Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
June 7, 2018 FY 2018 WIN8C03073 UACS No. 300111200001000 May 25, 2018 Region IX Regional Office IX
UACS No. 300111200001000
Project ID: P00257703MN
Local Program
National Roads and Bridges - National Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Road Including Right-of-Way for the Proposed By-pass National Road along Sumagdang - Menzi - Lanote, Isabela City, Basilan
Physical Target:
CW-1- Construction of Concrete Road: 13.48 Lane km
Unit Cost: P 17,874,708.16/Lane km
Physical Target:
ROW: 996.45 Sq.m.
Unit Cost: P 300/Sq.m.
EAO: P 8,750,000.00
Allocation: P 250,000,000.00
June 7, 2018 FY 2018 WIN8C03060 UACS No. 300203100118000 May 25, 2018 Region IX Regional Office IX
UACS No. 300203100118000
Project ID: P00230016MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads Leading to Declared Tourism Destinations
NRJ Ayala- La Paz Road Leading to La Paz Resort, Zamboanga City
Physical Target:
CW-1- Construction of Concrete Road: 7.22 Lane km
Unit Cost: P 20,048,476.45/Lane km
EAO: P 5,250,000.00
Allocation: P 150,000,000.00
June 7, 2018 FY 2018 GAA WIN8C03109 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION

FROM: OO2: Project Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Revetment, Maco River, Maco, Compostela Valley
Physical Target
CW-1: 1,720 Lineal meters (Construction of Revetment)
CW-2: 3,051 Cubic meters (Channelization)
ROW: 1,429 Square meters (ROW Acquisation)
ALLOCATION
Total: P 35,000,000.00
CW-1: P 31,697,352.00 (Construction of Revetment)
CW-2: P 2,357,648.00 (Channelization)
ROW: P 245,000.00
EAO: P 700,000.00

TO: OO2: Project Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Revetment, Maco River, Maco, Compostela Valley
Physical Target
CW-1: 1,841.48 Lineal meters (Construction of Revetment)
CW-2: 2,743 Cubic meters (Channelization)
ROW: 1,429 Square meters (ROW Acquisation)
ALLOCATION
Total: P 35,000,000.00
CW-1: P 33,469,880.30 (Construction of Revetment)
CW-2: P 585,119.70 (Channelization)
ROW: P 245,000.00
EAO: P 700,000.00
June 7, 2018 FY 2018 WIN8C03071 UACS No. 300111200002000 May 25, 2018 Region IX Regional Office IX
UACS No. 300111200002000
Project ID: P00257704MN
Local Program
National Roads and Bridges - National Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Road Widening along Basilan Circumferential Road (BCR) Isabela - Maluso Road, Isabela City, Basilan Including Right-of-Way (ROW)
K0002+000 - K0005+000
Physical Target:
CW-1- Road Widening: 6.00 Lane Km
Unit Cost: P 17,171,180.28/Lane Km
ROW: 42,576.39 sq.m.
Unit Cost: P 300/ Sq.m.
EAO: P 4,200,000.00
Allocation: P 120,000,000.00
June 7, 2018 FY 2018 WIN8C03069 UACS No. 300111200003000 May 25, 2018 Region IX Regional Office IX
UACS No. 300111200003000
Project ID: P00257705MN
Local Program
National Roads and Bridges - National Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Road Widening along Basilan Circumferential Road (BCR) Isabela - Maluso Road, Isabela City, Basilan including Road-Right-of-Way (ROW)
K0008+000.00 - K0011+500.00
Physical Target:
CW-1- Road Widening: 7.00 Lane km
Unit Cost: P 16,482,184.90/Lane km
ROW: 1,415.69 Sq.m.
Unit Cost: P 300/Sq.m
EAO: P 4,200,000.00
Allocation: P 120,000,000.00
June 7, 2018 FY 2018 WIN8C03077 UACS No. 310201100146000 May 25, 2018 Region IX Regional Office IX
UACS No. 310201100146000
Project ID: P00200589MN
OO1: Ensure Safe and Reliable National Road System - Network Development
Road Widening - Primary Roads
Lanao - Pagadian - Zamboanga City Rd
K1740+498.63 - K1744+551.63
Physical Target:
CW-1- Road Widening: 8.11 Lane km
Unit Cost: P 15,070,371.69/Lane km
ROW: 10,764.29 sq.m.
Unit Cost: P 300/sq.m
EAO: P4,550,000.00
Allocation: P 130,000,000.00
June 7, 2018 FY 2018 WIN8C03076 UACS No. 310204100314000 May 25, 2018 Region IX Regional Office IX
UACS No. 310204100314000
Project ID: P00200312MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Zamboanga City Diversion Road (Zambowood - Mampang Section), Zamboanga City
Physical Target:
CW-1- Construction of Concrete Road: 7.32 lane km
Unit Cost: P 18,455,931.99/lane km
ROW: 8.59 sq.m.
Unit Cost: P 300/Sq.m.
EAO: P 4,900,000.00
Allocation: P 140,000,000.00
June 7, 2018 FY 2018 WIN8C03065 UACS No. 320101102162000 May 25, 2018 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 320101102162000
Project ID: P00223435MN
OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/ Extension of Flood Control Structure along Dipolog River, Guinles (Upstream), Polanco, Zamboanga del Norte
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 269.20 l.m.
Unit Cost: P 109,212.48/l.m.
EAO: P 600,000.00
Allocation: P 30,000,000.00
June 7, 2018 FY 2018 WIN8C03079 UACS No. 300117202008000 May 25, 2018 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 300117202008000
Project ID: P00258879MN
Local Program
Local Infrastructure Program
Local Roads and Bridges
Local Roads
Rehabilitation of Road Leading to the Maniway Peaks and Highland Resort, Rizal, Zamboanga del Norte
Physical Target:
CW-1- Road Concreting: 0.772 lane km
Unit Cost: P 6,411,917.10/lane km
EAO: P 50,000.00
Allocation: P 5,000,000.00
June 7, 2018 FY 2018 WIN8C03072 UACS No. 310201100261000 May 25, 2018 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310201100261000
Project ID: P00200598MN
OO1: Ensure Safe and Reliable National Road
Network Development - Road Widening - Primary Roads
Jct. Aurora - Ozamis City Rd
K1640+400 - K1642+000
Physical Target:
CW-1- Road Widening: 3.20 Lane km
Unit Cost: P 15.313M/Lane km
EAO: P 1.00 M
Allocation: P 50.0 M
June 7, 2018 FY 2018 WIN8C03053 UACS No. 300203100519000 May 25, 2018 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 300203100519000
Project ID: P00230023MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads Leading to Declared Tourism Destination
NRJ leading to Eden Park Panoramic View/ Zipline and Shrine , Brgy. Bayabas to Brgy. Acad, Aurora, Zamboanga del Sur
Physical Target:
CW-1- Construction of Concrete Road: 2.72 lane km
Unit Cost: P 9.007M/ Lane km
EAO: P 0.50M
Allocation: P 25 M
June 7, 2018 FY 2018 WIN8C03064 UACS No. 300104204114000 May 25, 2018 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 300104204114000
Project ID: P00255192MN
Buildings and Other Structures - Multipurpose/ Facilities
Local Infrastructure Program
Construction of Multi-Purpose Building, Brgy. Labangon, Dumingag, Zamboanga del Sur
Physical Target:
CW-1- Construction of Multi Purpose Building: 1.0 Building
Unit Cost: P 2.475 M/ Building
EAO: P 0.025M
Allocation: P 2.5M
June 7, 2018 FY 2018 WIN8C03082 UACS No. 300204100201000 May 25, 2018 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 300204100201000
Project ID: P00230033MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads Leading to Trades, Industries and Economic Zones
NRJ to Brgy. San Juan, Aurora-Brgy. Man-ilan, in support of Aurora Coco Activated Carbon, Zamboanga del Sur
Physical Target:
CW-1- Paving of Unpaved Roads: 2.26 lane km
Unit Cost: P 8.673M/lane km
EAO: P 0.400 M
Allocation: P 20.0M
June 7, 2018 FY 2018 WIN8C03070 UACS No. 300116201165000 May 25, 2018 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 300116201165000
Project ID: P00258447MN
Local Program
Local Roads and Bridges - Local Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of Barangay Sanito - Pag-Asa (Going to Fisheries), Ipil, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 3.1673 Lane km
Unit Cost: P 6,188,236.04/ Lane km
EAO: P 0.40M
Allocation: P 20M
June 6, 2018 FY 2018 WIN8G02144 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Sur 1st District Engineering Office
UACS No.: 310204100353000
Project ID: P00201086LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of By-Pass and Diversion Roads - Milaor-Pili Bypass Road, Camarines Sur
Physical Target - CW1 – Construction of Gravel Road/ 3.608 lane-km
CW2 - Construction of Road Slope Protection Structure/ 944.12 sq.m.
Unit Cost: CW1 – Php 9.55M /lane-km
CW2 – Php 15.39T/sq.m.
Estimated Cost: Php 50.0M
(As Modified)

June 6, 2018 FY 2018 WIN8G02143 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Sur 1st District Engineering Office
UACS No.: 310204100354000
Project ID: P00201087LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of By-Pass and Diversion Roads – Pamplona-San Fernando Bypass Road, Camarines Sur
Physical Target - CW1 – Construction of Gravel Road/ 2.914 lane-km
CW2 - Construction of Road Slope Protection Structure/ 772.10 sq.m.
Unit Cost: CW1 – Php 11.85M /lane-km
CW2 – Php 18.73T/sq.m.
Estimated Cost: Php 50.0M
(As Modified)


June 6, 2018 FY 2018 WIN8G02141 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Sorsogon 2nd District Engineering Office
UACS No.: 300116200987000
Project ID: P00240931LZ
Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of San Juan-San Julian Road, Sta. 0+000 - Sta. 0+483, Irosin, Sorsogon
Physical Target - CW1 – Construction of Concrete Road/ 0.966 lane-km
Unit Cost: P6.09M/lane-km
Estimated Cost: Php 6.00M
(As Modified)
June 6, 2018 FY 2018 WIN8G02175 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Sorsogon 2nd District Engineering Office
UACS No.: 320101101743000
Project ID: P00220510LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Structure along Binanuahan River (Downstream), Juban, Sorsogon
Physical Target - CW1 - Construction of Flood Mitigation Structure/ 400.00 lm.
Unit Cost: Php 98.00T/ lm
Estimated Cost: Php 40.00M
(As Modified)
June 6, 2018 FY 2018 WIN8G01910 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 1st District Engineering Office
UACS No.: 3102305100056000
Project ID: P00202268LZ
OO1: Ensure Safe and Reliable National Road System – Bridge Program - Widening of Permanent Bridges - Manulbi Br. (B00012MT) along Jct Milagros-Baleno-Lagta Rd
Physical Target - CW1 - Widening of Bridge/456.86 sq.m.
Unit Cost: CW1- Php 116.17T/sq.m.
Estimated Cost: Php 55.0M
(As Modified)
June 6, 2018 FY 2018 WIN8G02014 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 1st District Engineering Office
UACS No.: 310205100200000
Project ID: P00201162LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of Missing Links/New Roads - Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, incl. ROW and Slope Protection, Masbate
Physical Target - CW1 – Construction of Concrete Road/ 1.17 lane-km
CW2 - Construction of Road Slope Protection/ 3,015.00 sq.m.
Right-of-Way Acquisition/ 19,020.00 sq.m.
Unit Cost: CW1 – Php 22.455M /lane-km
CW2 – Php 1.966T/sq.m.
ROW Acquisition – Php 883.28/sq.m.
Estimated Cost: Php 50.0M
(As Modified)
June 6, 2018 FY 2018 WIN8G01891 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 1st District Engineering Office
UACS No.: 31020510020200
Project ID: P00201163LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of Missing Links/New Roads - Mandaon-Dayhagan Road, Masbate
Physical Target - CW1 – Construction of Concrete Road/ 2.10 lane-km
Unit Cost: CW1 - Php 23.333M
Estimated Cost: Php 50.0M
(As Modified)

June 6, 2018 FY 2018 WIN8G01862 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 1st District Engineering Office
UACS No.: 310208100096000
Project ID: P00201556LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Off-Carriageway Improvement - Secondary Roads – Jct Milagros-Baleno-Lagta-Rd – K0044+797 – K0045+527
Physical Target - CW1 - Off-Carriageway improvement: Shoulder Paving/Construction/ 4,140.00 sq.m.
Unit Cost: CW1 - Php 5,954.33/sq.m.
Estimated Cost: Php 25.154M
(As Modified)
June 6, 2018 FY 2018 WIN8G01885 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 1st District Engineering Office
UACS No.: 310208100099000
Project ID: P00201560LZ
OO1: Ensure Safe and Reliable National Road System – Off-Carriageway Improvement - Secondary Roads – Masbate-Milagros Rd - K0003+407 - K0004+134, K0026+313 - K0026+480
Physical Target - CW1 - Off-Carriageway improvement: Shoulder Paving/Construction/ 4,622.00 sq.m.
Unit Cost: CW1 - Php 5,798.80/sq.m.
Estimated Cost: Php 27.349M
(As Modified)
June 6, 2018 FY 2018 WIN8G01865 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 1st District Engineering Office
UACS No.: 310108100113000
Project ID: P00200852LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads – Jct Milagros-Baleno-Lagta Rd - K0079+902 - K0080+608
Physical Target - CW2 - Construction of Road Slope Protection Structure/ 4,917.60 sq.m.
Unit Cost: CW1 - Php7,449.24/sq.m.
Estimated Cost: Php 37.380M
(As Modified)
June 6, 2018 FY 2018 WIN8G02015 FY 2018 GAA R.A. 10964 December 28, 2017 Region V Masbate 1st District Engineering Office
UACS No.: 310108100032000
Project ID: P00200845LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads – Masbate-Milagros Rd - K0007+075 - K0007+325, K0008+120 - K0008+318, K0008+369 - K0008+485, K0008+531 - K0008+580, K0008+922 - K0009+584, K0008+901 - K0009+584
Physical Target - CW2 - Construction of Road Slope Protection Structure/ 16,250.12 sq.m.
Unit Cost: CW1 - 3,718.64/sq.m.
Estimated Cost: Php 62.620M
(As Modified)

June 5, 2018 2018 WIN8C03081 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Surigao del Norte 2nd District Engineering Office
CONVERGENCE AND SPECIAL SUPPORT PROGRAM -
CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS

FROM:

Construction/Improvement of Access Road leading to Borongkot Beach, Brgy. Banban, Tagana-an, Surigao del Norte

Project ID No. – P00230261MN
Physical Target: 1.006 Lane Km
Type of Work: Construction of Concrete Road

Allocation: Php 25,000,000.00 (Total)
Php 24,500,000.00 (Road)
Php 500,000.00 (EAO)


TO:

Construction/Improvement of Access Road leading to Borongkot Beach, Brgy. Banban, Tagana-an, Surigao del Norte

Project ID No. – P00230261MN
Physical Target: 2.0128 Lane Km
Type of Work: Construction of Concrete Road

Allocation: Php 25,000,000.00 (Total)
Php 24,500,000.00 (Road)
Php 500,000.00 (EAO)
June 5, 2018 2018 WIN8C03075 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Surigao del Norte 2nd District Engineering Office
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS

FROM:

NRJ Poblacion Alegria Road Leading to Mainit Lake Boat Landing Facility, Brgy. Poblacion (Alegria), Alegria, Surigao del Norte

Project ID No. – P00230320MN
Physical Target: 1.25 Lane Km
Type of Work: Construction of Concrete Road

Allocation: Php 22,000,000.00 (Total)
Php 21,560,000.00 (Road)
Php 440,000.00 (EAO)

TO:

NRJ Poblacion Alegria Road Leading to Mainit Lake Boat Landing Facility, Brgy. Poblacion (Alegria), Alegria, Surigao del Norte

Project ID No. – P00230320MN
Physical Target: 0.9798 Lane Km
Type of Work: Construction of Concrete Road

Allocation: Php 22,000,000.00 (Total)
Php 21,560,000.00 (Road)
Php 440,000.00 (EAO)
June 5, 2018 2018 WIN8C03090 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Surigao del Norte 2nd District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System - Network Development – Road Widening - Primary Roads

FROM:

Daang Maharlika (Surigao - Agusan Sect) – K1160 + 784 - K1162 + 242, K1162 + 264 - K1162 + 326, K1162 + 341 - K1163 + 142, K1163 + 160 - K1163 + 310, K1163 + 325 - K1163 + 501


Project ID No. P00200694MN
Scope of Work: Road Widening
Physical Target: 5.306 Lane Km

Allocation: Php 87,868,000.00 (Total)
Php 84,792,620.00 (Widening)
Php 3,075,380.00 (EAO)

TO:

Daang Maharlika (Surigao - Agusan Sect) – K1162 + 084.72 - K1162 + 180, K1162 + 400 - K1163 + 080, K1163 + 080 - K1163 + 136.09, K1163 + 165.91 - K1163 + 200, K1163 + 200 - K1163 + 270, K1163 + 270 - K1163 + 303.09, K1163 + 332.91 - K1163 + 365, K1163 + 365 - K1163 + 497.8


Project ID No. P00200694MN
Scope of Work: Road Widening and Upgrading / Raising of Grade
Physical Target: 4.04272 Lane Km

Allocation: Php 87,868,000.00 (Total)
Php 84,792,620.00 (Widening)
Php 3,075,380.00 (EAO)
June 5, 2018 2018 WIN8C03092 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Surigao del Norte 2nd District Engineering Office
LOCAL PROGRAM - Local Roads
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

FROM:

NRJ Lipata - Punta Bilar - Lo-oc - Mabua - Ipil Road, Surigao del Norte

Project ID No. – P00240324MN
Scope of Work: Construction of Concrete Road
Physical Target: 0.000 Lane Km

Allocation - Php 1,250,000.00 (Total)
- Php 1,225,000 (Road)
- Php 25,000 (EAO)

TO:

NRJ Lipata - Punta Bilar - Lo-oc - Mabua - Ipil Road, Surigao del Norte

Project ID No. – P00240324MN
Scope of Work: Construction of Concrete Road
Physical Target: 0.0502 Lane Km

Allocation - Php 1,250,000.00 (Total)
- Php 1,225,000 (Road)
- Php 25,000 (EAO)
June 4, 2018 2018 WIN8G02186 WIN8G02186 April 23, 2018 Cordillera Administrative Region Abra District Engineering Office
From: Repair/Rehabilitation/Improvement of Abra-Ilocos Norte Road with Selective Reblocking and Asphalt Overlay, Abra - Ilocos Norte Road K0433+000-K0422+000; Physical Target:17.924 Lane Km; Allocation = Php 100,000,000

To: Repair/Rehabilitation/Improvement of Abra-Ilocos Norte Road with Selective Reblocking and Asphalt Overlay, Abra - Ilocos Norte Road K0433+000-K0442+000; Physical Target:10.992 Lane Km; Allocation = Php100,000,000
June 4, 2018 2018 WIN8G02100 WIN8G02100 April 5, 2018 Cordillera Administrative Region Abra District Engineering Office
From: Rehabilitation of Drainage Canal, Brgy. Poblacion, Bangued, Abra; Physical Target:128.3 meters; Allocation = Php 1,500,000

To: Rehabilitation of Drainage Canal, Brgy. Patucannay, Bangued, Abra; Physical Target:128.30 meters; Allocation = Php1,500,000
June 4, 2018 2018 WIN8G02203 WIN8G02203 April 23, 2018 Cordillera Administrative Region Abra District Engineering Office
From: Repair/Rehabilitation/Improvement of Abra-Ilocos Sur Road with Selective Reblocking and Asphalt Overlay, K0387+(-957) - K0408+190; Physical Target:10.074 Lane Km; Allocation = Php 100,000,000

To: Organizational Outcome 1: Ensure safe and Reliable National Road System/ Asset Preservation Program/ Preventive Maintenance/ Secondary Road, Abra-Ilocos Sur Road K0400+000-K0408+000; Physical Target:16.144 Lane Km; Allocation = Php100,000,000
June 4, 2018 2018 WIN8G02204 WIN8G02204 April 23, 2018 Cordillera Administrative Region Abra District Engineering Office
From: Repair/Rehabilitation/Improvement of Abra-Kalinga Norte Road with Selective Reblocking and Asphalt Overlay, K0429+850, K0434+800-K0435+551, K0438+000-K0440+000, K0447+000-K0449+000; Physical Target:16.438 Lane Km; Allocation = Php 100,000,000

To: Organizational Outcome 1: Ensure safe and Reliable National Road System/ Asset Preservation Program/ Preventive Maintenance/ Tertiary Road, Abra-Kalinga Norte Road, K0429+850, K0434+800-K0435+551, K0438+000-K0440+000, K0447+000-K0449+000; Physical Target:14.68 Lane Km; Allocation = Php100,000,000
June 4, 2018 2018 WIN8G02138 WIN8G02138 April 23, 2018 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Construction of Missing Links/ New Roads - Tuel Jct - Ambongdolan Jct (Section 3 of BLISTT Outer Ring Circumferential Road) incl ROW, Bridge and Slope Protection, Tublay, Benguet; Physical Target:ROW : 5,000 Square meters, CW1 : 1.40 Lane Km, CW2 : 6,800 Square meters, CW3 : 477 Square meters; Allocation = Php 100,000,000

To: Construction of Missing Links/ New Roads - Tuel Jct - Ambongdolan Jct (Section 3 of BLISTT Outer Ring Circumferential Road) incl ROW, Bridge and Slope Protection, Tublay, Benguet; Physical Target:CW1 : 2.40 Lane Km, CW2 : 8,800 Square meters, CW3 : 443.61 Square meters; Allocation = Php100,000,000
June 4, 2018 FY 2018 WIN8G02288 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Local Program – Local – Buildings and Other Structures – Multipurpose / Facilities – Construction / Improvement of Multi-Purpose Building, Atlag, Malolos City, Bulacan
June 4, 2018 FY 2018 WIN8G02295 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems Construction / Rehabilitation / Improvement of Dike / Seawall at Tibaguin, Hagonoy, Bulacan
June 4, 2018 FY 2018 GAA WIN8C03095 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development
Construction of Bypass and Diversion Roads
Jct. Davao City Diversion ROad - Cabantian Road (Banco Extension Road), incl. ROW, Davao City

Physical Target:
CW1: 1.514 lane km (Construction of Concrete Road)
ROW: 7,570.00 sq.m.
Allocation:
TOTAL: P 135,000,000.00
CW1: P 40,908,280.00 (Construction of Concrete Road)
ROW: P 89,366,720.00
EAO: P 4,725,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development
Construction of Bypass and Diversion Road
Jct. Davao City Diversion ROad - Cabantian Road (Banco Extension Road), incl. ROW, Davao City

Physical Target:
CW1: 1.718 lane km (Construction of Concrete Road)
ROW: 7,570.00 sq.m.
Allocation:
TOTAL: P 135,000,000.00
CW1: P 40,908,280.00 (Construction of Concrete Road)
ROW: P 89,366,720.00
EAO: P 4,725,000.00
June 1, 2018 FY - 2018 WIN8C02816 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Convergence and Special Support - Construction/Improvement of Access Roads leading to Seaports

FROM:
Little Caramay - TDC - Pagdanan leading to proposed
port, San Vicente, Palawan

CW1: 4.832 lane km ( Construction of Concrete Road )
Allocation: 80,000,000 Php

TO:
Little Caramay - TDC - Pagdanan leading to Proposed
Port, San Vicente, Palawan

CW1: 2.42 lane km ( Construction of Concrete Road )
Allocation: 80,000,000 Php

June 1, 2018 GAA FY 2018 WIN8F05552 UACS No. 300103200108000 January 1, 2018 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 300103200108000
Project ID: P0024789LZ
WIN8F05552
Local Program
Local - Building and Other Structures – Multipurpose/ Facilities – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction/Completion of Multi – Purpose Building (Hall) and Completion of Facilities at National Center for Mental Health, Barangay Addition Hills, Mandaluyong City
Physical Target: CW1-Construction of Multi-Purpose Building – 1.0
Unit Cost (P’000): P6,860.00/bldg.
Allocation (‘000): P 6,860.00 M
EAO (‘000) P 140.00 M
Total (‘000) : P 7,000.00 M

As Modified
Project ID: P0024789LZ
WIN8F05552
Local Program
Local - Building and Other Structures – Multipurpose/ Facilities – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction/Completion of Multi – Purpose Building (Hall) and Completion of Facilities at National Center for Mental Health, Barangay Mauway, Mandaluyong City
Physical Target: CW1-Construction of Multi-Purpose Building – 1.0
Unit Cost (P’000): P6,860.00/bldg.
Allocation (‘000): P 6,860.00 M
EAO (‘000) P 140.00 M
Total (‘000) : P 7,000.00 M
June 1, 2018 GAA FY 2018 WIN8F05536 UACS No. 320101100499000 January 1, 2018 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA/Original
UACS No. 320101100499000
Project ID: P00221544LZ
WIN8F05536
002: Protect Lives and Properties
Flood Management – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement / Dredging of Villanueva Creek and Sapang Buwaya Creek Junction, Brgy. Don Galo, Parañaque City
Physical Target: CW1 Construction of Mitigation Structure L=900 lineal meter
Unit Cost (P’000): P54.44/ lineal meter
Allocation (‘000) : P 49,000.00
EAO (‘000) P 1,000.00
Total (‘000): P 50,000.00

As Modified
UACS No. 320101100499000
Project ID: P00221544LZ
WIN8F05536
002: Protect Lives and Properties
Flood Management – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement / Dredging of Villanueva Creek and Sapang Buwaya Creek Junction, Brgy. San Dionisio, Parañaque City
Physical Target: CW1 Construction of Mitigation Structure L=323 lineal meter
Unit Cost (P’000): P151.702/ lineal meter
Allocation (‘000) : P 49,000.00
EAO (‘000) P 1,000.00
Total (‘000): P 50,000.00
June 1, 2018 GAA FY 2018 WIN8F05551 UACS No. 320101100497000 January 1, 2018 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA/Original
UACS No. 320101100497000
Project ID: P00222779LZ
WIN8F05551
002: Protect Lives and Properties
Flood Management – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement of Sapang Buwaya Creek, Reymar Village, Parañaque City
Physical Target: CW1 Construction of Mitigation Structure L=480 lineal meter
Unit Cost (P’000): P40.83/ lineal meter
Allocation (‘000) : P 19,600.00
EAO (‘000) P 400.00
Total (‘000): P 20,000.00

As Modified
UACS No. 320101100497000
Project ID: P00222779LZ
WIN8F05551
002: Protect Lives and Properties
Flood Management – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement of Sapang Buwaya Creek, Reymanville Village, Brgy. San Antonio, Parañaque City
Physical Target: CW1 Construction of Mitigation Structure L=440 lineal meter
Unit Cost (P’000): P44.54/ lineal meter
Allocation (‘000) : P 19,600.00
EAO (‘000) P 400.00
Total (‘000): P 20,000.00
June 1, 2018 GAA FY 2018 WIN8F05538 UACS No. 300116200365000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300116200365000
Project ID: P00240263LZ
WIN8F05538
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Rehabilitation of Roads and Drainage in Makipot St., Brgy. Malinta, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 2.158 Lane Km
EAO (‘000) – P 0.410 M
Unit Cost (P’000): P9,309.55/ lane km
Allocation: P 20.090 M
Total: P 20.50 M

As Modified
UACS No. 300116200365000
Project ID: P00240263LZ
WIN8F05538
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Rehabilitation of Roads and Drainage in Makipot St., Brgy. Malinta, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.420 Lane Km
EAO (‘000) – P 0.410 M
Unit Cost (P’000): P14,147.89/ lane km
Estimated Cost: P 20.090 M
Total: P 20.5 M
June 1, 2018 GAA FY 2018 WIN8F05537 UACS No. 300116200373000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300116200373000
Project ID: P00240629LZ
WIN8F05537
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Upgrading of Claudio Molina St., Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 2.200 Lane Km
EAO (‘000) – P 0.520 M
Unit Cost (P’000): P11,581.82/ lane km
Allocation: P 25.480 M
Total: P 26.0 M

As Modified
UACS No. 300116200373000
Project ID: P00240629LZ
WIN8F05537
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Upgrading of Claudio Molina St., Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.620 Lane Km
EAO (‘000) – P 0.520 M
Unit Cost (P’000): P15,728.40/ lane km
Allocation: P 25.480 M
Total: P 26.0 M
June 1, 2018 GAA FY 2018 WIN8F05546 UACS No. 300116200320000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300116200320000
Project ID: P00240612LZ
WIN8F05546
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Improvement of Road and drainage system - Claudio Molina St., Veinte Reales (from T. Santiago St., to Mercury St.) Brgy. Veinte Reales, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.500 Lane Km
EAO (‘000) – P 0.520 M
Unit Cost (P’000): P16,986.67/ lane km
Allocation: P 25.480 M
Total: P 26.0 M

As Modified
UACS No. 300116200320000
Project ID: P00240612LZ
WIN8F05546
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Improvement of Road and drainage system - Claudio Molina St., Veinte Reales (from T. Santiago St., to Mercury St.) Brgy. Veinte Reales, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.014 Lane Km
EAO (‘000) – P 0.520 M
Unit Cost (P’000): P25,128.21/ lane km
Allocation: P 25.480 M
Total: P 26.0 M
June 1, 2018 GAA FY 2018 WIN8F05547 UACS No. 310105100020000 January 1, 2018 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 310105100020000
Project ID: P00200427LZ
WIN8F05547
Local Program
001: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Elliptical Road – K0012+-510 – K0012+920
Physical Target: CW1-Rehabilitation of Paved Road L = 7.15 lane km
Unit Cost (P’000): P13,489.75/ lane km
Allocation (‘000): P 96,451.75
EAO (‘000) P 3,498.25
Total (‘000) : P 99,950.00

As Modified
UACS No. 310105100020000
Project ID: P00200427LZ
WIN8F05547
Local Program
001: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Elliptical Road – K0012+-505 – K0013+483
Physical Target: CW1-Rehabilitation of Paved Road L = 9.03 lane km
Unit Cost (P’000): P10,681.25/ lane km
Allocation (‘000): P 96,451.75
EAO (‘000) P 3,498.25
Total (‘000) : P 99,950.00
June 1, 2018 FY - 2018 WIN8C02829 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Cnvergence and Special Support -
Construction/Improvement of Access Roads leading to Airports

FROM:
New Ibajay - Mabini - Sandoval Access Road leading to Taytay Airport

CW1: 4.98 lane km ( Construction of Gravel Road )
Allocation: 70,000,000 Php

TO:
New Ibahay - Mabini - Sandoval Access Road leading to Taytay Airport , Taytay, Palawan

CW1: 4.98 lane km ( Construction of Gravel Road )
Allocation: 70,000.000 Php
June 1, 2018 GAA FY 2018 WIN8F05545 UACS No. 310112100011000 January 1, 2018 National Capital Region Quezon City 2nd Engineering District Office
UACS No. 310112100011000
Project ID: P00200705LZ
WIN8F05545
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Balete Drive – K0010+-740 – K0010+-174
Physical Target: CW1-Upgrading of Drainage along Road L = 1,132 lineal meter
Unit Cost (P’000): P 9.22 / lineal meter
Allocation (‘000): P 10,446.80
EAO (‘000) P 213.20
Total (‘000): P 10,660.00

As Modified
UACS No. 310105100020000
Project ID: P00200427LZ
WIN8F05545
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Balete Drive – K0010+-740 – K0010+-290
Physical Target: CW1-Upgrading of Drainage along Road L = 800 lineal meter
Unit Cost (P’000): P 13.06 / lineal meter
Allocation (‘000): P 10,446.80
EAO (‘000) P 213.20
Total (‘000): P 10,660.00
June 1, 2018 FY - 2018 WIN8C02825 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/upgrading
of Damaged Paved Roads - Secondary Roads

FROM:
Puerto Princesa North Rd
K0173+439 - K0173+611

CW1: 0.344 lane km ( Rehabilitation of Paved Road )
Allocation: 10,000,000 Php

TO;
Puerto Princesa North Rd
K0173+420 - K0173+580

CW1: 0.32 lane km ( Rehabilitation of Paved Road )
Allocation: 10,000,000 Php
June 1, 2018 GAA FY 2018 WIN8F05540 UACS No. 310106100072000 January 1, 2018 National Capital Region Quezon City 2nd Engineering District Office
roject ID: P00200531LZ
WIN8F05540
001: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Road – Tertiary Roads
C. Benitez St. – K0010+-001 – K0010+367
Physical Target: CW1-Rehabilitation of Paved Road L = .736 lane km
Unit Cost (P’000): P 13,301.90 / lane km
Allocation (‘000): P 9,790.20
EAO (‘000) P 199.80
Total (‘000): P 9,990.00

As Modified
UACS No. 310106100072000
Project ID: P00200531LZ
WIN8F05540
001: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Road – Tertiary Roads
C. Benitez St. – K0010+-856 – K0010+-371
Physical Target: CW1-Rehabilitation of Paved Road L = .970 lane km
Unit Cost (P’000): P 13,301.90 / lane km
Allocation (‘000): P 9,790.20
EAO (‘000) P 199.80
Total (‘000): P 9,990.00
June 1, 2018 GAA FY 2018 WIN8F05535 UACS No. 310112100012000 January 1, 2018 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 310112100012000
Project ID: P00200707LZ
WIN8F05535
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Camp Crame Rd Network – (S05562LZ) Chainage 0 – Chainage 131, (S05563LZ) Chainage 0 – Chainage 127, (S05564LZ) Chainage 0 – Chainage 170, (S05566LZ) Chainage 0 – Chainage 325
Physical Target: CW1-Upgrading of Drainage Structure along Road L = 1,506 lineal meter
Unit Cost (P’000): P 14.97 / lineal meter
Allocation (‘000): P 22,540.00
EAO (‘000) P 460.00
Total (‘000): P 23,000.00

As Modified
UACS No. 310112100012000
Project ID: P00200707LZ
WIN8F05535
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Camp Crame Rd Network – (S05562LZ) Chainage 0 – Chainage 131, (S05563LZ) Chainage 0 – Chainage 127, (S05564LZ) Chainage 0 – Chainage 393, (S05566LZ) Chainage 0 – Chainage 325
Physical Target: CW1-Upgrading of Drainage Structure along Road L = 1,125 lineal meter
Unit Cost (P’000): P 20.04 / lineal meter
Allocation (‘000): P 22,540.00
EAO (‘000) P 460.00
Total (‘000): P 23,000.00
June 1, 2018 GAA FY 2018 WIN8F05548 UACS No. 320101100392000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101100392000
Project ID: P00221852LZ-CW1
WIN8F05548
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Upgrading/Improvement/Construction of Riverwall (Sta. 0+359.8 – Sta. 0+798.8) along San Rafael Village (Phase II), Navotas City
Physical Target: CW1 – Construction of Flood Mitigation Structure: 439.0 lm
EAO P 0.5 M
Unit Cost: P 55,808.65/ lm
Allocation: P 24.5 M
Total: P 25 M

As Modified
UACS No. 320101100392000
Project ID: P00221852LZ-CW1
WIN8F05548
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Upgrading/Improvement/Construction of Riverwall (Sta. 0+359.8 – Sta. 0+542.20) along San Rafael Village (Phase II), Navotas City
Physical Target: CW1 – Construction of Flood Mitigation Structure: 182.4 lm
EAO P 0.5 M
Excess: P 0.019 M
Unit Cost: P 134,216.01/ lm
Allocation: P 24.481 M
Total: P 25 M
June 1, 2018 GAA FY 2018 WIN8F05539 UACS No. 320101100384000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101100384000
Project ID: P00221627LZ
WIN8F05539
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Raising and Improvement of Drainage Canal (Sta. 0+000 – Sta. 0+204) at B. Cruz, Brgy. Tangos, Navotas City
Physical Target: CW1 – Upgrading of Drainage Structure: 204 lm
EAO P 0.3 M
Unit Cost: P 72,058.82/ lm
Allocation: P 14.7 M
Total: P 15 M

As Modified
UACS No. 320101100384000
Project ID: P00221627LZ
WIN8F05539
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Raising and Improvement of Drainage Canal (Sta. 0+000 – Sta. 0+545.70) at B. Cruz St., Brgy. Tangos, Navotas City
Physical Target: CW1 – Upgrading of Drainage Structure: 545.70 lm
EAO P 0.3 M
Unit Cost: P 26,937.88/ lm
Estimated Cost: P 14.7 M
Total: P 15 M
June 1, 2018 GAA FY 2018 WIN8F05550 UACS No. 320101100385000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101100385000
Project ID: P00221628LZ
WIN8F05550
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Raising and Improvement of Drainage Canal (Sta. 0+000 – Sta. 0+180) at Takino St., Brgy. Bangkulasi, Navotas City
Physical Target: CW1 – Upgrading of Drainage Structure: 220.55 lm
EAO P 0.3 M
Unit Cost: P 66,650 / lm
Allocation: P 14.7 M
Total: P 15 M

As Modified
UACS No. 320101100385000
Project ID: P00221628LZ
WIN8F05550
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Raising and Improvement of Drainage Canal (Sta. 0+000 – Sta. 0+220.55) at Takino St., Brgy. Bangkulasi, Navotas City
Physical Target: CW1 – Upgrading of Drainage Structure: 220.55 lm
EAO P 0.3 M
Excess: P2.972 M
Unit Cost: P 53,180 / lm
Estimated Cost: P 11.728 M
Total: P 15 M
June 1, 2018 FY - 2018 WIn8C02828 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Local Program

Local Roads and Bridges - Local Roads -
Construction/Repair/rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Rehabilitation/Improvement of Dumaran - Araceli Road,
Dumaran, Palawan

CW1: 4 lane km ( Rehabilitation of Concrete Road )
Allocation: 50,000,000 Php

TO:
Rehabilitation/Improvement of Dumaran - Araceli Road,
Dumaran, Palawan

CW1: 3.62 lane km ( Rehabilitation of Concrete Road )
Allocation: 50,000,000 Php
June 1, 2018 FY - 2018 WIN8C02827 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
001 - Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:
Road Widening - Puerto Princesa North Road
incl. ROW
K0267+532 - K0267+2532

CW1: 4 lane km ( Road Widening )
ROW - ROW acquisition - 20,000 sq.m.
Allocation: 978,994,000 Php

TO:
Road Widening - Puerto Princesa North Road
including ROW
K0267+960 - K0267+2512

CW1: 3.104 lane km ( Road Widening )
ROW - ROW Acquisition - 20,000 sq.m.
Allocation: 97,994,000 Php
June 1, 2018 FY 2018 WIN8G02278 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Road Dike leading to Bancal Pugad, Lubao, Pampanga
June 1, 2018 FY 2018 WIN8G02280 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Natividad, Guagua, Pampanga
June 1, 2018 FY 2018 WIN8G02281 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Paving of Sta. Rita Road, Lubao, , Pampanga
June 1, 2018 FY 2018 WIN8G02282 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Concreting of Road, Brgy. Dila-Dila, Zone 4, Santa Rita, Pampanga
June 1, 2018 FY 2018 WIN8G02284 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Concreting of Barangay Road, Barangay San Jose Mitla – Mitla Proper, Sta. 0+118 – Sta. 0+597.40, Sta. 1+722.40 – Sta. 2+636, Sta. 3+105 – Sta. 3+642.40, Sta. 3+853.90 – Sta. 4+920, Porac, Pampanga
June 1, 2018 FY 2018 WIN8G02285 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Concreting of Road, Sta. Teresa 1, Lubao, Pampanga
June 1, 2018 GAA FY 2018 WIN8F05558 UACS No. 310102100052000 January 1, 2018 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 310102100052000
Project ID: P00202390LZ
WIN8F05558
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
JA Santos Ave – K0004+-375 – K0004+359.5, K0004+515.0 – K0004+682.80, K0004+987.7 – K0005+009.5, K0005+021.6 – K0005+158.0, K0006+056 – K0006+224.5, K0006+510.4 – K0006+-347.5, K0006+-377.2 – K0006+-175.90, K0006+-164.6 – K0006+056.10, K0006+070.2 – K0006+311.4
Physical Target: CW1 Preventive Maintenance of Road: Asphalt Overlay L=4.4364 lane km
Unit Cost (P’000): P6,922,558.83/ lane km
Allocation: P 30,711,240.00
EAO P 626,760.00
Total: P 31,338,000.00

As Modified
As per GAA/Original
UACS No. 310102100052000
Project ID: P00202390LZ
WIN8F05558
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
JA Santos Ave – K0004+-375 – K0004+275
Physical Target: CW1 Preventive Maintenance of Road: Asphalt Overlay L=1.30 lane km
Unit Cost (P’000): P23,624,030.77/ lane km
Allocation: P 30,711,240.00
EAO P 626,760.00
Total: P 31,338,000.00
June 1, 2018 GAA FY 2018 WIN8F05555 UACS No. 300116200313000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300116200313000
Project ID: P00247879LZ
WIN8F05555
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Construction/ Rehabilitation/ Improvement of Road and Drainage System along Durian Road, Brgy. 178, (Connecting to Deparo-Camarin Road), Caloocan City
Physical Target: CW1-Rehabilitation of Concrete Road = 2.450 Lane Km
EAO (‘000) – P 0.600 M
Unit Cost (P’000): P12,000/lane km
Allocation: P 29.400 M
Total: P 30.0 M

As Modified
UACS No. 300116200313000
Project ID: P00247879LZ
WIN8F05555
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Construction/ Rehabilitation/ Improvement of Road and Drainage System along Durian Road, Brgy. 178, (Connecting to Deparo-Camarin Road), Caloocan City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.170 Lane Km
EAO (‘000) – P 0.600 M
Unit Cost (P’000): P25,128.21/lane km
Allocation: P 29.400 M
Total: P 30.0 M
June 1, 2018 GAA FY 2018 WIN8F05557 UACS No. 300118200032000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300118200032000
Project ID: P00240561LZ
WIN8F05557
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Rehabilitation of Roads with Bridge Replacement, Brgy. 171, Caloocan City
Physical Target: CW1-Replacement of Bridge = 73.20 sq.m.
EAO (‘000) – P 200.00
Unit Cost (P’000): P133.88/sq.m.
Allocation (‘000): P 9,800.00
Total: P 10,000.00 M

As Modified
UACS No. 300116200313000
UACS No. 300118200032000
Project ID: P00240561LZ
WIN8F05557
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Rehabilitation of Roads with Bridge Replacement, Brgy. 171, Caloocan City
Physical Target: CW1-Replacement of Bridge = 66.00 sq.m.
CW2-Rehabilitation of Concrete Road 0.338 lane km
EAO (‘000) – P 100.00
Unit Cost (P’000): P111.56/sq.m.
P7,506.92/ lane km
Allocation (‘000): P 7,363.00
P 2,537.00
Total: P 10,000.00 M
June 1, 2018 FY 2018 WIN02286 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Flood Control and Drainage – Drainage / Protection Works – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Construction of Drainage System (Line Canal) Brgy. Pulung Masle, Guagua, Pampanga
June 1, 2018 FY 2018 WIN8G02287 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Ascomo, Guagua, Pampanga
June 1, 2018 FY 2018 WIN8G02289 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Concreting of Road, Brgy. Pulungmasle, Guagua, Pampanga
June 1, 2018 FY 2018 WIN8G02290 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation / Improvement of Dike with Slope Protection along Porac River, Sta. Rita, Lubao, Pampanga
June 1, 2018 FY 2018 WIN8G02296 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Repair / Rehabilitation of Access Road leading to SCTEX and Economic Zone, San Jose, Floridablanca, Pampanga
May 31, 2018 FY - 2018 WIn8C02807 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
002 - Protect Lives and Properties Against Major Flood

Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage System

FROM:
Construction of Flood Control Structure at
Tubuan Bridge, PPNR, Palawan

CW1: 650 lm ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php

TO:
Construction of Flood Control Structure at
Tubuan Bridge, PPNR, Taytay, Palawan

CW1: 520 lm ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php
May 31, 2018 FY - 2018 WIN8C02811 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Local Program

Local Roads and Bridges - Local Roads
Local Infrastructure Program

FROM:
Construction of Roads in barangay 3, Roxas, Palawan

CW1: 0.528 lane km ( Construction of Concrete Road )
Allocation: 3,000,000 Php

TO:
Construction of Roads in Barangay 3, Roxas, Palawan

CW1: 0.590 Lane Km ( Construction of Concrete Road )
Allocation: 3,000,000 Php
May 31, 2018 FY - 2018 WIN8C02826 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
001 - Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement -
Tertiary Road

FROM:
Coron - Busuanga Rd
K0028+624 - K0029+515.60,
K0033+200 - K0033+308.00,
K0043+889 - K0044+181.00,
K0048+505 - K0049+000.00,
K0072+167 - K0072+446.30

CW1: 6,303 sq.m. ( Off-Carriageway Improvement
Shoulder Paving/Construction )
Allocation: 50,291,000 Php

TO:
Coron - Busuanga Rd
K0028+624 - K0029+515.60,
K0033+200 - K0033+308.00,
K0043+889 - K0044+180.00,
K0048+505 - K0049+000.00,
K0072+167 - K0072+446.30

CW1: 9,732 sq.m. ( Off-Carriageway Improvement
Shoulder Paving/Construction )
Allocation: 50,291,000 Php
May 31, 2018 FY - 2018 WIN8C02815 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse and Landslide -
Tertiary Road

FROM:
Coron - Busuanga Rd
K0058+537 - K0058+738

CW1: 2,412 sq.m. ( Construction of Road Slope
Protection Structure )
Allocation: 12,14,,000 Php

TO:
Coron - Busuanga Rd
K0058+537 - K0058+738

CW1: 2,424.10 sq m ( Construction of Road Slope
Protection Structure )
Allocation; 12,141,000 Php

May 31, 2018 FY 2018 WIN8G02279 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Secondary Roads - Paniqui – Camiling - Wawa Rd - K0156 + 380 - K0157 + 210.20, K0162 + 699 - K0162 + 929, K0168 + 710 - K0169 + 629.50
May 31, 2018 FY 2018 WIN8G02283 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Barangay Balibago Bypass, Barangay Balibago, Tarlac City
May 31, 2018 FY 2018 WIN8G02291 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Convergence and Special Support Program - Construction / Improvement of Access Roads leading to Declared Tourism Destinations - Access Road leading to Tarlac Ecotourism Park, San Jose, Tarlac
May 31, 2018 FY 2018 WIN8G02292 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads – Primary Roads - Manila North Rd - K0153 + 260 - K0153 + 963, K0155 + 507 - K0158 + 487.20
May 29, 2018 FY - 2018 WIN8C02813 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Convergence and Special Support -
Construction/Improvement of Access Roads leading to Airports

FROM:
Brgy. Port Barton - Brgy. Kemdeng - Begy.Poblacion
leading to San Vicente Airport, Palawan

CW1: 5.90 lane km ( Construction of Gravel Road )
Allocation: 90,000,000 php

TO:
Brgy. Port Barton - Brgy. Kemdeng - Brgy. Poblacion
leading to San Vicente Airport, Palawan

CW1: 3.24 lane km ( Construction of Gravel Road )
Allocation: 90,000,000 Php
May 29, 2018 FY - 2018 WIN8C02814 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
002 - Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of Fllod
Mitigation Structures and Drainage Systems

FROM:
Construction of Flood Control Structure at
Balolo Bridge, CBNR< Palawan

CW1: 260 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 php

TO:
Construction of Flood Control Structure at
Balolo Bridge, CBNR, Coron, Palawan

CW1: 258 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php
May 29, 2018 FY - 2018 WINC02817 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
002 - Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage Systems

FROM:
Construction of Flood Control Structure at
Batacalan bridge, CBNR, Palawan

CW1: 280 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php

TO:
Construction of Flood Control Structure at
Batacalan Bridge, CBNR, Coron, Palawan

CW1: 250 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 php

May 29, 2018 FY - 2018 WIN8C02810 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
002 - Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage Systems

FROM:
Construction of Flood Control Structure at
Lele Bridge, CBNR, Palawan


CW1: 280 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php

TO:
Construction of Flood Control Structure at
Lele Bridge, CBNR, Busuanga, Palawan

CW1: 245.70 lm ( Construction of Flood Mitigation
Structure )
Allocation: 10,000,000 Php
May 29, 2018 FY - 2018 WIN8C02808 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
002 - Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage Systems

FROM:
Construction of Flood Control Structure at
Malabnao Bridge, CBNR, Palawan

CW1: 350 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php

TO:
Construction of Flood Control Structure at
Malabnao Bridge, CBNR, Busuanga, Palawan

CW1: 240 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php
May 29, 2018 FY 2018 GAA (RA 10964) WIN8G02265 SR2018-01-002524 January 1, 2018 Region III Regional Office III
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations

Dinadiawan-Ditawini Bypass Road leading to Tourism Sites/Destinations, Bridgy. Dinadiawan, Dipaculao, Aurora

CW-1 (Construction of Concrete Road) - 6.00 lane km
CW-2 (Construction of Road Slope Protection Structure) - 1,635 sq.m.

Allotment: PHP 137.50M
May 29, 2018 FY 2018 GAA (RA 10964) WIN8G02264 SR2018-01-001414 January 1, 2018 Region III Regional Office III
OO-1: Ensure Safe and Reliable National Road System
Network Development Program\
Construction of Missing Links/New Roads

Capas-Botolan Road, incl. Slope Protection, Tarlac

CW-1 (Construction of Concrete Road including Drainage Structure) - 13.8704 lane km
CW-2 (Construction of Road Slope Protection Structure) - 9,698.90 sq.m.


Allotment: PHP 300M
May 29, 2018 FY 2018 GAA (RA 10964) WIN8G02271 SR2018-01-001282 January 1, 2018 Region III Regional Office III
OO-1: Ensure Safe and Reliable National Road System
Network Development Program
Road Widening - Tertiary Roads

NCR/Bulacan Bdry - Bigte - Ipo Dam Rd
K0033 + 384 - K0033 + 814.50,
K0034 + 238.70 - K0035 + 587,
K0035 + 683 - K0037 + 664


CW-1 (Road Widening) - 4.840 lane km
ROW (ROW Acquisition) - 5,246.00 sq.m.

Allotment: PHP 137.143M
Excess: PHP 38.761M
May 29, 2018 FY 2018 GAA (RA 10964) WIN8G02266 SR2018-01-000921 January 1, 2018 Region III Regional Office III
OO-1: Ensure safe and Reliable National Road System
Network Development Program
Road Widening - Primary Roads

Daang Maharlika (LZ) incl. ROW
K0040 + 506 - K0041 + 296, K0041 + 313 - K0042 + 000,
K0042 + 218 - K0042 + 680, K0043 + 006 - K0043 + 613,
K0045 + 635 - K0046 + 450, K0046 + 466 - K0047 + 508

CW-1 (Road Widening) - 8.8040 lane km
ROW (ROW Acquisition) - 10,000 sq.m.

ALLOTMENT: PHP 164.037M
EXCESS: PHP 40.020M
May 29, 2018 FY 2018 GAA (RA 10964) WIN8G02266 SR2018-01-000921 January 1, 2018 Region III Regional Office III
OO-1: Ensure safe and Reliable National Road System
Network Development Program
Road Widening - Primary Roads

Daang Maharlika (LZ) incl. ROW
K0040 + 506 - K0041 + 296, K0041 + 313 - K0042 + 000,
K0042 + 218 - K0042 + 680, K0043 + 006 - K0043 + 613,
K0045 + 635 - K0046 + 450, K0046 + 466 - K0047 + 508

CW-1 (Road Widening) - 8.8040 lane km
ROW (ROW Acquisition) - 10,000 sq.m.

ALLOTMENT: PHP 164.037M
EXCESS: PHP 40.020M
May 28, 2018 FY - 2018 WIN8C02812 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Convergence and Special Support -
Construction/Improvement of Access Roads leading to Trades, Industries, and Economic Zones

FROM:
Access Road leading to Palawan Super Corn Development
Corporation in support of Agribusiness Industry, Cullion,
Palawan

CW1: 4 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php

TO:
Access Road leading to Palawan Super Corn Development
Corporation in support of Agribusiness Industry, Cullion,
Palawan

CW1: 2.4026 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php
May 28, 2018 FY - 2018 WIN8C02824 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Convergence and Special Support Program -
Construction/Improvement of Access Roads leading to
Trades, Industries, and Economic Zones

FROM:
Access Road leading to Seaweed Plantations in
Brgy. Danleg, Dumaran, Palawan

CW1: 4 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php

TO:
Access Road leading to Seaweed Plantations in
Danleg, Dumaran, Palawan

CW1: 2.894 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php
May 28, 2018 FY - 2018 WIN8C02809 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Convergence and Special Support -
Construction/Improvement of Access Roads leading to
Declared Tourism Destinations

FROM:
Access Road to Malampaya Sound, Mt. Capuas and
San Vicente Long Beach, Bebeladan El Nido, Palawan

CW1: 1.6 lane km ( Construction of Concrete Road )
Allocation: 20,000,000 Php

TO:
Access Road to Malampaya Sound, Mt. Capuas and
San Vicente Long Beach, Taytay & San Vicente, Palawan

CW1: 1.215 lane km ( Construction of Concrete Road )
Allocation: 20,000,000 Php
May 28, 2018 FY 2018 WIN8G02241 FY 2018 GAA January 4, 2018 Region III Bataan 1st District Engineering Office
Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Repair / Rehabilitation / Improvement, Overlay with Pavement Markings along Jct. Layac – Balanga – Mariveles Port Road, K0102+(-100) – K0104+529, K0106+000 – K0107+393, K0107+500 – K0107+980, Hermosa and Orani, Bataan
May 28, 2018 FY 2018 GAA WIN8C03050 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Patel-Kapatagan Road Package 4, Davao del Norte
Physical Target:
CW1: 26.667 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 400,000,000.00
CW1: P 386,000,000.00 (Construction of Gravel Road)
EAO: P 14,000,000.00

TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Patel-Kapatagan Road Package 4, Davao del Norte
Physical Target:
CW1: 15.28874 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 400,000,000.00
CW1: P 386,000,000.00 (Construction of Gravel Road)
EAO: P 14,000,000.00
May 28, 2018 FY 2018 GAA WIN8C03057 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Mawab-Maragusan-Caraga Road (Section 1), Package D, incl. Bridge and ROW, Compostela Valley
Physical Target:
CW1: 8.682 Lane Km (Construction of Concrete Road)
CW2: 763.20 sq. m. (Construction of Concrete Bridge)
ROW: 40,816.327 sq. m.
Allocation:
TOTAL: P 295,000,000.00
CW1: P 171,770,000.00 (Construction of Concrete Road)
CW2: P 109,045,000.00 (Construction of Concrete Bridge)
ROW: P 3,860,000.00
EAO: P 10,325,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Mawab-Maragusan-Caraga Road (Section 1), Package D, incl. Bridge and ROW, Compostela Valley
Physical Target:
CW1: 9.58216 Lane Km (Construction of Concrete Road)
ROW: 40,816.327 sq. m.
Allocation:
TOTAL: P 295,000,000.00
CW1: P 280,815,000.00 (Construction of Concrete Road)
ROW: P 3,860,000.00
EAO: P 10,325,000.00
May 28, 2018 FY 2018 GAA WIN8C03051 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan), Package A, incl. ROW, Davao del Norte
Physical Target:
CW1: 6.036 Lane Km (Construction of Gravel Road)
CW2: 10.268 Lane Km (Construction of Concrete Road)
ROW: 87,210.00 sq. m.
Allocation:
TOTAL: P 345,235,000.00
CW1: P 82,777,700.00 (Construction of Gravel Road)
CW2: P 211,774,075.00 (Construction of Concrete Road)
ROW: P 38,600,000.00
EAO: P 12,083,225.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan), Package A, incl. ROW, Davao del Norte
Physical Target:
CW1: 4.42462 Lane Km (Reconstruction to Concrete Pavement)
CW2: 17.14992 Lane Km (Construction of Concrete Road)
ROW: 87,210.00 sq. m.
Allocation:
TOTAL: P 345,235,000.00
CW1: P 35,480,818.69 (Construction of Gravel Road)
CW2: P 259,070,956.31 (Construction of Concrete Road)
ROW: P 38,600,000.00
EAO: P 12,083,225.00
May 28, 2018 FY 2018 GAA WIN8C03056 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Bukidnon-Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon-Laak Compostela Valley), Package 1, incl. ROW, Compostela Valley
Physical Target:
CW1: 12.910 Lane Km (Construction of Concrete Road)
ROW: 96,840.00 Lane Km
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800 (Construction of Concrete Road)
ROW: P 9,142,200.00
EAO: P 10,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Bukidnon-Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon-Laak Compostela Valley), Package 1, incl. ROW, Compostela Valley
Physical Target:
CW1: 15.836 Lane Km (Construction of Concrete Road)
ROW: 96,840.00 Lane Km
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800 (Construction of Concrete Road)
ROW: P 9,142,200.00
EAO: P 10,500,000.00
May 28, 2018 FY 2018 GAA WIN8C03040 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Construction/Upgrading/Rehabilitation of Drainage along National Roads – Primary Roads
Daang Maharlika (MN) – K1457+128 – K1459+280.50
Physical Target:
CW1: 7,463.00 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 149,269,000.00
CW1: P 144,044,585.00 (Construction of Drainage Structure along Road)
EAO: P 5,224,415.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Construction/Upgrading/Rehabilitation of Drainage along National Roads – Primary Roads
Daang Maharlika (MN) – K1457+128 – K1459+750
Physical Target:
CW1: 4,822.00 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 149,269,000.00
CW1: P 144,044,585.00 (Construction of Drainage Structure along Road)
EAO: P 5,224,415.00
May 25, 2018 FY 2018 WIN8G02261 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Dila-Dila, Zone 6, Santa Rita, Pampanga
May 25, 2018 FY 2018 WIN8G02257 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Rehabilitation / Improvement / Upgrading of Lubao – Floridablanca road, San Pablo 2nd, Lubao, Pampanga
May 25, 2018 FY 2018 WIN8G02258 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Network Development Program – Road Widening – Secondary Roads - Angeles – Porac – Floridablanca – Dinalupihan Road – K0108+1260 – K0110+300, K0110+380 – K0111+937.38, K0108+1260 – K0110+300, K0110+434 – K0111+937.
May 25, 2018 FY 2018 WIN8G02259 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Sitio Tabun, San Basilio, Santa Rita, Pampanga

Pages