April 27, 2018 2018 WIN8C02603 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Regional Office XIII
OO 1 : Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links/New Roads

FROM:

Completion of the East-West lateral road connecting Agusan Del Sur/Agusan del Norte to Bukidnon Sampaguita - Makilos (Agusan del Sur/Bukidnon Boundary), Package 8, Agusan del Sur

Project Component ID: P00200567MN
Scope of Work: Construction of Concrete Road
Physical Target: 19.234 lane km

Allocation: Php 300,000,000 (Total)
Php 289,500,000 (Road)
Php 10,500,000 (EAO)


TO:

Completion of the East-West lateral road connecting Agusan Del Sur/Agusan del Norte to Bukidnon Sampaguita - Makilos (Agusan del Sur/Bukidnon Boundary), Package 8, Agusan del Sur

Project Component ID: P00200567MN
Scope of Work: Construction of Gravel Road
Physical Target: 9.18 lane km

Allocation: Php 300,000,000 (Total)
Php 289,500,000 (Road)
Php 10,500,000 (EAO)
April 27, 2018 2018 WIN8C02604 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Regional Office XIII
OO 1 : Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links/New Roads

FROM:

Completion of the East-West lateral road connecting Agusan Del Sur/Agusan del Norte to Bukidnon Sampaguita - Makilos (Agusan del Sur/Bukidnon Boundary), Package 13, Agusan del Sur

Project Component ID: P00200563MN
Scope of Work: Construction of Gravel Road
Physical Target: 7.272 lane km

Allocation: Php 200,000,000 (Total)
Php 193,000,000 (Road)
Php 7,000,000 (EAO)

TO:

Completion of the East-West lateral road connecting Agusan Del Sur/Agusan del Norte to Bukidnon Sampaguita - Makilos (Agusan del Sur/Bukidnon Boundary), Package 13, Agusan del Sur

Project Component ID: P00200563MN
Scope of Work: Construction of Gravel Road
Physical Target: 4.40 lane km

Allocation: Php 200,000,000 (Total)
Php 193,000,000 (Road)
Php 7,000,000 (EAO)
April 27, 2018 2018 WIN8C03018 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Regional Office XIII
OO1 : Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/New Roads

FROM:

Cabadbaran – Puting Bato – Lanuza Road, Surigao del Sur

Project Component ID: P00200561MN
Scope of Work: Construction of Gravel Road
Physical Target: 12.10 lane km

Allocation: Php 270,000,000 (Total)
Php 260,550,000 (Road)
Php 9,450,000 (EAO)

TO:

Cabadbaran – Puting Bato – Lanuza Road, Surigao del Sur

Project Component ID: P00200561MN
Scope of Work: Construction of Gravel Road
Physical Target: 7.00 lane km

Allocation: Php 270,000,000 (Total)
Php 260,550,000 (Road)
Php 9,450,000 (EAO)
April 27, 2018 2018 WIN8C02568 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Regional Office XIII
OO1 : Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links/New Roads

FROM:

Butuan City – Pianing – Tandag Road (Tandag Section), Surigao del Sur

Project Component ID: P00200558MN
Scope of Work: Construction of Gravel Road
Physical Target: 8.00 lane km

Allocation: Php 180,000,000 (Total)
Php 173,700,000 (Road)
Php 6,300,000 (EAO)

TO:

Butuan City – Pianing – Tandag Road (Tandag Section), Surigao del Sur

Project Component ID: P00200558MN
Scope of Work: Construction of Gravel Road
Physical Target: 3.64 lane km

Allocation: Php 180,000,000 (Total)
Php 173,700,000 (Road)
Php 6,300,000 (EAO)
April 27, 2018 2018 WIN8C02630 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Regional Office XIII
OO1 : Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links/New Roads

FROM:

Completion of the East-West lateral road connecting Agusan Del Sur/Agusan del Norte to Bukidnon Sampaguita - Makilos (Agusan del Sur/Bukidnon Boundary), Package 14, Agusan del Sur

Project Component ID: P00200564MN
Scope of Work: Construction of Gravel Road
Physical Target: 7.272 lane km

Allocation: Php 200,000,000 (Total)
Php 193,000,000 (Road)
Php 7,000,000 (EAO)

TO:

Completion of the East-West lateral road connecting Agusan Del Sur/Agusan del Norte to Bukidnon Sampaguita - Makilos (Agusan del Sur/Bukidnon Boundary), Package 14, Agusan del Sur

Project Component ID: P00200564MN
Scope of Work: Construction of Gravel Road
Physical Target: 4.32 lane km

Allocation: Php 200,000,000 (Total)
Php 193,000,000 (Road)
Php 7,000,000 (EAO)
April 26, 2018 FY - 2018 WIN8F05276 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Support Program

Convergence and Special Support Program -
Construction/Improvement of Access Roads leading to Declared Tourism Destinations

FROM:
Access Road from Coron Town Proper to Borac Roro Port,
Coron, Palawan

CW1: 4.78 lane km ( Construction of Concrete Road )
Allocation; 75,000,000 Php

TO:
Access Road from Coron Town Proper to Borac Roro Port,
Coron, Palawan

CW1: 4.154 lane km ( Construction of Concrete Road )
Allocation: 75,000,000 Php
April 26, 2018 FY - 2018 WIN8F05248 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Convergence and Special Support Program -
Construction/Improvement of Access Roads leading to Declared Tourism Destinations

FROM:
New Agutaya - Alimanguan Tourism Road leading to
San Vicente Long Beach, San Vicente, Palawan

CW1: 1.18 lane km ( Construction of Concrete Road )
Allocation: 13,000,000 Php

TO:
New Agutaya - Alimanguan Tourism Road leading to
San Vicente Long Beach, San Vicente, Palawan

CW1: 0.816 lane km ( Construction of Concrete Road )
Allocation: 13,000,000 Php
April 26, 2018 FY - 2018 WIN8F05270 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide -
Secondary Roads

FROM:
Puerto Princesa North Rd
K0082+523 - K0082+596,
K0188+257 - K0188+434,
K0225+026 - K0225+085,
K0266+067 - K0266+165,
K0266+190 - K0266+350

CW1: 11,151 sq.m. ( Construction of Road Slope Protection Structure )
Allocation; 97,503,000 Php

TO:
Puerto Princesa North Rd
K0266+067 - K0266+140,
K0266+240 - K0266+290,
K0225+026 - K0225+086

CW1: 5,375 sq.m. ( Construction of Road Slope
Protection Structure )
Allocation: 97,503,000 Php
April 26, 2018 FY - 2018 WIN8F05223 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Preventive maintenance - Tertiary Roads

FROM:
Looc ( Cogon Tulay ) - Odiongan Rd
K0119+000 - K0120+300

CW1: 2.516 lane km ( Preventive Maintenance of Road )
Allocation: 11,203,000 Php

TO:
Looc ( Cogon Tulay ) - Odiongan Rd
K0110+225.70 - K0113+599.70,
K0113+728.4 0- K0115+941.20,
K0116+007.90 - K0117+032.60,
K0117+109.80 - K0117+832.10,
K0117+854.70 - K0120+54+.60

CW1: 2.544 lane km ( Preventive Maintenance of Road )
Allocation: 11,203,000 hp
April 26, 2018 FY - 2018 WIN8F05323 FY - 2018 GAA DPWG Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides
- Secondary Roads

FROM:
Sibuyan Circumferential Rd
K0033+896 - K0034+108

CW1: 5,411 square meters ( Construction of Road Slope Protection Structure )
Allocation: 89,270,000 Php

TO:
Sibuyan Circumferential Rd
K0039+420 - K0039+570

CW1: 3,822.30 square meters ( Construction of Road Slope Protection Structure )
Allocation: 89,270,000 Php
April 26, 2018 FY - 2018 WIN8F05247 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads

FROM:
Dapawan - Torrel Rd
K0001+(-828) - K0001+000,
K0001+971 - K0003+085

CW1: 3.886 lane km ( Rehabilitation of Paved Road )
Allocation: 60,134,000 Php

TO:
Dapawan - Torrel Rd
K0001+( -825 ) - L0001+074,
K0001+971 - K0002+781,
K0002+781 - K0003+085

CW1: 4.026 lane km ( Rehabilitation of paved Road )
Allocation: 60,134,000 Php
April 26, 2018 FY - 2018 WIN8F05310 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement -
Secondary Roads

FROM:
Sibuyan Circumferential Rd
K0000+632 - K0002+850,
K0003+104 - K0006+119,
K0073+1003 - K0075+720

CW1: 20,736 square meters ( Off-Carriageway Improvement )
Allocation: 67,728,000 Php

TO:
Sibuyan Circumferential Rd
K0000+632 - K0002+935,
K0003+104 - K0006+114.25,
K0073+1003 - K0075+677.85

CW1: 20,795.49 square meters ( Off-Carriageway Improvement )
Allocation: 67,728,000 php

April 26, 2018 FY - 2018 WIN8F05295 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable national Road System

Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide -
- Secondary Roads

FROM:
Romblon - Cogon - Sablayan Rd
K00019+300 - K0019+400,
K0015+730 - K0015+780,
K0015+980 - K0016+020,
K0019+000 - K0019+699

CW1: 5,156 square meters ( Construction of Road Slope Protection Structure )
Allocation: 56,500,000 Php

TO:
Romblon - Cogon - Sablayan Rd
K0014+469.40 - K0014+525.30,
K0014+531.20 - K0014+611.50,
K0014+615 - K0014+720,
K0014+734 - K0014+860,
K0015+714 - K0016+020,
K0016+160 - K0016+244.70,
K0016+246.53 - K0016+480,
K0016+498.50 - K0016+600,
K0016+602.18 - K0016+649.17,
K0016+651.35 - K0016+805.40,
K0017+890.20 - K0017+906.80,
K0017+908.63 - K0017+940,
K0017+940.50 - K0017+975.50,
K0017+977.33 - K0018+056.40,
K0018+058.23 - K0018+232.70,
K0018+234.83 - K0018+320,
K0018+321.83 - K0018+455.80,
K0018+457.03 - K0018+622.90,
K0018+624.73 - K0018+820,
K0019+400 - K0019+760

CW1: 7,410.62 square meters
Allocation: 56,500,000 Php



April 26, 2018 FY - 2018 WIN8F05309 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable National Road SYstem

Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged paved Roads - Secondary Roads

FROM:
Sibuyan Circumferential Rd
K0075+937 - K0076+138

CW1: 0.358 lane km ( rehabilitation of Paved road )
Allocation: 5,551,000 Php

TO:
Sibuyan Circumferential Rd
K0075+937 - K0076+252

CW1: 0.586 lane km ( Rehabilitation of Paved Road )
Allocation: 5,551,000 Php
April 26, 2018 FY - 2018 WIN8F05273 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads

FROM;
Tablas Circumferential Road
K0069+000 - K0069+600

CW1: 3,600 square meters ( Construction of Road Slope Protection Structure )
Allocation: 25,000,000 Php

TO:
Tablas Circumferential Rd
K0069+090 - K0069+160,
K0069+190 - K0069+340,
K0069+345 - K0069+538,
K0069+543 - K0069+625,
K0069+635 - K0069+840

CW1: 5,113.15 square meters ( Construction of Road Slope Protection Structure )
Allocation: 25,000,000 Php
April 26, 2018 FY - 2018 WIN8F05312 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and landslide -
Tertiary Roads

FROM:
Looc ( Cogon Tulay ) - Odiongan Rd
K0111+917.37 - K0112+128.40,
K00115+010 - k0115+190

CW1: 3,882 square meters ( Construction of Road Slope Protection Structure )
Allocation: 48,600,000 Php

TO:
Looc ( Cogon Tulay ) - Odiongan Rd
K0111+744 - K0112+000,
K0115+002 - K0115+320

CW1: 3,238.80 square meters ( Construction of Road Slope Protection Structure )
Allocation: 48,600,000 Php
April 26, 2018 FY - 2018 WIN8F05319 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable National Road System

Network Development - Off- Carriageway Improvement
- Secondary Roads

FROM:
Romblon - Cogon - Sablayan Rd
K0007+280 - K0008+708,
K0011+000 - K0013+724,
K0013+915 - K0014+430,
K0015+792 - K0016+009,
K0017+054 - K0017+356,
K0017+659 - K0017+861

CW1: 16,164 square meters ( Off-Carriageway
Improvement )
Allocation: 51,000,000 Php

TO:
Romblon - Cogon - Sablayan Rd
K0007+280 - K0008+699.40,
K0011+000 - K0013+710.40,
K0013+871.30 - K0014+430,
K0015+714.50 - K0016+020,
K0017+035 - K0017+372,
K0017+646.40 - K0017+880

CW1: 15,290.84 square meters ( Off-Carriageway
Improvement )
Allocation: 51,000,000 Php
April 26, 2018 FY - 2018 WIN8F05281 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable National ROad System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads

FROM:
Odiongan - East - West Rd
K0003+ (- 176) - K0003+724,
K0004+633 - K0005+000

CW1: 2.560 lane km ( Rehabilitation oof Paved Road )
Allocation: 39,692,000 Php

TO:
Odiongan - East - West Rd
K0003+ (-176) - K0003+724,
K0004+602 - K0005+000

CW1: 2.62 lane km ( Rehabilitation of Paved Road )
Allocation: 39,692,000





April 26, 2018 FY - 2018 WIN8F05278 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National roads with Slips, Slope Collapse, and Landslide
- Secondary Roads

FROM:
Tablas Circumferential Rd
K0026+580 - K0027+220,
K0027+480 - K0027+930,
K0040+600 - K0040+680

CW1: 7,450 square meters ( Construction of Road Slope Protection Structure )
Allocation: 99,081.000 Php

TO:
Tablas Circumferential Rd
K0026+580 - K0026+722,
K0026+760.75 - K0027+010,
K0040+600 - K0040+720

CW1: 4,346.40 square meters ( Construction of Road Slope Protection Structure )
Allocation: 99,081,000 Php
April 26, 2018 FY - 2018 WIN8F05277 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads- Tertiary Roads

FROM:
Looc ( Cogon Tulay ) - Odiongan Rd
K0103+ (-303) - K0103+000,
K0104+409 - K0104+912

CW1: 10612 lane km ( Rehabilitation of Pved Road )
Allocation: 24,994,000 Php

TO:
Looc ( Cogon Tulay ) - Odiongan Road
K0103+(-303) - K0103+008.78,
K0104+409 - K0104+838.68

CW1: 1.483 lane km ( rehabilitation of Paved Road )
Allocation: 24,994,000 Php
April 25, 2018 FY - 2018 WIN8F05230 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
Local Program

Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities

FROM:
Construction of Senior Citizens Federation Building,
Brgy. Poblacion. Sofronio Espanola, Palawan

CW1: 1 Building ( Construction of Multi-Purpose Building )
Allocation: 1,000,000 Php

TO:
Construction of Sr. Citizen Federation Building,
Brgy. Pulot Center, Sofronio Espanola, Palawan

CW1: 1 Building ( Construction of Multi-Purpose Building )
Allocation: 1,000,000 Php
April 25, 2018 FY - 2018 WIN8F05234 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
Local Program

Local Infrastructure Program - Buildings and Other Structures
- School Buildings

FROM:
Construction of one (1) Classroom Building in Pob. 2 Elementary School, Poblacion 2, Balabac, Palawan

CW1: 1 classroom ( Construction of 1-storey Classrooms)
Allocation: 1,100,000 Php

TO:
Construction of one (1) Classroom Building Balabac Central School, Balabac, Palawan

CW1: 1 classroom ( Construction of 1-storey Classrooms )
Allocation: 1,100,000 Php
April 25, 2018 FY - 2018 WIN8F05210 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
Local Program

Local Infrastructure Program - Buildings and Other Structures
- Schgool Buildings

FROM:
Construction of one (1) Classroom Building in Pob. 4 Elementary School, Poblacion 4, Balabac, Palawan

CW1: 1 Classroom ( Construction of 1-storey Classrooms )
Allocation; 1,100,000 Php

TO:
Construction of one (1) Classroom Building Balabac Central School, Balabac, Palawan

CW1: 1 Classroom ( Construction of 1-storey Classrooms )
Allocation; 1,100,000 Php
April 25, 2018 FY - 2018 WIN8F05294 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence and Special Support Program

Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations

FROM:
Guadalupe - San Nicolas - Borac - Roro Port, Coron

CW1: 4.0 lane km ( Construction of Concrete Road )
Allocation: 60,000,000 Php

TO:
Guadalupe - San Nicolas - Borac Roro Port, Coron

CW1: 3.45 lane km ( Construction of Concrete Road )
Allocation: 60,000,000 Php
April 25, 2018 FY- 2018 WIN8F5292 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
001 - Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement
- Secondary Roads

FROM;
Puerto Pincesa North Rd.
K0193+000 - K0194+000,
K0206+000 - K0207+000,
K0209+915 - K0211+000

CW1: 8,139 sq.m. ( Off-Carriageway Improvement
Shoulder Paving/Construction )
Allocation: 70,967,000 Php

TO:
Puerto Princesa North Rd
K0192+681 - K0194+000,
K0206+000 - K0207+000,
K0211+ (-667) - K211+000

CW1: 18,234 sq.m. ( Off-Carriageway Imrovement
Shoulde Paving/Construction )
Allocation; 70,967,000 Php
April 25, 2018 FY - 2018 WIN8F05296 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Convergence and Special Support - Construction/Improvement of Access Roads leading to Declare Tourism Destination

FROM:
San Jose - Port Barton Road leading to various resorts in Port Barton, San Vicente, Palawan

CW1: 2.722 lane km ( Construction of Concrete Road )
Allocation: 55,000,000 Php

TO:
San Jose - Port Barton leading to various resorts in Port Barton, San Vicente, Palawan

CW1: 2.128 lane km ( Construction of Concrete Road )
Allocation; 55,000,000 Php
-
April 25, 2018 FY - 2018 WIN8F05305 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Convergence Special Support Program - Construction/Improvement of access Roads Leading to Seaports

FROM:
Access Road leading to Port Barton Docking Area,
San Vicente, Palawan

CW1: 3.2 lane km ( Construction of Concrete Road )
Allocation; 40,000,000 Php

TO:
Access Road leading to Port Barton Docking Area,
San Vicente, Palawan

CW1: 1.910 lane km ( Construction of Concrete Road )
Allocation: 40,000,000 Php
April 25, 2018 2018 320101101020000 GAA FY 2018 January 1, 2018 Region II Isabela 4th District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Nemmatan Flood Control Project, San Agustin, Isabela
April 25, 2018 2018 310101100064000 GAA FY 2018 January 1, 2018 Region II Isabela 1st District Engineering Office
OO1: Ensure safe and Reliable National Road System - Asset Preservation Program – Preventive Maintenance - Primary Roads:

Daang Maharlika (LZ) K0394+ -827 – K0394+000, K0411+138 – K0411+190, K0415+520 – K0415+900, K0416+433 – K0417+144, K0419+152 – K0419+305
April 25, 2018 2018 310112100018000 GAA FY 2018 January 1, 2018 Region II Isabela 1st District Engineering Office
OO1: Ensure safe and Reliable National Road System - Asset Preservation Program – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads

Ilagan – Delfin Albano – Mallig Rd – K0406 + 572 – K0406 + 738, K0409 + 953 – K0410 + 249
April 24, 2018 FY - 2018 WIN8F05274 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
Convergence and Special Support Program

Construction/Improvement of Access Roads leading to Declared Tourism Destinations

FROM:
NRJ leading to kapangyan Falls, Brgy. Malihud,
Bataraza, Palawan

CW1: 2.295 lane km ( Construction of Concrete Road )
Allocation: 35,000,000 Php

TO:
NRJ leading to Kapangyan Falls, Brgy. Malihud
Bataraza, Palawan

CW1: 3.34 lane km ( Construction of Concrete Road )
Allocation: 35,000,000 Php
April 24, 2018 FY - 2018 WIN8F05275 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
001 - Ensure Safe and Reliable National Road System

Bridge - Construction of New Permanent Bridges

FROM:
Tagbung Saing Br. Along Aramaywan - Berong - Pto. Princesa Rd

CW1: 283.20 sq.m. ( Construction of Concrete Bridge )
Allocation: 43,750,000 Php

TO:
Tagbung Saing Br. Along Aramaywan - Berong - Pto. Princesa Rd

CW1: 333.90 sq.m ( Construction of Concrete Bridge )
Allocation: 43,750,000 Php
April 24, 2018 FY - 2018 WIN8F05271 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
Convergence and Special Support Program

Construction/Improvement of Access Roads leading to Declared Tourism Destination

FROM:
Access Roads leading to Calasaguen Shore,
Brgy. Calasuguen, Brooke's Point, Palawan

CW1: 2.34 lane km ( Construction of Concrete Road )
Allocation: 35,000,000 Php

TO:
Access Road leading to Calasuguen Shore,
Brgy. Calasuguen, Brooke's Point, Palawan

CW1: 4.27 lane km ( Construction of Concrete Road )
Allocation: 35,000,000
April 24, 2018 FY - 2018 WIN8F05205 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
Local Program

Local Infrastructure Program - Buildings and Other Structures
- School Buildings

FROM: Construction of One (1) Classroom Building in Pob. 1
Elementary School, Poblacion 1, Balabac, Palawan

CW1: 1 - Classroom ( Construction of 1-storey Classrooms )
Allocation: 1,100,000 Php

TO:
Construction of One (1) Classroom Building
Balabac Central School, Balabac, Palawan

CW1: 1 Classroom ( Construction of 1- storey Classrooms )
Allocation: 1,100,000 Php
April 24, 2018 FY 2018 GAA WIN8C02370 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Construction of Missing Links/New Roads
Montevista-DNAS Road (DNAS-Laak), Package 1, incl. ROW, Compostela Valley
Physical Target:
CW1: 9.600 Lane Km (Construction of Concrete Road)
ROW: 81,632.653 sq.m.
Allocation:
TOTAL: P 200,000,000.00
CW1: P 185,280,000.00 (Construction of Concrete Road)
ROW: P 7,720,000.00
EAO: P 7,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Construction of Missing Links/New Roads
Montevista-DNAS Road (DNAS-Laak), Package 1, incl. ROW, Compostela Valley
Physical Target:
CW1: 11.15462 Lane Km (Construction of Concrete Road)
ROW: 81,632.653 sq.m.
Allocation:
TOTAL: P 200,000,000.00
CW1: P 185,280,00.00 (Construction of Concrete Road)
ROW: P 7,720,000.00
EAO: P 7,000,000.00
April 24, 2018 FY - 2018 WIN8F05233 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
Convergence and Special Support Program

Construction/Improvement of Access Roads leading to Declared Trades, Industries and Economic Zones

FROM:
Punang Christian Muslim Native Road connecting to Barangay Road of Punang in support of Oil Palm Industry, Soforonio Espanola, Palawan

CW1: 3.20 lane km ( Construction of Concrete Road )
Allocation; 40,000,000 Php

TO:
Punang Christian Muslim Native Road connecting Barangay Road of Punang in support of Oil Palm Industry,Soforonio Espanola, Palawan

CW1: 4.246 lane km ( Construction of Concrete Road )
Allocation: 40,000,000 Php

April 24, 2018 FY - 2018 WIN8F05235 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
Local Program

Local Infrastructure Program - Buildings and Other Structures
- Multipurpose / Facilities

FROM:
Rehabilitation of Sr. Citizens Federation Building,
Brgy. Poblacion, Brooke's Point, Palawan

CW1: 1 Building ( Rehabilitation of Multi-Purpose Building )
Allocation: 500,000 Php

TO:
Rehabilitation of Sr. Citizen Federation Building,
Brgy. Poblacion I, Brooke's point, Palawan

CW1: 1 Building ( Rehabilitation of Multi-Purpose Building )
Allocation: 500,000 Php
April 24, 2018 FY - 2018 WIN8F05226 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
Local Program

Local infrastructure Program - Buildings and Other Structures
- Multipurpose / Facilities

FROM:
Rehabilitation of Sr. Citizens Federation Building,
Brgy. Poblacion, Rizal, Palawan

CW1: 1 Building ( Rehabilitation of Multi-Purpose Building )
Allocation: 500,000 Php

TO:
Rehabilitation od Sr. Citizen Federation Building,
Brgy. Punta Baja, Rizal, Palawan

CW1: 1 Building ( Rehabilitation of Multi-Purpose Building )
Allocation: 500,000 Php

April 24, 2018 FY - 2018 WIN8F05209 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
Local Program

Local Infrastructure - Buildings and Other Structures
- School Buildings

FROM:
Construction of Latud Elementary School,
Latud, Quezon, Palawan

CW1: 1 Classroom ( Construction of Classroom )
Allocation: 1,000,000 Php

TO:
Construction of Latud Elementary School,
Latud, Rizal, Palawan

CW1: 1 Classroom ( Construction of Classroom )
Allocation: 1,000,000 Php
April 24, 2018 FY 2018 WIN8G02080 FY 2018 GAA January 4, 2018 Region III Bataan 2nd District Engineering Office
Network Development Program – Road Widening – Secondary Roads – Roman Expressway, K0121+871 – K0122+067, K0122+113 – K0122+857, K0122+904 – K0124+142, K0124+203 – K0124+698
April 24, 2018 FY 2018 GAA WIN8C02267 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Asuncion-New Alegria-Cuambogan Road Connecting Asuncion Overland Transport Terminal in support of Coconut and Banana Industries, Asuncion, Davao del Norte
Physical Target:
CW1: 6.400 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 140,000,000.00
CW1: P 135,100,000.00 (Construction of Concrete Road)
EAO: P 4,900,000.00

TO: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Asuncion-New Alegria-Cuambogan Road Connecting Asuncion Overland Transport Terminal in support of Coconut and Banana Industries, Asuncion, Davao del Norte
Physical Target:
CW1: 10.519 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 140,000,000.00
CW1: P 135,100,000.00 (Construction of Concrete Road)
EAO: P 4,900,000.00
April 24, 2018 FY 2018 WIN8G02099 FY 2018 GAA January 4, 2018 Region III Bataan 2nd District Engineering Office
Local Infrastructure Program - Local Roads and Bridges - Local Bridges – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Replacement of Sibacan Bridge, Brgy. Sibacan, Balanga City, Bataan
April 24, 2018 FY - 2018 WIN8F05208 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
Convergence and Special Support Program

Construction/Improvement of Access Roads leading to Declared Tourism Destinations

FROM:
Access Road leading to Ogis Tau't Bato Cultural Community, Brgy. Ransang, Rizal, Palawan

CW1: 1.60 lane km ( Construction of Concrete Road )
Allocation; 400,000 Php

TO:
Access Road leading to Ogis Tau't Bato Cultural Community, Brgy. Ransang, Rizal, Palawan

CW1: 2.35 lane km ( Construction of Concrete Road )
Allocation: 400,000 Php
April 24, 2018 FY 2018 WIN8G02030 FY 2018 GAA February 4, 2018 Region III Zambales 1st District Engineering Office
Construction of Slope Protection / Flood Control, Bancal River, Brgy. Parel, Sta. 0+761 – Sta. 0+996, Botolan Side, Botolan, Zambales
April 24, 2018 FY 2018 WIN8G01982 FY 2018 GAA January 4, 2018 Region III Zambales 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads - Amungan – Palauig – Banlog Road, K0221+720 – K0223+414, Palauig, Zambales
April 24, 2018 FY 2018 GAA WIN8C02368 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Bolila-Kibalatong-Bito-Mana Diversion Road, Package 2, incl. ROW, Davao Occidental
Physical Target:
CW1: 7.350 lane km (Construction of Concrete Road)
ROW: 36,750 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 141,855,000.00 (Construction of Concrete Road)
ROW: P 2,895,000.00
EAO: P 5,250,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Bolila-Kibalatong-Bito-Mana Diversion Road, Package 2, incl. ROW, Davao Occidental
Physical Target:
CW1: 8.850 lane km (Construction of Concrete Road)
ROW: 36,750 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 141,855,000.00 (Construction of Concrete Road)
ROW: P 2,895,000.00
EAO: P 5,250,000.00
April 24, 2018 2018 310106100099000 GAA FY 2018 January 1, 2018 Region II Batanes District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0005 + 504 - K0005 + 586, K0003 + 238.70 - K0003 + 273.70, K0003 + 294.50 - K0003 + 359.50, K0007 + 270 - K0007 + 312, K0016 + 894 - K0017 + 044.70, K0018 + 000 - K0018 + 205
April 24, 2018 FY - 2018 WIN8F05231 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
Local Program

Local Infrastructure Program -- Buildings and Other Structures
- Multipurpose / Facilities

FROM:
Rehabilitation of Sr. Citizens Federarion Building,
Brgy. Poblacion, Bataraza, Palawan

CW1: 1 Building ( Rehabilitation of Multi-Purpose Building )
Allocation; 500,000 Php

TO:
Rehabilitation of Sr. Citizen Federation Building,
Brgy. Marangas, Bataraza, Palawan

CW1: 1 Building ( Rehabilitation of Multi-Purpose Building )
Allocation: 500,000 Php
April 24, 2018 FY 2018 WIN8G02120 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Network Development Program – Construction of By-Pass and Diversion Roads – Licab – Victoria Rd, Nueva Ecija
April 24, 2018 2018 310103100085000 GAA FY 2018 January 1, 2018 Region II Batanes District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0014+(-177) - K0014+008
April 24, 2018 FY 2018 WIN8G02115 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Asset Preservation Program – Preventive Maintenance - Tertiary Roads – Jct. Pinagpanaan – Rizal – Pantabangan Road, K0135+000 – K0135+545, K0138+000 – K0138+350, K0141+000 – K0141+529, K0142+179 – K0142+315
April 24, 2018 2018 310212100053000 GAA FY 2018 January 1, 2018 Region II Batanes District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Tertiary Roads

Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0023 + 200 - K0023 + 305, K0023 + 836 - K0024 + 032, S00002ST Chainage 099 - Chainage 116
April 24, 2018 2018 310109100049000 GAA FY 2018 January 1, 2018 Region II Batanes District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Basco-Mahatao-Ivana-Uyugan-Imnajbu Rd - K0004 + 067 - K0004 + 112, K0005 + 160 - K0005 + 194
April 24, 2018 FY 2018 WIN8G02131 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Local Program – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Project – Local Roads – Reconstruction / Rehabilitation / Upgrading of Landig – Villaflores Road, Cuyapo, Nueva Ecija
April 24, 2018 FY 2018 GAA WIN8C02372 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Secondary Roads
Tagum City Diversion Rd incl. ROW –
K1456+1002 - K1457+604, K1460+804 - K1461+640
Physical Target:
CW1: 3.160 lane km (Road Widening)
ROW: 5,061.523 sq.m.
Allocation:
TOTAL: P 127,630,000.00
CW1: P 74,405,360.00 (Road Widening)
ROW: P 48,757,590.00
EAO: P 4,467,050.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Secondary Roads
Tagum City Diversion Rd incl. ROW –
K1456+1002 - K1457+604, K1460+804 - K1461+640
Physical Target:
CW1: 3.3955 lane km
ROW: 5,061.523 sq.m.
Allocation:
TOTAL: P 127,630,000.00
CW1: P 74,405,360.00 (Road Widening)
ROW: P 48,757,590.00
EAO: P 4,467,050.00
April 24, 2018 FY 2018 WIN8G02119 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Asset Preservation – Preventive Maintenance – Secondary Roads – San Jose City – Rizal Rd via Pinili – Porais – Villa Joson (Palarilla) Rd, K0160+-141.10 – K0160+000, K0160+100 – K0161+000, K0161+000 – K0161+104, K0161+309 – K0161+506.70, K0161+905 – K0163+522, K0163+531.70 – K0165+128.70, K0163+515 – K0166+480, K0172+091.70 – K0172+275, K0172+510 – K0172+716, K0173+508 – K0173+813, K0176+606 – K0176+841
April 24, 2018 FY 2018 GAA WIN8C02333 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Primary Roads
Pres. Diosdado P. Macapagal Nat'l Hi-way incl. ROW –
K1732+220 - K1734+106, K1734+326 - K1736+055
Physical Target:
CW1: 7.826 lane km (Road Widening)
ROW:34,972.800 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 143,947,120.00 (Road Widening)
ROW: P 802,880.00
EAO: P 5,250,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Primary Roads
Pres. Diosdado P. Macapagal Nat'l Hi-way incl. ROW –
K1731+360 - K1732+194, K1732+260 - K1734+106,
K1734+326 - K1735+950
Physical Target:
CW1: 8.63522 lane km (Road Widening)
ROW:34,972.800 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 143,947,120.00 (Road Widening)
ROW: P 802,880.00
EAO: P 5,250,000.00
April 24, 2018 FY 2018 WIN8G02116 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Construction of Slope Protection along Balantacan Creek, Sta, Cruz to Balantacan, Lubao, Pampanga
April 24, 2018 2018 310106100098000 GAA FY 2018 January 1, 2018 Region II Batanes District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads

Tertiary Roads - Mayan-Mauyen Port Rd - K0008 + 498.20 - K0008 + 533.50
April 24, 2018 FY 2018 WIN8G02127 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Rehabilitation/Improvement of Dike with Slope Protection along Porac River, Hacienda Dolores, Porac, Pampanga
April 24, 2018 FY - 2018 WIN8F05227 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
Convergence and Special Support Program

Construction/Improvement of Access Roads leading to Declared Tourism Destinations

FROM:
Jct. Puerto Princesa South Road leading to Mainit Falls,
Brgy. Mainit, Brooke's Point, Palawan

CW1: 1.60 lane km ( Construction of Concrete Road )
Allocation: 20,000,000 Php

TO:
Jct. Puerto Princesa South Road leading to mainit Falls,
Brgy. Mainit, Brooke's Point, Palawan

CW1: 1.786 lane km ( Construction of Concrete Road )
Allocation: 20,000,000 Php
April 24, 2018 FY - 2018 WIN8F05228 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
Convergence and Special Support Program

Construction/Improvement of Access Roads leading to Declared Tourism Destinations

FROM:
Pangobilian Road leading to Mainit Seven Falls,
Brgy. Mainit, Brooke's Point, Palawan

CW1: 1.96 lane km ( Construction of Concrete Road )
Allocation: 35,000,000 Php

TO:
Pangobilian Road leading to Mainit Seven Falls,
Brgy. Mainit, Brooke's Point, Palawan

CW1: 4.36 lane km ( Construction of Concrete Road )
Allocation: 35,000,000 Php
April 24, 2018 FY - 2018 WIN8F05232 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
002 - Protect Lives and Properties Against Major Floods

Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

FROM:
Construction of Malambunga Flood Control Structure,
Bataraza, Palawan

CW1: 440 lineal meters ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php

TO:
Construction of Malambunga Flood Control Structure,
Rizal, Palawan

CW1: 440 lineal meters ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php
April 24, 2018 FY 2018 GAA WIN8C02366 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development
Construction of Bypass and Diversion Roads
Bypass Road at Jct Daang Maharlika-Licanan-Bunawan-Mahayag-Indangan-Cabantian-Jct Davao City Diversion Road (Buhangin-Lapanday Road), Package 9, incl. ROW, Davao City
Physical Target:
CW1: 10.720 Lane Km (Road Widening)
ROW: 4,984.501 sq. m.
Allocation:
TOTAL: P 262,000,000.00
CW1: P 229,554,200.00 (Road Widening)
ROW: P 23,275,800.00
EAO: P 9,170,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development
Construction of Bypass and Diversion Roads
Bypass Road at Jct Daang Maharlika-Licanan-Bunawan-Mahayag-Indangan-Cabantian-Jct Davao City Diversion Road (Buhangin-Lapanday Road), Package 9, incl. ROW, Davao City
Physical Target:
CW1: 10.200 Lane Km (Road Widening)
ROW: 4,984.501 sq. m.
Allocation:
TOTAL: P 262,000,000.00
CW1: P 229,554,200.00 (Road Widening)
ROW: P 23,275,800.00
EAO: P 9,170,000.00
April 24, 2018 FY 2018 GAA WIN8C02373 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Primary Roads
Pres. Diosdado P. Macapagal Nat'l Hi-way incl. ROW –
K1736+055 - K1737+033, K1764+184 - K1766+825,
K1767+872 - K1769+000
Physical Target:
CW1: 9.942 lane km (Road Widening)
ROW:45,561.60 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 142,820,000.00 (Road Widening)
ROW: P 1,930,000.00
EAO: P 5,250,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Primary Roads
Pres. Diosdado P. Macapagal Nat'l Hi-way incl. ROW –
K1735+950 - K1737+040, K1737+600 - K1741+987
Physical Target:
CW1: 10.93884 lane km (Road Widening)
ROW:45,561.60 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 142,820,000.00 (Road Widening)
ROW: P 1,930,000.00
EAO: P 5,250,000.00
April 24, 2018 2018 WIN8F05409 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Asset Preservation – Preventive Maintenance – Secondary Roads, Tagbilaran East Rd (Tagbilaran-Jagna) – K0250 + 492.50 – K0251 + 000
April 24, 2018 FY 2018 WIN8G02132 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Construction of Flood Mitigation Structure – Improvement of dike with slope protection along Porac River, Calantas, Floridablanca, Pampanga
April 24, 2018 2018 WIN8C02299 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Road – Jct (TNR) Cortes-Balilihan-Catigbian-Macaas Rd – K0034+200 – K0035+000, K0039+493 – K0041+679
April 24, 2018 FY 2018 GAA WIN8C02274 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/ New Roads
Montevista-DNAS Road (DNAS-Laak), Package 2, incl. ROW, Compostela Valley
Physical Target:
CW1: 9.600 lane km (Construction of Concrete Road)
ROW: 81,632.653 sq.m.
Allocation:
TOTAL: P 200,000,000.00
CW1: P 185,820,000.00 (Construction of Concrete Road)
ROW: P 7,720,000.00
EAO: P 7,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/ New Roads
Montevista-DNAS Road (DNAS-Laak), Package 2, incl. ROW, Compostela Valley
Physical Target:
CW1: 6.94112 lane km (Construction of Concrete Road)
CW2: 715.5 sq.m. (Construction of Concrete Bridge)
ROW: 81,632.653 sq.m.
Allocation:
TOTAL: P 200,000,000.00
CW1: P 116,698,287.13 (Construction of Concrete Road)
CW2: P 68,581,712.87 (Construction of Concrete Bridge)
ROW: P 7,720,000.00
EAO: P 7,000,000.00
April 24, 2018 2018 WIN8C02302 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development – Off-Carriageway Improvement – Tertiary Roads, Jct (TNR) Maribojoc-Antequera-Catagbacan (Loon) – K0013 + 931 – K0015 + 423.30
April 24, 2018 FY 2018 WIN8G02126 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems of Upper Dalan Bapor, Sasmuan, Pampanga
April 24, 2018 FY 2018 WIN8G02118 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office Concreting of Road, Brgy. Gumi, Lubao, Pampanga
April 24, 2018 2018 WIN8C02297 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development – Off-Carriageway Improvement – Tertiary Roads, Panglao Island Circumferential Rd – (S00064BH) K0005 + 500 – K0007 + 137
April 24, 2018 2018 WIN8C02298 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development – Off-Carriageway Improvement – Tertiary Roads, Panglao Island Circumferential Rd – (S00064BH) K0007 + 137 – K0008 + 000, (S00065BH) K0009 + 000 – K0010 + 000
April 24, 2018 2018 WIN8C02304 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development – Off-Carriageway Improvement – Tertiary Roads, Tagbilaran City-Corella-Sikatuna-Loboc Rd – K0011 + 017 – K0012 + 000, K0019 + 645 – K0019 + 900
April 24, 2018 2018 WIN8C02303 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Looc (Binlod) – Bil-isan-Crossing Tangnan leading to Veraneante Resort, Momo Beach and House, and Ayacca Condo-residences Resort, Brgy Looc, Panglao, Bohol
April 24, 2018 2018 WIN8C02306 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Construction/Improvement of Access Roads leading to Trades Industries and Economic Zones – La Paz (Cortes)-Cabaguan-Lourdes-Anislag (Corella) Road in Support of the Agribusiness Industry, Cortes, Bohol
April 24, 2018 2018 WIN8C02305 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Construction/Improvement of Access Roads leading to Trades Industries and Economic Zones – Maribojoc-Pagnitoan-Candavid-Basak (Loon) Provincial Road in support of the Agribusiness Industry, Maribojoc, Bohol
April 24, 2018 FY 2018 GAA WIN8C02489 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Maragusan-Pantukan Road (Pantukan Section), Package A, incl. ROW, Compostela Valley
Physical Target:
CW1: 19.032 lane km (Construction of Gravel Road)
ROW: 147,959.184 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 275,507,500.00 (Construction of Gravel Road)
ROW: P 13,992,500.00
EAO: P 10,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Maragusan-Pantukan Road (Pantukan Section), Package A, incl. ROW, Compostela Valley
Physical Target:
CW1: 19.11106 lane km (Construction of Concrete Road)
ROW: 147,959.184 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 275,507,500.00 (Construction of Concrete Road)
ROW: P 13,992,500.00
EAO: P 10,500,000.00
April 24, 2018 2018 WIN8F05411 R.A. 10964 December 19, 2017 Region VII Cebu 2nd District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System, Construction of Bypass/Diversion Road ,Carcar Diversion Road incl. ROW, Cebu
April 24, 2018 2018 WIN8F05379 R.A. 10964 December 19, 2017 Region VII Cebu 2nd District Engineering Office
Convergence and Special Support Program, Construction/Improvement of Access Road-leading to declared Tourism Destination Barangay Simala-Lindogon Leading to Simala Parish Church, Simala, Sibonga, Cebu
April 24, 2018 2018 WIN8F05416 R.A. 10964 December 19, 2017 Region VII Cebu 2nd District Engineering Office
Organizational Outcome 2: Protect Lives and Properties Flood Management Program -Construction /Maintenance of Flood Control Mitigation Structure and Drainage System-Construction of Revetments (Gabions) along Suba River at Suba Bridge (K0050+640), Sibonga,Cebu
April 24, 2018 2018 WIN8F05415 R.A. 10964 December 19, 2017 Region VII Cebu 2nd District Engineering Office
Organizational Outcome 2: Protect Lives and Properties Flood Management Program -Construction /Maintenance of Flood Control Mitigation Structure and Drainage System-Construction of Suba River Control Structure (Gabions) Suba, Sibonga,Cebu
April 24, 2018 2018 WIN8C02149 R.A. 10964 December 19, 2017 Region VII Cebu 3rd District Engineering Office
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers, Construction of Revetment (Rubble Concrete) at Guinabasan River along Toledo-Tabuelan-San Remigio Rd, Brgy. Sta. Lucia, Asturias, Cebu
April 24, 2018 2018 WIN8C02148 R.A. 10964 December 19, 2017 Region VII Cebu 3rd District Engineering Office
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers, Construction of Weir Dam at Sapangdaku Bridge along Toledo-Tabuelan-Sn Remegio Rd., Brgy. Dumlog-Brgy. Daanlungsod, Toledo City, Cebu
April 24, 2018 2018 WIN8C02397 R.A. 10964 December 19, 2017 Region VII Cebu 5th District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads, Tertiary Roads, Sogod-Tabuelan Rd - K0123 + 089 - K0123 + 716, K0120+133 - K00120+598, K0119+(-927) - K0019+(-841)
April 24, 2018 2018 WIN8C02301 R.A. 10964 December 19, 2017 Region VII Cebu 5th District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development Program, Off-Carriageway Improvement, Secondary Roads, Cebu North Hagnaya Wharf Rd - K0043 + 000 - K0044 + 560, K0046 + 918 - K0047 + 668, K0055 + 725 - K0056 + 840, K0070 + 725 - K0071 + 615, K0073 + 687 - K0073 + 771, K0073 + 822 - K0073 + 847
April 24, 2018 2018 WIN8C02300 R.A. 10964 December 19, 2017 Region VII Cebu 5th District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Asset Preservation Program, Construction/Upgrading/Rehabilitation of Drainage along National Roads, Secondary Roads, Cebu North Hagnaya Wharf Rd - K0037 + 301 - K0038+877, K0039+800 - K0040+178, K0040+700 - K0041+000
April 24, 2018 2018 WIN8C02144 R.A. 10964 December 19, 2017 Region VII Cebu 6th District Engineering Office
LOCAL PROGRAM, Local Infrastructure Program, Buildings and Other Structures, Multipurpose/Facilities, Construction (Completion) of Multi-Purpose Building (Barangay Hall), Brgy. Tilhaong, Consolacion, Cebu
April 24, 2018 2018 WIN8C02147 R.A. 10964 December 19, 2017 Region VII Cebu 6th District Engineering Office
LOCAL PROGRAM, Local Infrastructure Program Local Roads and Bridges, Local Roads, Rehabilitation/Upgrading of S.E. Llenes Road with Drainage Facilities, Brgy. Pakna-an & Brgy. Labogon, Mandaue City, Cebu
April 24, 2018 2018 WIN8C02145 R.A. 10964 December 19, 2017 Region VII Cebu 6th District Engineering Office
LOCAL PROGRAM, Local Infrastructure Program, Buildings and Other Structures, Multipurpose/Facilities, Construction of Multi-purpose Building, Brgy. Poblacion, Cordova, Cebu
April 24, 2018 2018 WIN8F05260 R.A. 10964 December 19, 2017 Region VII Negros Oriental 1st District Engineering Office
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System-Asset Preservation Program-Rehabilitation /Reconstruction of Roads with Slips, Slope Collapse and Landslide-Tertiary Roads- Guihulngan-Baloc-Isabela Rd. K0120+800 - K0120+850, K0121+000 - K0121+119, K0129+938 - K0130+010
April 24, 2018 2018 WIN8F05237 R.A. 10964 December 19, 2017 Region VII Negros Oriental 1st District Engineering Office
ORGANIZATIONAL OUTCOME -1: Ensure Safe and Reliable National Road System- Network Development Program - Paving of Unpaved Road-Tertiary Roads-Guihulngan-Baloc-Isabela Roads. K0130+940 - K0130+960, K0150+000 - K0150+260
April 24, 2018 2018 WIN8F05238 R.A. 10964 December 19, 2017 Region VII Negros Oriental 1st District Engineering Office
LOCAL PROGRAM: Local Infrastructure Program- Local Roads and Bridges- Local Roads-Construction of Local Roads, Barangay Manogtong, Ayungon, Negros Oriental
April 24, 2018 2018 WIN8F05412 R.A. 10964 December 19, 2017 Region VII Negros Oriental 1st District Engineering Office
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods-Flood Management Program-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems-Construction of Flood Control along Tampocon River (Upstream) at Brgy. Tampocon, Ayungon, Negros Oriental
April 24, 2018 2018 WIN8C02390 R.A. 10964 December 19, 2017 Region VII Negros Oriental 2nd District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development Program, Construction of By-Pass and Diversion Roads, Metro Dumaguete Diversion Road (Section 1), Negros Oriental
April 24, 2018 2018 WIN8C02401 R.A. 10964 December 19, 2017 Region VII Negros Oriental 2nd District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development Program, Road Widening - Primary Roads, Bais-Kabankalan Rd incl. ROW - K0085 + 848 - K0086 + 420, K0086 + 500 - K0086 + 756.50, K0086 + 640 - K0086 + 757
April 24, 2018 2018 WIN8C02558 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Agusan del Sur 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction /Upgrading of Damaged Paved Roads

FROM:
Daang Maharlika (Agusan-Davao Sect) - K1312 + 578 - K1312 + 715 , K1324 + 875 - K1325 + 001 , K1350 + 463 - K1350 + 485, K1375 + 000 - K1375 + 100 , K1376 + 088 - K1376 + 328, K1349 + 491 - K1349 + 509, K1349 + 518 - K1349 + 554, K1349 + 654 - K1349 + 667, K1349 + 709 - K1349 + 767, K1350 + 685 - K1350 + 700, K1352 + 454 - K1352 + 485, K1355 + 372 - K1355 + 389, K1355 + 538 - K1355 + 561, K1355 + 584 - K1355 + 602

Project ID No. P00200113MN
Scope of Work: Reconstruction from Paved to Concrete
Physical Target: 1.147 Lane Km
Allocation: Php 36,063,000.00 (Total)
Php 35,341,740.00 (Road)
Php 721,260.00 (EAO)

TO:
Daang Maharlika (Agusan-Davao Sect) -K1312 + 578 - K1312 + 715, K1324+875 - K1325+001, K1325+238 - K1325+808, K1338+991.5 – K1339+005, K1338+996 – K1339+000.5, K1339+231 – K1339+244.5, K1339+253 – K1339+262, K1339+290 – K1339+299, K1339+331 – K1339+371.5, K1339+568 – K1339+581.5, K1342+085 – K1342+112, K1344+000 – K1344+100, K1345+508 – K1346+000, K1349 + 269 - K1349 + 366, K1349 + 450 - K1349 + 469, K1349 + 491 - K1349 + 509, K1349 + 518 - K1349 + 545, K1349 + 604 - K1349 + 613, K1349 + 617 - K1349 + 622, K1349 + 644 - K1349 + 658, K1349 + 671 -K1349 + 680, K1349+686 – K1349+691, K1349+728 – K1349+737, K1349 + 700 - K1349 + 710, K1349 + 732 - K1349 + 743, K1349 + 755 - K1349 + 759, K1349 + 764 - K1349 + 768, K1350 + 291 - K1350 + 300, K1350 + 463 - K1350 + 485, K1350 + 605 - K1350 + 614, K1350 + 671 - K1350 + 703, K1351 + 019 - K1351 + 039, K1352 + 167 - K1352 + 180, K1352 + 454 - K1352 + 485, K1352 + 491 - K1352 + 505, K1355 + 438 - K1355 + 452, K1355 + 494 - K1355 + 516, K1355 + 520 - K1355 + 534, K1355 + 538 - K1355 + 561, K1355+538+K1355+557, K1355 + 584 - K1355 + 602, K1375 + 000 - K1375 + 100, K1376 + 088 - K1376 + 328, K1376 + 802 - K1376 + 832

Project ID No. P00200113MN
Scope of Work: Reconstruction from Paved to Concrete
Physical Target: 3.252 Lane Km
Allocation: Php 36,063,000.00 (Total)
Php 35,341,740.00 (Road)
Php 721,260.00 (EAO)
April 24, 2018 2018 WIN8C02400 R.A. 10964 December 19, 2017 Region VII Negros Oriental 2nd District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development Program, Road Widening - Primary Roads, Dumaguete North Road (Dumaguete-Jct Bais-Kabankalan) incl. ROW-K0045+600-K0046+148
April 24, 2018 2018 WIN8C02399 R.A. 10964 December 19, 2017 Region VII Negros Oriental 2nd District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development Program, Road Widening - Primary Roads, Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) incl. ROW - K0026 + 700 - K0027 + 555

Pages