June 16, 2021 2021 WIN1F06288 GAA FY 2021 January 25, 2021 Region VIII Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (SM) (Sn Isidro – Sn Juanico Br) K0745+652 – K0746+000

Physical Target: Allocation:

CW1-Road Widening: 0.86 Lane Km P 14.70 M

EAO P 0.30 M

Total P 15.00 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro – Sn Juanico Br.) K0745+652 – K0746+000

Physical Target: Allocation:

CW1-Road Widening: 0.469Lane Km P 8.23 M

CW2-Off-Carriageway Improvement: P 4.51 M
Shoulder Paving:2,296.80 Square Meters

ROW-ROW Acquisition: 3,867.95 Square Meters P 2.00 M

EAO P 0.26 M

Total P 15.00 M
June 16, 2021 2021 WIN1F06275 GAA FY 2021 January 1, 2021 Region VIII Biliran District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

Biliran Circumferential Rd - K1031 + 400 - K1032 + 769

Physical Target: Allocation:

CW1-Road Widening: 2.806 Lane Km P 29.400 M

EAO P 0.600 M

Total P 30.00 M

AS MODIFIED:

Biliran Circumferential Rd - K1031 + 252 - K1032 + 328

Physical Target: Allocation:

CW1-Road Widening: 2.220 Lane Km P 29.400 M

EAO P 0.600 M

Total P 30.00 M
June 16, 2021 FY 2021 GAA WIN1F06146 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 310102100583000
Project ID : P00516138LZ

001: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM:

Calapan South Road
K0005 + 415 - K005 + 876,
K0009 + 572 - K0010 + 521,
K0012 + 733 - K0015 + 162
Physical Target - CW1 - Preventive Maintenance Of Road :
Asphalt Overlay : 7.676 Lane Km
Allocation : Php 93.187 Million

TO;

Calapan South Road
K0005 + 415 - K0005 + 861,
K0009 + 571 - K0010 + 803,
K0012 + 799 - K0015 + 211
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 8.178 Lane Km
Allocation : Php 93.187 Million
June 16, 2021 2021 WIN1F06267 GAA FY 2021 February 2, 2021 Region VIII Leyte 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

AS PER GAA/ORIGINAL:

Palo-Carigara-Ormoc Rd - K0958 + 254 - K0958 + 413, K0958 + 534.35 - K0958 + 685

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 6.95702 M
Asphalt Overlay: 1.239 Lane Km

EAO P 0.14198 M

Total P 7.099 M

AS MODIFIED:

Palo-Carigara-Ormoc Rd - K0958 + 123.67 - K0958 + 413, K0958 + 534.35 - K0958 + 827.40

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 6.95702 M
Asphalt Overlay: 1.16476 Lane Km

EAO P 0.14198 M

Total P 7.099 M
June 16, 2021 2021 WIN1F06266 GAA FY 2021 February 2, 2021 Region VIII Leyte 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement - Tertiary Roads

AS PER GAA/ORIGINAL:

Jaro-Dagami-Burauen-La Paz Rd - K0944 + 292 - K0944 + 747

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: Shoulder P 9.80 M
Paving /Construction: 2,275.00 Square Meters

EAO P 0.20 M

Total P 10.00 M

AS MODIFIED:

Jaro-Dagami-Burauen-La Paz Rd - K0944 + 290 - K0944 + 881

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: Shoulder P 9.80 M
Paving /Construction: 2,364.00 Square Meters

EAO P 0.20 M

Total P 10.00 M
June 16, 2021 2021 WIN1F06268 GAA FY 2021 February 1, 2021 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development – Off-Carriageway Improvement-Primary Roads

AS PER GAA/ORIGINAL:

Off-Carriageway Improvement: Shoulder Paving/ Construction – Ormoc-Baybay-Southern Leyte Bdry. Rd – K1013+063 – K1013+960

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: Shoulder P 8.790600 M
Paving/ Construction: 2,242.500 Square Meters

EAO P 0.179400 M

Total P 8.970 M

AS MODIFIED:

Off-Carriageway Improvement: Shoulder Paving/ Construction – Ormoc-Baybay-Southern Leyte Bdry. Rd – K1013+710 – K1014+249

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: Shoulder P 8.790600 M
Paving/ Construction: 2,251.15 Square Meters

EAO P 0.179400 M

Total P 8.970 M
June 16, 2021 2021 WIN1F06260 GAA FY 2021 February 1, 2021 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development – Off-Carriageway Improvement-Primary Roads

AS PER GAA/ORIGINAL:

Off-Carriageway Improvement: Shoulder Paving/ Construction – Ormoc-Baybay-Southern Leyte Bdry. Rd – K1013+968 – K1015+355

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: Shoulder P 13.690600 M
Paving/ Construction: 3,492.500 Square Meters

EAO P 0.279400 M

Total P 13.970 M

AS MODIFIED:

Off-Carriageway Improvement: Shoulder Paving/ Construction – Ormoc-Baybay-Southern Leyte Bdry. Rd – K1014+249 – K1015+100

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: Shoulder P 13.690600 M
Paving/ Construction: 3,621.5 Square Meters

EAO P 0.279400 M

Total P 13.970 M
June 16, 2021 2021 WIN1F06289 GAA FY 2021 February 1, 2021 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development – Off-Carriageway Improvement-Primary Roads

AS PER GAA/ORIGINAL:

Off-Carriageway Improvement: Shoulder Paving/ Construction – Palo-Carigara-Ormoc Rd – K0993+186 – K0994+030

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: Shoulder P 8.36920 M
Paving/ Construction: 2,135 Square Meters

EAO P 0.17080 M

Total P 8.540 M

AS MODIFIED:

Off-Carriageway Improvement: Shoulder Paving/ Construction – Palo-Carigara-Ormoc Road, K0993+186 – K0994+070; K0995+859 – K0996+062

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: Shoulder P 8.36920 M
Paving/ Construction: 2,135.80 Square Meters

EAO P 0.17080 M

Total P 8.540 M
June 16, 2021 2021 WIN1F06269 GAA FY 2021 February 1, 2021 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Road

AS PER GAA/ORIGINAL:

Reconstruction to Concrete Pavement – Palompon-Isabel-Merida-Ormoc Rd – K1089+000 – K1089+424

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement: P 18.892440 M
0.848 Lane Km
EAO P 0.385560 M

Total P 19.278 M

AS MODIFIED:

Reconstruction to Concrete Pavement – Palompon-Isabel-Merida-Ormoc Rd – K088+050 – K1088+068 (B); K1088+202 – K1088+220 (B); K1088+329 – K1088+409 (R); K1088+655 – K1088+673 (B); K1089+000 – K1089+027 (B); K1089+027 – K1089+045 (L); K1089+045 – K1089+392 (B); K1089+392 – K1089+410 (R);
K1089+410 (R); K1089+451 – K1089+528 – K1089+528 (R); K1089+528 – K1089+569 (B); K1090+000 – K1090+013 (B); K1090+013 – K1090+186 (R); 1090+239 - K1090+248 (B);
K1090+362 – K1090+380 (B); K1090+380 - K1090+403 (R); K1090+420 – K1090+438 (L); K1090+488 - K1090+515 (R); K1090+583 – K1090+673 (B); K1090+696 - K1090+714 (B); K1090+733 – K1090+760 (R); K1090+841 - K1090+913 (B); K1090+945 – K1090+981 (R); K1091+130 - K1091+189 (B); K1091+277 – K1091+417 (B); K1091+586 - K1091+604 (R); K1091+687 – K1091+705 (R); K1092+019 - K1092+037 (L); K1092+059 – K1092+331 (R); K1092+426 - K1092+449 (L); K1092+476 – K1092+527 (R)


Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement: P 18.892440 M
2.842 Lane Km
EAO P 0.385560 M

Total P 19.278 M
June 16, 2021 2021 WIN1F06290 GAA FY 2021 February 1, 2021 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Primary Roads

AS PER GAA/ORIGINAL:

Preventive Maintenance of Road: Asphalt Overlay Ormoc-Baybay-So. Leyte Bdry. Road, K1023+000 – K1023+421


Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 14.700 M
Asphalt Overlay : 1.684 Lane Km
EAO P 0.300 M

Total P 15.00 M

AS MODIFIED:

Preventive Maintenance of Road: Asphalt Overlay Ormoc-Baybay-So. Leyte Bdry. Road, K1023+000 – K1023+842


Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 14.700 M
Asphalt Overlay : 1.684 Lane Km
EAO P 0.300 M

Total P 15.00 M
June 16, 2021 2021 WIN1F06282 GAA FY 2021 February 1, 2021 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Primary Roads

AS PER GAA/ORIGINAL:

Construction of Drainage Structure along Road – Palo-Carigara-Ormoc Rd – K1009+700 – K1010+516

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 14.700 M
along Road: 1,704.00 Lineal Meters
EAO P 0.300 M

Total P 15.00 M

AS MODIFIED:

Construction of Drainage Structure along Road – Palo-Carigara-Ormoc Road, K1009+544- K1010+069

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 14.700 M
along Road: 944.00 Lineal Meters
EAO P 0.300 M

Total P 15.00 M
June 16, 2021 2021 WIN1F06279 GAA FY 2021 January 1, 2021 Region VIII Northern Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Bugko-Nenita-Mirador-Cagpanit-an-De Maria-Sn Jose Rd - K0768 + 561 - K0768 + 674

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 10.8192 M
Structure: 904.00 Square Meters
EAO P 0.2208 M

Total P 11.0400 M

AS MODIFIED:

Bugko-Nenita-Mirador-Cagpanit-an-De Maria-Sn Jose Rd - K0768 + 610 - K0768 + 728.50

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 10.8192 M
Structure: 569.895 Square Meters
EAO P 0.2208 M

Total P 11.0400 M
June 16, 2021 2021 WIN1F06277 GAA FY 2021 January 16, 2021 Region VIII Southern Leyte District Engineering Office
Local Program

Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program

AS PER GAA/ORIGINAL:

Construction (Completion) of Multi-Purpose Building (Barangay Health Station), Calag-itan, Limasawa, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Multi Purpose Building: P 1.485 M
1 Number of Building
EAO P 0.015 M

Total P 1.50 M

AS MODIFIED:

Construction (Completion) of Multi-Purpose Building (Barangay Health Station), Calag-itan, Hinunangan, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Multi Purpose Building: P 1.485 M
1 Number of Building
EAO P 0.015 M

Total P 1.50 M
June 16, 2021 2021 WIN1F06226 GAA FY 2021 April 13, 2021 Region VIII Tacloban City District Engineering Office
Local Program

Local - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

AS PER GAA/ORIGINAL:

Construction of Flood Mitigation Structure and Riverbank Protection, Sangyan AFP PNP Housing, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation Structure: P 34.300 M
1,415 Lineal Meters
EAO P 0.700 M

Total P 35.00 M

AS MODIFIED:

Construction of Flood Mitigation Structure and Riverbank Protection, Sangyaw AFP PNP Housing, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation Structure: P 34.650 M
1,415 Lineal Meters
EAO P 0.350 M

Total P 35.00 M
June 16, 2021 FY 2021 GAA WIN1E02294 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1565+000 - K1567+000
Physical Target:
CW1: 4.000 Lane Km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Road Widening)
EAO: P 1,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1564+533 - K1566+033
Physical Target:
CW1: 3.000 Lane Km (Road Widening)
ROW: 22,500.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 41,784,500.00 (Road Widening)
ROW: P 6,465,500.00 (ROW Acquisition)
EAO: P 1,750,000.00
June 16, 2021 FY 2021 GAA WIN1E02286 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Drainage Protection Works - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Rehabilitation of Concrete Revetment along Digos River, Purok Centennial Section, Barangay Zone 1, Digos City
Physical Target:
CW1: 482.000 lm (Rehabilitation/Major Repair of Flood Control Structure)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Rehabilitation/Major Repair of Flood Control Structure)
EAO: P 2,100,000.00

TO: Local Program - Flood Control and Drainage - Drainage Protection Works - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Rehabilitation of Concrete Revetment along Digos River, Purok Centennial Section, Barangay Zone 1, Digos City
Physical Target:
CW1: 683.000 lm (Rehabilitation/Major Repair of Flood Control Structure)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Rehabilitation/Major Repair of Flood Control Structure)
EAO: P 2,100,000.00
June 16, 2021 2021 WIN1F06228 GAA FY 2021 April 13, 2021 Region VIII Tacloban City District Engineering Office
Local Program

Local - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

AS PER GAA/ORIGINAL:

Construction of Flood Control Mitigation Structure and Riverbank Protection, Knightsbridge Residence, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation Structure: P 44.100 M
315 Lineal Meters
EAO P 0.900 M

Total P 45.00 M

AS MODIFIED:

Construction of Flood Control Mitigation Structure and Riverbank Protection, Knightsridge Bridge Residence, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation Structure: P 44.550 M
315 Lineal Meters
EAO P 0.450 M

Total P 45.00 M
June 16, 2021 FY 2021 GAA WIN1E02288 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1563+000 - K1563+400
Physical Target:
CW1: 0.800 Lane Km (Road Widening)
Allocation:
TOTAL: P 24,000,000.00
CW1: P 23,520,000.00 (Road Widening)
EAO: P 480,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1563+198 - K1563+400
Physical Target:
CW1: 0.404 Lane Km (Road Widening)
CW2: 0.202 km (Road Safety: Street Lighting)
ROW: 3,471.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 24,000,000.00
CW1: P 10,323,330.00 (Road Widening)
CW2: P 2,182,670.00 (Road Safety: Street Lighting)
ROW: P 11,014,000.00 (ROW Acquisition)
EAO: P 480,000.00
June 16, 2021 2021 WIN1F06273 GAA FY 2021 January 1, 2021 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Avenida Veteranos St – (S00003LT) Chainage 393 – Chainage 641

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement: P 11.050480 M
0.496 Lane Km
EAO P 0.225520 M

Total P 11.276 M

AS MODIFIED:

Avenida Veteranos St - (S00003LT) Chainage 121 - Chainage 641

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement: P 11.050480 M
0.768 Lane Km
EAO P 0.225520 M

Total P 11.276 M
June 15, 2021 2021 WIN1F06235 GAA FY 2021 January 1, 2021 Region VIII Biliran District Engineering Office
Local Program

Local -Local Roads and Bridges - Local Roads - Local Infrastructure Program

AS PER GAA/ORIGINAL:

Rehabilitation of Barangay Road, Barangay Lucsoon, Naval, Biliran

Physical Target: Allocation:

CW1-Rehabilitation of Concrete Road : P 1.98 M
0.188 Lane Km
EAO P 0.20 M

Total P 2.00 M

AS MODIFIED:

Rehabilitation of Barangay Road, Barangay Lucsoon, Naval, Biliran

Physical Target: Allocation:

CW1-Rehabilitation of Concrete Road : P 1.98 M
0.328 Lane Km
EAO P 0.20 M

Total P 2.00 M
June 15, 2021 2021 WIN1F06234 GAA FY 2021 February 2, 2021 Region VIII Leyte 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

AS PER GAA/ORIGINAL:

Jaro-Dagami-Burauen-Lapaz Rd - K0981 + 700 - K0982 + 723

Physical Target: Allocation:

CW1-Road Widening: 2.16 Lane Km P 29.40 M

EAO P 0.60 M

Total P 30.00 M

AS MODIFIED:

Jaro-Dagami-Burauen-Lapaz Rd - K0980 + 649 - K0981 + 327, K0981 + 373 - K0981 + 706

Physical Target: Allocation:

CW1-Road Widening: 2.16 Lane Km P 29.40 M

EAO P 0.60 M

Total P 30.00 M
June 15, 2021 2021 WIN1C03932 GAA 2021 June 11, 2021 Cordillera Administrative Region CAR - Regional Office
From: Asset Preservation - Preventive Maintenance - Asphalt Overlay (Instapave) along Baguio - Bontoc Road K0284+969 - K0300+636;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 125,000,000

To: Asset Preservation - Preventive Maintenance - Asphalt Overlay (Instapave) along Baguio - Bontoc Road K0284+969 - K0294+969;
Physical Target: CW1 : 20.00 Lane Km;
Allocation= Php 125,000,000


June 15, 2021 2021 WIN1C03906 GAA 2021 June 4, 2021 Cordillera Administrative Region Ifugao 1st District Engineering Office
From: Construction of Ap-Apid Multi-Purpose Building (1st Phase), Ap-Apid, Tinoc, Ifugao;
Physical Target: CW1: 1 Number of Buildings;
Allocation= Php 3,000,000

To: Construction of Ap-Apid Multi-Purpose Building (2nd Phase), Ap-Apid, Tinoc, Ifugao;
Physical Target: CW1: 1 Number of Buildings;
Allocation= Php 3,000,000

June 15, 2021 2021 WIN1F06241 SR2021-02-002205 February 4, 2021 Region VI Regional Office VI
FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Construction of By-Pass and Diversion Roads

Bacolod Negros Occidental Economic Highway (BANOCEH), Section 1, Package D, E, F, Negros Occidental

CW1- Road Widening: 9.536 lane km
20,866.51 / lane km - 198,983.00
EAO - 7,217.00
Total: 206,200.00

TO:

OO1: Ensure Safe and Reliable National Road System

Network Development - Construction of By-Pass and Diversion Roads

Bacolod Negros Occidental Economic Highway (BANOCEH), Section 1, Package D, E, F, Negros Occidental

CW1- Road Widening: 6.170 lane km
32,250.08 /lane km - 198,983.00
EAO - 7,217.00
Total: 206,200.00


June 15, 2021 2021 WIN1F06250 SR2021-02-002197 February 4, 2021 Region VI Regional Office VI
FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

Passi-Sn Rafael-Lemery-Sara Rd - K0092 + 565 - K0095 + 886

CW1- Road Widening: 6.654 lane km
16,887.50 /lane km - 112,369.425

EAO - 4,075.575

Total: 116,445.00

TO:

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

Passi-Sn Rafael-Lemery-Sara Rd - K0092 + 364 - K0095 + 886

CW1- Road Widening: 7.056 lane km
15,515.08 / lane km - 109,474.425

ROW Acquisition: 35,280 square meters
0.082 / square meter - 2,895.00

EAO - 4,075.575
Total: 116,445.00
June 15, 2021 2021 WIN1F06225 GAA FY 2021 February 1, 2021 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development – Off-Carriageway Improvement-Primary Roads

AS PER GAA/ORIGINAL:

Off-Carriageway Improvement Shoulder Paving/Construction – Palo-Carigara-Ormoc Rd – K0994+345 – K0995+344

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: Shoulder P 9.80 M
Paving/ Construction: 2,500.22

EAO P 0.20 M

Total P 10.00 M

AS MODIFIED:

Off-Carriageway Improvement Shoulder Paving/Construction – Palo-Carigara-Ormoc Road, K0994+345 – K0995+344; K0995+344 – K0995+859

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: Shoulder P 9.80 M
Paving/ Construction: 2,500.50

EAO P 0.20 M

Total P 10.00 M
June 15, 2021 2021 WIN1F06219 SR-2021-02-002360 February 4, 2021 Region VI Regional Office VI
FROM:

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Construction/ Improvement of Access Roads leading to Declared Tourism Destinations

Access Road leading to Sitio Bago - ATA Village, Brgy. Puey, Sagay City, Negros Occidental

CW1- Construction of Concrete Road: 8.40 lane km
12,062.50 /lane km - 101,325.00
EAO - 3,675.00
Total: 105,000.00

TO:

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Construction/ Improvement of Access Roads leading to Declared Tourism Destinations

Access Road leading to Sitio Bago - ATA Village, Brgy. Puey, Sagay City, Negros Occidental

CW1- Construction of Concrete Road: 4.88 lane km
20,763.32 /lane km - 101,325.00
EAO - 3,675.00
Total: 105,000.00
June 15, 2021 2021 WIN1F06236 SR2021-02-002184 February 4, 2021 Region VI Regional Office VI
FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Primary Roads

Kabankalan-Bais Rd - K0109 + 034 - K0111 + 763

CW1- Road Widening: 5.376 lane km
17,950.15 /lane km - 96,500.00

EAO - 3,500.00

Total: 100,000.00

TO:

OO1: Ensure Safe and Reliable National Road
System

Network Development Program - Road Widening - Primary Roads

Kabankalan-Bais Rd - K0109 + 034 - K0111 + 421

CW1- Road Widening: 4.692 lane km
18,771.43 / lane km - 88,075.55

ROW Acquisition: 23,460 square meters
0.359 / square meter - 8,424.45

EAO - 3,500.00

Total: 100,000.00
June 15, 2021 2021 WIN1F06214 SR2021-02-002214 February 4, 2021 Region VI Regional Office VI
FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Construction of By-Pass and Diversion Roads

Bacolod Negros Occidental Economic Highway (BANOCEH), Section 1, Segment 3, Negros
Occidental

CW1- Construction of Concrete Road: 10.00 lane km
16,887.50 /lane km - 168,875.00

ROW Acquisition: 14,285.71 sq.m
2.70/ sq.m - 38,600.00

EAO - 7,525.00

Total: 215,000.00

TO:

OO1: Ensure Safe and Reliable National Road System

Network Development - Construction of By-Pass and Diversion Roads

Bacolod Negros Occidental Economic Highway (BANOCEH), Section 1, Segment 3, Negros
Occidental

CW1- Construction of Concrete Road: 8.45238 lane km
21,760.14 /lane km - 183,925.00

ROW Acquisition: 14,285.71 sq.m
1.65/ sq.m - 23,550.00

EAO - 7,525.00

Total: 215,000.00

June 14, 2021 FY 2021 GAA WIN1G02920 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Road: Asphalt Overlay - Davao-Cotabato Old Rd - K1520+029 - K1522+678
Physical Target:
CW1: 17.644 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 211,400,000.00
CW1: P 204,001,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 7,399,000.00

TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Road: Asphalt Overlay - Davao-Cotabato Old Rd - K1520+389 - K1522+680, K1526+(-)432 - K1526+398
Physical Target:
CW1: 12.460 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 211,400,000.00
CW1: P 204,001,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 7,399,000.00
June 14, 2021 FY 2021 GAA WIN1G02918 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay - Slaughterhouse Bypass Road, Davao City
Physical Target:
CW1: 15.720 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 167,500,000.00
CW1: P 161,637,500.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,862,500.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay - Slaughterhouse Bypass Road, Davao City
Physical Target:
CW1: 10.320 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 167,500,000.00
CW1: P 108,562,500.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,937,500.00
EXC: P 55,000,000.00
June 14, 2021 FY 2021 GAA WIN1G02917 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Road (Asphalt Overlay) - Davao-Cotabato Road (Davao City-Jct. Digos Section) -
K1516+280 - K1518+155, K1518+655 - K1519+606
Physical Target:
CW1: 13.621 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 163,300,000.00
CW1: P 157,488,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,712,000.00

TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Road (Asphalt Overlay) - Davao-Cotabato Road (Davao City-Jct. Digos Section) -
K1522+764 - K1524+471
Physical Target:
CW1: 10.200 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 163,300,000.00
CW1: P 157,488,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,712,000.00
June 14, 2021 2021 WIN1C03835 GAA 2021 May 20, 2021 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Road- K0388 + (-882) - K0388 + (-862), K0403 + 790 - K0403 + 805, K0405 + 700 - K0405 + 710, K0409 + 450 - K0409 + 465, K0409 + 550 - K0409 + 610, K0410 + 115 - K0410 + 130, K0411 + 210 - K0411 + 245, K0413 + 465 - K0413 + 487;
Physical Target: CW1: 2,967.754 Square meters;
Allocation= Php 29,260,000

To: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Road- K0409 + 438 - K0409 + 453, K0409 + 600 - K0409 + 660, K0411 + 195 - K0411 + 220, K0413 + 305 - K0413 + 320, K0414 + 520 - K0414 +570;
Physical Target: CW1: 1,596 Square meters;
Allocation= Php 29,260,000

June 14, 2021 2021 WIN1C03886 GAA 2021 June 1, 2021 Cordillera Administrative Region CAR - Regional Office
From: Asset Preservation - Preventive Maintenance - Asphalt Overlay (Instapave) along Asin (KM 8) - Nangalisan - Sn Pascual, Tuba, Benguet -La Union Bdry Road - K0258+(-351) - K0282+540;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 250,000,000

To: Asset Preservation - Preventive Maintenance - Asphalt Overlay (Instapave) along Asin (KM 8) - Nangalisan - Sn Pascual, Tuba, Benguet -La Union Bdry Road - K0258+(-351) - K0282+540;
Physical Target: CW1 : 46.272 Lane Km;
Allocation= Php 250,000,000

June 14, 2021 2021 WIN1C03860 GAA 2021 May 25, 2021 Cordillera Administrative Region CAR - Regional Office
From: Shilan-Beckel Rd - K0262 + 870 - K0263 + 000, K0263 + 345 - K0263 + 410;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 110,000,000

To: Shilan-Beckel Rd - K0262 + 870 - K0263 + 000, K0263 + 345 - K0263 + 410;
Physical Target: CW1 : 4,299 Square meters;
Allocation= Php 110,000,000

June 14, 2021 2021 WIN1C03878 GAA 2021 June 1, 2021 Cordillera Administrative Region CAR - Regional Office
From: Preventive Maintenance- Secondary Roads- Nueva Viscaya- Ifugao- Mt. Province Bdry. Road K0312+060-K0314+000, K0321+232-K0322+374, K0323+770-K0334+500;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 20,000,000

To: Preventive Maintenance- Secondary Roads- Nueva Viscaya- Ifugao- Mt. Province Bdry. Road K0323+770 - K0324+015, K0324+738 - K0326+200;
Physical Target: CW1 : 3.414 Lane Km;
Allocation= Php 20,000,000

June 14, 2021 2021 WIN1C03855 GAA 2021 May 25, 2021 Cordillera Administrative Region CAR - Regional Office
From: Construction of Baney Flood Control at Barangay Baculongan Sur, Buguias, Benguet;
Physical Target: CW1 : 874 Lineal meters;
Allocation= Php 100,000,000

To: Construction of Baney Flood Control at Barangay Baculongan Sur, Buguias, Benguet;
Physical Target: CW1 : 920 Lineal meters;
Allocation= Php 100,000,000

June 14, 2021 FY 2021 GAA WIN1G02922 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Rehabilitation of Road with Line Canal, Barangay 21-C, Davao City
Physical Target:
CW1: 0.272 Lane Km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,980,000.00 (Rehabilitation of Concrete Road)
EAO: P 20,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Rehabilitation of Road with Line Canal, Barangay 21-C, Davao City
Physical Target:
CW1: 0.480 Lane Km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,980,000.00 (Rehabilitation of Concrete Road)
EAO: P 20,000.00
June 14, 2021 FY 2021 GAA WIN1G02919 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Sitio Dafra, Brgy. Colorado, Digos City
Physical Target:
CW1: 1.200 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Sitio Dafra, Brgy. Colorado, Digos City
Physical Target:
CW1: 1.920 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00
June 14, 2021 FY 2021 GAA WIN1G02926 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao Occidental District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Demoloc-Little Baguio-Alabel Rd - K1650+027 - K1650+832, K1650+254 - K1650+832
Physical Target:
CW1: 3.922 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 15,639,000.00
CW1: P 15,326,220.00 (Reconstruction to Concrete Pavement)
EAO: P 312,780.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Demoloc-Little Baguio-Alabel Rd - K1650+027 - K1650+832
Physical Target:
CW1: 1.610 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 15,639,000.00
CW1: P 15,326,220.00 (Reconstruction to Concrete Pavement)
EAO: P 312,780.00
June 14, 2021 FY 2021 GAA WIN1G02935 FY 2021 GAA RA 11518 January 1, 2021 Region XI 22677
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1513+068 - K1514+000,
K1515+000 - K1515+219, K1515+254 - K1516+000, K1518+000 - K1518+443
Physical Target:
CW1: 7.497 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 600,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1513+068 - K1514+000,
K1515+000 - K1515+219, K1515+254 - K1516+000, K1518+000 - K1518+443
Physical Target:
CW1: 4.680 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 600,000.00
June 14, 2021 FY 2021 GAA WIN1G02936 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of junction Salingcomot-Batawan Road, Baganga, Davao Oriental
Physical Target:
CW1: 3.304 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Gravel Road)
EAO: P 1,050,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of junction Salingcomot-Batawan Road, Baganga, Davao Oriental
Physical Target:
CW1: 3.304 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Concrete Road)
EAO: P 1,050,000.00
June 14, 2021 2021 310201100647000 GAA FY 2021 January 25, 2021 Region II Regional Office II
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Santiago - Tuguegarao Rd - K0353+337 - K0355+002.5
June 14, 2021 2021 310201100644000 GAA FY 2021 January 25, 2021 Region II Regional Office II
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0375+297.20 - K0376+613.72
June 11, 2021 FY 2021 GAA WIN1F06147 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 310109100556000
Project ID : P00505814LZ

001: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and
Landslide - Tertiary Roads

FROM:
Parpagoha (Marigindon) - Binoog Road
K0026 + 500 - K0026 + 700
Physical Target: CW1 - Construction of Road Slope Protection:
7,721.913 square meter
Allocation : Php 139.00 Million

TO:
Parpagoha (Marigondon) - Binoog Road
K0026 + 500 - K0026 + 640,
K0026 + 661 - K0026 + 700,
K0026 + 720 - K0026 + 775
Physical Target : CW1 - Construction of Road Slope Protection:
6,158.03 square meter
Allocation : Php 139.00 Million
June 11, 2021 FY 2021 GAA WIN1F06182 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 310108100527000
Project ID : P00505815LZ

001: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse
and Landslide - Secondary Roads

FROM:
Tablas Circumferential Road
K0069 + 400 - K0069 + 470,
K0069 + 520 - K0069 + 840
Physical Target : CW1 - Construction of Road Slope Protection :
7,722.223 square meter
Allocation : Php 139.00 Million

TO:
Tablas Circumferential Road
K0069 + 400 - K0069 + 470,
K0069 + 520 - K0069 + 730
Physical Target : CW1 - Construction of Road Slope Protection :
6,559.00 square meter
Allocation : Php 139.00 Million
June 11, 2021 FY 2021 GAA WIN1F06093 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 310108100521000
Project ID : P00505925LZ

001: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse
and Landslide - Secondary Roads

FROM:
Romblon - C0hg0n - Sablayan Road
K0013 + 135 - K0013 + 285,
K0016 + 000 - K0016 + 150
Physical Target : CW1 - Construction of Road Slope Protection :
8,328.50 square meter
Allocation : Php 186.00 Million

TO:
Romblon - Cogon - Sablayan Road
K0013 + 135 - K0013 + 285,
K0016 + 000 - K0016 + 171
Physical Target : CW1 - Construction of Road Slope Protection :
8,328.50 square meter
Allocation : Php 186.00 Million

June 11, 2021 2021 WIN1C03894 FY 2021 GAA December 28, 2020 Region III Aurora District Engineering Office
Asset Preservation - Preventive Maintenance - Tertiary Roads

A. Castaneda - Ma. Aurora - San Luis Road, K0196+924 - K0197+497
June 11, 2021 2021 WIN1C03902 FY 2021 GAA December 28, 2020 Region III Bataan 1st District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads

Roman Expressway, K0105+758 - K0106+121

June 11, 2021 FY2021 WIN1E02237 310204101141000 April 12, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Airport-Turno-Sinaman Bypass Road, Zamboanga del Norte

Type of Work: Road Widening
Physical Target: 6.764 lane km.
Unit Cost: P 14,299,815.58/Lane Km.
ROW Acquisition: 6,302.3636 square meters
EAO: P 3,385,338.34
Total Allocation: P 102,000,000.00
June 11, 2021 FY2021 WIN1E02236 310305101246000 April 12, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges

Piao Br. (B00454MN) along Dipolog-Sindangan-Liloy Rd

Type of Work: Widening of Bridge
Physical Target: 2,023.434 square meters
Unit Cost: P 71,448.83222/Square meter
ROW Acquisition: 593.3454333 square meters
EAO: P 5,250,000.00
Total Allocation: P 150,000,000.00
June 11, 2021 FY 2021 GAA WIN1F06079 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 310108100523000
Project ID : P00505930LZ

001: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse
and Landslide - Secondary Roads

FROM:
Sibuyan Circumferential Road
K0005 + 446 - K0006 + 072
Physical Target : CW1 - Construction of Road Slope Protection :
4,400.00 square meter
Allocation : Php 80.00 Million

TO:
Sibuyan Circumferential Road
K0003 + 900 - K0003 + 1075,
K0004 + 000 - K0004 + 120,
K0004 + 160 - K0004 + 224
Physical Target : CW1 - Construction of Road Slope Protection :
3,283.40 square meter
Allocation : Php 80.00 Million
June 11, 2021 FY2021 WIN1E02253 320101106232000 April 12, 2021 Region IX Regional Office IX
OO2: Protect Lives and Properties - Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure along Ayala River, Tulungatung Section, Zamboanga City

Type of Work: Construction of Flood Mitigation Structure
Physical Target: 500.00 Lineal meters
Unit Cost: P 121.587..9425/Lineal meter
EAO: P 2,127,788.99
Total Allocation: P 62,931,000.00
June 11, 2021 FY2021 WIN1E02264 310202100719000 April 12, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Road - Basilan Circumferential Rd - K17+200.00 - K19+847.82

Type of Work: Road Widening
Physical Target: 5.296 Lane Km.
Unit Cost: P 20,046,768.81/Lane km.
ROW Acquisition: 32,107.708 square meters
EAO: P 4,200,000.00
Total Allocation: P 120,000,000.00
June 11, 2021 FY2021 WIN1E02251 310201100681000 April 12, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Dipolog-Sindangan-Liloy Rd - K1903+736.00 - K1905+284.62, K1905+347.00 - K1906+700.00

Type of Work: Road Widening
Physical Target: 5.803 Lane Km.
Unit Cost: P 16,429,359.48/Lane Km.
ROW Acquisition: 11,078.473 square meters
EAO: P 3,336,885.06
Total Allocation: P 102,000,000.00
June 11, 2021 2021 WIN1C03944 FY 2021 GAA December 28, 2020 Region III Regional Office III
Bridge Program - Widening of Permanent Bridges

Cojuangco Br. (B01363LZ) along Paniqui - Camiling - Wawa Rd (Phase II)
June 11, 2021 2021 WIN1C03928 FY 2021 GAA December 28, 2020 Region III Pampanga 1st District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads

Baliwag - Candaba - Sta. Ana Rd, K0075+650 - K0076+141

June 11, 2021 2021 WIN1C03923 FY 2021 GAA December 28, 2020 Region III Bataan 1st District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads

Tabacan Poblacion Rd, K0102 +(-127) - K0102+047, K0102+349 - K0102+593

June 11, 2021 2021 WIN1C03934 FY 2021 GAA December 28, 2020 Region III Bataan 1st District Engineering Office
Convergence and Special Support - Special Road - Motor Vehicle Users Charge (MVUC) as per R. A. 11239

Preventive Maintenance (Asphalt Overlay) along Jct. Layac - Balanga - Mariveles port Rd (S01272LZ), K0107+980 - K0108+750, K0111+000 - K0113+143, Orani and Samal, Bataan
June 11, 2021 2021 WIN1C03922 FY 2021 GAA December 28, 2020 Region III Nueva Ecija 2nd District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads

Jose Abad Santos Ave (JASA), K0108+587.50 - K0108+827.30, K0112+000.00 - K0112+848.80
June 10, 2021 FY 2021 WIN1F06058 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS NO.: 310202100707000
Project ID : P00505154LZ

001: Ensure Safe and Reliable National Road Systems

Network Development - Road Widening - Secondary Roads

FROM:
Puerto Princesa North Road
K0082+(-672) - K0084+835
Physical Target: CW1 - Road Widening: 6.996 Lane Km
Allocation : Php 104.940 Million

TO:
Puerto Princesa North Road
K0213+740 - K0216+283
Physical Target: CW1 - Road Widening: 5.058 Lane Km
Allocation : Php 104.940 Million
June 10, 2021 FY 2021 GAA WIN1F06065 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 310202100709000
Project ID : P00505157LZ

001: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:
Puerto Princesa South Road
K0101+000 - K0101+908,
K0101+1001 - K0104+334
Physical Target: CW1 - Road Widening: 6.514 Lane Km
Allocation : Php 105.00 Million

TO:
Puerto Princesa South Road
K0101+000 - K0101+908,
K0101+1001 - K0102+332,
K0102+726 - K0104+776
Physical Target : CW1 - Road Widening - 6.610 Lane Km
Allocation : Php 105.00 Million
June 10, 2021 FY 2021 GAA WIN1F06179 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 310202100708000
Project ID : P00505158LZ

001: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:
Puerto Princesa South Road
K0022+595 - K0022+974,
K0023+049 - K0023+650,
K0025+024 - K0027+156,
K0029+962 - K0030+681,
K0030+772 - K0031+045
Physical Target : CW1 - Road Widening: 8.466 Lane Km
Allocation : Php 103.00 Million

TO:
Puerto Princesa South Road
K0022+595 - K0022+974,
K0023+049 - K0023+650,
K0025+024 - K0027+156
Physical Target : CW1 - Road Widening: 6.336 Lane Km
Allocation : Php 103.00 Million
June 10, 2021 FY 2021 GAA WIN1F06073 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 310202100706000
Project ID : P00505159LZ

001: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:
Puerto Princesa North Road
K0034+000 - K0035+000,
K0037+1004 - K0038+000,
K0039+000 - K0040+000
Physical Target : CW1 - Road Widening : 4.006 Lane Km
Allocation : Php 102.485 Million

TO:
Puerto Princesa North Road
K0034+000 - K0035+000,
K0037+1004 - K0038+000,
K0039+000 - K0041+161
Physical Target : CW1 - Road Widening : 6.330 Lane Km
Allocation : Php 102.485 Million
June 10, 2021 FY 2021 GAA WIN1F06066 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 310202100701000
Project ID : P00505160LZ

001: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:
Irawan - Tagburos Road
K0012 + (-667) - K0012 + (-291),
K0012+1003 - K0015+1007
Physical Target : CW1 - Road Widening : 6.808 Lane Km
Allocation : Php 101.875 Million

TO:
Irawan - Tagburos Road
K0012 + (-667) - K0012+ (-291),
K0012 + 1003 - K00160+176
Physical Target : CW1 - Road Widening ; 7.162 Lane Km
Allocation : Php 101.875 Million
June 10, 2021 FY 2021 GAA WIN1F06151 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 310102100586000
Project ID : P00505408LZ

001: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM:
Calapan South Road
K0071+000 - K0072+850

Physical Target : CW1 - Preventive maintenance of Road :
Asphalt Overlay : 6.976 Lane Km
Allocation : Php 25.00 Million

TO :
Calapan South Road
K0071 + 000 - K0071 + 867
Physical Target : CW1 - Preventive Maintenance :
Asphalt Overlay : 1.734 Lane Km
Allocation : Php 25.00 Million


June 10, 2021 2021 WIN1C03892 FY 2021 GAA December 28, 2020 Region III Pampanga 1st District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads

Manila North Road, K0064+879 - K0065+357

June 10, 2021 FY 2021 GAA WIN1F06152 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 310109100555000
Project ID : P00505813LZ

001: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse,
and Landslide - Tertiary Roads

FROM:
F.B. Reyes ( Busuanga - Coron ) Road
K0012 + 810 - K0015 + 550,
K0020 + 763.98 - K0022 + 673.98
Physical Target : CW1 - Construction of Road Slope Protection :
5,750.00 square meter
Allocation : Php 115.00 Million

TO:
F.B. Reyes ( Busuanga - Coron ) Road
K0011 + 121 - K0011 + 220.00,
K0011 + 260 - K0011 + 393.00
Physical Target : CW1 - Construction of Road Slope protection:
5,094.00 square meter
Allocation : Php 115.00 Million
June 10, 2021 2021 WIN1C03901 FY 2021 GAA December 28, 2020 Region III Bulacan 2nd District Engineering Office
Asset Preservation - Preventive Maintenance - Tertiary Roads

NCR / Bulacan Bdry. - Bigte - Ipo Dam Road, K0037+102 - K0037+383.55
June 10, 2021 2021 WIN1C03895 FY 2021 GAA December 28, 2020 Region III Bulacan 2nd District Engineering Office
Asset Preservation - Preventive Maintenance - Tertiary Roads

Muzon - Tungkong Manga Road, K0042+000 - K0042+644.65
June 8, 2021 2021 WIN1C03869 FY 2021 GAA December 28, 2020 Region III Tarlac District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads

Manila North Road, K0142+891 - K0143+160
June 8, 2021 2021 WIN1C03830 FY 2021 GAA December 28, 2020 Region III Tarlac District Engineering Office
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers

Construction of Camiling - Agno River Floodway Phase 1, Sta. 0+000 - Sta. 0+280.86, Camiling, Tarlac
June 8, 2021 2021 WIN1C03829 FY 2021 GAA December 28, 2020 Region III Tarlac District Engineering Office
Asset Preservation - Preventive Maintenance - Primary Roads

Manila North Road, K0138+533.90 - K0138+812.60
June 8, 2021 2021 WIN1C03864 FY 2021 GAA December 28, 2020 Region III Tarlac District Engineering Office
Asset Preservation - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads


Manila North Road,K0156+350 - K0157+081




June 8, 2021 2021 WIN1C03841 FY 2021 GAA December 28, 2020 Region III Nueva Ecija 2nd District Engineering Office
Asset Preservation - Preventive Maintenance - Tertiary Roads


Gapan - Fort Magsaysay Rd - K0099+510.00 - K0099+828.32
June 8, 2021 2021 WIN1F06210 GAA FY 2021 January 1, 2021 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

AS PER GAA/ORIGINAL:

Apitong - Paterno Road – K0908+(-015) – K0908 +000, K0908 + (-017) – K0908 + (-015), K0908 + (-350) – K0908 +(-017), K0908 + (-915) – K0908 + (-896), K0908 + (-922) – K0908 + (-915), K0908 + 000 – K0908 + 058

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: Asphalt P 9.604980 M
Overlay: 1.710 Lane Km

EAO P 0.196020 M

Total P 9.801 M

AS MODIFIED:

Apitong - Paterno Road – (S00017LT) K0908+(-339) – K0908 +058

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: Asphalt P 9.604980 M
Overlay: 1.588 Lane Km

EAO P 0.196020 M

Total P 9.801 M
June 8, 2021 2021 win1c03858 FY 2021 GAA December 28, 2020 Region III Nueva Ecija 2nd District Engineering Office
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

Nueva Ecija - Aurora Rd, K0145+(-666) - K0145+000, K0145+000 - K0145+887.00



June 8, 2021 2021 WIN1F06208 GAA FY 2021 January 1, 2021 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

AS PER GAA/ORIGINAL:

Sn Jose-Manlurip-MacArthur Park Rd - K0912 + (-266) - K0912 + 117

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 8.604400 M
Asphalt Overlay : 1.532 Lane Km

EAO P 0.175600 M

Total P 8.780 M

AS MODIFIED:

Preventive Maintenance - Sn Jose-Manlurip-Macarthur Park Rd- K0912 +(-336) – K0912 + (-004) (S00252LT) Chainage 0 – Chainage 59

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 8.604400 M
Asphalt Overlay : 1.387 Lane Km

EAO P 0.175600 M

Total P 8.780 M
June 8, 2021 2021 WIN1C03806 FY 2021 GAA December 28, 2020 Region III Nueva Ecija 2nd District Engineering Office
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers

Construction of Peñaranda River Flood Control, Sta. 4+148.77 to Sta. 4+419.17, Brgy. Malapit, San Isidro, Nueva Ecija
June 8, 2021 2021 WIN1C03822 FY 2021 GAA December 28, 2020 Region III Nueva Ecija 2nd District Engineering Office
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers

Rehabilitation of Pampanga River Control, Sta. 0+000 - Sta. 0+540.80, Brgy. Calaba, San Isidro, Nueva Ecija
June 8, 2021 2021 WIN1F06216 GAA FY 2021 February 1, 2021 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development – Road Widening – Primary Road

AS PER GAA/ORIGINAL:

Road Widening – Palo-Carigara-Ormoc Rd – K0988+060.11 – K0989+073

Physical Target: Allocation:

CW1-Road Widening :1.00 Lane K m P 17.186260 M

EAO P 0.350740 M

Total P 17.537 M

AS MODIFIED:

Road Widening – Palo-Carigara-Ormoc Road – K0988+060 – K988+560

Physical Target: Allocation:

CW1-Road Widening : 1.00 Lane K m P 17.186260 M

EAO P 0.350740 M

Total P 17.537 M
June 8, 2021 2021 WIN1F06217 GAA FY 2021 January 1, 2021 Region VIII Biliran District Engineering Office
Local Program

Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

AS PER GAA/ORIGINAL:

Construction of Access Road Leading to Pondol Falls, Naval, Biliran

Physical Target: Allocation:

CW1-Construction of Concrete Road P 20.580 M
: 1.814 Lane Km
EAO P 0.420 M

Total P 21.00 M

AS MODIFIED:

Construction of Access Road Leading to Pondol Falls, Almeria, Biliran

Physical Target: Allocation:

CW1-Construction of Concrete Road P 20.580 M
: 0.896 Lane Km
EAO P 0.420 M

Total P 21.00 M
June 7, 2021 FY 2021 GAA WIN1G02902 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way - K1764+184 - K1765+957
Physical Target:
CW1: 3.510 Lane Km (Road Widening)
Allocation:
TOTAL: P 85,000,000.00
CW1: P 82,025,000.00 (Road Widening)
EAO: P 2,975,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way - K1735+883 - K1736+069,
K1736+140 - K1736+314, K1764+191 - K1765+1005
Physical Target:
CW1: 3.996 Lane Km (Road Widening)
ROW: 33,000.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 85,000,000.00
CW1: P 71,410,000.00 (Road Widening)
ROW: P 10,615,000.00 (ROW Acquisition)
EAO: P 2,975,000.00
June 7, 2021 FY 2021 GAA WIN1G02907 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Babak-Samal-Kaputian Rd - K1507+860 - K1509+062
Physical Target:
CW1: 2.272 Lane Km (Road Widening)
Allocation:
TOTAL: P 32,631,000.00
CW1: P 31,488,915.00 (Road Widening)
EAO: P 1,142,085.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Babak-Samal-Kaputian Rd - K1507+860 - K1509+062
Physical Target:
CW1: 1.500 Lane Km (Road Widening)
ROW: 11,250.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 32,631,000.00
CW1: P 25,505,915.00 (Road Widening)
ROW: P 5,983,000.00 (ROW Acquisition)
EAO: P 1,142,085.00
June 7, 2021 2021 310104100285000 GAA FY 2021 January 25, 2021 Region II Cagayan 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads - Manila North Rd - K0603+724 - K0604+307
June 7, 2021 FY 2021 GAA WIN1G02906 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance (Asphalt Overlay) - Davao City Div Rd, K1514+819 - K1515+911
Physical Target:
CW1: 16.781 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 201,060,000.00
CW1: P 194,022,900.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 7,037,100.00

TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance (Asphalt Overlay) - Davao City Div Rd, K1498+-165 - K1506+931
Physical Target:
CW1: 12.954 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 201,060,000.00
CW1: P 194,022,900.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 7,037,100.00
June 7, 2021 2021 320101106584000 GAA FY 2021 January 25, 2021 Region II Cagayan 2nd District Engineering Office
OO2: Protect Lives and Properties Against Major Flood - Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Reconstruction of Canayun - Sirit - Dana-ili Flood Control Along Abulug River, Abulug, Cagayan Sta. 12+860 - Sta. 12+980(L/S)
June 7, 2021 FY 2021 GAA WIN1G02904 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Tubo-tubo Road connecting Monkayo Public Transport Terminal and SACARBEMCO Rubber Sheet Processing, SEMPCO Organic Fertilizer in support of Rubber, Palm Oil and Cardava Industries, Brgy. Tubo-tubo, Monkayo, Compostela Valley
Physical Target:
CW1: 2.470 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Concrete Road)
EAO: P 600,000.00

TO: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Tubo-tubo Road connecting Monkayo Public Transport Terminal and SACARBEMCO Rubber Sheet Processing, SEMPCO Organic Fertilizer in support of Rubber, Palm Oil and Cardava Industries, Brgy. Tubo-tubo, Monkayo, Compostela Valley
Physical Target:
CW1: 1.770 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Concrete Road)
EAO: P 600,000.00
June 7, 2021 FY 2021 GAA WIN1G02901 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Concreting Road, King-King, Pantukan, Davao de Oro
Physical Target:
CW1: 1.266 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Road)
EAO: P 300,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Concreting Road, King-King, Pantukan, Davao de Oro
Physical Target:
CW1: 2.090 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Road)
EAO: P 300,000.00
June 7, 2021 2021 310201100741000 GAA FY 2021 January 25, 2021 Region II Cagayan 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Manila North Rd - K0622+024 - K0622+295, K0623+215 - K0624+355
June 7, 2021 2021 310201100646000 GAA FY 2021 January 25, 2021 Region II Cagayan 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Manila North Rd - K0660+620 - K0662+069
June 7, 2021 2021 310201100740000 GAA FY 2021 January 25, 2021 Region II Cagayan 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Bangag - Magapit Rd - K0687+1019 - K0688+200, K0689+970 - K0689+992, K0690+057 - K0690+130, K0691+180 - K0691+934
June 7, 2021 2021 WIN1C03896 FY 2021 GAA December 28, 2020 Region III Zambales 1st District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads

Amungan - Palauig - Banlog Rd, K0217+760 - K0218+753
June 7, 2021 2021 310201100645000 GAA FY 2021 January 25, 2021 Region II Cagayan 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Manila North Rd - K0654+322 - K0655+042, K0655+066 - K0655+388, K0655+411 - K0655+579
June 7, 2021 FY 2021 GAA WIN1G02905 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Babak-Samal-Kaputian Rd - K1503+781 - K1505+000
Physical Target:
CW1: 2.364 Lane Km (Road Widening)
Allocation:
TOTAL: P 32,369,000.00
CW1: P 31,236,085.00 (Road Widening)
EAO: P 1,132,915.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Babak-Samal-Kaputian Rd - K1503+750 - K1504+524
Physical Target:
CW1: 1.500 Lane Km (Road Widening)
ROW: 11,250.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 32,369,000.00
CW1: P 25,253,085.00 (Road Widening)
ROW: P 5,983,000.00 (ROW Acquisition)
EAO: P 1,132,915.00
June 7, 2021 FY 2021 GAA WIN1G02908 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of concreting road, Dona Josefa, Sta. Emelia Road (Phase 2), Laak, Davao de Oro
Physical Target:
CW1: 1.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Road)
EAO: P 300,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of concreting road, Dona Josefa, Sta. Emelia Road (Phase 2), Laak, Davao de Oro
Physical Target:
CW1: 1.300 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Road)
EAO: P 300,000.00
June 7, 2021 FY 2021 GAA WIN1G02909 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: Local Program - Water Management Facilities - Water Supply - Local Infrastructure Program
Concreting of Water System Level II/Spring Development, Sitio Malamig and Sitio Gaspang, Barangay Alegre, Bansalan, Davao del Sur
Physical Target:
CW1: 1 number of water supply system (Construction of Water Supply Systems)
Allocation:
TOTAL: P 4,000,000.00
CW1: P 3,960,000.00 (Construction of Water Supply Systems)
EAO: P 40,000.00

TO: Local Program - Water Management Facilities - Water Supply - Local Infrastructure Program
Construction of Water System Level II/Spring Development, Sitio Malamig and Sitio Gaspang, Barangay Alegre, Bansalan, Davao del Sur
Physical Target:
CW1: 1 number of water supply system (Construction of Water Supply Systems)
Allocation:
TOTAL: P 4,000,000.00
CW1: P 3,960,000.00 (Construction of Water Supply Systems)
EAO: P 40,000.00
June 7, 2021 2021 310107100201000 GAA FY 2021 January 25, 2021 Region II Cagayan 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads - Manila North Rd - K0590+(-030) - K0590+(-010), K0590+100 - K0590+200, K0590+235 - K0590+265, K0590+750 - K0590+800, K0592+260 - K0592+284, K0592+950 - K0592+1000
June 7, 2021 2021 WIN1E02275 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Regional Office XIII
UACS NO. 300119200432000
PROJECT ID: P00551501MN

Local Program - Local Roads and Bridges - Local Bridges - Local Infrastructure Program

FROM:

Construction of Las Nieves Bridge and Road Approaches in Cabadbaran City, Phase II, Agusan del Norte

Type of Work / Physical Target: Construction of
Bridge / 238.065 sq.m.

Unit Cost: P83,170.56/sq.m.

Allocation: P19,800,000

EAO: P200,000

TOTAL: P20,000,000


TO:

Construction of Las Nieves Bridge and Road Approaches in Las Nieves, Phase II, Agusan del Norte

Type of Work / Physical Target: Construction of
Steel Bridge / 5,234.6 sq.m.

Unit Cost: P3,782.52/sq.m.

Allocation: P19,800,000

EAO: P200,000

TOTAL: P20,000,000
June 7, 2021 2021 320102104064000 GAA FY 2021 January 25, 2021 Region II Cagayan 2nd District Engineering Office
OO2: Protect Lives and Properties Against Major Flood - Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Reconstruction of Canayun - Sirit - Dana-ili Flood Control Along Abulug River, Abulug, Cagayan Sta. 12+700 - Sta. 12+860, Sta. 13+220 - Sta. 13+300(L/S)

Pages