June 7, 2021 |
2021 |
300116203974000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 2nd District Engineering Office |
Local Program: Local - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - Concreting of Colony Road, Libertad, Abulug, Cagayan |
June 2, 2021 |
2021 |
310212100169000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Quirino District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Tertiary Roads - Jct. Victoria - Maddela - Alicia -Kasibu Bdry Rd (Jct. Victoria - Kasibu Bdry) - K0414+381 - K0414+886, K0416+105 - K0417+000 |
June 2, 2021 |
FY2021 |
WIN1E02221 |
310204101152000 |
April 12, 2021 |
Region IX |
Regional Office IX |
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Vitali - Sibulao - Bypass Road Project (Alternate Road of N1), Package 1, Zamboanga City
Type of Work: Road Widening
Physical Target: 5.280 Lane Km.
Unit Cost: P 16,156,036.45/Lane Km.
ROW Acquisition: 5,153.7584 Square meters
EAO: P 3,150,000.00
Total Allocation: P 90,000,000.00 |
June 2, 2021 |
FY2021 |
WIN1E02220 |
310204101149000 |
April 12, 2021 |
Region IX |
Regional Office IX |
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
NRJ Zamboanga City-Labuan-Limpapa Road (Sinunuc-Malagutay-San Roque Section), Zamboanga City
Type of Work: Construction of Concrete Road
Physical Target: 5.72 Lane Km.
Unit Cost: P 17,229,147.66/Lane Km.
EAO: P 3,449,275.36
Total Allocation: P 102,000,000.00 |
June 2, 2021 |
FY2021 |
WIN1E02222 |
310201100688000 |
April 12, 2021 |
Region IX |
Regional Office IX |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pagadian City - Zamboanga City Rd - K1867+700.00 - K1870+300.00
Type of Work: Road Widening
Physical Target: 5.20 Lane Km.
Unit Cost: P 18,794,705.18/Lane Km.
EAO: P 3,420,636.34
Total Allocation: P 102,000,000.00 |
June 2, 2021 |
FY2021 |
WIN1E02228 |
310201100686000 |
April 12, 2021 |
Region IX |
Regional Office IX |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pagadian City - Zamboanga City Rd - K1703+000 - K1705+200
Type of Work: Road Widening
Physical Target: 4.400 Lane Km.
Unit Cost: P 21,498,134.07/Lane Km.
ROW Acquisition: 13,658.62483 Square meters
EAO: P 3,310,712.65
Total Allocation: P 102,000,000.00 |
June 2, 2021 |
FY2021 |
WIN1E02241 |
310201100687000 |
April 12, 2021 |
Region IX |
Regional Office IX |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pagadian City - Zamboanga City Rd - K1705+200.00 - K1705+880.00, K1706+120.00 - K1708+660.00
Type of Work: Road Widening
Physical Target: 6.440 Lane Km.
Unit Cost: P 14,857,733.50/Lane Km.
ROW Acquisition: 9,890.877 Square meters
EAO: P 3,348,933.13
Total Allocation: P 102,000,000.00 |
June 2, 2021 |
FY2021 |
WIN1E02243 |
310201100691000 |
April 12, 2021 |
Region IX |
Regional Office IX |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Sindangan - Liloy Rd - K1939+125.00 - K1941+712.98, K1941+937.26 - K1942+480.00
Type of Work: Road Widening
Physical Target: 6.261 Lane Km.
Unit Cost: P 16,568,026.25/Lane Km.
ROW Acquisition: 8,789.844 Square meters
EAO: P 3,630,634.43
Total Allocation: P 110,000,000.00 |
June 1, 2021 |
2021 |
WIN1C03873 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation - Preventive Maintenance - Primary Roads
Jose Abad Santos Ave (JASA), K0098+569.05 - K0098+912.87 |
June 1, 2021 |
2021 |
WIN1C03872 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation - Preventive Maintenance - Secondary Roads
Jct. Tablang - Gabaldon Rd, K0146+000 - K0146+940.15 |
June 1, 2021 |
FY 2021 GAA |
WIN1E02268 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Digos-Makar Rd - K1564+(-030) - K1564+000, K1564+(-067) - K1564+(-030),
K1564+(-098) - K1564+(-067), K1564+(-140) - K1564+(-098),
K1564+(-153) - K1564+(-140), K1564+(-180) - K1564+(-153),
K1564+(-255) - K1564+(-180), K1564+(-271) - K1564+(-255),
K1564+(-495) - K1564+(-271), K1564+000 - K1564+004
Physical Target:
CW1: 1.936 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 24,774,000.00
CW1: P 24,278,520.00 (Reconstruction to Concrete Pavement)
EAO: P 495,480.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Digos-Makar Rd - K1564+(-030) - K1564+004, K1564+(-067) - K1564+(-030),
K1564+(-103.6) - K1564+(-067), K1564+(-153) - K1564+(-148.6),
K1564+(-180) - K1564+(-153), K1564+(-255) - K1564+(-180),
K1564+(-271) - K1564+(-255), K1564+(-484.5) - K1564+(-271),
K1564+004 - K1564+111
Physical Target:
CW1: 1.882 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 24,774,000.00
CW1: P 24,278,520.00 (Reconstruction to Concrete Pavement)
EAO: P 495,480.00 |
June 1, 2021 |
2021 |
WIN1C03880 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Roads - Tertiary Roads
Calaguiman - Vicinal Rd, K0129+219.50 - K0129+785 |
June 1, 2021 |
2021 |
WIN1C03887 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bulacan 2nd District Engineering Office |
Asset Preservation - Preventive Maintenance - Tertiary Roads
NCR/Bulacan Bdry - Bigte - Ipo Dam Rd, K0034+000 - K0034+302, K0035+000 - K0035+165
|
June 1, 2021 |
2021 |
WIN1C03875 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bulacan 2nd District Engineering Office |
Asset Preservation - Preventive Maintenance - Tertiary Roads
Meycauayan - Camalig - Bahay Pari Road, K0025+574 - K0025+766.50
|
June 1, 2021 |
2021 |
WIN1C03883 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Zambales 1st District Engineering Office |
Network Development - Road Widening - Tertiary Roads
Sn Marcelino - Sn Antonio - Sn Narciso Rd, K0163+469 - K0164+367
|
June 1, 2021 |
2021 |
WIN1E02218 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. 310107100235000
P00502029MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
FROM:
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1264 + 900 - K1266 + 000
Type of Work / Physical Target: CW1 - Construction of Road Slope Protection Structure: 10,423.35 sq.m
Unit Cost: P9,720.963 / lane km
Allocation: P101,325,000
EAO: P3,675,000
TOTAL: P105,000,000
TO:
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1262 + 590 - K1262 + 770, K1262 + 910 - K1263 + 010, K1264 + 580.60 - K1264 + 860.85
Type of Work / Physical Target: CW1 - Construction of Road Slope Protection Structure: 9,587.98 sq.m
Unit Cost: P10,567.919 / lane km
Allocation: P101,325,000
EAO: P3,675,000
TOTAL: P105,000,000 |
June 1, 2021 |
2021 |
WIN1E02245 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. 300116203603000
P00550740MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Construction of Road, Km 44 +000 - Km 60+000, Binicalan, San Luis, Agusan del Sur
Type of Work / Physical Target: CW1 - Construction of
Concrete Road: 9.815 lane km
Unit Cost: P10,323,484.46 / lane km
Allocation: P101,325,000
EAO: P3,675,000
TOTAL: P105,000,000
TO:
Construction of Road, Sta. 31+800 - Sta. 35+120, Binicalan, San Luis, Agusan del Sur
Type of Work / Physical Target: CW1 - Construction of
Gravel Road: 6.64 lane km
Unit Cost: P15,259,789.16 / lane km
Allocation: P101,325,000
EAO: P3,675,000
TOTAL: P105,000,000 |
June 1, 2021 |
2021 |
WIN1E02260 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 300117210455000
P00551464MN
Local Program - Local Roads and Bridges - Local Roads and Bridges - Local Roads - Local Infrastructure Program
FROM:
Concreting of Barangay Road, Barangay Suyoc to Barangay Bugas-Bugas, Placer, Surigao del
Norte
Type of Work / Physical Target: CW1 - Construction of
Concrete Road: 0 lane km
Unit Cost: P0 / lane km
Allocation: P9,900,000.00
EAO: P100,000.00
TOTAL: P10,000,000.00
TO:
Concreting of Barangay Road, Barangay Suyoc to Barangay Bugas-Bugas, Placer, Surigao del
Norte
Type of Work / Physical Target: CW1 - Construction of
Concrete Road: 0.9518 lane km
Unit Cost: P10,401,344.82 / lane km
Allocation: P9,900,000.00
EAO: P100,000.00
TOTAL: P10,000,000.00 |
June 1, 2021 |
2021 |
WIN1E02263 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 300117210454000
P00551463MN
Local Program - Local Roads and Bridges - Local Roads and Bridges - Local Roads - Local Infrastructure Program
FROM:
Concreting of road, Barangay Cayawan, Malimono, Surigao Del Norte
Type of Work / Physical Target: CW1 - Construction of
Concrete Road: 0.28 lane km
Unit Cost: P10,607,142.86 / lane km
Allocation: P2,970,000.00
EAO: P30,000.00
TOTAL: P3,000,000.00
TO:
Concreting of road, Barangay Cayawan, Malimono, Surigao Del Norte
Type of Work / Physical Target: CW1 - Construction of
Concrete Road: 0.369 lane km
Unit Cost: P8,048,780.49 / lane km
Allocation: P2,970,000.00
EAO: P30,000.00
TOTAL: P3,000,000.00
|
May 31, 2021 |
2021 |
WIN1C03788 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Coronel River Flood Control, Sta. 0+000 - Sta. 0+637.00, Gabaldon, Nueva Ecija |
May 31, 2021 |
2021 |
WIN1C03783 |
FY 2021 GAA |
December 28, 2021 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation - Preventive Maintenance - Tertiary Roads
Gapan - Fort Magsaysay Rd, K0110+278.88 - K0112+026.25 |
May 31, 2021 |
2021 |
WIN1C03795 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation - Preventive Maintenance - Primary Roads
Jose Abad Santos Ave (JASA), K0097+180 - K0097+540.20, K0097+961.20 - K0097+1180, K0098+066.70 - K0098+569.05 |
May 31, 2021 |
2021 |
WIN1C03832 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Sta. Rosa - Fort Magsaysay Rd, K0112+400 - K0112+857.68, K0115+005.10 - K0117+072.30, K0122+580 - K0123+186 |
May 31, 2021 |
2021 |
WIN1C03846 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Coronel River Flood Control, Sta. 0+000 - Sta. 0+555.000, Gabaldon, Nueva Ecija |
May 31, 2021 |
2021 |
WIN1C03840 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation - Preventive Maintenance - Secondary Roads
Nueva Ecija - Aurora Rd, K0130+504 - K0130+844 |
May 31, 2021 |
2021 |
WIN1C03845 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation - Preventive Maintenance - Tertiary Roads
Cabanatuan City - Carmen Rd , K0127+208 - K0127+794 |
May 31, 2021 |
2021 |
WIN1C03849 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation - Preventive Maintenance - Primary Roads
Sta. Rosa - Tarlac Rd, K0109+000 - K0109+726.00, K0110+1260.00 - K0111+117.15 |
May 31, 2021 |
2021 |
WIN1C03836 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Network Development - Off-Carriageway Improvement - Tertiary Roads
Gapan - Fort Magsaysay Rd - K0113+000.00 - K0113+78.03 |
May 31, 2021 |
2021 |
WIN1C03842 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Network Development - Road Widening - Primary Roads
Jose Abad Santos Ave (JASA), K0107+000 - K0107+591.15, K0108+284.80 - K0108+482.80, K0108+501.40 - K0108+587.50
|
May 31, 2021 |
2021 |
WIN1C03818 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation - Preventive Maintenance - Primary Roads
Jose Abad Santos Ave (JASA), K0115+000 - K0115+596.65 |
May 31, 2021 |
2021 |
WIN1C03844 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Rehabilitation of Pampanga River Control, Sta. 0+000 to Sta. 0+452.40, Brgy. Callos, Peñaranda, Nueva Ecija |
May 31, 2021 |
2021 |
WIN1C03789 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Zambales 1st District Engineering Office |
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection along olongapo - Bugallon Road, Salaza Section, Palauig, Zambales |
May 31, 2021 |
2021 |
310204101013000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Regional Office II |
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads - Alicia - Angadanan - San Guillermo - Cauayan City - Naguilian Alternate Route, Package 3, Isabela |
May 31, 2021 |
FY2021 |
WIN1E02265 |
310205100608000 |
April 13, 2021 |
Region IX |
Regional Office IX |
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/New Roads
Zamboanga del Sur Coastal Road (Vincenzo Sagun - Margosatubig Section), Zamboanga del Sur
Type of Work: Construction of Concrete Road
Physical Target: 2.70 Lane Km.
Unit Cost: P 36,500,268.39/Lane Km.
EAO: P 3,449,275.36
Total Allocation: P 102,000,000.00 |
May 31, 2021 |
2021 |
310205100535000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Regional Office II |
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/New Roads - Aritao - Quirino Road, Package 1, Quirino |
May 29, 2021 |
FY 2021 GAA |
WIN1E02257 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Tagum-Panabo Circum Rd - K1486+066 - K1487+000
Physical Target:
CW1: 1.808 Lane Km (Road Widening)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Road Widening)
EAO: P 1,050,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Tagum-Panabo Circum Rd - K1484+349 - K1485+214
Physical Target:
CW1: 1.740 Lane Km (Road Widening)
ROW: 13,050.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 24,704,000.00 (Road Widening)
ROW: P 2,246,000.00 (ROW Acquisition)
EAO: P 1,050,000.00 |
May 29, 2021 |
FY 2021 GAA |
WIN1E02258 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1564+801 - K1565+000,
K1566+000 - K1566+713, K1566+824 - K1567+616
Physical Target:
CW1: 3.546 Lane Km (Road Widening)
Allocation:
TOTAL: P 75,014,000.00
CW1: P 72,388,510.00 (Road Widening)
EAO: P 2,625,490.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1566+000 - K1566+740
Physical Target:
CW1: 1.480 Lane Km (Road Widening)
ROW: 26,605.1196 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 75,014,000.00
CW1: P 36,194,255.00 (Road Widening)
ROW: P 36,194,255.00 (ROW Acquisition)
EAO: P 2,625,490.00 |
May 29, 2021 |
FY 2021 GAA |
WIN1E02271 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1571+310 - K1572+000
Physical Target:
CW1: 1.446 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 35,505,000.00
CW1: P 34,794,900.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 710,100.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1571+310 - K1572+000
Physical Target:
CW1: 2.892 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 35,505,000.00
CW1: P 34,794,900.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 710,100.00 |
May 29, 2021 |
FY 2021 GAA |
WIN1E02226 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Digos-Makar Rd - K1584+702 - K1585+000,
K1588+547 - K1589+000, K1591+083 - K1591+160
Physical Target:
CW1: 2.773 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 29,453,000.00
CW1: P 28,863,940.00 (Reconstruction to Concrete Pavement)
EAO: P 589,480.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Digos-Makar Rd - K1584+702 - K1585+000,
K1588+471 - K1589+000, K1591+083 - K1591+160
Physical Target:
CW1: 2.492 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 29,453,000.00
CW1: P 28,863,940.00 (Reconstruction to Concrete Pavement)
EAO: P 589,480.00 |
May 29, 2021 |
FY 2021 GAA |
WIN1E02252 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Bansalan-Mt Apo Natl Park Rd - K1593+400 - K1594+061
Physical Target:
CW1: 5,400.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 27,000,000.00
CW1: P 26,460,000.00 (Construction of Road Slope Protection Structure)
EAO: P 540,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Bansalan-Mt Apo Natl Park Rd - K1593+400 - K1594+256
Physical Target:
CW1: 7,656.420 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 27,000,000.00
CW1: P 26,460,000.00 (Construction of Road Slope Protection Structure)
EAO: P 540,000.00 |
May 28, 2021 |
2021 |
WIN1C03807 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads
Gov. J.J. Linao Road, K0-170+000 - K0170+352, K0170+366 - K0170+540 |
May 28, 2021 |
2021 |
WIN1C03791 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bulacan 2nd District Engineering Office |
Asset Preservation - Preventive Maintenance - Tertiary Roads
Sta. Maria - Norzagaray Road, K0033+843 - K0034+141, K0034+496 - K0034+511.90 |
May 28, 2021 |
2021 |
WIN1F06188 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Catarman - Calbayog Rd - K0746+140- K0746+265
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,500 square meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Catarman - Calbayog Rd - K0753+879- K0753+949, K0758+458- K0758+510, K0766+000- K0766+114
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,405 square meters
EAO P 1.00 M
Total P 50.00 M
|
May 28, 2021 |
2021 |
WIN1C03851 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Aurora District Engineering Office |
Asset Preservation - Preventive Maintenance - Secondary Roads
Baler - Casiguran Rd, K0238+000 - K0238+767 |
May 28, 2021 |
2021 |
WIN1C03820 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Amungan - Palauig - Banlog Rd, K0212+500 - K0212+940, K0213+443 - K0213+709.20 |
May 28, 2021 |
2021 |
WIN1C03812 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Zambales 1st District Engineering Office |
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection at Lipay River Control (Upstream) North Approach, Sta. 0+000 - Sta. 0+505, Santa Cruz, Zambales |
May 28, 2021 |
2021 |
WIN1C03870 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Zambales 1st District Engineering Office |
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Slope Protection along Sta. Cruz - Mangatarem Road, Guisguis Section, Sta. Cruz, Zambales |
May 28, 2021 |
FY 2021 GAA |
WIN1E02262 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Fatima-Malabog Rd - K1507+010 - K1509+302
Physical Target:
CW1: 4.870 Lane Km (Road Widening)
Allocation:
TOTAL: P 120,000,000.00
CW1: P 115,800,000.00 (Road Widening)
EAO: P 4,200,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Fatima-Malabog Rd - K1507+010 - K1508+498
Physical Target:
CW1: 2.614 Lane Km (Road Widening)
CW2: 2,127.95 sq. m. (Construction of Road Slope Protection Structure)
ROW: 19,605.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 120,000,000.00
CW1: P 57,097,349.00 (Road Widening)
CW2: P 46,254,151.00 (Construction of Road Slope Protection Structure)
ROW: P 12,448,500.00 (ROW Acquisition)
EAO: P 4,200,000.00 |
May 27, 2021 |
2021 |
WIN1F06180 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Primary Roads
AS PER GAA/ORIGINAL:
Ormoc-Baybay-Southern Leyte Bdry Rd - K1056+179 - K1056+419
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: Shoulder P 3.528 M
Paving/Construction: 720 square meters
EAO P 0.072 M
Total P 3.60 M
AS MODIFIED:
Ormoc-Baybay-Southern Leyte Bdry Rd - K1038+(-732) - K1038+(-332)
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: Shoulder P 3.528 M
Paving/Construction: 1,200 square meters
EAO P 0.072 M
Total P 3.60 M |
May 27, 2021 |
2021 |
WIN1C03773 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Regional Office III |
Network Development - Road Widening - Tertiary Roads
Bocaue - Sn Jose Rd - K0039+100 - K0040+000, K0040+637 - K0041+617 |
May 27, 2021 |
2021 |
WIN1F06200 |
GAA FY 2021 |
January 16, 2021 |
Region VIII |
Southern Leyte District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Secondary Roads
AS PER GAA/ORIGINAL:
Bdry Southern Leyte-Maasin-Macrohon-Sogod-Jct Daang Maharlika - K1206 + 000 - K1206 + 160, K1206 + 175 - K1207 + 123
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: Shoulder P 14.5677 M
Paving / Construction: 7,400.25 square meters
EAO P 0.2973 M
Total P 14.865 M
AS MODIFIED:
Bdry Southern Leyte-Maasin-Macrohon-Sogod-Jct Daang Maharlika - K1206 + 000 - K1206 + 160, K1206 + 175 - K1206 + 330, K1206 + 357 - K1206 + 647
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: Shoulder P 14.5677 M
Paving / Construction: 3,630 square meters
EAO P 0.2973 M
Total P 14.865 M
|
May 27, 2021 |
2021 |
WIN1C03810 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Regional Office III |
Asset Preservation - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Nueva Ecija - Aurora Rd - K0193+270 - K0193+350 |
May 27, 2021 |
2021 |
WIN1F06190 |
GAA FY 2021 |
January 16, 2021 |
Region VIII |
Southern Leyte District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Bridge - Widening of Permanent Bridges
AS PER GAA/ORIGINAL:
Bogasong Br. 1 (B00601LT) along Daang Maharlika (LT)
Physical Target: Allocation:
CW1-Widening of Bridge : 118.4 square meters P 15.68 M
EAO P 0.32 M
Total P 16.00 M
AS MODIFIED:
Bogasong Br. 2 (B00602LT) along Daang Maharlika (LT)
Physical Target: Allocation:
CW1-Widening of Bridge : 114.48 square meters P 15.68 M
EAO P 0.32 M
Total P 16.00 M
|
May 27, 2021 |
2021 |
WIN1C03811 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Regional Office III |
Network Development - Road Widening - Tertiary Roads
Sta Maria - Norzagaray Rd - K0032+(-151) - K0032+383, K0034+768 - K0035+500, K0037+600 - K0038+903, K0039+060 - K0039+171, K0039+180 - K0039+329, K0039+341 - K0039+365, K0039+420 - K0036+703, K0039+720.9 - K0039+756 |
May 27, 2021 |
2021 |
WIN1F06197 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Picas-San Jose DZR Airport Rd - K0911 + 835 – K0912 + 127
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 6.844320 M
Asphalt Overlay: 1.172 Lane Km
EAO P 0.139680 M
Total P 6.984 M
AS MODIFIED:
Picas-San Jose DZR Airport Rd - K0911 + 690 – K0911 + 970
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 6.844320 M
Asphalt Overlay: 1.12 Lane Km
EAO P 0.139680 M
Total P 6.984 M
|
May 27, 2021 |
2021 |
WIN1C03769 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Regional Office III |
Network Development - Off-Carriageway Improvement - Tertiary Roads
Bagac - Mariveles Rd - K0162+221 - K0168+659, K0169+400 - K0169+890, K0170+101 - K0170+690, K0170+810 - K0170+910, K0171+050 - K0171+070, K0171+110 - K0171+390, K0171+930 - K0172+730, K0173+010 - K0173+250, K0173+730 - K0174+339, K0174+374 - K0174+970, K0175+050 - K0176+428, K0176+700 - K0176+820, K0177+300 - K0179+468 |
May 26, 2021 |
2021 |
WIN1C03804 |
GAA 2021 |
May 19, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Jct Talubin-Barlig-Natonin-Paracelis-Cal - (S04030LZ) Chainage 0 - Chainage 1250;
Physical Target: CW1: 1.25 Lane Km;
Allocation= Php 25,000,000
To: Jct-Talubin-Barlig-Natonin-Paracelis-Calaccad Road (S04030LZ)- Chainage 0 - Chainage 830;
Physical Target: CW1: 1.66 Lane Km;
Allocation= Php 25,000,000
|
May 26, 2021 |
2021 |
WIN1F06165 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) – K0906 + 941 – K0907 + 173
Physical Target: Allocation:
CW1-Road Widening : 0.396 Lane Km P 8.036 M
EAO P 0.164 M
Total P 8.200 M
AS MODIFIED:
Daang Maharlika (LT) – K0906 + 941 – K0907 + 173
Physical Target: Allocation:
CW1-Road Widening : 0.466 Lane Km P 8.036 M
EAO P 0.164 M
Total P 8.200 M
|
May 26, 2021 |
2021 |
WIN1F06164 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Gov Benjamin “kokoy” T Romualdez Div Rd – (S00254LT) Chainage 0 -Chainage 55
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 2.450980 M
: 0.110 Lane Km
EAO P 0.050020 M
Total P 2.501 M
AS MODIFIED:
Gov Benjamin “kokoy” T Romualdez Div Rd – (S00254LT) Chainage 0 -Chainage 55, (S00255LT) K0908+997 – K0909+030
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 2.450980 M
: 0.137 Lane Km
EAO P 0.050020 M
Total P 2.501 M
|
May 26, 2021 |
2021 |
WIN1F06177 |
GAA FY 2021 |
January 25, 2021 |
Region VIII |
Samar 1st District Engineering Office |
Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
AS PER GAA/ORIGINAL:
Construction of Road, Rueda Ext. - Brgy. Rizal, Calbayog City, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 42.14 M
: 2.90 Lane Km
EAO P 0.86 M
Total P 43.00 M
AS MODIFIED:
Construction of Road, Rueda Ext. - Brgy. Rizal I, Calbayog City, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 42.14 M
: 2.90 Lane Km
EAO P 0.86 M
Total P 43.00 M
|
May 26, 2021 |
2021 |
WIN1C03843 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Regional Office III |
Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Rehabilitation/Improvement of Eroded Pampanga River Bank, Sta. 0+000 - Sta. 0+100.82, Cansinala, Apalit, Pampanga |
May 26, 2021 |
2021 |
WIN1C03834 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation - Preventive Maintenance - Secondary Roads
Angeles - Porac - Floridablanca - Dinalupihan Rd - K0092+979 - K0094+000, K0095+000 - K0095+210.50 |
May 26, 2021 |
2021 |
WIN1C03828 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 2nd District Engineering Office |
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Spurdikes along Pasig-Potrero River (Phase I), Sta. 0+000 - Sta. 0+264, Porac, Pampanga |
May 25, 2021 |
2021 |
WIN1F06131 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Ormoc-Baybay-Southern Leyte Bdry Rd - K1041 + 399.32 - K1041 + 835
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 3.4153 M
Road : 435.68 Lineal Meters
EAO P 0.0697 M
Total P 3.485 M
AS MODIFIED:
Ormoc-Baybay-Southern Leyte Bdry Rd - K1041 + 399.32 - K1041 + 732
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 3.4153 M
Road : 441.00 Lineal Meters
EAO P 0.0697 M
Total P 3.485 M
|
May 25, 2021 |
2021 |
WIN1F06133 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0965 + 200, K0980 + 981, K0984 + 300, K0994 + 300
Physical Target: Allocation:
CW1-Upgrading of Drainage Structure along P 5.684 M
Road: 48.00 Lineal Meters
EAO P 0.116 M
Total P 5.800 M
AS MODIFIED:
Daang Maharlika (LT) - K0975 + 200, K0980 + 981, K0984 + 300, K0994 + 300
Physical Target: Allocation:
CW1-Upgrading of Drainage Structure along P 5.684 M
Road: 71.80 Lineal Meters
EAO P 0.116 M
Total P 5.800 M
|
May 25, 2021 |
2021 |
WIN1F06132 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
AS PER GAA/ORIGINAL:
Daang maharlika (LT) – K0974+000 – K0974+247
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road P 9.800 M
: 0.494 Lane Km
EAO P 0.200 M
Total P 10.00 M
AS MODIFIED:
Daang Maharlika (LT) – K0974+000 – K0974+716
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road P 9.800 M
: 1.432 Lane Km
EAO P 0.200 M
Total P 10.00 M
|
May 25, 2021 |
2021 |
WIN1F06138 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
AS PER GAA/ORIGINAL:
Tacloban-Baybay South Rd - K0992 + 306.70 - K0992 + 528.70
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 9.88526 M
: 0.444 Lane Km
EAO P 0.20174 M
Total P 10.087 M
AS MODIFIED:
Tacloban-Baybay South Rd - K0992 + 306.70 - K0993 + 000
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 9.88526 M
: 1.402 Lane Km
EAO P 0.20174 M
Total P 10.087 M
|
May 25, 2021 |
2021 |
WIN1F06075 |
GAA FY 2021 |
January 16, 2021 |
Region VIII |
Southern Leyte District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Liloan-S Ricardo Rd - K1082 + 483 - K1083 + 140
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 29.0472 M
: 1.318 Lane Km
EAO P 0.5928 M
Total P 29.64 M
AS MODIFIED:
Liloan-S Ricardo Rd - K1082 + 483 - K1083 + 140, K1083+336-K1083+747
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 29.0472 M
: 2.14 Lane Km
EAO P 0.5928 M
Total P 29.64 M
|
May 25, 2021 |
2021 |
WIN1F06109 |
GAA FY 2021 |
January 16, 2021 |
Region VIII |
Southern Leyte District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K1100 + 087 - K1100+177
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 0.00 square meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Daang Maharlika (LT) - K1006 + 801 - K1006+901
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 3000 square meters
EAO P 1.00 M
Total P 50.00 M
|
May 25, 2021 |
2021 |
WIN1F06130 |
GAA FY 2021 |
January 16, 2021 |
Region VIII |
Southern Leyte District Engineering Office |
Local Program
Local - National Roads and Bridges - National Roads - Local Infrastructure Program
AS PER GAA/ORIGINAL:
Improvement of Liloan - San Ricardo Road (S00218LT) K1056+-896 - K1070+000, Maasin City, Southern Leyte
Physical Target: Allocation:
CW1-Rehabilitation of Concrete Road P 59.40 M
: 5.383 Lane Km
EAO P 0.60 M
Total P 60.00 M
AS MODIFIED:
Improvement of Liloan - San Ricardo Road (S00218LT) K1078 + 000 - K1078 + 823, K1078 + 839 - K1079 + 676, K1079 + 711 - K1082 + 000 ,K1083 + 200 - K1084 + 415, K1084 + 460 -K1084 + 759, K1084 + 774 - K1086 + 000
Physical Target: Allocation:
CW1-Rehabilitation of Concrete Road P 59.40 M
: 13.380 Lane Km
EAO P 0.60 M
Total P 60.00 M
|
May 25, 2021 |
2021 |
WIN1F06099 |
GAA FY 2021 |
January 2, 2021 |
Region VIII |
Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0802 + 000 - K0802 + 880
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 9.80 M
Asphalt Overlay : 1.76 Lane Km
EAO P 0.20 M
Total P 10.00 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0803 + 110 - K0803 + 990
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 9.80 M
Asphalt Overlay : 1.76 Lane Km
EAO P 0.20 M
Total P 10.00 M
|
May 25, 2021 |
2021 |
WIN1F06096 |
GAA FY 2021 |
January 2, 2021 |
Region VIII |
Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Wright-Taft-Borongan Rd-K0846+820-K0846+848, K0854+100-K0854+123
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 19.60 M
Structure: 2,000 square meters
EAO P 0.40 M
Total P 20.00 M
AS MODIFIED:
Wright-Taft-Borongan Rd- K0846 + 820 - K0846 + 852, K0847 + 950 - K0848 + 006, K0851 + 905 - K0851 + 965, K0854 + 159 - K0854 + 183
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 19.60 M
Structure: 2,000 square meters
EAO P 0.40 M
Total P 20.00 M
|
May 25, 2021 |
2021 |
WIN1F06176 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Basey-Marabut-Pinamitinan Rd - K0937 + 808 - K0942 + 643
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 53.075 M
Asphalt Overlay: 9.518 Lane Km
EAO P 1.925 M
Total P 55.00 M
AS MODIFIED:
Basey-Marabut-Pinamitinan Rd-K0937 + 808 - K0940 + 100
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 53.075 M
Asphalt Overlay: 4.536 Lane Km
EAO P 1.925 M
Total P 55.00 M
|
May 25, 2021 |
2021 |
WIN1F06171 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1040 + 063 - K1042 + 085, K1042 + 285 - K1045 + 000
Physical Target: Allocation:
CW1-PreventiveMaintenance of Road: P 51.632325 M
Asphalt Overlay : 9.336 Lane Km
EAO P 1.872675 M
Total P 53.505 M
AS MODIFIED:
Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1040 + 063 - K1042 + 085
Physical Target: Allocation:
CW1-PreventiveMaintenance of Road: P 51.632325 M
Asphalt Overlay : 4.016 Lane Km
EAO P 1.872675 M
Total P 53.505 M
|
May 25, 2021 |
2021 |
WIN1C03809 |
SR2021-02-004929 |
February 17, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Calupaan Flood Control, Sta. 6+044 - Sta. 6+758 (RS), Alfonso Lista, Ifugao;
Physical Target: CW1 : 648.5 Lineal meters;
Allocation= Php 47,956,000
To: Construction of Calupaan Flood Control, Sta. 40 + 975 - Sta. 41 + 668 (LS), Alfonso Lista, Ifugao;
Physical Target: CW1 : 648.5 Lineal meters;
Allocation= Php 47,956,000
|
May 25, 2021 |
2021 |
WIN1C03798 |
SR2021-02-004932 |
February 17, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Calimag Flood Control, Sta. 5+328 - Sta. 5+708 (LS), Alfonso Lista, Ifugao;
Physical Target: CW1 : 206.5 Lineal meters;
Allocation= Php 20,000,000
To: Construction of Calimag Flood Control, Sta. 5 + 823 - Sta. 6 + 132 (RS), Alfonso Lista, Ifugao;
Physical Target: CW1 : 206.5 Lineal meters;
Allocation= Php 20,000,000
|
May 25, 2021 |
2021 |
WIN1C03794 |
SR2021-02-00437 |
February 17, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of San Juan Flood Control, Sta. 2+340 - Sta. 3+280 (RS), Alfonso Lista, Ifugao;
Physical Target: CW1 : 794.5 Lineal meters;
Allocation= Php 60,000,000
To: Construction of San Juan Flood Control, Sta. 38 + 023 - Sta. 38 + 792 (LS), Alfonso Lista, Ifugao ;
Physical Target: CW1 : 794.5 Lineal meters;
Allocation= Php 60,000,000
|
May 25, 2021 |
2021 |
WIN1F06102 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) K0917+000-K0917+401
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 9.800 M
Road : 802 Lineal Meters
EAO P 0.200 M
Total P 10.00 M
AS MODIFIED:
Daang Maharlika (LT) K0917+000-K0917+280
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 9.800 M
Road : 560 Lineal Meters
EAO P 0.200 M
Total P 10.00 M
|
May 25, 2021 |
2021 |
WIN1F06173 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Kiling-Tanauan-Tabontabon-Julita Rd - K0930 + 594 - K0931 + 363
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 8.63870 M
Asphalt Overlay : 1.538 Lane Km
EAO P 0.17630 M
Total P 8.815 M
AS MODIFIED:
Kiling-Tanauan-Tabontabon-Julita Rd - K0930 + 594 - K0931 + 184
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 8.63870 M
Asphalt Overlay : 1.180 Lane Km
EAO P 0.17630 M
Total P 8.815 M |
May 25, 2021 |
2021 |
WIN1C03815 |
SR2021-02-002709 |
February 4, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0343 + 734 - K0343 + 751, K0343 + 919 - K0343 + 985, K0344 + 485 - K0344 + 501, K0344 + 649 - K0344 + 677, K0344 + 806 - K0344 + 829, K0345 + 025 - K0345 + 048, K0345 + 542 - K0345 + 565, K0345 + 775 - K0345 + 793, K0346 + 078 - K0346 + 121, K0346 + 564 - K0346 + 581, K0346 + 630 - K0346 + 695, K0347 + 830 - K0347 + 862, K0348 + 000 - K0348 + 100, K0349 + 044 - K0349 + 063, K0349 + 210 - K0349 + 230, K0350 + 548 - K0350 + 570, K0351 + 892 - K0351 + 918, K0353 + 044 - K0353 + 085, K0354 + 698 - K0354 + 758, K0361 + 870 - K0361 + 1000;
Physical Target: CW1 : 8,897.5 Square meters;
Allocation= Php 109,081,000
To: Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0347+940 - K0348+000, K0361+715 - K0361+850;
Physical Target: CW1 : 5,124.83 Square meters;
Allocation= Php 109,081,000
|
May 25, 2021 |
2021 |
WIN1C03808 |
SR2021-02-004939 |
February 21, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Quartering Facility Building, Kalinga Police Provincial Office, Tabuk City, Benguet;
Physical Target: CW1 : 1 Number of Facilities;
Allocation= Php 20,000,000
To: Construction of Quartering Facility Building, Kalinga Police Provincial Office, Tabuk City, Kalinga ;
Physical Target: CW1 : 1 Number of Facilities;
Allocation= Php 20,000,000
|
May 25, 2021 |
2021 |
WIN1C03799 |
GAA 2021 |
May 19, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Baguio-Itogon Rd - K0260 + 724 - K0261 + 000;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 20,000,0000
To: Baguio-Itogon Rd - K0260 + 800 - K0260+954;
Physical Target: CW1 : 8,186 Square meters;
Allocation= Php 20,000,0000
|
May 21, 2021 |
2021 |
WIN1F06095 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
AS PER GAA/ORIGINAL:
Tigbao-Pulak-Sta Fe Rd - K0911 + 988 - K0912 + 847
Physical Target: Allocation:
CW1-Road Widening: 1.720 Lane Km P 14.700 M
EAO P 0.300 M
Total P 15.00 M
AS MODIFIED:
Tigbao-Pulak-Sta Fe Rd - K0912 + 640 - K0913 + 047
Physical Target: Allocation:
CW1-Road Widening: 0.814 Lane Km P 14.700 M
EAO P 0.300 M
Total P 15.00 M
|
May 21, 2021 |
2021 |
WIN1F06061 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Tacloban-Baybay South Rd-K0917+(-247)-K0917+407
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 10.25472 M
along Road : 1,308 lineal meters
EAO P 0.20928 M
Total P 10.464 M
AS MODIFIED:
Tacloban-Baybay South Rd-K0917+088.5 + K0917+407
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 10.25472 M
along Road : 590 lineal meters
EAO P 0.20928 M
Total P 10.464 M
|
May 21, 2021 |
2021 |
WIN1F06089 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Mainit-Sn Miguel-Santol Rd - K0938 + 272 - K0939 + 088
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: Asphalt P 9.12576 M
Overlay: 1.624 Lane Km
EAO P 0.18624 M
Total P 9.312 M
AS MODIFIED:
Mainit-Sn Miguel-Santol Rd - K0938 + 272 - K0938 + 854
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: Asphalt P 9.12576 M
Overlay: 1.164 Lane Km
EAO P 0.18624 M
Total P 9.312 M
|
May 21, 2021 |
2021 |
WIN1F06067 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
AS PER GAA/ORIGINAL:
Allen - Catarman Rd - K0700+214 - K0701+367
Physical Target: Allocation:
CW1-Road Widening: 2.308 Lane Km P 14.700 M
EAO P 0.300 M
Total P 15.00 M
AS MODIFIED:
Allen - Catarman Rd - K0700+214 - K0700+714
Physical Target: Allocation:
CW1-Road Widening: 1.00 Lane Km P 14.700 M
EAO P 0.300 M
Total P 15.00 M
|
May 21, 2021 |
2021 |
WIN1F06085 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico) – K0687 + 964 - K0688 + 333
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road P 18.591 M
: 0.748 Lane Km
EAO P 0.379 M
Total P 18.970 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico) – K0688 + 092 – K0688 + 743
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road P 18.591 M
: 1.302 Lane Km
EAO P 0.379 M
Total P 18.970 M
|
May 21, 2021 |
2021 |
WIN1F06101 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Allen-Catarman Rd - K0741+300 - K0741+630
Physical Target: Allocation:
CW1-Reconstruction Concrete Pavement : P 14.700 M
0.660 Lane Km
EAO P 0.300 M
Total P 15.00 M
AS MODIFIED:
Allen-Catarman Rd - K0741+815 - K0742+195
Physical Target: Allocation:
CW1-Reconstruction Concrete Pavement : P 14.700 M
0.778 Lane Km
EAO P 0.300 M
Total P 15.00 M
|
May 21, 2021 |
2021 |
WIN1F06068 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Catarman - Laoang Rd - K0752+000 - K0752+200
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement: P 9.800 M
0.400 Lane Km
EAO P 0.200 M
Total P 10.00 M
AS MODIFIED:
Catarman - Laoang Rd - K0763+883.12 - K0764+196.50
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement: P 9.800 M
0.633 Lane Km
EAO P 0.200 M
Total P 10.00 M
|
May 21, 2021 |
2021 |
WIN1F06127 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0961+200 - K0961+863, K0961+948 - K0962+271
Physical Target: Allocation:
CW1-Road Widening:1.976 Lane Km P 29.40 M
EAO P 0.60 M
Total P 30.00 M
AS MODIFIED:
Daang Maharlika (LT) - K0961+200 - K0961+858, K0961+953 - K0962+548
Physical Target: Allocation:
CW1-Road Widening:2.51 Lane Km P 24.432 M
CW2-Construction of Road Slope Protection P 4.968 M
Structure: 1,080.00 Square meters
EAO P 0.60 M
Total P 30.00 M
|
May 21, 2021 |
2021 |
WIN1F06128 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
AS PER GAA/ORIGINAL:
Abuyog-Silago Rd - K0968+380 - K0968+968
Physical Target: Allocation:
CW1-Road Widening: 1.176 Lane Km P 9.80 M
EAO P 0.200 M
Total P 10.00 M
AS MODIFIED:
Abuyog-Silago Rd - K0968+341 - K0968+968
Physical Target: Allocation:
CW1-Road Widening: 1.254 Lane Km P 9.80 M
EAO P 0.200 M
Total P 10.00 M
|
May 20, 2021 |
2021 |
WIN1F06108 |
GAA FY 2021 |
May 6, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL :
Jct Buenavista-Lawaan-Marabut Rd - K0977 + 200 - K0977 + 320
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 89.745 M
Structure: 9,300 square meters
EAO P 3.255 M
Total P 93.00 M
AS MODIFIED :
Jct Buenavista-Lawaan-Marabut Rd - K0977 + 200 - K0977 + 320,
K0988 + 780 – K0988 + 880, K0993 + 920 – K0994 + 090
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 89.745 M
Structure: 4,540.80 square meters
EAO P 3.255 M
Total P 93.00 M |
May 20, 2021 |
2021 |
WIN1F06103 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL :
Catarman-Calbayog Rd - K0751 + 450 - K0751 + 700
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 91.675 M
Structure: 6,333.333 square meters
EAO P 3.325 M
Total P 95.00 M
AS MODIFIED :
Catarman-Calbayog Rd- K0751 + 000 - K0751 + 840, K0778 + 690 - K0779 + 100
Physical Target: Allocation:
CW1-Road Widening: 2.344 Lane Km P 36.616145 M
CW2-Construction of Road Slope Protection P 52.058855 M
Structure: 3,100.64 square meters
EAO P 3.325 M
Total P 95.00 M
|
May 20, 2021 |
2021 |
WIN1F06107 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL :
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0684 + 395 - K0684 + 475, K0686 + 823.60 - K0686 + 881.10
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 53.075 M
Structure: 5,500 square meters
EAO P 1.925 M
Total P 55.00 M
AS MODIFIED :
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0684 + 395 - K0684 + 475, K0686 + 823.60 - K0686 + 910
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 53.075 M
Structure: 2,900.380 square meters
EAO P 1.925 M
Total P 55.00 M
|
May 20, 2021 |
2021 |
WIN1F06064 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
AS PER GAA/ORIGINAL :
Palompon-Isabel-Merida-Ormoc Rd - K1095 + 000 - K1097 + 555, K1097 + 653 - K1098 + 000
Physical Target: Allocation:
CW1-Road Widening: 5.662 Lane Km P 101.325 M
EAO P 3.675 M
Total P 105.00 M
AS MODIFIED :
Palompon-Isabel-Merida-Ormoc Rd - K1095 + 000 - K1097 + 555, K1097 + 564 - K1098 + 000
Physical Target: Allocation:
CW1-Road Widening: 5.840 Lane Km P 101.325 M
EAO P 3.675 M
Total P 105.00 M
|
May 20, 2021 |
2021 |
WIN1F06056 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL :
Biliran Circumferential Rd - K1070 + 000 - K1072 + 000, K1073 + 000 - K1077 + 000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 67.550 M
Asphalt Overlay:12.206 Lane Km
EAO P 2.450 M
Total P 70.00 M
AS MODIFIED :
Biliran Circumferential Rd - K1070 + 000 - K1071 + 950, K1073 + 000 - K1074 + 700
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 67.550 M
Asphalt Overlay:7.264 Lane Km
EAO P 2.450 M
Total P 70.00 M
|
May 20, 2021 |
2021 |
300207100334000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Regional Office II |
Convergence and Special Support Program - Construction/ Improvement of Various Infrastructure in Support of National Security - Construction of Multi-Purpose Building, Aurora Police Station with firing range, Aurora, Isabela |
May 20, 2021 |
2021 |
WIN1F06062 |
GAA FY 2021 |
May 6, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL :
Wright-Taft-Borongan Rd - K0871 + 260 - K0872 + 160
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 96.500 M
Structure: 10,000 square meters
EAO P 3.500 M
Total P 100.00 M
AS MODIFIED :
Wright-Taft-Borongan Rd - K0871 + 721 - K0871 + 821
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 96.500 M
Structure: 4,378.74 square meters
EAO P 3.500 M
Total P 100.00 M
|
May 20, 2021 |
2021 |
WIN1F06076 |
GAA FY 2021 |
May 6, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL :
Wright-Taft-Borongan Rd - K0872 + 160 - K0872 + 660
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 96.500 M
Structure: 10,000 square meters
EAO P 3.500 M
Total P 100.00 M
AS MODIFIED :
Wright-Taft-Borongan Rd - K0871 + 821 - K0872 + 000
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 96.500 M
Structure: 4,382.72 square meters
EAO P 3.500 M
Total P 100.00 M
|
May 20, 2021 |
2021 |
300211100063000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Isabela 2nd District Engineering Office |
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Support Program as per R.A. 11239 - Installation/ Application/ Construction of Road safety Devices in identified blackspots along Santiago-Tuguegarao Road K0382+061-K0383+065, K0383+080-K0384+046, K0365+(-580)-K0365+420, K0408+350-K0409+345, K0392+424-K0393+424 and K0367+000-K0368+300 |