Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
May 5, 2023 2023 FY 2023 GAA RA 11936 January 1, 2023 Region VI Negros Occidental 4th District Engineering Office
UACS No. 310106100976000
Project ID: P00705959VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Sum-ag-Abuanan Rd - K0011 + 612 - K0011 + 625, K0012 + 380 - K0012 + 406

CW1 - Rehabilitation of Paved Road:
0.143 lane km - 2,290.26
EAO - 46.74


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Sum-ag Abuanan Rd - K0011 + 200 – K0011 + 371.50

CW1 - Reconstruction to Concrete Pavement:
0.279 lane km - 2,290.26
EAO - 46.74
May 5, 2023 2023 WIN3F06898 FY 2023 GAA RA 11936 January 1, 2023 Region VI Iloilo 3rd District Engineering Office
UACS No. 310202101448000
Project ID: P00705314VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

Iloilo East Coast-Capiz Rd - K0188 + 635 - K0189 + 640

CW1- Road Widening:
2.028 lane km - 43,723.68
EAO - 892.32


TO:

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

Iloilo East Coast-Capiz Rd - K0188 + 287 - K0189 + 640

CW1- Road Widening:
2.724 lane km - 43,223.68
ROW Acquisition: 4,000 sq.m - 500.00
EAO - 892.32
May 5, 2023 2023 WIN3F06904 FY 2023 GAA RA 11936 January 1, 2023 Region VI Iloilo 3rd District Engineering Office
UACS No. 310202101451000
Project ID: P00705320VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

Iloilo East Coast-Capiz Rd - K0234 + 000 - K0234 + 802, K0234 + 820 - K0234 + 865

CW1- Road Widening:
1.694 lane km - 32,478.18
EAO - 662.82


TO:

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

Iloilo East Coast-Capiz Rd - K0234 + 000 - K0234 + 766

CW1- Road Widening:
1.694 lane km - 32,478.18
ROW Acquisition: 1,000 sq.m - 300.00
EAO - 662.82
May 5, 2023 2023 FY 2023 GAA RA 11936 January 1, 2023 Region VI Iloilo 3rd District Engineering Office
UACS No. 310105100927000
Project ID: P00705901VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Iloilo East Coast-Capiz Rd - K0246 + 251 - K0246 + 479

CW1 - Rehabilitation of Paved Road:
0.912 lane Km - 14,139.44
EAO - 288.56


TO:

OO1: Ensure Safe and Reliable National Road
System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads –
Secondary Roads

Iloilo East Coast-Capiz Rd - K0246 + 251 - K0247 + 077

CW1 –
Reconstruction to Concrete Pavement:
1.668 lane km - 14,139.44
EAO - 288.56
May 5, 2023 2023 WIN3F06944 FY 2023 GAA RA 11936 January 1, 2023 Region VI Negros Occidental 5th District Engineering Office
UACS No. 310202101294000
Project ID: P00705461VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

Jct Balintawak-Old Escalante Rd - K0100 + 466 - K0102 + 033

CW1- Road Widening:
2.944 lane km - 48,221.05
EAO - 1,748.95


TO:

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

Jct Balintawak-Old Escalante Rd - K0100 + 466 - K0101 + 680

CW1- Road Widening:
1.978 lane km - 28,043.125
ROW
Acquisition: 13,353.2 sq. m. - 20,177.925
EAO - 1,748.95
May 5, 2023 2023 WIN3F07001 FY 2023 GAA RA 11936 January 1, 2023 Region VI Negros Occidental 5th District Engineering Office
UACS No. 310101100833000
Project ID: P00705843VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

Bacolod North Rd - K0096 + 000 - K0097 + 000, K0104 + 474 - K0106 + 000

CW1 - Preventive Maintenance of Road: Asphalt Overlay: 9.988 Lane Km - 87,844.915
EAO - 3,186.085


TO:

OO1: Ensure Safe and Reliable National Road
System

Asset Preservation - Preventive Maintenance - Primary Roads

Bacolod North Rd - K0096 + 660 - K0097 + 000, K0104 + 474 - K0105 + 800

CW1 - Preventive Maintenance of Road: Asphalt Overlay: 6.548 Lane Km - 87,844.915
EAO - 3,186.085
May 5, 2023 2023 WIN4F06947 FY 2023 GAA RA 11936 January 1, 2023 Region VI Negros Occidental 5th District Engineering Office
UACS No. 310101100834000
Project ID: P00705844VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

Bacolod North Rd - K0122 + 000 - K0123 + 055

CW1 - Preventive Maintenance of Road: Asphalt Overlay: 2.112 Lane Km - 18,575.285
EAO - 673.715


TO:

OO1: Ensure Safe and Reliable National Road
System

Asset Preservation - Preventive Maintenance - Primary Roads

Bacolod North Rd - K0122 + 000 - K0122 + 605

CW1 - Preventive Maintenance of Road: Asphalt Overlay: 1.210 Lane Km - 18,575.285
EAO - 673.715
May 5, 2023 2023 WIN3F06945 FY 2023 GAA RA 11936 January 1, 2023 Region VI Negros Occidental 5th District Engineering Office
UACS No. 310101100835000
Project ID: P00705845VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

Bacolod North Rd - K0124 + 1078 - K0126 + 000

CW1 - Preventive Maintenance of Road: Asphalt Overlay: 2.014 Lane Km - 17,713.54
EAO - 642.46


TO:

OO1: Ensure Safe and Reliable National Road
System

Asset Preservation - Preventive Maintenance - Primary Roads

Bacolod North Rd - K0124 + 1078 - K0125 + 566

CW1 - Preventive Maintenance of Road: Asphalt Overlay: 1.140 Lane Km - 17,713.54
EAO - 642.46
May 5, 2023 2023 WIN3F06978 FY 2023 GAA RA 11936 January 1, 2023 Region VI Negros Occidental 5th District Engineering Office
UACS No. 310101100836000
Project ID: P00705846VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

Bacolod North Rd - K0146 + 531 - K0146 + 829, K0148 + 000 - K0148 + 015

CW1 - Preventive Maintenance of Road: Asphalt Overlay: 1.237 Lane Km - 10,879.41
EAO - 394.59


TO:

OO1: Ensure Safe and Reliable National Road
System

Asset Preservation - Preventive Maintenance - Primary Roads

Bacolod North Rd - K0146 + 531 - K0146 + 829, K0147 + 332 - K0147 + 484

CW1 - Preventive Maintenance of Road: Asphalt Overlay: 0.90 Lane Km - 10,879.41
EAO - 394.59
May 5, 2023 2023 FY 2023 GAA RA 11936 January 1, 2023 Region VI Negros Occidental 5th District Engineering Office
UACS No. 310104100478000
Project ID: P00705961VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Bacolod North Rd - K0102 + 487 - K0103 + 556

CW1 – Rehabilitation of Paved Road:
4.256 Lane Km - 67,102.24
EAO - 2,433.76


TO:

OO1: Ensure Safe and Reliable National Road
System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Bacolod North Rd - K0101 + 514 – K0104 + 321

CW1 – Reconstruction to Concrete Pavement:
5.612 Lane Km - 67,102.24
EAO - 2,433.76
May 5, 2023 2023 FY 2023 GAA RA 11936 January 1, 2023 Region VI Negros Occidental 5th District Engineering Office
UACS No. 310109101180000
Project ID: P00706145VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Stop Aguinaldo-Bug-ang Rd - K0109 + 508 - K0109 + 553, K0109 + 638.5 - K0109 + 665.50, K0111 + 270 - K0111 + 338, K0113 + 049 - K0113 + 085

CW1 – Construction of Road Slope Protection Structure: 1,337.27 sq. m. - 17,370.00
EAO - 630.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Stop Aguinaldo-Bug-ang Rd - K0109 + 540 - K0109 + 575, K0109 + 664 - K0109 + 692, K0110 + 030 – K0110 + 052, K0111 + 260 - K0111 + 380, K0113 + 049 - K0113 + 085

CW1 – Construction of Road Slope Protection Structure: 2,028.79 sq. m. - 17,370.00
EAO - 630.00
May 5, 2023 2023 WIN3F07032 FY 2023 GAA RA 11936 January 1, 2023 Region VI Negros Occidental 5th District Engineering Office
UACS No. 310109101181000
Project ID: P00706146VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Prosperidad-Quezon-Cabaron Rd - K0078 + 553.50 - K0078 + 598.50

CW1 – Construction of Road Slope Protection Structure: 1,000.00 sq. m. - 9,650.00
EAO - 350.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Prosperidad-Quezon-Cabaron Rd - K0078 + 534 - K0078 + 659

CW1 – Construction of Road Slope Protection Structure: 316.33 sq. m. - 9,650.00
EAO - 350.00
May 5, 2023 2023 SR2023-03-005941 March 2, 2023 Region VI Negros Occidental 5th District Engineering Office
UACS No. 310101100839000
Project ID: P00706756VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

Bacolod-Murcia-DS Benedictor-Sn Carlos Rd (S00427NR) K0053+000 - K0057+149, Negros Occidental

CW1- Preventive Maintenance of Road: Asphalt Overlay: 8.00 lane km - 96,500.00
EAO - 3,500.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

Bacolod-Murcia-DS Benedicto-Sn Carlos Rd (S00427NR) K0053+000 - K0056+742

CW1- Preventive Maintenance of Road: Asphalt Overlay: 14.44 lane km - 96,500.00
EAO - 3,500.00
May 5, 2023 2023 WIN3F07066 SR2023-03-005945 March 2, 2023 Region VI Negros Occidental 5th District Engineering Office
UACS No. 310103101098000
Project ID: P00706767VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

Stop Aguinaldo-Bug-Ang Rd (S00395NR) - K0117+258- K0119+881, K0115+520 - K0115+1017

CW1- Preventive Maintenance of Road: Asphalt Overlay: 5.994 lane km - 37,596.40
EAO - 1,363.60

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

Stop Aguinaldo-Bug-Ang Rd (S00395NR) - K0117+258- K0119+826

CW1- Preventive Maintenance of Road: Asphalt Overlay: 4.89lane km - 37,596.40
EAO - 1,363.60
May 5, 2023 2023 FY 2023 GAA RA 11936 January 1, 2023 Region VI Negros Occidental 5th District Engineering Office
UACS No. 300214100410000
Project ID: P00731655VS


FROM:

Convergence and Special Support Program

Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

Bacolod-Murcia-DS Benedicto- Sn Carlos City Rd (S00427NR) K0036+(-624) - K0043-862

CW1- Road Safety: Street Lighting:
3.957 km - 38,600.00
EAO - 1,400.00


TO:

Convergence and Special Support Program

Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

Bacolod-Murcia-DS Benedicto- Sn Carlos City Rd (S00427NR) K0036+(-624) - K0043+862

CW1- Road Safety: Street Lighting:
8.16 km - 38,600.00
EAO - 1,400.00
May 5, 2023 2023 WIN3F07098 FY 2023 GAA RA 11936 January 1, 2023 Region VI Aklan District Engineering Office
UACS No. 310202101435000
Project ID: P00705266VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Aklan East Rd - K0296 + 564 - K0296 + 905, K0296 + 969 - K0298 + 000, K0299 + 000 - K0299 + 802

CW1- Road Widening: 4.368 lane km - 25,253.62
EAO - 515.38

TO:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Aklan East Rd - K0298 + 650 - K0299 + 652

CW1- Road Widening: 1.904 lane km - 24,953.62
ROW Acquisition: 3.00 sq. m. - 300.00
EAO - 515.38
May 5, 2023 2023 WIN3F07097 FY 2023 GAA RA 11936 January 1, 2023 Region VI Aklan District Engineering Office
UACS No. 310202101436000
Project ID: P00705267VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Jaime Cardinal Sin Ave - K0293 + 000 - K0295 + 000

CW1- Road Widening: 4.00 lane km- 35,094.78
EAO - 716.22


TO:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Jaime Cardinal Sin Ave - K0293 + 000 - K0293 + 600

CW1- Road Widening: 1.20 lane km - 29,753.78
ROW Acquisition: 1,090.00 sq. m. - 5,341.00
EAO - 716.22
May 5, 2023 2023 WIN3F07099 FY 2023 GAA RA 11936 January 1, 2023 Region VI Aklan District Engineering Office
UACS No. 310202101437000
Project ID: P00705269VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Aklan West Rd (Kalibo-Nabas) - K0239 + 616 - K0239 + 655, K0239 + 691 - K0239 + 805, K0241 + 900 - K0246 + 092

CW1- Road Widening: 8.938 lane km- 40,354.44
EAO - 823.56


TO:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Aklan West Rd (Kalibo-Nabas) - K0237 + 600 - K0237 + 690, K0237 + 690 -K0238 + 730, K0250 + 180 - K0250 +750, K0251 + 700 - K0252 + 250

CW1- Road Widening: 3.525lane km- 38,354.44
ROW Acquisition: 198.40 sq. m. - 2,000.00
EAO - 823.56
May 5, 2023 2023 WIN3F07155 FY 2023 GAA RA 11936 January 1, 2023 Region VI Aklan District Engineering Office
UACS No. 310111100583000
Project ID: P00705491VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

Aklan East Rd - K0296 + 564 - K0296 + 905, K0296 + 969 - K0301 + 031

CW1- Construction of Drainage Structure along Road: 4,356.00 lineal meters - 20,175.26
EAO - 411.74


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

Aklan East Rd - K0298 + 650 - K0299 + 622

CW1- Construction of Drainage Structure along Road: 1,844.00 lineal meters - 18,175.26
ROW Acquisition: 141.67 sq. m. - 2,000.00
EAO - 411.74
May 5, 2023 2023 FY 2023 GAA RA 11936 January 1, 2023 Region VI Aklan District Engineering Office
UACS No. 310111100497000
Project ID: P00705492VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

Jaime Cardinal Sin Ave - K0294 + 595 - K0296 + 423

CW1- Construction of Drainage along Road: 1,828.00 lineal meters - 57,900.00
EAO - 2,100.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

Jaime Cardinal Sin Ave - K0293 + 600 - K0295 + 320

CW1- Construction of Drainage along Road: 3,440.00 lineal meters - 43,869.00
ROW Acquisition: 1,787.00 sq. m. - 14,031.00
EAO - 2,100.00
May 5, 2023 2023 FY 2023 GAA RA 11936 January 1, 2023 Region VI Aklan District Engineering Office
UACS No. 310105100813000
Project ID: P00705851VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Aklan East Rd - K0310 + 033 - K0311 + 612

CW1- Rehabilitation of Paved Road:
6.308 lane km - 96,500.00
EAO - 3,500.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Aklan East Road - K0288 + 864 - K0289 + 187, K0289 + 501 - K0289 + 723, K0290 + 769 - K0291 + 007, K0291 + 597 - K0291 + 700, K0294 + 000 - K0294 + 793,K0295 + 034 - K0295 + 204, K0295 + 692 - K0296 + 000, K0296 + 029 - K0296 + 290, K0296 + 568 - K0296 + 890, K0301 + 000 -K0301 + 235, K0306 + 405 - K0306 + 515, K0307 + 485 - K0307 + 803, K0307 +976 - K0308 + 237, K0308 + 691 - K0309 + 195, K0309 + 790 - K0309 + 990, K0310 + 058 - K0310 + 758, K0310 + 966 - K0311 + 610

CW1- Reconstruction to Concrete Pavement:
11.644 lane km - 96,500.00
EAO - 3,500.00
May 5, 2023 2023 FY 2023 GAA RA 11936 January 1, 2023 Region VI Aklan District Engineering Office
UACS No. 310105100920000
Project ID: P00705852VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Aklan West Rd (Kalibo-Nabas) - K0241 + 755 - K0243 + 352

CW1- Rehabilitation of Paved Road:
3.154 lane km - 49,000.00
EAO - 1,000.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Aklan West Rd (Kalibo - Nabas) - K0242 + (-060) - K0242 + 093, K0242 + 210 - K0242 + 570, K0242 + 840 - K0244 + 040, K0244 + 100 - K0244 + 200, K0244 + 330 - K0245 + 060, K0261 + 950 - K0262 + 164

CW1- Reconstruction to Concrete Pavement:
5.432 lane km - 49,000.00
EAO - 1,000.00
May 5, 2023 2023 WIN3F07073 FY 2023 GAA RA 11936 January 1, 2023 Region VI Aklan District Engineering Office
UACS No. 310108101373000
Project ID: P00705980VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Aklan West Rd (Kalibo-Nabas) - K0243 + 925 - K0244 + 010

CW1- Construction of Road Slope Protection Structure: 5,416.67 sq.m - 94,087.50
EAO - 3,412.50


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Aklan West Rd (Kalibo-Nabas) - K0244 + 305 - K0244 + 390

CW1- Construction of Road Slope Protection Structure: 4,456.67 sq.m - 94,087.50
EAO - 3,412.50
May 5, 2023 2023 WIN3F06936 FY 2023 GAA RA 11936 January 1, 2023 Region VI Aklan District Engineering Office
UACS No. 310108101374000
Project ID: P00705981VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Aklan West Rd (Kalibo-Nabas) - K0244 + 010 - K0244 + 075

CW1- Construction of Road Slope Protection Structure: 5,416.67 sq.m - 94,087.50
EAO - 3,412.50


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Aklan West Rd (Kalibo-Nabas) - K0244 + 036 - K0244 + 101

CW1- Construction of Road Slope Protection Structure: 4,457.85 sq.m - 94,087.50
EAO - 3,412.50
May 5, 2023 2023 WIN3F06937 SARO-BMB-A-23-0014661 March 21, 2023 Region VI Aklan District Engineering Office
UACS No. 300226107325000
Project ID: P00733797VS


FROM:

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Basic Infrastructure Program - Multi-Purpose Buildings/ Facilities to support Social Services

Construction of Multi-Purpose Facility (Tangalan Public Market), Brgy. Poblacion, Nabas, Aklan

CW1 - Construction of Multipurpose Building:
1 No. of Building - 19,500.00
EAO - 500.00


TO:

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Basic Infrastructure Program - Multi-Purpose Buildings/ Facilities to support Social Services

Construction of Multi-Purpose Facility (Tangalan Public Market), Brgy. Poblacion, Tangalan, Aklan

CW1 - Construction of Multipurpose Building:
1 No. of Building - 19,500.00
EAO - 500.00
May 5, 2023 2023 WIN3F06984 FY 2023 GAA RA 11936 January 1, 2023 Region VI Negros Occidental 5th District Engineering Office
UACS No. 310101100837000
Project ID: P00705847VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

Bacolod North Rd - K0158 + 343 - K0159 + 485

CW1 - Preventive Maintenance of Road: Asphalt Overlay: 3.316 Lane Km - 29,164.23
EAO - 1,057.77


TO:

OO1: Ensure Safe and Reliable National Road
System

Asset Preservation - Preventive Maintenance - Primary Roads

Bacolod North Rd – K0147 + 484 – K0147 + 542, K0148 + 015 – K0148 + 365, K0158 + 343 - K0159 + 485

CW1 - Preventive Maintenance of Road: Asphalt Overlay: 2.474 Lane Km - 29,164.23
EAO - 1,057.77
May 5, 2023 2023 WIN3F06948 FY 2023 GAA RA 11936 January 1, 2023 Region VI Antique District Engineering Office
UACS No. 310109101334000
Project ID: P00706039VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Odiong-Sibalom-Sn Remigio-Leon Rd - K0118 + 370 - K0118 + 540, K0123 + 550 - K0123 + 650, K0124 + 520 - K0124 + 560, K0125 + 290 - K0125 + 360, K0128 + 200 - K0128 + 240, K0129 + 730 - K0129 + 790, K0132 + 330 - K0132 + 390, K0132 + 540 - K0132 + 603

CW1- Construction of Road Slope Protection Structure: 2,712.00 sq.m - 36,388.38
EAO - 742.62


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Odiong-Sibalom-Sn Remigio-Leon Rd - K0123+790 - K0124+000, K0124+200 - K0124+280, K0125+075 - K0125+127, K0125+670 - K0125+720, K0132+500 - K0132+570

CW1- Construction of Road Slope Protection Structure: 1,999.94 sq.m - 28,757.38
CW2-
Reconstruction to Concrete Pavement:
0.4646 lane km - 7,631.00
EAO - 742.62
May 5, 2023 2023 SARO-BMB-A-23-0013755 March 6, 2023 Region VI Antique District Engineering Office
UACS No. 300205100844000
Project ID: P00732836VS


FROM:

Convergence and Special Support Program

Construction/ Rehabilitation of Water Supply/ Septage and Sewerage/ Rain Water Collectors - Water Supply System

Construction of Solar Water System, Pattinson, Antique

CW1- Construction of Water Supply System:
1 Project - 9,900.00
EAO - 100.00


TO:

Convergence and Special Support Program

Construction/ Rehabilitation of Water Supply/ Septage and Sewerage/ Rain Water Collectors - Water Supply System

Construction of Solar Water System, Patnongon, Antique

CW1- Construction of Water Supply System:
1 Project - 9,900.00
EAO - 100.00
May 5, 2023 2023 FY 2023 GAA RA 11936 January 1, 2023 Region VI Iloilo 1st District Engineering Office
UACS No. 310102101352000
Project ID: P00705654VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Roads

Iloilo-Antique Rd - K0068 + 000 - K0068 + 762, K0070 + 076 - K0070 + 333, K0071 + 000 - K0071 + 520

CW1- Preventive Maintenance of Road: Asphalt Overlay: 3.078 lane km - 17,314.64
EAO - 353.36


TO:

OO1: Ensure Safe and Reliable National Road
System

Asset Preservation – Preventive Maintenance – Secondary Roads

Iloilo-Antique Rd – K0011 + 921 – K0012+315, K0068+000 – K0068+762

CW1- Preventive Maintenance of Road: Asphalt Overlay: 3.076 lane km - 17,314.64
EAO - 353.36
May 5, 2023 2023 FY 2023 GAA RA 11936 January 1, 2023 Region VI Iloilo 1st District Engineering Office
UACS No. 310102101353000
Project ID: P00705655VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Roads

Tiolas-Sinugbuhan Rd - K0062 + 147 - K0062 + 204, K0067 + 098 - K0067 + 495, K0067 + 717 - K0067 + 721

CW1- Preventive Maintenance of Road: Asphalt Overlay: 0.916 lane Km - 5,152.84
EAO - 105.16


TO:

OO1: Ensure Safe and Reliable National Road
System

Asset Preservation – Preventive Maintenance – Secondary Roads

Tiolas-Sinugbuhan Rd – K0062 + 147 – K0062 + 204, K0067 + 098 – K0067 + 495

CW1- Preventive Maintenance of Road: Asphalt Overlay: 0.908 lane Km - 5,152.84
EAO - 105.16
May 5, 2023 2023 FY 2023 GAA RA 11936 January 1, 2023 Region VI Iloilo 1st District Engineering Office
UACS No. 310103101270000
Project ID: P00705656VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Tertiary Roads

Tigbauan-Cordova-Leon Jct Rd - K0023 + 539 - K0023 + 728, K0024 + 000 - K0024 + 268, K0027 + 092 - K0027 + 866, K0028 + 014 - K0029 + 394

CW1- Preventive Maintenance of Road: Asphalt Overlay: 5.228 lane Km - 29,400.00
EAO - 600.00


TO:

OO1: Ensure Safe and Reliable National Road
System

Asset Preservation – Preventive Maintenance – Tertiary Roads

Tigbauan-Cordova-Leon Jct Rd – K0023 + 539 – K0023 + 728, K0024 + 129 – K0024 + 268, K0027 + 288 – K0027 + 866, K0028 + 014 – K0029 + 394

CW1- Preventive Maintenance of Road: Asphalt Overlay: 4.578 lane Km - 29,400.00
EAO - 600.00
May 5, 2023 2023 FY 2023 GAA RA 11936 January 1, 2023 Region VI Iloilo 1st District Engineering Office
UACS No. 310105100815000
Project ID: P00705863VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads

Iloilo-Antique Rd - K0023 + 294 - K0023 + 790, K0023 + 811 - K0024 + 080, K0032 + 145 - K0032 + 724, K0032 + 846 - K0032 + 1004, K0035 + 235 - K0035 + 689, K0040 + 779 - K0041 + 326

CW1- Reconstruction to Concrete Pavement:
5.826 lane km - 85,541.46
EAO - 3,102.54


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Iloilo-Antique Rd – K0023 + 294 - K0023 + 790, K0023 + 811 - K0024 + 080, K0032 + 145 - K0032 + 724, K0032 + 846 - K0032 + 1004, K0035 + 235 - K0035 + 689, K0040 + 779 - K0041 + 326, K0045 + 379 - K0046 + 240, K0051 + 620 - K0052 + 879

CW1- Reconstruction to Concrete Pavement:
9.08 lane km - 85,541.46
EAO - 3,102.54
May 5, 2023 2023 FY 2023 GAA RA 11936 January 1, 2023 Region VI Iloilo 1st District Engineering Office
UACS No. 310106100972000
Project ID: P00705864VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Guimbal-Igbaras-Tubungan-Leon Rd - K0040 + 346 - K0040 + 523, K0042 + 374 - K0042 + 578

CW1- Rehabilitation of Paved Road: 0.762 lane Km - 11,817.82
EAO - 241.18


TO:

OO1: Ensure Safe and Reliable National Road
System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads –
Tertiary Roads

Guimbal-Igbaras-Tubungan-Leon Rd – K0040 + 346 -K0040 + 523, K0042 + 097 - K0042 + 354, K0042 + 374 - K0042 + 578

CW1- Rehabilitation of Paved Road: 1.276 lane Km - 11,817.82
EAO - 241.18
May 5, 2023 2023 FY 2023 GAA RA 11936 January 1, 2023 Region VI Iloilo 1st District Engineering Office
UACS No. 310106100973000
Project ID: P00705865VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Miagao-Igbaras Rd - K0039 + 210.40 - K0040 + 244

CW1- Rehabilitation of Paved Road:
2.071 lane Km - 32,181.24
EAO - 656.76


TO:

OO1: Ensure Safe and Reliable National Road
System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads –
Tertiary Roads

Miagao-Igbaras Rd – K0037 + 605 - K0038 + 025, K0039 + 210 - K0040 + 244, K0040 + 648 - K0040 + 981

CW1 - Reconstruction to Concrete Pavement:
3.572 lane Km - 32,181.24
EAO - 656.76
May 5, 2023 2023 FY 2023 GAA RA 11936 January 1, 2023 Region VI Iloilo 1st District Engineering Office
UACS No. 310106100974000
Project ID: P00705866VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Tigbauan-Cordova-Leon Jct Rd - K0026 + 800 - K0027 + 092

CW1- Rehabilitation of Paved Road:
0.578 lane Km - 8,741.60
EAO - 178.40


TO:

OO1: Ensure Safe and Reliable National Road
System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads –
Tertiary Roads

Tigbauan-Cordova-Leon Jct Rd – K0026 + 800 -K0027 + 288

CW1- Reconstruction to Concrete Pavement:
0.970 lane Km - 8,741.60
EAO - 178.40
May 5, 2023 2023 FY 2023 GAA RA 11936 January 1, 2023 Region VI Iloilo 1st District Engineering Office
UACS No. 310108101386000
Project ID: P00705993VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Iloilo-Antique Rd - K0061 + 750 - K0061 + 900

CW1- Construction of Road Slope Protection Structure: 4,444.44 sq.m - 77,200.00
EAO - 2,800.00


TO:

OO1: Ensure Safe and Reliable National Road
System

Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide –
Secondary Roads

Iloilo-Antique Rd – K0064 + 806 - K0064 + 942, K0069 + 220 - K0069 + 340, K0070 + 381 -K0070 + 450

CW1- Construction of Road Slope Protection Structure: 13,000 sq.m - 75,200.00
ROW Acquisition: 14,000 sq.m. - 2,000.00
EAO - 2,800.00
May 5, 2023 2023 FY 2023 GAA RA 11936 January 1, 2023 Region VI Iloilo 1st District Engineering Office
UACS No. 310109101174000
Project ID: P00706015VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Guimbal-Igbaras-Tubungan-Leon Rd - K0063 + 030 - K0063 + 297

CW1- Construction of Road Slope Protection Structure: 5,555.56 sq.m - 96,500.00
EAO - 3,500.00


TO:

OO1: Ensure Safe and Reliable National Road
System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Guimbal-Igbaras-Tubungan-Leon Rd – K0052 + 375 - K0052 + 640

CW1- Construction of Road Slope Protection Structure: 10,000 sq.m - 94,500.00
ROW Acquisition: 10,000 sq.m. - 2,000.00
EAO - 3,500.00
May 5, 2023 2023 WIN3F06951 FY 2023 GAA RA 11936 January 1, 2023 Region VI Iloilo 2nd District Engineering Office
UACS No. 310203100642000
Project ID: P00705287VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

Iloilo-Capiz Rd (Old Route) - K0065 + 776 - K0069 + 022

CW1 - Road Widening: 6.342 lane km - 71,540.275
EAO - 2,594.725


TO:

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

Iloilo-Capiz Rd (Old Route) - K0057 + (-400) - K0057 + (-067.70), K0065 + 776 - K0066 + 720

CW1 - Road Widening: 3.1434 lane km - 37,282.775
ROW Acquisition: 35,000 sq.m. - 34,257.500
EAO - 2,594.725
May 5, 2023 2023 WIN3F06950 FY 2023 GAA RA 11936 January 1, 2023 Region VI Iloilo 2nd District Engineering Office
UACS No. 310109101182000
Project ID: P00706019VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Lambunao-INCA Rd - K0052 + 500 - K0052 + 661

CW1- Construction of Road Slope Protection Structure: 3,269.30 sq.m - 52,307.825
EAO - 1,897.175


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Lambunao-INCA Rd - K0051 + 645 - K0051 + 710, K0052 + 779 - K0052 + 860, K0058 + 020 - K0058 + 055, K0059 + 964 - K0060 + 005

CW1- Construction of Road Slope Protection Structure: 1,887.00 sq.m - 52,307.825
EAO - 1,897.175
May 5, 2023 2023 WIN3F06977 FY 2023 GAA RA 11936 January 1, 2023 Region VI Iloilo 2nd District Engineering Office
UACS No. 310109101179000
Project ID: P00706049VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Iloilo-Capiz Rd (Old Route) - K0059 + 890 - K0060 + 065, K0063 + 090 - K0063 + 142, K0065 + 545 - K0065 + 614, K0065 + 710 - K0065 + 769, K0066 + (-018) - K0066 + 108

CW1- Construction of Road Slope Protection Structure: 7,170.80 sq.m - 73,714.42
EAO - 2,673.58


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Iloilo-Capiz Rd (Old Route) - K0059 + 578 - K0059 + 679, K0059 + 890 - K0060 + 065, K0063 + 090 - K0063 + 142, K0065 + 400 - K0065 + 460, K0065 + 545 - K0065 + 614, K0065 + 710 - K0065 + 769, K0066 + (-018) - K0066 + 108

CW1- Construction of Road Slope Protection Structure: 5,564.08 sq.m - 73,714.42
EAO - 2,673.58
May 5, 2023 FY 2023 GAA WIN3E02850 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Saturnino R. Silva Rd - K1479+000 - K1481+336
Physical Target:
CW1: 4.586 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Saturnino R. Silva Rd -
K1479+174 - K1479+860, K1480+286 - K1481+318
Physical Target:
CW1: 3.476 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00
May 4, 2023 2023 WIN3F07190 SR2023-01-000833 January 30, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - (S00066LT) Chainage 526 - Chainage 600, Chainage 680 - Chainage 720, Chainage 880 - Chainage 966

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 144.750 M
Structure: 8,333.330 Square meters

EAO P 5.250 M

Total P 150.00 M

AS MODIFIED:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - (S00066LT) K0927+058 - K0927+098, K0927+188 - K0927+228, K0927+363 - K0927+393

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 144.750 M
Structure: 6,027.78 Square meters

EAO P 5.250 M

Total P 150.00 M
May 4, 2023 2023 SR2023-03-007137 March 15, 2023 Cordillera Administrative Region CAR - Regional Office
"From:
Installation of Road Safety Devices and Street Lightings along Baguio-Bontoc Road, K0300 + 000 - K0341 + 000;
Physical Target: 4.954 Km;
Allocation: Php 200,000,000.000"

"To:
Installation of Road Safety Devices and Street Lightings along Baguio-Bontoc Road, K0300 + 000 - K0308 + 203;
Physical Target: 402 Number of Street Lighting;
Allocation: Php 200,000,000.000"
May 4, 2023 2023 WIN3F07183 SR2023-01-000937 January 30, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Tigbao-Sta Fe-Sn Miguel Rd - K0909+(-366) - K0909+
(-291)


Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 57.923160 M
Structure: 3,334.67 Square meters

EAO P 2.100840 M

Total P 60.024 M

AS MODIFIED:

Tigbao-Sta Fe-Sn Miguel Rd - K0908+567 - K0908+642

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 57.923160 M
Structure: 2,198.63 Square meters

EAO P 2.100840 M

Total P 60.024 M
May 3, 2023 2023 WIN3F07096 SR2023-02-005575 February 27, 2023 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/ New Roads

AS PER GAA/ORIGINAL:

Jaro-Rubas-Ormoc Road (Ormoc City Side), Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road P 144.750 M
: 4.630 Lane Km

EAO P 5.250 M

Total P 150.00 M

AS MODIFIED:

Jaro-Rubas-Ormoc Road (Ormoc City Side), Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road P 52.52843682 M
: 2.706 Lane Km

CW2-Construction of Road Slope Protection P 92.22156318 M
Structure: 9,143.44 Square meters

EAO P 5.250 M

Total P 150.00 M
May 3, 2023 FY 2023 GAA P00707774MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1468+670 - K1469+000
Physical Target:
CW1: 0.898 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1468+000 - K1468+1048
Physical Target:
CW1: 4.192 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00
May 3, 2023 FY 2023 GAA P00707774MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1468+670 - K1469+000
Physical Target:
CW1: 0.898 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1468+000 - K1468+1048
Physical Target:
CW1: 4.192 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00
May 3, 2023 FY 2023 WIN3F06881 RA 11936 January 3, 2023 Region IV-B Romblon District Engineering Office Tablas Circumferential Rd - K0031 + 242 - K0031 + 446
May 3, 2023 FY 2023 WIN3F06876 RA 11936 January 3, 2023 Region IV-B Romblon District Engineering Office Tablas Circumferential Rd - K0077 + 815.97 - K0077 + 847.80
May 3, 2023 FY 2023 WIN3F06858 RA 11936 January 3, 2023 Region IV-B Romblon District Engineering Office Tablas Circumferential Rd - K0039 + 007.20 - K0039 + 096.51
May 3, 2023 FY 2023 WIN3F06883 RA 11936 January 3, 2023 Region IV-B Romblon District Engineering Office
Tablas Circumferential Rd - K0042 + 100 - K0042 + 125, K0042 + 700 - K0042 + 718, K0042 + 750 - K0042 + 768.30
May 3, 2023 FY 2023 WIN3F07105 RA 11936 January 3, 2023 Region IV-B Romblon District Engineering Office Tablas Circumferential Rd - K0044 + 120 - K0044 + 160, K0045 + 400 - K0045 + 414
May 3, 2023 FY 2023 WIN3F06875 RA 11936 January 3, 2023 Region IV-B Romblon District Engineering Office
Tablas Circumferential Rd - K0069 + 202 - K0069 + 238.20, K0069+246.60 – K0069+262
May 3, 2023 FY 2023 WIN3F06856 RA 11936 January 3, 2023 Region IV-B Romblon District Engineering Office
Lubi-Binoog Rd - K0065 + 440 - K0065 + 480, K0065 + 620 - K0065 + 736, K0065 + 810 - K0065 + 894
May 3, 2023 FY 2023 WIN3F06912 RA 11936 January 3, 2023 Region IV-B Romblon District Engineering Office Odiongan-East-West Rd - K0007 + 177.73 - K0007 + 232.53
May 3, 2023 FY 2023 RA 11936 January 3, 2023 Region IV-B Romblon District Engineering Office Sibuyan Circumferential Rd - K0015 + 480 - K0016 + 557
May 3, 2023 FY 2023 WIN3F06874 RA 11936 January 3, 2023 Region IV-B Romblon District Engineering Office Sibuyan Circumferential Rd - K0051 + 317 - K0051 + 412
May 3, 2023 FY 2023 RA 11936 January 3, 2023 Region IV-B Romblon District Engineering Office Tablas Circumferential Rd - K0113 + 865 - K0113 + 966
May 3, 2023 FY 2023 RA 11936 January 3, 2023 Region IV-B Romblon District Engineering Office Tablas Circumferential Rd - K0113 + 865 - K0113 + 966
May 3, 2023 FY 2023 WIN3F06845 GAA-RA-11936 January 1, 2023 Region IV-B Romblon District Engineering Office Marinduque Circumferential Rd – K005+200-K0006+575
May 3, 2023 FY 2023 SR2023-01-003607 January 31, 2023 Region IV-B Romblon District Engineering Office
Dr Damian Reyes Rd (Boac Side) – K0011+261 – K0012+038, K0012+286 – K0012+336, K0020+000 – K0020+575
May 3, 2023 2023 WIN3F07256 SR2023-03-006097 March 2, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0922 + 840 - K0923 + 000

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 110.975 M
Structure: 6,388.89 Square meters

EAO P 4.025 M

Total P 115.00 M

AS MODIFIED:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0922 + 805 - K0923 + 011

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 110.975 M
Structure: 4,621.88 Square meters

EAO P 4.025 M

Total P 115.00 M
May 3, 2023 2023 WIN3F07229 SR2023-01-000744 January 30, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - (S00066LT) Chainage 1068 - Chainage 1150, Chainage 1200 - Chainage 1300, Chainage 1900 Chainage 1940

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 135.100 M
Structure: 12,529.48 Square meters

EAO P 4.900 M

Total P 140.00 M

AS MODIFIED:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - (S00066LT) K0927+560 - K0927+658, K0927+757 - K0927+813

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 135.100 M
Structure: 5,646.98 Square meters

EAO P 4.900 M

Total P 140.00 M
May 3, 2023 2023 WIN3F07198 SR2023-01-000985 January 30, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Tigbao-Sta Fe-Sn Miguel Rd - K0909+(-687) - K0909+
(-550)


Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 111.841570 M
Structure: 6,438.78 Square meters

EAO P 4.056430 M

Total P 115.898 M

AS MODIFIED:

Tigbao-Sta Fe-Sn Miguel Rd - K0908+060 - K0908+140 (L/S), K0908+240 - K0908+377 (L/S)

Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 111.841570 M
Structure: 4,615.05 Square meters

EAO P 4.056430 M

Total P 115.898 M
May 3, 2023 2023 XII-085 GAA 2023 RA 11936 January 1, 2023 Region XII Cotabato 2nd District Engineering Office
23MC0023 - Construction of Flood Control Dike along Kabacan River L/S, Barangay Binay, Magpet, North Cotabato
May 3, 2023 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region Benguet 1st District Engineering Office
"From:
Asin (Km. 8)-Nangalisan-Sn Pascual, Tuba, Benguet-LU Bdry Rd - K0277+388 - K0277+404, K0277+423 - K0277+433, K0280+500 - K0280+525;
Physical Target: 308.92 Square Meters;
Allocation: Php 4,740,000.000"

"To:
Asin (Km. 8)-Nangalisan-Sn Pascual, Tuba, Benguet-LU Bdry Rd - K0277+388 - K0277+398, K0277+408 - K0277+433, K0280+495 - K0280+529;
Physical Target: 459.9 Square Meters;
Allocation: Php 4,740,000.000"
May 3, 2023 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region Benguet 1st District Engineering Office
"From:
Baguio-Bauang Rd - K0291+500 - K0293+342;
Type of Work: Preventive Maintenance of Road: Asphalt Overlay;
Physical Target: 3.698 Lane Km;
Allocation: Php 22,244,000.000"

"To:
Baguio-Bauang Rd - K0291+460 - K0292+860;
Type of Work:
CW1: Preventive Maintenance of Road: Asphalt Overlay
CW2: Construction of
Road Slope Protection Structure;
Physical Target:
CW1: 2.802 Lane Km
CW2: 440.00 Square Meters ;
Allocation: Php 22,244,000.000"
May 3, 2023 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region Benguet 1st District Engineering Office
"From:
Cong. Andres Acop Cosalan Rd - K0312+000 - K0313+175;
Physical Target: 2.476 Lane Km;
Allocation: Php 14,894,000.000"

"To:
Cong. Andres Acop Cosalan Rd - K0312+088 - K0313+160;
Physical Target: 2.27 Lane Km;
Allocation: Php 14,894,000.000"
May 3, 2023 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region Benguet 1st District Engineering Office
"From:
Cong. Andres Acop Cosalan Rd - K0322+717 - K0322+732;
Physical Target: 119.97 Square Meters;
Allocation: Php 1,850,000.000"

"To:
Cong. Andres Acop Cosalan Rd - K0338+090 - K0338+122;
Physical Target: 185.6 Square Meters;
Allocation: Php 1,850,000.000"
May 3, 2023 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region Benguet 1st District Engineering Office
"From:
Pico-Lamtang Rd - K0260+750 - K0261+1965;
Physical Target: 4.44 Lane Km;
Allocation: Php 26,707,000.000"


"To:
Pico-Lamtang Rd - K0260+650 - K0261+1965;
Physical Target: 4.64 Lane Km;
Allocation: Php 26,707,000.000"
May 3, 2023 2023 SR2023-01-004168 January 31, 2023 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Bridge - Construction of New Bridges

AS PER GAA/ORIGINAL:

Raquiza Br. (B00205LT) along Palompon-Isabel-Merida-Ormoc Road

Physical Target: Allocation:

CW1-Construction of Bridge: 287.631 P 58.865 M
Square meters

EAO P 2.135 M

Total P 61.00 M

AS MODIFIED:

Raquiza Br. (B00205LT) along Palompon-Isabel-Merida-Ormoc Road

Physical Target: Allocation:

CW1-Construction of Bridge: 508.329 P 58.865 M
Square meters

EAO P 2.135 M

Total P 61.00 M
May 3, 2023 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region Benguet 1st District Engineering Office
"From:
Tawang-Ambiong Rd - K0261+576 - K0261+594, K0263+122 - K0263+136, K0263+947 - K0263+957, K0264+779 - K0264+800;
Physical Target: 363.02 Square Meters;
Allocation: Php 5,280,000.000"

"To:
Tawang-Ambiong Rd - K0261+475 - K0261+500, K0261+572.4 - K0261+600, K0263+115 - K0263+160, K0263+940 - K0263+963, K0264+773.5 - K0264+798;
Physical Target: 525.85 Square Meters;
Allocation: Php 5,280,000.000"
May 3, 2023 FY 2023 GAA-RA-11936 January 1, 2023 Region IV-B Palawan 2nd District Engineering Office Palawan Circum. Rd (Panalingaan-Tagbita-Latud) - K0253 + 682 - K0253 + 840
May 3, 2023 FY 2023 GAA-RA-11936 January 1, 2023 Region IV-B Palawan 2nd District Engineering Office
Construction of Panitian River Flood Control Structure, Sta. 0+131 – Sta. 0+280 B/S Downstream, Barangay Panitian, Quezon, Palawan
May 3, 2023 FY 2023 GAA-RA-11936 January 1, 2023 Region IV-B Palawan 2nd District Engineering Office
Quezon-Punta Baja Rd K0189 + 511 - K0189 + 541, K0190 + 000 - K0190 + 037, K0190 + 206 - K0190 + 222, K0190 + 267 - K0190 + 291, K0190 + 641 - K0190 + 691
May 3, 2023 FY 2023 WIN3F06879 GAA-RA-11936 January 1, 2023 Region IV-B Palawan 2nd District Engineering Office
Quezon-Punta Baja Rd K0154 + 010 - K0154 + 030, K0161 + 580 - K0161 + 618, K0165 + 1029 - K0166 + 002, K0167 + 825 - K0167 + 857
May 3, 2023 FY 2023 WIN3F06878 GAA-RA-11936 January 1, 2023 Region IV-B Palawan 2nd District Engineering Office
Quezon-Aramaywan Rd K0158 + 876 - K0158 + 911, K0166 + 960 - K0166 + 1000, K0167 + 050 - K167 + 105
May 3, 2023 FY 2023 GAA-RA-11936 January 1, 2023 Region IV-B Palawan 2nd District Engineering Office
Construction of New Bridges Culimbawang Br. Along Culandanum-Panalingaan Cross Country Road (Phase III)
May 2, 2023 2023 GAA FY 2023 January 1, 2023 Region VIII Biliran District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

Biliran Circumferential Rd - K1021 + 080 - K1021 + 674

Physical Target: Allocation:

CW1-Road Widening- 1.188 Lane Km P 19.600 M

EAO P 0.400 M

Total P 20.00 M

AS MODIFIED:

Biliran Circumferential Rd - K1021 + 080 - K1021 + 621

Physical Target: Allocation:

CW1-Road Widening- 1.082 Lane Km P 19.600 M

EAO P 0.400 M

Total P 20.00 M
May 2, 2023 2023 WIN3F07197 GAA FY 2023 January 1, 2023 Region VIII Biliran District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

Biliran Circumferential Rd - K1050 + 175 - K1051 + 217

Physical Target: Allocation:

CW1-Road Widening-2.092 Lane Km P 15.985760 M

EAO P 0.326240 M

Total P 16.312 M

AS MODIFIED:

Biliran Circumferential Rd - K1050 + 175 - K1050 + 209, K1050 + 230 - K1050 +875

Physical Target: Allocation:

CW1-Road Widening-0.713 Lane Km P 15.985760 M

EAO P 0.326240 M

Total P 16.312 M
May 2, 2023 2023 WIN3F07169 GAA FY 2023 January 1, 2023 Region VIII Leyte 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0941 + 988 - K0942 + 637, K0942 + 338 - K0943 + 000

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 49.00 M
5.332 Lane Km

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Daang Maharlika (LT) - K0941 + 988 - K0943 + 000

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 49.00 M
4.136 Lane Km

EAO P 1.00 M

Total P 50.00 M
May 2, 2023 2023 WIN3F07179 GAA FY 2023 January 1, 2023 Region VIII Leyte 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0939 + 641 - K0940 + 084, K0939 + 1000 - K0940 + 329

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 19.600 M
4.328 Lane Km

EAO P 0.400 M

Total P 20.00 M

AS MODIFIED:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0939 + 641 - K0940 + 329

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 19.600 M
2.9132 Lane Km

EAO P 0.400 M

Total P 20.00 M
May 2, 2023 2023 WIN3E02775 SR2023-03-005650 May 2, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0481 + 650 - K0481 + 800;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000

To:
Abra-Kalinga Rd - K0488 + 250 - K0488 + 450;
Physical Target: 3577 Square meters;
Allocation: Php 100,000,000.000

May 2, 2023 2023 WIN3F07027 GAA FY 2023 January 25, 2023 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

AS PER GAA/ORIGINAL:

Kananga-Tungonan Hot Spring Rd – K0990+(-1060) – K0990+(-704), K0993+603 – K0994+000

Physical Target: Allocation:

CW1-Road Widening: 1.304 Lane Km P 26.805940 M

EAO P 0.547060 M

Total P 27.353 M

AS MODIFIED:

Kananga-Tungonan Hot Spring Road K0990+(-1050) – K0990+(-704)

Physical Target: Allocation:

CW1-Road Widening: 0.692 Lane Km P 26.805940 M

EAO P 0.547060 M

Total P 27.353 M
May 2, 2023 2023 WIN3E02779 SR2023-03-005630 May 2, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0438 + 100 - K0489 + 200;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000

To:
Abra-Kalinga Rd - K0488 + 000 - K0488 + 200;
Physical Target: 3576.6 Square meters;
Allocation: Php 100,000,000.000

May 2, 2023 2023 WIN3E02783 SR2023-03-005634 March 2, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0438 + 400 - K0489 + 500;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000

To:
Abra-Kalinga Rd - K0489 + 680 - K0489 + 800;
Physical Target: 3577 Square meters;
Allocation: Php 100,000,000.000

May 2, 2023 2023 WIN3E02799 SR2023-03-005633 March 2, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0438 + 250 - K0489 + 350;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000

To:
Abra-Kalinga Rd - K0489 + 460 - K0489 + 630;
Physical Target: 3577 Square meters;
Allocation: Php 100,000,000.000

May 2, 2023 2023 WIN3E02777 SR2023-03-005800 March 2, 2023 Cordillera Administrative Region CAR - Regional Office
From:
Kennon Rd - K0241 + (-060) - K0241 + 100;
Physical Target: 5555.556 Square meters;
Allocation: Php 100,000,000.000

To:
Kennon Rd - K0241 + 798 - K0241 + 920;
Physical Target: 2980.600 Square meters;
Allocation: Php 100,000,000.000

May 2, 2023 2023 WIN3E02790 SR2023-03-005817 March 2, 2023 Cordillera Administrative Region CAR - Regional Office
From:
Banaue-Mayoyao-Alfonso Lista-Isabela Bndry Rd, K0350 + 660 - K0350 + 775, Banaue, Ifugao;
Physical Target: 6,666.670 Square meters;
Allocation: Php 120,000,000.000

To:
Banaue-Mayoyao-Alfonso Lista-Isabela Bndry Rd, K0351 + 160 - K0351 + 260, K0351 + 300 - K0351 + 400, Banaue, Ifugao;
Physical Target: 4,454 Square meters;
Allocation: Php 120,000,000.000

May 2, 2023 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region CAR - Regional Office
From:
Construction of Flood Control along Lamut River, Sta. 18 + 300 - Sta. 18 + 850 (Lawig Side), Lamut, Ifugao;
Physical Target: 550 Lineal meters;
Allocation: Php 39,500,000.000

To:
Construction of Flood Control along Lamut River, Sta. 18 + 300 - Sta. 18 + 900, (Lawig Side), Lamut, Ifugao;
Physical Target: 616 Lineal meters;
Allocation: Php 39,500,000.000

May 2, 2023 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region CAR - Regional Office
From:
Construction of Flood Control along Tinoc River, Sta. 98 + 960 - Sta. 99 + 420 (Manaan Section), Tinoc, Ifugao;
Physical Target: 460 Lineal meters;
Allocation: Php 33,170,000.000

To:
Construction of Flood Control along Tinoc River, Sta. 98 + 960 - Sta. 99 + 440, (Manaan Section), Tinoc, Ifugao;
Physical Target: 480 Lineal meters;
Allocation: Php 33,170,000.000

May 2, 2023 2023 WIN3E02826 GAA 2023 January 24, 2023 Cordillera Administrative Region CAR - Regional Office
From:
Construction of Flood Control along Tinoc River, Sta. 21 + 310 - Sta. 21 + 800 (Ahin Section), Tinoc, Ifugao;
Physical Target: 490 Lineal meters;
Allocation: Php 30,810,000.000

To:
Construction of Flood Control along Tinoc River, Sta. 21 + 310 - Sta. 21 + 385, Sta. 22 + 000 - Sta. 22 + 070, Sta. 22 + 700 - Sta. 22 + 750, Sta. 22 + 900 - Sta. 22 + 950, Sta. 23 + 050 - Sta. 23 + 150, (Ahin Section), Tinoc, Ifugao;
Physical Target: 345 Lineal meters;
Allocation: Php 30,810,000.000

May 2, 2023 2023 WIN3E02814 GAA 2023 January 24, 2023 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Baguio-Bontoc Rd - K0266+600 - K0266+700, K0267+150 - K0267+180, K0268+850 - K0268+920, K0270+015 - K0270+045, K0272+720 - K0272+750;
Physical Target: 2680.36 Square Meters;
Allocation: Php 30,000,000.000"

"To:
Baguio-Bontoc Rd - K0266+600 - K0266+700, K0267+150 - K0267+180, K0268+850 - K0268+920, K0272+713 - K0272+770;
Physical Target: 1602 Square Meters;
Allocation: Php 30,000,000.000"

May 2, 2023 2023 WIN3E02791 GAA 2023 January 24, 2023 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Baguio-Bontoc Rd - K0317+820 - K0317+837, K0318+012 - K0318+049, K0318+052 - K0318+070, K0318+320 - K0318+350, K0320+345 - K0320+410;
Physical Target: 2692.09 Square Meters;
Allocation: Php 35,074,000.000"

"To:
Baguio-Bontoc Rd - K0317+820 - K0317+837, K0318+012 - K0318+049, K0318+052 - K0318+070, K0318+320 - K0318+396, K0320+345 - K0320+410;
Physical Target: 1810 Square Meters;
Allocation: Php 35,074,000.000"
May 2, 2023 2023 WIN3E02817 GAA 2023 January 24, 2023 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Abatan-Mankayan-Cervantes Rd - K0334+360 - K0334+390, K0334+630 - K0334+670, K0342+955 - K0342+975;
Physical Target: 540 Square Meters;
Allocation: Php 9,000,000.000"

"To:
Abatan-Mankayan-Cervantes Rd - K0334+360 - K0334+375, K0335+470 - K0335+511, K0342+955 - K0342+974, K0348+350 - K0348+368;
Physical Target: 417 Square Meters;
Allocation: Php 9,000,000.000"
May 2, 2023 2023 WIN3F07029 GAA FY 2023 January 25, 2023 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement - Primary Roads

AS PER GAA/ORIGINAL:

Ormoc-Baybay-Southern Leyte Bdry Rd - K1013 + 064 - K1013 + 710, K1015 + 100 - K1015 +503

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: Paving of P 19.110 M
Shoulders:3,594.930 Square meters

EAO P 0.390 M

Total P 19.500 M

AS MODIFIED:

Ormoc-Baybay-Southern Leyte Bdry Rd - K1013 + 064 - K1013 + 710, K1015 + 100 - K1015 +503

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: Paving of P 19.110 M
Shoulders:1,883 Square meters

EAO P 0.390 M

Total P 19.500 M
May 2, 2023 2023 WIN3E02785 GAA 2023 January 24, 2023 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Gov. Bado Dangwa National Rd - K0277+000 - K0277+032, K0278+250 - K0278+370, K0279+912 - K0279+942;
Physical Target: 1912.3 Square Meters;
Allocation: Php 21,000,000.000"

"To:
Gov. Bado Dangwa National Rd - K0276+725 - K0276+910, K0276+920 - K0277+040, K0278+250 - K0278+370, K0279+912 - K0279+942;
Physical Target: 1353.75 Square Meters;
Allocation: Php 21,000,000.000"
May 2, 2023 2023 WIN3F07068 SR2023-01-004153 January 31, 2023 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Libungao-Matag-ob-Palompon Rd - K1016 + 822 - K1016 + 906, K1020 + 100 - K1020 + 360, K1022 + 148 - K1022 + 490

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 77.200 M
Structure: 3,999.910 Square meters

EAO P 2.800 M

Total P 80.00 M

AS MODIFIED:

Libungao-Matag-ob-Palompon Road – K1016+822 – K1016+906, K1020+100 – K1020+360, K1022+388 – K1022+730

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 77.200 M
Structure: 3,182.550 Square meters

EAO P 2.800 M

Total P 80.00 M
May 2, 2023 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Gov. Bado Dangwa National Rd - K0293+930 - K0293+990, K0297+840 - K0297+890;
Physical Target: 440 Square Meters;
Allocation: Php 6,000,000.000"

"To:
Gov. Bado Dangwa National Rd - K0293+930 - K0293+990, K0297+840 - K0297+890;
Physical Target: 540.5 Square Meters;
Allocation: Php 6,000,000.000"
May 2, 2023 2023 WIN3E02812 GAA 2023 January 24, 2023 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Gov. Bado Dangwa National Rd - K0324+445 - K0324+470, K0331+540 - K0331+575, K0338+060 - K0338+086, K0338+515 - K0338+560, K0338+875 - K0338+890, K0339+360 - K0339+440;
Physical Target: 2006.03 Square Meters;
Allocation: Php 32,000,000.000"

"To:
Gov. Bado Dangwa National Rd - K0324+445 - K0324+470, K0331+540 - K0331+575, K0338+515 - K0338+560, K0342+625 - K0342+665, K0344+415 - K0344+426;
Physical Target: 1317.6 Square Meters;
Allocation: Php 32,000,000.000"

Pages