Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
May 19, 2022 2022 WIN2E02362 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Quezon Blvd (MN) - K1509+ (-214) - K1510 + 799
Physical Target:
CW1: 4.010 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,100,000.00
CW1: P 39,298,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 802,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Quezon Blvd (MN) - K1509+ 819 - K1510 + 711
Physical Target:
CW1: 1.768 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,100,000.00
CW1: P 39,298,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 802,000.00
May 19, 2022 2022 WIN2E02364 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Davao City Div Rd - K1509 + 360 - K1509 + 400
Physical Target:
CW1: 5,555.56 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Davao City Div Rd – K1509 + 340 – K1509 + 440
Physical Target:
CW1: 1,410.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
May 19, 2022 2022 WIN2E02360 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program – Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Installation of Road Safety Facilities - ABS-CBN-Quimpo Blvd Div. Rd - K1514 + 000 - K1515 + 343, Davao City
Physical Target:
CW1: 10.048 Lane Km (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 12,500,000.00
CW1: P 12,250,000.00 (Road Safety: Pavement Markings)
EAO: P 250,000.00

TO: Convergence and Special Support Program – Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Installation of Road Safety Facilities - ABS-CBN-Quimpo Blvd Div. Rd - K1513 + 620 - K1514 + 470, Davao City
Physical Target:
CW1: 0.871 Km (Road Safety: Street Lighting)
Allocation:
TOTAL: P 12,500,000.00
CW1: P 12,250,000.00 (Road Safety: Street Lighting)
EAO: P 250,000.00
May 19, 2022 2022 WIN2E02363 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program – Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Installation of Road Safety Facilities – Davao-Cotabato Rd (Davao City – Jct Digos Sect), K1516 + 000 – K1517 + 000
Physical Target:
CW1: 8.039 Lane Km (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Road Safety: Pavement Markings)
EAO: P 200,000.00

TO: Convergence and Special Support Program – Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Installation of Road Safety Facilities – Davao-Cotabato Rd (Davao City – Jct Digos Sect), K1516 + 000 – K1517 + 000
Physical Target:
CW1: 0.975 km (Road Safety: Street Lighting)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Road Safety: Street Lighting)
EAO: P 200,000.00
May 19, 2022 2022 WIN2E02368 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads
Montevista – Compostela – Mati Bdry Rd - K1455 + 800 – K1455 + 920, K1456 + 300 – K1456 + 400, K1468 + 000 – K1468 + 060
Physical Target:
CW1: 3,100.000 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 15,400,000.00
CW1: P 15,092,000.00 (Construction of Road Slope Protection Structure)
EAO: P 308,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads
Montevista – Compostela – Mati Bdry Rd - K1460 + 320 – K1460 + 395
Physical Target:
CW1: 450.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 15,400,000.00
CW1: P 15,092,000.00 (Construction of Road Slope Protection Structure)
EAO: P 308,000.00
May 19, 2022 2022 WIN2E02377 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of By-Pass and Diversion Roads
Matina Crossing Road (Jct. Davao - Cotabato Road - Jct. Davao City Diversion Road), Davao City
Physical Target:
CW1: 0.674 Lane Km (Construction of Concrete Road)
CW2: 1.051 Lane Km (Construction of Concrete Road)
CW3: 2,899.038 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 159,235,000.00
CW1: P 17,823,550.00 (Construction of Concrete Road)
CW2: P 59,007,820.00 (Construction of Concrete Road)
CW3: P 76,830,405.00 (Construction of Concrete Bridge)
EAO: P 5,573,225.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of By-Pass and Diversion Roads
Matina Crossing Road (Jct. Davao - Cotabato Road - Jct. Davao City Diversion Road), Davao City
Physical Target:
CW1: 0.916 Lane Km (Reconstruction to Concrete Pavement)
CW2: 139.000 ln. m. (Construction of Drainage Structure along Road)
ROW Acquisition: 2,899.038 sq. m.
Allocation:
TOTAL: P 159,235,000.00
CW1: P 35,119,482.83 (Reconstruction to Concrete Pavement)
CW2: P 22,298,017.17 (Construction of Drainage Structure along Road)
ROW Acquisition: P 57,417,500.00
EAO: P 4,165,000.00
EXCESS: P 40,235,000.00
May 18, 2022 FY 2022 GAA WIN2G02965 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300214100067000
Project ID : P00635854LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Special Road Fund - Motor Vehicle Motor's Charge (MVUC)
as per R.A. 11239

FROM :

Preventive Maintenance (Asphalt Overlay) along
Sn Jose - Caminawit Port Road
K0237+(-663) - K0240+209
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 5.187 Lane Km
Allocation - Php 75.549 Million

TO :

Preventive Maintenance (Asphalt Overlay) along
Sn Jose - Caminawit Port Road
K0237+(-663) - K0239+522
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 6.366 Lane Km
Allocation - Php 75.549 Million


May 18, 2022 FY 2022 GAA WIN2G02947 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100243000
Project ID : P00636845LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s
leading to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Sta. 7+163.00 - Sta. 7+571.00,
Kemdeng, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 7,672.202 Square Meter
Allocation - Php 342.369 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Sta. 7+163.00 - Sta. 7+646.00,
Kemdeng, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 15,785.230 Square Meter
Allocation - Php 342.369 Million
May 18, 2022 FY 2022 GAA WIN2G02944 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 3002151016360000
Project ID : P00636958LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s
leading to Major/Strategic public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Port barton - Kemdeng Road,
San Vicente, Palawan
Sta. 0+373.00 - Sta. 0+443.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 723.35 Square Meter
Allocation - Php 32.279 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Port Barton - Kemdeng Road
Sta. 0+218.00 - Sta. 0+250.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1,346.93 Square Meter
Allocation - Php 32.279 Million

May 18, 2022 FY 2022 GAA WIn2G02945 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215101641000
Project ID : P00636973LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation Road with Slips, Slope Collapse, and Landslide
Port Barton - Kemdeng Road
San Vicente, Palawan
Sta. 1+527.00 - Sta. 1+573.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 503.31 Square Meter
Allocation - Php 22.460 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Port Barton - Kemdeng Road,
San Vicente, Palawan
Sta. 1+070.00 - Sta. 0+105.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 913.12 Square Meter
Allocation - Php 22.460 Million
May 18, 2022 FY 2022 GAA WIN2G02817 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215101609000
Project ID : P00639228LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 171+039.00 - Sta. 171+062.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 272.11 Square Meter
Allocation - Php 12.143 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 171+0.9.00 - Sta. 171+062.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 527.03 Square Meter
Allocation - Php 12.143 Million
May 18, 2022 FY 2022 GAA WIN2G02884 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300219100142000
Project ID : P00639383LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Flood Mitigation Structures protecting
Public Infrastructures/Facilities

FROM :

Construction (Completion) of River Control Structure and
Drainage System,
Bangon River Control, Tablas Island, Romblon
Physical Target - CW1 - Construction of Flood mitigation Structure :
915.165 Lineal Meter
Allocation - 110.000 million

TO :

Construction (Completion) of River Control Structure
and Drainage System,
Bangon River Control, Tablas Island, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
542.65 Lineal Meter
Allocation - Php 110.00 Million
May 18, 2022 2022 WIN2F06359 FY 2022 GAA December 30, 2021 Region III Regional Office III
Network Development Program - Construction of By-Pass and Diversion Roads

Concepcion - Mabalacat Bypass Road
May 18, 2022 2022 WIN2F06354 FY 2022 GAA December 30, 2021 Region III Regional Office III
Network Development Program - Construction of By-Pass and Diversion Roads

Lubao - Guagua - Minalin - Sto. Tomas Road (Sto. Tomas - Minalin Section), Package 2, Pampanga
May 18, 2022 2022 WIN2F06358 FY 2022 GAA December 30, 2021 Region III Regional Office III
Network Development Program - Construction of By-Pass and Diversion Roads

Lubao - Guagua - Minalin - Sto. Tomas Road (Sto. Tomas - Minalin Section) Package 1, Pampanga
May 18, 2022 2022 WIN2E02324 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 310101100598000
Project ID: P00604689MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads

FROM:

Daang Maharlika (Surigao-Agusan Section) - K1199 + 435 - K1203 + 571, K1208 + 328 - K1210 + 404

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 22.827 Lane Km

Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000

Unit Cost:
CW1: P 6,341,174.9244/ Lane Km

TO:

Daang Maharlika (Surigao-Agusan Section) - K1182+812 - K1183+780, K1183+820-K1184+892, K1199+435-K1199+709, K1200+291-K1200+318, K1200+318-K1200+683, K1202+627-K1203+000, K1203+231-K1203+249.50 ,K1203+249.50 -K1203+258.5, K1203+258.5-K1203+328, K1204+912-K1205+089, K1208+121-K1208+130

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 9.118 Lane Km

Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000

Unit Cost:
CW1: P 15,875,191.928/ Lane Km
May 18, 2022 2022 WIN2E02323 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 320101107783000
Project ID: P00620100MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

FROM:

Construction of Dike Revetment along Hubo River Basin Protecting Hubo Bridge Abutment "A" Upstream, Brgy. Buhisan, Sta. 0+000.00 - Sta. 0+346.00, San Agustin, Surigao del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 819.920 Lineal meters

Allocation:
TOTAL: P 104,000,000
CW1: P 100,360,000
EAO: P 3,640,000

Unit Cost:
CW1: P 122,402.186/ Lineal meters

TO:

Construction of Dike Revetment along Hubo River Basin Protecting Hubo Bridge Abutment "A" Upstream, Brgy. Buhisan, Sta. 0+000.00 - Sta. 0+305.098, San Agustin, Surigao del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 305.098 Lineal meters

Allocation:
TOTAL: P 104,000,000
CW1: P 100,360,000
EAO: P 3,640,000

Unit Cost:
CW1: P 328,943.487/ Lineal meters
May 18, 2022 2022 WIN2E02325 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 320102104750000
Project ID: P00620257MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

FROM:

Construction of Flood Mitigation Structure, Agusan River Basin (Bit-os Section), Sta. 0+000.00 - Sta. 0+157.00, Butuan City, Agusan del Norte

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 465.116 Lineal meters

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 207,475.12/ Lineal meters

TO:

Construction of Flood Mitigation Structure, Agusan River Basin (Bit-os Section), Sta. 0+124.935 - Sta. 0+244.00, Butuan City, Agusan del Norte

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 119.065 Lineal meters

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 810,481.67/ Lineal meters
May 18, 2022 2022 WIN2E02321 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 310205100950000
Project ID: P00603819MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads

FROM:

Bdry. Bukidnon/Agusan del Norte, Lawan-Lawan Section, Package I, Las Nieves, Butuan City

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 2.800 Lane Km

Allocation:
TOTAL: P 98,000,000
CW1: P 94,570,000
EAO: P 3,430,000

Unit Cost:
CW1: P 33,775,000/ Lane Km

TO:

Bdry. Bukidnon/Agusan del Norte, Lawan-Lawan Section, Package I, Las Nieves, Butuan City

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 2.760 Lane Km

Allocation:
TOTAL: P 98,000,000
CW1: P 94,570,000
EAO: P 3,430,000

Unit Cost:
CW1: P 34,264,492.75/ Lane Km

May 18, 2022 2022 WIN2E02321 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 310205100950000
Project ID: P00603819MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads

FROM:

Bdry. Bukidnon/Agusan del Norte, Lawan-Lawan Section, Package I, Las Nieves, Butuan City

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 2.800 Lane Km

Allocation:
TOTAL: P 98,000,000
CW1: P 94,570,000
EAO: P 3,430,000

Unit Cost:
CW1: P 33,775,000/ Lane Km

TO:

Bdry. Bukidnon/Agusan del Norte, Lawan-Lawan Section, Package I, Las Nieves, Butuan City

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 2.760 Lane Km

Allocation:
TOTAL: P 98,000,000
CW1: P 94,570,000
EAO: P 3,430,000

Unit Cost:
CW1: P 34,264,492.75/ Lane Km

May 18, 2022 2022 WIN2E02320 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 310205100951000
Project ID: P00603820MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads

FROM:

Bdry. Bukidnon/Agusan del Norte, Lawan-Lawan Section, Package J, Las Nieves, Butuan City

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4,679.560 Square meters

Allocation:
TOTAL: P 68,000,000
CW1: P 65,620,000
EAO: P 2,380,000

Unit Cost:
CW1: P 14,022.69/ Square meters

TO:

Bdry. Bukidnon/Agusan del Norte, Lawan-Lawan Section, Package J, Las Nieves, Butuan City

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4,559.925 Square meters

Allocation:
TOTAL: P 68,000,000
CW1: P 65,620,000
EAO: P 2,380,000

Unit Cost:
CW1: P 14,390.59/ Square meters

May 18, 2022 2022 WIN2E02291 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 310104100453000
Project ID: P00601313MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

FROM:

Daang Maharlika (Agusan-Davao Sect) - K1250 + 098 - K1250 + 960

Type of Work:
CW1- Reconstruction to Concrete Pavement

Physical Target:
CW1- 1.528 Lane Km

Allocation:
TOTAL: P 14,297,000
CW1: P 14,011,060
EAO: P 285,940

Unit Cost:
CW1: P 9,169,541.88/ Lane Km

TO:

Daang Maharlika (Agusan-Davao Sect) - K1244 + 671.00 - K1244 + 684.50, K1246 + 980.00 - K1247 + 030.00, K1247 + 260.00 - K1247 + 570.00, K1248 + 196.00 - K1248 + 256.00, K1248 + 378.00 - K1248 + 550.00

Type of Work:
CW1- Reconstruction to Concrete Pavement

Physical Target:
CW1- 1.225 Lane Km

Allocation:
TOTAL: P 14,297,000
CW1: P 14,011,060
EAO: P 285,940

Unit Cost:
CW1: P 11,437,600/ Lane Km

May 18, 2022 FY 2022 WIN2E02341 310102101055000 March 31, 2022 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310102101055000
Project ID : P00601154MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads

Jct. Polo-Dapitan Park Natl Rd - K1826+920 - K1827+021.10, K1827+371.43 - K1827+672.30

CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target: 1.58674 Lane km
Unit Cost : P 9,264,277.70/Lane km
EAO : P 300,000.00
Allocation : P 15,000,000.00
May 18, 2022 FY 2022 WIN2E02299 310204101580000 March 23, 2022 Region IX Regional Office IX
UACS No. 310204101580000
Project ID: P00604255MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Ipil Circumferential Road, Veterans-Tiayon-Don Andres Section, Package I, including Bridge, Zamboanga Sibugay

CW1- Road Widening
Physical Target: 5.976 Lane Km
Unit Cost: ₱ 11,971,473.07/Lane km
CW2- Widening of Bridge
Physical Target: 294.214 sq.m
Unit Cost: ₱ 52,201.72/sq.m.
ROW- Right-Of-Way Acquisition
Physical Target: 33,333.33 sq.m.
Unit Cost: ₱ 345.90/sq.m.
EAO: ₱ 3,570,000.00
Allocation: ₱ 102,000,000.00
May 18, 2022 FY 2022 WIN2E02297 310204101598000 March 23, 2022 Region IX Regional Office IX
UACS No. 310204101598000
Project ID: P00604240MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Zamboanga City Diversion Road, Package 3, Zamboanga City

CW1- Construction of Concrete Bridge
Physical Target: 1,734.372 sq.m.
Unit Cost: ₱ 54,630.73/sq.m.
ROW- Right-Of-Way Acquisition
Physical Target: 16,666.67 sq.m.
Unit Cost: ₱ 394.50/sq.m.
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00
May 18, 2022 FY 2022 WIN2E02303 10204101592000 March 23, 2022 Region IX Regional Office IX
UACS No. 310204101592000
Project ID: P00604242MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Vitali - Sibulao - Bypass Road Project (Alternate Road of N1), Package 2, Zamboanga City

CW1- Construction of Concrete Road
Physical Target: 5.95 Lane Km
Unit Cost: ₱ 15,882,352.94/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 33,333.33 sq.m.
Unit Cost: ₱ 349.50/sq.m.
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
May 18, 2022 FY 2022 WIN2E02310 320101107695000 March 23, 2022 Region IX Regional Office IX
UACS No. 320101107695000
Project ID: P00620019MN

OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure including Pumping Station (Package 1 & 2), Zamboanga City

CW1- Construction of Flood Mitigation Structure
Physical Target: 1,193.00 Lineal Meters
Unit Cost: ₱ 95,557.41/ Lineal Meters
EAO: ₱ 4,200,000.00
Excess: ₱ 1,800,000.00
Allocation: ₱ 120,000,000.00
May 18, 2022 FY 2022 WIN2E02298 310204101593000 March 22, 2022 Region IX Regional Office IX
UACS No. 310204101593000
Project ID: P00604233MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Zamboanga City By-Pass Road, (West Coast Section), Phase I, Zamboanga City

CW1- Construction of Concrete Road
Physical Target: 6.097 Lane Km
Unit Cost: ₱ 15,499,425.96/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 33,333.33 sq.m.
Unit Cost: ₱ 349.50/sq.m.
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
May 18, 2022 FY 2022 WIN2E02308 310204101586000 March 22, 2022 Region IX Regional Office IX
UACS No. 310204101586000
Project ID: P00604247MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

NRJ Biasong - Minaog Bypass Road, Zamboanga del Norte

CW1- Construction of Concrete Bridge
Physical Target: 1,156.248 sq.m
Unit Cost: ₱ 85,660.40/sq.m.
ROW- Right-Of-Way Acquisition
Physical Target: 33,333,330 sq.m.
Unit Cost: ₱ 357.91/sq.m
EAO: ₱ 4,025,000.00
Allocation: ₱ 115,000,000.00
May 18, 2022 FY 2022 WIN2E02311 310104100359000 March 23, 2022 Region IX Regional Office IX
UACS No. 310104100359000
Project ID: P00601148MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads

Dipolog-Sindangan-Liloy Rd - K1850 + 000.00 – K1851 + 000.00, K1851 + 000.00 – K1852 + 985.68, K1853 + 002.34 – K1853 + 236.00, K1853 + 267.58 – K1854 + 299.16, K1854 + 369.40 – K1855 + 103.45, K1855 + 199.00 – K1855 + 342.00, K1859 + 968.00 – K1861 + 633.00

CW1- Reconstruction to Concrete Pavement
Physical target: 13.739 Lane Km
Unit Cost: ₱ 7,467,439.06/Lane Km
EAO: ₱ 3,731,000.00
Excess: ₱ 273,854.73
Allocation: ₱ 106,600,000.00
May 17, 2022 FY 2022 GAA WIN2G02967 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 320102104986000
Project ID : P00621622LZ

002 : Protect Lives and Properties Against Major Floods

Flood Management Program - Construction/Rehabilitation of
Flood mitigation facilities within Major River Basins and
Principal Rivers

FROM ;

Construction of Tiguion River Flood Control,
Gasan, Marinduque (Package 1)
Physical Target - CW1 - Construction of Flood Mitigation
Structure : 166.39 lineal meter
Allocation - Php 20.00 Million

TO :

Construction of Tiguion River Flood Control,
Gasan, Marinduque (Package1)
Physical Target - CW1 - Construction of Flood Mitigation
Structure ; 140.60 Lineal Meter
Allocation - Php 20.00 Million
May 17, 2022 FY 2022 GAA WIn2G02968 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No : 300215100241000
Project ID : P00636843LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s
leading to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along TDC - Pagdanan Road, San Vicente, Palawan
Sta. 14+747 - Sta. 14+896
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,358.533 square meter
Allocation - Php 60.624 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along TDC - Pagdanan Road, San Vicente, Palawan
Sta. 14+747 - Sta. 14+896
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,489.53 square meter
Allocation - Php 60.624 Million
May 17, 2022 FY 2022 GAA WIN2G02955 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. :300215101648000
Project ID : P00636978LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the national Road/s
leading to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Tabon Cave Road,
Sta. 7+100 - Sta. 7+154
Quezon, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 402.56 Square Meter
Allocation - Php 17.64 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Tabon Cave Road
Sta. 7+100 - Sta. 7+154
Quezon, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 813.27 Square Meter
Allocation - Php 17.964 Million
May 17, 2022 FY 2022 GAA WIN2G02911 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100234000
Project ID : P00630102LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s
leading to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
San Jose - Port Barton Road,
Sta. 13+000 - Sta 13+060,
Sta. 13+129 - Sta. 13+140,
Sta. 13+210 - Sta. 13+250,
Sta. 13+393 - Sta. 13+573
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,352.96 Square Meter
Allocation - Php 105.00 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
San jose - Port Barton Road,
Sta. 13+000 - Sta. 13+060,
Sta. 13+129 - Sta. 13+140,
Sta. 13+210 - Sta. 13+250,
Sta. 13+393 - Sta. 13+465.40
Physical Target - CW1 - Construction of Road Slope Protection
Structure ; 4,934.80 Square Meter
Allocation - Php 105.00 Million
May 17, 2022 FY 2022 GAA WIN2G02962 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100231000
Project ID : P00630099LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from National Road/s leading to
Major/Strategic Public Buildings/Facilities

FROM :

Construction of Road,
Barangay Poblacion, Narra, Palawan
Physical Target - CW1 - Construction of Concrete Road :
4.958 Lane Km
Allocation - Php 55.00 Million

TO :

Construction of Road,
Barangay Poblacion, Narra, Palawan
Physical Target - CW1 - Construction of Concrete Road :
5.906 Lane Km
Allocation - 55.00 Million

May 17, 2022 FY 2022 WIN2C03529 UACS No. 300214100105000 March 1, 2022 National Capital Region Quezon City 1st Engineering District Office
As per GAA/Original
UACS No. 300214100105000
Project ID.: P00635866LZ
Convergence and Special Support Program
Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Preventive Maintenance along Fairview Ave – K0023+638 – K0021+000
Physical Target: CW1- Preventive Maintenance of Road: Concrete Re-blocking - 3.02 lane km
Unit Cost = P 9,735.10/lane km
Allocation = P 29,400,000
EAO = P 600,000
Total = P 30,000,000

As Modified
Convergence and Special Support Program
Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Preventive Maintenance along Fairview Ave – K0023+638 – K0024+620
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay – 3.387 lane km
Unit Cost = P 8,680.25/lane km
Allocation = P 29,400,000
EAO = P 600,000
Total = P 30,000,000
WIN2C03529
May 17, 2022 FY 2022 GAA WIN2G02960 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300203102047000
Project ID : P00635433LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Construction/Improvement of Access Roads leading to Declared
Tourism Destinations
(Tourism Road infrastructure Program - TRIP)

FROM :

New Agutaya Tourism Road leading to San Vicente Long Beach,
San Vicente, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.660 Lane Km
Allocation - php 24.900 Million

TO :

New Agutaya Tourism Road leading to San Vicente Long beach,
San Vicente, Palawan
Physical Target - CW1 - Construction of Concrete Road :
2.842 Lane Km
Allocation - php 24.900 Million

May 16, 2022 2022 WIN2F06299 FY 2022 GAA December 30, 2021 Region III Bataan 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Bataan Technical Park Inc Rd (BTPI) - K0175+(-506) - K0175+506
May 16, 2022 2022 WIN2F06169 FY 2022 GAA December 30, 2021 Region III Bataan 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Calaguiman Vicinal Rd - K0127+260 - K0127+460.20, K0127+517 - K0127+997, K0128+041 - K0128+176.40
May 16, 2022 2022 WIN2F06150 FY 2022 GAA December 30, 2021 Region III Bataan 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads

Roman Expressway - K0101+(-158) - K0101+100, K0101+230 - K0101+849
May 16, 2022 2022 WIN2F06298 FY 2022 GAA December 30, 2021 Region III Bataan 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads

Gov JJ Linao Rd - K0166+300 - K0166+501
May 16, 2022 2022 WIN2F06228 FY 2022 GAA December 30, 2021 Region III Bataan 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Jose Abad Santos Ave (JASA) - K0109+455 - K0109+514, K0110+445 - K0110+489, K0112+846.50 - K0112+970
May 16, 2022 FY 2022 GAA WIN2G02953 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310202100964000
Project ID : P00606196LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

El Nido - Jct New Ibahay Road
K0277+000 - K0280+000
Physical Target - CW1 - Road Widening : 5.808 Lane Km
Allocation - Php 87.120 Million

TO :
El Nido - Jct New Ibahay Road
K0277+000 - K0279+767
Physical Target - CW1 - Road Widening : 5.416 Lane Km
Allocation - Php 87.120 Million
May 16, 2022 2022 WIN2F06312 FY 2022 GAA December 30, 2021 Region III Bataan 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Nuclear Power Plant Rd - K0166+101 - K0166+414
May 16, 2022 2022 WIN2F06322 FY 2022 GAA December 30, 2021 Region III Bataan 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Calaguiman Vicinal Rd - K0124+320 - K0124+826.30
May 16, 2022 2022 WIN2F06311 FY 2022 GAA December 30, 2021 Region III Bataan 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Gov JJ Linao Rd - K0166+072 - K0166+300, K0168+000 - K0168+515
May 16, 2022 2022 WIN2F06189 FY 2022 GAA December 30, 2021 Region III Bataan 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Tabacan Poblacion Rd - K0102+593 - K0102+930
May 16, 2022 FY 2022 GAA WIN2G02969 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310202100965000
Project ID : P00606197LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

El Nido - Jct New Ibahay Road
K0280+000 - K0283+000
Physical Target - CW1 - Road Widening : 5.644 Lane Km
Allocation - Php 84.660 Million

TO :

El Nido - Jct Ibahay Road
K0279+767 - K0283+000
Physical Target - CW1 - Road Widening : 6.036 Lane Km
- CW2 - Road Safety : Pavement Markings :
6.036 Lane Km
Allocation - php 84.660 Million
May 16, 2022 FY 2022 GAA Win2G02964 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310205100813000
Project ID : P00608163LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/New Roads

FROM :

Sofronio Espanola - Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package D
Palawan
Physical Target - CW1 - Construction of Concrete Road :
5.102 Lane Km
Allocation - Php 50.00 Million

TO :

Sofronio Espanola - Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package D
Palawan
Physical Target - CW1 - Construction of Concrete Road :
5.370 Lane Km
Allocation - Php 50.00 Million

May 16, 2022 FY 2022 GAA WIN2G02961 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310102100819000
Project ID : P00609336LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM :

Puerto Princesa North Road
K0227+000 - K0232+385
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 10.850 Lane Km
Allocation - Php 105.851 Million

TO :

Puerto Princesa North Road
K0227+000 - K0231+698
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt overlay - 9.464 Lane Km
- CW2 - Road Safety : Pavement Markings :
9.464 Lane Km
Allocation - Php 105.851 Million
May 16, 2022 FY 2022 GAA WIN2G02970 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310108100882000
Project ID : P00611358LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM :

PPSR Jct - napsan - Apurawan Road (S00033PW)
K0036+825 - K0036+976
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 3,154.72 square meter
Allocation - Php 56.785 Million

TO :

PPSr Jct - Napsan - Apurawan Road
K0036+825 - K0036+976,
K0037+469 - K0037+490
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 2,439.40 square meter
Allocation - Php 56.785 Million


May 16, 2022 FY 2022 GAA WIn2G02943 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 32010204626000
Project ID : P00621107LZ

002 : Protect Lives and Properties Against major Floods

Construction/Rehabilitation of Flood Mitigation Facilities
within Major River Basins and Principal Rivers

FROM :

Construction of Flood Control Structure,
Amnay River
Sta. 0+000 - Sta. 0+456,
Claudio Salgado Section
Sablayan Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
444 lineal meter
Allocation - php 45.00 Million

TO :

Construction of Flood Control Structure
Amnay River
Sta. 0+320 - Sta. 0+603,
Claudio Salgado Section,
Sablayan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
283 lineal meter
Allocation - Php 45.00 Million
May 16, 2022 FY 2022 GAA WIn2G02942 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 320102104628000
Project ID : P00621109LZ

002 ; Protect Lives and Properties Against Major Floods

Construction/Rehabilitation of Flood Mitigation Facilities
within Major River basins and Principal Rivers

FROM :

Construction of Flood Control Structure,
Amnay River,
Sta. 0+000 - Sta. 0+462,
Guitong Section,
Sablayan, occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
462 lineal meter
Allocation - Php 45.00 Million

TO :

Construction of Flood Control Structure
Amnay River,
Sta. 1+303 - Sta. 1+680,
Guitong Section,
Sablayan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood mitigation Structure :
377 lineal meter
Allocation - Php 45.00 Million
May 13, 2022 FY 2022 GAA WIN2G02868 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300203101636000
Project ID : P00635431LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
(Tourism Road Infrastructure Program - TRIP)

FROM :

New Agutaya - Alimanguan Tourism Road leading to
San Vicente Long Beach, San Vicente, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.333 lane Km
Allocation - 20.00 Million

TO :

New Agutaya - Alimanguan Tourism Road leading to
San Vicente Long Beach, San Vicente, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.280 Lane Km
Allocation - Php 20.00 Million
May 13, 2022 FY 2022 GAA WIN2G02887 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300203102048000
Project ID : P00635434LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
(Tourism Road Infrastructure Program - TRIP)

FROM :

Purok 4 Sto. Nino Road leading to Ombo Falls via
Bato Ningning Site, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.142 Lane Km
Allocation - Php 20.00 Million

TO :

Purok 4, Sto. Nino leading to Ombo Falls via
Bato Ningning Site, Palawan
Physical Target - CW1 - Construction of Concrete Road :
0.850 Lane Km
Allocation - Php 20.00 Million
May 13, 2022 FY 2022 GAA WIN2G02867 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300203102049000
Project ID : P00635435LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
(Tourism Road infrastructure Program - TRIP)

FROM :

Road from Poblacion to Capari Cove, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.333 Lane Km
Allocation - Php 20.00 Million

TO :

Road from Poblacion to Capari Cove, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.201 Lane Km
Allocation - Php 20.00 million
May 13, 2022 FY 2022 GAA WIN2G02878 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300203101629000
Project ID : P00635469LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

FROM :

Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
(Tourism Road Infrastructure Program - TRIP)

FROM :

Access Roads to Malampaya Sound, Mt. Capuas and
San Vicente Long Beach, San Vicente and Taytay, palawan
Physical Target - CW1 - Construction of Concrete Road :
2.403 Lane Km
Allocation - Php 36.046 Million

TO :

Access Road to Malampaya Sound, Mt. Capuas and
San Vicente Long Beach, San Vicente and Taytay, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.800 Lane Km
Allocation - Php 36.046 Million
May 13, 2022 FY 2022 GAA WIN2G02928 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100240000
Project ID : P00636842LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the national Road/s
leading to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along TDC - Pagdanan Road, San Vicente, Palawan,
Sta. 10+458.00 - Sta. 10+612.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,246.61 square meter
Allocation - Php 100.254 Million

To :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along TDC - Pagdanan Road, San Vicente, Palawan
Sta. 10+458.00 - Sta. 10+624.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 4,302.70 square meter
Allocation - Php 100.254 Million
May 13, 2022 2022 WIN2E02261 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
Installation of Road Safety Facilities - R Castillo St - (S01459MN) Chainage 0 - Chainage 3153, Davao City
Physical Target:
CW1: 12.219 Lane Km (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 15,200,000.00
CW1: P 14,896,000.00 (Road Safety: Pavement Markings)
EAO: P 304,000.00

TO: Convergence and Special Support Program
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
Installation of Road Safety Facilities - R Castillo St - (S01459MN) Chainage 0 - Chainage 2740, Davao City
Physical Target:
CW1: 2.740 Lane Km (Road Safety: Street Lighting)
Allocation:
TOTAL: P 15,200,000.00
CW1: P 14,896,000.00 (Road Safety: Street Lighting)
EAO: P 304,000.00
May 13, 2022 2022 WIN2E02075 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Matina River, Sta. 5+643 - Sta. 6+023, Matina Pangi Br. 1 Upstream, Matina Pangi Section, Left Bank, Davao City
Physical Target:
CW1: 380 lineal m. (Construction of Revetment:)
ROW: 1,140 sq. m. (ROW acquisition)

Allocation:
TOTAL: P 89,400,000.00
CW1: P 75,270,000.00 (Construction of Revetment)
ROW: P11,001,000 (ROW acquisition)
EAO: P 3,129,000.00

TO: OO2: Protect Lives and Properties Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Matina River, Sta. 6+207 - Sta. 6+440, Matina Pangi Br. 1 Upstream, Matina Pangi Section, Left Bank, Davao City
Physical Target:
CW1: 233 lineal m. (Construction of Revetment:)
ROW: 2,790.69 sq. m. (ROW acquisition)

Allocation:
TOTAL: P 89,400,000.00
CW1: P 75,270,000.00 (Construction of Revetment)
ROW: P11,001,000 (ROW acquisition)
EAO: P 3,129,000.00
May 13, 2022 FY 2022 GAA WIN2G02888 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100244000
Project ID : P00636846LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildingd/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Sta. 9+180.00 - Sta. 9+440.00
Kemdeng, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,803.005 square meter
Allocation - Php 125.083 Million

TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Sta. 9+180.00 - Sta. 9+435.00
Kemdeng, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 5,384.78 square meter
Allocation - Php 125.083 Million

May 13, 2022 2022 WIN2E02094 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Davao River, Sta. 0+077 - Sta. 0+412, Generoso Bridge Downstream, Right Bank, Davao City
Physical Target:
CW1: 245 lineal m. (Construction of Revetment:)

Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Revetment)
EAO: P 3,500,000.00

TO: OO2: Protect Lives and Properties Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Davao River, Sta. 2+001 - Sta. 2+246, Generoso Bridge Downstream, Right Bank, Davao City
Physical Target:
CW1: 245 lineal m. (Construction of Revetment:)

Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Revetment)
EAO: P 3,500,000.00
May 13, 2022 2022 WIN2E02106 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Installation of Road Safety Devices – ABS-CBN-Quimpo Blvd Div. Rd - K1514 + 000 – K1515 + 343, Davao City
Physical Target:
CW1: 10.048 lane km. (Road Safety: Pavement Markings)

Allocation:
TOTAL: P 12,500,000.00
CW1: P 12,250,000.00 (Road Safety: Pavement Markings)
EAO: P 250,000.00

TO: Convergence and Special Support Program - Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239:
Installation of Road Safety Devices – ABS-CBN-Quimpo Blvd Div. Rd - K1514 + 470 – K1515 + 320, Davao City
Physical Target:
CW1: 0.820 km. (Road Safety: Street Lighting)

Allocation:
TOTAL: P 12,500,000.00
CW1: P 12,250,000.00 (Road Safety: Street Lighting)
EAO: P 250,000.00
May 13, 2022 2022 320102104940000 GAA 2022 January 3, 2022 Region II Isabela 4th District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Rehabilitation of Cagayan River Flood Control Project, Sta. 0+000 - Sta. 0+202, Dammang West, Echague, Isabela
May 13, 2022 2022 300219100613000 GAA 2022 January 3, 2022 Region II Isabela 4th District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure/Facilities

Construction of Brgy. Panang Flood Control Structure, Sta. 0 + 400 - Sta. 0 + 795, San Agustin, Isabela
May 13, 2022 2022 300219100615000 GAA 2022 January 3, 2022 Region II Isabela 4th District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure/Facilities

Construction of Flood Control Structure, Sta. 0 + 385 - Sta. 0 + 855, Sinaoangan Sur, San Agustin, Isabela
May 13, 2022 2022 300219100607000 GAA 2022 January 3, 2022 Region II Isabela 4th District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure/Facilities

Construction of Addalam Flood Control Structure, Jones, Isabela
May 13, 2022 FY 2022 GAA WIN2G02939 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215101637000
Project ID : P00636969LZ


CONVERGENCE AND SPECIAL SUPPORT PROGRAMM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Port barton - Kemdeng Road, San Vicente, Palawan
Sta. 0+692.00 - Sta. 735.00
Physical Target - CW1- Construction of Road Slope Protection
Structure : 407.735 square meter
Allocation - ph 18.195 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Port Barton - Kemdeng Road, San Vicente, Palawan
Sta. 0+458.00 - Sta. 0+485.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 738.00 square meter
Allocation - Php 18.195 Million

May 13, 2022 FY 2022 GAA WIN2G02901 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215101646000
Project ID : P00636976LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the national Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Tabon Cave Road, Sta. 6+356.00 - Sta.06+436.00
Quezon, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 641.89 square meter
Allocation - Php 28.644 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Tabon Cave Road, Sta. 6+356.00 - Sta. 6+436.00
Quezon, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,296.72 square meter
Allocation - Php 28.644 Million
May 13, 2022 FY 2022 GAA WIN2G02882 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100248000
Project ID : P00636850LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Construction of PPSR Jct. - napsan - Apurawan Road
Sta. 35+634.00 - Sta. 35+765.00 Palawan
Physical Target - CW1 - Construction of Concrete Road ;
9.127 lane km
Allocation - Php 110.155 Million

TO :

Construction of PPSR Jct. - Napsan - Apurawan Road
Sta. 35+634.00 - Sta. 35+772.00
Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 4,922.74 square meter
Allocation - Php 110.155 Million
May 13, 2022 2022 300219100044000 GAA 2022 January 3, 2022 Region II Isabela 4th District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure/Facilities

Construction of Flood Control Structure at Brgy. Calaocan Section 1, Santiago City, Isabela
May 13, 2022 2022 300219100045000 GAA 2022 January 3, 2022 Region II Isabela 4th District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure/Facilities

Construction of Flood Control Structure at Brgy. Calaocan Section 2, Santiago City, Isabela
May 13, 2022 2022 300219100612000 GAA 2022 January 3, 2022 Region II Isabela 4th District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure/Facilities

Construction of Brgy. Minuri Flood Control Structure, Sta. 0 + 400 - Sta. 0 + 915, Jones, Isabela
May 13, 2022 FY 2022 GAA WIN2G02922 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215101647000
Project ID : P00636977LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Tabon Cave Road, Sta. 6+539.00 - Sta. 6+649.00
Quezon, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure ; 1,043.08 square meter
Allocation - Php 46.547 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along tabon Cave Road, Sta. 6+539.00 - Sta. 6+640.00
Quezon, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,019.35 square meter
Allocation - Php 46.547 Million
May 13, 2022 2022 320101107353000 GAA 2022 January 3, 2022 Region II Isabela 4th District Engineering Office
OO2: Protects Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage System

Construction of Villaflor Flood Control Structure, Sta. 0+000 - Sta. 0+595, San Isidro, Isabela
May 13, 2022 FY 2022 GAA WIN2G02907 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100406000
Project ID : P00638962LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the national Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Access Road Malbog jct. - Sta. Fe Gumbirayan Provincial
Road leading to San Jose Beaches, Sta. 8+360 - Sta. 8+520
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,577.05 square meter
Allocation - 115.00 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Access Road Malbog Jct. - Sta. Fe Gumbirayan Provincial
Road leading to San Jose Beaches, Sta. 7+953 - Sta. 8+154
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 4,954.40 square meter
Allocation - Php 115.00 Million



May 13, 2022 2022 WIN2E02197 FY 2022 GAA R.A.11639 January 1, 2022 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1560+ 890 - K1560 + 990
Physical Target:
CW1: 5,555.56.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1560 + 890 - K1560 + 990
Physical Target:
CW1: 3,600.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
May 13, 2022 2022 WIN2E02188 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1570+ 035 - K1570 + 135
Physical Target:
CW1: 5,555.56.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1568 + 225 - K1568 + 247, K1570 + 000 – K1570 + 086
Physical Target:
CW1: 3,577.64 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
May 13, 2022 2022 WIN2E02158 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Manat River (Downstream), Sta. 19+110 – Sta. 19+900 (LS), Sta. 19+500 – Sta. 21+500 (RS), Brgy. Mainit, Nabunturan, Davao de Oro
Physical Target:
CW1: 2,790 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Revetment)
EAO: P 2,450,000.00

TO: OO2: Protect Lives and Properties – Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Manat River (Downstream), Sta. 19+110 - Sta. 19+900 (LS), Sta. 20+115.73 - Sta. 21+007.73 (RS), Sta. 21+028.00 - Sta. 21+500.00 (RS), Brgy. Mainit, Nabunturan, Davao de Oro
Physical Target:
CW1: 2,150 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Revetment)
EAO: P 2,450,000.00
May 13, 2022 2022 WIN2E02133 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River, Sta. 1+000 – Sta. 2+000 (LS), Sta. 3+000 – Sta. 4+200 (LS), Brgy. Tandawan, New Bataan, Davao de Oro
Physical Target:
CW1: 2,200.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00

TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River, Sta. 4+400 – Sta. 7+340, Brgy. Tandawan, New Bataan, Davao de Oro
Physical Target:
CW1: 2,000.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00
May 13, 2022 2022 WIN2E02147 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River, Sta. 2+000 - Sta. 3+500 (LS), Brgy. Katipunan, Maragusan, Davao de Oro
Physical Target:
CW1: 1,500.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00

TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River, Sta. 2+000.000 – Sta. 2+512.382 (LS), Sta. 3+839.493 – Sta. 5+169.202 (LS), Sta. 5+546.574 – Sta. 5+822.483 (LS), Brgy. Katipunan, Maragusan, Davao de Oro
Physical Target:
CW1: 2,118.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00
May 13, 2022 2022 WIN2E02152 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River, Sta. 5+000 – Sta. 7+500 (RS), Brgy. Magsaysay, New Bataan, Davao de Oro
Physical Target:
CW1: 2,500.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00

TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River, Sta. 16+347 – Sta. 18+570 (RS), Brgy. Magsaysay, New Bataan, Davao de Oro
Physical Target:
CW1: 2,243.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00
May 13, 2022 2022 WIN2E02134 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Hijo River, Sta. 0+200 – Sta. 2+200 (RS), Brgy. Panibasan, Maco, Davao de Oro
Physical Target:
CW1: 2,000.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 80,000,000.00
CW1: P 77,200,000.00 (Construction of Revetment)
EAO: P 2,800,000.00

TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Hijo River, Sta. 3+400 - Sta. 6+000, Brgy. Panibasan, Maco, Davao de Oro
Physical Target:
CW1: 2,218.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 80,000,000.00
CW1: P 77,200,000.00 (Construction of Revetment)
EAO: P 2,800,000.00
May 13, 2022 2022 WIN2E02080 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Manat River (Up-stream and Down Stream) leading to Agusan River, Sta. 12+700 – Sta. 13+200 (LS), Bankeruhan Sur to Bankerohan Norte, Davao de Oro
Physical Target:
CW1: 500.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00

TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Manat River (Up-stream and Down Stream) leading to Agusan River, Sta. 12+793.671 – Sta. 13+057.781 (LS), Sta. 13+066.790 – Sta. 13+200 (LS), Bankeruhan Sur to Bankeruhan Norte, Davao de Oro
Physical Target:
CW1: 420.420 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00
May 13, 2022 2022 WIN2E02138 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River (Downstream), Sta. 2+400 – Sta. 3+900 (LS), Brgy. Cambagang, Maragusan, Davao de Oro
Physical Target:
CW1: 1,500.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00

TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River (Downstream), Sta. 2+400 – Sta. 2+419.318 (LS), Sta. 2+431.645 – Sta. 2+930.00 (LS), Sta. 3+098.557 – Sta. 3+246.896 (LS), Sta. 3+266.034 – Sta. 3+783.342 (LS), Brgy. Cambagang, Maragusan, Davao de Oro
Physical Target:
CW1: 1,300.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00
May 13, 2022 2022 WIN2E02144 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River (Upstream), Sta. 4+640 – Sta. 6+140 (LS), Brgy. Cambagang, Maragusan, Davao de Oro
Physical Target:
CW1: 1,500.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00

TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River (Upstream), Sta. 4+640 – Sta. 5+070 (LS), Sta. 5+070 – Sta. 5+909.00 (LS), Brgy. Cambagang, Maragusan, Davao de Oro
Physical Target:
CW1: 1,329.000 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00
May 13, 2022 2022 WIN2E02170 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Hijo River, Sta. 0+550.07 – Sta. 1+350.07 (RS), Sta. 1+547.93 – Sta. 1+747.93, Brgy. Elizalde, Maco, Davao de Oro
Physical Target:
CW1: 1,000.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00

TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Hijo River, Sta. 0+550.07 – Sta. 1+837.070 (RS), Sta. 1+547.93 – Sta. 1+870.930 (LS), Brgy. Elizalde, Maco, Davao de Oro
Physical Target:
CW1: 1,610.000 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00
May 13, 2022 2022 WIN2E02148 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Revetment along Hijo River, Barangay Dumlan, Maco, Davao de Oro
Physical Target:
CW1: 431.20 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Revetment)
EAO: P 2,450,000.00

TO: Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Revetment along Hijo River, Barangay Dumlan, Maco, Davao de Oro
Physical Target:
CW1: 453.53 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Revetment)
EAO: P 2,450,000.00
May 13, 2022 2022 WIN2E02136 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program – Basic Infrastructure Program (BIP) – Multi-Purpose Buildings/Facilities to support Social Services
Construction of Multi-purpose Building Kidaraan ES, Mabini, Davao de Oro
Physical Target:
CW1: 1 No. of Building (Construction of Multi Purpose Building)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Multi Purpose Building)
EAO: P 50,000.00

TO: Convergence and Special Support Program – Basic Infrastructure Program (BIP) – Multi-Purpose Buildings/Facilities to support Social Services
Construction of Multi-purpose Building Masicareg ES, Prk. Kidaraan, Mabini, Davao de Oro
Physical Target:
CW1: 1 No. of Building (Construction of Multi Purpose Building)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Multi Purpose Building)
EAO: P 50,000.00
May 13, 2022 2022 WIN2E02181 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Binuangan Creek leading to Maco River, Sta. 0+000 – Sta, 0+500 (LS), Sta. 0+000 – Sta. 1+000 (RS), Brgy. Binuangan, Maco, Davao de Oro
Physical Target:
CW1: 1,500.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00

TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Binuangan Creek leading to Maco River, Sta. 0+400 – Sta. 1+200, Brgy. Binuangan, Maco, Davao de Oro
Physical Target:
CW1: 1,300.000 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00
May 12, 2022 2022 WIN2E02030 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Dahican-Lawigan Rd - K1716+500 - K1716+653.10,
K1717+653 - K1720+000, K1720+000 - K1722+000
Physical Target:
CW1: 9.000 Lane Km (Road Widening)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Road Widening)
EAO: P 5,250,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Dahican-Lawigan Rd - K1716+653 - K1721+418
Physical Target:
CW1: 7.531 Lane Km (Road Widening)
ROW: 50,084.701 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 109,045,000.00 (Road Widening)
ROW: P 35,705,000.00 (ROW Acquisition)
EAO: P 5,250,000.00
May 12, 2022 2022 WIN2E02072 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1605 + 000 - K1608 + 826
Physical Target:
CW1: 7.648 Lane Km (Road Widening)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Road Widening)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1604 + 966 - K1608 + 799
Physical Target:
CW1: 7.662 Lane Km (Road Widening)
ROW: 50,952.30 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 88,500,000.00 (Road Widening)
ROW: P 8,000,000.00 (ROW Acquisition)
EAO: P 3,500,000.00
May 12, 2022 2022 WIN2E02089 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1536 + 850 - K1536 + 950
Physical Target:
CW1: 5,555.560 sq. m. (Construction of Road Slope Protection)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1536 + 680 – K1536 + 740,
K1536 + 780 - K1536 + 840
Physical Target:
CW1: 3,504.00 sq. m. (Construction of Road Slope Protection)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection)
EAO: P 3,500,000.00
May 12, 2022 2022 WIN2E02025 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1781+(-486) - K1785+000, K1792+298 - K1792+608,
K1793+356 - K1795+735, K1796+085 - K1799+000, K1802+000 - K1806+109
Physical Target:
CW1: 15.000 Lane Km (Road Widening)
Allocation:
TOTAL: P 250,000,000.00
CW1: P 241,250,000.00 (Road Widening)
EAO: P 8,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1795+185 - K1795+735,
K1796+085 - K1799+041, K1802+000 - K1804+334
Physical Target:
CW1: 11.548 Lane Km (Road Widening)
ROW: 115,480.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 250,000,000.00
CW1: P 176,112,500.00 (Road Widening)
ROW: P 65,137,500.00 (ROW Acquisition)
EAO: P 8,750,000.00
May 12, 2022 2022 WIN2E02027 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Mati-Maragusan Rd - K1527+593 - K1532+000
Physical Target:
CW1: 8.828 Lane Km (Road Widening)
Allocation:
TOTAL: P 131,159,000.00
CW1: P 126,568,435.00 (Road Widening)
EAO: P 4,590,565.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Mati-Maragusan Rd - K1527+593 - K1529+892
Physical Target:
CW1: 4.608 Lane Km (Road Widening)
ROW: 30,645.049 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 131,159,000.00
CW1: P 119,330,935.00 (Road Widening)
ROW: P 7,237,500.00 (ROW Acquisition)
EAO: P 4,590,565.00
May 12, 2022 2022 WIN2E02023 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
By-Pass Road at Jct. Davao City Diversion Road-Communal-Cabantian-Tigatto Road, Davao City
Physical Target:
CW1: 379.940 sq. m. (Construction of Concrete Bridge)
CW2: 0.068 Lane Km (Construction of Concrete Road)
CW3: 0.291 Lane Km (Construction of Concrete Road)
ROW: 1,475.406 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 96,742,000.00
CW1: P 83,129,925.00 (Construction of Concrete Bridge)
CW2: P 518,205.00 (Construction of Concrete Road)
CW3: P 2,219,500.00 (Construction of Concrete Road)
ROW: P 7,488,400.00 (ROW Acquisition)
EAO: P 3,385,970.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
By-Pass Road at Jct. Davao City Diversion Road-Communal-Cabantian-Tigatto Road, Davao City
Physical Target:
CW1: 0.340 Lane Km (Road Widening)
CW2: 0.398 Lane Km (Construction of Concrete Road)
CW3: 550.100 sq. m. (Off-Carriageway Improvement)
ROW: 4,550.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 96,742,000.00
CW1: P 10,085,989.12 (Road Widening)
CW2: P 7,307,288.54 (Construction of Concrete Road)
CW3: P 2,871,722.34 (Off-Carriageway Improvement)
ROW: P 20,265,000.00 (ROW Acquisition)
EAO: P 1,470,00.00
EXC: P 54,742,000.00
May 12, 2022 2022 WIN2E02028 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Davao-Bukidnon Rd - K1635+157 - K1635+660, K1638+818 - K1639+100,
K1643+018 - K1643+900, K1644+321 - K1646+000, K1669+564 - K1671+000
Physical Target:
CW1: 12.520 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 149,886,000.00
CW1: P 144,620,690.00 (Reconstruction to Concrete Pavement)
EAO: P 5,245,310.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Davao-Bukidnon Rd - K1644+321 - K1647+409, K1648+055 - K1648+560,
K1653+090 - K1654+713, K1660+094 - K1660+402, K1667+159 - K1667+238,
K1668+085 - K1668+409, K1668+499 - K1668+562, K1669+192 - K1669+516,
K1672+939 - K1673+220, K1681+350 - K1682+220
Physical Target:
CW1: 14.932 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 149,886,000.00
CW1: P 144,620,690.00 (Reconstruction to Concrete Pavement)
EAO: P 5,245,310.00
May 12, 2022 2022 WIN2E02026 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Tibanban-Lavigan Rd - K1744+436 - K1745+200, K1749+735 - K1753+000,
K1753+000 - K1755+000, K1755+000 - K1757+055, K1757+547 - K1759+902
Physical Target:
CW1: 21.032 Lane Km (Road Widening)
Allocation:
TOTAL: P 200,000,000.00
CW1: P 193,000,000.00 (Road Widening)
EAO: P 7,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Tibanban-Lavigan Rd - K1782+600 - K1784+506
Physical Target:
CW1: 3.534 Lane Km (Road Widening)
CW2: 673.180 sq. m. (Construction of Road Slope Protection Structure (Seawall))
CW3: 2,340.00 sq. m. (Construction of Road Slope Protection Structure (MSE Wall))
ROW: 23,501.10 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 200,000,000.00
CW1: P 80,655,296.01 (Road Widening)
CW2: P 37,450,252.66 (Construction of Road Slope Protection Structure (Seawall))
CW3: P 65,244,451.33 (Construction of Road Slope Protection Structure (MSE Wall))
ROW: P 9,650,000.00 (ROW Acquisition)
EAO: P 7,000,000.00
May 12, 2022 2022 WIN2E02090 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1632 + 200 - K1632 + 300
Physical Target:
CW1: 5,555.56 sq. m. (Construction of Road Slope Protection)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1692 + 580 - K1692 + 720
Physical Target:
CW1: 3,598.00 sq. m. (Construction of Road Slope Protection)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection)
EAO: P 3,500,000.00
May 12, 2022 2022 WIN2E02091 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1528 + 475 - K1529 + 286
Physical Target:
CW1: 1.560 Lane Km (Road Widening)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Road Widening)
EAO: P 600,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1528 + 336 - K1529 + 286
Physical Target:
CW1: 1.838 Lane Km (Road Widening)
ROW: 12,222.70 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 26,460,000.00 (Road Widening)
ROW: P 2,940,000.00 (ROW Acquisition)
EAO: P 600,000.00

Pages