June 7, 2018 |
FY 2018 |
WIN8C03073 |
UACS No. 300111200001000 |
May 25, 2018 |
Region IX |
Regional Office IX |
UACS No. 300111200001000
Project ID: P00257703MN
Local Program
National Roads and Bridges - National Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Road Including Right-of-Way for the Proposed By-pass National Road along Sumagdang - Menzi - Lanote, Isabela City, Basilan
Physical Target:
CW-1- Construction of Concrete Road: 13.48 Lane km
Unit Cost: P 17,874,708.16/Lane km
Physical Target:
ROW: 996.45 Sq.m.
Unit Cost: P 300/Sq.m.
EAO: P 8,750,000.00
Allocation: P 250,000,000.00 |
June 7, 2018 |
FY 2018 |
WIN8C03060 |
UACS No. 300203100118000 |
May 25, 2018 |
Region IX |
Regional Office IX |
UACS No. 300203100118000
Project ID: P00230016MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads Leading to Declared Tourism Destinations
NRJ Ayala- La Paz Road Leading to La Paz Resort, Zamboanga City
Physical Target:
CW-1- Construction of Concrete Road: 7.22 Lane km
Unit Cost: P 20,048,476.45/Lane km
EAO: P 5,250,000.00
Allocation: P 150,000,000.00 |
June 7, 2018 |
FY 2018 GAA |
WIN8C03109 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION
FROM: OO2: Project Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Revetment, Maco River, Maco, Compostela Valley
Physical Target
CW-1: 1,720 Lineal meters (Construction of Revetment)
CW-2: 3,051 Cubic meters (Channelization)
ROW: 1,429 Square meters (ROW Acquisation)
ALLOCATION
Total: P 35,000,000.00
CW-1: P 31,697,352.00 (Construction of Revetment)
CW-2: P 2,357,648.00 (Channelization)
ROW: P 245,000.00
EAO: P 700,000.00
TO: OO2: Project Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Revetment, Maco River, Maco, Compostela Valley
Physical Target
CW-1: 1,841.48 Lineal meters (Construction of Revetment)
CW-2: 2,743 Cubic meters (Channelization)
ROW: 1,429 Square meters (ROW Acquisation)
ALLOCATION
Total: P 35,000,000.00
CW-1: P 33,469,880.30 (Construction of Revetment)
CW-2: P 585,119.70 (Channelization)
ROW: P 245,000.00
EAO: P 700,000.00 |
June 7, 2018 |
FY 2018 |
WIN8C03071 |
UACS No. 300111200002000 |
May 25, 2018 |
Region IX |
Regional Office IX |
UACS No. 300111200002000
Project ID: P00257704MN
Local Program
National Roads and Bridges - National Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Road Widening along Basilan Circumferential Road (BCR) Isabela - Maluso Road, Isabela City, Basilan Including Right-of-Way (ROW)
K0002+000 - K0005+000
Physical Target:
CW-1- Road Widening: 6.00 Lane Km
Unit Cost: P 17,171,180.28/Lane Km
ROW: 42,576.39 sq.m.
Unit Cost: P 300/ Sq.m.
EAO: P 4,200,000.00
Allocation: P 120,000,000.00 |
June 7, 2018 |
FY 2018 |
WIN8C03069 |
UACS No. 300111200003000 |
May 25, 2018 |
Region IX |
Regional Office IX |
UACS No. 300111200003000
Project ID: P00257705MN
Local Program
National Roads and Bridges - National Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Road Widening along Basilan Circumferential Road (BCR) Isabela - Maluso Road, Isabela City, Basilan including Road-Right-of-Way (ROW)
K0008+000.00 - K0011+500.00
Physical Target:
CW-1- Road Widening: 7.00 Lane km
Unit Cost: P 16,482,184.90/Lane km
ROW: 1,415.69 Sq.m.
Unit Cost: P 300/Sq.m
EAO: P 4,200,000.00
Allocation: P 120,000,000.00 |
June 7, 2018 |
FY 2018 |
WIN8C03077 |
UACS No. 310201100146000 |
May 25, 2018 |
Region IX |
Regional Office IX |
UACS No. 310201100146000
Project ID: P00200589MN
OO1: Ensure Safe and Reliable National Road System - Network Development
Road Widening - Primary Roads
Lanao - Pagadian - Zamboanga City Rd
K1740+498.63 - K1744+551.63
Physical Target:
CW-1- Road Widening: 8.11 Lane km
Unit Cost: P 15,070,371.69/Lane km
ROW: 10,764.29 sq.m.
Unit Cost: P 300/sq.m
EAO: P4,550,000.00
Allocation: P 130,000,000.00 |
June 7, 2018 |
FY 2018 |
WIN8C03076 |
UACS No. 310204100314000 |
May 25, 2018 |
Region IX |
Regional Office IX |
UACS No. 310204100314000
Project ID: P00200312MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Zamboanga City Diversion Road (Zambowood - Mampang Section), Zamboanga City
Physical Target:
CW-1- Construction of Concrete Road: 7.32 lane km
Unit Cost: P 18,455,931.99/lane km
ROW: 8.59 sq.m.
Unit Cost: P 300/Sq.m.
EAO: P 4,900,000.00
Allocation: P 140,000,000.00 |
June 7, 2018 |
FY 2018 |
WIN8C03065 |
UACS No. 320101102162000 |
May 25, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 320101102162000
Project ID: P00223435MN
OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/ Extension of Flood Control Structure along Dipolog River, Guinles (Upstream), Polanco, Zamboanga del Norte
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 269.20 l.m.
Unit Cost: P 109,212.48/l.m.
EAO: P 600,000.00
Allocation: P 30,000,000.00 |
June 7, 2018 |
FY 2018 |
WIN8C03079 |
UACS No. 300117202008000 |
May 25, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 300117202008000
Project ID: P00258879MN
Local Program
Local Infrastructure Program
Local Roads and Bridges
Local Roads
Rehabilitation of Road Leading to the Maniway Peaks and Highland Resort, Rizal, Zamboanga del Norte
Physical Target:
CW-1- Road Concreting: 0.772 lane km
Unit Cost: P 6,411,917.10/lane km
EAO: P 50,000.00
Allocation: P 5,000,000.00 |
June 7, 2018 |
FY 2018 |
WIN8C03072 |
UACS No. 310201100261000 |
May 25, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310201100261000
Project ID: P00200598MN
OO1: Ensure Safe and Reliable National Road
Network Development - Road Widening - Primary Roads
Jct. Aurora - Ozamis City Rd
K1640+400 - K1642+000
Physical Target:
CW-1- Road Widening: 3.20 Lane km
Unit Cost: P 15.313M/Lane km
EAO: P 1.00 M
Allocation: P 50.0 M |
June 7, 2018 |
FY 2018 |
WIN8C03053 |
UACS No. 300203100519000 |
May 25, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300203100519000
Project ID: P00230023MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads Leading to Declared Tourism Destination
NRJ leading to Eden Park Panoramic View/ Zipline and Shrine , Brgy. Bayabas to Brgy. Acad, Aurora, Zamboanga del Sur
Physical Target:
CW-1- Construction of Concrete Road: 2.72 lane km
Unit Cost: P 9.007M/ Lane km
EAO: P 0.50M
Allocation: P 25 M |
June 7, 2018 |
FY 2018 |
WIN8C03064 |
UACS No. 300104204114000 |
May 25, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300104204114000
Project ID: P00255192MN
Buildings and Other Structures - Multipurpose/ Facilities
Local Infrastructure Program
Construction of Multi-Purpose Building, Brgy. Labangon, Dumingag, Zamboanga del Sur
Physical Target:
CW-1- Construction of Multi Purpose Building: 1.0 Building
Unit Cost: P 2.475 M/ Building
EAO: P 0.025M
Allocation: P 2.5M |
June 7, 2018 |
FY 2018 |
WIN8C03082 |
UACS No. 300204100201000 |
May 25, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300204100201000
Project ID: P00230033MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads Leading to Trades, Industries and Economic Zones
NRJ to Brgy. San Juan, Aurora-Brgy. Man-ilan, in support of Aurora Coco Activated Carbon, Zamboanga del Sur
Physical Target:
CW-1- Paving of Unpaved Roads: 2.26 lane km
Unit Cost: P 8.673M/lane km
EAO: P 0.400 M
Allocation: P 20.0M |
June 7, 2018 |
FY 2018 |
WIN8C03070 |
UACS No. 300116201165000 |
May 25, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300116201165000
Project ID: P00258447MN
Local Program
Local Roads and Bridges - Local Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of Barangay Sanito - Pag-Asa (Going to Fisheries), Ipil, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 3.1673 Lane km
Unit Cost: P 6,188,236.04/ Lane km
EAO: P 0.40M
Allocation: P 20M |
June 6, 2018 |
FY 2018 |
WIN8G02144 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 1st District Engineering Office |
UACS No.: 310204100353000
Project ID: P00201086LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of By-Pass and Diversion Roads - Milaor-Pili Bypass Road, Camarines Sur
Physical Target - CW1 – Construction of Gravel Road/ 3.608 lane-km
CW2 - Construction of Road Slope Protection Structure/ 944.12 sq.m.
Unit Cost: CW1 – Php 9.55M /lane-km
CW2 – Php 15.39T/sq.m.
Estimated Cost: Php 50.0M
(As Modified)
|
June 6, 2018 |
FY 2018 |
WIN8G02143 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 1st District Engineering Office |
UACS No.: 310204100354000
Project ID: P00201087LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of By-Pass and Diversion Roads – Pamplona-San Fernando Bypass Road, Camarines Sur
Physical Target - CW1 – Construction of Gravel Road/ 2.914 lane-km
CW2 - Construction of Road Slope Protection Structure/ 772.10 sq.m.
Unit Cost: CW1 – Php 11.85M /lane-km
CW2 – Php 18.73T/sq.m.
Estimated Cost: Php 50.0M
(As Modified)
|
June 6, 2018 |
FY 2018 |
WIN8G02141 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Sorsogon 2nd District Engineering Office |
UACS No.: 300116200987000
Project ID: P00240931LZ
Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of San Juan-San Julian Road, Sta. 0+000 - Sta. 0+483, Irosin, Sorsogon
Physical Target - CW1 – Construction of Concrete Road/ 0.966 lane-km
Unit Cost: P6.09M/lane-km
Estimated Cost: Php 6.00M
(As Modified)
|
June 6, 2018 |
FY 2018 |
WIN8G02175 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Sorsogon 2nd District Engineering Office |
UACS No.: 320101101743000
Project ID: P00220510LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Structure along Binanuahan River (Downstream), Juban, Sorsogon
Physical Target - CW1 - Construction of Flood Mitigation Structure/ 400.00 lm.
Unit Cost: Php 98.00T/ lm
Estimated Cost: Php 40.00M
(As Modified)
|
June 6, 2018 |
FY 2018 |
WIN8G01910 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 3102305100056000
Project ID: P00202268LZ
OO1: Ensure Safe and Reliable National Road System – Bridge Program - Widening of Permanent Bridges - Manulbi Br. (B00012MT) along Jct Milagros-Baleno-Lagta Rd
Physical Target - CW1 - Widening of Bridge/456.86 sq.m.
Unit Cost: CW1- Php 116.17T/sq.m.
Estimated Cost: Php 55.0M
(As Modified)
|
June 6, 2018 |
FY 2018 |
WIN8G02014 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 310205100200000
Project ID: P00201162LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of Missing Links/New Roads - Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, incl. ROW and Slope Protection, Masbate
Physical Target - CW1 – Construction of Concrete Road/ 1.17 lane-km
CW2 - Construction of Road Slope Protection/ 3,015.00 sq.m.
Right-of-Way Acquisition/ 19,020.00 sq.m.
Unit Cost: CW1 – Php 22.455M /lane-km
CW2 – Php 1.966T/sq.m.
ROW Acquisition – Php 883.28/sq.m.
Estimated Cost: Php 50.0M
(As Modified)
|
June 6, 2018 |
FY 2018 |
WIN8G01891 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 31020510020200
Project ID: P00201163LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of Missing Links/New Roads - Mandaon-Dayhagan Road, Masbate
Physical Target - CW1 – Construction of Concrete Road/ 2.10 lane-km
Unit Cost: CW1 - Php 23.333M
Estimated Cost: Php 50.0M
(As Modified)
|
June 6, 2018 |
FY 2018 |
WIN8G01862 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 310208100096000
Project ID: P00201556LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Off-Carriageway Improvement - Secondary Roads – Jct Milagros-Baleno-Lagta-Rd – K0044+797 – K0045+527
Physical Target - CW1 - Off-Carriageway improvement: Shoulder Paving/Construction/ 4,140.00 sq.m.
Unit Cost: CW1 - Php 5,954.33/sq.m.
Estimated Cost: Php 25.154M
(As Modified)
|
June 6, 2018 |
FY 2018 |
WIN8G01885 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 310208100099000
Project ID: P00201560LZ
OO1: Ensure Safe and Reliable National Road System – Off-Carriageway Improvement - Secondary Roads – Masbate-Milagros Rd - K0003+407 - K0004+134, K0026+313 - K0026+480
Physical Target - CW1 - Off-Carriageway improvement: Shoulder Paving/Construction/ 4,622.00 sq.m.
Unit Cost: CW1 - Php 5,798.80/sq.m.
Estimated Cost: Php 27.349M
(As Modified)
|
June 6, 2018 |
FY 2018 |
WIN8G01865 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 310108100113000
Project ID: P00200852LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads – Jct Milagros-Baleno-Lagta Rd - K0079+902 - K0080+608
Physical Target - CW2 - Construction of Road Slope Protection Structure/ 4,917.60 sq.m.
Unit Cost: CW1 - Php7,449.24/sq.m.
Estimated Cost: Php 37.380M
(As Modified)
|
June 6, 2018 |
FY 2018 |
WIN8G02015 |
FY 2018 GAA R.A. 10964 |
December 28, 2017 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 310108100032000
Project ID: P00200845LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads – Masbate-Milagros Rd - K0007+075 - K0007+325, K0008+120 - K0008+318, K0008+369 - K0008+485, K0008+531 - K0008+580, K0008+922 - K0009+584, K0008+901 - K0009+584
Physical Target - CW2 - Construction of Road Slope Protection Structure/ 16,250.12 sq.m.
Unit Cost: CW1 - 3,718.64/sq.m.
Estimated Cost: Php 62.620M
(As Modified)
|
June 5, 2018 |
2018 |
WIN8C03081 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
CONVERGENCE AND SPECIAL SUPPORT PROGRAM -
CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS
FROM:
Construction/Improvement of Access Road leading to Borongkot Beach, Brgy. Banban, Tagana-an, Surigao del Norte
Project ID No. – P00230261MN
Physical Target: 1.006 Lane Km
Type of Work: Construction of Concrete Road
Allocation: Php 25,000,000.00 (Total)
Php 24,500,000.00 (Road)
Php 500,000.00 (EAO)
TO:
Construction/Improvement of Access Road leading to Borongkot Beach, Brgy. Banban, Tagana-an, Surigao del Norte
Project ID No. – P00230261MN
Physical Target: 2.0128 Lane Km
Type of Work: Construction of Concrete Road
Allocation: Php 25,000,000.00 (Total)
Php 24,500,000.00 (Road)
Php 500,000.00 (EAO) |
June 5, 2018 |
2018 |
WIN8C03075 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS
FROM:
NRJ Poblacion Alegria Road Leading to Mainit Lake Boat Landing Facility, Brgy. Poblacion (Alegria), Alegria, Surigao del Norte
Project ID No. – P00230320MN
Physical Target: 1.25 Lane Km
Type of Work: Construction of Concrete Road
Allocation: Php 22,000,000.00 (Total)
Php 21,560,000.00 (Road)
Php 440,000.00 (EAO)
TO:
NRJ Poblacion Alegria Road Leading to Mainit Lake Boat Landing Facility, Brgy. Poblacion (Alegria), Alegria, Surigao del Norte
Project ID No. – P00230320MN
Physical Target: 0.9798 Lane Km
Type of Work: Construction of Concrete Road
Allocation: Php 22,000,000.00 (Total)
Php 21,560,000.00 (Road)
Php 440,000.00 (EAO)
|
June 5, 2018 |
2018 |
WIN8C03090 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System - Network Development – Road Widening - Primary Roads
FROM:
Daang Maharlika (Surigao - Agusan Sect) – K1160 + 784 - K1162 + 242, K1162 + 264 - K1162 + 326, K1162 + 341 - K1163 + 142, K1163 + 160 - K1163 + 310, K1163 + 325 - K1163 + 501
Project ID No. P00200694MN
Scope of Work: Road Widening
Physical Target: 5.306 Lane Km
Allocation: Php 87,868,000.00 (Total)
Php 84,792,620.00 (Widening)
Php 3,075,380.00 (EAO)
TO:
Daang Maharlika (Surigao - Agusan Sect) – K1162 + 084.72 - K1162 + 180, K1162 + 400 - K1163 + 080, K1163 + 080 - K1163 + 136.09, K1163 + 165.91 - K1163 + 200, K1163 + 200 - K1163 + 270, K1163 + 270 - K1163 + 303.09, K1163 + 332.91 - K1163 + 365, K1163 + 365 - K1163 + 497.8
Project ID No. P00200694MN
Scope of Work: Road Widening and Upgrading / Raising of Grade
Physical Target: 4.04272 Lane Km
Allocation: Php 87,868,000.00 (Total)
Php 84,792,620.00 (Widening)
Php 3,075,380.00 (EAO) |
June 5, 2018 |
2018 |
WIN8C03092 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
LOCAL PROGRAM - Local Roads
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
FROM:
NRJ Lipata - Punta Bilar - Lo-oc - Mabua - Ipil Road, Surigao del Norte
Project ID No. – P00240324MN
Scope of Work: Construction of Concrete Road
Physical Target: 0.000 Lane Km
Allocation - Php 1,250,000.00 (Total)
- Php 1,225,000 (Road)
- Php 25,000 (EAO)
TO:
NRJ Lipata - Punta Bilar - Lo-oc - Mabua - Ipil Road, Surigao del Norte
Project ID No. – P00240324MN
Scope of Work: Construction of Concrete Road
Physical Target: 0.0502 Lane Km
Allocation - Php 1,250,000.00 (Total)
- Php 1,225,000 (Road)
- Php 25,000 (EAO) |
June 4, 2018 |
2018 |
WIN8G02186 |
WIN8G02186 |
April 23, 2018 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Repair/Rehabilitation/Improvement of Abra-Ilocos Norte Road with Selective Reblocking and Asphalt Overlay, Abra - Ilocos Norte Road K0433+000-K0422+000; Physical Target:17.924 Lane Km; Allocation = Php 100,000,000
To: Repair/Rehabilitation/Improvement of Abra-Ilocos Norte Road with Selective Reblocking and Asphalt Overlay, Abra - Ilocos Norte Road K0433+000-K0442+000; Physical Target:10.992 Lane Km; Allocation = Php100,000,000
|
June 4, 2018 |
2018 |
WIN8G02100 |
WIN8G02100 |
April 5, 2018 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Rehabilitation of Drainage Canal, Brgy. Poblacion, Bangued, Abra; Physical Target:128.3 meters; Allocation = Php 1,500,000
To: Rehabilitation of Drainage Canal, Brgy. Patucannay, Bangued, Abra; Physical Target:128.30 meters; Allocation = Php1,500,000
|
June 4, 2018 |
2018 |
WIN8G02203 |
WIN8G02203 |
April 23, 2018 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Repair/Rehabilitation/Improvement of Abra-Ilocos Sur Road with Selective Reblocking and Asphalt Overlay, K0387+(-957) - K0408+190; Physical Target:10.074 Lane Km; Allocation = Php 100,000,000
To: Organizational Outcome 1: Ensure safe and Reliable National Road System/ Asset Preservation Program/ Preventive Maintenance/ Secondary Road, Abra-Ilocos Sur Road K0400+000-K0408+000; Physical Target:16.144 Lane Km; Allocation = Php100,000,000
|
June 4, 2018 |
2018 |
WIN8G02204 |
WIN8G02204 |
April 23, 2018 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Repair/Rehabilitation/Improvement of Abra-Kalinga Norte Road with Selective Reblocking and Asphalt Overlay, K0429+850, K0434+800-K0435+551, K0438+000-K0440+000, K0447+000-K0449+000; Physical Target:16.438 Lane Km; Allocation = Php 100,000,000
To: Organizational Outcome 1: Ensure safe and Reliable National Road System/ Asset Preservation Program/ Preventive Maintenance/ Tertiary Road, Abra-Kalinga Norte Road, K0429+850, K0434+800-K0435+551, K0438+000-K0440+000, K0447+000-K0449+000; Physical Target:14.68 Lane Km; Allocation = Php100,000,000
|
June 4, 2018 |
2018 |
WIN8G02138 |
WIN8G02138 |
April 23, 2018 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Construction of Missing Links/ New Roads - Tuel Jct - Ambongdolan Jct (Section 3 of BLISTT Outer Ring Circumferential Road) incl ROW, Bridge and Slope Protection, Tublay, Benguet; Physical Target:ROW : 5,000 Square meters, CW1 : 1.40 Lane Km, CW2 : 6,800 Square meters, CW3 : 477 Square meters; Allocation = Php 100,000,000
To: Construction of Missing Links/ New Roads - Tuel Jct - Ambongdolan Jct (Section 3 of BLISTT Outer Ring Circumferential Road) incl ROW, Bridge and Slope Protection, Tublay, Benguet; Physical Target:CW1 : 2.40 Lane Km, CW2 : 8,800 Square meters, CW3 : 443.61 Square meters; Allocation = Php100,000,000
|
June 4, 2018 |
FY 2018 |
WIN8G02288 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bulacan 1st District Engineering Office |
Local Program – Local – Buildings and Other Structures – Multipurpose / Facilities – Construction / Improvement of Multi-Purpose Building, Atlag, Malolos City, Bulacan |
June 4, 2018 |
FY 2018 |
WIN8G02295 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bulacan 1st District Engineering Office |
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems Construction / Rehabilitation / Improvement of Dike / Seawall at Tibaguin, Hagonoy, Bulacan |
June 4, 2018 |
FY 2018 GAA |
WIN8C03095 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development
Construction of Bypass and Diversion Roads
Jct. Davao City Diversion ROad - Cabantian Road (Banco Extension Road), incl. ROW, Davao City
Physical Target:
CW1: 1.514 lane km (Construction of Concrete Road)
ROW: 7,570.00 sq.m.
Allocation:
TOTAL: P 135,000,000.00
CW1: P 40,908,280.00 (Construction of Concrete Road)
ROW: P 89,366,720.00
EAO: P 4,725,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development
Construction of Bypass and Diversion Road
Jct. Davao City Diversion ROad - Cabantian Road (Banco Extension Road), incl. ROW, Davao City
Physical Target:
CW1: 1.718 lane km (Construction of Concrete Road)
ROW: 7,570.00 sq.m.
Allocation:
TOTAL: P 135,000,000.00
CW1: P 40,908,280.00 (Construction of Concrete Road)
ROW: P 89,366,720.00
EAO: P 4,725,000.00 |
June 1, 2018 |
FY - 2018 |
WIN8C02816 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Convergence Special Support Program
Convergence and Special Support - Construction/Improvement of Access Roads leading to Seaports
FROM:
Little Caramay - TDC - Pagdanan leading to proposed
port, San Vicente, Palawan
CW1: 4.832 lane km ( Construction of Concrete Road )
Allocation: 80,000,000 Php
TO:
Little Caramay - TDC - Pagdanan leading to Proposed
Port, San Vicente, Palawan
CW1: 2.42 lane km ( Construction of Concrete Road )
Allocation: 80,000,000 Php
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05552 |
UACS No. 300103200108000 |
January 1, 2018 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 300103200108000
Project ID: P0024789LZ
WIN8F05552
Local Program
Local - Building and Other Structures – Multipurpose/ Facilities – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction/Completion of Multi – Purpose Building (Hall) and Completion of Facilities at National Center for Mental Health, Barangay Addition Hills, Mandaluyong City
Physical Target: CW1-Construction of Multi-Purpose Building – 1.0
Unit Cost (P’000): P6,860.00/bldg.
Allocation (‘000): P 6,860.00 M
EAO (‘000) P 140.00 M
Total (‘000) : P 7,000.00 M
As Modified
Project ID: P0024789LZ
WIN8F05552
Local Program
Local - Building and Other Structures – Multipurpose/ Facilities – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction/Completion of Multi – Purpose Building (Hall) and Completion of Facilities at National Center for Mental Health, Barangay Mauway, Mandaluyong City
Physical Target: CW1-Construction of Multi-Purpose Building – 1.0
Unit Cost (P’000): P6,860.00/bldg.
Allocation (‘000): P 6,860.00 M
EAO (‘000) P 140.00 M
Total (‘000) : P 7,000.00 M
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05536 |
UACS No. 320101100499000 |
January 1, 2018 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As per GAA/Original
UACS No. 320101100499000
Project ID: P00221544LZ
WIN8F05536
002: Protect Lives and Properties
Flood Management – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement / Dredging of Villanueva Creek and Sapang Buwaya Creek Junction, Brgy. Don Galo, Parañaque City
Physical Target: CW1 Construction of Mitigation Structure L=900 lineal meter
Unit Cost (P’000): P54.44/ lineal meter
Allocation (‘000) : P 49,000.00
EAO (‘000) P 1,000.00
Total (‘000): P 50,000.00
As Modified
UACS No. 320101100499000
Project ID: P00221544LZ
WIN8F05536
002: Protect Lives and Properties
Flood Management – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement / Dredging of Villanueva Creek and Sapang Buwaya Creek Junction, Brgy. San Dionisio, Parañaque City
Physical Target: CW1 Construction of Mitigation Structure L=323 lineal meter
Unit Cost (P’000): P151.702/ lineal meter
Allocation (‘000) : P 49,000.00
EAO (‘000) P 1,000.00
Total (‘000): P 50,000.00
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05551 |
UACS No. 320101100497000 |
January 1, 2018 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As per GAA/Original
UACS No. 320101100497000
Project ID: P00222779LZ
WIN8F05551
002: Protect Lives and Properties
Flood Management – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement of Sapang Buwaya Creek, Reymar Village, Parañaque City
Physical Target: CW1 Construction of Mitigation Structure L=480 lineal meter
Unit Cost (P’000): P40.83/ lineal meter
Allocation (‘000) : P 19,600.00
EAO (‘000) P 400.00
Total (‘000): P 20,000.00
As Modified
UACS No. 320101100497000
Project ID: P00222779LZ
WIN8F05551
002: Protect Lives and Properties
Flood Management – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement of Sapang Buwaya Creek, Reymanville Village, Brgy. San Antonio, Parañaque City
Physical Target: CW1 Construction of Mitigation Structure L=440 lineal meter
Unit Cost (P’000): P44.54/ lineal meter
Allocation (‘000) : P 19,600.00
EAO (‘000) P 400.00
Total (‘000): P 20,000.00
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05538 |
UACS No. 300116200365000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300116200365000
Project ID: P00240263LZ
WIN8F05538
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Rehabilitation of Roads and Drainage in Makipot St., Brgy. Malinta, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 2.158 Lane Km
EAO (‘000) – P 0.410 M
Unit Cost (P’000): P9,309.55/ lane km
Allocation: P 20.090 M
Total: P 20.50 M
As Modified
UACS No. 300116200365000
Project ID: P00240263LZ
WIN8F05538
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Rehabilitation of Roads and Drainage in Makipot St., Brgy. Malinta, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.420 Lane Km
EAO (‘000) – P 0.410 M
Unit Cost (P’000): P14,147.89/ lane km
Estimated Cost: P 20.090 M
Total: P 20.5 M
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05537 |
UACS No. 300116200373000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300116200373000
Project ID: P00240629LZ
WIN8F05537
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Upgrading of Claudio Molina St., Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 2.200 Lane Km
EAO (‘000) – P 0.520 M
Unit Cost (P’000): P11,581.82/ lane km
Allocation: P 25.480 M
Total: P 26.0 M
As Modified
UACS No. 300116200373000
Project ID: P00240629LZ
WIN8F05537
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Upgrading of Claudio Molina St., Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.620 Lane Km
EAO (‘000) – P 0.520 M
Unit Cost (P’000): P15,728.40/ lane km
Allocation: P 25.480 M
Total: P 26.0 M
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05546 |
UACS No. 300116200320000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300116200320000
Project ID: P00240612LZ
WIN8F05546
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Improvement of Road and drainage system - Claudio Molina St., Veinte Reales (from T. Santiago St., to Mercury St.) Brgy. Veinte Reales, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.500 Lane Km
EAO (‘000) – P 0.520 M
Unit Cost (P’000): P16,986.67/ lane km
Allocation: P 25.480 M
Total: P 26.0 M
As Modified
UACS No. 300116200320000
Project ID: P00240612LZ
WIN8F05546
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Improvement of Road and drainage system - Claudio Molina St., Veinte Reales (from T. Santiago St., to Mercury St.) Brgy. Veinte Reales, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.014 Lane Km
EAO (‘000) – P 0.520 M
Unit Cost (P’000): P25,128.21/ lane km
Allocation: P 25.480 M
Total: P 26.0 M
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05547 |
UACS No. 310105100020000 |
January 1, 2018 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 310105100020000
Project ID: P00200427LZ
WIN8F05547
Local Program
001: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Elliptical Road – K0012+-510 – K0012+920
Physical Target: CW1-Rehabilitation of Paved Road L = 7.15 lane km
Unit Cost (P’000): P13,489.75/ lane km
Allocation (‘000): P 96,451.75
EAO (‘000) P 3,498.25
Total (‘000) : P 99,950.00
As Modified
UACS No. 310105100020000
Project ID: P00200427LZ
WIN8F05547
Local Program
001: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Elliptical Road – K0012+-505 – K0013+483
Physical Target: CW1-Rehabilitation of Paved Road L = 9.03 lane km
Unit Cost (P’000): P10,681.25/ lane km
Allocation (‘000): P 96,451.75
EAO (‘000) P 3,498.25
Total (‘000) : P 99,950.00
|
June 1, 2018 |
FY - 2018 |
WIN8C02829 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Convergence Special Support Program
Cnvergence and Special Support -
Construction/Improvement of Access Roads leading to Airports
FROM:
New Ibajay - Mabini - Sandoval Access Road leading to Taytay Airport
CW1: 4.98 lane km ( Construction of Gravel Road )
Allocation: 70,000,000 Php
TO:
New Ibahay - Mabini - Sandoval Access Road leading to Taytay Airport , Taytay, Palawan
CW1: 4.98 lane km ( Construction of Gravel Road )
Allocation: 70,000.000 Php |
June 1, 2018 |
GAA FY 2018 |
WIN8F05545 |
UACS No. 310112100011000 |
January 1, 2018 |
National Capital Region |
Quezon City 2nd Engineering District Office |
UACS No. 310112100011000
Project ID: P00200705LZ
WIN8F05545
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Balete Drive – K0010+-740 – K0010+-174
Physical Target: CW1-Upgrading of Drainage along Road L = 1,132 lineal meter
Unit Cost (P’000): P 9.22 / lineal meter
Allocation (‘000): P 10,446.80
EAO (‘000) P 213.20
Total (‘000): P 10,660.00
As Modified
UACS No. 310105100020000
Project ID: P00200427LZ
WIN8F05545
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Balete Drive – K0010+-740 – K0010+-290
Physical Target: CW1-Upgrading of Drainage along Road L = 800 lineal meter
Unit Cost (P’000): P 13.06 / lineal meter
Allocation (‘000): P 10,446.80
EAO (‘000) P 213.20
Total (‘000): P 10,660.00
|
June 1, 2018 |
FY - 2018 |
WIN8C02825 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/upgrading
of Damaged Paved Roads - Secondary Roads
FROM:
Puerto Princesa North Rd
K0173+439 - K0173+611
CW1: 0.344 lane km ( Rehabilitation of Paved Road )
Allocation: 10,000,000 Php
TO;
Puerto Princesa North Rd
K0173+420 - K0173+580
CW1: 0.32 lane km ( Rehabilitation of Paved Road )
Allocation: 10,000,000 Php |
June 1, 2018 |
GAA FY 2018 |
WIN8F05540 |
UACS No. 310106100072000 |
January 1, 2018 |
National Capital Region |
Quezon City 2nd Engineering District Office |
roject ID: P00200531LZ
WIN8F05540
001: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Road – Tertiary Roads
C. Benitez St. – K0010+-001 – K0010+367
Physical Target: CW1-Rehabilitation of Paved Road L = .736 lane km
Unit Cost (P’000): P 13,301.90 / lane km
Allocation (‘000): P 9,790.20
EAO (‘000) P 199.80
Total (‘000): P 9,990.00
As Modified
UACS No. 310106100072000
Project ID: P00200531LZ
WIN8F05540
001: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Road – Tertiary Roads
C. Benitez St. – K0010+-856 – K0010+-371
Physical Target: CW1-Rehabilitation of Paved Road L = .970 lane km
Unit Cost (P’000): P 13,301.90 / lane km
Allocation (‘000): P 9,790.20
EAO (‘000) P 199.80
Total (‘000): P 9,990.00
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05535 |
UACS No. 310112100012000 |
January 1, 2018 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 310112100012000
Project ID: P00200707LZ
WIN8F05535
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Camp Crame Rd Network – (S05562LZ) Chainage 0 – Chainage 131, (S05563LZ) Chainage 0 – Chainage 127, (S05564LZ) Chainage 0 – Chainage 170, (S05566LZ) Chainage 0 – Chainage 325
Physical Target: CW1-Upgrading of Drainage Structure along Road L = 1,506 lineal meter
Unit Cost (P’000): P 14.97 / lineal meter
Allocation (‘000): P 22,540.00
EAO (‘000) P 460.00
Total (‘000): P 23,000.00
As Modified
UACS No. 310112100012000
Project ID: P00200707LZ
WIN8F05535
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Camp Crame Rd Network – (S05562LZ) Chainage 0 – Chainage 131, (S05563LZ) Chainage 0 – Chainage 127, (S05564LZ) Chainage 0 – Chainage 393, (S05566LZ) Chainage 0 – Chainage 325
Physical Target: CW1-Upgrading of Drainage Structure along Road L = 1,125 lineal meter
Unit Cost (P’000): P 20.04 / lineal meter
Allocation (‘000): P 22,540.00
EAO (‘000) P 460.00
Total (‘000): P 23,000.00
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05548 |
UACS No. 320101100392000 |
January 1, 2018 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 320101100392000
Project ID: P00221852LZ-CW1
WIN8F05548
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Upgrading/Improvement/Construction of Riverwall (Sta. 0+359.8 – Sta. 0+798.8) along San Rafael Village (Phase II), Navotas City
Physical Target: CW1 – Construction of Flood Mitigation Structure: 439.0 lm
EAO P 0.5 M
Unit Cost: P 55,808.65/ lm
Allocation: P 24.5 M
Total: P 25 M
As Modified
UACS No. 320101100392000
Project ID: P00221852LZ-CW1
WIN8F05548
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Upgrading/Improvement/Construction of Riverwall (Sta. 0+359.8 – Sta. 0+542.20) along San Rafael Village (Phase II), Navotas City
Physical Target: CW1 – Construction of Flood Mitigation Structure: 182.4 lm
EAO P 0.5 M
Excess: P 0.019 M
Unit Cost: P 134,216.01/ lm
Allocation: P 24.481 M
Total: P 25 M
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05539 |
UACS No. 320101100384000 |
January 1, 2018 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 320101100384000
Project ID: P00221627LZ
WIN8F05539
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Raising and Improvement of Drainage Canal (Sta. 0+000 – Sta. 0+204) at B. Cruz, Brgy. Tangos, Navotas City
Physical Target: CW1 – Upgrading of Drainage Structure: 204 lm
EAO P 0.3 M
Unit Cost: P 72,058.82/ lm
Allocation: P 14.7 M
Total: P 15 M
As Modified
UACS No. 320101100384000
Project ID: P00221627LZ
WIN8F05539
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Raising and Improvement of Drainage Canal (Sta. 0+000 – Sta. 0+545.70) at B. Cruz St., Brgy. Tangos, Navotas City
Physical Target: CW1 – Upgrading of Drainage Structure: 545.70 lm
EAO P 0.3 M
Unit Cost: P 26,937.88/ lm
Estimated Cost: P 14.7 M
Total: P 15 M
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05550 |
UACS No. 320101100385000 |
January 1, 2018 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 320101100385000
Project ID: P00221628LZ
WIN8F05550
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Raising and Improvement of Drainage Canal (Sta. 0+000 – Sta. 0+180) at Takino St., Brgy. Bangkulasi, Navotas City
Physical Target: CW1 – Upgrading of Drainage Structure: 220.55 lm
EAO P 0.3 M
Unit Cost: P 66,650 / lm
Allocation: P 14.7 M
Total: P 15 M
As Modified
UACS No. 320101100385000
Project ID: P00221628LZ
WIN8F05550
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Raising and Improvement of Drainage Canal (Sta. 0+000 – Sta. 0+220.55) at Takino St., Brgy. Bangkulasi, Navotas City
Physical Target: CW1 – Upgrading of Drainage Structure: 220.55 lm
EAO P 0.3 M
Excess: P2.972 M
Unit Cost: P 53,180 / lm
Estimated Cost: P 11.728 M
Total: P 15 M
|
June 1, 2018 |
FY - 2018 |
WIn8C02828 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Local Program
Local Roads and Bridges - Local Roads -
Construction/Repair/rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation/Improvement of Dumaran - Araceli Road,
Dumaran, Palawan
CW1: 4 lane km ( Rehabilitation of Concrete Road )
Allocation: 50,000,000 Php
TO:
Rehabilitation/Improvement of Dumaran - Araceli Road,
Dumaran, Palawan
CW1: 3.62 lane km ( Rehabilitation of Concrete Road )
Allocation: 50,000,000 Php
|
June 1, 2018 |
FY - 2018 |
WIN8C02827 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Road Widening - Puerto Princesa North Road
incl. ROW
K0267+532 - K0267+2532
CW1: 4 lane km ( Road Widening )
ROW - ROW acquisition - 20,000 sq.m.
Allocation: 978,994,000 Php
TO:
Road Widening - Puerto Princesa North Road
including ROW
K0267+960 - K0267+2512
CW1: 3.104 lane km ( Road Widening )
ROW - ROW Acquisition - 20,000 sq.m.
Allocation: 97,994,000 Php
|
June 1, 2018 |
FY 2018 |
WIN8G02278 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Road Dike leading to Bancal Pugad, Lubao, Pampanga |
June 1, 2018 |
FY 2018 |
WIN8G02280 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Natividad, Guagua, Pampanga |
June 1, 2018 |
FY 2018 |
WIN8G02281 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Paving of Sta. Rita Road, Lubao, , Pampanga |
June 1, 2018 |
FY 2018 |
WIN8G02282 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Concreting of Road, Brgy. Dila-Dila, Zone 4, Santa Rita, Pampanga |
June 1, 2018 |
FY 2018 |
WIN8G02284 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Concreting of Barangay Road, Barangay San Jose Mitla – Mitla Proper, Sta. 0+118 – Sta. 0+597.40, Sta. 1+722.40 – Sta. 2+636, Sta. 3+105 – Sta. 3+642.40, Sta. 3+853.90 – Sta. 4+920, Porac, Pampanga |
June 1, 2018 |
FY 2018 |
WIN8G02285 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Concreting of Road, Sta. Teresa 1, Lubao, Pampanga |
June 1, 2018 |
GAA FY 2018 |
WIN8F05558 |
UACS No. 310102100052000 |
January 1, 2018 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 310102100052000
Project ID: P00202390LZ
WIN8F05558
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
JA Santos Ave – K0004+-375 – K0004+359.5, K0004+515.0 – K0004+682.80, K0004+987.7 – K0005+009.5, K0005+021.6 – K0005+158.0, K0006+056 – K0006+224.5, K0006+510.4 – K0006+-347.5, K0006+-377.2 – K0006+-175.90, K0006+-164.6 – K0006+056.10, K0006+070.2 – K0006+311.4
Physical Target: CW1 Preventive Maintenance of Road: Asphalt Overlay L=4.4364 lane km
Unit Cost (P’000): P6,922,558.83/ lane km
Allocation: P 30,711,240.00
EAO P 626,760.00
Total: P 31,338,000.00
As Modified
As per GAA/Original
UACS No. 310102100052000
Project ID: P00202390LZ
WIN8F05558
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
JA Santos Ave – K0004+-375 – K0004+275
Physical Target: CW1 Preventive Maintenance of Road: Asphalt Overlay L=1.30 lane km
Unit Cost (P’000): P23,624,030.77/ lane km
Allocation: P 30,711,240.00
EAO P 626,760.00
Total: P 31,338,000.00
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05555 |
UACS No. 300116200313000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300116200313000
Project ID: P00247879LZ
WIN8F05555
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Construction/ Rehabilitation/ Improvement of Road and Drainage System along Durian Road, Brgy. 178, (Connecting to Deparo-Camarin Road), Caloocan City
Physical Target: CW1-Rehabilitation of Concrete Road = 2.450 Lane Km
EAO (‘000) – P 0.600 M
Unit Cost (P’000): P12,000/lane km
Allocation: P 29.400 M
Total: P 30.0 M
As Modified
UACS No. 300116200313000
Project ID: P00247879LZ
WIN8F05555
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Construction/ Rehabilitation/ Improvement of Road and Drainage System along Durian Road, Brgy. 178, (Connecting to Deparo-Camarin Road), Caloocan City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.170 Lane Km
EAO (‘000) – P 0.600 M
Unit Cost (P’000): P25,128.21/lane km
Allocation: P 29.400 M
Total: P 30.0 M
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05557 |
UACS No. 300118200032000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300118200032000
Project ID: P00240561LZ
WIN8F05557
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Rehabilitation of Roads with Bridge Replacement, Brgy. 171, Caloocan City
Physical Target: CW1-Replacement of Bridge = 73.20 sq.m.
EAO (‘000) – P 200.00
Unit Cost (P’000): P133.88/sq.m.
Allocation (‘000): P 9,800.00
Total: P 10,000.00 M
As Modified
UACS No. 300116200313000
UACS No. 300118200032000
Project ID: P00240561LZ
WIN8F05557
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Rehabilitation of Roads with Bridge Replacement, Brgy. 171, Caloocan City
Physical Target: CW1-Replacement of Bridge = 66.00 sq.m.
CW2-Rehabilitation of Concrete Road 0.338 lane km
EAO (‘000) – P 100.00
Unit Cost (P’000): P111.56/sq.m.
P7,506.92/ lane km
Allocation (‘000): P 7,363.00
P 2,537.00
Total: P 10,000.00 M
|
June 1, 2018 |
FY 2018 |
WIN02286 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Flood Control and Drainage – Drainage / Protection Works – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Construction of Drainage System (Line Canal) Brgy. Pulung Masle, Guagua, Pampanga |
June 1, 2018 |
FY 2018 |
WIN8G02287 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Ascomo, Guagua, Pampanga |
June 1, 2018 |
FY 2018 |
WIN8G02289 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Concreting of Road, Brgy. Pulungmasle, Guagua, Pampanga |
June 1, 2018 |
FY 2018 |
WIN8G02290 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation / Improvement of Dike with Slope Protection along Porac River, Sta. Rita, Lubao, Pampanga |
June 1, 2018 |
FY 2018 |
WIN8G02296 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Repair / Rehabilitation of Access Road leading to SCTEX and Economic Zone, San Jose, Floridablanca, Pampanga |
May 31, 2018 |
FY - 2018 |
WIn8C02807 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
002 - Protect Lives and Properties Against Major Flood
Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage System
FROM:
Construction of Flood Control Structure at
Tubuan Bridge, PPNR, Palawan
CW1: 650 lm ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php
TO:
Construction of Flood Control Structure at
Tubuan Bridge, PPNR, Taytay, Palawan
CW1: 520 lm ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php |
May 31, 2018 |
FY - 2018 |
WIN8C02811 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Local Program
Local Roads and Bridges - Local Roads
Local Infrastructure Program
FROM:
Construction of Roads in barangay 3, Roxas, Palawan
CW1: 0.528 lane km ( Construction of Concrete Road )
Allocation: 3,000,000 Php
TO:
Construction of Roads in Barangay 3, Roxas, Palawan
CW1: 0.590 Lane Km ( Construction of Concrete Road )
Allocation: 3,000,000 Php |
May 31, 2018 |
FY - 2018 |
WIN8C02826 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement -
Tertiary Road
FROM:
Coron - Busuanga Rd
K0028+624 - K0029+515.60,
K0033+200 - K0033+308.00,
K0043+889 - K0044+181.00,
K0048+505 - K0049+000.00,
K0072+167 - K0072+446.30
CW1: 6,303 sq.m. ( Off-Carriageway Improvement
Shoulder Paving/Construction )
Allocation: 50,291,000 Php
TO:
Coron - Busuanga Rd
K0028+624 - K0029+515.60,
K0033+200 - K0033+308.00,
K0043+889 - K0044+180.00,
K0048+505 - K0049+000.00,
K0072+167 - K0072+446.30
CW1: 9,732 sq.m. ( Off-Carriageway Improvement
Shoulder Paving/Construction )
Allocation: 50,291,000 Php
|
May 31, 2018 |
FY - 2018 |
WIN8C02815 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse and Landslide -
Tertiary Road
FROM:
Coron - Busuanga Rd
K0058+537 - K0058+738
CW1: 2,412 sq.m. ( Construction of Road Slope
Protection Structure )
Allocation: 12,14,,000 Php
TO:
Coron - Busuanga Rd
K0058+537 - K0058+738
CW1: 2,424.10 sq m ( Construction of Road Slope
Protection Structure )
Allocation; 12,141,000 Php
|
May 31, 2018 |
FY 2018 |
WIN8G02279 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Secondary Roads - Paniqui – Camiling - Wawa Rd - K0156 + 380 - K0157 + 210.20, K0162 + 699 - K0162 + 929, K0168 + 710 - K0169 + 629.50 |
May 31, 2018 |
FY 2018 |
WIN8G02283 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Barangay Balibago Bypass, Barangay Balibago, Tarlac City |
May 31, 2018 |
FY 2018 |
WIN8G02291 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Convergence and Special Support Program - Construction / Improvement of Access Roads leading to Declared Tourism Destinations - Access Road leading to Tarlac Ecotourism Park, San Jose, Tarlac |
May 31, 2018 |
FY 2018 |
WIN8G02292 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads – Primary Roads - Manila North Rd - K0153 + 260 - K0153 + 963, K0155 + 507 - K0158 + 487.20 |
May 29, 2018 |
FY - 2018 |
WIN8C02813 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Convergence Special Support Program
Convergence and Special Support -
Construction/Improvement of Access Roads leading to Airports
FROM:
Brgy. Port Barton - Brgy. Kemdeng - Begy.Poblacion
leading to San Vicente Airport, Palawan
CW1: 5.90 lane km ( Construction of Gravel Road )
Allocation: 90,000,000 php
TO:
Brgy. Port Barton - Brgy. Kemdeng - Brgy. Poblacion
leading to San Vicente Airport, Palawan
CW1: 3.24 lane km ( Construction of Gravel Road )
Allocation: 90,000,000 Php
|
May 29, 2018 |
FY - 2018 |
WIN8C02814 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of Fllod
Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Control Structure at
Balolo Bridge, CBNR< Palawan
CW1: 260 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 php
TO:
Construction of Flood Control Structure at
Balolo Bridge, CBNR, Coron, Palawan
CW1: 258 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php |
May 29, 2018 |
FY - 2018 |
WINC02817 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Control Structure at
Batacalan bridge, CBNR, Palawan
CW1: 280 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php
TO:
Construction of Flood Control Structure at
Batacalan Bridge, CBNR, Coron, Palawan
CW1: 250 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 php
|
May 29, 2018 |
FY - 2018 |
WIN8C02810 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Control Structure at
Lele Bridge, CBNR, Palawan
CW1: 280 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php
TO:
Construction of Flood Control Structure at
Lele Bridge, CBNR, Busuanga, Palawan
CW1: 245.70 lm ( Construction of Flood Mitigation
Structure )
Allocation: 10,000,000 Php |
May 29, 2018 |
FY - 2018 |
WIN8C02808 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Control Structure at
Malabnao Bridge, CBNR, Palawan
CW1: 350 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php
TO:
Construction of Flood Control Structure at
Malabnao Bridge, CBNR, Busuanga, Palawan
CW1: 240 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php |
May 29, 2018 |
FY 2018 GAA (RA 10964) |
WIN8G02265 |
SR2018-01-002524 |
January 1, 2018 |
Region III |
Regional Office III |
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Dinadiawan-Ditawini Bypass Road leading to Tourism Sites/Destinations, Bridgy. Dinadiawan, Dipaculao, Aurora
CW-1 (Construction of Concrete Road) - 6.00 lane km
CW-2 (Construction of Road Slope Protection Structure) - 1,635 sq.m.
Allotment: PHP 137.50M |
May 29, 2018 |
FY 2018 GAA (RA 10964) |
WIN8G02264 |
SR2018-01-001414 |
January 1, 2018 |
Region III |
Regional Office III |
OO-1: Ensure Safe and Reliable National Road System
Network Development Program\
Construction of Missing Links/New Roads
Capas-Botolan Road, incl. Slope Protection, Tarlac
CW-1 (Construction of Concrete Road including Drainage Structure) - 13.8704 lane km
CW-2 (Construction of Road Slope Protection Structure) - 9,698.90 sq.m.
Allotment: PHP 300M |
May 29, 2018 |
FY 2018 GAA (RA 10964) |
WIN8G02271 |
SR2018-01-001282 |
January 1, 2018 |
Region III |
Regional Office III |
OO-1: Ensure Safe and Reliable National Road System
Network Development Program
Road Widening - Tertiary Roads
NCR/Bulacan Bdry - Bigte - Ipo Dam Rd
K0033 + 384 - K0033 + 814.50,
K0034 + 238.70 - K0035 + 587,
K0035 + 683 - K0037 + 664
CW-1 (Road Widening) - 4.840 lane km
ROW (ROW Acquisition) - 5,246.00 sq.m.
Allotment: PHP 137.143M
Excess: PHP 38.761M |
May 29, 2018 |
FY 2018 GAA (RA 10964) |
WIN8G02266 |
SR2018-01-000921 |
January 1, 2018 |
Region III |
Regional Office III |
OO-1: Ensure safe and Reliable National Road System
Network Development Program
Road Widening - Primary Roads
Daang Maharlika (LZ) incl. ROW
K0040 + 506 - K0041 + 296, K0041 + 313 - K0042 + 000,
K0042 + 218 - K0042 + 680, K0043 + 006 - K0043 + 613,
K0045 + 635 - K0046 + 450, K0046 + 466 - K0047 + 508
CW-1 (Road Widening) - 8.8040 lane km
ROW (ROW Acquisition) - 10,000 sq.m.
ALLOTMENT: PHP 164.037M
EXCESS: PHP 40.020M |
May 29, 2018 |
FY 2018 GAA (RA 10964) |
WIN8G02266 |
SR2018-01-000921 |
January 1, 2018 |
Region III |
Regional Office III |
OO-1: Ensure safe and Reliable National Road System
Network Development Program
Road Widening - Primary Roads
Daang Maharlika (LZ) incl. ROW
K0040 + 506 - K0041 + 296, K0041 + 313 - K0042 + 000,
K0042 + 218 - K0042 + 680, K0043 + 006 - K0043 + 613,
K0045 + 635 - K0046 + 450, K0046 + 466 - K0047 + 508
CW-1 (Road Widening) - 8.8040 lane km
ROW (ROW Acquisition) - 10,000 sq.m.
ALLOTMENT: PHP 164.037M
EXCESS: PHP 40.020M |
May 28, 2018 |
FY - 2018 |
WIN8C02812 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Convergence Special Support Program
Convergence and Special Support -
Construction/Improvement of Access Roads leading to Trades, Industries, and Economic Zones
FROM:
Access Road leading to Palawan Super Corn Development
Corporation in support of Agribusiness Industry, Cullion,
Palawan
CW1: 4 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php
TO:
Access Road leading to Palawan Super Corn Development
Corporation in support of Agribusiness Industry, Cullion,
Palawan
CW1: 2.4026 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php |
May 28, 2018 |
FY - 2018 |
WIN8C02824 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Convergence Special Support Program
Convergence and Special Support Program -
Construction/Improvement of Access Roads leading to
Trades, Industries, and Economic Zones
FROM:
Access Road leading to Seaweed Plantations in
Brgy. Danleg, Dumaran, Palawan
CW1: 4 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php
TO:
Access Road leading to Seaweed Plantations in
Danleg, Dumaran, Palawan
CW1: 2.894 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php |
May 28, 2018 |
FY - 2018 |
WIN8C02809 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Convergence Special Support Program
Convergence and Special Support -
Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
FROM:
Access Road to Malampaya Sound, Mt. Capuas and
San Vicente Long Beach, Bebeladan El Nido, Palawan
CW1: 1.6 lane km ( Construction of Concrete Road )
Allocation: 20,000,000 Php
TO:
Access Road to Malampaya Sound, Mt. Capuas and
San Vicente Long Beach, Taytay & San Vicente, Palawan
CW1: 1.215 lane km ( Construction of Concrete Road )
Allocation: 20,000,000 Php |
May 28, 2018 |
FY 2018 |
WIN8G02241 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Repair / Rehabilitation / Improvement, Overlay with Pavement Markings along Jct. Layac – Balanga – Mariveles Port Road, K0102+(-100) – K0104+529, K0106+000 – K0107+393, K0107+500 – K0107+980, Hermosa and Orani, Bataan |
May 28, 2018 |
FY 2018 GAA |
WIN8C03050 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Patel-Kapatagan Road Package 4, Davao del Norte
Physical Target:
CW1: 26.667 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 400,000,000.00
CW1: P 386,000,000.00 (Construction of Gravel Road)
EAO: P 14,000,000.00
TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Patel-Kapatagan Road Package 4, Davao del Norte
Physical Target:
CW1: 15.28874 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 400,000,000.00
CW1: P 386,000,000.00 (Construction of Gravel Road)
EAO: P 14,000,000.00 |
May 28, 2018 |
FY 2018 GAA |
WIN8C03057 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Mawab-Maragusan-Caraga Road (Section 1), Package D, incl. Bridge and ROW, Compostela Valley
Physical Target:
CW1: 8.682 Lane Km (Construction of Concrete Road)
CW2: 763.20 sq. m. (Construction of Concrete Bridge)
ROW: 40,816.327 sq. m.
Allocation:
TOTAL: P 295,000,000.00
CW1: P 171,770,000.00 (Construction of Concrete Road)
CW2: P 109,045,000.00 (Construction of Concrete Bridge)
ROW: P 3,860,000.00
EAO: P 10,325,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Mawab-Maragusan-Caraga Road (Section 1), Package D, incl. Bridge and ROW, Compostela Valley
Physical Target:
CW1: 9.58216 Lane Km (Construction of Concrete Road)
ROW: 40,816.327 sq. m.
Allocation:
TOTAL: P 295,000,000.00
CW1: P 280,815,000.00 (Construction of Concrete Road)
ROW: P 3,860,000.00
EAO: P 10,325,000.00 |
May 28, 2018 |
FY 2018 GAA |
WIN8C03051 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan), Package A, incl. ROW, Davao del Norte
Physical Target:
CW1: 6.036 Lane Km (Construction of Gravel Road)
CW2: 10.268 Lane Km (Construction of Concrete Road)
ROW: 87,210.00 sq. m.
Allocation:
TOTAL: P 345,235,000.00
CW1: P 82,777,700.00 (Construction of Gravel Road)
CW2: P 211,774,075.00 (Construction of Concrete Road)
ROW: P 38,600,000.00
EAO: P 12,083,225.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan), Package A, incl. ROW, Davao del Norte
Physical Target:
CW1: 4.42462 Lane Km (Reconstruction to Concrete Pavement)
CW2: 17.14992 Lane Km (Construction of Concrete Road)
ROW: 87,210.00 sq. m.
Allocation:
TOTAL: P 345,235,000.00
CW1: P 35,480,818.69 (Construction of Gravel Road)
CW2: P 259,070,956.31 (Construction of Concrete Road)
ROW: P 38,600,000.00
EAO: P 12,083,225.00 |
May 28, 2018 |
FY 2018 GAA |
WIN8C03056 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Bukidnon-Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon-Laak Compostela Valley), Package 1, incl. ROW, Compostela Valley
Physical Target:
CW1: 12.910 Lane Km (Construction of Concrete Road)
ROW: 96,840.00 Lane Km
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800 (Construction of Concrete Road)
ROW: P 9,142,200.00
EAO: P 10,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Bukidnon-Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon-Laak Compostela Valley), Package 1, incl. ROW, Compostela Valley
Physical Target:
CW1: 15.836 Lane Km (Construction of Concrete Road)
ROW: 96,840.00 Lane Km
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800 (Construction of Concrete Road)
ROW: P 9,142,200.00
EAO: P 10,500,000.00 |
May 28, 2018 |
FY 2018 GAA |
WIN8C03040 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Construction/Upgrading/Rehabilitation of Drainage along National Roads – Primary Roads
Daang Maharlika (MN) – K1457+128 – K1459+280.50
Physical Target:
CW1: 7,463.00 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 149,269,000.00
CW1: P 144,044,585.00 (Construction of Drainage Structure along Road)
EAO: P 5,224,415.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Construction/Upgrading/Rehabilitation of Drainage along National Roads – Primary Roads
Daang Maharlika (MN) – K1457+128 – K1459+750
Physical Target:
CW1: 4,822.00 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 149,269,000.00
CW1: P 144,044,585.00 (Construction of Drainage Structure along Road)
EAO: P 5,224,415.00 |
May 25, 2018 |
FY 2018 |
WIN8G02261 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Dila-Dila, Zone 6, Santa Rita, Pampanga |
May 25, 2018 |
FY 2018 |
WIN8G02257 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Rehabilitation / Improvement / Upgrading of Lubao – Floridablanca road, San Pablo 2nd, Lubao, Pampanga |
May 25, 2018 |
FY 2018 |
WIN8G02258 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Network Development Program – Road Widening – Secondary Roads - Angeles – Porac – Floridablanca – Dinalupihan Road – K0108+1260 – K0110+300, K0110+380 – K0111+937.38, K0108+1260 – K0110+300, K0110+434 – K0111+937. |
May 25, 2018 |
FY 2018 |
WIN8G02259 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Sitio Tabun, San Basilio, Santa Rita, Pampanga |