Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
April 26, 2022 2022 WIN2C03500 GAA FY 2022 January 2, 2022 Region VIII Eastern Samar District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

Wright-Taft-Borongan Rd - K0861 + (-439) - K0861 + 938, K0861 + 969 - K0865 + 404, K0865 + 418.87 - K0865 + 1008

Physical Target: Allocation:

CW1-Road Widening: 1.667 Lane Km P 24.500 M

EAO P 0.500 M

Total P 25.00 M

AS MODIFIED:

Wright-Taft-Borongan Rd – K0861+318 – K0861+938, K0861+969 – K0862+100

Physical Target: Allocation:

CW1-Road Widening: 1.524 Lane Km P 24.500 M

EAO P 0.500 M

Total P 25.00 M
April 26, 2022 2022 WIN2E02047 FY 2022 GAA R.A 11639 January 20, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 320102105120000
Project ID: P00620296MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

FROM:

Construction of Maug Flood Control Structure along Riverbank of Maug Bridge Phase III (Downstream), Sta. 0+000.00 - Sta. 0+070.00 R/S, Prosperidad, Agusan del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 320.000 Lineal meters

Allocation:
TOTAL: P 46,000,000
CW1: P 45,080,000
EAO: P 920,000

Unit Cost:
CW1: P 140,875/Lineal meters

TO:

Construction of Maug Flood Control Structure along Riverbank of Maug Bridge Phase III (Downstream), Sta. 0+000.00 - Sta. 0+320.00 R/S, Prosperidad, Agusan del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 320.000 Lineal meters

Allocation:
TOTAL: P 46,000,000
CW1: P 45,080,000
EAO: P 920,000

Unit Cost:
CW1: P 140,875/Lineal meters
April 26, 2022 2022 WIN2C03503 SARO-BMB-A-22-0003173 March 21, 2022 Region VIII Eastern Samar District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

Arteche-Jipapad-Las Navas-Rawis Rd - K0971 + 280 - K0972 + 400

Physical Target: Allocation:

CW1-Road Widening: 2.240 Lane Km P 19.600 M

EAO P 0.400 M

Total P 20.00 M

AS MODIFIED:

Arteche-Jipapad-Las Navas-Rawis Rd - K0971 + 280 - K0971 + 764

Physical Target: Allocation:

CW1-Road Widening: 0.968 Lane Km P 19.600 M

EAO P 0.400 M

Total P 20.00 M
April 26, 2022 2022 WIN2E02122 FY 2022 GAA R.A 11639 January 20, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 320102105121000
Project ID: P00620297MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

FROM:

Construction/Rehabilitation of Maytibog River Training along Agusan-Davao Road, Sta. 0+011.00 - Sta. 0+211.00, Bayugan City, Agusan del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 289.000 Lineal meters

Allocation:
TOTAL: P 45,109,000
CW1: P 44,206,820
EAO: P 902,180

Unit Cost:
CW1: P 152,964.78/Lineal meters

TO:

Construction/Rehabilitation of Maytibog River Training along Agusan-Davao Road, Sta. 0+011.00 - Sta. 0+300.00, Bayugan City, Agusan del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 289.000 Lineal meters

Allocation:
TOTAL: P 45,109,000
CW1: P 44,206,820
EAO: P 902,180

Unit Cost:
CW1: P 152,964.78/Lineal meters
April 26, 2022 2022 WIN2E02077 FY 2022 GAA R.A 11639 January 20, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 320102105122000
Project ID: P00620298MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

FROM:

Construction/Rehabilitation of Sinadyap River Phase II, Sta. 0+067.00 - Sta. 0+100 (L/S), Sta. 0+040.00 - Sta. 0+100.00 (R/S), Bayungan City, Agusan del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 752.000 Lineal meters

Allocation:
TOTAL: P 46,000,000
CW1: P 45,080,000
EAO: P 920,000

Unit Cost:
CW1: P 59,946.81/Lineal meters

TO:

Construction/Rehabilitation of Sinadyap River Phase II, Sta. 0+067.00 - Sta. 0+429.00 (L/S), Sta. 0+040.00 - Sta. 0+430.00 (R/S), Bayugan City, Agusan del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 752.000 Lineal meters

Allocation:
TOTAL: P 46,000,000
CW1: P 45,080,000
EAO: P 920,000

Unit Cost:
CW1: P 59,946.81/Lineal meters
April 26, 2022 2022 WIN2E02114 FY 2022 GAA R.A 11639 January 20, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 300215100625000
Project ID: P00632264MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of Road, Kauswagan - Maharlika (Phase I), Talacogon, Agusan del Sur

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 6.992 Lane Km

Allocation:
TOTAL: P 75,000,000
CW1: P 72,375,000
EAO: P 2,625,000

Unit Cost:
CW1: P 10,351,115.56/Lane Km

TO:

Construction of Road, Kauswagan - Maharlika (Phase I), Talacogon, Agusan del Sur

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 5.250 Lane Km

Allocation:
TOTAL: P 75,000,000
CW1: P 72,375,000
EAO: P 2,625,000

Unit Cost:
CW1: P 13,785,714.29/Lane Km
April 26, 2022 2022 WIN2E02063 FY 2022 GAA R.A 11639 January 20, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 300226104199000
Project ID: P00631700MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services

FROM:

Construction of Multi-Purpose Building, Barangay Anolingan, Prosperidad, Agusan del Sur

Type of Work:
CW1- Construction of Multi Purpose Building

Physical Target:
CW1- 1 Number of Buildings

Allocation:
TOTAL: P 7,000,000
CW1: P 6,930,000
EAO: P 70,000

Unit Cost:
CW1: P 6,930,000/ Number of Buildings

TO:

Construction of Multi-Purpose Building, Barangay Anolingan, Esperanza, Agusan del Sur

Type of Work:
CW1- Construction of Multi Purpose Building

Physical Target:
CW1- 1 Number of Buildings

Allocation:
TOTAL: P 7,000,000
CW1: P 6,930,000
EAO: P 70,000

Unit Cost:
CW1: P 6,930,000/ Number of Buildings
April 26, 2022 2022 WIN2C03497 SR2022-03-006960 March 22, 2022 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation- Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

AS PER GAA/ORIGINAL:

Palompon-Isabel-Merida-Ormoc Road-K1089+000-K1094+848

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 96.500 M
: 11.476 Lane Km

EAO P 3.500 M

Total P 100.00 M

AS MODIFIED:

Palompon-Isabel-Merida-Ormoc Road – K1092+620 – K1093+000; K1095+401 – K1096+000; K1097+000 – K1098+000; K1098+000 – K1098+931; K1103+426 – K1104+000; K1104+000 – K1104+842; K1105+000 – K1105+956; K1106+000 – K1106+547

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 96.500 M
: 11.476 Lane Km

EAO P 3.500 M

Total P 100.00 M
April 26, 2022 2022 WIN2C03498 GAA FY 2022 January 18, 2022 Region VIII Leyte 4th District Engineering Office
Convergence and Special Support Program

Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

AS PER GAA/ORIGINAL:

Preventive Maintenance along Ormoc-Baybay-Southern Leyte Bdry Rd - K1028 + 277 - K1031 + 207

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 33.320 M
Asphalt Overlay: 3.436 Lane Km

EAO P 0.680 M

Total P 34.00 M

AS MODIFIED:

Preventive Maintenance along Ormoc-Baybay-Southern Leyte Bdry Rd - K1027 + 671 - K1029+ 567

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 33.320 M
Asphalt Overlay: 3.436 Lane Km

EAO P 0.680 M

Total P 34.00 M
April 26, 2022 2022 WIN2F06334 FY 2022 GAA December 30, 2021 Region III Bulacan 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Gen. Alejo Santos Highway - K0059+572 - K0059+819, K0068+570.20 - K0069+000
April 26, 2022 2022 WIN2F06304 FY 2022 GAA December 30, 2021 Region III Bulacan 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Meycauayan - Camalig - Bahay Pari Rd - K0024+1010 - K0025+053, K0025+258 - K0025+456
April 26, 2022 2022 WIN2F06321 FY 2022 GAA December 30, 2021 Region III Bulacan 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Eastern Bulacan Road - K0073+028 - K0073+153
April 26, 2022 2022 310109100970000 GAA 2022 January 3, 2022 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Peñablanca-Callao Cave Rd (S05071LZ) - K0485+616 - K0485+641, K0486+(-100) - K0486+(-070), K0485+032 - K0485+130, K0485+006- K0485+130
April 26, 2022 2022 WIN2F06026 FY 2022 GAA December 30, 2021 Region III Bataan 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Ave of the Phils - K0163+(-292)- K0163+050, K0163+460 - K0163+630
April 26, 2022 2022 WIN2F06030 FY 2022 GAA December 30, 2021 Region III Bataan 2nd District Engineering Office
Network Development Program - Off-Carriageway Improvement - Secondary Roads

Jct Layac - Balanga - Mariveles Port Rd - K0137+(-170) - K0138+000, K0140+000 - K0140+858
April 26, 2022 2022 310201100860000 GAA 2022 January 3, 2022 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening Primary Roads

Cagayan Valley Rd (S04161LZ) - K0490 + 800 - K0491 + 490, K0491 + 965 - K0493 + 040
April 26, 2022 2022 310109100812000 GAA 2022 January 3, 2022 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Peñablanca-Callao Cave Rd - Package 6
April 26, 2022 2022 320101107349000 GAA 2022 January 3, 2022 Region II Cagayan 3rd District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Drainage System along Pallua, Tuguegarao City, Cagayan, Phase I
April 26, 2022 2022 320102104517000 GAA 2022 January 3, 2022 Region II Cagayan 3rd District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Cagayan River Flood Management Projects, San Isidro (Sta 1+127 - Sta 1+377), Iguig, Cagayan
April 26, 2022 2022 WIN2E02214 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Surigao del Norte 1st District Engineering Office
UACS No. : 310105100648000
Project ID: P00601316MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

FROM:

Dapa-Jct Cancohoy Rd - K0006 + 000 - K0007 + 902.50

Type of Work:
CW1- Reconstruction to Concrete Pavement

Physical Target:
CW1- 3.805 Lane Km

Allocation:
TOTAL: P 63,728,000
CW1: P 61,497,520
EAO: P 2,230,480

Unit Cost:
CW1: P 16,162,291.72/ Lane Km

TO:

Dapa-Jct Cancohoy Rd- K0002+116 - K0002+863, K0008+805 - K0009+075, K0009+337 - K0009+409, K0013+505 - K0014+100, K0014+779 - K0015+150

Type of Work:
CW1- Reconstruction to Concrete Pavement

Physical Target:
CW1- 4.192 Lane Km

Allocation:
TOTAL: P 63,728,000
CW1: P 61,497,520
EAO: P 2,230,480

Unit Cost:
CW1: P 14,670,209.92/ Lane Km
April 26, 2022 2022 WIN2E02220 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Surigao del Sur 2nd District Engineering Office
UACS No. : 300219100390000
Project ID: P00632321MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities

FROM:

Rehabilitation and Road Slope Protection Structures along Bislig-Trento Road, K1484+400 -K1484+750

Type of Work:
CW1- Rehabilitation / Major Repair of Slope Protection Structure

Physical Target:
CW1- 4,295.082 Square meters

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 22,467.56/ Square meters

TO:

Rehabilitation and Road Slope Protection Structures along Bislig-Trento Road, K1484+225.50 - K1484+480, K1484+590 - K1484+652

Type of Work:
CW1- Rehabilitation / Major Repair of Slope Protection Structure

Physical Target:
CW1- 6,933.470 Square meters

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 13,917.99/ Square meters
April 25, 2022 2022 300203101523000 GAA 2022 January 3, 2022 Region II Cagayan 1st District Engineering Office
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations - Construction of Concrete Road - Access Road leading to Beach Resort Amunitan, Gonzaga, Cagayan
April 25, 2022 2022 300219100052000 GAA 2022 January 3, 2022 Region II Cagayan 1st District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure/Facilities - Construction of Drainage Structure - Construction of Waterway Structure along Riverbanks, Barangay Catayauan (Downstream), Lal-lo, Cagayan
April 25, 2022 2022 300204100855000 GAA 2022 January 3, 2022 Region II Cagayan 1st District Engineering Office
Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Trades Industries and Economic Zone - Construction of Concrete Road - Jct. Gattaran Cumao Capissayan Sta. Margarita Bolos Point Road to Capissayan Norte - Sibugan leading to Banana Plantation, Gattaran, Cagayan
April 25, 2022 2022 300203102105000 GAA 2022 January 3, 2022 Region II Cagayan 1st District Engineering Office
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP) - Construction of Concrete Road - Bucale-Tagcar Road leading to Bucale Cave, Sta. Teresita, Cagayan
April 25, 2022 2022 300219100577000 GAA 2022 January 3, 2022 Region II Cagayan 1st District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure/Facilities

Construction of Revetment - Construction of Revetment along Cagayan River, Barangay Tucalana, Lal-lo, Cagayan
April 25, 2022 2022 310109100966000 GAA 2022 January 3, 2022 Region II Cagayan 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Construction of Road Slope Protection Structure - Port Irene Access Road - K0623+(-262) - K0623+(-102)
April 25, 2022 2022 300203102107000 GAA 2022 January 3, 2022 Region II Cagayan 1st District Engineering Office
Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations

Construction of Concrete Road - Luga - Palagao Road, Sta. Teresita, Cagayan
April 25, 2022 2022 300204101194000 GAA 2022 January 3, 2022 Region II Cagayan 1st District Engineering Office
Convergence and Special Support Program - Construction / Improvement of Access Roads leading to Trades, Industries and Economic Zones

Construction of Concrete Road - Access Road leading to Meat and Dairy Stations, Dagupan, Lal-lo, Cagayan
April 25, 2022 2022 310204101482000 GAA 2022 January 3, 2022 Region II Cagayan 1st District Engineering Office
OO1 - Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-pass and Diversion Roads

Construction of Concrete Road - Gattaran Diversion Road (Package I), Cagayan
April 25, 2022 2022 310204101733000 GAA 2022 January 3, 2022 Region II Cagayan 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-pass and Diversion Roads

Construction of Concrete Road - Alcala By-pass Road (Package I), Cagayan
April 25, 2022 2022 300204100854000 GAA 2022 January 3, 2022 Region II Cagayan 1st District Engineering Office
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones

Construction of Concrete Road - Diora-Zinungan-Barangay Road leading to Dugo San Vicente Road in Support of Agribusiness (Pineapple Growers), Sta. Ana, Cagayan
April 25, 2022 2022 WIN2C03512 GAA FY 2022 January 1, 2022 Region VIII Leyte 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0956 + 022 - K0956 + 581

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 23.42494 M
Asphalt Overlay: 2.236 Lane Km

EAO P 0.47806 M

Total P 23.903.00 M

AS MODIFIED:

Daang Maharlika (LT) - K0956 + (-417.50) - K0956 + (-286.50), K0956 + (-225.50) - K0956 + 204.70

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 23.42494 M
Asphalt Overlay: 2.2448 Lane Km

EAO P 0.47806 M

Total P 23.903.00 M
April 25, 2022 2022 WIN2C03458 GAA FY 2022 January 1, 2022 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation- Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Sn Jose-Candahug Rd - K0913 + (-956) - K0913 + (-706)

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 14.700 M
along Road: 500 Lineal meters

EAO P 0.300 M

Total P 15.00 M

AS MODIFIED:

Sn Jose-Candahug Rd - K0913 + (-926) - K0913 + (-522)

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 14.700 M
along Road: 532 Lineal meters

EAO P 0.300 M

Total P 15.00 M
April 25, 2022 2022 300203102106000 GAA 2022 January 3, 2022 Region II Cagayan 1st District Engineering Office
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destination- Construction of Concrete Road - Calla Bayview Boulevard including Access Road, Callao, Gonzaga, Cagayan
April 25, 2022 2022 300221100465000 GAA 2022 January 3, 2022 Region II Cagayan 1st District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities

Rehabilitation of Dungeg Road, Sta. Teresita, Cagayan
April 25, 2022 2022 WIN2C03460 GAA FY 2022 January 1, 2022 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation- Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Calanipawan Rd - K0914 + 526 - K0915 + 214

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 20.972 M
along Road: 1,376 Lineal meters

EAO P 0.428 M

Total P 21.400 M

AS MODIFIED:

Calanipawan Rd - K0914 + 579 - K0915 + 214

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 20.972 M
along Road: 944 Lineal meters

EAO P 0.428 M

Total P 21.400 M
April 25, 2022 2022 WIN2C03454 GAA FY 2022 January 1, 2022 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation- Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Leyte-Samar Rd (via Guintigui-an) - K0900 + 200 - K0900 + 300

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 2.254 M
along Road: 100 Lineal meters

EAO P 0.046 M

Total P 2.300 M

AS MODIFIED:

Leyte-Samar Rd (via Guintigui-an) - K0900 + 646 - K0900 + 710

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 2.254 M
along Road: 64 Lineal meters

EAO P 0.046 M

Total P 2.300 M
April 25, 2022 2022 300219100576000 GAA 2022 January 3, 2022 Region II Cagayan 1st District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructures/Facilities

Construction of Drainage Structure - Construction of Drainage System 1 at Centro, Santa Ana, Cagayan
April 25, 2022 2022 WIN2C03464 GAA FY 2022 January 1, 2022 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation- Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

AS PER GAA/ORIGINAL:

Tacloban Baybay South Rd - K0916 + 060 - K0916 + 568

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 24.500 M
along Road: 1,016 Lineal meters

EAO P 0.500 M

Total P 25.00 M

AS MODIFIED:

Tacloban Baybay South Rd - K0911 + 307 - K0911 + 777

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 24.500 M
along Road: 920 Lineal meters

EAO P 0.500 M

Total P 25.00 M
April 25, 2022 2022 300225100198000 GAA 2022 January 3, 2022 Region II Cagayan 1st District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities - Construction of Flood Mitigation Structure

Rehabilitation of Seawall at the Crab Hotel, Centro, Buguey, Cagayan
April 25, 2022 2022 300219100051000 GAA 2022 January 3, 2022 Region II Cagayan 1st District Engineering Office
Construction and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructures/Facilities

Construction of Drainage Structure - Construction of Waterway Structure along Riverbanks, Barangay Catayauan (Upstream), Lal-lo, Cagayan
April 25, 2022 2022 300204100857000 GAA 2022 January 3, 2022 Region II Cagayan 1st District Engineering Office
Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Construction of Concrete Road - Jct. Gattaran Cumao Capissayan Sta. Margarita Bolos Point to Piña Weste leading to Banana Planatation, Gattaran, Cagayan
April 25, 2022 2022 WIN2C03462 GAA FY 2022 January 1, 2022 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

Basic Infrastructure Program (BIP)-Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Rehabilitation of Road (from Tacloban Ultrasteel to Stefti to Tacloban Bypass Road), Barangay 91 Abucay to Barangay 94, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Rehabilitation of Concrete Road P 7.920 M
: 0.737 Lane Km

EAO P 0.080 M

Total P 8.00 M

AS MODIFIED:

Rehabilitation of Road (from Tacloban Ultrasteel to Stefti to Tacloban Bypass Road), Barangay 91 Abucay and Barangay 94, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Rehabilitation of Concrete Road P 7.920 M
: 1.021 Lane Km

EAO P 0.080 M

Total P 8.00 M
April 25, 2022 2022 WIN2C03457 GAA FY 2022 January 1, 2022 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

Basic Infrastructure Program (BIP)-Multi-Purpose Buildings/ Facilities to support Social Services

AS PER GAA/ORIGINAL:

Construction of Multi-Purpose Building, Northern Tacloban City, Leyte National High School, Barangay 101 New Kawayan, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Construction of Multi Purpose Building P 5.940 M
: 1.00 Number of Buildings

EAO P 0.060 M

Total P 6.00 M

AS MODIFIED:

Construction of Multi-Purpose Building, Northern Tacloban City, National High School, Barangay 101 New Kawayan, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Construction of Multi Purpose Building P 5.940 M
: 1.00 Number of Buildings

EAO P 0.060 M

Total P 6.00 M
April 25, 2022 2022 300225100194000 GAA 2022 January 3, 2022 Region II Cagayan 1st District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Public Infrastructures/Facilities - Construction of Slope Protection Structrure

Construction of Slope Protection at Calaoagan Dackel National High School - Capissayan Annex, Barangay Capissayan Sur, Gattaran, Cagayan
April 25, 2022 2022 WIN2C03456 GAA FY 2022 January 1, 2022 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

Basic Infrastructure Program (BIP)-Multi-Purpose Buildings/ Facilities to support Social Services

AS PER GAA/ORIGINAL:

Rehabilitation of 2-Storey Multi-Purpose Building (Office Building) (CCDLAO, PESO, CENRO), Tacloban City, Leyte

Physical Target: Allocation:

CW1-Rehabilitation / Major Repair of Multi P 15.840 M
Purpose Building:1.00 Number of Buildings

EAO P 0.160 M

Total P 16.00 M

AS MODIFIED:

Rehabilitation of 1-Storey Multi-Purpose Building (Office Building) (CCDLAO, PESO, CENRO), Tacloban City, Leyte

Physical Target: Allocation:

CW1-Rehabilitation / Major Repair of Multi P 15.840 M
Purpose Building:1.00 Number of Buildings

EAO P 0.160 M

Total P 16.00 M
April 25, 2022 2022 WIN2C03509 SARO-BMB-A-22-0003147 March 23, 2022 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

Basic Infrastructure Program (BIP)-Multi-Purpose Buildings/ Facilities to support Social Services

AS PER GAA/ORIGINAL:

Construction of Multi-Purpose Building, Brgy. 62, Sangkahan, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Construction of Multi Purpose Building: P 4.950 M
: 1.00 Number of Buildings

EAO P 0.050 M

Total P 5.00 M

AS MODIFIED:

Construction of Multi-Purpose Building, Brgy. 62, Sagkahan, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Construction of Multi Purpose Building: P 4.950 M
: 1.00 Number of Buildings

EAO P 0.050 M

Total P 5.00 M
April 23, 2022 2022 WIN2F06338 GAA 2022 January 2, 2022 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Nueva Vizcaya-Ifugao-Mt Province Rd - K0337 + 334 - K0339 + 162;
Physical Target: 3.724 Lane Km;
Allocation: Php 19,139,000.000

To: Nueva Vizcaya-Ifugao-Mt Province Rd K0337 + 334 - K0338 +790;
Physical Target: 2.950 Lane Km;
Allocation: Php 19,139,000.000

April 23, 2022 2022 WIN2F06332 SARO-BMB-A-22-0002938 March 21, 2022 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0341 + 240 – K0 341 + 270;
Physical Target: 0.270 Lane Km;
Allocation: Php 7,016,000.000

To: Banaue-Mayoyao-Alista-Isabela Bdry Rd - K0341+240-K0341+270, K0363+540-K0363+576, K0364+000-K0364+580.5;
Physical Target: 0.570 Lane Km;
Allocation: Php 7,016,000.000


April 23, 2022 2022 WIN2F06335 GAA 2022 January 2, 2022 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Nueva Vizcaya-Ifugao-Mt Province Rd - K0337 + 973, K0338 + 009, K0339 + 514, K0339 + 807, K0339 + 958, K0343 + 285, K0343 + 520, K0343 + 946;
Physical Target: 1,600.000 Lineal Meters;
Allocation: Php 1,529,000.000

To: Nueva Vizcaya-Ifugao-Mt Province Rd - K0337 + 973, K0338+009, K0339+958, 343+285,K0343+520, K0343 + 946;
Physical Target: 339.810 Lineal Meters;
Allocation: Php 1,529,000.000

April 23, 2022 2022 WIN2F06323 SARO-BMB-A-22-0002938 March 21, 2022 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Banaue-Hungduan-Benguet Bdry Rd - K0345 + (-004) - K0345 + 065, K0352 + 208 - K0352 + 220;
Physical Target: 417.000 Square Meters;
Allocation: Php 3,150,000.000

To: Banaue - Hungduan - Benguet Bdry Rd - K0345+(-010)-K0345+061, K0352+207-K0352+220;
Physical Target: 438.000 Square Meters;
Allocation: Php 3,150,000.000

April 23, 2022 2022 WIN2F06329 SARO-BMB-A-22-0002938 March 21, 2022 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0393 + 029 - K0393 + 047, K0393 + 154 - K0393 + 174, K0397 + 318 - K0397 + 378, K0401 + 581 - K0401 + 601, K0403 + 635 - K0403 + 691, K0403 + 321 - K0403 + 348, K0399 + 498 - K0399 + 528, K0406 + 845 - K0406 + 880;
Physical Target: 1,813.000 Square Meters;
Allocation: Php 9,972,000.000

To: Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0393 + 029 - K0393 + 047, K0393 + 154 - K0393 + 175, K0397 + 318 - K0397 + 378, K0399 + 498 - K0399 + 527, K0401 + 581 - K0401 + 601, K0403 + 321 - K0403 + 393, K0403 + 635 - K0403 + 661, K0406 + 845 - K0406 + 880;
Physical Target: 1,240.600 Square Meters;
Allocation: Php 9,972,000.000

April 23, 2022 2022 WIN2F06314 GAA 2022 January 2, 2022 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Nueva Vizcaya-Ifugao-Mt Province Rd - K0336 + 1002 - K0337 + 000, K0337 + 727 - K0337 + 746, K0338 + 755 - K0338 + 775;
Physical Target: 307.000 Square Meters;
Allocation: Php 2,054,000.000

To: Nueva Vizcaya-Ifugao-Mt. Province Road - K0336 + 1002 - K0337 +000, K0338+755-K0338+775;
Physical Target: 320.000 Square Meters;
Allocation: Php 2,054,000.000

April 23, 2022 2022 WIN2F06333 SR2022-02-000866 February 3, 2022 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Nueva Vizcaya-Ifugao-Mt Province Rd - K0340 + 579 - K0340 + 660, K0344 + 017 - K0344 + 092, K0352 + 154 - K0352 + 580, K0354 + 412 - K0354 + 589, K0357 + 790 - K0357 + 802, K0357 + 802 - K0357 + 820, K0357 + 848 - K0357 + 855, K0357 + 890 - K0357 + 896, K0357 + 947 - K0357 + 955, K0358 + 036 - K0358 + 042, K0358 + 116 - K0358 + 120, K0358 + 153 - K0358 + 157, K0358 + 228 - K0358 + 242, K0358 + 235 - K0358 + 468, K0358 + 283 - K0358 + 297, K0358 + 345 - K0358 + 366;
Physical Target: 5,083.200 Square Meters;
Allocation: Php 91,497,000.000

To: Nueva Vizcaya-Ifugao-Mt Province Rd -K0344 + 019.60 - K0344 + 092, K0352 + 154 - K0352 + 580, K0354 + 412 - K0354 +543.5 , K0357 + 789 - K0357 + 802, K0357 + 802 - K0357 + 818, K0357 + 848 - K0357 + 855, K0357 + 890 - K0357 + 896, K0357 + 947 - K0357 + 955, K0358 + 036 - K0358 + 042, K0358 + 116 - K0358 + 120, K0358 + 153 - K0358 + 157, K0358 + 228 - K0358 + 243, K0358 + 235 - K0358 + 468, K0358 + 283 - K0358 + 297, K0358 + 345 - K0358 + 366;
Physical Target: 8,092.690 Square Meters;
Allocation: Php 91,497,000.000

April 23, 2022 2022 WIN2F06324 GAA 2022 January 2, 2022 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Construction of Flood Control Structure, Sta. 27+000 - Sta. 27+490, Busilac, Alfonso Lista, Ifugao;
Physical Target: 150.000 Lineal Meters;
Allocation: Php 24,500,000.000

To: Construction of Flood Control Structure, Sta. 27+140 - Sta. 27+490, Busilac, Alfonso Lista, Ifugao;
Physical Target: 350.000 Lineal Meters;
Allocation: Php 24,500,000.000

April 23, 2022 2022 WIN2F06336 GAA 2022 January 2, 2022 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Construction of Mapacopaco Flood Control Structure, Sta. 41+000 - Sta. 41+670, Posnaan, Aguinaldo, Ifugao;
Physical Target: 150.000 Lineal Meters;
Allocation: Php 32,467,000.000

To: Construction of Mapacopaco Flood Control Structure, Sta. 41+000 - Sta. 41+510, Posnaan, Aguinaldo, Ifugao;
Physical Target: 510.000 Lineal Meters;
Allocation: Php 32,467,000.000

April 23, 2022 2022 WIN2F06341 GAA 2022 January 2, 2022 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Construction of Mapacopaco Flood Control Structure, Sta. 42+555 - Sta. 43+000, Posnaan, Aguinaldo, Ifugao;
Physical Target: 150.000 Lineal Meters;
Allocation: Php 21,217,000.000

To: Construction of Mapacopaco Flood Control Structure, Sta. 42+555 - Sta. 42+913.60, Posnaan, Aguinaldo, Ifugao;
Physical Target: 346.000 Lineal Meters;
Allocation: Php 21,217,000.000

April 23, 2022 2022 WIN2F06337 SARO-BMB-A-22-0002938 March 21, 2022 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Construction of Flood Mitigation Structures along Magat River, Sta. 39 + 563 - Sta. 40 + 975, Sta. 41 + 668 - Sta. 41 + 706, San Juan and Calupaan, Alfonso Lista, Ifugao;
Physical Target: 512.000 Lineal Meters;
Allocation: Php 50,000,000.000

To: Construction of Flood Mitigation Structures along Magat River, Sta. 39 + 563 - Sta. 40 + 075, San Juan, Alfonso Lista, Ifugao;
Physical Target: 512.000 Lineal Meters;
Allocation: Php 50,000,000.000

April 23, 2022 2022 WIN2F06313 SARO-BMB-A-22-0002938 March 21, 2022 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Construction of Namillangan Flood Control ta. 45+500- Sta. 48+100 (L/S) Namillangan, Alfonso Lista, Ifugao;
Physical Target: 491.500 Lineal Meters;
Allocation: Php 50,000,000.000

To: Construction of Namillangan Flood Control Sta. 43+700- Sta. 44+217.5 (R/S) Namillangan, Alfonso Lista, Ifugao;
Physical Target: 491.500 Lineal Meters;
Allocation: Php 50,000,000.000

April 22, 2022 2022 WIN2F06225 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

A Castañeda - Ma. Aurora - San Luis Rd - K0196+506 - K0196+533, K0198+530 - K0198+555, K0198+572 - K0198+580, K0198+950 - K0198+980, K0202+932 - K0202+950
April 22, 2022 2022 WIN2F06288 FY 2022 GAA December 30, 2021 Region III Pampanga 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Sn Antonio - Floridablanca Rd - K0081+134.30 - K0082+358.60, K0082+358.60 - K0082+760, K0088+09720 - K0089+057.71
April 22, 2022 2022 WIN2F06172 FY 2022 GAA December 30, 2021 Region III Pampanga 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Angeles - Porac - Floridablanca - Dinalupihan Rd - K0088+000 - K0089+000, K0089+1320 - K0090+000, K0090+000 - K0090+683.50
April 22, 2022 FY 2022 WIN2C03520 UACS No. 310103100844000 February 22, 2022 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 310103100844000
Project ID.: P00603558LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
G. Tuazon St – K0009+(-110) – K0009+000, K0009+(-237) – K0009+(-110),
K0009+(-434))+(-237), K0009+000-K0009+437
Physical Target: CW1- Preventive Maintenance of Road: Concrete Reblocking=0.871 lane Km
Unit Cost = P 3,375,431/lane km
Allocation = P 2,940,000
EAO = P 60,000
Total = P 3,000,000

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
G. Tuazon St – K0009+414.30-K0009+264.0
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay=0.301 lane Km
Unit Cost = P 9,767,442/lane km
Allocation = P 2,940,000
EAO = P 60,000
Total = P 3,000,000
WIN2C03520
April 22, 2022 2022 WIN2F06255 FY 2022 GAA December 30, 2021 Region III Nueva Ecija 1st District Engineering Office
Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructure /Facilities

Construction of Drainage Canal, Brgy. Poblacion, Guimba, Nueva Ecija

April 21, 2022 2022 WIN2F06284 FY 2022 GAA December 30, 2021 Region III Nueva Ecija 2nd District Engineering Office
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R. A. 11239

Repair/Rehabilitation/Improvement along Daang Maharlika (LZ) - K0084+380 - K0084+499, K0084+576 - K0084+613, K0087+780 - K0088+000, K0088+450 - K0088+491, K0088+540 - K0088+595, K0088+820 - K0089+020, K0090+543.3 - K0090+780, K0090+904.50 - K0091+006.30
April 21, 2022 2022 WIN2F06227 FY 2022 GAA December 30, 2021 Region III Bulacan 2nd District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Meycauayan - Camalig - Bahay Pari Rd - K0023+000 - K0023+084
April 21, 2022 2022 WIN2F06230 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Roads leading to Major / Strategic Public Buildings / Facilities

Construction of Suguit - Punglo Road, Maria Aurora, Aurora
April 21, 2022 2022 WIN2F06230 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Roads leading to Major / Strategic Public Buildings / Facilities

Construction of Suguit - Punglo Road, Maria Aurora, Aurora
April 21, 2022 2022 WIN2F06253 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and / or Bridges from the National Road/s leading to Major / Strategic Public Buildings / Facilities

Construction of Road (Baler - San Luis - Dingalan), Baler, Aurora
April 21, 2022 2022 WIN2F06223 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Madella-Dinadiawan Rd - K0409+150 - K0409+220, K0409+300 - K0409+348, K0409+550 - K0409+565, K0409+650 - K0409+665, K0409+750 - K0409+790, K0410+050 - K0410+096, K0410+150 - K0410+162, K0410+635 - K0410+670, K0411+100 - K0411+115, K0411+250 - K0411+260, K0411+810 - K0411+825, K0412+180 - K0412+195, K0418+920 - K0419+004, K0419+050 - K0419+080, K0419+100 - K0419+115, K0419+400 - K0419+472, K0419+500 - K0419+536
April 21, 2022 2022 WIN2F06224 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Network Development Program - Off-Carriageway Improvement - Secondary Roads

Baler - Casiguran Rd (Dinadiawan - Casiguran Sect) - K0339+275 - K0339+431, K0339+606 - K0340+023, K0340+845 - K0342+292
April 21, 2022 2022 WIN2F06250 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Nueva Ecija - Aurora Road - K0174+300 - K0174+312.56, K0174+900 - K0174+927, K0176+470 - K0176+497, K0176+610 - K0176+622.56, K0177+311 - K0177+323, K0177+450 - K0177+456, K0177+600 - K0177+612, K0177+760 - K0177+775, K0177+850 - K0177+862, K0178+450 - K0178+475, K0179+475 - K0179+661, K0185+300 - K0185+315, K0186+500 - K0186+512.56, K0187+600 - K0187+606, K0189+300 - K0189+312, K0192+100 - K0192+112, K0192+122 - K0192+131, K0192+200 - K0192+215.84, K0192+950 - K0192+962, K0198+450 - K0198+474, K0199+150 - K0199+237, K0210+965 - K0210+977.56, K0214+300 - K0214+312.56
April 21, 2022 2022 WIN2G02623 FY 2022 GAA RA 11639 January 3, 2022 Region VI Aklan District Engineering Office
UACS No. 310202101157000
Project ID: P00604800VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

Aklan East Rd - K0298 + 000 - K0299 + 000, K0309 + 369 - K0309 + 372, K0309 + 747 - K0309 + 791, K0316 + 677 - K0317 + 171, K0317 + 211 - K0317 + 890, K0322 + 737 - K0322 + 840

CW1 - Road Widening : 4.556 lane km - 45,820.88
EAO - 935.12


TO:

OO1: Ensure Safe and Reliable National Road System


Network Development - Road Widening - Secondary Roads

Aklan East Rd - K0299 + 652 - K0301 + 000

CW1 - Road Widening : 2.696 lane km - 41,813.16
ROW Acquisition: 263.70 sq.m. - 4,007.72
EAO - 935.12

April 21, 2022 2022 WIN2G02624 SR2022-02-001265 February 4, 2022 Region VI Aklan District Engineering Office
UACS No. 310208100393000
Project ID: P00604793VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement - Secondary Roads

Aklan East Rd - K0276 + 000 - K0276 + 061, K0278 + 000 - K0278 + 175, K0281 + 281 - K0282 + 726, K0284 + 539 - K0285 + 471, K0309 + 791 - K0311 + 854, K0311 + 923 - K0315 + 895, K0316 + 295 - K0316 + 677

CW1 - Off-Carriageway Improvement: Paving of Shoulders:
25,149.00 sq.m. - 63,097.490

CW2 - Off-Carriageway Improvement: Construction of Sidewalk: 109.50 sq.m. - 211.335

EAO - 2,296.175

TO:

OO1: Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement - Secondary Roads

Aklan East Rd - K0277 + 720 - K0278 + 020, K0278 + 215 - K0280 + 070, K0279 + 700 - K0279 + 785, K0279 + 785 - K0280 + 820, K0280 + 070 -K0280 + 300, K0280 + 820 - K0282 + 000, K0281 + 170 - K0282 + 200, K0282 + 000 -K0282 + 980, K0282 + 440 - K0285 + 380, K0282 + 980 - K0283 + 070, K0283 + 215 -K0285 + 380, K0311 + 000 - K0311 + 775, K0312 + 410 - K0313 + 500, K0313 + 185 -K0315 + 250, K0313 + 185 - K0315 + 405, K0315 + 582 - K0315 + 875, K0315 + 670 - K0315 + 875, K0315 + 915 - K0316 + 290

CW1 - Off-Carriageway Improvement: Paving of Shoulders:
18,117.50 sq.m. - 61,889.825

CW2 - Off-Carriageway Improvement: Construction of Sidewalk:
2,706.00 sq.m. - 219.00

ROW Acquisition: 600.00 sq.m. - 1,200.00

EAO - 2,296.175



April 21, 2022 2022 WIN2G02622 SR2022-02-000179 February 3, 2022 Region VI Aklan District Engineering Office
UACS No. 310102100830000
Project ID: P00603617VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

Aklan East Rd (S00322PN) - K0278 + 237 - K0279 + 782, K0281 + 000 - K0282 + 000

CW1- Preventive Maintenance of Road: Asphalt Overlay:
9.952 lane km - 78,315.54

EAO - 2,840.46

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

Aklan East Rd (S00322PN) - K0276 + 000 - K0278 + 082, K0286 + 045 - K0290 + 113

CW1- Preventive Maintenance of Road: Asphalt Overlay:
16.516 lane km - 78,315.54

EAO - 2,840.46
April 21, 2022 2022 WIN2G02625 FY 2022 GAA RA 11639 January 3, 2022 Region VI Aklan District Engineering Office
UACS No. 310108101163000
Project ID: P00604062VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Aklan West Rd (Kalibo-Nabas) - K0264 + 450 - K0264 + 520, K0265 + 400 - K0265 + 430

CW1- Construction of Road Slope Protection Structure:
2,000.00 sq.m. - 19,600.00

EAO - 400.00

TO:

OO1: Ensure Safe and Reliable National Road System


Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Aklan West Rd (Kalibo-Nabas) - K0262 + 940 - K0262 + 990, K0264 + 450 - K0264 + 570, K0265 + 400 - K0265 + 460, K0266 + 000 -K0266 + 080


CW1- Construction of Road Slope Protection Structure:
1,360.00 sq.m. - 19,600.00

EAO - 400.00

April 21, 2022 2022 WIN2G02626 SR2022-02-001270 February 4, 2022 Region VI Aklan District Engineering Office
UACS No. 310208100394000
Project ID: P00604794VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement - Secondary Roads

Aklan West Rd (Kalibo-Nabas) - K0234 + (-905) - K0234 + 579, K0234 + 856 - K0236 + 575, K0236 + 724 - K0237 + 430, K0238 + 704 - K0239 + 246, K0240 + 000 - K0240 + 086

CW1 - Off-Carriageway Improvement: Paving of Shoulders:
12,931.50 sq.m. - 81,131.41

EAO - 2,942.59

TO:

OO1: Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement - Secondary Roads

Aklan West Rd (Kalibo-Nabas) - K0238 + 704 - K0239 + 150, K0238 + 704 - K0239 + 246, K0239 + 620-K0239 + 246, K0254 + 000 - K0254 + 300, K0254 + 000 -K0254 + 630, K0258 + 400 - K0259 + 380, K0265 + 600 -K0266 + 800, K0271 + 640 - K0272 + 020, K0272 + 145 - K0274 + 440, K0272 + 145 -K0273 + 640, K0274 + 440 - K0275 + 080, K0275 + 130 - K0275 + 360

CW1 - Off-Carriageway Improvement: Paving of Shoulders:
30,609.70 sq.m. - 81,131.41

EAO - 2,942.59
April 21, 2022 2022 WIN2G02629 SR2022-02-000274 February 3, 2022 Region VI Regional Office VI
UACS No. 310109100880000
Project ID: P00604080VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Lambunao-INCA Rd - K0048 + 700 - K0048 + 920

CW1- Construction of Road Slope Protection Structure:
3,333.33 sq.m - 57,900.00

EAO - 2,100.00

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Lambunao-INCA Rd – K0059 + 405 – K0059 + 446.10

CW1- Construction of Road Slope Protection Structure:
2,599.257 sq.m - 57,900.00

EAO - 2,100.00

April 21, 2022 2022 WIN2G02627 SR2022-02-000249 February 3, 2022 Region VI Regional Office VI
UACS No. 310109100874000
Project ID: P00604084VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Jct Bancal-Leon-Antique Bdry Rd - K0041 + 790 - K0041 + 820, K0049 + 000 - K0049 + 114

CW1- Construction of Road Slope Protection Structure:
3,888.89 sq.m - 67,550.00

EAO - 2,450.00

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Jct Bancal-Leon-Antique Bdry Rd - K0041 + 593 - K0041 + 623

CW1- Construction of Road Slope Protection Structure:
3,099.95 sq.m - 67,550.00

EAO - 2,450.00

April 21, 2022 2022 WIN2F06246 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Nueva Ecija - Aurora Rd - K0171+200 - K0171+305
April 21, 2022 2022 WIN2F06283 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

Baler-Casiguran Rd (Baler-Dinadiawan) - K0242+327 - K0242+870, K0245+700 - K0245+877, K0252+444 - K0252+784.08
April 21, 2022 2022 WIN2F06231 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Baler-Casiguran Rd (Baler-Dinadiawan) - K0277+420 - K0277+435, K0278+400 - K0278+415, K0278+800 - K0278+815, K0279+700 - K0279+721, K0280+050-K0280+071
April 20, 2022 FY 2022 WIN2C03522 UACS No. 300220100188000 February 8, 2022 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 300220100188000
Project ID.: P00637105LZ
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of 6-Storey Multi-purpose Building (Government Center) Package 9, Brgy. St. Joseph,
San Juan City
Physical Target: CW1-Construction of Multi-Purpose Building = 1.0 No. of Building
Unit Cost = P 7,840,000/no. of bldg.
Allocation = P 7,840,000
EAO = P 160,000
Total = P 8,000,000

As Modified
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of 6-Storey Multi-purpose Building (Government Center) Package 10, Brgy. St. Joseph,
San Juan City
Physical Target: CW1-Construction of Multi-Purpose Building = 1.0 No. of Building
Unit Cost = P 7,840,000/no. of bldg.
Allocation = P 7,840,000
EAO = P 160,000
Total = P 8,000,000
WIN2C03522
April 20, 2022 2022 WIN2F05972 FY 2022 GAA RA 11639 December 30, 2021 Region V Catanduanes District Engineering Office
UACS No.: 310103100965000
Project ID: P00603965LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Tertiary Roads - Jct Bato-Baras Rd – K0013+195 – K0014+000, K0022+300 – K0023+000
Physical Target: CW1 – Preventive Maintenance of Road: Concrete Reblocking – 2.908 Lane km.
Allocation: Php 12,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Tertiary Roads - Jct Bato-Baras Rd – K0013+195 – K0014+000, K0014+000 – K0015+000
Physical Target: CW1 - Preventive Maintenance of Road: Concrete Reblocking – 1.584 Lane km.
Estimated Cost: Php 12,000,000.00
April 20, 2022 2022 WIN2F06179 FY 2022 GAA RA 11639 December 30, 2021 Region V Catanduanes District Engineering Office
UACS No.: 310112100321000
Project ID: P00604141LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads - Baras-Gigmoto-Viga Rd – K0026+000 – K0026+742
Physical Target: CW1 - Construction of Drainage Structure along Road – 742 Lineal Meters.
Allocation: Php 22,274,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads - Baras-Gigmoto-Viga Rd – K0029+000 – K0030+00, K0050+791 – K0050+848, K0087+900 – K0088+000, K0090+100 – K0090+325
Physical Target: CW1 - Construction of Drainage Structure along Road – 1143 Lineal Meters.
Estimated Cost: Php 22,274,000.00
April 20, 2022 2022 WIN2F06305 FY 2022 GAA December 30, 2021 Region III Regional Office III
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R. A. 11239

Installation of Reflective Pavement Studs A Castaneda - Ma. Aurora - San Luis Rd - K0193+(-307) - K0193+068, K0193+920 - K0206+712, Baler Airport Road - K0227+979 - K0229+657, Nueva Ecija - Aurora Rd - K0171+(-322) - K0184+621
April 20, 2022 2022 WIN2F05889 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 1st District Engineering Office
UACS No.: 310106100776000
Project ID: P00603976LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Tertiary Roads - Sn Fernando-Talisay Rd – K0001+798 – K0002+116
Physical Target: CW1 – Reconstruction to Concrete Pavement – 0.596 Lane km.
Allocation: Php 9,855,000

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Tertiary Roads - Sn Fernando-Talisay Rd – K0011+765 – K0011+865, K0011+975 – K0012+058.50, K0012+252 – K0012+291
Physical Target: CW1 - Reconstruction to Concrete Pavement – 0.517 Lane km.
Estimated Cost: Php 9,855,000
April 20, 2022 2022 WIN2F05886 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 1st District Engineering Office
UACS No.: 310111100436000
Project ID: P00604144LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Construction/ Upgrading Rehabilitation of Drainage along National Roads – Secondary Roads – Sn Fernando North Rd – K0012+871 – K0012+921, K0013+895 – K0014+213, K0024+843 – K0025+000
Physical Target: CW1 - Construction of Drainage Construction along Road – 521 Lineal Meters
Allocation: Php 7,850,000

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Construction/ Upgrading Rehabilitation of Drainage along National Roads – Secondary Roads – Sn Fernando North Rd – K0012+889 – K0012+921, K0012+980 – K0013+106, K0013+991 – K0014+213, K0024+846 – K0025+000
Physical Target: CW1 - Construction of Drainage Construction along Road – 521 Lineal Meters
Estimated Cost: Php 7,850,000
April 20, 2022 2022 WIN2F05883 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 1st District Engineering Office
UACS No.: 310109101000000
Project ID: P00604432LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Tertiary Roads - Sn Fernando-Talisay Rd – K0002+741 – K0002+781
Physical Target: CW1 - Construction of Road Slope Protection Structure – 1666.67 Square Meters.
Allocation: Php 30,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Tertiary Roads - Sn Fernando-Talisay Rd – K0002+741 – K0002+781
Physical Target: CW1 - Construction of Road Slope Protection Structure – 1324.84 Square Meters.

Estimated Cost: Php 30,000,000.00
April 20, 2022 2022 WIN2F05885 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 1st District Engineering Office
UACS No.: 310109100870000
Project ID: P00604433LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Tertiary Roads - Sn Fernando-Talisay Rd – K0003+000 – K0003+095
Physical Target: CW1 - Construction of Road Slope Protection Structure – 4444.44 Square Meters.
Allocation: Php 80,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Tertiary Roads - Sn Fernando-Talisay Rd – K0003+065 – K0003+209
Physical Target: CW1 - Construction of Road Slope Protection Structure – 3697.71 Square Meters.

Estimated Cost: Php 80,000,000.00
April 20, 2022 2022 WIN2F05884 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 1st District Engineering Office
UACS No.: 310209100371000
Project ID: P00606440LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement – Tertiary Roads – Sn Pascual-Claveria Rd – K0012+000 – K0012+277, K0012+478 – K0012+850, K0017+041 – K0017+801
Physical Target: CW1 – Off-Carriageway Improvement: Paving of Shoulders – 4227 Square Meters.
Allocation: Php 30,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement – Tertiary Roads – Sn Pascual-Claveria Rd – K0012+478 – K0012+850, K0017+041 – K0018+ 042
Physical Target: CW1 - Off-Carriageway Improvement: Paving of Shoulders – 4227 Square Meters.
Estimated Cost: Php 30,000,000.00
April 20, 2022 2022 WIN2F05910 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310111100438000
Project ID: P00604143LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Construction/ Upgrading of Drainage along National Roads – Secondary Roads - Masbate-Milagros Rd – K0021+256 – K0021+577
Physical Target: CW1 - Construction of Drainage Structure along Road – 321 Lineal Meters
Allocation: Php 13,740,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Construction/ Upgrading of Drainage along National Roads – Secondary Roads - Masbate-Milagros Rd – K0023+045 – K0023+285
Physical Target: CW1 - Construction of Drainage Structure along Road – 240 Lineal Meters
Estimated Cost: Php 13,740,000.00
April 20, 2022 2022 WIN2F06091 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310102100825000
Project ID: P00610123LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Crossing-Mandaon Rd – K0045+800 – K0049+250
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 6.858 Lane km.
Allocation: Php 128,500,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Crossing-Mandaon Rd – K0046+(-358) – K0046+000, K0047+000 – K0048+620
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay – 7.876 Lane km.
Estimated Cost: Php 128,500,000.00
April 20, 2022 2022 22-6801 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310102100826000
Project ID: P00610124LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0025+050 – K0033+380
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 30.14 Lane km.
Allocation: Php 295,300,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0025+(-115) – K0030+140
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay – 19.686 Lane km.
Estimated Cost: Php 295,300,000.00
April 20, 2022 2022 WIN2F05982 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310102100827000
Project ID: P00610125LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0042+780 – K0047+200
Physical Target: CW1 – Preventive Maintenance of the Road: Asphalt Overlay – 16.861 Lane km.
Allocation: Php 180,350,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0042+682 – K0045+725
Physical Target: CW1 - Preventive Maintenance of the Road: Asphalt Overlay – 11.736 Lane km.
Estimated Cost: Php 180,350,000.00
April 20, 2022 2022 WIN2F0610 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310102100828000
Project ID: P00610126LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Tawad-Balud Rd – K0027+300 – K0031+756
Physical Target: CW1 – Preventive Maintenance of Road: Concrete Reblocking – 8.848 Lane km.
Allocation: Php 165,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Tawad-Balud Rd – K0027+(-360) – K0028+944, K0029+910 – K0031+390
Physical Target: CW1 - Preventive Maintenance of Road: Concrete Reblocking – 11.032 Lane km.
CW2 - Construction of Drainage Structure along Road – 1,729.450 Lineal meters
Estimated Cost: Php 165,000,000.00
April 20, 2022 2022 WIN2F06168 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310102100829000
Project ID: P00610127LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Masbate-Milagros Rd – K0024+000 – K0026+500
Physical Target: CW1 - Preventive Maintenance of Road: Concrete Reblocking – 4.682 Lane km.
Allocation: Php 85,000,000.00

AS MODIFIED:
OO1 : : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Masbate-Milagros Rd – K0024+274 – K0025+610
Physical Target: CW1 - Preventive Maintenance of Road: Concrete Reblocking – 5.456 Lane km.
Estimated Cost: Php 85,000,000.00
April 20, 2022 2022 WIN2F05931 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 320101107540000
Project ID: P00620280LZ
AS PER GAA:
OO2 : Protect Lives and Properties – Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Calsuche Seawall, Milagros, Masbate
Physical Target: CW1 - Construction of Flood Mitigation Structure – 168 Lineal Meters
Allocation: Php 100,000,000.00

AS MODIFIED:
OO2 : Protect Lives and Properties – Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Calasuche Seawall, Milagros, Masbate
Physical Target: CW1 - Construction of Flood Mitigation Structure – 168 Lineal Meters
Estimated Cost: Php 100,000,000.00
April 20, 2022 2022 WIN2F05958 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 3rd District Engineering Office
UACS No.: 310108100899000
Project ID: P00611363LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads - Masbate-Cataingan-Placer Rd – K0021+257 – K0021+507
Physical Target: CW1 – Road Slope Protection Structure – 5277.78 Square Meters.
Allocation: Php 95,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads - Masbate-Cataingan-Placer Rd – K0022+345 – K0022+595
Physical Target: CW1 - Road Slope Protection Structure – 5277.78 Square Meters.
Estimated Cost: Php 95,000,000.00