Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
June 29, 2018 FY 2018 WIN8G02448 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads - Romulo H-way - K0130+000 - K0130+590
June 29, 2018 FY 2018 WIN8G02463 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads - Romulo H-way, K0137 + 180.80 - K0139 + 349.00, K0143 + 000.00 - K0143 + 836.00, K0143 + 872.00 - K0144 + 000.00, K0153 + 750.80 - K0153 + 801.50, K0154 + 695.00 - K0155 + 529.20
June 29, 2018 FY 2018 WIN8G02450 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads - Paniqui – Camiling - Wawa Rd, K0146 + (-412.40) - K0146 + 571.80, K0146 + 615.50 - K0147 + 313.00, K0154 + 194.00 - K0154 + 396.50, K0156 + 235.70 - K0156 + 380.00, K0162 + 052.10 - K0162 + 699.00, K0165 + 156.70 - K0166 + 241.30, K0166 + 260.00 - K0167 + 000.00, K0167 + 000.00 - K0168 + 710.00
June 29, 2018 FY 2018 WIN802320 FY 2018 GAA January 4, 2018 Region III Bulacan 2nd District Engineering Office
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Rehabilitation / Reconstruction / Improvement of Igay – Montalban Road, San Jose Del Monte City, Bulacan
June 29, 2018 FY 2018 WIN8G02357 FY 2018 GAA January 4, 2018 Region III Bulacan 2nd District Engineering Office
Network Development Program – Road Widening – Tertiary Roads – Muzon – Tungkong Manga Road, K0043+585 – K0045+030, San Jose Del Monte City, Bulacan
June 29, 2018 FY 2018 WIN8G02385 FY 2018 GAA January 4, 2018 Region III Bulacan 2nd District Engineering Office
Network Development Program – Road Widening – Secondary Roads – Meycauayan - Camalig - Bahay Pari Road, K0020+(-854) – K0020+596

June 29, 2018 FY 2018 WIN8G02382 FY 2018 GAA January 4, 2017 Region III Bulacan 2nd District Engineering Office
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Construction / Concreting of Sapang Putik – Basuit – Gabihan Road, San Ildefonso, Bulacan
June 29, 2018 FY 2018 WIN8G02387 FY 2018 GAA January 4, 2018 Region III Bulacan 2nd District Engineering Office
Network Development Program – Road Widening – Tertiary Roads – Meycauayan – Camalig – Bahay Pari Road incl. ROW, K0023+200 – K0024+637, K0024+856 – K0024+1024, K0025+194 – K0025+255, K0025+435 – K0025+790, Meycauayan City, Bulacan

June 28, 2018 2018 WIN8G02493 SR2018-01-002514 January 31, 2018 Region III Regional Office III
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations

Clark-Bamban-Capas Access Road leading to Clark City (Section I), Capas, Tarlac

CW-1 (Construction of Concrete Road) - 1.508 lane-km
ALLOTMENT: PHP 180M
June 27, 2018 GAA FY 2018 WIN8F05636 UACS No. 300116200221000 January 1, 2018 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 300116200221000
Project ID: P00240380LZ
WIN8F05636
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges
Local – Local Roads and Bridges – Local Roads
Construction of Road including Drainage System along Rizal Street and Bucat Street, Brgy. Poblacion , Muntinlupa City
Physical Target: CW1 – Construction of Drainage Structure along Road 500.00 Lineal Meters
EAO – P 200,000.40
Unit Cost (P’000): P19,600.00/ lineal meter
Allocation: P 9,800,000.00
Total : P 10,000,000.00

As Modified
UACS No. 300116200221000
Project ID: P00240380LZ
WIN8F05636
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges
Local – Local Roads and Bridges – Local Roads
Construction of Road including Drainage System along Rizal Street, Brgy. Poblacion , Muntinlupa City
Physical Target: CW1 – Construction of Drainage Structure along Road 380.00 Lineal Meters
EAO – P 200,000.40
Unit Cost (P’000): P25,789.47/ lineal meter
Allocation: P 9,800,000.00
Total: P 10,000,000.00
June 27, 2018 GAA FY 2018 WIN8F05643 UACS No. 320101100420000 January 1, 2018 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 320101100420000
Project ID: P00222766LZ
WIN8F05643
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of RCBC along Tañong Creek, Brgy. Dela Peña, Marikina City
Physical Target: CW1-Construction of Drainage Structure 260.00 l.m.
Unit Cost (P’000): P37.69/l.m.
Allocation (‘000): P 9,800.00
EAO (‘000) P 200.00 M
Total (‘000): P 10,000.00

As Modified
UACS No. 320101100420000
Project ID: P00222766LZ
WIN8F05643
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of RCBC along Tañong Creek, Brgy. Dela Peña, Marikina City
Physical Target: CW1-Construction of Drainage Structure 160.00 l.m.
Unit Cost (P’000): P61.25/l.m.
Allocation (‘000): P 9,800.00
EAO (‘000) P 200.00 M
Total (‘000): P 10,000.00
June 27, 2018 GAA FY 2018 WIN8F05645 UACS No. 320101100605000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
UACS No. 320101100605000
Project ID: P00221534LZ
WIN8F05645
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement of Flood Control Wall along Pugad Baboy Creek, Brgy. Gen. T. de Leon, Valenzuela City
Physical Target: CW1- Construction of Flood Mitigation Structure 670 l.m.
EAO (‘000) – P 470.00
Unit Cost (P’000): P34.373/ l.m.
Allocation (000): P 23,030.00
Total (‘000): P 23,500.00

As Modified
UACS No. 320101100605000
Project ID: P00221534LZ
WIN8F05645
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement of Flood Control Wall along Pugad Baboy Creek, Brgy. Gen. T. de Leon, Valenzuela City
Physical Target: CW1- Construction of Flood Mitigation Structure 347 l.m.
EAO (‘000) – P 470.00
Unit Cost (P’000): P66.369/ l.m.
Allocation (000): P 23,030.00
Total (‘000): P 23,500.00
June 27, 2018 GAA FY 2018 WIN8F05642 UACS No. 300102200038000 January 1, 2018 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 300102200038000
Project ID: P00255929LZ
WIN8F05642
Local Infrastructure Program
Building and Other Structure – School Building
Completion of 4-Storey, 12 Classroom Building at P. Bernardo High School, Quezon City
Physical Target: CW1- Construction of Classroom 12 Classroom
Unit Cost (P’000): P 123.75/ classroom
Allocation (‘000): P 1,485.00
EAO (‘000) P 15.00
Total (‘000): P 1,500.00

As Modified
UACS No. 300102200038000
Project ID: P00255929LZ
WIN8F05642
Local Infrastructure Program
Building and Other Structure – School Building
Completion of 4-Storey, 8 Classroom Building at P. Bernardo High School, Quezon City
Physical Target: CW1- Construction of Classroom 8 Classroom
Unit Cost (P’000): P 185.62/ classroom
Allocation (‘000): P 1,485.00
EAO (‘000) P 15.00
Total (‘000): P 1,500.00
June 27, 2018 GAA FY 2018 WIN8F05641 UACS No. 300102200034000 January 1, 2018 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 300102200034000
Project ID: P00249206LZ
WIN8F05641
Local Infrastructure Program
Building and Other Structure – School Building
Construction (Completion) of 4-Storey, 12 - Classroom Building, Quezon City High School, Barangay Sacred Heart, Quezon City
Physical Target: CW1- Construction of Classroom 12 Classroom
Unit Cost (P’000): P 165,000/ classroom
Allocation (‘000): P 1,980.00
EAO (‘000) P 20.00
Total (‘000): P 2,000.00

As Modified
UACS No. 300102200034000
Project ID: P00249206LZ
WIN8F05641
Local Infrastructure Program
Building and Other Structure – School Building
Construction (Completion) of 4-Storey, 8 - Classroom Building, Quezon City High School, Barangay Sacred Heart, Quezon City
Physical Target: CW1- Construction of Classroom 8 Classroom
Unit Cost (P’000): P 247,500/ classroom
Allocation (‘000): P 1,980.00
EAO (‘000) P 20.00
Total (‘000): P 2,000.00
June 27, 2018 GAA FY 2018 WIN8F05640 UACS No. 310111100020000 January 1, 2018 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 310111100020000
Project ID: P00200663LZ
WIN8F05640
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Secondary Roads
Elliptical Rd – K0012+920 – K0013+483
Physical Target: CW1- Upgrading of Drainage Structure along Road L= 1,100 lineal meter
Unit Cost (P’000): P 13.73/ lineal meter
Allocation (‘000): P 15,101.80
EAO (‘000) P 308.20
Total (‘000): P 15,410.00

As Modified
UACS No. 310111100020000
Project ID: P00200663LZ
WIN8F05640
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Secondary Roads
Elliptical Rd – K0012+(-505) – K0012+460
Physical Target: CW1- Upgrading of Drainage Structure along Road L= 869.20 lineal meter
Unit Cost (P’000): P 17.37/ lineal meter
Allocation (‘000): P 15,101.80
EAO (‘000) P 308.20
Total (‘000): P 15,410.00
June 26, 2018 2018 WIN8C03158 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Surigao del Norte 1st District Engineering Office
Local Program - National Roads and Bridges - Local Roads - Local Infrastructure Program

FROM:

Construction of Cancohoy to Bongdo, San Benito Road, Brgy. Cancohoy, Del Carmen, Siargao, Surigao del Norte

Project ID No. P00253993MN
Scope of Work: Construction of Concrete Road
Physical Target: 7.00 Lane Km
Amount : Php 100,000,000.00 (Total)
: Php 99,000,000.00 (Road)
: Php 1,000,000.00 (EAO)

TO:

Construction of Cancohoy to Bongdo, San Benito Road, Brgy. Cancohoy, Del Carmen, Siargao, Surigao del Norte

Project ID No. P00253993MN
Scope of Work: Construction of Concrete Road
Physical Target: 6.080 Lane Km
Amount : Php 100,000,000.00 (Total)
: Php 96,500,000.00 (Road)
: Php 1,000,000.00 (EAO)
: Php 2,500,000.00 (ROW)
June 26, 2018 2018 WIN8C03106 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Surigao del Norte 1st District Engineering Office
Local Program - National Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local

FROM:

Concreting of Socorro – Songkoy – Suhoton Road, Socorro, Bucas Grande, Surigao del Norte

Project ID No. P00257839MN
Scope of Work: Construction of Concrete Road
Physical Target: 4.00 Lane Km
Amount : Php 60,000,000.00 (Total)
: Php 57,900,000.00 (Road)
: Php 2,100,000.00 (EAO)

TO:

Concreting of Socorro – Songkoy – Suhoton Road, Socorro, Bucas Grande, Surigao del Norte

Project ID No. P00257839MN
Scope of Work: Construction of Concrete Road
Physical Target: 3.218 Lane Km
Amount : Php 60,000,000.00 (Total)
: Php 57,900,000.00 (Road)
: Php 2,100,000.00 (EAO
June 26, 2018 FY 2018 WIN8G02447 SR2018-02-003458 February 1, 2018 Region III Regional Office III
Flood Control and Drainage - Flood Control Structures / Facilities - Construction of a Revetment, Masukol, Paombong, Bulacan
June 26, 2018 2018 WIN8C03105 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Surigao del Norte 1st District Engineering Office
Local Program - National Roads and Bridges - Local Roads – Local Infrastructure Program

FROM:

Completion of Union-Malinao Road, Dapa, Surigao del Norte

Project ID No. P00255870MN
Scope of Work: Construction of Concrete Road
Physical Target: .80 Lane Km
Amount : Php 1,000,000.00 (Total)

TO:

Completion of Union-Malinao Road, Dapa, Surigao del Norte

Project ID No. P00255870MN
Scope of Work: Construction of Concrete Road
Physical Target: 0.172 Lane Km
Amount : Php 1,000,000.00 (Total)
June 26, 2018 FY 2018 WIN8G02451 SR2018-01-001311 January 29, 2018 Region III Regional Office III
OO-1: Ensure Safe and Reliable National Road System
Network Development Program
Construction of Bypass and Diversion Roads

Bocaue - Sta. Maria Bypass Road, Bocaue and Sta. Maria, Bulacan
June 26, 2018 2018 WIN8C03121 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Surigao del Norte 1st District Engineering Office
Local Program - National Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local

FROM:

Gravelling of Barangay Road (along Jct. Gen. Luna-Catangnan Road to Brgy.5), Dapa, Surigao del Norte

Project ID No. P00258535MN
Scope of Work: Construction of Concrete Road
Physical Target: 0.50 Lane Km
Amount : Php 3,500,000.00 (Total)
: Php 3,430,000.00 (Road)
: Php 70,000.00 (EAO)

TO:

Gravelling of Barangay Road (along Jct. Gen. Luna-Catangnan Road to Brgy.5), Dapa, Surigao del Norte

Project ID No. P00258535MN
Scope of Work: Construction of Concrete Road
Physical Target: 0.50 Lane Km
Amount : Php 3,500,000.00 (Total)
: Php 3,430,000.00 (Road)
: Php 70,000.00 (EAO)
June 26, 2018 FY 2018 WIN8G01857 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Norte District Engineering Office
UACS No.: 310204100275000
Project ID: P00201083LZ
OO1: Ensure Safe and Reliable National Road System –
Network Development Program – Construction of By-Pass and Diversion Road – Tagkawayan – Labo Diversion Road, incl. ROW, Camarines Norte
Physical Target: CW1 – Construction of Concrete Road/ 2.411 lane-km
CW2 - Construction of Road Slope Protection Structure/ 2,897.23 sq.m.
Right-of-Way Acquisition (ROW)/ 75,000 sq.m.
Unit Cost: CW1 – Php 27.265 M/lane-km
CW2 – Php 8,892.29/sq.m.
ROW Acquisition – Php 66.67/sq.m.
Estimated Cost: Php 100.00 M
(As Modified)
June 26, 2018 FY 2018 WIN8G01856 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Norte District Engineering Office
UACS No.: 310109100083000
Project ID: P00200931LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads – Bagong Silang-Capalonga Rd – K0301+086 – K0301+110, K0302+054 – K0302+196, K0308+172 – K0308+185, K0308+750 – K0308+790, K0309+007 – K0309+032, K0309+590 – K0309+622, K0309+865 – K0309+885, K0309+980 – K0309+1004, K0309+1135 – K0309+1148
Physical Target: CW1 - Construction of Road Slope Protection Structure/ 4,426.90 sq.m.
Unit Cost: CW1 – Php 7,194.65/sq.m.
Estimated Cost: Php 32.50 M
(As Modified)
June 26, 2018 FY 2018 WIN8G01860 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Norte District Engineering Office
UACS No.: 310108100109000
Project ID: P00200849LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Secondary Roads – Talobatib-Jose Panganiban Pob-Port Rd – K0326+086 – K0326+171, K0333+890 – K0334+030, K0334+260 – K0334+327
Physical Target: CW1 - Construction of Road Slope Protection Structure/ 1,518.80 sq.m.
Unit Cost: CW1 – Php 9,678.69/sq.m.
Estimated Cost: Php 15.0 M
(As Modified)
June 26, 2018 FY 2018 WIN8C03272 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao del Norte District Engineering Office
FROM: Local Program – Local – Local Road and Bridges – Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Anglas Bridge, Brgy. Mamangan, san Isidro, Davao del Norte
Physical Target:
CW1: 168 sq.m. (Construction of Bridge)
Allocation:
TOTAL: P 17,651.00
CW1: P 17,297.980 (Construction of Bridge)
EAO: P 353.020

TO: Local Program – Local – Local Road and Bridges – Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Anglas Bridge, Brgy. Mamangan, san Isidro, Davao del Norte
Physical Target:
CW1: 381.60 sq.m. (Construction of Bridge)
Allocation:
TOTAL: P 17,651.00
CW1: P 17,297.980 (Construction of Bridge)
EAO: P 353.020


Justification:
Increase in physical target by 213.60 sq.m. (from 168 sq.m. to 381.60sq.m.) were due to the following:
• The length of the bridge as per actual survey is 40.00 ln.m. instead of the anticipated 17.00 ln.m.
• The cost per sq.m. decreases because of the non-inclusion of slope protection of the abutment and approaches in the Program of Work to prioritize the completion of the bridge to make it functional.




June 26, 2018 FY 2018 WIN8G01859 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Norte District Engineering Office
UACS No.: 310109100084000
Project ID: P00200932LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads – Batobalani-Tawig-Tugos-Paracale Rd – K0333+770 – K0333+810, K0334+390 – K0334+430
Physical Target: CW1 - Construction of Road Slope Protection Structure/ 665.00 sq.m.
Unit Cost: CW1 – Php 10.316 T/sq.m.
Estimated Cost: Php 7.0 M
(As Modified)
June 26, 2018 FY 2018 WIN8G01883 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Norte District Engineering Office
UACS No.: 310109100085000
Project ID: P00200933LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads – Sta. Elena-Capalonga By Pass Coastal Rd – Chainage 9584 – Chainage 9634, Chainage 10020 – Chainage 10065, Chainage 10224 – Chainage 10264
Physical Target: CW1 - Construction of Road Slope Protection Structure/ 810.00 sq.m.
Unit Cost: CW2 – Php 12.099 T/sq.m.
Estimated Cost: Php 10.0 M
(As Modified)
June 26, 2018 FY 2018 WIN8C03224 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: Local Program – Local – Local Road and Bridges – Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Rehabilitation of Road Purok Sta. Cruz – Purok San Miguel, Brgy, San Miguel, San Isidro, Davao del Norte
Physical Target:
CW1: 0.520 lane km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 6,000.00
CW1: P 5,880.00 (Rehabilitation of Concrete Road)
EAO: P 120.00

TO: Local Program – Local – Local Road and Bridges – Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Rehabilitation of Road Purok Sta. Cruz – Purok San Miguel, Brgy, Mamangan, San Isidro, Davao del Norte
Physical Target:
CW1: 0.600 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 6,000.00
CW1: P 5,880.00 (Construction of Concrete Road)
EAO: P 120.00


Justification:
Change in project name due to typographical errors, to wit:
• Typographical error on name of Brgy. From “San Miguel” to “Mamangan” since Purok Sta. Cruz and Purok San Francisco are located in Brgy. Mamangan there is no such puroks in Brgy. San Miguel
• Change in type of work from “Rehabilitation of Concrete Road” to “Construction of Concrete Road” since as per actual survey there is no existing paved road to be rehabilitated along the alignment.
Increase in physical target from 0.520 lane km. to 0.600 lane km. due to change in pavement design from 6.10m width – 230mm thk. To 6.00m width – 230mm thk., since the road is classified as barangay road and not a city road.

There is a need to extend the project limits to pave the remaining unpaved portion of the road.


June 26, 2018 FY 2018 WIN8G01848 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Norte District Engineering Office
UACS No.: 310302100061000
Project ID: P00201724LZ
OO1: Ensure Safe and Reliable National Road System – Bridge Program - Replacement of Permanent Weak Bridges - Malacbang Br. (B00497LZ) along Talobatib-Jose Panganiban Pob-Port Rd
Physical Target: CW1 - Construction of Concrete Bridge/ 339.624 sq.m.
Unit Cost: CW1 - Php 89.45T/sq.m.
Estimated Cost: Php 31.0 M
(As Modified)
June 26, 2018 FY 2018 WIN8G01887 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Norte District Engineering Office
UACS No.: 310305100255000
Project ID: P00202624LZ
OO1: Ensure Safe and Reliable National Road System – Bridge Program – Widening of Permanent Bridges - Bical Br. (B02719LZ) along Daang Maharlika (LZ)
Physical Target: CW1 - Widening of Bridge/ 527.436 sq.m.
Unit Cost: CW1 - Php 89.19T/sq.m.
Estimated Cost: Php 48.0 M
(As Modified)

June 26, 2018 FY 2018 WIN8G01880 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Norte District Engineering Office
UACS No.: 310305100258000
Project ID: P00202623LZ
OO1: Ensure Safe and Reliable National Road System – Bridge Program – Widening of Permanent Bridges - Mag-Atip Br. (B02707LZ) along Daang Maharlika (LZ)
Physical Target: CW1 - Widening of Bridge/ 176.462 sq.m.
Unit Cost: CW1 - Php 176.462 sq.m.
Estimated Cost: Php 16.0 M
(As Modified)
June 26, 2018 FY 2018 WIN8C03273 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: Local Program – Local Bridges – Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Saug Bridge, Brgy. Cabaywa, Asuncion , Davao del Norte
Physical Target:
CW1: 239.00 sq.m. (Construction of Bridge)
Allocation:
TOTAL: P 25,000.00
CW1: P 24,500.00 (Construction of Bridge)
EAO: P 500.00

TO: Local Program – Local Bridges – Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Saug Bridge, Brgy. Cabaywa, Asuncion , Davao del Norte
Physical Target:
CW1: 1 number of bridge (Construction of Substructure)
Allocation:
TOTAL: P 25,000.00
CW1: P 24,500.00 (Construction of Substructure)
EAO: P 500.00


Justification:
The physical target for Saug Bridge is modified from 239.00 sq.m. to construction of substructure only due to insufficient fund allocated the bridge construction considering that as per actual survey the length of the bridge is 70.00 ln.m. instead of the anticipated 25 ln.m.



June 26, 2018 FY 2018 WIN8G02091 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Norte District Engineering Office
UACS No.: 320101100274000
Project ID: P00223232LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/Improvement of Mangcamagong Seawall, Barangay Mangcamagong, Basud, Camarines Norte
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 975 lm
Unit Cost: CW1 – Php 61.333 T/lm.
Estimated Cost: Php 65.0 M
(As Modified)
June 26, 2018 FY 2018 WIN8C03285 SR2018-01-0008347 January 26, 2018 Region XI Davao del Norte District Engineering Office
WIN8C03285

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Kapalong – Talaingod – Valencia (Bukidnon) Road
K1504 + 570 – K1504 + 600
K1507 + 410 – K1507 + 455
K1515 + (-130) – K1515 + (-016)
K1517 + 785 – K1517 + 830
Physical Target:
CW1: 6,655.00 sq.m. (Construction of Slope Protection Structure)
Allocation:
TOTAL: P 95,000.00
CW1: P 91,675.00 (Construction of Slope Protection Structure)
EAO: P 3,325.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Kapalong – Talaingod – Valencia (Bukidnon) Road
K1507 + 480 – K1507 + 540
K1509 + 415 – K1509 + 440
K1509 + 680 – K1509 + 693
K1509 + 753 – K1509 + 770
K1511 + 880 – K1511 + 905
Physical Target:
CW1: 771.82 sq.m. (Construction of Slope Protection Structure)
Allocation:
TOTAL: P 95,000.00
CW1: P 91,675.00 (Construction of Slope Protection Structure)
EAO: P 3,325.00


Justification:
Modified station limits due to the following:

• Original 1st section, K1504+570 – K1504+600 was transferred/clustered to Project ID P00200239MN under FY 2018 GAA in the amount of P38.0M for proximity reasons.
• Original 2nd to 4th sections were deleted to prioritize more critical sections which need immediate measures/interventions to prevent traffic accidents. These road slip sections (K1507+480 – K1507+540, K1509+415- K1509+440, K1509+680 – K1509+693, K1509+753 – K1509 + 770 and K1511 + 880 – K1511 + 905) occurred due to heavy rains during the 4th quarter of CY 2017 and aggravated every time there is a heavy downpour and will continue to erode if not addressed immediately.

Decrease in physical target from (6,655.00sq.m. to 771.82 sq.m.) were due to the following:
• Adoption of Under Drain (Perforated Pipe Wrapped with Geotextile) Cellular Confinement System for Slope and Retaining Wall in the design instead of conventional slope protection structures because of the presence of staggered high-pressure water seepage as per D.O. 54, series of 1998.
• Inclusion of miscellaneous structures such as geotextile, separation geotextile and drainage geotextile (public drain) to confine the water from penetrating the base of the carriageway.
• The soil characteristics of Talaingod are predominantly shale, silty sand and streaks of rocks varying in diameter from 15 – 500mm. Slope angle for the cut side is from 60 – 80 degrees with occasional debris flow and landslides during rainfall. On the lower slopes of embankment side, slope angle is about 50 – 60 degrees with rilles and guilles on almost all sites. Seepage is a main issue in the areas this occurs in unpredictable points in any slope section. This condition induces more stress on the soil and deformation, settlement and heaving; thus, can be seen in many pavement distresses in Talaingod. An observed expansive clay on some sites are the causes of these failures.
• To introduce a rigid approach in slope protection like concrete structures and other conventional methods has limitations especially with these severe conditions. Initial cost may be a consideration to design but the long-term value engineering impact should be the determining factor moreover with the design and project performance.
• Geosynthetics are installed layer per layer, as this method anchors on ground improvement techniques. There are also situations, that even with 2 sites have the same slope angle and depth but different seepage flow, it can have varying design on geosynthetics and filters whereby cost can vary.
• It is obvious from many ocular inspections on failed slope sites in Talaingod, Davao del Norte that conventional practice and methods like: riprap, gabion, stone masonry, sheet pile and erosion control coco net have resulted in may poor performances eventually a huge loss on the part of government budget.
• To compare the cost through value-engineering against Geosynthetics prove a more cheaper solution than the conventional one.
• Several DPWH pilot areas on the use of Geosynthetics were implemented on critical slope sites including Talaingod and its performance has proven to be very effective and successful.
• Composite approach in conventional and Geosynthetics solutions in road slips are very effective considering flexibility and higher factor of safety in stability as can be seen on actual performance. Whether this stability be in overturning, sliding and bearing failure, Geosynthetics have always a higher degree of success than the conventional approach.


June 25, 2018 FY 2018 WIN8G02354 FY 2018 GAA January 4, 2018 Region III Aurora District Engineering Office
Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Umiray, Dingalan, Aurora
June 25, 2018 FY 2018 WIN8G02426 FY 2018 GAA January 4, 2018 Region III Zambales 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Secondary Roads – Olongapo – Bugallon Road, K0164+140 – K0164+851
June 25, 2018 FY 2018 WIN8G02352 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Sur 2nd District Engineering Office
UACS No.: 310203100103000
Project ID: P00202633LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Roads - Naga City Bdry-Calabanga-Balongay Rd. incl. ROW - K0444+880 - K0445+418
Physical Target: CW1 - Road Widening/ 1.08 lane km
CW2 - Construction of Drainage Structure along Road / 1,080 lm.
ROW Acquisition - 425.00 sq.m.
Unit Cost: CW1 - Php 13.42M/lane km
CW2 - Php 13,332.64/lm
ROW - Php 3,647.06/sq.m
Allocation: Php 31.063M
(As Modified)
June 25, 2018 FY 2018 WIN8G01867 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Albay 3rd Engineering Office
UACS No.: 310102100142000
Project ID: P00200187LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Preventive Maintenance – Secondary Roads – Ligao-Pio Duran Rd – K0526+222 – K0527+861
Physical Target: CW1 -Preventive Maintenance of Road: Asphalt Overlay/ 3.296 lane-km
Unit Cost: CW1 – Php 6.097 T/lane-km
Estimated Cost: Php 20.51 M
(As Modified)

June 25, 2018 FY 2018 WIN8G01866 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Albay 3rd Engineering Office
UACS No.: 310101100088000
Project ID: P00200056LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Preventive Maintenance – Primary Roads – Daang Maharlika (LZ) - K0491+700 - K0491+767.5, K0491+789.3 - K0492+220, K0492+220 - K0492 + 572.5, K0492+594.3 - K0492+970.4
Physical Target: CW1 -Preventive Maintenance of Road: Asphalt Overlay/ 2.4536 lane-km
Unit Cost: CW1 – Php 12.37 T/lane-km
Estimated Cost: Php 30.96 M
(As Modified)
June 25, 2018 FY 2018 WIN8G01784 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 2nd District Engineering Office
UACS No.: 300203100323000
Project ID: P00230371LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Daraga, Placer-Divisoria, Cawayan Road (Package II), Placer, Masbate
Physical Target: CW1 – Construction of Concrete Road/ 4.00 lane-km
Unit Cost: CW1 – Php 12.25 M/lane-km
Estimated Cost: Php 50.00 M
(As Modified)
June 25, 2018 FY 2018 WIN8G01842 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 2nd District Engineering Office
UACS No.: 300117201457000
Project ID: P00251684LZ
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Concreting of Buracan – Buenaflor Road, Brgy. Buracan and Brgy. Buenaflor, Dimasalang, Masbate
Physical Target: CW1 – Construction of Concrete Road/ 1.092 lane-km
Unit Cost: CW1 – Php 9.065 M/lane-km
Estimated Cost: Php 10.00 M
(As Modified)
June 25, 2018 FY 2018 WIN8G01892 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 2nd District Engineering Office
UACS No.: 300117201458000
Project ID: P00255764LZ
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Concreting of Esperanza – Placer Road leading to Pasiagon Beach Front, Balay na Bato and Esperanza Seaport, Masbate
Physical Target: CW1 – Construction of Concrete Road/ 4.00 lane-km
Unit Cost: CW1 – Php 12.375 M/lane-km
Estimated Cost: Php 50.00 M
(As Modified)
June 25, 2018 FY 2018 WIN8G01829 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 2nd District Engineering Office
UACS No.: 300117201456000
Project ID: P00251685LZ
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Concreting of Buenaflor – Cabanoyoan Road, Brgy. Buenaflor and Cabanoyoan, Dimasalang, Masbate
Physical Target: CW1 – Construction of Concrete Road/ 1.418 lane-km
Unit Cost: CW1 – Php 6.982 M/lane-km
Estimated Cost: Php 10.00 M
(As Modified)
June 25, 2018 FY 2018 WIN8G01844 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 2nd District Engineering Office
UACS No.: 300104202752000
Project ID: P00255040LZ
Local Infrastructure Program – Buildings and Other Structures – Multipurpose / Facilities – Construction of Multi-Purpose, Covered Court, Brgy. Bugtong, Pio V. Corpus, Masbate
Physical Target: CW1 - Construction of Other Building/ 1 Building
Unit Cost: Php 2.475
Estimated Cost: Php 2.500 M
(As Modified)
June 25, 2018 FY 2018 WIN8G01782 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 2nd District Engineering Office
UACS No.: 300104202753000
Project ID: P00255041LZ
Local Infrastructure Program – Buildings and Other Structures – Multipurpose / Facilities – Construction of Multi-Purpose, Covered Court, Brgy. Bunducan, Pio V. Corpus, Masbate
Physical Target: CW1 - Construction of Other Building/ 1 Building
Unit Cost: Php 2.475 M/Building
Estimated Cost: Php 2.500 M
(As Modified)
June 25, 2018 FY 2018 WIN8G01785 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 2nd District Engineering Office
UACS No.: 320101101727000
Project ID: P00222794LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/Improvement of Palanas Flood Control, Poblacion, Palanas, Masbate
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 619.0 lm
Unit Cost: CW1 – Php 31.664 T/lm.
Estimated Cost: Php 20.00 M
(As Modified)
June 25, 2018 FY 2018 WIN8G01825 FY 2018 GAA R.A. 10964 December 28, 2017 Region V Masbate 2nd District Engineering Office
UACS No.: 320101101723000
Project ID: P00222795LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program –
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/Improvement of Gahit Flood Control, Gahit, Cataingan, Masbate
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 500.0 lm
Unit Cost: CW1 – Php 39.200 T/lm.
Estimated Cost: Php 20.00 M
(As Modified)
June 25, 2018 FY 2018 WIN8G01780 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 2nd District Engineering Office
UACS No.: 320101101724000
Project ID: P00222792LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/Improvement of Impapanan Flood Control, Armenia, Uson, Masbate
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 602.0 lm
Unit Cost: CW1 – Php 32.558 T/lm.
Estimated Cost: Php 20.00 M
(As Modified)
June 25, 2018 FY 2018 WIN8G01845 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 2nd District Engineering Office
UACS No.: 320101101726000
Project ID: P00222796LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/Improvement of Matagangtang Flood Control, Matagangtang, Placer, Masbate
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 258.0 lm
Unit Cost: CW1 – Php 75.969 T/lm.
Estimated Cost: Php 20.00 M
(As Modified)
June 25, 2018 FY 2018 WIN8G01826 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 2nd District Engineering Office
UACS No.: 320101101725000
Project ID: P00222793LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/Improvement of Masisi Flood Control, G. Aliño, Dimasalang, Masbate
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 683.0 lm
Unit Cost: CW1 – Php 28.697 T/lm.
Estimated Cost: Php 20.00 M
(As Modified)
June 25, 2018 2018 WIN8C03107 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Surigao del Norte 1st District Engineering Office
Local Program - Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure Program

FROM:

Construction of Flood Control System, Brgy. Tuboran, Del Carmen, Siargao, Surigao del Norte

Project ID No. P00253998MN
Scope of Work: Construction of Flood Mitigation Structure
Physical Target: 572.50 Lineal Meters

Allocation: Php 100,000,000.00 (Total)
Php 99,000,000.00 (Flood Mitigation Structure)
Php 1,000,000.00 (EAO)


TO:

Construction of Flood Control System, Brgy. Tuboran, Del Carmen, Siargao, Surigao del Norte

Project ID No. P00253998MN
Scope of Work: Construction of Flood Mitigation Structure
Physical Target: 1,901.00 Lineal Meters

Allocation: Php 100,000,000.00 (Total)
Php 99,000,000.00 (Flood Mitigation Structure)
Php 1,000,000.00 (EAO)
June 22, 2018 2018 310106100106000 GAA FY 2018 January 1, 2018 Region II Quirino District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads

Jct Abbag-Guingin Bdry Rd (S04752LZ),
K0387+134 - K0387+262, K0387+442 - K0387+575, K0387+585 - K0387+607, K0387+749 - K0387+781, K0388+020 - K0388+060.04, K0388+166 - K0388+180, K0388+280 - K0389+100, K0389+100 - K0389+210, K0389+220 - K0389+323, K0389+385 - K0389+398, K0389+700 - K0389+727, K0389+758 - K0389+830, K0389+884 - K0389+897
June 22, 2018 FY 2018 GAA WIN8C03091 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION

FROM: Convergence and Special Support Program
Construction / Improvement of Access Roads leading to Declared Tourism Destinations
Mapawa Road leading to Pyalitan Falls, Brgy. Mapawa, Maragusan, Compostela Valley
Physical Target:
CW-1 - 3.700 Lane Km (Construction of Concrete Road)
ALLOCATION:
Total: P 42,360,000.00
CW-1 - P 41,512,800.00 (Construction of Concrete Road)
EAO - P 847,200.00

TO: Convergence and Special Support Program
Construction / Improvement of Access Roads leading to Declared Tourism Destinations
Mapawa Road leading to Pyalitan Falls, Brgy. Mapawa, Maragusan, Compostela Valley
Physical Target:
CW-1 - 3.718 Lane Km (Construction of Concrete Road)
ALLOCATION:
Total: P 42,360,000.00
CW-1 - P 41,512,800.00 (Construction of Concrete Road)
EAO - P 847,200.00
June 22, 2018 FY 2018 GAA WIN8C03007 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Programs
Local - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Roads
Concreting of Linda - Handurumog Road, Nabunturan, Compostela Valley
Physical Target:
CW-1 - 1.000 Lane Km (Construction of Concrete Road)
ALLOCATION:
Total: P 20,000,000.00
CW-1 - P 19,600,000.00 (Construction of Concrete Road)
EAO - P 400,000.00

TO: Local Programs
Local - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Roads
Concreting of Linda - Handurumog Road, Nabunturan, Compostela Valley
Physical Target:
CW-1 - 0.810 Lane Km (Construction of Concrete Road)
ALLOCATION:
Total: P 20,000,000.00
CW-1 - P 19,600,000.00 (Construction of Concrete Road)
EAO - P 400,000.00
June 21, 2018 GAA FY 2018 WIN8F05618 UACS No. 310112100013000 January 1, 2018 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 310112100013000
Project ID: P00200708LZ
WIN8F05618
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads–Tertiary Road
Cordillera St – K0006+(-410) – K0006+528
Physical Target: CW1- Upgrading of Drainage Structure along Road L=1,876 lineal meter
Unit Cost (P’000): P 10.45/ lineal meter
Allocation (‘000): P 19,600.00
EAO (‘000) P 400.00
Total (‘000): P 20,000.00

As Modified
UACS No. 310112100013000
Project ID: P00200708LZ
WIN8F05618
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads–Tertiary Road
Cordillera St – K0006+(-410) – K0006+338
Physical Target: CW1- Upgrading of Drainage Structure along Road L=1,374 lineal meter
Unit Cost (P’000): P 14.26/ lineal meter
Allocation (‘000): P 19,600.00
EAO (‘000) P 400.00
Total (‘000): P 20,000.00
June 21, 2018 GAA FY 2018 WIN8F05619 UACS No. 300103200093000 January 1, 2018 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 300103200093000
Project ID: P00256004LZ
WIN8F05619
Local Program – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Building and Other Structures – Multipurpose/ Facilities –
Construction of Multi – Purpose Building including Completion of Facilities and Ground Improvement at Mataas na Paaralang Neptali A. Gonzales Annex, Barangay, Mauway, Mandaluyong City
Physical Target: CW1-Construction of Multi-Purpose Building – 1.0
Unit Cost (P’000): P24,500.00/bldg.
Allocation (‘000): P 24,500.00
EAO (‘000) P 500.00 M
Total (‘000) : P 25,000.00

As Modified
UACS No. 300103200093000
Project ID: P00256004LZ
WIN8F05619
Local Program – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Building and Other Structures – Multipurpose/ Facilities –
Construction of Multi – Purpose Building including Completion of Facilities and Ground Improvement at Senator Neptali A. Gonzales Integrated School, Barangay, Mauway, Mandaluyong City
Physical Target: CW1-Construction of Multi-Purpose Building – 1.0
Unit Cost (P’000): P24,500.00/bldg.
Allocation (‘000): P 24,500.00
EAO (‘000) P 500.00 M
Total (‘000) : P 25,000.00
June 21, 2018 FY 2018 GAA WIN8C03249 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System
Network Development Program
Construction of Missing Links/New Roads
Fatima-Malabog Road (Malabog-Gumitan), incl. ROW, Davao City
Physical Target:
CW1: 1.601 Lane Km (Construction of Concrete Road)
ROW: 16,006.510 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 34,025,900.00 (Construction of Concrete Road)
ROW: P 62,474,100.00 (ROW Acquisition)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System
Network Development Program
Construction of Missing Links/New Roads
Fatima-Malabog Road (Malabog-Gumitan), incl. ROW, Davao City
Physical Target:
CW1: 1.601 Lane Km (Reconstruction to Concrete Pavement)
ROW: 16,006.510 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 41,346,900.00 (Reconstruction to Concrete Pavement)
CW2: P 49,478,900.00 (Construction of Road Slope Protection Structure)
ROW: P5,674,200.00 (ROW Acquisition)
EAO: P 3,500,000.00
June 21, 2018 FY 2018 GAA WIN8C03250 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System
Network Development Program
Construction of Bypass and Diversion Roads
Jct. R. Castillo St. (Ubalde Section) incl. ROW, Davao City
Physical Target:
CW1: 0.762 Lane Km (Rehabilitation of Paved Road)
ROW: 1,929.667 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 67,585,000.00
CW1: P 54,046,755.00 (Construction of Concrete Road)
ROW: P 11,172,770.00 (ROW Acquisition)
EAO: P 2,365,475.00

TO: OO1: Ensure Safe and Reliable National Road System
Network Development Program
Construction of Bypass and Diversion Roads
Jct. R. Castillo St. (Ubalde Section) incl. ROW, Davao City
Physical Target:
CW1: 0.762 Lane Km (Rehabilitation of Paved Road)
CW2: 762 Lineal meters (Construction of Drainage Structures along Road)
ROW: 1,929.667 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 67,585,000.00
CW1: P 9,377,554.00 (Construction of Concrete Road)
CW2 : P 31,430,052.00 (Construction of Drainage Structures along Road)
ROW: P 24,411,919.00 (ROW Acquisition)
EAO: P 2,365,475.00
June 21, 2018 FY 2018 GAA WIN8C03251 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office


MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System
Network Development Program
Construction of Bypass and Diversion Roads
Bypass Road at Jct Daang Maharlika-Eliong-
Jct Acacia Road, Davao City
Physical Target:
CW1: 8.755 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,714,000.00
CW1: P 15,399,720.00 (Construction of Concrete Road)
EAO: P 314,280.00

TO: OO1: Ensure Safe and Reliable National Road System
Network Development Program
Construction of Bypass and Diversion Roads
Bypass Road at Jct Daang Maharlika-Eliong-
Jct Acacia Road, Davao City
Physical Target:
CW1: 8.755 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,714,000.00
CW1: P 15,399,720.00 (Construction of Concrete Road)
EAO: P 314,280.00
June 21, 2018 FY 2018 GAA WIN8C03252 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening
Davao City Diversion Road Including ROW – K1512+460 – K1513+775
Physical Target:
CW1: 2.34 lane km (Road Widening)
ROW: 3,389.333 square meters (ROW Acquisition)
Allocation:
TOTAL: P 43,217,000.00
CW1: P 19,340,300.00 (Construction of Concrete Road)
ROW: P 23,012,360.00 (ROW Acquisition)
EAO: P 864,340.00

TO: OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening
Davao City Diversion Road Including ROW – K1513+000 – K1515+080, K1515+911
Physical Target:
CW1: 1.263 lane km (Road Widening)
CW2: 592 lineal meters (Construction of Drainage Structure along Road)
ROW: 3,389.333 square meters (ROW Acquisition)
Allocation:
TOTAL: P 43,217,000.00
CW1: P 18,603,340.00 ( Road Widening)
CW2: P 12,926,200.00 (Construction of Drainage Structure along Road)
ROW: P 10,823,120.00 (ROW Acquisition)
EAO: P 864,340.00
June 20, 2018 FY 2018 WIN8G02360 FY 2018 GAA January 4, 2018 Region III Pampanga 3rd District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Secondary Roads - Arayat – Magalang – Mabalacat Rd
June 20, 2018 FY 2018 WIN8G02395 FY 2018 GAA January 4, 2018 Region III Bataan 1st District Engineering Office
Asset Preservation Program – Preventive Maintenance – Secondary Roads – Repair / Rehabilitation (Asphalt Overlay) Overlay with Pavement Markings along Roman Expressway, K0102+447 – K0102+768, K0106+200 – K0106+748, K0107+739 – K0108+298, K0109+000 – K0110+710, K0111+586 – K0111+994, Hermosa, Orani, Samal and Abucay Bataan
June 20, 2018 GAA FY 2018 WIN8F05604 UACS No. 300116200318000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300116200318000
Project ID: P00240609LZ
WIN8F05604
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects = Local Roads and Bridges
Local Roads and Bridges – Local Roads
Improvement of Road and drainage system – Balubaran Road, Brgy. Malinta (from MacArthur HW to L Prodon St. Maysam Road), Poblacion Malinta, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road 1.754 lane km
EAO (‘000) – P 500.00
Unit Cost (P’000): P13,968.07/lane km
Allocation: P 24,500.00 M
Total: P 25,000.00 M

As Modified
UACS No. 300116200318000
Project ID: P00240609LZ
WIN8F05604
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects = Local Roads and Bridges
Local Roads and Bridges – Local Roads
Improvement of Road and drainage system – Balubaran Road, Brgy. Malinta (from MacArthur HW to L Prodon St. Maysam Road), Poblacion Malinta, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road 1.306 lane km
EAO (‘000) – P 500.00
Unit Cost (P’000): P18,759.57/lane km
Allocation: P 24,500.00
Total: P 25,000.00 M
June 20, 2018 GAA FY 2018 WIN8F05606 UACS No. 320101100586000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 320101100586000
Project ID: P00220653LZ
WIN8F05606
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Wall/ Riprapping along the Bank of Creeks with Dredging in Brgy. 177, Caloocan City
Physical Target: CW1-Construction of Flood Mitigation Structure = 1,925.00 l.m.
EAO (‘000) – P 0.94 M
Unit Cost (P’000): P34.373/l.m.
Allocation: P 46.060 M
Total: P 47.00 M

As Modified
UACS No. 320101100586000
Project ID: P00220653LZ
WIN8F05606
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Wall/ Riprapping along the Bank of Creeks with Dredging in Brgy. 177, Caloocan City
Physical Target: CW1- Construction of Flood Mitigation Structure = 450.00 l.m.
CW2 – Dredging/Desilting = 8,017.80 cu.m.
EAO (‘000) – P 0.94 M
Unit Cost (P’000): P89.344/l.m.
: P0.730/ cu.m.
Allocation: P 40.205 M
P 5.855 M
Total: P 47.00 M
June 20, 2018 GAA FY 2018 WIN8F05609 UACS No. 310204100054000 January 1, 2018 National Capital Region NCR - Regional Office
As per GAA/Original
UACS No. 310204100054000
Project ID: P00200942LZ
WIN8F05609
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
C-6, Napindan – M.L. Quezon Ave., Taguig City
Physical Target: CW1-Construction of Concrete Road L=2.680 lane km
Unit Cost (P’000): P50,770.52/ lane km
Allocation: P 136,065.00
EAO (‘000): P 4,935 M
Total (‘000): P 141,000.00

As Modified
UACS No. 310204100054000
Project ID: P00200942LZ
WIN8F05609
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
C-6, Napindan – M.L. Quezon Ave., Taguig City
Physical Target: CW1-Construction of Concrete Road L=3.604 lane km
ROW: A = 200 sq.m. = 118.91/sq.m. = P23.781.15
Unit Cost (P’000): P31,153.37/ lane km
Allocation: P 112,283.95
EAO (‘000): P 4,935 M
Total (‘000): P 141,000.00

June 20, 2018 GAA FY 2018 WIN8F05605 UACS No. 310205100131000 January 1, 2018 National Capital Region NCR - Regional Office
As per GAA/Original
UACS No. 310205100131000
Project ID: P002022779LZ
WIN8F05605
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links/ New Roads
Mindanao Avenue Extension Segment 2C, Phase I and Phase II, incl. ROW, Caloocan City and Valenzuela City
Physical Target: CW1-Construction of Concrete Road L=4.160 lane km
Unit Cost (P’000): P74,926.68/ lane km
Allocation: P 311,695.00
EAO (‘000): P 11,305
Total (‘000): P 323,000.00

As Modified
UACS No. 310205100131000
Project ID: P002022779LZ
WIN8F05605
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links/ New Roads
Mindanao Avenue Extension Segment 2C, Phase I and Phase II, incl. ROW, Caloocan City and Valenzuela City
Physical Target: CW1-Construction of Concrete Road L=4.344 lane km
ROW – A = 20,653 sq.m
Unit Cost (P’000): P17,805.85/ lane km
P11.35/ sq.m.
Allocation: P 77,348.60
EAO (‘000): P 11,305
Total (‘000): P 323,000.00
June 20, 2018 GAA FY 2018 WIN8F05607 UACS No. 320101100147000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101100147000
Project ID: P00222432LZ – CW1
WIN8F05607
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Riverwall and Road Dike, (Sta. 2+199 to Sta. 1+989), (Phase I), Brgy. Dampalit, Malabon City
Physical Target: CW1 – Construction of Revetment: 210 lm
EAO P 2.625 M
Unit Cost: P 344,642.86 / lm
Allocation: P 72.375 M
Total: P 75 M

As Modified
UACS No. 320101100147000
Project ID: P00222432LZ – CW1
WIN8F05607
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Riverwall and Road Dike, (Sta. 2+226 to Sta. 2+048), (Phase I), Brgy. Dampalit, Malabon City
Physical Target: CW1 – Construction of Revetment: 178.0 lm
EAO P 1.50 M
Excess: 0.377 M
Unit Cost: P 411,028.09 / lm
Allocation: P 73.163 M
Total: P 75 M
June 20, 2018 FY 2018 WIN8G02364 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300204100016000
Project ID: P00230361LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones – Brgy. 3-Brgy 2-Brgy.1 Road connecting Ligao-Pioduran Road and Pioduran-Donsol Road in support to Agribusiness (Food Resource Based Processing) Pio-Duran, Albay
Physical Target: CW1 – Construction of Concrete Road/ 0.504 lane-km
CW2 - Construction of Road Slope Protection Structure/ 9,621.650 sq.m.
Unit Cost: CW1 – Php 35.09 M /lane-km
CW2 – Php 5,182.35/sq.m.
Estimated Cost: Php 70.0 M
(As Modified)

June 20, 2018 FY 2018 WIN8G02340 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300202100009000
Project ID: P00230378LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Seaport - Guinobatan-Jovellar-Donsol Road Leading to Pilar Port, Albay
Physical Target: CW1 – Construction of Concrete Road/ 4.76 lane-km
CW2 - Construction of Drainage Structure along Road/ 2,610.20 lm.
Unit Cost: CW1 – Php 12.37 M /lane-km
Estimated Cost: Php 80.0 M
CW2 – Php 7,013.10/lm.
(As Modified)
June 20, 2018 FY 2018 WIN8G02333 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300116200122000
Project ID: P00257843LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects – Construction of Balud del Norte – Cota na Daco – Cogon Coastal Road and Shore Protection, Gubat Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.752 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,936.40 sq.m.
Unit Cost: CW1 – Php 34.40 M /lane-km
CW2 – Php 36,477.49/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
June 20, 2018 FY 2018 WIN8G02342 FY 2018 GAA R.A. 10964 November 29, 2017 Region V Regional Office V
UACS No.: 300116200129000
Project ID: P00257850LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects – Construction of Caloocan-Tabunan-Paghuliran Coastal Road with Shore Protection, Matnog, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.63822 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,350.69 sq.m.
Unit Cost: CW1 – Php 59.58 M /lane-km
CW2 – Php 43,290.93/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
June 20, 2018 FY 2018 WIN8G02401 FY 2018 GAA R.A. 10964 December 28, 2017 Region V Regional Office V
UACS No.: 300116200132000
Project ID: P00257853LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects – Construction of Diamante-Perlas Coastal Road and Shore Protection, Prieto Diaz, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.772 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,9,87.90 sq.m.
Unit Cost: CW1 – Php 32.06 M /lane-km
CW2 – Php 36,093.08/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
June 20, 2018 FY 2018 WIN8G02362 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300116200136000
Project ID: P00257857LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects – Construction of Luna Candol – Balud del Sur Coastal Road and Shore Protection, Gubat, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.762 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,962.150 sq.m.
Unit Cost: CW1 – Php 32.59 M /lane-km
CW2 – Php 36,526.22/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
June 20, 2018 FY 2018 WIN8G02343 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300116200145000
Project ID: P00257866LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects – Construction of Pobalcion Norte, Central and Sur Coastal Road and Shore Protection, Barcelona, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.6702 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,476.56 sq.m.
Unit Cost: CW1 – Php 44.08 M /lane-km
CW2 – Php 43,346.79/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
June 20, 2018 FY 2018 WIN8G02341 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300116200152000
Project ID: P00257873LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects – Construction of San Vicente-San Rafael Coastal Rd and Shore Protection, Bulan, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.604 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,555.30 sq.m.
Unit Cost: CW1 – Php 52.55 M /lane-km
CW2 – Php 41,638.47/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
June 20, 2018 FY 2018 WIN8G02411 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300116200158000
Project ID: P00257879LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects – Construction of Zone 2 – Sabang – San Vicente Coastal Rd with Shore Protection, Bulan, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.86558 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,498.65 sq.m.
Unit Cost: CW1 – Php 39.08 M /lane-km
CW2 – Php 41,817.60/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
June 20, 2018 FY 2018 WIN8G02351 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310108100015000
Project ID: P00200842LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Secondary Roads - Catanduanes Cir Rd - K0155+000 - k0156+020
Physical Target: CW1 - Construction of Road Slope Protection Structure/ 7,603.20 sq.m.
Unit Cost: CW1 – Php 19,195.54/sq.m.
Estimated Cost: Php 151.241 M
(As Modified)
June 20, 2018 FY 2018 GAA WIN8C03206 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1484 + (-844) - K1484 + 068,
K1484 + 722 - K1485 + 825, K1493 + 316 - K1493 + 825,
K1495 + 000 - K1495 + 151, K1495 + 299 - K1495 + 384,
K1496 + 765 - K1497 + 190, K1498 + 000 - K1498 + 068,
K1499 + 370 - K1500 + 040
Physical Target:
CW1: 12,350 square meters (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 20,620,000.00
CW1: P 20,207,600.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 412,400.00

TO: OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1484 + (-844) - K1484 + 068,
K1484 + 722 - K1485 + 825, K1493 + 316 - K1493 + 825,
K1495 + 000 - K1495 + 151, K1495 + 229 - K1495 + 384,
K1496 + 765 - K1497 + 190, K1498 + 000 - K1498 + 068,
K1499 + 370 - K1500 + 040
Physical Target:
CW1: 13,560.34 square meters (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 20,620,000.00
CW1: P 20,207,600.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 412,400.00
June 20, 2018 FY 2018 WIN8G02324 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310101100018000
Project ID: P00202666LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Preventive Maintenance – Primary Roads – Daang Maharlika (LZ) – K0576+1000 – K0578+000, K0578+250 – K0578+480, K0579+000 – K0579+705, K0580+930 – K0581+300, K0581+780 – K0581+845, K0581+845 – K0582+000, K0591+200 – K0591+817, K0591+817 – K0593+447, K0593+581 – K0593+656, K0593+656 – K0593+922, K0595+470 – K0595+810, K0595+947 – K0596+095, K0598+073 – K0598+276, K0599+386 – K0599+751
Physical Target: CW1 -Preventive Maintenance of Road: Asphalt Overlay/ 21.295 lane-km
Unit Cost: CW1 – Php 7.84 M /lane-km
Estimated Cost: Php 173.0 M
(As Modified)
June 20, 2018 FY 2018 WIN8G02331 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310204100117000
Project ID: P00201073LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of By-Pass and Diversion Roads – Gubat bypass Road, incl. ROW, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 3.965 lane-km
Right-of-Way Acquisition (ROW)/ 38,032.40 sq.m.
Unit Cost: CW1 – Php 18.25 M /lane-km
ROW Acquisition – Php 634.33/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)

June 20, 2018 FY 2018 WIN8G02350 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310202100067000
Project ID: P00201386LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Road Widening – Secondary Roads – Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd – K0471+840 – K0472+1008, K0474+000 – K0475+000, K0489+135.55 – K0489+455
Physical Target: CW1 - Road Widening/ 4.9809 lane-km
Unit Cost: CW1 – Php 14.95092 M /lane-km
Estimated Cost: Php 77.170 M
(As Modified)
June 20, 2018 FY 2018 WIN8G02350 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310202100067000
Project ID: P00201386LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Road Widening – Secondary Roads – Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd – K0471+840 – K0472+1008, K0474+000 – K0475+000, K0489+135.55 – K0489+455
Physical Target: CW1 - Road Widening/ 4.9809 lane-km
Unit Cost: CW1 – Php 14.95092 M /lane-km
Estimated Cost: Php 77.170 M
(As Modified)
June 20, 2018 FY 2018 GAA WIN8C03178 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/Upgrading/Rehabiliation of Drainage along National Roads
Magsaysay Ave - K1510 + (-499) - K1510 + 680
Physical Target:
CW1: 1,379 lineal meters (Rehabilitation/Major Repair of Drainage Structure along Road)
Allocation:
TOTAL: P 32,390,000.00
CW1: P 31,742,200.00 (Rehabilitation/Major Repair of Drainage Structure along Road)
EAO: P 647,800.00

TO: OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/Upgrading/Rehabiliation of Drainage along National Roads
Magsaysay Ave - K1510 + (-499) - K1510 + 680
Physical Target:
CW1: 1,509 lineal meters (Rehabilitation/Major Repair of Drainage Structure along Road)
Allocation:
TOTAL: P 32,390,000.00
CW1: P 31,742,200.00 (Rehabilitation/Major Repair of Drainage Structure along Road)
EAO: P 647,800.00
June 20, 2018 FY 2018 WIN8G02361 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Network Development Program – Road Widening – Primary Roads – Daang Maharlika (LZ) K0129+378.65 – K0129+419.50, K0129+738.50 – K0130+000, K0131+926 – K0132+000, K0132+914 – K0133+000, K0134+169 – K0134+180, K0143+584 – K0145+790
June 20, 2018 FY 2018 WIN8G02293 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Local Infrastructure Program – Local Roads and Bridges - Local Roads – Construction of Road, Brgy. Saverona - Brgy. Villa Rosenda, Talugtug, Nueva Ecija
June 20, 2018 FY 2018 WIN8G02307 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Local Program – Local Roads and Bridges - Local Roads –Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Project - Rehabilitation of Science City of Muñoz – Talugtug Road, Science City of Muñoz and Talugtug, Nueva Ecija
June 20, 2018 FY 2018 WIN8G02310 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Construction / Rehabilitation of Flood Control Dikes, Brgy. Bacayao, Guimba, Nueva Ecija
June 20, 2018 FY 2018 GAA WIN8C03205 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Ponciano St.-Bangoy St.-Jacinto Extension St. leading to Marco Polo Hotel-Aldevinco Shopping Center-Madrazo Fruit Stands-Central Bank, Brgy. 34D, Davao city
Physical Target:
CW1: 2.520 lane kilometers (Reconstruction from Paved to Concrete)
Allocation:
TOTAL: P 22,780,000.00
CW1: P 22,324,400.00 (Reconstruction from Paved to Concrete)
EAO: P 455,600.00

TO: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Ponciano St.-Bangoy St.-Jacinto Extension St. leading to Marco Polo Hotel-Aldevinco Shopping Center-Madrazo Fruit Stands-Central Bank, Brgy. 34D, Davao city
Physical Target:
CW1: 1.046 lane kilometers (Reconstruction to Concrete Pavement)
CW2: 269 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 22,780,000.00
CW1: P 18,237,800.00 (Reconstruction from Paved to Concrete)
CW2: P 4,086,600.00 (Construction of Drainage Structure along Road)
EAO: P 455,600.00
June 20, 2018 FY 2018 WIN8G02336 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 320101100298000
Project ID: P00223248LZ
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – construction of Flood Control Structures along Downstream of Rangas Bridge both sides Sta. 0+562 – Sta. 0+690, Sta. 0+562 – Sta. 0+677.66, Sta. 1+761 – Sta. 2+034.57, Sta. 0+425 – Sta. 0+549, Sta. 0+450 – Sta. 0+544, irosin, Sorsogon
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 735.23 lm
Unit Cost: CW1 – Php 131.25 T/lm.
Estimated Cost: Php 100.00 M
(As Modified)
June 20, 2018 FY 2018 WIN8G02327 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Local Roads and Bridges - Local Roads – Upgrading of Brgy. Road, Umbuyan Road, Perez, Bulakan, Bulacan
June 20, 2018 FY 2018 WIN8G02328 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 320101100333000
Project ID: P00223283LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program –
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/improvement of Kamanitohan River Flood Control Dike (Upstream of Kamanitohan Bridge), Sta. 2+372 – Sta. 3+002.20, pobalacion It-Ba, Manito, Albay
Physical Target: CW1 – Construction of Dike/ 630.20 lm
Unit Cost: CW1 – Php 153.126 T/lm.
Estimated Cost: Php 100.00 M
(As Modified)
June 20, 2018 FY 2018 GAA WIN8C03185 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: Local Program
Local - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Rehabilitation/Improvement of Drainage System, Brgy. Maa, Davao City
Physical Target:
CW1: 300 lineal meters (Rehabilitation/Major Repair of Drainage Structure)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Rehabilitation/Major Repair of Drainage Structure)
EAO: P 50,000.00

TO: Local Program
Local - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Rehabilitation/Improvement of Drainage System, Brgy. Maa, Davao City
Physical Target:
CW1: 838 lineal meters (Rehabilitation/Major Repair of Drainage Structure)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000 (Rehabilitation/Major Repair of Drainage Structure)
EAO: P 50,000.00
June 20, 2018 FY - 2018 WIN8F05572 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
Local Programs: Local Infrastructure Program

Local - National Roads and Bridges - Local Roads
- Local Infrastructure Program

FROM:
Construction of Roads,
Brgy. Tubigon Proper, Ferrol, Romblon

CW1: 0.352 lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php

TO:
Construction of Roads,
Brgy. Tubigon Proper, Ferrol, Romblon

CW1: 0.3128 lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php
June 20, 2018 FY 2018 WIN8G02349 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 320101100022000
Project ID: P00222428LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction and Improvement of Flood Control Dikes in Guinobatan, Albay for critical sections of Barangays San Francisco, Travesia, Iraya, Pobalcion and Morera, Guinobatan, Albay
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 1,213.80 lm
Unit Cost: CW1 – Php 119.254 T/lm.
Estimated Cost: Php 150.00 M
(As Modified)
June 20, 2018 FY 2018 WIN8G02335 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Tertiary Roads – Plaridel – Pulilan Div Rd, K0042+(-784) – K0042+058
June 20, 2018 FY 2018 WIN8G02326 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Local Roads and Bridges - Local Roads - Construction of Road, Sitio Buga, Sta. Elena, Hagonoy, Bulacan
June 20, 2018 FY 2018 WIN8G02402 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Tertiary Roads – Bigaa – Plaridel via Bulacan & Malolos Rd, K0032+000 – K0033+000
June 20, 2018 FY 2018 WIN8G02393 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Tertiary Roads – Bigaa – Plaridel via Bulacan & Malolos Rd, K0051+000 – K0051+750
June 20, 2018 FY - 2018 WIN8F05564 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
Local Programs: Local Infrastructure Program

Local - National Roads and Bridges - Local Roads
- Local Infrastructure Program

FROM:
Construction of Roads,
Brgy. Gabawan, Odiongan, Romblon

CW1: 0.352 lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php

TO:
Construction of Roads,
Brgy, Gabawan, Odiongan, Romblon

CW1: 0.148 lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php

June 20, 2018 FY 2018 WIN8G02398 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Bigaa – Plaridel via Bulacan & Malolos Rd, K0036+035 – K0036+093, K0036+226 – K0036+426, K0042+625 – K0043+716.6

Pages