August 21, 2019 |
FY 2019 GAA |
WIN9G02651 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Regional Office XI |
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Road Widening (2-4 lanes) along Surigao del Sur Bdry-Davao Or. Coastal Road -
K1661+140 - K1663+540, K1664+167 - K1664+765
Physical Target:
CW1: 6.000 Lane Km (Road Widening)
Allocation:
TOTAL: P 78,000,000.00
CW1: P 75,270,000.00 (Road Widening)
EAO: P 2,730,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Road Widening (2-4 lanes) along Surigao del Sur Bdry-Davao Or. Coastal Road -
K1661+160 - K1661+920, K1662+940 - K1663+540,
K1664+167 - K1664+765
Physical Target:
CW1: 3.914 Lane Km (Road Widening)
CW2: 484.58 sq. m. (Construction of Road Slope Protection Structure)
ROW: 26,028.10 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 78,000,000.00
CW1: P 54,887,400.00 (Road Widening)
CW2: P 13,145,100.00 (Construction of Road Slope Protection Structure)
ROW: P 7,500,000.00 (ROW Acquisition)
EAO: P 2,467,500.00 |
August 21, 2019 |
FY 2019 GAA |
WIN9G02655 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Regional Office XI |
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Road Widening (2-4 lanes) along Surigao del Sur Bdry-Davao Or. Coastal Road -
K1685+430 - K1688+778, K1689+246 - K1689+699,
K1689+137 - K1690+700
Physical Target:
CW1: 10.756 Lane Km (Road Widening)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Road Widening)
EAO: P 5,250,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Road Widening (2-4 lanes) along Surigao del Sur Bdry-Davao Or. Coastal Road -
K1687+500 - K1688+778, K1689+246 - K1689+699,
K1689+137 - K1690+700
Physical Target:
CW1: 4.570 Lane Km (Road Widening)
ROW: 30,390.50 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 129,310,000.00 (Road Widening)
ROW: P 16,000,000.00 (ROW Acquisition)
EAO: P 4,690,000.00 |
August 21, 2019 |
FY 2019 |
WIN9G02701 |
300109200479000 |
July 22, 2019 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300109200479000
Project ID: P00345243MN
Local Program - Flood Control and Drainage - Drainage / Protection Works - Local Infrastructure Program
Construction/Rehabilitation of Drainage Facilities, Barangay Upper Calarian, Zamboanga City
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 452.30 ln.m.
Unit Cost: P 9,849.66/ln.m.
EAO: P45,000.00
Allocation: P 4,500,000.00 |
August 21, 2019 |
FY 2019 |
WIN9G02703 |
300117204928000 |
July 22, 2019 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117204928000
Project ID: P00355541MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreating of Road at Brgy. Recodo, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.6757 lane km.
Unit Cost: P 7,330,000.00/lane km
EAO: P 50,000.00
Allocation: P 5,000,000.00 |
August 20, 2019 |
2019 |
WIN9C03476 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Daang Maharlika (LZ) - K0104+979.30 - K0105+386.00, K0120+560.00 - K0121+355.00 |
August 20, 2019 |
FY 2019 |
WIN9G02719 |
310205100265000 |
July 30, 2019 |
Region IX |
Regional Office IX |
UACS No. 310205100265000
Project ID: P00304101MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/ New Roads
Midsalip-Buboan Road, Zamboanga Del Sur
Physical Target:
CW-1 - Construction of Concrete Road: 3.80 lane km.
Unit Cost: P 14,833,677.98/lane km.
ROW: 5,106.75 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 1,972,879.17
Excess: P 127,120.83
Allocation: P 60,000,000.00
|
August 20, 2019 |
FY 2019 |
WIN9G02724 |
300113200002000 |
July 30, 2019 |
Region IX |
Regional Office IX |
UACS No. 300113200002000
Project ID: P00353684MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Bridge along By-Pass National Road Sumagdang-Menzi-Lanote, Isabela City,
Basilan
Physical Target:
CW-1 - Construction of Bridge: 645.75 Sq.m.
Unit Cost: P 84,195.68/sq.m.
Physical Target:
ROW: 10,000 Sq.m.
Unit Cost: P 300/sq.m.
EAO: P 1,902,927.63
Excess: P 727,711.46
Allocation: P 60,000,000.00 |
August 20, 2019 |
FY 2019 |
WIN9G02725 |
320102100664000 |
July 29, 2019 |
Region IX |
Regional Office IX |
UACS No. 320102100664000
Project ID: P00321932MN
OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure, Salug Daku Flood Control, Sta. 0+000 - Sta.0+590.00, Mahayag, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 590.00 ln.m.
Unit Cost: P 163,311.6885/ln.m.
Physical Target:
ROW: 3,964.23 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 3,372,386.37
Excess: P 165,448.64
Allocation: P101,081,000.00 |
August 20, 2019 |
FY 2019 |
WIN9G02717 |
310305100574000 |
July 29, 2019 |
Region IX |
Regional Office IX |
UACS No. 310305100574000
Project ID: P00300008MN
OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
Tigbao Br. (B00556MN) along Pagadian City-Zamboanga City Rd
Physical Target:
CW-1 - Widening of Permanent Bridge: 1,156.248 sq.m.
Unit Cost: P 104,282.86/sq.m.
EAO: P 4,375,000.00
Excess: P 48,151.40
Allocation: P 125,000,000.00
|
August 20, 2019 |
FY 2019 |
WIN9G02722 |
300111200055000 |
July 31, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200055000
Project ID: P00345269MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Road Widening along By-pass National Road Sumagdang-Menzi-Lanote, Isabela City, Basilan
Physical Target:
CW-1 - Road Widening: 8.38 lane km
Unit Cost: P 15,825,854.16/lane km
Physical Target:
ROW: 41,079.34 Sq.m.
Unit Cost: P 1,000/sq.m.
EAO: P 4,641,723.03
Excess: P 1,658,276.97
Allocation: P 180,000,000.00 |
August 19, 2019 |
2019 |
WIN9C03429 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local - Flood Control and Drainage - Flood Control Structures / Facilities
Construction of Flood Control Structure along Pampanga River, Brgy. San Roque, Jaen, Nueva Ecija, Sta. 34+243.20 - Sta. 34+460.00 |
August 16, 2019 |
2019 |
WIN9C03444 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Tarlac District Engineering Office |
Network Development - Construction of Bypass and Diversion Roads
Gerona - Victoria Road via Estipona Pura, Tarlac
P 60.00 Million |
August 15, 2019 |
FY - 2019 |
WIN9F05835 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS NO. 320101103517000
Project ID: P00321113LZ
002: Protect Lives and properties Against Major Floods
Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Control Structure along
Busuanga River, (Central Section), Rizal, Occidental Mindoro
CW1- Construction of Flood Mitigation Structure : 360 LM
Unit Cost - Php 97.22/ Lm
Allocation - Php 35.00 Million
TO:
Construction of Flood Control Structures along
Busuanga River, (Central Section), San Jose,
Occidental Mindoro
CW1 - Construction of Flood Mitigation Structure: 360 LM
Unit Cost - Php 97.22/ Lm
Allocation - Php 35.00 Million
|
August 15, 2019 |
FY 2019 |
WIN9G02668 |
310205100264000 |
July 18, 2019 |
Region IX |
Regional Office IX |
UACS No. 310205100264000
Project ID: P00304100MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/New Roads
Labangan-Midsalip Road, Zamboanga Del Sur
Physical Target:
CW-1- Construction of Gravel Road: 3.44 lane km
Unit Cost: P 14,610,000.00/lane km
Physical Target:
ROW: 33,333.33 sq. m
Unit Cost: P 229.22/sq. m
EAO: P 1,759,080.23
Excess: P 340,919.76
Allocation: P 60,000,000.00 |
August 15, 2019 |
FY - 2019 |
WIN9F05834 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. 300116201805000
Project ID: P00345946LZ
Local Program
Local Roads and Bridges - Local Roads -
Construction/Repair/rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Concreting/Construction of Poblacion - Maranao Road
(Maduron - Orecon Street), Paluan, Occidental Mindoro
CW1 - Construction of Concrete Road : 0.696 Lane Km
Unit Cost - Php 35,919.54/Lane-km
Allocation - Php 25.00 Million
TO:
Concreting/Construction of Poblacion - Mananao Road
(Maduron - Orecon Street), Paluan, Occidental Mindoro
CW1 - 0.696 Lane Km
Unit Cost - Php 35,919.54/Lane-km
Allocation - Php 25.00 Million |
August 15, 2019 |
FY 2019 |
WIN9G02666 |
310201100316000 |
July 18, 2019 |
Region IX |
Regional Office IX |
UACS No. 310201100316000
Project ID: P00303615MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Dipolog-Oroquieta National Rd -
K1805 + 335.00 - K1806 + 263.00,
K1806 + 472.00 - K1808 + 882.51,
K1809 + 843.83 - K1810 + 900.00
Physical Target:
CW-1 - Road Widening: 8.922 lane km.
Unit Cost: P 16,190,000.00/lane km.
ROW: 333.33 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 5,056,040.98
Excess: P 385,645.43
Allocation: P 150,000,000.00
|
August 15, 2019 |
FY - 2019 |
WIN9F05838 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Marinduque District Engineering Office |
UACS No. 300104208496000
Project ID: P00350509LZ
Local Program
Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
FROM:
Construction of Multi-Purpose Building (Covered Court/
Multi-Purpose Hall), at Barangay Poblacion,
Torrijos, Phase III, Marinduque
CW1 - Number of Buildings
Unit Cost - Php 19,800.00/Building
Allocation - Php 20.00 Million
TO:
Construction of Multi-Purpose Building (Covered Court/
Multi-Purpose Hall), at Barangay Poblacion,
Torrijos, Phase II, Marinduque
CW1 - Number of Buildings
Unit Cost - Php 19,800.00/ Builiding
Allocation - Php 20.00 Million |
August 15, 2019 |
2019 |
WIN9F05846 |
300111200076000 |
January 3, 2019 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300111200076000
Project ID.: P00353597LZ
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects – Local Roads and Bridges
National Road and Bridges – National Roads
Coloong Road S02067LZ, K0021+(-490) – K0020+160
Physical Target – CW1-Rehabilitation of Paved Road=1.152 Lane km
Unit Cost (P’000) = P 21,267.36/Lane km
Allocation = P 24.500 M
EAO = P 0.500M
Total = P 25.000 M
As Modified
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects – Local Roads and Bridges
National Road and Bridges – National Roads
Coloong Road S02067LZ, K0019+000 – K0019+576
Physical Target – CW1-Rehabilitation of Paved Road=1.152 Lane km
Unit Cost (P’000) = P 21,267.36/Lane km
Allocation = P 24.500 M
EAO = P 0.500M
Total = P 25.000 M
WIN9F05846
|
August 15, 2019 |
FY 2019 |
WIN9G02665 |
310211100042000 |
July 18, 2019 |
Region IX |
Regional Office IX |
UACS No. 310211100042000
Project ID: P00303209MN
OO1: Ensure safe and Reliable National Road System
Network Development - Paving of Unpaved Roads - Secondary Roads
Rizal-Dakak-Dapitan Coastal Loop Rd
K1812+075 - K1812+213.70,
K1834+776 - K1835+209,
K1852+193 - K1852+291,
K1854+860 - K1856+000
Physical Target:
CW-1- Paving of Unpaved Road: 3.619 lane km
Unit Cost: P 27,125,000.00/lane km
Physical Target:
ROW: 1,325.0009 sq.m
Unit Cost: P 300/sq. m
EAO: P 3,435,833.32
Allocation: P 102,000,000.00 |
August 15, 2019 |
FY 2019 |
WIN9G02669 |
310201100322000 |
July 18, 2019 |
Region IX |
Regional Office IX |
UACS No. 310201100322000
Project ID: P00303627MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Lanao-Pagadian-Zamboanga City Rd
K1817 + 700.00 - K1817 + 825.06
K1817 + 867.01 - K1819 + 220.00
Physical Target:
CW-1 - Road Widening: 2.96 lane km.
Unit Cost: P 24,370,000.00/lane km.
CW-2 - Drainage and Slope Protection Structure: 1,478.05 ln.m.
Unit Cost: 17,401.73/ln.m.
ROW: 20,000.00 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 3,425,363.42
Excess: P 707,110.24
Allocation: P 108,000,000.00
|
August 15, 2019 |
FY 2019 |
WIN9G02664 |
310306100089000 |
July 18, 2019 |
Region IX |
Regional Office IX |
UACS No. 310306100089000
Project ID: P00301629MN
OO1: Ensure Safe and Reliable National Road System -Bridge - Construction of New Bridge
Polo Br. along Jct Polo-Dapitan Park Natl Rd
Physical Target:
CW-1- Construction of Concrete Bridge: 3,468.74 sq.m.
Unit Cost: P 29,210.90/sq.m
EAO: P 3,546,375.00
Excess: P 128,625.00
Allocation: P 105,000,000.00 |
August 15, 2019 |
FY 2019 |
WIN9G02676 |
310204100491000 |
July 18, 2019 |
Region IX |
Regional Office IX |
UACS No. 310204100491000
Project ID: P00303796MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Bypass and Diversion Roads
Labangan-Pagadian City-Dumalinao By-Pass Road, Package 1, Zamboanga del Sur
Physical Target:
CW1- Construction of Concrete Road: 7.00 lane km
Unit Cost: P 15,770,000.00/lane km
ROW: 34,105.12597 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 3,863,771.18
Excess: 511,228.83
Allocation: P 125,000,000.00 |
August 15, 2019 |
FY 2019 |
WIN9G02672 |
310204100260000 |
July 18, 2019 |
Region IX |
Regional Office IX |
UACS No. 310204100260000
Project ID: P00303802MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Bypass and Diversion Roads
Sominot-Mahayag Road, Zamboanga del Sur
Physical Target:
CW1- Construction of Concrete Road: 5.28 lane km
Unit Cost: P 17,050,000.00/lane km
ROW: 37,202.406 sq.m.
Unit Cost: P 252.10/sq.m.
EAO: P 3,150,565.73
Excess: 454,434.26
Allocation: P 103,000,000.00 |
August 15, 2019 |
FY 2019 |
WIN9G02671 |
310201100317000 |
July 18, 2019 |
Region IX |
Regional Office IX |
UACS No. 310201100317000
Project ID: P00303614MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Dipolog-Punta-Dansullan-S Osmeña-Zambo N/Sur Bdry - K1862 + 900 - K1868 + 158
Physical Target:
CW-1 - Road Widening: 10.28 lane km.
Unit Cost: P 13,076,000.00/lane km.
ROW: 33,333.33 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 4,704,575.11
Excess: P 878,993.21
Allocation: P 150,000,000.00
|
August 14, 2019 |
2019 |
WIN9C03426 |
General Appropriations Act FY 2019 (RA 11260) |
April 29, 2019 |
Region III |
Tarlac 2nd District Engineering Office |
Flood Control and Drainage - Drainage/ Protection Works
Rehabilitation of Existing Bank along Lucung River, Right Side, D/S of Cutcut Bridge Sta. (-) 7+000 to Sta (-)7+228.40
Amount: P 30M |
August 13, 2019 |
FY - 2019 |
WIN9F05824 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Marinduque District Engineering Office |
UACS No. 300106200209000
Project ID: P00344729LZ
Local Program
Flood Control and Drainage - Flood Control Structures/Facilities
- Construction/Repair/Rehabilitation/Improvement of Various Infrastructure Including Local Projects
FROM:
Construction of Flood Mitigation Structure -
Construction of Flood Control Structure (including Rechanneling)
along Boac River ( Sta. 4+155 - Sta. 5+105 ),
Boac, Marinduque
CW1 - Construction of Flood Mitigation Structure: 290.00 lm
Unit Cost - Php 168.966/lm
Allocation - Php 50.00 Million
TO:
Construction of Flood Mitigation Structutre -
Construction of Flood Control Structure (including Rechanneling) along Boac River ( Sta. 4+155 - Sta. 4+445 ),
Boac, Marinduque
CW1 - Construction of Flood Mitigation Structure - 290.00 lm
Unit Cost - Php 168.966/lm
Allocation - Php 50.00 Million
|
August 13, 2019 |
FY - 2019 |
WIN9F05823 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. 300116201804000
Project ID: P00345945LZ
Local Program
Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
FROM:
Concreting/Construction of Poblacion - Harrison Road
( Pula - Pamutusin Section ), Paluan, Occidental Mindoro
CW1 - Construction of Concrete Road - 2.266 lane Km
Unit Cost - Php 11,032.66/ Lane km
Allocation - php 25.00 Million
TO:
Concreting/Construction of Poblacion - Harison Road
(Pula - Pamutusin Section), Paluan, Occidental Mindoro
CW1 - Construction of Concrete Road - 0.880 Lane km
Unit Cost - php 28,409.09/Lane km
Allocation - Php 25.00 Million |
August 13, 2019 |
FY 2019 GAA |
WIN9G02625 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao del Norte District Engineering Office |
FROM: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Construction of Multi-Purpose Covered Court in Sta. Cruz National High School, Talicud Island, Katipunan District, Island Garden City of Samal, Davao del Norte
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00
TO: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Construction of Multi-Purpose Covered Court in Sta. Cruz National High School, Talicud Island, Kaputian District, Island Garden City of Samal, Davao del Norte
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00 |
August 13, 2019 |
FY 2019 GAA |
WIN9G02622 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao del Norte District Engineering Office |
FROM: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Rehabilitation of Tulalian Multi-Purpose Building (Covered Court), Brgy. Tulilian, Sto. Tomas, Davao del Norte
Physical Target:
CW1: 1 Building (Rehabilitation/Major Repair of Multi-Purpose Building)
Allocation:
TOTAL: P 1,500,000.00
CW1: P 1,485,000.00 (Rehabilitation/Major Repair of Multi-Purpose Building)
EAO: P 15,000.00
TO: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Rehabilitation of Tulalian Multi-Purpose Building (Covered Court), Brgy. Tulalian, Sto. Tomas, Davao del Norte
Physical Target:
CW1: 1 Building (Rehabilitation/Major Repair of Multi-Purpose Building)
Allocation:
TOTAL: P 1,500,000.00
CW1: P 1,485,000.00 (Rehabilitation/Major Repair of Multi-Purpose Building)
EAO: P 15,000.00 |
August 13, 2019 |
FY 2019 GAA |
WIN9G02618 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao del Norte District Engineering Office |
FROM: Local Program - Water Management Facilities - Water Supply -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Water System, Purok Taglaya, Tagbitang-ag, Samal District, Island Garden City of Samal, Davao del Norte
Physical Target:
CW1: 1 Building (Construction of Water Supply Systems)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,960,000.00 (Construction of Water Supply Systems)
EAO: P 40,000.00
TO: Local Program - Water Management Facilities - Water Supply -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Water System, Purok Taglaya, Tagbitan-ag, Samal District, Island Garden City of Samal, Davao del Norte
Physical Target:
CW1: 1 Building (Construction of Water Supply Systems)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,960,000.00 (Construction of Water Supply Systems)
EAO: P 40,000.00 |
August 13, 2019 |
FY 2019 GAA |
WIN9G02624 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao del Norte District Engineering Office |
FROM: Local Program - Water Management Facilities - Water Supply -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Water System at Tabaobo, Katipunan District, IGaCoS, Davao del Norte
Physical Target:
CW1: 1 Building (Construction of Water Supply Systems)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,960,000.00 (Construction of Water Supply Systems)
EAO: P 40,000.00
TO: Local Program - Water Management Facilities - Water Supply -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Water System at Tabaobo, Kaputian District, IGaCoS, Davao del Norte
Physical Target:
CW1: 1 Building (Construction of Water Supply Systems)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,960,000.00 (Construction of Water Supply Systems)
EAO: P 40,000.00 |
August 13, 2019 |
FY2019 |
WIN9G02570 |
320102100942000 |
June 27, 2019 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102100942000
Project ID: P00322293MN
OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control along Lanao - Pagadian - Zamboanga City Road, Part of Sibuguey River, (0+412 - 0+450.00) and (00+000 - 00+082.00), (Upstream), Brgy, Balugo, Imelda, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 120 lm
Unit Cost: P 81,666.67/lm
EAO: P 200,000.00
Allocation: P 10,000,000.00 |
August 13, 2019 |
FY - 2019 |
WIN9F05821 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Palawan 1st District Engineering Office |
UACS No. 300111200074000
Project ID: P00345374LZ
Local Program
National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation/Improvement (Asphalt Overlay)
Jct. Paglaum - Bato Road,
K0187+(-691) - K0191+026,
K0194+749 - K0197+059,
K0200+827 - K0201+019,
Taytay, Palawan
CW1 - Preventive Maintenance of Road: Asphalt Overlay
5.552 lane km
Unit Cost - Php 10,590.79/lane km
Allocation - Php 60.00 Million TO:
TO:
Rehabilitation/Improvement (Asphalt Overlay)
Jct. Paglaum - Bato Road,
K0187+(-691) - K0189+683,
K0194+749 - K0197+059,
K0200+827 - K0201+019,
Taytay, Palawan
CW1- Preventive Maintenance of Road: Asphalt Overlay
11.742 Lane Km
Unit Cost - Php 5,007.66/ lane km
Allocation - Php 60.00 Million
|
August 13, 2019 |
FY - 2019 |
WIN9F05820 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No. 300104208650000
Project ID: P00342409LZ
Local Program
Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
FROM:
Construction of Multi-Purpose Building ( Covered Court ),
Brgy. San Juan, Aborlan, Palawan
CW1 - Construction of Other Building - 1 building
Unit Cost - Php 2,772.00/Building
Allocation - Php 2.80 Million
TO:
Construction (Completion) of Multi-Purpose Building
(Covered Court), Brgy. San Juan, Aborlan, Palawan
CW1 - Construction of Other Building - 1 Building
Unit Cost - Php 2,772.00/Building
Allocation - Php 2.80 Million |
August 13, 2019 |
FY 2019 |
WIN9G02571 |
320102100667000 |
June 27, 2019 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102100667000
Project ID: P00321936MN
OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Rehabilitation of Flood Control Structure along Sibuguey River, Sta. 0+513 to Sta. 1+122 and Sta. 0+000 to Sta. 0+088, Barangay Pilar, Diplahan, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 697 lm
Unit Cost: P 111,699.10/lm
EAO: P 2,823,730.00
Allocation: P 80,678,000.00 |
August 13, 2019 |
FY 2019 |
WIN9G02579 |
300116201303000 |
July 3, 2019 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 300116201303000
Project ID: P00345452MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Brgy. New Dapitan to Brgy. Sipaon Road, Rizal, Zamboanga del Norte
Physical Target:
CW-1 - Construction of Concrete Road: 8.581 lane km.
Unit Cost: P 6,747,000.00/lane km.
EAO: P 2,100,000.00
Allocation: P 60,000,000.00 |
August 13, 2019 |
FY - 2019 |
WIN9F05822 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No. 300116201822000
Project ID: P00345592LZ
Local Program
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various
Infrastructure including Local Projects
FROM:
Reconstruction of Roxas Street, Barangay Tagumpay and Barangay Princesa, Puerto Princesa City, Palawan
CW1 - Construction of Concrete Road - 4.531 Lane km
Allocation - 50.00 Million
TO:
Reconstruction of Roxas Street, Barangay Tagumpay and
Barangay Princesa, Puerto princesa City, Palawan
CW1 - Construction of Concrete Road ; 1.528 lane km
Unit Cost - Php 17,853.80/Lane km
Allocation - Php 28.28055 Million
Excess - Php 21.71945 Million
|
August 13, 2019 |
FY 2019 |
WIN9G02582 |
320101103904000 |
July 3, 2019 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 320101103904000
Project ID: P00322940MN
OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control (Revetment/Dike) Structure along Layawan River, Dapdap Bridge Upstream, Labrador Side, Polanco, Zamboanga del Norte
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 125.60 ln.m.
Unit Cost: P 152,929.94/ln.m.
EAO: P 392,000.00
Excess: P 400,000.00
Allocation: P 20,000,000.00 |
August 13, 2019 |
FY 2019 |
WIN9G02566 |
320101103911000 |
July 3, 2019 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 320101103911000
Project ID: P00320243MN
OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Extension of Flood Control Structure (Revetment) along Dapitan River, Barcelona-Leop Section, Zamboanga del Norte
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 216 ln.m.
Unit Cost: P 181,079.86/ln.m.
Physical Target:
ROW: 1,629 sq. m
Unit Cost: P 500/sq. m
EAO: P 798,230.00
Allocation: P 40,726,000.00 |
August 13, 2019 |
FY 2019 |
WIN9G02584 |
300107200596000 |
July 3, 2019 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 300107200596000
Project ID: P00353546MN
Local Program - Flood Control and Drainage - Flood Control Structure/Facilities - Local Infrastructure Program
Construction of Rockfall Protection System (Soil Protection) along Rizal - Dakak - Dapitan Coastal Loop Road at KM 1853+000 - KM 1853+074.90, Zamboanga del Norte
Physical Target:
CW-1 - Construction of Road Slope Protection Structure: 1,707.130 sq.m.
Unit Cost: P17,397.621/sq.m.
EAO: P 300,000.00
Allocation: P 30,000,000.00 |
August 9, 2019 |
2019 |
WIN9C03469 |
SR2019-06-003692 |
June 6, 2019 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction/Rehabilitation with Road Opening of Lenneng-Cayapa Road, Baay-Licuan, Abra and Langangilang, Abra;
Physical Target:
CW1 : 7.80 Lane Km;
Allocation= Php 100,000,000
To: Construction/Rehabilitation with Road Opening of Lenneng-Cayapa Road, Baay-Licuan, Abra and Lagangilang, Abra;
Physical Target:
CW1 : 23.364 Lane Km;
Allocation= Php 100,000,000
|
August 9, 2019 |
2019 |
WIN9C03465 |
SR2019-06-003695 |
June 6, 2019 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction/Rehabilitation with Road Opening of Naguilian-Lam-awan Road, Sallapadan, Abra;
Physical Target:
CW1: 9.23 Lane Km;
Allocation= Php 100,000,000
To: Construction/Rehabilitation with Road Opening of Naguilian-Lam-awan Road, Sallapadan, Abra;
Physical Target:
CW1: 19.354 Lane Km;
Allocation= Php 100,000,000
|
August 9, 2019 |
2019 |
WIN9C03445 |
SR2019-06-003698 |
June 6, 2019 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction/Rehabilitation with Road Opening of Sabagan-Nagpaoayan Road, Baay-Licuan, Abra;
Physical Target:
CW1: 6.40 Lane Km;
Allocation= Php 100,000,000
To: Construction/Rehabilitation with Road Opening of Subagan-Nagpaoayan Road, Baay-Licuan, Abra;
Physical Target:
CW1: 10.20 Lane Km;
Allocation= Php 100,000,000
|
August 9, 2019 |
2019 |
WIN9C03447 |
GAA 2019 |
May 6, 2019 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Construction of Tublay Central Barangay Hall/ RHU, Kabayan, Benguet;
Physical Target:
CW1 : 1 Number of Buildings;
Allocation= Php 2,000,000
To: Construction of Tublay Central Barangay Hall/ RHU, Tublay, Benguet;
Physical Target:
CW1 : 1 Number of Buildings;
Allocation= Php 2,000,000
|
August 9, 2019 |
2019 |
WIN9C03455 |
GAA 2019 |
May 6, 2019 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: Improvement of Roads at Monongaa - Umilag Road, Lamut, Ifugao;
Physical Target:
CW1 : 0.408 Lane Km;
Allocation= Php 2,500,000
To: Improvement of Road at Sitio Mongonga-a - Umilag Road, Lamut, Ifugao;
Physical Target:
CW1 : 0.408 Lane Km;
Allocation= Php 2,500,000
|
August 9, 2019 |
2019 |
WIN9C03443 |
GAA 2019 |
May 6, 2019 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Rehabilitation of Multi-Purpose Buiding, Brgy. Eyeb, Poblacion, Bontoc, Mountain Province;
Physical Target:
CW1 : 1 Number of Buildings;
Allocation= Php 2,000,000
To: Rehabilitation of Multi-Purpose Buiding, Eyeb, Brgy. Poblacion, Bontoc, Mountain Province;
Physical Target:
CW1 : 1 Number of Buildings;
Allocation= Php 2,000,000
|
August 8, 2019 |
FY - 2019 |
WIN9F05758 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Romblon District Engineering Office |
UACS No. 310108100236000
Project ID: P00300366LZ
Organizational Outcome 1:
Ensure safe and Reliable National Road Systems
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslides-
Secondary Roads
FROM:
Tablas Circumferential Rd.,
K0039+945 - K0039+975,
K0040+945 - K0040+962,
K0041+505 - K0041+530,
K0042+119.20 - K0042+169.20,
K0068+385 - K0068+535,
K0087+845 -K0087+873,
K0111+208 - K0112+047
CW1 - Construction of Road Slope Protection Structure:
5,136 square meters
Unit Cost - Php 7.95/ square meters
Allocation - Php 41.642 Million
TO:
Tablas Circumferential Rd.,
K0039+945 - K0040+001,
K0041+505 - K0041+560,
K0068+385 - K0068+569,
K0087+845 - K0087+871
CW1 - Construction of Road Slope Protection Structure:
5,136 square meters
Unit Cost - Php 7.95/ square meters
Allocation - Php 41.642 Million
|
August 8, 2019 |
FY - 2019 |
WIN9F05791 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS NO. 310208100150000
Project ID: P00302062LZ
Organizational Outcome 1:
Ensure Safe and Reliable National Road System
Network Development Program - Off-carriageway improvement -
Secondary Roads
FROM:
Calapan North Rd.,
K0016+000 - K0016+054,
K0037+310 - K0037+457,
K0037+561 - K0037+620,
K0037+662 - K0037+751,
K0037+868 - K0038+148,
K0038+400 - K0038+445,
K0038+472 - K0038+594,
K0038+614 - K0038+752,
K0038+770 - K0039+175,
K0039+850 - K0039+1005,
K0040+046 - K0040+526,
K0040+547 - K0040+822,
K0040+876 - K0040+916,
K0040+945 - K0041+149,
K0041+246 - K0041+982.50,
K0045+144 - K0045+272,
K0045+361 - K0045+417,
K0045+439 - K0046+159,
K0049+000 - K0049+024,
K0049+113 - K0049+132,
K0049+180 - K0050+000
CW1 - Off-Carriageway Improvement:
Shoulder Paving/Construction 12,859.00 square meters
Unit Cost - Php 4.56/ square meters
Allocation - Php 60.812 Million
TO:
Calapan North Rd.,
K0016+000 - K0016+054,
K0037+310 - K0037+457,
K0037+561 - K0037+620,
K0037+662 - K0037+751,
K0037+868 - K0038+148,
K0038+400 - K0038+445,
K0038+472 - K0038+594,
K0038+514 - K0038+752,
K0038+770 - K0039+175,
K0039+850 - K0039+1005,
K0040+046 - K0040+526,
K0040+547 - K0040+822,
K0040+876 - K0040+916,
K0040+945 - K0041+149,
K0041+246 - K0041+982.50,
K0045+144 - K0045+272,
K0045+361 - K0045+417,
K0045+439 - K0046+159,
K0049+000 - K0049+024,
K0049+113 - K00049+132,
K0049+180 - K0049+510,
K0049+510 - K0049+917,
K0049+917 - K0050+000
CW1 - Off-Carriageway Improvement:
Shoulder Paving/Construction 13,877.50 square meters
Unit Cost - Php 4.23/ square meters
Allocation - Php 60.812 Million
|
August 8, 2019 |
FY - 2019 |
WIN9F05784 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. 32010210090000
Project ID: P00323024LZ
Organizational Outcome 002: Protect Lives and Properties
Flood management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
FROM:
Construction of Flood Mitigationg Structure along Mag-Asawang Tubig, San Andres Putik, Calapan city, Oriental Mindoro
CW1 - Construction of Flood Mitigation Structure : 130 l.m.
Unit Cost - Php 150.77/ L.m.
Allocation - Php 20.00 Million
TO:
Construction oof Flood Mitigating Structure along Mag-Asawang Tubig, San Andres Putik, Naujan, Oriental Mindoro
CW1 - Construction of Flood Mitigation Structure : 130.0 l.m.
Unit Cost - Php 150.77/ l.m.
Allocation - Php 20.00 Million |
August 8, 2019 |
FY - 2019 |
WIN9F05785 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. 300117203786000
Project ID: P00354854LZ
Local Program
Local - Local Roads and Bridges - Local Roads -
Local Infrastructure Program
FROM:
Construction/Widening of Socorro-Batong Dalig Road,
Municipality of Socorro, Oriental Mindoro
CW1 - Construction of Concrete Road : 4.20 Lane Km
Unit Cost - php 4,714.29/ Lane km
Allocation - Php 20.00 Million
TO:
Construction/Widening of Socorro-Batong Dalig Road,
Municipality of Socorro, Oriental Mindoro
CW1 - Construction of Concrete Road : 3.038 Lane Km
Unit Cost - Php 6,517.45/ Lane Km
Allocation - Php 20.00 Million
|
August 8, 2019 |
FY - 2019 |
WIN9F05786 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No 300117203787000
Project ID: P00354855LZ
Local Program
Local - Local Roads and Bridges - Local Road -
Local Infrastructure Program
FROM:
Concreting of Sta. Rosa - Binaybay Road,
Baco, Oriental Mindoro
CW1 - Construction of Concrete Road : 1.05 Lane Km
Unit Cost - Php 4,714.29/ Lane Km
Allocation - Php 5.00 Million
TO:
Concreting of Sta. Rosa - Binaybay Road,
Baco, Oriental Mindoro
CW1 - 0.700 Lane Km
Unit Cost - Php 7,071.43/ Lane Km
Allocation - Php 5.00 Million |
August 8, 2019 |
FY - 2019 |
WIN9F05807 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. 310202100405000
Project ID: P00303396LZ
Organizational Outcome 1:
Ensure Safe and Reliable National Road System
Network Development Program - Road Widening -
Secondary Roads
FROM:
Calapan North rd.,
K0008+023 - K0008+600,
K0011+000 - K0011+403,
K0027+436 - K0027+550,
K0027+559 - K0028+000,
K0030+589 - K0030+969
CW1 - Road Widening : 3.86 Lane km
Unit Cost - Php 8,518.64/ Lane Km
Allocation - Php 33.553 Million
TO:
Calapan North Rd.,
K0008+023 - K0008+575,
K0010+908 - K0011+404,
K0027+486 - K0027+520,
K0027+520 - K0027+620,
K0027+620 - K0027+660,
K0027+660 - K0028+005,
K0030+589 - K0030+865
CW1 - Road Widening : 3.614 Lane Km
Unit Cost - Php 9,098.49/ Lane Km
Allocation - Php 33.553 Million |
August 8, 2019 |
2019 |
WIN9C03449 |
GAA 2019 |
May 6, 2019 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Itogon - Dalupirip - Sn Manuel Bdry Rd -
K0275+358 - K0275+387, K0275+419 - K0275+453, K0276+071 - K0276+248;
Physical Target:
CW1 : 2,226 Square meters;
Allocation= Php 30,908,220
To: Itogon - Dalupirip - Sn Manuel Bdry Rd -
K0275+358 - K0275+387, K0276+071 - K0276+248,
K0277+845 - K0277+930;
Physical Target:
CW1 : 2,633 Square meters;
Allocation= Php 30,908,220
|
August 7, 2019 |
GAA 2019 |
WIN9F05805 |
UACS No. 300116201441000 |
January 3, 2019 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300116201441000
Project ID.: P00345755LZ
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects – Local Roads and Bridges
Local Road and Bridges – Local Roads
Improvement of Roads and Drainage along Fortune Village 5 & 6, Brgy. Parada, Valenzuela City
Physical Target – CW-Rehabilitation of Paved Road=0.450 Lane km
Unit Cost (P’000) = P 21,777.78/Lane km
Allocation = P 9.800 M
EAO = P 0.200M
Total = P 10.000 M
As Modified
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects – Local Roads and Bridges
Local Road and Bridges – Local Roads
Improvement of Roads and Drainage along Fortune 5 & 6, Brgy. Parada, Valenzuela City
Physical Target – CW-Rehabilitation of Paved Road=0.450 Lane km
Unit Cost (P’000) = P 21,777.78/Lane km
Allocation = P 9.800 M
EAO = P 0.200M
Total = P 10.000 M
WIN9F05805
|
August 7, 2019 |
FY 2019 GAA |
WIN9G02572 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Regional Office XI |
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Construction of Missing Links/New Roads
Mawab-Maragusan-Caraga Road, Section 2, Package C, Compostela Valley
Physical Target:
CW1: 4.768 Lane Km (Construction of Concrete Road)
ROW: 23,840.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 105,000,000.00
CW1: P 94,531,400.00 (Construction of Concrete Road)
ROW: P 7,040,000.00 (ROW Acquisition)
EAO: P 3,428,600.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Construction of Missing Links/New Roads
Mawab-Maragusan-Caraga Road, Section 2, Package H, Compostela Valley
Physical Target:
CW1: 4.768 Lane Km (Construction of Concrete Road)
ROW: 23,840.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 105,000,000.00
CW1: P 94,531,400.00 (Construction of Concrete Road)
ROW: P 7,040,000.00 (ROW Acquisition)
EAO: P 3,428,600.00 |
August 7, 2019 |
FY 2019 GAA |
WIN9G02621 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Regional Office XI |
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation
Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Daang Maharlika (MN) -
K1383+764-K1384+710, K1386+000-K1386+641, K1387+944-K1390+000,
K1394+744-K1395+178, K1395+307-K1395+498, K1394+744-K1395+178,
K1395+307-K1395+498
Physical Target:
CW1: 8.516 Lane Km (Reconstruction to Concrete Pavement)
CW2: 2.460 Lane Km (Road Widening)
Allocation:
TOTAL: P 118,914,000.00
CW1: P 81,620,660.00 (Reconstruction to Concrete Pavement)
CW2: P 33,131,350.00 (Road Widening)
EAO: P 4,161,990.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation
Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Daang Maharlika (MN) -
K1383+764-K1384+710, K1386+000-K1386+641, K1387+944-K1390+000,
K1394+744-K1395+178, K1395+307-K1395+498
Physical Target:
CW1: 8.516 Lane Km (Reconstruction to Concrete Pavement)
CW2: 2.460 Lane Km (Road Widening)
Allocation:
TOTAL: P 118,914,000.00
CW1: P 81,620,660.00 (Reconstruction to Concrete Pavement)
CW2: P 33,131,350.00 (Road Widening)
EAO: P 4,161,990.00 |
August 7, 2019 |
FY 2019 GAA |
WIN9G02620 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Regional Office XI |
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Asuncion-San Isidro-Laak-Veruela Rd -
K1494+000 - K1496+000, K1500+000 - K1502+000
Physical Target:
CW1: 7.567 Lane Km (Road Widening)
ROW: 50,323.689 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 93,778,700.00 (Road Widening)
ROW: P 2,820,000.00 (ROW Acquisition)
EAO: P 3,401,300.00
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Asuncion-San Isidro-Laak-Veruela Rd -
K1494+000 - K1496+000, K1500+000 - K1503+136
Physical Target:
CW1: 6.272 Lane Km (Road Widening)
ROW: 50,323.689 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 93,778,700.00 (Road Widening)
ROW: P 2,820,000.00 (ROW Acquisition)
EAO: P 3,401,300.00 |
August 7, 2019 |
FY 2019 GAA |
WIN9G02568 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao de Oro 1st District Engineering Office |
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Tertiary Roads
Montevista-Compostela-New Bataan-Maragusan-Mati Bdry Rd, Compostela and New Bataan -
K1440+128 - K1441+000
Physical Target:
CW1: 1.666 Lane Km (Road Widening)
ROW: 12,495.000 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 31,990,000.00
CW1: P 25,115,350.00 (Road Widening)
ROW: P 7,000,000.00 (ROW Acquisition)
EAO: P 874,650.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Tertiary Roads
Montevista-Compostela-New Bataan-Maragusan-Mati Bdry Rd, Compostela and New Bataan -
K1440+220 - K1441+000
Physical Target:
CW1: 1.522 Lane Km (Road Widening)
CW2: 4,405.00 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: 12,495.000 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 31,990,000.00
CW1: P 17,503,580.00 (Road Widening)
CW2: P 6,611,770.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: P 7,000,000.00 (ROW Acquisition)
EAO: P 874,650.00 |
August 7, 2019 |
FY 2019 GAA |
WIN9G02573 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao City District Engineering Office |
FROM: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Construction of Multi-Purpose Building Sitio Awa, Brgy. Catalunan, Davao City
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Multi-Purpose Building)
EAO: P 50,000.00
TO: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Construction of Multi-Purpose Building Sitio Awa, Brgy. Catalunan Grande, Davao City
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Multi-Purpose Building)
EAO: P 50,000.00 |
August 7, 2019 |
FY 2019 GAA |
WIN9G05605 |
FY 2018 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao City District Engineering Office |
FROM: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Construction of Multi-Purpose Building (Covered Court), Pañalum, Brgy. Davao City
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 5,400,000.00
CW1: P 5,346,000.00 (Construction of Multi-Purpose Building)
EAO: P 54,000.00
TO: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Construction of Multi-Purpose Building (Covered Court), Pañalum ES, Brgy. Pañalum, Davao City
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 5,400,000.00
CW1: P 5,346,000.00 (Construction of Multi-Purpose Building)
EAO: P 54,000.00 |
August 7, 2019 |
FY 2019 GAA |
WIN9G02586 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao del Sur District Engineering Office |
FROM: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Construction of Multi-Purpose Building (Bayanihan Irrigators Asst., Admin Bldg.), Sinayawan, Hagonoy, Davao del Norte
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 1,500,000.00
CW1: P 1,485,000.00 (Construction of Multi-Purpose Building)
EAO: P 15,000.00
TO: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Construction of Multi-Purpose Building (Bayanihan Irrigators Asst., Admin Bldg.), Sinayawan, Hagonoy, Davao del Sur
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 1,500,000.00
CW1: P 1,485,000.00 (Construction of Multi-Purpose Building)
EAO: P 15,000.00 |
August 7, 2019 |
FY 2019 GAA |
WIN9G02585 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao del Sur District Engineering Office |
FROM: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Construction of Multipurpose Building (Barangay Hall), Sinarangan, Matanao, Davao del Sur
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00
TO: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Construction of Multipurpose Building (Barangay Hall), Sinaragan, Matanao, Davao del Sur
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00 |
August 7, 2019 |
FY 2019 GAA |
WIN9G02604 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao del Sur District Engineering Office |
FROM: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Construction (Completion) of Multi-Purpose Buidling, Brgy. Poblacion, Matan-ao, Davao del Sur
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00
TO: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Construction (Completion) of Multi-Purpose Building, Brgy. Poblacion, Matanao, Davao del Sur
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00 |
August 6, 2019 |
2019 |
WIN9C03424 |
2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 320101103568000
Project ID: P00322870LZ
FROM:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Daet River Control, (Mantagbac Section) Brgy.. Mantagbac, Daet, Camarines Norte
Allocation: Php 10,000,000
Physical Target: CW1 - Construction of Flood Mitigation Structure - 70.0 Ln.m.
TO:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Daet River Control, (Mantagbac Section) Brgy. IV, Daet, Camarines Norte
Allocation: Php 10,000,000
Physical Target: CW1 - Construction of Flood Mitigation Structure - 70.0 Ln.m. |
August 6, 2019 |
2019 |
WIN9C03425 |
2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300117203878000
Project ID: P00347151LZ
FROM:
Local Program - Local Program - Local Roads - Local Infrastructure Program - Concreting of Guisican Road, Brgy. Guisican, Labo, camarines Norte
Allocation: Php 2,000,000
Physical Target: CW1 - Construction of Concrete Road - 0.266 Lane KM
TO:
Local Program - Local Program - Local Roads - Local Infrastructure Program - Concreting of Guisican Road, Brgy. Guisican, Labo, camarines Norte
Allocation: Php 2,000,000
Physical Target: CW1 - Construction of Concrete Road - 0.226 Lane KM
|
August 6, 2019 |
2019 |
WIN9C03417 |
2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300117203892000
Project ID: P00347167LZ
FROM:
Local Program - Local Program - Local Roads - Local Infrastructure Program - Construction of Barangay Road , Brgy . San Isidro, San Lorenzo Ruiz Camarines Norte
Allocation: Php 3,000,000
Physical Target: CW1 - Construction of Concrete Road - 0.752 Lane KM
TO:
Local Program - Local Program - Local Roads - Local Infrastructure Program - Construction of Barangay Road , Brgy . San Isidro, San Lorenzo Ruiz Camarines Norte
Allocation: Php 3,000,000
Physical Target: CW1 - Construction of Concrete Road - 0.758 Lane KM
|
August 6, 2019 |
2019 |
WIN9C03427 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300117203897000
Project ID: P00347170LZ
FROM:
Local Program - Local Program - Local Roads - Local Infrastructure Program - Construction of Road, Brgy. Mang - ogob, San Vicente, Camarines Norte
Allocation: Php 2,000,000
Physical Target: CW1 - Construction of Concrete Road - 0.55 Lane KM
TO:
Local Program - Local Program - Local Roads - Local Infrastructure Program - Construction of Road, Brgy. Man - ogob, San Vicente, Camarines Norte
Allocation: Php 2,000,000
Physical Target: CW1 - Construction of Concrete Road - 0.55 Lane KM |
August 6, 2019 |
2019 |
WIN9C03412 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300103201279000
Project ID: P00348592LZ
FROM:
Local Program - Local - Buildings And Other Structures - Multipurpose /Facilities - Construction / Repair/ Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Multi Purpose Building, Barangay 11, Daet, Camarines Norte
Allocation: Php 20,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 Number of Building
TO:
Local Program - Local - Buildings And Other Structures - Multipurpose /Facilities - Construction / Repair/ Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Multi Purpose Building, Barangay II, Daet, Camarines Norte
Allocation: Php 20,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 Number of Building
|
August 6, 2019 |
2019 |
WIN9C03420 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300104208880000
Project ID: P0000350701LZ
FROM:
Local Program -Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction (Completion) of Barangay Multi-Purpose Building, Brgy. Mactan, Capalonga, Camarines Norte
Allocation: Php 2,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg.
TO:
Local Program -Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction (Completion) of Barangay Multi-Purpose Building, Brgy. Mactang, Capalonga, Camarines Norte
Allocation: Php 2,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg. |
August 6, 2019 |
2019 |
WIN9C03404 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300104208904000
Project ID: P00350709LZ
FROM:
Local Program - Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of Multi -Purpose Building in Tagontong Elementary School, Brgy. Taqontonq. Mercedes, Camarines Norte
Allocation: Php 5,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg.
TO:
Local Program - Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of Multi -Purpose Building in Tagontong Elementary School, Brgy. Del Rosario. Mercedes, Camarines Norte
Allocation: Php 5,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg. |
August 6, 2019 |
2019 |
WIN9C03438 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300104208925000
Project ID: P00350714LZ
FROM:
Local Program -Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction oF Multi Purpose Building Camambungan National High School Annex, Camambunqan, Daet, Camarines Norte
Allocation: Php 3,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg.
TO:
Local Program -Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction oF Multi Purpose Building Camarines Norte National High School Annex, Camambungan, Daet, Camarines Norte
Allocation: Php 3,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg.
|
August 6, 2019 |
2019 |
WIN9C03416 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300104208934000
Project ID: P00350719LZ
FROM:
Local Program -Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of Multi-Purpose Building, Manqcruz Elementary School, Barangay Manqcruz, Daet, Camarines Norte
Allocation: Php 3,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg.
TO:
Local Program -Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of Multi-Purpose Building, Mancruz Elementary School, Barangay Mancruz, Daet, Camarines Norte
Allocation: Php 3,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg. |
August 6, 2019 |
2019 |
WIN9C03423 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300104208940000
Project ID: P00350722LZ
FROM:
Local Program - Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of Multi-Purpose Building, T.F. Obusan Elementary School , Barangay Mamnuntay, Basud, Camarines Norte
Allocation: Php 3,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg.
TO:
Local Program - Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of Multi-Purpose Building, T.F. Obusan Elementary School , Barangay Manmuntay, Basud, Camarines Norte
Allocation: Php 3,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg. |
August 6, 2019 |
2019 |
WIN9C03402 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300104208943000
Project ID: P00350723LZ
FROM:
Local Program -Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction/Repair/ Rehabilitation of Camarines Norte, State College Cooperative Building, Phase 1, Albaño Campus Daet, Camarines Norte
Allocation: Php 20,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg.
TO:
Local Program -Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction/Repair/ Rehabilitation of Camarines Norte, State College Cooperative Building, Phase 1, Abaño Campus Daet, Camarines Norte
Allocation: Php 20,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg.
|
August 6, 2019 |
2019 |
WIN9C03428 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300104208948000
Project ID: P00350728LZ
FROM:
Local Program -Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of Multi-Purpose Building in Zantua-Abondo
Elementary School, Brgy. San Francisco, Talisay, Camarines Norte
Allocation: Php 2,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg.
TO:
Local Program -Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of Multi-Purpose Building in Zantua-Abordo
Elementary School, Brgy. San Francisco, Talisay, Camarines Norte
Allocation: Php 2,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg.
|
August 6, 2019 |
2019 |
WIN9C03413 |
FY 2019 GAA |
April 28, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300117203910000
Project ID: P00354940LZ
FROM:
Local Program - Local Program - Local Roads - Local Infrastructure Program - Concreting of Pulongguitguit- Guit Road, Brgy, Pulongguitguit, Sta. Elena, Camarines Norte
Allocation: Php 10,000,000
Physical Target: CW1 - Construction of Concrete Road - 1.70 Lane KM
TO:
Local Program - Local Program - Local Roads - Local Infrastructure Program - Concreting of Pulongguit- Guit Road, Brgy, Pulongguit, Sta. Elena, Camarines Norte
Allocation: Php 10,000,000
Physical Target: CW1 - Construction of Concrete Road - 1.70 Lane KM |
August 5, 2019 |
FY - 2019 |
WIN9F05774 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. 300104208710000
Project ID: P00350602LZ
Local Program
Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
FROM:
Construction of Mlti-Purpose Building ( Covered Court ),
Barangay Odiongan, Roxas, Oriental Mindoro
CW1 - Construction of Other Building - 1 Number of Buildings
Unit Cost - Php 2,871/Number of Building
Allocation - Php 2.90 Million
TO:
Construction of Multi-Purpose Building ( Covered Court ),
Barangay Odiong, Roxas, Oriental Mindoro
CW1 - Construction of Other Building - 1 Number of Buildings
Unit Cost - Php 2,871.00/Number of Building
Allocation - Php 2.90 Million
|
August 5, 2019 |
FY - 2019 |
WIN9F05794 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Marinduque District Engineering Office |
UACS No. 300112200048000
Project ID: P00353634 LZ
Local Program
National Roads and Bridges - National Roads -
Local Infrastructure Program
FROM:
Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide
Marinduque Circumferential Road
K0078+300 - K0078+420,
Torrijos, Marinduque
CW1 - Construction of Road Slope Protection Structure/
3,840.00 sq.m.
Unit Cost - Php 25.781/sq.m.
Allocation - Php 100.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide
Marinduque Circumferential Road
K0052+690 - K0052+940,
K0052+980 - K0053+100,
Torrijos, Marinduque
CW1 - Construction of Road Slope Protection Structure/
4,587.00 sq.m.
Unit Cost - Php 21.583/sq.m.
Allocation - Php 100.00 Million
|
August 5, 2019 |
FY - 2019 |
WIN9F05780 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Palawan 1st District Engineering Office |
UACS No. 300116201315000
Project ID: P00345464 LZ
Local Program
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various
Infrastructure including Local Projects
FROM:
Construction of Lamoro - New Ibajay Provincial Road,
El nido, Palawan
CW1 - Construction of Concrete Road: 9.063 lane km
Unit Cost - Php 10,647.69/Lane km
Allocation - Php 100.00 Million
TO:
Construction of Lamoro - New Ibajay Provincial Road,
El Nido, Palawan
CW1 - Construction of Concrete Road: 7.24 Lane km
Unit Cost - Php 13,328.73/Lane km
Allocation - Php 100.00 Million |
August 5, 2019 |
FY - 2019 |
WIN9F05792 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Romblon District Engineering Office |
UACS No. 310108100235000
Project ID: P00300364 LZ
Organizational Outcome 1:
Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse, and Landslides -
Secondary Roads
FROM:
Romblon - Cogon - Sablayan Rd,
K0015+030 - K0015+080,
K0015+488 - K0015+508
CW1 - Construction of Road Slope Protection Structure:
3,075 square meters
Unit Cost - Php 3.82/square meters
Allocation - Php 12.00 Million
TO:
Romblon - Cogon - Sablayan Rd
K0015+030 - K0015+081,
K0015+488 - K0015+514
CW1 - Construction of Road Slope Protection Structure:
3,075 square meters
Unit Cost - Php 3.82/ square meters
Allocation - Php 12.00 Million
|
August 5, 2019 |
FY - 2019 |
WIN9F05796 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Romblon District Engineering Office |
UACS No. 310105100259000
Project ID: P00301405 LZ
Organizational Outcome 1:
Ensure safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/
Upgrading of Damaged Paved Roads
FROM:
Tablas Circumferential Road,
K0126+807 - K0127+542,
K0128+020 - K0128+278.30
CW1 - Reconstruction to Concrete Pavement: 1.985 lane km
Unit Cost - Php 18,217.63/ lane km
Allocation - Php 36.90 Million
TO:
Tablas Circumferential Road,
K0126+900 - K0127+540.00,
K0128+020 - K0128+277.34,
K0128+500 - K0128+943.00
CW1 - Reconstruction to Concrete Road: 2.68068 Lane km
Unit Cost - Php 13,489.86/Lane km
Allocation - Php 36.90 Million |
August 5, 2019 |
FY - 2019 |
WIN9F05795 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Romblon District Engineering Office |
UACS No. 310109100224000
Project ID: P00300373 LZ
Organizational Outcome 1:
Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslides -
Secondary Roads
FROM:
Parpagoha ( Marigondon ) - Binoog Rd.,
K0020+900 - K0021+080
CW1 - Construction of Road Slope Protection Structure :
702 square meters
Unit Cost - Php 69.80/ square meters
Allocation - Php 50.00 Million
TO:
Parpagoha ( Marigondon ) - Binoog Rd.,
K0020+900 - K0020+958.90
CW1 - Construction of Road Slope Protection Structure:
702 square meters
Unit Cost - Php 69.80/square meters
Allocation - Php 50.00 Million
|
August 5, 2019 |
2019 |
WIN9C03414 |
SR2019-07-005980 |
July 4, 2019 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, KO453+000 - KO456+400, Licuan-Baay, Abra;
Physical Target:
CW1 : 7,156 Square meters;
Allocation= Php 96,500,000
To: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, K0457+320 - K0457+794, Licuan-Baay, Abra;
Physical Target:
CW1 : 7,037 Square meters;
Allocation= Php 96,500,000
|
August 5, 2019 |
2019 |
WIN9C03433 |
SR2019-07-005983 |
July 4, 2019 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, KO453+050 - KO454+000, Licuan-Baay, Abra;
Physical Target:
CW1 : 5,945.92 Square meters;
Allocation= Php 98,500,000
To: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, K0453+068 - K0453+117, K0453+475 - K0453+487, K0453+555 - K0453+600, Licuan-Baay, Abra;
Physical Target:
CW1 : 5,945.92 Square meters;
Allocation= Php 98,500,000
|
August 5, 2019 |
2019 |
WIN9C03431 |
SR2019-07-005976 |
July 4, 2019 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, KO452+600 - KO454+250, Licuan-Baay, Abra;
Physical Target:
CW1 : 5,943.68 Square meters;
Allocation= Php 98,500,000
To: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, K0455+775 - K0455+820, K0469+000 - K0469+050, K0469+350 - K0469+400, Licuan-Baay, Abra;
Physical Target:
CW1 : 5,943.68 Square meters;
Allocation= Php 98,500,000
|
August 5, 2019 |
2019 |
WIN9C03415 |
SR2019-07-005989 |
July 4, 2019 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, KO454+390 - KO455+150, Licuan-Baay, Abra;
Physical Target:
CW1 : 6,007.51 Square meters;
Allocation= Php 98,400,000
To: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, K0454+274 - K0454+396, Licuan-Baay, Abra;
Physical Target:
CW1 : 6,021 Square meters;
Allocation= Php 98,400,000
|
August 5, 2019 |
2019 |
WIN9C03434 |
SR2019-07-005990 |
July 4, 2019 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, KO468+950 -KO469+620, Liccuan-Baay, Abra;
Physical Target:
CW1 : 5,971 Square meters;
Allocation= Php 98,400,000
To: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, K0454+396 - K0454+448, K0454+516 - K0454+645, Licuan-Baay, Abra;
Physical Target:
CW1 : 5,971 Square meters;
Allocation= Php 98,400,000
|
August 5, 2019 |
2019 |
WIN9C03441 |
SR2019-07-005987 |
July 4, 2019 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, KO453+800 - KO454+650, Licuan-Baay, Abra;
Physical Target:
CW1 : 6,894 Square meters;
Allocation= Php 98,000,000
To: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, K0457+000 - K0457+320, Licuan-Baay, Abra;
Physical Target:
CW1 : 6,897 Square meters;
Allocation= Php 98,000,000
|
August 5, 2019 |
2019 |
WIN9C03432 |
SR2019-07-005825 |
July 4, 2019 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Kennon Rd -
K0233 + 685 - K0233 + 889, K0234 + 579 - K0234 + 758;
Physical Target:
CW1 : 8,704 Square meters;
Allocation= Php 150,000,000
To: Kennon Rd -
K0233 + 685 - K0233 + 889, K0234 + 000 - K0234+062, K0234+539 - K0234 + 595, K0234 + 682 - K0234 + 758;
Physical Target:
CW1 : 9,156.4 Square meters;
Allocation= Php 150,000,000
|
August 5, 2019 |
2019 |
WIN9C03439 |
SR2019-07-005948 |
July 4, 2019 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Lunas Br. (B04609LZ) along Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd;
Physical Target:
CW1 : 240.03 Square meters;
Allocation= Php 138,300,000
To: Lunas Br. (B04609LZ) along Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd;
Physical Target: CW1 : 240.03 Square meters; Allocation= Php 138,300,000
|
August 5, 2019 |
2019 |
WIN9C03409 |
GAA 2019 |
May 6, 2019 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Shilan - Beckel Rd - K0262+036 - K0262+063, K0262+110 - K0262+145, K0262+265 - K0262+350, K0262+501 - K0262+620;
Physical Target:
CW1 : 2,820 Square meters;
Allocation= Php 46,266,000
To: Shilan - Beckel Rd - K0262+036 - K0262+089, K0262+110 - K0262+145, K0262+202 - K0262+350, K0262+773 - K0262+890;
Physical Target:
CW1 : 3,127 Square meters;
Allocation= Php 46,266,000
|
August 5, 2019 |
2019 |
WIN9C03440 |
GAA 2019 |
May 6, 2019 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Construction of Multi-Purpose Building (Gymnasium), Bunhian Central School, Barangay Bunhian, Aguinaldo, Ifugao;
Physical Target:
CW1 : 1 Number of Buildings;
Allocation= Php 2,000,000
To: Construction of Multi-Purpose Building (Gymnasium), Aguinaldo Central School, Barangay Bunhian, Aguinaldo, Ifugao;
Physical Target:
CW1 : 1 Number of Buildings;
Allocation= Php 2,000,000
|
August 5, 2019 |
2019 |
WIN9C03442 |
GAA 2019 |
May 6, 2019 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Manabo - Luba - Tubo Road leading to Kili Falls and Hotspring, Brgy. Kili, Tubo, Abra;
Physical Target:
CW1 : 1.5 Lane Km;
Allocation= Php 15,000,000
To: Manabo - Luba - Tubo Road leading to Kili Falls and Hotspring, Brgy. Kili, Tubo, Abra;
Physical Target:
CW1 : 0.482 Lane Km,
CW2: 841.34 Square Meters;
Allocation= Php 15,000,000
|
August 5, 2019 |
2019 |
WIN9C03408 |
GAA 2019 |
May 6, 2019 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Bulbula Flood Control Project, La Paz, Abra, Sta. 44+280.8 - Sta. 44+702;
Physical Target:
CW1 : 398.40 Lineal Meter;
Allocation= Php 50,000,000
To: Construction of Bulbulala Flood Control Project, La Paz, Abra, Sta. 44+280.8 - Sta. 44+702;
Physical Target:
CW1 : 404.80 Lineal Meter;
Allocation= Php 50,000,000
|
August 2, 2019 |
FY - 2019 |
WIN9F05758 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. 310202100406000
Project ID: P00303405LZ
001: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Bongabong - Sagana - Roxas - San Aquilino Road,
K0103+433 - K0105+068,
K0105+199 - K0105+767,
K0110+734 - K0112+074
CW1 - Road Widening: 3.0860 lane km
Unit Cost - Php 7,939.08/lane km
Allocation - Php 25.00 Million
TO:
Bongabong - Sagana - Roxas - San Aquilino Road,
K0112+074 - K0113+077
CW1 - Road Widening: 2.0080 lane km
Unit Cost - Php 12,201.20/ Lane km
Allocation - Php 25.00 Million |
August 2, 2019 |
FY - 2019 |
WIN9F05757 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. 310202100407000
Project ID: P00304502LZ
001: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Calapan South Road,
K0100+378 - K0100+400,
K0102+050 - K0102+105,
K0102+187 - K0102+550,
K0103+000 - K0103+581,
K0104+224 - K0107+000
CW1 - Road Widening: 0.00 lane km
Unit Cost - Php 0/ Lane km
Allocation - Php 25.00 million
TO:
Calapan South Road,
K0105+000 - K0106+000
CW1 - Road Widening: 1.996 lane km
Unit Cost - Php 12,274.55/ Lane km
Allocation - Php 25.00 Million |
August 2, 2019 |
FY - 2019 |
WIN9F05773 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. 300104208704000
Project ID: P00350596LZ
Local Program
Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Building
FROM:
Construction of Multi-Purpose Building ( Covered Court ),
Barangay Binle, Bulalacao, Oriental Mindoro
CW1 - Construction of Other Building - 1
Number of Buildings
Unit Cost - Php 2,970.00/Number of Buidings
Allocation - Php 3.00 Million
TO:
Construction of Multi-Purpose Building ( Covered Court ),
Barangay Benli, Bulalacao, Oriental Mindoro
CW1 - Construction of Other Building - 1
Number of Buildings
Unit Cost - Php 2,970.00/ Number of Buildings
Allocation - Php 3.00 Million
|
August 1, 2019 |
FY - 2019 |
WIN9F05772 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No. 300104208658000
Project ID: P00342417LZ
Organizational Outcome: Local Program
Local - Buildings and Other Structures - Multipurpose/Facilities
- Local Infrastructure Program
FROM:
Construction of Multi-purpose Building (Women's Center),
Brgy. Mabini, Puerto Princesa, Palawan
CW1 - Construction of Other Building
Unit Cost - Php 1,980.00/Building
Allocation - Php 2.00 Million
TO:
Construction of Multi-Purpose Building (Women's Center),
Brgy. Mabini, Aborlan, Palawan
CW1 - Construction of Other Building
Unit Cost - Php 1,980.00/Building
Allocation - Php 2.00 Million
|
August 1, 2019 |
FY - 2019 |
WIN9F05760 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS NO. 300117203791000
Project ID: P00354858LZ
Local Program
Local - National Roads and Bridges - Local Roads
- Local Infrastructure Program
FROM:
Concreting of Abueg Road, Alfonso XIII, Quezon, Palawan
CW1 - Construction of Concrete Road: 0 lane km
Unit Cost - Php 0/lane km
Allocation - Php 2.00 Million
TO:
Concreting of Abueg Road, Alfonso XIII, Quezon, Palawan
CW1 - Construction of Concrete Road: 0.19 lane km
Unit Cost - Php 10,421.0526/lane km
Allocation - Php 2.00 Million |
August 1, 2019 |
FY - 2019 |
WIN9F05762 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. 300107200467000
Project ID: P00353442LZ
Local program
Local - Flood Control and Drainage -
Flood Control Structure/Facilities - Local Infrastructure Program
FROM:
Construction of Abo-Abo Flood Control, Barangay Abo-Abo,
Sofronio Espanola, Palawan
CW1 - Construction of Flood Mitigation Structure: 0 lineal meter
Unit Cost - Php 0/lineal meter
Allocation - Php 5.00 Million
TO:
Construction of Abo-Abo Flood Control, Barangay Abo-Abo,
Sofronio Espanola, Palawan
CW1 - Construction of Flood Mitigation Structure:
120 lineal meters
Unit Cost - Php 41.25/lineal meters
Allocation - Php 5.00 Million
|