August 23, 2021 |
FY 2021 |
WIN1C03951 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 310204101092000
Project ID: P00506293LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Naga-Jct Magarao-Canaman-Libmanan Jct PPH Road (Skybridge), Camarines Sur
Physical Target: CW1- Construction of Concrete Road – 0.96 Lane Km
ROW - ROW Acquisition – 16,411.041 Square meters
Allocation: Php 30,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Naga-Jct Magarao-Canaman-Libmanan Jct PPH Road (Skybridge), Camarines Sur
Physical Target: CW1- Construction of Road Slope Protection Structure – 2,675.91 Square meters
ROW - ROW Acquisition – 8,381.6 Square meters
Allocation: Php 30,000,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04293 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 310204101086000
Project ID: P00506300LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Juban-Bulan Diversion Road, Bulan Section, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.502 Lane Km
CW2 - Construction of Concrete Bridge – 713.16 Square meters
CW3 - Construction of Concrete Bridge – 679.2 Square meters
ROW - ROW Acquisition – 43,780 Square meters
Allocation: Php 100,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Juban-Bulan Diversion Road, Bulan Section, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.544 Lane Km
CW2 - Construction of Concrete Bridge – 713.16 Square meters
CW3 - Construction of Concrete Bridge – 679.2 Square meters
ROW - ROW Acquisition – 5,440 Square meters
Allocation: Php 100,000,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04428 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 300116203403000
Project ID: P00561890LZ
AS PER GAA:
Local Program: Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Diamante- Perlas Coastal Road and Shore Protection, Phase II, Prieto Diaz, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 9.904 Lane Km
Allocation: Php 100,000,000.00
AS MODIFIED:
Local Program: Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Diamante- Perlas Coastal Road and Shore Protection, Phase II, Prieto Diaz, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 1.35556 Lane Km
CW2- Construction of Road Slope Protection Structure – 1,074.16 Square meters
Allocation: Php 100,000,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04427 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 300116203394000
Project ID: P00561887LZ
AS PER GAA:
Local Program: Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Balud del Norte- Cota na Daco- Cogon Coastal Road and Shore Protection, Package II, Gubat, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.798 Lane Km
CW2- Construction of Road Slope Protection Structure – 2,059.64 Square meters
Allocation: Php 100,000,000.00
AS MODIFIED:
Local Program: Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Balud del Norte- Cota na Daco- Cogon Coastal Road and Shore Protection, Package II, Gubat, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.7756 Lane Km
CW2- Construction of Road Slope Protection Structure – 2,001.82 Square meters
Allocation: Php 100,000,000.00
|
August 20, 2021 |
CY 2021 |
WIN1F06711 |
UACS No. 320101106474000 |
March 4, 2021 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 320101106474000
Project ID.: P00525840LZ
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Rehabilitation of Flood Control Structures at Lambakan Creek, Barangay Matandang
Balara, Quezon City
Physical Target: CW1 = Construction of Flood Mitigation Structure L=892.00 lineal meter
Unit Cost (P’000) = P 54.93/ l. m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 100.00
Total (P’000) = P 50,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Rehabilitation of Flood Control Structures at Lumban Creek, Barangay Matandang
Balara, Quezon City
Physical Target: CW1 = Construction of Flood Mitigation Structure L=384.70 lineal meter
Unit Cost (P’000) = P 127.37/ l. m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 100.00
Total (P’000) = P 50,000.00
WIN1F06711
|
August 20, 2021 |
CY 2021 |
WIN1F06712 |
UACS No. 310102100614000 |
June 8, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 310102100614000
Project ID.: P00505506LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
JA Santos – (S02287LZ) K0005+229.0 – K0005+319.0
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L= 0.180 lane km.
Unit Cost (P’000) = P 6,549.00/ lane km.
Allocation = P 1,178,940.00
EAO = P 24,060.00
Total = P 1,203,000.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
JA Santos – (S02287LZ) K0005+299.0 – K0005+319.0
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L= 0.180 lane km.
Unit Cost (P’000) = P 6,549.00/ lane km. P13 m/km
Allocation = P 1,178,940.00
EAO = P 24,060.00
Total = P 1,203,000.00
WIN1F06712
|
August 20, 2021 |
2021 |
WIN1E02785 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 300117210433000
Project ID: P00551442MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
FROM:
Construction/Improvement of Circumferential Road along Marsh Road, Bunawan Section, Phase II, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.935 Lane Km
Allocation:
TOTAL: P 10,000,000
CW1: P 9,900,000
EAO: P 100,000
Unit Cost:
CW1: P 10,588,235.29/Lane Km
TO:
Construction/Improvement of Circumferential Road along Marsh Road, Bunawan Section, Phase II, Agusan del Sur
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 0.110 Lane Km
Allocation:
TOTAL: P 10,000,000
CW1: P 9,900,000
EAO: P 100,000
Unit Cost:
CW1: P 90,000,000/Lane Km
|
August 18, 2021 |
2021 |
WIN1F06699 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Govt Ctr Rd Network - (S00227LT) Chainage 0 - Chainage 432
Physical Target: Allocation:
CW1-Preventive Maintenance: P 4.85296 M
Asphalt Overlay: 0.864 Lane Km
EAO P 0.09904 M
Total P 4.952 M
AS MODIFIED:
Govt Ctr Rd Network - (S00227LT) Chainage 0 - Chainage 206
Physical Target: Allocation:
CW1-Preventive Maintenance: P 4.85296 M
Asphalt Overlay: 0.412 Lane Km
EAO P 0.09904 M
Total P 4.952 M
|
August 18, 2021 |
2021 |
300211100056000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Isabela 1st District Engineering Office |
Convergence and Special Support Program - Convergence and Special Support - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Construction of Paculagu Bridge, Brgy. Naganacan, Sta. Maria, Isabela |
August 18, 2021 |
2021 |
310204101011000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Regional Office II |
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads - Alicia Bypass Road, Isabela |
August 18, 2021 |
2021 |
310204101025000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Regional Office II |
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads - San Mateo - Alfonso Lista Diversion Road, San Mateo Section, Isabela |
August 17, 2021 |
FY 2021 GAA |
WIN1F06440 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204187000
Project ID : P00562448LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roiads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Brgy. Pahilahan, Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.312 Lane Km
Allocation : Php 2.00 Million
TO :
Concreting of Road,
Brgy. Pahilahan, Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.212 Lane Km
Allocation : Php 2.00 Million
|
August 17, 2021 |
FY 2021 GAA |
WIN1F06456 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300117209112000
Project ID : P00564665LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Local Infrastructure Program
FROM :
Concreting Sitio Manuro, Brgy. Malamig,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
1.510 Lane Km
Allocation : Php 8.50 Million
TO :
Concreting Sitio Manuro, Brgy. Malamig,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
1.535 Lane Km
Allocation : Php 8.50 Million |
August 17, 2021 |
FY 2021 GAA |
WIN1F06473 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204158000
Project ID : P00562419LZ\
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road at Lemon St., Lalud,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.312 Lane Km
Allocation : Php 2.00 Million
TO :
Concreting of Concrete Road at Lemon St., Lalud,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.13 Lane Km
Allocation : Php 2.00 Million
|
August 17, 2021 |
FY 2021 GAA |
WIN1F06441 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204183000
Project ID : P00562444LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Various Roads,
Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
1.906 Lane Km
CW2 - Construction of Concrete Road :
1.906 Lane Km
CW3 - Construction of Concrete Road :
0.906 Lane Km
Allocation : Php 25.00 Million
TO :
Concreting of Various Road,
Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
1.739 Lane Km
CW2 - Construction of Concrete Road :
1.912 Lane Km
CW3 - Construction of Concrete Road :
1.24 Lane Km
Allocation : Php 25.00 Million |
August 17, 2021 |
FY 2021 GAA |
WIN1F06442 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204157000
Project ID : P00562418LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Brgy. Palangan Circumferential Road,
Puerto Galera, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
30340 lane Km
Allocation : Php 20.00 Million
TO :
Concreting of Brgy. Palangan Circumferential Road,
Puerto Galera, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
3.584 Lane Km
Allocation : Php 20.00 Million |
August 17, 2021 |
FY 2021 GAA |
WIN1F06447 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204167000
Project ID : P00562428LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Brgy. Nag-Iba II, Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
4.43 Lane Km
Allocation : Php 25.00 Million
TO :
Concreting of Road,
Brgy. Nag-Iba II, Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
4.274 Lane Km
Allocation : Php 25.00 Million |
August 17, 2021 |
FY 2021 GAA |
WIN1F06463 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310203100465000
Project ID : P00505133LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
FROM :
CSR Jct - Pola Road,
K0066 + 935 - K0067 + 027
Physical Target - CW1 - Network Development - Road Widening -
Tertiary Roads - 0.244 Lane Km
Allocation : Php 3.74 Million
TO :
CSR Jct - Pola Road,
K0065 + 052 - K0065 + 254
Physical Target - CW1 - Network Development - Road Widening -
Tertiary Roads - 0.202 Lane Km
Allocation ; Php 3.74 Million
|
August 17, 2021 |
FY 2021 GAA |
WIN1F06463 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310203100465000
Project ID : P00505133LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
FROM :
CSR Jct - Pola Road,
K0066 + 935 - K0067 + 027
Physical Target - CW1 - Network Development - Road Widening -
Tertiary Roads - 0.244 Lane Km
Allocation : Php 3.74 Million
TO :
CSR Jct - Pola Road,
K0065 + 052 - K0065 + 254
Physical Target - CW1 - Network Development - Road Widening -
Tertiary Roads - 0.202 Lane Km
Allocation ; Php 3.74 Million
|
August 17, 2021 |
FY 2021 GAA |
WIN1F06470 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300117209111000
Project ID : P00564664LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Local Infrastructure Program
FROM :
Concreting of Sitio Silangan, Balingayan,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
1.510 Lane Km
Allocation : Php 8.50 Million
TO :
Concreting of Sitio Silangan, Balingayan,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
1.352 Lane Km
Allocation : Php 8.50 Million
|
August 17, 2021 |
FY 2021 GAA |
WIN1F06489 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300106200714000
Project ID : P00561577Lz
LOCAL PROGRAM
Local - Flood Control and Drainage - Flood Control
Construction/Repair/rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Construction of Shore protection/Causeway leading to
Poctoy Port, Odiongan, Romblom
Physical Target - CW1 - Construction of Flood Mitigation Structure :
586.988 lineal meters
Allocation : Php 50.00 Million
TO :
Construction of ShoreProtection/Causeway leading to
Poctoy Port, Odiongan, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
161.88 lineal meters
Allocation : Php 50.00 Million |
August 17, 2021 |
FY 2021 GAA |
WIN1F06472 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300116203716000
Project ID : P00561990LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Construction of Causeway along
Mabini Fish Port, San Andres, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.000 Lane Km
Allocation : Php 30.00 Million
TO :
Construction of Causeway along
Mabini Fish Port, San Andres, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.120 Lane Km
Allocation : Php 30.00 Million |
August 17, 2021 |
FY 2021 GAA |
WIN1F06416 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 1st District Engineering Office |
UACS No. : 310203100467000
Project ID : P00505156LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
FROM :
Road Widening of Coron - Busuanga Road,
K0046 + 690 - K0047 + 721
Physical Target - CW1 - Road Widening ; 2.072 lane Km
Allocation : Php 28.00 Million
TO :
Road Widening of Coron - Busuanga Road,
K0046 + 690 - K0047 + 383
Physical Target - Road Widening : 1.386 Lane Km
Allocation : Php 28.00 Million |
August 17, 2021 |
FY 2021 GAA |
WIN1E02779 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
L Garcia St - (S01456MN) Chainage 647 - Chainage 838
Physical Target:
CW1: 0.764 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 4,481,000.00
CW1: P 4,391,380.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 89,620.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
L Garcia St - (S01456MN) Chainage 647 - Chainage 748
Physical Target:
CW1: 0.202 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 4,481,000.00
CW1: P 4,391,380.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 89,620.00 |
August 17, 2021 |
FY 2021 GAA |
WIN1F06415 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 310205100686000
Project ID : P00506143LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/New Roads
FROM :
Sofronio Espanola - Quezon Cross Country Road
( Pulot Interior - Tagusao Section ), Palawan
Physical Target - CW1 - Construction of Concrete Road :
5.00 Lane Km
Allocation : Php 50.00 Million
TO :
Sofronio Espanola - Quezon Cross Country Road
( Pulot Interior - Tagusao Section ), Palawan
Physical Target - CW1 - Construction of Gravel Road :
3.00 Lane Km
Allocation : Php 50.00 Million |
August 17, 2021 |
FY 2021 GAA |
WIN1E02772 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage System at NHA Bangkal, Matutum St to Outfall, Davao City
Physical Target:
CW1: 3,000.00 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 92,000,000.00
CW1: P 88,780,000.00 (Construction of Drainage Structure)
EAO: P 3,220,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage System at NHA Bangkal, Matutum St to Outfall, Davao City
Physical Target:
CW1: 1,600.00 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 92,000,000.00
CW1: P 88,780,000.00 (Construction of Drainage Structure)
EAO: P 3,220,000.00 |
August 17, 2021 |
FY 2021 GAA |
WIN1E02780 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation / Major Repair of Flood Control Structure along Davao River, Sandawa Section, Right Bank, Davao City (Sta. 2+225 - Sta. 2+565)
Physical Target:
CW1: 763.010 lm (Rehabilitation/Major Repair of Flood Control Structure)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Rehabilitation/Major Repair of Flood Control Structure)
EAO: P 2,450,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation / Major Repair of Flood Control Structure along Davao River, Sandawa Section, Right Bank, Davao City (Sta. 2+246 - Sta. 2+635)
Physical Target:
CW1: 389.00 lm (Rehabilitation/Major Repair of Flood Control Structure)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Rehabilitation/Major Repair of Flood Control Structure)
EAO: P 2,450,000.00 |
August 17, 2021 |
FY 2021 GAA |
WIN1E02773 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Matina Pangi Downstream, Matina Pangi Section, Davao City
Physical Target:
CW1: 410.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 90,750,000.00
CW1: P 87,573,750.00 (Construction of Revetment)
EAO: P 3,176,250.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Matina Pangi Downstream, Matina Pangi Section, Davao City
Physical Target:
CW1: 300.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 90,750,000.00
CW1: P 87,573,750.00 (Construction of Revetment)
EAO: P 3,176,250.00 |
August 17, 2021 |
FY 2021 GAA |
WIN1E02778 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Quezon Boulevard (MN) (S01457MN) Chainage 0 - Chainage 2005
Physical Target:
CW1: 4.284 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 79,000,000.00
CW1: P 76,235,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,765,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Quezon Boulevard (MN) (S01457MN) Chainage 0 - Chainage 1848
Physical Target:
CW1: 3.814 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 79,000,000.00
CW1: P 76,235,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,765,000.00 |
August 16, 2021 |
2021 |
WIN1E02689 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 310110100202000
Project ID: P00501648MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
FROM:
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1233 + (-088) - K1233 + 584, K1235 + 130 - K1236 + 229
Type of Work:
CW1- Construction of Drainage Structure along Road
Physical Target:
CW1- 3,616.00 Lineal meters
Allocation:
TOTAL: P 58,000,000
CW1: P 55,970,000
EAO: P 2,030
Unit Cost:
CW1: P 15,478.43/Lineal meters
TO:
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1233 + 244.00 - K1234 + 125, K1235 + 322 -K1236 + 372
Type of Work:
CW1- Construction of Drainage Structure along Road
Physical Target:
CW1- 3,207.00 Lineal meters
Allocation:
TOTAL: P 58,000,000
CW1: P 55,970,000
EAO: P 2,030
Unit Cost:
CW1: P 17,452.45/Lineal meters
|
August 16, 2021 |
2021 |
WIN1C04475 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Network Development - Road Widening - Primary Roads
Daang Maharlika (LZ) - K0095+400 - K0095+451.20 |
August 16, 2021 |
2021 |
WIN1C04335 |
GAA 2021 |
July 16, 2021 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Repair/Rehabilitation of Lap-angan Water System at Barangay Lap-angan, Mankayan, Benguet;
Physical Target: CW1: 1 Number of Water Supply Systems;
Allocation= Php 3,000,000
To: Repair/Rehabilitation of Lap-angan Water System at Barangay Palasaan, Mankayan, Benguet;
Physical Target: CW1: 1 Number of Water Supply Systems;
Allocation= Php 3,000,000
|
August 16, 2021 |
2021 |
WIN1C04155 |
GAA 2021 |
June 30, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0454+000 - K0455 + 100;
Type of Work: CW1: Reconstruction to Concrete Pavement ;
Physical Target: CW1: 2.026 Lane Km;
Allocation= Php 99,000,000
To: Abra-Kalinga Rd - K0454+000 - K0455 + 100;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 2.026 Lane Km
CW2: 3,307.68 Square meters;
Allocation= Php 99,000,000
|
August 16, 2021 |
2021 |
WIN1C04156 |
GAA 2021 |
June 30, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Presentar Flood Control, Barangay Presentar, Lagangilang, Abra;
Physical Target: CW1: 224.40 Lineal meters;
Allocation= Php 50,000,000
To: Construction of Presentar Flood Control, Barangay Presentar, Lagangilang, Abra;
Physical Target: CW1: 538 Lineal meters;
Allocation= Php 50,000,000
|
August 16, 2021 |
2021 |
WIN1C04154 |
GAA 2021 |
June 30, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Wayangan Flood Control, Tubo, Abra;
Physical Target: CW1: 1,224 Lineal meters;
Allocation= Php 100,000,000
To: Construction of Wayangan Flood Control, Tubo, Abra;
Physical Target: CW1: 1,120 Lineal meters;
Allocation= Php 100,000,000
|
August 16, 2021 |
2021 |
WIN1C04153 |
GAA 2021 |
June 30, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Bollilising Flood Control Phase II, Sta. 27+000 - Sta. 27+500, Villaviciosa, Abra;
Physical Target: CW1: 339 Lineal meters;
Allocation= Php 20,000,000
To: Construction of Bollilising Flood Control Phase II, Sta. 27+000 - Sta. 27+500, Villaviciosa, Abra;
Physical Target: CW1: 481.5 Lineal meters;
Allocation= Php 20,000,000
|
August 16, 2021 |
2021 |
WIN1C04152 |
GAA 2021 |
June 30, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Rehabilitation/Improvement of Bucay-Manabo Road, Bucay and Manabo, Abra;
Physical Target: CW1: 3.794 Lane Km;
Allocation= Php 40,000,000
To: Rehabilitation/Improvement of Bucay-Manabo Road, Bucay and Manabo, Abra;
Physical Target: CW1: 4.64 Lane Km;
Allocation= Php 40,000,000
|
August 13, 2021 |
2021 |
WIN1F06677 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Avenida Veteranos St. – (S00003LT) Chainage 000 – Chainage 110
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 2.617580 M
Road : 220 Lineal Meters
EAO P 0.53420 M
Total P 2.671 M
AS MODIFIED:
Avenida Veteranos St. – (S00003LT) Chainage 011 – Chainage 102
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 2.617580 M
Road : 91 Lineal Meters
EAO P 0.53420 M
Total P 2.671 M
|
August 13, 2021 |
2021 |
WIN1F06667 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika LT - K0905+077-K0905+423, K0905+453-K0905+982, K0906+000-K0906+261,K909+333-K909+371
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 11.854080 M
along Road: 1,174 Lineal Meters
EAO P 0.241920 M
Total P 12.096 M
AS MODIFIED:
Daang Maharlika (S00022LT) - K0909+260-K0910+000, K0909+377-K0909+415, K0909+549-K0909+573
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 11.854080 M
along Road: 386 Lineal Meters
EAO P 0.241920 M
Total P 12.096 M
|
August 13, 2021 |
2021 |
WIN1F06668 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Avenida Veteranos St. – (S00004LT) Chainage 000 – Chainage 123
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 4.900 M
along Road: 246 Lineal Meters
EAO P 0.100 M
Total P 5.00 M
AS MODIFIED:
Avenida Veteranos St. – (S00004LT) Chainage 119 – Chainage 223
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 4.900 M
along Road: 208 Lineal Meters
EAO P 0.100 M
Total P 5.00 M
|
August 13, 2021 |
2021 |
WIN1F06679 |
GAA FY 2021 |
January 25, 2021 |
Region VIII |
Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (SM) (Sn Isidro – Sn Juanico Br.) K0772 + 829 - K0773 + 000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 7.33334 M
Asphalt Overlay: 0.680 Lane Km
EAO P 0.14966 M
Total P 7.483 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro – Sn Juanico Br.) K0727 + 280 - K0727 + 500
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 7.33334 M
Asphalt Overlay: 0.440 Lane Km
EAO P 0.14966 M
Total P 7.483 M
|
August 13, 2021 |
FY 2021 GAA |
WIN1E02648 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction/Upgrading of Drainage Structures, Barangay 30-C, Davao City
Physical Target:
CW1: 140.00 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Drainage Structure)
EAO: P 30,000.00
TO: Local Program - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction/Upgrading of Drainage Structures, Barangay 30-C, Davao City
Physical Target:
CW1: 110.00 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Drainage Structure)
EAO: P 30,000.00 |
August 13, 2021 |
FY 2021 GAA |
WIN1E02742 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction Flood Mitigation Structure protecting Daang Maharlika (MN) at Brgy. Sasa, Davao City
Physical Target:
CW1: 300.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction Flood Mitigation Structure)
EAO: P 500,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction Flood Mitigation Structure protecting Daang Maharlika (MN) at Brgy. Sasa, Davao City
Physical Target:
CW1: 115.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction Flood Mitigation Structure)
EAO: P 500,000.00 |
August 13, 2021 |
FY 2021 GAA |
WIN1E02648 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: Local Program - Buildings And Other Structures - School Buildings - Local Infrastructure Program
Construction of two (2) Classroom Building at Barangay San Miguel, Matanao, Davao del Sur
Physical Target:
CW1: 1 classroom (Construction of Classrooms)
Allocation:
TOTAL: P 1,000,000.00
CW1: P 1,000,000.00 (Construction of Drainage Structure)
TO: Local Program - Buildings And Other Structures - School Buildings - Local Infrastructure Program
Construction of one (1) Classroom Building at Barangay San Miguel, Matanao, Davao del Sur
Physical Target:
CW1: 1 classroom (Construction of Classrooms)
Allocation:
TOTAL: P 1,000,000.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02741 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure at Purok 6, Bago Gallera, Talomo District, Davao City
Physical Target:
CW1: 1,700.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,100,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure at Purok 6, Bago Gallera, Talomo District, Davao City
Physical Target:
CW1: 1,306.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,100,000.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02732 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Matina Aplaya Section, Davao City
Physical Target:
CW1: 450.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Revetment)
EAO: P 3,500,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Matina Aplaya Section, Davao City
Physical Target:
CW1: 300.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Revetment)
EAO: P 3,500,000.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02724 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage System at Libby Bridge, Purok 6, Bago Gallera. Talomo District, Davao City
Physical Target:
CW1: 200.00 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Drainage Structure)
EAO: P 200,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage System at Libby Bridge, Purok 6, Bago Gallera. Talomo District, Davao City
Physical Target:
CW1: 252.00 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 10,000,000.00
CW1: 9,800,000.00 (Construction of Drainage Structure)
EAO: P 200,000.00
|
August 12, 2021 |
FY 2021 GAA |
WIN1E02714 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Camia St., Juna - Jct Davao-Cotabato Road, Davao City
Physical Target:
CW1: 1.602 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,300,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 700,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Camia St., Juna - Jct Davao-Cotabato Road, Davao City
Physical Target:
CW1: 1.748 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,300,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 700,000.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02731 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Marang St., Juna, Davao City
Physical Target:
CW1: 0.554 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,755,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 245,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Marang St., Juna, Davao City
Physical Target:
CW1: 0.602 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,755,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 245,000.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02755 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Drainage and Protection Works - Local Infrastructure Program
Construction of Road in Barangay Sumimao (Paquibato District), Davao City, Davao del Sur
Physical Target:
CW1: 1.000 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00
TO: Local Program - Flood Control and Drainage - Drainage and Protection Works - Local Infrastructure Program
Construction of Road in Barangay Sumimao (Paquibato District), Davao City, Davao del Sur
Physical Target:
CW1: 0.640 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02704 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Connecting Bridge from Eye Institute to OPD JICA Building, Southern Philippines Medical Center, Davao City
Physical Target:
CW1: 195.00 sq. m. (Construction of Bridge)
Allocation:
TOTAL: P 24,037,000.00
CW1: P 23,556,260.00 (Construction of Bridge)
EAO: P 480,740.00
TO: Local Program - Local Roads and Bridges - Local Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Connecting Bridge from Eye Institute to OPD JICA Building, Southern Philippines Medical Center, Davao City
Physical Target:
CW1: 120.00 sq. m. (Construction of Bridge)
Allocation:
TOTAL: P 24,037,000.00
CW1: P 23,556,260.00 (Construction of Bridge)
EAO: P 480,740.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02761 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Off-Carriageway Improvement of Road, Barangay 34-D, Davao City
Physical Target:
CW1: 0.503 lane km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 3,700,000.00
CW1: P 3,663,000.00 (Rehabilitation of Concrete Road)
EAO: P 37,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Off-Carriageway Improvement of Road, Barangay 34-D, Davao City
Physical Target:
CW1: 1,130.66 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 3,700,000.00
CW1: P 3,663,000.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 37,000.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02612 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, NRJ Daang Maharlika Bunawan Proper - Barangay San Isidro - Kiotoy - Mabunao - Kauswagan - Jct. Panabo City Fatima - Malabog Road, Panabo City, Davao del Norte
Physical Target:
CW1: 7.920 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 92,000,000.00
CW1: P 88,780,000.00 (Construction of Concrete Road)
EAO: P 3,220,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, NRJ Daang Maharlika Bunawan Proper - Barangay San Isidro - Kiotoy - Mabunao - Kauswagan - Jct. Panabo City Fatima - Malabog Road, Panabo City, Davao del Norte
Physical Target:
CW1: 7.420 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 92,000,000.00
CW1: P 88,780,000.00 (Construction of Concrete Road)
EAO: P 3,220,000.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02763 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1380+686 - K1380+786,
K1381+693 - K1382+072, K1387+000 - K1387+176
Physical Target:
CW1: 7.164 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 31,863,000.00
CW1: P 31,225,740.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 637,260.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) -
K1396+793 - K1397+353, K1397+396 - K1398+100
Physical Target:
CW1: 5.120 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 31,863,000.00
CW1: P 31,225,740.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 637,260.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02746 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Outfall Section, Sta. 0+671 to Sta. 1+000, Left Bank, Davao City
Physical Target:
CW1: 452.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Revetment)
EAO: P 3,500,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Outfall Section, Sta. 0+465 to Sta. 0+790, Left Bank, Davao City
Physical Target:
CW1: 325.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Revetment)
EAO: P 3,500,000.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02750 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Jct. 5th Ave - Soliman St. - Jct. Leon Garcia St, Barangay 27-C and Barangay Kap Tomas Monteverde, Sr., Davao City
Physical Target:
CW1: 1.448 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 82,575,000.00
CW1: P 79,684,875.00 (Construction of Concrete Road)
EAO: P 2,890,125.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Jct. 5th Ave - Soliman St. - Jct. Leon Garcia St, Barangay 27-C and Barangay Kap Tomas Monteverde, Sr., Davao City
Physical Target:
CW1: 0.920 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 82,575,000.00
CW1: P 79,684,875.00 (Construction of Concrete Road)
EAO: P 2,890,125.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02753 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basin and Principal Rivers
Construction of Revetment along Talomo River, Sta. 3+880 to Sta. 4+120, Right Bank, Davao City
Physical Target:
CW1: 240.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 67,200,000.00
CW1: P 64,848,000.00 (Construction of Revetment)
EAO: P 2,352,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basin and Principal Rivers
Construction of Revetment along Talomo River, Sta. 3+817 to Sta. 4+022, Right Bank, Davao City
Physical Target:
CW1: 205.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 67,200,000.00
CW1: P 64,848,000.00 (Construction of Revetment)
EAO: P 2,352,000.00 |
August 12, 2021 |
2021 |
WIN1E02712 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 310107100237000
Project ID: P00509852MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
FROM:
NRJ Bayugan-Calaitan-Tandag Road, K1273+550 - K1273+691 R/S
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 0.000 Square meters
Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000
Unit Cost:
CW1: -
TO:
NRJ Bayugan-Calaitan-Tandag Road, K1273+550 - K1273+691 R/S
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 5,532.69 Square meters
Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000
Unit Cost:
CW1: P 17,441.79/ Square meters
|
August 12, 2021 |
FY 2021 GAA |
WIN1E02745 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Outfall Section, Right Bank, Davao City
Physical Target:
CW1: 130.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Revetment)
EAO: P 600,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Outfall Section, Right Bank, Davao City
Physical Target:
CW1: 105.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Revetment)
EAO: P 600,000.00 |
August 12, 2021 |
2021 |
WIN1E02723 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 310107100236000
Project ID: P00509851MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
FROM:
NRJ Bayugan-Calaitan-Tandag Road, K1275+374 - K1275+592 R/S
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 0.000 Square meters
Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000
Unit Cost:
CW1: -
TO:
NRJ Bayugan-Calaitan-Tandag Road, K1275+374 - K1275+592 R/S
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 5,538.93 Square meters
Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000
Unit Cost:
CW1: P 17,422.14/ Square meters
|
August 12, 2021 |
2021 |
WIN1E02719 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 320101107177000
Project ID: P00522269MN
OO2 : Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction/Improvement of Riverbank Protection of Ihawan River (Phase 2), Sta.0+000 - Sta. 0+140, Loreto, Agusan del Sur
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 35.000 Lineal meters
Allocation:
TOTAL: P 10,000,000
CW1: P 9,800,000
EAO: P 200,000
Unit Cost:
CW1: P 280,000/Lineal meters
TO:
Construction/Improvement of Riverbank Protection of Ihawan River (Phase 2), Sta.0+000 - Sta. 0+035, Loreto, Agusan del Sur
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 35.000 Lineal meters
Allocation:
TOTAL: P 10,000,000
CW1: P 9,800,000
EAO: P 200,000
Unit Cost:
CW1: P 280,000/Lineal meters
|
August 12, 2021 |
2021 |
WIN1E02722 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Dinagat Islands District Engineering Office |
UACS No. : 300116204616000
Project ID: P00550966MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Construction of Road, Sta. Cruz to Cambinliw (Lauban to Mini Hydro), Barangay Sta. Cruz-Sitio Cambinliw, Loreto, Dinagat Islands
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 3.600 Lane Km
Allocation:
TOTAL: P 45,000,000
CW1: P 44,100,000
EAO: P 900,000
Unit Cost:
CW1: P 12,250,000/Lane Km
TO:
Construction of Road, Sta. Cruz to Cambinliw (Lauban to Mini Hydro), Barangay Sta. Cruz-Sitio Cambinliw, Loreto, Dinagat Islands
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Gravel Road
Physical Target:
CW1- 1.460 Lane Km
CW2- 5.878 Lane Km
Allocation:
TOTAL: P 45,000,000
CW1: P 15,636,894
CW2: P 28,463,106
EAO: P 900,000
Unit Cost:
CW1: P 10,710,201.37/Lane Km
CW2: P 4,842,311.33/Lane Km
|
August 12, 2021 |
FY 2021 GAA |
WIN1E02743 |
FY 2020 GAA RA 11465 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Completion of Road with drainage, Brgy. Elizalde to Panibasan, Maco, Davao de Oro
Physical Target:
CW1: 1.640 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Road)
EAO: P 300,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Completion of Road with drainage, Brgy. Elizalde to Panibasan, Maco, Davao de Oro
Physical Target:
CW1: 1.396 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Road)
EAO: P 300,000.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02743 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of road (Opening) Tigpa, Napnapan to Mabaros, Panangason, Kingking, Pantukan, Davao de Oro (Phase 2)
Physical Target:
CW1: 1.892 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Gravel Road)
EAO: P 700,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of road (Opening) Tigpa, Napnapan to Mabaros, Panangason, Kingking, Pantukan, Davao de Oro (Phase 2)
Physical Target:
CW1: 1.892 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Gravel Road)
EAO: P 700,000.00Justification:
Increase in physical target from 1.892 lane km to 4.986 lane km due to the following:
- Road traverses a combination of flat to rolling terrain instead of the anticipated rolling to mountainous terrain;
- The road design is almost on-grade for flat sections and has an existing carriageway of up to 4 m. Design of project requires 6.00 m width of gravel road, hence, requires lesser earthworks (cut/fill) than anticipated to conform with the DPWH Design Guidelines and Standards (Horizontal and Vertical Alignment and Road Width). As such, decrease in unit cost, correspondingly, increase in physical target; and
- This involves drainage structures of pipe culverts with different sizes (910 mm, 1220 mm dia.) including stone masonry for headwall. |
August 12, 2021 |
FY 2021 GAA |
WIN1E02771 |
FY 2020 GAA RA 11465 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basin and Principal Rivers
Construction of Revetment along Talomo River, Sta. 3+542 to Sta. 3+800, Left Bank, Davao City
Physical Target:
CW1: 258.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 67,740,000.00
CW1: P 65,369,100.00 (Construction of Revetment)
EAO: P 2,370,900.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basin and Principal Rivers
Construction of Revetment along Talomo River, Sta. 3+542 to Sta. 3+747, Left Bank, Davao City
Physical Target:
CW1: 205.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 67,740,000.00
CW1: P 65,369,100.00 (Construction of Revetment)
EAO: P 2,370,900.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02762 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basin and Principal Rivers
Construction of Revetment along Talomo River, Sta. 0+430 - Sta. 0+860, Left Bank, Davao City
Physical Target:
CW1: 430.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Revetment)
EAO: P 3,500,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basin and Principal Rivers
Construction of Revetment along Talomo River, Sta. 0+000 - Sta. 0+213, Sta. 0+405 - Sta. 0+460, Left Bank, Davao City
Physical Target:
CW1: 268.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Revetment)
EAO: P 3,500,000.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02770 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Drainage Structure - Jade Valley Section to outfall, Davao City (Sta. 0+000 - Sta. 1+285)
Physical Target:
CW1: 3,097.094 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Drainage Structure)
EAO: P 2,100,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Drainage Structure - Jade Valley Section to outfall, Davao City
(Sta. 0+473 - Sta. 0+950, Sta. 0+000 - Sta. 0+288, Sta. 0+000 - Sta. 0+185, Sta. 0+000 - Sta. 0+493)
Physical Target:
CW1: 3,130.00 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Drainage Structure)
EAO: P 2,100,000.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02764 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction/Upgrading of Road (Raising of Grade), Barangay 21-C, Davao City
Physical Target:
CW1: 0.300 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Concrete Road)
EAO: P 30,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction/Upgrading of Road (Raising of Grade), Barangay 21-C, Davao City
Physical Target:
CW1: 0.686 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Reconstruction to Concrete Pavement)
EAO: P 30,000.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02765 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Improvement of Critical Intersections including installation of Rockfall Netting at Jct. Shrine Hills along Davao City Diversion Road, Davao City
Physical Target:
CW1: 40,000.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 400,000,000.00
CW1: P 386,000,000.00 (Construction of Road Slope Protection Structure)
EAO: P 14,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Improvement of Critical Intersections including installation of Rockfall Netting at Jct. Shrine Hills along Davao City Diversion Road, Davao City
Physical Target:
CW1: 3,120.08 sq. m. (Construction of Road Slope Protection Structure)
CW2: 1.00 intersection (Off-Carriageway Improvement: Flaring of Intersection/Improvement of Intersection)
ROW: 19,300.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 400,000,000.00
CW1: P 174,381,127.00 (Construction of Road Slope Protection Structure)
CW2: P 18,618,873.00 (Off-Carriageway Improvement: Flaring of Intersection/Improvement of Intersection)
ROW: P 193,000,000.00 (ROW Acquisition)
EAO: P 14,000,000.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02760 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1474+091 - K1474+714
Physical Target:
CW1: 8,958.74 sq. m. (Off-Carriageway Improvement: Construction of Bike Lanes)
Allocation:
TOTAL: P 35,797,000.00
CW1: P 35,081,060.00 (Off-Carriageway Improvement: Construction of Bike Lanes)
EAO: P 715,940.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1477+154 - K1477+405
Physical Target:
CW1: 9,713.70 sq. m. (Off-Carriageway Improvement: Construction of Bike Lanes)
Allocation:
TOTAL: P 35,797,000.00
CW1: P 35,081,060.00 (Off-Carriageway Improvement: Construction of Bike Lanes)
EAO: P 715,940.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02661 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Coastal Protection Protecting Surigao Del Sur Bdry. - Davao Oriental Coastal Road (Tarragona Section), Caraga, Davao Oriental (Sta. 0+000 - Sta. 0+360)
Physical Target:
CW1: 374.173 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 32,191,000.00
CW1: P 31,547,180.00 (Construction of Flood Mitigation Structure)
EAO: P 643,820.00
TO: OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Coastal Protection Protecting Surigao Del Sur Bdry - Davao Oriental Coastal Road (Tarragona Section), Tarragona, Davao Oriental (Sta. 0+000 - Sta. 0+360)
Physical Target:
CW1: 374.173 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 32,191,000.00
CW1: P 31,547,180.00 (Construction of Flood Mitigation Structure)
EAO: P 643,820.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02673 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd - K1507+925 - K1508+211
Physical Target:
CW1: 4,647.270 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd -
K1508+000 - K1508+040, K1508+120 - K1508+200
Physical Target:
CW1: 3,423.400 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02666 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd -
K1501+212 - K1501+368, K1502+343 - K1502+478
Physical Target:
CW1: 9,300.000 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 65,138,000.00
CW1: P 62,858,170.00 (Construction of Road Slope Protection Structure)
EAO: P 2,279,830.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd - K1504+803 - K1504+880
Physical Target:
CW1: 2,674.050 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 65,138,000.00
CW1: P 62,858,170.00 (Construction of Road Slope Protection Structure)
EAO: P 2,279,830.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02658 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd - K1507+500 - K1507+638
Physical Target:
CW1: 3,947.368 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 75,000,000.00
CW1: P 72,375,000.00 (Construction of Road Slope Protection Structure)
EAO: P 2,625,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd - K1507+500 - K1507+619
Physical Target:
CW1: 3,137.450 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 75,000,000.00
CW1: P 72,375,000.00 (Construction of Road Slope Protection Structure)
EAO: P 2,625,000.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02655 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd - K1505+029 - K1505+129, K1505+166 - K1505+310
Physical Target:
CW1: 7,820.000 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 67,358,000.00
CW1: P 65,000,470.00 (Construction of Road Slope Protection Structure)
EAO: P 2,357,530.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd - K1505+166 - K1505+290
Physical Target:
CW1: 3,085.630 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 67,358,000.00
CW1: P 65,000,470.00 (Construction of Road Slope Protection Structure)
EAO: P 2,357,530.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02696 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basin and Principal Rivers
Construction of Flood Mitigation Structure along Talomo River, Teacher's Village Section, Right Bank, Davao City
Physical Target:
CW1: 500.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,450,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basin and Principal Rivers
Construction of Flood Mitigation Structure along Talomo River, Teacher's Village Section, Right Bank, Davao City
Physical Target:
CW1: 260.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,450,000.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02693 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Drainage and Protection Works - Local Infrastructure Program
Construction/Upgrading of Drainage Structure, Barangay 17-B, Davao City
Physical Target:
CW1: 200.00 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,500,000.00
CW1: P 3,465,000.00 (Construction of Drainage Structure)
EAO: P 35,000.00
TO: Local Program - Flood Control and Drainage - Drainage and Protection Works - Local Infrastructure Program
Construction/Upgrading of Drainage Structure, Barangay 17-B, Davao City
Physical Target:
CW1: 159.00 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,500,000.00
CW1: P 3,465,000.00 (Construction of Drainage Structure)
EAO: P 35,000.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02699 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Davao-Agusan Rd-DAPECOL Compound Rd (Channelization) - (S00085MN) Chainage 000 - Chainage 288
Physical Target:
CW1: 288.000 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 14,092,000.00
CW1: P 13,810,160.00 (Construction of Drainage Structure along Road)
EAO: P 281,840.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Davao-Agusan Rd-DAPECOL Compound Rd (Channelization) - (S00085MN) Chainage 000 - Chainage 220
Physical Target:
CW1: 220.000 lm (Construction of Drainage Structure along Road)
ROW: 880.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 14,092,000.00
CW1: P 12,732,160.00 (Construction of Drainage Structure along Road)
ROW: P 1,078,000.00 (ROW Acquisition)
EAO: P 281,840.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02700 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd - K1480+532 - K1483+905
Physical Target:
CW1: 6.698 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 42,945,000.00
CW1: P 42,086,100.00(Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 858,900.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd -
K1467+985 - K1470+270, K1470+300 - K1470+773
Physical Target:
CW1: 6.100 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 42,945,000.00
CW1: P 42,086,100.00(Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 858,900.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02483 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Babak-Samal-Kaputian Rd - K1502+249 - K1504+600
Physical Target:
CW1: 4.650 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,469,000.00
CW1: P 29,859,620.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 609,380.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Babak-Samal-Kaputian Rd - K1501+(-508) - K1501+280
Physical Target:
CW1: 3.152 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,469,000.00
CW1: P 29,859,620.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 609,380.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02489 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Kapalong-Talaingod-Valencia (Bukidnon) Rd -
K1497+480 - K1497+507.40, K1511+003 - K1511+031,
K1511+407 - K1511+432, K1512+200 - K1512+233
Physical Target:
CW1: 2,823.250 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1497+446 - K1497+500,
K1520+640 - K1520+680, K1503+925 - K1503+968
Physical Target:
CW1: 2,636.620 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,000,000.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02607 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of Road, Barangay Sta. Cruz, Talicud Island to Purok Tisa to Leticia by the Sea Resort to Drilon, Lindgreen and Lanos Beaches, Island Garden City of Samal, Davao Del Norte
Physical Target:
CW1: 5.059 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Concrete Road)
EAO: P 2,450,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of Road, Barangay Sta. Cruz, Talicud Island to Purok Tisa to Leticia by the Sea Resort to Drilon, Lindgreen and Lanos Beaches, Island Garden City of Samal, Davao Del Norte
Physical Target:
CW1: 5.353 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Concrete Road)
EAO: P 2,450,000.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02604 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Tanglaw-Dujali-Carmen-Tagum Road, Sto. Tomas and B.E. Dujali, Davao del Norte
Physical Target:
CW1: 5.620 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Construction of Concrete Road)
EAO: P 1,750,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Tanglaw-Dujali-Carmen-Tagum Road, Sto. Tomas and B.E. Dujali, Davao del Norte
Physical Target:
CW1: 5.150 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Concrete Road)
EAO: P 2,450,000.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02606 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete road Jct. National Road from Zone 1 to Zone 6, Brgy. Villarica, Island Garden City of Samal, Davao del Norte
Physical Target:
CW1: 4.139 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Concrete Road)
EAO: P 800,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete road Jct. National Road from Zone 1 to Zone 6, Brgy. Villarica, Island Garden City of Samal, Davao del Norte
Physical Target:
CW1: 2.616 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Concrete Road)
EAO: P 800,000.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02594 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road at Brgy. Tanglaw to Panabo Tagum Circumferential Road (Section A), Brgy. Tanglaw, BE Dujali, Davao Del Norte
Physical Target:
CW1: 0.570 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road at Brgy. Tanglaw to Panabo Tagum Circumferential Road (Section A), Brgy. Tanglaw, BE Dujali, Davao Del Norte
Physical Target:
CW1: 0.450 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02710 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basin and Principal Rivers
Construction of Revetment along Manat River leading to Agusan River, Brgy. Banlag, Monkayo, Davao de Oro (Sta. 3+671.557 - Sta. 3+943.541)
Physical Target:
CW1: 627.050 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Flood Mitigation Structure)
EAO: P 3,500,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basin and Principal Rivers
Construction of Revetment along Manat River leading to Agusan River, Brgy. Banlag, Monkayo, Davao de Oro (Sta. 2+015.420 - Sta. 2+493.590 LS, Sta. 0+020 - Sta. 0+135 LS & RS)
Physical Target:
CW1: 627.050 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Flood Mitigation Structure)
EAO: P 3,500,000.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02698 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Dacudao Rd - K1507+(-726) - K1507+861
Physical Target:
CW1: 6.348 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 34,857,000.00
CW1: P 34,159,860.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 697,140.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Dacudao Rd - K1507+070 - K1507+800
Physical Target:
CW1: 1.814 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 34,857,000.00
CW1: P 34,159,860.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 697,140.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02701 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Buhangin-Lapanday Flyover - K1506+(-038) - K1506+219
Physical Target:
CW1: 0.514 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 3,404,000.00
CW1: P 3,335,920.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 68,080.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Dacudao Rd - K1507+070 - K1507+800
Physical Target:
CW1: 0.216 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 3,404,000.00
CW1: P 3,335,920.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 68,080.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02691 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Drainage and Protection Works - Local Infrastructure Program
Construction/Upgrading of Drainage Structure, Barangay 16-B, Davao City
Physical Target:
CW1: 200.00 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,500,000.00
CW1: P 3,465,000.00 (Construction of Drainage Structure)
EAO: P 35,000.00
TO: Local Program - Flood Control and Drainage - Drainage and Protection Works - Local Infrastructure Program
Construction/Upgrading of Drainage Structure, Barangay 16-B, Davao City
Physical Target:
CW1: 150.00 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,500,000.00
CW1: P 3,465,000.00 (Construction of Drainage Structure)
EAO: P 35,000.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02736 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Asphalt Overlay of Davao Cotabato Road, Digos (JCT. Digos-Cotabato Section) (S00163MN) 1569+727 - 1571+445
Physical Target:
CW1: 5.824 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Asphalt Overlay of Davao Cotabato Road, Digos (JCT. Digos-Cotabato Section) (S00163MN)
K1573+032 - K1573+893, K1576+173 - K1576+768
Physical Target:
CW1: 5.824 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02718 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, NRJ Agusan-Davao Road Guadalupe, Carmen Section to Upper Tuganay-Mabaus-Kinamayan-Tibal-Og, Sto. Tomas, Davao del Norte
Physical Target:
CW1: 4.060 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 81,700,000.00
CW1: P 78,840,500.00 (Construction of Concrete Road)
EAO: P 2,859,500.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, NRJ Agusan-Davao Road Guadalupe, Carmen Section to Upper Tuganay-Mabaus-Kinamayan-Tibal-Og, Sto. Tomas, Davao del Norte
Physical Target:
CW1: 3.920 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 81,700,000.00
CW1: P 78,840,500.00 (Construction of Concrete Road)
EAO: P 2,859,500.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02727 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building (LTO Building), Dujali, Panabo, Davao Del Norte
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00(Construction of Multi-Purpose Building)
EAO: P 700,000.00
TO: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building (LTO Building), Panabo City, Davao Del Norte
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00(Construction of Multi-Purpose Building)
EAO: P 700,000.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02738 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1461+560 - K1461+793
Physical Target:
CW1: 3,350.45 sq. m. (Off-Carriageway Improvement: Construction of Bike Lanes)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Off-Carriageway Improvement: Construction of Bike Lanes)
EAO: P 200,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1458+000 - K1458+960
Physical Target:
CW1: 7,347.32 sq. m. (Off-Carriageway Improvement: Construction of Bike Lanes)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Off-Carriageway Improvement: Construction of Bike Lanes)
EAO: P 200,000.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02711 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) - K1450+134 - K1450+618
Physical Target:
CW1: 968.000 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 30,0000,000.00
CW1: P 29,400,000.00 (Construction of Drainage Structure along Road)
EAO: P 600,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) -
K1450+972.10 - K1451+415 L/S, K1451+018.10 - K1451+415 R/S
Physical Target:
CW1: 853.800 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 30,0000,000.00
CW1: P 29,400,000.00 (Construction of Drainage Structure along Road)
EAO: P 600,000.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02735 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Daang Maharlika (MN) - K1438+981 - K1440+362
Physical Target:
CW1: 2.792 Lane Km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Road Widening)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Daang Maharlika (MN) - K1438+981 - K1439+835
Physical Target:
CW1: 1.720 Lane Km (Road Widening)
ROW: 17,200.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 46,500,000.00 (Road Widening)
ROW: P 2,500,000.000 (ROW Acquisition)
EAO: P 1,000,000.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02706 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Rehabilitation/Improvement of Road from Cabuyoan to Brgy. Anitapan, Mabini, Davao de Oro
Physical Target:
CW1: 1.550 Lane Km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Rehabilitation of Concrete Road)
EAO: P 1,750,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Rehabilitation/Improvement of Road from Cabuyoan to Brgy. Anitapan, Mabini, Davao de Oro
Physical Target:
CW1: 3.680 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Construction of Concrete Road)
EAO: P 1,750,000.00
|
August 11, 2021 |
FY 2021 GAA |
WIN1E02733 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1488+057 - K1488+600
Physical Target:
CW1: 3.258 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 29,442,000.00
CW1: P 28,853,160.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 588,840.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1488+057 - K1488+456
Physical Target:
CW1: 1.596 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 29,442,000.00
CW1: P 28,853,160.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 588,840.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02747 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1511+684 - K1511+764 (L/S)
Physical Target:
CW1: 0.000 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1511+741 - K1511+795
Physical Target:
CW1: 1,984.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02720 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd -
K1505+522 - K1505+679, K1505+920 - K1506+000
Physical Target:
CW1: 5.000 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 95,000,000.00
CW1: P 91,675,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,325,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd - K1505+522 - K1505+646
Physical Target:
CW1: 4,026.32 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 95,000,000.00
CW1: P 91,675,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,325,000.00 |
August 11, 2021 |
FY 2021 GAA |
WIN1E02734 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Quezon Blvd (MN) - K1510+225
Physical Target:
CW1: 1,200.000 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 50,0000,000.00
CW1: P 49,000,000.00 (Construction of Drainage Structure along Road)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Quezon Blvd (MN) - K1510+225
Physical Target:
CW1: 2,759.000 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 50,0000,000.00
CW1: P 49,000,000.00 (Construction of Drainage Structure along Road)
EAO: P 1,000,000.00 |