May 5, 2023 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310106100976000
Project ID: P00705959VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Sum-ag-Abuanan Rd - K0011 + 612 - K0011 + 625, K0012 + 380 - K0012 + 406
CW1 - Rehabilitation of Paved Road:
0.143 lane km - 2,290.26
EAO - 46.74
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Sum-ag Abuanan Rd - K0011 + 200 – K0011 + 371.50
CW1 - Reconstruction to Concrete Pavement:
0.279 lane km - 2,290.26
EAO - 46.74 |
May 5, 2023 |
2023 |
WIN3F06898 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo 3rd District Engineering Office |
UACS No. 310202101448000
Project ID: P00705314VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Iloilo East Coast-Capiz Rd - K0188 + 635 - K0189 + 640
CW1- Road Widening:
2.028 lane km - 43,723.68
EAO - 892.32
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Iloilo East Coast-Capiz Rd - K0188 + 287 - K0189 + 640
CW1- Road Widening:
2.724 lane km - 43,223.68
ROW Acquisition: 4,000 sq.m - 500.00
EAO - 892.32 |
May 5, 2023 |
2023 |
WIN3F06904 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo 3rd District Engineering Office |
UACS No. 310202101451000
Project ID: P00705320VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Iloilo East Coast-Capiz Rd - K0234 + 000 - K0234 + 802, K0234 + 820 - K0234 + 865
CW1- Road Widening:
1.694 lane km - 32,478.18
EAO - 662.82
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Iloilo East Coast-Capiz Rd - K0234 + 000 - K0234 + 766
CW1- Road Widening:
1.694 lane km - 32,478.18
ROW Acquisition: 1,000 sq.m - 300.00
EAO - 662.82 |
May 5, 2023 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo 3rd District Engineering Office |
UACS No. 310105100927000
Project ID: P00705901VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd - K0246 + 251 - K0246 + 479
CW1 - Rehabilitation of Paved Road:
0.912 lane Km - 14,139.44
EAO - 288.56
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads –
Secondary Roads
Iloilo East Coast-Capiz Rd - K0246 + 251 - K0247 + 077
CW1 –
Reconstruction to Concrete Pavement:
1.668 lane km - 14,139.44
EAO - 288.56 |
May 5, 2023 |
2023 |
WIN3F06944 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Negros Occidental 5th District Engineering Office |
UACS No. 310202101294000
Project ID: P00705461VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Jct Balintawak-Old Escalante Rd - K0100 + 466 - K0102 + 033
CW1- Road Widening:
2.944 lane km - 48,221.05
EAO - 1,748.95
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Jct Balintawak-Old Escalante Rd - K0100 + 466 - K0101 + 680
CW1- Road Widening:
1.978 lane km - 28,043.125
ROW
Acquisition: 13,353.2 sq. m. - 20,177.925
EAO - 1,748.95 |
May 5, 2023 |
2023 |
WIN3F07001 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Negros Occidental 5th District Engineering Office |
UACS No. 310101100833000
Project ID: P00705843VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod North Rd - K0096 + 000 - K0097 + 000, K0104 + 474 - K0106 + 000
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 9.988 Lane Km - 87,844.915
EAO - 3,186.085
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod North Rd - K0096 + 660 - K0097 + 000, K0104 + 474 - K0105 + 800
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 6.548 Lane Km - 87,844.915
EAO - 3,186.085 |
May 5, 2023 |
2023 |
WIN4F06947 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Negros Occidental 5th District Engineering Office |
UACS No. 310101100834000
Project ID: P00705844VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod North Rd - K0122 + 000 - K0123 + 055
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 2.112 Lane Km - 18,575.285
EAO - 673.715
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod North Rd - K0122 + 000 - K0122 + 605
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 1.210 Lane Km - 18,575.285
EAO - 673.715 |
May 5, 2023 |
2023 |
WIN3F06945 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Negros Occidental 5th District Engineering Office |
UACS No. 310101100835000
Project ID: P00705845VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod North Rd - K0124 + 1078 - K0126 + 000
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 2.014 Lane Km - 17,713.54
EAO - 642.46
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod North Rd - K0124 + 1078 - K0125 + 566
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 1.140 Lane Km - 17,713.54
EAO - 642.46 |
May 5, 2023 |
2023 |
WIN3F06978 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Negros Occidental 5th District Engineering Office |
UACS No. 310101100836000
Project ID: P00705846VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod North Rd - K0146 + 531 - K0146 + 829, K0148 + 000 - K0148 + 015
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 1.237 Lane Km - 10,879.41
EAO - 394.59
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod North Rd - K0146 + 531 - K0146 + 829, K0147 + 332 - K0147 + 484
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 0.90 Lane Km - 10,879.41
EAO - 394.59 |
May 5, 2023 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Negros Occidental 5th District Engineering Office |
UACS No. 310104100478000
Project ID: P00705961VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Bacolod North Rd - K0102 + 487 - K0103 + 556
CW1 – Rehabilitation of Paved Road:
4.256 Lane Km - 67,102.24
EAO - 2,433.76
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Bacolod North Rd - K0101 + 514 – K0104 + 321
CW1 – Reconstruction to Concrete Pavement:
5.612 Lane Km - 67,102.24
EAO - 2,433.76 |
May 5, 2023 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Negros Occidental 5th District Engineering Office |
UACS No. 310109101180000
Project ID: P00706145VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Stop Aguinaldo-Bug-ang Rd - K0109 + 508 - K0109 + 553, K0109 + 638.5 - K0109 + 665.50, K0111 + 270 - K0111 + 338, K0113 + 049 - K0113 + 085
CW1 – Construction of Road Slope Protection Structure: 1,337.27 sq. m. - 17,370.00
EAO - 630.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Stop Aguinaldo-Bug-ang Rd - K0109 + 540 - K0109 + 575, K0109 + 664 - K0109 + 692, K0110 + 030 – K0110 + 052, K0111 + 260 - K0111 + 380, K0113 + 049 - K0113 + 085
CW1 – Construction of Road Slope Protection Structure: 2,028.79 sq. m. - 17,370.00
EAO - 630.00 |
May 5, 2023 |
2023 |
WIN3F07032 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Negros Occidental 5th District Engineering Office |
UACS No. 310109101181000
Project ID: P00706146VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Prosperidad-Quezon-Cabaron Rd - K0078 + 553.50 - K0078 + 598.50
CW1 – Construction of Road Slope Protection Structure: 1,000.00 sq. m. - 9,650.00
EAO - 350.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Prosperidad-Quezon-Cabaron Rd - K0078 + 534 - K0078 + 659
CW1 – Construction of Road Slope Protection Structure: 316.33 sq. m. - 9,650.00
EAO - 350.00 |
May 5, 2023 |
2023 |
|
SR2023-03-005941 |
March 2, 2023 |
Region VI |
Negros Occidental 5th District Engineering Office |
UACS No. 310101100839000
Project ID: P00706756VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod-Murcia-DS Benedictor-Sn Carlos Rd (S00427NR) K0053+000 - K0057+149, Negros Occidental
CW1- Preventive Maintenance of Road: Asphalt Overlay: 8.00 lane km - 96,500.00
EAO - 3,500.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod-Murcia-DS Benedicto-Sn Carlos Rd (S00427NR) K0053+000 - K0056+742
CW1- Preventive Maintenance of Road: Asphalt Overlay: 14.44 lane km - 96,500.00
EAO - 3,500.00 |
May 5, 2023 |
2023 |
WIN3F07066 |
SR2023-03-005945 |
March 2, 2023 |
Region VI |
Negros Occidental 5th District Engineering Office |
UACS No. 310103101098000
Project ID: P00706767VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Stop Aguinaldo-Bug-Ang Rd (S00395NR) - K0117+258- K0119+881, K0115+520 - K0115+1017
CW1- Preventive Maintenance of Road: Asphalt Overlay: 5.994 lane km - 37,596.40
EAO - 1,363.60
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Stop Aguinaldo-Bug-Ang Rd (S00395NR) - K0117+258- K0119+826
CW1- Preventive Maintenance of Road: Asphalt Overlay: 4.89lane km - 37,596.40
EAO - 1,363.60 |
May 5, 2023 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Negros Occidental 5th District Engineering Office |
UACS No. 300214100410000
Project ID: P00731655VS
FROM:
Convergence and Special Support Program
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
Bacolod-Murcia-DS Benedicto- Sn Carlos City Rd (S00427NR) K0036+(-624) - K0043-862
CW1- Road Safety: Street Lighting:
3.957 km - 38,600.00
EAO - 1,400.00
TO:
Convergence and Special Support Program
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
Bacolod-Murcia-DS Benedicto- Sn Carlos City Rd (S00427NR) K0036+(-624) - K0043+862
CW1- Road Safety: Street Lighting:
8.16 km - 38,600.00
EAO - 1,400.00 |
May 5, 2023 |
2023 |
WIN3F07098 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Aklan District Engineering Office |
UACS No. 310202101435000
Project ID: P00705266VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Aklan East Rd - K0296 + 564 - K0296 + 905, K0296 + 969 - K0298 + 000, K0299 + 000 - K0299 + 802
CW1- Road Widening: 4.368 lane km - 25,253.62
EAO - 515.38
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Aklan East Rd - K0298 + 650 - K0299 + 652
CW1- Road Widening: 1.904 lane km - 24,953.62
ROW Acquisition: 3.00 sq. m. - 300.00
EAO - 515.38 |
May 5, 2023 |
2023 |
WIN3F07097 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Aklan District Engineering Office |
UACS No. 310202101436000
Project ID: P00705267VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Jaime Cardinal Sin Ave - K0293 + 000 - K0295 + 000
CW1- Road Widening: 4.00 lane km- 35,094.78
EAO - 716.22
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Jaime Cardinal Sin Ave - K0293 + 000 - K0293 + 600
CW1- Road Widening: 1.20 lane km - 29,753.78
ROW Acquisition: 1,090.00 sq. m. - 5,341.00
EAO - 716.22 |
May 5, 2023 |
2023 |
WIN3F07099 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Aklan District Engineering Office |
UACS No. 310202101437000
Project ID: P00705269VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Aklan West Rd (Kalibo-Nabas) - K0239 + 616 - K0239 + 655, K0239 + 691 - K0239 + 805, K0241 + 900 - K0246 + 092
CW1- Road Widening: 8.938 lane km- 40,354.44
EAO - 823.56
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Aklan West Rd (Kalibo-Nabas) - K0237 + 600 - K0237 + 690, K0237 + 690 -K0238 + 730, K0250 + 180 - K0250 +750, K0251 + 700 - K0252 + 250
CW1- Road Widening: 3.525lane km- 38,354.44
ROW Acquisition: 198.40 sq. m. - 2,000.00
EAO - 823.56 |
May 5, 2023 |
2023 |
WIN3F07155 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Aklan District Engineering Office |
UACS No. 310111100583000
Project ID: P00705491VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Aklan East Rd - K0296 + 564 - K0296 + 905, K0296 + 969 - K0301 + 031
CW1- Construction of Drainage Structure along Road: 4,356.00 lineal meters - 20,175.26
EAO - 411.74
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Aklan East Rd - K0298 + 650 - K0299 + 622
CW1- Construction of Drainage Structure along Road: 1,844.00 lineal meters - 18,175.26
ROW Acquisition: 141.67 sq. m. - 2,000.00
EAO - 411.74 |
May 5, 2023 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Aklan District Engineering Office |
UACS No. 310111100497000
Project ID: P00705492VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Jaime Cardinal Sin Ave - K0294 + 595 - K0296 + 423
CW1- Construction of Drainage along Road: 1,828.00 lineal meters - 57,900.00
EAO - 2,100.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Jaime Cardinal Sin Ave - K0293 + 600 - K0295 + 320
CW1- Construction of Drainage along Road: 3,440.00 lineal meters - 43,869.00
ROW Acquisition: 1,787.00 sq. m. - 14,031.00
EAO - 2,100.00 |
May 5, 2023 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Aklan District Engineering Office |
UACS No. 310105100813000
Project ID: P00705851VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Aklan East Rd - K0310 + 033 - K0311 + 612
CW1- Rehabilitation of Paved Road:
6.308 lane km - 96,500.00
EAO - 3,500.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Aklan East Road - K0288 + 864 - K0289 + 187, K0289 + 501 - K0289 + 723, K0290 + 769 - K0291 + 007, K0291 + 597 - K0291 + 700, K0294 + 000 - K0294 + 793,K0295 + 034 - K0295 + 204, K0295 + 692 - K0296 + 000, K0296 + 029 - K0296 + 290, K0296 + 568 - K0296 + 890, K0301 + 000 -K0301 + 235, K0306 + 405 - K0306 + 515, K0307 + 485 - K0307 + 803, K0307 +976 - K0308 + 237, K0308 + 691 - K0309 + 195, K0309 + 790 - K0309 + 990, K0310 + 058 - K0310 + 758, K0310 + 966 - K0311 + 610
CW1- Reconstruction to Concrete Pavement:
11.644 lane km - 96,500.00
EAO - 3,500.00 |
May 5, 2023 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Aklan District Engineering Office |
UACS No. 310105100920000
Project ID: P00705852VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Aklan West Rd (Kalibo-Nabas) - K0241 + 755 - K0243 + 352
CW1- Rehabilitation of Paved Road:
3.154 lane km - 49,000.00
EAO - 1,000.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Aklan West Rd (Kalibo - Nabas) - K0242 + (-060) - K0242 + 093, K0242 + 210 - K0242 + 570, K0242 + 840 - K0244 + 040, K0244 + 100 - K0244 + 200, K0244 + 330 - K0245 + 060, K0261 + 950 - K0262 + 164
CW1- Reconstruction to Concrete Pavement:
5.432 lane km - 49,000.00
EAO - 1,000.00 |
May 5, 2023 |
2023 |
WIN3F07073 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Aklan District Engineering Office |
UACS No. 310108101373000
Project ID: P00705980VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Aklan West Rd (Kalibo-Nabas) - K0243 + 925 - K0244 + 010
CW1- Construction of Road Slope Protection Structure: 5,416.67 sq.m - 94,087.50
EAO - 3,412.50
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Aklan West Rd (Kalibo-Nabas) - K0244 + 305 - K0244 + 390
CW1- Construction of Road Slope Protection Structure: 4,456.67 sq.m - 94,087.50
EAO - 3,412.50 |
May 5, 2023 |
2023 |
WIN3F06936 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Aklan District Engineering Office |
UACS No. 310108101374000
Project ID: P00705981VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Aklan West Rd (Kalibo-Nabas) - K0244 + 010 - K0244 + 075
CW1- Construction of Road Slope Protection Structure: 5,416.67 sq.m - 94,087.50
EAO - 3,412.50
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Aklan West Rd (Kalibo-Nabas) - K0244 + 036 - K0244 + 101
CW1- Construction of Road Slope Protection Structure: 4,457.85 sq.m - 94,087.50
EAO - 3,412.50 |
May 5, 2023 |
2023 |
WIN3F06937 |
SARO-BMB-A-23-0014661 |
March 21, 2023 |
Region VI |
Aklan District Engineering Office |
UACS No. 300226107325000
Project ID: P00733797VS
FROM:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Basic Infrastructure Program - Multi-Purpose Buildings/ Facilities to support Social Services
Construction of Multi-Purpose Facility (Tangalan Public Market), Brgy. Poblacion, Nabas, Aklan
CW1 - Construction of Multipurpose Building:
1 No. of Building - 19,500.00
EAO - 500.00
TO:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Basic Infrastructure Program - Multi-Purpose Buildings/ Facilities to support Social Services
Construction of Multi-Purpose Facility (Tangalan Public Market), Brgy. Poblacion, Tangalan, Aklan
CW1 - Construction of Multipurpose Building:
1 No. of Building - 19,500.00
EAO - 500.00 |
May 5, 2023 |
2023 |
WIN3F06984 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Negros Occidental 5th District Engineering Office |
UACS No. 310101100837000
Project ID: P00705847VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod North Rd - K0158 + 343 - K0159 + 485
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 3.316 Lane Km - 29,164.23
EAO - 1,057.77
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod North Rd – K0147 + 484 – K0147 + 542, K0148 + 015 – K0148 + 365, K0158 + 343 - K0159 + 485
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 2.474 Lane Km - 29,164.23
EAO - 1,057.77 |
May 5, 2023 |
2023 |
WIN3F06948 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Antique District Engineering Office |
UACS No. 310109101334000
Project ID: P00706039VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Odiong-Sibalom-Sn Remigio-Leon Rd - K0118 + 370 - K0118 + 540, K0123 + 550 - K0123 + 650, K0124 + 520 - K0124 + 560, K0125 + 290 - K0125 + 360, K0128 + 200 - K0128 + 240, K0129 + 730 - K0129 + 790, K0132 + 330 - K0132 + 390, K0132 + 540 - K0132 + 603
CW1- Construction of Road Slope Protection Structure: 2,712.00 sq.m - 36,388.38
EAO - 742.62
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Odiong-Sibalom-Sn Remigio-Leon Rd - K0123+790 - K0124+000, K0124+200 - K0124+280, K0125+075 - K0125+127, K0125+670 - K0125+720, K0132+500 - K0132+570
CW1- Construction of Road Slope Protection Structure: 1,999.94 sq.m - 28,757.38
CW2-
Reconstruction to Concrete Pavement:
0.4646 lane km - 7,631.00
EAO - 742.62 |
May 5, 2023 |
2023 |
|
SARO-BMB-A-23-0013755 |
March 6, 2023 |
Region VI |
Antique District Engineering Office |
UACS No. 300205100844000
Project ID: P00732836VS
FROM:
Convergence and Special Support Program
Construction/ Rehabilitation of Water Supply/ Septage and Sewerage/ Rain Water Collectors - Water Supply System
Construction of Solar Water System, Pattinson, Antique
CW1- Construction of Water Supply System:
1 Project - 9,900.00
EAO - 100.00
TO:
Convergence and Special Support Program
Construction/ Rehabilitation of Water Supply/ Septage and Sewerage/ Rain Water Collectors - Water Supply System
Construction of Solar Water System, Patnongon, Antique
CW1- Construction of Water Supply System:
1 Project - 9,900.00
EAO - 100.00 |
May 5, 2023 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo 1st District Engineering Office |
UACS No. 310102101352000
Project ID: P00705654VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Iloilo-Antique Rd - K0068 + 000 - K0068 + 762, K0070 + 076 - K0070 + 333, K0071 + 000 - K0071 + 520
CW1- Preventive Maintenance of Road: Asphalt Overlay: 3.078 lane km - 17,314.64
EAO - 353.36
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation – Preventive Maintenance – Secondary Roads
Iloilo-Antique Rd – K0011 + 921 – K0012+315, K0068+000 – K0068+762
CW1- Preventive Maintenance of Road: Asphalt Overlay: 3.076 lane km - 17,314.64
EAO - 353.36 |
May 5, 2023 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo 1st District Engineering Office |
UACS No. 310102101353000
Project ID: P00705655VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Tiolas-Sinugbuhan Rd - K0062 + 147 - K0062 + 204, K0067 + 098 - K0067 + 495, K0067 + 717 - K0067 + 721
CW1- Preventive Maintenance of Road: Asphalt Overlay: 0.916 lane Km - 5,152.84
EAO - 105.16
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation – Preventive Maintenance – Secondary Roads
Tiolas-Sinugbuhan Rd – K0062 + 147 – K0062 + 204, K0067 + 098 – K0067 + 495
CW1- Preventive Maintenance of Road: Asphalt Overlay: 0.908 lane Km - 5,152.84
EAO - 105.16 |
May 5, 2023 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo 1st District Engineering Office |
UACS No. 310103101270000
Project ID: P00705656VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Tigbauan-Cordova-Leon Jct Rd - K0023 + 539 - K0023 + 728, K0024 + 000 - K0024 + 268, K0027 + 092 - K0027 + 866, K0028 + 014 - K0029 + 394
CW1- Preventive Maintenance of Road: Asphalt Overlay: 5.228 lane Km - 29,400.00
EAO - 600.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Tigbauan-Cordova-Leon Jct Rd – K0023 + 539 – K0023 + 728, K0024 + 129 – K0024 + 268, K0027 + 288 – K0027 + 866, K0028 + 014 – K0029 + 394
CW1- Preventive Maintenance of Road: Asphalt Overlay: 4.578 lane Km - 29,400.00
EAO - 600.00 |
May 5, 2023 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo 1st District Engineering Office |
UACS No. 310105100815000
Project ID: P00705863VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Iloilo-Antique Rd - K0023 + 294 - K0023 + 790, K0023 + 811 - K0024 + 080, K0032 + 145 - K0032 + 724, K0032 + 846 - K0032 + 1004, K0035 + 235 - K0035 + 689, K0040 + 779 - K0041 + 326
CW1- Reconstruction to Concrete Pavement:
5.826 lane km - 85,541.46
EAO - 3,102.54
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo-Antique Rd – K0023 + 294 - K0023 + 790, K0023 + 811 - K0024 + 080, K0032 + 145 - K0032 + 724, K0032 + 846 - K0032 + 1004, K0035 + 235 - K0035 + 689, K0040 + 779 - K0041 + 326, K0045 + 379 - K0046 + 240, K0051 + 620 - K0052 + 879
CW1- Reconstruction to Concrete Pavement:
9.08 lane km - 85,541.46
EAO - 3,102.54 |
May 5, 2023 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo 1st District Engineering Office |
UACS No. 310106100972000
Project ID: P00705864VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Guimbal-Igbaras-Tubungan-Leon Rd - K0040 + 346 - K0040 + 523, K0042 + 374 - K0042 + 578
CW1- Rehabilitation of Paved Road: 0.762 lane Km - 11,817.82
EAO - 241.18
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads –
Tertiary Roads
Guimbal-Igbaras-Tubungan-Leon Rd – K0040 + 346 -K0040 + 523, K0042 + 097 - K0042 + 354, K0042 + 374 - K0042 + 578
CW1- Rehabilitation of Paved Road: 1.276 lane Km - 11,817.82
EAO - 241.18 |
May 5, 2023 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo 1st District Engineering Office |
UACS No. 310106100973000
Project ID: P00705865VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Miagao-Igbaras Rd - K0039 + 210.40 - K0040 + 244
CW1- Rehabilitation of Paved Road:
2.071 lane Km - 32,181.24
EAO - 656.76
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads –
Tertiary Roads
Miagao-Igbaras Rd – K0037 + 605 - K0038 + 025, K0039 + 210 - K0040 + 244, K0040 + 648 - K0040 + 981
CW1 - Reconstruction to Concrete Pavement:
3.572 lane Km - 32,181.24
EAO - 656.76 |
May 5, 2023 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo 1st District Engineering Office |
UACS No. 310106100974000
Project ID: P00705866VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Tigbauan-Cordova-Leon Jct Rd - K0026 + 800 - K0027 + 092
CW1- Rehabilitation of Paved Road:
0.578 lane Km - 8,741.60
EAO - 178.40
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads –
Tertiary Roads
Tigbauan-Cordova-Leon Jct Rd – K0026 + 800 -K0027 + 288
CW1- Reconstruction to Concrete Pavement:
0.970 lane Km - 8,741.60
EAO - 178.40 |
May 5, 2023 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo 1st District Engineering Office |
UACS No. 310108101386000
Project ID: P00705993VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Iloilo-Antique Rd - K0061 + 750 - K0061 + 900
CW1- Construction of Road Slope Protection Structure: 4,444.44 sq.m - 77,200.00
EAO - 2,800.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide –
Secondary Roads
Iloilo-Antique Rd – K0064 + 806 - K0064 + 942, K0069 + 220 - K0069 + 340, K0070 + 381 -K0070 + 450
CW1- Construction of Road Slope Protection Structure: 13,000 sq.m - 75,200.00
ROW Acquisition: 14,000 sq.m. - 2,000.00
EAO - 2,800.00 |
May 5, 2023 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo 1st District Engineering Office |
UACS No. 310109101174000
Project ID: P00706015VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Guimbal-Igbaras-Tubungan-Leon Rd - K0063 + 030 - K0063 + 297
CW1- Construction of Road Slope Protection Structure: 5,555.56 sq.m - 96,500.00
EAO - 3,500.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Guimbal-Igbaras-Tubungan-Leon Rd – K0052 + 375 - K0052 + 640
CW1- Construction of Road Slope Protection Structure: 10,000 sq.m - 94,500.00
ROW Acquisition: 10,000 sq.m. - 2,000.00
EAO - 3,500.00 |
May 5, 2023 |
2023 |
WIN3F06951 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo 2nd District Engineering Office |
UACS No. 310203100642000
Project ID: P00705287VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Iloilo-Capiz Rd (Old Route) - K0065 + 776 - K0069 + 022
CW1 - Road Widening: 6.342 lane km - 71,540.275
EAO - 2,594.725
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Iloilo-Capiz Rd (Old Route) - K0057 + (-400) - K0057 + (-067.70), K0065 + 776 - K0066 + 720
CW1 - Road Widening: 3.1434 lane km - 37,282.775
ROW Acquisition: 35,000 sq.m. - 34,257.500
EAO - 2,594.725
|
May 5, 2023 |
2023 |
WIN3F06950 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo 2nd District Engineering Office |
UACS No. 310109101182000
Project ID: P00706019VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Lambunao-INCA Rd - K0052 + 500 - K0052 + 661
CW1- Construction of Road Slope Protection Structure: 3,269.30 sq.m - 52,307.825
EAO - 1,897.175
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Lambunao-INCA Rd - K0051 + 645 - K0051 + 710, K0052 + 779 - K0052 + 860, K0058 + 020 - K0058 + 055, K0059 + 964 - K0060 + 005
CW1- Construction of Road Slope Protection Structure: 1,887.00 sq.m - 52,307.825
EAO - 1,897.175 |
May 5, 2023 |
2023 |
WIN3F06977 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo 2nd District Engineering Office |
UACS No. 310109101179000
Project ID: P00706049VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Iloilo-Capiz Rd (Old Route) - K0059 + 890 - K0060 + 065, K0063 + 090 - K0063 + 142, K0065 + 545 - K0065 + 614, K0065 + 710 - K0065 + 769, K0066 + (-018) - K0066 + 108
CW1- Construction of Road Slope Protection Structure: 7,170.80 sq.m - 73,714.42
EAO - 2,673.58
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Iloilo-Capiz Rd (Old Route) - K0059 + 578 - K0059 + 679, K0059 + 890 - K0060 + 065, K0063 + 090 - K0063 + 142, K0065 + 400 - K0065 + 460, K0065 + 545 - K0065 + 614, K0065 + 710 - K0065 + 769, K0066 + (-018) - K0066 + 108
CW1- Construction of Road Slope Protection Structure: 5,564.08 sq.m - 73,714.42
EAO - 2,673.58 |
May 5, 2023 |
FY 2023 GAA |
WIN3E02850 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Saturnino R. Silva Rd - K1479+000 - K1481+336
Physical Target:
CW1: 4.586 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Saturnino R. Silva Rd -
K1479+174 - K1479+860, K1480+286 - K1481+318
Physical Target:
CW1: 3.476 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00 |
May 4, 2023 |
2023 |
WIN3F07190 |
SR2023-01-000833 |
January 30, 2023 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - (S00066LT) Chainage 526 - Chainage 600, Chainage 680 - Chainage 720, Chainage 880 - Chainage 966
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 144.750 M
Structure: 8,333.330 Square meters
EAO P 5.250 M
Total P 150.00 M
AS MODIFIED:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - (S00066LT) K0927+058 - K0927+098, K0927+188 - K0927+228, K0927+363 - K0927+393
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 144.750 M
Structure: 6,027.78 Square meters
EAO P 5.250 M
Total P 150.00 M
|
May 4, 2023 |
2023 |
|
SR2023-03-007137 |
March 15, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
"From:
Installation of Road Safety Devices and Street Lightings along Baguio-Bontoc Road, K0300 + 000 - K0341 + 000;
Physical Target: 4.954 Km;
Allocation: Php 200,000,000.000"
"To:
Installation of Road Safety Devices and Street Lightings along Baguio-Bontoc Road, K0300 + 000 - K0308 + 203;
Physical Target: 402 Number of Street Lighting;
Allocation: Php 200,000,000.000"
|
May 4, 2023 |
2023 |
WIN3F07183 |
SR2023-01-000937 |
January 30, 2023 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Tigbao-Sta Fe-Sn Miguel Rd - K0909+(-366) - K0909+
(-291)
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 57.923160 M
Structure: 3,334.67 Square meters
EAO P 2.100840 M
Total P 60.024 M
AS MODIFIED:
Tigbao-Sta Fe-Sn Miguel Rd - K0908+567 - K0908+642
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 57.923160 M
Structure: 2,198.63 Square meters
EAO P 2.100840 M
Total P 60.024 M
|
May 3, 2023 |
2023 |
WIN3F07096 |
SR2023-02-005575 |
February 27, 2023 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/ New Roads
AS PER GAA/ORIGINAL:
Jaro-Rubas-Ormoc Road (Ormoc City Side), Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road P 144.750 M
: 4.630 Lane Km
EAO P 5.250 M
Total P 150.00 M
AS MODIFIED:
Jaro-Rubas-Ormoc Road (Ormoc City Side), Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road P 52.52843682 M
: 2.706 Lane Km
CW2-Construction of Road Slope Protection P 92.22156318 M
Structure: 9,143.44 Square meters
EAO P 5.250 M
Total P 150.00 M
|
May 3, 2023 |
FY 2023 GAA |
P00707774MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1468+670 - K1469+000
Physical Target:
CW1: 0.898 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1468+000 - K1468+1048
Physical Target:
CW1: 4.192 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00 |
May 3, 2023 |
FY 2023 GAA |
P00707774MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1468+670 - K1469+000
Physical Target:
CW1: 0.898 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1468+000 - K1468+1048
Physical Target:
CW1: 4.192 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00 |
May 3, 2023 |
FY 2023 |
WIN3F06881 |
RA 11936 |
January 3, 2023 |
Region IV-B |
Romblon District Engineering Office |
Tablas Circumferential Rd - K0031 + 242 - K0031 + 446 |
May 3, 2023 |
FY 2023 |
WIN3F06876 |
RA 11936 |
January 3, 2023 |
Region IV-B |
Romblon District Engineering Office |
Tablas Circumferential Rd - K0077 + 815.97 - K0077 + 847.80 |
May 3, 2023 |
FY 2023 |
WIN3F06858 |
RA 11936 |
January 3, 2023 |
Region IV-B |
Romblon District Engineering Office |
Tablas Circumferential Rd - K0039 + 007.20 - K0039 + 096.51 |
May 3, 2023 |
FY 2023 |
WIN3F06883 |
RA 11936 |
January 3, 2023 |
Region IV-B |
Romblon District Engineering Office |
Tablas Circumferential Rd - K0042 + 100 - K0042 + 125, K0042 + 700 - K0042 + 718, K0042 + 750 - K0042 + 768.30 |
May 3, 2023 |
FY 2023 |
WIN3F07105 |
RA 11936 |
January 3, 2023 |
Region IV-B |
Romblon District Engineering Office |
Tablas Circumferential Rd - K0044 + 120 - K0044 + 160, K0045 + 400 - K0045 + 414 |
May 3, 2023 |
FY 2023 |
WIN3F06875 |
RA 11936 |
January 3, 2023 |
Region IV-B |
Romblon District Engineering Office |
Tablas Circumferential Rd - K0069 + 202 - K0069 + 238.20, K0069+246.60 – K0069+262 |
May 3, 2023 |
FY 2023 |
WIN3F06856 |
RA 11936 |
January 3, 2023 |
Region IV-B |
Romblon District Engineering Office |
Lubi-Binoog Rd - K0065 + 440 - K0065 + 480, K0065 + 620 - K0065 + 736, K0065 + 810 - K0065 + 894 |
May 3, 2023 |
FY 2023 |
WIN3F06912 |
RA 11936 |
January 3, 2023 |
Region IV-B |
Romblon District Engineering Office |
Odiongan-East-West Rd - K0007 + 177.73 - K0007 + 232.53 |
May 3, 2023 |
FY 2023 |
|
RA 11936 |
January 3, 2023 |
Region IV-B |
Romblon District Engineering Office |
Sibuyan Circumferential Rd - K0015 + 480 - K0016 + 557 |
May 3, 2023 |
FY 2023 |
WIN3F06874 |
RA 11936 |
January 3, 2023 |
Region IV-B |
Romblon District Engineering Office |
Sibuyan Circumferential Rd - K0051 + 317 - K0051 + 412 |
May 3, 2023 |
FY 2023 |
|
RA 11936 |
January 3, 2023 |
Region IV-B |
Romblon District Engineering Office |
Tablas Circumferential Rd - K0113 + 865 - K0113 + 966 |
May 3, 2023 |
FY 2023 |
|
RA 11936 |
January 3, 2023 |
Region IV-B |
Romblon District Engineering Office |
Tablas Circumferential Rd - K0113 + 865 - K0113 + 966 |
May 3, 2023 |
FY 2023 |
WIN3F06845 |
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Romblon District Engineering Office |
Marinduque Circumferential Rd – K005+200-K0006+575 |
May 3, 2023 |
FY 2023 |
|
SR2023-01-003607 |
January 31, 2023 |
Region IV-B |
Romblon District Engineering Office |
Dr Damian Reyes Rd (Boac Side) – K0011+261 – K0012+038, K0012+286 – K0012+336, K0020+000 – K0020+575 |
May 3, 2023 |
2023 |
WIN3F07256 |
SR2023-03-006097 |
March 2, 2023 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0922 + 840 - K0923 + 000
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 110.975 M
Structure: 6,388.89 Square meters
EAO P 4.025 M
Total P 115.00 M
AS MODIFIED:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0922 + 805 - K0923 + 011
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 110.975 M
Structure: 4,621.88 Square meters
EAO P 4.025 M
Total P 115.00 M
|
May 3, 2023 |
2023 |
WIN3F07229 |
SR2023-01-000744 |
January 30, 2023 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - (S00066LT) Chainage 1068 - Chainage 1150, Chainage 1200 - Chainage 1300, Chainage 1900 Chainage 1940
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 135.100 M
Structure: 12,529.48 Square meters
EAO P 4.900 M
Total P 140.00 M
AS MODIFIED:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - (S00066LT) K0927+560 - K0927+658, K0927+757 - K0927+813
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 135.100 M
Structure: 5,646.98 Square meters
EAO P 4.900 M
Total P 140.00 M
|
May 3, 2023 |
2023 |
WIN3F07198 |
SR2023-01-000985 |
January 30, 2023 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Tigbao-Sta Fe-Sn Miguel Rd - K0909+(-687) - K0909+
(-550)
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 111.841570 M
Structure: 6,438.78 Square meters
EAO P 4.056430 M
Total P 115.898 M
AS MODIFIED:
Tigbao-Sta Fe-Sn Miguel Rd - K0908+060 - K0908+140 (L/S), K0908+240 - K0908+377 (L/S)
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 111.841570 M
Structure: 4,615.05 Square meters
EAO P 4.056430 M
Total P 115.898 M
|
May 3, 2023 |
2023 |
XII-085 |
GAA 2023 RA 11936 |
January 1, 2023 |
Region XII |
Cotabato 2nd District Engineering Office |
23MC0023 - Construction of Flood Control Dike along Kabacan River L/S, Barangay Binay, Magpet, North Cotabato |
May 3, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
"From:
Asin (Km. 8)-Nangalisan-Sn Pascual, Tuba, Benguet-LU Bdry Rd - K0277+388 - K0277+404, K0277+423 - K0277+433, K0280+500 - K0280+525;
Physical Target: 308.92 Square Meters;
Allocation: Php 4,740,000.000"
"To:
Asin (Km. 8)-Nangalisan-Sn Pascual, Tuba, Benguet-LU Bdry Rd - K0277+388 - K0277+398, K0277+408 - K0277+433, K0280+495 - K0280+529;
Physical Target: 459.9 Square Meters;
Allocation: Php 4,740,000.000"
|
May 3, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
"From:
Baguio-Bauang Rd - K0291+500 - K0293+342;
Type of Work: Preventive Maintenance of Road: Asphalt Overlay;
Physical Target: 3.698 Lane Km;
Allocation: Php 22,244,000.000"
"To:
Baguio-Bauang Rd - K0291+460 - K0292+860;
Type of Work:
CW1: Preventive Maintenance of Road: Asphalt Overlay
CW2: Construction of
Road Slope Protection Structure;
Physical Target:
CW1: 2.802 Lane Km
CW2: 440.00 Square Meters ;
Allocation: Php 22,244,000.000"
|
May 3, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
"From:
Cong. Andres Acop Cosalan Rd - K0312+000 - K0313+175;
Physical Target: 2.476 Lane Km;
Allocation: Php 14,894,000.000"
"To:
Cong. Andres Acop Cosalan Rd - K0312+088 - K0313+160;
Physical Target: 2.27 Lane Km;
Allocation: Php 14,894,000.000"
|
May 3, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
"From:
Cong. Andres Acop Cosalan Rd - K0322+717 - K0322+732;
Physical Target: 119.97 Square Meters;
Allocation: Php 1,850,000.000"
"To:
Cong. Andres Acop Cosalan Rd - K0338+090 - K0338+122;
Physical Target: 185.6 Square Meters;
Allocation: Php 1,850,000.000"
|
May 3, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
"From:
Pico-Lamtang Rd - K0260+750 - K0261+1965;
Physical Target: 4.44 Lane Km;
Allocation: Php 26,707,000.000"
"To:
Pico-Lamtang Rd - K0260+650 - K0261+1965;
Physical Target: 4.64 Lane Km;
Allocation: Php 26,707,000.000"
|
May 3, 2023 |
2023 |
|
SR2023-01-004168 |
January 31, 2023 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Bridge - Construction of New Bridges
AS PER GAA/ORIGINAL:
Raquiza Br. (B00205LT) along Palompon-Isabel-Merida-Ormoc Road
Physical Target: Allocation:
CW1-Construction of Bridge: 287.631 P 58.865 M
Square meters
EAO P 2.135 M
Total P 61.00 M
AS MODIFIED:
Raquiza Br. (B00205LT) along Palompon-Isabel-Merida-Ormoc Road
Physical Target: Allocation:
CW1-Construction of Bridge: 508.329 P 58.865 M
Square meters
EAO P 2.135 M
Total P 61.00 M
|
May 3, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
"From:
Tawang-Ambiong Rd - K0261+576 - K0261+594, K0263+122 - K0263+136, K0263+947 - K0263+957, K0264+779 - K0264+800;
Physical Target: 363.02 Square Meters;
Allocation: Php 5,280,000.000"
"To:
Tawang-Ambiong Rd - K0261+475 - K0261+500, K0261+572.4 - K0261+600, K0263+115 - K0263+160, K0263+940 - K0263+963, K0264+773.5 - K0264+798;
Physical Target: 525.85 Square Meters;
Allocation: Php 5,280,000.000"
|
May 3, 2023 |
FY 2023 |
|
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Palawan 2nd District Engineering Office |
Palawan Circum. Rd (Panalingaan-Tagbita-Latud) - K0253 + 682 - K0253 + 840 |
May 3, 2023 |
FY 2023 |
|
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Palawan 2nd District Engineering Office |
Construction of Panitian River Flood Control Structure, Sta. 0+131 – Sta. 0+280 B/S Downstream, Barangay Panitian, Quezon, Palawan |
May 3, 2023 |
FY 2023 |
|
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Palawan 2nd District Engineering Office |
Quezon-Punta Baja Rd K0189 + 511 - K0189 + 541, K0190 + 000 - K0190 + 037, K0190 + 206 - K0190 + 222, K0190 + 267 - K0190 + 291, K0190 + 641 - K0190 + 691 |
May 3, 2023 |
FY 2023 |
WIN3F06879 |
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Palawan 2nd District Engineering Office |
Quezon-Punta Baja Rd K0154 + 010 - K0154 + 030, K0161 + 580 - K0161 + 618, K0165 + 1029 - K0166 + 002, K0167 + 825 - K0167 + 857 |
May 3, 2023 |
FY 2023 |
WIN3F06878 |
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Palawan 2nd District Engineering Office |
Quezon-Aramaywan Rd K0158 + 876 - K0158 + 911, K0166 + 960 - K0166 + 1000, K0167 + 050 - K167 + 105 |
May 3, 2023 |
FY 2023 |
|
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Palawan 2nd District Engineering Office |
Construction of New Bridges Culimbawang Br. Along Culandanum-Panalingaan Cross Country Road (Phase III) |
May 2, 2023 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Biliran District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
AS PER GAA/ORIGINAL:
Biliran Circumferential Rd - K1021 + 080 - K1021 + 674
Physical Target: Allocation:
CW1-Road Widening- 1.188 Lane Km P 19.600 M
EAO P 0.400 M
Total P 20.00 M
AS MODIFIED:
Biliran Circumferential Rd - K1021 + 080 - K1021 + 621
Physical Target: Allocation:
CW1-Road Widening- 1.082 Lane Km P 19.600 M
EAO P 0.400 M
Total P 20.00 M
|
May 2, 2023 |
2023 |
WIN3F07197 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Biliran District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
AS PER GAA/ORIGINAL:
Biliran Circumferential Rd - K1050 + 175 - K1051 + 217
Physical Target: Allocation:
CW1-Road Widening-2.092 Lane Km P 15.985760 M
EAO P 0.326240 M
Total P 16.312 M
AS MODIFIED:
Biliran Circumferential Rd - K1050 + 175 - K1050 + 209, K1050 + 230 - K1050 +875
Physical Target: Allocation:
CW1-Road Widening-0.713 Lane Km P 15.985760 M
EAO P 0.326240 M
Total P 16.312 M |
May 2, 2023 |
2023 |
WIN3F07169 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Leyte 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0941 + 988 - K0942 + 637, K0942 + 338 - K0943 + 000
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 49.00 M
5.332 Lane Km
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Daang Maharlika (LT) - K0941 + 988 - K0943 + 000
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 49.00 M
4.136 Lane Km
EAO P 1.00 M
Total P 50.00 M
|
May 2, 2023 |
2023 |
WIN3F07179 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Leyte 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0939 + 641 - K0940 + 084, K0939 + 1000 - K0940 + 329
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 19.600 M
4.328 Lane Km
EAO P 0.400 M
Total P 20.00 M
AS MODIFIED:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0939 + 641 - K0940 + 329
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 19.600 M
2.9132 Lane Km
EAO P 0.400 M
Total P 20.00 M
|
May 2, 2023 |
2023 |
WIN3E02775 |
SR2023-03-005650 |
May 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0481 + 650 - K0481 + 800;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0488 + 250 - K0488 + 450;
Physical Target: 3577 Square meters;
Allocation: Php 100,000,000.000
|
May 2, 2023 |
2023 |
WIN3F07027 |
GAA FY 2023 |
January 25, 2023 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
AS PER GAA/ORIGINAL:
Kananga-Tungonan Hot Spring Rd – K0990+(-1060) – K0990+(-704), K0993+603 – K0994+000
Physical Target: Allocation:
CW1-Road Widening: 1.304 Lane Km P 26.805940 M
EAO P 0.547060 M
Total P 27.353 M
AS MODIFIED:
Kananga-Tungonan Hot Spring Road K0990+(-1050) – K0990+(-704)
Physical Target: Allocation:
CW1-Road Widening: 0.692 Lane Km P 26.805940 M
EAO P 0.547060 M
Total P 27.353 M
|
May 2, 2023 |
2023 |
WIN3E02779 |
SR2023-03-005630 |
May 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0438 + 100 - K0489 + 200;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0488 + 000 - K0488 + 200;
Physical Target: 3576.6 Square meters;
Allocation: Php 100,000,000.000
|
May 2, 2023 |
2023 |
WIN3E02783 |
SR2023-03-005634 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0438 + 400 - K0489 + 500;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0489 + 680 - K0489 + 800;
Physical Target: 3577 Square meters;
Allocation: Php 100,000,000.000
|
May 2, 2023 |
2023 |
WIN3E02799 |
SR2023-03-005633 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0438 + 250 - K0489 + 350;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0489 + 460 - K0489 + 630;
Physical Target: 3577 Square meters;
Allocation: Php 100,000,000.000
|
May 2, 2023 |
2023 |
WIN3E02777 |
SR2023-03-005800 |
March 2, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From:
Kennon Rd - K0241 + (-060) - K0241 + 100;
Physical Target: 5555.556 Square meters;
Allocation: Php 100,000,000.000
To:
Kennon Rd - K0241 + 798 - K0241 + 920;
Physical Target: 2980.600 Square meters;
Allocation: Php 100,000,000.000
|
May 2, 2023 |
2023 |
WIN3E02790 |
SR2023-03-005817 |
March 2, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From:
Banaue-Mayoyao-Alfonso Lista-Isabela Bndry Rd, K0350 + 660 - K0350 + 775, Banaue, Ifugao;
Physical Target: 6,666.670 Square meters;
Allocation: Php 120,000,000.000
To:
Banaue-Mayoyao-Alfonso Lista-Isabela Bndry Rd, K0351 + 160 - K0351 + 260, K0351 + 300 - K0351 + 400, Banaue, Ifugao;
Physical Target: 4,454 Square meters;
Allocation: Php 120,000,000.000
|
May 2, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From:
Construction of Flood Control along Lamut River, Sta. 18 + 300 - Sta. 18 + 850 (Lawig Side), Lamut, Ifugao;
Physical Target: 550 Lineal meters;
Allocation: Php 39,500,000.000
To:
Construction of Flood Control along Lamut River, Sta. 18 + 300 - Sta. 18 + 900, (Lawig Side), Lamut, Ifugao;
Physical Target: 616 Lineal meters;
Allocation: Php 39,500,000.000
|
May 2, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From:
Construction of Flood Control along Tinoc River, Sta. 98 + 960 - Sta. 99 + 420 (Manaan Section), Tinoc, Ifugao;
Physical Target: 460 Lineal meters;
Allocation: Php 33,170,000.000
To:
Construction of Flood Control along Tinoc River, Sta. 98 + 960 - Sta. 99 + 440, (Manaan Section), Tinoc, Ifugao;
Physical Target: 480 Lineal meters;
Allocation: Php 33,170,000.000
|
May 2, 2023 |
2023 |
WIN3E02826 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From:
Construction of Flood Control along Tinoc River, Sta. 21 + 310 - Sta. 21 + 800 (Ahin Section), Tinoc, Ifugao;
Physical Target: 490 Lineal meters;
Allocation: Php 30,810,000.000
To:
Construction of Flood Control along Tinoc River, Sta. 21 + 310 - Sta. 21 + 385, Sta. 22 + 000 - Sta. 22 + 070, Sta. 22 + 700 - Sta. 22 + 750, Sta. 22 + 900 - Sta. 22 + 950, Sta. 23 + 050 - Sta. 23 + 150, (Ahin Section), Tinoc, Ifugao;
Physical Target: 345 Lineal meters;
Allocation: Php 30,810,000.000
|
May 2, 2023 |
2023 |
WIN3E02814 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Baguio-Bontoc Rd - K0266+600 - K0266+700, K0267+150 - K0267+180, K0268+850 - K0268+920, K0270+015 - K0270+045, K0272+720 - K0272+750;
Physical Target: 2680.36 Square Meters;
Allocation: Php 30,000,000.000"
"To:
Baguio-Bontoc Rd - K0266+600 - K0266+700, K0267+150 - K0267+180, K0268+850 - K0268+920, K0272+713 - K0272+770;
Physical Target: 1602 Square Meters;
Allocation: Php 30,000,000.000"
|
May 2, 2023 |
2023 |
WIN3E02791 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Baguio-Bontoc Rd - K0317+820 - K0317+837, K0318+012 - K0318+049, K0318+052 - K0318+070, K0318+320 - K0318+350, K0320+345 - K0320+410;
Physical Target: 2692.09 Square Meters;
Allocation: Php 35,074,000.000"
"To:
Baguio-Bontoc Rd - K0317+820 - K0317+837, K0318+012 - K0318+049, K0318+052 - K0318+070, K0318+320 - K0318+396, K0320+345 - K0320+410;
Physical Target: 1810 Square Meters;
Allocation: Php 35,074,000.000"
|
May 2, 2023 |
2023 |
WIN3E02817 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Abatan-Mankayan-Cervantes Rd - K0334+360 - K0334+390, K0334+630 - K0334+670, K0342+955 - K0342+975;
Physical Target: 540 Square Meters;
Allocation: Php 9,000,000.000"
"To:
Abatan-Mankayan-Cervantes Rd - K0334+360 - K0334+375, K0335+470 - K0335+511, K0342+955 - K0342+974, K0348+350 - K0348+368;
Physical Target: 417 Square Meters;
Allocation: Php 9,000,000.000"
|
May 2, 2023 |
2023 |
WIN3F07029 |
GAA FY 2023 |
January 25, 2023 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Primary Roads
AS PER GAA/ORIGINAL:
Ormoc-Baybay-Southern Leyte Bdry Rd - K1013 + 064 - K1013 + 710, K1015 + 100 - K1015 +503
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: Paving of P 19.110 M
Shoulders:3,594.930 Square meters
EAO P 0.390 M
Total P 19.500 M
AS MODIFIED:
Ormoc-Baybay-Southern Leyte Bdry Rd - K1013 + 064 - K1013 + 710, K1015 + 100 - K1015 +503
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: Paving of P 19.110 M
Shoulders:1,883 Square meters
EAO P 0.390 M
Total P 19.500 M
|
May 2, 2023 |
2023 |
WIN3E02785 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Gov. Bado Dangwa National Rd - K0277+000 - K0277+032, K0278+250 - K0278+370, K0279+912 - K0279+942;
Physical Target: 1912.3 Square Meters;
Allocation: Php 21,000,000.000"
"To:
Gov. Bado Dangwa National Rd - K0276+725 - K0276+910, K0276+920 - K0277+040, K0278+250 - K0278+370, K0279+912 - K0279+942;
Physical Target: 1353.75 Square Meters;
Allocation: Php 21,000,000.000"
|
May 2, 2023 |
2023 |
WIN3F07068 |
SR2023-01-004153 |
January 31, 2023 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Libungao-Matag-ob-Palompon Rd - K1016 + 822 - K1016 + 906, K1020 + 100 - K1020 + 360, K1022 + 148 - K1022 + 490
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 77.200 M
Structure: 3,999.910 Square meters
EAO P 2.800 M
Total P 80.00 M
AS MODIFIED:
Libungao-Matag-ob-Palompon Road – K1016+822 – K1016+906, K1020+100 – K1020+360, K1022+388 – K1022+730
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 77.200 M
Structure: 3,182.550 Square meters
EAO P 2.800 M
Total P 80.00 M
|
May 2, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Gov. Bado Dangwa National Rd - K0293+930 - K0293+990, K0297+840 - K0297+890;
Physical Target: 440 Square Meters;
Allocation: Php 6,000,000.000"
"To:
Gov. Bado Dangwa National Rd - K0293+930 - K0293+990, K0297+840 - K0297+890;
Physical Target: 540.5 Square Meters;
Allocation: Php 6,000,000.000"
|
May 2, 2023 |
2023 |
WIN3E02812 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Gov. Bado Dangwa National Rd - K0324+445 - K0324+470, K0331+540 - K0331+575, K0338+060 - K0338+086, K0338+515 - K0338+560, K0338+875 - K0338+890, K0339+360 - K0339+440;
Physical Target: 2006.03 Square Meters;
Allocation: Php 32,000,000.000"
"To:
Gov. Bado Dangwa National Rd - K0324+445 - K0324+470, K0331+540 - K0331+575, K0338+515 - K0338+560, K0342+625 - K0342+665, K0344+415 - K0344+426;
Physical Target: 1317.6 Square Meters;
Allocation: Php 32,000,000.000"
|