May 18, 2023 |
FY 2023 GAA |
P00705599MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1592+293 - K1593+057
Physical Target:
CW1: 2.094 lane km (Road Widening)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Road Widening)
EAO: P 3,150,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Jct Digos-Cotabato Sect) -
K1591+808 - K1591+880, K1592+028 - K1593+057
Physical Target:
CW1: 2.768 lane km (Road Widening)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Road Widening)
EAO: P 3,150,000.00 |
May 18, 2023 |
FY 2023 GAA |
P00705603MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Davao-Cotabato By-Pass Rd - K1549+(-778) - K1549+(-431)
Physical Target:
CW1: 0.694 lane km (Road Widening)
Allocation:
TOTAL: P 11,563,000.00
CW1: P 11,331,740.00 (Road Widening)
EAO: P 231,260.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Davao-Cotabato By-Pass Rd - K1549+(-778) - K1549+(-431)
Physical Target:
CW1: 0.510 lane km (Road Widening)
ROW: 640.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 11,563,000.00
CW1: P 8,581,740.00 (Road Widening)
ROW: P 2,750,000.00 (ROW Acquisition)
EAO: P 231,260.00 |
May 18, 2023 |
FY 2023 GAA |
P00705601MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Digos Div Rd - K1562+(-444) - K1562+017
Physical Target:
CW1: 0.922 lane km (Road Widening)
Allocation:
TOTAL: P 37,684,000.00
CW1: P 36,903,320.00 (Road Widening)
EAO: P 753,680.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Digos Div Rd - K1562+(-444) - K1562+017
Physical Target:
CW1: 0.922 lane km (Road Widening)
ROW: 1,413.86 square meters (ROW Acquisition)
Allocation:
TOTAL: P 37,684,000.00
CW1: P 20,170,320.00 (Road Widening)
ROW: P 16,760,000.00 (ROW Acquisition)
EAO: P 753,680.00 |
May 17, 2023 |
2023 |
WIN3F07322 |
SR2023-03-008642 |
March 27, 2023 |
Region VIII |
Regional Office VIII |
Convergence and Special Support Program
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Constrution Road Opening Maslog - Jipapad, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road: P 99.00 M
7.251 Lane Km
EAO P 1.00 M
Total P 100.00 M
AS MODIFIED:
Construction Road Opening Maslog - Jipapad, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road: P 99.00 M
1.5735 Lane Km
EAO P 1.00 M
Total P 100.00 M
|
May 17, 2023 |
2023 |
WIN3F07347 |
SR2023-01-003266 |
January 31, 2023 |
Region VIII |
Regional Office VIII |
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
AS PER GAA/ORIGINAL:
Construction of Revetment along Tigbao River, Tacloban City
Physical Target: Allocation:
CW1-Construction of Revetment: P 96.500 M
712.635 Lineal meters
EAO P 3.500 M
Total P 100.00 M
AS MODIFIED:
Construction of Revetment along Tigbao River, Tacloban City
Physical Target: Allocation:
CW1-Construction of Revetment: P 96.500 M
398.00 Lineal meters
EAO P 3.500 M
Total P 100.00 M
|
May 17, 2023 |
2023 |
WIN3F07349 |
SR2023-01-003032 |
January 31, 2023 |
Region VIII |
Regional Office VIII |
OO2: Protect Lives and Properties Against Major Floods
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Flood Control Structure, Tigbao River, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation Structure: P 110.975 M
819.53 Lineal meters
EAO P 4.025 M
Total P 115.00 M
AS MODIFIED:
Construction of Flood Control Structure, Tigbao River, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation Structure: P 110.975 M
450.00 Lineal meters
EAO P 4.025 M
Total P 115.00 M
|
May 17, 2023 |
2023 |
310201101145000 |
GAA FY 2023 |
December 26, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Manila North Road K0632+679-K0633+236, Sanchez Mira, Cagayan |
May 17, 2023 |
2023 |
|
SARO-BMB-A-23-0014244 |
March 13, 2023 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
"From:
Construction of River Wall, Monkilong River, Kiangan, Ifugao;
Type of Work: Construction of Concrete Road;
Physical Target: 0.33 Lane Km;
Allocation: Php 5,000,000.000"
"To:
Construction of River Wall, Mongkilong River, Kiangan, Ifugao;
Type of Work: Construction of Flood Mitigation Structure;
Physical Target: 75 Lineal meters;
Allocation: Php 5,000,000.000"
|
May 17, 2023 |
2023 |
WIN3E02747 |
SARO-BMB-A-23-0013208 |
February 20, 2023 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
"From:
Kalinga-Abra Rd - K0470 + 110 - K0471 + 050;
Physical Target: 2500 Square Meters;
Allocation: Php 25,000,000.000"
"To:
Kalinga-Abra Rd - K0470 + 1101 - K0471 + 016;
Physical Target: 1077 Square Meters;
Allocation: Php 25,000,000.000"
|
May 17, 2023 |
2023 |
WIN3E02749 |
SR2023-01-002044 |
January 30, 2023 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
"From:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0427 + 718 - K0427 + 772;
Physical Target: 5555.56 Square Meters;
Allocation: Php 100,000,000.000"
"To:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0427 + 718 - K0427 + 797 ;
Physical Target: 4388.45 Square Meters;
Allocation: Php 100,000,000.000"
|
May 17, 2023 |
2023 |
WIN3E02764 |
SR2023-01-002089 |
January 30, 2023 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
"From:
Construction of Daoangan-Poswoy-Ababaan Road, Kalinga;
Physical Target: 5.236 Lane Km;
Allocation: Php 80,000,000.000"
"To:
Construction of Daoangan-Poswoy-Ababaan Road, Kalinga;
Physical Target: 3.6 Lane Km;
Allocation: Php 80,000,000.000"
|
May 17, 2023 |
2023 |
WIN3E02769 |
SR2023-01-002081 |
January 30, 2023 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
"From:
Construction of Ableg-Molayong-Amdalao Rd (Connecting to Pasil Town Hall), Pasil, kalinga;
Physical Target: 6.545 Lane Km;
Allocation: Php 100,000,000.000"
"To:
Construction of Ableg-Molayong-Amdalao Rd (Connecting to Pasil Town Hall), Pasil, kalinga;
Physical Target: 4.2 Lane Km;
Allocation: Php 100,000,000.000"
|
May 17, 2023 |
2023 |
WIN3E02770 |
SR2023-03-005786 |
March 2, 2023 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
"From:
Kalinga-Abra Rd - K0500 + 632 - K0500 + 695;
Physical Target: 3333.33 Square Meters;
Allocation: Php 60,000,000.000"
"To:
Kalinga-Abra Rd - K0500 + 656 - K0500 + 683;
Physical Target: 2025 Square Meters;
Allocation: Php 60,000,000.000"
|
May 17, 2023 |
2023 |
WIN3E02776 |
SR2023-03-005783 |
March 2, 2023 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
"From:
Kalinga-Abra Rd - K0500 + 526 - K0500 + 632;
Physical Target: 5555.56 Square Meters;
Allocation: Php 100,000,000.000"
"To:
Kalinga-Abra Rd - K0500 + 610 - K0500 + 656;
Physical Target: 3450 Square Meters;
Allocation: Php 100,000,000.000"
|
May 16, 2023 |
2023 |
|
SR2023-01-002085 |
January 30, 2023 |
Region VIII |
Northern Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
AS PER GAA/ORIGINAL:
Catarman-Laoang Rd - K0778+000 - K0779+630, K0779+666 - K0779+793, K0783+605 - K0783+859.30, K0783+990 - K0785+000, K0785+148 - K0786+000, K0786+575 - K0786+958
Physical Target: Allocation:
CW1-Road Widening: 8.541 Lane Km P 82.526800 M
EAO P 2.993200 M
Total P 85.520 M
AS MODIFIED:
Catarman-Laoang Rd - K0778+000 - K0779+630, K0783+961.30 - K0785+992
Physical Target: Allocation:
CW1-Road Widening: 7.3562 Lane Km P 82.526800 M
EAO P 2.993200 M
Total P 85.520 M
|
May 12, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Surigao del Norte 1st District Engineering Office |
UACS No. : 310105100997000
Project ID: P00706328MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
FROM:
Dapa-Jct Cancohoy Rd - K0002 + 116 - K0002 + 863, K0013 + 396 - K0013 + 906
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 2.514 Lane Km
Allocation:
TOTAL: P 38,042,000
CW1: P 37,281,160
EAO: P 760,840
Unit Cost:
CW1: P 14,829,419.25/ Lane Km
TO:
Dapa-Jct Cancohoy Rd - K0011 + 256 - K0012 + 000, K0014 + 100 - K0014 + 749
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 2.772 Lane Km
Allocation:
TOTAL: P 38,042,000
CW1: P 37,281,160
EAO: P 760,840
Unit Cost:
CW1: P 13,449,191.92/ Lane Km |
May 12, 2023 |
2023 |
WIN3F07307 |
SARO-BMB-A-23-0013913 |
June 3, 2023 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
AS PER GAA/ORIGINAL:
Installation of Solar LED Street Lights Along Magsaysay Blvd. (S00248LT) K090+(-161) K0910+475 & (S00249LT) K0910 +(-451)- K0909+014, Tacloban, City
Physical Target: Allocation:
CW1-Road Safety: Street Lighting: 2.925 Km P 25.589760 M
EAO P 0.522240 M
Total P 26.112 M
AS MODIFIED:
Installation of Solar LED Street Lights Along Magsaysay Blvd. (S00248LT) K0909+(-161) K0910+475 & (S00249LT) K0910 +(-451)- K0909+014, Tacloban, City
Physical Target: Allocation:
CW1-Road Safety: Street Lighting: 179.00 P 25.589760 M
number of street lights
EAO P 0.522240 M
Total P 26.112 M
|
May 12, 2023 |
2023 |
WIN3F07318 |
SARO-BMB-A-23-0013913 |
June 3, 2023 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
AS PER GAA/ORIGINAL:
Installation of Solar LED Street Lights Along Paterno Road (S00017LT) K0908+(-992) -K0909+442, Tacloban, City
Physical Target: Allocation:
CW1-Road Safety: Street Lighting: 3.215 Km P 28.126 M
EAO P 0.574 M
Total P 28.700 M
AS MODIFIED:
Installation of Solar LED Street Lights Along Apitong-Paterno Road (S00017LT) K0908+(-992) -K0909+442, Tacloban, City
Physical Target: Allocation:
CW1-Road Safety: Street Lighting: 197.00 P 28.126 M
number of street lights
EAO P 0.574 M
Total P 28.700 M
|
May 12, 2023 |
2023 |
WIN3F07320 |
SARO-BMB-A-23-0013913 |
June 3, 2023 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
AS PER GAA/ORIGINAL:
Installation of Solar LED Street Lights Along Calanipawan Road (S00028LT) K0914+(279) (S00019LT)K0913+(-721) - K0913+076 , Tacloban, City
Physical Target: Allocation:
CW1-Road Safety: Street Lighting: 2.406 Km P 21.050400 M
EAO P 0.429600 M
Total P 21.480 M
AS MODIFIED:
Installation of Solar LED Street Lights Along Calanipawan Road (S00028LT) K0914+(-279) – K0915 + 214 & (S00019LT) K0913+(-721) - K0913+076 , Tacloban, City
Physical Target: Allocation:
CW1-Road Safety: Street Lighting: 147.00 P 21.050400 M
number of street lights
EAO P 0.429600 M
Total P 21.480 M
|
May 12, 2023 |
2023 |
WIN3F07303 |
SARO-BMB-A-23-0013913 |
June 3, 2023 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
AS PER GAA/ORIGINAL:
Installation of Solar LED Street Lights Along Daang Maharlika (S00013LT)
K0897+000-K0907+700, Tacloban, City
Physical Target: Allocation:
CW1-Road Safety: Street Lighting: 1.344 Km P 11.760 M
EAO P 0.240 M
Total P 12.00 M
AS MODIFIED:
Installation of Solar LED Street Lights Along Daang Maharlika (S00013LT) K0897+000-K0897+620, Tacloban, City
Physical Target: Allocation:
CW1-Road Safety: Street Lighting: 82.00 P 11.760 M
number of street lights
EAO P 0.240 M
Total P 12.00 M
|
May 12, 2023 |
2023 |
WIN3F07330 |
SR2023-01-003028 |
January 31, 2023 |
Region VIII |
Regional Office VIII |
OO2: Protect Lives and Properties Against Major Floods
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Flood Control Structure, Camansihay, Tacloban City
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 110.975 M
Structure: 819.53 lineal meters
EAO P 4.025 M
Total P 115.00 M
AS MODIFIED:
Construction of Flood Control Structure, Camansihay, Tacloban City
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 110.975 M
Structure: 440.00 lineal meters
EAO P 4.025 M
Total P 115.00 M |
May 12, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310101100922000
Project ID: P00707531MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1270 + 110 - K1270 + 495, K1274 + 414 - K1276 + 000, K1278 + 073 - K1278 + 272, K1278 + 696 - K1280 + 469, K1288 + 504 - K1288 + 964
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 8.902 Lane Km
Allocation:
TOTAL: P 125,910,000
CW1: P 121,503,150
EAO: P 4,406,850
Unit Cost:
CW1: P 13,648,972.14/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1270 + 110 - K1270 + 495, K1274 + 414 - K1276 + 360, K1295 + 623 - K1297 + 125
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 8.528 Lane Km
Allocation:
TOTAL: P 125,910,000
CW1: P 121,503,150
EAO: P 4,406,850
Unit Cost:
CW1: P 14,247,555.11/Lane Km
|
May 11, 2023 |
2023 |
|
GAA FY 2023 |
January 2, 2023 |
Region VIII |
Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Basey-Marabut-Pinamitinan Rd - K0927 + 000 - K0928 + 524, K0929 + 000 - K0930 + 000, K0930 + 144 - K0931 + 853, K0932 + 000 - K0933 + 000, K0933 + 169 - K0933 + 526
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 120.625 M
Asphalt Overlay: 11.178 Lane Km
EAO P 4.375 M
Total P 125.00 M
AS MODIFIED:
Basey-Marabut-Pinamitinan Rd – K0910 + 100 – K0910 + 750, K0912 + 530 – K0913 + 000, K0923 + 335 – K0924 + 000, K0924 + 000 – K0924 + 701, K0926 + 093 - K0927 + 000, K0928 + 524 – K0929 + 000, K0930 + 000 – K0930 + 150, K0931 + 847 – K0932 + 000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 120.625 M
Asphalt Overlay: 8.206 Lane Km
EAO P 4.375 M
Total P 125.00 M
|
May 11, 2023 |
2023 |
WIN3F07305 |
GAA FY 2023 |
January 2, 2023 |
Region VIII |
Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Basey-Marabut-Pinamitinan Rd - K0926 + 313 - K0927 + 000, K0928 + 524 - K0929 + 000, K0930 + 000 - K0930 + 144, K0931 + 853 - K0932 + 000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 30.293760 M
Asphalt Overlay: 2.764 Lane Km
EAO P 0.618240 M
Total P 30.912 M
AS MODIFIED:
Basey-Marabut-Pinamitinan Rd - K0913 + 000 - K0913 + 834, K0914 + 003 - K0914 + 223
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 30.293760 M
Asphalt Overlay: 2.108 Lane Km
EAO P 0.618240 M
Total P 30.912 M
|
May 11, 2023 |
2023 |
WIN3F07323 |
GAA FY 2023 |
January 2, 2023 |
Region VIII |
Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0842 + 660 - K0843 + 000, K0843 + 356 - K0844 + 400, K0845 + 000 - K0846 + 808, K0846 + 932 - K0848 + 000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 71.981280 M
Concrete Reblocking: 14.818 Lane Km
EAO P 2.610720 M
Total P 74.592 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0842 + 660 - K0843 + 000, K0843 + 356 - K0847 + 896
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 71.981280 M
Concrete Reblocking: 9.798 Lane Km
EAO P 2.610720 M
Total P 74.592 M
|
May 11, 2023 |
2023 |
|
GAA FY 2023 |
January 2, 2023 |
Region VIII |
Samar 2nd District Engineering Office |
Convergence and Special Support Program
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Construction of Road, Cabsadong to Barangay Hinangutdan, Santa Rita, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road: P 9.900 M
: 0.654 Lane Km
EAO P 0.100 M
Total P 10.00 M
AS MODIFIED:
Construction of Road, Barangay Cansadong to Barangay Hinangutdan, Santa Rita, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road: P 9.900 M
: 0.654 Lane Km
EAO P 0.100 M
Total P 10.00 M
|
May 11, 2023 |
2023 |
WIN3F07302 |
SR2023-01-002746 |
January 31, 2023 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads – Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0903 + 095 - K0904 + 000
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 50.180 M
along Road: 1,816.00 Lineal meters
EAO P 1.820 M
Total P 52.00 M
AS MODIFIED:
Daang Maharlika (LT) - K0903 + 200 - K0904 + 061
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 50.180 M
along Road: 1,454.00 Lineal meters
EAO P 1.820 M
Total P 52.00 M
|
May 11, 2023 |
2023 |
|
FY 2023 GAA |
January 3, 2023 |
Region XII |
Sultan Kudarat 1st District Engineering Office |
23MF0001 - Marbel-Allah Valley-Cotabato Rd - K1765 + 519 - K1765 + 829 |
May 11, 2023 |
2023 |
|
FY 2023 GAA |
January 3, 2023 |
Region XII |
Sultan Kudarat 1st District Engineering Office |
23MF0002 - Kidapawan-Allah Junction Rd - K1666 + 284 - K1668 + 294, K1668 + 521 - K1669 + 755 |
May 11, 2023 |
2023 |
|
FY 2023 GAA |
January 3, 2023 |
Region XII |
Sultan Kudarat 1st District Engineering Office |
23MF0003 - Kidapawan-Allah Junction Rd - K1673 + 935 - K1674 + 959, K1675 + 340 - K1676 + 095 |
May 11, 2023 |
2023 |
|
FY 2023 GAA |
January 3, 2023 |
Region XII |
Sultan Kudarat 1st District Engineering Office |
23MF0009 - Kidapawan-Allah Junction Rd - K1665 + 290 - K1666 + 284 |
May 10, 2023 |
2023 |
WIN3F07057 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Northern Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Catarman-Laoang Rd - K0756 + 494 - K0757 + 006
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 9.224740 M
Asphalt Overlay: 1.034 Lane Km
EAO P 0.188260 M
Total P 9.413 M
AS MODIFIED:
Catarman-Laoang Rd - K0756 + 609 - K0757 + 006
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 9.224740 M
Asphalt Overlay: 0.804 Lane Km
EAO P 0.188260 M
Total P 9.413 M
|
May 10, 2023 |
2023 |
WIN3F07022 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Northern Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Catarman-Laoang Rd - K0743 + (-230) - K0743 + 481, K0744 + (-348) - K0744 + (-200)
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 15.326220 M
Asphalt Overlay: 1.718 Lane Km
EAO P 0.312780 M
Total P 15.639 M
AS MODIFIED:
Catarman-Laoang Rd - K0743 + (-230) - K0743 + (-192), K0743 + (-043) - K0743 + 449, K0744 + (-348) - K0744 + (-200)
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 15.326220 M
Asphalt Overlay: 1.356 Lane Km
EAO P 0.312780 M
Total P 15.639 M
|
May 10, 2023 |
2023 |
WIN3F07043 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Northern Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Catarman Cadre Road - (S00052SM) Chainage 0 - Chainage 312
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 5.566400 M
Asphalt Overlay: 0.624 Lane Km
EAO P 0.113600 M
Total P 5.680 M
AS MODIFIED:
Catarman Cadre Road - (S00052SM) Chainage 0 - Chainage 211
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 5.566400 M
Asphalt Overlay: 0.422 Lane Km
EAO P 0.113600 M
Total P 5.680 M
|
May 10, 2023 |
2023 |
WIN3F07041 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Northern Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Catarman-Laoang Rd - K0761 + 377 - K0762 + 000
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 19.600 M
:1.248 Lane Km
EAO P 0.400 M
Total P 20.00 M
AS MODIFIED:
Catarman-Laoang Rd - K0761 + 480 - K0762 + 000
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 19.600 M
:1.024 Lane Km
EAO P 0.400 M
Total P 20.00 M
|
May 10, 2023 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Northern Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Catarman-Calbayog Rd - K0744 + (-154) - K0744 + (-080)
Physical Target: Allocation:
CW1-Rehabilitation Paved Road: P 6.553260 M
: 0.296 Lane Km
EAO P 0.133740 M
Total P 6.687 M
AS MODIFIED:
Catarman-Calbayog Rd - K0744 + (-154) - K0744 + 000
Physical Target: Allocation:
CW1-Rehabilitation Paved Road: P 6.553260 M
: 0.616 Lane Km
EAO P 0.133740 M
Total P 6.687 M
|
May 10, 2023 |
2023 |
WIN3F07078 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Northern Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Allen-Catarman Rd - K0703 + 475 - K0703 + 530
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 14.700 M
Structure: 1,500 Square meters
EAO P 0.300 M
Total P 15.00 M
AS MODIFIED:
Allen-Catarman Rd - K0704 + 385 - K0704 + 429
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 14.700 M
Structure: 923.120 Square meters
EAO P 0.300 M
Total P 15.00 MM
|
May 10, 2023 |
FY 2023 GAA |
WINE02876 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Mitigation Structure along Bunawan River Sta. 2+550 - Sta. 3+150, West Side, Right Bank, Davao City
Physical Target:
CW1: 600.00 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
TO: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Mitigation Structure along Bunawan River Sta. 2+726 - Sta. 3+061, West Side, Right Bank, Davao City
Physical Target:
CW1: 335.00 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00 |
May 10, 2023 |
2023 |
WIN3F07316 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Govt Ctr Rd Network - (S00047LT) K0913 + (-500) - K0913 + 730
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 26.460 M
Asphalt Overlay: 4.920 Lane Km
EAO P 0.540 M
Total P 27.00 M
AS MODIFIED:
Govt Ctr Rd Network - (S00047LT) K0913 + (-500) - K0913 + (-157)
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 26.460 M
Asphalt Overlay: 1.372 Lane Km
EAO P 0.540 M
Total P 27.00 M
|
May 10, 2023 |
FY 2023 GAA |
WIN3E02874 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Mitigation Structure along Bunawan River Sta. 5+575 - Sta. 6+175, East Side, Left Bank, Davao City
Physical Target:
CW1: 600.00 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
TO: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Mitigation Structure along Bunawan River Sta. 5+667 - Sta. 6+017, East Side, Left Bank, Davao City
Physical Target:
CW1: 350.00 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00 |
May 10, 2023 |
FY 2023 GAA |
WIN3E02879 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Mitigation Structure along Bunawan River Sta. 3+150 - Sta. 3+750, West Side, Right Bank, Davao City
Physical Target:
CW1: 600.00 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
TO: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Mitigation Structure along Bunawan River Sta. 3+061 - Sta. 3+401, West Side, Right Bank, Davao City
Physical Target:
CW1: 340.00 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00 |
May 10, 2023 |
FY 2023 GAA |
WIN3E02870 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structures along Surigao Del Sur-Davao Oriental Coastal Road (Sta. Filomena-Central Section), Sta. 1541+000.000 - Sta. 1544+000.00, Cateel, Davao Oriental
Physical Target:
CW1: 3,000.00 lineal meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Flood Mitigation Structure)
EAO: P 400,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structures along Surigao Del Sur-Davao Oriental Coastal Road (Sta. Filomena-Central Section), Sta. 1541+000.000 - Sta. 1544+000.00, Cateel, Davao Oriental
Physical Target:
CW1: 569.00 lineal meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Flood Mitigation Structure)
EAO: P 400,000.00 |
May 10, 2023 |
FY 2023 GAA |
P00706138MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1475+745 - K1477+620
Physical Target:
CW1: 3.567 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 67,788,000.00
CW1: P 65,415,420.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,372,580.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) -
K1476+928 - K1477+620, K1477+(-620) - K1477+069
Physical Target:
CW1: 4.134 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 67,788,000.00
CW1: P 65,415,420.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,372,580.00 |
May 10, 2023 |
FY 2023 GAA |
P00707219MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Babak-Samal-Kaputian Rd - K1501+280 - K1502+249
Physical Target:
CW1: 1.902 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,125,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 875,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Babak-Samal-Kaputian Rd - K1501+300 - K1501+825
Physical Target:
CW1: 2.100 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,125,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 875,000.00 |
May 10, 2023 |
FY 2023 GAA |
P00707743MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1468+000 - K1468+1000
Physical Target:
CW1: 2.000 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1468+000 - K1468+444
Physical Target:
CW1: 2.664 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00 |
May 10, 2023 |
2023 |
WIN3F07315 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Kiling-Tanauan-Tabontabon-Julita Rd (S00068LT) - K0931 + 184 - K0931 + 363
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road P 5.880 M
: 0.358 Lane Km
EAO P 0.120 M
Total P 6.00 M
AS MODIFIED:
Kiling-Tanauan-Tabontabon-Julita Rd (S00068LT) - K0931 + 184 - K0931 + 317
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road P 5.880 M
: 0.266 Lane Km
EAO P 0.120 M
Total P 6.00 MM
|
May 10, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310201101134000
Project ID: P00705685MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1241 + 498 - K1244 + 000
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 5.004 Lane Km
Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000
Unit Cost:
CW1: P 20,248,800.96/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1241 + 498 - K1243+800
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 4.606 Lane Km
Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000
Unit Cost:
CW1: P 21,998,480.24/Lane Km |
May 10, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 300221104508000
Project ID: P00734342MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of San Luis - Bincalan - Zamboangauita Road, Bgy Mahayahay, San Luis Agusan Del Sur (Package 2)
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 10.800 Lane Km
Allocation:
TOTAL: P 250,000,000
CW1: P 247,500,000
EAO: P 2,500,000
Unit Cost:
CW1: P 22,916,666.67/Lane Km
TO:
Construction of San Luis - Binicalan - Zamboanguita Road, Brgy. Mahayahay, San Luis, Agusan Del Sur (Package 2)
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 10.800 Lane Km
Allocation:
TOTAL: P 250,000,000
CW1: P 247,500,000
EAO: P 2,500,000
Unit Cost:
CW1: P 22,916,666.67/Lane Km
|
May 10, 2023 |
FY 2023 GAA |
WIN3E02863 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd (S01377MN) - K1509+031 - K1511+124,
K1512+000 - K1512+823, K1514+000 - K1515+000,
K1516+000 - K1518+000, K1518+443 - K1520+307
Physical Target:
CW1: 15.560 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 95,000,000.00
CW1: P 91,675,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,325,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd (S01377MN) - K1509+031 - K1511+124,
K1512+016 - K1512+823, K1514+018 - K1514+920
Physical Target:
CW1: 8.910 lane km (Preventive Maintenance of Road: Asphalt Overlay)
CW1: 8.910 lane km (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 95,000,000.00
CW1: P 72,563,118.66 (Preventive Maintenance of Road: Asphalt Overlay)
CW2: P 19,111,881.34 (Road Safety: Pavement Markings)
EAO: P 3,325,000.00 |
May 10, 2023 |
2023 |
|
SARO-BMB-A-23-0013838 |
March 6, 2023 |
Region VIII |
Leyte 1st District Engineering Office |
Convergence and Special Support Program
Construction/ Rehabilitation of Water Supply/ Septage and Sewerage/ Rain Water Collectors - Water Supply System
AS PER GAA/ORIGINAL:
Construction of Solar Water System, Municipality of Babatngo, Leyte
Physical Target: Allocation:
CW1-Construction of Water Supply Systems: P 9.800M
1.00 Number of Water Supply System
EAO P 0.200 M
Total P 10.00 M
AS MODIFIED:
Construction of Solar Water System, Municipality of Babatngon, Leyte
Physical Target: Allocation:
CW1-Construction of Water Supply Systems: P 9.800M
1.00 Number of Water Supply System
EAO P 0.200 M
Total P 10.00 M
|
May 10, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310201101135000
Project ID: P00705687MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1314 + 101 - K1314 + 501, K1314 + 525.30 - K1314 + 638, K1315 + 012 - K1315 + 085, K1317 + 708 - K1317 + 852, K1321 + 532 - K1323 + 000, K1323 + 605 - K1323 + 621
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 4.427 Lane Km
Allocation:
TOTAL: P 111,655,000
CW1: P 107,747,075
EAO: P 3,907,925
Unit Cost:
CW1: P 24,338,620.96/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1312+808 - K1313+076, K1313+354 - K1313+420, K1313+690 - K1313+915, K1314+101 - K1314+400, K1315+012 - K1315+085, K1317+708 - K1317+782, K 1321+532 - K1322+520
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 3.986 Lane Km
Allocation:
TOTAL: P 111,655,000
CW1: P 107,747,075
EAO: P 3,907,925
Unit Cost:
CW1: P 27,031,378.58/Lane Km |
May 10, 2023 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Leyte 3rd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1010 + 959 - K1011 + 916
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,400.380 Square meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1010 + 156 - K1010 + 176, K1010 + 300 – K1010 + 339, K1010 + 391 – K1010 + 430, K1014 + 583 - K1014 + 603, K1014 + 855 – K1014 + 895
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,392.14 Square meters
EAO P 1.00 M
Total P 50.00 M
|
May 10, 2023 |
2023 |
WIN3E02608 |
FY 2023 GAA R.A 11936 |
December 26, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310201101136000
Project ID: P00705439MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
FROM:
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1255 + 836 - K1256 + 006
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 0.348 Lane Km
Allocation:
TOTAL: P 17,544,000
CW1: P 16,929,960
EAO: P 614,040
Unit Cost:
CW1: P 48,649,310.34/Lane Km
TO:
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1256 + 006 - K1256 + 187.8, K1256 + 301.77 - K1256 + 420
Type of Work:
CW1- Road Widening
ROW- ROW Acquisition
Physical Target:
CW1- 0.601 Lane Km
ROW- 9009 Square meters
Allocation:
TOTAL: P 17,544,000
CW1: P 9,760,010
ROW: 7,169,950
EAO: P 614,040
Unit Cost:
CW1: P 16,239,617.30/Lane Km
ROW: P 795.86/ Square meters |
May 10, 2023 |
2023 |
WIN3F07308 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Leyte 3rd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Tabing-Kawayan-Sta Rosa-Lawis-Tabango Rd - K1026 + 000 - K1026 + 064
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 39.200 M
Structure: 1,920.310 Square meters
EAO P 0.800 M
Total P 40.00 M
AS MODIFIED:
Tabing-Kawayan-Sta Rosa-Lawis-Tabango Rd - K1025 + (-094) - K1025 + 013, K1026 + 275 – K1026 +355
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 39.200 M
Structure: 1,270.68 Square meters
EAO P 0.800 M
Total P 40.00 M
|
May 10, 2023 |
2023 |
WIN3E02616 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310102101218000
Project ID: P00707533MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads
FROM:
Surigao-Davao Coastal Rd - K1371 + 084 - K1374 + 769, K1374 + 784 - K1376 + 738, K1376 + 756 - K1377 + 456, K1377 + 672 - K1379 + 342, K1379 + 403 - K1383 + 816, K1383 + 838 - K1384 + 719, K1384 + 749 - K1385 + 426, K1385 + 682 - K1385 + 695, K1385 + 993 - K1387 + 700
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 31.400 Lane Km
Allocation:
TOTAL: P 250,000,000
CW1: P 241,250,000
EAO: P 8,750,000
Unit Cost:
CW1: P 7,683,121.02/Lane Km
TO:
Surigao-Davao Coastal Rd - K1371 + 084 - K1377 + 456, K1377 + 672 - K1378 + 000, K1378 + 100 - K1382 + 000
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 21.200 Lane Km
Allocation:
TOTAL: P 250,000,000
CW1: P 241,250,000
EAO: P 8,750,000
Unit Cost:
CW1: P 11,379,716.98/Lane Km |
May 10, 2023 |
2023 |
WIN3F07321 |
SARO-BMB-A-23-0013164 |
February 20, 2023 |
Region VIII |
Leyte 3rd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Calubian Jct - San Isidro - Tabango - Villaba - Palompon Road, Brgy. Balite, Villaba, Leyte
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,777.780 Square meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Calubian Jct - San Isidro - Tabango - Villaba - Palompon Rd, K1047 + 536 – K1047 + 556, K1048 + 684 – K1048 + 700, K1048 + 708.5 – K1048 + 732.5, K1048 + 745.5 – K1048 +760.5, K1048 + 905 – K1049 + 046
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,093.25 Square meters
EAO P 1.00 M
Total P 50.00 M
|
May 10, 2023 |
2023 |
|
SR2023-03-006036 |
March 2, 2023 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Palompon-Isabel-Merida-Ormoc Rd - K1129 + 000 - K1132 + 753
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 96.500 M
Asphalt Overlay: 7.530 Lane Km
EAO P 3.500M
Total P 100.00 M
AS MODIFIED:
Palompon-Isabel-Merida-Ormoc Rd - K1129 + 000 - K1130 + 814
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 96.500 M
Asphalt Overlay: 7.720 Lane Km
EAO P 3.500M
Total P 100.00 M
|
May 10, 2023 |
2023 |
XII-084 |
SARO-BMB-A-23-0014231 |
March 13, 2023 |
Region XII |
Cotabato 2nd District Engineering Office |
23MC0060 - Construction of Road Slope Protection, Magpet-Nowa-Doroluman-Greenfield Road, Magpet, North Cotabato |
May 10, 2023 |
FY 2023 GAA |
WIN3E02862 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd (S01377MN) -
K1499+011 - K1503+220, K1505+400 - K1509+031
Physical Target:
CW1: 15.680 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 95,000,000.00
CW1: P 91,675,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,325,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd (S01377MN) -
K1499+000 - K1503+220, K1505+463 - K1505+633
Physical Target:
CW1: 8.780 lane km (Preventive Maintenance of Road: Asphalt Overlay)
CW1: 8.780 lane km (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 95,000,000.00
CW1: P 70,985,324.89 (Preventive Maintenance of Road: Asphalt Overlay)
CW2: P 20,689,675.11 (Road Safety: Pavement Markings)
EAO: P 3,325,000.00 |
May 10, 2023 |
FY 2023 GAA |
WIN3E02864 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd (S01377MN) - K1495+307 - K1497+000,
K1498+000 - K1499+000, K1520+307 - K1525+000
Physical Target:
CW1: 14.772 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 95,000,000.00
CW1: P 91,675,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,325,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd (S01377MN) - K1495+307 - K1497+000,
K1498+000 - K1499+000, K1520+307 - K1522+180
Physical Target:
CW1: 9.132 lane km (Preventive Maintenance of Road: Asphalt Overlay)
CW1: 9.132 lane km (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 95,000,000.00
CW1: P 71,958,758.93 (Preventive Maintenance of Road: Asphalt Overlay)
CW2: P 19,716,241.07 (Road Safety: Pavement Markings)
EAO: P 3,325,000.00 |
May 10, 2023 |
2023 |
|
GAA FY 2023 |
March 31, 2023 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) – K0973 + 416 – K0975 + 155
Physical Target: Allocation:
CW1-Road Widening: 3.500 Lane Km P 34.300 M
EAO P 0.700 M
Total P 35.00 M
AS MODIFIED:
Daang Maharlika (LT) – K0973 + 416 – K0974 + 500
Physical Target: Allocation:
CW1-Road Widening: 2.176 Lane Km P 22.800 M
CW2-Construction of Drainage Structure P 11.500 M
along Road: 1,013 Lineal meters
EAO P 0.700 M
Total P 35.00 M
|
May 10, 2023 |
FY 2023 GAA |
WIN3E02882 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao de Oro 2nd District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Live and Properties Against Major Floods - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Kalamokan Creek, Sar Roque to Andap, New Bataan, Davao de Oro
Physical Target:
CW1: 2,000.00 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00
TO: OO2: Protect Live and Properties Against Major Floods - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Kalamokan Creek, San Roque to Andap, New Bataan, Davao de Oro
Physical Target:
CW1: 1,260.00 lineal meters (Construction of Revetment)
CW1: 23,238.00 cubic meters (Channelization)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 41,642,463.00 (Construction of Revetment)
CW2: P 7,357,537.00 (Channelization)
EAO: P 1,000,000.00 |
May 10, 2023 |
2023 |
WIN3F07194 |
GAA FY 2023 |
March 31, 2023 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) – K0970 + 000 – K0971 + 323
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 30.647540 M
Asphalt Overlay: 5.284 Lane Km
EAO P 0.625460M
Total P 31.273 M
AS MODIFIED:
Daang Maharlika (LT) – K0970 + 000 – K0970 + 213, K0970 + 268 – K0970 + 690, K0970 + 812 – K0971 + 029
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 30.647540 M
Asphalt Overlay: 3.246 Lane Km
EAO P 0.625460M
Total P 31.273 M
|
May 10, 2023 |
FY 2023 GAA |
P00707696MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Pres. Diosdado P. Macapagal National Hi-way - K1773+917 - K1774+021
Physical Target:
CW1: 5,555.56 lane km (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Pres. Diosdado P. Macapagal National Hi-way - K1774+330 - K1774+538
Physical Target:
CW1: 4,664.50 lane km (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00 |
May 10, 2023 |
2023 |
WIN3F07193 |
GAA FY 2023 |
March 31, 2023 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
AS PER GAA/ORIGINAL:
Ormoc-Baybay-Southern Leyte Bdry Rd – K1051 + 151 – K1051 + 886, K1052 + 010 – K1052 + 202, K1052 + 229 – k1053 + 143
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 19.600 M
Asphalt Overlay: 3.560 Lane Km
EAO P 0.400 M
Total P 20.00 M
AS MODIFIED:
Ormoc-Baybay-Southern Leyte Bdry Rd – K1051 + 270 – K1051 + 841, K1051 + 956 – K1052 + 193, K1052 + 240 – K1052 + 456
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 19.600 M
Asphalt Overlay: 2.008 Lane Km
EAO P 0.400 M
Total P 20.00 M
|
May 10, 2023 |
2023 |
WIN3F07210 |
GAA FY 2023 |
March 31, 2023 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Tacloban – Baybay South Rd – K0996 + 160 – K0996 + 200
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 14.700 M
Structure: 1,000 Square meters
EAO P 0.300 M
Total P 15.00 M
AS MODIFIED:
Tacloban – Baybay South Rd – K0989 + 050 – K0989 + 085
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 14.700 M
Structure: 598.50 Square meters
EAO P 0.300 M
Total P 15.00 M
|
May 10, 2023 |
2023 |
|
SR2023-01-002213 |
January 30, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
"From:
Construction of Carupian Flood Control, Sta. 74 + 155 - Sta. 75 + 055 (L.S.), Anonat, Paracelis, Mountain Province;
Physical Target: 550 Lineal Meters;
Allocation: Php 65,000,000.000"
"To:
Construction of Carupian Flood Control, Sta. 74 + 155 - Sta. 74 + 646 (L.S.), Anonat, Paracelis, Mountain Province;
Physical Target: 500 Lineal Meters;
Allocation: Php 65,000,000.000"
|
May 10, 2023 |
2023 |
WIN3E02836 |
SR2023-01-001839 |
January 30, 2023 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Tabuk-Banawe via Tanudan-Barlig Rd - K0536 + 200 - K0536 + 290;
Physical Target: 5555.56 Square Meters;
Allocation: Php 100,000,000.000"
"To:
Tabuk-Banawe via Tanudan-Barlig Rd - K0535 + 622 - K0535 + 760;
Physical Target: 4628.07 Square Meters;
Allocation: Php 100,000,000.000"
|
May 10, 2023 |
2023 |
|
GAA FY 2023 |
March 31, 2023 |
Region VIII |
Leyte 5th District Engineering Office |
OO2: Protect Lives and Properties
Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Balinsasayao Flood Control Structure, Barangay Balinsasayo, Abuyog, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation Structure: P 53.075 M
410.00 Lineal meters
EAO P 1.925 M
Total P 55.00 M
AS MODIFIED:
Construction of Balinsasayao Flood Control Structure, Barangay Balinsasayao, Abuyog, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation Structure: P 53.075 M
410.00 Lineal meters
EAO P 1.925 M
Total P 55.00 M
|
May 10, 2023 |
2023 |
|
SARO-BMB-A-23-0014197 |
March 28, 2023 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Improvement of Beling Belis - Tawang Barangay Road, Barangay Beling Belis, Kapangan, Benguet;
Type of Work: Rehabilitation of Concrete Road;
Physical Target: 0.498 Lane Km;
Allocation: Php 5,000,000.000"
"To:
Improvement of Beling Belis - Tawang Barangay Road, Barangay Beling Belis, Kapangan, Benguet;
Type of Work: Construction of Gravel Road;
Physical Target: 0.8 Lane Km;
Allocation: Php 5,000,000.000"
|
May 10, 2023 |
2023 |
|
SARO-BMB-A-23-0014197 |
March 28, 2023 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Improvement/Concreting of Beyeng-Tacadang Road, Brgy. Bakun and Brgy. Kibugan Benguet;
Physical Target: 0.744387999322071 Lane Km;
Allocation: Php 10,000,000.000"
"To:
Improvement/Concreting of Beyeng-Tacadang Road, Bakun, Benguet;
Physical Target: 0.64 Lane Km;
Allocation: Php 10,000,000.000"
|
May 10, 2023 |
2023 |
|
SARO-BMB-A-23-0014244 |
March 13, 2023 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
"From:
Construction of Road, Brgy. Banguige, Kiangan, Ifugao;
Physical Target: 0.655 Lane Km;
Allocation: Php 10,000,000.000"
"To:
Construction of Road, Brgy. Baguinge, Kiangan, Ifugao;
Physical Target: 0.832 Lane Km;
Allocation: Php 10,000,000.000"
|
May 10, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
"From:
Construction of Access Road, Brgy. Baguinge and Bogod, Kiangan, Ifugao;
Physical Target: 0.327 Lane Km;
Allocation: Php 5,000,000.000"
"To:
Construction of Access Road, Brgy. Baguinge and Bolog, Kiangan, Ifugao;
Physical Target: 0.712 Lane Km;
Allocation: Php 5,000,000.000"
|
May 10, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
"From:
Mt. Province- Ifugao Rd (Kiling- Paracelis Sect)- K0476 + 304 - K0477 + 000;
Physical Target: 1.442 Lane Km;
Allocation: Php 24,044,000.000"
"To:
Mt. Province- Ifugao Rd (Kiling- Paracelis Sect)- K0476 + 380 - K0477 + 000;
Physical Target: 1.258 Lane Km;
Allocation: Php 24,044,000.000"
|
May 10, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
"From:
Jct. Talubin-Barlig-Natonin-Paracelis-Calaccad Rd- K0463 + (-122) - K0463 + 101, K0464 + 379 - K0464 + 879;
Physical Target: 1.446 Lane Km;
Allocation: Php 24,110,000.000"
"To:
Jct. Talubin-Barlig-Natonin-Paracelis-Calaccad Rd- K0463 + (-122) - K0463 + 101, K0464 + 379 - K0464 + 800;
Physical Target: 1.288 Lane Km;
Allocation: Php 24,110,000.000"
|
May 10, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
"From:
Mt. Province-Isabela Rd - (S00535LZ) Chainage 792 - Chainage 1244, Chainage 1341 - Chainage 1452, Chainage 6996 - Chainage 7658;
Physical Target: 2.352 Lane Km;
Allocation: Php 39,217,000.000"
"To:
Mt. Province-Isabela Rd - (S00535LZ) Chainage 792 - Chainage 1244, Chainage 1351 - Chainage 1452, Chainage 6996 - Chainage 7658;
Physical Target: 2.43 Lane Km;
Allocation: Php 39,217,000.000"
|
May 10, 2023 |
2023 |
WIN3E02756 |
SR2023-03-005723 |
March 2, 2023 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
"From:
Claveria – Calanasan - Kabugao Rd - K0668 + 007 - K0668 + 116;
Physical Target: 5541.44 Square Meters;
Allocation: Php 99,746,000.000"
"To:
Claveria - Calanasan - Kabugao Road - K0668 + 077 - K0668 + 116;
Physical Target: 3587.78 Square Meters;
Allocation: Php 99,746,000.000"
|
May 10, 2023 |
2023 |
WIN3E02755 |
SR2023-03-005666 |
March 2, 2023 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
"From:
Claveria – Calanasan - Kabugao Rd - K0633+505-K0633+722;
Physical Target: 5425 Square Meters;
Allocation: Php 97,650,000.000"
"To:
Claveria - Calanasan - Kabugao Road - K0633 + 505 - K0633 + 649;
Physical Target: 3468.8 Square Meters;
Allocation: Php 97,650,000.000"
|
May 10, 2023 |
2023 |
WIN3E02765 |
SR2023-03-005721 |
March 2, 2023 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
"From:
Claveria – Calanasan - Kabugao Rd - K0662+423-K0662+667;
Physical Target: 4873.83 Square Meters;
Allocation: Php 87,729,000.000"
"To:
Claveria - Calanasan - Kabugao Road - K0662 + 667 - K0662 + 742;
Physical Target: 3112.56 Square Meters;
Allocation: Php 87,729,000.000"
|
May 10, 2023 |
2023 |
WIN3E02746 |
SR2023-03-005699 |
March 2, 2023 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
"From:
Claveria – Calanasan - Kabugao Rd - K0634+157-K0636+939;
Physical Target: 5450 Square Meters;
Allocation: Php 98,100,000.000"
"To:
Claveria - Calanasan - Kabugao Road - K0634 + 098 - K0634 + 189;
Physical Target: 3453.6 Square Meters;
Allocation: Php 98,100,000.000"
|
May 10, 2023 |
2023 |
WIN3E02774 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
"From:
Ayaga-Sta. Marcela-Flora-Lasam Rd - K0686+772 - K0686+825, K0686+905 - K0686+965;
Type of Work: Rehabilitation of Paved Road ;
Physical Target: 0.226 Lane Km;
Allocation: Php 3,768,000.000"
"To:
Ayaga-Sta. Marcela-Flora-Lasam Rd - K0686+772 - K0686+825;
Type of Work: Reconstruction to Concrete Pavement;
Physical Target: 0.106 Lane Km;
Allocation: Php 3,768,000.000"
|
May 10, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
"From:
Claveria-Calanasan-Kabugao Rd - K0642 + 768 - K0643 + 150;
Type of Work: Rehabilitation of Paved Road ;
Physical Target: 0.38 Lane Km;
Allocation: Php 6,336,000.000"
"To:
Claveria – Calanasan - Kabugao Rd - K0634 + 834.5 - K0634 + 902, K0634 + 988 - K0634 + 1096;
Type of Work:
CW1 - Reconstruction to Concrete Pavement
CW2 - Construction of Drainage Structure along Road
CW3 - Construction of Road Slope Protection Structure
CW4 - Off-Carriageway Improvement: Shoulder Paving / Construction;
Physical Target:
CW1: 0.2475 Lane Km
CW2: 70.5 Lineal Meters
CW3: 103.6 Square Meters
CW4: 371.25 Square Meters ;
Allocation: Php 6,336,000.000"
|
May 10, 2023 |
2023 |
WIN3E02816 |
SR2023-03-005697 |
March 2, 2023 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
"From:
Claveria – Calanasan - Kabugao Rd - K0633+722-K0634+939;
Physical Target: 5450 Square Meters;
Allocation: Php 98,100,000.000"
"To:
Claveria - Calanasan - Kabugao Road - K0633 + 649 - K0634 + 058;
Physical Target: 3507.4 Square Meters;
Allocation: Php 98,100,000.000"
|
May 9, 2023 |
2023 |
XII-062 |
GAA 2023 RA 11936 |
January 1, 2023 |
Region XII |
Cotabato 2nd District Engineering Office |
23MC0010 - Road Widening along Paco-Roxas-Arakan Valley Jct. Davao-Bukidnon Road K1662+749 - K1663+000, K1663+127 - K1664+257, Pres. Roxas, Cotabato |
May 9, 2023 |
2023 |
XII-072 |
GAA 2023 RA 11936 |
January 1, 2023 |
Region XII |
Cotabato 2nd District Engineering Office |
23MC0008 - Road Widening along Davao-Cotabato Rd (Jct Digos-Cotabato Section) - K1627 + 446 - K1629 + 000, Kidapawan City |
May 9, 2023 |
2023 |
XII-113 |
GAA FY 2023 |
January 30, 2023 |
Region XII |
Cotabato 1st District Engineering Office |
23MD0076 - Sitio Lampaki-Campo 3 Agri-Tourist Road passing through Lampaki 7 Falls
Brgy. Kimarayag, Pigcawayan, North Cotabato, Pigcawayan, Cotabato
|
May 9, 2023 |
FY 2023 GAA |
P00721564MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao de Oro 2nd District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Live and Properties Against Major Floods - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure along Cogonon River, Barangay Cabinuangan, New Bataan, Davao de Oro
Physical Target:
CW1: 958.190 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Revetment)
EAO: P 3,500,000.00
TO: OO2: Protect Live and Properties Against Major Floods - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure along Callawan River, Barangay Cabinuangan, New Bataan, Davao de Oro
Physical Target:
CW1: 958.190 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Revetment)
EAO: P 3,500,000.00 |
May 9, 2023 |
2023 |
P00705725MN |
SR2023-01-001384 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00170-ROAD WIDENING - BANISILAN-GUILING-ALAMADA-LIBUNGAN RD, K1640+945 -K1642+964, BANISILAN, NORTH COTABATO |
May 9, 2023 |
2023 |
P00706524MN |
SR2023-01-000638 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00007-CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD, K1642+770.00 - K1642+1000, PRESIDENT ROXAS, NORTH COTABATO |
May 9, 2023 |
2023 |
P00705755MN |
SR2023-01-002668 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00086-PAVING OF UNPAVED ROADS - SNA-LEBAK-KALAMANSIG RD - K1885+687- K1886+687, KALAMANSIG, SULTAN KUDARAT |
May 9, 2023 |
2023 |
P00706526MN |
SR2023-01-000650 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00009-CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD, K1684+240.00 - K1684+440.00, ARAKAN, NORTH COTABATO |
May 9, 2023 |
2023 |
P00732147MN |
SR2023-01-002143 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00054-CONSTRUCTION OF ROAD, BARANGAY DATAL BATONG TO BARANGAY DATAL BILA, STA. 0+000 - STA. 1+600, MALUNGON, SARANGANI |
May 9, 2023 |
2023 |
P00705754MN |
SR2023-01-002665 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00085-PAVING OF UNPAVED ROADS - SNA-LEBAK-KALAMANSIG RD - K1884+482.000 - K1885+687.000, KALAMANSIG, SULTAN KUDARAT |
May 9, 2023 |
2023 |
P00706378MN |
SR2023-01-000666 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00012-CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE- KIDAPAWAN-ILOMAVIS TOURIST RD, K1636+660.00-K1636+693.15, K1636+880.00-K1636+933.33, K1637+060.00-K1637+116.31, K1638+020-K1638+120, KIDAPAWAN CITY, NORTH COTABATO |
May 9, 2023 |
2023 |
P00706527MN |
SR2023-01-000657 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00010-CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD, K1684+440.00 - K1684+640.00, ARAKAN, NORTH COTABATO |
May 9, 2023 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo 4th District Engineering Office |
UACS No.: 310209100435000
Project ID: P00705595VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Tertiary Roads
Mandurriao-Sn Miguel-Alimodian-Maasin-Cabatuan Rd - K0022 + 626 - K0023 + 316
CW1 - Off- Carriageway Improvement: Paving of Shoulders:
2,031 sq.m. - 16,618.84
EAO - 399.16
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Tertiary Roads
Mandurriao-Sn Miguel-Alimodian-Maasin-Cabatuan Rd - K0022 + 302 - K0022 + 783
CW1 - Off- Carriageway Improvement: Paving of Shoulders: 1,924.00 sq.m. - 16,618.84
EAO - 399.16 |
May 9, 2023 |
2023 |
WIN3F07039 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo 4th District Engineering Office |
UACS No.: 310102101359000
Project ID: P00705807VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance – Secondary Roads
New Lucena-Sta. Barbara Rd - K0023 + 000 - K0023 + 603
CW1 – Preventive Maintenance of Road: Concrete Reblocking: 1.206 lane km - 5,762.40
EAO - 117.60
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Secondary Roads
New Lucena-Sta. Barbara Rd – K0022 + 828 – K0023 +603
CW1 – Preventive Maintenance of Road: Concrete Reblocking: 0.6276lane km - 5,762.40
EAO - 117.60 |
May 9, 2023 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo 4th District Engineering Office |
UACS No. 310107100473000
Project ID: P00705968VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance – Secondary Roads
Iloilo East Coast-Capiz Rd - K0284 + 100 - K0284 + 467, K0284 + 570 - K0284 + 658
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 1.82 lane km - 10,238.06
EAO - 208.94
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Iloilo East Coast-Capiz Rd - K0284 + 100 - K0284 + 467, K0284 + 570 - K0284 + 611
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 1.632 lane km - 10,238.06
EAO - 208.94 |
May 9, 2023 |
2023 |
WIN3F06918 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo 4th District Engineering Office |
UACS No.: 310106100848000
Project ID: P00705950VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Jct Bancal-Leon-Antique Bdry Rd - K0027 + 000 - K0027 + 246, K0027 + 612 - K0028 + 642, K0041 + 000 - K0041 + 583
CW1 -Rehabilitation of Paved Road:
3.702 lane km - 56,640.675
EAO - 2,054.325
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Jct Bancal-Leon-Antique Bdry Rd - K0026 + 320 - K0027 + 246, K0027 + 612 - K0027 + 710, K0040 + 994 - K0041 + 583
CW1 -Rehabilitation of Paved Road:
2.958 lane km - 56,640.675
EAO - 2,054.325 |
May 9, 2023 |
2023 |
WIN3F06928 |
SR2023-03-005918 |
March 2, 2023 |
Region VI |
Iloilo 4th District Engineering Office |
UACS No.: 310109101184000
Project ID: P00706527VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Jct Bancal-Leon-Antique Bdry Rd, K0043 + 230 - K0043 + 330
CW1- Construction of Road Slope Protection Structure: 5,555.56 sq.m - 96,500.00
EAO - 3,500.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Jct Bancal-Leon-Antique Bdry Rd, K0043 + 250 - K0043 + 330, K0042 + 1015 - K0043 + 020
CW1- Construction of Road Slope Protection Structure: 3,775.89 sq.m - 96,500.00
EAO - 3,500.00 |