August 2, 2021 |
2021 |
WIN1C04313 |
GAA 2021 |
July 16, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Rehabilitation of Peñarrubia Cawaw Road, Peñarrubia, Abra;
Physical Target: CW1: 3.72 Lane Km;
Allocation= Php 50,000,000
To: Rehabilitation of Peñarrubia Cawaw Road, Peñarrubia, Abra;
Physical Target: CW1: 5.066 Lane Km;
Allocation= Php 50,000,000
|
August 2, 2021 |
2021 |
WIN1C04400 |
GAA 2021 |
July 28, 2021 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
From: Construction of Sta. Filomena Floodway / Flood Control Structure, Sta. Filomena, Calanasan, Apayao;
Physical Target: CW1: 100 Lineal meters;
Allocation= Php 10,000,000
To: Construction of Sta. Filomena Floodway / Flood Control Structure, Sta. Filomena, Calanasan, Apayao;
Physical Target: CW1: 45 Lineal meters;
Allocation= Php 10,000,000
|
August 2, 2021 |
2021 |
WIN1C04346 |
GAA 2021 |
July 19, 2021 |
Cordillera Administrative Region |
Baguio City District Engineering Office |
From: South Drive- K0252+755;
Type of Work: Off-Carriageway Improvement: Flaring of Intersections / Improvement of Intersections;
Physical Target: CW1: 1 No. of Intersection;
Allocation= Php 5,000,000
To: South Drive- K0251+755 – K0252+595;
Type of Work: Off-Carriageway Improvement: Shoulder Paving/ Construction;
Physical Target: CW1: 1,260 Square meters;
Allocation= Php 5,000,000
|
August 2, 2021 |
2021 |
WIN1C04408 |
GAA 2021 |
July 28, 2021 |
Cordillera Administrative Region |
Baguio City District Engineering Office |
From: Construction of Road, Iron Street Purok 6, Upper Quezon Hill, Baguio City;
Physical Target: CW1: 0.08 Lane Km;
Allocation= Php 3,000,000
To: Construction of Road, Iron Street Purok 7, Upper Quezon Hill, Baguio City;
Physical Target: CW1: 0.08 Lane Km;
Allocation= Php 3,000,000
|
August 2, 2021 |
2021 |
WIN1C04360 |
GAA 2021 |
July 22, 2021 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Road Slope Protection Project along Governor Bado Dangwa National Road, Mayus, Poblacion, Kibungan, Benguet, K0320 + 442 - K0320 + 542;
Physical Target: CW1: 1800 Square meter;
Allocation= Php 50,000,000
To: Road Slope Protection Project along Governor Bado Dangwa National Road, Mayus, Poblacion, Kibungan, Benguet, K0320 + 442 - K0320 + 592;
Physical Target: CW1: 2,493.55 Square meter;
Allocation= Php 50,000,000
|
August 2, 2021 |
2021 |
WIN1C04362 |
GAA 2021 |
July 22, 2021 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Construction of Guinaoang Flood Control Sta. 21+404 - Sta. 21+644 (R.S.), Mankayan, Benguet;
Physical Target: CW1: 240 Lineal meters;
Allocation= Php 10,000,000
To: Construction of Guinaoang Flood Control Sta. 21+404 - Sta. 21+527 (R.S.), Sta. 21+441 - Sta. 21+561 (L.S.), Mankayan, Benguet;
Physical Target: CW1: 240 Lineal meters;
Allocation= Php 10,000,000
|
August 2, 2021 |
2021 |
WIN1C04366 |
GAA 2021 |
July 22, 2021 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Construction of Balili Flood Control Sta. 1+429 - 2+149 (R.S.), Mankayan, Benguet;
Physical Target: CW1: 735 Lineal meters;
Allocation= Php 30,000,000
To: Construction of Balili Flood Control Sta. 1+429 - Sta. 1+698 (L.S.), Sta. 1+445 - Sta. 1+698 (R.S.), Sta. 1+711 - Sta. 1+849 (L.S.), Sta. 1+727 - Sta. 1+803(R.S.), Mankayan, Benguet;
Physical Target: CW1: 735 Lineal meters;
Allocation= Php 30,000,000
|
August 2, 2021 |
2021 |
WIN1C04369 |
GAA 2021 |
July 22, 2021 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Construction of Copias Flood Control Sta. 5+120 - Sta. 5+360 (L.S.),Kapangan, Benguet;
Physical Target: CW1: 240 Lineal meters;
Allocation= Php 10,000,000
To: Construction of Copias Flood Control Sta. 5+264 - Sta. 5+434 (R.S.),Kapangan, Benguet;
Physical Target: CW1: 185 Lineal meters;
Allocation= Php 10,000,000
|
August 2, 2021 |
2021 |
WIN1C04364 |
GAA 2021 |
July 22, 2021 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Construction of Palina Flood Control Sta. 3+238 - Sta. 3+358 (B.S.), Kibungan, Benguet;
Physical Target: CW1: 195 Lineal meters;
Allocation= Php 10,000,000
To: Construction of Palina Flood Control Sta. 3+322 - Sta. 3+437 (L.S.), Sta. 3+322 - Sta. 3+400 (R.S.), St. 4+126 - Sta. 4+166 (L.S.), Sta. 4+125 - Sta. 4+150 (R.S.), Kibungan, Benguet;
Physical Target: CW1: 195 Lineal meters;
Allocation= Php 10,000,000
|
August 2, 2021 |
2021 |
WIN1C04363 |
GAA 2021 |
July 22, 2021 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Construction of Mayus Flood Control Sta. 0+158 - Sta. 0+278 (B.S.), Kibungan, Benguet;
Physical Target: CW1: 220 Lineal meters;
Allocation= Php 10,000,000
To: Construction of Mayus Flood Control Sta. 0+158 - Sta. 0+278 (R.S.), Sta. 0+187 - Sta. 0+292 (L.S.), Kibungan, Benguet;
Physical Target: CW1: 220 Lineal meters;
Allocation= Php 10,000,000
|
August 2, 2021 |
2021 |
WIN1C04371 |
GAA 2021 |
July 23, 2021 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: National Road System along Kalinga-Abra Road(Balbalan Section), K0497+505-K0497+651, Balbalan, Kalinga;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 0.292 Lane Km;
Allocation= Php 60,000,000
To: National Road System along Kalinga-Abra Road (Balbalan Section), K0487+1235-K0487+1260, K0487+1310-K0487+1381, K0489+081-K0489+211, K0489+286-K0489+500, K0489+1715-K0489+1755, K0494+055–K0494+201, K0497+440-K0497+618, Balbalan, Kalinga;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 1.608 Lane Km
CW2: 2,065.65 Square meters;
Allocation= Php 60,000,000
|
August 2, 2021 |
2021 |
WIN1C04367 |
GAA 2021 |
July 22, 2021 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Construction of Saliok Flood Control, Sta. 129 + 695 – Sta. 129 + 835 (L.S.), Sta. 129 + 775 – Sta. 129 + 875 (R.S.), Natonin, Mountain Province;
Physical Target: CW1: 262 Lineal meters;
Allocation= Php 20,000,000
To: Construction of Saliok Flood Control, Sta. 129 + 875 - Sta. 130 + 137(R.S.), Natonin, Mountain Province;
Physical Target: CW1: 262 Lineal meters;
Allocation= Php 20,000,000
|
July 30, 2021 |
FY 2021 GAA |
WIN1F06382 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 300116204224000
Project ID : P00562485LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road at
Mansalay, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
6.50 Lane Km
Allocation : Php 39.00 Million
TO :
Concreting of Road at
Mansalay, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
7.3040 Lane Km
Allocation : Php 39.00 Million |
July 30, 2021 |
FY 2021 GAA |
WIN1F06347 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 300116204225000
Project ID : P00562486LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road at
Roxas, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
6.00 Lane Km
Allocation : Php 36.00 Million
TO :
Concreting of Road at
Roxas, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
6.00 Lane Km
Allocation : Php 36.00 Million
TO :
Concreting of Road at
Roxas, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
6.0192 Lane Km
Allocation : Php 36.00 Million |
July 30, 2021 |
CY 2021 |
WIN1F06599 |
UACS No. 310205100513000 |
June 28, 2021 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 310205100513000
Project ID.: P00506024LZ
OO1: Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links / New Roads
Laguna Lake Highway Extension (Phase 2), Taguig City
Physical Target: CW1 = Construction of Concrete Road 10.80 lane Km
Unit Cost (P’000) = P 10,722.22 / l.m.
Allocation (P’000) = P 115,800.00
EAO (P’000) = P 4,200.00
Total (P’000) = P 120,000.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links / New Roads
Laguna Lake Highway Extension (Phase 2), Taguig City
Physical Target: CW1 = Construction of Concrete Road 1.52 lane Km
CW2 = RROW 1,428.57 sq.m
Unit Cost (P’000) = P 69,923.37 / lane km. 140 m/km
= P 7.00 / sq.m.
Allocation (P’000) = P 106,283.52
= P 10,000.00
EAO (P’000) = P 3,716.48
Total (P’000) = P 120,000.00
WIN1F06599
|
July 30, 2021 |
CY 2021 |
WIN1F06601 |
UACS No. 310205100510000 |
June 28, 2021 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 310205100510000
Project ID.: P00506025LZ
OO1: Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links / New Roads
Laguna Lake Highway Extension (Phase 1), Muntinlupa City
Physical Target: CW1 = Construction of Concrete Road 10.80 lane Km
Unit Cost (P’000) = P 10,722.22 / l.m.
Allocation (P’000) = P 115,800.00
EAO (P’000) = P 4,200.00
Total (P’000) = P 120,000.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links / New Roads
Laguna Lake Highway Extension (Phase 2), Muntinlupa City
Physical Target: CW1 = Construction of Concrete Road 1.27 lane Km
CW2 = RROW 1,428.57 sq.m
Unit Cost (P’000) = P 83,686.15 / lane km. P166 m/km
= P 7.00 / sq.m.
Allocation (P’000) = P 106,281.41
= P 10,000.00
EAO (P’000) = P 3,718.59
Total (P’000) = P 120,000.00
WIN1F06601
|
July 30, 2021 |
CY 2021 |
WIN1F06600 |
UACS No. 31020510052000 |
June 28, 2021 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 31020510052000
Project ID.: P00506026LZ
OO1: Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links / New Roads
Laguna Lake Highway Extension (Phase 2), Muntinlupa City
Physical Target: CW1 = Construction of Concrete Road 10.80 lane Km
Unit Cost (P’000) = P 10,722.22 / l.m.
Allocation (P’000) = P 115,800.00
EAO (P’000) = P 4,200.00
Total (P’000) = P 120,000.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links / New Roads
Laguna Lake Highway Extension (Phase 2), Muntinlupa City
Physical Target: CW1 = Construction of Concrete Road 1.27 lane Km
CW2 = RROW 1,428.57 sq.m
Unit Cost (P’000) = P 73,296.76 / lane km. P146 m/km
= P 7.00 / sq.m.
Allocation (P’000) = P 106,280.31
= P 10,000.00
EAO (P’000) = P 3,719.69
Total (P’000) = P 120,000.00
WIN1F06600
|
July 30, 2021 |
2021 |
WIN1F06469 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Regional Office VI |
FROM:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Road Section Comprising Barangay Gov. Evelio B. Javier (Lanag) to
Bongbongan II, Hamtic, Antique
CW1- Construction of Concrete Road: 3.572 lane km - 39,600.00
EAO - 400.00
Total: 40,000.00
TO:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Road Section Comprising Barangay Gov. Evelio B. Javier (Lanag) to
Bongbongan II, Hamtic, Antique
CW1- Construction of Concrete Road: 3.572 lane km - 39,600.00
EAO - 400.00
Total: 40,000.00
|
July 30, 2021 |
2021 |
WIN1F06280 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Antique District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Bridge - Widening of Permanent Bridges
Igbawaran Br. (B00326PN) along Iloilo-Antique Rd
CW1- Widening of Bridge: 155.311 sq.m - 22,389.08
EAO - 456.92
Total: 22,846.00
TO:
OO1: Ensure Safe and Reliable National Road System
Bridge - Widening of Permanent Bridges
Igbawaran Br. (B00326PN) along Iloilo-Antique Rd
CW1- Widening of Bridge: 183.96 sq.m - 21,489.08
ROW Acquisition: 1,668 sq.m - 900.00
EAO - 456.92
Total: 22,846.00
|
July 30, 2021 |
2021 |
WIN1F06169 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Antique District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo-Antique Rd - K0151 + 681 - K0152 + 111
CW1- Reconstruction to Concrete Pavement:
0.87 lane km - 17,409.70
EAO - 355.30
Total: 17,765.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo-Antique Rd - K0151+576 – K0152+380
CW1- Reconstruction to Concrete Pavement:
1.562 lane km - 17,409.70
EAO - 355.30
Total: 17,765.00
|
July 30, 2021 |
2021 |
WIN1F06125 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Antique District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Odiong-Sibalom-Sn Remigio-Leon Rd - K0124 + 440 - K0126 + 581
CW1- Construction of Road Slope Protection Structure:
2127.867 sq.m - 31,279.64
EAO - 638.36
Total: 31,918.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Odiong-Sibalom-Sn Remgio-Leon Rd- K0124+440 – K0124+510, K0127+070 – K0127+093, K0127+218 – K0127+313, K0134+(-088) – K0134+(-065), K0134+033 –K0134+081.50, K0134+291 – K0134+340, K0134+554.80 -K0134+581
CW1- Construction of Road Slope Protection Structure:
1,759.40 sq.m - 31,279.64
EAO - 638.36
Total: 31,918.00
|
July 30, 2021 |
2021 |
WIN1F06125 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Antique District Engineering Office |
FROM:
OO2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structures along Sibalom River, Barangay Igbonglo, San Jose, Antique
CW1- Construction of Flood Mitigation Structure:
244 lineal meters - 49,000.00
EAO - 1,000.00
Total: 50,000.00
TO:
OO2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structures along Sibalom River, Barangay San Pedro, San Jose, Antique
CW1- Construction of Flood Mitigation Structure:
244 lineal meters - 49,000.00
EAO - 1,000.00
Total: 50,000.00 |
July 30, 2021 |
2021 |
WIN1F06125 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Antique District Engineering Office |
FROM:
OO2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structures along Sibalom River, Barangay Igbonglo, San Jose, Antique
CW1- Construction of Flood Mitigation Structure:
244 lineal meters - 49,000.00
EAO - 1,000.00
Total: 50,000.00
TO:
OO2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structures along Sibalom River, Barangay San Pedro, San Jose, Antique
CW1- Construction of Flood Mitigation Structure:
244 lineal meters - 49,000.00
EAO - 1,000.00
Total: 50,000.00 |
July 30, 2021 |
FY 2021 GAA |
WIN1F06387 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 1st District Engineering Office |
UACS No. : 310203100466000
Project ID : P00505155LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
FROM :
Coron - Busuanga Road,
K0040 + 798 - K0042 + 000
Physical Target - CW1 - Road Widening : 2.400 Lane Km
Allocation : Php 35.285 Million
TO :
Coron - Busuanga Road,
K0040 + 798 - K0041 + 461.50
Physical Target - CW1 - Road Widening : 1.327 Lane Km
Allocation : Php 365.285 Million |
July 30, 2021 |
2021 |
WIN1F06545 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Regional Office VI |
FROM:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects
Construction of Concrete Bridge, Barangay Tamayoc, Municipality of Patnongon, Antique
CW1- Construction of Bridge: 712.50 sq.m - 29,400.00
EAO - 600.00
Total: 30,000.00
TO:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects
Construction of Concrete Bridge, Barangay Tamayoc, Municipality of Patnongon, Antique
CW1- Construction of Bridge: 715.50 sq.m - 29,400.00
EAO - 600.00
Total: 30,000.00
|
July 30, 2021 |
FY 2021 GAA |
WIN1F06381 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 1st District Engineering Office |
UACS No. : 300117209127000
Project ID : P00564680LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Local Infrastructure Program
FROM :
Upgrading of Lungsod - Lagariao FMR,
Cuyo, Palawan
Physical Target - CW1 - Rehabilitation of Concrete Road :
2.061 Lane Km
Allocation : Php 15.00 Million
TO :
Upgrading of Lungsod - Lagaoriao FMR,
Cuyo, Palawan
Physical Target - CW1 - Rehabilitation of Concrete Road :
2.246 Lane Km
Allocation : Php 15.00 Million
|
July 30, 2021 |
FY 2021 GAA |
WIN1F06331 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 310205100685000
Project ID : P00515600LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/New Roads
FROM :
Palawan Circumferential Road
( Latud - Canipaan Section )
Physical Target - CW1 - Construction of Concrete Road :
1.500 Lane Km
Allocation : Php 30.00 Million
TO :
Palawan Circumferential Road
( Latud - Canipaan Section )
Physical Target - CW1 - Construction of Concrete Road :
2.400 Lane Km
Allocation : Php 30.00 Million |
July 30, 2021 |
FY 2021 GAA |
WIN1F06365 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No. : 310105100554000
Project ID : P00505449LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads
FROM :
Puerto Princesa South Road,
K0010 + 543 - K0011 + 000
Physical Target - CW1 - Reconstruction to Concrete Pavement :
1.014 Lane Km
Allocation : Php 21.898 Million
TO :
Puerto Princesa South Road,
K0010 + 543 - K0010 + 707,
K0010 + 781 - K0011 + 000,
K0011 + 000 - K0011 + 555,
K0012 + 850 - K0013 + 000
Physical Target - CW1 - Reconstruction to Concrete Pavement :
2.355 Lane Km
Allocation : Php 21.898 Million
|
July 30, 2021 |
FY 2021 GAA |
WIN1F06313 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No. : 310105100553000
Project ID : P00505612LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads
FROM :
Puerto Princesa Road,
K0001 + 393 - K0001 + 732.66
Physical Target - CW1 - Reconstruction to Concrete Pavement :
1.359 Lane Km
Allocation : Php 28.111 Million
TO :
Puerto Princesa South Road,
K0014 + 894 - K0015 + 820,
K0019 + 961 - K0020 + 151,
K0027 + 660 - K0028 + 037
Physical Target - CW1 - Reconstruction to Concrete Pavement :
2.986 Lane Km
Allocation : Php 28.111 Million |
July 29, 2021 |
2021 |
WIN1F06077 |
SR2021-02-004551 |
February 15, 2021 |
Region VI |
Regional Office VI |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Bacolod Negros Occidental Economic Highway (BANOCEH), Section 1, Package H, Negros Occidental
CW1- Road Widening: 4.847 lane km - 73,340.00
EAO - 2,660.00
Total: 76,000.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Bacolod Negros Occidental Economic Highway (BANOCEH), Section 1, Package H, Negros Occidental
CW1- Road Widening: 3.956 lane km - 73,340.00
EAO - 2,660.00
Total: 76,000.00 |
July 29, 2021 |
2021 |
WIN1F06199 |
SR2021-02-002182 |
February 4, 2021 |
Region VI |
Regional Office VI |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development- Road Widening - Primary Roads
Bacolod North Rd - K0118 + 531 - K0120 + 611
CW1- Road Widening: 4.146 lane km - 94,980.125
EAO - 3,444.875
Total: 98,425.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development- Road Widening - Primary Roads
Bacolod North Rd - K0118 + 531 - K0119 + 714
CW1- Road Widening: 2.378 lane km - 84,466.45
ROW Acquisition: 11,890 square meters - 10,513.675
EAO - 3,444.875
Total: 98,425.00
|
July 29, 2021 |
2021 |
WIN1F06194 |
SR2021-02-002199 |
February 4, 2021 |
Region VI |
Regional Office VI |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd - K0094 + 788 - K0098 + 000
CW1- Road Widening: 6.532 lane km - 95,505.085
EAO - 3,463.915
Total: 98,969.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd - K0094 + 444 - K0097 + 403
CW1- Road Widening: 5.992 lane km - 87,447.335
ROW Acquisition: 29,960 square meters - 8,057.75
EAO - 3,463.915
Total: 98,969.00
|
July 29, 2021 |
2021 |
WIN1F06112 |
SR2021-02-002166 |
February 4, 2021 |
Region VI |
Regional Office VI |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0073 + 300 - K0073 + 800
CW1- Construction of Road Slope Protection Structure:
4,218.75 sq.m - 72,375.00
EAO - 2,625.00
Total: 75,000.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0073 + 250 - K0073 + 800
CW1- Construction of Road Slope Protection Structure:
9,109.00 sq.m - 72,375.00
EAO - 2,625.00
Total: 75,000.00
|
July 29, 2021 |
FY 2021 GAA |
WIN1G02987 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Buhangin-Lapanday Flyover - (S01470MN) Chainage 000 - Chainage 294
Physical Target:
CW1: 0.588 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 3,229,000.00
CW1: P 3,164,420.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 64,580.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Buhangin-Lapanday Flyover - (S01470MN) Chainage 000 - Chainage 213
Physical Target:
CW1: 0.213 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 3,229,000.00
CW1: P 3,164,420.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 64,580.00 |
July 29, 2021 |
2021 |
WIN1F06084 |
SR2021-02-002155 |
February 4, 2021 |
Region VI |
Regional Office VI |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Kabankalan-Bais Rd - K0094 + 000 - K0094 + 529, K0095 + 500 - K0096 + 000, K0099 + 000 - K0100 + 000, K0101 + 000 - K0101 + 318
CW1- Preventive Maintenance of Road: Asphalt Overlay:
9.372 lane km - 49,436.95
EAO - 1,793.05
Total: 51,230.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Kabankalan-Bais Rd - K0094 + 000 - K0094 + 529, K0099 + 000 - K0100 + 000, K0101 + 000 - K0102 + 000
CW1- Preventive Maintenance of Road: Asphalt Overlay:
10.028 lane km - 49,436.95
EAO - 1,793.05
Total: 51,230.00 |
July 29, 2021 |
FY 2021 GAA |
WIN1G02976 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Daang Maharlika (MN) - (S01460MN) Chainage 030 - Chainage 1015
Physical Target:
CW1: 3.940 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 800,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Daang Maharlika (MN) - (S01460MN) Chainage 030 - Chainage 760
Physical Target:
CW1: 2.190 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 800,000.00 |
July 29, 2021 |
2021 |
WIN1F06088 |
SR2021-02-002161 |
February 4, 2021 |
Region VI |
Regional Office VI |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Bacolod North Rd - K0143 + 623 - K0144 + 000, K0144 + 363 - K0144 + 805
CW1- Reconstruction to Concrete Pavement:
2.536 lane km - 51,281.065
EAO - 1,859.935
Total: 53,141.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads –
Primary Roads
Bacolod North Rd - K0143 + 623 - K0144 + 056, K0144 + 317- K0144 + 939
CW1- Reconstruction to Concrete Pavement:
2.904 lane km - 51,281.065
EAO - 1,859.935
Total: 53,141.00
|
July 29, 2021 |
FY 2021 GAA |
WIN1G02967 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Drainage System Leading to Dacudao Maindrain, Davao City
Physical Target:
CW1: 3,028.133 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 58,664,000.00
CW1: P 56,610,760.00 (Construction of Drainage Structure)
EAO: P 2,053,240.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Drainage System Leading to Dacudao Maindrain, Davao City
Physical Target:
CW1: 1,500.000 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 58,664,000.00
CW1: P 56,610,760.00 (Construction of Drainage Structure)
EAO: P 2,053,240.00 |
July 29, 2021 |
FY 2021 GAA |
WIN1G02974 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
L Garcia St - K1508+(-205) - K1508+(-012)
Physical Target:
CW1: 0.772 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 4,239,000.00
CW1: P 4,154,220.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 84,780.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
L Garcia St - K1508+(-113) - K1508+(-012)
Physical Target:
CW1: 2.190 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 4,239,000.00
CW1: P 4,154,220.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 84,780.00 |
July 29, 2021 |
2021 |
WIN1F06098 |
SR2021-02-002249 |
February 4, 2021 |
Region VI |
Regional Office VI |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/ New Roads
Candoni-Gatuslao-Basay Bdry Road, Negros Occidental
CW1- Construction of Concrete Road: 4.025 lane km - 101,325.00
EAO - 3,675.00
Total: 105,000.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/ New Roads
Candoni-Gatuslao-Basay Bdry Road, Negros Occidental
CW1- Construction of Concrete Road: 4.960 lane km - 101,325.00
EAO - 3,675.00
Total: 105,000.00 |
July 29, 2021 |
2021 |
WIN1F06143 |
SR2021-02-002170 |
February 4, 2021 |
Region VI |
Regional Office VI |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Candoni-Sipalay Rd - K0144 + 050 - K0144 + 100
CW1- Construction of Road Slope Protection Structure:
7,285.974 sq.m - 57,900.00
EAO - 2,100.00
Total: 60,000.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Candoni-Sipalay Rd - K0144 + 126 - K0144 + 860, K0145 + 580 - K0146 + 126
CW1- Construction of Road Slope Protection Structure:
7,518.47 sq.m - 46,477.295
ROW Acquisition: 5,870 sq.m - 11,422.705
EAO - 2,100.00
Total: 60,000.00
|
July 29, 2021 |
2021 |
WIN1F06139 |
SR2021-02-002227 |
February 4, 2021 |
Region VI |
Regional Office VI |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Escalante City Circumferential Road, Negros Occidental
CW1- Construction of Concrete Road:
2.202 lane km - 39,362.35
ROW Acquisition: 67,540 sq.m - 28,187.65
EAO - 2,450.00
Total: 70,000.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Escalante City Circumferential Road, Negros Occidental
CW1- Construction of Concrete Road:
2.67526 lane km - 38,340.00
ROW Acquisition:
67,540 sq.m - 29,210.00
EAO - 2,450.00
Total: 70,000.00
|
July 29, 2021 |
2021 |
WIN1F06360 |
SR2021-02-004546 |
February 15, 2021 |
Region VI |
Regional Office VI |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
President Corazon C. Aquino Ave. - (S00558PN) Chainage 000 - Chainage 1233.5
CW1 - Construction of Drainage Structure along Road:
2,467 lineal meters - 8,685.00
EAO - 315.00
Total: 9,000.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
President Corazon C. Aquino Ave. - (S00558PN) Chainage 549 - Chainage 1203
CW1 - Construction of Drainage Structure along Road:
654 lineal meters - 8,685.00
EAO - 315.00
Total: 9,000.00
|
July 29, 2021 |
2021 |
WIN1F06587 |
SR2021-02-002211 |
February 4, 2021 |
Region VI |
Regional Office VI |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Bacolod Negros Occidental Economic Highway (BANOCEH), Section 1, Package I, Negros Occidental
CW1 - Construction of Drainage Structure along Road:
4,496 lineal meters - 86,850.00
CW2 - Widening of Bridge : 756 sq.m - 60,795.00
CW3 - Off-Carriageway Improvement: Construction of Bike Lanes : 6,253.41 sq.m - 42,055.665
EAO - 6,880.335
Total: 196,581.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Bacolod Negros Occidental Economic Highway (BANOCEH), Section 1, Package I, Negros Occidental
CW1 - Off-Carriageway Improvement: Construction of Bike Lanes : 9,331.84 sq.m - 141,488.665
CW2 - Construction of Road Slope Protection Structure:
10,145 sq.m - 48,212.00
EAO - 6,880.335
Total: 196,581.00
|
July 29, 2021 |
2021 |
300211100066000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 3rd District Engineering Office |
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Installation of Road Safety Devices Along Cagayan Valley Road (K0484+800 - K0488+207) |
July 29, 2021 |
FY 2021 GAA |
WIN1F06353 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310202100827000
Project ID : P00505153LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Calapan South Road,
K0106 + 000 - K0107 + 500
Physical Target - CW1 - Road Widening : 2.99 Lane Km
Allocation : Php 20.00 Million
TO :
Calapan South Road,
K0106 + 002.40 - K0106 + 880
Physical Target - CW1 - Road Widening : 1.755 Lane Km
Allocation : Php 20.00 Million |
July 29, 2021 |
FY 2021 GAA |
WIN1F06259 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310102100694000
Project ID : P00505616LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM :
Mindoro Oriental/Occidental East Coastal Road,
K0189 + 000 - K0189 + 482
Physical Target - CW1 - Preventive Maintenance : 0.964 Lane Km
Allocation : Php 9.298 Million
TO :
Mindoro Oriental/Occidental East Coastal Road,
K0189 + 000 - K0189 + 307
Physical Target - CW1 - Preventive Maintenance : 0.614 Lane Km
Allocation : Php 9.298 Million |
July 29, 2021 |
2021 |
WIN1F06592 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 4th District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Jct Bagonawa-La Castellana-Isabela Rd - K0043 + 239 - K0044 + 345
CW1- Construction of
Drainage Structure along Road: 2,214 lineal meters - 14,097.30
EAO - 287.70
Total: 14,385.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Jct Bagonawa-La Castellana-Isabela Rd - K0043 + 239 - K0044 + 345
CW1- Construction of
Drainage Structure along Road: 1,592 lineal meters - 14,097.30
EAO - 287.70
Total: 14,385.00 |
July 29, 2021 |
FY 2021 GAA |
WIN1F06397 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 300116203389000
Project ID : P00561886LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Pinamalayan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
12.50 Lane Km
Allocation : Php 75.00 Million
TO :
Concreting of Road,
Pinamalayan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
11.281 Lane Km
Allocation : Php 75.00 Million
|
July 29, 2021 |
2021 |
310106100579000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Batanes District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads - Sn Vicente - Savidug - Chavayan - Sumnanga - Nakanmuan Rd - K0007 + 312 - K0007 + 369, K0014 + (-005) - K0014 + 182 |
July 29, 2021 |
2021 |
310109100633000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Batanes District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Basco - Mahatao - Ivana - Uyugan - Imnajbu Rd - K0000 + 790 - K0000 + 850, K0000 + 912 - K0000 + 946 |
July 29, 2021 |
FY 2021 GAA |
WIN1F06350 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 300116204213000
Project ID : P00562474LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
So. Ilaya, Brgy. San Miguel - Brgy. Uyao - Brgy. Libertad,
Roxas, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.90 Lane Km
Allocation : 20.00 Million
TO :
Concreting of Road,
So. Ilaya, Brgy. San miguel - Brgy. Uyao - Brgy. Libertad,
Roxas, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
3.304 Lane Km
Allocation : Php 20.00 Million |
July 29, 2021 |
FY 2021 GAA |
WIN1F06349 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 300116204222000
Project ID : P00562483LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road at
Bongabong, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
7.50 Lane Km
Allocation : Php 45.00 Million
TO :
Concreting of Road at
Bongabong, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
7.23 Lane Km
Allocation : Php 45.00 Million
|
July 29, 2021 |
2021 |
310106100578000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Batanes District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Sn Vicente - Savidug - Chavayan - Sumnanga - Nakanmuan Rd - K0023 + 003 - K0023 + 190.25 |
July 29, 2021 |
2021 |
WIN1F06547 |
SR2021-02-001643 |
February 4, 2021 |
Region VI |
Regional Office VI |
FROM:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Rehabilitation/Improvement of Boracay Circumferential Road, Tambisaan Jetty Port Road and Boracay Jetty Port Road Junction to Cagban Jetty Port, Aklan
CW1- Rehabilitation of Concrete Road:
16.232 lane km - 135,100.00
EAO - 4,900.00
Total: 140,000.00
TO:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Rehabilitation/Improvement of Boracay Circumferential Road, Tambisaan Jetty Port Road and Boracay Jetty Port Road Junction to Cagban Jetty Port, Aklan
CW1- Rehabilitation of Concrete Road:
2.847 lane km - 135,100.00
EAO - 4,900.00
Total: 140,000.00 |
July 29, 2021 |
2021 |
WIN1F06547 |
SR2021-02-001643 |
February 4, 2021 |
Region VI |
Regional Office VI |
FROM:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Rehabilitation/Improvement of Boracay Circumferential Road, Tambisaan Jetty Port Road and Boracay Jetty Port Road Junction to Cagban Jetty Port, Aklan
CW1- Rehabilitation of Concrete Road:
16.232 lane km - 135,100.00
EAO - 4,900.00
Total: 140,000.00
TO:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Rehabilitation/Improvement of Boracay Circumferential Road, Tambisaan Jetty Port Road and Boracay Jetty Port Road Junction to Cagban Jetty Port, Aklan
CW1- Rehabilitation of Concrete Road:
2.847 lane km - 135,100.00
EAO - 4,900.00
Total: 140,000.00 |
July 29, 2021 |
2021 |
WIN1F06296 |
SR2021-02-004552 |
February 15, 2021 |
Region VI |
Regional Office VI |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Bacolod Negros Occidental Economic Highway (BANOCEH), Section 2, Segment 3, Package B,
Negros Occidental
CW1- Construction of Concrete Road: 1.968 lane km - 58,865.00
ROW Acquisition: 67,500 sq.m - 13,510.00
EAO - 2,625.00
Total: 75,000.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Bacolod Negros Occidental Economic Highway (BANOCEH), Section 2, Segment 3, Package B,
Negros Occidental
CW1- Construction of Concrete Road:
0.71852 lane km - 16,813.372
CW2- Construction of Concrete Bridge: 1,010.286 sq.m - 55,561.628
EAO - 2,625.00
Total: 75,000.00
|
July 29, 2021 |
2021 |
WIN1C04077 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bulacan 1st District Engineering Office |
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure, Sta. 0+000 - Sta. 0+456.00 along Babatnin, Malolos, Bulacan
|
July 29, 2021 |
2021 |
WIN1C04249 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 2nd District Engineering Office |
Network Development - Road Widening - Secondary Roads
Angeles - Porac - Floridablanca - Dinalupihan Rd, K0104+205 - K0106+000 |
July 28, 2021 |
FY 2021 GAA |
WIN1F06383 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204168000
Project ID : P00562429LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Brgy. Pahilahan - Brgy. Matulatula Road,
Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
3.978 Lane Km
Allocation : Php 25.00 Million
TO :
Concreting of Road,
Brgy. Pahilahan - Brgy. Matulatula Road,
Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.212 Lane Km
Allocation : Php 25.00 Million |
July 28, 2021 |
FY 2021 GAA |
WIN1F06386 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204175000
Project ID : P00562436LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Sitio Buena Vista, Brgy. Loyal,
Victoria, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road ;
4.740 Lane Km
Allocation : 25.00 Million
TO :
Concreting of Road,
Sitio Buena Vista, Brgy. Loyal,
Victoria, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
3.088 Lane Km
Allocation : Php 25.00 Million |
July 28, 2021 |
FY 2021 GAA |
WIN1G02970 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) - K1479+500 - K1480+761
Physical Target:
CW1: 2,200 ln. m. (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 55,000,000.00
CW1: P 53,075,000.00 (Construction of Drainage Structure along Road)
EAO: P 1,925,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1478+392
Physical Target:
CW1: 718 ln. m. (Construction of Drainage Structure along Road)
ROW: 2,872.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 55,000,000.00
CW1: P 47,767,500.00 (Construction of Drainage Structure along Road)
ROW: P 5,307,500.00 (ROW Acquisition)
EAO: P 1,925,000.00 |
July 28, 2021 |
CY 2021 |
WIN1F06594 |
UACS No. 300209100003000 |
April 30, 2021 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 300209100003000
Project ID.: P00531625LZ
Convergence and Special Support Program
Construction / Improvement of Access Roads leading to Railways Stations
Candido St. leading to Quirino Highway
Physical Target: CW1 = Construction of Drainage Structure 800 l.m.
CW2 = Shoulder Paving / Construction 1600 sq.m.
Unit Cost (P’000) = P 9.73 / l.m.
= P 3.21 / sq.m.
Allocation (P’000) = P 7,784.66
= P 5,136.70
EAO (P’000) = P 468.65
Total (P’000) = P 13,390.00
As Modified
Convergence and Special Support Program
Construction / Improvement of Access Roads leading to Railways Stations
Candido St. leading to Quirino Highway
Physical Target: CW1 = Shoulder Paving/Construction 767 sq.m.
Unit Cost (P’000) = P 11.53 / sq.m.
Allocation (P’000) = P 8,845.87
EAO (P’000) = P 309.61
Total (P’000) = P 9,155.48
Excess Amount = P 4,234.52
WIN1F06594
|
July 28, 2021 |
FY 2021 GAA |
WIN1G02992 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance (Asphalt Overlay) - Monteverde St. (Jct. Magsaysay Avenue - Jct. Guerrero St.), Davao City
Physical Target:
CW1: 3.339 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 38,600,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,400,000.00
TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance (Asphalt Overlay) - Monteverde St. (Jct. Magsaysay Avenue - Jct. Guerrero St.), Davao City
Physical Target:
CW1: 1.934 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 38,600,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,400,000.00 |
July 28, 2021 |
FY 2021 GAA |
WIN1G02985 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Rehabilitation of Drainage, Sto. Rosario Creek, Barangay Buhangin Proper, Davao City
Physical Target:
CW1: 300 Lineal Meters (Rehabilitation of Major Repair of Drainage Structure)
Allocation:
TOTAL: P 2,500,000.00
CW1: P 2,475,000.00 (Rehabilitation of Major Repair of Drainage Structure)
EAO: P 25,000.00
TO: Local Program - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Rehabilitation of Drainage, Sto. Rosario Creek, Barangay Buhangin Proper, Davao City
Physical Target:
CW1: 505 Lineal Meters (Rehabilitation of Major Repair of Drainage Structure)
Allocation:
TOTAL: P 2,500,000.00
CW1: P 2,475,000.00 (Rehabilitation of Major Repair of Drainage Structure)
EAO: P 25,000.00 |
July 28, 2021 |
FY 2021 GAA |
WIN1G02986 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Nabunturan-Maragusan Rd - K1471+000 - K1472+893
Physical Target:
CW1: 3.786 lane km (Road Widening)
Allocation:
TOTAL: P 61,789,000.00
CW1: P 59,626,385.00 (Road Widening)
EAO: P 2,162,615.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Nabunturan-Maragusan Rd - K1471+265 - K1472+925
Physical Target:
CW1: 3.320 lane km (Road Widening)
ROW: 33,320.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 61,789,000.00
CW1: P 54,626,385.00 (Road Widening)
ROW: P 5,000,000.00 (ROW Acquisition)
EAO: P 2,162,615.00 |
July 28, 2021 |
FY 2021 GAA |
WIN1F06363 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204182000
Project ID : P00562443LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concretinbg of Various Roads,
Calapan City, Oriental Mindoro
Physical Target - CW1- Construction of Concrete Road :
0.312 Lane Km
CW2 - Construction of Concrete Road :
0.312 Lane Km
CW3 - Construction of Concrete Road :
0.312 Lane Km
CW4 - Construction of Concrete Road :
0.312 Lane Km
CW5 - Construction of Concrete Road :
0.312 Lane Km
Allocation : Php 10.00 Million
TO :
Concreting of various Road,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.470 Lane Km
CW2 - Construction of Concrete Road :
0.197 lane Km
CW3 - Construction of Concrete Road :
0.343 Lane Km
CW4 - Construction of Concrete Road :
0.286 Lane Km
CW5 - Construction of Concrete Road :
0.452 Lane Km
Allocation : Php 10.00 million |
July 28, 2021 |
FY 2021 GAA |
WIN1F06368 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204186000
Project ID : P00562447LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Various Roads,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.906 Lane Km
CW2 - Construction of Concrete Road :
0.906 Lane Km
Allocation : Php 10.00 Million
TO :
Concreting of Various Road,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.649 Lane Km
CW2 - Construction of Concrete Road :
0.614 Lane Km
Allocation : Php 10.00 Million
|
July 28, 2021 |
FY 2021 GAA |
WIN1F06385 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. : 310105100550000
Project ID : P00505595LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads
FROM :
Mindoro West Coastal Road,
K0402 + 990 - K0403 + 409
Physical Target - CW1 - Reconstruction of Concrete Pavement :
1.064 Lane Km
Allocation : Php 22.990 Million
TO :
Mindoro West Coastal Road,
K0402 + 990 - K0403 + 738
Physical Target - CW1 - 1.722 Lane Km
Allocation : Php 22.990 Million
|
July 28, 2021 |
FY 2021 GAA |
WIN1G02989 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building, Barangay Tubod, Panabo City, Davao del Norte
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,980,000.00 (Construction of Multi-Purpose Building)
EAO: P 20,000.00
TO: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building, Barangay Tubod, Carmen, Davao del Norte
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,980,000.00 (Construction of Multi-Purpose Building)
EAO: P 20,000.00 |
July 28, 2021 |
FY 2021 GAA |
WIN1G02973 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Digos Div Rd -
K1562+(-444) - K1562+120, K1565+256 - K1566+210
Physical Target:
CW1: 2.990 Lane Km (Road Widening)
Allocation:
TOTAL: P 79,503,000.00
CW1: P 76,720,395.00 (Road Widening)
EAO: P 2,782,605.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Digos Div Rd - K1565+256 - K1566+198
Physical Target:
CW1: 1.838 Lane Km (Road Widening)
ROW: 15,796.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 79,503,000.00
CW1: P 38,488,395.00 (Road Widening)
ROW: P 38,232,000.00 (ROW Acquisition)
EAO: P 2,782,605.00 |
July 28, 2021 |
FY 2021 GAA |
WIN1F06373 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310202100825000
Project ID : P00505143LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Bongabong - Sagana - Roxas - San Aquilino Road,
K0128 + 809 - K0129 + 126
Physical Target - CW1 - Road Widening : 0.60 Lane Km
Allocation : Php 9.00 Million
TO :
Bongabong - Sagana - Roxas - San Aquilino Road,
K0128 + 808 - K0129 + 059
Physical Target - CW1 - Road Widening : 0.468 Lane Km
Allocation : Php 9.00 Million
|
July 28, 2021 |
2021 |
WIN1C04368 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Rehabilitation/Improvement of Pampanga River Flood Control Structure, Sta. 3+533.72 - Sta. 4+139.72, Julo, San Antonio, Nueva Ecija |
July 28, 2021 |
FY 2021 GAA |
WIN1F06356 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310208100351000
Project ID : P00505150LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement -
Secondary Roads
FROM :
Mindoro Oriental/Occidental East Coastal Road,
K0195 + 000 - K0195 + 545
Physical Target - CW1 - Shoulder Paving/Construction :
2,180.0 sq.m.
Allocation : Php 6.00 Million
TO :
Mindoro oriental/Occidental east Coastal road,
K0195 + 000 - K0195 + 258
Physical Target - CW1 - Shoulder Paving/Construction :
1,617.10 sq.m.
Allocation : Php 6.00 Million
|
July 28, 2021 |
2021 |
WIN1C04204 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Rehabilitation/Improvement of Pampanga River Flood Control Structure, Sta. 4+489.72 - Sta. 4+820.52, Julo, San Antonio, Nueva Ecija |
July 28, 2021 |
FY 2021 GAA |
WIN1G02975 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Pakiputan Wharf - K1501+(-032) - K1501+474
Physical Target:
CW1: 3.036 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 22,228,000.00
CW1: P 21,783,440.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 444,560.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Pakiputan Wharf - K1501+(-032) - K1501+296
Physical Target:
CW1: 1.312 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 22,228,000.00
CW1: P 21,783,440.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 444,560.00 |
July 28, 2021 |
2021 |
WIN1C04361 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads
Jose Abad Santos Ave (JASA) - K0100+636.60 - K0100+652.00, K0100+655 - K0100+963.40, K0099+886.60 - K0099+948.10, K0100+272.30 - K0100+453 |
July 28, 2021 |
2021 |
WIN1C04175 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (LZ) - K0101+020 - K0101+314
|
July 28, 2021 |
FY 2021 GAA |
WIN1G02969 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Dacudao Rd - K1509+(-760) - K1509+813
Physical Target:
CW1: 3.146 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 34,550,000.00
CW1: P 33,859,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 691,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Dacudao Rd - K1509+(-760) - K1509+(-184)
Physical Target:
CW1: 1.856 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 34,550,000.00
CW1: P 33,859,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 691,000.00 |
July 28, 2021 |
FY 2021 GAA |
WIN1G02968 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Drainage and Protection Works - Local Infrastructure Program
Improvement of Drainage Structure, Barangay 38-D, Davao City
Physical Target:
CW1: 360.00 Lineal meters (Rehabilitation/Major Repair of Drainage Structure)
Allocation:
TOTAL: P 3,500,000.00
CW1: P 3,465,000.00 (Rehabilitation/Major Repair of Drainage Structure)
EAO: P 35,000.00
TO: Local Program - Flood Control and Drainage - Drainage and Protection Works - Local Infrastructure Program
Improvement of Drainage Structure, Barangay 38-D, Davao City
Physical Target:
CW1: 260.00 Lineal meters (Rehabilitation/Major Repair of Drainage Structure)
Allocation:
TOTAL: P 3,500,000.00
CW1: P 3,465,000.00 (Rehabilitation/Major Repair of Drainage Structure)
EAO: P 35,000.00 |
July 28, 2021 |
2021 |
WIN1G02988 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. : 310305101269000
Project ID: P00502481MN
OO1: Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges
FROM:
Carac-an Parallel Br. along Surigao-Davao Coastal Rd
Type of Work:
CW1- Construction of Parallel Bridge
Physical Target:
CW1- 5564.16 Square meters
Allocation:
TOTAL: P 134,760,000
CW1: P 130,043,400
EAO: P 4,716,600
Unit Cost:
CW1: P 23,371.61/ Square meters
TO:
Carac-an Parallel Br. along Surigao-Davao Coastal Rd
Type of Work:
CW1- Construction of Parallel Bridge
Physical Target:
CW1- 5,301.62 Square meters
Allocation:
TOTAL: P 134,760,000
CW1: P 130,043,400
EAO: P 4,716,600
Unit Cost:
CW1: P 24,528.99/ Square meters |
July 28, 2021 |
2021 |
WIN1E02626 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. : 320102104198000
Project ID: P00522333MN
OO2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
FROM:
Construction of Bank Protection along Wawa River Protecting the National Road, along Bayugan - Esperanza Road (Crossing Luna Section), Agusan del Sur, Package 1
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 0.000 Lineal meters
Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000
Unit Cost:
CW1: P 0/ Lineal meters
TO:
Construction of Bank Protection along Wawa River Protecting the National Road, along Bayugan - Esperanza Road (Crossing Luna Section), Agusan del Sur, Package 1
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 365 Lineal meters
Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000
Unit Cost:
CW1: P 277,602.74/ Lineal meters |
July 28, 2021 |
2021 |
WIN1E02625 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. : 300108200274000
Project ID: P00550439MN
Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Construction of Bank Protection Protecting the National Road, Butuan City-Esperanza-San Luis, Talacogon, Agusan del Sur, Package 2
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 1,144.806 Lineal meters
Allocation:
TOTAL: P 145,000,000
CW1: P 139,925,000
EAO: P 5,075,000
Unit Cost:
CW1: P 122,225.95/ Lineal meters
TO:
Construction of Bank Protection Protecting the National Road, Butuan City-Esperanza-San Luis, Talacogon, Agusan del Sur, Package 2
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 387.953 Lineal meters
Allocation:
TOTAL: P 145,000,000
CW1: P 139,925,000
EAO: P 5,075,000
Unit Cost:
CW1: P 360,675.13/ Lineal meters
|
July 28, 2021 |
2021 |
WIN1E02495 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
UACS No. : 310202100750000
Project ID: P00501365MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
FROM:
NRJ Barobo-Agusan Del Sur Bdry Rd - K1404 + 000 - K1407 + 163
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 6.326 Lane Km
Allocation:
TOTAL: P 95,000,000
CW1: P 91,675,000
EAO: P 3,325,000
Unit Cost:
CW1: P 14,491,779.96/Lane Km
TO:
NRJ Barobo-Agusan Del Sur Bdry Rd - K1403 + 181 - K1405 + 761
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 5.160 Lane Km
Allocation:
TOTAL: P 95,000,000
CW1: P 91,675,000
EAO: P 3,325,000
Unit Cost:
CW1: P 17,766,472.89/Lane Km
|
July 28, 2021 |
2021 |
WIN1E02624 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
UACS No. : 320101106332000
Project ID: P00522133MN
OO2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems .
FROM:
Construction of Tandag Flood Control, Brgy. Dagocdoc, Tandag City, Surigao Del Sur
Type of Work:
CW1- Construction of Revetment
Physical Target:
CW1- 364.192 Lineal meters
Allocation:
TOTAL: P 76,712,000
CW1: P 74,027,080
EAO: P 2,684,920
Unit Cost:
CW1: P 203,263.88/ Lineal meters
TO:
Construction of Tandag Flood Control, Brgy. Dagocdoc, Tandag City, Surigao Del Sur
Type of Work:
CW1- Construction of Revetment
Physical Target:
CW1- 256.80 Lineal meters
Allocation:
TOTAL: P 76,712,000
CW1: P 74,027,080
EAO: P 2,684,920
Unit Cost:
CW1: P 288,267.45/ Lineal meters
|
July 28, 2021 |
2021 |
WIN1E02639 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 310103100774000
Project ID: P00501879MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Tertiary Roads
FROM:
Butuan City-Pianing-Tandag Rd - K1232 + (-1016) - K1232 + (-298)
Type of Work:
CW1- Preventive Maintenance of Road: Concrete Reblocking
Physical Target:
CW1- 1.436 Lane Km
Allocation:
TOTAL: P 6,478,000
CW1: P 6,348,440
EAO: P 129,560
Unit Cost:
CW1: P 4,420,919.22/Lane Km
TO:
Butuan City-Pianing-Tandag Rd - K1232 + (-1008.50) - K1232 + (-626)
Type of Work:
CW1- Preventive Maintenance of Road: Concrete Reblocking
Physical Target:
CW1- 0.765 Lane Km
Allocation:
TOTAL: P 6,478,000
CW1: P 6,348,440
EAO: P 129,560
Unit Cost:
CW1: P 8,298,614.38/Lane Km
|
July 28, 2021 |
2021 |
WIN1E02632 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. : 310112100274000
Project ID: P00501692MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
FROM:
Surigao City-Sn Juan Coastal Rd - K1119 + 221 - K1119 + 479
Type of Work:
CW1- Rehabilitation /Major Repair of Drainage Structure along Road
Physical Target:
CW1- 258.00 Lineal meters
Allocation:
TOTAL: P 3,000,000
CW1: P 2,940,000
EAO: P 60,000
Unit Cost:
CW1: P 11,395.35/ Lineal meters
TO:
Surigao City-Sn Juan Coastal Rd - K1119 + 221 - K1119 + 466
Type of Work:
CW1- Rehabilitation /Major Repair of Drainage Structure along Road
Physical Target:
CW1- 281.00 Lineal meters
Allocation:
TOTAL: P 3,000,000
CW1: P 2,940,000
EAO: P 60,000
Unit Cost:
CW1: P 10,462.63/ Lineal meters
|
July 27, 2021 |
2021 |
WIN1C04350 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Regional Office III |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Baler Bypass Road, Baler, Aurora |
July 27, 2021 |
2021 |
WIN1C04359 |
FY 2021 GAA |
December 27, 2020 |
Region III |
Regional Office III |
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Repair / Rehabilitation / Improvement, Overlay with Pavement Markings along Jose Abad Santos Avenue (JASA), K0109+015 - K0109+400, K0111+000 - K0111+502.15 Phase 1 |
July 27, 2021 |
2021 |
WIN1C04354 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Regional Office III |
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Road (Phase 1), Barangay Quinawan, Bagac, Bataan |
July 27, 2021 |
2021 |
WIN1F06562 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
AS PER GAA/ORIGINAL:
Tigbao-Sta Fe-Sn Miguel Rd – K0903+641-K0904+195, K0907+209-K0907+581
Physical Target: Allocation:
CW1-Road Widening: 1.872 Lane Km P 26.83828 M
EAO P 0.547720 M
Total P 27.386 M
AS MODIFIED:
Tigbao-Sta Fe-Sn Miguel Rd – K0903+641-K0904+195
Physical Target: Allocation:
CW1-Road Widening: 1.128 Lane Km P 26.83828 M
EAO P 0.547720 M
Total P 27.386 M
|
July 27, 2021 |
2021 |
WIN1E02633 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 320102104445000
Project ID: P00522383MN
OO2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
FROM:
Rehabilitation of Adlayan River Bank, Sta.0+000.00 - Sta. 0+120.00, San Francisco, Agusan del Sur
Type of Work:
CW1- Rehabilitation / Major Repair of Flood Control Structure
Physical Target:
CW1- 28.000 Lineal meters
Allocation:
TOTAL: P 5,000,000
CW1: P 4,900,000
EAO: P 100,000
Unit Cost:
CW1: P 175,000.00/Lineal meters
TO:
Rehabilitation of Adlayan River Bank, Sta.0+000.00 - Sta. 0+028.00, San Francisco, Agusan del Sur
Type of Work:
CW1- Rehabilitation / Major Repair of Flood Control Structure
Physical Target:
CW1- 28.000 Lineal meters
Allocation:
TOTAL: P 5,000,000
CW1: P 4,900,000
EAO: P 100,000
Unit Cost:
CW1: P 175,000.00/Lineal meters
|
July 26, 2021 |
FY 2021 GAA |
WIN1E02654 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road with drainage Taglawig, Maco, Davao de Oro
Physical Target:
CW1: 1.568 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Road)
EAO: P 300,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road with drainage Taglawig, Maco, Davao de Oro
Physical Target:
CW1: 2.100 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Road)
EAO: P 300,000.00 |
July 26, 2021 |
2021 |
WIN1F06261 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Iloilo City District Engineering Office |
FROM:
LOCAL PROGRAM
Local - Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program
Construction/Rehabilitation of Multi-Purpose Building in Barangay San Raphael, Mandurriao,
Iloilo City
CW1- Construction of Multi Purpose Building: 1.00 Building - 4,950.00
EAO - 50.00
Total: 5,000.00
TO:
LOCAL PROGRAM
Local - Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program
Construction/Rehabilitation of Multi-Purpose Building in Barangay San Rafael, Mandurriao,
Iloilo City
CW1- Construction of Multi Purpose Building: 1.00 Building - 4,950.00
EAO - 50.00
Total: 5,000.00
|
July 26, 2021 |
2021 |
WIN1F06070 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Guimaras District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Guimaras Circumferential Rd - K0054 + 000 - K0055 + 000
CW1- Road Widening: 2.004 lane km - 37,903.46
EAO - 773.54
Total: 38,677.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Guimaras Circumferential Rd - K0054 + 000 - K0054 + 815
CW1- Road Widening: 1.630 lane km - 36,406.02
ROW Acquisition: 4,075 sq.m - 1,497.44
EAO - 773.54
Total: 38,677.00
|
July 26, 2021 |
2021 |
WIN1F06070 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Guimaras District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Guimaras Circumferential Rd - K0054 + 000 - K0055 + 000
CW1- Road Widening: 2.004 lane km - 37,903.46
EAO - 773.54
Total: 38,677.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Guimaras Circumferential Rd - K0054 + 000 - K0054 + 815
CW1- Road Widening: 1.630 lane km - 36,406.02
ROW Acquisition: 4,075 sq.m - 1,497.44
EAO - 773.54
Total: 38,677.00
|
July 26, 2021 |
FY 2021 GAA |
WIN1E02646 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Ma-a Rd - K1511+827 - K1513+000
Physical Target:
CW1: 4.616 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 26,455,000.00
CW1: P 25,925,900.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 529,100.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Ma-a Rd - K1511+827 - K1513+000
Physical Target:
CW1: 1.520 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 26,455,000.00
CW1: P 25,925,900.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 529,100.00 |
July 26, 2021 |
2021 |
WIN1F06060 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Guimaras District Engineering Office |
FROM:
LOCAL PROGRAM
Local – Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Brgy. Alaguisoc to Brgy. Bugnay, Sta. 0+000 - Sta. 2+100, Jordan, Guimaras
CW1- Construction of Concrete Road: 4.409 lane km -
40,748.40
EAO - 411.60
Total: 41,160.00
TO:
LOCAL PROGRAM
Local – Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Brgy. Alaguisoc to Brgy. Bugnay, Jordan, Guimaras, Sta. 0+100- Sta. 0+145, Sta. 0+244 - Sta. 0+515, Sta. 3+200- Sta. 5+088.50
CW1- Construction of Concrete Road: 4.409 lane km -
40,748.40
EAO - 411.60
Total: 41,160.00 |
July 26, 2021 |
2021 |
WIN1F06413 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Guimaras District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Central Rd (Sn Miguel-Constancia-Cabano-Igcawayan) - K0061 + 000 - K0061 + 800
CW1- Road Widening: 1.60 lane km - 45,691.52
EAO - 932.48
Total: 46,624.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Central Rd (Sn Miguel-Constancia-Cabano-Igcawayan) - K0061 + 000 - K0062 + 000
CW1- Road Widening: 2.01 lane km - 44,495.92
ROW Acquisition:5,030 sq.m - 1,195.60
EAO - 932.48
Total: 46,624.00
|
July 26, 2021 |
2021 |
WIN1F06278 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Guimaras District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Bridge - Widening of Permanent Bridges
Atgang Br. (B00011GR) along Guimaras Circumferential Rd
CW1- Widening of Bridge: 190.10 sq.m - 30,375.835
ROW Acquisition: 500.00 sq.m - 592.165
EAO - 632.00
Total: 31,600.00
TO:
OO1: Ensure Safe and Reliable National Road System
Bridge - Widening of Permanent Bridges
Atgang Br. (B00011GR) along Guimaras Circumferential Rd
CW1- Widening of Bridge: 381.60 sq.m - 30,363.75
ROW Acquisition: 500.00 sq.m - 604.25
EAO - 632.00
Total: 31,600.00
|