete Road)
ROW: 9,148,000.00
EAO: P 10,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Bukidnon – Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon – Laak COmpostela Valley), Package 3, incl. ROW, Davao del Norte
Physical Target:
CW1: 6.8063 Lane Km (Construction of Concrete Road)
ROW: 96,840 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800.00 (Construction of Concrete Road)
ROW: 9,148,000.00
EAO: P 10,500,000.00
|
June 19, 2018 |
FY 2018 |
WIN8C03122 |
UACS No. 310105100166000 |
June 4, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310105100166000
Project ID: P00200117MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation: Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Zamboanga City - Labuan - Limpapa Rd
K1959+598.5 - K1959+639
K1962+185.5 - K1962+799
K1963+841 - K1963+935.5
K1964+266.5 - K1964+738.5
K1966+018 - K 1966+945
K1972+928 - K1973+206
Physical Target:
CW-1- Reconstruction from Paved to Concrete: 0.810 lane km
Unit Cost: P 9,254,345.68/ lane km
EAO: P 152,980.00
Allocation: P 7,649,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03052 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Roxas Avenue - Padre Gomez St. - Palma Gil St. - Camus St. - Legaspi St. leading to People's Park, Davao City
Physical Targets:
CW1: 2.52 Lane Km (Reconstruction from Paved to Concrete)
Allocation:
TOTAL: P 23,080,000.00
CW1: P 22,618,400.00 (Reconstruction from Paved to Concrete)
EAO: P 461,600.00
TO: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Roxas Avenue - Padre Gomez St. - Palma Gil St. - Camus St. - Legaspi St. leading to People's Park, Davao City
Physical Targets:
CW1: 1.09 Lane Km (Reconstruction from Paved to Concrete)
CW2: 664 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 23,080,000.00
CW1: P 7,759,430.00 (Reconstruction from Paved to Concrete)
CW2: P 14,858,970.00 (Construction of Drainage Structure)
EAO: P 461,600.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03240 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Bukidnon – Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon – Laak COmpostela Valley), Package 2, incl. ROW, Davao del Norte
Physical Target:
CW1: 12.912 Lane Km (Construction of Concrete Road)
ROW: 96,840 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800.00 (Construction of Concrete Road)
ROW: 9,148,000.00
EAO: P 10,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Bukidnon – Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon – Laak COmpostela Valley), Package 2, incl. ROW, Davao del Norte
Physical Target:
CW1: 7.17934 Lane Km (Construction of Concrete Road)
ROW: 96,840 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800.00 (Construction of Concrete Road)
ROW: 9,148,000.00
EAO: P 10,500,000.00
|
June 19, 2018 |
FY 2018 |
WIN8C03216 |
UACS No. 310202100001000 |
June 6, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310202100001000
Project ID: P00200706MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Airport Road incl. ROW - (S01208MN)
Chainage 000 - Chainage 493
Physical Target:
CW-1- Road Widening: 0.5352 lane km
Unit Cost: P 31,310,756.93/ lane km
ROW: 72,300.00 sq.m.
Unit Cost: P 1,012.04471/sq.m.
EAO: P 3,261,650.00
Allocation: P 93,190,000.00 |
June 19, 2018 |
FY 2018 |
WIN8G02407 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 3rd District Engineering Office |
Local Roads and Bridges – Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Construction of New Road including Drainage leading to Pampanga Economic Zone (PEZ), Angeles City, Pampanga |
June 19, 2018 |
FY 2018 GAA |
WIN8C03242 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Bukidnon – Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon – Laak COmpostela Valley), Package 4, incl. ROW, Davao del Norte
Physical Target:
CW1: 12.912 Lane Km (Construction of Concrete Road)
ROW: 96,840 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800.00 (Construction of Concrete Road)
ROW: 9,148,000.00
EAO: P 10,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Bukidnon – Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon – Laak COmpostela Valley), Package 4, incl. ROW, Davao del Norte
Physical Target:
CW1: 6.5443 Lane Km (Construction of Concrete Road)
ROW: 96,840 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800.00 (Construction of Concrete Road)
ROW: 9,148,000.00
EAO: P 10,500,000.00
|
June 19, 2018 |
FY 2018 GAA |
WIN8C03199 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
Daang Maharlika (MN) incl. ROW -
K1484 + (-979) - K1484 + (-844),
K1485 + 573 - K1485 + 870,
K1486 + 863 - K1487 + 109,
K1487 + 708 - K1488 + 500
Physical Target:
CW1: 2.391 Lane Km (Road Widening)
CW2: 523.338 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 56,400,000.00
CW1: P 44,652,480.00 (Road Widening)
CW2: P 9,773,520.00 (ROW Acquisition)
EAO: P 1,974,000.00
TO: OO1 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
Daang Maharlika (MN) incl. ROW -
K1484 + (-979) - K1484 + (-844),
K1485 + 573 - K1485 + 870,
K1486 + 863 - K1487 + 109,
K1487 + 708 - K1488 + 500
Physical Target:
CW1: 2.094 Lane Km (Road Widening)
CW2: 523.338 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 56,400,000.00
CW1: P 44,652,480.00 (Road Widening)
CW2: P 9,773,520.00 (ROW Acquisition)
EAO: P 1,974,000.00 |
June 19, 2018 |
FY 2018 |
WIN8C03213 |
UACS No. 300109200205000 |
June 6, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300109200205000
Project ID: P00250068MN
Local Program
Local - Flood Control and Drainage
Drainage/ Protection Works - Local Infrastructure Program
Construction of Drainage System, Bungiao, Zamboanga City
Physical Target:
CW-1- Construction of Drainage Structure: 520.00 l.m.
Unit Cost: P 3,807.69/ l.m.
EAO: P 20,000.00
Allocation: P 2,000,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03194 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System
Asset Preservation
Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Davao City Div Rd - K1507 + 815 - K1510 + 905
Physical Target:
CW1: 6,020 Lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Drainage Structure along Road)
Allocation:
EAO: P 2,100,000.00
TO: OO1: Ensure Safe and Reliable National Road System
Asset Preservation
Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Davao City Div Rd – K1508 + 280 – K1510 + 905
Physical Target:
CW1: 5,206 Lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Drainage Structure along Road)
Allocation:
EAO: P 2,100,000.00 |
June 19, 2018 |
FY 2018 |
WIN8C03210 |
UACS No. 300106200141000 |
June 6, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300106200141000
Project ID: P00257639MN
Local Program
Flood Control and Drainage - Flood Control Structures/ Facilities
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Control at Sta. Maria Creek, Sta. Maria, Zamboanga City
Physical Target:
CW-1- Construction of Drainage Structure: 187.32 l.m.
Unit Cost: P 15,695.07/l.m.
EAO: P 60,000.00
Allocation: P 3,000,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03134 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Revetment along Lasang River, Lasang Section, Davao City
Physical Target:
CW1: 185 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00
TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Revetment along Lasang River, Lasang Section, Davao City
Physical Target:
CW1: 350 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03174 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Mabini Extension Road leading to Davao Crocodile Park, Davao City
Physical Targets:
CW1: 1.130 lane kilometers (Construction of Concrete Road)
CW2: 1,340 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 25,870,000.00
CW1: P 15,503,600.00 (Construction of Concrete Road)
CW2: P 9,849,000.00 lane kilometers (Construction of Drainage Structure)
EAO: P 517,400.00
TO: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Mabini Extension Road leading to Davao Crocodile Park, Davao City
Physical Targets:
CW1: 0.278 lane kilometers (Construction of Concrete Road)
CW2: 406 lineal meters(Construction of Drainage Structure)
CW3: 1.722 lane kilometers (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 25,870,000.00
CW1: P 1,625,580.00 (Construction of Concrete Road)
CW2: P 2,322,600.00 lane kilometers (Construction of Drainage Structure)
CW3: P 21,404,420.00 (Reconstruction to Concrete Pavement)
EAO: P 517,400.00 |
June 18, 2018 |
FY - 2018 |
WIN8F05578 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Marinduque District Engineering Office |
Local Program
Buildings and Other Structures - Multipurpose/Facilities
- Local Infrastructure Program
FROM:
Construction of Multi-Purpose Building,
Brgy. Binuga, Boac, Marinduque
CW1: 1 Bldg. ( Construction of Multi-Purpose Building )
Allocation: 5,000,000 Php
TO:
Construction/Completion of Multi-Purpose Building,
Brgy. Binunga, Boac, Marinduque
CW1: 1 Bldg. ( Construction of Multi-Purpose Building )
Allocation: 5,000,000 Php
|
June 18, 2018 |
FY - 2018 |
WIN8F05565 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
Local Programs: Local Infrastructure Program
Local - National Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Tumingad - Canlumay - Patoo Road
leading to Romblon Airport, Phase 2, Odiongan, Romblon
CW1: 7.15 lane km ( Construction of Gravel Road )
Allocation: 100,000,000 Php
TO:
Construction of Tumingad - Canlumay - Patoo Road
leading to Romblon Airport, Phase 2, Odiongan, Romblon
CW1: 3.80 lane km ( Construction of Gravel Road )
Allocation : 100,000,000 Php |
June 18, 2018 |
FY - 2018 |
WIN8F05568 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
Local Programs: Local Infrastructure Program
Local - National Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Roads, Brgy. Bangon,
Odiongan, Romblon
CW1: 0.352 lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php
TO:
Construction of Roads, Brgy. Bangon,
Odiongan, Romblon
CW1: 0.456 lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php |
June 18, 2018 |
FY - 2018 |
WIN8F05567 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
Local Programs: Local Infrastructure Program
Local - National Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Gravel Road -
Construction of Claro M. Recto Road and
Odiongan - Tugdan Road leading to Romblon Airport,
Recto, Ferrol, Romblon
CW1: 5.303 lane km ( Construction of Gravel Road )
Allocation: 87,000,000 Php
TO:
Construction of Gravel Road -
Construction of Claro M. Recto Road and
Odiongan - Tugdan Road leading to Romblon Airport,
Recto, Ferrol, Romblom
CW1: 6021 lane km ( Construction of Gravel Road )
Allocation: 87,000,000 Php
|
June 18, 2018 |
FY - 2018 |
WIN8F05566 |
FY - 2018 GAA DPWH Infra PRogram |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
Local Programs : Local Infrastructure Program
Local - national Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation of Concrete Road -
Improvement/Rehabilitation of Road, Barangay Mabini,
Corcuera, Romblon
CW1: 0.190 lane km ( Rehabilitation of Concrete Road )
Allocation: 2,500,000 Php
TO:
Rehabilitation of Concrete Road -
Improvement/Rehabilitation of Road, Barangay Mabini,
Corcuera, Romblon
CW1: 0.296 lane km ( Rehabilitation of Concrete Road )
Allocation: 2,500,000 Php
|
June 18, 2018 |
FY 2018 GAA |
WIN8C03171 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe Reliable National Road System – Asset Preservation
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Primary Roads
Digos-Makar Rd-
K1589 + 994 – K1589 + 1077,
K1589 + 454 – K1591 + 160
Physical Target:
CW1: 16,780 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 80,870,000.00
CW1: P 78,039,550.00 (Construction of Road Slope Protection Structure)
EAO: P 2,830,450.00
TO: OO1: Ensure Safe Reliable National Road System – Asset Preservation
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Primary Roads
Digos-Makar Rd-
K1589 + 935 – K1589 + 987,
K1589 + 997 – K1589 + 1065,
K1589 + 1071 – K1589 + 1225,
K1590 + 454 – K1590 + 560,
K1590 + 658 – K1590 + 798,
K1590 + 800 – K1591 + 040,
K1591 + 062 – K1591 + 164
Physical Target:
CW1: 5,093 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 80,870,000.00
CW1: P 78,039,550.00 (Construction of Road Slope Protection Structure)
EAO: P 2,830,450.00
|
June 18, 2018 |
FY - 2018 |
WIN8F05569 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
Local Programs : Local Infrastructure Program
Local - National Roads and bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Roads,
Brgy. Poblacion, Calatrava, Romblon
CW1: 0.704 llane km ( Construction of Concrete Road )
Allocation: 4,000,000 Php
TO:
Construction of Roads,
Brgy. Poblacion, Calatrava, Romblon
CW1: 0.35028 lane km ( Construction of Concrete Road )
Allocation: 4,000,000 Php |
June 18, 2018 |
FY 2018 GAA |
WIN8C03150 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction/Rehabilitation of Road Brgy. Concepcion, Asuncion – Brgy. Kipalili, San Isidro, Davao del Norte
Physical Target:
CW1: 0.800 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
TO: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction/Rehabilitation of Road Brgy. Concepcion, Asuncion – Brgy. Kipalili, San Isidro, Davao del Norte
Physical Target:
CW1: 1.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
|
June 18, 2018 |
FY 2018 GAA |
WIN8C03117 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program
Local – Local Roads and Bridges – Local Bridges – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Bunawan Bridge, Brgy. Concepcion, Asuncion, Davao de Norte
Physical Target:
CW1: 191 Sq.m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Bridge)
EAO: P 400,000.00
TO: Local Program
Local – Local Roads and Bridges – Local Bridges – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Bunawan Bridge, Brgy. Concepcion, Asuncion, Davao del Norte
Physical Target:
CW1: 286.20 Sq.m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Bridge)
EAO: P 400,000.00
|
June 18, 2018 |
FY 2018 GAA |
WIN8C03141 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: 001: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Collapse, and Landslide – Secondary Roads
Kapalong – Talaingod – Valencia (Bukidnon) Rd –
K1485 + 927 – K1485 + 943,
K1493 + 329 – K1493 + 360,
K1494 + 507 – K1494 + 520,
K1495 + 380 – K1495 + 465
Physical Target:
CW1: 4,385 Sq.m. (Construction of Slope Protection Structure)
Allocation:
TOTAL: P 38,000,000.00
CW1: P 37,240,000.00 (Construction of Slope Protection Structure)
EAO: P 760,000.00
TO: 001: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Collapse, and Landslide – Secondary Roads
Kapalong – Talaingod – Valencia (Bukidnon) Rd –
K1494 + 507.2 – K1494 + 520.2,
K1495 + 380 – K1495 + 460,
K1504 + 570 – K1504 + 600
Physical Target:
CW1: 618.91 Sq.m. (Construction of Slope Protection Structure)
Allocation:
TOTAL: P 38,000,000.00
CW1: P 37,240,000.00 (Construction of Slope Protection Structure)
EAO: P 760,000.00
|
June 18, 2018 |
FY 2018 GAA |
WIN8C03182 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION
FROM: Local Program
Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Improvement/ Construction of Drainage along Acacia St., - Jct. Patnubay St., Davao City
Physical Target:
CW1: 405 Lineal Meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 16,200,000.00
CW1: P 15,633,000.00 (Construction of Drainage Structure)
EAO: P 567,000.00
TO: Local Program
Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Improvement/ Construction of Drainage along Acacia St., - Jct. Patnubay St., Davao City
Physical Target:
CW1: 810 Lineal Meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 16,200,000.00
CW1: P 15,633,000.00 (Construction of Drainage Structure)
EAO: P 567,000.00 |
June 18, 2018 |
FY 2018 GAA |
WIN8C03188 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction/Improvement of Road, Lake Village with Bridge Component, Brgy. Sawata, San Isidro, Davao del Norte
Physical Target:
CW1: 1.090 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00
TO: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction/Improvement of Road, Lake Village, Brgy. Sawata, San Isidro, Davao del Norte
Physical Target:
CW1: 1.360 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00
|
June 18, 2018 |
FY 2018 GAA |
WIN8C03159 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program
Local – Local Roads and Bridges – Local Roads – Local Infrastructure Program
Construction of Lawig Subdivision Road connecting Barangay San Agustin Road, Bakbak District, Island Garden City of Samal, Davao del Norte
Physical Target:
CW1: 0.650 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Concrete Road)
EAO: P 50,000.00
TO: Local Program
Local – Local Roads and Bridges – Local Roads – Local Infrastructure Program
Construction of Lawig Subdivision Road connecting Barangay San Agustin Road, Babak District, Island Garden City of Samal, Davao del Norte
Physical Target:
CW1: 0.776 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Concrete Road)
EAO: P 50,000.00
|
June 18, 2018 |
FY 2018 GAA |
WIN8C03183 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program
Local – Local Roads and Bridges – Local Bridges – Local Infrastructure Program
Construction of Mama Bridge, Brgy. San Miguel, San Isidro, Davao del Norte
Physical Target:
CW1: 143 Sq.m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Bridge)
EAO: P 300,000.00
TO: Local Program
Local – Local Roads and Bridges – Local Bridges – Local Infrastructure Program
Construction of Mama Bridge, Brgy. San Miguel, San Isidro, Davao del Norte
Physical Target:
CW1: 248.80 Sq.m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Bridge)
EAO: P 300,000.00
|
June 18, 2018 |
FY 2018 GAA |
WIN8C03197 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction/Rehabilitation of Road Purok 1 Brgy. Linao – Purok 4, Brgy. San Miguel, San Isidro with Bridge Component, Brgy. San Miguel, San Isidro, Davao del Norte
Physical Target:
CW1: 2.600 Lane Km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Concrete Road)
EAO: P 800,000.00
TO: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction/Rehabilitation of Road Purok 1 Brgy. Linao – Purok 4, Brgy. San Miguel, San Isidro, Davao del Norte
Physical Target:
CW1: 2.520 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Concrete Road)
EAO: P 800,000.00
|
June 18, 2018 |
FY 2018 GAA |
WIN8C03187 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Road Prk. 13 – Pro. 4 with Bridge Component at Sabangan, San Isidro, Davao del Norte
Physical Target:
CW1: 0.600 Lane Km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Rehabilitation of Concrete Road)
EAO: P 300,000.00
TO: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Road Purok 13 – Purok 4 at Sabangan, San Isidro, Davao del Norte
Physical Target:
CW1: 1.380 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Road)
EAO: P 300,000.00
|
June 18, 2018 |
FY 2018 GAA |
WIN8C03204 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction/Rehabilitation of Sabangan – Purok Falcata – Brgy. Sawata with Bridge component, Sabangan, San Isidro, Davao del Norte
Physical Target:
CW1: 1.700 Lane Km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Rehabilitation of Concrete Road)
EAO: P 400,000.00
TO: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction/Rehabilitation of Sabangan – Purok Falcata – Brgy. Sawata, Sabangan, San Isidro, Davao del Norte
Physical Target:
CW1: 1.930 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00
|
June 18, 2018 |
FY 2018 GAA |
WIN8C03193 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Drainage Canal Upper La Filipina, Tagum City, Davao del Norte
Physical Target:
CW1: 6 Lineal Meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Rehabilitation of Concrete Road)
EAO: P 1,750,000.00
TO: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Drainage Canal Upper La Filipina, Tagum City, Davao del Norte
Physical Target:
CW1: 2,038.98 Lineal Meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Rehabilitation of Concrete Road)
EAO: P 1,750,000.00
|
June 14, 2018 |
FY 2018 |
WIN8G01858 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 4th District Engineering Office |
UACS No.: 310102100144000
Project ID: P00200189LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Preventive Maintenance – Secondary Roads – Baao-Iriga City Nabua Rd - K0470+014 - K0470+1075, K0472+000 - K0473+280
Physical Target - CW1-Preventive Maintenance of Road: Aspha;t Overlay / 4.39 Lane-Km
Unit Cost: CW1 – Php 8.603 M /lane-km
Estimated Cost: Php 38.538 M
(As Modified)
|
June 14, 2018 |
FY 2018 |
WIN8G01893 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 4th District Engineering Office |
UACS No.: 310109100087000
Project ID: P00200935LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads – Nabua-Balatan Rd – K0486+334 – K0486+360, K0486+393 – K0486+480, k0490+(-020) – K0490+130, K0490+187 – K0490+225
Physical Target - CW1 - Construction of Road Slope Protection Structure/ 7,826.00 sq.m.
Unit Cost: CW1 – Php 4,361.54/sq.m.
Estimated Cost: Php 34.83 M
(As Modified)
|
June 14, 2018 |
FY 2018 |
WIN8G01895 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 4th District Engineering Office |
UACS No.: 310208100093000
Project ID: P00201554LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Off-Carriageway Improvement – Secondary Road – Iriga City-San isidro-Sagrada-Sn Ramon-Hanawan Rd – K0473+009 – K0473+442.20, K0473+452 – K0473+955, K0479+760 – K0480+503, K0480+600 – K0481+000
Physical Target - CW1 - Off-Carriageway improvement: Shoulder Paving/Construction/ 2,956.00 sq.m.
Unit Cost: CW1 – Php 6,630.58/sq.m.
Estimated Cost: Php 20.0 M
(As Modified)
|
June 14, 2018 |
FY 2018 |
WIN8G02150 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 300104202418000
Project ID: P00249128LZ
Local Program – Buildings and Other Structures - Multipurpose/Facilities - Local Infrastructure Program – Construction of Multi-Purpose Building, Anislag Elementary School, Anislag, Daraga, Albay
Physical Target - CW1 - Construction of Mulri-Purpose building/ 1 building
Unit Cost: CW1- Php 4.950 M/building
Estimated Cost: Php 5.0 M
(As Modified)
|
June 14, 2018 |
FY 2018 |
WIN8G02145 |
FY 2018 GAA R.A. 10964 |
December 28, 2017 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 310209100066000
Project ID: P00201619LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Off-Carriageway Improvement – Tertiary Roads – Comun-Inarado-Peñafrancia Rd - K0529+229 - K0529+610
Physical Target - CW1 - Off-Carriageway improvement: Shoulder Paving/Construction/ 1,511.00 sq.m.
Unit Cost: CW1 – Php 10.86T/sq.m.
Estimated Cost: Php 16.741 M
(As Modified)
|
June 14, 2018 |
FY 2018 |
WIN8G02137 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 310102100139000
Project ID: P00200184LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Preventive Maintenance – Secondary Roads – Legazpi Airport Rd – K0530+-972 – K0530+-242
Physical Target: CW1 - Preventive maintenance of Road: Asphalt Overlay/ 1.46 lane-km
Unit Cost: CW1 - Php 8.26355 M/lane-km
Estimated Cost: Php 16.741 M
(As Modified)
|
June 14, 2018 |
FY 2018 |
WIN8G02134 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 310208100006000
Project ID: P00201546LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Off-Carriageway Improvement – Secondary Roads – Banquerohan-Bariis-Sogoy-Sorsogon Bdry Rd - K0551+000 - K0551+592, K0552+000 - K0552+795, k0552+844 - k0555+107
Physical Target: CW1 - Off-Carriageway improvement: Shoulder Paving/Construction/ 15,433.00 sq.m.
Unit Cost: CW1 – Php 4.6896T/sq.m.
Estimated Cost: Php 75.00 M
(As Modified)
|
June 14, 2018 |
FY 2018 |
WIN8G02135 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 310208100032000
Project ID: P00201550LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Off-Carriageway Improvement – Secondary Roads – Legazpi City-Punta de Jesus Rd – K0538+563 – K0539+242, K0552+000 – K0554+844
Physical Target: CW1 - Off-Carriageway improvement: Shoulder Paving/Construction/ 19,640.00 sq.m.
Unit Cost: CW1 – Php 4.6531 T/sq.m.
Estimated Cost: Php 94.702 M
(As Modified)
|
June 14, 2018 |
FY 2018 |
WIN8G02176 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 320102100425000
Project ID: P00221297LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction/Improvement of Quirangay River Course (Tagaytay Section), Sta 1+141 – Sta. 1+252 (BS), Albay
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 222.00 lm
Unit Cost: CW1 – Php 88.29 T/lm.
Estimated Cost: Php 20.0 M
(As Modified)
|
June 14, 2018 |
FY 2018 |
WIN8G02140 |
FY 2018 GAA R.A. 10964 |
December 28, 2017 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 320101101617000
Project ID: P00221304LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage System – Construction of Cagsawa Ruins Protection Dike, Sta. 0+446 – Sta. 0+595 (B/S, Tributary “B”), Brgy. Cullat, Daraga, Albay
Physical Target: CW1 – Construction of Dike/ 298.00 lm
Unit Cost: CW1 – Php 131.54 T/lm.
Estimated Cost: Php 40.0 M
(As Modified)
|
June 14, 2018 |
FY 2018 |
WIN8G02136 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 320102100427000
Project ID: P00222704LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction/Rehabilitation of Yawa Flood Control Structure, La Playa Section, Sta. 0+268 - Sta. 0+446, Bonot, Legazpi City, Albay
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 178.00 lm
Unit Cost: CW1 – Php 115.62 T/lm.
Estimated Cost: Php 21.0 M
(As Modified)
|
June 14, 2018 |
FY 2018 |
WIN8G02337 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Sorsogon District Engineering Office |
UACS No.: 310102100030000
Project ID: P00202700LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Preventive Maintenance – Secondary Roads – Jct Putiao-Pilar-Donsol Rd - K0556+700 - K0559+028
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay/ 4.54 lane-km
CW2 - Off-Carriageway Improvement: Shoulder Paving/Construction/ 5,061 sq.m.
Unit Cost: CW1 – Php 15.84 M/ lane-km.
CW2 – Php 4,853.59 / sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
|
June 14, 2018 |
FY 2018 |
WIN8G02334 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Sorsogon District Engineering Office |
UACS No.: 310102100029000
Project ID: P00202699LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Preventive Maintenance – Secondary Roads – Jct Putiao-Pilar-Donsol Rd - K0554+480 - K0556+700
Physical Target: CW1 -Preventive Maintenance of Road: Asphalt Overlay/ 4.22 lane-km
CW2 - Off-Carriageway improvement: Shoulder Paving/Construction/ 5,133 sq.m.
Unit Cost: CW1 – Php 16.53 M /lane-km
CW2 – Php 5,208.26/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
|
June 14, 2018 |
FY 2018 |
WIN8G02347 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Sorsogon District Engineering Office |
UACS No.: 310207100026000
Project ID: P00201492LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Off-Carriageway Improvement – Primary Roads – Daang Maharlika (LZ) – K0543+556, K0544+697, K0548+174, K0548+773, K0552+510, K0553+044, K0553+686, K0553+910, K0554+960, K0559+490, K0562+519, K0566+668, K0574+335, K0574+769, K0575+612, K0577+145, K0582+362, K0582+981, K0585+192, K0588+200, K0596+390, K0598+473
Physical Target: CW1 – Off-Carriageway Improvement: Flaring of Intersections/ 22 intersections
Unit Cost: CW1 – Php 1.54 M/intersection
Estimated Cost: Php 34.60 M
(As Modified)
|
June 14, 2018 |
FY 2018 |
WIN8G02098 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Sorsogon 2nd District Engineering Office |
UACS No.: 300116200980000
Project ID: P00240933LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects - Construction of Mapaso-Cabarbuhan Road, Sta. 0+000 – Sta. 0+905, Irosin, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 1.81 lane-km
Unit Cost: CW1 – Php 4.06 M/lm.
Estimated Cost: Php 7.50 M
(As Modified)
|
June 14, 2018 |
FY 2018 |
WIN8G02067 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Sorsogon 2nd District Engineering Office |
UACS No.: 310209100073000
Project ID: P00201626LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Off-Carriageway Improvement – Tertiary Roads – Bacon-Sawanga-Prieto Diaz Rd – K0612+(-249) – K0612+660, K0612+701 – K0613+924, K0613+931 – K0614+249, K0614+269 – K0615+103, K0615+467 – K0615+518, K0615+857 – K0615+952
Physical Target: CW1 - Off-Carriageway improvement: Shoulder Paving/Construction/ 12,660 sq.m.
Unit Cost: CW1 – Php 3,087.15/sq.m.
Estimated Cost: Php 39.881 M
(As Modified)
|
June 14, 2018 |
FY 2018 |
WIN8G02082 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Sorsogon District Engineering Office |
UACS No.: 310209100071000
Project ID: P00201624LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Off-Carriageway Improvement – Tertiary Roads – Ariman-Casiguran Rd – K0602+(-864) – K0604+677, K0606+315 – K0607+500, K0611+093 – K0611+678
Physical Target: CW1 - Off-Carriageway improvement: Shoulder Paving/Construction/ 19,734 sq.m.
Unit Cost: CW1 – Php 2,483.02/sq.m.
Estimated Cost: Php 50.0 M
(As Modified)
|
June 14, 2018 |
F |
WIN8G02391 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Concreting of Road, Sitio Remedios, Brgy. San Nicolas, Sasmuan, Pampanga |
June 14, 2018 |
FY 2018 |
WIN8G02394 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Slope Protection along Sta. Ursula Creek, Guagua, Pampanga |
June 14, 2018 |
FY 2018 |
WIN8G02359 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Network Development Project - Off-Carriageway Improvement – Tertiary Rd – San Fernando – Lubao Rd, K0083+153 – K0083+526, K0083+538.20 – K0084+160, K0084+188.60 – K0084+703.90 – K0084+713.60 – K0084+875 |
June 14, 2018 |
FY 2018 |
WIN8G02392 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Purok 6 to Purok 7, Brgy. Santiago, Lubao, Pampanga |
June 14, 2018 |
FY 2018 |
WIN8G02399 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Flood Control and Drainage – Drainage / Protection Works – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Line Canal , Barangay Sinura, Porac, Pampanga |
June 14, 2018 |
FY 2018 |
WIN8G02390 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Purok 6, Brgy. San Pablo, Lubao, Pampanga |
June 13, 2018 |
FY - 2018 |
WIN8F05534 |
FY - 2018 GAA DPWH Infra Proram |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Convergence Special Support Program
Convergence and Special Support -
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
Busuanga Airport - Kiwit Road leading to Various Beaches, Island Destinations, and World War II
Ship Wreck Dive Sites, incl. Bridge, Busuanga, Palawan
CW1: 2.800 lane km ( Construction of Concrete Road )
CW2: 267.12 sq.m. ( Construction of Concrete Bridge )
Allocation: 70,000,000 Php
TO:
Busuanga Airport - Kiwit Road leading to Various
Beaches, Island Destinations, and World War II
Ship Wreck Dive Sites, incl. Bridge, Busuanga , Palawan
CW1: 1.12 lane km ( Construction of Concrete Road )
CW2: 267.12 sq.m. ( Construction of Concrete Bridge )
Allocation: 70,000,000 Php
|
June 13, 2018 |
FY - 2018 |
WIN8F05530 |
FY - 2018 GAA DOWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
Local Program
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects -
Local Roads
FROM:
Road Opening of the Missing Gap,
Dr. Damian Reyes Road ( Boac Side ),
Boac, Marinduque
CW1: 35.18 lane km ( Construction of Concrete Road )
Allocation: 200,000,000 Php
TO:
Road Opening of the Missing Gap,
Dr. Damian Reyes Road ( Boac Side ),
Boac, Marinduque
CW1: 4.007 lane km ( Construction of Concrete Road )
Allocation: 200,000,000 Php |
June 13, 2018 |
2018 |
310201100199000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Isabela 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System Network Development Program - Road Widening - Primary Roads
Santiago-Tuguegarao Rd K0411+000 - K0412+105 |
June 13, 2018 |
FY - 2018 |
WIN8F05544 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
Local Program
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects -
Local Roads and Bridges - Local Roads
FROM:
Rehabilitation/Concreting of Pinagsabangan Beach Road
including Drainage, Oriental Mindoro
CW1: 24.626 lane km ( Construction of Concrete Road )
Allocation: 140,000,000 Php
TO:
Rehabilitation/Concreting of Pinagsabangan Beache Road
including Drainage, Naujan, Oriental Mindoro
CW1: 9.53476 lane km ( Rehabilitation of Paved Road )
Allocation: 140,000,000 Php |
June 13, 2018 |
FY - 2018 |
WIN8F05098 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Calapan South Rd
K0064+456 - K0064+635,
K0064+824 - K0066+680,
K0066+850 - K0069+060,
K0069+356 - K0071+105,
K0064+(-780) - K0064+(-319),
K0064+(-199) - K0064+325
CW1: 14.13 lane km ( Road Widening )
Allocation: 211,950,000 Php
TO:
Calapan South Rd
K0064+(-780) - K0064+(-320),
K0064+(-200) - K0064+328,
K0064+456 - K0064+638,
K0064+822 - K0066+680,
K0066+868 - KJ0069+053,
K0069+356 - K0071+160,
K0071+273 - K0072+128,
K0072+241 - K0072+445,
K0072+628 - K0073+687,
K0073+794 - K0074+640
CW1: 20.072 lane km ( Road Widening )
Allocation: 211,950,000 Php
K
|
June 13, 2018 |
2018 |
WIN8F05477 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Regional Office VII |
Organizational Outcome 1: Ensure safe and Reliable National Road System, Network Development-Road Widening of Primary Roads, N. Bacalso Ave (Cebu South Rd) incl. ROW-K057+(-815)-K0057+793, K0057+799-K0060+000 |
June 13, 2018 |
2018 |
WIN8F05478 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Regional Office VII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System, Network Development Program -Road Widening -Primary Roads- Cebu North Hagnaya Wharf Rd incl. ROW- K0024+795 - K0025+374, K0025+413 - K0025+298, K0028+090 - K0029+080, K0031+963 - K0032+192.65 |
June 13, 2018 |
2018 |
WIN8F05553 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Cebu 5th District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development - Road Widening - Cebu North Hagnaya Wharf Rd - K0050 + 630 - K0051 + 602, K0073+847 - K0074+562, K0076+640 - K0077+044 |
June 13, 2018 |
2018 |
WIN8C02876 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Cebu 6th District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development - Road Widening - Tertiary Roads, M Logarta Rd - (S00192CB) Chainage 056.4 - Chainage 1328,
(S00194CB) Chainage 000 - Chainage 411 |
June 13, 2018 |
2018 |
WIN8C02849 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Cebu 6th District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development - Road Widening - Tertiary Roads, Canduman-Cebu North Rd - K0011 + (-639) - K0011 + 400 |