Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
October 8, 2019 2019 WIN9C03711 FY 2019 GAA April 15, 2019 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads

Concreting of Roads Puroks 4-6 San Antonio, Lubao, Pampanga
October 8, 2019 2019 WIN9C03722 FY 2019 GAA April 15, 2019 Region III Pampanga 2nd District Engineering Office
National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Road Widening Jose Abad Santos Avenue (JASA) - K0093+956.20 - K0094+433.61, Lubao, Pampanga
October 3, 2019 CY 2019 WIN9F05941 UACS No. 320101102899000 June 13, 2019 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA/Original
UACS No. 320101102899000
Project ID: P00320509LZ

OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Upgrading of Drainage System at Gawad Kalinga PH4, Brgy. Marcelo Green, Parañaque City, Metro Manila
Physical Target – CW1-Rehabilitation/Major Repair of Drainage Structure 687 Lineal Meters
Unit Cost (P’000) – P21.39738/l.m.
Allocation (P’000) – P14,700.00
EAO (Allocation P’000) – P300.00
Total – P15,000,000.00

As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Upgrading of Drainage System at Gawad Kalinga, Brgy. Marcelo Green, Parañaque City, Metro Manila
Physical Target – CW1-Rehabilitation/Major Repair of Drainage Structure 687 Lineal Meters
Unit Cost (P’000) – P21.39738/l.m.
Allocation (P’000) – P14,700.00
EAO (Allocation P’000) – P300.00
Total – P15,000,000.00
WIN9F05941
October 3, 2019 CY 2019 WIN9F05947 UACS No. 320101102855000 May 14, 2019 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA/Original
UACS No. 320101102855000
Project ID: P00322730LZ
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement /Sheet Piling along Coastal Service Road (Phase IV), Parañaque City, Metro Manila
Physical Target – CW1 Construction of Flood Mitigation Structure 117 Lineal meters
Unit Cost (P’000) – P167.52137/l.m.
Allocation (P’000) – P19,600.00
EAO (Allocation P’000) – P400.00
Total – P20,000,000.00

As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement /Sheet Piling along Coastal Service Road (Phase V), Parañaque City, Metro Manila
Physical Target – CW1 Construction of Flood Mitigation Structure 117.60 Lineal meters
Unit Cost (P’000) – P166.6667/l.m.
Allocation (P’000) – P19,600.00
EAO (Allocation P’000) – P400.00
Total – P20,000,000.00
WIN9F05947
October 3, 2019 CY 2019 WIN9F0552 UACS No. 320101102896000 June 21, 2019 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA/Original
UACS No. 320101102896000
Project ID: P00320496LZ
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Upgrading of Drainage System along the Mañalac Avenue and its Vicinity, Brgy. San Martin de Porres, Parañaque City
Physical Target – CW1-Rehabilitation/Major Repair of Drainage Structure 600 Lineal Meters
Unit Cost (P’000) – P24,500/l.m.
Allocation (P’000) – P14,700.00
EAO (Allocation P’000) – P300.00
Total – P15,000,000.00

As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Upgrading of Drainage System along Dungon St. and its Vicinity, Brgy. San Martin de Porres, Parañaque City
Physical Target – CW1-Rehabilitation/Major Repair of Drainage Structure 585 Lineal Meters
Unit Cost (P’000) – P25,128/l.m.
Allocation (P’000) – P14,700.00
EAO (Allocation P’000) – P300.00
Total – P15,000,000.00
WIN9F05952
October 3, 2019 CY 2019 WIN9F05945 UACS No. 310112100070000 June 25, 2019 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 310112100070000
Project ID: P00300002LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Gov W Pascual K0013+620.50 – K0014+292
Physical Target – CW1 – Construction of Drainage Structure along Road L= 523.5 l.m.
Unit Cost (P’000) – P18,720.00/lineal meter
Allocation (P’000) – P9,800.00
EAO (Allocation P’000) – P200.00
Total (Allocation P’000) – 10,000.00

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Gov W Pascual K0014+084.5 – K0014+292
Physical Target – CW1 – Construction of Drainage Structure along Road L= 207.5 l.m.
Unit Cost (P’000) – P18,720.00/lineal meter
Physical Target – P47,202.00 lineal meter
EAO (Allocation P’000) – P200.00
Total (Allocation P’000) – P9,794.447
Excess (Allocation P’000) – P5.553
Total (Allocation P’000) – 10,000.00
WIN9F05945
October 3, 2019 CY 2019 WIN9F05939 UACS No. 320101102904000 June 17, 2019 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 320101102904000
Project ID: P00320523LZ
OO2: Protect Lives and Properties Against Major Flood
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Canal (Open Channel) along Ramitex Creek, Brgy. Bagbaguin, Valenzuela City
Physical Target – CW1-Construction of Drainage Structure 0.00 Lineal Meter
Unit Cost (P’000) – P ---/Lineal Meter
Allocation – P34.300 M
EAO (Allocation) – P0.700 M
Total – P 35.000 M

As Modified
OO2: Protect Lives and Properties Against Major Flood
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Canal (Open Channel) along Bragados Creek, Brgy. Bagbaguin, Valenzuela City
Physical Target – CW1-Construction of Drainage Structure 390.00 Lineal Meter
Unit Cost (P’000) – P 87.95/Lineal Meter
Estimated – P34.300 M
EAO (Allocation) – P0.700 M
Total – P 35.000 M
WIN9F05939
October 3, 2019 2019 WIN9G02767 FY2019 GAA RA 11260 April 29, 2019 Region XIII Regional Office XIII
UACS No. 310201100362000
Project ID: P00303789MN

OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads

FROM:

Daang Maharlika (Surigao-Agusan Sect) - K1175 + 605 - K1177 + 340, K1183 + 815 - K1185 + 194

CW1: Road Widening 6.238 lane km
UNIT COST: PHP 17.01667M/lane km
ALLOCATION: PHP 106.150M

EAO: PHP 3.850M

TOTAL: PHP 110.0M

TO:

Daang Maharlika (Surigao-Agusan Sect) - K1175 + 394 - K1176 + 960

CW1: Road Widening 3.132 lane km
UNIT COST: PHP 33.89208M/lane km
ALLOCATION: PHP 106.150M

EAO: PHP 3.850M

TOTAL: PHP 110.0M
October 3, 2019 2019 WIN9G02765 FY2019 GAA RA 11260 April 29, 2019 Region XIII Regional Office XIII
UACS No. 310108100204000
Project ID: P00304404MN

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM:

Surigao-Davao Coastal Rd - K1188+589.6 - K1188+727.6

CW1: Construction of Road Slope Protection Structure
ALLOCATION: PHP 117.48682M
EAO: PHP 4.26118M
TOTAL: PHP 121.748M

TO:

Surigao-Davao Coastal Rd - K1188+580 - K1188+740

CW1: Construction of Road Slope Protection Structure/ 6,450/SQ.M
UNIT COST: PHP 18.215T
ALLOCATION: PHP 117.48682M
EAO: PHP 4.26118M
TOTAL: PHP 121.748M
October 3, 2019 2019 WIN9G02773 FY2019 GAA RA 11260 April 29, 2019 Region XIII Surigao del Sur 1st District Engineering Office
UACS No. 310204100602000
Project ID: P00303977MN

OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads

FROM:

Lianga Coastal Bypass Road (SDCR Alternate Route), Surigao del Sur

CW1: Construction of Concrete Road / 3.164 lane km
UNIT COST: PHP 16.88902M / lane km
ALLOCATION: PHP 53.436875M
EAO: PHP 1.938125M
TOTAL: PHP 55.375M

TO:

Lianga Coastal Bypass Road (SDCR Alternate Route), Surigao del Sur

CW1: Construction of Concrete Road / 0.414 lane km
UNIT COST: PHP 39.54676M / lane km
ALLOCATION: PHP 16.372359M

CW2: Construction of Road Slope Protection Structure / 1,031.15 sq.m
UNIT COST: PHP 35.945T / sq.m
ALLOCATION: PHP 37.064516M

EAO: PHP 1.938125M
TOTAL: PHP 55.375M
October 2, 2019 2019 WIN9C03541 FY 2019 GAA April 29, 2019 Region V Camarines Norte District Engineering Office
UACS No. 320102100913000
Project ID: P00323026LZ

FROM:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal River - Construction of Labo River Flood Control Project, Brgy. Mantigbi, Vinzons, Camarines Norte
Allocation: Php 10,000,000
Physical Target: CW1 - Construction of Flood Mitigation Structure - 70.0 Ln.m.

TO:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal River - Construction of Labo River Flood Control Project, Vinzons, Camarines Norte
Allocation: Php 10,000,000
Physical Target: CW1 - Construction of Flood Mitigation Structure - 70.0 Ln.m.

October 2, 2019 2019 WIN9C03546 FY 2019 GAA April 29, 2019 Region V Camarines Sur 1st District Engineering Office
UACS No. 320101103575000
Project ID: P00321229LZ

FROM:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Yabo River Revetment, (North Villazar and Sooc Section), Sipocot, Camarines Sur
Allocation: Php 49,212,000
Physical Target: CW1 - Construction of Revetment - 624.0 Ln.m.

TO:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Yabo River Revetment, (North Villazar and Sooc Section), Sipocot and Lupi, Camarines Sur
Allocation: Php 49,212,000
Physical Target: CW1 - Construction of Revetment - 624.0 Ln.m.
October 2, 2019 2019 WIN9C03527 FY 2019 GAA April 29, 2019 Region V Camarines Sur 1st District Engineering Office
UACS No. 310107100087000
Project ID: P00300377LZ

FROM:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of national Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Rolando R Andaya Highway - K0312 + 040 - K0312 + 067, K0312 + 383 - K0312 + 514, K0327 + 465 - K0327 + 480, K0329 +415 - K0329 + 522
Allocation: Php 32,000,000
Physical Target: CW1 - Construction of Road Slope Protection Structure - 2,750.0 Sq.M.

TO:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of national Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Rolando R Andaya Highway - K0312 + 033 - K0312 + 080, K0312 + 378 - K0312 + 555, K0327 + 465 - K0327 + 480, K0329 +405 - K0329 + 522
Allocation: Php 32,000,000
Physical Target: CW1 - Construction of Road Slope Protection Structure - 2,935.0 Sq.M.
October 2, 2019 2019 WIN9C03609 FY 2019 GAA April 29, 2019 Region V Albay 3rd Engineering Office
UACS No. 310105100263000
Project ID: P00301428LZ

FROM:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Ligao-Pio Duran Rd - K0520 + 930 - K0520 + 1130, K0522 + 059 - K0522 + 153, K0522 + 805 - K0523 + 000, K0530 + 561 - K0530 + 611, K0530 + 850 - K0530 + 900, K0532 + 000 - K0532 + 100, K0534 + 780 - K0535 + 160, K0538 + 367 - K0538 + 557
Allocation: Php 14,306,000
Physical Target: CW1 - Reconstruction to Concrete Pavement - 2.54 Ln.Km.

TO:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Ligao-Pio Duran Rd - K0520 + 930 - K0520 + 1130, K0522 + 805 - K0523 + 000, K0530 + 850 - K0530 + 900, K0534 + 780 - K0535 + 160
Allocation: Php 14,306,000
Physical Target: CW1 - Reconstruction to Concrete Pavement - 1.672 Ln.Km.
October 2, 2019 2019 WIN9C03561 FY 2019 GAA April 29, 2019 Region V Sorsogon 2nd District Engineering Office
UACS No. 320101103625000
Project ID: P00321289LZ

FROM:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Mitigation Structure, Upstream Both Sides, Brgy. Fabrica, Bulan, Sorsogon City
Allocation: Php 25,000,000
Physical Target: CW1 - Construction of Flood Mitigation Structure - 179.0 Ln.m.

TO:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Mitigation Structure, Upstream Both Sides, Brgy. Fabrica, Bulan, Sorsogon
Allocation: Php 25,000,000
Physical Target: CW1 - Construction of Flood Mitigation Structure - 179.0 Ln.m.
October 2, 2019 2019 WIN9C03534 FY 2019 GAA April 28, 2019 Region V Masbate 1st District Engineering Office
UACS No. 300116201862000
Project ID: P00353905LZ

FROM:
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Concrete Road, Poblacion-Morocborocan-Guinhadap Road leading to San Miguel Island Dive Site and Lighthouse, Halea Nature Park, Paborito Rock Garden, Danao Beach, Lapuslapus Blue Lagoon, Tres Marias Island, Guilatayan Bird Sanctuary, Boronbangkaso Rock Formation, Brgy. Guinhadap, Monreal, Masbate
Allocation: Php 10,000,000
Physical Target: CW1 - Construction of Concrete Road - 0.40Lane KM

TO:
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Concrete Road, Poblacion-Morocborocan-Guinhadap Road leading to San Miguel Island Dive Site and Lighthouse, Halea Nature Park, Paborito Rock Garden, Danao Beach, Lapuslapus Blue Lagoon, Tres Marias Island, Guilatayan Bird Sanctuary, Boronbangkaso Rock Formation, Brgy. Guinhadap, Monreal, Masbate
Allocation: Php 10,000,000
Physical Target:
CW1 - Construction of Concrete Road - 0.120Lane KM
CW2 - Construction of Slope Protection Structure - 150 Sq.M.
October 2, 2019 2019 WIN9G02752 320102100665000 August 15, 2019 Region IX Regional Office IX
UACS No. 320102100665000
Project ID: P00321933MN

OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control Structure, Salug Daku Flood Control, Mahayag, Zamboanga del Sur
Sta. 1+540.00 - Sta. 2+092.00,
Sta. 2+092.24 - Sta. 2+148.00

Physical Target: 608.00 ln.m.
Unit Cost: P161,891.45/ln.m.
EAO: P3,570,000.00
Allocation: P 102,000,000.00
October 2, 2019 2019 WIN9C03656 FY 2019 GAA April 29, 2019 Region V Camarines Sur 4th District Engineering Office
UACS No. 300106200214000
Project ID: P00353270LZ

FROM:
Local - Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Disaster Mitigation Structure using Rock Fall Technology along Pili-Tigaon-Albay and Lagonoy-Presentacion Boundary Roads, Pili, Camarines Sur
Allocation: Php 20,000,000
Physical Target: CW1 - Construction of Slope Protection Structure - 1.0 Square Meter.

TO:
Local - Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Disaster Mitigation Structure using Rock Fall Technology along Pili-Tigaon-Albay and Lagonoy-Presentacion Boundary Roads, Sagñay and Presentacion, Camarines Sur
Allocation: Php 20,000,000
Physical Target: CW1 - Construction of Slope Protection Structure - 861.90 Square Meter.
October 2, 2019 2019 WIN9G02751 310204100495000 August 15, 2019 Region IX Regional Office IX
UACS No. 310204100495000
Project ID: P00303807MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-pass and Diversion Roads

Zamboanga City Diversion Road, (Cabaluay - Zambowood - Mampang Section), Zamboanga City

Physical Target: 7.38 lane km.
Unit Cost: P 15,001,587.44/lane km.
ROW Acquisition: 16,666.66 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 3,874,910.04
Excess: P 413,374.64
Allocation: P 120,000,000.00
October 2, 2019 2019 WIN9G02754 320102100663000 August 15, 2019 Region IX Regional Office IX
UACS No. 320102100663000
Project ID: P00322966MN

OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control Structure along Dicayo River (Downstream), Barangay Daanglungsod, Katipunan, Zamboanga del Norte

Physical Target: 428.00 sq.m.
Unit Cost: P 172,095.81/sq.m.
EAO: P 2,577,995.17
Allocation: P 76,235,000.00
October 2, 2019 2019 WIN9G02715 310108100273000 July 23, 2019 Region IX Zamboanga del Norte 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads

Rizal - Dakak - Dapitan Coastal Loop National Road
K1804+780 - K1805+280,
K1817+200 - K1817+282

Physical Target: 5,523.24 sq.m.
Unit Cost: P 3,548.64/sq.m.
EAO: P 400,000.00
Allocation: P 20,000,000.00
October 1, 2019 FY 2019 GAA WIN9G02735 FY 2019 GAA RA 11260 January 1, 2019 Region XI Regional Office XI
FROM: Local Program - National Roads and Bridges - National Roads
Local Infrastructure Program
Montevista-DNAS Road (DNAS-Laak), Compostela Valley
Physical Target:
CW1: 5.240 Lane Km (Construction of Concrete Road)
ROW: 52,400.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 142,560,000.00 (Construction of Concrete Road)
ROW: P 6,000,000.00 (ROW Acquisition)
EAO: P 1,440,000.00

TO: Local Program - National Roads and Bridges - National Roads
Local Infrastructure Program
Montevista-DNAS Road (DNAS-Laak), Compostela Valley
Physical Target:
CW1: 6.08082 Lane Km (Road Widening)
CW2: 1,425.28 sq. m. (Construction of Road Slope Protection)
ROW: 70,841,00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 103,077,000.00 (Road Widening)
CW2: P 30,573,000.00 (Construction of Road Slope Protection)
ROW: P 15,000,000.00 (ROW Acquisition)
EAO: P 1,350,000.00
October 1, 2019 FY 2019 GAA WIN9G02762 FY 2019 GAA RA 11260 January 1, 2019 Region XI Davao de Oro 1st District Engineering Office
FROM: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Mawab-Maragusan Road to Brgy. Limbo to Brgy. Panangan, Maco, Compostela Valley
Physical Target:
CW1: 0.920 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00

TO: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Mawab-Maragusan Road to Brgy. Limbo to Brgy. Panangan, Maco, Compostela Valley
Physical Target:
CW1: 1.505 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
October 1, 2019 FY 2019 GAA WIN9G02768 FY 2019 GAA RA 11260 January 1, 2019 Region XI Davao de Oro 1st District Engineering Office
FROM: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Opening of Road, Purok 5, Datu Davao, Laak, Compostela Valley
Physical Target:
CW1: 0.740 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Gravel Road)
EAO: P 200,000.00

TO: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Opening of Road, Purok 5, Datu Davao, Laak, Compostela Valley
Physical Target:
CW1: 3.100 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Gravel Road)
EAO: P 200,000.00
October 1, 2019 2019 WIN9C03704 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation / Improvement of Sapang Are Creek, Sta. 0+144.70 - Sta. 0+165.30, Sta. 1+305 - Sta. 1+405.30 at Apalit, Pampanga
October 1, 2019 2019 WIN9C03708 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Sto. Tomas - Minalin Rd (Minalin Tail Dike Section), K0068+033 - K0069+000, K0070+800 - K0071+246, K0071+292 - K0071+325, K0071+375 - K0071+387.50, K0071+425.70 - K0071+437.7, K0071+618.4 - K0071+637.4, K0071+930.5 - K0071+963.8, K0071+976.5 - K0071+995
October 1, 2019 2019 WIN9C03709 FY 2019 GAA April 15, 2019 Region III Nueva Ecija 1st District Engineering Office
Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building (Covered Court, Mini Gym with Stage), Brgy. Namulandayan, Lupao, Nueva Ecija
September 23, 2019 2019 WIN9C03681 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Sto. Tomas - Minalin Rd (Minalin - Macabebe Sect) - K0072+098 - K0072+873, K0073+344 - K0074+458.70
September 23, 2019 2019 WIN9C03682 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Network Development Program - Road Widening - Tertiary Roads

Baliwag - Candaba - Sta. Ana Rd - K0071+894 - K0072+964
September 23, 2019 2019 WIN9C03678 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Candaba - Sn Miguel Rd - K0080+000 - K0080+133, K0080+806 - K0080+930, K0081+057 - K0081+228, K0081+403 - K0081+705, K0083+000 - K0083+252, K0084+000 - K0084+083
September 23, 2019 2019 WIN9C03689 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Bahay Pare - Sn Luis - Sto. Domingo Rd - K0065+122 - K0065+181, K0065+610 - K0065+796, K0065+808 - K0066+109
September 23, 2019 2019 WIN9C03684 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation / Improvement of Slope Protection along Sto. Tomas - Minalin - Macabebe Road (Pasac - Culcul Portion), Minalin, Pampanga
September 23, 2019 2019 WIN9C03683 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Network Development Program - Off-Carriageway Improvement - Tertiary Roads

Tulauc - Sto. Domingo Rd - K0060+(-546) - K0063+906
September 20, 2019 2019 WIN9C03665 FY 2019 GAA April 15, 2019 Region III Bulacan 1st District Engineering Office
Asset Preservation - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads

Pulilan - Calumpit Rd - K0043+455 - K0044+000, K0045+000 - K0045+800, K0046+500 - K0047+550, K0047+880.80 - K0048+150, K0049+(-316) - K0049+397, K0049+683 - K0049+729, K0050+370 - K0050+660, K0051+170 - K0051+350, K0051+470 - K0051+500, K0051+580 - K0051+730, K0052+060 - K0052+135, K0052+360 - K0052+400, K0052+760 - K0052+800
September 20, 2019 2019 WIN9C03677 FY 2019 GAA April 15, 2019 Region III Bulacan 1st District Engineering Office
Asset Preservation - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Old Cagayan Valley Rd - K0043+-855 - K0043+-704
September 20, 2019 FY - 2019 WIN9F05920 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Marinduque District Engineering Office
UACS No. 300112200047000
Project ID: P00353633LZ

Local Program

National Roads and Bridges - National Roads -
Local Infrastructure Program

FROM:

Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse,
and Landslide
Marinduque Circumferential Road,
K0061+060 - K0061+240,
K0061+840 - K0061+900,
Torrijos, Marinduque
Cw1 - Construction of Road Slope Protection Structure -
3,686.00 sq.m.
Unit Cost - Php 25.784/ sq.m.
Allocation - Php 96.00Million

TO:

Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse,
and Landslide
Marinduque Circumferential Road,
K0061+000 - K0062+047,
Torrijos, Marinduque
CW1 - Construction of Road Slope Protection Structure -
4,360.00 sq.m.
Unit Cost - Php 21.798/ sq.m.
Allocation - Php 96.00 Million
September 20, 2019 2019 WIN9C03669 FY 2019 GAA April 15, 2019 Region III Bataan 1st District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation / Major Repair of Flood Control Structures

Rehabilitation of Flood Control Structures along Pagalanggang River (Tucop Section), Sta. 0+118 - Sta. 0+332.40, Brgy. Tucop, Dinalupihan, Bataan
September 20, 2019 2019 WIN9C03686 FY 2019 GAA April 15, 2019 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads - Local Infrastructure Program

Upgrading / Concreting of Road w/ drainage canal at San Miguel (Villa Rosemarie), Guagua, Pampanga
September 20, 2019 2019 WIN9C03657 FY 2019 GAA April 15, 2019 Region III Bulacan 2nd District Engineering Office
Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Replacement of Dulong Bayan Bridge, City of San Jose Del Monte, Bulacan
September 20, 2019 2019 WIN9C03697 FY 2019 GAA April 15, 2019 Region III Zambales 2nd District Engineering Office
Network Development - Construction of By-Pass and Diversion Roads

Subic Bypass Road Extension (Naugsol - Tipo - Dinalupihan), Zambales
September 20, 2019 FY - 2019 WIN9F05921 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Mindoro Occidental District Engineering Office
UACS No. 300117203770000
Project ID: P00354847LZ

Local Program

Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM:
Construction of Roads - P. Viana St., to Rizal St., Barangay 9,
Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road - 1.0 Lane-Km
Unit Cost - Php 4,950.00/ lane-km
Allocation - Php 5.00 Million

TO:

Construction of Roads, P. Viana St., Barangay 9,
Mamburao, Occidental Mindoro
CW1 - Constructon of Concrete Road - 0.626 Lane-km
Unit Cost - Php 7,907.35/ lane-km
Allocation - Php 5.00 Million
September 20, 2019 2019 WIN9C03687 FY 2019 GAA April 15, 2019 Region III Zambales 1st District Engineering Office
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Malabon - Malimanga - Sinabacan Flood Control Phase II, Candelaria, Zambales
September 20, 2019 2019 WIN9C03693 FY 2019 GAA April 15, 2019 Region III Zambales 1st District Engineering Office
Local Program - Buildings and Other Structures - Multipurpose /Facilities

Construction / Repair / Rehabilitation / Improvement of Various Infrastructure Including Local Projects

Construction of Multi-Purpose Building at Brgy. Casabaan, Cabangan, Zambales
September 20, 2019 FY - 2019 WIN9F05923 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Mindoro Occidental District Engineering Office
UACS No. 300117203767000
Project ID: P00354844LZ

Local Program

Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM:

Construction of Road, Sitio Bagong Silang to Dapi Proper &
Deped Payompon, Barangay 9, Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road - 1.0 Lane - Km
Unit Cost - Php 3,960.00/ lane - km
Allocation - Php 4.00 Million

TO:

Construction of Road, Sitio Bagong Silang to Dapi Proper &
Deped Payompon, Barangay 9, Mamburao, Occidental Mindoro
CW1- Construction of Concrete Road - 0.650 Lane - Km
Unit Cost - Php 6,092.31/ lane - km
Allocation - Php 4.00 Million
September 20, 2019 2019 WIN9C03661 FY 2019 GAA April 15, 2019 Region III Zambales 1st District Engineering Office
Flood Management - Construction / Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Slope Protection / Flood Control at Nayum River Control, Sta. 0+100 - Sta. 0+338.50, Sta. Cruz, Zambales
September 20, 2019 FY - 2019 WIN9F05931 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Mindoro Occidental District Engineering Office
UACS No. 300117203766000
Project ID: P00354843LZ

Local Program

Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM;

Construction of Road, San nicolas St., & San Isidro St.,
to Sitio Dapi Bagong Silang, Barangay 9,
Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road - 1.0 Lane - Km
Unit Cost - Php 4,950.00/ lane - km
Allocation - Php 5.00 Million

TO:

Construction of Road, San Nicolas Extension and
Sitio Dapi Bagong Silang, Barangay 9, Mamburao,
Occidental Mindoro
CW1 - Construction of Concrete Road - 0.800 Lane - Km
Unit Cost - Php 6,187.50/ lane - km
Allocation - Php 5.00 Million
September 20, 2019 2019 WIN9C03659 FY 2019 GAA April 15, 2019 Region III Aurora District Engineering Office
Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Road, Brgy. Dimabuno, Dipaculao, Aurora
September 20, 2019 2019 WIN9C03699 FY 2019 GAA April 15, 2019 Region III Aurora District Engineering Office
Local Roads and Bridges - Local Roads

Concreting of Dimanpudso to San Joaquin Road, Ma. Aurora, Aurora

September 20, 2019 2019 WIN9C03685 FY 2019 GAA April 15, 2019 Region III Aurora District Engineering Office
Local Roads and Bridges - Local Roads

Concreting of Road, Brgy. Reserva, Baler, Aurora
September 20, 2019 FY - 2019 WIN9F05930 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Mindoro Occidental District Engineering Office
UACS No. 300117203765000
Project ID: O00354842LZ

Local Program

Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM:

Construction of Road, F. Alcaide to Capitol Road,
Barangay 9, Mamburao, Occidental Mindoro
CW1 - Construction of Road - 1.0 Lane-Km
Unit Cost - Php 3,960.00/ lane - km
Allocation Php 4.00 million

TO:

Construction of Road, F. Alcaide to Capitol Road,
Barangay 9, Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road - 0.468 Lane - Km
Unit Cost - Php 8,461.54/ lane - km
Allocation - Php 4.00 Million

September 20, 2019 2019 WIN9C03670 FY 2019 GAA April 15, 2019 Region III Aurora District Engineering Office
Flood Control and Drainage - Drainage / Protection Works

Construction of Drainage Canal at Buton St., Brgy. Sabang, Baler, Aurora
September 20, 2019 2019 WIN9C03666 FY 2019 GAA April 15, 2019 Region III Aurora District Engineering Office
Network Development - Paving of Unpaved Roads - Secondary Roads

Nueva Ecija - Aurora Rd - K0172+097 - K0172+158, K0173+900 - K0174+357
September 20, 2019 2019 WIN9C03673 FY 2019 GAA April 15, 2019 Region III Aurora District Engineering Office
Asset Preservation - Preventive Maintenance - Tertiary Roads

Baler - Cemento via Dicaloyungan, K0231+640 - K0231+882, K0231+1000 - K0233+068, K0236+481 - K0237+000
September 20, 2019 2019 WIN9C03690 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Tertiary Roads

Baliwag - Candaba - Sta. Ana Rd - K0067+433 - K0067+571
September 20, 2019 2019 WIN9C03692 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Sn Simon - Baliwag Rd - K0059+-171 - K0059+024
September 20, 2019 2019 WIN9C03688 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads

Tulauc - Sto. Domingo Rd - Chainage 021.35 - Chainage 161.35
September 16, 2019 2019 WIN9C03555 FY 2019 GAA April 29, 2019 Region V Catanduanes District Engineering Office
UACS No. 300117204039000
Project ID: P00355012LZ

FROM:
Local Program - Local Program - Local Roads - Local Infrastructure Program - Concreting of Valencia Road, Virac, Catanduanes
Allocation: Php 9,000,000
Physical Target: CW1 - Construction of Concrete Road - 0 Lane KM

TO:
Local Program - Local Program - Local Roads - Local Infrastructure Program - Concreting of Valencia Road, Virac, Catanduanes
Allocation: Php 9,000,000
Physical Target: CW1 - Off-Carriageway Improvement: Shoulder - 1,379.50 LM
September 16, 2019 2019 WIN9C03543 FY 2019 GAA April 29, 2019 Region V Catanduanes District Engineering Office
UACS No. 30018200187000
Project ID: P00355809LZ

FROM:
Local Program - Local Program - Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Constrcution of Bana-bananon Bridge, Sogod, Simamlo, Virac, Catanduanes
Allocation: Php 20,000,000
Physical Target: CW1 - Construction of Bridge - 0 Sq.M

TO:
Local Program - Local Program - Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Constrcution of Bana-bananon Bridge, Sogod, Simamlo, Virac, Catanduanes
Allocation: Php 20,000,000
Physical Target: CW1 - Construction of Bridge - 130.20 Sq.M
September 16, 2019 2019 WIN9C03599 FY 2019 GAA April 29, 2019 Region V Catanduanes District Engineering Office
UACS No. 300119200242000
Project ID: P00355895LZ

FROM:
Local Program - Local Roads and Bridges - Local Bridges - Local Infrastructure Program - Construction of Buyo to Simamla Footbridge, Virac, Catanduanes
Allocation: Php 10,000,000
Physical Target: CW1 - Construction of Bridge - 0 Sq.M.

TO:
Local Program - Local Roads and Bridges - Local Bridges - Local Infrastructure Program - Construction of Buyo to Simamla Footbridge, Virac, Catanduanes
Allocation: Php 10,000,000
Physical Target: CW1 - Construction of Bridge - 184.22 Sq.M.
September 16, 2019 2019 WIN9C03545 FY 2019 GAA April 29, 2019 Region V Catanduanes District Engineering Office
UACS No. 300116201857000
Project ID: P00353901LZ

FROM:
Local Program - Local - Local Roads and Bridges - Local Roads - Construction/Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Cavinitan - Pajo San Isidro Road, Virac, Catanduanes
Allocation: Php 50,000,000
Physical Target: CW1 - Construction of Concrete Road - 2.0 Lane KM

TO:
Local Program - Local - Local Roads and Bridges - Local Roads - Construction/Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Cavinitan - Pajo San Isidro Road, Virac, Catanduanes
Allocation: Php 50,000,000
Physical Target: CW1 - Construction of Concrete Road - 3.038 Lane KM
September 16, 2019 2019 WIN9C03552 FY 2019 GAA April 29, 2019 Region V Sorsogon District Engineering Office
UACS No. 320101102650000
Project ID: P00320153LZ

FROM:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance Of flood mitigation structures And Drainage System - Construction of Flood Mitigation Structures along Donsol/Manlato River Basin, Sta. 0+000 - Sta. 0+610 (RS), Brgy. Banuang Gurang, Donsol, Sorsogon
Allocation: Php 80,000,000
Physical Target: CW1 - Construction of Flood Mitigation Structure - 344.0 Ln.m.

TO:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance Of flood mitigation structures And Drainage System - Construction of Flood Mitigation Structures along Donsol/Manlato River Basin, Sta. 0+000 - Sta. 0+344 (RS), Brgy. Banuang Gurang, Donsol, Sorsogon
Allocation: Php 80,000,000
Physical Target: CW1 - Construction of Flood Mitigation Structure - 344.0 Ln.m.
September 16, 2019 2019 WIN9C03548 FY 2019 GAA April 29, 2019 Region V Sorsogon District Engineering Office
UACS No. 320101102649000
Project ID: P00320154LZ

FROM:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of FLood Mitigation Structures along Donsol/Manlato River Basin, Sta. 0+000 - Sta. 0+610 (LS), Banuang Gurang, Donsol, Sorsogon
Allocation: Php 80,000,000
Physical Target: CW1 - Construction of Flood Mitigation Structure - 344.0 Lineal Meter.

TO:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of FLood Mitigation Structures along Donsol/Manlato River Basin, Sta. 0+978 - Sta. 1+322 (LS), Banuang Gurang, Donsol, Sorsogon
Allocation: Php 80,000,000
Physical Target: CW1 - Construction of Flood Mitigation Structure - 344.0 Lineal Meter.

September 16, 2019 2019 WIN9C03547 FY 2019 GAA April 29, 2019 Region V Sorsogon District Engineering Office
UACS No. 320102100649000
Project ID: P00321908LZ

FROM:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Rehabilitation Of Flood Mitigation Facilities Along Major River Basins And Principal Rivers - Construction of Flood Mitigation Structures along Donsol/Manlato River Basin, Sta. 0+610 - Sta. 1+296, Banuang Gurang, Donsol, Sorsogon
Allocation: Php 90,000,000
Physical Target: CW1 - Construction of Flood Mitigation Structure - 336.0 Ln.m.

TO:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Rehabilitation Of Flood Mitigation Facilities Along Major River Basins And Principal Rivers - Construction of Flood Mitigation Structures along Donsol/manlato River Basin, Sta. 0+344 - Sta. 0+680, Banuang Gurang, Donsol, Sorsogon
Allocation: Php 90,000,000
Physical Target: CW1 - Construction of Flood Mitigation Structure - 336.0 Ln.m.
September 12, 2019 2019 WIN9C03604 SR2019-07-006753 July 9, 2019 Region III Regional Office III
Local Roads and Bridges - Local Bridges

Construction of Ciudad de Victoria Interchange Overpass Bridge, Phase 2, Bocaue, Bulacan
September 12, 2019 2019 WIN9C03662 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Rd - K0053+980 - K0054+400
September 12, 2019 2019 WIN9C03671 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Jose Abad Santos Avenue - K0076+431 - K0076+685
September 10, 2019 FY - 2019 WIN9F05915 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Mindoro Occidental District Engineering Office
UACS No. 300117203769000
Project ID: P00354846LZ

Local Program

Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM:

Construction of Road, Sitio Purok Maligaya, Barangay 9,
Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road - 1.0 Lane-Km
Unit Cost - Php 2,970/ lane-km
Allocation - Php 3.00 Million

TO:

Construction of Road, Sitio Purok Maligaya, Barangay 9,
Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road - 0.426 Lane-Km
Unit Cost - Php 6,971.83/ lane-km
Allocation - Php 3.0 Million
September 10, 2019 FY - 2019 WIN9F05910 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Mindoro Occidental District Engineering Office
UACS No. 300117203771000
Project ID: P00354848LZ

Local Program

Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM:

Upgrading of Calawag - Junction National Road (JNR) - Laste Rd.,
KM 0+000 to KM 5+000 in the Municipality of Magsaysay,
Occidental Mindoro
CW1 - Construction of Concrete Road - 2.0 Lane-Km
Unit Cost - Php 9,900/ lane-km
Allocation - 20.00 Million

TO:

Upgrading of Calawag - Junction National Road (JNR) - Laste Rd.,
KM 0+000 to KM 1+276 in the Municipality of Magsaysay,
Occidental Mindoro
CW1 - Construction of Concrete Road - 2.552 Lane-Km
Unit Cost - Php 7,758.62/ lane-km
Allocation - Php 20.00 Million
September 10, 2019 FY - 2019 WIN9F05914 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Mindoro Occidental District Engineering Office
UACS NO. 300117203773000
Project ID: P00354850LZ

Local Program

Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM:

Upgrading of Mindoro East Coast Road (MECR) Sibalat Road,
Km 0+000 to KM 2+500 in the Municipality of Magsaysay,
Occidental Mindoro
CW1 - Construction of Concrete Road - 2.0 Lane-Km
Unit Cost - Php 9,900/ lane-km
Allocation - Php 20.00 Million

TO:

Upgrading of Mindoro East Coast Road (MECR) Sibalat Road,
KM 0+000 to KM 1+000 in the Municipality of Magsaysay,
Occidental Mindoro
CW1 - Construction of Concrete Road - 2.0 Lane-Km
Unit Cost - Php 9,900/ lane-km
Allocation - Php 20.00 Million
September 10, 2019 2019 WIN9C03606 GAA 2019 May 6, 2019 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Improvement of Purok 5 Local Road, Brgy. Cabaruan, Tabuk City, Kalinga;
Physical Target: CW1: 0 Lane Km;
Allocation= Php 500,000

To: Improvement of Purok 5 Local Road, Brgy. Cabaruan, Tabuk City, Kalinga;
Physical Target: CW1: 0.2626 Lane Km; Allocation= Php 500,000
September 10, 2019 2019 WIN9C03616 GAA 2019 May 6, 2019 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Concreting/Improvement of Local Road, Ammacian-CAVNAS, Brgy. Ammacian, Pinukpuk, Kalinga;
Physical Target: CW1: 0 Lane Km;
Allocation= Php 1,000,000

To: Concreting/Improvement of Local Road, Ammacian-CAVNAS, Brgy. Ammacian, Pinukpuk, Kalinga;
Physical Target: CW1: 0.27906 Lane Km; Allocation= Php 1,000,000

September 10, 2019 2019 WIN9C03637 GAA 2019 May 6, 2019 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Bulanao-Paracelis Rd - K0507 + 600 - K0507 + 620, K0513 + 700 - K0513 + 750; Physical Target: CW1: 370 Sq. meters; Allocation= Php 4,580,000

To: Bulanao-Paracelis Rd - K0507 + 600 - K0507 + 620, K0510 + 654 - K0510 + 692; Physical Target: CW1: 386 Sq. meters; Allocation= Php 4,580,000
September 10, 2019 2019 WIN9C03608 GAA 2019 May 6, 2019 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0531 + 950 - K0532 + 000;
Physical Target: CW1: 0.144 Lane Km; Allocation= Php 2,023,000

To: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0531 + 870 - K0531 + 985;
Physical Target: CW1: 0.23 Lane Km; Allocation= Php 2,023,000

September 10, 2019 2019 WIN9C03625 GAA 2019 May 6, 2019 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Construction/Improvement of Local Road, Brgy. Bado Dangwa, Rizal, Kalinga;
Physical Target: CW1: 0.27 Lane Km; Allocation= Php 2,000,000

To: Construction/Improvement of Local Road, Brgy. Bado Dangwa, Tabuk City, Kalinga; Physical Target: CW1: 0.27 Lane Km; Allocation= Php 2,000,000
September 10, 2019 2019 WIN9C03594 GAA 2019 May 6, 2019 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Tabuk-Banawe via Tanudan-Barlig Rd - K0510 + 150 - K0510 + 190, K0512 + 050 - K0512 + 075, K0515 + 600 - K0515 + 618, K0521 + 250 - K0521 + 370, K0521 + 370 - K0521 + 520, K0522 + 120 - K0522 + 150, K0522 + 150 - K0522 +250;
Physical Target: CW1: 2608 Sq. meters; Allocation= Php 21,332,000

To: Tabuk-Banawe via Tanudan-Barlig Rd - K0510 + 150 - K0510 + 190, K0512 + 050 - K0512 + 075, K0515 + 600 - K0515 + 618, K0521 + 250 - K0521 + 370, K0521 + 370 - K0521 + 520, K0522 + 120 - K0522 + 150, K0522 + 250 - K0522 +465;
Physical Target: CW1: 2608 Sq. meters; Allocation= Php 21,332,000

September 10, 2019 2019 WIN9C03600 GAA 2019 May 6, 2019 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Improvement of National Road - Hilltop Local Road, Brgy. Agbannawag, Tabuk City, Kalinga;
Physical Target: CW1: 0 Lane Km;
Allocation= Php 500,000

To: Improvement of National Road - Hilltop Local Road, Brgy. Agbannawag, Tabuk City, Kalinga;
Physical Target: CW1: 0.1878 Lane Km; Allocation= Php 500,000

September 10, 2019 2019 WIN9C03632 GAA 2019 May 6, 2019 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Construction/Concreting of Road in Pinukpuk Junction, Tabuk City, Kalinga;
Physical Target: CW1: 0 Lane Km;
Allocation= Php 2,000,000

To: Construction/Concreting of Road in Pinukpuk Junction, Pinukpuk, Kalinga;
Physical Target: CW1: 0.60 Lane Km; Allocation= Php 2,000,000

September 10, 2019 2019 WIN9C03614 GAA 2019 May 6, 2019 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Construction of Ngipen, Bantay Flood Control along Chico River, Lucog, Tabuk City, Kalinga;
Physical Target: CW1: 455 LM;
Allocation= Php 30,000,000

To: Construction of Ngipen, Bantay Flood Control along Chico River, Bantay, Tabuk City, Kalinga;
Physical Target: CW1: 455 LM;
Allocation= Php 30,000,000
September 9, 2019 FY - 2019 WIN9F05899 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Mindoro Occidental District Engineering Office
UACS No. 300109200411000
Project ID: P00353182LZ

Local Program

Flood Control and Drainage - Drainage/Protection Works -
Local Infrastructure Program

FROM:

Construction of Drainage Canal in Barangay 2,
San Jose, Occidental Mindoro
CW1 - Construction of Drainage Structure - 100 LM
Unit Cost - Php 10.0/ LM
Allocation - 1.00 Million

TO:

Construction of Drainage Canal in Barangay 2,
San Jose, Occidental Mindoro
CW1 - 103 LM
Unit Cost - Php 9.71/ LM
Allocation - 1.00 Million
September 9, 2019 FY - 2019 WIN9F05897 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Mindoro Occidental District Engineering Office
UACS No. 300107200466000
Project ID: P00353441LZ

Local Program

Flood Control and Drainage - Flood Control Structures/Facilities -
Local Infrastructure Program

FROM:

Construction of Seawall in Barangay Tilik,
Lubang, Occidental Mindoro
CW1 - Construction of Dike - 200 LM
Unit Cost - Php 14.85/ lm
Allocation - 3.00 Million

TO;

Construction of Seawall in Barangay Tilik,
Lubang, Occidental Mindoro
CW1 - 94 LM
Unit Cost - Php 31.60/ lm
Allocation - Php 3.00 Million
September 9, 2019 FY - 2019 WIN9F05913 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Mindoro Occidental District Engineering Office
UACS No. 300106200212000
Project ID: P00344864 LZ

Local Program

Flood Control and Drainage - Flood Control Structures/Facilities -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:

Construction of Seawall, Brgy. Payompon,
Mamburao, Occidental Mindoro
CW1 - 273.499 LM
Unit Cost - Php 14.33/ lm
Allocation - 4.00 Million

TO:

Construction of Seawall, Brgy. Payompon,
Mamburao, Occidental Mindoro
CW1 - 100.LM
Unit Cost - Php 39.20/ lm
Allocation - 4.00 Million
September 9, 2019 FY - 2019 WIN9F05912 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Mindoro Occidental District Engineering Office
UACS No. 300107200465000
Project ID: P00353440LZ

Local Program

Flood Control and Drainage- Flood Control Structures/Facilities-
Local Infrastructure Program

FROM:

Construction of Seawall in Barangay Maligaya,
Lubang, Occidental Mindoro
CW1 - Construction of Dike - 200 LM
Unit Cost - Php 14.85/ lm
Allocation - 3.00 Million

TO:

Construction of Seawall in Barangay Maligaya,
Lubang, Occidental Mindoro
CW1 - Construction of Dike - 99.70 LM
Unit Cost - 29.79/ lm
Allocation - 3.00 Million
September 9, 2019 FY - 2019 WIN9F05916 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Mindoro Occidental District Engineering Office
UACS NO. 300117203768000
Project ID: P00354845LZ

Local Program

Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM:

Construction of Road, Sitio Bigohan,
Barangay Tangkalan,Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road - 1.0 Lane Km
Unit Cost - Php 2,970/ lane-km
Allocation - 3.00 Million

TO:

Construction of Road, Sitio Bigohan,
Barangay Tangkalan, Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road - 0.374 nLane-Km
Unit Cost - Php 7,941.18/lane-km
Allocation - 3.00 Million


September 5, 2019 2019 WIN9G02736 FY2019 GAA RA 11260 April 29, 2019 Region XIII Agusan del Norte District Engineering Office
UACS No. 310104100173000
Project ID: P00300262MN

FROM:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Daang Maharlika Road (Surigao-Agusan Section) - K1219 + 292 - K1219 + 392, K1219 + 410 - K1219 + 625, K1219 + 643 - K1219 + 743
CW1 - Reconstruction to Concrete Pavement/ 0.830 Lane Km
Unit Cost - P29.51807M/ Lane Km
Allocation - P24.500M
EAO - P500.0T
TOTAL: 25.0M

TO:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Daang Maharlika Road (Surigao-Agusan Section) - K1219 + 300 - K1219 + 386, K1219 + 419 - K1219 + 619, K1219 + 649 - K1219 + 740
CW1 - Reconstruction to Concrete Pavement/ 0.76 Lane Km
Unit Cost - P32.23684M/ Lane Km
Allocation - P24.500M
EAO - P500.0T
TOTAL: 25.0M
September 5, 2019 2019 WIN9G02731 FY2019 GAA RA 11260 April 29, 2019 Region XIII Agusan del Norte District Engineering Office
UACS No. 310109100258000
Project ID: P00300572MN

FROM:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Agusan-Malaybalay Rd - K1274 + 600 - K1274 + 700
CW1 - Construction of Road Slope Protection Structure/ 4,524.00 sq.m.
Unit Cost - P4,900 / sq.m.
Allocation - P22,167,600
EAO - P452,400
TOTAL : P22.62M

TO:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Agusan-Malaybalay Rd - K1274 + 632 - K1274 + 672, K1274 + 850 - K1274 + 901
CW1 - Construction of Road Slope Protection Structure/ 1,329.60 sq.m.
Unit Cost - P13.93 / sq.m.
Allocation - P18,524,569.22
CW2 - Construction of Paved to Concrete/ 0.0225 lane km
Unit Cost - P10,615.56 / lane km
Allocation - P238,850.18
CW3 - Road Widening/ 0.1110 lane km
Unit Cost - P30,668.29 / lane km
Allocation - P3,404,180.6
EAO - P452,400
TOTAL : P22.62M
September 5, 2019 2019 WIN9G02733 FY2019 GAA RA 11260 April 29, 2019 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. 300104213180000
Project ID: P00352983MN

FROM:
Local Program - Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program

Repair/Rehabilitation of Multi-Purpose Building (2 Storey Barangay Hall), Barangay Cagniog, Surigao City, Surigao del Norte

CW1 - Rehabilitation / Major Repair of Multi Purpose Building/ 1 bldg.
Unit Cost - P2.475M/ bldg.
Allocation - P2.475M
EAO - P25.0T
TOTAL: P2.500M

TO:
Local Program - Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program

Repair/Rehabilitation of Multi-Purpose Building (1 Storey Barangay Hall), Barangay Cagniog, Surigao City, Surigao del Norte

CW1 - Rehabilitation / Major Repair of Multi Purpose Building/ 1 bldg.
Unit Cost - P1.92859498M/ bldg.
Allocation - P1.92859498M
EAO - P19.48076T
SUBTOTAL: P1.94807574M
EXCESS: P551.92426T
TOTAL: P2.500M
September 5, 2019 FY 2019 WIN9G02718 310107100100000 July 24, 2019 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310107100100000
Project ID: P00300485MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Lanao-Pagadian-Zamboanga City Rd -
K1633 + 878 - K1633 + 920,
K1636 + 775 - K1636 + 850,
K1637 + 136 - K1637 + 180,
K1640 + 700 - K1640 + 720
K1641 + 840 - K1641 + 900

Physical Target:
CW-1 - Construction of Road Slope Protection Structure: 7,024.00 sq. m.
Unit Cost: P 5,580.87/sq.m.
EAO: P 800,000.00
Allocation: P 40,000,000.00
September 5, 2019 2019 WIN9C03601 FY 2019 GAA April 15, 2019 Region III Bulacan 1st District Engineering Office
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads

Pulilan Railroad Station Rd - K0044+(-380) - K0044+(-174.6), K0044+458.9 - K0044+523.4, K0044+611.5 - K0044+636.5, K0044+636.5 - K0044+651.8, K0044+651.8 - K0044+712.3, K0044+712.3 - K0044+816.9
September 5, 2019 2019 WIN9C03633 FY 2019 GAA April 15, 2019 Region III Bulacan 1st District Engineering Office
Asset Preservation - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Old Cagayan Valley Rd. - K0043+(-240) - K0043+(-50.00)
September 5, 2019 FY 2019 WIN9G02721 300104211220000 July 24, 2019 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 300104211220000
Project ID: P00351915MN

Local Program - Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program

Construction of Multi-Purpose Building, Bogo Kapalaran, Molave, Zamboanga del Sur

Physical Target:
CW-1 - Construction of Multi Purpose Building: 1 Building
Unit Cost: P 1,980,000.00/building
EAO: P 20,000.00
Allocation: P 2,000,000.00
September 5, 2019 2019 WIN9C03621 FY 2019 GAA April 15, 2019 Region III Bulacan 1st District Engineering Office
Asset Preservation - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Bigaa - Plaridel via Bulacan & Malolos Rd - K0047+366 - K0047+510.50, K0048+517 - K0048+539
September 5, 2019 2019 WIN9C03612 FY 2019 GAA (RA 11260) April 15, 2019 Region III Regional Office III
Flood Control and Drainage - Flood Control Structures/ Facilities

Construction of Seawall and Rehabilitation of Sto. Niño - Sto. Rosario - Pinalagdan - San Isidro 1, Paombong River, Paombong, Bulacan
September 5, 2019 FY 2019 WIN9G02723 310203100239000 July 26, 2019 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310203100239000
Project ID: P00304411MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads

Jct. Aurora-Monte Alegre-Jct. Labangan Road, K1652 + 000 - K1653 + 440, Zamboanga Del Sur

Physical Target:
CW-1 - Road Widening: 2.88 lane km.
Unit Cost: P 17,013,890.00/lane km.
EAO: P 1,000,000.00
Allocation: P 50,000,000.00
September 4, 2019 FY 2019 GAA WIN9G02678 FY 2019 GAA RA 11260 January 1, 2019 Region XI Davao del Norte District Engineering Office
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Off-Carriageway Improvement - Secondary Roads
Tagum-Panabo Circum Rd -
K1494+443 - K1497+675
Physical Target:
CW1: 8,961.870 sq.m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 49,922,000.00
CW1: P 48,923,560.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 998,440.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Off-Carriageway Improvement - Secondary Roads
Tagum-Panabo Circum Rd -
K1494+443 - K1497+675
Physical Target:
CW1: 8,961.870 sq.m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: 10,665.60 sq.m. (ROW Acquisition)
Allocation:
TOTAL: P 49,922,000.00
CW1: P 46,473,560.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: P 2,500,000.00 (ROW Acquisition)
EAO: P 948,440.00
September 4, 2019 FY 2019 GAA WIN9G02667 FY 2019 GAA RA 11260 January 1, 2019 Region XI Davao de Oro 1st District Engineering Office
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Tertiary Roads
Montevista-Compostela-New Bataan-Maragusan-Mati Bdry. Rd, Compostela and New Bataan -
K1428+(-)342 - K1428+325
Physical Target:
CW1: 1.334 Lane Km (Road Widening)
ROW: 10,005.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 29,305,000.00
CW1: P 25,384,325.00 (Road Widening)
ROW: P 3,000,000.00 (ROW Acquisition)
EAO: P 920,675.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Tertiary Roads
Montevista-Compostela-New Bataan-Maragusan-Mati Bdry. Rd, Compostela and New Bataan
K1428+(-)342 - K1428+325
Physical Target:
CW1: 1.372 Lane Km (Road Widening)
CW2: 1,371.740 sq.m. (Off-Carriageway: Construction of Median/Center Island)
ROW: 10,005.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 29,305,000.00
CW1: P 15,288,262.00 (Road Widening)
CW2: P 10,096,063.00 (Off-Carriageway: Construction of Median/Center Island)
ROW: P 3,000,000.00 (ROW Acquisition)
EAO: P 920,675.00
September 4, 2019 FY 2019 GAA WIN9G02737 FY 2019 GAA RA 11260 January 1, 2019 Region XI Davao de Oro 1st District Engineering Office
FROM: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road National Highway Junction to Brgy. Amorcruz, Laak, Compostela Valley
Physical Target:
CW1: 2.480 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Concrete Road)
EAO: P 500,000.00

TO: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road National Highway Junction to Brgy. Amorcruz, Laak, Compostela Valley
Physical Target:
CW1: 1.760 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Concrete Road)
EAO: P 500,000.00
September 4, 2019 FY 2019 GAA WIN9G02738 FY 2019 GAA RA 11260 January 1, 2019 Region XI Davao de Oro 1st District Engineering Office
FROM: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road Brgy. Poblacion Laak - Brgy. Brgy. Inakayan, Laak, Compostela Valley
Physical Target:
CW1: 3.560 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,600,000.00 (Construction of Concrete Road)
EAO: P 500,000.00

TO: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road Brgy. Poblacion Laak - Brgy. Brgy. Inakayan, Laak, Compostela Valley
Physical Target:
CW1: 2.722 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,600,000.00 (Construction of Concrete Road)
EAO: P 500,000.00
September 3, 2019 2019 WIN9C03510 FY 2019 GAA April 29, 2019 Region V Masbate 1st District Engineering Office
UACS No.: 30017204046000
Project ID: P00355016LZ
FROM:
Local Program - Local Roads and Bridges - Local Roads -Local Infrastructure Program - Concreting of Road Junction National Road to Sitio Tacdugan, Bagahangalad, San Jacinto, Masbate, (Sta. 2+310 - Sta. 3+610)
Physical Target:
CW1 - Construction of Concrete Road - 2.00 Lane.Km
Unit Cost: P 24,750,000.00/ Lane Km
Allocation: P 50,000,000.00

TO:
Local Program - Local Roads and Bridges - Local Roads -Local Infrastructure Program - Concreting of Road Junction National Road to Sitio Tacdugan, Bagahangalad, San Jacinto, Masbate, (Sta. 2+610 - Sta. 3+610)
Physical Target:
CW1 - Construction of Concrete Road - 2.00 Lane.Km
Unit Cost: P 24,750,000.00/ Lane Km
Allocation: P 50,000,000.00
September 3, 2019 2019 WIN9C03491 FY 2019 GAA April 29, 2019 Region V Camarines Norte District Engineering Office
UACS No.: 300117203894000
Project ID: P00354931LZ
FROM:
Local Program - Local Roads and Bridges - Local Roads -Local Infrastructure Program - Construction of Road Opening, Brgy. Bibirao to Brgy. Dogongan, Daet, Camarines Norte.
Physical Target:
CW1 - Construction of Gravel Road -
Unit Cost:
Allocation: P 30,000,000.00

TO:
Local Program - Local Roads and Bridges - Local Roads -Local Infrastructure Program - Construction of Road Opening, Brgy. Bibirao to Brgy. Dogongan, Daet, Camarines Norte
Physical Target:
CW1 - Construction of Concrete Road - 4.134Lane.Km
Unit Cost: P 7,184,325.109/ Lane Km
Allocation: P 30,000,000.00
September 3, 2019 2019 WIN9C03493 SR2019-06-003837 June 7, 2019 Region III Regional Office III
Network Development - Construction of Bypass and Diversion Roads

Western Bulacan Connector