September 3, 2020 |
FY 2020 GAA |
WIN0G03054 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Reconstruction to Concrete Pavement along Ponciano St.-Bangoy St.-Jacinto Extension St. leading to Marco Polo Hotel-Aldevino Shopping Center-Madrazo Fruit Stands-Central Bank-F. Torres St., Davao City
Physical Target:
CW1: 2.042 lane km (Rehabilitation of Paved Road)
Allocation:
TOTAL: P 27,993,000.00
CW1: P 27,433,140.00 (Rehabilitation of Paved Road)
EAO: P 559,860.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Reconstruction to Concrete Pavement along Ponciano St.-Bangoy St.-Jacinto Extension St. leading to Marco Polo Hotel-Aldevinco Shopping Center-Madrazo Fruit Stands-Central Bank-F. Torres St., Davao City
Physical Target:
CW1: 2.364 lane km (Rehabilitation of Paved Road)
Allocation:
TOTAL: P 27,993,000.00
CW1: P 27,433,140.00 (Rehabilitation of Paved Road)
EAO: P 559,860.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03050 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Drainage/Protection Works - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage System, Lampa Lapidan Elementary School, Brgy. Mandug, Davao City
Physical Target:
CW1: 330.00 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,940,000.00 (Construction of Drainage Structure)
EAO: P 60,000.00
TO: Local Program - Flood Control and Drainage - Drainage/Protection Works - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage System, Lampa Lapidan Elementary School, Brgy. Mandug, Davao City
Physical Target:
CW1: 273.00 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,940,000.00 (Construction of Drainage Structure)
EAO: P 60,000.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03061 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay - Davao-Cotabato Old Rd -
K1522+968 - K1524+319
Physical Target:
CW1: 2.268 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 600,000.00
TO: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay - Davao-Cotabato Old Rd -
K1522+968 - K1523+535
Physical Target:
CW1: 2.268 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 600,000.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03055 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay - Davao-Cotabato Old Rd -
K1520+(-521) - K1521+067
Physical Target:
CW1: 2.200 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 600,000.00
TO: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay - Davao-Cotabato Old Rd -
K1520+(-521) - K1520+029
Physical Target:
CW1: 2.200 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 600,000.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03070 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Drainage/Protection Works - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage System, T. Awad Echevarria Elementary School, Brgy. Mandug, Davao City
Physical Target:
CW1: 520.00 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,940,000.00 (Construction of Drainage Structure)
EAO: P 60,000.00
TO: Local Program - Flood Control and Drainage - Drainage/Protection Works - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage System, T. Awad Echevarria Elementary School, Brgy. Mandug, Davao City
Physical Target:
CW1: 262.00 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,940,000.00 (Construction of Drainage Structure)
EAO: P 60,000.00 |
September 1, 2020 |
2020 |
WIN0C03976 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Bulacan 2nd District Engineering Office |
Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building, St. Bernadette Children's Hospital, Brgy. Muzon, San Jose Del Monte City, Bulacan |
August 27, 2020 |
FY 2020 GAA |
WIN0F06244 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202927000
Project ID: P00446988LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitaton/Reconstruction of Roads with Slips,
Slope Collapse and landslide along
San Jose - Port Barton Road Section
K0013+170 - K0013+300
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure - 2,240.00 sq.m
Allocation - Php 40.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0013+140 - K0013+210
Palawan
Physical target: CW1 - Construction of Road Slope
Protection Structure: 1,719.05 sq.m
Allocation: Php 40.00 Million
|
August 27, 2020 |
FY 2020 GAA |
WIN0F06246 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202930000
Project ID: P00446993LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Reconstruction/Rehabilitation of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0014+510 - K0014+790
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 2,523.00 sq.m
Allocation: Php 45.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0014+840.00 - K0014+921.40
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 1,945.75 sq.m
Allocation: Php 45.00 Million
|
August 27, 2020 |
CY 2020 |
WIN0F06252 |
UACS No. 300102200371000 |
March 12, 2020 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
UACS No. 300102200371000
Project ID.: P00445753LZ
Local Infrastructure Program
School Buildings
Completion/Rehabilitation of School Building and Other Improvements, Golden Acres Elementary School,
Talon 3, Las Piñas City
Physical Target: CW1 = Rehabilitation/Major Repair of School Building
Unit Cost (P’000) = P 14,850.00/Building
Allocation = P 14,850,000.00
EAO = P 150,000.00
Total (P’000) = P 15,000,000.00
As Modified
Local Infrastructure Program
School Buildings
Completion/Rehabilitation of School Building and Other Improvements, Golden Acres Elementary School,
Talon 1, Las Piñas City
Physical Target: CW1 = Rehabilitation/Major Repair of School Building
Unit Cost (P’000) = P 14,850.00/Building
Allocation = P 14,850,000.00
EAO = P 150,000.00
Total (P’000) = P 15,000,000.00
WIN0F06252
|
August 27, 2020 |
CY 2020 |
WIN0F06256 |
UACS No. 300102200370000 |
February 19, 2020 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 300102200370000
Project ID.: P0041233lz
Local Program
Local – Buildings and Other Structures – School Buildings – Local Infrastructure Program
Rehabilitation of School Building, ALS, Brgy. Tunasan, Muntinlupa City
Physical Target: CW1 = Rehabilitation/Major Repair of School Building = 1 No. of Building
Unit Cost (P’000) = P 1,980 / building
Allocation = P 1,980.00
EAO = P 20.00
Total (P’000) = P 2,000.00
As Modified
Local Program – Building and other Structures
Local – Buildings and Other Structures – School Buildings – Local Infrastructure Program
Rehabilitation of School Building, ALS, Brgy. Bayanan, Muntinlupa City
Physical Target: CW1 = Rehabilitation/Major Repair of School Building – 1 No. of Building
Unit Cost (P’000) = P 1,980/building
Allocation = P 1,980.00
EAO = P 20.00
Total (P’000) = P 2,000.00
WIN0F06256
|
August 27, 2020 |
FY 2020 GAA |
WIN0F06232 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300117205397000
Project ID: P00447725LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Local Infrastructure Program
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
Langongan - Roxas Road Section
Palawan
K0099+470 - K0099+525
K0099+717 - K0099+770
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 3,936.00 sq.m
Allocation: 68.885 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
Langongan - Roxas Road Section
Palawan
K0099+480 - K0099+570
K0099+730 - K0099+830.30
Physical Target: CW1- Construction of Road Slope
Protection Structure: 3,145.77 sq.m.
Allocation: Php 68.885 Million
|
August 27, 2020 |
FY 2020 GAA |
WIN0F06233 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202938000
Project ID: P00447007LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0016+950 - K0017+020,
K0017+700 - K0017+750
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 2,240.00 sq.m.
Allocation: Php 40.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0017+100.00 - K0017+161.80
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 1,730.73 sq.m
Allocation: Php 40.00 Million
|
August 27, 2020 |
FY 2020 |
WIN0G03005 |
310108100447000 |
June 3, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310108100447000
Projects ID: P00400095MN
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary Roads
Rizal-Dakak-Dapitan Coastal Loop Rd
K1827+194 - K1827+325.20
Physical Target:
CW-1- Construction of Road Slope Protection Structure: 3,345.80 sq.m.
Unit Cost: P 7,323.00/sq.m
EAO: P 500,000.00
Allocation: P 25,000,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G03008 |
320101105350000 |
June 3, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 320101105350000
Project ID: P00420457MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/extension of flood control structure (revetment) along Dapitan River, Tutua-Polo Section, (2+398.09 - 2+666.25), Zamboanga del Norte
CW1 - Construction of Revetment: 268.16 lm
Unit Cost: P 182,726.73/lm
EAO: P 1,000,000.00
Allocation: P 50,000,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G02946 |
310112100226000 |
June 10, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310112100226000
Project ID: P00400400MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
Piñan - Mutia Rd
K1822+572 - K1823+541
(S01035MN)
Chainage 000 - Chainage 548
CW1 - Construction of Drainage Structure along Road: 1,376.00 lm.
Unit Cost: P 10,480.16/lm
ROW:455.00 sq.m.
Unit Cost: P 1,000.00/sq.m
EAO: P 294,300.00
Allocation: P 15,170,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G02967 |
300117207298000 |
June 3, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 300117207298000
Project ID: P00444004MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Del Pilar Brgy. Road, Piñan, Zamboanga del Norte
Physical Target:
CW-1- Construction of Concrete Road: 1.0062 lane km
Unit Cost: P 7,315,000.00/Lane km
EAO: P 74,350.00
Allocation: P 7,435,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G02854 |
310108100446000 |
March 16, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310108100446000
Projects ID: P00400094MN
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary Roads
Rizal-Dakak-Dapitan Coastal Loop Rd
K1825+600 - K1825+831.90
Physical Target:
CW-1- Construction of Road Slope Protection Structure: 4,555.57 sq.m.
Unit Cost: P 7,529.24/sq.m
EAO: P 700,000.00
Allocation: P 35,000,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G02976 |
300204100574000 |
June 3, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 300204100574000
Project ID: P00431554MN
CSSP: Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
Barangay San Juan-Dampalan - San Isidro Road Connecting National Road and Marapong in support of Rubber, Coconut and Abaca Industries, Sergio Osmeña, Zamboanga del Norte
CW1 - Construction of Concrete Road: 0.6184 lane km.
Unit Cost: P 15,847,000.00/lane km.
EAO: P 200,000.00
Allocation: P 10,000,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G02970 |
310105100467000 |
June 11, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310105100467000
Project ID: P00400623MN
Organizational Outcome 1:
Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Jct Pulauan Port Rd
K1827+(-320) - K1827+(-256),
K1828+215 - K1828+421.30
CW1 - Reconstruction from Pave to Concrete: 0.5406 lane km.
Unit Cost: P 8,016,200.00/lane km.
EAO: P 88,440.00
Allocation: P 4,422,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G02988 |
310202100659000 |
June 18, 2020 |
Region IX |
Zamboanga City 2nd District Engineering Office |
'UACS No. 310202100659000
Project ID: P00400305MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Zamboanga City - Labuan - Limpapa Rd
K1955+021 - K1955+081,
K1955+205 - K1955+216,
K1957+244 - K1957+540,
K1957+355 - K1957+540
CW1 - Road Widening:.0.572 lane km.
Unit Cost: P 14,620,468.80/lane km.
ROW: 50,000.00 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 331,700.00
Excess: P 7,890,391.84
Allocation: P 31,585,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G02944 |
310102100559000 |
June 11, 2020 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310102100559000
Project ID: P00400515MN
Organizational Outcome 1:
Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Zamboanga City - Labuan - Limpapa Rd
K1958+274 - K1958+362,
K1958+362 - K1958+456,
K1958+456 - 1959+246,
K1959+282 - K1959+853,
K1959+945 - K1960+776,
K1960+776 - K1961+000,
K1961+000 - K1961+290
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 9.326 lane km.
Unit Cost: P 5,254,128.244/lane km.
EAO: P 1,000,000.00
Allocation: P 50,000,000.00 |
August 27, 2020 |
FY 2020 GAA |
WIN0F06234 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300117205398000
Project ID: P00447729LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Local Infrastructure Program
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
Langongan - Roxas Road Section
Palawan
K0100+290 - K0100+430,
K0101+192 - K0101+309
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 5,075.00 sq.m
Allocation: Php 88.665 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
Langongan - Roxas Road Section
Palawan
K0100+310.00 - K0100+440.00,
K0101+120.00 - K0101+202.90
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 4,052.81 sq.m
Allocation: Php 88.665 Million
|
August 27, 2020 |
FY 2020 |
WIN0G02943 |
310201100483000 |
June 5, 2020 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310201100483000
Project ID: P00400266MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pagadian City-Zamboanga City Rd -
K1911+327.88 - K1911+767.25
K1911+789.27 - K1913+260
CW1 - Road Widening: 3.82026 lane km.
Unit Cost: P 15,661,237.72/lane km.
ROW: 1,800.00 sq. m.
Unit Cost: P 20,000/sq. m.
EAO: P 2,170,000.00
Allocation: P 98,000,000.00 |
August 27, 2020 |
FY 2020 GAA |
WIN0F06237 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300117205396000
Project ID: P00447723LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Local Infrastructure Program
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
Langongan - Roxas Road Section
Palawan
K0098+150 - K0098+350,
K0099+445 - K0099+470
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 4,274.00 sq.m
Allocation: Php 74.750 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
Langongan - Roxas Road Section
Palawan K0098+160.00 - K0098+330.00
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 3,404.15 sq.m
Allocation Php 74.750 million |
August 27, 2020 |
FY 2020 |
WIN0G03002 |
300116202155000 |
June 18, 2020 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300116202155000
Project ID: P00443224MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Parang Parang - Dita Road, Brgy. DIta, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 9.866 lane km.
Unit Cost: P 9,781,000.00/lane km.
EAO: P 3,500,000.00
Allocation: P 100,000,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G03001 |
300113200028000 |
June 26, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300113200028000
Project ID: P00443204MN
Local Program - National Roads and Bridges -National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Buayan Br. (Parallel Br.) along Lanao - Pagadian - Zamboanga City Rd
Physical Target:
CW-1 - Construction of Parallel Bridge: 609.033 sq.m.
Unit Cost: P 33,791.27/sq.m.
EAO: P 420,000.00
Allocation: P 21,000,000.00 |
August 27, 2020 |
FY 2020 |
WINOG03013 |
320102101360000 |
June 16, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102101360000
Project ID: P00420642MN
OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of flood control structures (revetment wall) along Sibuguey River (Upstream), Sta. 0+000 - Sta. 0+191.80, Brgy. STa. Barbara, Imelda, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Revetment: 191.80 lm.
Unit Cost: P 111,509.49/lm
EAO: P 436,480.00
Allocation: P 21,824,000.00
|
August 27, 2020 |
FY 2020 GAA |
WIN0F06238 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. 300117205400000
Project Id: P00447735LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Local Infrastructure Program
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
Langongan - Roxas Road Section
Palawan
K0104+810 - K0104+935,
K0105+243 - K0105+343
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 3,787 sq.m
Allocation : Php 74.750 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
Langongan - Roxas Road Section
Palawan
K0104+780 - K0104+860,
K0105+180 - K0105+282
Physical Target: CW1 - Construction of Roads Slope
Protection Structure: 3,409.65 sqm.
Allocation: Php 74.750 million |
August 27, 2020 |
FY 2020 |
WIN0G03012 |
320102101364000 |
June 16, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102101364000
Project ID: P00420646MN
OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Rehabilitation of Flood Control Structure along Sibuguey River, Sta. 0+000 - Sta. 0+104.50, Brgy. Pilar, Diplahan, Zamboanga Sibugay
Physical Target:
CW-1 - Rehabilitation/ Major repair of Flood Control Structure: 104.50 lm.
Unit Cost: P 123,226.79/lm
EAO: P 262,800.00
Allocation: P 13,140,000.00 |
August 27, 2020 |
FY 2020 GAA |
WIn0F06236 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202939000
Project ID: P00447009LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0017+910 - K0017+970,
K0018+030 - K0018+120
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 2,240 sq.m.
Allocation: Php 40.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0018+307.90 - K0018+427.00
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 1,730.80 sq.m
Allocation Php 40.00 Million |
August 27, 2020 |
FY 2020 |
WIN0G03018 |
320101105353000 |
June 16, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No.320101105353000
Project ID: P00420460MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood COntrol for prevention and mitigation along Sibuguey River, Brgy. Balugo - Brgy. Poblacion, Imelda, Zamboanga Sibugay, Sta. 0+000 - Sta. 0+178.80
CW1 - Construction of Flood Mitigation Structure: 178.80 lm
Unit Cost: P 219,239.37/lm
EAO: P 800,000.00
Allocation: P 40,000,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G03021 |
320102101355000 |
June 16, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102101355000
Project ID: P00420637MN
OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of flood control structure (revetment wall) along Sibuguey River (Upstream), Sta. 0+000 - Sta. 0+192, Barangay Conception, Alicia, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Revetment: 192 lm.
Unit Cost: P 86,770.83/lm
EAO: P 340,000.00
Allocation: P 17,000,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G03019 |
320102101363000 |
June 16, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102101363000
Project ID: P00420645MN
OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Rehabilitation of Flood Control Structure along Sibuguey River (Upstream), Sta. 0+167 - Sta. 0+291.70, Barangay Paradise, Diplahan, Zamboanga Sibugay
Physical Target:
CW-1 - Rehabilitation/ Major Repair of Flood Control Structure: 124.70 lm.
Unit Cost: P 117,882.92/lm
EAO: P 300,000.00
Allocation: P 15,000,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G03014 |
320102101358000 |
June 16, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102101358000
Project ID: P00420640MN
OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of flood control structures (revetment wall) along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road part of Sibuguey River (Upstream), Sta. 0+000 - Sta. 0+052.20, Brgy. Paradise, Diplahan, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Revetment: 52.20 lm.
Unit Cost: P 118,294.64/lm
EAO: P 126,020.00
Allocation: P 6,301,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G03017 |
320102101357000 |
June 16, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102101357000
Project ID: P00420639MN
OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure along Lanao - Pagadian - Zamboanga City Road, part of Sibuguey River (Upstream), Sta. 0+191.80 - Sta. 0+402.30, Brgy. Sta. Barbara, Imelda, Zamboanga Sibugay
Physical Target:
CW-1 - Rehabilitation/ Major Repair of Flood Control Structure: 210.50 lm.
Unit Cost: P 116,389.55/lm
EAO: P 500,000.00
Allocation: P 25,000,000.00 |
August 26, 2020 |
FY 2020 GAA |
WIN0F06248 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202932000
Project ID: P00446997LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0015+300 - K0015+350
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 1,558.00 sq.m.
Allocation: Php 30.00 Millionn
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K00156.50 - K0015+220
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 1,276.85 sq.m.
Allocation: Php 30.00 Million
|
August 26, 2020 |
FY 2020 GAA |
WIN0F06247 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202931000
Project ID: P00446995LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local projects
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0014+880 - K0015+00,
K0015+100 - K0015+200
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 2,239.00 sq.m.
Allocation: Php 40.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0015+232 - K0015+291.90
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 1,730.13 sq.m.
Allocation: Php 40.00 Million
|
August 26, 2020 |
FY 2020 GAA |
WIN0F06240 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202936000
Project ID: P00447003LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and landslide along
San Jose - Port Barton Road Section
K0016+500 - K0016+630 - K0016+650
Palawan
Physical Target - CW1: Construction of Road Slope
Protection Structure: 2,240.00 sq.m.
Allocation: Php 40.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0016+770 - K0016+830
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 1,724.80 sq.m.
Allocation : Php 40.00 Million
|
August 26, 2020 |
FY 2020 GAA |
WIN0F06241 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202929000
Project ID: P00446992LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Construction/Repair/rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0014+000 - K0014+120
K0014+200 - K0014+300
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 2,356.00 sq.m.
Allocation: Php 45.00 million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0014+118.90 - K0014+200
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 1,956.10 sq.m.
Allocation: Php 45.00 Million
|
August 26, 2020 |
FY 2020 GAA |
WIN0F06243 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202933000
Project ID: P00446999LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0015+550 - K0015+700
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 2,533.00 sq.m.
Allocation: Php 45.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0015+723.00 - K0015+770.00
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 1,953.59 sq.m.
Allocation: Ph 45.00 Million
|
August 26, 2020 |
FY 2020 GAA |
WIN0F06242 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202935000
Project ID: P00447001LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0016+380 - K0016+450
Palawan
Physical Target: CW1 - Construction of Road Slope
Protecton Structure: 1,672.00 sq.m.
Allocation: Php 30.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0015+415.00 - K0015+456.80
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 1,286.03 sq.m.
Allocation: Php 30.00 Million |
August 26, 2020 |
FY 2020 |
WIN0G03006 |
310305100838000 |
June 22, 2020 |
Region IX |
Regional Office IX |
UACS No. 310305100838000
Project ID: P00401430MN
OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
Polo Parallel br. along Jct. Polo - Dapitan Park Natl Rd (Phase II)
CW1 - Construction of Parallel Bridge: 3,468.744 sq.m.
Unit Cost: P 52,910.71/sq.m.
EAO: P 6,423,680.33
Allocation: P 190,000,000.00 |
August 26, 2020 |
FY 2020 |
WIN0G02929 |
310201100472000 |
May 6, 2020 |
Region IX |
Regional Office IX |
UACS No. 310201100472000
Project ID: P00400312MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Dipolog-Sindangan-Liloy Rd
K1910+383 - K1911+886.94,
K1912+028.38 - K1912+102.96,
K1912+245 - K1913+420
CW1 - Road Widening: 5.507 lane km.
Unit Cost: P 16,416,972.33/lane km.
ROW: 26,838.14677 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 3,164,289.33
Allocation: P 101,624,000.00 |
August 26, 2020 |
FY 2020 |
WIN0G02920 |
310212100121000 |
May 11, 2020 |
Region IX |
Regional Office IX |
UACS No. 310212100121000
Project ID: P00401552MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Tertiary Roads
Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Road (S01184MN)
Sta. 9+960.00 - Sta. 11+917.34,
Sta. 1738+376.00 - Sta. 1738+951.28,
Sta. 1742+127.00 - Sta. 1743+678.44,
Sta. 1743+880.00 - Sta. 1744+241.86,
Sta. 1747+308.00 - Sta. 1747+560.00
CW1 - Paving of Unpaved Roads: 8.96 lane km.
Unit Cost: P 16,174,000.00/lane km.
EAO: P 5,072,463.77
Allocation: P 150,000,000.00 |
August 26, 2020 |
FY 2020 |
WIN0G02923 |
310212100122000 |
May 11, 2020 |
Region IX |
Regional Office IX |
UACS No. 310212100122000
Project ID: P00400478MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Tertiary Roads
Zamboanga del Sur Coastal Rd - (S01168MN)
Chainage 197 - Chainage 400,
Chainage 7891.84 - Chainage 8540,
Chainage 12835 - Chainage 14280,
Chainage 16140 - Chainage 18845
CW1 - Paving of Unpaved Roads: 10.00232 lane km.
Unit Cost: P 14,315,149.38/lane km.
ROW: 6,012.768233 sq.m.
Unit Cost: 300/sq.m.
EAO: P 5,011,464.67
Allocation: P 150,000,000.00 |
August 26, 2020 |
FY 2020 |
WIN0G02891 |
320101104214000 |
May 26, 2020 |
Region IX |
Regional Office IX |
UACS No. 320101104214000
Project ID: P00420372MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control along Kabasalan River (Phase II),
0+000.00 to 0+583.00, FL Pena, Kabasalan, Zamboanga Sibugay
CW1 - Construction of Flood Mitigation Structure: 583.00 lm
Unit Cost: P 168,316,723.30/lm
ROW : 1,456.158567 sq. m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,434,502.74
Allocation: P 102,000,000.00 |
August 26, 2020 |
FY 2020 |
WIN0G02888 |
320101104215000 |
May 26, 2020 |
Region IX |
Regional Office IX |
UACS No. 320101104215000
Project ID: P00420373MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Project at Dipolo River - Bridge Approach, Brgy Upper Timonan, Dumingag, Zamboanga del Sur
CW1 - Construction of Flood Mitigation Structure: 560.00 lm
Unit Cost: P 178,374.4784/lm
ROW : 5,380.507633 sq. m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,496,139.78
Allocation: P 105,000,000.00 |
August 26, 2020 |
FY 2020 |
WIN0G02881 |
310104100190000 |
May 13, 2020 |
Region IX |
Regional Office IX |
UACS No. 310104100190000
Project ID: P00401407MN
Organizational Outcome 1:
Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Pagadian City - Zamboanga City Rd
K1850+980 - K1854+360
CW1 - Reconstruction to Concrete Pavement: 10.12 lane km.
Unit Cost: P 9,697,686.14/lane km.
EAO: P 3,434,920.43
Excess: 424,495.83
Allocation: P 102,000,000.00 |
August 26, 2020 |
FY 2020 |
WIN0G02918 |
310201100477000 |
May 26, 2020 |
Region IX |
Regional Office IX |
UACS No. 310201100477000
Project ID: P00400318MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pagadian City - Zamboanga City Rd
K1684+271 - K1684+620.09,
K1684+751.28 - K1689+165.03,
K1689+323.67 - K1690+490.97,
K1690+613.89 - K1690+900
CW1 - Road Widening:.12.432 lane km.
Unit Cost: P 13,928,019.48/lane km.
ROW: 69,288.33983 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 6,060,359.85
Allocation: P 200,000,000.00 |
August 26, 2020 |
2020 |
310209100199000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Batanes District Engineering Office |
Network Development - Off-Carriageway Improvement - Tertiary Roads - Airport-Mauyen Port Rd - K0009 + 441 - K0010 + 537 |
August 26, 2020 |
2020 |
310112100172000 |
GAA FY 2020 |
February 12, 2020 |
Region II |
Batanes District Engineering Office |
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads - Basco-Contracosta Div Rd - (S00010BN) Chainage 120 - Chainage 564 |
August 26, 2020 |
2020 |
300103202116000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Batanes District Engineering Office |
Buildings and Other Structures - Multipurpose / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Multi-Purpose Building (Land Transportation Office (LTO) - Annex Building), Brgy. Kayvaluganan, Basco, Batanes |
August 26, 2020 |
2020 |
310209100201000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Batanes District Engineering Office |
Network Development - Off-Carriageway Improvement - Tertiary Roads - Mayan-Mauyen Port Rd - K0005 + 040.40 - K0005 + 310.50 |
August 26, 2020 |
2020 |
310112100175000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Batanes District Engineering Office |
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads - San Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K00005 + 480 - K0005 + 504.93, K0005 + 586 - K0005 + 720, K0005 + 820 - K0006 + 423 |
August 26, 2020 |
2020 |
300202100160000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Batanes District Engineering Office |
Convergence and Special Support Program - Construction / Improvement of Access Roads leading to Seaports - Access Road leading to Tachimus Port, Itbayat, Batanes |
August 26, 2020 |
2020 |
310109100359000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Batanes District Engineering Office |
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slip, Slope Collapse, and Landslide - Tertiary Roads - Uyugan-Mahatao Interior Rd - K0029 + 046 - K0029 + 118, K0029 + 247 - K0029 + 255, K0032 + 300 - K0032 + 325, K0030 + (-290) - K0030 + (-223) |
August 25, 2020 |
FY 2020 |
WIN0G02940 |
300111200296000 |
June 5, 2020 |
Region IX |
Isabela City District Engineering Office |
UACS No. 300111200296000
Project ID: P00442674MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Rehabilitation/Upgrading of Damaged Paved Roads (Reblocking) along Basilan Circumferential Road (Lamitan - Tipo-Tipo -Tumahubong Road Section)
Sta. 51+600 - Sta. 52+355
Physical Target:
CW-1 - Preventive Maintenance of Road: Concrete Reblocking: 1.364 lane km.
Unit Cost: P 14,369,500.00/lane km.
EAO: P 400,000.00
Allocation: P 20,000,000.00 |
August 25, 2020 |
FY 2020 |
WIN0G02975 |
300111200295000 |
June 5, 2020 |
Region IX |
Isabela City District Engineering Office |
UACS No. 300111200295000
Project ID: P00442685MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Rehabilitation/Upgrading of Damaged Paved Roads (Reblocking) along Basilan Circumferential Road (Lamitan - Tipo-Tipo -Tumahubong Road Section)
Sta. 36+600 - Sta. 37+200
Physical Target:
CW-1 - Preventive Maintenance of Road: Concrete Reblocking: 1.026 lane km.
Unit Cost: P 14,327,490.00/lane km.
EAO: P 300,000.00
Allocation: P 15,000,000.00 |
August 25, 2020 |
2020 |
WIN0C03971 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 310201100447000
Project ID: P00400336LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development – Road Widening – Primary Roads - Daang Maharlika (LZ) – K0324 + 284 – K0326 + 398, K0326 + 598 – K0327 +703, K0326 + 852 – K0327 + 351
Physical Target: CW1 – Road Widening – 5.586 Lane Km
Amount: Php 90,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System - Network Development – Road Widening – Primary Roads - Daang Maharlika (LZ) – K0324 + 284 – K0326 + 300
Physical Target: CW1 – Road Widening – 4.126 Lane Km
CW2 – Construction of Road Slope Protection Structure – 6,194.8 Square meters
Amount: Php 90,000,000.00
|
August 25, 2020 |
2020 |
WIN0C03879 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310205100402000
Project ID: P00402358LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/ New Roads – Asid-Tigbao-Bara-Malbug Road, Milagros Section, Masbate
Physical Target: CW1 - Construction of Concrete Road – 3.048 Lane Km
CW2 – Construction of Drainage Structure along Road – 1,838.53 lineal meters
ROW – ROW Acquisition – 37,491.42 Square meters
Amount: Php 110,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/ New Roads – Asid-Tigbao-Bara-Malbug Road, Milagros Section, Masbate
Physical Target: CW1 - Construction of Concrete Road – 4.134 Lane Km
CW2 – Construction of Drainage Structure along Road – 1,838.53 lineal meters
ROW – ROW Acquisition – 37,491.42 Square meters
Amount: Php 110,000,000.00
Increase in physical targets and unit cost of civil works.
Decrease of unit cost of ROW component
|
August 25, 2020 |
2020 |
WIN0C03867 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 31010910041300
Project ID: P00400243LZ
FROM:
OO1: Ensure Safe and Reliable National Road System – Asset preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Tertiary Road – Comun-Inarado-Peñafrancia Rd – K0521 +768 – K0522 + 030
Physical Target: CW1 - Construction of Road Slope Protection – 3,504 Sq.m.
Amount: Php 20,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System – Asset preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Tertiary Road – Comun-Inarado-Peñafrancia Rd – K0521 +768 – K0522 + 030
Physical Target: CW1 - Construction of Road Slope Protection – 2,590 Sq.m.
CW2 – Reconstruction of Concrete Pavement – 1.0 Lane Km
Amount: Php 20,000,000.00
|
August 25, 2020 |
2020 |
WIN0C03860 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 310111100206000
Project ID: P00400618LZ
FROM:
OO1: Ensure Safe and Reliable National Road System – Asset preservation – Construction/Upgrading/Rehabilitation of Drainage along National Roads – Secondary Roads – Legazpi City-Punta de Jesus Rd – K0532 + 899 – K0533 + 607
Physical Target: CW1 - Construction of Drainage Structure along Road – 1,416 Lineal meters.
Amount: Php 15,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System – Asset preservation – Construction/Upgrading/Rehabilitation of Drainage along National Roads – Secondary Roads – Legazpi City-Punta de Jesus Rd – K0532 + 899 – K0533 + 607
Physical Target: CW1 - Construction of Drainage Structure along Road – 624.60 Lineal meters.
Amount: Php 15,000,000.00
|
August 25, 2020 |
2020 |
WIN0C03997 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 300121200664000
Project ID: P00442721LZ
FROM:
Local Program – Water Management Facilities – Water Supply – Local Infrastructure Program – Construction of Water Supply System Level II at Banquerohan Resettlement Area, Brgy Banquerohan, Rapu-Rapu, Albay
Physical Target: CW1 - Construction of Water Supply System – 1 No. of Water Supply System
Amount: Php 4,000,000.00
TO:
Local Program – Water Management Facilities – Water Supply – Local Infrastructure Program – Construction of Water Supply System Level II at Banquerohan Resettlement Area, Brgy Banquerohan, Legazpi City, Albay
Physical Target: CW1 - Construction of Water Supply System – 1 No. of Water Supply System
Amount: Php 4,000,000.00
|
August 25, 2020 |
2020 |
WIN0C03933 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Albay 2nd Engineering Office |
WIN0C03933
UACS No.: 300104215810000
Project ID: P00447092LZ
FROM:
Local Program – Building and Other Structures – Multipurpose/Facilities – Local Infrastructure Program – Construction of Cogon, Elementary School Multi-Purpose Bldg., Legazpi City, Albay
Physical Target: CW1 - Construction of Multi-Purpose Building – 1 No. of Buildings
Amount: Php 7,500,000.00
TO:
Local Program – Building and Other Structures – Multipurpose/Facilities – Local Infrastructure Program – Construction of Gogon, Elementary School Multi-Purpose Bldg., Legazpi City, Albay
Physical Target: CW1 - Construction of Multi-Purpose Building – 1 No. of Buildings
Amount: Php 7,500,000.00
|
August 25, 2020 |
2020 |
WIN0C03941 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 300104215829000
Project ID: P00447096LZ
FROM:
Local Program – Building and Other Structures – Multipurpose/Facilities – Local Infrastructure Program – Construction of Multi-Purpose Building, Albay Farmers Bounty Village, Brgy. Camalig, Legazpi City, Albay
Physical Target: CW1 - Construction of Multi-Purpose Building – 1 No. of Buildings
Amount: Php 15,000,000.00
TO:
Local Program – Building and Other Structures – Multipurpose/Facilities – Local Infrastructure Program – Construction of Multi-Purpose Building, Albay Farmers Bounty Village, Brgy. Camalig, Albay
Physical Target: CW1 - Construction of Multi-Purpose Building – 1 No. of Buildings
Amount: Php 15,000,000.00
|
August 25, 2020 |
2020 |
WIN0C03930 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Albay 3rd Engineering Office |
UACS No.: 310305100814000
Project ID: P00401619LZ
FROM:
OO1: Ensure Safe and Reliable National Road System – Bridge – Widening of Permanent Bridges – Agos Bridge (B00279LZ) along Daang Maharlika LZ
Physical Target: CW1 – Widening of Permanent Bridges – 951.138 Square meters.
Amount: Php 100,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System – Bridge – Widening of Permanent Bridges – Agos Bridge (B00279LZ) along Daang Maharlika LZ
Physical Target: CW1 – Widening of Permanent Bridges – 364.90 Square meters.
Amount: Php 100,000,000.00
|
August 25, 2020 |
2020 |
WIN0C03872 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Albay 3rd Engineering Office |
UACS No.: 310204100744000
Project ID: P00408570LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads – Palanas-Del Rosario Road, Jovellar, Albay
Physical Target: CW1 - Construction of Concrete Road – 0 Lane Km
Amount: Php 75,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads – Palanas-Del Rosario Road, Jovellar, Albay
Physical Target: CW1 - Construction of Concrete Road – 4.23 Lane Km
Amount: Php 75,000,000.00
|
August 25, 2020 |
2020 |
WIN0C03891 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Albay 3rd Engineering Office |
UACS No.: 300117206643000
Project ID: P00447720LZ
FROM:
Local Program – Local Roads and Bridges – Local Roads – Local Infrastructure Program – Improvement of Albay-Camsur Diversion Rd. (Oas Section), Phase 2, Oas, Albay
Physical Target: CW1 - Construction of Concrete Road – 0.492 Lane km
Amount: Php 10,000,000.00
TO:
Local Program – Local Roads and Bridges – Local Roads – Local Infrastructure Program – Improvement of Albay-Camsur Diversion Rd. (Oas Section), Phase 2, Oas, Albay
Physical Target: CW1 - Construction of Concrete Road – 0.542 Lane km
Amount: Php 10,000,000.00
|
August 25, 2020 |
2020 |
WIN0C03861 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Albay 3rd Engineering Office |
UACS No.: 300117206645000
Project ID: P00447727LZ
FROM:
Local Program – Local Roads and Bridges – Local Roads – Local Infrastructure Program – Improvement of Albay-Camsur Diversion Rd. (Oas Section), Oas, Albay
Physical Target: CW1 - Construction of Concrete Road – 0.466 Lane km
Amount: Php 10,000,000.00
TO:
Local Program – Local Roads and Bridges – Local Roads – Local Infrastructure Program – Improvement of Albay-Camsur Diversion Rd. (Oas Section), Oas, Albay
Physical Target: CW1 - Construction of Concrete Road – 0.5332 Lane km
Amount: Php 10,000,000.00
|
August 25, 2020 |
2020 |
WIN0C03869 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Albay 3rd Engineering Office |
UACS No.: 300107200651000
Project ID: P00449008LZ
FROM:
Local Program – Flood Control and Drainage – Flood Control Structure Facilities – Local Infrastructure Program – Rehab/Improvement of Masarawang Flood Control Structure, Brgy. Masarawang, Guinobatan, Albay
Physical Target: CW1 – Rehabilitation/Major Repair of Flood Control Structure – 0 Lineal Meter
Amount: Php 60,000,000.00
TO:
Local Program – Flood Control and Drainage – Flood Control Structure Facilities – Local Infrastructure Program – Rehab/Improvement of Masarawag Flood Control Structure, Brgy. Masarawag, Guinobatan, Albay
Physical Target: CW1 – Rehabilitation/Major Repair of Flood Control Structure – 660 Lineal Meter
Amount: Php 60,000,000.00
|
August 25, 2020 |
2020 |
WIN0C03986 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Camarines Sur 5th District Engineering Office |
UACS No.: 300107200878000
Project ID: P00449171LZ
FROM:
Local Program – Flood Control and Drainage – Flood Control Structure Facilities – Local Infrastructure Program – Construction of Flood Control, Downstream of San Miguel Bridge, San Miguel Section (Sta. 0+506 – Sta. 0+806, right side), Nabua, Camarines Sur
Physical Target: CW1 – Construction of Flood Mitigation Structure – 388.0 Lineal Meter
Amount: Php 50,000,000.00
TO:
Local Program – Flood Control and Drainage – Flood Control Structure Facilities – Local Infrastructure Program – Construction of Flood Control, Downstream of San Miguel Bridge, San Miguel Section (Sta. 0+506 – Sta. 0+894, right side), Nabua, Camarines Sur
Physical Target: CW1 – Construction of Flood Mitigation Structure – 388.0 Lineal Meter
Amount: Php 50,000,000.00
|
August 25, 2020 |
2020 |
WIN0C03937 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Camarines Sur 5th District Engineering Office |
UACS No.: 300107200879000
Project ID: P00449172LZ
FROM:
Local Program – Flood Control and Drainage – Flood Control Structure Facilities – Local Infrastructure Program – Rehabilitation at Barit River, Upstream, Mampuag Bridge (Sta. 0+500 – Sta. 0+800, right side), Santiago Old, Nabua, Camarines Sur
Physical Target: CW1 – Construction of Flood Mitigation Structure – 370.0 Lineal Meter
Amount: Php 50,000,000.00
TO:
Local Program – Flood Control and Drainage – Flood Control Structure Facilities – Local Infrastructure Program – Rehabilitation at Barit River, Upstream, Mampuag Bridge (Sta. 0+059 – Sta. 0+455, right side), Santiago Old, Nabua, Camarines Sur
Physical Target: CW1 – Construction of Flood Mitigation Structure – 396.0 Lineal Meter
Amount: Php 50,000,000.00
|
August 25, 2020 |
2020 |
WIN0C04000 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Camarines Sur 5th District Engineering Office |
UACS No.: 300107200880000
Project ID: P00449173LZ
FROM:
Local Program – Flood Control and Drainage – Flood Control Structure Facilities – Local Infrastructure Program – Construction of Flood Control, Upstream of Cresini Bridge, San Francisco Section (Sta. 0+358 – Sta. 0+558, right side), Iriga City, Camarines Sur
Physical Target: CW1 – Construction of Flood Mitigation Structure – 340.0 Lineal Meter
Amount: Php 50,000,000.00
TO:
Local Program – Flood Control and Drainage – Flood Control Structure Facilities – Local Infrastructure Program – Construction of Flood Control, Upstream of Cresini Bridge, San Francisco Section (Sta. 0+358 – Sta. 0+728, right side), Iriga City, Camarines Sur
Physical Target: CW1 – Construction of Flood Mitigation Structure – 370.0 Lineal Meter
Amount: Php 50,000,000.00
|
August 25, 2020 |
FY 2020 GAA |
WIN0F06245 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No.: 310108100387000
Project ID: P00400140LZ
OO1: Ensure Safe and Reliable national Road System
Asset Preservation - Rehabilitation/Reconstruction of
Roads with Slips, Slope Collapse, and
Landslide - Secondary Roads
FROM:
Sibuyan Circumferential Road,
K0047+950 - K0048+050
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 1,666.67 sq.m
Allocation: Php 30.00 Million
TO:
Sibuyan Circumferential Road
K0047+950 - K0047+997.55
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 1,263.64 sq.m
Allocation: Php 30.00 Million
|
August 25, 2020 |
FY 2020 GAA |
WIN0F06250 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202928000
Project ID: P00446990LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section,
K0013+360 - K0013+500,
Palawan
Phtsical Target: CW1 - Construction of Road Slope
Protection Structure: 2,239.00 sq.m
Allocation: Php 40.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slipsa,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0013+250 - K0013+336.30,
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure : 1,717.55 sq.m
Allocation Php 40.00 Million |
August 25, 2020 |
2020 |
WIN0C03943 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Masbate 3rd District Engineering Office |
UACS No.: 310102100506000
Project ID: P00402624LZ
FROM:
OO1: Ensure Safe and Reliable National Road System – Asset preservation – Preventive Maintenance – Secondary Roads – Masbate-Cataingan-Placer Rd – K0038+000 – K0040+000
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay – 4.046 Lane Km
Amount: Php 50,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System – Asset preservation – Preventive Maintenance – Secondary Roads – Masbate-Cataingan-Placer Rd – K0021+000 – K0021+253, K0021+267 – K0021+790, K0022+132 – K0023+220
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay – 3.820 Lane Km
Amount: Php 50,000,000.00
|
August 25, 2020 |
FY 2020 GAA |
WIN0F06239 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No: 300116202925000
Project ID: P00446984LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Construction/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San jose - Port Barton Road Section,
K0010+700 - K0010+850
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 2,240.00 sq.m
Allocation: Php 40.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0010+711.40 - K0010+795
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 1,718.45 sq.m
Allocation: Php 40.00 Million |
August 25, 2020 |
2020 |
WIN0C03981 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Camarines Sur 5th District Engineering Office |
UACS No.: 310106100462000
Project ID: P00402072LZ
FROM:
OO1: Ensure Safe and Reliable National Road System Network Development – Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads – Nabua-Balatan Rd – K0481 + 279 + K0481 + 295, K0488 + 627 – K0488 + 924, K0489 +461 – K0489 + 745
Physical Target: CW1 - Reconstruction of Concrete Pavement – 0.932 Lane Km
Amount: Php 7,500,000.00
TO:
OO1: Ensure Safe and Reliable National Road System Network Development – Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads – Nabua-Balatan Rd – K0481 + 279 + K0481 + 295, K0488 + 627 – K0488 + 924, K0489 +592 – K0489 + 745
Physical Target: CW1 - Reconstruction of Concrete Pavement – 0.932 Lane Km
Amount: Php 7,500,000.00
|
August 25, 2020 |
2020 |
WIN0C03957 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Camarines Sur 2nd District Engineering Office |
UACS No.: 300118200220000
Project ID: P00448556LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects – Construction of San Vicente Bridge, Brgy. Dalipay-Brgy. Dalipay, Milaor, Camarines Sur
Physical Target: CW1 – Construction of Concrete Bridge – 667.8 square meters
Amount: Php 60,000,000.00
TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects – Construction of San Vicente Bridge, Brgy. San Vicente-Brgy. Dalipay, Milaor, Camarines Sur
Physical Target: CW1 – Construction of Concrete Bridge – 667.8 square meters
Amount: Php 60,000,000.00
|
August 20, 2020 |
2020 |
WIN0C04009 |
GAA 2020 |
August 17, 2020 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: Kalinga - Abra Road, K0470+890 – K0471+(-005);
Physical Target: CW1 : 5,746.0 Square meters; Allocation= Php 100,000,000
To: Kalinga - Abra Road, K0470+890 – K0471+(-005);
Physical Target: CW1 : 5,174.10 Square meters;
Allocation= Php 100,000,000
|
August 20, 2020 |
2020 |
WIN0C04013 |
GAA 2020 |
August 17, 2020 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: Kalinga - Abra Road, K0499+315 – K0499+515;
Physical Target: CW1 : 5,700.0 Square meters; Allocation= Php 100,000,000
To: Kalinga - Abra Road, K0499+315 – K0499+515;
Physical Target: CW1 : 5,186.25 Square meters;
Allocation= Php 100,000,000
|
August 20, 2020 |
2020 |
WIN0C04011 |
GAA 2020 |
August 17, 2020 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Bridge across Tumbal River connecting Luba to Manabo, Abra; Physical Target: CW1: 2,590.11 Square Meters; Allocation= Php 30,000,000
To: Construction of Bridge across Tumbal River connecting Luba to Manabo, Abra; Physical Target: CW1: 3,448.71 Square Meters;
Allocation= Php 30,000,000
|
August 20, 2020 |
2020 |
WIN0C04010 |
GAA 2020 |
August 17, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Rehabilitation/Improvement of Brgy. Agbannawag Road, Tabuk City, Kalinga; Physical Target: CW1 : 0 Lane Km;
Allocation= Php 10,000,000
To: Rehabilitation/Improvement of Brgy. Agbannawag Road, Tabuk City, Kalinga; Physical Target: CW1 : 1.40 Lane Km; Allocation= Php 10,000,000
|
August 19, 2020 |
2020 |
WIN0C03964 |
GAA 2020 |
August 3, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Construction of Slope Protection along Malalao National Road, Tabuk City, Kalinga; Physical Target: CW1: 0 Lineal Meters; Allocation= Php 10,000,000
To: Construction of Slope Protection along Malalao National Road, Tabuk City, Kalinga; Physical Target: CW1: 190 Lineal Meters; Allocation= Php 10,000,000
|
August 18, 2020 |
2020 |
WIN0C03992 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Regional Office III |
Local Roads and Bridges - Local Roads
Concreting of Roads from Casiguran Town Proper Leading to Casapsapan Bay and Casapsapan to Diniog, Aurora |
August 18, 2020 |
2020 |
WIN0C03859 |
GAA 2020 |
July 19, 2020 |
Cordillera Administrative Region |
Baguio City District Engineering Office |
From: Quezon Hill Rd #1 - K0307+805 - K0307+855;
Physical Target: CW1 : 50 Lineal meters; Allocation= Php 3,477,000
To: Quezon Hill Rd #1 - K0307+795 - K0307+907;
Physical Target: CW1 : 112 Lineal meters; Allocation= Php 3,477,000
|
August 18, 2020 |
2020 |
WIN0C03954 |
GAA 2020 |
June 23, 2020 |
Cordillera Administrative Region |
Baguio City District Engineering Office |
From: Construction of Flood Mitigation Facilities along Camp Lagoon Drain Tunnel, Baguio City (Sta.0+000-Sta.0+298);
Physical Target: CW1 : 298 Lineal meters; Allocation= Php 18,500,000
To: Construction of Flood Mitigation Facilities along Camp Lagoon Drain Tunnel, Baguio City (Sta.0+173-Sta.0+340, Sta. 0+440-Sta. 0+618);
Physical Target: CW1 : 345 Lineal meters; Allocation= Php 18,500,000
|
August 18, 2020 |
2020 |
WIN0C03902 |
GAA 2020 |
July 2, 2020 |
Cordillera Administrative Region |
Baguio City District Engineering Office |
From: Construction of Sewerline, Session- Governor Pack Road, Baguio City;
Type of Work: Construction of Other Building; Physical Target: CW1 : 1 No. of Buildings; Allocation= Php 2,000,000
To: Construction of Sewerline, Session- Governor Pack Road, Baguio City;
Type of Work: Construction of Other Facilities;
Physical Target: CW1 : 1 No. of Facilities; Allocation= Php 2,000,000
|
August 18, 2020 |
2020 |
WIN0C03990 |
GAA 2020 |
July 30, 2020 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
From: Improvement of Poblacion - Langnao Road, Poblacion, Calanasan, Apayao;
Type of Work: Construction of Concrete Road; Physical Target: CW1 : 2.0 Lane Km;
Allocation= Php 100,000,000
To: Improvement of Poblacion - Langnao Road, Poblacion, Calanasan, Apayao;
Type of Work Construction of Gravel Road; Physical Target: CW1 : 2.0 Lane Km; Allocation= Php 100,000,000
|
August 18, 2020 |
2020 |
WIN0C03972 |
GAA 2020 |
July 30, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Road (Cagaluan-Calanan Section), K0481 + 866 – K0482 + 000;
Physical Target: CW1 : 10,000 Square meters; Allocation= Php 100,000,000
To: Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Road (Cagaluan-Calanan Section), K0481 + 861 – K0481 + 901;
Physical Target: CW1 : 5,075.75 Square meters;
Allocation= Php 100,000,000
|
August 18, 2020 |
2020 |
WIN0C03977 |
GAA 2020 |
July 30, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Rizal National Rd. (Romualdez-Santor-Calaocan-Sn Pascual Sect.) - K0428 + 385 - K0428 + 535;
Physical Target: CW1 : 0.30 Lane Km; Allocation= Php 4,891,000
To: Rizal National Rd. (Romualdez-Santor-Calaocan-Sn Pascual Sect.) - K0428 + 385 - K0428 + 431, K0428 + 446 - K0428 + 550; Physical Target: CW1 : 0.30 Lane Km; Allocation= Php 4,891,000
|
August 18, 2020 |
2020 |
WIN0C03998 |
GAA 2020 |
July 30, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Nambaran-Isabela Rd - K0512 + 343 - K0512 + 877, K0513 + 600 - K0514 + 284, K0516 + 000 - K0516 + 762;
Physical Target: CW1 : 5.166 Lane Km; Allocation= Php 21,781,000
To: Nambaran-Isabela Rd - K0512 + 343 - K0512 + 877, K0513 + 600 - K0514 + 284, K0516 + 000 - K0516 + 476;
Physical Target: CW1 : 3.388 Lane Km; Allocation= Php 21,781,000
|
August 18, 2020 |
2020 |
WIN0C03988 |
GAA 2020 |
July 30, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Construction/Concreting of the Tabuk City, Kalinga - Tuao, Cagayan Road via the Burayugan-San Francisco-Naruangan Section, Cagayan Road, Tabuk City, Cagayan; Physical Target: CW1 : 0 Lane Km; Allocation= Php 30,000,000
To: Construction/Concreting of the Tabuk City, Kalinga - Tuao, Cagayan Road via the Burayugan-San Francisco-Naruangan Section, Cagayan Road, Tabuk City, Kalinga; Physical Target: CW1 : 4.80 Lane Km; Allocation= Php 30,000,000
|
August 18, 2020 |
2020 |
WIN0C03974 |
GAA 2020 |
July 30, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Mt. Province Boundary - Calanan-Pinukpuk-Abbut Road, K0488 + 291 - K0488 + 416; Type of Work: Construction of Concrete Road;
Physical Target: CW1 : 0 Lane Km; Allocation= Php 100,000,000
To: Mt. Province Boundary - Calanan-Pinukpuk-Abbut Road, -K0492 + 320 - K0492 + 572; Type of Work: Construction of Road Slope Protection Structure;
Physical Target: CW1 : 5,075.75 Square meters;
Allocation= Php 100,000,000
|
August 18, 2020 |
2020 |
WIN0C03987 |
GAA 2020 |
July 30, 2020 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Luba-Sabnangan Flood Control, Luba, Abra;
Physical Target: CW1 : 0 Lineal meters;
Allocation= Php 100,000,000
To: Construction of Luba-Sabnangan Flood Control, Luba, Abra;
Physical Target: CW1 : 1,121 Lineal meters; Allocation= Php 100,000,000
|
August 18, 2020 |
2020 |
WIN0C03897 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Albay 1st Engineering Office |
UACS No.: 310108100312000
Project ID: P00400208LZ
FROM:
OO1: Ensure Safe and Reliable National Road System – Asset preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Secondary Road – Daang Maharlika Jct – Legazpi Sto. Domingo – Tabaco – Camarines Sur Bdry Rd - K0572 + 833 - K0572 + 975, K0573 + 573 - K0573 + 623, K0573 + 684 - K0573 + 749, K0574 + 067 - K0574 + 167, K0574 + 941 - K0575 + 420, K0576 + 950 - K0577 + 417, K0578 + 893 - K0578 + 968, K0579 + 120 - K0579 + 180
Physical Target: CW1 - Construction of Road Slope Protection – 21,321.60 Sq.m.
Amount: Php 110,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System – Asset preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Secondary Road – Daang Maharlika Jct – Legazpi Sto. Domingo – Tabaco – Camarines Sur Bdry Rd - K0582 + 330 – K0582 + 405, K0582 + 856 – K0582 + 889, K0582 + 910 – K0582 + 955
Physical Target: CW1 - Construction of Road Slope Protection – 6,239.62 Sq.m.
Amount: Php 110,000,000.00
|
August 18, 2020 |
2020 |
WIN0C03973 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Albay 1st Engineering Office |
UACS No.: 300204100160000
Project ID: P00330999LZ
FROM:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations – Cagraray Circumferential Road, Bacacay, Albay
Physical Target: CW1 - Construction of Concrete Road – 7.56 Lane Km
Amount: Php 150,000,000.00
TO:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations – Cagraray Circumferential Road, Bacacay, Albay
Physical Target: CW1 - Construction of Concrete Road – 2.24 Lane Km
CW2 - Construction of Gravel Road – 4.76 Lane Km
Amount: Php 150,000,000.00
|
August 18, 2020 |
2020 |
WIN0C03779 |
FY 2020 GAA RA 11465 |
January 20, 2020 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 300103202499000
Project ID: P00446434LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects – Rehabilitation of Multi-Purpose Building, Brgy. Buinobatan, Bato, Catanduanes
Physical Target: CW1 – Rehabilitation/Major Repair of Multi-Purpose Building – 1.0 Number of Building
Amount: Php 6,000,000.00
TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects – Rehabilitation of Multi-Purpose Building, Brgy. Guinobatan, Bato, Catanduanes
Physical Target: CW1 – Rehabilitation/Major Repair of Multi-Purpose Building – 1.0 Number of Building
Amount: Php 6,000,000.00
|
August 18, 2020 |
2020 |
WIN0C03793 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 300104215929000
Project ID: P00441620LZ
FROM:
Local Program – Building and Other Structures – Multipurpose/Facilities – Local Infrastructure Program – Construction of La Purisima High School, Multi-purpose Building, Brgy. La Purisma, Pili, Camarines Sur
Physical Target: CW1 - Construction of Multi-Purpose Building – 1 No. of Buildings
Amount: Php 3,000,000.00
TO:
Local Program – Building and Other Structures – Multipurpose/Facilities – Local Infrastructure Program – Construction of Multi-purpose Building, Brgy. La Purisma, Pili, Camarines Sur
Physical Target: CW1 - Construction of Multi-Purpose Building – 1 No. of Buildings
Amount: Php 3,000,000.00
|
August 18, 2020 |
FY 2020 |
WIN0G03022 |
310211100058000 |
May 11, 2020 |
Region IX |
Regional Office IX |
UACS No. 310211100058000
Project ID: P00400476MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Secondary Roads
Zamboanga West Coastal Rd (Sibuco-Sirawai Section) - (S01166MN)
Chainage 9029.87 - Chainage 10675;
CW1 - Paving of Unpaved Roads: 3.290 lane km.
Unit Cost: P 43,974,000.00/lane km.
ROW: 870.5271333 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 5,063,632.33
Allocation: P 150,000,000.00 |